Software IMprovement using Product LinEs
Project Final Presentation
Liana Lisboa – PMProject: Starship
2
Summary
SIMPLE Factory Domain Analysis Phase Architecture Design Phase Implementation Phase Testing Project Metrics Project Strong and Weak Points Project Learned Lessons Improvement
3
SIMPLE Factory
The factory started with 7 members and an collaborator, and ended up with one member less.
Members Jobs
Liana Barachisio Project Management (PM)/ Domain Analyst
Fernando Raposo Domain Analyst/ Tests Engineer
Leandro Marques do Nascimento
Architect (ARQ)
Alexandre Martins Quality Analyst (SQA)/ Architect (ARQ)
Aline Timóteo Quality Analyst (SQA)
Rodrigo Cavalcante Mendes Configuration Management/ Architect (ARQ)
Fred Durão Developer/Consultant/PM
5
Domain Analysis Phase
Feature Model Changes occurred during the design and implementation
phases.
These changes reflected redundancy in the model (the implication relationships) and improvement of the relationships.
8
Domain Analysis
Activities Followed
Identification of existing, future and potential applications
X
Identification of domain features X
Evaluation functions X
Domain modeling X
Features and domain documentation X
Domain requirements based on the features X
Domain use cases based on the features X
Process Evidence
9
Domain Analysis Phase
Feature matrix – no changes
Domain requirements – no changes
Domain use cases – Its was further detailed with the inclusion of “alternative fluxes” during the design phase
10
Domain Analysis Phase
Learned Lessons Necessity of a domain expert for the identification of the
features;
Inclusion of the domain requirement documentation improved the documentation of the domain;
Feature documentation could become extremely complex as the domain grows, although its is helpful to identify if the feature is really a part of the domain;
11
Project Metrics
Domain Analysis Phase
Planning - Foresight X Done
0:00
4:48
9:36
14:24
19:12
24:00
28:48
Lica Alexandre Fernando Aline Rodrigo Leandro Cássio Outros
Team
Ho
urs
Team
foresight
done
12
Design Phase
Artifacts Domain Architecture Feature Dependency Matrix Component Specification Evidence Document
14
Design Phase
Components identified before the implementation phase Game Presentation Game Core Audio Display End Game High Score Configuration Collision Screen Control
15
Design Phase
Problems identified in the component division The “component grouping” put together the majority of the
domain variability
The components were too connected
17
Design Phase
Modifications Game Core divided in:
Entity Movement Actions Event
Audio and Configuration put together in: Audio
Game Presentation and Display became: Graphic
Collision is now part of Event
18
Design Phase
Components division – third round
Movement were further divided in:
Movement
Strategy -> The movement strategy for the enemies
19
Design Phase
Component Specification -> updated according to the new components
Feature Dependency Matrix -> Was left aside in the new components division
Evidence Document -> no changes
20
Design Phase
Process Evidence
Activities Followed
Module decomposition X
Module refinement X
Variability representation X
Component grouping *
Component Identification X
Component Specification X
Domain Architecture Representation
21
Design Phase
Learned Lessons
Each component has to be a unique kind of variability;
The components have to be “self-contained”
22
Project Metrics
Design Phase
Design - Foresight X Done
0:00
4:48
9:36
14:24
19:12
24:00
28:48
Lica Alexandre Fernando Aline Rodrigo Leandro Cássio Outros
Equipe
Ho
ras Team
foresight
done
23
Implementation Phase
Components implemented usually with java and latter with OSGi
The implemented components with and without OSGi: Audio Graphic Movement Strategies Core -> application that can be extended
25
Implementation Phase
How variability was implemented? Optional – with the Builder Pattern
Or-feature -> with the Strategy Pattern
26
Implementation Phase - Testing
Issues: 16 issues reported on issue tracker; Some Issues:
No documentation (Javadoc, component description); Components assigned as High and Medium not implemented; No exception handling;
It is not hard to validate a component contract if you have: Proper component specification; A process to validate then; Tools to support the activity.
27
Implementation Phase - Testing
Conclusion It is hard to create automated tests for components that
have basically user interaction (i.e. audio, image quality...) Ideally, the component must come with a test bed for
anyone who wants to see if that component fulfills its own acceptance criteria.
It is possible to test components!
28
Implementation Phase
Learned Lessons To create the OSGI services from the self-contained
components, it is necessary a minimum documentation Main test Classes Component Documentation of Use
It is strongly recommended the presence of the component developer in the first phases of OSGI creation
It is strongly recommended the presence a technical leader to get the wide angle view of implementation activities Avoid necklaces and dependencies Improve the communication among distant developers
29
Implementation Phase
Learned Lessons (cont.) The developers must be physically together (or at least
virtually together) in the initial and during critical phases of development Distributed implementation in these phases are a risk to the
project schedule
31
Project Metrics
Implementation Phase – Construction #1
Construção #1 - Foresight X Done
0:002:244:487:129:36
12:0014:2416:4819:1221:36
Lica
Alexan
dre
Ferna
ndo
Aline
Rodrig
o
Lean
dro
Cássio
Outro
s
Equipe
Ho
ras Team
foresight
done
32
Project Metrics
Implementation Phase – Construction #2
Construção #2 - Foresight X Done
00,10,20,30,40,50,60,70,8
Equipe
Ho
ras Team
foresight
done
33
Project Metrics
Implementation Phase – Construction #3
Construction #3 - Foresight X Done
0:00:00
12:00:00
24:00:00
36:00:00
48:00:00
Lica Alexandre Fernando Aline Rodrigo Leandro Cássio outros
Team
Ho
urs
Team
foresight
done
34
Project Metrics
Closing Phase
Closing
0:00:00
4:48:00
9:36:00
14:24:00
19:12:00
24:00:00
28:48:00
Lica Alexandre Fernando Aline Rodrigo Leandro Cássio Fred
Team
Ho
urs
Team
foresight
done
35
Project Metrics
General View
0%
20%
40%
60%
80%
100%
Planning Design Const #1 Const #2 Const #3 Closing
TEST
IMPLE
ARQ
REQ
SCM
SQA
GP
36
Project Strong and Weak Points
Strong Points Coherent and well defined division of the activities in the Domain
Analysis Process; Software Architect experience in Games Domain; Reuse of information from other teams and areas; Team commitment at the beginning of the project;
Weak Points The process for the design phase was not very easy to
understand; It is strange that one of the most important documents for the
design phase is the use case document since it is not part of the domain analysis process proposed;
Team lack of commitment in the final phase; Lack of experience of the team with SPL;
37
Learned Lessons
The domain expert is necessary specially in the domain analysis and design phases;
The requirements and use cases should describe the common {how they are common to the domain} and an overview of the variability, and should not describe specifically functions {in our case, “play game” should not exist};
The architecture must be planned to the technology that it will be developed.
38
Improvements
Include the domain analysis documents to the process and set its relations;
Define the metric for the DA phase, and which evaluation functions should be considered to define the domain scope and how it influences the DA;
Clarify that features beside the ones extracted from the analyzed documentation can be included in the domain;
The phases should be more connected. Like in the DA process there is no mention of the use case document that is necessary for the design phase, which does not consider the technology to be used in the implementation phase;
39
Improvements
The architecture classes should be defined after the components identification, so that each components architecture can be more isolated;
Using the OSGi as the implementation technology, it would be interesting that each variability could be implemented as a service and its component would verify if the service is available or not. That way, the variability change in the application would be dynamic.