SOFTWARE GUIDE – RISK MANAGER RISK ASSESSMENTS
www.3istudio.com | [email protected] | 0345 675 5051
www.3istudio.com | [email protected] | 0345 675 5051 Page| 1
CONTENTS
RISK Manager ............................................................................................................................. 2
Introduction to this Guide ...................................................................................................... 2
Risk Assessments - Usage Notes ............................................................................................ 2
Assessment Overview ............................................................................................................ 3
Risk Assessments .................................................................................................................... 4
Viewing a Risk Assessment ................................................................................................. 6
Adding a New Assessment ................................................................................................. 7
Editing an Assessment ...................................................................................................... 10
Assessment Sign-Off (Complete) ...................................................................................... 10
Re-Assessment ................................................................................................................. 12
Remedial Actions .................................................................................................................. 12
Generate an action plan ................................................................................................... 13
Update Actions ................................................................................................................. 14
View Email Log ..................................................................................................................... 14
Contact Us ................................................................................................................................ 15
www.3istudio.com | [email protected] | 0345 675 5051 Page| 2
RISK MANAGER
Introduction to this Guide
This guide is designed to give the user a good understanding of how to complete and manage
risk assessments in the 3i Studio ESTATE Suite system.
This guide covers usage of the software and expects that the user already has a good
knowledge of the risk assessment question sets, how they should be assessed and answered,
and the specific requirements of assessments within the user’s organisation.
This document also assumes that the user has first completed the ESTATE Suite Basic Training
which covers generic system functions such as login, navigation, searching, filtering, screen
layout manipulation, and data exports.
Risk Assessments - Usage Notes
The Risk Assessments section in RISK Manager contains 4 sections, these sections are:
▪ Assessment Overview – An information-only page collating data from all the risk
assessments to provide an overview of the number of outstanding actions and where
the highest risks are occurring.
▪ Risk Assessments – This page is where all the risk assessments are added and
managed.
▪ Remedial Actions – This Page shows all the remedial actions produced from the risk
assessments. Here they can be sent to responsible persons, updated and closed off.
▪ View Email Log – This page will show a log where remedial actions have been sent
from the system via email
Note:
The assessment overview is the default page displayed when launching Risk Assessments,
however the user can change this default, to do this go to Tools > Manage [username]’s
Settings > Start Pages and pick the page you require against the Risk Assessment component
www.3istudio.com | [email protected] | 0345 675 5051 Page| 3
Assessment Overview
The assessment overview provides a summary of each type of risk assessment against sites
and buildings this also includes the number of outstanding remedial actions, maximum, and
avenge risks.
This page can be filtered and sorted using the dropdowns at the top of each section, and has
pre-filtering at the top of the screen to specify active or all property options (see ESTATE
Suite Training – System Basics for more details). Additional data rows can be expanded to
show summary information at block level by clicking the expansion arrows next to each row.
www.3istudio.com | [email protected] | 0345 675 5051 Page| 4
Risk Assessments
Risk Assessment Actions
1. New – Click here to start a new risk assessment. Use this if you are creating an
assessment for an area for the first time.
2. Edit Record – Click here to edit the existing assessment. Note: this option becomes
greyed out once an assessment is signed off (completed).
3. Print Report – Produce a PDF output of the risk assessment report.
4. Transfer Backlog – This will add items to Appraisal under the Fire facet for item in the
risk assessment that are flagged as ‘Transfer to backlog’.
5. Transfer Helpdesk – NHS Scotland do not have the 3i Studio helpdesk component so
this button can be ignored (Note; this will be greyed out or switched off in future
releases).
www.3istudio.com | [email protected] | 0345 675 5051 Page| 5
6. Sign off – Completes the assessment and allows the user to apply an overall Risk for
the assessment.
7. Archive Record – when an assessment is no longer relevant or has been replaced by
a newer assessment it can be archived. Note: there is no option to delete an
assessment so this should also be used for incorrectly added assessments.
8. Duplicate Assignment – This can be used to either:
a. Re-assess an assessment area
b. Duplicate an assessment to another assessment area or site/building
Note:
If your main activity in the system is carrying out Risk Assessment you may want to set this
screen as your default page. This is covered earlier in this guide.
Tip:
To find your assessments quickly, filter the ‘Surveyor’ column to your name or set a filter for
the site(s) you are interested in. This can be saved as a layout which you can load from the
Choose Layout dropdown or set as your default layout so that it loads each time you open the
Risk Assessment page. This is covered in the ESTATE SUITE TRAINING – SYSTEM BASICS guide.
www.3istudio.com | [email protected] | 0345 675 5051 Page| 6
Viewing a Risk Assessment To view a risk assessment, click on the row expansion arrow (or blue box on selected records)
at the very left of the row. This will expand the row and show the details of the risk
assessment. Once expanded you will see several tabs of information, these tabs are:
▪ Assessment Details – Covering what type of assessment this is, which assessment area
it applies to, when it was assessed, and who is was assessed by.
▪ Answers – This tab shows the questions and answers for this particular assessment.
▪ Documents – This tab shows documents that have been attached to this assessment.
▪ Photos – This tab shows photos and images that have been attached to this document.
▪ Surveyor Reports – This tab allows for the creation of custom reports; however, this is
not covered in detail in this guide.
▪ Tasks – This tab holds any tasks associated with the risk assessment.
Image showing expanded risk assessment.
www.3istudio.com | [email protected] | 0345 675 5051 Page| 7
Adding a New Assessment A new risk assessment is required when an area has not been previously assessed (for this
assessment type) or after an update to the question set for a particular assessment type
template. If re-assessing an existing area based on an existing assessment see Re-Assessment.
To add a new assessment, click the new button, you will then be presented with the Start New
Assessment screen.
Fill in the required fields and click on the save option to create the assessment. Site, Block,
and Assessment Type are required by the system; however, we recommend that you
complete all fields in this section. Once complete click on the save option to save the
assessment and allow access to all of the additional tabs.
▪ Site Code – Use the dropdown to select the required site.
▪ Block Code – Use the dropdown to select the required block.
▪ Assessment Date – Use the dropdown to open a calendar and select the date that the
assessment was completed. You can also type directly in this field and enter the date
in the format DD/MM/YYY
▪ Assessment Type – Select the required assessment type from the dropdown list.
▪ Surveyor – Select the required surveyor / assessor name from the dropdown list.
▪ Assessment Area – Select the assessment area from the dropdown list, or if it does not
exist click in the white space in the box and simply type the name you require.
▪ Use this option if the assessment template has predefined answers and you would like
to use these as defaults.
www.3istudio.com | [email protected] | 0345 675 5051 Page| 8
To complete the assessment answers, go to the Answers tab and answer all questions relevant
to this assessment area.
1. Show / Hide Navigation Bar – Use this button to show or hide the question navigation
bar.
2. Navigation bar section header – Click to expand a particular section and see the
questions therein.
3. Section Questions – Click on a question to show the details and complete the answers
for this question.
4. Answer Box – Pick or type the answer you require. Different questions will have
different answer types depending on the template setup, these can include Text, Multi
Choice, Multi Choice & Text, Y/N, Y/N/NA etc.
5. Risk – The risk score is calculated based on the selected Consequence and Likelihood
and uses a 5x5 matrix to generate the score. The matrix for this calculation is shown
here, and it should be noted that this is not the same as the 5x5 risk matrix used in
Property Appraisal.
www.3istudio.com | [email protected] | 0345 675 5051 Page| 9
Risk Matrix Likelihood
1 2 3 4 5
Co
nse
qu
ence
1 Low Low Low Moderate Moderate
2 Low Moderate Moderate High High
3 Low Moderate High High Extreme
4 Moderate High High Extreme Extreme
5 Moderate High Extreme Extreme Extreme
6. Risk Responsibility – Pick the person / department responsible for mitigating this risk
from the dropdown list.
7. Timeframe – Pick the timeframe for mitigation from the dropdown list.
8. Comment – This box can be used for free text notes for further description when
required.
9. Remedial Action – A description of the remedial action required to mitigate the risk on
this particular item. Please not it is not necessary to complete this if there is no action
required. These actions are used to produce the remedial actions so any item in this
box will be transferred to the remedial actions screen for completion.
10. Add Std – Use this option to add the comment or remedial action you have typed to
the standard list. Note this option may not be available on all systems dependent on
administrative configuration.
11. Pick Std – Use this option to open a window listing all standard comments / remedial
actions for this question and then pick the required standard answer.
12. Edit Photos – Click on this option to add photos to your answer, these can be selected
from your hard drive or network and are associated with the specific answer. Photos
can be view as a full set in the photos tab.
13. Save – This option saves you answer. Important: If you navigate away from your
answer without saving your changes will be lost.
14. Save & Next – This option saves your answer and then moves to the next question.
15. Cancel – Cancel any changes made to this answer since the last save.
Note:
You can save and exit at any point during this process and come back and edit any open
assessment as required.
www.3istudio.com | [email protected] | 0345 675 5051 Page| 10
Tip:
To check your answers, go to the risk assessment main screen then use the Expand arrow
against a risk assessment to view all the sections and questions:
Editing an Assessment On the main Risk Assessment listing screen clicking the pencil icon will allow you to edit any
risk assessment that has not yet been signed-off (completed).
Assessment Sign-Off (Complete) Once you have finished answering all the questions and have no further changes to make the
assessment should be signed off. This locks the assessment and prevents any further changes
being made to it. This is an important step and should be carried out for all assessments to
prevent any unwanted edits to the assessment.
Assessments can be signed-off from either the main Risk Assessment listing screen using the
sign-off button on the row next to the relevant risk assessment, or by using the relevant
button at the top of the Assessment Details tab when editing an assessment.
After clicking the sign-off option in either location you will be prompted to click ok to continue,
and then you will be presented with a summary of your risk assessment showing:
www.3istudio.com | [email protected] | 0345 675 5051 Page| 11
▪ Risk Overview: This shows the overall risk for each section allowing you to see an
overview of the risks to help with decision making for the overall Risk.
▪ Remedial Actions: Lists all the actions from the assessment along with the risk.
▪ Assessment Details: Displays the Assessment header details: Location, surveyor,
assessment area etc.
When the summary screen opens fill in the Consequence and Likelihood options to complete
the overall risk for the assessment. Finally clicking the sign-off button will complete the
process and lock the risk assessment so no further changes can be made.
Image showing Risk Assessment Sign-Off Screen
After a risk assessment is signed-off you will see only the Report, Duplicate, and Archive
options on the main Risk Assessment listing screen.
Tip:
If you discover an error or want to redo and assessment you can duplicate it to create a new
assessment and then archive the original.
www.3istudio.com | [email protected] | 0345 675 5051 Page| 12
Re-Assessment To carry out a re-assessment of an assessment area use the ‘Duplicate Assessment’ function.
You will receive a couple of notifications, one to confirm the action and another giving you
the ID number of the assessment it has created.
The duplicate Risk Assessment page will then load. It will have duplicated all the details of the
original assessment except for Assessment Date and Surveyor. Fill in these required fields and
make any other changes you require.
Update the answers as you would for completing a new assessment and Sign-Off.
Archive the original assessment so that you do not have multiple current assessments for the
same assessment area.
Note:
You can use this same process to copy an assessment to a different area by updating the
Assessment Details appropriately.
Remedial Actions
The remedial actions screen shows all outstanding actions from all Risk Assessments. Use the
Filters or Search options to find the areas you are interested in. For example:
▪ Filter by a Site to show all the actions from all the assessment for that site
▪ Filter by Section Description or Question to see all the actions for a specific part of the
risk assessment or specific question.
▪ Filter by Risk Responsibility and Site to show all the actions for ‘Estates’ on a particular
site.
Note:
See ESTATE Suite Basic Training for more information on filter etc.
www.3istudio.com | [email protected] | 0345 675 5051 Page| 13
Generate an action plan Once you have filtered the remedial action list how you require you can either select all items
(1) or individually select (or unselect) specific actions (2).
Once you have selected your required action scroll to the bottom of the screen and click
Export to Excel
This will produce an Excel output that you can then attach to an email and send to the
responsible person to action.
Similar to the Export to Excel option the Email to Responsible User and Email to Address
options can be used to send the remedial actions by email to either a system user or contact
with a stored email address or an email address you fill in at the time of sending. Please note
that this option is not currently in use for NHS Scotland.
Tip:
Use the ‘Action Plan Template’ saved layout to export the most relevant columns including
Completed By and Date Completed.
www.3istudio.com | [email protected] | 0345 675 5051 Page| 14
Update Actions Once you have feedback from responsible persons or complete actions yourself you can then
update the actions appropriately.
Click on Edit Record pencil icon to update an action.
Fill in the Completed By and Date Complete fields, you can then apply an updated risk by
selecting the new consequence and likelihood. You can also add any required notes.
Click Save and Complete to update the Remedial action to Complete. This will update the risk
in the risk assessment.
Completing the actions and updating the risk will save having to duplicate and update your
risk assessments until the next assessment is due.
View Email Log
Use the view email log option to view and track emails that have been sent from the remedial
actions screen. This screen is not currently in use for NHS Scotland.
www.3istudio.com | [email protected] | 0345 675 5051 Page| 15
CONTACT US
Call: 0345 675 5051
Email: [email protected]
Address: 3i Studio
Burlington House
369 Wellingborough Road
Northampton, NN1 4EU