 SAP COMMUNITY NETWORK SDN - sdn.sap.com | BPX - bpx.sap.com | BOC - boc.sap.com | UAC - uac.sap.com  © 2010 SAP AG Enabling Multiple Change Document Creation from Single Change Request in Solution Manager  Applies to: Article applies to Solution Manager functional consultants in SAP practice. Summary This document will explain how to enable creation of multiple change documents from single change request in SAP Solution Manager. Author: Senthil Kumar Panneer Selvam Company: Infosys Technologies Ltd Created on: 20th October 2010 Author Bio Senthil Kumar Panneer Selvam is a PP / Solution Manager functional consultant with Infosys Technologies Ltd and has over 4.5 years of experience in SAP PP / Solution Manager module and about 9.5 years of experience in total. He is basically a production engineering graduate from Bharathiyar University.

Socm Copy Document

  • Upload
    anandna

  • View
    233

  • Download
    0

Embed Size (px)

Citation preview

Page 1: Socm Copy Document

8/3/2019 Socm Copy Document

http://slidepdf.com/reader/full/socm-copy-document 1/7

 

SAP COMMUNITY NETWORK SDN - sdn.sap.com | BPX - bpx.sap.com | BOC - boc.sap.com | UAC - uac.sap.com

  © 2010 SAP AG

Enabling Multiple ChangeDocument Creation from SingleChange Request in SolutionManager  

Applies to:

Article applies to Solution Manager functional consultants in SAP practice.

Summary This document will explain how to enable creation of multiple change documents from single change requestin SAP Solution Manager.

Author: Senthil Kumar Panneer Selvam

Company: Infosys Technologies Ltd

Created on: 20th October 2010

Author Bio

Senthil Kumar Panneer Selvam is a PP / Solution Manager functional consultant with Infosys TechnologiesLtd and has over 4.5 years of experience in SAP PP / Solution Manager module and about 9.5 years ofexperience in total. He is basically a production engineering graduate from Bharathiyar University.

Page 2: Socm Copy Document

8/3/2019 Socm Copy Document

http://slidepdf.com/reader/full/socm-copy-document 2/7

 

SAP COMMUNITY NETWORK SDN - sdn.sap.com | BPX - bpx.sap.com | BOC - boc.sap.com | UAC - uac.sap.com

  © 2010 SAP AG

Table of Contents Introduction ......................................................................................................................................................... 3 Procedure to Enable Multiple CD Creation ......................................................................................................... 3 

Step 1: ............................................................................................................................................................. 3 Step 2: ............................................................................................................................................................. 3 Step 3: ............................................................................................................................................................. 4 Step 4: ............................................................................................................................................................. 4 Step 5: ............................................................................................................................................................. 5 

Disclaimer and Liability Notice ............................................................................................................................ 7 

Page 3: Socm Copy Document

8/3/2019 Socm Copy Document

http://slidepdf.com/reader/full/socm-copy-document 3/7

 

SAP COMMUNITY NETWORK SDN - sdn.sap.com | BPX - bpx.sap.com | BOC - boc.sap.com | UAC - uac.sap.com

  © 2010 SAP AG

Introduction

In Solution Manager change request management process (ChaRM), Only one change document can becreated from a change request as a standard functionality. In some business cases, multiple changedocuments to be created from one change request. This document will help to enable the multiple changedocument creation from a change request.

Procedure to Enable Multiple CD Creation

The subject and ibase fields in the fast entry screen are being used as a reference to create the changerequest and change document. The subject field refers the process type which needs to be created andIbase component is to identify the system landscape to which the change has to be implemented. Basicallyonce the change document is created from the change request, the subject and Ibase fields will greyed out.

In standard, by default the change document check is enabled in the change request to restrict the multiplechange document creation. If required the change document check can be disabled in the change request bychanging the action profile settings.

Step 1:

Follow the IMG path to access the action profile

SPROSAP Solution manager Scenario specific settings Service deskservice desk Define actionprofilechange actions and conditions Define action profile and action

Step 2:

Select the action profile which you have assigned to the transaction type.

Page 4: Socm Copy Document

8/3/2019 Socm Copy Document

http://slidepdf.com/reader/full/socm-copy-document 4/7

 

SAP COMMUNITY NETWORK SDN - sdn.sap.com | BPX - bpx.sap.com | BOC - boc.sap.com | UAC - uac.sap.com

  © 2010 SAP AG

Step 3:

Choose the action definition “Upon Release: Create Change Document” 

Step 4:

Select the process type assigned for the action definition. 

Page 5: Socm Copy Document

8/3/2019 Socm Copy Document

http://slidepdf.com/reader/full/socm-copy-document 5/7

 

SAP COMMUNITY NETWORK SDN - sdn.sap.com | BPX - bpx.sap.com | BOC - boc.sap.com | UAC - uac.sap.com

  © 2010 SAP AG

Step 5: Click on “Display” icon 

Page 6: Socm Copy Document

8/3/2019 Socm Copy Document

http://slidepdf.com/reader/full/socm-copy-document 6/7

 

SAP COMMUNITY NETWORK SDN - sdn.sap.com | BPX - bpx.sap.com | BOC - boc.sap.com | UAC - uac.sap.com

  © 2010 SAP AG

The following pop-up will be displayed.

In the container editor check for the value “X” for the container element “CHECK”.

The value “X” is set to the container element to restrict multiple Change document creation. Toenable multiple change document creation, remove the value “X” for the container element“CHECK”.

Save the changes.

When the action is triggered, it will refer the container values. If the change document “CHECK” isnot activated, it will allow to create multiple change documents from one change request.

Page 7: Socm Copy Document

8/3/2019 Socm Copy Document

http://slidepdf.com/reader/full/socm-copy-document 7/7

 

SAP COMMUNITY NETWORK SDN - sdn.sap.com | BPX - bpx.sap.com | BOC - boc.sap.com | UAC - uac.sap.com

  © 2010 SAP AG

Disclaimer and Liability Notice

This document may discuss sample coding or other information that does not include SAP official interfaces and therefore is notsupported by SAP. Changes made based on this information are not supported and can be overwritten during an upgrade.

SAP will not be held liable for any damages caused by using or misusing the information, code or methods suggested in this document,and anyone using these methods does so at his/her own risk.

SAP offers no guarantees and assumes no responsibility or liability of any type with respect to the content of this technical article orcode sample, including any liability resulting from incompatibility between the content within this document and the materials andservices offered by SAP. You agree that you will not hold, or seek to hold, SAP responsible or liable with respect to the content of thisdocument.