SNP’s handling BBK cargo experience

Cargo: transformer

Dimensions (LxBxH): 5.300x2.300x3.460

Weight: 56,2 tons

Shipment was directly delivery at quay side by Mobihub Crane

Page 3: SNPL PROJECT

Unloading method

Page 4: SNPL PROJECT

MOBIHUB CRANE(max lifting capacity: 400T)

Page 5: SNPL PROJECT

SNP’s handling SKIFF boat

Cargo: SKIFF boat

Dimensions (LxBxH): 12400x5600x5400

Weight: 40 tons

Shipment was directly delivery at quay side by Gantry crane

Page 6: SNPL PROJECT

Combine Barging and Trucking

Page 7: SNPL PROJECT

SNP’s handling Yacht

Cargo: Yacht Dimensions (LxBxH):

17.29x 4.75x 6 m Weight: 27.7 tons Shipment was directly

delivery at quay side by Gantry crane and launching to the water directly

Page 8: SNPL PROJECT

SNP’s handling Benline’s shipment

Cargo: Machine shipmetn

Dimensions (LxBxH): 13.89x 4.34x 2.65 m

Weight: 13.5 tons

Page 9: SNPL PROJECT

SNP’s handling Samsung’s shipment

Page 10: SNPL PROJECT

SNP’s handling Samsung’s shipment

Page 11: SNPL PROJECT

Building Cranes Projects

Page 12: SNPL PROJECT

Moving Cranes Projects

Page 13: SNPL PROJECT

Moving Cranes Projects

Page 14: SNPL PROJECT

RMGs RELOCATION

RELOCATION 02 UNITS OF RMG

FROM TAN CANG

WAREHOUS TO NHON TRACH

ICD

JUNE.2015

Page 15: SNPL PROJECT

RMGs RELOCATION

Page 16: SNPL PROJECT

LOADING SHIPMENTS ON BARGE

Page 17: SNPL PROJECT

Others Projects

Page 18: SNPL PROJECT

Other Projects