Snøhvit CCS · 2018. 9. 27. · Sleipner CCS operational since 1996 Snøhvit CCS operational since 2008 CO 2 capture test centre (TCM) operational since 2012 22 years of operations

  • Upload
    others

  • View
    5

  • Download
    0

Embed Size (px)

Citation preview

Page 1: Snøhvit CCS · 2018. 9. 27. · Sleipner CCS operational since 1996 Snøhvit CCS operational since 2008 CO 2 capture test centre (TCM) operational since 2012 22 years of operations
Page 2: Snøhvit CCS · 2018. 9. 27. · Sleipner CCS operational since 1996 Snøhvit CCS operational since 2008 CO 2 capture test centre (TCM) operational since 2012 22 years of operations

2

Page 3: Snøhvit CCS · 2018. 9. 27. · Sleipner CCS operational since 1996 Snøhvit CCS operational since 2008 CO 2 capture test centre (TCM) operational since 2012 22 years of operations

Sleipner CCS operational since 1996

Snøhvit CCS operational since 2008

CO2 capture test centre (TCM) operational since 2012

➢ 22 years of operations

➢ Building confidence in CCS

➢ >22 Mt CO2 stored

➢ New full-scale CCS projectbeing developed

Norwegian CCS value chain project (2016-2022)

3

Page 4: Snøhvit CCS · 2018. 9. 27. · Sleipner CCS operational since 1996 Snøhvit CCS operational since 2008 CO 2 capture test centre (TCM) operational since 2012 22 years of operations

CCUS – Accumulation of experience and learning

Page 5: Snøhvit CCS · 2018. 9. 27. · Sleipner CCS operational since 1996 Snøhvit CCS operational since 2008 CO 2 capture test centre (TCM) operational since 2012 22 years of operations

Improve likelihood of the emerge of a scalable CO2 transport and

storage (T&S) infrastructure by

• significantly improve probability of third party CO2 volumes to

Northern Lights

• mature CO2 storage locations in time and scale to

accommodate clean hydrogen projects

• demonstrate radical cost reduction potential in CCUS value

chains

• demonstrate business case for CO2 for EOR and storage pilots,

as first step to commercial scale-up

Source: One North Sea report, 2010, NSBTF (North Sea Basin Task Force).

Page 6: Snøhvit CCS · 2018. 9. 27. · Sleipner CCS operational since 1996 Snøhvit CCS operational since 2008 CO 2 capture test centre (TCM) operational since 2012 22 years of operations

Pipeline

Well

Subsea structure

Export pump

Umbilical

CO2 transport ship

LCO2LCO2

LCO

2

Heater

LCO

2

LCO

2

LCO

2

Evaporator

improve probability of third party CO2 volumes to Northern Lights

Page 7: Snøhvit CCS · 2018. 9. 27. · Sleipner CCS operational since 1996 Snøhvit CCS operational since 2008 CO 2 capture test centre (TCM) operational since 2012 22 years of operations

Page 8: Snøhvit CCS · 2018. 9. 27. · Sleipner CCS operational since 1996 Snøhvit CCS operational since 2008 CO 2 capture test centre (TCM) operational since 2012 22 years of operations