Measure O BondAlternative Education Facility
District Office FacilityMarch 7, 2013
SAN MATEO UNION HIGH SCHOOL DISTRICT
7/29/2019 Smuhsd 3-7-13 Phs Study Session
2/56
1
Agenda Alternative Education Facility
District Office Facility
Recommendation
Next Steps
1
7/29/2019 Smuhsd 3-7-13 Phs Study Session
3/56
2
Alternative Education Facility
2
Background Information
Facility Programming
Location Options
Community Input and Timeline
Enrollment Projections
Facility MatrixMeasure O Project List
Facility Thumbnail Schematics
Land Preferences
CDE Guidelines
CEQA
7/29/2019 Smuhsd 3-7-13 Phs Study Session
4/56
33
Background Information
Peninsula High School has resided at various locations within the District
boundaries in the past decades The program is currently housed at the Crestmoorschool site
The Crestmoor facility was constructed in 1960 and occupied in 1962 making it51years old
Studies have found that older buildings present obstacles to teaching and learningand cause the loss of instructional time
68% of the students reside in Burlingame, Foster City or San Mateo
The current site is located 12 miles from the heart of San Mateo
86% of the students take the bus to attend school
The District bus takes 60 minutes each way
The Samtransbus takes 90 minutes each way
The Caltrainto San Bruno connection to Samtrans takes100 minutes each way The last bus leaves Peninsula High School at 2:40 p.m.
7/29/2019 Smuhsd 3-7-13 Phs Study Session
5/56
4
Profile of Typical Peninsula High School Student
Credit deficient at risk of not graduating
Desire for alternative program to comprehensive high school
Need for greater counseling support
50% are from homes with a single parent
20% of the students received discipline at previous school
60% categorized as economically disadvantaged
86% get to school without family help or support
71% of students engaged in after school in non-school relatedactivities including work, babysitting, volunteering, communityservice
67% male 40% do not attend school regularly due to its remote location
80% attend post-secondary schools after graduation (communitycollege, trade schools, private schools, etc.)
4
7/29/2019 Smuhsd 3-7-13 Phs Study Session
6/56
5
Alternative High School Students City of Residence
7/29/2019 Smuhsd 3-7-13 Phs Study Session
7/56
6
Alternative High School-Student City of Residence
Number
City Students PercentageSouth San Francisco 1 0.4%
Daly City 1 0.4%
San Bruno 55 24.7%
Millbrae 13 4.5%
Burlingame 29 13.0%
Hillsborough 2 0.9%
San Mateo 111 49.8%Foster City 10 4.5%
Total 223 100%
*Burlingame, San Mateo and Foster City students compose 68.2% of studentpopulation
6
7/29/2019 Smuhsd 3-7-13 Phs Study Session
8/56
7
What Alternative School Students Want?
Desire to graduate and prepare for post secondary educational
options
Career Technical Education course opportunities
Co-curricular sport programs
Extracurricular activities Access to work study programs, internships, and job shadowing
Counseling services
Social services Accessible facilities
Opportunities to use educational technology
A site that facilitates a sense of belonging and community An environment that validates their worth as learners
7
7/29/2019 Smuhsd 3-7-13 Phs Study Session
9/56
88
Facility Characteristics
Desired Characteristics for Facility:
State-of-the-art teaching facility
Flexible teaching spaces
Technology options
Career Technical Education classrooms
Accessibility to sports programs and extracurricular activities
Accessibility to social services
Accessibility to after school employment
Near transportation options
Childcare center
Readily accessible to students residenceReliable and energy-efficient buildings and facilities
7/29/2019 Smuhsd 3-7-13 Phs Study Session
10/56
9
Architect Program Alternative High SchoolDraft Program for a 350 student Alternative Education facility with classrooms loaded
at 1:27 and assume a classroom is vacant for one period in sevenfor prep periodUnit Subtotal Total
Administration Quantity Area Area Area NotesReception lobby 1.0 250 250 At main campus entry
Principal 1.0 180 180 Office with desk and table for 4
Asst Principal 1.0 150 150 Private Office
Secretary 1.0 80 80 Open off lobby
Office Asst. 1.0 80 80 Open off lobby
Health Attendance 1.0 180 180 Office nurse room
Counselor 2.0 120 240 Private Offices
Counselor Secretary 1.0 80 80 Adjacent to Counselors
School Safety Advocate 1.0 120 120 Private Office
Campus Supervisor 1.0 120 120
Conference Room 1.0 200 200 Accommodate 8
Cum File Storage Room 1.0 60 60 Fire resistant storage room
Admin Storage 1.0 50 50Staff Work Room 1.0 200 200 Convenient for staff and teachers
Staff Lounge 1.0 250 250 Convenient for staff and teachers
Staff Toilet Rooms 2.0 200 400
Circulation (20% of above) 1.0 528 528
Subtotal 3,168 Sq. Ft.
9
7/29/2019 Smuhsd 3-7-13 Phs Study Session
11/56
10
Architect Program Alternative High SchoolUnit Subtotal Total
Facilities Quantity Area Area Area NotesClassroomsClassrooms 9.0 960 8,640 Loaded at 27:1
Science Labs 2.0 1,500 3,000 Loaded at 27:1
Digital Arts 1.0 1,200 1,200 Co-locate with library
Pathway-Hospital 1.0 2,500 2,500 Incldsarea for kitchen
Pathway-Health 1.0 1,500 1,500Pathway-Construction 1.0 2,000 2,000
Subtotal 18,840 Sq. Ft.
Library, Cafeteria and Other Spaces
Library, College and Career Center 1.0 3,500 3,500
Large Group Area and Cafeteria 1.0 6,400 6,400 Located with rethermkitchenChild Care-three years and younger 1.0 1,800 1,800 18 students and outdoor area
Subtotal 11,700 Sq. Ft
Support Spaces
Student Toilet Rooms 2.0 400 800
Custodians 1.0 120 120
Mechanical spaces 1.0 100 100
Electrical and TelcomSpaces 1.0 200 200
Subtotal 1,220 Sq. Ft
Total Alternative Education Facility 34,928 Sq. Ft.
Property 2-5 Acres
10
7/29/2019 Smuhsd 3-7-13 Phs Study Session
12/56
1111
Location Options
On February 24, 2011 District Administration presentedoptions for the possible locations for the Alternative HighSchool.
The options included placing a modernized facility at:Crestmoor High School
Hillsdale High School
San Mateo High School
OR
Purchasing land and/or a facility that is centrally located and easily
accessible to students and families
7/29/2019 Smuhsd 3-7-13 Phs Study Session
13/56
12
Community Input and TimelineConsiderations State of the art facility Centrally located Program identity Cost to maintain Crestmoor site until new facility is available Construction escalation (schedule) Development and construction cost Trade off of Measure O monies if land is purchased other projects will not be funded
Property Acquisition California Environmental Quality Act
Detailed technical review Political
Detailed California Department of Education review Department of Toxic Substance Control clearance Total land cost Schedule
Existing Property California Environmental Quality Act
Negative Declaration or Categorical Exemption
Total project Cost
Schedule
7/29/2019 Smuhsd 3-7-13 Phs Study Session
14/56
13
Aragon High School Moderate Enrollment
13
Aragon H.S. 2009 2010 2011 2012 2013 2014 2015 2016 2017 2018 2019 2020 2021 20229th Grade 408 369 341 394 395 428 415 437 467 483 486 494 489 489
10th Grade 468 385 372 339 397 398 427 413 436 466 482 484 493 488
11th Grade 424 436 369 362 325 379 377 403 394 415 444 459 461 469
12th Grade 341 401 419 360 353 317 369 366 391 381 402 430 444 447
Total 1,641 1,591 1,501 1,455 1,470 1,522 1,588 1,619 1,688 1,745 1,814 1,867 1,887 1,893
Difference (50) (90) (46) 15 52 66 31 69 57 69 53 20 6
Cum Difference (50) (140) (186) (171) (119) (53) (22) 47 104 173 226 246 252
Facility Capacity 2,125
Available Capacity 232
7/29/2019 Smuhsd 3-7-13 Phs Study Session
15/56
14
Burlingame High School Moderate Enrollment
14
Burlingame HS 2009 2010 2011 2012 2013 2014 2015 2016 2017 2018 2019 2020 2021 20229th Grade 333 355 311 340 365 410 397 424 427 431 453 440 418 418
10th Grade 335 343 357 323 339 363 408 395 423 425 429 452 439 416
11th Grade 322 312 335 353 310 324 348 390 381 408 410 414 436 423
12th Grade 353 344 321 351 344 302 315 338 382 372 399 401 405 426
Total 1,343 1,354 1,324 1,367 1,358 1,399 1,468 1,547 1,613 1,636 1,691 1,707 1,698 1,683
Difference 11 (30) 43 (9) 41 69 79 66 23 55 16 (9) (15)
Cum Difference 11 (19) 24 15 56 125 204 270 293 348 364 355 340
Facility Capacity 1,890
Available Capacity 207
7/29/2019 Smuhsd 3-7-13 Phs Study Session
16/56
15
CapuchinoHigh School Moderate Enrollment
15
Capuchino H.S. 2009 2010 2011 2012 2013 2014 2015 2016 2017 2018 2019 2020 2021 20229th Grade 322 301 292 292 301 347 303 335 307 295 310 335 314 331
10th Grade 312 301 307 288 283 291 335 292 330 302 291 305 329 308
11th Grade 272 269 271 280 264 258 266 306 269 303 278 267 281 303
12th Grade 254 254 269 266 274 259 253 261 298 262 295 271 260 273
Total 1,160 1,125 1,139 1,126 1,122 1,155 1,157 1,194 1,204 1,162 1,174 1,178 1,184 1,215
Difference (35) 14 (13) (4) 33 2 37 10 (42) 12 4 6 31
Cum Difference (35) (21) (34) (38) (5) (3) 34 44 2 14 18 24 55
Facility Capacity 1,795
Available Capacity 580
7/29/2019 Smuhsd 3-7-13 Phs Study Session
17/56
16
Hillsdale High School Moderate Enrollment
16
Hillsdale H.S. 2009 2010 2011 2012 2013 2014 2015 2016 2017 2018 2019 2020 2021 2022
9th Grade 368 359 349 358 373 384 396 410 443 456 462 472 469 471
10th Grade 337 363 352 350 362 377 386 397 411 444 455 460 470 467
11th Grade 291 312 333 335 344 355 368 376 386 400 430 441 446 455
12th Grade 280 283 305 343 328 337 347 360 365 375 387 416 427 432
Total 1,276 1,317 1,339 1,386 1,407 1,453 1,497 1,543 1,605 1,675 1,734 1,789 1,812 1,825
Difference 41 22 47 21 46 44 46 62 70 59 55 23 13
Cum Difference 41 63 110 131 177 221 267 329 399 458 513 536 549
Facility Capacity 1,807
Available Capacity (18)
7/29/2019 Smuhsd 3-7-13 Phs Study Session
18/56
17
Mills High School Moderate Enrollment
17
Mills H.S. 2009 2010 2011 2012 2013 2014 2015 2016 2017 2018 2019 2020 2021 20229th Grade 340 353 319 301 297 314 306 288 273 260 282 302 271 273
10th Grade 381 342 341 323 300 296 313 305 287 272 260 281 301 271
11th Grade 378 354 333 340 310 288 284 300 296 279 265 253 273 293
12th Grade 377 376 342 340 334 304 282 279 294 291 274 260 248 268
Total 1,476 1,425 1,335 1,304 1,241 1,202 1,185 1,172 1,150 1,102 1,081 1,096 1,093 1,105Difference (51) (90) (31) (63) (39) (17) (13) (22) (48) (21) 15 (3) 12
Cum Difference (51) (141) (172) (235) (274) (291) (304) (326) (374) (395) (380) (383) (371)
Facility Capacity 1,725
Available Capacity 620
7/29/2019 Smuhsd 3-7-13 Phs Study Session
19/56
18
San Mateo High School Moderate Enrollment
18
San Mateo H.S. 2009 2010 2011 2012 2013 2014 2015 2016 2017 2018 2019 2020 2021 20229th Grade 418 384 392 382 392 419 409 426 456 470 472 480 474 474
10th Grade 334 393 359 383 378 388 412 402 423 452 466 468 476 470
11th Grade 333 286 333 328 343 339 346 368 367 385 412 424 426 433
12th Grade 276 288 282 328 305 319 315 322 343 341 358 383 395 397
Total 1,361 1,351 1,366 1,421 1,418 1,465 1,482 1,518 1,589 1,648 1,708 1,755 1,771 1,774Difference -10 15 55 -3 47 17 36 71 59 60 47 16 3
Cum Difference -10 5 60 57 104 121 157 228 287 347 394 410 413
Facility Capacity 1,970
Available Capacity 196
7/29/2019 Smuhsd 3-7-13 Phs Study Session
20/56
19
District Moderate Enrollment
19
Totals 2009 2010 2011 2012 2013 2014 2015 2016 2017 2018 2019 2020 2021 20229th Grade 2,190 2,123 2,004 2,070 2,126 2,306 2,229 2,324 2,376 2,398 2,469 2,527 2,438 2,460
10th Grade 2,174 2,127 2,096 2,016 2,062 2,116 2,285 2,207 2,314 2,364 2,386 2,453 2,512 2,423
11th Grade 2,111 2,074 2,069 2,086 1,991 2,033 2,081 2,244 2,189 2,292 2,343 2,363 2,431 2,487
12th Grade 2,026 2,086 2,083 2,138 2,096 2,001 2,040 2,089 2,249 2,192 2,295 2,346 2,366 2,434Total 8,501 8,410 8,252 8,310 8,275 8,456 8,635 8,864 9,128 9,246 9,493 9,689 9,747 9,804
Difference (91) (158) 58 (35) 181 179 229 264 118 247 196 58 57
Cum Difference (91) (249) (191) (226) (45) 134 363 627 745 992 1,188 1,246 1,303
F ilit M t i
7/29/2019 Smuhsd 3-7-13 Phs Study Session
21/56
20
Facility Matrix
20
M O A d P j t Li t
7/29/2019 Smuhsd 3-7-13 Phs Study Session
22/56
21
Measure O Approved Project List
21
Site Project 2011 2012 2013 2014 2015 2016 2017 Total
Approved Projects :
BHS StadiumBleacher Upgrades $0 $0 $1,762,189 $0 $0 $0 $0 $1,762,189
BHS Replace Home Economics Bld $0 $0 $10,572,519 $0 $0 $0 $0 $10,572,519
SMHSStadiumBleacher Upgrades $0 $0 $1,861,458 $0 $0 $0 $0 $1,861,458
DW Technology $481,350 $454,739 $500,000 $500,000 $500,000 $500,000 $2,063,911 $5,000,000DW COP Payment $80,655,261 $0 $0 $0 $0 $0 $0 $80,655,261
DW Radios $0 $140,000 $0 $0 $0 $0 $0 $140,000
SMHSRepair / Upgrade Brick Building $0 $0 $7,320,813 $0 $0 $0 $0 $7,320,813
DW Furniture, Fixtures, Equipment $0 $0 $0 $100,000 $150,000 $150,000 $150,000 $550,000
DW Topside Contingency $0 $0 $1,000,000 $1,000,000 $1,000,000 $1,000,000 $1,000,000 $5,000,000
DW Administrative Overhead $0 $0 $0 $750,000 $750,000 $750,000 $750,000 $3,000,000Total $81,136,611 $594,739 $23,016,979 $2,350,000 $2,400,000 $2,400,000 $3,963,911 $115,862,240
M O P di P j t Li t
7/29/2019 Smuhsd 3-7-13 Phs Study Session
23/56
22
Measure O Pending Project List
22
Site Project 2011 2012 2013 2014 2015 2016 2017
DW Land Acquisition Alt. Education $15,000,000 $15,000,000 $15,000,000 $15,000,000
DW Alt Education Center SMHS/HHS $28,678,182 $30,685,655 $32,833,651 $35,132,006
DW Alt Education Center Crestmoor $27,552,119 $28,929,725 $30,954,806 $33,121,642
DW Land Acquisition Dist.Office $5,000,000 $5,000,000 $5,000,000 $5,000,000
DW Administrative Office $18,528,318 $19,825,300 $21,213,071 $22,697,986
DW Maintenace, Ops, Transportation $12,875,611 $13,776,904 $14,741,287 $15,773,177
HHS HHS 4th Classroom Building (21 Classrooms) $18,304,869 $19,586,210 $20,957,245 $22,424,252
Construction Escalation Projected at 7%
M O P j t Li t
7/29/2019 Smuhsd 3-7-13 Phs Study Session
24/56
23
Measure O Project List
23
Energy Savings and Deferred Mainten 2011 2012 2013 2014 2015 2016 2017AHS Transite Panel Replacement $7,830,000 $8,378,100 $8,964,567 $9,592,087
HHS Transite Panel Replacement $6,771,000 $7,244,970 $7,752,118 $8,294,766
MHS Transite Panel Replacement $7,244,970 $7,752,118 $8,294,766 $8,875,400
DW Solar Thermal Pool Heaters $5,270,400 $5,639,328 $6,034,081 $6,456,467
AHS New HVAC Controls / Ventilation $1,220,000 $1,305,400 $1,396,778 $1,494,552BHS Air Condition South Wing $762,500 $815,875 $872,986 $934,095
CHS Air Condition "D" Wing" $610,000 $652,700 $698,389 $747,276
CHS Fence Stadium Field $305,000 $4,291,350 $4,591,745 $4,913,167
CHS Fence Entire Site $533,750 $571,113 $611,090 $653,867
CHS Repave All Roads $1,756,800 $1,879,776 $2,011,360 $2,152,156HHS Replace Fencing $1,275,144 $1,364,404 $1,459,912 $1,562,106
New Buildings:
MHS New 5-Classroom Building $4,003,125 $4,283,344 $4,583,178 $4,904,000
MeasureO Project List
7/29/2019 Smuhsd 3-7-13 Phs Study Session
25/56
24
Measure O Project List
24
Athletic Fields & Court: 2011 2012 2013 2014 2015 2016 2017
AHS Artificial Turf Baseball Field $1,982,500 $2,121,275 $2,269,764 $2,428,648
CHS Artificial Turf Baseball / Softball Fields $2,635,200 $2,819,664 $3,017,040 $3,228,233CHS Artificial Turf Soccer Field $3,050,000 $3,263,500 $3,491,945 $3,736,381
HHS Artificial Turf Baseball Field $1,372,500 $1,468,575 $1,571,375 $1,681,372
HHS Artificial Turf Soccer Field $1,830,000 $1,958,100 $2,095,167 $2,241,829
MHS Artificial Turf Baseball Field $1,903,200 $2,036,424 $2,178,974 $2,331,502
MHS Artificial Turf Soccer Field $3,263,500 $3,491,945 $3,736,381 $3,997,928
MHS Resurface Lower Basketball Courts $228,750 $244,763 $261,896 $280,229SMHS Artificial Turf Baseball / Softball Fields $1,903,200 $2,036,424 $2,178,974 $2,331,502
AHS Lights for Stadium Field $610,000 $652,700 $698,389 $747,276
CHS Lights for Stadium Field $610,000 $652,700 $698,389 $747,276
HHS Lights for Stadium Field $610,000 $652,700 $698,389 $747,276
MHS Lights for Stadium Field $610,000 $652,700 $698,389 $747,276
SMHS Lights for Stadium Field $610,000 $652,700 $698,389 $747,276
Facility Requests:
CHS Improve Bus Loop $610,000 $652,700 $698,389 $747,276
CHS Bleachers for Tennis Courts $62,500 $66,875 $71,556 $76,565
CHS Hand Dryers in All Bathrooms $156,250 $167,188 $178,891 $191,413
CHS Storage Building by Tennis Courts $114,375 $122,381 $130,948 $140,114
DW Security Upgrades $1,525,000 $1,631,750 $1,745,973 $1,868,191
DO Pave Bus Yard Parking Lot $937,500 $1,003,125 $1,073,344 $1,148,478
HHS Restructure science labs for class of 35
MHS Multi-purpose Building behind Gyms $2,592,500 $2,773,975 $2,968,153 $3,175,924
SMHS Transform E115 & E116 into Classrooms $750,000 $802,500 $858,675 $918,782
SMHS Install Bike Lockers $38,125 $40,794 $43,649 $46,705SMHS Concrete Emergency Ops Building $106,750 $114,223 $122,218 $130,773
Location Options San MateoHigh School
7/29/2019 Smuhsd 3-7-13 Phs Study Session
26/56
2525
Location Options San Mateo High School
Location Options San MateoHigh School
7/29/2019 Smuhsd 3-7-13 Phs Study Session
27/56
26
Location Options San Mateo High School
26
Location Options San MateoHigh School
7/29/2019 Smuhsd 3-7-13 Phs Study Session
28/56
27
Location Options San Mateo High School
27
Location Options San MateoHigh School
7/29/2019 Smuhsd 3-7-13 Phs Study Session
29/56
28
Location Options San Mateo High School
28
Location Options HillsdaleHigh School
7/29/2019 Smuhsd 3-7-13 Phs Study Session
30/56
2929
Location Options Hillsdale High School
Location Option HillsdaleHigh School
7/29/2019 Smuhsd 3-7-13 Phs Study Session
31/56
30
Location Option Hillsdale High School
30
Location Options Remain at PeninsulaSite
7/29/2019 Smuhsd 3-7-13 Phs Study Session
32/56
31
Location Options Remain at Peninsula Site
Location Options Remain at PeninsulaSite
7/29/2019 Smuhsd 3-7-13 Phs Study Session
33/56
32
Location Options Remain at Peninsula Site
Land AcquisitionProperty Development
7/29/2019 Smuhsd 3-7-13 Phs Study Session
34/56
3333
Land Acquisition Property Development
The District assembled a specialized team and established a
process to assess viable properties that were either owned orcould be accessed through acquisitions
Team consists of:
Benson Lee, CEQA (California Environmental Quality Act) Consultant
Westgate Ventures, Asset Managers
QKA Architects
GreystoneWest, Construction Management
Land AcquisitionPreferences
7/29/2019 Smuhsd 3-7-13 Phs Study Session
35/56
3434
Parcel size of 2 to 5 acres or more that is relatively level ideally with two streetfrontages
Direct access to arterial or similar sized street avoid sites with small streets,particularly if they run through residential neighborhoods
Property that has water, sewer, power, natural gas, phone, cableTV, utilities andstorm drains on or directly adjacent in order to avoid excessiveoff-site costs or
entitlements by local jurisdictionsProperty that is easily accessible from public transportation
Property with a fire hydrant of at least 1,500 gallons per minute (more may berequired depending on design) or if no hydrant, immediate accessto fire water to addhydrants. It is possible two fire hydrants may be required for this size of a school. Fireflow is becoming a bigger issue with DSA which accentuates this preference
Property in a commercial or business area to reduce controversy
Land AcquisitionCDE Guidelines
7/29/2019 Smuhsd 3-7-13 Phs Study Session
36/56
3535
q
CDE Guidelines: In the California Department of Educations (CDE) School SiteSelection & Approval Guide, CDE establishes a number of criteriafor selectingnew school properties. Below are a summary of the issues. Seehttp://www.cde.ca.gov/ls/fa/sf/schoolsiteguide.aspfor the complete document: Proximity to Airports: From the CDE Guide:
If the site is within two nautical miles of an existing airport runway or a potential runway included in anairport master plan, as measured by direct air line from the part of the runway that is nearest to the schoolsite, the following procedures must be followed before the site can be approved.
Proximity to High Voltage Power Lines: From the CDE Guide. See guide for further descriptions and exceptions.
In consultation with the State Department of Health Services (DHS) and electric power companies, theDepartment has established the following limits for locating anypart of a school site property line near the
edge of easements for high-voltage power transmission lines: 100 feet from the edge of an easement for a 50-133kV (kilo volts) line
150 feet from the edge of an easement for a 220-230kV line
350 feet from the edge of an easement for a 500-550kV line
These figures represent kV strengths of transmission lines used by
Presence of Toxic & Hazardous Substances: While the Guide goes into greater detail, sites should be pass a PhaseOne Environmental Site Assessment and not be near landfills, former dumps, chemical plants, fuel storagefacilities or contain naturally occurring materials such as asbestos, oil and gas.
Hazardous Air Emissions and Facilities Within a Quarter Mile: As the title implies, properties that are adjacent orwithin a quarter of a mile of hazardous air emissions (includingmajor freeways) should be avoided.
Land AcquisitionCDE Guidelines
7/29/2019 Smuhsd 3-7-13 Phs Study Session
37/56
3636
q
CDE Guidelines Continued::
Proximity to Railroads: From the Guide (see Guide for complete description). It is highly advisable to select aproperty that is at least 1,500 feet from a railroad track easement.
If the proposed site is within 1,500 feet of a railroad track easement, a safety study shall be done by acompetent professional trained in assessing cargo manifests, frequency, speed, and schedule of railroadtraffic, grade, curves, type and condition of track, need for sound or safety barriers, need for pedestrian and
vehicle safeguards at railroad crossing, presence of high pressure gas lines near the tracks that couldrupture in the event of a derailment, preparation of an evacuation plan. In addition to the analysis, possibleand reasonable mitigation measures must be identified.
Proximity to Pressurized Gas, Gasoline or Sewer Pipeline: The distances from these pressurized pipes aredetermined by the pipe size and pressure. A consultant is required to evaluate blast potential and other hazards ifthe property is near such pressurized pipelines. It is best if the property is not near pressurized gas, gasoline orsewer pipelines.
Proximity to Propane Tanks: Like pressurized pipes, it is best to avoid sites that are adjacent to propane tanks.
Noise: CDE is concerned with adjacent noise including industrial andlight industrial uses. Properties that havemore than 50 decibels at the property line should be avoided, asmitigation measures may be required.
Proximity to Major Roadways: While from above we want streets capable of handling the schools traffic, theCDE Guide does indicate "The site shall not be adjacent to a road or freeway that any site-related traffic and sound
level studies have determined will have safety problems or soundlevels which adversely affect the educationalprogram."
Geological Studies and Soils Analysis: Because the SMUHSD is adjacent to the San Francisco Bay, specialattention should be paid to soil characteristics to avoid soft bay mud or liquefiable soils. Mitigations for thesecan cost hundreds of thousands of dollars. A preliminary geotechnical report can easily access a propertys soilcharacteristics. Likewise careful consideration must be made for distances from known earthquake faults.
Safe Route to Schools: Sites without established and safe pedestrian paths of travel should be avoided.
CEQA Environmental Documentation
7/29/2019 Smuhsd 3-7-13 Phs Study Session
38/56
37
Given the limited information about the proposed project at any of the sites, the
scope of the environmental review under CEQA and the associated timeframes forpreparation of documentation cannot be determined at this time. Greater projectdetails, along with input from responsible public agencies and the public at-large,would be required to adequately ascertain the level of analysis,which could rangefrom a relatively simple categorical exemption to an Environmental Impact Report
(typically triggered when there are potentially significant and unmitigatedenvironmental effects resulting from a project). In addition, anumber of CDEGuideline topics (e.g., hazmat; geologic hazards; safe routes toschool) overlapissues that must be addressed as part of the CEQA evaluation.
Based upon the very preliminary drawings that have been provided, the followingscope of environmental review and approximate timeframes have been providedfor each option location:
Crestmoor High School San Mateo High School
Hillsdale High School
Purchasing land or facility
CEQA-Crestmoor High School
7/29/2019 Smuhsd 3-7-13 Phs Study Session
39/56
38
If a primary intent for the project is replacement/reconstruction of existing facilities
to provide earthquake-resistant structures, and no potentially significantenvironmental impacts would result from the development, a categoricalexemption may meet CEQA requirements. A categorical exemption could beprepared within two to three days, followed by a 30-day public comment period.
Concerns associated with soil displacement were discussed as possible issues.Traffic and parking do not appear to be major concerns since many students woulduse public transit and traffic volumes appear to be low along local roadways. Inthe event that the project needs to address issues, CEQA documentation may
require at least a Negative Declaration, supported by an Initial Study, along withpossible geologic and biological studies and possible permits within the area of thewatercourse. Document preparation and processing could range from two monthsto a year or more.
CEQA-San Mateo High School
7/29/2019 Smuhsd 3-7-13 Phs Study Session
40/56
39
Either of the two location options would probably require at least a Negative
Declaration, supported by an Initial Study. A parking lot with a new entry,requiring a curb cut, on Humboldt Street would be developed, which wouldpreclude the applicability of a categorical exemption. According to previouscontinuation school information, a total of 45 spaces for staff and 50 for studentswould be provided. As the responsible agency for local roadways, the City of San
Mateo would need to be contacted to discuss the scope of a possible traffic/parkingstudy and possible offsets, resulting from the removal of the existing bus parkingfacility, and an encroachment permit for the curb cut. Other issues may includenoise and visual effects depending upon the chosen layout alternative.
In the past, residents at the condominium development along the northernperimeter of the high school have been vocal about proposed development at thehigh school. The level of public concerns and involvement may have a bearing
upon the level of environmental review and documentation preparation andprocessing. The timeframe for completion of CEQA review could range from twoto three months to perhaps five to six months.
CEQA-Hillsdale High School
7/29/2019 Smuhsd 3-7-13 Phs Study Session
41/56
40
Either of the two location options would probably require at least a Negative
Declaration, supported by an Initial Study. The two-story building wing, shown inboth layouts, may pose a possible visual effect upon nearby residents. Sinceexisting parking areas already exist and streets appear to carry low volumes ofvehicles, a traffic study may not be required although the City of San Mateo shouldbe contacted to clarify this issue. Assuming that neither visual impacts or an
increase in traffic will pose significant issues, the CEQA document preparation andprocess could range from three to four months. The level of public concerns andinvolvement may have a bearing upon the level of environmental review anddocumentation preparation and processing.This could extend the CEQA timeline.
CEQA-Purchasing Land or Other Facility
7/29/2019 Smuhsd 3-7-13 Phs Study Session
42/56
41
Assuming that a suitable parcel of land or facility is acquired,either a Negative
Declaration, supported by an Initial Study, or an Environmental Impact Reportwould likely be needed to meet CEQA review requirements. However, the extentof issues that must be evaluated will vary with the specific site conditions andsurrounding land uses, which are currently unavailable. As stated in the LandAcquisitionPreferences, zoning will have to be considered. In addition, an
amendment to the local general plan may also be needed. Under state law, onlyfour amendments per year to a general plan are permitted.
Currently, lacking project location and design specifics, a timeestimate for the
completion of CEQA documentation and processing cannot be determined. ANegative Declaration, supported by an Initial Study could take as little as threemonths while an Environmental Impact Report would require seven months ormore.
Alternative High School Facility
7/29/2019 Smuhsd 3-7-13 Phs Study Session
43/56
42
Site Options CEQA
Level
CEQA
Timeline
GeneralPlanChang
es
CDEA
pproval
Design
Allocation
DSAT
imeAllocation
ProjectSchedule
TotalT
imeline
ProjectCost
Centra
llyLocated
Access
ibletoPublicTransportatio
n
SchoolI
dentity
AthleticFacilities
Childcare
FacilityFitOnSite
Parkin
g
Crestmoor High school
Hillsdale High School
San Mateo High School
New Site
*Matrix for Board to utilize as they consider options
District Office
7/29/2019 Smuhsd 3-7-13 Phs Study Session
44/56
43
District Office Programming
CEQA Field Act
Architect Program District Office
7/29/2019 Smuhsd 3-7-13 Phs Study Session
45/56
44
Draft Program for District OfficeUnit Subtotal Total
Administration Quantity Area Area Area NotesAttendance and Welfare
Reception 1.0 300 300
Work stations 4.0 62.5 250
Computer workstations 1.0 150 150
Offices 2.0 150 300
Private Investigator 1.0 80 80
Storage 2.0 50 50
Subtotal 1,130
Bond Accounting
Office 1.0 150 150Reception 1.0 50 50
Open office space 1.0 100 100
Subtotal 300
Technology
Reception 1.0 100 100Office 2.0 150 150
Open Office 4.0 62.5 250
Workshop 1.0 100 100
Storage 1.0 50 50
Subtotal 650
44
Architect Program District Office
7/29/2019 Smuhsd 3-7-13 Phs Study Session
46/56
45
Draft Program for District OfficeUnit Subtotal Total
Administration Quantity Area Area Area NotesBusiness Office
Reception 1.0 100 100
Deputy office 1.0 249 249
Private offices 4.0 150 600
Open office space 7.0 50 350
Storage 1.0 100 100
Cash counting room 1.0 120 120
Subtotal 1,519
Human Resources
Reception 1.0 100 100Private offices 4.0 175 700
Open office space 6.0 50 300
Conference room 1.0 150 150
Storage 1.0 100 100
Nurse workstation 1.0 50 50Subtotal 1,400
Other
Mech, Elec, Misc 1.0 2,306 2,306
Circulations 1.0 5,765 5,765Subtotal 8,071
45
Architect Program District Office
7/29/2019 Smuhsd 3-7-13 Phs Study Session
47/56
46
Draft Program for District OfficeUnit Subtotal Total
Administration Quantity Area Area Area NotesInstructional Services
Reception 1.0 100 100
Work stations 6.0 100 600
Collaborative Room 1.0 500 500
Offices 5.0 170 850
Storage 1.0 100 100
Subtotal 2,150
Special Education
Office 2.0 150 300
Reception 1.0 150 150Open office space 3.0 100 300
Storage 1.0 250 250
Subtotal 1,000
Superintendent
Reception 1.0 100 100
Office 1.0 250 250
Admin. Asst 1.0 80 80
Storage 1.0 50 50
Subtotal 480
46
Architect Program District Office
7/29/2019 Smuhsd 3-7-13 Phs Study Session
48/56
47
Draft Program for District OfficeUnit Subtotal Total
Administration Quantity Area Area Area NotesBoard
Board Asst. 1.0 80 80
Conference Room 1.0 500 500
Board Room 1.0 3,000 3,000
Technology 1.0 50 50
Storage 2.0 50 100
Subtotal 3,730
Shared Space
Lobby and Reception 1.0 1,500 1,500
Large Conference (20+) 3.0 750 2,250Medium Conference (12) 4.0 500 2,000
Small Conference(10) 4.0 250 1,000
Central File Storage 1.0 500 500
Toilet Rooms 1.0 1,500 1,500
Copy Room 2.0 250 500Custodial/Janitorial 1.0 250 250
Staff Break Room 1.0 1,200 1,200
Subtotal 10,700
Total 31,130
47
Architect Program Maintenance, Operations, Transportation
7/29/2019 Smuhsd 3-7-13 Phs Study Session
49/56
48
Draft Program for Maintenance and Operations FacilityUnit Subtotal Total
Administration Quantity Area Area Area NotesMaintenance
Painter 1.0 300 300
Painters Storage 1.0 500 500
Painters changing room 1.0 100 100
Conference Room 1.0 500 500
Carpenters Shop 1.0 960 960
Tool Storage 1.0 800 800
Mechanical Shop 1.0 960 960
Electrical Shop 1.0 960 960
Electrical Storage 1.0 960 960Testing Materials 1.0 500 500
Subtotal 6,540
Facilities Use
Storage 1.0 50 50
Office 2.0 150 300Reception 1.0 200 200
Subtotal 550
Print Shop 1.0 500 500 500
Server Room 1.0 500 500 500
Emergency Services 1.0 500 500 500
48
Architect Program Maintenance, Operations, Transportation
f f i i d i
7/29/2019 Smuhsd 3-7-13 Phs Study Session
50/56
49
Draft Program for Maintenance, Operations and TransportationUnit Subtotal Total
Administration Quantity Area Area Area NotesShipping Receiving 1.0 500 500 500
Grounds
Equipment Shed 1.0 2,000 2,000
Seed Fertilizer Storage 1.0 400 400
Subtotal 2,400
Food Service Office
Storage 1.0 1,000 1,000
Office 1.0 120 120
Subtotal 1,120Locksmith 1.0 300 300 300
Shared Facilities
Staff Break Room 1.0 500 500
Electrical Storage 1.0 500 500
Subtotal 1,000
49
Architect Program Maintenance, Operations, Transportation
7/29/2019 Smuhsd 3-7-13 Phs Study Session
51/56
50
Draft Program for Maintenance, Operations and TransportationUnit Subtotal Total
Administration Quantity Area Area Area NotesTransportation
Offices 4.0 150 600
Open Office Space 6.0 100 600
Mechanics Bay 1.0 4,000 4,000
Tool Room 1.0 200 200
Lunch room 1.0 500 500
Storage 1.0 300 300
Subtotal 6,200
Mech., Elec., Circulation 1.0 3017 3,017 3,017
Total Maintenance and Operations 23,127
Total 54,257
Acres 7-10
50
CEQA-District Office
Thescopeof CEQA documentationrequiredfor relocationof theDistrictOfficeandInformation
7/29/2019 Smuhsd 3-7-13 Phs Study Session
52/56
51
The scope of CEQA documentation required for relocation of the District Office and InformationTechnology facilities to an existing commercial business park, in which four acres would be
needed, would depend on the site characteristics and surroundingsetting. On the one hand, if theexisting use characteristics (e.g., staffing levels, business hours; parking) of a site were similar tothe District Office functions and no potentially significant environmental issues or concerns (e.g.,hazmat, higher traffic volumes, cultural resources) are identified, a minimal evaluation may beneeded. On the other hand, issues such as increased traffic, greater parking needs, and potentialhazmat issues (especially if state funds were involved) would require more extensive review.
Another factor in determining the extent of the evaluation is also the baseline or existing conditionsat the time the CEQA review is initiated. If the proposed relocation site has been vacant, the analysiswill likely differ from a site that is currently occupied (e.g., new traffic would be added to localroadways under a vacant scenario vs. the likelihood of little difference under an existing usescenario).
Since relocation of District Office does not qualify under any of the categorical exemptions underCEQA, a Negative Declaration, supported by an Initial Study, would likely be the applicable andappropriate level of required documentation. Upon receipt of thebackground materials (e.g., design,operational parameters), the entire CEQA environmental review process would rangefrom about two and one-half to three months, including the 30-day review period, for an
environmental document in which less than significant effects are identified. In the event that anexpanded traffic analysis or other issues need to be addressed under a Negative Declaration, the timerequired could increase by 30 to 60 days. An Environmental Impact Report (EIR), whichwould take at least six to seven months to complete, is unlikely to be needed for location within anexisting commercial business park.
CEQA-Maintenance, Operations, Transportation
M i t dO ti
7/29/2019 Smuhsd 3-7-13 Phs Study Session
53/56
52
Maintenance and Operations
The scope of CEQA documentation required for relocation of the current Maintenance and
Operations facilities, which would include a Loading Dock, woulddepend on the sitecharacteristics and surrounding setting for an approximately two-acre property. Given thefunctions of current M,O&T facilities, a suitable location couldinclude an area with already
existing industrial uses. Resulting impacts associated with CEQA review could include, butmay not be limited to, potentially increased traffic (e.g., staffing and loading activities),possibly greater parking needs, presence of existing hazmat issues and the need to addressmanagement of hazmat at the new facilities, and possibly noise if sensitive land uses occurnear the property.
Unless the M,O&T is situated in proximity to such sensitive landuses or nearby roadintersections in which intersection thresholds of operation are exceeded during the a.m.traffic peak, the level of CEQA documentation would likely be a Negative Declaration,supported by an Initial Study, in which the timeframe for the review process would besimilar to the District Office facility.
CEQA- Maintenance, Operations, Transportation
Transportation
7/29/2019 Smuhsd 3-7-13 Phs Study Session
54/56
53
Transportation
The extent of CEQA documentation for relocation of the Bus Barn, to an approximately
one-acre site would again depend upon the site characteristics and surrounding settingalong with operational parameters (i.e., number of buses; do buses move in and out of thefacilities during the peak a.m. and p.m. traffic hours?). CEQA-related issues of concern
could include, but not be limited to, traffic, parking adequacy and noise if sensitive landuses occur nearby along with management of on-site fuels.
Like the M,O&T facilities, unless the Bus Barn is located in proximity to sensitive land
uses or road intersections in which intersection thresholds of operation are exceeded duringthe a.m. or p.m. traffic peak, the level of CEQA documentation would likely be a NegativeDeclaration, supported by an Initial Study, in which the timeframe for the review processwould be similar to the M,O&T facilities, discussed above.
Recommendation
Option Eliminated
7/29/2019 Smuhsd 3-7-13 Phs Study Session
55/56
5454
Option Eliminated:
Due to projected enrollment growth with Bay Meadows development coming on line,Hillsdale High School will be the southern school able to accommodate futureenrollment increase
Most Comprehensive Solution:Alternative SchoolPurchase property that is centrally located, easily accessible to public transportationfor the Alternative Education Facility
Allocate six months to identify and begin due diligence for potential propertypurchase for Alternative School
District Office
Purchase property that is centrally located, easily accessible for constituents
Alternative:If a viable property is not identified and secured, the Board of Trustees should reconsider anddiscuss if the Alternative High School should be built at San Mateo High School.
Crestmoor High School should be considered as a last resort
Next Steps
7/29/2019 Smuhsd 3-7-13 Phs Study Session
56/56
5555
District Administration will identify properties closelymeeting specific criteria
All property sites will be analyzed by team to determine
viabilityRecommendation will be brought forth to the Board of
Trustees for consideration
If a roadblock is encountered, the Board of Trustees will bereconvened for further discussion