DESCRIPTION
Small Spinning Cell 4 Buffing Smed Kaizen
Citation preview
Small Spinning Cell #4 Buffing Small Spinning Cell #4 Buffing SMEDSMED
March 5 - 7, 2007March 5 - 7, 2007
2
Small Spinning Cell #4 Buffing Small Spinning Cell #4 Buffing SMED SMED
Team Members: Mark Berninger, Brian Doll, John Mitchell, Chuck Crowder, Justin Whittle, Kris Gruner, Josh Panek, and Brandon Garrett
Team Picture
3
Small Spinning Cell #4 Buffing Small Spinning Cell #4 Buffing SMED SMED
BUSINESS CASEVariation in the small spinning buffing machine set-up process and the subsequent troubleshooting that often follows are two problems that if not remedied, could lead to bad quality, safety issue running the machine, unplanned machine downtime. This event will allow us to produce greater volume and variety of parts with reduced lead time - driving supply in-line with customer demand.
TARGET Reduce overall changeover time below 10 minutes Process parameters to be developed for all parts produced in Cell 4
DELIVERABLES
Standard Work Set-up Train 3 operators on kaizen team for buffing set up standard work Develop process parameters creation plan for all small spinning Audit Schedule for Monitoring Standard Work
Charter
4
Small Spinning Cell #4 Buffing Small Spinning Cell #4 Buffing SMED SMED
Initial Observations / Current State
Spindle/Buff changing station located too close to punch press – operator interference
Tools laid inside machine or on rack in cell
No documented parameters for buffing settings
Stack locations for new buffs on side and under machine
Quality of Buffed part is subjective
No work instructions in cell
5
Small Spinning Cell #4 Buffing Small Spinning Cell #4 Buffing SMED SMED
Fixtures miss ID’d in racks No Identification for fixture location No Identification of Buff fixture to part Machine being operated without internal
shields Some Fixtures missing Tools not 5S’d Oil under punch press Scrap pieces on floor
5 S Observations
6
Small Spinning Cell #4 Buffing Small Spinning Cell #4 Buffing SMED SMED EH&S Observations
1 Violation1 Unknown
7
Small Spinning Cell #4 Buffing Small Spinning Cell #4 Buffing SMED SMED SMED Highlights
Created location for tooling inside machine
8
Small Spinning Cell #4 Buffing Small Spinning Cell #4 Buffing SMED SMED SMED Highlights
Labeled Tooling Racks & Tool Location Tags
9
Small Spinning Cell #4 Buffing Small Spinning Cell #4 Buffing SMED SMED SMED Highlights
Developed Settings for all parts in cell
10
Small Spinning Cell #4 Buffing Small Spinning Cell #4 Buffing SMED SMED SMED Highlights
Part
Flange Buff
DiameterBody Buff Diameter
Body Buff Pressure
(psi)
Hand Wheel
F
Hand Wheel
B1
Hand Wheel
B2
Body Side Load Point
Body End Limit
Dwell at Side Load Point
Dwell at
End Limit
Flange Buff Max Dwell
# of Cut Passes
(w/comp)
# of Color Passes
(w/comp)
# of Color Passes
(w/o comp)
Body Compound Shots per
Stroke
Flange Compound % Volume
Cycle Time
CA22701C63 8 5 32 400 2320 2960 3.7 7.1 1 2 35 3 0 2 2 3 56
CA10601C63 8 5 32 400 2280 2900 3.7 6.8 1 2 35 5 0 1 2 3 67
CA00628S63 8 5 32 400 2320 2900 3.8 6.8 1 2 35 3 0 2 2 3 67
CA6290132B 8 5 32 360 2280 2870 3.6 5.8 3 2 0 3 0 1 2 0 47
CA23401C63 8 5 32 400 2360 3010 4.5 6.8 2 2 0 3 0 2 2 0 53
CA11001C63 8 5 32 400 2360 3010 3.8 7.1 2 2 35 3 0 2 2 3 59
11
Small Spinning Cell #4 Buffing Small Spinning Cell #4 Buffing SMED SMED SMED Highlights
Relocated Buff Change station
Relocated New Buff Storage
12
Small Spinning Cell #4 Buffing Small Spinning Cell #4 Buffing SMED SMED SMED Highlights
Remove waste steps
by developing
program settings
BEFOREThese times do NOT include
spindle change out times
13
Small Spinning Cell #4 Buffing Small Spinning Cell #4 Buffing SMED SMED SMED Highlights
AFTER
14
Small Spinning Cell #4 Buffing Small Spinning Cell #4 Buffing SMED SMED Basis for Improvement
Another 60 seconds could potentially be
eliminated - change PLC to accept settings by part number would give us a
total of 45% ImprovementSet-up Time Before 6.17
Set-up Time After 4.42Difference 1.75
Percent Improvement 28.4%
15
Small Spinning Cell #4 Buffing Small Spinning Cell #4 Buffing SMED SMED EH&S Observations
1 Violation Corrected
1 Unknown – will be corrected with newspaper item
16
Small Spinning Cell #4 Buffing Small Spinning Cell #4 Buffing SMED SMED
What are the key issues that could impact lack of sustainment ?
• Revisit 5S in Cell• Training of all operators• Completion of all the newspaper items• Revisit Standard Work• Weekly Audits• Quality Event - From Spun to Buffed• Shift to Shift communication
Key Success Factors
17
Small Spinning Cell #4 Buffing Small Spinning Cell #4 Buffing SMED SMED Report Card/Newspaper
BeforeKaizen
KaizenGoal % Improvement
AfterKaizen % Improvement
6.17 10 62.1% 4.42 -28.4%
0 6 100.0% 6 100.0%
Completion Status ECD
3/15/20073/15/20073/15/2007
3/8/20073/16/2007
4/6/20073/9/20073/9/20073/9/2007
Were any Enterprise Risk Areas affected? YES ______ NO___X____ If yes, what actions were taken to eliminate the risks?
Expected Results prior to the kaizen and opportunities after the kaizen
Remarks: Fire Extinguisher was moved but was approved by EH &S.
Event Date: 3/5/2007
Process Owner: Mike SimpsonTeam Leader: Mark BerningerArea: Small Spinning Cell 4 Buffing SMED
Expected Results Implemented Results
Process Description & Associated KPI or AIP:
Comments
4. Develop translation plan for other cells5. Install Buff rack on side panel6. PLC change for recipe called up by part number7. Label weights of Buff fixtures within cell
Newspaper Items
1. Sustainment team meeting 1 week after event2. Train all operators on all shifts3. First Cell Audit completed
8. Location for dry erase markers on rack9. Rubber hoses on end of New Buff Holders10.Kaizen Team Members: Mark Berninger, Brian Doll, John Mitchell, Chuck Crowder, Justin Whittle, Kris Gruner, Josh Panek, and Brandon Garrett
Kaizen Metrics (Targets/Goals)
Reduce overall changeover time below 10 minutesProcess parameters to be developed for all parts produced in Cell 4
18
Small Spinning Cell #4 Buffing Small Spinning Cell #4 Buffing SMED SMED