SmartGridTM
Remote Telemetry
Data Acquisition System
TRANSWORLD - SMARTGRID
Transworld
The Problems
• Power Theft
• Overload
• Meter Tampering
• Meter Failure
• Manpower
• Billing Delays
• Reading Delays
• Slow Response
Transworld
The Need
Automatic Meter Reading Collection Timely Billing Detection of Theft Detection of Meter Tampering Auto Disconnection on failure to pay Auto Trip on Overload Detection Real Time Load and Payment
Information
Transworld
The Solution
TRANSWORLD SMARTGRIDTRANSWORLD SMARTGRIDTM
Remote Telemetry
And
Data Acquisition System
Transworld
SMARTGRID
Acquire Meter Reading in Real TimeOver-The-Air Acquisition - WirelessOverload Protection & PenaltyTime-Of-Day Tariff for all ConsumersLog of Minute-by-Minute ConsumptionRemote Disconnection / ReconnectionDirect Reading as well as Manual DownloadAutomatic Billing and PaymentPrepaid OptionGIS based view
Transworld
The SmartGrid
Upto 50 Consumers
Metering Module
MSEB Server
BankPower Consumed
Wireless Link
Data
Control
Billing
Payment
Payment Data
Power
Transworld
Remote Metering Module
• Upto 50 Consumers• LCD for Local Read• Port for Local Data• Logs per Minute• Remote Disconnect• Remote Reconnect• Tx GSM/CDMA/PSTN• Live Load Real Time• Undeletable Data
Sensors
Processor LCD View
KeyPadData - RS232
Wireless Link to Server
Data
Control
Transworld
Central Server
• Downloads Consumption Data Automatically
• Maintains and Computes Bill and Payment Info
• Updates from Bank• Allows Consumer and
SEB Access• Serves Real Time Info• GIS Capable• Allows Remote
Disconnect / Reconnect
Server
Wireless Link
Payment
Billing
Distribution MIS
Consumer
Transworld
SmartGridTM
Automatic Billing & PaymentService Disconnect / ReconnectOverload DataManual Collection of Billing DataTime-Of-Day TariffReal time Information AccessHuge Savings
Transworld
Fiscal Impact
• Cost per home < Rs. 1500/-
• 1 Remote Module handles <= 50 homes
• Installation Time = Existing System
• Data Transmission Cost < Rs. 10/- per month
• Saves Wastage by TOD
• Modular - Simple and Cheap
• Self Diagnostic
Transworld
Roll Out Plan
• Proof Of Concept - 6 Weeks
• Prototyping & Testing - 12 Weeks
• Commercial Production - 24 Weeks
• Initial Commissioning - Urban Areas
Transworld
TRANSWORLD SmartGrid
Thank You!