39

SMART Work Zones: Technology for work zone management North Carolina Department of Transportation STAY ALERT Work Zone MAKING WORK ZONES WORK BETTER

Embed Size (px)

Citation preview

Page 1: SMART Work Zones: Technology for work zone management North Carolina Department of Transportation STAY ALERT Work Zone MAKING WORK ZONES WORK BETTER
Page 2: SMART Work Zones: Technology for work zone management North Carolina Department of Transportation STAY ALERT Work Zone MAKING WORK ZONES WORK BETTER

SMART Work Zones: SMART Work Zones: Technology for work zone Technology for work zone

managementmanagement

North CarolinaNorth CarolinaDepartment of TransportationDepartment of Transportation STAY ALERT

Work Zone

MAKING WORK ZONES WORK BETTER Through MAKING WORK ZONES WORK BETTER Through Innovations in Technologies, Practices, and ProductsInnovations in Technologies, Practices, and Products

Steve Kite, PE Steve Kite, PE Traffic Control Traffic Control Project EngineerProject Engineer

Page 3: SMART Work Zones: Technology for work zone management North Carolina Department of Transportation STAY ALERT Work Zone MAKING WORK ZONES WORK BETTER

FHWA Workzone Facts

Between 1980Between 1980 and 1998, vehicle travel was up and 1998, vehicle travel was up

73%, while the number of road miles increased by 73%, while the number of road miles increased by only 1%.only 1%.

13% of the National Highway System is under 13% of the National Highway System is under construction at any given time.construction at any given time.

24% of non-recurring congestion is due to work 24% of non-recurring congestion is due to work zones.zones.

Motorists are less tolerant with delays especially Motorists are less tolerant with delays especially those associated with workzones.those associated with workzones.

Page 4: SMART Work Zones: Technology for work zone management North Carolina Department of Transportation STAY ALERT Work Zone MAKING WORK ZONES WORK BETTER

Resulting in…...

Page 5: SMART Work Zones: Technology for work zone management North Carolina Department of Transportation STAY ALERT Work Zone MAKING WORK ZONES WORK BETTER

….and…..

Page 6: SMART Work Zones: Technology for work zone management North Carolina Department of Transportation STAY ALERT Work Zone MAKING WORK ZONES WORK BETTER

FHWA GoalsReduce work zone delay by ensuring all Reduce work zone delay by ensuring all states are engaged in aggressively states are engaged in aggressively anticipating and anticipating and mitigating congestionmitigating congestion caused by highway work zones. caused by highway work zones.

Actions for use by State Agencies:Actions for use by State Agencies:

1) Develop methods for measuring and monitoring 1) Develop methods for measuring and monitoring delays in work zonesdelays in work zones

2) Use available technology to reduce congestion in 2) Use available technology to reduce congestion in workzones.workzones.

3) Provide automated, real time travel information3) Provide automated, real time travel information in advance of the work zones.in advance of the work zones.

Page 7: SMART Work Zones: Technology for work zone management North Carolina Department of Transportation STAY ALERT Work Zone MAKING WORK ZONES WORK BETTER

What is North Carolina doing?!#

NCDOT is proactively deploying the NCDOT is proactively deploying the technology to mitigate congestion in technology to mitigate congestion in highway work zoneshighway work zones

hmm…..SMART Work hmm…..SMART Work ZonesZones

Page 8: SMART Work Zones: Technology for work zone management North Carolina Department of Transportation STAY ALERT Work Zone MAKING WORK ZONES WORK BETTER
Page 9: SMART Work Zones: Technology for work zone management North Carolina Department of Transportation STAY ALERT Work Zone MAKING WORK ZONES WORK BETTER

What is a SMARTZONE and how What is a SMARTZONE and how do they work?do they work?

““SMARTZONE” or ‘SMART Work Zone’ is the term SMARTZONE” or ‘SMART Work Zone’ is the term commonly used to describe the technology and equipment commonly used to describe the technology and equipment that monitors and manages traffic congestion due to work that monitors and manages traffic congestion due to work zones.zones.

Typically these systems incorporate roadside speed and Typically these systems incorporate roadside speed and volume sensors to detect work zone congestion. volume sensors to detect work zone congestion.

This information is then transmitted to an on-site This information is then transmitted to an on-site computer via radio, cellular or satellite communication for computer via radio, cellular or satellite communication for processing. processing.

The corresponding delay information is displayed on The corresponding delay information is displayed on portable changeable message signs in an automated, real-portable changeable message signs in an automated, real-time manner. time manner.

In some cases, once the delay exceeds a threshold, alternate In some cases, once the delay exceeds a threshold, alternate route messages may be displayed.route messages may be displayed.

Page 10: SMART Work Zones: Technology for work zone management North Carolina Department of Transportation STAY ALERT Work Zone MAKING WORK ZONES WORK BETTER

OUR SMARTZONE GOALS

Mitigate queues to 2 miles or less. Mitigate queues to 2 miles or less. Virtually eliminate “rear end” crashes due to queues.Virtually eliminate “rear end” crashes due to queues.

Earn trust with motorists to reestablish compliance Earn trust with motorists to reestablish compliance with work zone information. We want to exceed our with work zone information. We want to exceed our customers’ expectations !!customers’ expectations !!

Provide real time delay information in advance of work Provide real time delay information in advance of work

areas.areas.

Utilize alternate routes where available to reduce Utilize alternate routes where available to reduce volume thru work area.volume thru work area.

Eliminate Fatalities due to excessive traffic queuing in Eliminate Fatalities due to excessive traffic queuing in highway work zones.highway work zones.

Use this Technology to:Use this Technology to:

Page 11: SMART Work Zones: Technology for work zone management North Carolina Department of Transportation STAY ALERT Work Zone MAKING WORK ZONES WORK BETTER

How much does it cost?Depends on how much equipment is Depends on how much equipment is necessary to provide the required necessary to provide the required monitoring.monitoring.

Depends on length and duration of work Depends on length and duration of work zone and if both directions need zone and if both directions need simultaneous monitoringsimultaneous monitoring

Depends on the type of communication Depends on the type of communication technology that is required ( i.e. radio technology that is required ( i.e. radio versus cellular and satellite) versus cellular and satellite)

Depends on the complexity of the Depends on the complexity of the individual vendors system ( i.e. software individual vendors system ( i.e. software cost, communication costs, etc.)cost, communication costs, etc.)

Page 12: SMART Work Zones: Technology for work zone management North Carolina Department of Transportation STAY ALERT Work Zone MAKING WORK ZONES WORK BETTER

What are the measurable results?

Reduction of Congestion associated with lane Reduction of Congestion associated with lane closures closures

Reduction/elimination of “rear end” crashes Reduction/elimination of “rear end” crashes due to excessive queuingdue to excessive queuing

Reduction/elimination of Fatal Crashes due to Reduction/elimination of Fatal Crashes due to excessive queuingexcessive queuing

Increased Productivity for the ContractorIncreased Productivity for the Contractor

Page 13: SMART Work Zones: Technology for work zone management North Carolina Department of Transportation STAY ALERT Work Zone MAKING WORK ZONES WORK BETTER

Intangible FactorsBelievable, Real Time information resulting Believable, Real Time information resulting in better compliance with work zone in better compliance with work zone information.information.

Better relations with the media industry Better relations with the media industry which in turn is used as the key link to which in turn is used as the key link to provide information to the public.provide information to the public.

Improved Communication with the Improved Communication with the Motoring Public resulting in improved Motoring Public resulting in improved Department ImageDepartment Image

Regaining the trust from the Regaining the trust from the motoring public….providing them motoring public….providing them the information they want and need the information they want and need and more importantly…and more importantly…whenwhen they they need it!need it!

Page 14: SMART Work Zones: Technology for work zone management North Carolina Department of Transportation STAY ALERT Work Zone MAKING WORK ZONES WORK BETTER

SMARTZONESMARTZONEDeploymentsDeployments

in N.C.in N.C.

Page 15: SMART Work Zones: Technology for work zone management North Carolina Department of Transportation STAY ALERT Work Zone MAKING WORK ZONES WORK BETTER

Interstate Network in North CarolinaInterstate Network in North Carolina

I-95I-95

I-40I-40

I-85I-85I-77I-77

I-73I-73

I-40I-40

I-85I-85

I-95I-95

Nearly 80,000 miles of state maintained roads- 2nd Nearly 80,000 miles of state maintained roads- 2nd largest in the Nation largest in the Nation

Over 1000 miles of interstate highwayOver 1000 miles of interstate highway

I-26I-26I-77I-77

Page 16: SMART Work Zones: Technology for work zone management North Carolina Department of Transportation STAY ALERT Work Zone MAKING WORK ZONES WORK BETTER

Current SMARTZONE DeploymentsCurrent SMARTZONE Deployments

I-95I-95

I-95I-95

Near Kenly (MP 107)Near Kenly (MP 107)Contract Cost = $178,850Contract Cost = $178,850

I-85I-85

Near Charlotte (MP 29)Near Charlotte (MP 29)Contract Cost = $75K +/Contract Cost = $75K +/

Near Rocky Mt. (MP 145) Near Rocky Mt. (MP 145) Contract Cost = $264,500Contract Cost = $264,500

Near Fayetteville (MP 58) Near Fayetteville (MP 58) Contract Cost = $235,000Contract Cost = $235,000

Near Four Oaks (MP 87)Near Four Oaks (MP 87)Contract Cost = $247,600Contract Cost = $247,600

Scientex Corp.Scientex Corp. International Road Dynamics (IRD)International Road Dynamics (IRD)

PDP AssociatesPDP Associates

Highway Highway Information Information Systems (HIS)Systems (HIS)

International Road Dynamics International Road Dynamics (IRD)(IRD)

Page 17: SMART Work Zones: Technology for work zone management North Carolina Department of Transportation STAY ALERT Work Zone MAKING WORK ZONES WORK BETTER

SMARTZONE EQUIPMENT

Page 18: SMART Work Zones: Technology for work zone management North Carolina Department of Transportation STAY ALERT Work Zone MAKING WORK ZONES WORK BETTER

Fayetteville Project Website Fayetteville Project Website www.i95fayetteville.comwww.i95fayetteville.com

Page 19: SMART Work Zones: Technology for work zone management North Carolina Department of Transportation STAY ALERT Work Zone MAKING WORK ZONES WORK BETTER

I-95 Johnston County SMARTZONE https://tm100.irdinc.com/nci95johnston/public

Page 20: SMART Work Zones: Technology for work zone management North Carolina Department of Transportation STAY ALERT Work Zone MAKING WORK ZONES WORK BETTER

Website- System Status PageWebsite- System Status Page

Page 21: SMART Work Zones: Technology for work zone management North Carolina Department of Transportation STAY ALERT Work Zone MAKING WORK ZONES WORK BETTER

REAL TIME INFORMATION- REAL TIME INFORMATION- “Standby” Mode“Standby” Mode

Page 22: SMART Work Zones: Technology for work zone management North Carolina Department of Transportation STAY ALERT Work Zone MAKING WORK ZONES WORK BETTER

REAL TIME INFORMATION- REAL TIME INFORMATION- “Standby” Mode “Standby” Mode

Page 23: SMART Work Zones: Technology for work zone management North Carolina Department of Transportation STAY ALERT Work Zone MAKING WORK ZONES WORK BETTER

REAL TIME INFORMATION- REAL TIME INFORMATION- “Standby” Mode “Standby” Mode

Page 24: SMART Work Zones: Technology for work zone management North Carolina Department of Transportation STAY ALERT Work Zone MAKING WORK ZONES WORK BETTER

REAL TIME INFORMATIONREAL TIME INFORMATION Less than a 5 minute delay

Page 25: SMART Work Zones: Technology for work zone management North Carolina Department of Transportation STAY ALERT Work Zone MAKING WORK ZONES WORK BETTER

REAL TIME INFORMATION- REAL TIME INFORMATION- Delays exceeding 5 minutesDelays exceeding 5 minutes

12 MIN.12 MIN.

DELAY DELAY

AHEADAHEAD

Page 26: SMART Work Zones: Technology for work zone management North Carolina Department of Transportation STAY ALERT Work Zone MAKING WORK ZONES WORK BETTER

REAL TIME INFORMATION- REAL TIME INFORMATION- ‘Day and Time Stamp’‘Day and Time Stamp’

JULY 16JULY 16

2:21 PM2:21 PM

Page 27: SMART Work Zones: Technology for work zone management North Carolina Department of Transportation STAY ALERT Work Zone MAKING WORK ZONES WORK BETTER

REAL TIME INFORMATION- REAL TIME INFORMATION- Delays exceeding 10 minutes w/ alternate Delays exceeding 10 minutes w/ alternate

routeroute

ALT.ALT.

ROUTE ROUTE

EXIT 65EXIT 65

Page 28: SMART Work Zones: Technology for work zone management North Carolina Department of Transportation STAY ALERT Work Zone MAKING WORK ZONES WORK BETTER

REAL TIME INFORMATIONREAL TIME INFORMATION No Alternate Route Available

Page 29: SMART Work Zones: Technology for work zone management North Carolina Department of Transportation STAY ALERT Work Zone MAKING WORK ZONES WORK BETTER

REAL TIME INFORMATIONREAL TIME INFORMATION

Page 30: SMART Work Zones: Technology for work zone management North Carolina Department of Transportation STAY ALERT Work Zone MAKING WORK ZONES WORK BETTER

Real Time Information- “No Alternate Route Available”

Page 31: SMART Work Zones: Technology for work zone management North Carolina Department of Transportation STAY ALERT Work Zone MAKING WORK ZONES WORK BETTER

Project construction staff have reported much better Project construction staff have reported much better traffic flow and fewer crashes. No fatalities have been traffic flow and fewer crashes. No fatalities have been recordedrecorded

A research proposal is underway to document and report A research proposal is underway to document and report on the effectiveness of the current deployments. This report on the effectiveness of the current deployments. This report will be completed in the summer of 2004 will be completed in the summer of 2004

A lot of positive response from media and professional A lot of positive response from media and professional agenciesagencies

I-95 SMARTZONE Results

Delay information is accurate according to project Delay information is accurate according to project

inspectorsinspectors

Some utilization of alternate routesSome utilization of alternate routes

Page 32: SMART Work Zones: Technology for work zone management North Carolina Department of Transportation STAY ALERT Work Zone MAKING WORK ZONES WORK BETTER

Traffic warnings make I-95 cool

By VICKI HYMAN

Until now, I've never found cause to string together the words "North Carolina Department of Transportation" with "cool."

The state has installed its first "smart work zone" on Interstate 95 outside Fayetteville, equipping the highway with sensors to detect speed, calculate traffic conditions and relay real time information to electronic message boards and a Web site.

I'm not talking messages like "Delays Ahead" or "Expect Congestion" that you might see on I-40 around rush hour. With all due respect to the technicians who spend hours monitoring traffic conditions via live feeds from cameras posted along the highway, let me just say, "No duh."

The messages posted on I-95 can tell drivers, to the minute, how long a delay to expect. Once the delay reaches 10 minutes, the electronic message boards offer alternate route information. The state has placed the message boards far enough ahead of the backups to give drivers a way out before they actually hit the traffic.

On the Web site, http://www.I95fayetteville.com, you can even view how fast traffic is moving through the work zone.

News and Observer ArticleNews and Observer ArticleJuly 2, 2002July 2, 2002

Page 33: SMART Work Zones: Technology for work zone management North Carolina Department of Transportation STAY ALERT Work Zone MAKING WORK ZONES WORK BETTER

I-85 Hydroplane System

Page 34: SMART Work Zones: Technology for work zone management North Carolina Department of Transportation STAY ALERT Work Zone MAKING WORK ZONES WORK BETTER

I-95 SMARTZONE Problems

Downtime due to equipment malfunction Downtime due to equipment malfunction primarily caused by lightening strikesprimarily caused by lightening strikes

Communication problems with cameras. Communication problems with cameras.

Availability of speed, volume and video Availability of speed, volume and video informationinformation

Under-powered camera/sensor equipmentUnder-powered camera/sensor equipment

Downtime due to communication disruptionDowntime due to communication disruption

Page 35: SMART Work Zones: Technology for work zone management North Carolina Department of Transportation STAY ALERT Work Zone MAKING WORK ZONES WORK BETTER

Future ChangesFuture ChangesUtilize “on-site” technicianUtilize “on-site” technician

Improve Departments access to speed, volume and Improve Departments access to speed, volume and video information via the websitevideo information via the website

Utilize pay reduction for system downtimeUtilize pay reduction for system downtime

Have system notify (via Page, email, cell Have system notify (via Page, email, cell phone) appropriate personnel if a phone) appropriate personnel if a malfunctions occursmalfunctions occurs

Improve messages on CMS’s to enhance Improve messages on CMS’s to enhance ridership on the Alternate Routesridership on the Alternate Routes

Page 36: SMART Work Zones: Technology for work zone management North Carolina Department of Transportation STAY ALERT Work Zone MAKING WORK ZONES WORK BETTER

So far….what we think we know

1) SMARTZONES “AIN’T” a substitute for 1) SMARTZONES “AIN’T” a substitute for sound traffic engineeringsound traffic engineering

SMARTZONES work well on rural interstates with SMARTZONES work well on rural interstates with AADT’s up to 55,000 with available alternate routes. AADT’s up to 55,000 with available alternate routes. Interstate Rehabilitation Projects are ideal!Interstate Rehabilitation Projects are ideal!….primarily due to their high frequency of lane closure….primarily due to their high frequency of lane closure

(continued next page)(continued next page)

2) Need to understand what you want the 2) Need to understand what you want the system to do before you let a contractsystem to do before you let a contract

Guidelines for applicationGuidelines for application

Page 37: SMART Work Zones: Technology for work zone management North Carolina Department of Transportation STAY ALERT Work Zone MAKING WORK ZONES WORK BETTER

Guidelines Continued

SMARTZONES may have limited applications on high SMARTZONES may have limited applications on high volume roadways (above 65,000) with few reasonable volume roadways (above 65,000) with few reasonable alternate routes. However, if reoccurring congestion is a alternate routes. However, if reoccurring congestion is a problem, the technology could provide real time, delay problem, the technology could provide real time, delay information in lieu of congestion mitigation.information in lieu of congestion mitigation.

SMARTZONES may have applications on roadways with SMARTZONES may have applications on roadways with higher AADT’s (55,000 to 65,000) where we traditionally higher AADT’s (55,000 to 65,000) where we traditionally restrict lane closures to nightly activity. restrict lane closures to nightly activity.

You may look at using the SMARTZONE technology to You may look at using the SMARTZONE technology to mitigate the congestion during non-peak hour flow. Use mitigate the congestion during non-peak hour flow. Use traditional lane closure restrictions for peak hour.traditional lane closure restrictions for peak hour.

SMARTZONES can also be used for more traditional SMARTZONES can also be used for more traditional problems such as speeding and site condition problems problems such as speeding and site condition problems such as hydroplaning and/or severe alignment concerns.such as hydroplaning and/or severe alignment concerns.

Page 38: SMART Work Zones: Technology for work zone management North Carolina Department of Transportation STAY ALERT Work Zone MAKING WORK ZONES WORK BETTER

SMARTZONE EVOLUTION... What have we done and where do we go

from here?• Fayetteville project is redeployed and will remain active Fayetteville project is redeployed and will remain active thru the Fall of 2003. Access to the site at thru the Fall of 2003. Access to the site at www.i95fayetteville.com www.i95fayetteville.com

• Have 2 other contracts let on I-95 that are deployed. 1 of Have 2 other contracts let on I-95 that are deployed. 1 of these incorporatesthese incorporates moving alternate route locations! moving alternate route locations! These These deployments can be accessed from the following websites: deployments can be accessed from the following websites: https://tm100.irdinc.com/nci95nash/public https://tm100.irdinc.com/nci95nash/public https://tm100.irdinc.com/nci95johnston/publichttps://tm100.irdinc.com/nci95johnston/public

• The 4th deployment is just underway in Johnston County The 4th deployment is just underway in Johnston County near the Four Oaks interchange (MP 87)near the Four Oaks interchange (MP 87)

•Using this technology to help hydroplaning issues on I-85 Using this technology to help hydroplaning issues on I-85 outside of Charlotte (MP 29)outside of Charlotte (MP 29)

Page 39: SMART Work Zones: Technology for work zone management North Carolina Department of Transportation STAY ALERT Work Zone MAKING WORK ZONES WORK BETTER

SMARTZONES- The SMARTZONES- The technology for workzone technology for workzone

managementmanagement

Questions/Comments?Questions/Comments?