Smart Community in JapanKitakyushu Demonstration Project

5th March, 2015Fuji Electric Co., Ltd.

0

Page 2: Smart Community in Japan - NEDO · Role of smart meter With the smart meter, CEMS performs automated meter reading. In order to stabilize loads and balance supply and demand, the

© Fuji Electric Co., Ltd. All rights reserved.

Fuji Electric is Lead Manager of Kitakyushu Smart Community Project owned by METI Fuji Electric provides CEMS, FEMS, BEMS, and REMS for this demonstration.

Controlled Object: Power System

Controlled Object: Demand-Side

HEM

S

Multiple C

onsumer:

CEM

S, BEM

S, FEMS

Keihanna City✔for Residential Estate✔HEMS (Home EMS)

Yokohama City✔for Multiple of Power Consumer✔Comprehensive and Systematic Energy

Management (CEMS)✔Regional Heat Utilization

Toyota City✔for Residential Estate✔HEMS (Home EMS)✔Change of Existing Traffic System

Kitakyushu City✔for Multiple of Power Consumer✔CEMS, BEMS, FEMS, REMS (Retail EMS)

✔Variable Electricity Tall on Demand, Accommodation of Power

Smart Community Demonstrationsin Japan by METI

1

Page 3: Smart Community in Japan - NEDO · Role of smart meter With the smart meter, CEMS performs automated meter reading. In order to stabilize loads and balance supply and demand, the

© Fuji Electric Co., Ltd. All rights reserved.

Kitakyushu Smart Community Creation Project1. Implementation body

Kitakyushu Smart Community Council(Kitakyushu and about 70 companies / organizations)

2. Area of implementationHigashida district, Yahata-Higashi area(Approximately 1.2 km2 )

3. Period of implementationFY2010 – FY2014 (5 years)

4. Project scale38 projects15 billion yen(USD 150M)

2

Page 4: Smart Community in Japan - NEDO · Role of smart meter With the smart meter, CEMS performs automated meter reading. In order to stabilize loads and balance supply and demand, the

© Fuji Electric Co., Ltd. All rights reserved.

Linkage and coordinationwith large-scale system

・Power quality management・Stabilization of new energy output・Protection equipment of

Power system interconnection

Community Energy Management System

(CEMS)

Participation of Consumers

・Home or building EMS(energy managementsystem)

・Smart metering・Demand response

Large-scale power system

Consumers

Wind PV

Local Power Generation

Fuel cells(Hydrogen)

Generation using waste heat

Power storage system

Features of Kitakyushu Smart Community Project

3

Page 5: Smart Community in Japan - NEDO · Role of smart meter With the smart meter, CEMS performs automated meter reading. In order to stabilize loads and balance supply and demand, the

© Fuji Electric Co., Ltd. All rights reserved.

Features of Kitakyushu Smart Community ProjectRegional supply from the power source

independent from large-scale power system (New Asian city type smart grid)

Practical use of unused energy including factory waste heat

Use of hydrogen energy (Kitakyushu Hydrogen Town)

Regional energy management system that users take part in

Verification of smart metering and demand response

4

Page 6: Smart Community in Japan - NEDO · Role of smart meter With the smart meter, CEMS performs automated meter reading. In order to stabilize loads and balance supply and demand, the

© Fuji Electric Co., Ltd. All rights reserved.

Optimized Use of Local Energy and Demand Response

5

Factories

Community-installedStorage batteries

Buildings

Cogeneration

ConsumersSmartmeter

Concentrator

Energy Management System

CEMS

Load

AirLight

BEMS

Heat storage

- +

Generate

PCS

FEMS

Load Generate

Air

Light

Load

AirLight

Heat storage Generate

Operation Planning and Adjustment Dynamic Pricing /Incentive Program

Load control Charge and discharge control

Power Generate Plan

Dynamic Price request

Heart

By-product hydrogen

Generation control

CEMS makes the optimized plan for supply and demand of electric power, heat and gas (hydrogen).In case of supply-demand imbalance, supply-demand adjustment or demand response will be implemented via each EMS.

Load control Charge and discharge control

Charge and discharge controlPower

Generation Facilities

PCS

- +

PCS

PCS PCS

- +

PCS

Optimized planning of supply and demand

Page 7: Smart Community in Japan - NEDO · Role of smart meter With the smart meter, CEMS performs automated meter reading. In order to stabilize loads and balance supply and demand, the

© Fuji Electric Co., Ltd. All rights reserved.

f

New energy systems (soar and wind power) are not stable. Variation in electric power generated by the new energy systems cause the supply and demand imbalance. Demand for new energy is increasing significantly. A reverse power flow poses the voltage rise problem. CEMS plays a key role in solving these problems.

◆Key features- Prediction of power generated by new energy

(PV and Wind Turbine Generator)- Optimized planning and control of supply and demand, and

frequency control by utilization of storage batteries.- Demand response service for balancing the load - Smart meters for consumers

CEMS (Community Energy Management System)

6

◆Extendibility- Multi-languages

(Japanese, English and Chinese)- Control several regions by a single system- All in one package

Page 8: Smart Community in Japan - NEDO · Role of smart meter With the smart meter, CEMS performs automated meter reading. In order to stabilize loads and balance supply and demand, the

© Fuji Electric Co., Ltd. All rights reserved.

Community Installed Storage Battery

7

◆ Role of smart PCSSmart PCS plays a key role in controlling fluctuation of frequency and voltage caused by increased electric power generation byrenewable energy

CEMS

スマートPCSPLCPLC

Smart PCS

Rechargeable battery operation control system Rechargeable battery operation control system

CustomersCustomers

PLC

New lead acid batteries and lithium ion batteries

Electric power generation equipment

New energy equipment for generating electric power

Stand-alone operation system

FC PV Loads

◆ Advantageous functions● Communicating with EMS, stabilizing loads by two-way

communication and providing reserved capacity in an emergency● Reducing instantaneous frequency variations by high-speed

frequency control● Governor-free function● Controlling voltage by reactive power● Stand-alone operation with variable frequency control

Power-conditioningsystemPower-conditioningsystem

Page 9: Smart Community in Japan - NEDO · Role of smart meter With the smart meter, CEMS performs automated meter reading. In order to stabilize loads and balance supply and demand, the

© Fuji Electric Co., Ltd. All rights reserved.

Fuel Cell Pure-hydrogen gas-fed

8

Type Pure-hydrogen gas-fed

Rated output power AC 105kW

Output voltage / frequency 210V or 220V/50Hz or 60Hz

Electrical efficiency 48% [LHV]

Total efficiency99% [LHV],113kW[When 60 deg C water is used]If 90 deg C water is used, then 68kW

Exhaust gas NOx, SOx, dust:None

Consumption of fuel 74m3/h (Normal)

Volume W x L x H 2.2m (W) x 5.6m(L) x 3.4m(H)

Weight 14 tons

Page 10: Smart Community in Japan - NEDO · Role of smart meter With the smart meter, CEMS performs automated meter reading. In order to stabilize loads and balance supply and demand, the

© Fuji Electric Co., Ltd. All rights reserved.

Smart Meters for Demand Response

9

◆ Advantageous functions● Wireless bilateral communication with the home display● DR and DP information on the home display● Customers can see watt-hours usage, which will prompt them to

save energy.● 30-minute watt-hours and data for 44 days● Controlling electric power supply in an emergency● Amendment of electric power contract by service breaker

function

◆ Role of smart meterWith the smart meter, CEMS performs automated meter reading. In order to stabilize loads and balance supply and demand, the smart meter provides CEMS's request for demand response, and also shows watt-hour usage.

Smart Meter

wireless mesh network

Concentrator

Ethernet

Home Display

WiFi

Community energy management system (CEMS)

Page 11: Smart Community in Japan - NEDO · Role of smart meter With the smart meter, CEMS performs automated meter reading. In order to stabilize loads and balance supply and demand, the

© Fuji Electric Co., Ltd. All rights reserved.

Forecast of demand/supply and renewable power generation

The screen of demand forecast resultsYou can switch results of Demand forecast of whole community and each consumer. Forecast results of several methods are displayed, and operators can select the best method.オンライン登録Control

運用計画作成

Prior Check

Calculation ofDynamic pricingIncentive Program

Generation planning

Forecast ofdemand/supply and renewable power

Receive ofBEMS/HEMSoperation plan

Receive of weather data

Operation plan adjustment

Re-Forecastbased on operation plan

Generation planning

Online registration

Weather information

Demand forecast

Example of CEMS Screen

10

Page 12: Smart Community in Japan - NEDO · Role of smart meter With the smart meter, CEMS performs automated meter reading. In order to stabilize loads and balance supply and demand, the

© Fuji Electric Co., Ltd. All rights reserved.

オンライン登録Control

運用計画作成

Prior Check

Calculation ofDynamic pricingIncentive Program

Generation planning

Forecast ofdemand/supply and renewable power

Receive ofBEMS/HEMSoperation plan

Receive of weather data

Operation plan adjustment

Re-Forecastbased on operation plan

Generation planning

Online registration

Example of CEMS Screen

11

Generation planning

The screen for calculation results of power generation planGraphs of demand forecast, renewable energy generation prediction, and operation plan of generators and batteries are displayed.

Generation

Renewable energy

Battery

Demand & SupplyDemand by

BEMS

Page 13: Smart Community in Japan - NEDO · Role of smart meter With the smart meter, CEMS performs automated meter reading. In order to stabilize loads and balance supply and demand, the

© Fuji Electric Co., Ltd. All rights reserved.

Smart Grid Project with City of Kitakyushu

12

City of Kitakyushu Smart Community

India: Panipat Smart Grid

Vietnam: HaiPhong Industrial Estate

Thailand: PrachinBuri Industrial Park

Malaysia: Iskandar urban development

Indonesia: Surabaya Industrial Estate

Indonesia: Suryacipta Industrial Estate

Myanmar: Dawei complex development

Indonesia: South Tangerangurban development

Kitakyushu Asian Center for Low Carbon Society

Andhra Pradesh

Page 14: Smart Community in Japan - NEDO · Role of smart meter With the smart meter, CEMS performs automated meter reading. In order to stabilize loads and balance supply and demand, the

© Fuji Electric Co., Ltd. All rights reserved.

Panipat City, Haryana State, India

13

Panipat

Chandigarh

New Delhi

City Subdivision of PanipatPeek Demand : 42MVAFeeders : 8DTs : 539AT&C Losses : 23.15%Consumers : 31,623

UHBVN(Uttar Haryana Bijli Vitran Nigam)

90km

Page 15: Smart Community in Japan - NEDO · Role of smart meter With the smart meter, CEMS performs automated meter reading. In order to stabilize loads and balance supply and demand, the

© Fuji Electric Co., Ltd. All rights reserved.

Challenge of India Power Distribution Companies

14

[Challenge]1. Outage Management2. Peak Load Management3. Smart Meters

Page 16: Smart Community in Japan - NEDO · Role of smart meter With the smart meter, CEMS performs automated meter reading. In order to stabilize loads and balance supply and demand, the

© Fuji Electric Co., Ltd. All rights reserved.

CEMS ( Cluster Energy Management System )

Recharging System of CommunityInstallation Type ( Smart PCS )

Energy Management Systems for Smart Capital of AP State

15

Monitoring Equipment for BEMS

Electrical diagrams

Step1BEMS Preparation

Step2.1BEMS Visualization

Step2.2CEMS Preparation

Step3CEMS Visualization

Step4Battery Information

Page 17: Smart Community in Japan - NEDO · Role of smart meter With the smart meter, CEMS performs automated meter reading. In order to stabilize loads and balance supply and demand, the

© Fuji Electric Co., Ltd. All rights reserved.

Proposed Implementation steps

16

Fuji Electricpreparation

Andhra Pradesh Statepreparation Remarks

Kick-offApr.2015

Project StructureSystem Diagram

Target Area (city)Target Building

DemonstrationProject Definition

Step 1May.2015

BEMS preparationMonitoring Equipment

Electricity DiagramsEquipment Setting

Building DetailInformation

Step 2Jun.2015

BEMS VisualizationCEMS preparation

Demand/Supply dataPV/Wind firm data

Basic Informationfor CEMS

Step 3Jul.2015

CEMS simulation Weather / Weather Forecast Information

EMS related Information

Step 4Aug.2015

Battery Information PV/Wind Firm Future Direction

Cost issuesFinance

Step 5Sep.2015

Draft Proposal for Smart Capital/City/Community

Next step

Page 18: Smart Community in Japan - NEDO · Role of smart meter With the smart meter, CEMS performs automated meter reading. In order to stabilize loads and balance supply and demand, the

© Fuji Electric Co., Ltd. All rights reserved.

Patalganga Industrial Park, Maharashtra State Utilizing water resource more effectively and improving water

environment of the surrounding areas through establishment of water recycling system within CETPs (Common Effluent Treatment Plant) in India

Supplying recycled water at an affordable price than ever before by use of technology for reducing water desalination cost such as extension of maximum life-span of RO membrane, reduction of operating pressure, increase of hydraulic permeability

17Biologicaltreatment

SolidsRemoval

Filtration treatment by RO membrane CETP Effluent

Recycled Water(For industrial use)

Biological treatmentDissolving organic sludge by bacteria which has higher ability than the conventional bacteria in biological reactor.

Solids removalRemoving solids (organic/inorganic) by MF/UF membrane filtration, sand filtration.

Filtration treatment by RO membraneRemoving salt, metallic ion by using RO membrane and produce recycled water for industrial use.

Factory

Water lost through evaporation/production

After establishment of water recycling system

Water Manufacturing

Water RecyclingSystem

Reused as industrial water

Industrial water Factory EffluentCETP Effluent

CETP

Page 19: Smart Community in Japan - NEDO · Role of smart meter With the smart meter, CEMS performs automated meter reading. In order to stabilize loads and balance supply and demand, the

© Fuji Electric Co., Ltd. All rights reserved.

Fuji Electric Project in INDIA

18

Smart Grid in Panipat, Haryana State

Water Recycling System, Maharashtra State

Energy Management System,Andhra Pradesh State