Small Scale Distributed Generation in Brazil
Rio de Janeiro – RJ4/9/2015
Davi Rabelo Viana LeiteAgência Nacional de Energia
Elétrica – ANEEL
Up to ≤1MW
Wind
PV
HydroCogenaretion
Biomass
Generation register done
by DNO
Simplified connection contracts
Net metering
Simplified connection procedures
2
Small Scale Distributed Generation
3
Small Scale Distributed Generation
Hydro CHP Biomass
Any retail consumer of DNO with renewable generation withpeak capacity output of 1 MW or less is eligible.
Only the net monthly consumption is billed plus a minimumpayment (for demand). Credits expires in 36 months.
Consumers may use their credits on others units of their own –stores, houses, etc.
To participate, consumers must apply and receive approval tohave their system interconnected to the DNO grid.
The meter keeps track of how much electricity is consumed andhow much excess electricity is generated by the system and sentback into the electric utility grid.
There is no purchase or electricity selling.
Small Scale Distributed Generation
Actual Situation
0
100
200
300
400
500
600
700
800
900
Beforedec/12
jan-mar/13 apr-jun/13 jul-sep/13 oct-dec/13 jan-mar/14 apr-jun/14 jul-sept/14 oct-dec/14 jan-mar/15 apr/15 -jun/15
jul/15
3 8 1743 75
122189
293
420
546
732821
Consumers with small scale DG
Actual Situation
0
100
200
300
400
500
600
700
800
900
PV Biogas Biomass Wind Hydro PV/Wind TOTAL
774
5 1 28 1 12
821
Units
Energy source
Actual Situation
-
2.000
4.000
6.000
8.000
10.000
12.000
PV Biogas Biomass Wind Hydro PV/Wind TOTAL
8.151
838 1.000 98 825
250
11.162
kW
Installed Power
Actual Situation
16%
72%
2%
2%1%
7%
Division by consumers class
CommercialResidentialIndustrialGovernmentRuralHight voltage
Actual Situation
6%
42%
25%
13%
11% 1%1%0,4%
Power range (kW)
13510501005001000
Actual Situation
0
20
40
60
80
100
120
140
Cem
igCo
elce
Cele
scEn
ersu
lCo
pel
Aes S
ulCo
elba
Light
Cose
rnAm
pla
CPFL
Celp
eCE
BCe
mar
Ener
gisa
PB
CEEE
CPFL
Pira
tinin
gaEs
celsa
Elet
ropa
ulo
RGE
Cert
elBa
ndei
rant
eCe
lgEl
ektr
oCe
ltins
Eflu
lCe
lpa
Cetr
ilAm
azon
asCe
bran
orte
Ceja
ma
Cem
atUH
ENPA
LCa
iuá
Ceal
Cerc
iCe
rmof
ulCe
ron
CFLO
CNEE
Coce
lCo
oper
coca
lCP
FL S
ul P
aulis
taEB
OED
EVP
137
84
58 57 53 50
39 37 35 34 33 31
16 16 14 14 12 12 10 10 8 8 7 6 6 4 3 3 2 2 2 2 2 1 1 1 1 1 1 1 1 1 1 1 1
Connections per utilities
Public Policy and other initiatives
National production
Import parts
Funding sources
Federal and state taxes
11
DG main barriers in Brazil
What ANEEL is doing about: Taxes
REN 482/2012• The electricity injected on the grid is a kind of a loan from the
consumer to the DNO.
ICMS Agreement # 6/2013• ICMS (state sales tax) is charged over all consumption, not only over
the net consumption.• This reduces the economic viability of small scale DG.
ANEEL participated in meetings, performed studies,made contributions for a new agreement.
ICMS Agreements # 16 /2015, 44/2015 e 52/2015• Allow SP, PE, GO, RN, CE e TO to charge ICMS only over the net
consumption. MG does it already for the 5 first years after installation(State Law 20.824/2013).
• Revoked ICMS Agreement # 6/2013.
Portaria Inmetro nº 357/2014
Portaria Inmetro nº 240/2015
Portaria Inmetro nº 271/2015
PRODIST – Módulo 3
Ofício Circular n° 18/2015-SRD/ANEEL
Allow national and international certification.
The inverters should de certificated by Inmetro from February/2015.
Inmetro Public Hearting to extend the deadline until March/2016.
Authorizes new labs to certificate and suspend the deadline.
Directs that the DNO must accept national and international certification.
What ANEEL is doing about: Inverter certification
Brochure
An overview about the connection procedures for small scale DG and net metering system.
http://www.aneel.gov.br/biblioteca/EdicaoLivros2014cadernotematicomicroeminigeracao.cfm
Advertising actions
Small Scale DG Workshop, held on April/2014, in Brasília-DF.
Evaluate the evolution of small scale DG in Brazil after REN 482/2012 and identify the main improvements needed.
Slides and videos available on:http://www.aneel.gov.br/hotsite/mmgd/index.cfm
Advertising actions
Perspectives for small scale DG
DG is getting cheaper
Electricity tariffs are increasing
Consistent regulatory framework
The economic attractiveness is
increasing
Public Hearing 26/2015: amendment in the REN 482/2012 and PRODIST.
• We received 676 contributions from 110 agents: consumers,associations, banks, DNO, generators, manufacturer, universities,consultants, NGO.
• Documents available on PH 26/2015 website:http://www.aneel.gov.br/aplicacoes/audiencia/dspListaDetalhe.cfm?attAnoAud=2015&attIdeFasAud=971&id_area=13&attAnoFasAud=2015
Perspectives for small scale DG
PH 026/2015
Objectives:
• Reduce costs e time to small scale GD connection;
• Elucidate rights and obligations of consumers with DG;
• Increase the scope; and
• Improve information on the bill.
PH 026/2015 - Proposal
• Extend net metering for any renewable source or cogeneration.
• Extend net metering to the power of generation up to 3 MW for hydro and 5 MW for other sources.
• Allow net metering for different consumers in contiguous area (residential and commercial condominiums)
• Not charge the cost of meter change.
• Standardize forms in order do simplify the information and documents the consumers should present to the DNO.
• Reduce the maximum time to connection: from 82 days (actual) to 43 days.
Some contributions were related to:
• Sale the excess electricity
• ICMS• Inverters certification• Founding sources for DG
PH 026/2015
- Other REN object (not REN 482/12).- Only on the free market.
- It is not competence of ANEEL- But we are working...
Perspectives for small scale DG
Projeções 2015-2024
Additional information
23
Resolução Normativa nº 482/2012
PRODIST – Módulo 3 – Seção 3.7
FAC
Solar Guide (América do Sol)
Wind Guide (Instituto Ideal)
Seminário de Micro e Minigeração
Generation Databank
Muito Obrigado!