Slough IntErnAtIonAl FrEIght ExChAngE | design & access statement

60

9. LaYoUt

22.84IC22.84IC

31.53MH

31.45MH

22.07MH

20.84MH

22.75MH

30.60MH

28.38MH

22.85MH

102

147

149

149A

149B

149C

149D

149E

149F

149G

150E

150F

150G

56

57

58

300mm DIA SEWAGE PIPE

APPROXIMATE POSITIONOF DISUSED SEWAGE PIPE

UNIT A

UNIT B

UNIT C

N

WB

ETL

ETL

ETL

Col

ne

Drain

Drain

Water

Water

Water

Dra

in

Water

Water

Water

Drain

Drain

Pond

Drain

Drain

Colne Bro

ok

Pond

Slope

Slope

Slope

Slope

Slope

Slope

Slope

Slope

Slope

Slope

Slope

Slope

Slope

Slope

Slope

Slope

Slope

Slope

Slope

Slope

Slope

Slope

Slope

Slope

M 4

M 4

M 4

COLNBROOK BY-PASS

M 4

BY-PASS

WAYVICARAGE

A 4

COLNBROOK

Conif

Nc_sc

Lakeside

8

6 to 7

5

1

Estate

Pump House

75

Tank

(PH)

Greyhound

The

El

Sub Sta

Lakeside

Estate

TheBungalow

2

3

The King's

House

71

to

49

83

to

115

97

179

169

187

213

201189

104

106

78

80

6462

149

151

153

157

159

167

161

165

Farm

Speedway

12

New Cottages

Strathmore

Marita

Moor

Lodge

Gresham

Cottage

Hall

Lych

Gate

Church

St Thomas'

The

Vicarage

HouseOld

Schoo

l

to

145

147

131

129119

117

85 to 95

73

1 to 47

The Phippins

El Sub Sta

El Sub Sta

Tanks

Trac

k

Gantry

MP

Landfill Site

Gantry

SP

Trac

k

(disu

sed)

Railw

ay

Sub Sta

El

Sub Sta

El

Path (um)

Gantry

Sewage Works

Iver South

Sludge Bed

21.7m

Path

(um

)

Path

22.3m

Sta

Sub

El

WB

Landfill Site

(disu

sed)

BM

22.50m

21.5m

Railw

ay

Trac

k

Tanks

WB

22.6mBM 23.54m

Sludge Bed

Sludge Bed

Iver South Sewage Works

Sludge Bed

Sludge Bed

Sludge Bed

Footbridge

Path

Golf Course

GAP-FILLERGAP-FILLERGAP-FILLERGAP-FILLERGAP-FILLER

Home Wood

Oak Plantation

Gantry

Golf Course

Oak Plantation

25.8m

Trac

k

Yard

Scrap

20.9m

BM 21.25mSta

Sub

El

Playing Field

Landfill Site

Sp

Sp

Sp

Sp

SpSpSp

Sp

Sp

Sp

Sp

Sp

Sp

Sp Sp

Sp

Sp

Sp

Sp

Sp Sp

Sp

Sp

Sp

Sp

Sp

Sp

Sp

Sp Sp

Sp

Sp

Sp

Sp

Sp

Sp

Sp

Sp

Sp

39.91

48.92

48.93

44.71

41.59

42.71

33.47

33.48

31.84

31.87

39.80

39.38

39.51

43.61

44.86

46.35

47.79

52.90

49.85

51.99

53.46

50.70

50.73

52.16

53.48

40.35

39.44

38.83

38.25

52.47

40.26

38.23

38.69

39.40

30.33

30.79

37.95

38.05

36.31

35.21

30.41

30.88

32.94

36.45

39.71

32.82

36.42

39.69

30.23

31.39

39.91

41.65

44.74

42.77

40.89

40.77

48.93

44.71

39.51

32.32

34.07

37.33

42.33

48.68 51.97

42.23

37.34

34.14

32.38

30.05

30.65

31.27

31.39

31.08

51.98

43.61

44.86

46.35

47.79

49.85

Overhead W

ire

Overhead W

ire

Overhead W

ire

Overhead W

ire

Overhead Wire

Overhead Wire

Overhead Wire

Overhead Wire

Overhead Wire

Overhead Wire

Overhead Wire

Overhead Wire

Overhead W

ire

Overhead Wire

G8

G9

G10

G6

G4

G13

G14

G19

G18

G17

G16

G3

G2

G1

G26

G27

G25

20.990

22.175

23.170

21.762

21.495

22.193

22.094

21.825

22.664

22.630

22.886

23.784

22.086

30.972

22.993

24.102

24.045

KEEPCLEAR

A

A

A

B

B

C

D

D

D

E

E

E

This drawing, the works and concepts depicted are copyright of Stephen George & Partners and may not be reproduced or made use of, either directly or indirectly without express written consent. Do not scale off this drawing. All heights, levels, sizes and dimensions to be checked on site before any work is put to hand.

Indicative Master Plan 8544-00-MP05ZSIFE

a B c d e

F

g

H

i

JK

L

m

H

n

o

Page 2: Slough IntErnAtIonAl FrEIght ExChAngE | design & access … › UserFiles › sife › 61_pdfsam... · 2017-03-10 · Slough IntErnAtIonAl FrEIght ExChAngE | design & access statement

design & access statement | Slough IntErnAtIonAl FrEIght ExChAngE

61

the overall development area is laid out to take into account the various

constraints and opportunities identified in the site analysis. the following

considerations have been incorporated in the overall layout:

Area Efficiency

each plot has been designed to make effective use of the given area with

the majority used for the building itself, while irregular areas of land have

been used for car parking and necessary drainage attenuation. this helps

to ensure efficient use of the site area, without wasting the valuable land

that surrounds the development.

the site layout has also been shaped by the technical engineering

requirements for the new railway infrastructure, which were identified at

the site analysis stage. the building plateaux are intrinsically linked to the

levels of the rail link, which in turn is determined by the height of the rail

connection in relation to the road over the m4 and the existing sidings.

Site Frontages

the frontages to the a4 and m4 have been addressed by setting new built

development well back and both retaining and providing significant

landscape buffers. consideration has also been given to limiting the visual

effect from these directions, and also from the colne Valley Way to the

east, by careful consideration of the juxtaposition of the buildings with the

parking and servicing areas.

the administration/ amenity zones are located on the elevations facing the

residential area of colnbook Village and together with the staff car

parking and structural landscaping will present a more appropriate scale

to address the public face of the site.

9. LaYoUt

a distribution Unit - 52,860sqm

B international Freight transfer Rail sidings cranes container storage

c distribution with rail siding - 64,020sqm

d distribution Unit with rail siding - 69,610sqm

e Long term HgV Parking

F the old Wood with enhanced footpath

g eFW incinerator

H enhanced colne Valley Way landscape & bridleway

i new Rail sidings

J education centre

K stormwater attenuation Lagoons

L new site entrance & exit

m new HgV entrance

n thames Water sewerage Farm

short term HgV Parkingo

Page 3: Slough IntErnAtIonAl FrEIght ExChAngE | design & access … › UserFiles › sife › 61_pdfsam... · 2017-03-10 · Slough IntErnAtIonAl FrEIght ExChAngE | design & access statement

Slough IntErnAtIonAl FrEIght ExChAngE | design & access statement

62

Car Parking

nearly 1,000 car parking spaces are to be provided giving roughly one

space per 200sqm internal area including 5% of the total parking capacity

dedicated to disabled spaces at the nearest point to the main office

entrances. in addition, secure and sheltered cycle parking will be provided

according to standards set out in slough Borough council’s transport and

Highway guidance and motorcycle parking according to guidance

produced by the motorcycle industry association.

inclusive access throughout the site is achieved, where applicable, with

1.8m wide paths leading pedestrians from the car parks to the main office

entrances. 1.5m wide cycle lanes will be provided from access routes to

the cycle shelters located near to the office main entrance. as far as

possible pedestrian and cycle routes will be segregated from routes used

by motorised vehicles.

Service Yards

the site layout provides the opportunity to position service yards as inward

facing within the development site to minimise their prominence. this in

turn keeps the softer landscape features and office elements to the

periphery of the site. Where service yard and parking areas face the

perimeter boundary, structural planting and bunding would be provided

as part of a landscaping zone helping to screen the surrounding area.

generally, the yards are set out with 50m depth to accommodate the full

turning circle of an HgV within the parking and circulation zones, while

allowing vehicles to carry on loading at the adjacent loading docks. they

are laid out so that drivers can employ the right hand down manoeuvre

when reversing into docks, as British registered; right hand drive vehicles

are much easier to park using this high level of visibility from the lorry cab.

all access to service yard areas would controlled by the control Point

gatehouse, to ensure that unauthorised access is not permitted. Public

access would be actively discouraged from service yard areas, with access

limited to trained competent members of staff only.

9. LaYoUt

Page 4: Slough IntErnAtIonAl FrEIght ExChAngE | design & access … › UserFiles › sife › 61_pdfsam... · 2017-03-10 · Slough IntErnAtIonAl FrEIght ExChAngE | design & access statement

design & access statement | Slough IntErnAtIonAl FrEIght ExChAngE

63

9. LaYoUt

Building orientation

the principle criteria for orientating the units has been the segregation of

circulation within the site of the operational functions from a health and

safety viewpoint. this minimises conflicts of pedestrian, vehicular and rail

functions.

Crime Prevention

as a rail operating facility, the site will be made safe and secure by

perimeter fencing to the recommended standards of network Rail. this

will include weldmesh fencing to all boundaries to a height of 2.8m.

access and egress to the site will be controlled by security gatehouses,

manned by representatives of the estate management security team

twenty four hours a day. the perimeter will also be monitored by a

comprehensive cctV installation backed up by security guard patrols.

Within the site, car parking has been arranged so that it is overlooked by

the office accommodation.

refuse and recycling Strategy

each of the buildings will be provided with a dedicated area for the

provision of refuse and re-cycling facilities that will be tailored to the final

users’ operational requirements. typically, this would include dedicated

skips and compactors located in the service yards. during the construction

phase, a waste management plan will be put into place that will aim to

avoid all unnecessary waste. the design will similarly address this issue

along with the specification of recyclable materials and components where

possible.

Page 5: Slough IntErnAtIonAl FrEIght ExChAngE | design & access … › UserFiles › sife › 61_pdfsam... · 2017-03-10 · Slough IntErnAtIonAl FrEIght ExChAngE | design & access statement
Page 6: Slough IntErnAtIonAl FrEIght ExChAngE | design & access … › UserFiles › sife › 61_pdfsam... · 2017-03-10 · Slough IntErnAtIonAl FrEIght ExChAngE | design & access statement

10. scale

Page 7: Slough IntErnAtIonAl FrEIght ExChAngE | design & access … › UserFiles › sife › 61_pdfsam... · 2017-03-10 · Slough IntErnAtIonAl FrEIght ExChAngE | design & access statement

Slough IntErnAtIonAl FrEIght ExChAngE | design & access statement

66

10. scaLe

Whilst the buildings proposed are generally of significant scale, the site

offers significant potential for this scale of development. By introducing

significant new landscaping zones within the site, the potential visual

effects would be carefully taken into account.

the site landscaping cross sections show the relationship of the proposals

under this application, in relation to existing ground levels, context and

adjacent buildings off-site. in particular, the cross sections demonstrate the

relationship between infrastructure roads and buildings.

the unit sizes and associated service yards are based around the

practicalities required with maximum servicing capacity along each

available elevation. as warehouse units, each building must accommodate

docking facilities for HgVs while maintaining a sensible viable solution for

external transport infrastructure.

this is best achieved with a ground floor ratio of 1:2 – 1:3, enabling the

long facades to house loading bays while also allowing a high level of

visibility along this potentially busy route.

the resultant building sizes are:

Unit ‘a’ 281 x 193m (LxW)

Unit ‘B’ 449 x 146.5m

Unit ‘c’ 305 x 234m

With +/- 2m lateral variations.

the clear internal height has been determined at 15 metres and the

proposed roof design would give a maximum ridge height of 18.5 metres.

this enables the accommodation of modern racking systems, product

handling equipment and high level sprinklers. Whilst this creates buildings

of substantial volume and mass, the design utilises several devices to

reduce the apparent scale. the overall impression of each building when

viewed from outside, belies the overall floor area, with the visual effect

being spread across the site minimising the sense of mass and scale. the

size of each unit has been limited to allow sufficient space, externally, for

parking, servicing and landscaping, ensuring that it does not overpower

the surrounding environment. the curved roof design solution also helps

to break up the scale of the buildings and would help to link the buildings

with the surrounding context.

Horizontally, spanning panels would be used on the elevations to reduce

the perceived height, and these would be broken up with contrasting

materials in panelled areas, in order to punctuate the length of the

facades. at low level, dock doors would add interest and definition to the

ground level loading and servicing area.

two 25m high gantry cranes will operate over the intermodal terminal

sidings, adjacent HgV roadways and the stack of stored intermodal units.

stored intermodal units will be of a variety of sizes, the most common

being deep-sea martime containers (length 6.1m/12.2m, height

2.59m/2.9m, width 2.44m), short sea pallet-wide containers (length

13.7m, height 2.9m, width 2.55m) and swap bodies (length 13.6m).

Page 8: Slough IntErnAtIonAl FrEIght ExChAngE | design & access … › UserFiles › sife › 61_pdfsam... · 2017-03-10 · Slough IntErnAtIonAl FrEIght ExChAngE | design & access statement

design & access statement | Slough IntErnAtIonAl FrEIght ExChAngE

67

10. scaLe

ETL

Drain

Water

Water

M 4

M 4

Gantry

Path (um)

Gantry

21.7m

Path

(um

)

Path

Footbridge

Unable to survey this areadue to dense vegetation.

Unable to survey fence linedue to dense vegetation. Boundary

taken from OS tile.

47.79

52.90

49.85

51.99

53.46

50.70

50.73

52.16

53.4852.47

47.79

49.85

Overhead W

ire

Overhead W

ire

503000E

503050E

503100E

503150E

503200E

503250E

503300E

503350E

503400E

503450E

503500E

503550E

503600E

503650E

503700E

503750E

503800E

503850E

503900E

503950E

504000E

504050E

504100E

504150E

504200E

504250E

504300E

504350E

WB

ETL

Water

Dra

in

Drain

Dra

in

Water

Drain

Drain

Drain

Colne Bro

ok

Pond

COLNBROOK BY-PASS

M 4

A 4

COLNBROOK BY-PASS

M 4

WALK

ST THOMAS

STRE

ET

BY-PASS

MILL

WAYVICARAGE

A 4

COLNBROOK

Lakeside

8

6 to 7

5

1

Estate

Pump House

Tank

(PH)

Greyhound

The

El

Sub Sta

Depot

Lakeside

Estate

257263

267

19

22

22 to

28

21

16

15

14

11

7

6

54

2

3

1Hall

Court

Sherwood

1 to 9

CottageN

ursery

The King's

House

36

to

26

48 to

71

to

49

83

to

115

97

8

179

169

187

213

201189

104

106

120

100

102

90

78

80

6462

52 50

149

151

153

157

159

167

161

165

House

4

Cottage

Jasmine

Farm

Speedway

Works

Works

House

Mill

Farm

TanhouseWheelwrights Place

2

4

53

1240

4442

46 HomesteadVillas

Festival Cottages

6

13

12

New Cottages

Cottage

StrathmoreMarita

Moor

Lodge

Gresham

Cottage

Hall

Lych

Gate

Church

St Thomas'

The

Vicarage

HouseOld

Schoo

l

The

Lodge

(PH

)

Ye O

lde

Geo

rge

Park

Hou

se

Cottages

Garden

Sanbrooke

Cottages

Barber

Harrison

3634

Derwent

House

The

Cottage

Han

sfor

d

Lizb

eth

Lund

y

Veny

an

Hur

ley

El F

ran

Chapel6

11

1

to

145

147

38

2 to

24

131

129119

117

85 to 95

73

1 to 47House

Pump

The Phippins

Bakery

Cottages

Belmont

Sunnyside

13

5

1

El Sub Sta

El Sub Sta

Tanks

MP

Gantry

SP

Trac

k

(disu

sed)

Railw

ay

Sub Sta

El

Sub Sta

El

Gantry

Sewage Works

Iver South

Sludge Bed

Sta

Sub

El

WB

Landfill Site

(disu

sed)BM

22.50m

21.5m

Railw

ay

Trac

k

Tanks

WB

22.6mBM 23.54m

Sludge Bed

Sludge Bed

Iver South Sewage Works

Sludge Bed

Sludge Bed

Sludge Bed

GAP-FILLERGAP-FILLERGAP-FILLERGAP-FILLERGAP-FILLER

Gantry

Sta

El Sub

Car Park

Trac

k

Yard

Scrap

Weir

FB

19.8m

TCB

BM 20.10m

20.9m

BM 21.25mSta

Sub

El

Playing Field

39.91

48.92

48.93

44.71

41.59

42.71

33.47

33.48

31.84

31.87

39.80

39.38

39.51

43.61

44.86

46.35

47.79

40.35

39.44

38.83

38.25

40.26

38.23

38.69

39.40

30.33

30.79

37.95

38.05

36.31

35.21

30.41

30.88

32.94

36.45

39.71

32.82

36.42

39.69

30.23

31.39

39.91

41.65

44.74

42.77

40.89

40.77

48.93

44.71

39.51

32.32

34.07

37.33

42.33

48.68 51.97

42.23

37.34

34.14

32.38

30.05

30.65

31.27

31.39

31.08

51.98

43.61

44.86

46.35

47.79

Overhead W

ire

Overhead W

ire

Overhead Wire

Overhead Wire

Overhead Wire

Overhead Wire

Overhead Wire

Overhead Wire

Overhead Wire

Overhead Wire

Overhead W

ire

Overhead Wire

502350E

502400E

502450E

502500E

502550E

502600E

502650E

502700E

502750E

502800E

502850E

502900E

502950E

503000E

503050E

503100E

503150E

503200E

503250E

503300E

503350E

503400E

503450E

503500E

503550E

503600E

503650E

503700E

503750E

503800E

503850E

503900E

503950E

504000E

504050E

504100E

504150E

504200E

504250E

504300E

504350E

Unit AFF Level - 24.00mMax. Ht - 42.30mAOD(H=18.3m)

Unit BFF Level - 25.26mMax. Ht - 43.56mAOD(H=18.3m)

Unit CFF Level - 25.26mMax. Ht - 43.56mAOD(H=18.3m)

This drawing, the works and concepts depicted are copyright of Stephen George & Partners and may not be reproduced or made use of, either directly or indirectly without express written consent. Do not scale off this drawing. All heights, levels, sizes and dimensions to be checked on site before any work is put to hand.

Scale: Building Plots, Positions & HeightsSIFE

Key:

Building Plot

Proposed Building Position

Maximum Ridge Heights(-2m. height variation)

Proposed Level meters aod

(H=18.3m)

Level

Building Size:

Plot A: 281 x 193m

Plot B: 449 x 146.5m

Plot C: 305 x 234m

(Length x width)+- 2m. lateral variation

BUiLding PLot, Positions & HeigHts