Slide No 1

R-APDRP Part -A

Karnataka

June 2015

Page 2: Slide No 1 R-APDRP Part -A Karnataka June 2015. Slide No 2 1. R-APDRP & Its Objectives RESTRUCTURED ACCELERATED POWER DEVELOPMENT & REFORMS PROGRAMME

Slide No 2

1. R-APDRP & Its Objectives

RESTRUCTURED ACCELERATED POWER DEVELOPMENT & REFORMS PROGRAMME (R-APDRP), KARNATAKA

► Ministry of Power, Govt. of India launched the R-APDRP in the XI Five year Plan

► Most ambitious initiative in power distribution sector taken by Ministry of Power; Rs 50000 Crore funded programme is Govt’s renewed attempt to revive power sector reforms

► Power Finance Corporation (PFC) designated as the Nodal Agency

Key Objectives of R-APDRP

► To reduce AT&C losses to 15% in project area across India in all states

► Actual, demonstrable performance in terms of loss reduction; Loss reduction targets at utility level

► Success factor: Establishment of reliable & automated systems for sustained collection of accurate base line data

► Adoption of IT in the areas of energy accounting

Page 3: Slide No 1 R-APDRP Part -A Karnataka June 2015. Slide No 2 1. R-APDRP & Its Objectives RESTRUCTURED ACCELERATED POWER DEVELOPMENT & REFORMS PROGRAMME

Slide No 3

2. R-APDRP - Phases & Value Proposition to DISCOMs

R-APDRP scheme has 2 phases – Part A & Part B

► Part-A - For establishment of baseline data & IT applications for energy accounting/auditing & better consumer services

► Part-B - System improvement, strengthening and augmentation etc.

Key Objectives of R-APDRP

► R- APDRP is distribution reforms program using Information Technology (IT)

► To baseline accurate data for energy flow in the power distribution system

► To take necessary measures for reducing technical & commercial losses

► To bring transparency & accountability in the system by use of IT

► Improved customer services in nearly monopolistic electricity distribution biz

► To prepare power sector for adoption of future technologies by bringing all the public power utilities on a level playing field

RESTRUCTURED ACCELERATED POWER DEVELOPMENT & REFORMS PROGRAMME (R-APDRP), KARNATAKA

Page 4: Slide No 1 R-APDRP Part -A Karnataka June 2015. Slide No 2 1. R-APDRP & Its Objectives RESTRUCTURED ACCELERATED POWER DEVELOPMENT & REFORMS PROGRAMME

Slide No 4

3. R-APDRP Key Benefits to Utilities

► Strengthening of sub-transmission & distribution networks in the urban areas

► for enhancement of reliability and efficiency.

► Metering of feeders /distribution transformers / consumers in the urban areas for proper energy accounting and auditing

► bringing transparency and AT&C reduction.

► Continuation of IT enablement of distribution sector & strengthening of distribution network

► for infusing transparency , reliability and efficiency in the distribution network

► help to achieve 24x7 Power supply.

RESTRUCTURED ACCELERATED POWER DEVELOPMENT & REFORMS PROGRAMME (R-APDRP), KARNATAKA

Page 5: Slide No 1 R-APDRP Part -A Karnataka June 2015. Slide No 2 1. R-APDRP & Its Objectives RESTRUCTURED ACCELERATED POWER DEVELOPMENT & REFORMS PROGRAMME

Slide No 5

4. R-APDRP Implementation in Karnataka – An Overview

5 electricity distribution companies in State►Bangalore Electricity Supply Company (BESCOM)

►Chamundeshwari Electricity Supply Corporation (CESC)

►Gulbarga Electricity Supply Company (GESCOM)

►Hubli Electricity Supply Company (HESCOM)

►Mangalore Electricity Supply Company (MESCOM)

RESTRUCTURED ACCELERATED POWER DEVELOPMENT & REFORMS PROGRAMME (R-APDRP), KARNATAKA

Area 5012 sq. Km

Consumers 7.2 Million

Distribution Transformers 55,621 Nos.

Cable 672,145 Ckt Km

Total Assets ~60 Million

Page 6: Slide No 1 R-APDRP Part -A Karnataka June 2015. Slide No 2 1. R-APDRP & Its Objectives RESTRUCTURED ACCELERATED POWER DEVELOPMENT & REFORMS PROGRAMME

Slide No 6

5. R-APDRP Part – A Overview in Karnataka

► 17 mandatory modules to be implemented

► Single solution for all ESCOMs

► Each ESCOM project to be treated individually by ITIA – Infosys; Overall guidance & support from the office of the Chairman (ESCOMs)

► DGPS based GIS survey of 57,000 KMs & 72+ lakhs consumers

► AMR Implementation for DTs and HT customers – 65,000+ modems

► Establishment of LAN, MPLS, VPN across 700+ offices in 98 towns

► 1 Customer Call center per ESCOM with toll free number

► Training of approx. 5000+ utility personnel

RESTRUCTURED ACCELERATED POWER DEVELOPMENT & REFORMS PROGRAMME (R-APDRP), KARNATAKA

BESCOM : Bangalore

MESCOM : Shikaripura

HESCOM : Dharwad

CESC : Mandya

GESCOM : Gulbarga

BESCOM : Bangalore

MESCOM : Mangalore

HESCOM : Hubli

CESC : Mysore

GESCOM : Gulbarga

Disaster Recovery Center: Chennai

Data Center : Bangalore

Pilo

t Site

Cu

stom

er C

are Cn

tres

Page 7: Slide No 1 R-APDRP Part -A Karnataka June 2015. Slide No 2 1. R-APDRP & Its Objectives RESTRUCTURED ACCELERATED POWER DEVELOPMENT & REFORMS PROGRAMME

Slide No 7

6. R-APDRP Part- A : 17 modules to be implemented

RESTRUCTURED ACCELERATED POWER DEVELOPMENT & REFORMS PROGRAMME (R-APDRP), KARNATAKA

Other Modules

Disconnection/Dismantling

Network Analysis

MIS

Identity & Access Mgmt

System Security Requirement

Maintenance Management

Page 8: Slide No 1 R-APDRP Part -A Karnataka June 2015. Slide No 2 1. R-APDRP & Its Objectives RESTRUCTURED ACCELERATED POWER DEVELOPMENT & REFORMS PROGRAMME

Slide No 8

7. Module – Metering, Billing & Collection

RESTRUCTURED ACCELERATED POWER DEVELOPMENT & REFORMS PROGRAMME (R-APDRP), KARNATAKA

Objective

► Metering - An Effective meter reading system to enhance effectiveness of measurement process, allows accurate metering for all customers & tapping revenue loss through the identification and handing of exceptions

► Billing and Collection - ensure the timely and accurate billing and collection

Benefits► Automatic collection of meter data

► Interfacing with Spot billing devices & MRI data for uploading meter readings incl consumer meter readings

► Meter reading plan generation

► Monitoring meter reading plan

► Monitoring Customer exception

► Automatic Overdue alerts; Bill correction & amendments online

► Integration & flexibility of using SBMs

► Decentralized payment processing & centralized reconciliation; Daily reconciliation of cash and bank

Page 9: Slide No 1 R-APDRP Part -A Karnataka June 2015. Slide No 2 1. R-APDRP & Its Objectives RESTRUCTURED ACCELERATED POWER DEVELOPMENT & REFORMS PROGRAMME

Slide No 9

8. Module – Asset Management (WAMS)

RESTRUCTURED ACCELERATED POWER DEVELOPMENT & REFORMS PROGRAMME (R-APDRP), KARNATAKA

Objective

Accounting & maintaining the vast fixed asset base efficiently, with following features:

►Easy data migration from legacy

►Easy to update asset data as asset base grows dynamically

►Easy to integrate with other applications for accurate data exchange (GIS/Maintenance etc)

►Scalable for growing requirements of utilities

►Billing & Collection

Benefits► Life cycle analysis

► Manage various depreciation policies

► Manage the budgets for assets

► Manage extensive reporting using built-in reporting tools and business analytics

► Manage the compliance related to process/statutory requirements

► Work Orders

Page 10: Slide No 1 R-APDRP Part -A Karnataka June 2015. Slide No 2 1. R-APDRP & Its Objectives RESTRUCTURED ACCELERATED POWER DEVELOPMENT & REFORMS PROGRAMME

Slide No 10

9. Module – GIS based Integrated Network Analysis

RESTRUCTURED ACCELERATED POWER DEVELOPMENT & REFORMS PROGRAMME (R-APDRP), KARNATAKA

Objective

► Perform several types of analyses on balanced or unbalanced three-phase, two phase and single-phase systems that are operated in radial, looped, meshed or mixed configurations. Create "what-if" studies and performing simulations to evaluate the impact of modifications to existing network.

Benefits► Online Creation and editing of network

► Online Load flow and voltage drop analysis

► Optimization studies like capacitor placement, network reconfiguration, conductor up-gradation, express feeder, load balancing & load allocation etc.

► Network design reports, cost estimates, financial analysis

► Integration with New connection module for checking network capability, augmentation requirement (if any)

► Can generate Single Line Diagrams (SLD) based on GIS Surveyed Data of Electric Lines & various equipments and it enables HT/ LT network analysis of the system. The SLD depicts the location of pole, transformer, distance between poles and other network features.

Page 11: Slide No 1 R-APDRP Part -A Karnataka June 2015. Slide No 2 1. R-APDRP & Its Objectives RESTRUCTURED ACCELERATED POWER DEVELOPMENT & REFORMS PROGRAMME

Slide No 11

10. Module – Meter Data Acquisition System

RESTRUCTURED ACCELERATED POWER DEVELOPMENT & REFORMS PROGRAMME (R-APDRP), KARNATAKA

Objective

To acquire meter data from System & Selected consumer meters automatically from remote avoiding any human intervention, Monitor important distribution parameters, use meter data for accurate billing purposes and generate exceptions and MIS reports for proper planning, monitoring, decision support and taking corrective actions on the business activities by the management.

Expected Benefits

To provide continuous on line monitoring & logging of parameters on real time basis

► Voltage, Phase to Phase and Phase to Neutral

► Current on each phase, Power factor, Frequency

► Power - Active / reactive / Apparent

► Energy – Active, Reactive and Apparent

To provide continuous on line monitoring & logging of above mentioned parameters & MIS report for

► System outage / downtime feeder wise

► Energy balancing at sub stations

► Daily peak loads feeder / transformer wise

► Peak Load of the Station

► Bus bar profile; Daily Log sheets & required reports

Page 12: Slide No 1 R-APDRP Part -A Karnataka June 2015. Slide No 2 1. R-APDRP & Its Objectives RESTRUCTURED ACCELERATED POWER DEVELOPMENT & REFORMS PROGRAMME

Slide No 12

11. R-APDRP – Outcomes

RESTRUCTURED ACCELERATED POWER DEVELOPMENT & REFORMS PROGRAMME (R-APDRP), KARNATAKA

Page 13: Slide No 1 R-APDRP Part -A Karnataka June 2015. Slide No 2 1. R-APDRP & Its Objectives RESTRUCTURED ACCELERATED POWER DEVELOPMENT & REFORMS PROGRAMME

Slide No 13

12. R-APDRP Phase A – Go-live Status of Karnataka

Scheduled date for Go live / integration of all towns

Town Integration Energy Audit Schedule

Month

Up to Jan’ 13

Up to Feb’ 13

Up to

Mar’ 13

Up to

Apr’ 13

Up to

May’ 13

Up to

Jun’ 13

Up to Jul’ 13

Up to Aug’ 13

Up to

Sep’ 13

Up to

Oct’ 13

Up to Nov’ 13

Up to

Dec’ 13

Up to Jan’ 14

Up to

Feb’ 14

Up to Mar’ 14

Up to Apr’ 14

Up to

May’ 14

Up to

Jun’ 14

Up to

Jul’ 14

Up to Aug’ 14

Up to Sep’ 14

Up to Oct’ 14

Up to

Nov’ 14

Up to

Dec’ 14

Up to Jan’ 15

Up to

Feb’ 15

Up to Mar’ 15

Up to

Apr’ 15

Up to May’ 15

Up to

Jun’ 15

Target 10 18 40 40 50 50 50 50 53 55 75 91 98 98 98 98 98 98 98 98 98 98 98 98 98 98 98 98 98 98

Achieved 6 10 31 31 46 46 46 46 46 46 46 51 51 60 60 60 60 60 60 60 60 60 60 60 60 60 60 60 60

Sep 2015

ESCOM MBC live (100% implementation) Full Stack with EA

BESCOM 25 16

CESC 12 6

GESCOM 21 11

HESCOM 29 26

MESCOM 11 1

TOTAL 98 60

Page 14: Slide No 1 R-APDRP Part -A Karnataka June 2015. Slide No 2 1. R-APDRP & Its Objectives RESTRUCTURED ACCELERATED POWER DEVELOPMENT & REFORMS PROGRAMME

Slide No 14

13. R-APDRP Part – A – Financial Progress

RESTRUCTURED ACCELERATED POWER DEVELOPMENT & REFORMS PROGRAMME (R-APDRP), KARNATAKA

ESCOM NO.OF TOWNS

TOTAL PROJECT

COST

LOAN SANCTIONED (Convertible

to Grant )

PFC DISBURSEMEN

T DETAILS

TOTAL EXPENDITURE INCURRED

FROM PFC FUNDS

FROM OWN

FUNDSTOTAL

BESCOM 25 272.80 252.00 146.65 104.16 31.47 135.63

MESCOM 11 38.75 29.05 7.24 7.24 10.63 17.87

CESC 12 28.94 28.91 16.64 13.14 0 13.14

HESCOM 29 55.31 54.66 31.56 28.35 0 28.35

GESCOM 21 35.21 34.11 19.20 19.20 3.19 22.39

TOTAL 98 431.01 398.7 221.29 172.09 45.29 217.38

* Rs. 31.47 crores spent for metering out of BESCOM funds, which needs to be approved in the revised DPR by PFC.

Rs in Crores

Page 15: Slide No 1 R-APDRP Part -A Karnataka June 2015. Slide No 2 1. R-APDRP & Its Objectives RESTRUCTURED ACCELERATED POWER DEVELOPMENT & REFORMS PROGRAMME

Slide No 15

Thank You