Sizing Variable Flow Piping – An Opportunity for Reducing

Energy

Page 2: Sizing Variable Flow Piping – An Opportunity for Reducing Energy 1

Learning Outcomes

Upon completion of this training one should be able to:

• Compare pipe sizing methods

• Understand the impact of pipe sizing on the system performance

• Apply ASHRAE Standard 90.1 to pipe sizing

• Understand how VV/VS pumping influences pipe sizing

• Utilize life cycle cost economics to justify the use of Magna3 in both new and renovated systems

2

Page 3: Sizing Variable Flow Piping – An Opportunity for Reducing Energy 1

Overview

• Pipe Sizing Considerations• Pipe Sizing Methods• Work Through a Pipe Sizing Example• Discuss Pump & System Energy Costs as They

Relate to Pipe Sizing

3

Page 4: Sizing Variable Flow Piping – An Opportunity for Reducing Energy 1

4

Importance

Pipe size selection impacts:• Pump head• Hydronic system performance • Energy consumption

Page 5: Sizing Variable Flow Piping – An Opportunity for Reducing Energy 1

5

Sizing Considerations

Pipe size depends on: •Material• First cost• Pump energy costs

• Internal pipe erosion• Noise• Budget

Page 6: Sizing Variable Flow Piping – An Opportunity for Reducing Energy 1

6

Pipe Material

•Material selection influences pipe size• Nominal pipe size may be the same but different inside diameter (free area) • Influencing the friction loss and velocity

Page 7: Sizing Variable Flow Piping – An Opportunity for Reducing Energy 1

7

Copper has the more restrictive ID

Nominal 2” Copper ID=1.985”Nominal 2” Steel ID=2.067”

Page 8: Sizing Variable Flow Piping – An Opportunity for Reducing Energy 1

8

Typical Procedure

Size pipe based on: • Constant Friction Rate• Velocity

• Use rule of thumb or common values

Page 9: Sizing Variable Flow Piping – An Opportunity for Reducing Energy 1

9

Constant Friction Rate

• Range: 1’/100’ - 4’/100’ • 2.5’/100’ used on average (ASHRAE Fundamentals 2009

Chpt 22)

• 4’/100’ when > 2” pipe diameter

Page 10: Sizing Variable Flow Piping – An Opportunity for Reducing Energy 1

10

Velocity

• Define a maximum (Common: 4 fps ≤ 2”, 8 fps > 2”)• Limited primarily for noise & erosion • Higher values acceptable when air is removed from system

ASHRAE Fundamentals 2009 Chapter 22

Page 11: Sizing Variable Flow Piping – An Opportunity for Reducing Energy 1

11

Velocity - Material Impact

Maximum velocity per Copper Tube Handbook* • Chilled Water 8 fps• Hot Water (<140ºF) 5 fps• Hot water (>140ºF) 3 fps

≤ ½” diameter pipe, lower velocities should be used due to craftsmanship and abrupt changes in flow direction

*Copper Development Association

Page 12: Sizing Variable Flow Piping – An Opportunity for Reducing Energy 1

12

Commercial Steel Pipe (schedule 40)

ASHRAE Fundamentals 2009 Chapter 22 Figure 4

Page 13: Sizing Variable Flow Piping – An Opportunity for Reducing Energy 1

13

Commercial Steel Pipe (schedule 40)

2.5’/100’ hd loss

ASHRAE Fundamentals 2009 Chapter 22 Figure 4

Page 14: Sizing Variable Flow Piping – An Opportunity for Reducing Energy 1

14

Commercial Steel Pipe (schedule 40)

2.5’/100’ hd loss

4’/100’ hd loss

ASHRAE Fundamentals 2009 Chapter 22 Figure 4

Page 15: Sizing Variable Flow Piping – An Opportunity for Reducing Energy 1

15

Commercial Steel Pipe (schedule 40)

ASHRAE Fundamentals 2009 chapter 22 Figure 4

4 fps

2.5’/100’ hd loss

4’/100’ hd loss

Page 16: Sizing Variable Flow Piping – An Opportunity for Reducing Energy 1

16

Commercial Steel Pipe (schedule 40)

ASHRAE Fundamentals 2009 chapter 22 Figure 4

4 fps

2.5’/100’ hd loss

4’/100’ hd loss

Page 17: Sizing Variable Flow Piping – An Opportunity for Reducing Energy 1

17

Schedule 40 Steel Pipe Sizing Chart

Page 18: Sizing Variable Flow Piping – An Opportunity for Reducing Energy 1

18

Copper Tubing (Types K, L, M)

ASHRAE Fundamentals 2009 chapter 22 Figure 5

4 fps

2.5’/100’ hd loss

4’/100’ hd loss

Page 19: Sizing Variable Flow Piping – An Opportunity for Reducing Energy 1

19

Copper Type L Pipe Sizing Chart

Page 20: Sizing Variable Flow Piping – An Opportunity for Reducing Energy 1

20

Material Comparison

Steel

Copper

Page 21: Sizing Variable Flow Piping – An Opportunity for Reducing Energy 1

21

Noise

• Noise velocity limits are difficult to pin point as it is dependent on many variables:• Insulation• Number of turns, fittings, valves• Air quantity• Partial flow

• Typically not a significant concern as long as entrained air has been eliminated from a closed loop system.

Page 22: Sizing Variable Flow Piping – An Opportunity for Reducing Energy 1

22

Erosion

• Velocities < 10 fps – erosion is not significant as long as there is no cavitation

ASHRAE Fundamentals 2009 Chapter 22

Page 23: Sizing Variable Flow Piping – An Opportunity for Reducing Energy 1

23

Aging

•Build up and increased roughness occurs in pipe over time •Narrow the pipe free area increasing head•Often ignored •Unpredictable•Research data is not available •A greater concern for open systems

•Consider as a factor in retrofit • removed and examine section of pipe•Conduct a pressure drop analysis

Page 24: Sizing Variable Flow Piping – An Opportunity for Reducing Energy 1

24

EXAMPLE

Page 25: Sizing Variable Flow Piping – An Opportunity for Reducing Energy 1

25

Example

• 4 Story Office Building• Located in Houston, Texas• HVAC system: Fan Coil Units with Chilled Water coils

Page 26: Sizing Variable Flow Piping – An Opportunity for Reducing Energy 1

26

Basement

2

1

3

4

Mechanical Room

5

6

Zoning

Page 27: Sizing Variable Flow Piping – An Opportunity for Reducing Energy 1

27

Main Floor

5

1 2

4

3

6

7

8

9 10 11

12 13

Zoning

Page 28: Sizing Variable Flow Piping – An Opportunity for Reducing Energy 1

28

2nd/3rd Floor

1

2

4

5

3

7

8

6

9

10 11

Zoning

Page 29: Sizing Variable Flow Piping – An Opportunity for Reducing Energy 1

29

23.7 GPM 2”, 2”

3RD

2ND

MAIN

BASE

22.3 GPM 2”, 2”

46 GPM 2½”, 2½”

24.3 GPM 2”, 2”

10.7 GPM 1¼”, 1¼”

70.3 GPM 3”, 3”

81 GPM 3”, 3”

Steel Schedule 402.5’/100’

Copper2.5’/100’

Riser

Page 30: Sizing Variable Flow Piping – An Opportunity for Reducing Energy 1

30

Basement

0-1(0.9)

0-2(2.2)

0-3(2.2)

0-4(1.7)

0-5(1.7)

0-6(1.1)

co

½”, ½”

¾”, 1”

1”, 1”

1¼”, 1¼”

1¼”, 1¼”

3”, 3”

MECH ROOM(0.8)

3”, 3”

Fan Coil Unit

Steel Schedule 402.5’/100’

Copper2.5’/100’

Example

Page 31: Sizing Variable Flow Piping – An Opportunity for Reducing Energy 1

31

Main Floor

1-5(1.9)

1-1(1.5)

1-2(0.95)

1-3(0.8)

1-7(2.0)

1-9(2.0)

1-8(1.9)

1-4(1.6)

1-10(1.0)

1-11 (1.4)

1-12 (3.7)

1-13 (4.9)

co

1”, 1” 1¼”, 1¼”

1¼”, 1¼”

1 ¼”, 1 ½”

1½”, 1½”

2”, 2”

Fan Coil Unit

Steel Schedule 402.5’/100’

Copper2.5’/100’

Example

1-6 (0.8)

Page 32: Sizing Variable Flow Piping – An Opportunity for Reducing Energy 1

32

2nd Floorco

2-1(1.6)

2-2(2.1)

2-5(3.0)

2-3(1.2)

2-7(1.5)

2-6(1.3)

2-8(3.0)

2-9 (2.6)

2-11(2.2)2-10

(1.9)

1”, 1”

1¼”, 1¼”

2”, 2”

1¼”, 1½”

1¼”, 1¼”

1½”, 2”

2-4(2.0)

Fan Coil Unit

Steel Schedule 402.5’/100’

Copper2.5’/100’

Example

Page 33: Sizing Variable Flow Piping – An Opportunity for Reducing Energy 1

33

3rd Floor

3-1(2.2)

3-2(2.2)

3-5(3.0)

3-3(1.3)

3-7(1.6)

3-4(2.1)

3-6(1.4)

3-8(3.1)

3-9 (2.8)

3-11 (2.2)3-10

(1.9)

1”, 1”

1¼”, 1½”

2”, 2”

1½”, 1½”

2”, 1½”

Fan Coil Unit

Steel Schedule 402.5’/100’

Copper2.5’/100’

Example

Page 34: Sizing Variable Flow Piping – An Opportunity for Reducing Energy 1

34

Steel Schedule 402.5’/100’4’/100’4fps(≤2”); 8fps(>2”)

23.7 GPM 2”, 2”, 1½”

3RD

2ND

MAIN

BASE

22.3 GPM 2”, 1½”, 1 ½”

46 GPM 2½”, 2½”, 2½”

24.3 GPM 2”, 2”, 1 ½”

10.7 GPM 1¼”, 1¼”, 1”

70.3 GPM 3”, 2½”, 2½”

81 GPM 3”, 3”, 2½”

Riser

Page 35: Sizing Variable Flow Piping – An Opportunity for Reducing Energy 1

35

Basement

0-1(0.9)

0-2(2.2)

0-3(2.2)

0-4(1.7)

0-5(1.7)

0-6(1.1)

co

½” ½” ½”

¾”, ¾”, ¾”

1” 1” ¾”

1 ¼”, 1”, 1”

1¼”, 1¼”, 1”

2½”2½” 2½”

MECH ROOM(0.8)

3” 3”

2½”

Steel Schedule 402.5’/100’4’/100’4fps(≤2”); 8fps(>2”)

Example

Page 36: Sizing Variable Flow Piping – An Opportunity for Reducing Energy 1

36

Main Floor

1-5(1.9)

1-1(1.5)

1-2(0.95)

1-3(0.8)

1-7(2.0)

1-9(2.0)

1-8(1.9)

1-4(1.6)

1-10(1.0)

1-11 (1.4)

1-12 (3.7)

1-13 (4.9)

co

1”¾”½”

1¼”1”1”

1¼”1”1”

1¼”, 1¼”, 1¼”

1½”, 1¼”, 1¼”

2”2”1½”

Steel Schedule 402.5’/100’4’/100’4fps(≤2”); 8fps(>2”)

Example

1-6 (0.8)

Page 37: Sizing Variable Flow Piping – An Opportunity for Reducing Energy 1

37

2nd Floorco

2-1(1.6)

2-2(2.1)

2-5(3.0)

2-3(1.2)

2-7(1.5)

2-6(1.3)

2-8(3.0)

2-9 (2.6)

2-11(2.2)2-10

(1.9)

1”, ¾”, ½”

1¼”, 1¼”, 1”

2”, 1½”, 1½”

1¼”, 1¼”, 1”

1¼”, 1¼”, 1¼”

1½”, 1½”, 1½”

2-4(2.0)

Steel Schedule 402.5’/100’4’/100’4fps(≤2”); 8fps(>2”)

Example

Page 38: Sizing Variable Flow Piping – An Opportunity for Reducing Energy 1

38

3rd Floor

3-1(2.2)

3-2(2.2)

3-5(3.0)

3-3(1.3)

3-7(1.6)

3-4(2.1)

3-6(1.4)

3-8(3.1)

3-9 (2.8)

3-11(2.2)3-10

(1.9)

1”, 1”, 1” 1¼”, 1¼”, 1”

2”, 2”, 1½”

1½”1¼”1¼”

2”, 1½”, 1½”

Steel Schedule 402.5’/100’4’/100’4fps(≤2”); 8fps(>2”)

Example

Page 39: Sizing Variable Flow Piping – An Opportunity for Reducing Energy 1

39

Pump Energy Costs

• Pressure drop (head)• Hours of operation• Annual flow profile• Pump control: constant vs variable pump flow• Energy rates• Efficiency of the pump

Page 40: Sizing Variable Flow Piping – An Opportunity for Reducing Energy 1

40

Pressure Drop

• Energy must exerted to overcome resistance seen by the critical circuit• Poor hydronic system design and pipe lay out influences energy consumed• Items that impose resistance:• Valves• Coils• Fittings• Pipe ASHRAE Tables

Manufacturer Literature

Page 41: Sizing Variable Flow Piping – An Opportunity for Reducing Energy 1

41

Pipe Resistance

• Based on pipe size, flow, and material, length Example: 3” Schedule 40 pipe with 80 GPM, 50’ long

ASHRAE Fundamentals 2009 Chapter 22 Figure 4

1.5

’/100’

1.5’ of Head/100’ of pipe length

50’ of pipe X1.5’/100’ = 0.75’ Hd

Page 42: Sizing Variable Flow Piping – An Opportunity for Reducing Energy 1

42

Fitting Resistance

• Based on pipe size and velocity

ASHRAE Fundamentals 2009 Chapter 22

Page 43: Sizing Variable Flow Piping – An Opportunity for Reducing Energy 1

43

Pipe Resistance

• Based on pipe size, flow, and material, length Example: 3” Schedule 40 pipe with 81 GPM

ASHRAE Fundamentals 2009 Chapter 22 Figure 4

Velocity = 3.3 fps

3.3 fps

Page 44: Sizing Variable Flow Piping – An Opportunity for Reducing Energy 1

44

Fitting Resistance

• Based on pipe size and velocity

ASHRAE Fundamentals 2009 Chapter 2290⁰ ElbowResistance = 8.1’ of straight pipe

Page 45: Sizing Variable Flow Piping – An Opportunity for Reducing Energy 1

45

Fitting Resistance

ASHRAE Fundamentals 2009 Chapter 22

Page 46: Sizing Variable Flow Piping – An Opportunity for Reducing Energy 1

46

Fitting Resistance

• Based on pipe size and velocityExample: 3.5 FPS, 3” Steel pipe

45⁰ ElbowMultiply by the 0.7 correction valueResistance = 8.1’ x 0.75.7’ of straight pipe

Page 47: Sizing Variable Flow Piping – An Opportunity for Reducing Energy 1

47

Pressure Drop Calculation

• The calculation is cumbersome and time consuming• Often simplified• Sized pipe using 2.5’/100’, apply this value to the total pipe length of critical circuit• Much of the pipe likely to operate at less than 2.5’/100’ at full load as in example • More common to multiply value by a factor such as 1.5

• Result: Over estimated head

Page 48: Sizing Variable Flow Piping – An Opportunity for Reducing Energy 1

48

Prescriptive Path requirements Section 6.5.4.5 – Hydronic Systems and Control

ASHRAE Standard 90.1-2010

Page 49: Sizing Variable Flow Piping – An Opportunity for Reducing Energy 1

49

Hours of Operation

Page 50: Sizing Variable Flow Piping – An Opportunity for Reducing Energy 1

50

Example: Schedule 40 pipe with 81 GPM

→ 3” pipe using traditional sizing methods

ASHRAE Standard 90.1-2010

Page 51: Sizing Variable Flow Piping – An Opportunity for Reducing Energy 1

51

Example: Schedule 40 pipe with 81 GPM→Constant Speed = 3”; →VV/VS = 2 ½”

ASHRAE Standard 90.1-2010

Page 52: Sizing Variable Flow Piping – An Opportunity for Reducing Energy 1

52

• Should a 2 ½” pipe be used for a VV/VS system?• Remember that 90.1 concentrates on energy only!• Does not account for noise or erosion

ASHRAE Fundamentals 2009 chapter 22 Figure 4

4.5

’/100’

5.2 fps

ASHRAE Standard 90.1-2010

Page 53: Sizing Variable Flow Piping – An Opportunity for Reducing Energy 1

53

• Should a 2 ½” pipe be used for a VV/VS system?• Remember that 90.1 concentrates on energy only!• Does not account for noise or erosion

ASHRAE Fundamentals 2009 chapter 22 Figure 4

1.7

5’/

100’

3.5 fps

ASHRAE Standard 90.1-2010

Page 54: Sizing Variable Flow Piping – An Opportunity for Reducing Energy 1

54

Pipe Size

3” pipe• 1.75’/100’ head loss• 3.5 fps

For lowest head loss the 3” pipe is preferable3” pipe is more expensive than 2 ½”REMEMBER:System will operate at peak (81 GPM) only 19 hrs/yr

2 ½” pipe• 4.5’/100’ head loss• 5.2 fps

Page 55: Sizing Variable Flow Piping – An Opportunity for Reducing Energy 1

55

Page 56: Sizing Variable Flow Piping – An Opportunity for Reducing Energy 1

56

Pipe Size

3” pipe• 1.75’/100’ head loss• 3.5 fps

For lowest head loss the 3” pipe is preferable

REMEMBER:• System will operate at peak (81 GPM) only 19 hrs/yr• Head loss & velocity for 2 ½” pipe will be much less most of the time • Closed loop system will have little issues with noise and erosion since air is eliminated

2 ½” pipe• 4.5’/100’ head loss• 5.2 fps

Page 57: Sizing Variable Flow Piping – An Opportunity for Reducing Energy 1

57

Decreased Pipe Size Justification2 ½” pipe is potentially justifiable:• Decrease first cost• Little to no sacrifice in system life/performance• Inconsistent with pipe sizing using the constant friction rate method• Designer must consider LLC and system operation

Page 59: Sizing Variable Flow Piping – An Opportunity for Reducing Energy 1

59

Economic Analysis

• Using this software and its defaults, an economic analysis was performed for a constant and variable volume system

Variable VolumeGPM = 81Total Head = 36Smaller Pipe Size, VFD1st Cost = $35,678LCC = $39,470

Constant VolumeGPM = 81Total Head = 34Larger Pipe Size1st Cost = $32,234LCC = $44,040

Note: generic pump performance curves utilized for this analysis (58% Eff)

Actual savings in energy by a Magna3 pump will exceed these values (74% Eff)

Page 60: Sizing Variable Flow Piping – An Opportunity for Reducing Energy 1

60

• Concern with limitation on pipe sizing by ASHRAE Standard 90.1-2010 on retrofits:• Pipes exist and there is a need for increased capacity• These limitations can restrict the design

• Change to VV/VS pumping allows for increased GPM • Increased capacity without increasing GPM• Change the water ∆T GPM=BTUh/(500∆T)

Retrofit

Page 61: Sizing Variable Flow Piping – An Opportunity for Reducing Energy 1

61

Other Free Resources

• Chilled Water design Guide http://www.energydesignresources.com/resources/publications/design-guidelines/design-guidelines-cooltools-chilled-water-plant.aspxOptimizing

• Energy Calculator for Horizontal Piping http://www.wbdg.org/design/midg_design_echp.php

• Temperature Drop Calculator for Hydronic Piping http://www.wbdg.org/design/midg_design_tdchp.php