Six monthly progress report for the period of six months from July-2015 to December-2015 for 24 MW Co-Gen .Power Plant at The Shahabad Co-Op Sugar Mills Limited, Shahabad (M) Haryana Distt. Kurkshetra (Haryana). The Shahabad Co-Op Sugar Mills Limited, Shahabad (M) Haryana Distt. Kurkshetra (Haryana). The Shahabad Co-Op Sugar Mills Limited Shahabad (M) Haryana Distt. Kurkshetra (Haryana) Six monthly progress reports for the period of six month from July-2015 to December-2015 STATUS OF COMPLIANCE CONDITIONS S. No. (A) GENERAL CONDITION :- STATUS OF COMPLIANCE. 01 No Additional Land shall be acquired for any Utilities related to the project. Complied 02 The Stack Height of the stack shall be as per the EPA Act, 1986 in this regard with continuous online monitoring system on APCM and ETP. Complied. 03 Dry ash collection system shall be provided. The Project authorities shall adhere to provision stipulated in the fly ash notification of Sep.1999, and as amended in August 2003 in regard to fly ash utilization. Fly ash shall be disposed in the ash pond through HCSD mode and bottom ash through medium slurry mode. Complied. (Installation an Automatic collection system of fly ash as per requirement of our plant.) 04 The Ash Pond shall be provided with liming on all sides. Not Applicable in our plant. 05 Effective dust suppression measures shall be taken to control SPM level in the area and ensure that the ash from the ash pond does not get airborne. Complied 06 Dust extraction and suppression system and water spikiness shall be provided for controlling fugitive dust during transportation and other vulnerable area of the plant. Complied 07 Water requirement shall not exceed about 300KLD and shall be met from the existing bore well. Complied. 08 Treated effluent conforming to the prescribed standards shall be recycled and reused within the plant area. No effluent shall be discharge outside the plant boundary. Complied. 09 Rain water harvesting shall be practiced. A detailed scheme for rain water harvesting to recharge the ground water aquifer shall be prepared in consultation with CGWA/SGWA. Complied. 10 Leq of Noise level shall be limited to 75 dB A and regular maintenance of equipment should be undertaken. For people working in high noise area personal protection devices should provided. Complied.

Six monthly progress report for the period of six months ...nromoef.gov.in/SMPR/18022016/122.pdfSix monthly progress report for the period of six months from July-2015 to December-2015

  • Upload
    buibao

  • View
    222

  • Download
    4

Embed Size (px)

Citation preview

Page 1: Six monthly progress report for the period of six months ...nromoef.gov.in/SMPR/18022016/122.pdfSix monthly progress report for the period of six months from July-2015 to December-2015

Six monthly progress report for the period of six months from July-2015 to December-2015 for 24 MW Co-Gen .Power Plant at The Shahabad Co-Op Sugar Mills Limited, Shahabad (M) Haryana Distt. Kurkshetra (Haryana).

The Shahabad Co-Op Sugar Mills Limited, Shahabad (M) Haryana Distt. Kurkshetra (Haryana).

The Shahabad Co-Op Sugar Mills Limited

Shahabad (M) Haryana Distt. Kurkshetra (Haryana) Six monthly progress reports for the period of six month from

July-2015 to December-2015

STATUS OF COMPLIANCE CONDITIONS S. No. (A) GENERAL CONDITION :- STATUS OF

COMPLIANCE. 01 No Additional Land shall be acquired for any Utilities

related to the project. Complied

02 The Stack Height of the stack shall be as per the EPA Act, 1986 in this regard with continuous online monitoring system on APCM and ETP.

Complied.

03 Dry ash collection system shall be provided. The Project authorities shall adhere to provision stipulated in the fly ash notification of Sep.1999, and as amended in August 2003 in regard to fly ash utilization. Fly ash shall be disposed in the ash pond through HCSD mode and bottom ash through medium slurry mode.

Complied. (Installation an Automatic collection system of fly ash as per requirement of our plant.)

04 The Ash Pond shall be provided with liming on all sides.

Not Applicable in our plant.

05 Effective dust suppression measures shall be taken to control SPM level in the area and ensure that the ash from the ash pond does not get airborne.

Complied

06 Dust extraction and suppression system and water spikiness shall be provided for controlling fugitive dust during transportation and other vulnerable area of the plant.

Complied

07 Water requirement shall not exceed about 300KLD and shall be met from the existing bore well.

Complied.

08 Treated effluent conforming to the prescribed standards shall be recycled and reused within the plant area. No effluent shall be discharge outside the plant boundary.

Complied.

09 Rain water harvesting shall be practiced. A detailed scheme for rain water harvesting to recharge the ground water aquifer shall be prepared in consultation with CGWA/SGWA.

Complied.

10 Leq of Noise level shall be limited to 75 dB A and regular maintenance of equipment should be undertaken. For people working in high noise area personal protection devices should provided.

Complied.

Page 2: Six monthly progress report for the period of six months ...nromoef.gov.in/SMPR/18022016/122.pdfSix monthly progress report for the period of six months from July-2015 to December-2015

Six monthly progress report for the period of six months from July-2015 to December-2015 for 24 MW Co-Gen .Power Plant at The Shahabad Co-Op Sugar Mills Limited, Shahabad (M) Haryana Distt. Kurkshetra (Haryana).

The Shahabad Co-Op Sugar Mills Limited, Shahabad (M) Haryana Distt. Kurkshetra (Haryana).

11 The PP will plant area trees all around the periphery of the projects and noise along the road side. The total green area in the project will be 33 % of the project area.

Complied.

12 First aid and sanitation arrangement shall be made for the drivers and other contact workers during construction phase.

Complied

13 Regular monitoring of the ambient air quality shall be carried out in and around the power plant and records maintained. The location of monitoring stations and frequency of monitoring shall be decided in consultation with HSPCB.

Under Compliance

14 The PP shall advertise in at least two newspapers widely circulated in region around the project one of which shall be in the vernacular language of the locality concerned.

Complied.

15 Half yearly report on the status of implementation of the stipulated condition and environmental safeguards shall be submitted to R.O. MOEF./HSPCB.

Complied.

16 R.O.MOEF and HSPCB will monitor the implementation of the stipulated condition. a completed set of EIA and EMP with the additional information submitted from the time to time shall be forwarded to the RO for their use during the monitoring.

Complied.

17 Separate funds shall be allocated for implementation of environmental protection measures along with item wise break up. These cost shall be included as part of the project cost. The funds earmarked for the environmental protection measures shall not be diverted for other purpose and year wise expenditure shall be reported to the MOEF/SEAC.

Partially Complied.

Page 3: Six monthly progress report for the period of six months ...nromoef.gov.in/SMPR/18022016/122.pdfSix monthly progress report for the period of six months from July-2015 to December-2015

Six monthly progress report for the period of six months from July-2015 to December-2015 for 24 MW Co-Gen .Power Plant at The Shahabad Co-Op Sugar Mills Limited, Shahabad (M) Haryana Distt. Kurkshetra (Haryana).

The Shahabad Co-Op Sugar Mills Limited, Shahabad (M) Haryana Distt. Kurkshetra (Haryana).

(B) SPECIAL CONDITION :-

01to 03 The Special Conditions S.No. 01, 02 and 03 related to Authorities.

--------

04 The Above Stipulations shall be enforced along with the provision of the Water (Prevention & Control of pollution ) Act- 1974 , the Air (Prevention & Control of Pollution ) ,Act-1981 and the Environmental Protection Act-1986, the manufacturing , storage and import of Hazardous chemical Rules, 1989,Hazardous waste ( Management & Handling ) Rules , 1989, the Public Liability Insurance Act, 1991 and rules there under Environmental Impact Assessment Notifications no. 1533 (E) dated 14/06/2006 and any other applicable legislation or restrictions / conditions imposed by any statutory authority.

Complied. (Grant the Consent for AIR/Water /HW from the Haryana State Pollution Control Board for the year 2014-2016. Ref. No. HSPCB/Consent/2779413/ Kur/cto/329022. From 03/01/2014 to 02/01/2016 And further we have applied from 2016 to 2019 under Air /water Acts.

05 S. No. 05 related to SLEIAA. Not Applicable. 06 All other statutory clearance such as the approvals for

storage of diesel from chief controller of explosives, Fire Department, civil aviation, Deptt. Of Forest (Conservation) Act, 1980 and Wildlife (Protections) Act-1972 etc., shall be obtained as applicable, by project proponents from the competent authorities. All other safety measure is under taken at site as required under the laws.

Complied.

07 & 08 The Special Conditions S. No. 07 and 08 related to the Authorities.

Complied

Note:- The details of Environmental Monitoring Reports as per below.

1) Ambient Air Monitoring Report s - Annexure-1 2) Ground Water Analysis Reports – Annexure-II 3) Noise Monitoring – Annexure-III 4) Soil Testing Reports – Annexure- IV

For The Shahabad Co-op Sugar Mills Limited (Managing Director)

Page 4: Six monthly progress report for the period of six months ...nromoef.gov.in/SMPR/18022016/122.pdfSix monthly progress report for the period of six months from July-2015 to December-2015

Six monthly progress report for the period of six months from July-2015 to December-2015 for 24 MW Co-Gen .Power Plant at The Shahabad Co-Op Sugar Mills Limited, Shahabad (M) Haryana Distt. Kurkshetra (Haryana).

The Shahabad Co-Op Sugar Mills Limited, Shahabad (M) Haryana Distt. Kurkshetra (Haryana).

Annexure-I

Detailed Ambient Air Quality Monitoring Results (24-hourly Monitoring)

S. No.

Date DD/MM/Y

Y

Location Code No.

Locations. Concentration.

PM-10 (g/m3

)

PM-2.5

(g/m3

)

SO2

(g/m3) NOx

(g/m3

)

CO (mg/m3

)

1. 21/12/2015 AAQ I

Shahabad Co-Sugar Mills Factory Area

(g/m3)

92 52 21 26

1.1

2. 21/12/2015 AAQ II

Shahabad Town

(g/m3) 94 56 23 31

1.1

3. 22/12/2015 AAQ

III Ramnagar Village

(g/m3) 82 49 21 22

1.0

4. 22/12/2015 AAQ

IV Deeg Village

(g/m3) 80 50 19 24

1.0

5. 22/12/2015 AAQ

V Dhola Majra Village

(g/m3)

78 51 20 24

1.0

Page 5: Six monthly progress report for the period of six months ...nromoef.gov.in/SMPR/18022016/122.pdfSix monthly progress report for the period of six months from July-2015 to December-2015

Six monthly progress report for the period of six months from July-2015 to December-2015 for 24 MW Co-Gen .Power Plant at The Shahabad Co-Op Sugar Mills Limited, Shahabad (M) Haryana Distt. Kurkshetra (Haryana).

The Shahabad Co-Op Sugar Mills Limited, Shahabad (M) Haryana Distt. Kurkshetra (Haryana).

Annexure-II

Details of Ground Water Quality Monitoring Stations

S. No. Location Code Type Locations and Source. 1 GW1 Ground Water Borewell water Shahabad Co-Sugar

Mills Factory Area.

2 GW2 Ground Water Hand Pump Shahabad

3 GW3 Ground Water Borewell Ramnagar Village

4 GW4 Ground Water Borewell Deeg Village

5 GW5 Ground Water Borewell Dhola Majra Village

Groundwater Quality Monitoring Results.

S.No. Parameters Unit Results

GW1 GW2 GW3 GW4 GW5 1 pH - 7.56 7.24 7.84 7.16 7.44

2 Temperature oC 17 17 19 19 18 3 Colour Hazen <5 <5 <5 <5 <5 4 Taste - Agreeable Agreeable Agreeable Agreeable Agreeable

5 Conductivity µs/cm 478 541 342 421 510 6 Turbidity NTU 0.2 0.2 0.2 0.2 0.3 7 TSS mg/l <5 <5 <5 <5 <5 8 TDS mg/l 349 542 336 304 402 9 Dissolved

Oxygen mg/l 7.8 7.2 7.4 7.6 6.4

10 Chemical Oxygen Demand

mg/l <10 <10 <10 <10 <10

11 Biochemical Oxygen Demand

mg/l <5 <5 <5 <5 <5

12 Oil and Grease

mg/l N.D. <2 <2 <2 <2

13 Total Hardness as CaCO3

mg/l 96 164 82 149 231

Page 6: Six monthly progress report for the period of six months ...nromoef.gov.in/SMPR/18022016/122.pdfSix monthly progress report for the period of six months from July-2015 to December-2015

Six monthly progress report for the period of six months from July-2015 to December-2015 for 24 MW Co-Gen .Power Plant at The Shahabad Co-Op Sugar Mills Limited, Shahabad (M) Haryana Distt. Kurkshetra (Haryana).

The Shahabad Co-Op Sugar Mills Limited, Shahabad (M) Haryana Distt. Kurkshetra (Haryana).

S.No. Parameters Unit Results GW1 GW2 GW3 GW4 GW5

14 Calcium as Ca

mg/l 18 41 24 31 39

15 Sodium as Na mg/l 14 17 16 14 26 16 Magnesium

as Mg mg/l 12 19 21 22 17

17 Alkalinity mg/l 253 210 239 174 236

18 Nitrate- N mg/l 0.14 0.14 0.12 0.24 0.2

19 Ammonical – N

mg/l ND ND ND ND ND

20 Phosphate as PO4

mg/l ND ND ND ND ND

21 Sulphate as SO4

mg/l 8 27 10 14 19

22 Chloride as Cl

mg/l 43 64 47 69 44

23 Fluoride as F mg/l 0.10 ND 0.20 0.2 0.20 24 Phenols mg/l ND ND ND ND ND

25 Arsenic as As mg/l < 0.001 < 0.001 < 0.001 < 0.001 < 0.001 26 Cadmium as

Cd mg/l ND ND ND ND ND

27 Copper as Cu mg/l < 0.02 < 0.02 < 0.02 < 0.02 < 0.02 28 Lead as Pb mg/l < 0.010 < 0.010 < 0.010 < 0.010 < 0.010 29 Iron as Fe mg/l 0.10 0.12 0.14 0.12 0.12 30 Total

Chromium mg/l < 0.002 < 0.002 < 0.002 < 0.002 < 0.002

31 Zinc as Zn mg/l < 0.05 < 0.05 0.04 <0.05 <0.05

32 Total Coliform

MPN/ 100 ml

Absent Absent Absent Absent Absent

33 Faecal Coliform

MPN/ 100 ml

Absent Absent Absent Absent Absent

Source: Water samples were collected by us on 21/12/2015 to 23/12/2015.

Page 7: Six monthly progress report for the period of six months ...nromoef.gov.in/SMPR/18022016/122.pdfSix monthly progress report for the period of six months from July-2015 to December-2015

Six monthly progress report for the period of six months from July-2015 to December-2015 for 24 MW Co-Gen .Power Plant at The Shahabad Co-Op Sugar Mills Limited, Shahabad (M) Haryana Distt. Kurkshetra (Haryana).

The Shahabad Co-Op Sugar Mills Limited, Shahabad (M) Haryana Distt. Kurkshetra (Haryana).

Annexure-III

Ambient Noise Levels.

Location

Code

Locations

Area Code.

Leq (dBA) Standard Limits (Leq dB (A))

Day Night Daytime Night Time ANQ1 Shahabad

Co-Sugar Mills Factory Area

Ind. 72.6 64.2 Industrial – 75 Commercial/Mixed – 65 Residential/Rural – 55

Industrial – 70 Commercial/Mixed – 55 Residential/Rural – 45

ANQ2 Shahabad Town

CR 72.8 53.2

ANQ3 Ramnagar Village

R 55.6 41.9

ANQ4 Deeg Village R 54.4 43.8

ANQ5 Dhola Majra Village

R 53.8 43.2

Source: Noise Monitoring on 21/12/2015and 23/12/2015.

Area category: I-Industrial, C-Commercial, R-Residential, S-Silence zone Day time: 6.00 a.m. to 10.00 p.m. Night time: 10.00 p.m. to 6.00 a.m.

Permissible ambient noise standards in dB(A): Industrial Area : Day time: 75, Night time: 70 Commercial Area : Day time: 65, Night time: 55 Residential Area : Day time: 55, Night time: 45

Silence Zone : Day time: 50, Night time: 40

Page 8: Six monthly progress report for the period of six months ...nromoef.gov.in/SMPR/18022016/122.pdfSix monthly progress report for the period of six months from July-2015 to December-2015

Six monthly progress report for the period of six months from July-2015 to December-2015 for 24 MW Co-Gen .Power Plant at The Shahabad Co-Op Sugar Mills Limited, Shahabad (M) Haryana Distt. Kurkshetra (Haryana).

The Shahabad Co-Op Sugar Mills Limited, Shahabad (M) Haryana Distt. Kurkshetra (Haryana).

Annexure-IV

Details of Soil Quality Monitoring Locations.

S.No. Station Code Sampling Location

Approximate Distance from

the Power Plant

Direction with respect

from the site.

Land Use

1. SQ-I Shahabad Co-Sugar Mills Factory Area

- - Agriculture

2. SQ-II Agriculture land near Shahabad Town

2.0 WWN Agriculture

3. SQ-III Ramnagar Village

6.0 WN Agriculture

4. SQ-IV Deeg Village 3.0 EES Agriculture

5. SQ-V Dhola Majra Village

7.0 SW Agriculture

Page 9: Six monthly progress report for the period of six months ...nromoef.gov.in/SMPR/18022016/122.pdfSix monthly progress report for the period of six months from July-2015 to December-2015

Six monthly progress report for the period of six months from July-2015 to December-2015 for 24 MW Co-Gen .Power Plant at The Shahabad Co-Op Sugar Mills Limited, Shahabad (M) Haryana Distt. Kurkshetra (Haryana).

The Shahabad Co-Op Sugar Mills Limited, Shahabad (M) Haryana Distt. Kurkshetra (Haryana).

Physico-Chemical Characteristics of Soil in the Study Area.

S.

No. Parameters Unit Soil Monitoring Locations SQ-I SQ-II SQ-III SQ-IV SQ-V

1 pH - 7.44 7.10 7.66 6.4 7.85

2 Conductivity µmhos/cm 914 219 239 190 204

3 Bulk Density gm/cm 1.34 1.16 1.20 1.36 1.25

4 Soil Porosity % 34 34 39 34 36

5 Permeability cm/sec 0.06 0.06 0.10 0.06 0.08

6 Water Holding Capacity % 36 38 36 34 23

7 Organic Carbon % 1.34 4.6 4.0 4.8 4.4

8 Cation Exchange Capacity

meq/100 gm 12.4 14.8 16.2 16.8 15.8

9 Nitrogen µg/g 58.9 63.6 61.8 63.4 61.10

10 Phosphorous as P µg/g 16.4 19.6 21.8 22.6 22.8

11 Iron as Fe gm/kg 0.079 0.082 0.09 0.082 0.084

12 Lead as Pb gm/kg BDL BDL BDL BDL BDL

13 Sodium µg/g 41.8 60.4 61.8 62.6 60.8

14 Potassium µg/g

104.8

102.6 122.8 122.6 120.4

15

Texture a. Sand b. Silt c. Clay

% % %

24 31 29

26 40 31

36 30 29

34 42 36

34 35 32

Source: Soil samples were collected by us on 21/12/2015 to 23/12/2015.