SiTRA test beams at CERN: infrastructure developments and results Annual EUDET meeting NIKHEF Alexandre CHARPY

SiTRA test beams at CERN: infrastructure developments and results Annual EUDET meeting NIKHEF Alexandre CHARPY

Embed Size (px)

Citation preview

Page 1: SiTRA test beams at CERN: infrastructure developments and results Annual EUDET meeting NIKHEF Alexandre CHARPY

SiTRA test beams at CERN: infrastructure developments

and resultsAnnual EUDET meeting

NIKHEF

Alexandre CHARPY

Page 2: SiTRA test beams at CERN: infrastructure developments and results Annual EUDET meeting NIKHEF Alexandre CHARPY

October 6th-8th, 2008 Alexandre [email protected] 2

General Overview

III.Mechanics Module conception Tools development Clean room Modules manufacturing

IV.DAQ FEE electronics ALTERA 2 Software development

I. Status of the last test beam

Overview Some results

II.Project Test SiTr130-88 chip Alignment study

Page 3: SiTRA test beams at CERN: infrastructure developments and results Annual EUDET meeting NIKHEF Alexandre CHARPY

October 6th-8th, 2008 Alexandre [email protected] 3Status of the 2007 beam-test and testbench with source @

Paris

Faraday cage @ Paris: 3D table PM + Scintillator for triggering Infrared laser Radioactive source Sr90

Page 4: SiTRA test beams at CERN: infrastructure developments and results Annual EUDET meeting NIKHEF Alexandre CHARPY

October 6th-8th, 2008 Alexandre [email protected] 4Status of the 2007 beam-test and testbench with source @

ParisSome results of VA1

Pedestal subtraction Common noise study Signal to Noise

Page 5: SiTRA test beams at CERN: infrastructure developments and results Annual EUDET meeting NIKHEF Alexandre CHARPY

October 6th-8th, 2008 Alexandre [email protected] 5Status of the 2007 beam-test and testbench with source @

Paris

Some results of SiTr130-4: Pedestal study (vs

channel, sample ...) Signal to noise Vs

Channel Signal to noise Linearity

Page 6: SiTRA test beams at CERN: infrastructure developments and results Annual EUDET meeting NIKHEF Alexandre CHARPY

October 6th-8th, 2008 Alexandre [email protected] 6

Project Testing the SiTr130-88 chips

New HPK sensors performance characterization Performance extraction of the new chip SiTr130-88

(more statistics) Alignement system (M.Fernandez Garcia, I.Villa)

Develop an environnement for modules manufacturing for EUDET collaboration (G.Badet, A.Charpy, G.Daubard, C.Evrard, P.Ghislain, D.Imbault, P.Repain)

parameters of HPK sensors: dimension, pitch, transparency

Front-end electronics Development of toolbox Clean room installation

Page 7: SiTRA test beams at CERN: infrastructure developments and results Annual EUDET meeting NIKHEF Alexandre CHARPY

October 6th-8th, 2008 Alexandre [email protected] 7

Mechanic development Module conception (LPNHE team)

Modules with two sensors Different FEE (chip development) Bonding constraints (I.McGill) Faraday cage integration Alignment study Easy and secure handleStudy for global structure

Schematic view

0.6

15.71

PAFEE VA1

1.60.145.0

0.31.24

Page 8: SiTRA test beams at CERN: infrastructure developments and results Annual EUDET meeting NIKHEF Alexandre CHARPY

October 6th-8th, 2008 Alexandre [email protected] 8

Mechanic development

Tools conception for “automated” manufacturing

Precise alignment of the different parts of the modules:

silicon strips pitch adapter connectivity FEE

Perfect integration on the carbon fiber support during the gluing

Analogical video camera

Suction system with micro metric screw

System tolerance

Page 9: SiTRA test beams at CERN: infrastructure developments and results Annual EUDET meeting NIKHEF Alexandre CHARPY

October 6th-8th, 2008 Alexandre [email protected] 9

Mechanic development

Tools conception for “automated” manufacturing

Keep alignement during the gluing process Perfect integration on the carbon fiber support during the gluing

Gluing toolSuction transfert tool

Page 10: SiTRA test beams at CERN: infrastructure developments and results Annual EUDET meeting NIKHEF Alexandre CHARPY

October 6th-8th, 2008 Alexandre [email protected] 10

Mechanic development

Definition of the procedure and the critical point during the assembly Installation of the cleanroom and the first module is done

Work environement

Page 11: SiTRA test beams at CERN: infrastructure developments and results Annual EUDET meeting NIKHEF Alexandre CHARPY

October 6th-8th, 2008 Alexandre [email protected] 11

Mechanic development

Definition of the procedure and the critical point during the assembly Installation of the cleanroom and the first module is done

Work environement

Page 12: SiTRA test beams at CERN: infrastructure developments and results Annual EUDET meeting NIKHEF Alexandre CHARPY

October 6th-8th, 2008 Alexandre [email protected] 12

Mechanic development

Definition of the procedure and the critical point during the assembly Installation of the cleanroom and the first module is done

Work environement

Page 13: SiTRA test beams at CERN: infrastructure developments and results Annual EUDET meeting NIKHEF Alexandre CHARPY

October 6th-8th, 2008 Alexandre [email protected] 13

Mechanic development

Definition of the procedure and the critical point during the assembly Installation of the cleanroom and the first module is done

Work environement

Page 14: SiTRA test beams at CERN: infrastructure developments and results Annual EUDET meeting NIKHEF Alexandre CHARPY

October 6th-8th, 2008 Alexandre [email protected] 14

Mechanic development Faraday cage (I.Villa and V.Saveliev)

Two reference sensors equipped with the VA1' chip

Example of configuration:

Sensors equipped with SiTr130-88 chip

Collimator for alignment study

Possibility to do a “standalone” tracking + EUDET tracking

Page 15: SiTRA test beams at CERN: infrastructure developments and results Annual EUDET meeting NIKHEF Alexandre CHARPY

October 6th-8th, 2008 Alexandre [email protected] 15

Data Acquisition System

Flexible system: work with VA1 chip, SiTr130-88 (A.Comerma, H.PHAM, R.Sefri), and future

Idea: develop a DAQ, can work in EUDET environnement or on standalone for local test

Easy upgradable system → FPGA board with USB output/input

Real tool box to automatize the different study: pedestal, calibration, alignment etc ....

Page 16: SiTRA test beams at CERN: infrastructure developments and results Annual EUDET meeting NIKHEF Alexandre CHARPY

October 6th-8th, 2008 Alexandre [email protected] 16

Power supply

+5V

+3,3V

+1,2V

+2V

-2V

-5V

20 Drivers LVDS

Connecte

ur

2020 Drivers LVDS

Connecte

ur

2020 Drivers LVDS

Connecto

r

20

Connecte

ur

20Level Translator

ADC

SM

B

130_88

VA1

+1,2V+3,3V

-12V

-12V

+12V

+12V

+12V

+12V

Optional :Voltage control

Data Taking Avril 2008

Connecto

r

20Level Translator

As reference+5V+2V-2V-5V

USB

Data Acquisition System

Hardware parts

FPGA board with USB connexion (A.Comerma) – VHDL code to manage (M.Dhellot, A.Charpy):

SiTr-130 and FEE acquisition for tracking VA1 acquisition for reference tracking

Page 17: SiTRA test beams at CERN: infrastructure developments and results Annual EUDET meeting NIKHEF Alexandre CHARPY

October 6th-8th, 2008 Alexandre [email protected] 17

Data Acquisition System

Software parts

Slow control is managed by Labview code (J.F.Huppert)

DAQ system is written in C++ and using the Root framework (C.Ciobanu, A.Charpy):

Set the DAQ system and chip configurations

Written the raw data Possibility of on-line

monitoring Send the data to EUDET

DAQ system if needed

Page 18: SiTRA test beams at CERN: infrastructure developments and results Annual EUDET meeting NIKHEF Alexandre CHARPY

October 6th-8th, 2008 Alexandre [email protected] 18

Data Acquisition System

Software parts DAQ system is written in C++ and using the Root framework (C.Ciobanu, A.Charpy):

XML Documentation generated by Doxygen (Activity diagram, time diagram)

Universal raw data format

Unified the control command for the DAQ system

Possibility of on-line monitoring

Send the data to EUDET DAQ system if needed

Page 19: SiTRA test beams at CERN: infrastructure developments and results Annual EUDET meeting NIKHEF Alexandre CHARPY

October 6th-8th, 2008 Alexandre [email protected] 19

Summary Mechanical status

Tools are ready to produce the module sensors

Availability for EUDET collaboration → Need to know new specification for tool customization or if changes is needed

DAQ status VHDL and C++ code is under development (will be ready for the

next testbeam)

Next step: SiTr130 management

Next tasks Validation of the DAQ system

Behaviour study of the electronics and sensors with local tests

Characterization of the new SiTr130-88 chips → beam test @ DESY in March 2009

Status is available on the following link: http://lpnhe-lc.in2p3.fr/internal/Status.html

Page 20: SiTRA test beams at CERN: infrastructure developments and results Annual EUDET meeting NIKHEF Alexandre CHARPY

October 6th-8th, 2008 Alexandre [email protected] 20

Thanks