SITR: FORCAST. February 19, 2010 Cornell University. Herter. FORCAST Status. FORCAST is up and running in lab at DOAF! Kudos to the FORCAST team George Gull, Chuck Henderson, Justin Schoenwald Joe Adams, Luke Keller Schedule 2/05FriShipped via FedEx Custom Critical - PowerPoint PPT Presentation

Citation preview

Page 1: SITR: FORCAST

SITR: FORCAST

February 19, 2010

Cornell University

Herter

Page 2: SITR: FORCAST

19-Feb-10 2

FORCAST Status• FORCAST is up and running in lab at DOAF!• Kudos to the FORCAST team

George Gull, Chuck Henderson, Justin Schoenwald Joe Adams, Luke Keller

• Schedule 2/05 Fri Shipped via FedEx Custom Critical 2/07 Sun Arrived at DOAF parking lot 2/08 Mon Unpack & prep for cool down 2/10 Wed FORCAST to LN2 2/11 Thu FORCAST to LHe 2/12 Fri Full cold soaked, working nominally

4/07 Wed Start of mini line-ops 4/23 Fri TA Characterization/First Light

Flight

Page 3: SITR: FORCAST

Most Procedures in Place

• Signed off Vacuum and Leak

Check Warm Test Cold Test CWR Installation PI Rack Installation On-Aircraft Cryogen Fill CWR Removal

• Not yet signed Safe to Mate In-flight access

• Operational Mini line-ops plan First light plan Line ops plan

19-Feb-10 3

Airworthiness document signed off as well.

Page 4: SITR: FORCAST

Photos: Loading for Shipment

19-Feb-10 4

Page 5: SITR: FORCAST

Photos: In DAOF lab

19-Feb-10 5

Calibration boxElectronics

Pump out

Cooling down

Page 6: SITR: FORCAST

Lessoned Learned• In general, everything has gone rather well• Chris has done a great job in outfitting the lab

Tools, pumps, etc But check your H/W and tools: do you have specialty items? No H/W stock room (nuts, bolts, etc)

• No real problems with Safety and QA Mainly in observational mode, updating procedures Remember safety shoes You can’t roll crane under load Make sure you load certify your cart!

• Operational issue Access to instrument/lab requires planning Must have 2 team members + 1 USRA person present

19-Feb-10 6

Page 7: SITR: FORCAST

Optimizing FORCAST

• Tweaks to optimize signal-to-noise ratio Bias: Can increase G (good) and G (bad) Chop frequency: Influences1/f noise contributions Frame rate: Affects read noise contribution Mux gain: Affects read noise contribution

(high/low capacitance – low cap best)

• Optimization depends upon background photon flux G is both bias and background dependent

19-Feb-10 7

211

1

RNntSGGn

tSG

N

S

pixbckpix

src

Ssrc = source photon rate

Sbck = background (ph/sec/pix)t1 = 1/ (frame rate)npix = source area (in pixels)RN = read noiseS/N = signal-to-noise (one read)

Page 8: SITR: FORCAST

Fore Optics

• Simulate on-sky (faint) source Chop and “Nod” Set and regulate source T

(e.g. T = 2 K)

• Checks system with “real” source

Warm & cold throughput

19-Feb-10 8

-20 -10 0 10 20-100

-50

0

50

Pixel

Sig

nal

Line Plot (129,124) - (179,124)

2 4 6 8

0

10

20

30

Distance (pixels)

Sig

nal

Radial Plot at ( 144.42, 124.31)

Page 9: SITR: FORCAST

19-Feb-10 9

0.5 1.0 1.5 2.0

20

40

60

80

100

120

detbias

SN

R_g

LWC LoCap (dT = 5C)

Optimizing Bias

• Upper left: S/N vs. bias for LWC low capacitance (low background) mode

30 micron + neutral density filter• Upper right: S/N vs. bias for

LWC in high capacitance (high background) mode

38 micron filter• Lower left: S/N vs. well depth

for LWC hi-cap mode sigLevel in DN

0.8 1.0 1.2 1.4 1.6 1.8 2.0150

200

250

300

detbias

SN

R_g

LWC HiCap (dT = 10C)

2000 4000 6000 8000 10000 12000

100

200

300

sigLevel

SN

R_g

LWC HiCap (dT = 10C)

6800 < sigLevel < 10700

Page 10: SITR: FORCAST

19-Feb-10 10

Cornell Non-DAOF activities• Prep for new LWC detector (GFY10-11)

New fan-out board New detector cabling Modify test dewar for array checkout FPGA and S/W mods for running array

• Documentation updates/generation (GFY10-11) Based on DAOF and flight results

• Installation and testing of LWC array (GFY11) Different multiplexor (and size) from current array

• Response to issues arising from first light flights (GFY10-11) Update FORCAST operations S/W Update data acquisition procedures Update data reduction pipeline Miscellaneous hardware updates due to unforeseen issues?

Page 11: SITR: FORCAST

Final Comments

• We’re ready to go

• Plan to keep FORCAST cold for next two weeks Further parameter optimization Occasional “funnies” we want to track down Testing of IMC Fine tuning (setting of parameters, quick look <->

FORCAST communications, etc.)

• Back at Cornell Will look into digital bias control