74
Appr Project Embu 33/11 kV Substation Prep. Date Customer Kenya Power & Lighting Co Ltd Title Report on Site Visit Resp. dept Projects Status Doc. no. Lang. Rev. ind. Page 1 en 01 No. of p. 10 Site Survey Report To: Projects Engineer Station: Embu 33/11 kV 1. General: Information Project Site survey Site Survey Engineers Albert Kadala, Beatrice Muthoni Survey Date 26 th August 2014 Station Name & Contact Embu 33/11 kV Region &Town Mt. Kenya North, Embu Distance to Site(km) 472 km from Nairobi Station Coordinates Embu town Access Road Kaunda street, Embu Station Voltage 33/11 kV Cable Trenches Available, from switchyard to new station building Notes: Embu 33/11kV substation is situated in Embu town. It is a relatively new substation and in good condition. There is enough space for any new panels with accessible cable ducts.

Site Survey Report - Kenya Power Kenya Survey reports.pdf · 9.3 Control Room layout ... Photographic Report Substation building Equipment room AC distribution board ... Site Survey

Embed Size (px)

Citation preview

Page 1: Site Survey Report - Kenya Power Kenya Survey reports.pdf · 9.3 Control Room layout ... Photographic Report Substation building Equipment room AC distribution board ... Site Survey

Appr Project Embu 33/11 kV Substation Prep. Date Customer Kenya Power & Lighting Co Ltd Title

Report on Site Visit Resp. dept Projects Status

Doc. no. Lang. Rev. ind. Page 1 en 01 No. of p. 10

Site Survey Report

To: Projects Engineer

Station: Embu 33/11 kV

1. General: Information

Project Site survey

Site Survey Engineers Albert Kadala, Beatrice Muthoni

Survey Date 26th August 2014

Station Name & Contact Embu 33/11 kV

Region &Town Mt. Kenya North, Embu

Distance to Site(km) 472 km from Nairobi

Station Coordinates Embu town

Access Road Kaunda street, Embu

Station Voltage 33/11 kV

Cable Trenches Available, from switchyard to new station building

Notes:

Embu 33/11kV substation is situated in Embu town. It is a relatively new substation and in

good condition. There is enough space for any new panels with accessible cable ducts.

Page 2: Site Survey Report - Kenya Power Kenya Survey reports.pdf · 9.3 Control Room layout ... Photographic Report Substation building Equipment room AC distribution board ... Site Survey

Appro Project Embu /11 kV Substation Prep. Date Customer Kenya Power & Lighting Co Ltd Title

Report on Site Visit Dept Projects Status

Doc. no. Lang. Rev. ind. Page 2 en 01 No. of p. 10

2. Drawings

3. Equipment Room

Location 11kV room

Room type and Floor Stone building, concrete floor

Ceiling type Concrete slab

L x W x H in meters New building under construction

AC Power 415VAC available

DC Power 30VDC , 110VDC available for protection.

Rectifier Available

Batteries Available

Power Distribution Board Available

Grounding System Substation earthing

Security Security guard at the gate, room secured with standard padlock

Access Road Kaunda street Embu

RTU/SAS Not available

Marshalling Not available

Cable Routes Available

Communication Eqpt Not available

Page 3: Site Survey Report - Kenya Power Kenya Survey reports.pdf · 9.3 Control Room layout ... Photographic Report Substation building Equipment room AC distribution board ... Site Survey

Appro Project Embu /11 kV Substation Prep. Date Customer Kenya Power & Lighting Co Ltd Title

Report on Site Visit Dept Projects Status

Doc. no. Lang. Rev. ind. Page 3 en 01 No. of p. 10

4. RTU

No RTU installed

5. Marshalling Cubicles

Not available.

6. Communication Equipment

Not available.

Last mile fiber optic is to be installed from Kutus substation. A new FO terminal equipment to

kutus will be required for onward routing to Kiganjo control center.

7. Room layout

8. AC Supply

415VAC available

Page 4: Site Survey Report - Kenya Power Kenya Survey reports.pdf · 9.3 Control Room layout ... Photographic Report Substation building Equipment room AC distribution board ... Site Survey

Appro Project Embu /11 kV Substation Prep. Date Customer Kenya Power & Lighting Co Ltd Title

Report on Site Visit Dept Projects Status

Doc. no. Lang. Rev. ind. Page 4 en 01 No. of p. 10

9. DC Supply

30VDC, 110VDC for protection available, 48VDC for communication not available

10. Plant Interface

10.1 Signals list

Attached

10.2 Installation and adaptation works

New RTU, Marshalling cubicle and fiber optic multiplexer will need to be installed at site.

Complete wiring from the panel to the Marshalling and from the Marshalling to the RTU will be

required. Connection and configuration of the FO mux to last mile fiber will be required

Enclosures

9.1 Site Survey Report

9.2 Detailed plant drawings

9.3 Control Room layout

9.4 Equipment Room Layout

11. Notes

distance from the site (km) 135km from Nairobi

Nearby buildings Residential

Nearby industries Residential

Type of soil Red soil

Water availability Water available

Special authority pass Limitation of access, Permit to work

Type of area Residential

Power supply 240VAC

Pass issued by: Kiganjo regional control

Page 5: Site Survey Report - Kenya Power Kenya Survey reports.pdf · 9.3 Control Room layout ... Photographic Report Substation building Equipment room AC distribution board ... Site Survey

Appro Project Embu /11 kV Substation Prep. Date Customer Kenya Power & Lighting Co Ltd Title

Report on Site Visit Dept Projects Status

Doc. no. Lang. Rev. ind. Page 5 en 01 No. of p. 10

12. Photographic Report

Substation building

Equipment room

AC distribution board

Battery chargers room for 30V and 110V

Battery room

Signal list

Embu 33/11kV Signal list 

OBJECT  TYPE  SIGNAL  Indications  Alarms  Commands  Measurands 

Energy Meter Inputs 

33kV             LINE 1  DPI  X113 ISO  On/Off  1             

                       

   AMI  Active Power, P            1    

      Reactive Power, Q           1    

      Voltage, U           1    

                       

   ITI  Energy, KWHR Imp              1 

      Energy, KVARHR Imp              1 

Page 6: Site Survey Report - Kenya Power Kenya Survey reports.pdf · 9.3 Control Room layout ... Photographic Report Substation building Equipment room AC distribution board ... Site Survey

Appro Project Embu /11 kV Substation Prep. Date Customer Kenya Power & Lighting Co Ltd Title

Report on Site Visit Dept Projects Status

Doc. no. Lang. Rev. ind. Page 6 en 01 No. of p. 10

                       

LINE 2  DPI  X213 ISO  On/Off  1             

                       

   AMI  Active Power, P            1    

      Reactive Power, Q           1    

      Voltage, U           1    

                       

   ITI  Energy, KWHR Imp              1 

      Energy, KVARHR Imp              1 

                       

TX1 BAY  DPI  CB 1L5 On/Off  1             

      ISO 1L3 On/Off  1             

      ISO 1L7 On/Off  1             

                       

   SPI  MPT‐Main Prot. Trip     1          

      BPT‐Backup Prot. Trip     1          

      Protection Faulty     1          

      TCF‐Trip Circuit Faulty     1          

      SCF‐Spring Charge Fail    1          

      SF6 LOW first step     1          

      SF6 LOW second step     1          

                       

   DCO  CB 1L5  Open/Close        1       

                       

   AMI  Volts, kV           1    

      Active Power, P           1    

      Reactive Power, Q           1    

      Amps           1    

                       

TX2 BAY  DPI  CB 2L5 On/Off  1             

      ISO 2L3 On/Off  1             

      ISO 2L7 On/Off  1             

                       

   SPI  MPT‐Main Prot. Trip     1          

      BPT‐Backup Prot. Trip     1          

      Protection Faulty     1          

      TCF‐Trip Circuit Faulty     1          

      SCF‐Spring Charge Fail    1          

      SF6 LOW first step     1          

      SF6 LOW second step     1          

                       

   DCO  CB 2L5  Open/Close        1       

                       

   AMI  Volts, kV           1    

      Active Power, P           1    

      Reactive Power, Q           1    

      Amps           1    

                       

TX1  DPI  TC Auto/Manual  1             

      TC Local/Remote  1             

                       

   SPI  TTA‐Temp Alarm     1          

Page 7: Site Survey Report - Kenya Power Kenya Survey reports.pdf · 9.3 Control Room layout ... Photographic Report Substation building Equipment room AC distribution board ... Site Survey

Appro Project Embu /11 kV Substation Prep. Date Customer Kenya Power & Lighting Co Ltd Title

Report on Site Visit Dept Projects Status

Doc. no. Lang. Rev. ind. Page 7 en 01 No. of p. 10

      TTT TEMP TRIP     1          

      TBA BUCH AL     1          

      TBT BUCH TRIP     1          

      TOL OIL LEVEL ALARM    1          

      TGA TX GENERAL AL     1          

      TGT TX GEN TRIP     1          

      TBS TX OUT OF STEP     1          

                       

   DCO  TC Auto/Manual        1       

                       

   RCO  TC Raise/Lower        1       

                       

   AMI  Tap Position           1    

                       

TX2  DPI  TC Auto/Manual  1             

      TC Local/Remote  1             

                       

   SPI  TTA‐Temp Alarm     1          

      TTT TEMP TRIP     1          

      TBA BUCH AL     1          

      TBT BUCH TRIP     1          

      TOL OIL LEVEL ALARM    1          

      TGA TX GENERAL AL     1          

      TGT TX GEN TRIP     1          

      TBS TX OUT OF STEP     1          

                       

   DCO  TC Auto/Manual        1       

                       

   RCO  TC Raise/Lower        1       

                       

   AMI  Tap Position           1    

                       

11 KV                      

INCOMER 1  DPI  CB INC1 On/Off  1             

                       

   SPI  MPT‐Main Prot. Trip     1          

      BPT‐Backup Prot. Trip     1          

      Protection Faulty     1          

      TCF‐Trip Circuit Faulty     1          

      SCF‐Spring Charge Fail    1          

      SF6 LOW first step     1          

      SF6 LOW second step     1          

                       

   DCO  CB INC 1 Open/Close        1       

                       

   AMI  Volts, kV           1    

      Active Power, P           1    

      Reactive Power, Q           1    

      Amps           1    

                       

   ITI  Energy, KWHR               1 

      Energy, KVARHR               1 

Page 8: Site Survey Report - Kenya Power Kenya Survey reports.pdf · 9.3 Control Room layout ... Photographic Report Substation building Equipment room AC distribution board ... Site Survey

Appro Project Embu /11 kV Substation Prep. Date Customer Kenya Power & Lighting Co Ltd Title

Report on Site Visit Dept Projects Status

Doc. no. Lang. Rev. ind. Page 8 en 01 No. of p. 10

                       

INCOMER 2  DPI  CB INC2 On/Off  1             

                       

   SPI  MPT‐Main Prot. Trip     1          

      BPT‐Backup Prot. Trip     1          

      BYF‐Bay Faulty     1          

      Protection Faulty     1          

      TCF‐Trip Circuit Faulty     1          

      Lockout relay operated     1          

      SCF‐Spring Charge Fail    1          

      SF6 LOW first step     1          

      SF6 LOW second step     1          

                       

   DCO  CB INC 2 Open/Close        1       

                       

   AMI  Volts, kV           1    

      Active Power, P           1    

      Reactive Power, Q           1    

      Amps           1    

                       

   ITI  Energy, KWHR               1 

      Energy, KVARHR               1 

                       

11kV BUSBAR  DPI  CB BC  On/Off  1             

                       

   DCO  CB BC  Open/Close        1       

                       

   SPI  Busbar protection     1          

      Busbar supervision     1          

                       

   AMI  Volts, kV           1    

      Frequency, F           1    

                       

11kV Feeders                      

Murinduko  DPI  CB On/Off  1             

                       

   SPI  MPT‐Main Prot. Trip     1          

      TCF‐Trip Circuit Faulty     1          

      SCF‐Spring Charge Fail    1          

      SF6 LOW first step     1          

                       

   DCO  CB Open/Close        1       

                       

   AMI  Amps           1    

                       

   ITI  Energy, KWHR              1 

      Energy, KVARHR              1 

                       

Blue Valley  DPI  CB On/Off  1             

                       

   SPI  MPT‐Main Prot. Trip     1          

      TCF‐Trip Circuit Faulty     1          

Page 9: Site Survey Report - Kenya Power Kenya Survey reports.pdf · 9.3 Control Room layout ... Photographic Report Substation building Equipment room AC distribution board ... Site Survey

Appro Project Embu /11 kV Substation Prep. Date Customer Kenya Power & Lighting Co Ltd Title

Report on Site Visit Dept Projects Status

Doc. no. Lang. Rev. ind. Page 9 en 01 No. of p. 10

      SCF‐Spring Charge Fail    1          

      SF6 LOW first step     1          

                       

   DCO  CB Open/Close        1       

                       

   AMI  Amps           1    

                       

   ITI  Energy, KWHR              1 

      Energy, KVARHR              1 

                       

Spare  DPI  CB On/Off  1             

                       

   SPI  MPT‐Main Prot. Trip     1          

      TCF‐Trip Circuit Faulty     1          

      SCF‐Spring Charge Fail    1          

      SF6 LOW first step     1          

                       

   DCO  CB Open/Close        1       

                       

   AMI  Amps           1    

                       

   ITI  Energy, KWHR              1 

      Energy, KVARHR              1 

                       

Mungania  DPI  CB On/Off  1             

                       

   SPI  MPT‐Main Prot. Trip     1          

      TCF‐Trip Circuit Faulty     1          

      SCF‐Spring Charge Fail    1          

      SF6 LOW first step     1          

                       

   DCO  CB Open/Close        1       

                       

   AMI  Amps           1    

                       

   ITI  Energy, KWHR              1 

      Energy, KVARHR              1 

                       

Gichungu  DPI  CB On/Off  1             

                       

   SPI  MPT‐Main Prot. Trip     1          

      TCF‐Trip Circuit Faulty     1          

      SCF‐Spring Charge Fail    1          

      SF6 LOW first step     1          

                       

   DCO  CB Open/Close        1       

                       

   AMI  Amps           1    

                       

   ITI  Energy, KWHR              1 

      Energy, KVARHR              1 

                       

Page 10: Site Survey Report - Kenya Power Kenya Survey reports.pdf · 9.3 Control Room layout ... Photographic Report Substation building Equipment room AC distribution board ... Site Survey

Appro Project Embu /11 kV Substation Prep. Date Customer Kenya Power & Lighting Co Ltd Title

Report on Site Visit Dept Projects Status

Doc. no. Lang. Rev. ind. Page 10 en 01 No. of p. 10

Embu Town  DPI  CB On/Off  1             

                       

   SPI  MPT‐Main Prot. Trip     1          

      TCF‐Trip Circuit Faulty     1          

      SCF‐Spring Charge Fail    1          

      SF6 LOW first step     1          

                       

   DCO  CB Open/Close        1       

                       

   AMI  Amps           1    

                       

   ITI  Energy, KWHR              1 

      Energy, KVARHR              1 

                       

Station  DPI  Station Remote/Supervisory  1             

                       

   SPI  48 DC Battery Alarm     1          

      48 DC Charger Alarm     1          

      48V Charger A Fail Alarm    1          

      48V Charger B Fail Alarm    1          

      RTU Alarm     1          

      Communications Alarm    1          

      110V DC Battery Alarm    1          

      110V DC Charger Alarm    1          

      110V DC Charger A Fail Alarm    1          

      110V DC Charger B Fail Alarm    1          

      Smoke in Control Room     1          

                       

   AMI  48V DC1           1    

      48V DC2           1    

      110V DC1           1    

      110V DC2           1    

                    

Total  22  83  15  36  20 

Page 11: Site Survey Report - Kenya Power Kenya Survey reports.pdf · 9.3 Control Room layout ... Photographic Report Substation building Equipment room AC distribution board ... Site Survey

Appr Project Githambo 33/11 kV Substation Prep. Date Customer Kenya Power & Lighting Co Ltd Title

Report on Site Visit Resp. dept Projects Status

Doc. no. Lang. Rev. ind. Page 1 en 01 No. of p. 8

Site Survey Report

To: Projects Engineer

Station: Githambo 33/11kV

1. General: Information

Project Site surveys

Site Survey Engineers Beatrice Muthoni

Survey Date 2nd September 2014

Station Name & Contact Githambo 33/11 kV

Region &Town Mt. Kenya South

Distance to Site(km) 126 km from Thika Town

Station Coordinates Githambo town

Access Road Githambo Road

Station Voltage 33/11 kV

Cable Trenches Available

Notes:

Page 12: Site Survey Report - Kenya Power Kenya Survey reports.pdf · 9.3 Control Room layout ... Photographic Report Substation building Equipment room AC distribution board ... Site Survey

Appro Project Githambo 33/11 kV Substation Prep. Date Customer Kenya Power & Lighting Co Ltd Title

Report on Site Visit Dept Projects Status

Doc. no. Lang. Rev. ind. Page 2 en 01 No. of p. 8

2. Drawings

Single Line Diagram

Station Layout

Page 13: Site Survey Report - Kenya Power Kenya Survey reports.pdf · 9.3 Control Room layout ... Photographic Report Substation building Equipment room AC distribution board ... Site Survey

Appro Project Githambo 33/11 kV Substation Prep. Date Customer Kenya Power & Lighting Co Ltd Title

Report on Site Visit Dept Projects Status

Doc. no. Lang. Rev. ind. Page 3 en 01 No. of p. 8

3. Equipment Room

4. RTU

Not Available

5. Marshalling Cubicles

Not Available

6. Communication Equipment

Not Available

Location Tx1 relay room

Room type and Floor Stone building, concrete floor

Ceiling type Iron sheet

L x W x H in meters 3.5*3.5*3M

AC Power 415V

DC Power 48V for tx relay panel

Rectifier Available

Batteries Available

Power Distribution Board Not Available

Grounding System Substation earthing

Security Guard at the gate, room secured with standard padlock

Access Road Githambo Road

RTU/SAS Not Available

Marshalling Not Available

Cable Routes Available

Communication Eqpt Not Available

Page 14: Site Survey Report - Kenya Power Kenya Survey reports.pdf · 9.3 Control Room layout ... Photographic Report Substation building Equipment room AC distribution board ... Site Survey

Appro Project Githambo 33/11 kV Substation Prep. Date Customer Kenya Power & Lighting Co Ltd Title

Report on Site Visit Dept Projects Status

Doc. no. Lang. Rev. ind. Page 4 en 01 No. of p. 8

7. Room layout

Proposed RTU, MC and FO panels

8. AC Supply

415V

9. DC Supply

48V

10. Plant Interface

10.1 Signals list

Attached

10.2 Installation and adaptation works

Page 15: Site Survey Report - Kenya Power Kenya Survey reports.pdf · 9.3 Control Room layout ... Photographic Report Substation building Equipment room AC distribution board ... Site Survey

Appro Project Githambo 33/11 kV Substation Prep. Date Customer Kenya Power & Lighting Co Ltd Title

Report on Site Visit Dept Projects Status

Doc. no. Lang. Rev. ind. Page 5 en 01 No. of p. 8

11. Enclosures

9.1 Site Survey Report

9.2 Detailed plant drawings

9.3 Control Room layout

9.4 Equipment Room Layout

9.4

12. Notes

distance from the site (km) 126 km from Thika Town Nearby buildings Farms Nearby industries Githambo Tea Factory Type of soil Red Soil Water availability Available Special authority pass Permit to work Type of area Residential Power supply Not available Pass issued by: Mt. Kenya Region control

Signal list

Page 16: Site Survey Report - Kenya Power Kenya Survey reports.pdf · 9.3 Control Room layout ... Photographic Report Substation building Equipment room AC distribution board ... Site Survey

Appro Project Githambo 33/11 kV Substation Prep. Date Customer Kenya Power & Lighting Co Ltd Title

Report on Site Visit Dept Projects Status

Doc. no. Lang. Rev. ind. Page 6 en 01 No. of p. 8

Githambo 33/11kV Signal list 

OBJECT  TYPE  SIGNAL  Indications  Alarms  Commands  Measurands 

Energy Meter Inputs 

33kV                      LINE 1  DPI  X676 ISO  On/Off  1             

                       

   AMI  Active Power, P            1    

      Reactive Power, Q           1    

      Voltage, U           1    

                       

   ITI  Energy, KWHR Imp              1 

      Energy, KVARHR Imp              1 

                       

LINE 2  DPI  X675 ISO  On/Off  1             

                       

   AMI  Active Power, P            1    

      Reactive Power, Q           1    

      Voltage, U           1    

                       

   ITI  Energy, KWHR Imp              1 

      Energy, KVARHR Imp              1 

                       

                       

TX1 BAY  DPI  CB OX2 On/Off  1             

      ISO  On/Off  1             

                       

   SPI  MPT‐Main Prot. Trip     1          

      BPT‐Backup Prot. Trip     1          

      Protection Faulty     1          

      TCF‐Trip Circuit Faulty     1          

      SCF‐Spring Charge Fail    1          

      SF6 LOW first step    1          

      SF6 LOW second step    1          

                       

   DCO  CB OX2  Open/Close        1       

                       

   AMI  Volts, kV           1    

      Active Power, P           1    

      Reactive Power, Q           1    

      Amps           1    

                       

TX1  DPI  TC Auto/Manual  1             

      TC Local/Remote  1             

                       

   SPI  TTA‐Temp Alarm     1          

      TTT TEMP TRIP     1          

      TBA BUCH AL     1          

      TBT BUCH TRIP     1          

      TOL OIL LEVEL ALARM    1          

Page 17: Site Survey Report - Kenya Power Kenya Survey reports.pdf · 9.3 Control Room layout ... Photographic Report Substation building Equipment room AC distribution board ... Site Survey

Appro Project Githambo 33/11 kV Substation Prep. Date Customer Kenya Power & Lighting Co Ltd Title

Report on Site Visit Dept Projects Status

Doc. no. Lang. Rev. ind. Page 7 en 01 No. of p. 8

      TGA TX GENERAL AL    1          

      TGT TX GEN TRIP     1          

      TBS TX OUT OF STEP    1          

                       

   DCO  TC Auto/Manual        1       

                       

   RCO  TC Raise/Lower        1       

                       

   AMI  Tap Position           1    

                       

                       

11 KV                      

Kangema feeder  DPI  CB On/Off  1             

      ISO  On/Off  1             

                       

   SPI  MPT‐Main Prot. Trip     1          

      TCF‐Trip Circuit Faulty     1          

      SCF‐Spring Charge Fail    1          

      SF6 LOW second step    1          

                       

   DCO  CB  Open/Close        1       

                       

   AMI  Volts, kV           1    

      Amps           1    

                       

   ITI  Energy, KWHR               1 

      Energy, KVARHR               1 

                       

Githambo feeder  DPI  CB OSM6 On/Off  1             

      ISO On/Off  1             

                       

   SPI  MPT‐Main Prot. Trip     1          

      TCF‐Trip Circuit Faulty     1          

      SCF‐Spring Charge Fail    1          

      SF6 LOW second step    1          

                       

   DCO  CB OSM6 Open/Close        1       

                       

   AMI  Volts, kV           1    

      Amps           1    

                       

   ITI  Energy, KWHR               1 

      Energy, KVARHR               1 

                       

Station  DPI  Station Remote/Supervisory  1             

                       

   SPI  48 DC Battery Alarm    1          

      48 DC Charger Alarm    1          

      48V Charger A Fail Alarm    1          

      48V Charger B Fail Alarm    1          

      RTU Alarm     1          

      Communications Alarm    1          

Page 18: Site Survey Report - Kenya Power Kenya Survey reports.pdf · 9.3 Control Room layout ... Photographic Report Substation building Equipment room AC distribution board ... Site Survey

Appro Project Githambo 33/11 kV Substation Prep. Date Customer Kenya Power & Lighting Co Ltd Title

Report on Site Visit Dept Projects Status

Doc. no. Lang. Rev. ind. Page 8 en 01 No. of p. 8

      110V DC Battery Alarm    1          

      110V DC Charger Alarm    1          

      110V DC Charger A Fail Alarm    1          

      110V DC Charger B Fail Alarm    1          

      Smoke in Control Room     1          

                       

   AMI  48V DC1           1    

      48V DC2           1    

      110V DC1           1    

      110V DC2           1    

                    

Total  11  34  5  19  8 

Page 19: Site Survey Report - Kenya Power Kenya Survey reports.pdf · 9.3 Control Room layout ... Photographic Report Substation building Equipment room AC distribution board ... Site Survey

Appr Project Karatina 33/11 kV Substation Prep. Date Customer Kenya Power & Lighting Co Ltd Title

Report on Site Visit Resp. dept Projects Status

Doc. no. Lang. Rev. ind. Page 1 en 01 No. of p. 11

Site Survey Report

To: Projects Engineer

Station: Karatina 33/11kV

1. General: Information

Project Site survey

Site Survey Engineers Albert Kadala, Beatrice Muthoni

Survey Date 25th August 2014

Station Name & Contact Karatina 33/11 kV

Region &Town Mt. Kenya South

Distance to Site(km) 139 km from Nairobi

Station Coordinates 0.484S, 37.1277 E, 1762 meters

Access Road Nairobi-Nyeri Rd

Station Voltage 33/11 kV

Cable Trenches Available

Notes:

Karatina 33/11kV substation is situated in Karatina town. It is in good condition. There is

enough space for any new panels with accessible cable ducts.

Page 20: Site Survey Report - Kenya Power Kenya Survey reports.pdf · 9.3 Control Room layout ... Photographic Report Substation building Equipment room AC distribution board ... Site Survey

Appro Project Karatina 33/11 kV Substation Prep. Date Customer Kenya Power & Lighting Co Ltd Title

Report on Site Visit Dept Projects Status

Doc. no. Lang. Rev. ind. Page 2 en 01 No. of p. 11

2. Drawings

Single Line Diagram

Station Layout

Page 21: Site Survey Report - Kenya Power Kenya Survey reports.pdf · 9.3 Control Room layout ... Photographic Report Substation building Equipment room AC distribution board ... Site Survey

Appro Project Karatina 33/11 kV Substation Prep. Date Customer Kenya Power & Lighting Co Ltd Title

Report on Site Visit Dept Projects Status

Doc. no. Lang. Rev. ind. Page 3 en 01 No. of p. 11

3. Equipment Room

4. RTU

Not Available

5. Marshalling Cubicles

Not Available

6. Communication Equipment

Not Available.

Proposed last mile fiber optic is to be installed to Kiganjo substation. New FO terminal equipment

will be required for onward routing to Kiganjo control center.

Location 11kV room

Room type and Floor Stone building, concrete floor

Ceiling type Iron Sheets

L x W x H in meters 6.5*4.7*3M

AC Power 240/415 VAC

DC Power 30V

Rectifier Available

Batteries Available for protection panels

Power Distribution Board Available

Grounding System Substation earthing

Security Guard at the gate, room secured with standard padlock

Access Road Nyeri-Nairobi Highway

RTU/SAS Not Available

Marshalling Not Available

Cable Routes Available

Communication Eqpt Not Available

Page 22: Site Survey Report - Kenya Power Kenya Survey reports.pdf · 9.3 Control Room layout ... Photographic Report Substation building Equipment room AC distribution board ... Site Survey

Appro Project Karatina 33/11 kV Substation Prep. Date Customer Kenya Power & Lighting Co Ltd Title

Report on Site Visit Dept Projects Status

Doc. no. Lang. Rev. ind. Page 4 en 01 No. of p. 11

7. Room layout

8. AC Supply

240/415V

9. DC Supply

30V

10. Plant Interface

10.1 Signals list

Attached

10.2 Installation and adaptation works

New RTU, Marshalling cubicle and fiber optic multiplexer will need to be installed at site.

Complete wiring from the panel to the Marshalling and from the Marshalling to the RTU will be

required. Connection and configuration of the FO mux to last mile fiber will be required

Page 23: Site Survey Report - Kenya Power Kenya Survey reports.pdf · 9.3 Control Room layout ... Photographic Report Substation building Equipment room AC distribution board ... Site Survey

Appro Project Karatina 33/11 kV Substation Prep. Date Customer Kenya Power & Lighting Co Ltd Title

Report on Site Visit Dept Projects Status

Doc. no. Lang. Rev. ind. Page 5 en 01 No. of p. 11

11. Enclosures

9.1 Site Survey Report

9.2 Detailed plant drawings

9.3 Control Room layout

9.4 Equipment Room Layout

12. Notes

distance from the site (km) 139 km from Nairobi Nearby buildings G.M Kariuki Hardware Nearby industries None Type of soil Red Soil Water availability Available Special authority pass Permit to work Type of area Urban Power supply 240VACPass issued by: Mt. Kenya Region control

Page 24: Site Survey Report - Kenya Power Kenya Survey reports.pdf · 9.3 Control Room layout ... Photographic Report Substation building Equipment room AC distribution board ... Site Survey

Appro Project Karatina 33/11 kV Substation Prep. Date Customer Kenya Power & Lighting Co Ltd Title

Report on Site Visit Dept Projects Status

Doc. no. Lang. Rev. ind. Page 6 en 01 No. of p. 11

13. Photographic Report

Station building Switchyard Equipment room AC distribution

Page 25: Site Survey Report - Kenya Power Kenya Survey reports.pdf · 9.3 Control Room layout ... Photographic Report Substation building Equipment room AC distribution board ... Site Survey

Appro Project Karatina 33/11 kV Substation Prep. Date Customer Kenya Power & Lighting Co Ltd Title

Report on Site Visit Dept Projects Status

Doc. no. Lang. Rev. ind. Page 7 en 01 No. of p. 11

SIGNAL LIST

Karatina 33/11kV Signal list 

OBJECT  TYPE  SIGNAL  Indications  Alarms  Commands  Measurands 

Energy Meter Inputs 

33kV                      LINE   DPI  X405 ISO  On/Off  1             

      X407 ISO  On/Off  1             

      X594 ISO  On/Off  1             

                       

   AMI  Active Power, P            1    

      Reactive Power, Q           1    

      Voltage, U           1    

                       

   ITI  Energy, KWHR Imp              1 

      Energy, KVARHR Imp              1 

                       

TX1 BAY  DPI  CB 2L5 On/Off  1             

      ISO 2L3 On/Off  1             

      ISO 2L7 On/Off  1             

                       

   SPI  MPT‐Main Prot. Trip     1          

      BPT‐Backup Prot. Trip     1          

      Protection Faulty     1          

      TCF‐Trip Circuit Faulty     1          

      SCF‐Spring Charge Fail    1          

      SF6 LOW first step     1          

      SF6 LOW second step    1          

                       

   DCO  CB 2L5  Open/Close        1       

                       

   AMI  Volts, kV           1    

      Active Power, P           1    

      Reactive Power, Q           1    

      Amps           1    

                       

TX2 BAY  DPI  CB 1L5 On/Off  1             

      ISO 1L3 On/Off  1             

      ISO 1L7 On/Off  1             

                       

Page 26: Site Survey Report - Kenya Power Kenya Survey reports.pdf · 9.3 Control Room layout ... Photographic Report Substation building Equipment room AC distribution board ... Site Survey

Appro Project Karatina 33/11 kV Substation Prep. Date Customer Kenya Power & Lighting Co Ltd Title

Report on Site Visit Dept Projects Status

Doc. no. Lang. Rev. ind. Page 8 en 01 No. of p. 11

   SPI  MPT‐Main Prot. Trip     1          

      BPT‐Backup Prot. Trip     1          

      Protection Faulty     1          

      TCF‐Trip Circuit Faulty     1          

      SCF‐Spring Charge Fail    1          

      SF6 LOW first step     1          

      SF6 LOW second step    1          

                       

   DCO  CB 1L5  Open/Close        1       

                       

   AMI  Volts, kV           1    

      Active Power, P           1    

      Reactive Power, Q           1    

      Amps           1    

                       

TX1  DPI  TC Auto/Manual  1             

      TC Local/Remote  1             

                       

   SPI  TTA‐Temp Alarm     1          

      TTT TEMP TRIP     1          

      TBA BUCH AL     1          

      TBT BUCH TRIP     1          

      TOL OIL LEVEL ALARM    1          

      TGA TX GENERAL AL    1          

      TGT TX GEN TRIP     1          

      TBS TX OUT OF STEP    1          

                       

   DCO  TC Auto/Manual        1       

                       

   RCO  TC Raise/Lower        1       

                       

   AMI  Tap Position           1    

                       

TX2  DPI  TC Auto/Manual  1             

      TC Local/Remote  1             

                       

   SPI  TTA‐Temp Alarm     1          

      TTT TEMP TRIP     1          

      TBA BUCH AL     1          

      TBT BUCH TRIP     1          

      TOL OIL LEVEL ALARM    1          

      TGA TX GENERAL AL    1          

      TGT TX GEN TRIP     1          

      TBS TX OUT OF STEP    1          

                       

   DCO  TC Auto/Manual        1       

                       

   RCO  TC Raise/Lower        1       

                       

   AMI  Tap Position           1    

                       

                       

Page 27: Site Survey Report - Kenya Power Kenya Survey reports.pdf · 9.3 Control Room layout ... Photographic Report Substation building Equipment room AC distribution board ... Site Survey

Appro Project Karatina 33/11 kV Substation Prep. Date Customer Kenya Power & Lighting Co Ltd Title

Report on Site Visit Dept Projects Status

Doc. no. Lang. Rev. ind. Page 9 en 01 No. of p. 11

11 KV                      

INCOMER 1  DPI  CB OSM22 On/Off  1             

      ISO Y547 On/Off  1             

      ISO Y287 On/Off  1             

                       

   SPI  MPT‐Main Prot. Trip     1          

      TCF‐Trip Circuit Faulty     1          

      SCF‐Spring Charge Fail    1          

      SF6 LOW second step    1          

                       

   DCO  CB OSM22 Open/Close        1       

                       

   AMI  Volts, kV           1    

      Amps           1    

                       

   ITI  Energy, KWHR               1 

      Energy, KVARHR               1 

                       

INCOMER 2  DPI  CB OSM45 On/Off  1             

      ISO Y027 On/Off  1             

      ISO Y548 On/Off  1             

                       

   SPI  MPT‐Main Prot. Trip     1          

      TCF‐Trip Circuit Faulty     1          

      SCF‐Spring Charge Fail    1          

      SF6 LOW second step    1          

                       

   DCO  CB OSM45 Open/Close        1       

                       

   AMI  Volts, kV           1    

      Amps           1    

                       

   ITI  Energy, KWHR               1 

      Energy, KVARHR               1 

                       

                       

SPARE feeder  DPI  CB On/Off  1             

      ISO  On/Off  1             

                       

   SPI  MPT‐Main Prot. Trip     1          

      TCF‐Trip Circuit Faulty     1          

      SCF‐Spring Charge Fail    1          

      SF6 LOW second step    1          

                       

   DCO  CB  Open/Close        1       

                       

   AMI  Volts, kV           1    

      Amps           1    

                       

   ITI  Energy, KWHR               1 

      Energy, KVARHR               1 

                       

Page 28: Site Survey Report - Kenya Power Kenya Survey reports.pdf · 9.3 Control Room layout ... Photographic Report Substation building Equipment room AC distribution board ... Site Survey

Appro Project Karatina 33/11 kV Substation Prep. Date Customer Kenya Power & Lighting Co Ltd Title

Report on Site Visit Dept Projects Status

Doc. no. Lang. Rev. ind. Page 10 en 01 No. of p. 11

FEEDER 2  DPI  CB OSM20 On/Off  1             

      ISO Y116 On/Off  1             

                       

   SPI  MPT‐Main Prot. Trip     1          

      TCF‐Trip Circuit Faulty     1          

      SCF‐Spring Charge Fail    1          

      SF6 LOW second step    1          

                       

   DCO  CB OSM6 Open/Close        1       

                       

   AMI  Volts, kV           1    

      Amps           1    

                       

   ITI  Energy, KWHR               1 

      Energy, KVARHR               1 

                       

TOWN FEEDER  DPI  CB  On/Off  1             

      ISO On/Off  1             

                       

   SPI  MPT‐Main Prot. Trip     1          

      TCF‐Trip Circuit Faulty     1          

      SCF‐Spring Charge Fail    1          

      SF6 LOW second step    1          

                       

   DCO  CB OSM6 Open/Close        1       

                       

   AMI  Volts, kV           1    

      Amps           1    

                       

   ITI  Energy, KWHR               1 

      Energy, KVARHR               1 

                       

MUKURUWEINI  DPI  CB  On/Off  1             

      ISO On/Off  1             

                       

   SPI  MPT‐Main Prot. Trip     1          

      TCF‐Trip Circuit Faulty     1          

      SCF‐Spring Charge Fail    1          

      SF6 LOW second step    1          

                       

   DCO  CB OSM6 Open/Close        1       

                       

   AMI  Volts, kV           1    

      Amps           1    

                       

   ITI  Energy, KWHR               1 

      Energy, KVARHR               1 

                       

STATE HSE  DPI  CB  On/Off  1             

      ISO On/Off  1             

                       

   SPI  MPT‐Main Prot. Trip     1          

Page 29: Site Survey Report - Kenya Power Kenya Survey reports.pdf · 9.3 Control Room layout ... Photographic Report Substation building Equipment room AC distribution board ... Site Survey

Appro Project Karatina 33/11 kV Substation Prep. Date Customer Kenya Power & Lighting Co Ltd Title

Report on Site Visit Dept Projects Status

Doc. no. Lang. Rev. ind. Page 11 en 01 No. of p. 11

      TCF‐Trip Circuit Faulty     1          

      SCF‐Spring Charge Fail    1          

      SF6 LOW second step    1          

                       

   DCO  CB OSM6 Open/Close        1       

                       

   AMI  Volts, kV           1    

      Amps           1    

                       

   ITI  Energy, KWHR               1 

      Energy, KVARHR               1 

                       

                       

Station  DPI  Station Remote/Supervisory  1             

                       

   SPI  48 DC Battery Alarm    1          

      48 DC Charger Alarm    1          

      48V Charger A Fail Alarm    1          

      48V Charger B Fail Alarm    1          

      RTU Alarm     1          

      Communications Alarm    1          

      110V DC Battery Alarm    1          

      110V DC Charger Alarm    1          

      110V DC Charger A Fail Alarm    1          

      110V DC Charger B Fail Alarm    1          

      Smoke in Control Room     1          

                       

   AMI  48V DC1           1    

      48V DC2           1    

      110V DC1           1    

      110V DC2           1    

                    

Total  30  69  13  31  16 

Page 30: Site Survey Report - Kenya Power Kenya Survey reports.pdf · 9.3 Control Room layout ... Photographic Report Substation building Equipment room AC distribution board ... Site Survey

Appr Project Kerugoya 33/11 kV Substation Prep. Date Customer Kenya Power & Lighting Co Ltd Title

Report on Site Visit Resp. dept Projects Status

Doc. no. Lang. Rev. ind. Page 1 en 01 No. of p. 8

Site Survey Report

To: Projects Engineer

Station: Kerugoya 33/11kV

1. General: Information

Project Site survey

Site Survey Engineers Albert Kadala, Beatrice Muthoni

Survey Date 26th August 2014

Station Name & Contact Kerugoya 33/11 kV

Region &Town Mt. Kenya South

Distance to Site(km) 200 km from Nairobi

Station Coordinates Kerugoya town

Access Road Kerugoya-Kagio Road

Station Voltage 33/11 kV

Cable Trenches Available

Notes:

Equipment room is under construction.

Page 31: Site Survey Report - Kenya Power Kenya Survey reports.pdf · 9.3 Control Room layout ... Photographic Report Substation building Equipment room AC distribution board ... Site Survey

Appro Project Kerugoya 33/11 kV Substation Prep. Date Customer Kenya Power & Lighting Co Ltd Title

Report on Site Visit Dept Projects Status

Doc. no. Lang. Rev. ind. Page 2 en 01 No. of p. 8

2. Drawings

Single Line Diagram

Station Layout

Page 32: Site Survey Report - Kenya Power Kenya Survey reports.pdf · 9.3 Control Room layout ... Photographic Report Substation building Equipment room AC distribution board ... Site Survey

Appro Project Kerugoya 33/11 kV Substation Prep. Date Customer Kenya Power & Lighting Co Ltd Title

Report on Site Visit Dept Projects Status

Doc. no. Lang. Rev. ind. Page 3 en 01 No. of p. 8

3. Equipment Room

4. RTU

Not Available

5. Marshalling Cubicles

Not Available

6. Communication Equipment

Not Available

Proposed last mile fiber optic is to be installed to Kiganjo substation. New FO terminal equipment

will be required for onward routing to Kiganjo control center.

Location 11kV room

Room type and Floor Stone building, concrete floor

Ceiling type Concrete

L x W x H in meters 5*5*3.5M

AC Power Not Available

DC Power Not Available

Rectifier Not Available

Batteries Not Available

Power Distribution Board Not Available

Grounding System Substation earthing

Security Guard at the gate, room secured with standard padlock

Access Road Kerugoya-Kagio Road

RTU/SAS Not Available

Marshalling Not Available

Cable Routes Available

Communication Eqpt Not Available

Page 33: Site Survey Report - Kenya Power Kenya Survey reports.pdf · 9.3 Control Room layout ... Photographic Report Substation building Equipment room AC distribution board ... Site Survey

Appro Project Kerugoya 33/11 kV Substation Prep. Date Customer Kenya Power & Lighting Co Ltd Title

Report on Site Visit Dept Projects Status

Doc. no. Lang. Rev. ind. Page 4 en 01 No. of p. 8

7. Room layout

8. AC Supply

Not Available

9. DC Supply

110V and 30V

10. Plant Interface

10.1 Signals list

Attached

10.2 Installation and adaptation works

New RTU, Marshalling cubicle and fiber optic multiplexer will need to be installed at site.

Complete wiring from the panel to the Marshalling and from the Marshalling to the RTU will be

required. Connection and configuration of the FO mux to last mile fiber will be required

Page 34: Site Survey Report - Kenya Power Kenya Survey reports.pdf · 9.3 Control Room layout ... Photographic Report Substation building Equipment room AC distribution board ... Site Survey

Appro Project Kerugoya 33/11 kV Substation Prep. Date Customer Kenya Power & Lighting Co Ltd Title

Report on Site Visit Dept Projects Status

Doc. no. Lang. Rev. ind. Page 5 en 01 No. of p. 8

11. Enclosures

9.1 Site Survey Report

9.2 Detailed plant drawings

9.3 Control Room layout

9.4 Equipment Room Layout

9.4

12. Notes

distance from the site (km) 164 km from Nairobi Nearby buildings Residential Nearby industries None Type of soil Red Soil Water availability Available Special authority pass Permit to work Type of area Residential Power supply 240VAC Pass issued by: Mt. Kenya Region control

13. Photographic Report

Station building under construction

Cable trenches under construction Equipment room Communication and battery room

Page 35: Site Survey Report - Kenya Power Kenya Survey reports.pdf · 9.3 Control Room layout ... Photographic Report Substation building Equipment room AC distribution board ... Site Survey

Appro Project Kerugoya 33/11 kV Substation Prep. Date Customer Kenya Power & Lighting Co Ltd Title

Report on Site Visit Dept Projects Status

Doc. no. Lang. Rev. ind. Page 6 en 01 No. of p. 8

SIGNAL LIST

Kerugoya 33/11kV Signal list 

OBJECT  TYPE  SIGNAL  Indications  Alarms  Commands  Measurands 

Energy Meter Inputs 

33kV                      LINE   DPI  CB 44 On/Off  1             

      X487 ISO  On/Off  1             

      X488 ISO  On/Off  1             

                       

   AMI  Active Power, P            1    

      Reactive Power, Q           1    

      Voltage, U           1    

                       

   ITI  Energy, KWHR Imp              1 

      Energy, KVARHR Imp              1 

                       

TX1  DPI  TC Auto/Manual  1             

      TC Local/Remote  1             

                       

   SPI  TTA‐Temp Alarm     1          

      TTT TEMP TRIP     1          

      TBA BUCH AL     1          

      TBT BUCH TRIP     1          

      TOL OIL LEVEL ALARM     1          

      TGA TX GENERAL AL     1          

      TGT TX GEN TRIP     1          

      TBS TX OUT OF STEP     1          

                       

   DCO  TC Auto/Manual        1       

                       

   RCO  TC Raise/Lower        1       

                       

   AMI  Tap Position           1    

                       

11 KV                      

INCOMER 1  DPI  ISO Y287 On/Off  1             

                       

   SPI  MPT‐Main Prot. Trip     1          

      TCF‐Trip Circuit Faulty     1          

      SCF‐Spring Charge Fail     1          

      SF6 LOW second step     1          

                       

   DCO  CB OSM22 Open/Close        1       

                       

Page 36: Site Survey Report - Kenya Power Kenya Survey reports.pdf · 9.3 Control Room layout ... Photographic Report Substation building Equipment room AC distribution board ... Site Survey

Appro Project Kerugoya 33/11 kV Substation Prep. Date Customer Kenya Power & Lighting Co Ltd Title

Report on Site Visit Dept Projects Status

Doc. no. Lang. Rev. ind. Page 7 en 01 No. of p. 8

   AMI  Volts, kV           1    

      Amps           1    

                       

   ITI  Energy, KWHR               1 

      Energy, KVARHR               1 

                       

Feeder 1  DPI  CB FTU19 On/Off  1             

      ISO Y335 On/Off  1             

                       

   SPI  MPT‐Main Prot. Trip     1          

      TCF‐Trip Circuit Faulty     1          

      SCF‐Spring Charge Fail     1          

      SF6 LOW second step     1          

                       

   DCO  CB FTU19 Open/Close        1       

                       

   AMI  Volts, kV           1    

      Amps           1    

                       

   ITI  Energy, KWHR               1 

      Energy, KVARHR               1 

                       

FEEDER 2  DPI  CB KFE16 On/Off  1             

      ISO Y334 On/Off  1             

                       

   SPI  MPT‐Main Prot. Trip     1          

      TCF‐Trip Circuit Faulty     1          

      SCF‐Spring Charge Fail     1          

      SF6 LOW second step     1          

                       

   DCO  CB OSM6 Open/Close        1       

                       

   AMI  Volts, kV           1    

      Amps           1    

                       

   ITI  Energy, KWHR               1 

      Energy, KVARHR               1 

                       

FEEDER 3  DPI  CB KFE15 On/Off  1             

      ISO Y333 On/Off  1             

                       

   SPI  MPT‐Main Prot. Trip     1          

      TCF‐Trip Circuit Faulty     1          

      SCF‐Spring Charge Fail     1          

      SF6 LOW second step     1          

                       

   DCO  CB KFE15 Open/Close        1       

                       

   AMI  Volts, kV           1    

      Amps           1    

                       

   ITI  Energy, KWHR               1 

Page 37: Site Survey Report - Kenya Power Kenya Survey reports.pdf · 9.3 Control Room layout ... Photographic Report Substation building Equipment room AC distribution board ... Site Survey

Appro Project Kerugoya 33/11 kV Substation Prep. Date Customer Kenya Power & Lighting Co Ltd Title

Report on Site Visit Dept Projects Status

Doc. no. Lang. Rev. ind. Page 8 en 01 No. of p. 8

      Energy, KVARHR               1 

                       

Station  DPI  Station Remote/Supervisory  1             

                       

   SPI  48 DC Battery Alarm     1          

      48 DC Charger Alarm     1          

      48V Charger A Fail Alarm    1          

      48V Charger B Fail Alarm    1          

      RTU Alarm     1          

      Communications Alarm     1          

      110V DC Battery Alarm     1          

      110V DC Charger Alarm     1          

      110V DC Charger A Fail Alarm    1          

      110V DC Charger B Fail Alarm    1          

      Smoke in Control Room     1          

                       

   AMI  48V DC1           1    

      48V DC2           1    

      110V DC1           1    

      110V DC2           1    

                    

Total  13  35  6  16  10 

Page 38: Site Survey Report - Kenya Power Kenya Survey reports.pdf · 9.3 Control Room layout ... Photographic Report Substation building Equipment room AC distribution board ... Site Survey

Appr Project Kiganjo 33/11 kV Substation Prep. Date Customer Kenya Power & Lighting Co Ltd Title

Report on Site Visit Resp. dept Projects Status

Doc. no. Lang. Rev. ind. Page 1 en 01 No. of p. 9

Site Survey Report

To: Projects Engineer

Station: Kiganjo 33/11kV

1. General: Information

Project Site surveys

Site Survey Engineers Albert Kadala, Beatrice Muthoni

Survey Date 25th August 2014

Station Name & Contact Kiganjo 33/11 kV

Region &Town Mt. Kenya South

Distance to Site(km) 215 km from Nairobi

Station Coordinates

Access Road Kiganjo-Nyeri Road

Station Voltage 33/11 kV

Cable Trenches Available

Notes:

Page 39: Site Survey Report - Kenya Power Kenya Survey reports.pdf · 9.3 Control Room layout ... Photographic Report Substation building Equipment room AC distribution board ... Site Survey

Appro Project Kiganjo 33/11 kV Substation Prep. Date Customer Kenya Power & Lighting Co Ltd Title

Report on Site Visit Dept Projects Status

Doc. no. Lang. Rev. ind. Page 2 en 01 No. of p. 9

2. Drawings

Single Line Diagram

Station Layout

Page 40: Site Survey Report - Kenya Power Kenya Survey reports.pdf · 9.3 Control Room layout ... Photographic Report Substation building Equipment room AC distribution board ... Site Survey

Appro Project Kiganjo 33/11 kV Substation Prep. Date Customer Kenya Power & Lighting Co Ltd Title

Report on Site Visit Dept Projects Status

Doc. no. Lang. Rev. ind. Page 3 en 01 No. of p. 9

3. Equipment Room

4. RTU

RTU 560 Available

1 No. 560PSU01 card

2 No. 23BA20 cards

4 No. 23BE23 cards

1 No. 23AE23 cards

1 No. 560RTC01 card

1 No. 560CMU05 cards

5. Marshalling Cubicles

Not available

Location 11kV room

Room type and Floor Stone building, concrete floor

Ceiling type Iron Sheets

L x W x H in meters 6.8*4.5*3M

AC Power 240/415 VAC

DC Power 110/48/30V

Rectifier Available

Batteries Available

Power Distribution Board Available

Grounding System Substation earthing

Security Guard at the gate, room secured with standard padlock

Access Road Kiganjo-Nyeri Road

RTU/SAS Available

Marshalling Available

Cable Routes Available

Communication Eqpt Available

Page 41: Site Survey Report - Kenya Power Kenya Survey reports.pdf · 9.3 Control Room layout ... Photographic Report Substation building Equipment room AC distribution board ... Site Survey

Appro Project Kiganjo 33/11 kV Substation Prep. Date Customer Kenya Power & Lighting Co Ltd Title

Report on Site Visit Dept Projects Status

Doc. no. Lang. Rev. ind. Page 4 en 01 No. of p. 9

6. Communication Equipment

Radio to Kiganjo available and powered

7. Room layout

.

8. AC Supply

240/415V

9. DC Supply

110/48/30V

10. Plant Interface

10.1 Signals list

Attachment

10.2 Installation and adaptation works

Page 42: Site Survey Report - Kenya Power Kenya Survey reports.pdf · 9.3 Control Room layout ... Photographic Report Substation building Equipment room AC distribution board ... Site Survey

Appro Project Kiganjo 33/11 kV Substation Prep. Date Customer Kenya Power & Lighting Co Ltd Title

Report on Site Visit Dept Projects Status

Doc. no. Lang. Rev. ind. Page 5 en 01 No. of p. 9

11. Enclosures

9.1 Site Survey Report

9.2 Detailed plant drawings

9.3 Control Room layout

9.4 Equipment Room Layout

12. Notes

distance from the site (km) 215 km from Nairobi Nearby buildings Farms Nearby industries None Type of soil Red Soil Water availability Available Special authority pass Permit to work Type of area Rural Power supply 240VAC Pass issued by: Mt. Kenya Region control

13. Photographic Report

Station building and communication tower to Kiganjo RTU560 installed Radio to Kiganjo 110VDC and 48VDC chargers 48V charger and batteries

Page 43: Site Survey Report - Kenya Power Kenya Survey reports.pdf · 9.3 Control Room layout ... Photographic Report Substation building Equipment room AC distribution board ... Site Survey

Appro Project Kiganjo 33/11 kV Substation Prep. Date Customer Kenya Power & Lighting Co Ltd Title

Report on Site Visit Dept Projects Status

Doc. no. Lang. Rev. ind. Page 6 en 01 No. of p. 9

Signal list

Kiganjo 33/11kV Signal list 

OBJECT  TYPE  SIGNAL  Indications  Alarms  Commands  Measurands 

Energy Meter Inputs 

33kV                      LINE   DPI  X421 ISO  On/Off  1             

                       

   AMI  Active Power, P            1    

      Reactive Power, Q           1    

      Voltage, U           1    

                       

   ITI  Energy, KWHR Imp              1 

      Energy, KVARHR Imp              1 

                       

TX1 BAY  DPI  CB 1L5 On/Off  1             

      ISO 1L3 On/Off  1             

      ISO 1L7 On/Off  1             

                       

   SPI  MPT‐Main Prot. Trip     1          

      BPT‐Backup Prot. Trip     1          

      Protection Faulty     1          

      TCF‐Trip Circuit Faulty     1          

      SCF‐Spring Charge Fail    1          

      SF6 LOW first step     1          

      SF6 LOW second step    1          

                       

   DCO  CB 1L5  Open/Close        1       

                       

   AMI  Volts, kV           1    

      Active Power, P           1    

      Reactive Power, Q           1    

      Amps           1    

                       

TX2 BAY  DPI  CB 2L5 On/Off  1             

      ISO 2L3 On/Off  1             

      ISO 2L7 On/Off  1             

                       

   SPI  MPT‐Main Prot. Trip     1          

      BPT‐Backup Prot. Trip     1          

      Protection Faulty     1          

      TCF‐Trip Circuit Faulty     1          

      SCF‐Spring Charge Fail    1          

      SF6 LOW first step     1          

      SF6 LOW second step    1          

                       

   DCO  CB 2L5  Open/Close        1       

Page 44: Site Survey Report - Kenya Power Kenya Survey reports.pdf · 9.3 Control Room layout ... Photographic Report Substation building Equipment room AC distribution board ... Site Survey

Appro Project Kiganjo 33/11 kV Substation Prep. Date Customer Kenya Power & Lighting Co Ltd Title

Report on Site Visit Dept Projects Status

Doc. no. Lang. Rev. ind. Page 7 en 01 No. of p. 9

                       

   AMI  Volts, kV           1    

      Active Power, P           1    

      Reactive Power, Q           1    

      Amps           1    

                       

TX1  DPI  TC Auto/Manual  1             

      TC Local/Remote  1             

                       

   SPI  TTA‐Temp Alarm     1          

      TTT TEMP TRIP     1          

      TBA BUCH AL     1          

      TBT BUCH TRIP     1          

      TOL OIL LEVEL ALARM    1          

      TGA TX GENERAL AL     1          

      TGT TX GEN TRIP     1          

      TBS TX OUT OF STEP     1          

                       

   DCO  TC Auto/Manual        1       

                       

   RCO  TC Raise/Lower        1       

                       

   AMI  Tap Position           1    

                       

TX2  DPI  TC Auto/Manual  1             

      TC Local/Remote  1             

                       

   SPI  TTA‐Temp Alarm     1          

      TTT TEMP TRIP     1          

      TBA BUCH AL     1          

      TBT BUCH TRIP     1          

      TOL OIL LEVEL ALARM    1          

      TGA TX GENERAL AL     1          

      TGT TX GEN TRIP     1          

      TBS TX OUT OF STEP     1          

                       

   DCO  TC Auto/Manual        1       

                       

   RCO  TC Raise/Lower        1       

                       

   AMI  Tap Position           1    

                       

                       

11 KV                      

INCOMER 1  DPI  ISO Y547 On/Off  1             

      ISO Y287 On/Off  1             

                       

   SPI  MPT‐Main Prot. Trip     1          

      TCF‐Trip Circuit Faulty     1          

      SCF‐Spring Charge Fail    1          

      SF6 LOW second step    1          

                       

Page 45: Site Survey Report - Kenya Power Kenya Survey reports.pdf · 9.3 Control Room layout ... Photographic Report Substation building Equipment room AC distribution board ... Site Survey

Appro Project Kiganjo 33/11 kV Substation Prep. Date Customer Kenya Power & Lighting Co Ltd Title

Report on Site Visit Dept Projects Status

Doc. no. Lang. Rev. ind. Page 8 en 01 No. of p. 9

   DCO  CB  Open/Close        1       

                       

   AMI  Volts, kV           1    

      Amps           1    

                       

   ITI  Energy, KWHR               1 

      Energy, KVARHR               1 

                       

INCOMER 2  DPI  ISO Y027 On/Off  1             

      ISO Y548 On/Off  1             

                       

   SPI  MPT‐Main Prot. Trip     1          

      TCF‐Trip Circuit Faulty     1          

      SCF‐Spring Charge Fail    1          

      SF6 LOW second step    1          

                       

   DCO  CB Open/Close        1       

                       

   AMI  Volts, kV           1    

      Amps           1    

                       

   ITI  Energy, KWHR               1 

      Energy, KVARHR               1 

                       

                       

Kiganjo feeder  DPI  CB On/Off  1             

      ISO  On/Off  1             

                       

   SPI  MPT‐Main Prot. Trip     1          

      TCF‐Trip Circuit Faulty     1          

      SCF‐Spring Charge Fail    1          

      SF6 LOW second step    1          

                       

   DCO  CB  Open/Close        1       

                       

   AMI  Volts, kV           1    

      Amps           1    

                       

   ITI  Energy, KWHR               1 

      Energy, KVARHR               1 

                       

FEEDER 2  DPI  CB OSM20 On/Off  1             

      ISO Y116 On/Off  1             

                       

   SPI  MPT‐Main Prot. Trip     1          

      TCF‐Trip Circuit Faulty     1          

      SCF‐Spring Charge Fail    1          

      SF6 LOW second step    1          

                       

   DCO  CB OSM6 Open/Close        1       

                       

   AMI  Volts, kV           1    

Page 46: Site Survey Report - Kenya Power Kenya Survey reports.pdf · 9.3 Control Room layout ... Photographic Report Substation building Equipment room AC distribution board ... Site Survey

Appro Project Kiganjo 33/11 kV Substation Prep. Date Customer Kenya Power & Lighting Co Ltd Title

Report on Site Visit Dept Projects Status

Doc. no. Lang. Rev. ind. Page 9 en 01 No. of p. 9

      Amps           1    

                       

   ITI  Energy, KWHR               1 

      Energy, KVARHR               1 

                       

FEEDER 3  DPI  CB  On/Off  1             

      ISO On/Off  1             

                       

   SPI  MPT‐Main Prot. Trip     1          

      TCF‐Trip Circuit Faulty     1          

      SCF‐Spring Charge Fail    1          

      SF6 LOW second step    1          

                       

   DCO  CB OSM6 Open/Close        1       

                       

   AMI  Volts, kV           1    

      Amps           1    

                       

   ITI  Energy, KWHR               1 

      Energy, KVARHR               1 

                       

Station  DPI  Station Remote/Supervisory  1             

                       

   SPI  48 DC Battery Alarm     1          

      48 DC Charger Alarm    1          

      48V Charger A Fail Alarm    1          

      48V Charger B Fail Alarm    1          

      RTU Alarm     1          

      Communications Alarm    1          

      110V DC Battery Alarm    1          

      110V DC Charger Alarm    1          

      110V DC Charger A Fail Alarm    1          

      110V DC Charger B Fail Alarm    1          

      Smoke in Control Room     1          

                       

   AMI  48V DC1           1    

      48V DC2           1    

      110V DC1           1    

      110V DC2           1    

                    

Total  22  61  11  27  12 

Page 47: Site Survey Report - Kenya Power Kenya Survey reports.pdf · 9.3 Control Room layout ... Photographic Report Substation building Equipment room AC distribution board ... Site Survey

Appr Project Meru 33/11 kV Substation Prep. Date Customer Kenya Power & Lighting Co Ltd Title

Report on Site Visit Resp. dept Projects Status

Doc. no. Lang. Rev. ind. Page 1 en 01 No. of p. 10

Site Survey Report

To: Projects Engineer

Station: Meru-Kinoru 33/11kV

1. General: Information

Project Site survey

Site Survey Engineers Albert Kadala, Beatrice Muthoni

Survey Date 26th August 2014

Station Name & Contact Kinoru 33/11 kV

Region &Town Mt. Kenya South

Distance to Site(km) 358 km from Nairobi

Station Coordinates Meru town

Access Road Kinoru Road

Station Voltage 33/11 kV

Cable Trenches Available

Notes:

All isolators are motorized. Kinoru 33/11kV substation is situated in Meru town. It is a

relatively new substation and in good condition. There is enough space for any new panels

with accessible cable ducts.

Page 48: Site Survey Report - Kenya Power Kenya Survey reports.pdf · 9.3 Control Room layout ... Photographic Report Substation building Equipment room AC distribution board ... Site Survey

Appro Project Meru 33/11 kV Substation Prep. Date Customer Kenya Power & Lighting Co Ltd Title

Report on Site Visit Dept Projects Status

Doc. no. Lang. Rev. ind. Page 2 en 01 No. of p. 10

2. Drawings

Single Line Diagram

Station Layout

Page 49: Site Survey Report - Kenya Power Kenya Survey reports.pdf · 9.3 Control Room layout ... Photographic Report Substation building Equipment room AC distribution board ... Site Survey

Appro Project Meru 33/11 kV Substation Prep. Date Customer Kenya Power & Lighting Co Ltd Title

Report on Site Visit Dept Projects Status

Doc. no. Lang. Rev. ind. Page 3 en 01 No. of p. 10

3. Equipment Room

4. RTU

Not Available

5. Marshalling Cubicles

Not Available

6. Communication Equipment

ADSS Fibre to Meru 132kV substation available

Location 11kV room

Room type and Floor Stone building, concrete floor

Ceiling type Iron Sheets

L x W x H in meters 11*7.5*3.5M

AC Power 240/415 VAC

DC Power 110/30V

Rectifier Available

Batteries Available

Power Distribution Board Available

Grounding System Substation earthing

Security Guard at the gate, room secured with standard padlock

Access Road Kinoru Road

RTU/SAS Not Available

Marshalling Not Available

Cable Routes Available

Communication Eqpt Fibre Available

Page 50: Site Survey Report - Kenya Power Kenya Survey reports.pdf · 9.3 Control Room layout ... Photographic Report Substation building Equipment room AC distribution board ... Site Survey

Appro Project Meru 33/11 kV Substation Prep. Date Customer Kenya Power & Lighting Co Ltd Title

Report on Site Visit Dept Projects Status

Doc. no. Lang. Rev. ind. Page 4 en 01 No. of p. 10

7. Room layout

8. AC Supply

240/415V

9. DC Supply

110/30V

10. Plant Interface

10.1 Signals list

Attached

10.2 Installation and adaptation works

New RTU, Marshalling cubicle and fiber optic multiplexer will need to be installed at site.

Complete wiring from the panel to the Marshalling and from the Marshalling to the RTU will be

required. Connection and configuration of the FO mux to last mile fiber will be required

Page 51: Site Survey Report - Kenya Power Kenya Survey reports.pdf · 9.3 Control Room layout ... Photographic Report Substation building Equipment room AC distribution board ... Site Survey

Appro Project Meru 33/11 kV Substation Prep. Date Customer Kenya Power & Lighting Co Ltd Title

Report on Site Visit Dept Projects Status

Doc. no. Lang. Rev. ind. Page 5 en 01 No. of p. 10

11. Enclosures

9.1 Site Survey Report

9.2 Detailed plant drawings

9.3 Control Room layout

9.4 Equipment Room Layout

12. Notes

distance from the site (km) 358 km from Nairobi Nearby buildings Kinoru Stadium Nearby industries None Type of soil Red Soil Water availability Available Special authority pass Permit to work Type of area Urban Power supply 240VAC Pass issued by: Mt. Kenya Region control

13. Photographic Report

Substation building Switchyard ADSS ODF from Meru 132 kV substation in proposed Communication Room Equipment room

Page 52: Site Survey Report - Kenya Power Kenya Survey reports.pdf · 9.3 Control Room layout ... Photographic Report Substation building Equipment room AC distribution board ... Site Survey

Appro Project Meru 33/11 kV Substation Prep. Date Customer Kenya Power & Lighting Co Ltd Title

Report on Site Visit Dept Projects Status

Doc. no. Lang. Rev. ind. Page 6 en 01 No. of p. 10

Signal list

Kinoru 33/11kV Signal list 

OBJECT  TYPE  SIGNAL  Indications  Alarms  Commands  Measurands 

Energy Meter Inputs 

33kV                      LINE 1  DPI  FTU  On/Off  1             

      X667 ISO  On/Off 1             

                       

   AMI  Active Power, P            1    

      Reactive Power, Q           1    

      Voltage, U           1    

                       

   ITI  Energy, KWHR Imp              1 

      Energy, KVARHR Imp              1 

                       

LINE 2  AMI  Active Power, P            1    

      Reactive Power, Q           1    

      Voltage, U           1    

                       

   ITI  Energy, KWHR Imp              1 

      Energy, KVARHR Imp              1 

                       

TX1 BAY  DPI  CB 1L5 On/Off  1             

Page 53: Site Survey Report - Kenya Power Kenya Survey reports.pdf · 9.3 Control Room layout ... Photographic Report Substation building Equipment room AC distribution board ... Site Survey

Appro Project Meru 33/11 kV Substation Prep. Date Customer Kenya Power & Lighting Co Ltd Title

Report on Site Visit Dept Projects Status

Doc. no. Lang. Rev. ind. Page 7 en 01 No. of p. 10

      ISO 1L3 On/Off  1             

      ISO 1L7 On/Off  1             

                       

   SPI  MPT‐Main Prot. Trip     1          

      BPT‐Backup Prot. Trip     1          

      Protection Faulty     1          

      TCF‐Trip Circuit Faulty     1          

      SCF‐Spring Charge Fail    1          

      SF6 LOW first step    1          

      SF6 LOW second step    1          

                       

   DCO  CB 1L5  Open/Close        1       

                       

   AMI  Volts, kV           1    

      Active Power, P           1    

      Reactive Power, Q           1    

      Amps           1    

                       

TX2 BAY  DPI  CB 2L5 On/Off  1             

      ISO 2L3 On/Off  1             

      ISO 2L7 On/Off  1             

                       

   SPI  MPT‐Main Prot. Trip     1          

      BPT‐Backup Prot. Trip     1          

      Protection Faulty     1          

      TCF‐Trip Circuit Faulty     1          

      SCF‐Spring Charge Fail    1          

      SF6 LOW first step    1          

      SF6 LOW second step    1          

                       

   DCO  CB 2L5  Open/Close        1       

                       

   AMI  Volts, kV           1    

      Active Power, P           1    

      Reactive Power, Q           1    

      Amps           1    

                       

                       

TX1  DPI  TC Auto/Manual  1             

      TC Local/Remote  1             

                       

   SPI  TTA‐Temp Alarm     1          

      TTT TEMP TRIP     1          

      TBA BUCH AL     1          

      TBT BUCH TRIP     1          

      TOL OIL LEVEL ALARM    1          

      TGA TX GENERAL AL    1          

      TGT TX GEN TRIP    1          

      TBS TX OUT OF STEP    1          

                       

   DCO  TC Auto/Manual        1       

                       

Page 54: Site Survey Report - Kenya Power Kenya Survey reports.pdf · 9.3 Control Room layout ... Photographic Report Substation building Equipment room AC distribution board ... Site Survey

Appro Project Meru 33/11 kV Substation Prep. Date Customer Kenya Power & Lighting Co Ltd Title

Report on Site Visit Dept Projects Status

Doc. no. Lang. Rev. ind. Page 8 en 01 No. of p. 10

   RCO  TC Raise/Lower        1       

                       

   AMI  Tap Position           1    

                       

TX2  DPI  TC Auto/Manual  1             

      TC Local/Remote  1             

                       

   SPI  TTA‐Temp Alarm     1          

      TTT TEMP TRIP     1          

      TBA BUCH AL     1          

      TBT BUCH TRIP     1          

      TOL OIL LEVEL ALARM    1          

      TGA TX GENERAL AL    1          

      TGT TX GEN TRIP    1          

      TBS TX OUT OF STEP    1          

                       

   DCO  TC Auto/Manual        1       

                       

   RCO  TC Raise/Lower        1       

                       

   AMI  Tap Position           1    

                       

11 KV                      

INCOMER 1  DPI  CB On/Off  1             

                       

   SPI  MPT‐Main Prot. Trip     1          

      TCF‐Trip Circuit Faulty     1          

      SCF‐Spring Charge Fail    1          

      SF6 LOW second step    1          

                       

   DCO  CB  Open/Close        1       

                       

   AMI  Volts, kV           1    

      Amps           1    

                       

   ITI  Energy, KWHR               1 

      Energy, KVARHR               1 

                       

INCOMER 2  DPI  CB On/Off  1             

                       

   SPI  MPT‐Main Prot. Trip     1          

      TCF‐Trip Circuit Faulty     1          

      SCF‐Spring Charge Fail    1          

      SF6 LOW second step    1          

                       

   DCO  CB  Open/Close        1       

                       

   AMI  Volts, kV           1    

      Amps           1    

                       

   ITI  Energy, KWHR               1 

      Energy, KVARHR               1 

Page 55: Site Survey Report - Kenya Power Kenya Survey reports.pdf · 9.3 Control Room layout ... Photographic Report Substation building Equipment room AC distribution board ... Site Survey

Appro Project Meru 33/11 kV Substation Prep. Date Customer Kenya Power & Lighting Co Ltd Title

Report on Site Visit Dept Projects Status

Doc. no. Lang. Rev. ind. Page 9 en 01 No. of p. 10

                       

                       

Makutano feeder  DPI  CB  On/Off  1             

                       

   SPI  MPT‐Main Prot. Trip     1          

      TCF‐Trip Circuit Faulty     1          

      SCF‐Spring Charge Fail    1          

      SF6 LOW second step    1          

                       

   DCO  CB Open/Close        1       

                       

   AMI  Volts, kV           1    

      Amps           1    

                       

   ITI  Energy, KWHR               1 

      Energy, KVARHR               1 

                       

Imenti feeder  DPI  CB  On/Off  1             

                       

   SPI  MPT‐Main Prot. Trip     1          

      TCF‐Trip Circuit Faulty     1          

      SCF‐Spring Charge Fail    1          

      SF6 LOW second step    1          

                       

   DCO  CB Open/Close        1       

                       

   AMI  Volts, kV           1    

      Amps           1    

                       

   ITI  Energy, KWHR               1 

      Energy, KVARHR               1 

                       

Town feeder  DPI  CB  On/Off  1             

                       

   SPI  MPT‐Main Prot. Trip     1          

      TCF‐Trip Circuit Faulty     1          

      SCF‐Spring Charge Fail    1          

      SF6 LOW second step    1          

                       

   DCO  CB Open/Close        1       

                       

   AMI  Volts, kV           1    

      Amps           1    

                       

   ITI  Energy, KWHR               1 

      Energy, KVARHR               1 

                       

Forest feeder  DPI  CB  On/Off  1             

                       

   SPI  MPT‐Main Prot. Trip     1          

      TCF‐Trip Circuit Faulty     1          

      SCF‐Spring Charge Fail    1          

Page 56: Site Survey Report - Kenya Power Kenya Survey reports.pdf · 9.3 Control Room layout ... Photographic Report Substation building Equipment room AC distribution board ... Site Survey

Appro Project Meru 33/11 kV Substation Prep. Date Customer Kenya Power & Lighting Co Ltd Title

Report on Site Visit Dept Projects Status

Doc. no. Lang. Rev. ind. Page 10 en 01 No. of p. 10

      SF6 LOW second step    1          

                       

   DCO  CB Open/Close        1       

                       

   AMI  Volts, kV           1    

      Amps           1    

                       

   ITI  Energy, KWHR               1 

      Energy, KVARHR               1 

                       

Station  DPI  Station Remote/Supervisory  1             

                       

   SPI  48 DC Battery Alarm    1          

      48 DC Charger Alarm    1          

      48V Charger A Fail Alarm    1          

      48V Charger B Fail Alarm    1          

      RTU Alarm     1          

      Communications Alarm    1          

      110V DC Battery Alarm    1          

      110V DC Charger Alarm    1          

      110V DC Charger A Fail Alarm    1          

      110V DC Charger B Fail Alarm    1          

      Smoke in Control Room     1          

                       

   AMI  48V DC1           1    

      48V DC2           1    

      110V DC1           1    

      110V DC2           1    

                    

Total  19  65  12  32  16 

Page 57: Site Survey Report - Kenya Power Kenya Survey reports.pdf · 9.3 Control Room layout ... Photographic Report Substation building Equipment room AC distribution board ... Site Survey

Appr Project Nanyuki 33/11 kVPrep. Date Customer Kenya Power & Lighting Co Ltd Title

Report on Site Visit Resp. dept Projects Status

Doc. no. Lang. Rev. ind. Page 1 en 01 No. of p. 8

Site Survey Report

To: Projects Engineer

Station: NANYUKI 33/11 kV

1. General: Information

Project Nanyuki 33/11 kV

Site Survey Engineers Albert Kadala, Beatrice Muthoni

Survey Date 25/08/2014

Station Name & Contact Nanyuki 33/11 kV

Region &Town Nanyuki town

Distance to Site(km) 278km from nairobi

Station Coordinates Nanyuki town

Access Road Nyeri – Nanyuki road

Station Voltage 33/11 kV

Cable Trenches Available

Notes:

Page 58: Site Survey Report - Kenya Power Kenya Survey reports.pdf · 9.3 Control Room layout ... Photographic Report Substation building Equipment room AC distribution board ... Site Survey

Appro Project Nanyuki 33/11 kVPrep. Date Customer Kenya Power & Lighting Co Ltd Title

Report on Site Visit Dept Projects Status

Doc. no. Lang. Rev. ind. Page 2 en 01 No. of p. 8

2. Drawings

3. Equipment Room

Location 11 kV room

Room type and Floor Concrete

Ceiling type Galsheet

L x W x H in meters 15.5 x 10 x 5 meters

AC Power 415 VAC

DC Power 48VDC

Rectifier Available

Batteries Available

Power Distribution Board

Grounding System Substation earth

Security Room secured with standard padlock

Access Road Nyeri nanyuki road

RTU/SAS Not available

Marshalling Not available

Page 59: Site Survey Report - Kenya Power Kenya Survey reports.pdf · 9.3 Control Room layout ... Photographic Report Substation building Equipment room AC distribution board ... Site Survey

Appro Project Nanyuki 33/11 kVPrep. Date Customer Kenya Power & Lighting Co Ltd Title

Report on Site Visit Dept Projects Status

Doc. no. Lang. Rev. ind. Page 3 en 01 No. of p. 8

4. RTU

Not available

5. Marshalling Cubicles

Not available

6. Communication Equipment

Fox 515 available, ADSS fiber connection to Nanyuki 132 kV substation available

7. Room layout

.

Cable trench

AC Distribution board

11 kV Board and feeder Panels

TX and Tap Con Panels

Proposed RTU, Marshalling

48V charger and batteries

FOX

Cable trench

Wall

8. AC Supply

415 VAC available

Cable Routes Available

Communication Eqpt FOX 515, ADSS fiber to Nanyuki 132 available

Page 60: Site Survey Report - Kenya Power Kenya Survey reports.pdf · 9.3 Control Room layout ... Photographic Report Substation building Equipment room AC distribution board ... Site Survey

Appro Project Nanyuki 33/11 kVPrep. Date Customer Kenya Power & Lighting Co Ltd Title

Report on Site Visit Dept Projects Status

Doc. no. Lang. Rev. ind. Page 4 en 01 No. of p. 8

9. DC Supply

48VDC for communication and 30VDC for protection available

10. Plant Interface

10.1 Signals list

Attached

10.2 Installation and adaptation works

A new RTU and Marshalling cubicle will need to be installed. Full wiring from equipment

panels to marshalling and to the RTU will be done.

11. Enclosures

9.1 Site Survey Report

9.2 Detailed plant drawings

9.3 Control Room layout

9.4 Equipment Room Layout

12. Notes

distance from the site (km) 278 km from Nairobi

Nearby buildings Vineyards garden hotel

Nearby industries Vineyards garden hotel

Type of soil Black cotton

Water availability Water available

Special authority pass LOA, PTW

Type of area Urban

Power supply Available

Pass issued by: Kiganjo Control

Page 61: Site Survey Report - Kenya Power Kenya Survey reports.pdf · 9.3 Control Room layout ... Photographic Report Substation building Equipment room AC distribution board ... Site Survey

Appro Project Nanyuki 33/11 kVPrep. Date Customer Kenya Power & Lighting Co Ltd Title

Report on Site Visit Dept Projects Status

Doc. no. Lang. Rev. ind. Page 5 en 01 No. of p. 8

13. Photographic Report

Equipment room TX panels room FOX 515 Multiplexer Communication room 48VDC charger and batteries Substation works in progress

Signal room

Machakos 33/11kV Signal list 

OBJECT  TYPE  SIGNAL  Indications  Alarms  Commands  Measurands 

Energy Meter Inputs 

33kV                      LINE 1  DPI  X428 ISO  On/Off  1             

                       

   AMI  Active Power, P            1    

      Reactive Power, Q           1    

      Voltage, U           1    

                       

Page 62: Site Survey Report - Kenya Power Kenya Survey reports.pdf · 9.3 Control Room layout ... Photographic Report Substation building Equipment room AC distribution board ... Site Survey

Appro Project Nanyuki 33/11 kVPrep. Date Customer Kenya Power & Lighting Co Ltd Title

Report on Site Visit Dept Projects Status

Doc. no. Lang. Rev. ind. Page 6 en 01 No. of p. 8

   ITI  Energy, KWHR Imp              1 

      Energy, KVARHR Imp              1 

                       

TX1 BAY  DPI  CB VW40 On/Off  1             

      ISO X431 On/Off  1             

                       

   SPI  MPT‐Main Prot. Trip     1          

      BPT‐Backup Prot. Trip     1          

      Protection Faulty     1          

      TCF‐Trip Circuit Faulty     1          

      SCF‐Spring Charge Fail     1          

      SF6 LOW first step     1          

      SF6 LOW second step     1          

                       

   DCO  CB VPR1  Open/Close        1       

                       

   AMI  Volts, kV           1    

      Active Power, P           1    

      Reactive Power, Q           1    

      Amps           1    

                       

TX1  DPI  TC Auto/Manual  1             

      TC Local/Remote  1             

                       

   SPI  TTA‐Temp Alarm     1          

      TTT TEMP TRIP     1          

      TBA BUCH AL     1          

      TBT BUCH TRIP     1          

      TOL OIL LEVEL ALARM     1          

      TGA TX GENERAL AL     1          

      TGT TX GEN TRIP     1          

      TBS TX OUT OF STEP     1          

                       

   DCO  TC Auto/Manual        1       

                       

   RCO  TC Raise/Lower        1       

                       

   AMI  Tap Position           1    

                       

11 KV                      

INCOMER  DPI  CB OSM22 On/Off  1             

      ISO Y069 On/Off  1             

                       

   SPI  MPT‐Main Prot. Trip     1          

      TCF‐Trip Circuit Faulty     1          

      SCF‐Spring Charge Fail     1          

      SF6 LOW second step     1          

                       

   DCO  CB OSM22 Open/Close        1       

                       

   AMI  Volts, kV           1    

      Amps           1    

Page 63: Site Survey Report - Kenya Power Kenya Survey reports.pdf · 9.3 Control Room layout ... Photographic Report Substation building Equipment room AC distribution board ... Site Survey

Appro Project Nanyuki 33/11 kVPrep. Date Customer Kenya Power & Lighting Co Ltd Title

Report on Site Visit Dept Projects Status

Doc. no. Lang. Rev. ind. Page 7 en 01 No. of p. 8

                       

   ITI  Energy, KWHR               1 

      Energy, KVARHR               1 

                       

FEEDER 1  DPI  CB OSM79 On/Off  1             

      ISO Y068 On/Off  1             

                       

   SPI  MPT‐Main Prot. Trip     1          

      TCF‐Trip Circuit Faulty     1          

      SCF‐Spring Charge Fail     1          

      SF6 LOW second step     1          

                       

   DCO  CB OSM79 Open/Close        1       

                       

   AMI  Volts, kV           1    

      Amps           1    

                       

   ITI  Energy, KWHR               1 

      Energy, KVARHR               1 

                       

FEEDER 2  DPI  CB OSM38 On/Off  1             

      ISO Y016 On/Off  1             

                       

   SPI  MPT‐Main Prot. Trip     1          

      TCF‐Trip Circuit Faulty     1          

      SCF‐Spring Charge Fail     1          

      SF6 LOW second step     1          

                       

   DCO  CB OSM38 Open/Close        1       

                       

   AMI  Volts, kV           1    

      Amps           1    

                       

   ITI  Energy, KWHR               1 

      Energy, KVARHR               1 

                       

FEEDER 3  DPI  CB OSM23 On/Off  1             

      ISO Y023 On/Off  1             

                       

   SPI  MPT‐Main Prot. Trip     1          

      TCF‐Trip Circuit Faulty     1          

      SCF‐Spring Charge Fail     1          

      SF6 LOW second step     1          

                       

   DCO  CB OSM23 Open/Close        1       

                       

   AMI  Volts, kV           1    

      Amps           1    

                       

   ITI  Energy, KWHR               1 

      Energy, KVARHR               1 

                       

Page 64: Site Survey Report - Kenya Power Kenya Survey reports.pdf · 9.3 Control Room layout ... Photographic Report Substation building Equipment room AC distribution board ... Site Survey

Appro Project Nanyuki 33/11 kVPrep. Date Customer Kenya Power & Lighting Co Ltd Title

Report on Site Visit Dept Projects Status

Doc. no. Lang. Rev. ind. Page 8 en 01 No. of p. 8

                       

Station  DPI  Station Remote/Supervisory  1             

                       

   SPI  48 DC Battery Alarm     1          

      48 DC Charger Alarm     1          

      48V Charger A Fail Alarm     1          

      48V Charger B Fail Alarm     1          

      RTU Alarm     1          

      Communications Alarm     1          

      110V DC Battery Alarm     1          

      110V DC Charger Alarm     1          

      110V DC Charger A Fail Alarm    1          

      110V DC Charger B Fail Alarm    1          

      Smoke in Control Room     1          

                       

   AMI  48V DC1           1    

      48V DC2           1    

      110V DC1           1    

      110V DC2           1    

                    

Total  14  42  7  20  10 

Page 65: Site Survey Report - Kenya Power Kenya Survey reports.pdf · 9.3 Control Room layout ... Photographic Report Substation building Equipment room AC distribution board ... Site Survey

Appr Project Othaya 33/11 kV Substation Prep. Date Customer Kenya Power & Lighting Co Ltd Title

Report on Site Visit Resp. dept Projects Status

Doc. no. Lang. Rev. ind. Page 1 en 01 No. of p. 10

Site Survey Report

To: Projects Engineer

Station: Othaya 33/11kV

1. General: Information

Project Site survey

Site Survey Engineers Albert Kadala, Beatrice Muthoni

Survey Date 25th August 2014

Station Name & Contact Othaya 33/11 kV

Region &Town Mt. Kenya South

Distance to Site(km) 183 km from Nairobi

Station Coordinates Othaya

Access Road Othaya Road

Station Voltage 33/11 kV

Cable Trenches Available

Notes:

Othaya 33/11kV substation is situated in Othaya town. It is in good condition. There is

enough space for any new panels with accessible cable ducts.

Page 66: Site Survey Report - Kenya Power Kenya Survey reports.pdf · 9.3 Control Room layout ... Photographic Report Substation building Equipment room AC distribution board ... Site Survey

Appro Project Industrial 66/11 kV Substation Prep. Date Customer Kenya Power & Lighting Co Ltd Title

Report on Site Visit Dept Projects Status

Doc. no. Lang. Rev. ind. Page 2 en 01 No. of p. 10

2. Drawings

Single Line Diagram

Station layout

3. Equipment Room

Page 67: Site Survey Report - Kenya Power Kenya Survey reports.pdf · 9.3 Control Room layout ... Photographic Report Substation building Equipment room AC distribution board ... Site Survey

Appro Project Industrial 66/11 kV Substation Prep. Date Customer Kenya Power & Lighting Co Ltd Title

Report on Site Visit Dept Projects Status

Doc. no. Lang. Rev. ind. Page 3 en 01 No. of p. 10

4. RTU

Not Available

5. Marshalling Cubicles

Not Available

6. Communication Equipment

Not Available

Proposed last mile fiber optic to be installed to Kiganjo substation. New FO terminal equipment

will be required for onward routing to Kiganjo control center.

Location 11kV room

Room type and Floor Stone building, concrete floor

Ceiling type Iron Sheets

L x W x H in meters 6.5*4.5*3M

AC Power 240/415 VAC

DC Power 30V

Rectifier Available

Batteries Available for protection panels

Power Distribution Board Available, but no available slots for new CBs

Grounding System Substation earthing

Security Guard at the gate, room secured with standard padlock

Access Road Othaya Road

RTU/SAS Not Available

Marshalling Not Available

Cable Routes Available, but in bad condition

Communication Eqpt Not Available

Page 68: Site Survey Report - Kenya Power Kenya Survey reports.pdf · 9.3 Control Room layout ... Photographic Report Substation building Equipment room AC distribution board ... Site Survey

Appro Project Industrial 66/11 kV Substation Prep. Date Customer Kenya Power & Lighting Co Ltd Title

Report on Site Visit Dept Projects Status

Doc. no. Lang. Rev. ind. Page 4 en 01 No. of p. 10

7. Room layout

DOOR

RTCC ControlPanel

Rtcc PanelTx1 relaypanel

Tx2 relaypanel

240/415 MAINS D.B

30V DC CHARGER

DOOR

8. AC Supply

240/415V

9. DC Supply

30V

10. Plant Interface

10.1 Signals list

Attached

10.2 Installation and adaptation works

Page 69: Site Survey Report - Kenya Power Kenya Survey reports.pdf · 9.3 Control Room layout ... Photographic Report Substation building Equipment room AC distribution board ... Site Survey

Appro Project Industrial 66/11 kV Substation Prep. Date Customer Kenya Power & Lighting Co Ltd Title

Report on Site Visit Dept Projects Status

Doc. no. Lang. Rev. ind. Page 5 en 01 No. of p. 10

New RTU, Marshalling cubicle and fiber optic multiplexer will need to be installed at site.

Complete wiring from the panel to the Marshalling and from the Marshalling to the RTU will be

required. Connection and configuration of the FO mux to last mile fiber will be required

11. Enclosures

9.1 Site Survey Report

9.2 Detailed plant drawings

9.3 Control Room layout

9.4 Equipment Room Layout

12. Notes

distance from the site (km) 183 km from Nairobi Nearby buildings Residential homes Nearby industries None Type of soil Red Soil Water availability Available Special authority pass Permit to work Type of area Rural Power supply 240VAC Pass issued by: Mt. Kenya Region control

Page 70: Site Survey Report - Kenya Power Kenya Survey reports.pdf · 9.3 Control Room layout ... Photographic Report Substation building Equipment room AC distribution board ... Site Survey

Appro Project Industrial 66/11 kV Substation Prep. Date Customer Kenya Power & Lighting Co Ltd Title

Report on Site Visit Dept Projects Status

Doc. no. Lang. Rev. ind. Page 6 en 01 No. of p. 10

13. Photographic Report

Station building TX panels Switchyard Battery chargers

Signal list

Othaya 33/11kV Signal list 

OBJECT  TYPE  SIGNAL  Indications  Alarms  Commands  Measurands 

Energy Meter Inputs 

33kV                      LINE   DPI  X589 ISO  On/Off  1             

                      

   AMI  Active Power, P            1    

      Reactive Power, Q           1    

      Voltage, U           1    

                       

   ITI  Energy, KWHR Imp              1 

      Energy, KVARHR Imp              1 

                       

TX1 BAY  DPI  CB 2L5 On/Off  1             

      ISO 2L3 On/Off  1             

      ISO 2L7 On/Off  1             

                       

   SPI  MPT‐Main Prot. Trip     1          

      BPT‐Backup Prot. Trip     1          

      Protection Faulty     1          

      TCF‐Trip Circuit Faulty     1          

      SCF‐Spring Charge Fail    1          

      SF6 LOW first step     1          

Page 71: Site Survey Report - Kenya Power Kenya Survey reports.pdf · 9.3 Control Room layout ... Photographic Report Substation building Equipment room AC distribution board ... Site Survey

Appro Project Industrial 66/11 kV Substation Prep. Date Customer Kenya Power & Lighting Co Ltd Title

Report on Site Visit Dept Projects Status

Doc. no. Lang. Rev. ind. Page 7 en 01 No. of p. 10

      SF6 LOW second step    1          

                       

   DCO  CB 2L5  Open/Close        1       

                      

   AMI  Volts, kV           1    

      Active Power, P           1    

      Reactive Power, Q           1    

      Amps           1    

                       

TX2 BAY  DPI  CB 1L5 On/Off  1             

      ISO 1L3 On/Off  1             

      ISO 1L7 On/Off  1             

                       

   SPI  MPT‐Main Prot. Trip     1          

      BPT‐Backup Prot. Trip     1          

      Protection Faulty     1          

      TCF‐Trip Circuit Faulty     1          

      SCF‐Spring Charge Fail    1          

      SF6 LOW first step     1          

      SF6 LOW second step    1          

                       

   DCO  CB 1L5  Open/Close        1       

                      

   AMI  Volts, kV           1    

      Active Power, P           1    

      Reactive Power, Q           1    

      Amps           1    

                       

TX1  DPI  TC Auto/Manual  1             

      TC Local/Remote  1             

                       

   SPI  TTA‐Temp Alarm     1          

      TTT TEMP TRIP     1          

      TBA BUCH AL     1          

      TBT BUCH TRIP     1          

      TOL OIL LEVEL ALARM    1          

      TGA TX GENERAL AL     1          

      TGT TX GEN TRIP     1          

      TBS TX OUT OF STEP     1          

                       

   DCO  TC Auto/Manual        1       

                       

   RCO  TC Raise/Lower        1       

                       

   AMI  Tap Position           1    

                       

TX2  DPI  TC Auto/Manual  1             

      TC Local/Remote  1             

                       

   SPI  TTA‐Temp Alarm     1          

      TTT TEMP TRIP     1          

      TBA BUCH AL     1          

Page 72: Site Survey Report - Kenya Power Kenya Survey reports.pdf · 9.3 Control Room layout ... Photographic Report Substation building Equipment room AC distribution board ... Site Survey

Appro Project Industrial 66/11 kV Substation Prep. Date Customer Kenya Power & Lighting Co Ltd Title

Report on Site Visit Dept Projects Status

Doc. no. Lang. Rev. ind. Page 8 en 01 No. of p. 10

      TBT BUCH TRIP     1          

      TOL OIL LEVEL ALARM    1          

      TGA TX GENERAL AL     1          

      TGT TX GEN TRIP     1          

      TBS TX OUT OF STEP     1          

                       

   DCO  TC Auto/Manual        1       

                       

   RCO  TC Raise/Lower        1       

                       

   AMI  Tap Position           1    

                       

                       

11 KV                      

INCOMER 1  DPI  CB On/Off  1             

      ISO On/Off  1             

      ISO On/Off  1             

                       

   SPI  MPT‐Main Prot. Trip     1          

      TCF‐Trip Circuit Faulty     1          

      SCF‐Spring Charge Fail    1          

      SF6 LOW second step    1          

                       

   DCO  CB  Open/Close        1       

                      

   AMI  Volts, kV           1    

      Amps           1    

                       

   ITI  Energy, KWHR               1 

      Energy, KVARHR               1 

                       

INCOMER 2  DPI  CB  On/Off  1             

      ISO On/Off  1             

      ISO On/Off  1             

                       

   SPI  MPT‐Main Prot. Trip     1          

      TCF‐Trip Circuit Faulty     1          

      SCF‐Spring Charge Fail    1          

      SF6 LOW second step    1          

                       

   DCO  CB OSM45 Open/Close        1       

                      

   AMI  Volts, kV           1    

      Amps           1    

                       

   ITI  Energy, KWHR               1 

      Energy, KVARHR               1 

                       

                       

Othaya feeder  DPI  CB On/Off  1             

      ISO  On/Off  1             

                       

Page 73: Site Survey Report - Kenya Power Kenya Survey reports.pdf · 9.3 Control Room layout ... Photographic Report Substation building Equipment room AC distribution board ... Site Survey

Appro Project Industrial 66/11 kV Substation Prep. Date Customer Kenya Power & Lighting Co Ltd Title

Report on Site Visit Dept Projects Status

Doc. no. Lang. Rev. ind. Page 9 en 01 No. of p. 10

   SPI  MPT‐Main Prot. Trip     1          

      TCF‐Trip Circuit Faulty     1          

      SCF‐Spring Charge Fail    1          

      SF6 LOW second step    1          

                       

   DCO  CB  Open/Close        1       

                      

   AMI  Volts, kV           1    

      Amps           1    

                       

   ITI  Energy, KWHR               1 

      Energy, KVARHR               1 

                       

Chinga  DPI  CB OSM20 On/Off  1             

      ISO Y116 On/Off  1             

                      

   SPI  MPT‐Main Prot. Trip     1          

      TCF‐Trip Circuit Faulty     1          

      SCF‐Spring Charge Fail    1          

      SF6 LOW second step    1          

                       

   DCO  CB OSM6 Open/Close        1       

                      

   AMI  Volts, kV           1    

      Amps           1    

                       

   ITI  Energy, KWHR               1 

      Energy, KVARHR               1 

                       

Sagana  DPI  CB  On/Off  1             

      ISO On/Off  1             

                      

   SPI  MPT‐Main Prot. Trip     1          

      TCF‐Trip Circuit Faulty     1          

      SCF‐Spring Charge Fail    1          

      SF6 LOW second step    1          

                       

   DCO  CB OSM6 Open/Close        1       

                      

   AMI  Volts, kV           1    

      Amps           1    

                       

   ITI  Energy, KWHR               1 

      Energy, KVARHR               1 

                       

Kiriaini  DPI  CB  On/Off  1             

      ISO On/Off  1             

                      

   SPI  MPT‐Main Prot. Trip     1          

      TCF‐Trip Circuit Faulty     1          

      SCF‐Spring Charge Fail    1          

      SF6 LOW second step    1          

Page 74: Site Survey Report - Kenya Power Kenya Survey reports.pdf · 9.3 Control Room layout ... Photographic Report Substation building Equipment room AC distribution board ... Site Survey

Appro Project Industrial 66/11 kV Substation Prep. Date Customer Kenya Power & Lighting Co Ltd Title

Report on Site Visit Dept Projects Status

Doc. no. Lang. Rev. ind. Page 10 en 01 No. of p. 10

                       

   DCO  CB OSM6 Open/Close        1       

                      

   AMI  Volts, kV           1    

      Amps           1    

                       

   ITI  Energy, KWHR               1 

      Energy, KVARHR               1 

                       

Station  DPI  Station Remote/Supervisory  1             

                       

   SPI  48 DC Battery Alarm     1          

      48 DC Charger Alarm    1          

      48V Charger A Fail Alarm    1          

      48V Charger B Fail Alarm    1          

      RTU Alarm     1          

      Communications Alarm    1          

      110V DC Battery Alarm    1          

      110V DC Charger Alarm    1          

      110V DC Charger A Fail Alarm    1          

      110V DC Charger B Fail Alarm    1          

      Smoke in Control Room     1          

                       

   AMI  48V DC1           1    

      48V DC2           1    

      110V DC1           1    

      110V DC2           1    

                    

Total  26  65  12  29  14