1
AS AS OP OP AS 1 2 3 4 5 6 7 8 9 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 41 42 43 44 45 46 47 48 49 50 51 52 53 54 55 56 57 58 59 60 61 62 63 64 65 66 67 68 69 70 71 72 73 75 74 PUBLIC OPEN SPACE IDB Drainage Easement Route of Diverted Public Footpath IDB Drainage Easement Route of Diverted Public Footpath 15m easement from Pump Stn * * * * Drainage Easement * Electric cable easment OPP AS AS OPP AS AS AS 01 OPP 01 03 04 05 06 06 07 07 08 09 09 04 05 02 02 03 08 18 17 17 16 16 15 15 25 25 23 23 24 24 10 11 12 13 11 12 12 13 14 13 14 14 15 AS OPP 26 26 28 28 29 30 29 30 27 27 OPP 31 32 33 34 31 32 33 34 35 63 64 66 68 69 70 70 59 60 59 60 68 69 66 64 65 71 71 72 72 58 58 63 62 61 62 61 AS 73 73 74 74 75 75 54 54 55 55 56 57 56 57 45 46 45 46 AS 38 38 48 49 49 48 50 50 51 51 52 52 53 53 47 47 AS AS 42 42 43 43 44 35 67 67 65 OPP 20 21 22 23 24 37 * 39 41 42 44 43 43 AS AS OP AS AS AS OP AS OP 11 10 10 22 22 21 21 18 19 19 20 20 * * * * * 42 41 39 40 40 OP 37 36 36 F GEN WASTE MANAGEMENT SILO STORE STACKED CABIN ATLAS OFFICE TOILET PARKING SITE ACCESS STORAGE/ DELIVERY N W S E 118 - CMP - 01 DRAWING No: DRAWN: AR DRAWING TITLE: PROJECT: DATE: 11.11.2020 1 Goodison Road, Lincs Gateway Business Park, Spalding, Lincs, PE12 6FY T: 01406 490590 PROPOSED RESIDENTIAL DEVELOPMENT AT SUNNYDALE CLOSE SURFLEET REV: B SCALE: 1:500 @ A1 CONSTRUCTION MANAGEMENT PLAN REV DATE DESCRIPTION Where dust issues are likely to occur, for example when cutting and excavating, dust suppression and use of RPE (respiratory protection equipment), and where appropriate wetting practices should be implemented. The condition of site haul routes should be monitored. Mud is not to be taken onto public roads. Road sweeping and road wetting to be implemented as required. Control of dust The site manager should monitor noise pollution across their site at all times. Where practically possible, 'quite' equipment should be used. Machinery and equipment should only be used for the required time. Vehicles should not be revved and engines should not be left running when not required to be in operation. Noise Management SITE WORKING HOURS To be 7.30am - 5.00pm Monday to Friday. In the event that Saturday working becomes necessary this is to be restricted to the hours of 8.00am - 1.00pm. Materials suppliers are are to be instructed not to arrive to site prior 7.30am to avoid disturbance to neighbors or potential highway obstruction. IN CASE OF FIRE A SOUNDING OF AIR KLAXTON ALL PERSONEL TO FIRE POINT F KEY SITE WELFARE SITE OFFICE & CANTEEN SILOS STORAGE CONTAINERS COMPOUND STORAGE SITE INGRESS & EGRESS TO COMPOUND & SITE PARKING TRAFFIC OUT TRAFFIC IN A 11.11.2020 SITE ACCESS AMENDED B 24.02.2021 UPDATED TO NEW LAYOUT

SITE SITE OFFICE & CANTEEN ACCESS STORAGE/DELIVERY

  • Upload
    others

  • View
    1

  • Download
    0

Embed Size (px)

Citation preview

AS

AS O

P

OP

AS

1

2

3

4

5

6

7

8

9

25

26

27

28

29

30

31

32

33

34

35

36

37

38

39

40

41

42

43

44

45

46

47

48

49

50

51

52

53

54

55

56

57

58

59

60

61

62

63

64

65

66

67

68

69

70

71

72

73

75

74

PUBLIC OPEN SPACE

ID

B

D

r

a

in

a

g

e

E

a

s

e

m

e

n

t

Route of Diverted

Public Footpath

I

D

B

D

r

a

i

n

a

g

e

E

a

s

e

m

e

n

t

Route of Diverted

Public Footpath

15m easement

from Pump Stn

*

*

*

*

D

r

a

in

a

g

e

E

a

s

e

m

e

n

t

*

Electric cable

easment

OPP

AS

AS

OPP

AS

AS

AS

01

OPP

01

03

04

05

06

06

07

07

08

09

09

04

05

02

02

03

08

18

17

17

16

16

15

15

25

25

23

23

24

24

1011

1213

11

12

1213

14

1314

14

15

AS

OPP

26

26

28

28

29

30

29

302727

OPP

31

32

33

34

31

32

33

34

35

63 64

66

6869

70

70

59

60

59

60

6869

66

64 65

71

71

72

72

58

58

63

62

61 62

61

AS

7373

7474

75

75

54

54

55

55

56

57

56

57

45

46

45

46

AS

38

38

4849

494850

5051

51

5252

53

53

47

47

AS

AS

42

4243

43

44

35

67

67

65

OPP

20

21

22

23

24

37

*

39

41

42

44

43

43

AS

AS

OP

AS

AS

AS

OP

AS

OP

1110

10

22

22

21

21

18

19

19

2020

*

*

*

*

*

42

41

3940

40

OP

37

36

36

F

GEN

W

A

S

T

E

M

A

N

A

G

E

M

E

N

T

SILO

S

T

O

R

E

S

T

A

C

K

E

D

C

A

B

IN

A

T

L

A

S

O

F

F

IC

E

T

O

IL

E

T

P

A

R

K

I

N

G

SITE

ACCESS

S

T

O

R

A

G

E

/

D

E

L

IV

E

R

Y

N

W

S

E

118 - CMP - 01DRAWING No:

DRAWN: AR

DRAWING TITLE:

PROJECT:

DATE: 11.11.2020

1 Goodison Road, Lincs Gateway Business Park,Spalding, Lincs, PE12 6FY T: 01406 490590

PROPOSED RESIDENTIAL DEVELOPMENT ATSUNNYDALE CLOSESURFLEET

REV: B

SCALE: 1:500 @ A1

CONSTRUCTION MANAGEMENT PLAN

REV DATE DESCRIPTION

Where dust issues are likely to occur, for example

when cutting and excavating, dust suppression

and use of RPE (respiratory protection

equipment), and where appropriate wetting

practices should be implemented.

The condition of site haul routes should be

monitored. Mud is not to be taken onto public

roads. Road sweeping and road wetting to be

implemented as required.

Control of dust

The site manager should monitor noise pollution

across their site at all times.

Where practically possible, 'quite' equipment

should be used. Machinery and equipment should

only be used for the required time.

Vehicles should not be revved and engines should

not be left running when not required to be in

operation.

Noise Management

SITE WORKING HOURS

To be 7.30am - 5.00pm Monday to Friday. In the

event that Saturday working becomes necessary

this is to be restricted to the hours of 8.00am -

1.00pm.

Materials suppliers are are to be instructed not to

arrive to site prior 7.30am to avoid disturbance to

neighbors or potential highway obstruction.

IN CASE OF FIRE

A SOUNDING OF AIR

KLAXTON ALL PERSONEL TO

FIRE POINT

F

KEY

SITE WELFARE

SITE OFFICE & CANTEEN

SILOS

STORAGE CONTAINERS

COMPOUND STORAGE

SITE INGRESS & EGRESS

TO COMPOUND & SITE PARKING

TRAFFIC OUT

TRAFFIC IN

A 11.11.2020 SITE ACCESS AMENDED

B 24.02.2021 UPDATED TO NEW LAYOUT