Site Director, Trawsfynydd Nuclear Site

Dave Wilson

Date: 22 June 2011

Page 3: Site Director, Trawsfynydd Nuclear Site Dave Wilson Date: 22 June 2011

10 April 2023 3

Introduction

• Magnox Limited, the NDA and EnergySolutions

• What are we doing?

• Magnox Optimised Decommissioning Plan (MODP)

• Integrated Waste Strategy

• Stakeholder Engagement

Page 4: Site Director, Trawsfynydd Nuclear Site Dave Wilson Date: 22 June 2011

10 April 2023 4

Magnox Limited, the NDA and EnergySolutions

100% Owned

Parent Body Agreement

M&O ContractMagnox Limited

NDA

EnergySolutionsEU Ltd

Page 5: Site Director, Trawsfynydd Nuclear Site Dave Wilson Date: 22 June 2011

10 April 2023 5

What are we doing?

• Maximise the value of safe electricity generation at 2 sites

• Defuelling at 3 sites• Acceleration of decommissioning at 2 sites• Optimise decommissioning at 3 sites• Reshape the workforce in partnership with the TUs

Page 6: Site Director, Trawsfynydd Nuclear Site Dave Wilson Date: 22 June 2011

10 April 2023 6

Magnox Optimised Decommissioning Plan

Wylfa Trawsfynydd Hunterston A

Hinkley Point A

Chapelcross

Sizewell A Bradwell

Berkeley Oldbury Dungeness A

Page 7: Site Director, Trawsfynydd Nuclear Site Dave Wilson Date: 22 June 2011

10 April 2023 7

Integrated Waste Strategy

• Very Low-level waste (VLLW)• Low-level waste (LLW)• Intermediate-level waste (ILW)• Metals• Oils• Mini-stores• Asset value and cross-estate

working• Programmisation

Page 8: Site Director, Trawsfynydd Nuclear Site Dave Wilson Date: 22 June 2011

10 April 2023 8

Stakeholder Engagement

• Site Stakeholder Groups• The way we engage

– Cooling towers

• Skills for the UK– EdF/Magnox Limited agreement

• Sustainability– The Energy Island; Beyond Chapelcross

• Partnership with local communities

Page 9: Site Director, Trawsfynydd Nuclear Site Dave Wilson Date: 22 June 2011

10 April 2023 9

Summary

• Working as a strategic delivery partner for the NDA• Bringing the UK Magnox programme to a dignified end• Clarity of work for each of the Magnox sites• Delivering the customers waste strategy• Engaging with stakeholders and in partnership with our

workforce