N60 Balla to Claremorris Road Realignment at Heathlawn Scheme Method Statement: Site Clearance & Topsoil Strip Issue 0 Date 08/5/14 Ident No. MS-N60-03 Date : 8/5/2014 Page 1 Method Statement Site Clearance Works &Topsoil Strip Version Issue. Issue Date Version Details Revised by 0 8/5/14 First Issue Acceptance / Approvals. Name Signature Date Prepared by: M Blackweir 08/05/2014 Reviewed by: A McGinley 08/05/2014 Accepted by: D Meade 08/05/2014

Site Clearance and Topsoil Strip

  • Upload
    vodieu

  • View
    230

  • Download
    6

Embed Size (px)

Citation preview

Page 1: Site Clearance and Topsoil Strip

N60 Balla to Claremorris

Road Realignment at

Heathlawn Scheme

Method Statement: Site Clearance & Topsoil Strip

Issue

0

Date

08/5/14

Ident No.

MS-N60-03

Date : 8/5/2014 Page 1

Method Statement Site Clearance Works &Topsoil Strip

Version Issue.

Issue Date Version Details Revised by

0 8/5/14 First Issue

Acceptance / Approvals.

Name Signature Date

Prepared by: M Blackweir 08/05/2014

Reviewed by: A McGinley

08/05/2014

Accepted by:

D Meade 08/05/2014

Page 2: Site Clearance and Topsoil Strip

N60 Balla to Claremorris

Road Realignment at

Heathlawn Scheme

Method Statement: Site Clearance & Topsoil Strip

Issue

0

Date

08/5/14

Ident No.

MS-N60-03

Date : 8/5/2014 Page 2

Title: Site Clearance Works & Topsoil Strip Location: N60 Balla to Claremorris Road Realignment at Heathlawn Scheme Task at Hand This method statement outlines the procedure and methodology for site clearance works and topsoil stripping including removal/demolition of existing buildings, road signage and trees which interfere with the new road alignment. Timing of Task To be advised subject to Contractor appointment. Supervision of Task (Typical) Name Contact Number Contracts Manager: TBC Site Agent: TBC Foreman: TBC Site Engineer: TBC Suitably Qualified Ecologist: TBC Employees Involved (Typical) Plant Operators Banksman Site Supervisor General operatives Plant & Equipment to be used (Typical) 20 T – 60 T 3600 excavators A25 – A40 all terrain dumptrucks D65 dozers Tractor and attachments Specific Training All site personnel shall have FAS „Safe Pass‟ certification. All Excavator, Dumper and Crane drivers shall have CSCS certification. CSCS certified representative in underground service location

Page 3: Site Clearance and Topsoil Strip

N60 Balla to Claremorris

Road Realignment at

Heathlawn Scheme

Method Statement: Site Clearance & Topsoil Strip

Issue

0

Date

08/5/14

Ident No.

MS-N60-03

Date : 8/5/2014 Page 3

Personal Protective Equipment

Safety Gloves Hearing Protection

Eye Protection

Respiratory Protection

Coveralls Other

Hi Vis- Vest Hard Hats Boots

Yes

Where required

Yes

NO

No

Yes

Methodology

Site Clearance & Topsoil Strip

All personnel entering the site shall have received a site safety induction and have

attended a job toolbox talk.

A Permit to dig form shall be issued by the Site Engineer relating to the area where Site

Clearance and topsoil stripping is to be carried out. The Section Engineer will consult

relevant documentation for details of known services and will ensure that the required

protections are in place prior to issuing a Permit to Dig.

Access to site shall be via approved access points (Refer to Figure 2 in Appendix A for site

access points). Clearance of all shrub shall be completed using a 360deg excavator or

similar. The surplus vegetation shall be stockpiled in appropriate piles throughout the site

(at locations in accordance with Environmental mitigation shown in this Construction

Method Statement). Where appropriate this may involve the use of a dump truck or similar.

The surplus vegetation shall then be disposed of appropriately.

All works will be executed within the permanent fencing boundary.

Goal post protection system to be installed around any ESB & Eircom overhead lines

which cross works areas prior to any works in these areas.

Site clearance will also take place along the proposed fencing, with works undertaken from

within the permanent boundary fencing. Openings between the landowners adjacent to the

works will be fenced and left stock proof by the end of each working day unless otherwise

agreed with the Landowner.

Page 4: Site Clearance and Topsoil Strip

N60 Balla to Claremorris

Road Realignment at

Heathlawn Scheme

Method Statement: Site Clearance & Topsoil Strip

Issue

0

Date

08/5/14

Ident No.

MS-N60-03

Date : 8/5/2014 Page 4

Potential Ecological / Environmental Impacts, including impacts on Balla Turlough cSAC and/ or other European sites NIS / EAR: Relevant Extracts: Potential Impacts (in the absence of below Mitigation):

Surface & groundwater contamination during construction.

Potential Increase in run-off volumes to Turlough during construction.

Pollution from Surface Water run-off during Construction.

Direct Loss of Habitats/Flora species during Construction.

Indirect Loss of Habitats impacts during Construction.

Impact on Mammals during Construction (Other than bats).

Impact on Protected Mammals during Construction (Bats).

Impact on Birds during Construction. Mitigation:

Construction works carried out in the vicinity of the turloughs will be monitored by a suitably qualified ecologist.

To reduce potential increases in flows into the drainage system and downstream turloughs during construction, the period of exposure of bare areas and uncontrolled runoff from new hardstanding areas will be limited. Early covering/seeding/planting of exposed surfaces will be undertaken.

Material stockpiles will be kept to a minimum size, covered and located at least 10m from the drainage system and 100m from turloughs.

To prevent contaminated or silt-laden runoff from entering the turloughs, a range of temporary measures will be implemented, such as silt fences, cut-off ditches, silt traps, straw bales, entrapment matting and drainage to vegetated areas.

Runoff will be controlled and, if required, directed to settlement ponds or sumps. Any temporary attenuation and treatment facilities will be designed and implemented in accordance with CIRIA C697 (2007). All temporary treatment systems will be regularly inspected and maintained.

The extent of construction activities will be controlled to limit vegetation removal and the exposure and/or compaction of soils. Land surrounding the immediate construction area will be fenced off, or otherwise demarcated, to prevent inadvertent intrusion from construction plant.

Construction works will be avoided during prolonged periods of very heavy rainfall adjacent to the Balla Turlough cSAC and Un-named Turlough.

No construction plant or construction vehicles to enter the Balla Turlough cSAC boundary other than where this boundary has already been generally encroached by the existing road.

Refuelling of machinery shall be carried out off-site, or when on-site not within 100m of Turlough habitat.

Page 5: Site Clearance and Topsoil Strip

N60 Balla to Claremorris

Road Realignment at

Heathlawn Scheme

Method Statement: Site Clearance & Topsoil Strip

Issue

0

Date

08/5/14

Ident No.

MS-N60-03

Date : 8/5/2014 Page 5

All fuels, oils, greases, hydraulic fluids and chemical storage areas will be stored in bunded compounds/areas on impermeable bases at least 10m from the proposed drainage system and 100m from the cSAC and Un-named Turlough.

No machinery to enter Turlough habitats, no temporary access or haul routes are located in Turlough habitats and no temporary storage areas, plant or other obstacles are located within Turlough habitats.

Monitoring of turbidity (suspended solids) levels in Balla Turlough SAC and the Un-named Turlough will be undertaken on a monthly basis for a minimum of 6 months prior to construction and will include monitoring during the winter season when Turlough water levels are most likely to be present. Monitoring will also be undertaken on a weekly basis during construction for turbidity (suspended solids). In the event of suspended solids concentrations that are higher than the 95th %ile of those monitored during the pre-construction monitoring period, a review of the Sediment and Erosion Control measures and plan will be implemented and additional sediment control measures put in place as required. Daily visual inspections of Balla Turlough SAC and the Un-named Turlough will also be undertaken during the construction phase to confirm the absence of sediment from construction works.

The N60 Balla to Claremorris Erosion and Sediment Control Plan shall be implemented to prevent sediment or pollutants from reaching the Balla or Un-named Turloughs.

Prior to construction, and from November-February, the single Sweet Briar bush at Heathlawn (Ch. 3,220) shall be up-rooted and „heeled-in‟ in a suitable, dry, sheltered, unshaded habitat outside the working area but within the permanent fenceline boundary. This shall be supervised by a suitably qualified ecologist. The temporary planting area shall be fenced off and appropriately labelled to inform construction staff. Following completion of road construction, but prior to landscaping works, this bush will be removed from storage/or habitat in which it was heeled-in, and be included in landscape treatments.

The N60 Balla to Claremorris Invasive Species Management Plan will be implemented in full. The Three-Cornered Garlic within the footprint of the works at Ch. 1,500 in the abandoned garden at Garhawnagh will be dug out and either buried to depth of 2m, or removed to licensed landfill or incinerator. The landfill will be notified of the invasive species content. The roadside Snowberry shrubs at Ch. 2,070 will be sprayed with a strong glyphosate-based herbicide, which must be applied when the plant is in full leaf. Several applications may be required and care will be taken to avoid non-target species in adjacent hedges and grasslands (Cowslips, Violets and other woodland flora). Rhododendron is outside the working area within a private property boundary and will not be impacted.

Invasive species may have spread or changed distribution since the summer 2012 habitat surveys. Therefore, the Invasive Species Management Plan will include re-survey (pre-construction) of the working area as per NRA guidelines (NRA, 2010). This survey will include accurate 1:5,000 scale mapping for the precise location of invasive species. The pre-construction surveys will be undertaken by suitable experts with competence in identifying these species and ability to separate them from other species appearing similar to a non-professional (e.g. Three-Cornered Garlic from native Ramsons Allium ursinum).

A badger derogation license application was submitted and granted license returned. The potential disturbance of the potential subsidiary badger sett is north of Ch. 1,750, and in

Page 6: Site Clearance and Topsoil Strip

N60 Balla to Claremorris

Road Realignment at

Heathlawn Scheme

Method Statement: Site Clearance & Topsoil Strip

Issue

0

Date

08/5/14

Ident No.

MS-N60-03

Date : 8/5/2014 Page 6

close proximity to the proposed Un-named Turlough swale and outfall. This mitigation proposes monitoring of the sett prior to commencement of any construction works, and includes for potential permanent exclusion subject to badger activity and results of this monitoring.

Seasonal restrictions on vegetation removal will be imposed for breeding birds. This will avoid greatest impacts to both Hedgehog and Pygmy Shrew which are likely during the peak breeding season for these species (May-August according to Hayden & Harrington, 2001).

Two hedgehog nest boxes will be placed in existing hedges to be retained, within dense vegetation on the side of the hedge facing away from the roadway. These shall be placed at intact hedges where risk of Hedgehog road crossings collisions is reduced, or (preferably) in the base of dense hedgerow at distance from the roadway outside the CPO (subject to permission of local landowners).

There are no known bat roost features. However as a precautionary measure for the old forge at Rathduff Roof tiles will be removed by hand in the presence of a licenced bat ecologist. If no bats are found, the building shall be demolished immediately and preferably during the „shoulder season‟ (i.e. September to November). Should any bats be found during the removal of tiles, the bat specialist will consult with the NPWS and advise the contractor on the potential for a derogation licence to be obtained from the NPWS, in line with the NRA Guidelines for the Treatment of Bats during The Construction of National Road Schemes (NRA, 2005).

Potential indirect impacts via loss of hedge and treeline foraging habitats will be mitigated via hedgerow planting where practicable.

Construction lighting should be oriented away from hedges, woods, and other vegetated areas.

Vegetation (e.g. hedgerows, woodland, trees, scrub and grassland) will not be removed between March and August inclusive, to avoid impacts on nesting birds and breeding small mammals. Although the Wildlife Acts provide an exemption from this seasonal restriction for road construction, there is no exemption provided for intentional nest destruction. Where the construction programme does not allow this seasonal restriction to be observed, vegetated areas will be inspected by a suitably qualified ecologist for the presence of breeding birds prior to clearance. Where nests are found, the appointed ecologist will recommend whether a licence is required for vegetation removal from the NPWS. Areas found not to contain nests must be cleared within 3 days of the survey, or further surveys will be required to be undertaken.

All mitigation contained within the N60 Environmental Assessment Report and NATURA Impact Statement shall be implemented in full.

Page 7: Site Clearance and Topsoil Strip

N60 Balla to Claremorris

Road Realignment at

Heathlawn Scheme

Method Statement: Site Clearance & Topsoil Strip

Issue

0

Date

08/5/14

Ident No.

MS-N60-03

Date : 8/5/2014 Page 7

Specific Idendified Residual Risks for Civil Works The following is a list of identified particular risks associated with above works

Underground Services Plant and Equipment Biological Substances Manual Handling

Appendix B (attached) gives detailed risk assessments for risks identified above.

Page 8: Site Clearance and Topsoil Strip

N60 Balla to Claremorris

Road Realignment at

Heathlawn Scheme

Method Statement: Site Clearance & Topsoil Strip

Issue

0

Date

08/5/14

Ident No.

MS-N60-03

Date : 8/5/2014 Page 8

Relaying of Information; to each operative: “I wish to confirm that the information in this method statement has been communicated to me and I have understood it. I shall bring to the attention of the supervisor any issues, which may affect Safety whilst carrying out the task”. Information provided by Supervisor;

NAME (BLOCK) Signature DATE

In the event of the need for a deviation from the Method Statement, no further work will be done until agreement has been reached and recorded in writing between the client & the contractor on the method of work to be followed in the new circumstances.

Page 9: Site Clearance and Topsoil Strip

N60 Balla to Claremorris

Road Realignment at

Heathlawn Scheme

Method Statement: Site Clearance & Topsoil Strip

Issue

0

Date

08/5/14

Ident No.

MS-N60-03

Date : 8/5/2014 Page 9

Appendix A

Page 10: Site Clearance and Topsoil Strip

� �� �� �� � � �� �

� �� � � �� � � �

� �� � � � � � � � � � � � � � �� � � �� � � �� � � �� �� �

� �� � � �� � � �� �

� �� �� �� ��

� �� ��

! " #$% &'

() *+, - . /

0 1 2 3 4 5 6 7 8 4 1 9 :; < = > < ? @ < ; > A B C C D E F B C G HI J K

LMNO

P Q RS TUV W XY

LMZ[ \]

^ _`a bcd ef

g h i

j k lm no

p q

� � � �� �� �

� � � �� � �� �� �� �� �

� �� r� �� �� �� �� � � � � � �� � � �

� �� �� �� �� �� �� �� �� �� �� s �

� � �� �� � � �� �

� � � � � �� � � �� �� �� r� �� r� � � �

� � � �� �� � �� � � �� �t u v� � � �� � � �� r � �� � � � �� � � �� � � �� �

w wxy z { |

} ~� � = = � ? � � � � ;

� � D A � � B � D F � B � B � �� � � ��

� �� � ��� { |��� � � � ���

lm

� �  ¡¢ £

¤ ¥ ¦§

¨© � �� �� �� �� �� �� � � �� � � � r � �� �� �� �� � �� �� � � � �� �� �� �

� �� � � � � � � ª � ª � �� r � �� �� �� � � � r � � � � � � � rt t � � �� rt u� �� �� �� �� �� �

« ¬ ­ ®¯ ¯°±² ³ ´ µ ¶·¸¹º

» ¼½ ¾

¼ ¿½ ¼ ¼ ¿ ½ ¼

À Á À» à ½ ¿ Ä Å½ ¾Æ Ç ÈÆ ÉÂ Ê » Ľ Ë

¼ Ä ½ ˼ »½ ü ¿½ ÌÄ Å½ »Ä à ½ ÍÄ Ì½ ¿À ΠÈÄ Ã ½ Ì

Ä »½ ¼Ä ¿½ ¼

« ¬ ­ ® Ï Ð Ñ ÒÏ Ð Ñ Ò « ¬ ­ ®« ¬ ­ ® Ï Ð Ñ Ò « ¬ ­ ®ÓÔÕÖ×Ø ÙÚ

Û Ü Ý Þ ß à á â ã ãä å ä å æçèéê

ë ì í î ï ð ñòó ô õ ö ö ÷ ö ö ø ù

Ä » ½ »¼ Ľ Í

Ä ¾½ ÄÄ Ä½ ÍÄ Í ½ ͼ Í ½ ¿ ¼ ¼½ Ì ¼ ¼½ Ä Ç À À ¼ ¾½ Í

Ä Ì½ Ë

¼ Ľ Ì

ú û ü ý ú þ ü ÿ ���� ��

� � � � efÀ Ç À  ÈÄ Ë½ ¼� � �À ΠÆÄ Ã ½ »¼ ¾½ ¾Ä Ž ¾¼ ¾½ Ë

Ä ¾½ ÄÄ Ä½ Å� � � � �

� � � �� � � �

� ����

!"#

$ %&'(

)*+,

- ./ 0 1 2 3 4

5 6 789: ; <

=>?@ABCD

EFG H

IJK IJK

LM NOP QRS T U U V W X U Y Z T

» Ž ¿Ä ̽ Ä

Æ À λ »½ ¼ [ \] ^ » Í ½ » » Í ½ Ì Ä ¿ ½ ¿Ä ¾½ ÄÄ ¾½ ¾ » Ž Ë

Æ ÈÂ É » ¿½ » » ¿½ » » ¿½ Ä » Ľ Ã Ä Í ½ ¼ Ä Ä½ Ä� � �Ä Ì½ ÄÄ Ë½ ËÄ Ë½ ËÄ Ë½ ËÄ Ì ½ ÍÄ »½ Ã[ ^ ] _» à ½ ÌÆ Â Ê» Ž ÄÀ ` ÀÄ ¾½ ÍÄ ¿ ½ ÍÀ Æ ÆÄ ¿½ ¿ Ä Ä½ Å Ä Ã ½ Å ¼ ¾½ Ã Ä Ë½ Ë Ä Ì½ ¾Ä ˽ ËÄ Ë½ Ã

Ä ¾½ Å Ä ¿½ ¿ ¯ ¯°±² a b c d

� � � �efg hijkl m nopqrstuv w x y z { | } ~ ���

���� � �� �� � � � � � �� � �� � � � � � � � � � �� � � �� �� �   ¡ ¢ � � £ � � ¤¥¦ § ¦ ©� © � �ª« ¦ ¬� ­ � �¤ ® � ° � £ � ± � ² ³ ¡ � µ � ¶ � �· � ¡ ¢ ¡ � �   � �   � � � � � ¡ � ¢ µ ¹º » ¼ ½ º ¾ ½ ¼ ¿ À Á Áà ÁÄ Å ÆÇÈ É Ê Ä Ë É È ¿ Ì Í Î ¿Ï ÐÑ Ã ÅÈ »ÒÓ Ô Ô ÕÖ × ØÖ Ù ÚÓ ÛÓ ÜÝ Þ ß à ß á â ã ä à ã ã ãÒÓ Ô Ô ÕÖ × åÖ æ ç è æ éÝ Þ ß à ß á â ã ä à ê ë ãì Ù í Ü Õ × î ï ï ïð ñ æ òÖ í Ú ð òÖ óô õ ö ÷ ¥ ÷ ø ù � ö ¥ ÷ ø ù ¥ ú ûüý þ ÿ þ � � �� � � þ ��� �� ô� � �¥� � �� �� « �� � � � � � � � � � � � � �� � �� §� �¦ ­¦ ­¦ � �� � � � � � � � � � � � � � � ! � � � " # � � � $ % � � & � � � � ' � � ' � � ( �) * + , , , - . )�/ 0 1 23 4 5 2 6 / 0 !7 2 8/ 9 # 2: 27 ;7 0 2 �/ ; </ 4 0 9= %: 3 > 6 0 ? : 0 9 ! : 27 3 6 : @ # 2/ 3 : ?7 # <: 57AÈ Æ B Í Â C C  D à ŠC Ä Ã Ñ E À Ì FÍ Â C C  D à ŠC Ä Ã Ñ E G  H Ð Á Á IJ ÁÈ Ë Á É K K LM N O P QR S T R U V � � W � � X � � Y Z [ \K N ] _

a b ` b cd e f g h

i j k k j l m a k b m no c j pi j k k j l m a k b m n o o j i q l j l d r ld f l c

s st tuvw E Ð C É Á Á E Ð É Ê ÅÄ Ê Ä É È x Ðy Ê ÅÄ zÈ y È Ë Á E Â É H È È Ë x È É ÐÑ Ë È x É Ã { { Ð| Ð È Ë Á C Æ Á Ä H ÈÉ E Ä } Ë Â É Â Ê Å | Á Ð |  C É| E È y È~ Á E È x È É ÐÑ Ë } Ð C C H È {à ŠÁ E È Å ÅÈ { Ð Ë È x x à ŠРËÑ Á E Èx È Á РC È x x È É ÐÑ Ë Ê ÅÄ | È É É } E Ð| E y Â Æ ÅÈ É Ã C Á Ð Ë | E  ËÑ È É ÁÄ Ê Â Å Á É Ä { Á E È C ÐÑ Ëy È Ë Á Â Ë x Á E Ð É y Â Æ Â { {È | Á Ä Á E È Å Ð Ë {Ä Åy  Á Ð Ä Ë Ä Ë Á E Ð É x Å } Ð ËÑ�

hi�� �� �� �R � T � �R � � � R � �� � � � �R � �R �� � M � � � � � K N � K � �� �� T� V � �� T � � � �� �� �� �� � � �� � � � �   � � ¡ �� � �� � ¢£ � �� � ¤ �� ¥ £ ¦   � � ¡ �� �

m f f j § d e l m a k b m n oÀ Ð ÁÈ Ì| | È É É ¨  C Ä ËÑ È J Ð É Á Ð ËÑ © ª ½ «ÎÈ Åy Â Ë È Ë Á Ï È Ë| È ¬ Ð Ë È # 2: 2 4 2/ 3 ­ �7 1 </ 0 17 ® � 0 �/ 3 9 % @7 : 0 : @ :¯ ° ± ² ³ µ ¶ · ° ¹ ¯ ² º ² » ¼ ¯ ½ ¾¿ À ¹ ¿ Á  ¹ Á ¿ à ¯Ä Å Æ Ä Ç È À ¯É Ê · ¶ É Ë ¶ ¶Ì Í º Î ³ Ï µ Ð ¹ Ê ³ Å Ñ Ã ¶ ÒÓÌ Ë ¶ ² Ñ Ñ ¹ Ð Ï Ñ ¿ Ã Ô Ð ¿ ¿ Å À ¯ ³ Å Ñ Ã Ê É Ó Õ ¹ ¹ Á ¹ Ð ¿ È Ö ¿ Ð Â Ã À À ¯ Í Ã À × Ð ½ À à À ¹ Ð ØÙ Ú Ã Â ¹ Å Ð ½ À ¯ º ² ÖÎ ÅÄ Ê Ä É È x À Ð ÁÈ F Ä y Ê Ä Ã Ë x ¬ Ä |  Á Ð Ä Ëw Ð C C Ð Ë| C à x È F Â Å Î Â Å Û Ð ËÑ Â Ë x Ü Â ÁÈ Å Ð Â CÀ Á Ä ÅÂ Ñ È Â ÅÈ Â É « Ì| | È É É { ÅÄ y } Ð Á E Ð ËÈ J Ð É Á Ð ËÑ F Î Ý «Þ Ë Ë Â y È x D à ŠC Ä Ã Ñ E

Page 11: Site Clearance and Topsoil Strip

N60 Balla to Claremorris

Road Realignment at

Heathlawn Scheme

Method Statement: Site Clearance & Topsoil Strip

Issue

0

Date

08/5/14

Ident No.

MS-N60-03

Date : 8/5/2014 Page 10

APPENDIX B

Risk Assessments Hazard/Risk Assessment Proforma

Project: N60 Balla to Claremorris Road Realignment at Heathlawn Scheme

Risk Assessment No: N60/RA04 Rev 0 Review Dates:

May 2014

Operation/Task:

Site Clearance Method Statement Title:

Initial Site Clearance

Location/Area: All areas Method Statement No: MS-N60 03 Rev 0

CATEGORY OF PERSONS AT RISK AND MEANS OF BRIEFING

CATEGORY OF PERSONS Means of Briefing

RAMS SCS Other

Occupations involved in Activity (Specify):

Plant operators, general operatives , Y

Others Persons at Work (Specify): N/A

Public or Other Parties (Specify): NA

Description of the task/operation

1. All aspects of excavations . 2. Lifting operations

Page 12: Site Clearance and Topsoil Strip

N60 Balla to Claremorris

Road Realignment at

Heathlawn Scheme

Method Statement: Site Clearance & Topsoil Strip

Issue

0

Date

08/5/14

Ident No.

MS-N60-03

Date : 8/5/2014 Page 11

KEY: S = Severity Rating L = Likelihood of Occurrence

Severi

ty

RR = Risk Rating 9 Unacceptable risk, plan out or add further controls

1. Negligible 1. Improbable

3 3 6 9 4-6

Acceptable only if no other method viable and with high level controls in place

2. Minor 2. Reasonably likely

2 1 4 6 2-3 Acceptable if suitable controls

3. Notifiable/Major/Fatal 3. Certain or near certain 1 1 2 3 1 Acceptable, no further action required

1 2 3

Likelihood

Risk Assessment Prepared by (Name):

Signature: Date:

Risk Assessment Reviewed by (Name):

Signature: Date:

Page 13: Site Clearance and Topsoil Strip

N60 Balla to Claremorris

Road Realignment at

Heathlawn Scheme

Method Statement: Site Clearance & Topsoil Strip

Issue

0

Date

08/5/14

Ident No.

MS-N60-03

Date : 8/5/2014 Page 12

Item

Activity Hazards/Risks

Identified

Pre-Control Risk Rating Control Measures

Residual Risk Rating

Responsibility

Monitoring Responsibility

S L RR S L RR 01 Existing

Services Work near significant existing services ie

- ESB services

- Watermains

- Telecommunications

2 2 4 Detailed Method Statements and Risk Assessments to be carried out for all activities which have potential to impact on existing services

- Request temporary outages on services - Worker Briefings to be carried out - Adhere to Codes of Practice for avoiding dangers from under ground services - Trial holing in advance - Permit to Dig system to be implemented - Use of Catscan equipment - Use of trained plant operators - Use of Banksman - Request temporary outages on affected utilities

-

1 2 2 Full site Team BBI

Page 14: Site Clearance and Topsoil Strip

N60 Balla to Claremorris

Road Realignment at

Heathlawn Scheme

Method Statement: Site Clearance & Topsoil Strip

Issue

0

Date

08/5/14

Ident No.

MS-N60-03

Date : 8/5/2014 Page 13

Item

Activity Hazards/Risks

Identified

Pre-Control Risk Rating Control Measures

Residual Risk Rating

Responsibility

Monitoring Responsibility

S L RR S L RR 02

Heavy Plant and Equipment

Working adjacent to Heavy Plant and machinery including excavation plant and lifting appliances Hazards Noise. Operated by untrained individual Incorrect use. Speeding. Poor maintenance. Unsupervised reversing. Overloading Risks Struck by site transport Falls from vehicles. Splashed by fuel during refuelling. Tipping or overturning of vehicles. Contact with moving parts of machinery.

Struck by mater dropped while in lift.

3

2

6

- Detailed Method Statements and Risk

Assessments to be carried out for all activities to address the movement use of heavy equipment. - Worker Briefings to be carried out - Plant to be operated by Competent Personnel - Plant to be in good order and inspected prior to commencement of any works on site - Auxiliary devices and visual aids on plant as highlighted in Schedule 6 of 2006 Construction Regulations. - Carry out plant checks and record on plant checklists - Vehicle Banksmen to be utilised where required - Segregate traffic from public and workforce where possible - Implement work exclusion zones where appropriate - Implement Traffic Management Plans - Ensure all personnel were appropriate PPE

and high visibility clothing

3

1

3

Full site Team

Contr

Page 15: Site Clearance and Topsoil Strip

N60 Balla to Claremorris

Road Realignment at

Heathlawn Scheme

Method Statement: Site Clearance & Topsoil Strip

Issue

0

Date

08/5/14

Ident No.

MS-N60-03

Date : 8/5/2014 Page 14

Item

Activity Hazards/Risks

Identified

Pre-Control Risk Rating Control Measures

Residual Risk Rating

Responsibility

Monitoring Responsibility

S L RR S L RR 03

Biological Substances

Works which put person at work at risk from Biological substances - Leptospirosis /Weils Disease - Contact with contaminated ground or objects or materials - Working on existing streams and drains, particularly foul drains.

3 2 4 - Detailed Method Statements and Risk Assessments to be carried out for all activities where biological substances are envisaged including contaminated ground and dealing with asbestos gaskets

- Areas of potential contaminated ground to be tested and areas segregated

- COSHH Assessments to be carried out and briefed to workers

- MSDS Sheets to be available for construction chemicals in use

- Ensure adequate assessment of PPE requirements for surfacing operations

- All operatives engaged in sewer tie in works to wear appropriate PPE which will include gloves and disposable overalls.

- All operatives to be briefed and trained

- Adequate washing facilities to provided

- Ensure adequate ventilation is provided provide to avoid Asphyxiation

- Adequate awareness of and protection against Weils disease

3 1 2 Full site Team Contr

Page 16: Site Clearance and Topsoil Strip

N60 Balla to Claremorris

Road Realignment at

Heathlawn Scheme

Method Statement: Site Clearance & Topsoil Strip

Issue

0

Date

08/5/14

Ident No.

MS-N60-03

Date : 8/5/2014 Page 15

Item

Activity Hazards/Risks

Identified

Pre-Control Risk Rating Control Measures

Residual Risk Rating

Responsibility

Monitoring Responsibility

S L RR S L RR 04 Manual

Handling

Fractures, Strains, Sprains Cuts, Lacerations, Abrasions Injury through aggravation of previous/existing medical condition

3 2 6 -Use of mechanical assistance wherever possible,

e.g. forklift, plant, lifting appliance etc.

- Reduce loads by making them smaller or lighter.

- Ensure the working environment is suitable i.e. -

-- - Access ways are unimpeded and properly

lighted. - Working platforms should be non-slip

and kept clean

Ensure that the individual is lifting correctly,

maintains good posture, and lifts with knees bent

and back kept straight.

All loads should be assessed individually for size and weight, but generally loads greater than 25kg should be handled by more than one person or mechanical means employed. Operatives must wear appropriate gloves and other clothing to reduce the risk of injury. Ensure that all previously experienced back complaints are brought to the attention of management, in order that allowances may be made in ascertaining the safest method of manual handling.

3 1 2 Full Site Team Contr