SITE CLASSIFICATION REPORT SUMMARY BLOCK: 1 SECTION: 64 SUBURB: Taylor JOB No: 77418.29 DATE: March 2019 CLIENT: Indesco Consulting Engineers Pty Ltd Classification Procedures: Existing Subsurface Conditions: Refer attached test pit log(s) – Pit(s) 59,89 and Drawing 1. Bulk Earthworks: Filling within the block placed under Level 1 control as defined in AS 3798 – 2007 (Ref 1). Laboratory Results: Previous laboratory testing results indicated liquid limit ranging from 25-66%, plasticity index ranging from 6-49% and linear shrinkage ranging from 3-20.5%. Site Classification: Class M* (moderately reactive/filled) based on the current profile / state on limited subsurface information and determined in general accordance with the requirements of AS2870-2011 (Ref 2). The classification must be reassessed should the soil profile change either by adding fill or removing soil from the block and/or if the presence of service trenches or retaining walls are within the zone of influence of the block. Reference should be made to the comments provided below. Footing Systems: Reference must be made to AS2870-2011 (Ref 2) which indicates footing systems that are appropriate for each site classification. All footings must found within a uniform bearing stratum of suitable strength/material, below the zone of influence of any service trenches, backfill zones, retaining walls or underground structures. Masonry walls should be articulated in accordance with current best practice. Dwelling design must ensure uniform moisture conditions are maintained in the vicinity of footings. Footing systems must be confirmed by a structural engineer taking into consideration any onsite or offsite constraints. Maintenance Guidelines: Reference should be made to the attached CSIRO Sheet BTF 18 ‘Foundation Maintenance & Footing Performance’ to comments about gardens, landscaping and trees on the performance of foundation soils and in particular in respect to maintaining good surface drainage. It notes that minor cracking in most structures is inevitable, and it describes site maintenance practices aimed at minimising foundation movements that can lead to cracking damage. Comments/ Limitations: The successful purchaser must make their own interpretations, deductions and conclusions from the information made available and will need to accept full responsibility for such interpretations, deductions and conclusions. Development specific geotechnical investigations must be undertaken. Additional topsoils / filling may have been spread subsequent to the investigation. Site preparation prior to the construction should include removal of all vegetation, topsoil and any uncontrolled filling. All new filling must be placed under controlled conditions (AS 3798-2007), otherwise Class P conditions would be warranted. Some variability in subsurface conditions must be anticipated. Moisture condition of site soils and/or the presence of groundwater may vary considerably from time of investigation compared to at the time of construction. Depending on the depth of site cut and trenches, rock excavation may be required. It is recommended that footing excavations be inspected by a geotechnical engineer. This report must be read in conjunction with the attached “Limitations” and notes “About this Report”. References: 1. 2. AS 3798-2007 ‘Guidelines on Earthworks for Commercial and Residential Developments’, Standards Association of Australia. AS 2870-2011 ‘Residential Slabs and Footings,’ Standards Association of Australia. Attachments: Limitations & About this Report Explanatory Notes Test Pit Log(s) Pit(s) 59,89 Drawing 1

SITE CLASSIFICATION REPORT SUMMARY...Douglas Partners (DP) has prepared this report for this project at Taylor 2- Stage 3, Taylor in accordance with DP’s proposal dated 15 September

  • Upload
    others

  • View
    2

  • Download
    0

Embed Size (px)

Citation preview

Page 1: SITE CLASSIFICATION REPORT SUMMARY...Douglas Partners (DP) has prepared this report for this project at Taylor 2- Stage 3, Taylor in accordance with DP’s proposal dated 15 September

SITE CLASSIFICATION REPORT SUMMARY

BLOCK: 1 SECTION: 64 SUBURB: Taylor

JOB No: 77418.29 DATE: March 2019

CLIENT: Indesco Consulting Engineers Pty Ltd

Classification Procedures: Existing Subsurface Conditions: Refer attached test pit log(s) – Pit(s) 59,89 and Drawing 1. Bulk Earthworks: Filling within the block placed under Level 1 control as defined in AS 3798 – 2007 (Ref 1). Laboratory Results: Previous laboratory testing results indicated liquid limit ranging from 25-66%, plasticity index ranging from 6-49% and linear shrinkage ranging from 3-20.5%.

Site Classification: Class M* (moderately reactive/filled) based on the current profile / state on limited subsurface information and determined in general accordance with the requirements of AS2870-2011 (Ref 2). The classification must be reassessed should the soil profile change either by adding fill or removing soil from the block and/or if the presence of service trenches or retaining walls are within the zone of influence of the block. Reference should be made to the comments provided below.

Footing Systems: Reference must be made to AS2870-2011 (Ref 2) which indicates footing systems that are appropriate for each site classification. All footings must found within a uniform bearing stratum of suitable strength/material, below the zone of influence of any service trenches, backfill zones, retaining walls or underground structures. Masonry walls should be articulated in accordance with current best practice. Dwelling design must ensure uniform moisture conditions are maintained in the vicinity of footings. Footing systems must be confirmed by a structural engineer taking into consideration any onsite or offsite constraints.

Maintenance Guidelines: Reference should be made to the attached CSIRO Sheet BTF 18 ‘Foundation Maintenance & Footing Performance’ to comments about gardens, landscaping and trees on the performance of foundation soils and in particular in respect to maintaining good surface drainage. It notes that minor cracking in most structures is inevitable, and it describes site maintenance practices aimed at minimising foundation movements that can lead to cracking damage.

Comments/ Limitations:

The successful purchaser must make their own interpretations, deductions and conclusions from the information made available and will need to accept full responsibility for such interpretations, deductions and conclusions.

Development specific geotechnical investigations must be undertaken.

Additional topsoils / filling may have been spread subsequent to the investigation.

Site preparation prior to the construction should include removal of all vegetation, topsoil and any uncontrolled filling.

All new filling must be placed under controlled conditions (AS 3798-2007), otherwise Class P conditions would be warranted.

Some variability in subsurface conditions must be anticipated.

Moisture condition of site soils and/or the presence of groundwater may vary considerably from time of investigation compared to at the time of construction.

Depending on the depth of site cut and trenches, rock excavation may be required.

It is recommended that footing excavations be inspected by a geotechnical engineer.

This report must be read in conjunction with the attached “Limitations” and notes “About this Report”.

References:

1.

2.

AS 3798-2007 ‘Guidelines on Earthworks for Commercial and Residential Developments’, Standards Association of Australia.

AS 2870-2011 ‘Residential Slabs and Footings,’ Standards Association of Australia.

Attachments:

Limitations & About this Report Explanatory Notes Test Pit Log(s) Pit(s) 59,89 Drawing 1

Page 2: SITE CLASSIFICATION REPORT SUMMARY...Douglas Partners (DP) has prepared this report for this project at Taylor 2- Stage 3, Taylor in accordance with DP’s proposal dated 15 September

FS 604853

Douglas Partners Pty Ltd ABN 75 053 980 117

www.douglaspartners.com.au Unit 2, 73 Sheppard Street

Hume ACT 2620 PO Box 1487

Fyshwick ACT 2609 Phone (02) 6260 2788

Fax (02) 6260 1147

Brisbane • Cairns • Canberra • Central Coast • Coffs Harbour • Darwin • Geelong • Gold Coast • Macarthur • Melbourne Newcastle • North West Sydney • Perth • Port Macquarie • Sunshine Coast • Sydney • Townsville • Wollongong

Limitations Douglas Partners (DP) has prepared this report for this project at Taylor 2 - Stage 3, Taylor in accordance with DP’s proposal dated 15 September 2017 and acceptance received from Indesco Consulting Engineers Pty Ltd dated 13 March 2019. The work was carried out under DP’s Conditions of Engagement. This report is provided for the exclusive use of Indesco Consulting Engineers Pty Ltd for this project only and for the purposes as described in the report. It should not be used by or relied upon for other projects or purposes on the same or other site or by a third party. Any party so relying upon this report beyond its exclusive use and purpose as stated above, and without the express written consent of DP, does so entirely at its own risk and without recourse to DP for any loss or damage. In preparing this report DP has necessarily relied upon information provided by the client and/or their agents. The results provided in the report are indicative of the sub-surface conditions on the site only at the specific sampling and/or testing locations, and then only to the depths investigated and at the time the work was carried out. Sub-surface conditions can change abruptly due to variable geological processes and also as a result of human influences. Such changes may occur after DP’s field testing has been completed. DP’s advice is based upon the conditions encountered during this investigation. The accuracy of the advice provided by DP in this report may be affected by undetected variations in ground conditions across the site between and beyond the sampling and/or testing locations. The advice may also be limited by budget constraints imposed by others or by site accessibility. This report must be read in conjunction with all of the attached and should be kept in its entirety without separation of individual pages or sections. DP cannot be held responsible for interpretations or conclusions made by others unless they are supported by an expressed statement, interpretation, outcome or conclusion stated in this report. This report, or sections from this report, should not be used as part of a specification for a project, without review and agreement by DP. This is because this report has been written as advice and opinion rather than instructions for construction. The scope for work for this investigation/report did not include the assessment of surface or sub-surface materials or groundwater for contaminants, within or adjacent to the site. Should evidence of filling of unknown origin be noted in the report, and in particular the presence of building demolition materials, it should be recognised that there may be some risk that such filling may contain contaminants and hazardous building materials. The contents of this report do not constitute formal design components such as are required, by the Health and Safety Legislation and Regulations, to be included in a Safety Report specifying the hazards likely to be encountered during construction and the controls required to mitigate risk. This design process requires risk assessment to be undertaken, with such assessment being dependent upon factors relating to likelihood of occurrence and consequences of damage to property and to life. This, in turn, requires project data and analysis presently beyond the knowledge and project role respectively of DP. DP may be able, however, to assist the client in carrying out a risk assessment of potential hazards contained in the Comments section of this report, as an extension to the current scope of works, if so requested, and provided that suitable additional information is made available to DP. Any such risk assessment would, however, be necessarily restricted to the geotechnical components set out in this report and to their application by the project designers to project design, construction, maintenance and demolition.

Page 3: SITE CLASSIFICATION REPORT SUMMARY...Douglas Partners (DP) has prepared this report for this project at Taylor 2- Stage 3, Taylor in accordance with DP’s proposal dated 15 September

July 2010

Introduction These notes have been provided to amplify DP's report in regard to classification methods, field procedures and the comments section. Not all are necessarily relevant to all reports. DP's reports are based on information gained from limited subsurface excavations and sampling, supplemented by knowledge of local geology and experience. For this reason, they must be regarded as interpretive rather than factual documents, limited to some extent by the scope of information on which they rely. Copyright This report is the property of Douglas Partners Pty Ltd. The report may only be used for the purpose for which it was commissioned and in accordance with the Conditions of Engagement for the commission supplied at the time of proposal. Unauthorised use of this report in any form whatsoever is prohibited. Borehole and Test Pit Logs The borehole and test pit logs presented in this report are an engineering and/or geological interpretation of the subsurface conditions, and their reliability will depend to some extent on frequency of sampling and the method of drilling or excavation. Ideally, continuous undisturbed sampling or core drilling will provide the most reliable assessment, but this is not always practicable or possible to justify on economic grounds. In any case the boreholes and test pits represent only a very small sample of the total subsurface profile. Interpretation of the information and its application to design and construction should therefore take into account the spacing of boreholes or pits, the frequency of sampling, and the possibility of other than 'straight line' variations between the test locations. Groundwater Where groundwater levels are measured in boreholes there are several potential problems, namely: • In low permeability soils groundwater may

enter the hole very slowly or perhaps not at all during the time the hole is left open;

• A localised, perched water table may lead to an erroneous indication of the true water table;

• Water table levels will vary from time to time with seasons or recent weather changes. They may not be the same at the time of construction as are indicated in the report; and

• The use of water or mud as a drilling fluid will mask any groundwater inflow. Water has to be blown out of the hole and drilling mud must first be washed out of the hole if water measurements are to be made.

More reliable measurements can be made by installing standpipes which are read at intervals over several days, or perhaps weeks for low permeability soils. Piezometers, sealed in a particular stratum, may be advisable in low permeability soils or where there may be interference from a perched water table. Reports The report has been prepared by qualified personnel, is based on the information obtained from field and laboratory testing, and has been undertaken to current engineering standards of interpretation and analysis. Where the report has been prepared for a specific design proposal, the information and interpretation may not be relevant if the design proposal is changed. If this happens, DP will be pleased to review the report and the sufficiency of the investigation work. Every care is taken with the report as it relates to interpretation of subsurface conditions, discussion of geotechnical and environmental aspects, and recommendations or suggestions for design and construction. However, DP cannot always anticipate or assume responsibility for: • Unexpected variations in ground conditions.

The potential for this will depend partly on borehole or pit spacing and sampling frequency;

• Changes in policy or interpretations of policy by statutory authorities; or

• The actions of contractors responding to commercial pressures.

If these occur, DP will be pleased to assist with investigations or advice to resolve the matter.

Page 4: SITE CLASSIFICATION REPORT SUMMARY...Douglas Partners (DP) has prepared this report for this project at Taylor 2- Stage 3, Taylor in accordance with DP’s proposal dated 15 September

July 2010

Site Anomalies In the event that conditions encountered on site during construction appear to vary from those which were expected from the information contained in the report, DP requests that it be immediately notified. Most problems are much more readily resolved when conditions are exposed rather than at some later stage, well after the event. Information for Contractual Purposes Where information obtained from this report is provided for tendering purposes, it is recommended that all information, including the written report and discussion, be made available. In circumstances where the discussion or comments section is not relevant to the contractual situation, it may be appropriate to prepare a specially edited document. DP would be pleased to assist in this regard and/or to make additional report copies available for contract purposes at a nominal charge. Site Inspection The company will always be pleased to provide engineering inspection services for geotechnical and environmental aspects of work to which this report is related. This could range from a site visit to confirm that conditions exposed are as expected, to full time engineering presence on site.

Page 5: SITE CLASSIFICATION REPORT SUMMARY...Douglas Partners (DP) has prepared this report for this project at Taylor 2- Stage 3, Taylor in accordance with DP’s proposal dated 15 September

July 2010

Sampling Sampling is carried out during drilling or test pitting to allow engineering examination (and laboratory testing where required) of the soil or rock. Disturbed samples taken during drilling provide information on colour, type, inclusions and, depending upon the degree of disturbance, some information on strength and structure. Undisturbed samples are taken by pushing a thin-walled sample tube into the soil and withdrawing it to obtain a sample of the soil in a relatively undisturbed state. Such samples yield information on structure and strength, and are necessary for laboratory determination of shear strength and compressibility. Undisturbed sampling is generally effective only in cohesive soils. Test Pits Test pits are usually excavated with a backhoe or an excavator, allowing close examination of the in-situ soil if it is safe to enter into the pit. The depth of excavation is limited to about 3 m for a backhoe and up to 6 m for a large excavator. A potential disadvantage of this investigation method is the larger area of disturbance to the site. Large Diameter Augers Boreholes can be drilled using a rotating plate or short spiral auger, generally 300 mm or larger in diameter commonly mounted on a standard piling rig. The cuttings are returned to the surface at intervals (generally not more than 0.5 m) and are disturbed but usually unchanged in moisture content. Identification of soil strata is generally much more reliable than with continuous spiral flight augers, and is usually supplemented by occasional undisturbed tube samples. Continuous Spiral Flight Augers The borehole is advanced using 90-115 mm diameter continuous spiral flight augers which are withdrawn at intervals to allow sampling or in-situ testing. This is a relatively economical means of drilling in clays and sands above the water table. Samples are returned to the surface, or may be collected after withdrawal of the auger flights, but they are disturbed and may be mixed with soils from the sides of the hole. Information from the drilling (as distinct from specific sampling by SPTs or undisturbed samples) is of relatively low

reliability, due to the remoulding, possible mixing or softening of samples by groundwater. Non-core Rotary Drilling The borehole is advanced using a rotary bit, with water or drilling mud being pumped down the drill rods and returned up the annulus, carrying the drill cuttings. Only major changes in stratification can be determined from the cuttings, together with some information from the rate of penetration. Where drilling mud is used this can mask the cuttings and reliable identification is only possible from separate sampling such as SPTs. Continuous Core Drilling A continuous core sample can be obtained using a diamond tipped core barrel, usually with a 50 mm internal diameter. Provided full core recovery is achieved (which is not always possible in weak rocks and granular soils), this technique provides a very reliable method of investigation. Standard Penetration Tests Standard penetration tests (SPT) are used as a means of estimating the density or strength of soils and also of obtaining a relatively undisturbed sample. The test procedure is described in Australian Standard 1289, Methods of Testing Soils for Engineering Purposes - Test 6.3.1. The test is carried out in a borehole by driving a 50 mm diameter split sample tube under the impact of a 63 kg hammer with a free fall of 760 mm. It is normal for the tube to be driven in three successive 150 mm increments and the 'N' value is taken as the number of blows for the last 300 mm. In dense sands, very hard clays or weak rock, the full 450 mm penetration may not be practicable and the test is discontinued. The test results are reported in the following form. • In the case where full penetration is obtained

with successive blow counts for each 150 mm of, say, 4, 6 and 7 as:

4,6,7 N=13

• In the case where the test is discontinued before the full penetration depth, say after 15 blows for the first 150 mm and 30 blows for the next 40 mm as:

15, 30/40 mm

Page 6: SITE CLASSIFICATION REPORT SUMMARY...Douglas Partners (DP) has prepared this report for this project at Taylor 2- Stage 3, Taylor in accordance with DP’s proposal dated 15 September

July 2010

The results of the SPT tests can be related empirically to the engineering properties of the soils. Dynamic Cone Penetrometer Tests / Perth Sand Penetrometer Tests Dynamic penetrometer tests (DCP or PSP) are carried out by driving a steel rod into the ground using a standard weight of hammer falling a specified distance. As the rod penetrates the soil the number of blows required to penetrate each successive 150 mm depth are recorded. Normally there is a depth limitation of 1.2 m, but this may be extended in certain conditions by the use of extension rods. Two types of penetrometer are commonly used. • Perth sand penetrometer - a 16 mm diameter

flat ended rod is driven using a 9 kg hammer dropping 600 mm (AS 1289, Test 6.3.3). This test was developed for testing the density of sands and is mainly used in granular soils and filling.

• Cone penetrometer - a 16 mm diameter rod with a 20 mm diameter cone end is driven using a 9 kg hammer dropping 510 mm (AS 1289, Test 6.3.2). This test was developed initially for pavement subgrade investigations, and correlations of the test results with California Bearing Ratio have been published by various road authorities.

Page 7: SITE CLASSIFICATION REPORT SUMMARY...Douglas Partners (DP) has prepared this report for this project at Taylor 2- Stage 3, Taylor in accordance with DP’s proposal dated 15 September

May 2017

Description and Classification Methods The methods of description and classification of

soils and rocks used in this report are based on

Australian Standard AS 1726-1993, Geotechnical

Site Investigations Code. In general, the

descriptions include strength or density, colour,

structure, soil or rock type and inclusions.

Soil Types Soil types are described according to the

predominant particle size, qualified by the grading

of other particles present:

Type Particle size (mm)

Boulder >200

Cobble 63 - 200

Gravel 2.36 - 63

Sand 0.075 - 2.36

Silt 0.002 - 0.075

Clay <0.002

The sand and gravel sizes can be further

subdivided as follows:

Type Particle size (mm)

Coarse gravel 20 - 63

Medium gravel 6 - 20

Fine gravel 2.36 - 6

Coarse sand 0.6 - 2.36

Medium sand 0.2 - 0.6

Fine sand 0.075 - 0.2

The proportions of secondary constituents of soils

are described as:

Term Proportion Example

And Specify Clay (60%) and

Sand (40%)

Adjective 20 - 35% Sandy Clay

Slightly 12 - 20% Slightly Sandy

Clay

With some 5 - 12% Clay with some

sand

With a trace of 0 - 5% Clay with a trace

of sand

Definitions of grading terms used are:

• Well graded - a good representation of all

particle sizes

• Poorly graded - an excess or deficiency of

particular sizes within the specified range

• Uniformly graded - an excess of a particular

particle size

• Gap graded - a deficiency of a particular

particle size with the range

Cohesive Soils Cohesive soils, such as clays, are classified on the

basis of undrained shear strength. The strength

may be measured by laboratory testing, or

estimated by field tests or engineering

examination. The strength terms are defined as

follows:

Description Abbreviation Undrained shear strength

(kPa)

Very soft vs <12

Soft s 12 - 25

Firm f 25 - 50

Stiff st 50 - 100

Very stiff vst 100 - 200

Hard h >200

Cohesionless Soils Cohesionless soils, such as clean sands, are

classified on the basis of relative density, generally

from the results of standard penetration tests

(SPT), cone penetration tests (CPT) or dynamic

penetrometers (PSP). The relative density terms

are given below:

Relative Density

Abbreviation SPT N value

CPT qc value (MPa)

Very loose vl <4 <2

Loose l 4 - 10 2 -5

Medium

dense

md 10 - 30 5 - 15

Dense d 30 - 50 15 - 25

Very

dense

vd >50 >25

Page 8: SITE CLASSIFICATION REPORT SUMMARY...Douglas Partners (DP) has prepared this report for this project at Taylor 2- Stage 3, Taylor in accordance with DP’s proposal dated 15 September

May 2017

Soil Origin It is often difficult to accurately determine the origin

of a soil. Soils can generally be classified as:

• Residual soil - derived from in-situ weathering

of the underlying rock;

• Transported soils - formed somewhere else

and transported by nature to the site; or

• Filling - moved by man.

Transported soils may be further subdivided into:

• Alluvium - river deposits

• Lacustrine - lake deposits

• Aeolian - wind deposits

• Littoral - beach deposits

• Estuarine - tidal river deposits

• Talus - scree or coarse colluvium

• Slopewash or Colluvium - transported

downslope by gravity assisted by water.

Often includes angular rock fragments and

boulders.

Page 9: SITE CLASSIFICATION REPORT SUMMARY...Douglas Partners (DP) has prepared this report for this project at Taylor 2- Stage 3, Taylor in accordance with DP’s proposal dated 15 September

May 2017

Rock Strength Rock strength is defined by the Point Load Strength Index (Is(50)) and refers to the strength of the rock

substance and not the strength of the overall rock mass, which may be considerably weaker due to defects.

The test procedure is described by Australian Standard 4133.4.1 - 2007. The terms used to describe rock

strength are as follows:

Term Abbreviation Point Load Index

Is(50) MPa

Approximate Unconfined Compressive Strength MPa*

Extremely low EL <0.03 <0.6

Very low VL 0.03 - 0.1 0.6 - 2

Low L 0.1 - 0.3 2 - 6

Medium M 0.3 - 1.0 6 - 20

High H 1 - 3 20 - 60

Very high VH 3 - 10 60 - 200

Extremely high EH >10 >200

* Assumes a ratio of 20:1 for UCS to Is(50). It should be noted that the UCS to Is(50) ratio varies significantly

for different rock types and specific ratios should be determined for each site.

Degree of Weathering The degree of weathering of rock is classified as follows:

Term Abbreviation Description

Extremely weathered EW Rock substance has soil properties, i.e. it can be remoulded and classified as a soil but the texture of the original rock is still evident.

Highly weathered HW Limonite staining or bleaching affects whole of rock substance and other signs of decomposition are evident. Porosity and strength may be altered as a result of iron leaching or deposition. Colour and strength of original fresh rock is not recognisable

Moderately weathered

MW Staining and discolouration of rock substance has taken place

Slightly weathered SW Rock substance is slightly discoloured but shows little or no change of strength from fresh rock

Fresh stained Fs Rock substance unaffected by weathering but staining visible along defects

Fresh Fr No signs of decomposition or staining

Degree of Fracturing The following classification applies to the spacing of natural fractures in diamond drill cores. It includes

bedding plane partings, joints and other defects, but excludes drilling breaks.

Term Description

Fragmented Fragments of <20 mm

Highly Fractured Core lengths of 20-40 mm with some fragments

Fractured Core lengths of 40-200 mm with some shorter and longer sections

Slightly Fractured Core lengths of 200-1000 mm with some shorter and longer sections

Unbroken Core lengths mostly > 1000 mm

Page 10: SITE CLASSIFICATION REPORT SUMMARY...Douglas Partners (DP) has prepared this report for this project at Taylor 2- Stage 3, Taylor in accordance with DP’s proposal dated 15 September

May 2017

Rock Quality Designation The quality of the cored rock can be measured using the Rock Quality Designation (RQD) index, defined

as:

RQD % = cumulative length of 'sound' core sections ≥ 100 mm long

total drilled length of section being assessed

where 'sound' rock is assessed to be rock of low strength or better. The RQD applies only to natural

fractures. If the core is broken by drilling or handling (i.e. drilling breaks) then the broken pieces are fitted

back together and are not included in the calculation of RQD.

Stratification Spacing For sedimentary rocks the following terms may be used to describe the spacing of bedding partings:

Term Separation of Stratification Planes

Thinly laminated < 6 mm

Laminated 6 mm to 20 mm

Very thinly bedded 20 mm to 60 mm

Thinly bedded 60 mm to 0.2 m

Medium bedded 0.2 m to 0.6 m

Thickly bedded 0.6 m to 2 m

Very thickly bedded > 2 m

Page 11: SITE CLASSIFICATION REPORT SUMMARY...Douglas Partners (DP) has prepared this report for this project at Taylor 2- Stage 3, Taylor in accordance with DP’s proposal dated 15 September

May 2017

Introduction These notes summarise abbreviations commonly

used on borehole logs and test pit reports.

Drilling or Excavation Methods C Core drilling

R Rotary drilling

SFA Spiral flight augers

NMLC Diamond core - 52 mm dia

NQ Diamond core - 47 mm dia

HQ Diamond core - 63 mm dia

PQ Diamond core - 81 mm dia

Water � Water seep

� Water level

Sampling and Testing A Auger sample

B Bulk sample

D Disturbed sample

E Environmental sample

U50 Undisturbed tube sample (50mm)

W Water sample

pp Pocket penetrometer (kPa)

PID Photo ionisation detector

PL Point load strength Is(50) MPa

S Standard Penetration Test

V Shear vane (kPa)

Description of Defects in Rock The abbreviated descriptions of the defects should

be in the following order: Depth, Type, Orientation,

Coating, Shape, Roughness and Other. Drilling

and handling breaks are not usually included on

the logs.

Defect Type

B Bedding plane

Cs Clay seam

Cv Cleavage

Cz Crushed zone

Ds Decomposed seam

F Fault

J Joint

Lam Lamination

Pt Parting

Sz Sheared Zone

V Vein

Orientation

The inclination of defects is always measured from

the perpendicular to the core axis.

h horizontal

v vertical

sh sub-horizontal

sv sub-vertical

Coating or Infilling Term

cln clean

co coating

he healed

inf infilled

stn stained

ti tight

vn veneer

Coating Descriptor

ca calcite

cbs carbonaceous

cly clay

fe iron oxide

mn manganese

slt silty

Shape

cu curved

ir irregular

pl planar

st stepped

un undulating

Roughness

po polished

ro rough

sl slickensided

sm smooth

vr very rough

Other

fg fragmented

bnd band

qtz quartz

Page 12: SITE CLASSIFICATION REPORT SUMMARY...Douglas Partners (DP) has prepared this report for this project at Taylor 2- Stage 3, Taylor in accordance with DP’s proposal dated 15 September

May 2017

Graphic Symbols for Soil and Rock General

Soils

Sedimentary Rocks

Metamorphic Rocks

Igneous Rocks

Road base

Filling

Concrete

Asphalt

Topsoil

Peat

Clay

Conglomeratic sandstone

Conglomerate

Boulder conglomerate

Sandstone

Slate, phyllite, schist

Siltstone

Mudstone, claystone, shale

Coal

Limestone

Porphyry

Cobbles, boulders

Sandy gravel

Laminite

Silty sand

Clayey sand

Silty clay

Sandy clay

Gravelly clay

Shaly clay

Silt

Clayey silt

Sandy silt

Sand

Gravel

Talus

Gneiss

Quartzite

Dolerite, basalt, andesite

Granite

Tuff, breccia

Dacite, epidote

Page 13: SITE CLASSIFICATION REPORT SUMMARY...Douglas Partners (DP) has prepared this report for this project at Taylor 2- Stage 3, Taylor in accordance with DP’s proposal dated 15 September

ͱ·´ ̧°»­

̸» ¬§°»­ ±º ­±·´­ «­«¿´´§ °®»­»²¬ «²¼»® ¬¸» ¬±°­±·´ ·² ´¿²¼ ¦±²»¼ º±®®»­·¼»²¬·¿´ ¾«·´¼·²¹­ ½¿² ¾» ­°´·¬ ·²¬± ¬©± ¿°°®±¨·³¿¬» ¹®±«°­ P¹®¿²«´¿® ¿²¼ ½´¿§ò Ï«·¬» ±º¬»²ô º±«²¼¿¬·±² ­±·´ ·­ ¿ ³·¨¬«®» ±º ¾±¬¸¬§°»­ò ̸» ¹»²»®¿´ °®±¾´»³­ ¿­­±½·¿¬»¼ ©·¬¸ ­±·´­ ¸¿ª·²¹ ¹®¿²«´¿®½±²¬»²¬ ¿®» «­«¿´´§ ½¿«­»¼ ¾§ »®±­·±²ò Ý´¿§ ­±·´­ ¿®» ­«¾¶»½¬ ¬±­¿¬«®¿¬·±² ¿²¼ ­©»´´ñ­¸®·²µ °®±¾´»³­ò

Ý´¿­­·º·½¿¬·±²­ º±® ¿ ¹·ª»² ¿®»¿ ½¿² ¹»²»®¿´´§ ¾» ±¾¬¿·²»¼ ¾§¿°°´·½¿¬·±² ¬± ¬¸» ´±½¿´ ¿«¬¸±®·¬§ô ¾«¬ ¬¸»­» ¿®» ­±³»¬·³»­ «²®»´·¿¾´»¿²¼ ·º ¬¸»®» ·­ ¼±«¾¬ô ¿ ¹»±¬»½¸²·½¿´ ®»°±®¬ ­¸±«´¼ ¾» ½±³³·­­·±²»¼òß­ ³±­¬ ¾«·´¼·²¹­ ­«ºº»®·²¹ ³±ª»³»²¬ °®±¾´»³­ ¿®» º±«²¼»¼ ±² ½´¿§­±·´­ô ¬¸»®» ·­ ¿² »³°¸¿­·­ ±² ½´¿­­·º·½¿¬·±² ±º ­±·´­ ¿½½±®¼·²¹ ¬± ¬¸»¿³±«²¬ ±º ­©»´´ ¿²¼ ­¸®·²µ¿¹» ¬¸»§ »¨°»®·»²½» ©·¬¸ ª¿®·¿¬·±²­ ±º©¿¬»® ½±²¬»²¬ò ̸» ¬¿¾´» ¾»´±© ·­ Ì¿¾´» îòï º®±³ ßÍ îèéðô ¬¸»Î»­·¼»²¬·¿´ Í´¿¾ ¿²¼ Ú±±¬·²¹ ݱ¼»ò

Ý¿«­»­ ±º Ó±ª»³»²¬

Í»¬¬´»³»²¬ ¼«» ¬± ½±²­¬®«½¬·±²Ì¸»®» ¿®» ¬©± ¬§°»­ ±º ­»¬¬´»³»²¬ ¬¸¿¬ ±½½«® ¿­ ¿ ®»­«´¬ ±º½±²­¬®«½¬·±²æ{ ׳³»¼·¿¬» ­»¬¬´»³»²¬ ±½½«®­ ©¸»² ¿ ¾«·´¼·²¹ ·­ º·®­¬ °´¿½»¼ ±² ·¬­

º±«²¼¿¬·±² ­±·´ô ¿­ ¿ ®»­«´¬ ±º ½±³°¿½¬·±² ±º ¬¸» ­±·´ «²¼»® ¬¸»©»·¹¸¬ ±º ¬¸» ­¬®«½¬«®»ò ̸» ½±¸»­·ª» ¯«¿´·¬§ ±º ½´¿§ ­±·´ ³·¬·¹¿¬»­¿¹¿·²­¬ ¬¸·­ô ¾«¬ ¹®¿²«´¿® ø°¿®¬·½«´¿®´§ ­¿²¼§÷ ­±·´ ·­ ­«­½»°¬·¾´»ò

{ ݱ²­±´·¼¿¬·±² ­»¬¬´»³»²¬ ·­ ¿ º»¿¬«®» ±º ½´¿§ ­±·´ ¿²¼ ³¿§ ¬¿µ»°´¿½» ¾»½¿«­» ±º ¬¸» »¨°«´­·±² ±º ³±·­¬«®» º®±³ ¬¸» ­±·´ ±® ¾»½¿«­»±º ¬¸» ­±·´K­ ´¿½µ ±º ®»­·­¬¿²½» ¬± ´±½¿´ ½±³°®»­­·ª» ±® ­¸»¿® ­¬®»­­»­ò̸·­ ©·´´ «­«¿´´§ ¬¿µ» °´¿½» ¼«®·²¹ ¬¸» º·®­¬ º»© ³±²¬¸­ ¿º¬»®½±²­¬®«½¬·±²ô ¾«¬ ¸¿­ ¾»»² µ²±©² ¬± ¬¿µ» ³¿²§ §»¿®­ ·²»¨½»°¬·±²¿´ ½¿­»­ò

̸»­» °®±¾´»³­ ¿®» ¬¸» °®±ª·²½» ±º ¬¸» ¾«·´¼»® ¿²¼ ­¸±«´¼ ¾» ¬¿µ»²·²¬± ½±²­·¼»®¿¬·±² ¿­ °¿®¬ ±º ¬¸» °®»°¿®¿¬·±² ±º ¬¸» ­·¬» º±® ½±²­¬®«½ó¬·±²ò Þ«·´¼·²¹ Ì»½¸²±´±¹§ Ú·´» ïç øÞÌÚ ïç÷ ¼»¿´­ ©·¬¸ ¬¸»­»°®±¾´»³­ò

Û®±­·±²ß´´ ­±·´­ ¿®» °®±²» ¬± »®±­·±²ô ¾«¬ ­¿²¼§ ­±·´ ·­ °¿®¬·½«´¿®´§ ­«­½»°¬·¾´»¬± ¾»·²¹ ©¿­¸»¼ ¿©¿§ò Ûª»² ½´¿§ ©·¬¸ ¿ ­¿²¼ ½±³°±²»²¬ ±º ­¿§ ïðû±® ³±®» ½¿² ­«ºº»® º®±³ »®±­·±²ò

Í¿¬«®¿¬·±²Ì¸·­ ·­ °¿®¬·½«´¿®´§ ¿ °®±¾´»³ ·² ½´¿§ ­±·´­ò Í¿¬«®¿¬·±² ½®»¿¬»­ ¿ ¾±¹ó´·µ» ­«­°»²­·±² ±º ¬¸» ­±·´ ¬¸¿¬ ½¿«­»­ ·¬ ¬± ´±­» ª·®¬«¿´´§ ¿´´ ±º ·¬­¾»¿®·²¹ ½¿°¿½·¬§ò ̱ ¿ ´»­­»® ¼»¹®»»ô ­¿²¼ ·­ ¿ºº»½¬»¼ ¾§ ­¿¬«®¿¬·±²¾»½¿«­» ­¿¬«®¿¬»¼ ­¿²¼ ³¿§ «²¼»®¹± ¿ ®»¼«½¬·±² ·² ª±´«³» P°¿®¬·½«´¿®´§ ·³°±®¬»¼ ­¿²¼ º·´´ º±® ¾»¼¼·²¹ ¿²¼ ¾´·²¼·²¹ ´¿§»®­òر©»ª»®ô ¬¸·­ «­«¿´´§ ±½½«®­ ¿­ ·³³»¼·¿¬» ­»¬¬´»³»²¬ ¿²¼ ­¸±«´¼²±®³¿´´§ ¾» ¬¸» °®±ª·²½» ±º ¬¸» ¾«·´¼»®ò

Í»¿­±²¿´ ­©»´´·²¹ ¿²¼ ­¸®·²µ¿¹» ±º ­±·´ß´´ ½´¿§­ ®»¿½¬ ¬± ¬¸» °®»­»²½» ±º ©¿¬»® ¾§ ­´±©´§ ¿¾­±®¾·²¹ ·¬ô ³¿µ·²¹¬¸» ­±·´ ·²½®»¿­» ·² ª±´«³» ø­»» ¬¿¾´» ¾»´±©÷ò ̸» ¼»¹®»» ±º ·²½®»¿­»ª¿®·»­ ½±²­·¼»®¿¾´§ ¾»¬©»»² ¼·ºº»®»²¬ ½´¿§­ô ¿­ ¼±»­ ¬¸» ¼»¹®»» ±º¼»½®»¿­» ¼«®·²¹ ¬¸» ­«¾­»¯«»²¬ ¼®§·²¹ ±«¬ ½¿«­»¼ ¾§ º¿·® ©»¿¬¸»®°»®·±¼­ò Þ»½¿«­» ±º ¬¸» ´±© ¿¾­±®°¬·±² ¿²¼ »¨°«´­·±² ®¿¬»ô ¬¸·­°¸»²±³»²±² ©·´´ ²±¬ «­«¿´´§ ¾» ²±¬·½»¿¾´» «²´»­­ ¬¸»®» ¿®»°®±´±²¹»¼ ®¿·²§ ±® ¼®§ °»®·±¼­ô «­«¿´´§ ±º ©»»µ­ ±® ³±²¬¸­ô¼»°»²¼·²¹ ±² ¬¸» ´¿²¼ ¿²¼ ­±·´ ½¸¿®¿½¬»®·­¬·½­ò

̸» ­©»´´·²¹ ±º ­±·´ ½®»¿¬»­ ¿² «°©¿®¼ º±®½» ±² ¬¸» º±±¬·²¹­ ±º ¬¸»¾«·´¼·²¹ô ¿²¼ ­¸®·²µ¿¹» ½®»¿¬»­ ­«¾­·¼»²½» ¬¸¿¬ ¬¿µ»­ ¿©¿§ ¬¸»­«°°±®¬ ²»»¼»¼ ¾§ ¬¸» º±±¬·²¹ ¬± ®»¬¿·² »¯«·´·¾®·«³ò

͸»¿® º¿·´«®»Ì¸·­ °¸»²±³»²±² ±½½«®­ ©¸»² ¬¸» º±«²¼¿¬·±² ­±·´ ¼±»­ ²±¬ ¸¿ª»­«ºº·½·»²¬ ­¬®»²¹¬¸ ¬± ­«°°±®¬ ¬¸» ©»·¹¸¬ ±º ¬¸» º±±¬·²¹ò ̸»®» ¿®»¬©± ³¿¶±® °±­¬ó½±²­¬®«½¬·±² ½¿«­»­æ

{ Í·¹²·º·½¿²¬ ´±¿¼ ·²½®»¿­»ò{ λ¼«½¬·±² ±º ´¿¬»®¿´ ­«°°±®¬ ±º ¬¸» ­±·´ «²¼»® ¬¸» º±±¬·²¹ ¼«» ¬±

»®±­·±² ±® »¨½¿ª¿¬·±²ò{ ײ ½´¿§ ­±·´ô ­¸»¿® º¿·´«®» ½¿² ¾» ½¿«­»¼ ¾§ ­¿¬«®¿¬·±² ±º ¬¸» ­±·´

¿¼¶¿½»²¬ ¬± ±® «²¼»® ¬¸» º±±¬·²¹ò

Þ«·´¼·²¹­ ½¿² ¿²¼ ±º¬»² ¼± ³±ª»ò ̸·­ ³±ª»³»²¬ ½¿² ¾» «°ô ¼±©²ô ´¿¬»®¿´ ±® ®±¬¿¬·±²¿´ò ̸» º«²¼¿³»²¬¿´ ½¿«­»±º ³±ª»³»²¬ ·² ¾«·´¼·²¹­ ½¿² «­«¿´´§ ¾» ®»´¿¬»¼ ¬± ±²» ±® ³±®» °®±¾´»³­ ·² ¬¸» º±«²¼¿¬·±² ­±·´ò ׬ ·­ ·³°±®¬¿²¬ º±®¬¸» ¸±³»±©²»® ¬± ·¼»²¬·º§ ¬¸» ­±·´ ¬§°» ·² ±®¼»® ¬± ¿­½»®¬¿·² ¬¸» ³»¿­«®»­ ¬¸¿¬ ­¸±«´¼ ¾» °«¬ ·² °´¿½» ·² ±®¼»® ¬±»²­«®» ¬¸¿¬ °®±¾´»³­ ·² ¬¸» º±«²¼¿¬·±² ­±·´ ½¿² ¾» °®»ª»²¬»¼ô ¬¸«­ °®±¬»½¬·²¹ ¿¹¿·²­¬ ¾«·´¼·²¹ ³±ª»³»²¬ò

̸·­ Þ«·´¼·²¹ Ì»½¸²±´±¹§ Ú·´» ·­ ¼»­·¹²»¼ ¬± ·¼»²¬·º§ ½¿«­»­ ±º ­±·´ó®»´¿¬»¼ ¾«·´¼·²¹ ³±ª»³»²¬ô ¿²¼ ¬± ­«¹¹»­¬³»¬¸±¼­ ±º °®»ª»²¬·±² ±º ®»­«´¬¿²¬ ½®¿½µ·²¹ ·² ¾«·´¼·²¹­ò

Ú±«²¼¿¬·±² Ó¿·²¬»²¿²½»¿²¼ Ú±±¬·²¹ л®º±®³¿²½»æß Ø±³»±©²»®K­ Ù«·¼»

ÙÛÒÛÎßÔ ÜÛÚ×Ò×Ì×ÑÒÍ ÑÚ Í×ÌÛ ÝÔßÍÍÛÍ

Ý´¿­­ Ú±«²¼¿¬·±²

ß Ó±­¬ ­¿²¼ ¿²¼ ®±½µ ­·¬»­ ©·¬¸ ´·¬¬´» ±® ²± ¹®±«²¼ ³±ª»³»²¬ º®±³ ³±·­¬«®» ½¸¿²¹»­

Í Í´·¹¸¬´§ ®»¿½¬·ª» ½´¿§ ­·¬»­ ©·¬¸ ±²´§ ­´·¹¸¬ ¹®±«²¼ ³±ª»³»²¬ º®±³ ³±·­¬«®» ½¸¿²¹»­

Ó Ó±¼»®¿¬»´§ ®»¿½¬·ª» ½´¿§ ±® ­·´¬ ­·¬»­ô ©¸·½¸ ½¿² »¨°»®·»²½» ³±¼»®¿¬» ¹®±«²¼ ³±ª»³»²¬ º®±³ ³±·­¬«®» ½¸¿²¹»­

Ø Ø·¹¸´§ ®»¿½¬·ª» ½´¿§ ­·¬»­ô ©¸·½¸ ½¿² »¨°»®·»²½» ¸·¹¸ ¹®±«²¼ ³±ª»³»²¬ º®±³ ³±·­¬«®» ½¸¿²¹»­

Û Û¨¬®»³»´§ ®»¿½¬·ª» ­·¬»­ô ©¸·½¸ ½¿² »¨°»®·»²½» »¨¬®»³» ¹®±«²¼ ³±ª»³»²¬ º®±³ ³±·­¬«®» ½¸¿²¹»­

ß ¬± Ð Ú·´´»¼ ­·¬»­

Ð Í·¬»­ ©¸·½¸ ·²½´«¼» ­±º¬ ­±·´­ô ­«½¸ ¿­ ­±º¬ ½´¿§ ±® ­·´¬ ±® ´±±­» ­¿²¼­å ´¿²¼­´·°å ³·²» ­«¾­·¼»²½»å ½±´´¿°­·²¹ ­±·´­å ­±·´­ ­«¾¶»½¬¬± »®±­·±²å ®»¿½¬·ª» ­·¬»­ ­«¾¶»½¬ ¬± ¿¾²±®³¿´ ³±·­¬«®» ½±²¼·¬·±²­ ±® ­·¬»­ ©¸·½¸ ½¿²²±¬ ¾» ½´¿­­·º·»¼ ±¬¸»®©·­»

ÞÌÚ ïè®»°´¿½»­

ײº±®³¿¬·±²Í¸»»¬ ïðñçï

Page 14: SITE CLASSIFICATION REPORT SUMMARY...Douglas Partners (DP) has prepared this report for this project at Taylor 2- Stage 3, Taylor in accordance with DP’s proposal dated 15 September

Ì®»» ®±±¬ ¹®±©¬¸Ì®»»­ ¿²¼ ­¸®«¾­ ¬¸¿¬ ¿®» ¿´´±©»¼ ¬± ¹®±© ·² ¬¸» ª·½·²·¬§ ±º º±±¬·²¹­½¿² ½¿«­» º±«²¼¿¬·±² ­±·´ ³±ª»³»²¬ ·² ¬©± ©¿§­æ

{ ᱬ­ ¬¸¿¬ ¹®±© «²¼»® º±±¬·²¹­ ³¿§ ·²½®»¿­» ·² ½®±­­ó­»½¬·±²¿´­·¦»ô »¨»®¬·²¹ «°©¿®¼ °®»­­«®» ±² º±±¬·²¹­ò

{ ᱬ­ ·² ¬¸» ª·½·²·¬§ ±º º±±¬·²¹­ ©·´´ ¿¾­±®¾ ³«½¸ ±º ¬¸» ³±·­¬«®»·² ¬¸» º±«²¼¿¬·±² ­±·´ô ½¿«­·²¹ ­¸®·²µ¿¹» ±® ­«¾­·¼»²½»ò

˲»ª»²²»­­ ±º Ó±ª»³»²¬

̸» ¬§°»­ ±º ¹®±«²¼ ³±ª»³»²¬ ¼»­½®·¾»¼ ¿¾±ª» «­«¿´´§ ±½½«®«²»ª»²´§ ¬¸®±«¹¸±«¬ ¬¸» ¾«·´¼·²¹K­ º±«²¼¿¬·±² ­±·´ò Í»¬¬´»³»²¬ ¼«»¬± ½±²­¬®«½¬·±² ¬»²¼­ ¬± ¾» «²»ª»² ¾»½¿«­» ±ºæ

{ Ü·ºº»®·²¹ ½±³°¿½¬·±² ±º º±«²¼¿¬·±² ­±·´ °®·±® ¬± ½±²­¬®«½¬·±²ò

{ Ü·ºº»®·²¹ ³±·­¬«®» ½±²¬»²¬ ±º º±«²¼¿¬·±² ­±·´ °®·±® ¬± ½±²­¬®«½¬·±²ò

Ó±ª»³»²¬ ¼«» ¬± ²±²ó½±²­¬®«½¬·±² ½¿«­»­ ·­ «­«¿´´§ ³±®» «²»ª»²­¬·´´ò Û®±­·±² ½¿² «²¼»®³·²» ¿ º±±¬·²¹ ¬¸¿¬ ¬®¿ª»®­»­ ¬¸» º´±© ±® ½¿²½®»¿¬» ¬¸» ½±²¼·¬·±²­ º±® ­¸»¿® º¿·´«®» ¾§ »®±¼·²¹ ­±·´ ¿¼¶¿½»²¬ ¬± ¿º±±¬·²¹ ¬¸¿¬ ®«²­ ·² ¬¸» ­¿³» ¼·®»½¬·±² ¿­ ¬¸» º´±©ò

Í¿¬«®¿¬·±² ±º ½´¿§ º±«²¼¿¬·±² ­±·´ ³¿§ ±½½«® ©¸»®» ­«¾º´±±® ©¿´´­½®»¿¬» ¿ ¼¿³ ¬¸¿¬ ³¿µ»­ ©¿¬»® °±²¼ò ׬ ½¿² ¿´­± ±½½«® ©¸»®»ª»® ¬¸»®»·­ ¿ ­±«®½» ±º ©¿¬»® ²»¿® º±±¬·²¹­ ·² ½´¿§ ­±·´ò ̸·­ ´»¿¼­ ¬± ¿ ­»ª»®»®»¼«½¬·±² ·² ¬¸» ­¬®»²¹¬¸ ±º ¬¸» ­±·´ ©¸·½¸ ³¿§ ½®»¿¬» ´±½¿´ ­¸»¿®º¿·´«®»ò

Í»¿­±²¿´ ­©»´´·²¹ ¿²¼ ­¸®·²µ¿¹» ±º ½´¿§ ­±·´ ¿ºº»½¬­ ¬¸» °»®·³»¬»® ±º¬¸» ¾«·´¼·²¹ º·®­¬ô ¬¸»² ¹®¿¼«¿´´§ ­°®»¿¼­ ¬± ¬¸» ·²¬»®·±®ò ̸» ­©»´´·²¹°®±½»­­ ©·´´ «­«¿´´§ ¾»¹·² ¿¬ ¬¸» «°¸·´´ »¨¬®»³» ±º ¬¸» ¾«·´¼·²¹ô ±® ±²¬¸» ©»¿¬¸»® ­·¼» ©¸»®» ¬¸» ´¿²¼ ·­ º´¿¬ò Í©»´´·²¹ ¹®¿¼«¿´´§ ®»¿½¸»­ ¬¸»·²¬»®·±® ­±·´ ¿­ ¿¾­±®°¬·±² ½±²¬·²«»­ò ͸®·²µ¿¹» «­«¿´´§ ¾»¹·²­ ©¸»®»¬¸» ­«²K­ ¸»¿¬ ·­ ¹®»¿¬»­¬ò

Ûºº»½¬­ ±º ˲»ª»² ͱ·´ Ó±ª»³»²¬ ±² ͬ®«½¬«®»­

Û®±­·±² ¿²¼ ­¿¬«®¿¬·±²Û®±­·±² ®»³±ª»­ ¬¸» ­«°°±®¬ º®±³ «²¼»® º±±¬·²¹­ô ¬»²¼·²¹ ¬± ½®»¿¬»­«¾­·¼»²½» ±º ¬¸» °¿®¬ ±º ¬¸» ­¬®«½¬«®» «²¼»® ©¸·½¸ ·¬ ±½½«®­òÞ®·½µ©±®µ ©¿´´­ ©·´´ ®»­·­¬ ¬¸» ­¬®»­­ ½®»¿¬»¼ ¾§ ¬¸·­ ®»³±ª¿´ ±º­«°°±®¬ ¾§ ¾®·¼¹·²¹ ¬¸» ¹¿° ±® ½¿²¬·´»ª»®·²¹ «²¬·´ ¬¸» ¾®·½µ­ ±® ¬¸»³±®¬¿® ¾»¼¼·²¹ º¿·´ò Ñ´¼»® ³¿­±²®§ ¸¿­ ´·¬¬´» ®»­·­¬¿²½»ò Ûª·¼»²½» ±ºº¿·´«®» ª¿®·»­ ¿½½±®¼·²¹ ¬± ½·®½«³­¬¿²½»­ ¿²¼ ­§³°¬±³­ ³¿§ ·²½´«¼»æ

{ ͬ»° ½®¿½µ·²¹ ·² ¬¸» ³±®¬¿® ¾»¼­ ·² ¬¸» ¾±¼§ ±º ¬¸» ©¿´´ ±®¿¾±ª»ñ¾»´±© ±°»²·²¹­ ­«½¸ ¿­ ¼±±®­ ±® ©·²¼±©­ò

{ Ê»®¬·½¿´ ½®¿½µ·²¹ ·² ¬¸» ¾®·½µ­ ø«­«¿´´§ ¾«¬ ²±¬ ²»½»­­¿®·´§ ·² ´·²»©·¬¸ ¬¸» ª»®¬·½¿´ ¾»¼­ ±® °»®°»²¼­÷ò

×­±´¿¬»¼ °·»®­ ¿ºº»½¬»¼ ¾§ »®±­·±² ±® ­¿¬«®¿¬·±² ±º º±«²¼¿¬·±²­ ©·´´»ª»²¬«¿´´§ ´±­» ½±²¬¿½¬ ©·¬¸ ¬¸» ¾»¿®»®­ ¬¸»§ ­«°°±®¬ ¿²¼ ³¿§ ¬·´¬ ±®º¿´´ ±ª»®ò ̸» º´±±®­ ¬¸¿¬ ¸¿ª» ´±­¬ ¬¸·­ ­«°°±®¬ ©·´´ ¾»½±³» ¾±«²½§ô­±³»¬·³»­ ®¿¬¬´·²¹ ±®²¿³»²¬­ »¬½ò

Í»¿­±²¿´ ­©»´´·²¹ñ­¸®·²µ¿¹» ·² ½´¿§Í©»´´·²¹ º±«²¼¿¬·±² ­±·´ ¼«» ¬± ®¿·²§ °»®·±¼­ º·®­¬ ´·º¬­ ¬¸» ³±­¬»¨°±­»¼ »¨¬®»³·¬·»­ ±º ¬¸» º±±¬·²¹ ­§­¬»³ô ¬¸»² ¬¸» ®»³¿·²¼»® ±º ¬¸»°»®·³»¬»® º±±¬·²¹­ ©¸·´» ¹®¿¼«¿´´§ °»®³»¿¬·²¹ ·²­·¼» ¬¸» ¾«·´¼·²¹º±±¬°®·²¬ ¬± ´·º¬ ·²¬»®²¿´ º±±¬·²¹­ò ̸·­ ­©»´´·²¹ º·®­¬ ¬»²¼­ ¬± ½®»¿¬» ¿¼·­¸ »ºº»½¬ô ¾»½¿«­» ¬¸» »¨¬»®²¿´ º±±¬·²¹­ ¿®» °«­¸»¼ ¸·¹¸»® ¬¸¿² ¬¸»·²¬»®²¿´ ±²»­ò

̸» º·®­¬ ²±¬·½»¿¾´» ­§³°¬±³ ³¿§ ¾» ¬¸¿¬ ¬¸» º´±±® ¿°°»¿®­ ­´·¹¸¬´§¼·­¸»¼ò ̸·­ ·­ ±º¬»² ¿½½±³°¿²·»¼ ¾§ ­±³» ¼±±®­ ¾·²¼·²¹ ±² ¬¸»º´±±® ±® ¬¸» ¼±±® ¸»¿¼ô ¬±¹»¬¸»® ©·¬¸ ­±³» ½®¿½µ·²¹ ±º ½±®²·½»³·¬®»­ò ײ ¾«·´¼·²¹­ ©·¬¸ ¬·³¾»® º´±±®·²¹ ­«°°±®¬»¼ ¾§ ¾»¿®»®­ ¿²¼¶±·­¬­ô ¬¸» º´±±® ½¿² ¾» ¾±«²½§ò Û¨¬»®²¿´´§ ¬¸»®» ³¿§ ¾» ª·­·¾´»¼·­¸·²¹ ±º ¬¸» ¸·° ±® ®·¼¹» ´·²»­ò

ß­ ¬¸» ³±·­¬«®» ¿¾­±®°¬·±² °®±½»­­ ½±³°´»¬»­ ·¬­ ¶±«®²»§ ¬± ¬¸»·²²»®³±­¬ ¿®»¿­ ±º ¬¸» ¾«·´¼·²¹ô ¬¸» ·²¬»®²¿´ º±±¬·²¹­ ©·´´ ®·­»ò ׺ ¬¸»­°®»¿¼ ±º ³±·­¬«®» ·­ ®±«¹¸´§ »ª»²ô ·¬ ³¿§ ¾» ¬¸¿¬ ¬¸» ­§³°¬±³­ ©·´´¬»³°±®¿®·´§ ¼·­¿°°»¿®ô ¾«¬ ·¬ ·­ ³±®» ´·µ»´§ ¬¸¿¬ ­©»´´·²¹ ©·´´ ¾»«²»ª»²ô ½®»¿¬·²¹ ¿ ¼·ºº»®»²½» ®¿¬¸»® ¬¸¿² ¿ ¼·­¿°°»¿®¿²½» ·²­§³°¬±³­ò ײ ¾«·´¼·²¹­ ©·¬¸ ¬·³¾»® º´±±®·²¹ ­«°°±®¬»¼ ¾§ ¾»¿®»®­¿²¼ ¶±·­¬­ô ¬¸» ·­±´¿¬»¼ °·»®­ ©·´´ ®·­» ³±®» »¿­·´§ ¬¸¿² ¬¸» ­¬®·°º±±¬·²¹­ ±® °·»®­ «²¼»® ©¿´´­ô ½®»¿¬·²¹ ²±¬·½»¿¾´» ¼±³·²¹ ±º º´±±®·²¹ò

ß­ ¬¸» ©»¿¬¸»® °¿¬¬»®² ½¸¿²¹»­ ¿²¼ ¬¸» ­±·´ ¾»¹·²­ ¬± ¼®§ ±«¬ô ¬¸»»¨¬»®²¿´ º±±¬·²¹­ ©·´´ ¾» º·®­¬ ¿ºº»½¬»¼ô ¾»¹·²²·²¹ ©·¬¸ ¬¸» ´±½¿¬·±²­©¸»®» ¬¸» ­«²K­ »ºº»½¬ ·­ ­¬®±²¹»­¬ò ̸·­ ¸¿­ ¬¸» »ºº»½¬ ±º ´±©»®·²¹ ¬¸»»¨¬»®²¿´ º±±¬·²¹­ò ̸» ¼±³·²¹ ·­ ¿½½»²¬«¿¬»¼ ¿²¼ ½®¿½µ·²¹ ®»¼«½»­±® ¼·­¿°°»¿®­ ©¸»®» ·¬ ±½½«®®»¼ ¾»½¿«­» ±º ¼·­¸·²¹ô ¾«¬ ±¬¸»® ½®¿½µ­±°»² «°ò ̸» ®±±º ´·²»­ ³¿§ ¾»½±³» ½±²ª»¨ò

ܱ³·²¹ ¿²¼ ¼·­¸·²¹ ¿®» ¿´­± ¿ºº»½¬»¼ ¾§ ©»¿¬¸»® ·² ±¬¸»® ©¿§­ò ײ¿®»¿­ ©¸»®» ©¿®³ô ©»¬ ­«³³»®­ ¿²¼ ½±±´»® ¼®§ ©·²¬»®­ °®»ª¿·´ô©¿¬»® ³·¹®¿¬·±² ¬»²¼­ ¬± ¾» ¬±©¿®¼ ¬¸» ·²¬»®·±® ¿²¼ ¼±³·²¹ ©·´´ ¾»¿½½»²¬«¿¬»¼ô ©¸»®»¿­ ©¸»®» ­«³³»®­ ¿®» ¼®§ ¿²¼ ©·²¬»®­ ¿®» ½±´¼¿²¼ ©»¬ô ³·¹®¿¬·±² ¬»²¼­ ¬± ¾» ¬±©¿®¼ ¬¸» »¨¬»®·±® ¿²¼ ¬¸»«²¼»®´§·²¹ °®±°»²­·¬§ ·­ ¬±©¿®¼ ¼·­¸·²¹ò

Ó±ª»³»²¬ ½¿«­»¼ ¾§ ¬®»» ®±±¬­×² ¹»²»®¿´ô ¹®±©·²¹ ®±±¬­ ©·´´ »¨»®¬ ¿² «°©¿®¼ °®»­­«®» ±² º±±¬·²¹­ô©¸»®»¿­ ­±·´ ­«¾¶»½¬ ¬± ¼®§·²¹ ¾»½¿«­» ±º ¬®»» ±® ­¸®«¾ ®±±¬­ ©·´´ ¬»²¼¬± ®»³±ª» ­«°°±®¬ º®±³ «²¼»® º±±¬·²¹­ ¾§ ·²¼«½·²¹ ­¸®·²µ¿¹»ò

ݱ³°´·½¿¬·±²­ ½¿«­»¼ ¾§ ¬¸» ­¬®«½¬«®» ·¬­»´ºÓ±­¬ º±®½»­ ¬¸¿¬ ¬¸» ­±·´ ½¿«­»­ ¬± ¾» »¨»®¬»¼ ±² ­¬®«½¬«®»­ ¿®»ª»®¬·½¿´ P ·ò»ò »·¬¸»® «° ±® ¼±©²ò ر©»ª»®ô ¾»½¿«­» ¬¸»­» º±®½»­ ¿®»­»´¼±³ ­°®»¿¼ »ª»²´§ ¿®±«²¼ ¬¸» º±±¬·²¹­ô ¿²¼ ¾»½¿«­» ¬¸» ¾«·´¼·²¹®»­·­¬­ «²»ª»² ³±ª»³»²¬ ¾»½¿«­» ±º ·¬­ ®·¹·¼·¬§ô º±®½»­ ¿®» »¨»®¬»¼º®±³ ±²» °¿®¬ ±º ¬¸» ¾«·´¼·²¹ ¬± ¿²±¬¸»®ò ̸» ²»¬ ®»­«´¬ ±º ¿´´ ¬¸»­»º±®½»­ ·­ «­«¿´´§ ®±¬¿¬·±²¿´ò ̸·­ ®»­«´¬¿²¬ º±®½» ±º¬»² ½±³°´·½¿¬»­ ¬¸»¼·¿¹²±­·­ ¾»½¿«­» ¬¸» ª·­·¾´» ­§³°¬±³­ ¼± ²±¬ ­·³°´§ ®»º´»½¬ ¬¸»±®·¹·²¿´ ½¿«­»ò ß ½±³³±² ­§³°¬±³ ·­ ¾·²¼·²¹ ±º ¼±±®­ ±² ¬¸»ª»®¬·½¿´ ³»³¾»® ±º ¬¸» º®¿³»ò

Ûºº»½¬­ ±² º«´´ ³¿­±²®§ ­¬®«½¬«®»­Þ®·½µ©±®µ ©·´´ ®»­·­¬ ½®¿½µ·²¹ ©¸»®» ·¬ ½¿²ò ׬ ©·´´ ¿¬¬»³°¬ ¬± ­°¿²¿®»¿­ ¬¸¿¬ ´±­» ­«°°±®¬ ¾»½¿«­» ±º ­«¾­·¼»¼ º±«²¼¿¬·±²­ ±® ®¿·­»¼°±·²¬­ò ׬ ·­ ¬¸»®»º±®» «­«¿´ ¬± ­»» ½®¿½µ·²¹ ¿¬ ©»¿µ °±·²¬­ô ­«½¸ ¿­±°»²·²¹­ º±® ©·²¼±©­ ±® ¼±±®­ò

ײ ¬¸» »ª»²¬ ±º ½±²­¬®«½¬·±² ­»¬¬´»³»²¬ô ½®¿½µ·²¹ ©·´´ «­«¿´´§ ®»³¿·²«²½¸¿²¹»¼ ¿º¬»® ¬¸» °®±½»­­ ±º ­»¬¬´»³»²¬ ¸¿­ ½»¿­»¼ò

É·¬¸ ´±½¿´ ­¸»¿® ±® »®±­·±²ô ½®¿½µ·²¹ ©·´´ «­«¿´´§ ½±²¬·²«» ¬± ¼»ª»´±°«²¬·´ ¬¸» ±®·¹·²¿´ ½¿«­» ¸¿­ ¾»»² ®»³»¼·»¼ô ±® «²¬·´ ¬¸» ­«¾­·¼»²½»¸¿­ ½±³°´»¬»´§ ²»«¬®¿´·­»¼ ¬¸» ¿ºº»½¬»¼ °±®¬·±² ±º º±±¬·²¹ ¿²¼ ¬¸»­¬®«½¬«®» ¸¿­ ­¬¿¾·´·­»¼ ±² ±¬¸»® º±±¬·²¹­ ¬¸¿¬ ®»³¿·² »ºº»½¬·ª»ò

ײ ¬¸» ½¿­» ±º ­©»´´ñ­¸®·²µ »ºº»½¬­ô ¬¸» ¾®·½µ©±®µ ©·´´ ·² ­±³» ½¿­»­®»¬«®² ¬± ·¬­ ±®·¹·²¿´ °±­·¬·±² ¿º¬»® ½±³°´»¬·±² ±º ¿ ½§½´»ô ¸±©»ª»® ·¬·­ ³±®» ´·µ»´§ ¬¸¿¬ ¬¸» ®±¬¿¬·±²¿´ »ºº»½¬ ©·´´ ²±¬ ¾» »¨¿½¬´§ ®»ª»®­»¼ô¿²¼ ·¬ ·­ ¿´­± «­«¿´ ¬¸¿¬ ¾®·½µ©±®µ ©·´´ ­»¬¬´» ·² ·¬­ ²»© °±­·¬·±² ¿²¼©·´´ ®»­·­¬ ¬¸» º±®½»­ ¬®§·²¹ ¬± ®»¬«®² ·¬ ¬± ·¬­ ±®·¹·²¿´ °±­·¬·±²ò ̸·­³»¿²­ ¬¸¿¬ ·² ¿ ½¿­» ©¸»®» ­©»´´·²¹ ¬¿µ»­ °´¿½» ¿º¬»® ½±²­¬®«½¬·±²¿²¼ ½®¿½µ·²¹ ±½½«®­ô ¬¸» ½®¿½µ·²¹ ·­ ´·µ»´§ ¬± ¿¬ ´»¿­¬ °¿®¬´§ ®»³¿·²¿º¬»® ¬¸» ­¸®·²µ ­»¹³»²¬ ±º ¬¸» ½§½´» ·­ ½±³°´»¬»ò ̸«­ô »¿½¸ ¬·³»¬¸» ½§½´» ·­ ®»°»¿¬»¼ô ¬¸» ´·µ»´·¸±±¼ ·­ ¬¸¿¬ ¬¸» ½®¿½µ·²¹ ©·´´ ¾»½±³»©·¼»® «²¬·´ ¬¸» ­»½¬·±²­ ±º ¾®·½µ©±®µ ¾»½±³» ª·®¬«¿´´§ ·²¼»°»²¼»²¬ò

É·¬¸ ®»°»¿¬»¼ ½§½´»­ô ±²½» ¬¸» ½®¿½µ·²¹ ·­ »­¬¿¾´·­¸»¼ô ·º ¬¸»®» ·­ ²±±¬¸»® ½±³°´·½¿¬·±²ô ·¬ ·­ ²±®³¿´ º±® ¬¸» ·²½·¼»²½» ±º ½®¿½µ·²¹ ¬±­¬¿¾·´·­»ô ¿­ ¬¸» ¾«·´¼·²¹ ¸¿­ ¬¸» ¿®¬·½«´¿¬·±² ·¬ ²»»¼­ ¬± ½±°» ©·¬¸¬¸» °®±¾´»³ò ̸·­ ·­ ¾§ ²± ³»¿²­ ¿´©¿§­ ¬¸» ½¿­»ô ¸±©»ª»®ô ¿²¼³±²·¬±®·²¹ ±º ½®¿½µ­ ·² ©¿´´­ ¿²¼ º´±±®­ ­¸±«´¼ ¿´©¿§­ ¾» ¬®»¿¬»¼­»®·±«­´§ò

Ë°¸»¿ª¿´ ½¿«­»¼ ¾§ ¹®±©¬¸ ±º ¬®»» ®±±¬­ «²¼»® º±±¬·²¹­ ·­ ²±¬ ¿­·³°´» ª»®¬·½¿´ ­¸»¿® ­¬®»­­ò ̸»®» ·­ ¿ ¬»²¼»²½§ º±® ¬¸» ®±±¬ ¬± ¿´­±»¨»®¬ ´¿¬»®¿´ º±®½»­ ¬¸¿¬ ¿¬¬»³°¬ ¬± ­»°¿®¿¬» ­»½¬·±²­ ±º ¾®·½µ©±®µ¿º¬»® ·²·¬·¿´ ½®¿½µ·²¹ ¸¿­ ±½½«®®»¼ò

Ì®»»­ ½¿² ½¿«­» ­¸®·²µ¿¹» ¿²¼ ¼¿³¿¹»

Page 15: SITE CLASSIFICATION REPORT SUMMARY...Douglas Partners (DP) has prepared this report for this project at Taylor 2- Stage 3, Taylor in accordance with DP’s proposal dated 15 September

̸» ²±®³¿´ ­¬®«½¬«®¿´ ¿®®¿²¹»³»²¬ ·­ ¬¸¿¬ ¬¸» ·²²»® ´»¿º ±º ¾®·½µó©±®µ ·² ¬¸» »¨¬»®²¿´ ©¿´´­ ¿²¼ ¿¬ ´»¿­¬ ­±³» ±º ¬¸» ·²¬»®²¿´ ©¿´´­ø¼»°»²¼·²¹ ±² ¬¸» ®±±º ¬§°»÷ ½±³°®·­» ¬¸» ´±¿¼ó¾»¿®·²¹ ­¬®«½¬«®» ±²©¸·½¸ ¿²§ «°°»® º´±±®­ô ½»·´·²¹­ ¿²¼ ¬¸» ®±±º ¿®» ­«°°±®¬»¼ò ײ ¬¸»­»½¿­»­ô ·¬ ·­ ·²¬»®²¿´´§ ª·­·¾´» ½®¿½µ·²¹ ¬¸¿¬ ­¸±«´¼ ¾» ¬¸» ³¿·² º±½«­±º ¿¬¬»²¬·±²ô ¸±©»ª»® ¬¸»®» ¿®» ¿ º»© »¨¿³°´»­ ±º ¼©»´´·²¹­ ©¸±­»»¨¬»®²¿´ ´»¿º ±º ³¿­±²®§ °´¿§­ ­±³» ­«°°±®¬·²¹ ®±´»ô ­± ¬¸·­ ­¸±«´¼¾» ½¸»½µ»¼ ·º ¬¸»®» ·­ ¿²§ ¼±«¾¬ò ײ ¿²§ ½¿­»ô »¨¬»®²¿´´§ ª·­·¾´»½®¿½µ·²¹ ·­ ·³°±®¬¿²¬ ¿­ ¿ ¹«·¼» ¬± ­¬®»­­»­ ±² ¬¸» ­¬®«½¬«®» ¹»²»®¿´´§ô¿²¼ ·¬ ­¸±«´¼ ¿´­± ¾» ®»³»³¾»®»¼ ¬¸¿¬ ¬¸» »¨¬»®²¿´ ©¿´´­ ³«­¬ ¾»½¿°¿¾´» ±º ­«°°±®¬·²¹ ¬¸»³­»´ª»­ò

Ûºº»½¬­ ±² º®¿³»¼ ­¬®«½¬«®»­Ì·³¾»® ±® ­¬»»´ º®¿³»¼ ¾«·´¼·²¹­ ¿®» ´»­­ ´·µ»´§ ¬± »¨¸·¾·¬ ½®¿½µ·²¹¼«» ¬± ­©»´´ñ­¸®·²µ ¬¸¿² ³¿­±²®§ ¾«·´¼·²¹­ ¾»½¿«­» ±º ¬¸»·®º´»¨·¾·´·¬§ò ß´­±ô ¬¸» ¼±³·²¹ñ¼·­¸·²¹ »ºº»½¬­ ¬»²¼ ¬± ¾» ´±©»® ¾»½¿«­»±º ¬¸» ´·¹¸¬»® ©»·¹¸¬ ±º ©¿´´­ò ̸» ³¿·² ®·­µ­ ¬± º®¿³»¼ ¾«·´¼·²¹­ ¿®»»²½±«²¬»®»¼ ¾»½¿«­» ±º ¬¸» ·­±´¿¬»¼ °·»® º±±¬·²¹­ «­»¼ «²¼»® ©¿´´­òɸ»®» »®±­·±² ±® ­¿¬«®¿¬·±² ½¿«­» ¿ º±±¬·²¹ ¬± º¿´´ ¿©¿§ô ¬¸·­ ½¿²¼±«¾´» ¬¸» ­°¿² ©¸·½¸ ¿ ©¿´´ ³«­¬ ¾®·¼¹»ò ̸·­ ¿¼¼·¬·±²¿´ ­¬®»­­ ½¿²½®»¿¬» ½®¿½µ·²¹ ·² ©¿´´ ´·²·²¹­ô °¿®¬·½«´¿®´§ ©¸»®» ¬¸»®» ·­ ¿ ©»¿µ°±·²¬ ·² ¬¸» ­¬®«½¬«®» ½¿«­»¼ ¾§ ¿ ¼±±® ±® ©·²¼±© ±°»²·²¹ò ׬ ·­ô¸±©»ª»®ô «²´·µ»´§ ¬¸¿¬ º®¿³»¼ ­¬®«½¬«®»­ ©·´´ ¾» ­± ­¬®»­­»¼ ¿­ ¬± ­«ºº»®­»®·±«­ ¼¿³¿¹» ©·¬¸±«¬ º·®­¬ »¨¸·¾·¬·²¹ ­±³» ±® ¿´´ ±º ¬¸» ¿¾±ª»­§³°¬±³­ º±® ¿ ½±²­·¼»®¿¾´» °»®·±¼ò ̸» ­¿³» ©¿®²·²¹ °»®·±¼ ­¸±«´¼¿°°´§ ·² ¬¸» ½¿­» ±º «°¸»¿ª¿´ò ׬ ­¸±«´¼ ¾» ²±¬»¼ô ¸±©»ª»®ô ¬¸¿¬ ©¸»®»º®¿³»¼ ¾«·´¼·²¹­ ¿®» ­«°°±®¬»¼ ¾§ ­¬®·° º±±¬·²¹­ ¬¸»®» ·­ ±²´§ ±²» ´»¿º±º ¾®·½µ©±®µ ¿²¼ ¬¸»®»º±®» ¬¸» »¨¬»®²¿´´§ ª·­·¾´» ©¿´´­ ¿®» ¬¸»­«°°±®¬·²¹ ­¬®«½¬«®» º±® ¬¸» ¾«·´¼·²¹ò ײ ¬¸·­ ½¿­»ô ¬¸» ­«¾º´±±®³¿­±²®§ ©¿´´­ ½¿² ¾» »¨°»½¬»¼ ¬± ¾»¸¿ª» ¿­ º«´´ ¾®·½µ©±®µ ©¿´´­ò

Ûºº»½¬­ ±² ¾®·½µ ª»²»»® ­¬®«½¬«®»­Þ»½¿«­» ¬¸» ´±¿¼ó¾»¿®·²¹ ­¬®«½¬«®» ±º ¿ ¾®·½µ ª»²»»® ¾«·´¼·²¹ ·­ ¬¸»º®¿³» ¬¸¿¬ ³¿µ»­ «° ¬¸» ·²¬»®·±® ´»¿º ±º ¬¸» »¨¬»®²¿´ ©¿´´­ °´«­°»®¸¿°­ ¬¸» ·²¬»®²¿´ ©¿´´­ô ¼»°»²¼·²¹ ±² ¬¸» ¬§°» ±º ®±±ºô ¬¸»¾«·´¼·²¹ ½¿² ¾» »¨°»½¬»¼ ¬± ¾»¸¿ª» ¿­ ¿ º®¿³»¼ ­¬®«½¬«®»ô »¨½»°¬ ¬¸¿¬¬¸» »¨¬»®²¿´ ³¿­±²®§ ©·´´ ¾»¸¿ª» ·² ¿ ­·³·´¿® ©¿§ ¬± ¬¸» »¨¬»®²¿´ ´»¿º±º ¿ º«´´ ³¿­±²®§ ­¬®«½¬«®»ò

É¿¬»® Í»®ª·½» ¿²¼ Ü®¿·²¿¹»

ɸ»®» ¿ ©¿¬»® ­»®ª·½» °·°»ô ¿ ­»©»® ±® ­¬±®³©¿¬»® ¼®¿·²¿¹» °·°» ·­ ·²¬¸» ª·½·²·¬§ ±º ¿ ¾«·´¼·²¹ô ¿ ©¿¬»® ´»¿µ ½¿² ½¿«­» »®±­·±²ô ­©»´´·²¹ ±®­¿¬«®¿¬·±² ±º ­«­½»°¬·¾´» ­±·´ò Ûª»² ¿ ³·²«­½«´» ´»¿µ ½¿² ¾» »²±«¹¸¬± ­¿¬«®¿¬» ¿ ½´¿§ º±«²¼¿¬·±²ò ß ´»¿µ·²¹ ¬¿° ²»¿® ¿ ¾«·´¼·²¹ ½¿² ¸¿ª»¬¸» ­¿³» »ºº»½¬ò ײ ¿¼¼·¬·±²ô ¬®»²½¸»­ ½±²¬¿·²·²¹ °·°»­ ½¿² ¾»½±³»©¿¬»®½±«®­»­ »ª»² ¬¸±«¹¸ ¾¿½µº·´´»¼ô °¿®¬·½«´¿®´§ ©¸»®» ¾®±µ»²®«¾¾´» ·­ «­»¼ ¿­ º·´´ò É¿¬»® ¬¸¿¬ ®«²­ ¿´±²¹ ¬¸»­» ¬®»²½¸»­ ½¿² ¾»®»­°±²­·¾´» º±® ­»®·±«­ »®±­·±²ô ·²¬»®­¬®¿¬¿ ­»»°¿¹» ·²¬± ­«¾º´±±® ¿®»¿­¿²¼ ­¿¬«®¿¬·±²ò

з°» ´»¿µ¿¹» ¿²¼ ¬®»²½¸ ©¿¬»® º´±©­ ¿´­± »²½±«®¿¹» ¬®»» ¿²¼ ­¸®«¾®±±¬­ ¬± ¬¸» ­±«®½» ±º ©¿¬»®ô ½±³°´·½¿¬·²¹ ¿²¼ »¨¿½»®¾¿¬·²¹ ¬¸»°®±¾´»³òб±® ®±±º °´«³¾·²¹ ½¿² ®»­«´¬ ·² ´¿®¹» ª±´«³»­ ±º ®¿·²©¿¬»® ¾»·²¹½±²½»²¬®¿¬»¼ ·² ¿ ­³¿´´ ¿®»¿ ±º ­±·´æ

{ ײ½±®®»½¬ º¿´´­ ·² ®±±º ¹«¬¬»®·²¹ ³¿§ ®»­«´¬ ·² ±ª»®º´±©­ô ¿­ ³¿§¹«¬¬»®­ ¾´±½µ»¼ ©·¬¸ ´»¿ª»­ »¬½ò

{ ݱ®®±¼»¼ ¹«¬¬»®·²¹ ±® ¼±©²°·°»­ ½¿² ­°·´´ ©¿¬»® ¬± ¹®±«²¼ò

{ ܱ©²°·°»­ ²±¬ °±­·¬·ª»´§ ½±²²»½¬»¼ ¬± ¿ °®±°»® ­¬±®³©¿¬»®½±´´»½¬·±² ­§­¬»³ ©·´´ ¼·®»½¬ ¿ ½±²½»²¬®¿¬·±² ±º ©¿¬»® ¬± ­±·´ ¬¸¿¬ ·­¼·®»½¬´§ ¿¼¶¿½»²¬ ¬± º±±¬·²¹­ô ­±³»¬·³»­ ½¿«­·²¹ ´¿®¹»ó­½¿´»°®±¾´»³­ ­«½¸ ¿­ »®±­·±²ô ­¿¬«®¿¬·±² ¿²¼ ³·¹®¿¬·±² ±º ©¿¬»® «²¼»®¬¸» ¾«·´¼·²¹ò

Í»®·±«­²»­­ ±º Ý®¿½µ·²¹

ײ ¹»²»®¿´ô ³±­¬ ½®¿½µ·²¹ º±«²¼ ·² ³¿­±²®§ ©¿´´­ ·­ ¿ ½±­³»¬·½²«·­¿²½» ±²´§ ¿²¼ ½¿² ¾» µ»°¬ ·² ®»°¿·® ±® »ª»² ·¹²±®»¼ò ̸» ¬¿¾´»¾»´±© ·­ ¿ ®»°®±¼«½¬·±² ±º Ì¿¾´» Ýï ±º ßÍ îèéðò

ßÍ îèéð ¿´­± °«¾´·­¸»­ º·¹«®»­ ®»´¿¬·²¹ ¬± ½®¿½µ·²¹ ·² ½±²½®»¬» º´±±®­ô¸±©»ª»® ¾»½¿«­» ©¿´´ ½®¿½µ·²¹ ©·´´ «­«¿´´§ ®»¿½¸ ¬¸» ½®·¬·½¿´ °±·²¬­·¹²·º·½¿²¬´§ »¿®´·»® ¬¸¿² ½®¿½µ·²¹ ·² ­´¿¾­ô ¬¸·­ ¬¿¾´» ·­ ²±¬®»°®±¼«½»¼ ¸»®»ò

Ю»ª»²¬·±²ñÝ«®»

д«³¾·²¹É¸»®» ¾«·´¼·²¹ ³±ª»³»²¬ ·­ ½¿«­»¼ ¾§ ©¿¬»® ­»®ª·½»ô ®±±º °´«³¾·²¹ô­»©»® ±® ­¬±®³©¿¬»® º¿·´«®»ô ¬¸» ®»³»¼§ ·­ ¬± ®»°¿·® ¬¸» °®±¾´»³ò ׬ ·­ °®«¼»²¬ô ¸±©»ª»®ô ¬± ½±²­·¼»® ¿´­± ®»®±«¬·²¹ °·°»­ ¿©¿§ º®±³¬¸» ¾«·´¼·²¹ ©¸»®» °±­­·¾´»ô ¿²¼ ®»´±½¿¬·²¹ ¬¿°­ ¬± °±­·¬·±²­ ©¸»®»¿²§ ´»¿µ¿¹» ©·´´ ²±¬ ¼·®»½¬ ©¿¬»® ¬± ¬¸» ¾«·´¼·²¹ ª·½·²·¬§ò Ûª»² ©¸»®»¹«´´§ ¬®¿°­ ¿®» °®»­»²¬ô ¬¸»®» ·­ ­±³»¬·³»­ ­«ºº·½·»²¬ ­°·´´ ¬± ½®»¿¬»»®±­·±² ±® ­¿¬«®¿¬·±²ô °¿®¬·½«´¿®´§ ·² ³±¼»®² ·²­¬¿´´¿¬·±²­ «­·²¹­³¿´´»® ¼·¿³»¬»® ÐÊÝ º·¨¬«®»­ò ײ¼»»¼ô ­±³» ¹«´´§ ¬®¿°­ ¿®» ²±¬­·¬«¿¬»¼ ¼·®»½¬´§ «²¼»® ¬¸» ¬¿°­ ¬¸¿¬ ¿®» ·²­¬¿´´»¼ ¬± ½¸¿®¹» ¬¸»³ô©·¬¸ ¬¸» ®»­«´¬ ¬¸¿¬ ©¿¬»® º®±³ ¬¸» ¬¿° ³¿§ »²¬»® ¬¸» ¾¿½µº·´´»¼¬®»²½¸ ¬¸¿¬ ¸±«­»­ ¬¸» ­»©»® °·°·²¹ò ׺ ¬¸» ¬®»²½¸ ¸¿­ ¾»»² °±±®´§¾¿½µº·´´»¼ô ¬¸» ©¿¬»® ©·´´ »·¬¸»® °±²¼ ±® º´±© ¿´±²¹ ¬¸» ¾±¬¬±³ ±º¬¸» ¬®»²½¸ò ß­ ¬¸»­» ¬®»²½¸»­ «­«¿´´§ ®«² ¿´±²¹­·¼» ¬¸» º±±¬·²¹­ ¿²¼½¿² ¾» ¿¬ ¿ ­·³·´¿® ¼»°¬¸ô ·¬ ·­ ²±¬ ¸¿®¼ ¬± ­»» ¸±© ¿²§ ©¿¬»® ¬¸¿¬ ·­¬¸«­ ¼·®»½¬»¼ ·²¬± ¿ ¬®»²½¸ ½¿² »¿­·´§ ¿ºº»½¬ ¬¸» º±«²¼¿¬·±²K­ ¿¾·´·¬§ ¬±­«°°±®¬ º±±¬·²¹­ ±® »ª»² ¹¿·² »²¬®§ ¬± ¬¸» ­«¾º´±±® ¿®»¿ò

Ù®±«²¼ ¼®¿·²¿¹»×² ¿´´ ­±·´­ ¬¸»®» ·­ ¬¸» ½¿°¿½·¬§ º±® ©¿¬»® ¬± ¬®¿ª»´ ±² ¬¸» ­«®º¿½» ¿²¼¾»´±© ·¬ò Í«®º¿½» ©¿¬»® º´±©­ ½¿² ¾» »­¬¿¾´·­¸»¼ ¾§ ·²­°»½¬·±² ¼«®·²¹¿²¼ ¿º¬»® ¸»¿ª§ ±® °®±´±²¹»¼ ®¿·²ò ׺ ²»½»­­¿®§ô ¿ ¹®¿¬»¼ ¼®¿·² ­§­¬»³½±²²»½¬»¼ ¬± ¬¸» ­¬±®³©¿¬»® ½±´´»½¬·±² ­§­¬»³ ·­ «­«¿´´§ ¿² »¿­§­±´«¬·±²ò

׬ ·­ô ¸±©»ª»®ô ­±³»¬·³»­ ²»½»­­¿®§ ©¸»² ¿¬¬»³°¬·²¹ ¬± °®»ª»²¬©¿¬»® ³·¹®¿¬·±² ¬¸¿¬ ¬»­¬·²¹ ¾» ½¿®®·»¼ ±«¬ ¬± »­¬¿¾´·­¸ ©¿¬»®¬¿¾´»¸»·¹¸¬ ¿²¼ ­«¾­±·´ ©¿¬»® º´±©­ò ̸·­ ­«¾¶»½¬ ·­ ®»º»®®»¼ ¬± ·² ÞÌÚ ï翲¼ ³¿§ °®±°»®´§ ¾» ®»¹¿®¼»¼ ¿­ ¿² ¿®»¿ º±® ¿² »¨°»®¬ ½±²­«´¬¿²¬ò

Ю±¬»½¬·±² ±º ¬¸» ¾«·´¼·²¹ °»®·³»¬»®×¬ ·­ »­­»²¬·¿´ ¬± ®»³»³¾»® ¬¸¿¬ ¬¸» ­±·´ ¬¸¿¬ ¿ºº»½¬­ º±±¬·²¹­ »¨¬»²¼­©»´´ ¾»§±²¼ ¬¸» ¿½¬«¿´ ¾«·´¼·²¹ ´·²»ò É¿¬»®·²¹ ±º ¹¿®¼»² °´¿²¬­ô­¸®«¾­ ¿²¼ ¬®»»­ ½¿«­»­ ­±³» ±º ¬¸» ³±­¬ ­»®·±«­ ©¿¬»® °®±¾´»³­ò

Ú±® ¬¸·­ ®»¿­±²ô °¿®¬·½«´¿®´§ ©¸»®» °®±¾´»³­ »¨·­¬ ±® ¿®» ´·µ»´§ ¬±±½½«®ô ·¬ ·­ ®»½±³³»²¼»¼ ¬¸¿¬ ¿² ¿°®±² ±º °¿ª·²¹ ¾» ·²­¬¿´´»¼¿®±«²¼ ¿­ ³«½¸ ±º ¬¸» ¾«·´¼·²¹ °»®·³»¬»® ¿­ ²»½»­­¿®§ò ̸·­ °¿ª·²¹

ÝÔßÍÍ×Ú×ÝßÌ×ÑÒ ÑÚ ÜßÓßÙÛ É×ÌØ ÎÛÚÛÎÛÒÝÛ ÌÑ ÉßÔÔÍ

Ü»­½®·°¬·±² ±º ¬§°·½¿´ ¼¿³¿¹» ¿²¼ ®»¯«·®»¼ ®»°¿·® ß°°®±¨·³¿¬» ½®¿½µ ©·¼¬¸ Ü¿³¿¹»´·³·¬ ø­»» Ò±¬» í÷ ½¿¬»¹±®§

Ø¿·®´·²» ½®¿½µ­ äðòï ³³ ð

Ú·²» ½®¿½µ­ ©¸·½¸ ¼± ²±¬ ²»»¼ ®»°¿·® äï ³³ ï

Ý®¿½µ­ ²±¬·½»¿¾´» ¾«¬ »¿­·´§ º·´´»¼ò ܱ±®­ ¿²¼ ©·²¼±©­ ­¬·½µ ­´·¹¸¬´§ äë ³³ î

Ý®¿½µ­ ½¿² ¾» ®»°¿·®»¼ ¿²¼ °±­­·¾´§ ¿ ­³¿´´ ¿³±«²¬ ±º ©¿´´ ©·´´ ²»»¼ ëPïë ³³ ø±® ¿ ²«³¾»® ±º ½®¿½µ­ í¬± ¾» ®»°´¿½»¼ò ܱ±®­ ¿²¼ ©·²¼±©­ ­¬·½µò Í»®ª·½» °·°»­ ½¿² º®¿½¬«®»ò í ³³ ±® ³±®» ·² ±²» ¹®±«°÷É»¿¬¸»®¬·¹¸¬²»­­ ±º¬»² ·³°¿·®»¼

Û¨¬»²­·ª» ®»°¿·® ©±®µ ·²ª±´ª·²¹ ¾®»¿µ·²¹ó±«¬ ¿²¼ ®»°´¿½·²¹ ­»½¬·±²­ ±º ©¿´´­ô ïëPîë ³³ ¾«¬ ¿´­± ¼»°»²¼ ì»­°»½·¿´´§ ±ª»® ¼±±®­ ¿²¼ ©·²¼±©­ò É·²¼±© ¿²¼ ¼±±® º®¿³»­ ¼·­¬±®¬ò É¿´´­ ´»¿² ±² ²«³¾»® ±º ½®¿½µ­±® ¾«´¹» ²±¬·½»¿¾´§ô ­±³» ´±­­ ±º ¾»¿®·²¹ ·² ¾»¿³­ò Í»®ª·½» °·°»­ ¼·­®«°¬»¼

Page 16: SITE CLASSIFICATION REPORT SUMMARY...Douglas Partners (DP) has prepared this report for this project at Taylor 2- Stage 3, Taylor in accordance with DP’s proposal dated 15 September

­¸±«´¼ »¨¬»²¼ ±«¬©¿®¼­ ¿ ³·²·³«³ ±º çðð ³³ ø³±®» ·² ¸·¹¸´§®»¿½¬·ª» ­±·´÷ ¿²¼ ­¸±«´¼ ¸¿ª» ¿ ³·²·³«³ º¿´´ ¿©¿§ º®±³ ¬¸»¾«·´¼·²¹ ±º ïæêðò ̸» º·²·­¸»¼ °¿ª·²¹ ­¸±«´¼ ¾» ²± ´»­­ ¬¸¿² ïðð³³ ¾»´±© ¾®·½µ ª»²¬ ¾¿­»­ò

׬ ·­ °®«¼»²¬ ¬± ®»´±½¿¬» ¼®¿·²¿¹» °·°»­ ¿©¿§ º®±³ ¬¸·­ °¿ª·²¹ô ·º°±­­·¾´»ô ¬± ¿ª±·¼ ½±³°´·½¿¬·±²­ º®±³ º«¬«®» ´»¿µ¿¹»ò ׺ ¬¸·­ ·­ ²±¬°®¿½¬·½¿´ô »¿®¬¸»²©¿®» °·°»­ ­¸±«´¼ ¾» ®»°´¿½»¼ ¾§ ÐÊÝ ¿²¼¾¿½µº·´´·²¹ ­¸±«´¼ ¾» ±º ¬¸» ­¿³» ­±·´ ¬§°» ¿­ ¬¸» ­«®®±«²¼·²¹ ­±·´¿²¼ ½±³°¿½¬»¼ ¬± ¬¸» ­¿³» ¼»²­·¬§ò

Û¨½»°¬ ·² ¿®»¿­ ©¸»®» º®»»¦·²¹ ±º ©¿¬»® ·­ ¿² ·­­«»ô ·¬ ·­ ©·­» ¬±®»³±ª» ¬¿°­ ·² ¬¸» ¾«·´¼·²¹ ¿®»¿ ¿²¼ ®»´±½¿¬» ¬¸»³ ©»´´ ¿©¿§ º®±³¬¸» ¾«·´¼·²¹ P °®»º»®¿¾´§ ²±¬ «°¸·´´ º®±³ ·¬ ø­»» ÞÌÚ ïç÷ò

׬ ³¿§ ¾» ¼»­·®¿¾´» ¬± ·²­¬¿´´ ¿ ¹®¿¬»¼ ¼®¿·² ¿¬ ¬¸» ±«¬­·¼» »¼¹» ±º ¬¸»°¿ª·²¹ ±² ¬¸» «°¸·´´ ­·¼» ±º ¬¸» ¾«·´¼·²¹ò ׺ ­«¾­±·´ ¼®¿·²¿¹» ·­²»»¼»¼ ¬¸·­ ½¿² ¾» ·²­¬¿´´»¼ «²¼»® ¬¸» ­«®º¿½» ¼®¿·²ò

ݱ²¼»²­¿¬·±²×² ¾«·´¼·²¹­ ©·¬¸ ¿ ­«¾º´±±® ª±·¼ ­«½¸ ¿­ ©¸»®» ¾»¿®»®­ ¿²¼ ¶±·­¬­­«°°±®¬ º´±±®·²¹ô ·²­«ºº·½·»²¬ ª»²¬·´¿¬·±² ½®»¿¬»­ ·¼»¿´ ½±²¼·¬·±²­ º±®½±²¼»²­¿¬·±²ô °¿®¬·½«´¿®´§ ©¸»®» ¬¸»®» ·­ ´·¬¬´» ½´»¿®¿²½» ¾»¬©»»² ¬¸»º´±±® ¿²¼ ¬¸» ¹®±«²¼ò ݱ²¼»²­¿¬·±² ¿¼¼­ ¬± ¬¸» ³±·­¬«®» ¿´®»¿¼§°®»­»²¬ ·² ¬¸» ­«¾º´±±® ¿²¼ ­·¹²·º·½¿²¬´§ ­´±©­ ¬¸» °®±½»­­ ±º ¼®§·²¹±«¬ò ײ­¬¿´´¿¬·±² ±º ¿² ¿¼»¯«¿¬» ­«¾º´±±® ª»²¬·´¿¬·±² ­§­¬»³ô »·¬¸»®²¿¬«®¿´ ±® ³»½¸¿²·½¿´ô ·­ ¼»­·®¿¾´»ò

É¿®²·²¹æ ß´¬¸±«¹¸ ¬¸·­ Þ«·´¼·²¹ Ì»½¸²±´±¹§ Ú·´» ¼»¿´­ ©·¬¸½®¿½µ·²¹ ·² ¾«·´¼·²¹­ô ·¬ ­¸±«´¼ ¾» ­¿·¼ ¬¸¿¬ ­«¾º´±±® ³±·­¬«®» ½¿²®»­«´¬ ·² ¬¸» ¼»ª»´±°³»²¬ ±º ±¬¸»® °®±¾´»³­ô ²±¬¿¾´§æ

{ É¿¬»® ¬¸¿¬ ·­ ¬®¿²­³·¬¬»¼ ·²¬± ³¿­±²®§ô ³»¬¿´ ±® ¬·³¾»® ¾«·´¼·²¹»´»³»²¬­ ½¿«­»­ ¼¿³¿¹» ¿²¼ñ±® ¼»½¿§ ¬± ¬¸±­» »´»³»²¬­ò

{ Ø·¹¸ ­«¾º´±±® ¸«³·¼·¬§ ¿²¼ ³±·­¬«®» ½±²¬»²¬ ½®»¿¬» ¿² ·¼»¿´»²ª·®±²³»²¬ º±® ª¿®·±«­ °»­¬­ô ·²½´«¼·²¹ ¬»®³·¬»­ ¿²¼ ­°·¼»®­ò

{ ɸ»®» ¸·¹¸ ³±·­¬«®» ´»ª»´­ ¿®» ¬®¿²­³·¬¬»¼ ¬± ¬¸» º´±±®·²¹ ¿²¼©¿´´­ô ¿² ·²½®»¿­» ·² ¬¸» ¼«­¬ ³·¬» ½±«²¬ ½¿² »²­«» ©·¬¸·² ¬¸»´·ª·²¹ ¿®»¿­ò Ü«­¬ ³·¬»­ô ¿­ ©»´´ ¿­ ¼¿³°²»­­ ·² ¹»²»®¿´ô ½¿² ¾» ¿¸»¿´¬¸ ¸¿¦¿®¼ ¬± ·²¸¿¾·¬¿²¬­ô °¿®¬·½«´¿®´§ ¬¸±­» ©¸± ¿®»¿¾²±®³¿´´§ ­«­½»°¬·¾´» ¬± ®»­°·®¿¬±®§ ¿·´³»²¬­ò

̸» ¹¿®¼»²Ì¸» ·¼»¿´ ª»¹»¬¿¬·±² ´¿§±«¬ ·­ ¬± ¸¿ª» ´¿©² ±® °´¿²¬­ ¬¸¿¬ ®»¯«·®»±²´§ ´·¹¸¬ ©¿¬»®·²¹ ·³³»¼·¿¬»´§ ¿¼¶¿½»²¬ ¬± ¬¸» ¼®¿·²¿¹» ±® °¿ª·²¹»¼¹»ô ¬¸»² ³±®» ¼»³¿²¼·²¹ °´¿²¬­ô ­¸®«¾­ ¿²¼ ¬®»»­ ­°®»¿¼ ±«¬ ·²¬¸¿¬ ±®¼»®ò

Ѫ»®©¿¬»®·²¹ ¼«» ¬± ³·­«­» ±º ¿«¬±³¿¬·½ ©¿¬»®·²¹ ­§­¬»³­ ·­ ¿½±³³±² ½¿«­» ±º ­¿¬«®¿¬·±² ¿²¼ ©¿¬»® ³·¹®¿¬·±² «²¼»® º±±¬·²¹­ò ׺·¬ ·­ ²»½»­­¿®§ ¬± «­» ¬¸»­» ­§­¬»³­ô ·¬ ·­ ·³°±®¬¿²¬ ¬± ®»³±ª» ¹¿®¼»²¾»¼­ ¬± ¿ ½±³°´»¬»´§ ­¿º» ¼·­¬¿²½» º®±³ ¾«·´¼·²¹­ò

Û¨·­¬·²¹ ¬®»»­É¸»®» ¿ ¬®»» ·­ ½¿«­·²¹ ¿ °®±¾´»³ ±º ­±·´ ¼®§·²¹ ±® ¬¸»®» ·­ ¬¸»»¨·­¬»²½» ±® ¬¸®»¿¬ ±º «°¸»¿ª¿´ ±º º±±¬·²¹­ô ·º ¬¸» ±ºº»²¼·²¹ ®±±¬­ ¿®»­«¾­·¼·¿®§ ¿²¼ ¬¸»·® ®»³±ª¿´ ©·´´ ²±¬ ­·¹²·º·½¿²¬´§ ¼¿³¿¹» ¬¸» ¬®»»ô¬¸»§ ­¸±«´¼ ¾» ­»ª»®»¼ ¿²¼ ¿ ½±²½®»¬» ±® ³»¬¿´ ¾¿®®·»® °´¿½»¼ª»®¬·½¿´´§ ·² ¬¸» ­±·´ ¬± °®»ª»²¬ º«¬«®» ®±±¬ ¹®±©¬¸ ·² ¬¸» ¼·®»½¬·±² ±º¬¸» ¾«·´¼·²¹ò ׺ ·¬ ·­ ²±¬ °±­­·¾´» ¬± ®»³±ª» ¬¸» ®»´»ª¿²¬ ®±±¬­©·¬¸±«¬ ¼¿³¿¹» ¬± ¬¸» ¬®»»ô ¿² ¿°°´·½¿¬·±² ¬± ®»³±ª» ¬¸» ¬®»» ­¸±«´¼¾» ³¿¼» ¬± ¬¸» ´±½¿´ ¿«¬¸±®·¬§ò ß °®«¼»²¬ °´¿² ·­ ¬± ¬®¿²­°´¿²¬ ´·µ»´§±ºº»²¼»®­ ¾»º±®» ¬¸»§ ¾»½±³» ¿ °®±¾´»³ò

ײº±®³¿¬·±² ±² ¬®»»­ô °´¿²¬­ ¿²¼ ­¸®«¾­Í¬¿¬» ¼»°¿®¬³»²¬­ ±ª»®­»»·²¹ ¿¹®·½«´¬«®» ½¿² ¹·ª» ·²º±®³¿¬·±²®»¹¿®¼·²¹ ®±±¬ °¿¬¬»®²­ô ª±´«³» ±º ©¿¬»® ²»»¼»¼ ¿²¼ ­¿º» ¼·­¬¿²½»º®±³ ¾«·´¼·²¹­ ±º ³±­¬ ­°»½·»­ò Þ±¬¿²·½ ¹¿®¼»²­ ¿®» ¿´­± ­±«®½»­ ±º·²º±®³¿¬·±²ò Ú±® ·²º±®³¿¬·±² ±² °´¿²¬ ®±±¬­ ¿²¼ ¼®¿·²­ô ­»» Þ«·´¼·²¹Ì»½¸²±´±¹§ Ú·´» ïéò

Û¨½¿ª¿¬·±²Û¨½¿ª¿¬·±² ¿®±«²¼ º±±¬·²¹­ ³«­¬ ¾» °®±°»®´§ »²¹·²»»®»¼ò ͱ·´­«°°±®¬·²¹ º±±¬·²¹­ ½¿² ±²´§ ¾» ­¿º»´§ »¨½¿ª¿¬»¼ ¿¬ ¿² ¿²¹´» ¬¸¿¬¿´´±©­ ¬¸» ­±·´ «²¼»® ¬¸» º±±¬·²¹ ¬± ®»³¿·² ­¬¿¾´»ò ̸·­ ¿²¹´» ·­½¿´´»¼ ¬¸» ¿²¹´» ±º ®»°±­» ø±® º®·½¬·±²÷ ¿²¼ ª¿®·»­ ­·¹²·º·½¿²¬´§¾»¬©»»² ­±·´ ¬§°»­ ¿²¼ ½±²¼·¬·±²­ò λ³±ª¿´ ±º ­±·´ ©·¬¸·² ¬¸» ¿²¹´»±º ®»°±­» ©·´´ ½¿«­» ­«¾­·¼»²½»ò

λ³»¼·¿¬·±²

ɸ»®» »®±­·±² ¸¿­ ±½½«®®»¼ ¬¸¿¬ ¸¿­ ©¿­¸»¼ ¿©¿§ ­±·´ ¿¼¶¿½»²¬ ¬±º±±¬·²¹­ô ­±·´ ±º ¬¸» ­¿³» ½´¿­­·º·½¿¬·±² ­¸±«´¼ ¾» ·²¬®±¼«½»¼ ¿²¼½±³°¿½¬»¼ ¬± ¬¸» ­¿³» ¼»²­·¬§ò ɸ»®» º±±¬·²¹­ ¸¿ª» ¾»»²«²¼»®³·²»¼ô ¿«¹³»²¬¿¬·±² ±® ±¬¸»® ­°»½·¿´·­¬ ©±®µ ³¿§ ¾» ®»¯«·®»¼òλ³»¼·¿¬·±² ±º º±±¬·²¹­ ¿²¼ º±«²¼¿¬·±²­ ·­ ¹»²»®¿´´§ ¬¸» ®»¿´³ ±º ¿­°»½·¿´·­¬ ½±²­«´¬¿²¬ò

ɸ»®» ·­±´¿¬»¼ º±±¬·²¹­ ®·­» ¿²¼ º¿´´ ¾»½¿«­» ±º ­©»´´ñ­¸®·²µ »ºº»½¬ô¬¸» ¸±³»±©²»® ³¿§ ¾» ¬»³°¬»¼ ¬± ¿´´»ª·¿¬» º´±±® ¾±«²½» ¾§ º·´´·²¹¬¸» ¹¿° ¬¸¿¬ ¸¿­ ¿°°»¿®»¼ ¾»¬©»»² ¬¸» ¾»¿®»® ¿²¼ ¬¸» °·»® ©·¬¸¾´±½µ·²¹ò ̸» ¼¿²¹»® ¸»®» ·­ ¬¸¿¬ ©¸»² ¬¸» ²»¨¬ ­©»´´ ­»¹³»²¬ ±º ¬¸»½§½´» ±½½«®­ô ¬¸» »¨¬®¿ ¾´±½µ·²¹ ©·´´ °«­¸ ¬¸» º´±±® «° ·²¬± ¿²¿½½»²¬«¿¬»¼ ¼±³» ¿²¼ ³¿§ ¿´­± ½¿«­» ´±½¿´ ­¸»¿® º¿·´«®» ·² ¬¸» ­±·´ò׺ ·¬ ·­ ²»½»­­¿®§ ¬± «­» ¾´±½µ·²¹ô ·¬ ­¸±«´¼ ¾» ¾§ ¿ °¿·® ±º º·²»©»¼¹»­ ¿²¼ ³±²·¬±®·²¹ ­¸±«´¼ ¾» ½¿®®·»¼ ±«¬ º±®¬²·¹¸¬´§ò

̸·­ ÞÌÚ ©¿­ °®»°¿®»¼ ¾§ Ö±¸² Ô»©»® Úß×Þô Ó×ßÓßô ﮬ²»®ô

ݱ²­¬®«½¬·±² Ü·¿¹²±­·­ò

̸» ·²º±®³¿¬·±² ·² ¬¸·­ ¿²¼ ±¬¸»® ·­­«»­ ·² ¬¸» ­»®·»­ ©¿­ ¼»®·ª»¼ º®±³ ª¿®·±«­ ­±«®½»­ ¿²¼ ©¿­ ¾»´·»ª»¼ ¬± ¾» ½±®®»½¬ ©¸»² °«¾´·­¸»¼ò

̸» ·²º±®³¿¬·±² ·­ ¿¼ª·­±®§ò ׬ ·­ °®±ª·¼»¼ ·² ¹±±¼ º¿·¬¸ ¿²¼ ²±¬ ½´¿·³»¼ ¬± ¾» ¿² »¨¸¿«­¬·ª» ¬®»¿¬³»²¬ ±º ¬¸» ®»´»ª¿²¬ ­«¾¶»½¬ò

Ú«®¬¸»® °®±º»­­·±²¿´ ¿¼ª·½» ²»»¼­ ¬± ¾» ±¾¬¿·²»¼ ¾»º±®» ¬¿µ·²¹ ¿²§ ¿½¬·±² ¾¿­»¼ ±² ¬¸» ·²º±®³¿¬·±² °®±ª·¼»¼ò

Ü·­¬®·¾«¬»¼ ¾§

ÝÍ×ÎÑ ÐËÞÔ ×ÍØ ×ÒÙ ÐÑ Þ±¨ ïïíçô ݱ´´·²¹©±±¼ íðêêô ß«­¬®¿´·¿

Ú®»»½¿´´ ïèðð êìë ðëï Ì»´ øðí÷ çêêî éêêê Ú¿¨ øðí÷ çêêî éëëë ©©©ò°«¾´·­¸ò½­·®±ò¿«

Û³¿·´æ °«¾´·­¸·²¹ò­¿´»­à½­·®±ò¿«

w ÝÍ×ÎÑ îððíò ˲¿«¬¸±®·­»¼ ½±°§·²¹ ±º ¬¸·­ Þ«·´¼·²¹ Ì»½¸²±´±¹§ º·´» ·­ °®±¸·¾·¬»¼

Ù¿®¼»²­ º±® ¿ ®»¿½¬·ª» ­·¬»

Page 17: SITE CLASSIFICATION REPORT SUMMARY...Douglas Partners (DP) has prepared this report for this project at Taylor 2- Stage 3, Taylor in accordance with DP’s proposal dated 15 September

TOPSOIL FILLING-dry to moist, brown silty sand

FILLING-generally comprising well compacted, dry tomoist, yellow brown grey, medium plasticity silty sandyclay with some gravel and high plasticity portions between1.0m and 1.2m

Pit discontinued at 1.7m-limit of investigation

0.15

1.7

SAMPLING & IN SITU TESTING LEGEND

TEST PIT LOG

Taylor 2 Estate, Stage 3, Taylor

A Auger sample G Gas sample PID Photo ionisation detector (ppm)B Bulk sample P Piston sample PL(A) Point load axial test Is(50) (MPa)BLK Block sample Ux Tube sample (x mm dia.) PL(D) Point load diametral test Is(50) (MPa)C Core drilling W Water sample pp Pocket penetrometer (kPa)D Disturbed sample Water seep S Standard penetration testE Environmental sample Water level V Shear vane (kPa)

Indesco Consulting Engineers Pty LtdSite Classifications

Results &Comments

LOGGED: JPM SURVEY DATUM: MGA94

CLIENT:PROJECT:LOCATION:

PIT No: 59PROJECT No: 77418.29DATE: 11/1/2019SHEET 1 OF 1

Sampling & In Situ Testing

1

2

Wat

er

Dep

th

Sam

ple

Description

of

Strata Gra

phic

Log

Typ

e

REMARKS: Surface Levels & Coordinates are approximate only and must not be relied upon

RIG: Kubota KX057-4 mini-excavator with 300mm wide bucket

WATER OBSERVATIONS: No free groundwater observed

SURFACE LEVEL: 667.0 AHDEASTING: 209076NORTHING: 618774

Dynamic Penetrometer Test(blows per mm)

5 10 15 20

Cone Penetrometer AS1289.6.3.2Sand Penetrometer AS1289.6.3.3

Depth(m) R

L

1

2

667

666

665

D

D

0.5

1.1 pp >400

Page 18: SITE CLASSIFICATION REPORT SUMMARY...Douglas Partners (DP) has prepared this report for this project at Taylor 2- Stage 3, Taylor in accordance with DP’s proposal dated 15 September

TOPSOIL FILLING-dry to moist, brown silty sand

FILLING-generally comprising well compacted, dry tomoist, orange brown grey, medium plasticity silty sandyclay with some gravel

Pit discontinued at 1.5m-limit of investigation

0.1

1.5

SAMPLING & IN SITU TESTING LEGEND

TEST PIT LOG

Taylor 2 Estate, Stage 3, Taylor

A Auger sample G Gas sample PID Photo ionisation detector (ppm)B Bulk sample P Piston sample PL(A) Point load axial test Is(50) (MPa)BLK Block sample Ux Tube sample (x mm dia.) PL(D) Point load diametral test Is(50) (MPa)C Core drilling W Water sample pp Pocket penetrometer (kPa)D Disturbed sample Water seep S Standard penetration testE Environmental sample Water level V Shear vane (kPa)

Indesco Consulting Engineers Pty LtdSite Classifications

Results &Comments

LOGGED: JPM SURVEY DATUM: MGA94

CLIENT:PROJECT:LOCATION:

PIT No: 89PROJECT No: 77418.29DATE: 11/1/2019SHEET 1 OF 1

Sampling & In Situ Testing

1

2

Wat

er

Dep

th

Sam

ple

Description

of

Strata Gra

phic

Log

Typ

e

REMARKS: Surface Levels & Coordinates are approximate only and must not be relied upon

RIG: Kubota KX057-4 mini-excavator with 300mm wide bucket

WATER OBSERVATIONS: No free groundwater observed

SURFACE LEVEL: 670.0 AHDEASTING: 209061NORTHING: 618795

Dynamic Penetrometer Test(blows per mm)

5 10 15 20

Cone Penetrometer AS1289.6.3.2Sand Penetrometer AS1289.6.3.3

Depth(m) R

L

1

2

670

669

668

D 0.5

Page 19: SITE CLASSIFICATION REPORT SUMMARY...Douglas Partners (DP) has prepared this report for this project at Taylor 2- Stage 3, Taylor in accordance with DP’s proposal dated 15 September
Page 20: SITE CLASSIFICATION REPORT SUMMARY...Douglas Partners (DP) has prepared this report for this project at Taylor 2- Stage 3, Taylor in accordance with DP’s proposal dated 15 September

SITE CLASSIFICATION REPORT SUMMARY

BLOCK: 2 SECTION: 64 SUBURB: Taylor

JOB No: 77418.29 DATE: March 2019

CLIENT: Indesco Consulting Engineers Pty Ltd

Classification Procedures: Existing Subsurface Conditions: Refer attached test pit log(s) – Pit(s) 58,59 and Drawing 1. Bulk Earthworks: Filling within the block placed under Level 1 control as defined in AS 3798 – 2007 (Ref 1). Laboratory Results: Previous laboratory testing results indicated liquid limit ranging from 25-66%, plasticity index ranging from 6-49% and linear shrinkage ranging from 3-20.5%.

Site Classification: Class M* (moderately reactive/filled) based on the current profile / state on limited subsurface information and determined in general accordance with the requirements of AS2870-2011 (Ref 2). The classification must be reassessed should the soil profile change either by adding fill or removing soil from the block and/or if the presence of service trenches or retaining walls are within the zone of influence of the block. Reference should be made to the comments provided below.

Footing Systems: Reference must be made to AS2870-2011 (Ref 2) which indicates footing systems that are appropriate for each site classification. All footings must found within a uniform bearing stratum of suitable strength/material, below the zone of influence of any service trenches, backfill zones, retaining walls or underground structures. Masonry walls should be articulated in accordance with current best practice. Dwelling design must ensure uniform moisture conditions are maintained in the vicinity of footings. Footing systems must be confirmed by a structural engineer taking into consideration any onsite or offsite constraints.

Maintenance Guidelines: Reference should be made to the attached CSIRO Sheet BTF 18 ‘Foundation Maintenance & Footing Performance’ to comments about gardens, landscaping and trees on the performance of foundation soils and in particular in respect to maintaining good surface drainage. It notes that minor cracking in most structures is inevitable, and it describes site maintenance practices aimed at minimising foundation movements that can lead to cracking damage.

Comments/ Limitations:

The successful purchaser must make their own interpretations, deductions and conclusions from the information made available and will need to accept full responsibility for such interpretations, deductions and conclusions.

Development specific geotechnical investigations must be undertaken.

Additional topsoils / filling may have been spread subsequent to the investigation.

Site preparation prior to the construction should include removal of all vegetation, topsoil and any uncontrolled filling.

All new filling must be placed under controlled conditions (AS 3798-2007), otherwise Class P conditions would be warranted.

Some variability in subsurface conditions must be anticipated.

Moisture condition of site soils and/or the presence of groundwater may vary considerably from time of investigation compared to at the time of construction.

Depending on the depth of site cut and trenches, rock excavation may be required.

It is recommended that footing excavations be inspected by a geotechnical engineer.

This report must be read in conjunction with the attached “Limitations” and notes “About this Report”.

References:

1.

2.

AS 3798-2007 ‘Guidelines on Earthworks for Commercial and Residential Developments’, Standards Association of Australia.

AS 2870-2011 ‘Residential Slabs and Footings,’ Standards Association of Australia.

Attachments:

Limitations & About this Report Explanatory Notes Test Pit Log(s) Pit(s) 58,59 Drawing 1

Page 21: SITE CLASSIFICATION REPORT SUMMARY...Douglas Partners (DP) has prepared this report for this project at Taylor 2- Stage 3, Taylor in accordance with DP’s proposal dated 15 September

FS 604853

Douglas Partners Pty Ltd ABN 75 053 980 117

www.douglaspartners.com.au Unit 2, 73 Sheppard Street

Hume ACT 2620 PO Box 1487

Fyshwick ACT 2609 Phone (02) 6260 2788

Fax (02) 6260 1147

Brisbane • Cairns • Canberra • Central Coast • Coffs Harbour • Darwin • Geelong • Gold Coast • Macarthur • Melbourne Newcastle • North West Sydney • Perth • Port Macquarie • Sunshine Coast • Sydney • Townsville • Wollongong

Limitations Douglas Partners (DP) has prepared this report for this project at Taylor 2 - Stage 3, Taylor in accordance with DP’s proposal dated 15 September 2017 and acceptance received from Indesco Consulting Engineers Pty Ltd dated 13 March 2019. The work was carried out under DP’s Conditions of Engagement. This report is provided for the exclusive use of Indesco Consulting Engineers Pty Ltd for this project only and for the purposes as described in the report. It should not be used by or relied upon for other projects or purposes on the same or other site or by a third party. Any party so relying upon this report beyond its exclusive use and purpose as stated above, and without the express written consent of DP, does so entirely at its own risk and without recourse to DP for any loss or damage. In preparing this report DP has necessarily relied upon information provided by the client and/or their agents. The results provided in the report are indicative of the sub-surface conditions on the site only at the specific sampling and/or testing locations, and then only to the depths investigated and at the time the work was carried out. Sub-surface conditions can change abruptly due to variable geological processes and also as a result of human influences. Such changes may occur after DP’s field testing has been completed. DP’s advice is based upon the conditions encountered during this investigation. The accuracy of the advice provided by DP in this report may be affected by undetected variations in ground conditions across the site between and beyond the sampling and/or testing locations. The advice may also be limited by budget constraints imposed by others or by site accessibility. This report must be read in conjunction with all of the attached and should be kept in its entirety without separation of individual pages or sections. DP cannot be held responsible for interpretations or conclusions made by others unless they are supported by an expressed statement, interpretation, outcome or conclusion stated in this report. This report, or sections from this report, should not be used as part of a specification for a project, without review and agreement by DP. This is because this report has been written as advice and opinion rather than instructions for construction. The scope for work for this investigation/report did not include the assessment of surface or sub-surface materials or groundwater for contaminants, within or adjacent to the site. Should evidence of filling of unknown origin be noted in the report, and in particular the presence of building demolition materials, it should be recognised that there may be some risk that such filling may contain contaminants and hazardous building materials. The contents of this report do not constitute formal design components such as are required, by the Health and Safety Legislation and Regulations, to be included in a Safety Report specifying the hazards likely to be encountered during construction and the controls required to mitigate risk. This design process requires risk assessment to be undertaken, with such assessment being dependent upon factors relating to likelihood of occurrence and consequences of damage to property and to life. This, in turn, requires project data and analysis presently beyond the knowledge and project role respectively of DP. DP may be able, however, to assist the client in carrying out a risk assessment of potential hazards contained in the Comments section of this report, as an extension to the current scope of works, if so requested, and provided that suitable additional information is made available to DP. Any such risk assessment would, however, be necessarily restricted to the geotechnical components set out in this report and to their application by the project designers to project design, construction, maintenance and demolition.

Page 22: SITE CLASSIFICATION REPORT SUMMARY...Douglas Partners (DP) has prepared this report for this project at Taylor 2- Stage 3, Taylor in accordance with DP’s proposal dated 15 September

July 2010

Introduction These notes have been provided to amplify DP's report in regard to classification methods, field procedures and the comments section. Not all are necessarily relevant to all reports. DP's reports are based on information gained from limited subsurface excavations and sampling, supplemented by knowledge of local geology and experience. For this reason, they must be regarded as interpretive rather than factual documents, limited to some extent by the scope of information on which they rely. Copyright This report is the property of Douglas Partners Pty Ltd. The report may only be used for the purpose for which it was commissioned and in accordance with the Conditions of Engagement for the commission supplied at the time of proposal. Unauthorised use of this report in any form whatsoever is prohibited. Borehole and Test Pit Logs The borehole and test pit logs presented in this report are an engineering and/or geological interpretation of the subsurface conditions, and their reliability will depend to some extent on frequency of sampling and the method of drilling or excavation. Ideally, continuous undisturbed sampling or core drilling will provide the most reliable assessment, but this is not always practicable or possible to justify on economic grounds. In any case the boreholes and test pits represent only a very small sample of the total subsurface profile. Interpretation of the information and its application to design and construction should therefore take into account the spacing of boreholes or pits, the frequency of sampling, and the possibility of other than 'straight line' variations between the test locations. Groundwater Where groundwater levels are measured in boreholes there are several potential problems, namely: • In low permeability soils groundwater may

enter the hole very slowly or perhaps not at all during the time the hole is left open;

• A localised, perched water table may lead to an erroneous indication of the true water table;

• Water table levels will vary from time to time with seasons or recent weather changes. They may not be the same at the time of construction as are indicated in the report; and

• The use of water or mud as a drilling fluid will mask any groundwater inflow. Water has to be blown out of the hole and drilling mud must first be washed out of the hole if water measurements are to be made.

More reliable measurements can be made by installing standpipes which are read at intervals over several days, or perhaps weeks for low permeability soils. Piezometers, sealed in a particular stratum, may be advisable in low permeability soils or where there may be interference from a perched water table. Reports The report has been prepared by qualified personnel, is based on the information obtained from field and laboratory testing, and has been undertaken to current engineering standards of interpretation and analysis. Where the report has been prepared for a specific design proposal, the information and interpretation may not be relevant if the design proposal is changed. If this happens, DP will be pleased to review the report and the sufficiency of the investigation work. Every care is taken with the report as it relates to interpretation of subsurface conditions, discussion of geotechnical and environmental aspects, and recommendations or suggestions for design and construction. However, DP cannot always anticipate or assume responsibility for: • Unexpected variations in ground conditions.

The potential for this will depend partly on borehole or pit spacing and sampling frequency;

• Changes in policy or interpretations of policy by statutory authorities; or

• The actions of contractors responding to commercial pressures.

If these occur, DP will be pleased to assist with investigations or advice to resolve the matter.

Page 23: SITE CLASSIFICATION REPORT SUMMARY...Douglas Partners (DP) has prepared this report for this project at Taylor 2- Stage 3, Taylor in accordance with DP’s proposal dated 15 September

July 2010

Site Anomalies In the event that conditions encountered on site during construction appear to vary from those which were expected from the information contained in the report, DP requests that it be immediately notified. Most problems are much more readily resolved when conditions are exposed rather than at some later stage, well after the event. Information for Contractual Purposes Where information obtained from this report is provided for tendering purposes, it is recommended that all information, including the written report and discussion, be made available. In circumstances where the discussion or comments section is not relevant to the contractual situation, it may be appropriate to prepare a specially edited document. DP would be pleased to assist in this regard and/or to make additional report copies available for contract purposes at a nominal charge. Site Inspection The company will always be pleased to provide engineering inspection services for geotechnical and environmental aspects of work to which this report is related. This could range from a site visit to confirm that conditions exposed are as expected, to full time engineering presence on site.

Page 24: SITE CLASSIFICATION REPORT SUMMARY...Douglas Partners (DP) has prepared this report for this project at Taylor 2- Stage 3, Taylor in accordance with DP’s proposal dated 15 September

July 2010

Sampling Sampling is carried out during drilling or test pitting to allow engineering examination (and laboratory testing where required) of the soil or rock. Disturbed samples taken during drilling provide information on colour, type, inclusions and, depending upon the degree of disturbance, some information on strength and structure. Undisturbed samples are taken by pushing a thin-walled sample tube into the soil and withdrawing it to obtain a sample of the soil in a relatively undisturbed state. Such samples yield information on structure and strength, and are necessary for laboratory determination of shear strength and compressibility. Undisturbed sampling is generally effective only in cohesive soils. Test Pits Test pits are usually excavated with a backhoe or an excavator, allowing close examination of the in-situ soil if it is safe to enter into the pit. The depth of excavation is limited to about 3 m for a backhoe and up to 6 m for a large excavator. A potential disadvantage of this investigation method is the larger area of disturbance to the site. Large Diameter Augers Boreholes can be drilled using a rotating plate or short spiral auger, generally 300 mm or larger in diameter commonly mounted on a standard piling rig. The cuttings are returned to the surface at intervals (generally not more than 0.5 m) and are disturbed but usually unchanged in moisture content. Identification of soil strata is generally much more reliable than with continuous spiral flight augers, and is usually supplemented by occasional undisturbed tube samples. Continuous Spiral Flight Augers The borehole is advanced using 90-115 mm diameter continuous spiral flight augers which are withdrawn at intervals to allow sampling or in-situ testing. This is a relatively economical means of drilling in clays and sands above the water table. Samples are returned to the surface, or may be collected after withdrawal of the auger flights, but they are disturbed and may be mixed with soils from the sides of the hole. Information from the drilling (as distinct from specific sampling by SPTs or undisturbed samples) is of relatively low

reliability, due to the remoulding, possible mixing or softening of samples by groundwater. Non-core Rotary Drilling The borehole is advanced using a rotary bit, with water or drilling mud being pumped down the drill rods and returned up the annulus, carrying the drill cuttings. Only major changes in stratification can be determined from the cuttings, together with some information from the rate of penetration. Where drilling mud is used this can mask the cuttings and reliable identification is only possible from separate sampling such as SPTs. Continuous Core Drilling A continuous core sample can be obtained using a diamond tipped core barrel, usually with a 50 mm internal diameter. Provided full core recovery is achieved (which is not always possible in weak rocks and granular soils), this technique provides a very reliable method of investigation. Standard Penetration Tests Standard penetration tests (SPT) are used as a means of estimating the density or strength of soils and also of obtaining a relatively undisturbed sample. The test procedure is described in Australian Standard 1289, Methods of Testing Soils for Engineering Purposes - Test 6.3.1. The test is carried out in a borehole by driving a 50 mm diameter split sample tube under the impact of a 63 kg hammer with a free fall of 760 mm. It is normal for the tube to be driven in three successive 150 mm increments and the 'N' value is taken as the number of blows for the last 300 mm. In dense sands, very hard clays or weak rock, the full 450 mm penetration may not be practicable and the test is discontinued. The test results are reported in the following form. • In the case where full penetration is obtained

with successive blow counts for each 150 mm of, say, 4, 6 and 7 as:

4,6,7 N=13

• In the case where the test is discontinued before the full penetration depth, say after 15 blows for the first 150 mm and 30 blows for the next 40 mm as:

15, 30/40 mm

Page 25: SITE CLASSIFICATION REPORT SUMMARY...Douglas Partners (DP) has prepared this report for this project at Taylor 2- Stage 3, Taylor in accordance with DP’s proposal dated 15 September

July 2010

The results of the SPT tests can be related empirically to the engineering properties of the soils. Dynamic Cone Penetrometer Tests / Perth Sand Penetrometer Tests Dynamic penetrometer tests (DCP or PSP) are carried out by driving a steel rod into the ground using a standard weight of hammer falling a specified distance. As the rod penetrates the soil the number of blows required to penetrate each successive 150 mm depth are recorded. Normally there is a depth limitation of 1.2 m, but this may be extended in certain conditions by the use of extension rods. Two types of penetrometer are commonly used. • Perth sand penetrometer - a 16 mm diameter

flat ended rod is driven using a 9 kg hammer dropping 600 mm (AS 1289, Test 6.3.3). This test was developed for testing the density of sands and is mainly used in granular soils and filling.

• Cone penetrometer - a 16 mm diameter rod with a 20 mm diameter cone end is driven using a 9 kg hammer dropping 510 mm (AS 1289, Test 6.3.2). This test was developed initially for pavement subgrade investigations, and correlations of the test results with California Bearing Ratio have been published by various road authorities.

Page 26: SITE CLASSIFICATION REPORT SUMMARY...Douglas Partners (DP) has prepared this report for this project at Taylor 2- Stage 3, Taylor in accordance with DP’s proposal dated 15 September

May 2017

Description and Classification Methods The methods of description and classification of

soils and rocks used in this report are based on

Australian Standard AS 1726-1993, Geotechnical

Site Investigations Code. In general, the

descriptions include strength or density, colour,

structure, soil or rock type and inclusions.

Soil Types Soil types are described according to the

predominant particle size, qualified by the grading

of other particles present:

Type Particle size (mm)

Boulder >200

Cobble 63 - 200

Gravel 2.36 - 63

Sand 0.075 - 2.36

Silt 0.002 - 0.075

Clay <0.002

The sand and gravel sizes can be further

subdivided as follows:

Type Particle size (mm)

Coarse gravel 20 - 63

Medium gravel 6 - 20

Fine gravel 2.36 - 6

Coarse sand 0.6 - 2.36

Medium sand 0.2 - 0.6

Fine sand 0.075 - 0.2

The proportions of secondary constituents of soils

are described as:

Term Proportion Example

And Specify Clay (60%) and

Sand (40%)

Adjective 20 - 35% Sandy Clay

Slightly 12 - 20% Slightly Sandy

Clay

With some 5 - 12% Clay with some

sand

With a trace of 0 - 5% Clay with a trace

of sand

Definitions of grading terms used are:

• Well graded - a good representation of all

particle sizes

• Poorly graded - an excess or deficiency of

particular sizes within the specified range

• Uniformly graded - an excess of a particular

particle size

• Gap graded - a deficiency of a particular

particle size with the range

Cohesive Soils Cohesive soils, such as clays, are classified on the

basis of undrained shear strength. The strength

may be measured by laboratory testing, or

estimated by field tests or engineering

examination. The strength terms are defined as

follows:

Description Abbreviation Undrained shear strength

(kPa)

Very soft vs <12

Soft s 12 - 25

Firm f 25 - 50

Stiff st 50 - 100

Very stiff vst 100 - 200

Hard h >200

Cohesionless Soils Cohesionless soils, such as clean sands, are

classified on the basis of relative density, generally

from the results of standard penetration tests

(SPT), cone penetration tests (CPT) or dynamic

penetrometers (PSP). The relative density terms

are given below:

Relative Density

Abbreviation SPT N value

CPT qc value (MPa)

Very loose vl <4 <2

Loose l 4 - 10 2 -5

Medium

dense

md 10 - 30 5 - 15

Dense d 30 - 50 15 - 25

Very

dense

vd >50 >25

Page 27: SITE CLASSIFICATION REPORT SUMMARY...Douglas Partners (DP) has prepared this report for this project at Taylor 2- Stage 3, Taylor in accordance with DP’s proposal dated 15 September

May 2017

Soil Origin It is often difficult to accurately determine the origin

of a soil. Soils can generally be classified as:

• Residual soil - derived from in-situ weathering

of the underlying rock;

• Transported soils - formed somewhere else

and transported by nature to the site; or

• Filling - moved by man.

Transported soils may be further subdivided into:

• Alluvium - river deposits

• Lacustrine - lake deposits

• Aeolian - wind deposits

• Littoral - beach deposits

• Estuarine - tidal river deposits

• Talus - scree or coarse colluvium

• Slopewash or Colluvium - transported

downslope by gravity assisted by water.

Often includes angular rock fragments and

boulders.

Page 28: SITE CLASSIFICATION REPORT SUMMARY...Douglas Partners (DP) has prepared this report for this project at Taylor 2- Stage 3, Taylor in accordance with DP’s proposal dated 15 September

May 2017

Rock Strength Rock strength is defined by the Point Load Strength Index (Is(50)) and refers to the strength of the rock

substance and not the strength of the overall rock mass, which may be considerably weaker due to defects.

The test procedure is described by Australian Standard 4133.4.1 - 2007. The terms used to describe rock

strength are as follows:

Term Abbreviation Point Load Index

Is(50) MPa

Approximate Unconfined Compressive Strength MPa*

Extremely low EL <0.03 <0.6

Very low VL 0.03 - 0.1 0.6 - 2

Low L 0.1 - 0.3 2 - 6

Medium M 0.3 - 1.0 6 - 20

High H 1 - 3 20 - 60

Very high VH 3 - 10 60 - 200

Extremely high EH >10 >200

* Assumes a ratio of 20:1 for UCS to Is(50). It should be noted that the UCS to Is(50) ratio varies significantly

for different rock types and specific ratios should be determined for each site.

Degree of Weathering The degree of weathering of rock is classified as follows:

Term Abbreviation Description

Extremely weathered EW Rock substance has soil properties, i.e. it can be remoulded and classified as a soil but the texture of the original rock is still evident.

Highly weathered HW Limonite staining or bleaching affects whole of rock substance and other signs of decomposition are evident. Porosity and strength may be altered as a result of iron leaching or deposition. Colour and strength of original fresh rock is not recognisable

Moderately weathered

MW Staining and discolouration of rock substance has taken place

Slightly weathered SW Rock substance is slightly discoloured but shows little or no change of strength from fresh rock

Fresh stained Fs Rock substance unaffected by weathering but staining visible along defects

Fresh Fr No signs of decomposition or staining

Degree of Fracturing The following classification applies to the spacing of natural fractures in diamond drill cores. It includes

bedding plane partings, joints and other defects, but excludes drilling breaks.

Term Description

Fragmented Fragments of <20 mm

Highly Fractured Core lengths of 20-40 mm with some fragments

Fractured Core lengths of 40-200 mm with some shorter and longer sections

Slightly Fractured Core lengths of 200-1000 mm with some shorter and longer sections

Unbroken Core lengths mostly > 1000 mm

Page 29: SITE CLASSIFICATION REPORT SUMMARY...Douglas Partners (DP) has prepared this report for this project at Taylor 2- Stage 3, Taylor in accordance with DP’s proposal dated 15 September

May 2017

Rock Quality Designation The quality of the cored rock can be measured using the Rock Quality Designation (RQD) index, defined

as:

RQD % = cumulative length of 'sound' core sections ≥ 100 mm long

total drilled length of section being assessed

where 'sound' rock is assessed to be rock of low strength or better. The RQD applies only to natural

fractures. If the core is broken by drilling or handling (i.e. drilling breaks) then the broken pieces are fitted

back together and are not included in the calculation of RQD.

Stratification Spacing For sedimentary rocks the following terms may be used to describe the spacing of bedding partings:

Term Separation of Stratification Planes

Thinly laminated < 6 mm

Laminated 6 mm to 20 mm

Very thinly bedded 20 mm to 60 mm

Thinly bedded 60 mm to 0.2 m

Medium bedded 0.2 m to 0.6 m

Thickly bedded 0.6 m to 2 m

Very thickly bedded > 2 m

Page 30: SITE CLASSIFICATION REPORT SUMMARY...Douglas Partners (DP) has prepared this report for this project at Taylor 2- Stage 3, Taylor in accordance with DP’s proposal dated 15 September

May 2017

Introduction These notes summarise abbreviations commonly

used on borehole logs and test pit reports.

Drilling or Excavation Methods C Core drilling

R Rotary drilling

SFA Spiral flight augers

NMLC Diamond core - 52 mm dia

NQ Diamond core - 47 mm dia

HQ Diamond core - 63 mm dia

PQ Diamond core - 81 mm dia

Water � Water seep

� Water level

Sampling and Testing A Auger sample

B Bulk sample

D Disturbed sample

E Environmental sample

U50 Undisturbed tube sample (50mm)

W Water sample

pp Pocket penetrometer (kPa)

PID Photo ionisation detector

PL Point load strength Is(50) MPa

S Standard Penetration Test

V Shear vane (kPa)

Description of Defects in Rock The abbreviated descriptions of the defects should

be in the following order: Depth, Type, Orientation,

Coating, Shape, Roughness and Other. Drilling

and handling breaks are not usually included on

the logs.

Defect Type

B Bedding plane

Cs Clay seam

Cv Cleavage

Cz Crushed zone

Ds Decomposed seam

F Fault

J Joint

Lam Lamination

Pt Parting

Sz Sheared Zone

V Vein

Orientation

The inclination of defects is always measured from

the perpendicular to the core axis.

h horizontal

v vertical

sh sub-horizontal

sv sub-vertical

Coating or Infilling Term

cln clean

co coating

he healed

inf infilled

stn stained

ti tight

vn veneer

Coating Descriptor

ca calcite

cbs carbonaceous

cly clay

fe iron oxide

mn manganese

slt silty

Shape

cu curved

ir irregular

pl planar

st stepped

un undulating

Roughness

po polished

ro rough

sl slickensided

sm smooth

vr very rough

Other

fg fragmented

bnd band

qtz quartz

Page 31: SITE CLASSIFICATION REPORT SUMMARY...Douglas Partners (DP) has prepared this report for this project at Taylor 2- Stage 3, Taylor in accordance with DP’s proposal dated 15 September

May 2017

Graphic Symbols for Soil and Rock General

Soils

Sedimentary Rocks

Metamorphic Rocks

Igneous Rocks

Road base

Filling

Concrete

Asphalt

Topsoil

Peat

Clay

Conglomeratic sandstone

Conglomerate

Boulder conglomerate

Sandstone

Slate, phyllite, schist

Siltstone

Mudstone, claystone, shale

Coal

Limestone

Porphyry

Cobbles, boulders

Sandy gravel

Laminite

Silty sand

Clayey sand

Silty clay

Sandy clay

Gravelly clay

Shaly clay

Silt

Clayey silt

Sandy silt

Sand

Gravel

Talus

Gneiss

Quartzite

Dolerite, basalt, andesite

Granite

Tuff, breccia

Dacite, epidote

Page 32: SITE CLASSIFICATION REPORT SUMMARY...Douglas Partners (DP) has prepared this report for this project at Taylor 2- Stage 3, Taylor in accordance with DP’s proposal dated 15 September

ͱ·´ ̧°»­

̸» ¬§°»­ ±º ­±·´­ «­«¿´´§ °®»­»²¬ «²¼»® ¬¸» ¬±°­±·´ ·² ´¿²¼ ¦±²»¼ º±®®»­·¼»²¬·¿´ ¾«·´¼·²¹­ ½¿² ¾» ­°´·¬ ·²¬± ¬©± ¿°°®±¨·³¿¬» ¹®±«°­ P¹®¿²«´¿® ¿²¼ ½´¿§ò Ï«·¬» ±º¬»²ô º±«²¼¿¬·±² ­±·´ ·­ ¿ ³·¨¬«®» ±º ¾±¬¸¬§°»­ò ̸» ¹»²»®¿´ °®±¾´»³­ ¿­­±½·¿¬»¼ ©·¬¸ ­±·´­ ¸¿ª·²¹ ¹®¿²«´¿®½±²¬»²¬ ¿®» «­«¿´´§ ½¿«­»¼ ¾§ »®±­·±²ò Ý´¿§ ­±·´­ ¿®» ­«¾¶»½¬ ¬±­¿¬«®¿¬·±² ¿²¼ ­©»´´ñ­¸®·²µ °®±¾´»³­ò

Ý´¿­­·º·½¿¬·±²­ º±® ¿ ¹·ª»² ¿®»¿ ½¿² ¹»²»®¿´´§ ¾» ±¾¬¿·²»¼ ¾§¿°°´·½¿¬·±² ¬± ¬¸» ´±½¿´ ¿«¬¸±®·¬§ô ¾«¬ ¬¸»­» ¿®» ­±³»¬·³»­ «²®»´·¿¾´»¿²¼ ·º ¬¸»®» ·­ ¼±«¾¬ô ¿ ¹»±¬»½¸²·½¿´ ®»°±®¬ ­¸±«´¼ ¾» ½±³³·­­·±²»¼òß­ ³±­¬ ¾«·´¼·²¹­ ­«ºº»®·²¹ ³±ª»³»²¬ °®±¾´»³­ ¿®» º±«²¼»¼ ±² ½´¿§­±·´­ô ¬¸»®» ·­ ¿² »³°¸¿­·­ ±² ½´¿­­·º·½¿¬·±² ±º ­±·´­ ¿½½±®¼·²¹ ¬± ¬¸»¿³±«²¬ ±º ­©»´´ ¿²¼ ­¸®·²µ¿¹» ¬¸»§ »¨°»®·»²½» ©·¬¸ ª¿®·¿¬·±²­ ±º©¿¬»® ½±²¬»²¬ò ̸» ¬¿¾´» ¾»´±© ·­ Ì¿¾´» îòï º®±³ ßÍ îèéðô ¬¸»Î»­·¼»²¬·¿´ Í´¿¾ ¿²¼ Ú±±¬·²¹ ݱ¼»ò

Ý¿«­»­ ±º Ó±ª»³»²¬

Í»¬¬´»³»²¬ ¼«» ¬± ½±²­¬®«½¬·±²Ì¸»®» ¿®» ¬©± ¬§°»­ ±º ­»¬¬´»³»²¬ ¬¸¿¬ ±½½«® ¿­ ¿ ®»­«´¬ ±º½±²­¬®«½¬·±²æ{ ׳³»¼·¿¬» ­»¬¬´»³»²¬ ±½½«®­ ©¸»² ¿ ¾«·´¼·²¹ ·­ º·®­¬ °´¿½»¼ ±² ·¬­

º±«²¼¿¬·±² ­±·´ô ¿­ ¿ ®»­«´¬ ±º ½±³°¿½¬·±² ±º ¬¸» ­±·´ «²¼»® ¬¸»©»·¹¸¬ ±º ¬¸» ­¬®«½¬«®»ò ̸» ½±¸»­·ª» ¯«¿´·¬§ ±º ½´¿§ ­±·´ ³·¬·¹¿¬»­¿¹¿·²­¬ ¬¸·­ô ¾«¬ ¹®¿²«´¿® ø°¿®¬·½«´¿®´§ ­¿²¼§÷ ­±·´ ·­ ­«­½»°¬·¾´»ò

{ ݱ²­±´·¼¿¬·±² ­»¬¬´»³»²¬ ·­ ¿ º»¿¬«®» ±º ½´¿§ ­±·´ ¿²¼ ³¿§ ¬¿µ»°´¿½» ¾»½¿«­» ±º ¬¸» »¨°«´­·±² ±º ³±·­¬«®» º®±³ ¬¸» ­±·´ ±® ¾»½¿«­»±º ¬¸» ­±·´K­ ´¿½µ ±º ®»­·­¬¿²½» ¬± ´±½¿´ ½±³°®»­­·ª» ±® ­¸»¿® ­¬®»­­»­ò̸·­ ©·´´ «­«¿´´§ ¬¿µ» °´¿½» ¼«®·²¹ ¬¸» º·®­¬ º»© ³±²¬¸­ ¿º¬»®½±²­¬®«½¬·±²ô ¾«¬ ¸¿­ ¾»»² µ²±©² ¬± ¬¿µ» ³¿²§ §»¿®­ ·²»¨½»°¬·±²¿´ ½¿­»­ò

̸»­» °®±¾´»³­ ¿®» ¬¸» °®±ª·²½» ±º ¬¸» ¾«·´¼»® ¿²¼ ­¸±«´¼ ¾» ¬¿µ»²·²¬± ½±²­·¼»®¿¬·±² ¿­ °¿®¬ ±º ¬¸» °®»°¿®¿¬·±² ±º ¬¸» ­·¬» º±® ½±²­¬®«½ó¬·±²ò Þ«·´¼·²¹ Ì»½¸²±´±¹§ Ú·´» ïç øÞÌÚ ïç÷ ¼»¿´­ ©·¬¸ ¬¸»­»°®±¾´»³­ò

Û®±­·±²ß´´ ­±·´­ ¿®» °®±²» ¬± »®±­·±²ô ¾«¬ ­¿²¼§ ­±·´ ·­ °¿®¬·½«´¿®´§ ­«­½»°¬·¾´»¬± ¾»·²¹ ©¿­¸»¼ ¿©¿§ò Ûª»² ½´¿§ ©·¬¸ ¿ ­¿²¼ ½±³°±²»²¬ ±º ­¿§ ïðû±® ³±®» ½¿² ­«ºº»® º®±³ »®±­·±²ò

Í¿¬«®¿¬·±²Ì¸·­ ·­ °¿®¬·½«´¿®´§ ¿ °®±¾´»³ ·² ½´¿§ ­±·´­ò Í¿¬«®¿¬·±² ½®»¿¬»­ ¿ ¾±¹ó´·µ» ­«­°»²­·±² ±º ¬¸» ­±·´ ¬¸¿¬ ½¿«­»­ ·¬ ¬± ´±­» ª·®¬«¿´´§ ¿´´ ±º ·¬­¾»¿®·²¹ ½¿°¿½·¬§ò ̱ ¿ ´»­­»® ¼»¹®»»ô ­¿²¼ ·­ ¿ºº»½¬»¼ ¾§ ­¿¬«®¿¬·±²¾»½¿«­» ­¿¬«®¿¬»¼ ­¿²¼ ³¿§ «²¼»®¹± ¿ ®»¼«½¬·±² ·² ª±´«³» P°¿®¬·½«´¿®´§ ·³°±®¬»¼ ­¿²¼ º·´´ º±® ¾»¼¼·²¹ ¿²¼ ¾´·²¼·²¹ ´¿§»®­òر©»ª»®ô ¬¸·­ «­«¿´´§ ±½½«®­ ¿­ ·³³»¼·¿¬» ­»¬¬´»³»²¬ ¿²¼ ­¸±«´¼²±®³¿´´§ ¾» ¬¸» °®±ª·²½» ±º ¬¸» ¾«·´¼»®ò

Í»¿­±²¿´ ­©»´´·²¹ ¿²¼ ­¸®·²µ¿¹» ±º ­±·´ß´´ ½´¿§­ ®»¿½¬ ¬± ¬¸» °®»­»²½» ±º ©¿¬»® ¾§ ­´±©´§ ¿¾­±®¾·²¹ ·¬ô ³¿µ·²¹¬¸» ­±·´ ·²½®»¿­» ·² ª±´«³» ø­»» ¬¿¾´» ¾»´±©÷ò ̸» ¼»¹®»» ±º ·²½®»¿­»ª¿®·»­ ½±²­·¼»®¿¾´§ ¾»¬©»»² ¼·ºº»®»²¬ ½´¿§­ô ¿­ ¼±»­ ¬¸» ¼»¹®»» ±º¼»½®»¿­» ¼«®·²¹ ¬¸» ­«¾­»¯«»²¬ ¼®§·²¹ ±«¬ ½¿«­»¼ ¾§ º¿·® ©»¿¬¸»®°»®·±¼­ò Þ»½¿«­» ±º ¬¸» ´±© ¿¾­±®°¬·±² ¿²¼ »¨°«´­·±² ®¿¬»ô ¬¸·­°¸»²±³»²±² ©·´´ ²±¬ «­«¿´´§ ¾» ²±¬·½»¿¾´» «²´»­­ ¬¸»®» ¿®»°®±´±²¹»¼ ®¿·²§ ±® ¼®§ °»®·±¼­ô «­«¿´´§ ±º ©»»µ­ ±® ³±²¬¸­ô¼»°»²¼·²¹ ±² ¬¸» ´¿²¼ ¿²¼ ­±·´ ½¸¿®¿½¬»®·­¬·½­ò

̸» ­©»´´·²¹ ±º ­±·´ ½®»¿¬»­ ¿² «°©¿®¼ º±®½» ±² ¬¸» º±±¬·²¹­ ±º ¬¸»¾«·´¼·²¹ô ¿²¼ ­¸®·²µ¿¹» ½®»¿¬»­ ­«¾­·¼»²½» ¬¸¿¬ ¬¿µ»­ ¿©¿§ ¬¸»­«°°±®¬ ²»»¼»¼ ¾§ ¬¸» º±±¬·²¹ ¬± ®»¬¿·² »¯«·´·¾®·«³ò

͸»¿® º¿·´«®»Ì¸·­ °¸»²±³»²±² ±½½«®­ ©¸»² ¬¸» º±«²¼¿¬·±² ­±·´ ¼±»­ ²±¬ ¸¿ª»­«ºº·½·»²¬ ­¬®»²¹¬¸ ¬± ­«°°±®¬ ¬¸» ©»·¹¸¬ ±º ¬¸» º±±¬·²¹ò ̸»®» ¿®»¬©± ³¿¶±® °±­¬ó½±²­¬®«½¬·±² ½¿«­»­æ

{ Í·¹²·º·½¿²¬ ´±¿¼ ·²½®»¿­»ò{ λ¼«½¬·±² ±º ´¿¬»®¿´ ­«°°±®¬ ±º ¬¸» ­±·´ «²¼»® ¬¸» º±±¬·²¹ ¼«» ¬±

»®±­·±² ±® »¨½¿ª¿¬·±²ò{ ײ ½´¿§ ­±·´ô ­¸»¿® º¿·´«®» ½¿² ¾» ½¿«­»¼ ¾§ ­¿¬«®¿¬·±² ±º ¬¸» ­±·´

¿¼¶¿½»²¬ ¬± ±® «²¼»® ¬¸» º±±¬·²¹ò

Þ«·´¼·²¹­ ½¿² ¿²¼ ±º¬»² ¼± ³±ª»ò ̸·­ ³±ª»³»²¬ ½¿² ¾» «°ô ¼±©²ô ´¿¬»®¿´ ±® ®±¬¿¬·±²¿´ò ̸» º«²¼¿³»²¬¿´ ½¿«­»±º ³±ª»³»²¬ ·² ¾«·´¼·²¹­ ½¿² «­«¿´´§ ¾» ®»´¿¬»¼ ¬± ±²» ±® ³±®» °®±¾´»³­ ·² ¬¸» º±«²¼¿¬·±² ­±·´ò ׬ ·­ ·³°±®¬¿²¬ º±®¬¸» ¸±³»±©²»® ¬± ·¼»²¬·º§ ¬¸» ­±·´ ¬§°» ·² ±®¼»® ¬± ¿­½»®¬¿·² ¬¸» ³»¿­«®»­ ¬¸¿¬ ­¸±«´¼ ¾» °«¬ ·² °´¿½» ·² ±®¼»® ¬±»²­«®» ¬¸¿¬ °®±¾´»³­ ·² ¬¸» º±«²¼¿¬·±² ­±·´ ½¿² ¾» °®»ª»²¬»¼ô ¬¸«­ °®±¬»½¬·²¹ ¿¹¿·²­¬ ¾«·´¼·²¹ ³±ª»³»²¬ò

̸·­ Þ«·´¼·²¹ Ì»½¸²±´±¹§ Ú·´» ·­ ¼»­·¹²»¼ ¬± ·¼»²¬·º§ ½¿«­»­ ±º ­±·´ó®»´¿¬»¼ ¾«·´¼·²¹ ³±ª»³»²¬ô ¿²¼ ¬± ­«¹¹»­¬³»¬¸±¼­ ±º °®»ª»²¬·±² ±º ®»­«´¬¿²¬ ½®¿½µ·²¹ ·² ¾«·´¼·²¹­ò

Ú±«²¼¿¬·±² Ó¿·²¬»²¿²½»¿²¼ Ú±±¬·²¹ л®º±®³¿²½»æß Ø±³»±©²»®K­ Ù«·¼»

ÙÛÒÛÎßÔ ÜÛÚ×Ò×Ì×ÑÒÍ ÑÚ Í×ÌÛ ÝÔßÍÍÛÍ

Ý´¿­­ Ú±«²¼¿¬·±²

ß Ó±­¬ ­¿²¼ ¿²¼ ®±½µ ­·¬»­ ©·¬¸ ´·¬¬´» ±® ²± ¹®±«²¼ ³±ª»³»²¬ º®±³ ³±·­¬«®» ½¸¿²¹»­

Í Í´·¹¸¬´§ ®»¿½¬·ª» ½´¿§ ­·¬»­ ©·¬¸ ±²´§ ­´·¹¸¬ ¹®±«²¼ ³±ª»³»²¬ º®±³ ³±·­¬«®» ½¸¿²¹»­

Ó Ó±¼»®¿¬»´§ ®»¿½¬·ª» ½´¿§ ±® ­·´¬ ­·¬»­ô ©¸·½¸ ½¿² »¨°»®·»²½» ³±¼»®¿¬» ¹®±«²¼ ³±ª»³»²¬ º®±³ ³±·­¬«®» ½¸¿²¹»­

Ø Ø·¹¸´§ ®»¿½¬·ª» ½´¿§ ­·¬»­ô ©¸·½¸ ½¿² »¨°»®·»²½» ¸·¹¸ ¹®±«²¼ ³±ª»³»²¬ º®±³ ³±·­¬«®» ½¸¿²¹»­

Û Û¨¬®»³»´§ ®»¿½¬·ª» ­·¬»­ô ©¸·½¸ ½¿² »¨°»®·»²½» »¨¬®»³» ¹®±«²¼ ³±ª»³»²¬ º®±³ ³±·­¬«®» ½¸¿²¹»­

ß ¬± Ð Ú·´´»¼ ­·¬»­

Ð Í·¬»­ ©¸·½¸ ·²½´«¼» ­±º¬ ­±·´­ô ­«½¸ ¿­ ­±º¬ ½´¿§ ±® ­·´¬ ±® ´±±­» ­¿²¼­å ´¿²¼­´·°å ³·²» ­«¾­·¼»²½»å ½±´´¿°­·²¹ ­±·´­å ­±·´­ ­«¾¶»½¬¬± »®±­·±²å ®»¿½¬·ª» ­·¬»­ ­«¾¶»½¬ ¬± ¿¾²±®³¿´ ³±·­¬«®» ½±²¼·¬·±²­ ±® ­·¬»­ ©¸·½¸ ½¿²²±¬ ¾» ½´¿­­·º·»¼ ±¬¸»®©·­»

ÞÌÚ ïè®»°´¿½»­

ײº±®³¿¬·±²Í¸»»¬ ïðñçï

Page 33: SITE CLASSIFICATION REPORT SUMMARY...Douglas Partners (DP) has prepared this report for this project at Taylor 2- Stage 3, Taylor in accordance with DP’s proposal dated 15 September

Ì®»» ®±±¬ ¹®±©¬¸Ì®»»­ ¿²¼ ­¸®«¾­ ¬¸¿¬ ¿®» ¿´´±©»¼ ¬± ¹®±© ·² ¬¸» ª·½·²·¬§ ±º º±±¬·²¹­½¿² ½¿«­» º±«²¼¿¬·±² ­±·´ ³±ª»³»²¬ ·² ¬©± ©¿§­æ

{ ᱬ­ ¬¸¿¬ ¹®±© «²¼»® º±±¬·²¹­ ³¿§ ·²½®»¿­» ·² ½®±­­ó­»½¬·±²¿´­·¦»ô »¨»®¬·²¹ «°©¿®¼ °®»­­«®» ±² º±±¬·²¹­ò

{ ᱬ­ ·² ¬¸» ª·½·²·¬§ ±º º±±¬·²¹­ ©·´´ ¿¾­±®¾ ³«½¸ ±º ¬¸» ³±·­¬«®»·² ¬¸» º±«²¼¿¬·±² ­±·´ô ½¿«­·²¹ ­¸®·²µ¿¹» ±® ­«¾­·¼»²½»ò

˲»ª»²²»­­ ±º Ó±ª»³»²¬

̸» ¬§°»­ ±º ¹®±«²¼ ³±ª»³»²¬ ¼»­½®·¾»¼ ¿¾±ª» «­«¿´´§ ±½½«®«²»ª»²´§ ¬¸®±«¹¸±«¬ ¬¸» ¾«·´¼·²¹K­ º±«²¼¿¬·±² ­±·´ò Í»¬¬´»³»²¬ ¼«»¬± ½±²­¬®«½¬·±² ¬»²¼­ ¬± ¾» «²»ª»² ¾»½¿«­» ±ºæ

{ Ü·ºº»®·²¹ ½±³°¿½¬·±² ±º º±«²¼¿¬·±² ­±·´ °®·±® ¬± ½±²­¬®«½¬·±²ò

{ Ü·ºº»®·²¹ ³±·­¬«®» ½±²¬»²¬ ±º º±«²¼¿¬·±² ­±·´ °®·±® ¬± ½±²­¬®«½¬·±²ò

Ó±ª»³»²¬ ¼«» ¬± ²±²ó½±²­¬®«½¬·±² ½¿«­»­ ·­ «­«¿´´§ ³±®» «²»ª»²­¬·´´ò Û®±­·±² ½¿² «²¼»®³·²» ¿ º±±¬·²¹ ¬¸¿¬ ¬®¿ª»®­»­ ¬¸» º´±© ±® ½¿²½®»¿¬» ¬¸» ½±²¼·¬·±²­ º±® ­¸»¿® º¿·´«®» ¾§ »®±¼·²¹ ­±·´ ¿¼¶¿½»²¬ ¬± ¿º±±¬·²¹ ¬¸¿¬ ®«²­ ·² ¬¸» ­¿³» ¼·®»½¬·±² ¿­ ¬¸» º´±©ò

Í¿¬«®¿¬·±² ±º ½´¿§ º±«²¼¿¬·±² ­±·´ ³¿§ ±½½«® ©¸»®» ­«¾º´±±® ©¿´´­½®»¿¬» ¿ ¼¿³ ¬¸¿¬ ³¿µ»­ ©¿¬»® °±²¼ò ׬ ½¿² ¿´­± ±½½«® ©¸»®»ª»® ¬¸»®»·­ ¿ ­±«®½» ±º ©¿¬»® ²»¿® º±±¬·²¹­ ·² ½´¿§ ­±·´ò ̸·­ ´»¿¼­ ¬± ¿ ­»ª»®»®»¼«½¬·±² ·² ¬¸» ­¬®»²¹¬¸ ±º ¬¸» ­±·´ ©¸·½¸ ³¿§ ½®»¿¬» ´±½¿´ ­¸»¿®º¿·´«®»ò

Í»¿­±²¿´ ­©»´´·²¹ ¿²¼ ­¸®·²µ¿¹» ±º ½´¿§ ­±·´ ¿ºº»½¬­ ¬¸» °»®·³»¬»® ±º¬¸» ¾«·´¼·²¹ º·®­¬ô ¬¸»² ¹®¿¼«¿´´§ ­°®»¿¼­ ¬± ¬¸» ·²¬»®·±®ò ̸» ­©»´´·²¹°®±½»­­ ©·´´ «­«¿´´§ ¾»¹·² ¿¬ ¬¸» «°¸·´´ »¨¬®»³» ±º ¬¸» ¾«·´¼·²¹ô ±® ±²¬¸» ©»¿¬¸»® ­·¼» ©¸»®» ¬¸» ´¿²¼ ·­ º´¿¬ò Í©»´´·²¹ ¹®¿¼«¿´´§ ®»¿½¸»­ ¬¸»·²¬»®·±® ­±·´ ¿­ ¿¾­±®°¬·±² ½±²¬·²«»­ò ͸®·²µ¿¹» «­«¿´´§ ¾»¹·²­ ©¸»®»¬¸» ­«²K­ ¸»¿¬ ·­ ¹®»¿¬»­¬ò

Ûºº»½¬­ ±º ˲»ª»² ͱ·´ Ó±ª»³»²¬ ±² ͬ®«½¬«®»­

Û®±­·±² ¿²¼ ­¿¬«®¿¬·±²Û®±­·±² ®»³±ª»­ ¬¸» ­«°°±®¬ º®±³ «²¼»® º±±¬·²¹­ô ¬»²¼·²¹ ¬± ½®»¿¬»­«¾­·¼»²½» ±º ¬¸» °¿®¬ ±º ¬¸» ­¬®«½¬«®» «²¼»® ©¸·½¸ ·¬ ±½½«®­òÞ®·½µ©±®µ ©¿´´­ ©·´´ ®»­·­¬ ¬¸» ­¬®»­­ ½®»¿¬»¼ ¾§ ¬¸·­ ®»³±ª¿´ ±º­«°°±®¬ ¾§ ¾®·¼¹·²¹ ¬¸» ¹¿° ±® ½¿²¬·´»ª»®·²¹ «²¬·´ ¬¸» ¾®·½µ­ ±® ¬¸»³±®¬¿® ¾»¼¼·²¹ º¿·´ò Ñ´¼»® ³¿­±²®§ ¸¿­ ´·¬¬´» ®»­·­¬¿²½»ò Ûª·¼»²½» ±ºº¿·´«®» ª¿®·»­ ¿½½±®¼·²¹ ¬± ½·®½«³­¬¿²½»­ ¿²¼ ­§³°¬±³­ ³¿§ ·²½´«¼»æ

{ ͬ»° ½®¿½µ·²¹ ·² ¬¸» ³±®¬¿® ¾»¼­ ·² ¬¸» ¾±¼§ ±º ¬¸» ©¿´´ ±®¿¾±ª»ñ¾»´±© ±°»²·²¹­ ­«½¸ ¿­ ¼±±®­ ±® ©·²¼±©­ò

{ Ê»®¬·½¿´ ½®¿½µ·²¹ ·² ¬¸» ¾®·½µ­ ø«­«¿´´§ ¾«¬ ²±¬ ²»½»­­¿®·´§ ·² ´·²»©·¬¸ ¬¸» ª»®¬·½¿´ ¾»¼­ ±® °»®°»²¼­÷ò

×­±´¿¬»¼ °·»®­ ¿ºº»½¬»¼ ¾§ »®±­·±² ±® ­¿¬«®¿¬·±² ±º º±«²¼¿¬·±²­ ©·´´»ª»²¬«¿´´§ ´±­» ½±²¬¿½¬ ©·¬¸ ¬¸» ¾»¿®»®­ ¬¸»§ ­«°°±®¬ ¿²¼ ³¿§ ¬·´¬ ±®º¿´´ ±ª»®ò ̸» º´±±®­ ¬¸¿¬ ¸¿ª» ´±­¬ ¬¸·­ ­«°°±®¬ ©·´´ ¾»½±³» ¾±«²½§ô­±³»¬·³»­ ®¿¬¬´·²¹ ±®²¿³»²¬­ »¬½ò

Í»¿­±²¿´ ­©»´´·²¹ñ­¸®·²µ¿¹» ·² ½´¿§Í©»´´·²¹ º±«²¼¿¬·±² ­±·´ ¼«» ¬± ®¿·²§ °»®·±¼­ º·®­¬ ´·º¬­ ¬¸» ³±­¬»¨°±­»¼ »¨¬®»³·¬·»­ ±º ¬¸» º±±¬·²¹ ­§­¬»³ô ¬¸»² ¬¸» ®»³¿·²¼»® ±º ¬¸»°»®·³»¬»® º±±¬·²¹­ ©¸·´» ¹®¿¼«¿´´§ °»®³»¿¬·²¹ ·²­·¼» ¬¸» ¾«·´¼·²¹º±±¬°®·²¬ ¬± ´·º¬ ·²¬»®²¿´ º±±¬·²¹­ò ̸·­ ­©»´´·²¹ º·®­¬ ¬»²¼­ ¬± ½®»¿¬» ¿¼·­¸ »ºº»½¬ô ¾»½¿«­» ¬¸» »¨¬»®²¿´ º±±¬·²¹­ ¿®» °«­¸»¼ ¸·¹¸»® ¬¸¿² ¬¸»·²¬»®²¿´ ±²»­ò

̸» º·®­¬ ²±¬·½»¿¾´» ­§³°¬±³ ³¿§ ¾» ¬¸¿¬ ¬¸» º´±±® ¿°°»¿®­ ­´·¹¸¬´§¼·­¸»¼ò ̸·­ ·­ ±º¬»² ¿½½±³°¿²·»¼ ¾§ ­±³» ¼±±®­ ¾·²¼·²¹ ±² ¬¸»º´±±® ±® ¬¸» ¼±±® ¸»¿¼ô ¬±¹»¬¸»® ©·¬¸ ­±³» ½®¿½µ·²¹ ±º ½±®²·½»³·¬®»­ò ײ ¾«·´¼·²¹­ ©·¬¸ ¬·³¾»® º´±±®·²¹ ­«°°±®¬»¼ ¾§ ¾»¿®»®­ ¿²¼¶±·­¬­ô ¬¸» º´±±® ½¿² ¾» ¾±«²½§ò Û¨¬»®²¿´´§ ¬¸»®» ³¿§ ¾» ª·­·¾´»¼·­¸·²¹ ±º ¬¸» ¸·° ±® ®·¼¹» ´·²»­ò

ß­ ¬¸» ³±·­¬«®» ¿¾­±®°¬·±² °®±½»­­ ½±³°´»¬»­ ·¬­ ¶±«®²»§ ¬± ¬¸»·²²»®³±­¬ ¿®»¿­ ±º ¬¸» ¾«·´¼·²¹ô ¬¸» ·²¬»®²¿´ º±±¬·²¹­ ©·´´ ®·­»ò ׺ ¬¸»­°®»¿¼ ±º ³±·­¬«®» ·­ ®±«¹¸´§ »ª»²ô ·¬ ³¿§ ¾» ¬¸¿¬ ¬¸» ­§³°¬±³­ ©·´´¬»³°±®¿®·´§ ¼·­¿°°»¿®ô ¾«¬ ·¬ ·­ ³±®» ´·µ»´§ ¬¸¿¬ ­©»´´·²¹ ©·´´ ¾»«²»ª»²ô ½®»¿¬·²¹ ¿ ¼·ºº»®»²½» ®¿¬¸»® ¬¸¿² ¿ ¼·­¿°°»¿®¿²½» ·²­§³°¬±³­ò ײ ¾«·´¼·²¹­ ©·¬¸ ¬·³¾»® º´±±®·²¹ ­«°°±®¬»¼ ¾§ ¾»¿®»®­¿²¼ ¶±·­¬­ô ¬¸» ·­±´¿¬»¼ °·»®­ ©·´´ ®·­» ³±®» »¿­·´§ ¬¸¿² ¬¸» ­¬®·°º±±¬·²¹­ ±® °·»®­ «²¼»® ©¿´´­ô ½®»¿¬·²¹ ²±¬·½»¿¾´» ¼±³·²¹ ±º º´±±®·²¹ò

ß­ ¬¸» ©»¿¬¸»® °¿¬¬»®² ½¸¿²¹»­ ¿²¼ ¬¸» ­±·´ ¾»¹·²­ ¬± ¼®§ ±«¬ô ¬¸»»¨¬»®²¿´ º±±¬·²¹­ ©·´´ ¾» º·®­¬ ¿ºº»½¬»¼ô ¾»¹·²²·²¹ ©·¬¸ ¬¸» ´±½¿¬·±²­©¸»®» ¬¸» ­«²K­ »ºº»½¬ ·­ ­¬®±²¹»­¬ò ̸·­ ¸¿­ ¬¸» »ºº»½¬ ±º ´±©»®·²¹ ¬¸»»¨¬»®²¿´ º±±¬·²¹­ò ̸» ¼±³·²¹ ·­ ¿½½»²¬«¿¬»¼ ¿²¼ ½®¿½µ·²¹ ®»¼«½»­±® ¼·­¿°°»¿®­ ©¸»®» ·¬ ±½½«®®»¼ ¾»½¿«­» ±º ¼·­¸·²¹ô ¾«¬ ±¬¸»® ½®¿½µ­±°»² «°ò ̸» ®±±º ´·²»­ ³¿§ ¾»½±³» ½±²ª»¨ò

ܱ³·²¹ ¿²¼ ¼·­¸·²¹ ¿®» ¿´­± ¿ºº»½¬»¼ ¾§ ©»¿¬¸»® ·² ±¬¸»® ©¿§­ò ײ¿®»¿­ ©¸»®» ©¿®³ô ©»¬ ­«³³»®­ ¿²¼ ½±±´»® ¼®§ ©·²¬»®­ °®»ª¿·´ô©¿¬»® ³·¹®¿¬·±² ¬»²¼­ ¬± ¾» ¬±©¿®¼ ¬¸» ·²¬»®·±® ¿²¼ ¼±³·²¹ ©·´´ ¾»¿½½»²¬«¿¬»¼ô ©¸»®»¿­ ©¸»®» ­«³³»®­ ¿®» ¼®§ ¿²¼ ©·²¬»®­ ¿®» ½±´¼¿²¼ ©»¬ô ³·¹®¿¬·±² ¬»²¼­ ¬± ¾» ¬±©¿®¼ ¬¸» »¨¬»®·±® ¿²¼ ¬¸»«²¼»®´§·²¹ °®±°»²­·¬§ ·­ ¬±©¿®¼ ¼·­¸·²¹ò

Ó±ª»³»²¬ ½¿«­»¼ ¾§ ¬®»» ®±±¬­×² ¹»²»®¿´ô ¹®±©·²¹ ®±±¬­ ©·´´ »¨»®¬ ¿² «°©¿®¼ °®»­­«®» ±² º±±¬·²¹­ô©¸»®»¿­ ­±·´ ­«¾¶»½¬ ¬± ¼®§·²¹ ¾»½¿«­» ±º ¬®»» ±® ­¸®«¾ ®±±¬­ ©·´´ ¬»²¼¬± ®»³±ª» ­«°°±®¬ º®±³ «²¼»® º±±¬·²¹­ ¾§ ·²¼«½·²¹ ­¸®·²µ¿¹»ò

ݱ³°´·½¿¬·±²­ ½¿«­»¼ ¾§ ¬¸» ­¬®«½¬«®» ·¬­»´ºÓ±­¬ º±®½»­ ¬¸¿¬ ¬¸» ­±·´ ½¿«­»­ ¬± ¾» »¨»®¬»¼ ±² ­¬®«½¬«®»­ ¿®»ª»®¬·½¿´ P ·ò»ò »·¬¸»® «° ±® ¼±©²ò ر©»ª»®ô ¾»½¿«­» ¬¸»­» º±®½»­ ¿®»­»´¼±³ ­°®»¿¼ »ª»²´§ ¿®±«²¼ ¬¸» º±±¬·²¹­ô ¿²¼ ¾»½¿«­» ¬¸» ¾«·´¼·²¹®»­·­¬­ «²»ª»² ³±ª»³»²¬ ¾»½¿«­» ±º ·¬­ ®·¹·¼·¬§ô º±®½»­ ¿®» »¨»®¬»¼º®±³ ±²» °¿®¬ ±º ¬¸» ¾«·´¼·²¹ ¬± ¿²±¬¸»®ò ̸» ²»¬ ®»­«´¬ ±º ¿´´ ¬¸»­»º±®½»­ ·­ «­«¿´´§ ®±¬¿¬·±²¿´ò ̸·­ ®»­«´¬¿²¬ º±®½» ±º¬»² ½±³°´·½¿¬»­ ¬¸»¼·¿¹²±­·­ ¾»½¿«­» ¬¸» ª·­·¾´» ­§³°¬±³­ ¼± ²±¬ ­·³°´§ ®»º´»½¬ ¬¸»±®·¹·²¿´ ½¿«­»ò ß ½±³³±² ­§³°¬±³ ·­ ¾·²¼·²¹ ±º ¼±±®­ ±² ¬¸»ª»®¬·½¿´ ³»³¾»® ±º ¬¸» º®¿³»ò

Ûºº»½¬­ ±² º«´´ ³¿­±²®§ ­¬®«½¬«®»­Þ®·½µ©±®µ ©·´´ ®»­·­¬ ½®¿½µ·²¹ ©¸»®» ·¬ ½¿²ò ׬ ©·´´ ¿¬¬»³°¬ ¬± ­°¿²¿®»¿­ ¬¸¿¬ ´±­» ­«°°±®¬ ¾»½¿«­» ±º ­«¾­·¼»¼ º±«²¼¿¬·±²­ ±® ®¿·­»¼°±·²¬­ò ׬ ·­ ¬¸»®»º±®» «­«¿´ ¬± ­»» ½®¿½µ·²¹ ¿¬ ©»¿µ °±·²¬­ô ­«½¸ ¿­±°»²·²¹­ º±® ©·²¼±©­ ±® ¼±±®­ò

ײ ¬¸» »ª»²¬ ±º ½±²­¬®«½¬·±² ­»¬¬´»³»²¬ô ½®¿½µ·²¹ ©·´´ «­«¿´´§ ®»³¿·²«²½¸¿²¹»¼ ¿º¬»® ¬¸» °®±½»­­ ±º ­»¬¬´»³»²¬ ¸¿­ ½»¿­»¼ò

É·¬¸ ´±½¿´ ­¸»¿® ±® »®±­·±²ô ½®¿½µ·²¹ ©·´´ «­«¿´´§ ½±²¬·²«» ¬± ¼»ª»´±°«²¬·´ ¬¸» ±®·¹·²¿´ ½¿«­» ¸¿­ ¾»»² ®»³»¼·»¼ô ±® «²¬·´ ¬¸» ­«¾­·¼»²½»¸¿­ ½±³°´»¬»´§ ²»«¬®¿´·­»¼ ¬¸» ¿ºº»½¬»¼ °±®¬·±² ±º º±±¬·²¹ ¿²¼ ¬¸»­¬®«½¬«®» ¸¿­ ­¬¿¾·´·­»¼ ±² ±¬¸»® º±±¬·²¹­ ¬¸¿¬ ®»³¿·² »ºº»½¬·ª»ò

ײ ¬¸» ½¿­» ±º ­©»´´ñ­¸®·²µ »ºº»½¬­ô ¬¸» ¾®·½µ©±®µ ©·´´ ·² ­±³» ½¿­»­®»¬«®² ¬± ·¬­ ±®·¹·²¿´ °±­·¬·±² ¿º¬»® ½±³°´»¬·±² ±º ¿ ½§½´»ô ¸±©»ª»® ·¬·­ ³±®» ´·µ»´§ ¬¸¿¬ ¬¸» ®±¬¿¬·±²¿´ »ºº»½¬ ©·´´ ²±¬ ¾» »¨¿½¬´§ ®»ª»®­»¼ô¿²¼ ·¬ ·­ ¿´­± «­«¿´ ¬¸¿¬ ¾®·½µ©±®µ ©·´´ ­»¬¬´» ·² ·¬­ ²»© °±­·¬·±² ¿²¼©·´´ ®»­·­¬ ¬¸» º±®½»­ ¬®§·²¹ ¬± ®»¬«®² ·¬ ¬± ·¬­ ±®·¹·²¿´ °±­·¬·±²ò ̸·­³»¿²­ ¬¸¿¬ ·² ¿ ½¿­» ©¸»®» ­©»´´·²¹ ¬¿µ»­ °´¿½» ¿º¬»® ½±²­¬®«½¬·±²¿²¼ ½®¿½µ·²¹ ±½½«®­ô ¬¸» ½®¿½µ·²¹ ·­ ´·µ»´§ ¬± ¿¬ ´»¿­¬ °¿®¬´§ ®»³¿·²¿º¬»® ¬¸» ­¸®·²µ ­»¹³»²¬ ±º ¬¸» ½§½´» ·­ ½±³°´»¬»ò ̸«­ô »¿½¸ ¬·³»¬¸» ½§½´» ·­ ®»°»¿¬»¼ô ¬¸» ´·µ»´·¸±±¼ ·­ ¬¸¿¬ ¬¸» ½®¿½µ·²¹ ©·´´ ¾»½±³»©·¼»® «²¬·´ ¬¸» ­»½¬·±²­ ±º ¾®·½µ©±®µ ¾»½±³» ª·®¬«¿´´§ ·²¼»°»²¼»²¬ò

É·¬¸ ®»°»¿¬»¼ ½§½´»­ô ±²½» ¬¸» ½®¿½µ·²¹ ·­ »­¬¿¾´·­¸»¼ô ·º ¬¸»®» ·­ ²±±¬¸»® ½±³°´·½¿¬·±²ô ·¬ ·­ ²±®³¿´ º±® ¬¸» ·²½·¼»²½» ±º ½®¿½µ·²¹ ¬±­¬¿¾·´·­»ô ¿­ ¬¸» ¾«·´¼·²¹ ¸¿­ ¬¸» ¿®¬·½«´¿¬·±² ·¬ ²»»¼­ ¬± ½±°» ©·¬¸¬¸» °®±¾´»³ò ̸·­ ·­ ¾§ ²± ³»¿²­ ¿´©¿§­ ¬¸» ½¿­»ô ¸±©»ª»®ô ¿²¼³±²·¬±®·²¹ ±º ½®¿½µ­ ·² ©¿´´­ ¿²¼ º´±±®­ ­¸±«´¼ ¿´©¿§­ ¾» ¬®»¿¬»¼­»®·±«­´§ò

Ë°¸»¿ª¿´ ½¿«­»¼ ¾§ ¹®±©¬¸ ±º ¬®»» ®±±¬­ «²¼»® º±±¬·²¹­ ·­ ²±¬ ¿­·³°´» ª»®¬·½¿´ ­¸»¿® ­¬®»­­ò ̸»®» ·­ ¿ ¬»²¼»²½§ º±® ¬¸» ®±±¬ ¬± ¿´­±»¨»®¬ ´¿¬»®¿´ º±®½»­ ¬¸¿¬ ¿¬¬»³°¬ ¬± ­»°¿®¿¬» ­»½¬·±²­ ±º ¾®·½µ©±®µ¿º¬»® ·²·¬·¿´ ½®¿½µ·²¹ ¸¿­ ±½½«®®»¼ò

Ì®»»­ ½¿² ½¿«­» ­¸®·²µ¿¹» ¿²¼ ¼¿³¿¹»

Page 34: SITE CLASSIFICATION REPORT SUMMARY...Douglas Partners (DP) has prepared this report for this project at Taylor 2- Stage 3, Taylor in accordance with DP’s proposal dated 15 September

̸» ²±®³¿´ ­¬®«½¬«®¿´ ¿®®¿²¹»³»²¬ ·­ ¬¸¿¬ ¬¸» ·²²»® ´»¿º ±º ¾®·½µó©±®µ ·² ¬¸» »¨¬»®²¿´ ©¿´´­ ¿²¼ ¿¬ ´»¿­¬ ­±³» ±º ¬¸» ·²¬»®²¿´ ©¿´´­ø¼»°»²¼·²¹ ±² ¬¸» ®±±º ¬§°»÷ ½±³°®·­» ¬¸» ´±¿¼ó¾»¿®·²¹ ­¬®«½¬«®» ±²©¸·½¸ ¿²§ «°°»® º´±±®­ô ½»·´·²¹­ ¿²¼ ¬¸» ®±±º ¿®» ­«°°±®¬»¼ò ײ ¬¸»­»½¿­»­ô ·¬ ·­ ·²¬»®²¿´´§ ª·­·¾´» ½®¿½µ·²¹ ¬¸¿¬ ­¸±«´¼ ¾» ¬¸» ³¿·² º±½«­±º ¿¬¬»²¬·±²ô ¸±©»ª»® ¬¸»®» ¿®» ¿ º»© »¨¿³°´»­ ±º ¼©»´´·²¹­ ©¸±­»»¨¬»®²¿´ ´»¿º ±º ³¿­±²®§ °´¿§­ ­±³» ­«°°±®¬·²¹ ®±´»ô ­± ¬¸·­ ­¸±«´¼¾» ½¸»½µ»¼ ·º ¬¸»®» ·­ ¿²§ ¼±«¾¬ò ײ ¿²§ ½¿­»ô »¨¬»®²¿´´§ ª·­·¾´»½®¿½µ·²¹ ·­ ·³°±®¬¿²¬ ¿­ ¿ ¹«·¼» ¬± ­¬®»­­»­ ±² ¬¸» ­¬®«½¬«®» ¹»²»®¿´´§ô¿²¼ ·¬ ­¸±«´¼ ¿´­± ¾» ®»³»³¾»®»¼ ¬¸¿¬ ¬¸» »¨¬»®²¿´ ©¿´´­ ³«­¬ ¾»½¿°¿¾´» ±º ­«°°±®¬·²¹ ¬¸»³­»´ª»­ò

Ûºº»½¬­ ±² º®¿³»¼ ­¬®«½¬«®»­Ì·³¾»® ±® ­¬»»´ º®¿³»¼ ¾«·´¼·²¹­ ¿®» ´»­­ ´·µ»´§ ¬± »¨¸·¾·¬ ½®¿½µ·²¹¼«» ¬± ­©»´´ñ­¸®·²µ ¬¸¿² ³¿­±²®§ ¾«·´¼·²¹­ ¾»½¿«­» ±º ¬¸»·®º´»¨·¾·´·¬§ò ß´­±ô ¬¸» ¼±³·²¹ñ¼·­¸·²¹ »ºº»½¬­ ¬»²¼ ¬± ¾» ´±©»® ¾»½¿«­»±º ¬¸» ´·¹¸¬»® ©»·¹¸¬ ±º ©¿´´­ò ̸» ³¿·² ®·­µ­ ¬± º®¿³»¼ ¾«·´¼·²¹­ ¿®»»²½±«²¬»®»¼ ¾»½¿«­» ±º ¬¸» ·­±´¿¬»¼ °·»® º±±¬·²¹­ «­»¼ «²¼»® ©¿´´­òɸ»®» »®±­·±² ±® ­¿¬«®¿¬·±² ½¿«­» ¿ º±±¬·²¹ ¬± º¿´´ ¿©¿§ô ¬¸·­ ½¿²¼±«¾´» ¬¸» ­°¿² ©¸·½¸ ¿ ©¿´´ ³«­¬ ¾®·¼¹»ò ̸·­ ¿¼¼·¬·±²¿´ ­¬®»­­ ½¿²½®»¿¬» ½®¿½µ·²¹ ·² ©¿´´ ´·²·²¹­ô °¿®¬·½«´¿®´§ ©¸»®» ¬¸»®» ·­ ¿ ©»¿µ°±·²¬ ·² ¬¸» ­¬®«½¬«®» ½¿«­»¼ ¾§ ¿ ¼±±® ±® ©·²¼±© ±°»²·²¹ò ׬ ·­ô¸±©»ª»®ô «²´·µ»´§ ¬¸¿¬ º®¿³»¼ ­¬®«½¬«®»­ ©·´´ ¾» ­± ­¬®»­­»¼ ¿­ ¬± ­«ºº»®­»®·±«­ ¼¿³¿¹» ©·¬¸±«¬ º·®­¬ »¨¸·¾·¬·²¹ ­±³» ±® ¿´´ ±º ¬¸» ¿¾±ª»­§³°¬±³­ º±® ¿ ½±²­·¼»®¿¾´» °»®·±¼ò ̸» ­¿³» ©¿®²·²¹ °»®·±¼ ­¸±«´¼¿°°´§ ·² ¬¸» ½¿­» ±º «°¸»¿ª¿´ò ׬ ­¸±«´¼ ¾» ²±¬»¼ô ¸±©»ª»®ô ¬¸¿¬ ©¸»®»º®¿³»¼ ¾«·´¼·²¹­ ¿®» ­«°°±®¬»¼ ¾§ ­¬®·° º±±¬·²¹­ ¬¸»®» ·­ ±²´§ ±²» ´»¿º±º ¾®·½µ©±®µ ¿²¼ ¬¸»®»º±®» ¬¸» »¨¬»®²¿´´§ ª·­·¾´» ©¿´´­ ¿®» ¬¸»­«°°±®¬·²¹ ­¬®«½¬«®» º±® ¬¸» ¾«·´¼·²¹ò ײ ¬¸·­ ½¿­»ô ¬¸» ­«¾º´±±®³¿­±²®§ ©¿´´­ ½¿² ¾» »¨°»½¬»¼ ¬± ¾»¸¿ª» ¿­ º«´´ ¾®·½µ©±®µ ©¿´´­ò

Ûºº»½¬­ ±² ¾®·½µ ª»²»»® ­¬®«½¬«®»­Þ»½¿«­» ¬¸» ´±¿¼ó¾»¿®·²¹ ­¬®«½¬«®» ±º ¿ ¾®·½µ ª»²»»® ¾«·´¼·²¹ ·­ ¬¸»º®¿³» ¬¸¿¬ ³¿µ»­ «° ¬¸» ·²¬»®·±® ´»¿º ±º ¬¸» »¨¬»®²¿´ ©¿´´­ °´«­°»®¸¿°­ ¬¸» ·²¬»®²¿´ ©¿´´­ô ¼»°»²¼·²¹ ±² ¬¸» ¬§°» ±º ®±±ºô ¬¸»¾«·´¼·²¹ ½¿² ¾» »¨°»½¬»¼ ¬± ¾»¸¿ª» ¿­ ¿ º®¿³»¼ ­¬®«½¬«®»ô »¨½»°¬ ¬¸¿¬¬¸» »¨¬»®²¿´ ³¿­±²®§ ©·´´ ¾»¸¿ª» ·² ¿ ­·³·´¿® ©¿§ ¬± ¬¸» »¨¬»®²¿´ ´»¿º±º ¿ º«´´ ³¿­±²®§ ­¬®«½¬«®»ò

É¿¬»® Í»®ª·½» ¿²¼ Ü®¿·²¿¹»

ɸ»®» ¿ ©¿¬»® ­»®ª·½» °·°»ô ¿ ­»©»® ±® ­¬±®³©¿¬»® ¼®¿·²¿¹» °·°» ·­ ·²¬¸» ª·½·²·¬§ ±º ¿ ¾«·´¼·²¹ô ¿ ©¿¬»® ´»¿µ ½¿² ½¿«­» »®±­·±²ô ­©»´´·²¹ ±®­¿¬«®¿¬·±² ±º ­«­½»°¬·¾´» ­±·´ò Ûª»² ¿ ³·²«­½«´» ´»¿µ ½¿² ¾» »²±«¹¸¬± ­¿¬«®¿¬» ¿ ½´¿§ º±«²¼¿¬·±²ò ß ´»¿µ·²¹ ¬¿° ²»¿® ¿ ¾«·´¼·²¹ ½¿² ¸¿ª»¬¸» ­¿³» »ºº»½¬ò ײ ¿¼¼·¬·±²ô ¬®»²½¸»­ ½±²¬¿·²·²¹ °·°»­ ½¿² ¾»½±³»©¿¬»®½±«®­»­ »ª»² ¬¸±«¹¸ ¾¿½µº·´´»¼ô °¿®¬·½«´¿®´§ ©¸»®» ¾®±µ»²®«¾¾´» ·­ «­»¼ ¿­ º·´´ò É¿¬»® ¬¸¿¬ ®«²­ ¿´±²¹ ¬¸»­» ¬®»²½¸»­ ½¿² ¾»®»­°±²­·¾´» º±® ­»®·±«­ »®±­·±²ô ·²¬»®­¬®¿¬¿ ­»»°¿¹» ·²¬± ­«¾º´±±® ¿®»¿­¿²¼ ­¿¬«®¿¬·±²ò

з°» ´»¿µ¿¹» ¿²¼ ¬®»²½¸ ©¿¬»® º´±©­ ¿´­± »²½±«®¿¹» ¬®»» ¿²¼ ­¸®«¾®±±¬­ ¬± ¬¸» ­±«®½» ±º ©¿¬»®ô ½±³°´·½¿¬·²¹ ¿²¼ »¨¿½»®¾¿¬·²¹ ¬¸»°®±¾´»³òб±® ®±±º °´«³¾·²¹ ½¿² ®»­«´¬ ·² ´¿®¹» ª±´«³»­ ±º ®¿·²©¿¬»® ¾»·²¹½±²½»²¬®¿¬»¼ ·² ¿ ­³¿´´ ¿®»¿ ±º ­±·´æ

{ ײ½±®®»½¬ º¿´´­ ·² ®±±º ¹«¬¬»®·²¹ ³¿§ ®»­«´¬ ·² ±ª»®º´±©­ô ¿­ ³¿§¹«¬¬»®­ ¾´±½µ»¼ ©·¬¸ ´»¿ª»­ »¬½ò

{ ݱ®®±¼»¼ ¹«¬¬»®·²¹ ±® ¼±©²°·°»­ ½¿² ­°·´´ ©¿¬»® ¬± ¹®±«²¼ò

{ ܱ©²°·°»­ ²±¬ °±­·¬·ª»´§ ½±²²»½¬»¼ ¬± ¿ °®±°»® ­¬±®³©¿¬»®½±´´»½¬·±² ­§­¬»³ ©·´´ ¼·®»½¬ ¿ ½±²½»²¬®¿¬·±² ±º ©¿¬»® ¬± ­±·´ ¬¸¿¬ ·­¼·®»½¬´§ ¿¼¶¿½»²¬ ¬± º±±¬·²¹­ô ­±³»¬·³»­ ½¿«­·²¹ ´¿®¹»ó­½¿´»°®±¾´»³­ ­«½¸ ¿­ »®±­·±²ô ­¿¬«®¿¬·±² ¿²¼ ³·¹®¿¬·±² ±º ©¿¬»® «²¼»®¬¸» ¾«·´¼·²¹ò

Í»®·±«­²»­­ ±º Ý®¿½µ·²¹

ײ ¹»²»®¿´ô ³±­¬ ½®¿½µ·²¹ º±«²¼ ·² ³¿­±²®§ ©¿´´­ ·­ ¿ ½±­³»¬·½²«·­¿²½» ±²´§ ¿²¼ ½¿² ¾» µ»°¬ ·² ®»°¿·® ±® »ª»² ·¹²±®»¼ò ̸» ¬¿¾´»¾»´±© ·­ ¿ ®»°®±¼«½¬·±² ±º Ì¿¾´» Ýï ±º ßÍ îèéðò

ßÍ îèéð ¿´­± °«¾´·­¸»­ º·¹«®»­ ®»´¿¬·²¹ ¬± ½®¿½µ·²¹ ·² ½±²½®»¬» º´±±®­ô¸±©»ª»® ¾»½¿«­» ©¿´´ ½®¿½µ·²¹ ©·´´ «­«¿´´§ ®»¿½¸ ¬¸» ½®·¬·½¿´ °±·²¬­·¹²·º·½¿²¬´§ »¿®´·»® ¬¸¿² ½®¿½µ·²¹ ·² ­´¿¾­ô ¬¸·­ ¬¿¾´» ·­ ²±¬®»°®±¼«½»¼ ¸»®»ò

Ю»ª»²¬·±²ñÝ«®»

д«³¾·²¹É¸»®» ¾«·´¼·²¹ ³±ª»³»²¬ ·­ ½¿«­»¼ ¾§ ©¿¬»® ­»®ª·½»ô ®±±º °´«³¾·²¹ô­»©»® ±® ­¬±®³©¿¬»® º¿·´«®»ô ¬¸» ®»³»¼§ ·­ ¬± ®»°¿·® ¬¸» °®±¾´»³ò ׬ ·­ °®«¼»²¬ô ¸±©»ª»®ô ¬± ½±²­·¼»® ¿´­± ®»®±«¬·²¹ °·°»­ ¿©¿§ º®±³¬¸» ¾«·´¼·²¹ ©¸»®» °±­­·¾´»ô ¿²¼ ®»´±½¿¬·²¹ ¬¿°­ ¬± °±­·¬·±²­ ©¸»®»¿²§ ´»¿µ¿¹» ©·´´ ²±¬ ¼·®»½¬ ©¿¬»® ¬± ¬¸» ¾«·´¼·²¹ ª·½·²·¬§ò Ûª»² ©¸»®»¹«´´§ ¬®¿°­ ¿®» °®»­»²¬ô ¬¸»®» ·­ ­±³»¬·³»­ ­«ºº·½·»²¬ ­°·´´ ¬± ½®»¿¬»»®±­·±² ±® ­¿¬«®¿¬·±²ô °¿®¬·½«´¿®´§ ·² ³±¼»®² ·²­¬¿´´¿¬·±²­ «­·²¹­³¿´´»® ¼·¿³»¬»® ÐÊÝ º·¨¬«®»­ò ײ¼»»¼ô ­±³» ¹«´´§ ¬®¿°­ ¿®» ²±¬­·¬«¿¬»¼ ¼·®»½¬´§ «²¼»® ¬¸» ¬¿°­ ¬¸¿¬ ¿®» ·²­¬¿´´»¼ ¬± ½¸¿®¹» ¬¸»³ô©·¬¸ ¬¸» ®»­«´¬ ¬¸¿¬ ©¿¬»® º®±³ ¬¸» ¬¿° ³¿§ »²¬»® ¬¸» ¾¿½µº·´´»¼¬®»²½¸ ¬¸¿¬ ¸±«­»­ ¬¸» ­»©»® °·°·²¹ò ׺ ¬¸» ¬®»²½¸ ¸¿­ ¾»»² °±±®´§¾¿½µº·´´»¼ô ¬¸» ©¿¬»® ©·´´ »·¬¸»® °±²¼ ±® º´±© ¿´±²¹ ¬¸» ¾±¬¬±³ ±º¬¸» ¬®»²½¸ò ß­ ¬¸»­» ¬®»²½¸»­ «­«¿´´§ ®«² ¿´±²¹­·¼» ¬¸» º±±¬·²¹­ ¿²¼½¿² ¾» ¿¬ ¿ ­·³·´¿® ¼»°¬¸ô ·¬ ·­ ²±¬ ¸¿®¼ ¬± ­»» ¸±© ¿²§ ©¿¬»® ¬¸¿¬ ·­¬¸«­ ¼·®»½¬»¼ ·²¬± ¿ ¬®»²½¸ ½¿² »¿­·´§ ¿ºº»½¬ ¬¸» º±«²¼¿¬·±²K­ ¿¾·´·¬§ ¬±­«°°±®¬ º±±¬·²¹­ ±® »ª»² ¹¿·² »²¬®§ ¬± ¬¸» ­«¾º´±±® ¿®»¿ò

Ù®±«²¼ ¼®¿·²¿¹»×² ¿´´ ­±·´­ ¬¸»®» ·­ ¬¸» ½¿°¿½·¬§ º±® ©¿¬»® ¬± ¬®¿ª»´ ±² ¬¸» ­«®º¿½» ¿²¼¾»´±© ·¬ò Í«®º¿½» ©¿¬»® º´±©­ ½¿² ¾» »­¬¿¾´·­¸»¼ ¾§ ·²­°»½¬·±² ¼«®·²¹¿²¼ ¿º¬»® ¸»¿ª§ ±® °®±´±²¹»¼ ®¿·²ò ׺ ²»½»­­¿®§ô ¿ ¹®¿¬»¼ ¼®¿·² ­§­¬»³½±²²»½¬»¼ ¬± ¬¸» ­¬±®³©¿¬»® ½±´´»½¬·±² ­§­¬»³ ·­ «­«¿´´§ ¿² »¿­§­±´«¬·±²ò

׬ ·­ô ¸±©»ª»®ô ­±³»¬·³»­ ²»½»­­¿®§ ©¸»² ¿¬¬»³°¬·²¹ ¬± °®»ª»²¬©¿¬»® ³·¹®¿¬·±² ¬¸¿¬ ¬»­¬·²¹ ¾» ½¿®®·»¼ ±«¬ ¬± »­¬¿¾´·­¸ ©¿¬»®¬¿¾´»¸»·¹¸¬ ¿²¼ ­«¾­±·´ ©¿¬»® º´±©­ò ̸·­ ­«¾¶»½¬ ·­ ®»º»®®»¼ ¬± ·² ÞÌÚ ï翲¼ ³¿§ °®±°»®´§ ¾» ®»¹¿®¼»¼ ¿­ ¿² ¿®»¿ º±® ¿² »¨°»®¬ ½±²­«´¬¿²¬ò

Ю±¬»½¬·±² ±º ¬¸» ¾«·´¼·²¹ °»®·³»¬»®×¬ ·­ »­­»²¬·¿´ ¬± ®»³»³¾»® ¬¸¿¬ ¬¸» ­±·´ ¬¸¿¬ ¿ºº»½¬­ º±±¬·²¹­ »¨¬»²¼­©»´´ ¾»§±²¼ ¬¸» ¿½¬«¿´ ¾«·´¼·²¹ ´·²»ò É¿¬»®·²¹ ±º ¹¿®¼»² °´¿²¬­ô­¸®«¾­ ¿²¼ ¬®»»­ ½¿«­»­ ­±³» ±º ¬¸» ³±­¬ ­»®·±«­ ©¿¬»® °®±¾´»³­ò

Ú±® ¬¸·­ ®»¿­±²ô °¿®¬·½«´¿®´§ ©¸»®» °®±¾´»³­ »¨·­¬ ±® ¿®» ´·µ»´§ ¬±±½½«®ô ·¬ ·­ ®»½±³³»²¼»¼ ¬¸¿¬ ¿² ¿°®±² ±º °¿ª·²¹ ¾» ·²­¬¿´´»¼¿®±«²¼ ¿­ ³«½¸ ±º ¬¸» ¾«·´¼·²¹ °»®·³»¬»® ¿­ ²»½»­­¿®§ò ̸·­ °¿ª·²¹

ÝÔßÍÍ×Ú×ÝßÌ×ÑÒ ÑÚ ÜßÓßÙÛ É×ÌØ ÎÛÚÛÎÛÒÝÛ ÌÑ ÉßÔÔÍ

Ü»­½®·°¬·±² ±º ¬§°·½¿´ ¼¿³¿¹» ¿²¼ ®»¯«·®»¼ ®»°¿·® ß°°®±¨·³¿¬» ½®¿½µ ©·¼¬¸ Ü¿³¿¹»´·³·¬ ø­»» Ò±¬» í÷ ½¿¬»¹±®§

Ø¿·®´·²» ½®¿½µ­ äðòï ³³ ð

Ú·²» ½®¿½µ­ ©¸·½¸ ¼± ²±¬ ²»»¼ ®»°¿·® äï ³³ ï

Ý®¿½µ­ ²±¬·½»¿¾´» ¾«¬ »¿­·´§ º·´´»¼ò ܱ±®­ ¿²¼ ©·²¼±©­ ­¬·½µ ­´·¹¸¬´§ äë ³³ î

Ý®¿½µ­ ½¿² ¾» ®»°¿·®»¼ ¿²¼ °±­­·¾´§ ¿ ­³¿´´ ¿³±«²¬ ±º ©¿´´ ©·´´ ²»»¼ ëPïë ³³ ø±® ¿ ²«³¾»® ±º ½®¿½µ­ í¬± ¾» ®»°´¿½»¼ò ܱ±®­ ¿²¼ ©·²¼±©­ ­¬·½µò Í»®ª·½» °·°»­ ½¿² º®¿½¬«®»ò í ³³ ±® ³±®» ·² ±²» ¹®±«°÷É»¿¬¸»®¬·¹¸¬²»­­ ±º¬»² ·³°¿·®»¼

Û¨¬»²­·ª» ®»°¿·® ©±®µ ·²ª±´ª·²¹ ¾®»¿µ·²¹ó±«¬ ¿²¼ ®»°´¿½·²¹ ­»½¬·±²­ ±º ©¿´´­ô ïëPîë ³³ ¾«¬ ¿´­± ¼»°»²¼ ì»­°»½·¿´´§ ±ª»® ¼±±®­ ¿²¼ ©·²¼±©­ò É·²¼±© ¿²¼ ¼±±® º®¿³»­ ¼·­¬±®¬ò É¿´´­ ´»¿² ±² ²«³¾»® ±º ½®¿½µ­±® ¾«´¹» ²±¬·½»¿¾´§ô ­±³» ´±­­ ±º ¾»¿®·²¹ ·² ¾»¿³­ò Í»®ª·½» °·°»­ ¼·­®«°¬»¼

Page 35: SITE CLASSIFICATION REPORT SUMMARY...Douglas Partners (DP) has prepared this report for this project at Taylor 2- Stage 3, Taylor in accordance with DP’s proposal dated 15 September

­¸±«´¼ »¨¬»²¼ ±«¬©¿®¼­ ¿ ³·²·³«³ ±º çðð ³³ ø³±®» ·² ¸·¹¸´§®»¿½¬·ª» ­±·´÷ ¿²¼ ­¸±«´¼ ¸¿ª» ¿ ³·²·³«³ º¿´´ ¿©¿§ º®±³ ¬¸»¾«·´¼·²¹ ±º ïæêðò ̸» º·²·­¸»¼ °¿ª·²¹ ­¸±«´¼ ¾» ²± ´»­­ ¬¸¿² ïðð³³ ¾»´±© ¾®·½µ ª»²¬ ¾¿­»­ò

׬ ·­ °®«¼»²¬ ¬± ®»´±½¿¬» ¼®¿·²¿¹» °·°»­ ¿©¿§ º®±³ ¬¸·­ °¿ª·²¹ô ·º°±­­·¾´»ô ¬± ¿ª±·¼ ½±³°´·½¿¬·±²­ º®±³ º«¬«®» ´»¿µ¿¹»ò ׺ ¬¸·­ ·­ ²±¬°®¿½¬·½¿´ô »¿®¬¸»²©¿®» °·°»­ ­¸±«´¼ ¾» ®»°´¿½»¼ ¾§ ÐÊÝ ¿²¼¾¿½µº·´´·²¹ ­¸±«´¼ ¾» ±º ¬¸» ­¿³» ­±·´ ¬§°» ¿­ ¬¸» ­«®®±«²¼·²¹ ­±·´¿²¼ ½±³°¿½¬»¼ ¬± ¬¸» ­¿³» ¼»²­·¬§ò

Û¨½»°¬ ·² ¿®»¿­ ©¸»®» º®»»¦·²¹ ±º ©¿¬»® ·­ ¿² ·­­«»ô ·¬ ·­ ©·­» ¬±®»³±ª» ¬¿°­ ·² ¬¸» ¾«·´¼·²¹ ¿®»¿ ¿²¼ ®»´±½¿¬» ¬¸»³ ©»´´ ¿©¿§ º®±³¬¸» ¾«·´¼·²¹ P °®»º»®¿¾´§ ²±¬ «°¸·´´ º®±³ ·¬ ø­»» ÞÌÚ ïç÷ò

׬ ³¿§ ¾» ¼»­·®¿¾´» ¬± ·²­¬¿´´ ¿ ¹®¿¬»¼ ¼®¿·² ¿¬ ¬¸» ±«¬­·¼» »¼¹» ±º ¬¸»°¿ª·²¹ ±² ¬¸» «°¸·´´ ­·¼» ±º ¬¸» ¾«·´¼·²¹ò ׺ ­«¾­±·´ ¼®¿·²¿¹» ·­²»»¼»¼ ¬¸·­ ½¿² ¾» ·²­¬¿´´»¼ «²¼»® ¬¸» ­«®º¿½» ¼®¿·²ò

ݱ²¼»²­¿¬·±²×² ¾«·´¼·²¹­ ©·¬¸ ¿ ­«¾º´±±® ª±·¼ ­«½¸ ¿­ ©¸»®» ¾»¿®»®­ ¿²¼ ¶±·­¬­­«°°±®¬ º´±±®·²¹ô ·²­«ºº·½·»²¬ ª»²¬·´¿¬·±² ½®»¿¬»­ ·¼»¿´ ½±²¼·¬·±²­ º±®½±²¼»²­¿¬·±²ô °¿®¬·½«´¿®´§ ©¸»®» ¬¸»®» ·­ ´·¬¬´» ½´»¿®¿²½» ¾»¬©»»² ¬¸»º´±±® ¿²¼ ¬¸» ¹®±«²¼ò ݱ²¼»²­¿¬·±² ¿¼¼­ ¬± ¬¸» ³±·­¬«®» ¿´®»¿¼§°®»­»²¬ ·² ¬¸» ­«¾º´±±® ¿²¼ ­·¹²·º·½¿²¬´§ ­´±©­ ¬¸» °®±½»­­ ±º ¼®§·²¹±«¬ò ײ­¬¿´´¿¬·±² ±º ¿² ¿¼»¯«¿¬» ­«¾º´±±® ª»²¬·´¿¬·±² ­§­¬»³ô »·¬¸»®²¿¬«®¿´ ±® ³»½¸¿²·½¿´ô ·­ ¼»­·®¿¾´»ò

É¿®²·²¹æ ß´¬¸±«¹¸ ¬¸·­ Þ«·´¼·²¹ Ì»½¸²±´±¹§ Ú·´» ¼»¿´­ ©·¬¸½®¿½µ·²¹ ·² ¾«·´¼·²¹­ô ·¬ ­¸±«´¼ ¾» ­¿·¼ ¬¸¿¬ ­«¾º´±±® ³±·­¬«®» ½¿²®»­«´¬ ·² ¬¸» ¼»ª»´±°³»²¬ ±º ±¬¸»® °®±¾´»³­ô ²±¬¿¾´§æ

{ É¿¬»® ¬¸¿¬ ·­ ¬®¿²­³·¬¬»¼ ·²¬± ³¿­±²®§ô ³»¬¿´ ±® ¬·³¾»® ¾«·´¼·²¹»´»³»²¬­ ½¿«­»­ ¼¿³¿¹» ¿²¼ñ±® ¼»½¿§ ¬± ¬¸±­» »´»³»²¬­ò

{ Ø·¹¸ ­«¾º´±±® ¸«³·¼·¬§ ¿²¼ ³±·­¬«®» ½±²¬»²¬ ½®»¿¬» ¿² ·¼»¿´»²ª·®±²³»²¬ º±® ª¿®·±«­ °»­¬­ô ·²½´«¼·²¹ ¬»®³·¬»­ ¿²¼ ­°·¼»®­ò

{ ɸ»®» ¸·¹¸ ³±·­¬«®» ´»ª»´­ ¿®» ¬®¿²­³·¬¬»¼ ¬± ¬¸» º´±±®·²¹ ¿²¼©¿´´­ô ¿² ·²½®»¿­» ·² ¬¸» ¼«­¬ ³·¬» ½±«²¬ ½¿² »²­«» ©·¬¸·² ¬¸»´·ª·²¹ ¿®»¿­ò Ü«­¬ ³·¬»­ô ¿­ ©»´´ ¿­ ¼¿³°²»­­ ·² ¹»²»®¿´ô ½¿² ¾» ¿¸»¿´¬¸ ¸¿¦¿®¼ ¬± ·²¸¿¾·¬¿²¬­ô °¿®¬·½«´¿®´§ ¬¸±­» ©¸± ¿®»¿¾²±®³¿´´§ ­«­½»°¬·¾´» ¬± ®»­°·®¿¬±®§ ¿·´³»²¬­ò

̸» ¹¿®¼»²Ì¸» ·¼»¿´ ª»¹»¬¿¬·±² ´¿§±«¬ ·­ ¬± ¸¿ª» ´¿©² ±® °´¿²¬­ ¬¸¿¬ ®»¯«·®»±²´§ ´·¹¸¬ ©¿¬»®·²¹ ·³³»¼·¿¬»´§ ¿¼¶¿½»²¬ ¬± ¬¸» ¼®¿·²¿¹» ±® °¿ª·²¹»¼¹»ô ¬¸»² ³±®» ¼»³¿²¼·²¹ °´¿²¬­ô ­¸®«¾­ ¿²¼ ¬®»»­ ­°®»¿¼ ±«¬ ·²¬¸¿¬ ±®¼»®ò

Ѫ»®©¿¬»®·²¹ ¼«» ¬± ³·­«­» ±º ¿«¬±³¿¬·½ ©¿¬»®·²¹ ­§­¬»³­ ·­ ¿½±³³±² ½¿«­» ±º ­¿¬«®¿¬·±² ¿²¼ ©¿¬»® ³·¹®¿¬·±² «²¼»® º±±¬·²¹­ò ׺·¬ ·­ ²»½»­­¿®§ ¬± «­» ¬¸»­» ­§­¬»³­ô ·¬ ·­ ·³°±®¬¿²¬ ¬± ®»³±ª» ¹¿®¼»²¾»¼­ ¬± ¿ ½±³°´»¬»´§ ­¿º» ¼·­¬¿²½» º®±³ ¾«·´¼·²¹­ò

Û¨·­¬·²¹ ¬®»»­É¸»®» ¿ ¬®»» ·­ ½¿«­·²¹ ¿ °®±¾´»³ ±º ­±·´ ¼®§·²¹ ±® ¬¸»®» ·­ ¬¸»»¨·­¬»²½» ±® ¬¸®»¿¬ ±º «°¸»¿ª¿´ ±º º±±¬·²¹­ô ·º ¬¸» ±ºº»²¼·²¹ ®±±¬­ ¿®»­«¾­·¼·¿®§ ¿²¼ ¬¸»·® ®»³±ª¿´ ©·´´ ²±¬ ­·¹²·º·½¿²¬´§ ¼¿³¿¹» ¬¸» ¬®»»ô¬¸»§ ­¸±«´¼ ¾» ­»ª»®»¼ ¿²¼ ¿ ½±²½®»¬» ±® ³»¬¿´ ¾¿®®·»® °´¿½»¼ª»®¬·½¿´´§ ·² ¬¸» ­±·´ ¬± °®»ª»²¬ º«¬«®» ®±±¬ ¹®±©¬¸ ·² ¬¸» ¼·®»½¬·±² ±º¬¸» ¾«·´¼·²¹ò ׺ ·¬ ·­ ²±¬ °±­­·¾´» ¬± ®»³±ª» ¬¸» ®»´»ª¿²¬ ®±±¬­©·¬¸±«¬ ¼¿³¿¹» ¬± ¬¸» ¬®»»ô ¿² ¿°°´·½¿¬·±² ¬± ®»³±ª» ¬¸» ¬®»» ­¸±«´¼¾» ³¿¼» ¬± ¬¸» ´±½¿´ ¿«¬¸±®·¬§ò ß °®«¼»²¬ °´¿² ·­ ¬± ¬®¿²­°´¿²¬ ´·µ»´§±ºº»²¼»®­ ¾»º±®» ¬¸»§ ¾»½±³» ¿ °®±¾´»³ò

ײº±®³¿¬·±² ±² ¬®»»­ô °´¿²¬­ ¿²¼ ­¸®«¾­Í¬¿¬» ¼»°¿®¬³»²¬­ ±ª»®­»»·²¹ ¿¹®·½«´¬«®» ½¿² ¹·ª» ·²º±®³¿¬·±²®»¹¿®¼·²¹ ®±±¬ °¿¬¬»®²­ô ª±´«³» ±º ©¿¬»® ²»»¼»¼ ¿²¼ ­¿º» ¼·­¬¿²½»º®±³ ¾«·´¼·²¹­ ±º ³±­¬ ­°»½·»­ò Þ±¬¿²·½ ¹¿®¼»²­ ¿®» ¿´­± ­±«®½»­ ±º·²º±®³¿¬·±²ò Ú±® ·²º±®³¿¬·±² ±² °´¿²¬ ®±±¬­ ¿²¼ ¼®¿·²­ô ­»» Þ«·´¼·²¹Ì»½¸²±´±¹§ Ú·´» ïéò

Û¨½¿ª¿¬·±²Û¨½¿ª¿¬·±² ¿®±«²¼ º±±¬·²¹­ ³«­¬ ¾» °®±°»®´§ »²¹·²»»®»¼ò ͱ·´­«°°±®¬·²¹ º±±¬·²¹­ ½¿² ±²´§ ¾» ­¿º»´§ »¨½¿ª¿¬»¼ ¿¬ ¿² ¿²¹´» ¬¸¿¬¿´´±©­ ¬¸» ­±·´ «²¼»® ¬¸» º±±¬·²¹ ¬± ®»³¿·² ­¬¿¾´»ò ̸·­ ¿²¹´» ·­½¿´´»¼ ¬¸» ¿²¹´» ±º ®»°±­» ø±® º®·½¬·±²÷ ¿²¼ ª¿®·»­ ­·¹²·º·½¿²¬´§¾»¬©»»² ­±·´ ¬§°»­ ¿²¼ ½±²¼·¬·±²­ò λ³±ª¿´ ±º ­±·´ ©·¬¸·² ¬¸» ¿²¹´»±º ®»°±­» ©·´´ ½¿«­» ­«¾­·¼»²½»ò

λ³»¼·¿¬·±²

ɸ»®» »®±­·±² ¸¿­ ±½½«®®»¼ ¬¸¿¬ ¸¿­ ©¿­¸»¼ ¿©¿§ ­±·´ ¿¼¶¿½»²¬ ¬±º±±¬·²¹­ô ­±·´ ±º ¬¸» ­¿³» ½´¿­­·º·½¿¬·±² ­¸±«´¼ ¾» ·²¬®±¼«½»¼ ¿²¼½±³°¿½¬»¼ ¬± ¬¸» ­¿³» ¼»²­·¬§ò ɸ»®» º±±¬·²¹­ ¸¿ª» ¾»»²«²¼»®³·²»¼ô ¿«¹³»²¬¿¬·±² ±® ±¬¸»® ­°»½·¿´·­¬ ©±®µ ³¿§ ¾» ®»¯«·®»¼òλ³»¼·¿¬·±² ±º º±±¬·²¹­ ¿²¼ º±«²¼¿¬·±²­ ·­ ¹»²»®¿´´§ ¬¸» ®»¿´³ ±º ¿­°»½·¿´·­¬ ½±²­«´¬¿²¬ò

ɸ»®» ·­±´¿¬»¼ º±±¬·²¹­ ®·­» ¿²¼ º¿´´ ¾»½¿«­» ±º ­©»´´ñ­¸®·²µ »ºº»½¬ô¬¸» ¸±³»±©²»® ³¿§ ¾» ¬»³°¬»¼ ¬± ¿´´»ª·¿¬» º´±±® ¾±«²½» ¾§ º·´´·²¹¬¸» ¹¿° ¬¸¿¬ ¸¿­ ¿°°»¿®»¼ ¾»¬©»»² ¬¸» ¾»¿®»® ¿²¼ ¬¸» °·»® ©·¬¸¾´±½µ·²¹ò ̸» ¼¿²¹»® ¸»®» ·­ ¬¸¿¬ ©¸»² ¬¸» ²»¨¬ ­©»´´ ­»¹³»²¬ ±º ¬¸»½§½´» ±½½«®­ô ¬¸» »¨¬®¿ ¾´±½µ·²¹ ©·´´ °«­¸ ¬¸» º´±±® «° ·²¬± ¿²¿½½»²¬«¿¬»¼ ¼±³» ¿²¼ ³¿§ ¿´­± ½¿«­» ´±½¿´ ­¸»¿® º¿·´«®» ·² ¬¸» ­±·´ò׺ ·¬ ·­ ²»½»­­¿®§ ¬± «­» ¾´±½µ·²¹ô ·¬ ­¸±«´¼ ¾» ¾§ ¿ °¿·® ±º º·²»©»¼¹»­ ¿²¼ ³±²·¬±®·²¹ ­¸±«´¼ ¾» ½¿®®·»¼ ±«¬ º±®¬²·¹¸¬´§ò

̸·­ ÞÌÚ ©¿­ °®»°¿®»¼ ¾§ Ö±¸² Ô»©»® Úß×Þô Ó×ßÓßô ﮬ²»®ô

ݱ²­¬®«½¬·±² Ü·¿¹²±­·­ò

̸» ·²º±®³¿¬·±² ·² ¬¸·­ ¿²¼ ±¬¸»® ·­­«»­ ·² ¬¸» ­»®·»­ ©¿­ ¼»®·ª»¼ º®±³ ª¿®·±«­ ­±«®½»­ ¿²¼ ©¿­ ¾»´·»ª»¼ ¬± ¾» ½±®®»½¬ ©¸»² °«¾´·­¸»¼ò

̸» ·²º±®³¿¬·±² ·­ ¿¼ª·­±®§ò ׬ ·­ °®±ª·¼»¼ ·² ¹±±¼ º¿·¬¸ ¿²¼ ²±¬ ½´¿·³»¼ ¬± ¾» ¿² »¨¸¿«­¬·ª» ¬®»¿¬³»²¬ ±º ¬¸» ®»´»ª¿²¬ ­«¾¶»½¬ò

Ú«®¬¸»® °®±º»­­·±²¿´ ¿¼ª·½» ²»»¼­ ¬± ¾» ±¾¬¿·²»¼ ¾»º±®» ¬¿µ·²¹ ¿²§ ¿½¬·±² ¾¿­»¼ ±² ¬¸» ·²º±®³¿¬·±² °®±ª·¼»¼ò

Ü·­¬®·¾«¬»¼ ¾§

ÝÍ×ÎÑ ÐËÞÔ ×ÍØ ×ÒÙ ÐÑ Þ±¨ ïïíçô ݱ´´·²¹©±±¼ íðêêô ß«­¬®¿´·¿

Ú®»»½¿´´ ïèðð êìë ðëï Ì»´ øðí÷ çêêî éêêê Ú¿¨ øðí÷ çêêî éëëë ©©©ò°«¾´·­¸ò½­·®±ò¿«

Û³¿·´æ °«¾´·­¸·²¹ò­¿´»­à½­·®±ò¿«

w ÝÍ×ÎÑ îððíò ˲¿«¬¸±®·­»¼ ½±°§·²¹ ±º ¬¸·­ Þ«·´¼·²¹ Ì»½¸²±´±¹§ º·´» ·­ °®±¸·¾·¬»¼

Ù¿®¼»²­ º±® ¿ ®»¿½¬·ª» ­·¬»

Page 36: SITE CLASSIFICATION REPORT SUMMARY...Douglas Partners (DP) has prepared this report for this project at Taylor 2- Stage 3, Taylor in accordance with DP’s proposal dated 15 September

TOPSOIL FILLING-dry to moist, brown silty sand

FILLING-generally comprising well compacted, dry tomoist, orange brown, medium plasticity silty sandy claywith some gravel

Pit discontinued at 1.5m-limit of investigation

0.15

1.5

SAMPLING & IN SITU TESTING LEGEND

TEST PIT LOG

Taylor 2 Estate, Stage 3, Taylor

A Auger sample G Gas sample PID Photo ionisation detector (ppm)B Bulk sample P Piston sample PL(A) Point load axial test Is(50) (MPa)BLK Block sample Ux Tube sample (x mm dia.) PL(D) Point load diametral test Is(50) (MPa)C Core drilling W Water sample pp Pocket penetrometer (kPa)D Disturbed sample Water seep S Standard penetration testE Environmental sample Water level V Shear vane (kPa)

Indesco Consulting Engineers Pty LtdSite Classifications

Results &Comments

LOGGED: JPM SURVEY DATUM: MGA94

CLIENT:PROJECT:LOCATION:

PIT No: 58PROJECT No: 77418.29DATE: 11/1/2019SHEET 1 OF 1

Sampling & In Situ Testing

1

2

Wat

er

Dep

th

Sam

ple

Description

of

Strata Gra

phic

Log

Typ

e

REMARKS: Surface Levels & Coordinates are approximate only and must not be relied upon

RIG: Kubota KX057-4 mini-excavator with 300mm wide bucket

WATER OBSERVATIONS: No free groundwater observed

SURFACE LEVEL: 668.0 AHDEASTING: 209093NORTHING: 618793

Dynamic Penetrometer Test(blows per mm)

5 10 15 20

Cone Penetrometer AS1289.6.3.2Sand Penetrometer AS1289.6.3.3

Depth(m) R

L

1

2

668

667

666

D 1.2

Page 37: SITE CLASSIFICATION REPORT SUMMARY...Douglas Partners (DP) has prepared this report for this project at Taylor 2- Stage 3, Taylor in accordance with DP’s proposal dated 15 September

TOPSOIL FILLING-dry to moist, brown silty sand

FILLING-generally comprising well compacted, dry tomoist, yellow brown grey, medium plasticity silty sandyclay with some gravel and high plasticity portions between1.0m and 1.2m

Pit discontinued at 1.7m-limit of investigation

0.15

1.7

SAMPLING & IN SITU TESTING LEGEND

TEST PIT LOG

Taylor 2 Estate, Stage 3, Taylor

A Auger sample G Gas sample PID Photo ionisation detector (ppm)B Bulk sample P Piston sample PL(A) Point load axial test Is(50) (MPa)BLK Block sample Ux Tube sample (x mm dia.) PL(D) Point load diametral test Is(50) (MPa)C Core drilling W Water sample pp Pocket penetrometer (kPa)D Disturbed sample Water seep S Standard penetration testE Environmental sample Water level V Shear vane (kPa)

Indesco Consulting Engineers Pty LtdSite Classifications

Results &Comments

LOGGED: JPM SURVEY DATUM: MGA94

CLIENT:PROJECT:LOCATION:

PIT No: 59PROJECT No: 77418.29DATE: 11/1/2019SHEET 1 OF 1

Sampling & In Situ Testing

1

2

Wat

er

Dep

th

Sam

ple

Description

of

Strata Gra

phic

Log

Typ

e

REMARKS: Surface Levels & Coordinates are approximate only and must not be relied upon

RIG: Kubota KX057-4 mini-excavator with 300mm wide bucket

WATER OBSERVATIONS: No free groundwater observed

SURFACE LEVEL: 667.0 AHDEASTING: 209076NORTHING: 618774

Dynamic Penetrometer Test(blows per mm)

5 10 15 20

Cone Penetrometer AS1289.6.3.2Sand Penetrometer AS1289.6.3.3

Depth(m) R

L

1

2

667

666

665

D

D

0.5

1.1 pp >400

Page 38: SITE CLASSIFICATION REPORT SUMMARY...Douglas Partners (DP) has prepared this report for this project at Taylor 2- Stage 3, Taylor in accordance with DP’s proposal dated 15 September
Page 39: SITE CLASSIFICATION REPORT SUMMARY...Douglas Partners (DP) has prepared this report for this project at Taylor 2- Stage 3, Taylor in accordance with DP’s proposal dated 15 September

SITE CLASSIFICATION REPORT SUMMARY

BLOCK: 3 SECTION: 64 SUBURB: Taylor

JOB No: 77418.29 DATE: March 2019

CLIENT: Indesco Consulting Engineers Pty Ltd

Classification Procedures: Existing Subsurface Conditions: Refer attached test pit log(s) – Pit(s) 57,58 and Drawing 1. Bulk Earthworks: Filling within the block placed under Level 1 control as defined in AS 3798 – 2007 (Ref 1). Laboratory Results: Previous laboratory testing results indicated liquid limit ranging from 25-66%, plasticity index ranging from 6-49% and linear shrinkage ranging from 3-20.5%.

Site Classification: Class M* (moderately reactive/filled) based on the current profile / state on limited subsurface information and determined in general accordance with the requirements of AS2870-2011 (Ref 2). The classification must be reassessed should the soil profile change either by adding fill or removing soil from the block and/or if the presence of service trenches or retaining walls are within the zone of influence of the block. Reference should be made to the comments provided below.

Footing Systems: Reference must be made to AS2870-2011 (Ref 2) which indicates footing systems that are appropriate for each site classification. All footings must found within a uniform bearing stratum of suitable strength/material, below the zone of influence of any service trenches, backfill zones, retaining walls or underground structures. Masonry walls should be articulated in accordance with current best practice. Dwelling design must ensure uniform moisture conditions are maintained in the vicinity of footings. Footing systems must be confirmed by a structural engineer taking into consideration any onsite or offsite constraints.

Maintenance Guidelines: Reference should be made to the attached CSIRO Sheet BTF 18 ‘Foundation Maintenance & Footing Performance’ to comments about gardens, landscaping and trees on the performance of foundation soils and in particular in respect to maintaining good surface drainage. It notes that minor cracking in most structures is inevitable, and it describes site maintenance practices aimed at minimising foundation movements that can lead to cracking damage.

Comments/ Limitations:

The successful purchaser must make their own interpretations, deductions and conclusions from the information made available and will need to accept full responsibility for such interpretations, deductions and conclusions.

Development specific geotechnical investigations must be undertaken.

Additional topsoils / filling may have been spread subsequent to the investigation.

Site preparation prior to the construction should include removal of all vegetation, topsoil and any uncontrolled filling.

All new filling must be placed under controlled conditions (AS 3798-2007), otherwise Class P conditions would be warranted.

Some variability in subsurface conditions must be anticipated.

Moisture condition of site soils and/or the presence of groundwater may vary considerably from time of investigation compared to at the time of construction.

Depending on the depth of site cut and trenches, rock excavation may be required.

It is recommended that footing excavations be inspected by a geotechnical engineer.

This report must be read in conjunction with the attached “Limitations” and notes “About this Report”.

References:

1.

2.

AS 3798-2007 ‘Guidelines on Earthworks for Commercial and Residential Developments’, Standards Association of Australia.

AS 2870-2011 ‘Residential Slabs and Footings,’ Standards Association of Australia.

Attachments:

Limitations & About this Report Explanatory Notes Test Pit Log(s) Pit(s) 57,58 Drawing 1

Page 40: SITE CLASSIFICATION REPORT SUMMARY...Douglas Partners (DP) has prepared this report for this project at Taylor 2- Stage 3, Taylor in accordance with DP’s proposal dated 15 September

FS 604853

Douglas Partners Pty Ltd ABN 75 053 980 117

www.douglaspartners.com.au Unit 2, 73 Sheppard Street

Hume ACT 2620 PO Box 1487

Fyshwick ACT 2609 Phone (02) 6260 2788

Fax (02) 6260 1147

Brisbane • Cairns • Canberra • Central Coast • Coffs Harbour • Darwin • Geelong • Gold Coast • Macarthur • Melbourne Newcastle • North West Sydney • Perth • Port Macquarie • Sunshine Coast • Sydney • Townsville • Wollongong

Limitations Douglas Partners (DP) has prepared this report for this project at Taylor 2 - Stage 3, Taylor in accordance with DP’s proposal dated 15 September 2017 and acceptance received from Indesco Consulting Engineers Pty Ltd dated 13 March 2019. The work was carried out under DP’s Conditions of Engagement. This report is provided for the exclusive use of Indesco Consulting Engineers Pty Ltd for this project only and for the purposes as described in the report. It should not be used by or relied upon for other projects or purposes on the same or other site or by a third party. Any party so relying upon this report beyond its exclusive use and purpose as stated above, and without the express written consent of DP, does so entirely at its own risk and without recourse to DP for any loss or damage. In preparing this report DP has necessarily relied upon information provided by the client and/or their agents. The results provided in the report are indicative of the sub-surface conditions on the site only at the specific sampling and/or testing locations, and then only to the depths investigated and at the time the work was carried out. Sub-surface conditions can change abruptly due to variable geological processes and also as a result of human influences. Such changes may occur after DP’s field testing has been completed. DP’s advice is based upon the conditions encountered during this investigation. The accuracy of the advice provided by DP in this report may be affected by undetected variations in ground conditions across the site between and beyond the sampling and/or testing locations. The advice may also be limited by budget constraints imposed by others or by site accessibility. This report must be read in conjunction with all of the attached and should be kept in its entirety without separation of individual pages or sections. DP cannot be held responsible for interpretations or conclusions made by others unless they are supported by an expressed statement, interpretation, outcome or conclusion stated in this report. This report, or sections from this report, should not be used as part of a specification for a project, without review and agreement by DP. This is because this report has been written as advice and opinion rather than instructions for construction. The scope for work for this investigation/report did not include the assessment of surface or sub-surface materials or groundwater for contaminants, within or adjacent to the site. Should evidence of filling of unknown origin be noted in the report, and in particular the presence of building demolition materials, it should be recognised that there may be some risk that such filling may contain contaminants and hazardous building materials. The contents of this report do not constitute formal design components such as are required, by the Health and Safety Legislation and Regulations, to be included in a Safety Report specifying the hazards likely to be encountered during construction and the controls required to mitigate risk. This design process requires risk assessment to be undertaken, with such assessment being dependent upon factors relating to likelihood of occurrence and consequences of damage to property and to life. This, in turn, requires project data and analysis presently beyond the knowledge and project role respectively of DP. DP may be able, however, to assist the client in carrying out a risk assessment of potential hazards contained in the Comments section of this report, as an extension to the current scope of works, if so requested, and provided that suitable additional information is made available to DP. Any such risk assessment would, however, be necessarily restricted to the geotechnical components set out in this report and to their application by the project designers to project design, construction, maintenance and demolition.

Page 41: SITE CLASSIFICATION REPORT SUMMARY...Douglas Partners (DP) has prepared this report for this project at Taylor 2- Stage 3, Taylor in accordance with DP’s proposal dated 15 September

July 2010

Introduction These notes have been provided to amplify DP's report in regard to classification methods, field procedures and the comments section. Not all are necessarily relevant to all reports. DP's reports are based on information gained from limited subsurface excavations and sampling, supplemented by knowledge of local geology and experience. For this reason, they must be regarded as interpretive rather than factual documents, limited to some extent by the scope of information on which they rely. Copyright This report is the property of Douglas Partners Pty Ltd. The report may only be used for the purpose for which it was commissioned and in accordance with the Conditions of Engagement for the commission supplied at the time of proposal. Unauthorised use of this report in any form whatsoever is prohibited. Borehole and Test Pit Logs The borehole and test pit logs presented in this report are an engineering and/or geological interpretation of the subsurface conditions, and their reliability will depend to some extent on frequency of sampling and the method of drilling or excavation. Ideally, continuous undisturbed sampling or core drilling will provide the most reliable assessment, but this is not always practicable or possible to justify on economic grounds. In any case the boreholes and test pits represent only a very small sample of the total subsurface profile. Interpretation of the information and its application to design and construction should therefore take into account the spacing of boreholes or pits, the frequency of sampling, and the possibility of other than 'straight line' variations between the test locations. Groundwater Where groundwater levels are measured in boreholes there are several potential problems, namely: • In low permeability soils groundwater may

enter the hole very slowly or perhaps not at all during the time the hole is left open;

• A localised, perched water table may lead to an erroneous indication of the true water table;

• Water table levels will vary from time to time with seasons or recent weather changes. They may not be the same at the time of construction as are indicated in the report; and

• The use of water or mud as a drilling fluid will mask any groundwater inflow. Water has to be blown out of the hole and drilling mud must first be washed out of the hole if water measurements are to be made.

More reliable measurements can be made by installing standpipes which are read at intervals over several days, or perhaps weeks for low permeability soils. Piezometers, sealed in a particular stratum, may be advisable in low permeability soils or where there may be interference from a perched water table. Reports The report has been prepared by qualified personnel, is based on the information obtained from field and laboratory testing, and has been undertaken to current engineering standards of interpretation and analysis. Where the report has been prepared for a specific design proposal, the information and interpretation may not be relevant if the design proposal is changed. If this happens, DP will be pleased to review the report and the sufficiency of the investigation work. Every care is taken with the report as it relates to interpretation of subsurface conditions, discussion of geotechnical and environmental aspects, and recommendations or suggestions for design and construction. However, DP cannot always anticipate or assume responsibility for: • Unexpected variations in ground conditions.

The potential for this will depend partly on borehole or pit spacing and sampling frequency;

• Changes in policy or interpretations of policy by statutory authorities; or

• The actions of contractors responding to commercial pressures.

If these occur, DP will be pleased to assist with investigations or advice to resolve the matter.

Page 42: SITE CLASSIFICATION REPORT SUMMARY...Douglas Partners (DP) has prepared this report for this project at Taylor 2- Stage 3, Taylor in accordance with DP’s proposal dated 15 September

July 2010

Site Anomalies In the event that conditions encountered on site during construction appear to vary from those which were expected from the information contained in the report, DP requests that it be immediately notified. Most problems are much more readily resolved when conditions are exposed rather than at some later stage, well after the event. Information for Contractual Purposes Where information obtained from this report is provided for tendering purposes, it is recommended that all information, including the written report and discussion, be made available. In circumstances where the discussion or comments section is not relevant to the contractual situation, it may be appropriate to prepare a specially edited document. DP would be pleased to assist in this regard and/or to make additional report copies available for contract purposes at a nominal charge. Site Inspection The company will always be pleased to provide engineering inspection services for geotechnical and environmental aspects of work to which this report is related. This could range from a site visit to confirm that conditions exposed are as expected, to full time engineering presence on site.

Page 43: SITE CLASSIFICATION REPORT SUMMARY...Douglas Partners (DP) has prepared this report for this project at Taylor 2- Stage 3, Taylor in accordance with DP’s proposal dated 15 September

July 2010

Sampling Sampling is carried out during drilling or test pitting to allow engineering examination (and laboratory testing where required) of the soil or rock. Disturbed samples taken during drilling provide information on colour, type, inclusions and, depending upon the degree of disturbance, some information on strength and structure. Undisturbed samples are taken by pushing a thin-walled sample tube into the soil and withdrawing it to obtain a sample of the soil in a relatively undisturbed state. Such samples yield information on structure and strength, and are necessary for laboratory determination of shear strength and compressibility. Undisturbed sampling is generally effective only in cohesive soils. Test Pits Test pits are usually excavated with a backhoe or an excavator, allowing close examination of the in-situ soil if it is safe to enter into the pit. The depth of excavation is limited to about 3 m for a backhoe and up to 6 m for a large excavator. A potential disadvantage of this investigation method is the larger area of disturbance to the site. Large Diameter Augers Boreholes can be drilled using a rotating plate or short spiral auger, generally 300 mm or larger in diameter commonly mounted on a standard piling rig. The cuttings are returned to the surface at intervals (generally not more than 0.5 m) and are disturbed but usually unchanged in moisture content. Identification of soil strata is generally much more reliable than with continuous spiral flight augers, and is usually supplemented by occasional undisturbed tube samples. Continuous Spiral Flight Augers The borehole is advanced using 90-115 mm diameter continuous spiral flight augers which are withdrawn at intervals to allow sampling or in-situ testing. This is a relatively economical means of drilling in clays and sands above the water table. Samples are returned to the surface, or may be collected after withdrawal of the auger flights, but they are disturbed and may be mixed with soils from the sides of the hole. Information from the drilling (as distinct from specific sampling by SPTs or undisturbed samples) is of relatively low

reliability, due to the remoulding, possible mixing or softening of samples by groundwater. Non-core Rotary Drilling The borehole is advanced using a rotary bit, with water or drilling mud being pumped down the drill rods and returned up the annulus, carrying the drill cuttings. Only major changes in stratification can be determined from the cuttings, together with some information from the rate of penetration. Where drilling mud is used this can mask the cuttings and reliable identification is only possible from separate sampling such as SPTs. Continuous Core Drilling A continuous core sample can be obtained using a diamond tipped core barrel, usually with a 50 mm internal diameter. Provided full core recovery is achieved (which is not always possible in weak rocks and granular soils), this technique provides a very reliable method of investigation. Standard Penetration Tests Standard penetration tests (SPT) are used as a means of estimating the density or strength of soils and also of obtaining a relatively undisturbed sample. The test procedure is described in Australian Standard 1289, Methods of Testing Soils for Engineering Purposes - Test 6.3.1. The test is carried out in a borehole by driving a 50 mm diameter split sample tube under the impact of a 63 kg hammer with a free fall of 760 mm. It is normal for the tube to be driven in three successive 150 mm increments and the 'N' value is taken as the number of blows for the last 300 mm. In dense sands, very hard clays or weak rock, the full 450 mm penetration may not be practicable and the test is discontinued. The test results are reported in the following form. • In the case where full penetration is obtained

with successive blow counts for each 150 mm of, say, 4, 6 and 7 as:

4,6,7 N=13

• In the case where the test is discontinued before the full penetration depth, say after 15 blows for the first 150 mm and 30 blows for the next 40 mm as:

15, 30/40 mm

Page 44: SITE CLASSIFICATION REPORT SUMMARY...Douglas Partners (DP) has prepared this report for this project at Taylor 2- Stage 3, Taylor in accordance with DP’s proposal dated 15 September

July 2010

The results of the SPT tests can be related empirically to the engineering properties of the soils. Dynamic Cone Penetrometer Tests / Perth Sand Penetrometer Tests Dynamic penetrometer tests (DCP or PSP) are carried out by driving a steel rod into the ground using a standard weight of hammer falling a specified distance. As the rod penetrates the soil the number of blows required to penetrate each successive 150 mm depth are recorded. Normally there is a depth limitation of 1.2 m, but this may be extended in certain conditions by the use of extension rods. Two types of penetrometer are commonly used. • Perth sand penetrometer - a 16 mm diameter

flat ended rod is driven using a 9 kg hammer dropping 600 mm (AS 1289, Test 6.3.3). This test was developed for testing the density of sands and is mainly used in granular soils and filling.

• Cone penetrometer - a 16 mm diameter rod with a 20 mm diameter cone end is driven using a 9 kg hammer dropping 510 mm (AS 1289, Test 6.3.2). This test was developed initially for pavement subgrade investigations, and correlations of the test results with California Bearing Ratio have been published by various road authorities.

Page 45: SITE CLASSIFICATION REPORT SUMMARY...Douglas Partners (DP) has prepared this report for this project at Taylor 2- Stage 3, Taylor in accordance with DP’s proposal dated 15 September

May 2017

Description and Classification Methods The methods of description and classification of

soils and rocks used in this report are based on

Australian Standard AS 1726-1993, Geotechnical

Site Investigations Code. In general, the

descriptions include strength or density, colour,

structure, soil or rock type and inclusions.

Soil Types Soil types are described according to the

predominant particle size, qualified by the grading

of other particles present:

Type Particle size (mm)

Boulder >200

Cobble 63 - 200

Gravel 2.36 - 63

Sand 0.075 - 2.36

Silt 0.002 - 0.075

Clay <0.002

The sand and gravel sizes can be further

subdivided as follows:

Type Particle size (mm)

Coarse gravel 20 - 63

Medium gravel 6 - 20

Fine gravel 2.36 - 6

Coarse sand 0.6 - 2.36

Medium sand 0.2 - 0.6

Fine sand 0.075 - 0.2

The proportions of secondary constituents of soils

are described as:

Term Proportion Example

And Specify Clay (60%) and

Sand (40%)

Adjective 20 - 35% Sandy Clay

Slightly 12 - 20% Slightly Sandy

Clay

With some 5 - 12% Clay with some

sand

With a trace of 0 - 5% Clay with a trace

of sand

Definitions of grading terms used are:

• Well graded - a good representation of all

particle sizes

• Poorly graded - an excess or deficiency of

particular sizes within the specified range

• Uniformly graded - an excess of a particular

particle size

• Gap graded - a deficiency of a particular

particle size with the range

Cohesive Soils Cohesive soils, such as clays, are classified on the

basis of undrained shear strength. The strength

may be measured by laboratory testing, or

estimated by field tests or engineering

examination. The strength terms are defined as

follows:

Description Abbreviation Undrained shear strength

(kPa)

Very soft vs <12

Soft s 12 - 25

Firm f 25 - 50

Stiff st 50 - 100

Very stiff vst 100 - 200

Hard h >200

Cohesionless Soils Cohesionless soils, such as clean sands, are

classified on the basis of relative density, generally

from the results of standard penetration tests

(SPT), cone penetration tests (CPT) or dynamic

penetrometers (PSP). The relative density terms

are given below:

Relative Density

Abbreviation SPT N value

CPT qc value (MPa)

Very loose vl <4 <2

Loose l 4 - 10 2 -5

Medium

dense

md 10 - 30 5 - 15

Dense d 30 - 50 15 - 25

Very

dense

vd >50 >25

Page 46: SITE CLASSIFICATION REPORT SUMMARY...Douglas Partners (DP) has prepared this report for this project at Taylor 2- Stage 3, Taylor in accordance with DP’s proposal dated 15 September

May 2017

Soil Origin It is often difficult to accurately determine the origin

of a soil. Soils can generally be classified as:

• Residual soil - derived from in-situ weathering

of the underlying rock;

• Transported soils - formed somewhere else

and transported by nature to the site; or

• Filling - moved by man.

Transported soils may be further subdivided into:

• Alluvium - river deposits

• Lacustrine - lake deposits

• Aeolian - wind deposits

• Littoral - beach deposits

• Estuarine - tidal river deposits

• Talus - scree or coarse colluvium

• Slopewash or Colluvium - transported

downslope by gravity assisted by water.

Often includes angular rock fragments and

boulders.

Page 47: SITE CLASSIFICATION REPORT SUMMARY...Douglas Partners (DP) has prepared this report for this project at Taylor 2- Stage 3, Taylor in accordance with DP’s proposal dated 15 September

May 2017

Rock Strength Rock strength is defined by the Point Load Strength Index (Is(50)) and refers to the strength of the rock

substance and not the strength of the overall rock mass, which may be considerably weaker due to defects.

The test procedure is described by Australian Standard 4133.4.1 - 2007. The terms used to describe rock

strength are as follows:

Term Abbreviation Point Load Index

Is(50) MPa

Approximate Unconfined Compressive Strength MPa*

Extremely low EL <0.03 <0.6

Very low VL 0.03 - 0.1 0.6 - 2

Low L 0.1 - 0.3 2 - 6

Medium M 0.3 - 1.0 6 - 20

High H 1 - 3 20 - 60

Very high VH 3 - 10 60 - 200

Extremely high EH >10 >200

* Assumes a ratio of 20:1 for UCS to Is(50). It should be noted that the UCS to Is(50) ratio varies significantly

for different rock types and specific ratios should be determined for each site.

Degree of Weathering The degree of weathering of rock is classified as follows:

Term Abbreviation Description

Extremely weathered EW Rock substance has soil properties, i.e. it can be remoulded and classified as a soil but the texture of the original rock is still evident.

Highly weathered HW Limonite staining or bleaching affects whole of rock substance and other signs of decomposition are evident. Porosity and strength may be altered as a result of iron leaching or deposition. Colour and strength of original fresh rock is not recognisable

Moderately weathered

MW Staining and discolouration of rock substance has taken place

Slightly weathered SW Rock substance is slightly discoloured but shows little or no change of strength from fresh rock

Fresh stained Fs Rock substance unaffected by weathering but staining visible along defects

Fresh Fr No signs of decomposition or staining

Degree of Fracturing The following classification applies to the spacing of natural fractures in diamond drill cores. It includes

bedding plane partings, joints and other defects, but excludes drilling breaks.

Term Description

Fragmented Fragments of <20 mm

Highly Fractured Core lengths of 20-40 mm with some fragments

Fractured Core lengths of 40-200 mm with some shorter and longer sections

Slightly Fractured Core lengths of 200-1000 mm with some shorter and longer sections

Unbroken Core lengths mostly > 1000 mm

Page 48: SITE CLASSIFICATION REPORT SUMMARY...Douglas Partners (DP) has prepared this report for this project at Taylor 2- Stage 3, Taylor in accordance with DP’s proposal dated 15 September

May 2017

Rock Quality Designation The quality of the cored rock can be measured using the Rock Quality Designation (RQD) index, defined

as:

RQD % = cumulative length of 'sound' core sections ≥ 100 mm long

total drilled length of section being assessed

where 'sound' rock is assessed to be rock of low strength or better. The RQD applies only to natural

fractures. If the core is broken by drilling or handling (i.e. drilling breaks) then the broken pieces are fitted

back together and are not included in the calculation of RQD.

Stratification Spacing For sedimentary rocks the following terms may be used to describe the spacing of bedding partings:

Term Separation of Stratification Planes

Thinly laminated < 6 mm

Laminated 6 mm to 20 mm

Very thinly bedded 20 mm to 60 mm

Thinly bedded 60 mm to 0.2 m

Medium bedded 0.2 m to 0.6 m

Thickly bedded 0.6 m to 2 m

Very thickly bedded > 2 m

Page 49: SITE CLASSIFICATION REPORT SUMMARY...Douglas Partners (DP) has prepared this report for this project at Taylor 2- Stage 3, Taylor in accordance with DP’s proposal dated 15 September

May 2017

Introduction These notes summarise abbreviations commonly

used on borehole logs and test pit reports.

Drilling or Excavation Methods C Core drilling

R Rotary drilling

SFA Spiral flight augers

NMLC Diamond core - 52 mm dia

NQ Diamond core - 47 mm dia

HQ Diamond core - 63 mm dia

PQ Diamond core - 81 mm dia

Water � Water seep

� Water level

Sampling and Testing A Auger sample

B Bulk sample

D Disturbed sample

E Environmental sample

U50 Undisturbed tube sample (50mm)

W Water sample

pp Pocket penetrometer (kPa)

PID Photo ionisation detector

PL Point load strength Is(50) MPa

S Standard Penetration Test

V Shear vane (kPa)

Description of Defects in Rock The abbreviated descriptions of the defects should

be in the following order: Depth, Type, Orientation,

Coating, Shape, Roughness and Other. Drilling

and handling breaks are not usually included on

the logs.

Defect Type

B Bedding plane

Cs Clay seam

Cv Cleavage

Cz Crushed zone

Ds Decomposed seam

F Fault

J Joint

Lam Lamination

Pt Parting

Sz Sheared Zone

V Vein

Orientation

The inclination of defects is always measured from

the perpendicular to the core axis.

h horizontal

v vertical

sh sub-horizontal

sv sub-vertical

Coating or Infilling Term

cln clean

co coating

he healed

inf infilled

stn stained

ti tight

vn veneer

Coating Descriptor

ca calcite

cbs carbonaceous

cly clay

fe iron oxide

mn manganese

slt silty

Shape

cu curved

ir irregular

pl planar

st stepped

un undulating

Roughness

po polished

ro rough

sl slickensided

sm smooth

vr very rough

Other

fg fragmented

bnd band

qtz quartz

Page 50: SITE CLASSIFICATION REPORT SUMMARY...Douglas Partners (DP) has prepared this report for this project at Taylor 2- Stage 3, Taylor in accordance with DP’s proposal dated 15 September

May 2017

Graphic Symbols for Soil and Rock General

Soils

Sedimentary Rocks

Metamorphic Rocks

Igneous Rocks

Road base

Filling

Concrete

Asphalt

Topsoil

Peat

Clay

Conglomeratic sandstone

Conglomerate

Boulder conglomerate

Sandstone

Slate, phyllite, schist

Siltstone

Mudstone, claystone, shale

Coal

Limestone

Porphyry

Cobbles, boulders

Sandy gravel

Laminite

Silty sand

Clayey sand

Silty clay

Sandy clay

Gravelly clay

Shaly clay

Silt

Clayey silt

Sandy silt

Sand

Gravel

Talus

Gneiss

Quartzite

Dolerite, basalt, andesite

Granite

Tuff, breccia

Dacite, epidote

Page 51: SITE CLASSIFICATION REPORT SUMMARY...Douglas Partners (DP) has prepared this report for this project at Taylor 2- Stage 3, Taylor in accordance with DP’s proposal dated 15 September

ͱ·´ ̧°»­

̸» ¬§°»­ ±º ­±·´­ «­«¿´´§ °®»­»²¬ «²¼»® ¬¸» ¬±°­±·´ ·² ´¿²¼ ¦±²»¼ º±®®»­·¼»²¬·¿´ ¾«·´¼·²¹­ ½¿² ¾» ­°´·¬ ·²¬± ¬©± ¿°°®±¨·³¿¬» ¹®±«°­ P¹®¿²«´¿® ¿²¼ ½´¿§ò Ï«·¬» ±º¬»²ô º±«²¼¿¬·±² ­±·´ ·­ ¿ ³·¨¬«®» ±º ¾±¬¸¬§°»­ò ̸» ¹»²»®¿´ °®±¾´»³­ ¿­­±½·¿¬»¼ ©·¬¸ ­±·´­ ¸¿ª·²¹ ¹®¿²«´¿®½±²¬»²¬ ¿®» «­«¿´´§ ½¿«­»¼ ¾§ »®±­·±²ò Ý´¿§ ­±·´­ ¿®» ­«¾¶»½¬ ¬±­¿¬«®¿¬·±² ¿²¼ ­©»´´ñ­¸®·²µ °®±¾´»³­ò

Ý´¿­­·º·½¿¬·±²­ º±® ¿ ¹·ª»² ¿®»¿ ½¿² ¹»²»®¿´´§ ¾» ±¾¬¿·²»¼ ¾§¿°°´·½¿¬·±² ¬± ¬¸» ´±½¿´ ¿«¬¸±®·¬§ô ¾«¬ ¬¸»­» ¿®» ­±³»¬·³»­ «²®»´·¿¾´»¿²¼ ·º ¬¸»®» ·­ ¼±«¾¬ô ¿ ¹»±¬»½¸²·½¿´ ®»°±®¬ ­¸±«´¼ ¾» ½±³³·­­·±²»¼òß­ ³±­¬ ¾«·´¼·²¹­ ­«ºº»®·²¹ ³±ª»³»²¬ °®±¾´»³­ ¿®» º±«²¼»¼ ±² ½´¿§­±·´­ô ¬¸»®» ·­ ¿² »³°¸¿­·­ ±² ½´¿­­·º·½¿¬·±² ±º ­±·´­ ¿½½±®¼·²¹ ¬± ¬¸»¿³±«²¬ ±º ­©»´´ ¿²¼ ­¸®·²µ¿¹» ¬¸»§ »¨°»®·»²½» ©·¬¸ ª¿®·¿¬·±²­ ±º©¿¬»® ½±²¬»²¬ò ̸» ¬¿¾´» ¾»´±© ·­ Ì¿¾´» îòï º®±³ ßÍ îèéðô ¬¸»Î»­·¼»²¬·¿´ Í´¿¾ ¿²¼ Ú±±¬·²¹ ݱ¼»ò

Ý¿«­»­ ±º Ó±ª»³»²¬

Í»¬¬´»³»²¬ ¼«» ¬± ½±²­¬®«½¬·±²Ì¸»®» ¿®» ¬©± ¬§°»­ ±º ­»¬¬´»³»²¬ ¬¸¿¬ ±½½«® ¿­ ¿ ®»­«´¬ ±º½±²­¬®«½¬·±²æ{ ׳³»¼·¿¬» ­»¬¬´»³»²¬ ±½½«®­ ©¸»² ¿ ¾«·´¼·²¹ ·­ º·®­¬ °´¿½»¼ ±² ·¬­

º±«²¼¿¬·±² ­±·´ô ¿­ ¿ ®»­«´¬ ±º ½±³°¿½¬·±² ±º ¬¸» ­±·´ «²¼»® ¬¸»©»·¹¸¬ ±º ¬¸» ­¬®«½¬«®»ò ̸» ½±¸»­·ª» ¯«¿´·¬§ ±º ½´¿§ ­±·´ ³·¬·¹¿¬»­¿¹¿·²­¬ ¬¸·­ô ¾«¬ ¹®¿²«´¿® ø°¿®¬·½«´¿®´§ ­¿²¼§÷ ­±·´ ·­ ­«­½»°¬·¾´»ò

{ ݱ²­±´·¼¿¬·±² ­»¬¬´»³»²¬ ·­ ¿ º»¿¬«®» ±º ½´¿§ ­±·´ ¿²¼ ³¿§ ¬¿µ»°´¿½» ¾»½¿«­» ±º ¬¸» »¨°«´­·±² ±º ³±·­¬«®» º®±³ ¬¸» ­±·´ ±® ¾»½¿«­»±º ¬¸» ­±·´K­ ´¿½µ ±º ®»­·­¬¿²½» ¬± ´±½¿´ ½±³°®»­­·ª» ±® ­¸»¿® ­¬®»­­»­ò̸·­ ©·´´ «­«¿´´§ ¬¿µ» °´¿½» ¼«®·²¹ ¬¸» º·®­¬ º»© ³±²¬¸­ ¿º¬»®½±²­¬®«½¬·±²ô ¾«¬ ¸¿­ ¾»»² µ²±©² ¬± ¬¿µ» ³¿²§ §»¿®­ ·²»¨½»°¬·±²¿´ ½¿­»­ò

̸»­» °®±¾´»³­ ¿®» ¬¸» °®±ª·²½» ±º ¬¸» ¾«·´¼»® ¿²¼ ­¸±«´¼ ¾» ¬¿µ»²·²¬± ½±²­·¼»®¿¬·±² ¿­ °¿®¬ ±º ¬¸» °®»°¿®¿¬·±² ±º ¬¸» ­·¬» º±® ½±²­¬®«½ó¬·±²ò Þ«·´¼·²¹ Ì»½¸²±´±¹§ Ú·´» ïç øÞÌÚ ïç÷ ¼»¿´­ ©·¬¸ ¬¸»­»°®±¾´»³­ò

Û®±­·±²ß´´ ­±·´­ ¿®» °®±²» ¬± »®±­·±²ô ¾«¬ ­¿²¼§ ­±·´ ·­ °¿®¬·½«´¿®´§ ­«­½»°¬·¾´»¬± ¾»·²¹ ©¿­¸»¼ ¿©¿§ò Ûª»² ½´¿§ ©·¬¸ ¿ ­¿²¼ ½±³°±²»²¬ ±º ­¿§ ïðû±® ³±®» ½¿² ­«ºº»® º®±³ »®±­·±²ò

Í¿¬«®¿¬·±²Ì¸·­ ·­ °¿®¬·½«´¿®´§ ¿ °®±¾´»³ ·² ½´¿§ ­±·´­ò Í¿¬«®¿¬·±² ½®»¿¬»­ ¿ ¾±¹ó´·µ» ­«­°»²­·±² ±º ¬¸» ­±·´ ¬¸¿¬ ½¿«­»­ ·¬ ¬± ´±­» ª·®¬«¿´´§ ¿´´ ±º ·¬­¾»¿®·²¹ ½¿°¿½·¬§ò ̱ ¿ ´»­­»® ¼»¹®»»ô ­¿²¼ ·­ ¿ºº»½¬»¼ ¾§ ­¿¬«®¿¬·±²¾»½¿«­» ­¿¬«®¿¬»¼ ­¿²¼ ³¿§ «²¼»®¹± ¿ ®»¼«½¬·±² ·² ª±´«³» P°¿®¬·½«´¿®´§ ·³°±®¬»¼ ­¿²¼ º·´´ º±® ¾»¼¼·²¹ ¿²¼ ¾´·²¼·²¹ ´¿§»®­òر©»ª»®ô ¬¸·­ «­«¿´´§ ±½½«®­ ¿­ ·³³»¼·¿¬» ­»¬¬´»³»²¬ ¿²¼ ­¸±«´¼²±®³¿´´§ ¾» ¬¸» °®±ª·²½» ±º ¬¸» ¾«·´¼»®ò

Í»¿­±²¿´ ­©»´´·²¹ ¿²¼ ­¸®·²µ¿¹» ±º ­±·´ß´´ ½´¿§­ ®»¿½¬ ¬± ¬¸» °®»­»²½» ±º ©¿¬»® ¾§ ­´±©´§ ¿¾­±®¾·²¹ ·¬ô ³¿µ·²¹¬¸» ­±·´ ·²½®»¿­» ·² ª±´«³» ø­»» ¬¿¾´» ¾»´±©÷ò ̸» ¼»¹®»» ±º ·²½®»¿­»ª¿®·»­ ½±²­·¼»®¿¾´§ ¾»¬©»»² ¼·ºº»®»²¬ ½´¿§­ô ¿­ ¼±»­ ¬¸» ¼»¹®»» ±º¼»½®»¿­» ¼«®·²¹ ¬¸» ­«¾­»¯«»²¬ ¼®§·²¹ ±«¬ ½¿«­»¼ ¾§ º¿·® ©»¿¬¸»®°»®·±¼­ò Þ»½¿«­» ±º ¬¸» ´±© ¿¾­±®°¬·±² ¿²¼ »¨°«´­·±² ®¿¬»ô ¬¸·­°¸»²±³»²±² ©·´´ ²±¬ «­«¿´´§ ¾» ²±¬·½»¿¾´» «²´»­­ ¬¸»®» ¿®»°®±´±²¹»¼ ®¿·²§ ±® ¼®§ °»®·±¼­ô «­«¿´´§ ±º ©»»µ­ ±® ³±²¬¸­ô¼»°»²¼·²¹ ±² ¬¸» ´¿²¼ ¿²¼ ­±·´ ½¸¿®¿½¬»®·­¬·½­ò

̸» ­©»´´·²¹ ±º ­±·´ ½®»¿¬»­ ¿² «°©¿®¼ º±®½» ±² ¬¸» º±±¬·²¹­ ±º ¬¸»¾«·´¼·²¹ô ¿²¼ ­¸®·²µ¿¹» ½®»¿¬»­ ­«¾­·¼»²½» ¬¸¿¬ ¬¿µ»­ ¿©¿§ ¬¸»­«°°±®¬ ²»»¼»¼ ¾§ ¬¸» º±±¬·²¹ ¬± ®»¬¿·² »¯«·´·¾®·«³ò

͸»¿® º¿·´«®»Ì¸·­ °¸»²±³»²±² ±½½«®­ ©¸»² ¬¸» º±«²¼¿¬·±² ­±·´ ¼±»­ ²±¬ ¸¿ª»­«ºº·½·»²¬ ­¬®»²¹¬¸ ¬± ­«°°±®¬ ¬¸» ©»·¹¸¬ ±º ¬¸» º±±¬·²¹ò ̸»®» ¿®»¬©± ³¿¶±® °±­¬ó½±²­¬®«½¬·±² ½¿«­»­æ

{ Í·¹²·º·½¿²¬ ´±¿¼ ·²½®»¿­»ò{ λ¼«½¬·±² ±º ´¿¬»®¿´ ­«°°±®¬ ±º ¬¸» ­±·´ «²¼»® ¬¸» º±±¬·²¹ ¼«» ¬±

»®±­·±² ±® »¨½¿ª¿¬·±²ò{ ײ ½´¿§ ­±·´ô ­¸»¿® º¿·´«®» ½¿² ¾» ½¿«­»¼ ¾§ ­¿¬«®¿¬·±² ±º ¬¸» ­±·´

¿¼¶¿½»²¬ ¬± ±® «²¼»® ¬¸» º±±¬·²¹ò

Þ«·´¼·²¹­ ½¿² ¿²¼ ±º¬»² ¼± ³±ª»ò ̸·­ ³±ª»³»²¬ ½¿² ¾» «°ô ¼±©²ô ´¿¬»®¿´ ±® ®±¬¿¬·±²¿´ò ̸» º«²¼¿³»²¬¿´ ½¿«­»±º ³±ª»³»²¬ ·² ¾«·´¼·²¹­ ½¿² «­«¿´´§ ¾» ®»´¿¬»¼ ¬± ±²» ±® ³±®» °®±¾´»³­ ·² ¬¸» º±«²¼¿¬·±² ­±·´ò ׬ ·­ ·³°±®¬¿²¬ º±®¬¸» ¸±³»±©²»® ¬± ·¼»²¬·º§ ¬¸» ­±·´ ¬§°» ·² ±®¼»® ¬± ¿­½»®¬¿·² ¬¸» ³»¿­«®»­ ¬¸¿¬ ­¸±«´¼ ¾» °«¬ ·² °´¿½» ·² ±®¼»® ¬±»²­«®» ¬¸¿¬ °®±¾´»³­ ·² ¬¸» º±«²¼¿¬·±² ­±·´ ½¿² ¾» °®»ª»²¬»¼ô ¬¸«­ °®±¬»½¬·²¹ ¿¹¿·²­¬ ¾«·´¼·²¹ ³±ª»³»²¬ò

̸·­ Þ«·´¼·²¹ Ì»½¸²±´±¹§ Ú·´» ·­ ¼»­·¹²»¼ ¬± ·¼»²¬·º§ ½¿«­»­ ±º ­±·´ó®»´¿¬»¼ ¾«·´¼·²¹ ³±ª»³»²¬ô ¿²¼ ¬± ­«¹¹»­¬³»¬¸±¼­ ±º °®»ª»²¬·±² ±º ®»­«´¬¿²¬ ½®¿½µ·²¹ ·² ¾«·´¼·²¹­ò

Ú±«²¼¿¬·±² Ó¿·²¬»²¿²½»¿²¼ Ú±±¬·²¹ л®º±®³¿²½»æß Ø±³»±©²»®K­ Ù«·¼»

ÙÛÒÛÎßÔ ÜÛÚ×Ò×Ì×ÑÒÍ ÑÚ Í×ÌÛ ÝÔßÍÍÛÍ

Ý´¿­­ Ú±«²¼¿¬·±²

ß Ó±­¬ ­¿²¼ ¿²¼ ®±½µ ­·¬»­ ©·¬¸ ´·¬¬´» ±® ²± ¹®±«²¼ ³±ª»³»²¬ º®±³ ³±·­¬«®» ½¸¿²¹»­

Í Í´·¹¸¬´§ ®»¿½¬·ª» ½´¿§ ­·¬»­ ©·¬¸ ±²´§ ­´·¹¸¬ ¹®±«²¼ ³±ª»³»²¬ º®±³ ³±·­¬«®» ½¸¿²¹»­

Ó Ó±¼»®¿¬»´§ ®»¿½¬·ª» ½´¿§ ±® ­·´¬ ­·¬»­ô ©¸·½¸ ½¿² »¨°»®·»²½» ³±¼»®¿¬» ¹®±«²¼ ³±ª»³»²¬ º®±³ ³±·­¬«®» ½¸¿²¹»­

Ø Ø·¹¸´§ ®»¿½¬·ª» ½´¿§ ­·¬»­ô ©¸·½¸ ½¿² »¨°»®·»²½» ¸·¹¸ ¹®±«²¼ ³±ª»³»²¬ º®±³ ³±·­¬«®» ½¸¿²¹»­

Û Û¨¬®»³»´§ ®»¿½¬·ª» ­·¬»­ô ©¸·½¸ ½¿² »¨°»®·»²½» »¨¬®»³» ¹®±«²¼ ³±ª»³»²¬ º®±³ ³±·­¬«®» ½¸¿²¹»­

ß ¬± Ð Ú·´´»¼ ­·¬»­

Ð Í·¬»­ ©¸·½¸ ·²½´«¼» ­±º¬ ­±·´­ô ­«½¸ ¿­ ­±º¬ ½´¿§ ±® ­·´¬ ±® ´±±­» ­¿²¼­å ´¿²¼­´·°å ³·²» ­«¾­·¼»²½»å ½±´´¿°­·²¹ ­±·´­å ­±·´­ ­«¾¶»½¬¬± »®±­·±²å ®»¿½¬·ª» ­·¬»­ ­«¾¶»½¬ ¬± ¿¾²±®³¿´ ³±·­¬«®» ½±²¼·¬·±²­ ±® ­·¬»­ ©¸·½¸ ½¿²²±¬ ¾» ½´¿­­·º·»¼ ±¬¸»®©·­»

ÞÌÚ ïè®»°´¿½»­

ײº±®³¿¬·±²Í¸»»¬ ïðñçï

Page 52: SITE CLASSIFICATION REPORT SUMMARY...Douglas Partners (DP) has prepared this report for this project at Taylor 2- Stage 3, Taylor in accordance with DP’s proposal dated 15 September

Ì®»» ®±±¬ ¹®±©¬¸Ì®»»­ ¿²¼ ­¸®«¾­ ¬¸¿¬ ¿®» ¿´´±©»¼ ¬± ¹®±© ·² ¬¸» ª·½·²·¬§ ±º º±±¬·²¹­½¿² ½¿«­» º±«²¼¿¬·±² ­±·´ ³±ª»³»²¬ ·² ¬©± ©¿§­æ

{ ᱬ­ ¬¸¿¬ ¹®±© «²¼»® º±±¬·²¹­ ³¿§ ·²½®»¿­» ·² ½®±­­ó­»½¬·±²¿´­·¦»ô »¨»®¬·²¹ «°©¿®¼ °®»­­«®» ±² º±±¬·²¹­ò

{ ᱬ­ ·² ¬¸» ª·½·²·¬§ ±º º±±¬·²¹­ ©·´´ ¿¾­±®¾ ³«½¸ ±º ¬¸» ³±·­¬«®»·² ¬¸» º±«²¼¿¬·±² ­±·´ô ½¿«­·²¹ ­¸®·²µ¿¹» ±® ­«¾­·¼»²½»ò

˲»ª»²²»­­ ±º Ó±ª»³»²¬

̸» ¬§°»­ ±º ¹®±«²¼ ³±ª»³»²¬ ¼»­½®·¾»¼ ¿¾±ª» «­«¿´´§ ±½½«®«²»ª»²´§ ¬¸®±«¹¸±«¬ ¬¸» ¾«·´¼·²¹K­ º±«²¼¿¬·±² ­±·´ò Í»¬¬´»³»²¬ ¼«»¬± ½±²­¬®«½¬·±² ¬»²¼­ ¬± ¾» «²»ª»² ¾»½¿«­» ±ºæ

{ Ü·ºº»®·²¹ ½±³°¿½¬·±² ±º º±«²¼¿¬·±² ­±·´ °®·±® ¬± ½±²­¬®«½¬·±²ò

{ Ü·ºº»®·²¹ ³±·­¬«®» ½±²¬»²¬ ±º º±«²¼¿¬·±² ­±·´ °®·±® ¬± ½±²­¬®«½¬·±²ò

Ó±ª»³»²¬ ¼«» ¬± ²±²ó½±²­¬®«½¬·±² ½¿«­»­ ·­ «­«¿´´§ ³±®» «²»ª»²­¬·´´ò Û®±­·±² ½¿² «²¼»®³·²» ¿ º±±¬·²¹ ¬¸¿¬ ¬®¿ª»®­»­ ¬¸» º´±© ±® ½¿²½®»¿¬» ¬¸» ½±²¼·¬·±²­ º±® ­¸»¿® º¿·´«®» ¾§ »®±¼·²¹ ­±·´ ¿¼¶¿½»²¬ ¬± ¿º±±¬·²¹ ¬¸¿¬ ®«²­ ·² ¬¸» ­¿³» ¼·®»½¬·±² ¿­ ¬¸» º´±©ò

Í¿¬«®¿¬·±² ±º ½´¿§ º±«²¼¿¬·±² ­±·´ ³¿§ ±½½«® ©¸»®» ­«¾º´±±® ©¿´´­½®»¿¬» ¿ ¼¿³ ¬¸¿¬ ³¿µ»­ ©¿¬»® °±²¼ò ׬ ½¿² ¿´­± ±½½«® ©¸»®»ª»® ¬¸»®»·­ ¿ ­±«®½» ±º ©¿¬»® ²»¿® º±±¬·²¹­ ·² ½´¿§ ­±·´ò ̸·­ ´»¿¼­ ¬± ¿ ­»ª»®»®»¼«½¬·±² ·² ¬¸» ­¬®»²¹¬¸ ±º ¬¸» ­±·´ ©¸·½¸ ³¿§ ½®»¿¬» ´±½¿´ ­¸»¿®º¿·´«®»ò

Í»¿­±²¿´ ­©»´´·²¹ ¿²¼ ­¸®·²µ¿¹» ±º ½´¿§ ­±·´ ¿ºº»½¬­ ¬¸» °»®·³»¬»® ±º¬¸» ¾«·´¼·²¹ º·®­¬ô ¬¸»² ¹®¿¼«¿´´§ ­°®»¿¼­ ¬± ¬¸» ·²¬»®·±®ò ̸» ­©»´´·²¹°®±½»­­ ©·´´ «­«¿´´§ ¾»¹·² ¿¬ ¬¸» «°¸·´´ »¨¬®»³» ±º ¬¸» ¾«·´¼·²¹ô ±® ±²¬¸» ©»¿¬¸»® ­·¼» ©¸»®» ¬¸» ´¿²¼ ·­ º´¿¬ò Í©»´´·²¹ ¹®¿¼«¿´´§ ®»¿½¸»­ ¬¸»·²¬»®·±® ­±·´ ¿­ ¿¾­±®°¬·±² ½±²¬·²«»­ò ͸®·²µ¿¹» «­«¿´´§ ¾»¹·²­ ©¸»®»¬¸» ­«²K­ ¸»¿¬ ·­ ¹®»¿¬»­¬ò

Ûºº»½¬­ ±º ˲»ª»² ͱ·´ Ó±ª»³»²¬ ±² ͬ®«½¬«®»­

Û®±­·±² ¿²¼ ­¿¬«®¿¬·±²Û®±­·±² ®»³±ª»­ ¬¸» ­«°°±®¬ º®±³ «²¼»® º±±¬·²¹­ô ¬»²¼·²¹ ¬± ½®»¿¬»­«¾­·¼»²½» ±º ¬¸» °¿®¬ ±º ¬¸» ­¬®«½¬«®» «²¼»® ©¸·½¸ ·¬ ±½½«®­òÞ®·½µ©±®µ ©¿´´­ ©·´´ ®»­·­¬ ¬¸» ­¬®»­­ ½®»¿¬»¼ ¾§ ¬¸·­ ®»³±ª¿´ ±º­«°°±®¬ ¾§ ¾®·¼¹·²¹ ¬¸» ¹¿° ±® ½¿²¬·´»ª»®·²¹ «²¬·´ ¬¸» ¾®·½µ­ ±® ¬¸»³±®¬¿® ¾»¼¼·²¹ º¿·´ò Ñ´¼»® ³¿­±²®§ ¸¿­ ´·¬¬´» ®»­·­¬¿²½»ò Ûª·¼»²½» ±ºº¿·´«®» ª¿®·»­ ¿½½±®¼·²¹ ¬± ½·®½«³­¬¿²½»­ ¿²¼ ­§³°¬±³­ ³¿§ ·²½´«¼»æ

{ ͬ»° ½®¿½µ·²¹ ·² ¬¸» ³±®¬¿® ¾»¼­ ·² ¬¸» ¾±¼§ ±º ¬¸» ©¿´´ ±®¿¾±ª»ñ¾»´±© ±°»²·²¹­ ­«½¸ ¿­ ¼±±®­ ±® ©·²¼±©­ò

{ Ê»®¬·½¿´ ½®¿½µ·²¹ ·² ¬¸» ¾®·½µ­ ø«­«¿´´§ ¾«¬ ²±¬ ²»½»­­¿®·´§ ·² ´·²»©·¬¸ ¬¸» ª»®¬·½¿´ ¾»¼­ ±® °»®°»²¼­÷ò

×­±´¿¬»¼ °·»®­ ¿ºº»½¬»¼ ¾§ »®±­·±² ±® ­¿¬«®¿¬·±² ±º º±«²¼¿¬·±²­ ©·´´»ª»²¬«¿´´§ ´±­» ½±²¬¿½¬ ©·¬¸ ¬¸» ¾»¿®»®­ ¬¸»§ ­«°°±®¬ ¿²¼ ³¿§ ¬·´¬ ±®º¿´´ ±ª»®ò ̸» º´±±®­ ¬¸¿¬ ¸¿ª» ´±­¬ ¬¸·­ ­«°°±®¬ ©·´´ ¾»½±³» ¾±«²½§ô­±³»¬·³»­ ®¿¬¬´·²¹ ±®²¿³»²¬­ »¬½ò

Í»¿­±²¿´ ­©»´´·²¹ñ­¸®·²µ¿¹» ·² ½´¿§Í©»´´·²¹ º±«²¼¿¬·±² ­±·´ ¼«» ¬± ®¿·²§ °»®·±¼­ º·®­¬ ´·º¬­ ¬¸» ³±­¬»¨°±­»¼ »¨¬®»³·¬·»­ ±º ¬¸» º±±¬·²¹ ­§­¬»³ô ¬¸»² ¬¸» ®»³¿·²¼»® ±º ¬¸»°»®·³»¬»® º±±¬·²¹­ ©¸·´» ¹®¿¼«¿´´§ °»®³»¿¬·²¹ ·²­·¼» ¬¸» ¾«·´¼·²¹º±±¬°®·²¬ ¬± ´·º¬ ·²¬»®²¿´ º±±¬·²¹­ò ̸·­ ­©»´´·²¹ º·®­¬ ¬»²¼­ ¬± ½®»¿¬» ¿¼·­¸ »ºº»½¬ô ¾»½¿«­» ¬¸» »¨¬»®²¿´ º±±¬·²¹­ ¿®» °«­¸»¼ ¸·¹¸»® ¬¸¿² ¬¸»·²¬»®²¿´ ±²»­ò

̸» º·®­¬ ²±¬·½»¿¾´» ­§³°¬±³ ³¿§ ¾» ¬¸¿¬ ¬¸» º´±±® ¿°°»¿®­ ­´·¹¸¬´§¼·­¸»¼ò ̸·­ ·­ ±º¬»² ¿½½±³°¿²·»¼ ¾§ ­±³» ¼±±®­ ¾·²¼·²¹ ±² ¬¸»º´±±® ±® ¬¸» ¼±±® ¸»¿¼ô ¬±¹»¬¸»® ©·¬¸ ­±³» ½®¿½µ·²¹ ±º ½±®²·½»³·¬®»­ò ײ ¾«·´¼·²¹­ ©·¬¸ ¬·³¾»® º´±±®·²¹ ­«°°±®¬»¼ ¾§ ¾»¿®»®­ ¿²¼¶±·­¬­ô ¬¸» º´±±® ½¿² ¾» ¾±«²½§ò Û¨¬»®²¿´´§ ¬¸»®» ³¿§ ¾» ª·­·¾´»¼·­¸·²¹ ±º ¬¸» ¸·° ±® ®·¼¹» ´·²»­ò

ß­ ¬¸» ³±·­¬«®» ¿¾­±®°¬·±² °®±½»­­ ½±³°´»¬»­ ·¬­ ¶±«®²»§ ¬± ¬¸»·²²»®³±­¬ ¿®»¿­ ±º ¬¸» ¾«·´¼·²¹ô ¬¸» ·²¬»®²¿´ º±±¬·²¹­ ©·´´ ®·­»ò ׺ ¬¸»­°®»¿¼ ±º ³±·­¬«®» ·­ ®±«¹¸´§ »ª»²ô ·¬ ³¿§ ¾» ¬¸¿¬ ¬¸» ­§³°¬±³­ ©·´´¬»³°±®¿®·´§ ¼·­¿°°»¿®ô ¾«¬ ·¬ ·­ ³±®» ´·µ»´§ ¬¸¿¬ ­©»´´·²¹ ©·´´ ¾»«²»ª»²ô ½®»¿¬·²¹ ¿ ¼·ºº»®»²½» ®¿¬¸»® ¬¸¿² ¿ ¼·­¿°°»¿®¿²½» ·²­§³°¬±³­ò ײ ¾«·´¼·²¹­ ©·¬¸ ¬·³¾»® º´±±®·²¹ ­«°°±®¬»¼ ¾§ ¾»¿®»®­¿²¼ ¶±·­¬­ô ¬¸» ·­±´¿¬»¼ °·»®­ ©·´´ ®·­» ³±®» »¿­·´§ ¬¸¿² ¬¸» ­¬®·°º±±¬·²¹­ ±® °·»®­ «²¼»® ©¿´´­ô ½®»¿¬·²¹ ²±¬·½»¿¾´» ¼±³·²¹ ±º º´±±®·²¹ò

ß­ ¬¸» ©»¿¬¸»® °¿¬¬»®² ½¸¿²¹»­ ¿²¼ ¬¸» ­±·´ ¾»¹·²­ ¬± ¼®§ ±«¬ô ¬¸»»¨¬»®²¿´ º±±¬·²¹­ ©·´´ ¾» º·®­¬ ¿ºº»½¬»¼ô ¾»¹·²²·²¹ ©·¬¸ ¬¸» ´±½¿¬·±²­©¸»®» ¬¸» ­«²K­ »ºº»½¬ ·­ ­¬®±²¹»­¬ò ̸·­ ¸¿­ ¬¸» »ºº»½¬ ±º ´±©»®·²¹ ¬¸»»¨¬»®²¿´ º±±¬·²¹­ò ̸» ¼±³·²¹ ·­ ¿½½»²¬«¿¬»¼ ¿²¼ ½®¿½µ·²¹ ®»¼«½»­±® ¼·­¿°°»¿®­ ©¸»®» ·¬ ±½½«®®»¼ ¾»½¿«­» ±º ¼·­¸·²¹ô ¾«¬ ±¬¸»® ½®¿½µ­±°»² «°ò ̸» ®±±º ´·²»­ ³¿§ ¾»½±³» ½±²ª»¨ò

ܱ³·²¹ ¿²¼ ¼·­¸·²¹ ¿®» ¿´­± ¿ºº»½¬»¼ ¾§ ©»¿¬¸»® ·² ±¬¸»® ©¿§­ò ײ¿®»¿­ ©¸»®» ©¿®³ô ©»¬ ­«³³»®­ ¿²¼ ½±±´»® ¼®§ ©·²¬»®­ °®»ª¿·´ô©¿¬»® ³·¹®¿¬·±² ¬»²¼­ ¬± ¾» ¬±©¿®¼ ¬¸» ·²¬»®·±® ¿²¼ ¼±³·²¹ ©·´´ ¾»¿½½»²¬«¿¬»¼ô ©¸»®»¿­ ©¸»®» ­«³³»®­ ¿®» ¼®§ ¿²¼ ©·²¬»®­ ¿®» ½±´¼¿²¼ ©»¬ô ³·¹®¿¬·±² ¬»²¼­ ¬± ¾» ¬±©¿®¼ ¬¸» »¨¬»®·±® ¿²¼ ¬¸»«²¼»®´§·²¹ °®±°»²­·¬§ ·­ ¬±©¿®¼ ¼·­¸·²¹ò

Ó±ª»³»²¬ ½¿«­»¼ ¾§ ¬®»» ®±±¬­×² ¹»²»®¿´ô ¹®±©·²¹ ®±±¬­ ©·´´ »¨»®¬ ¿² «°©¿®¼ °®»­­«®» ±² º±±¬·²¹­ô©¸»®»¿­ ­±·´ ­«¾¶»½¬ ¬± ¼®§·²¹ ¾»½¿«­» ±º ¬®»» ±® ­¸®«¾ ®±±¬­ ©·´´ ¬»²¼¬± ®»³±ª» ­«°°±®¬ º®±³ «²¼»® º±±¬·²¹­ ¾§ ·²¼«½·²¹ ­¸®·²µ¿¹»ò

ݱ³°´·½¿¬·±²­ ½¿«­»¼ ¾§ ¬¸» ­¬®«½¬«®» ·¬­»´ºÓ±­¬ º±®½»­ ¬¸¿¬ ¬¸» ­±·´ ½¿«­»­ ¬± ¾» »¨»®¬»¼ ±² ­¬®«½¬«®»­ ¿®»ª»®¬·½¿´ P ·ò»ò »·¬¸»® «° ±® ¼±©²ò ر©»ª»®ô ¾»½¿«­» ¬¸»­» º±®½»­ ¿®»­»´¼±³ ­°®»¿¼ »ª»²´§ ¿®±«²¼ ¬¸» º±±¬·²¹­ô ¿²¼ ¾»½¿«­» ¬¸» ¾«·´¼·²¹®»­·­¬­ «²»ª»² ³±ª»³»²¬ ¾»½¿«­» ±º ·¬­ ®·¹·¼·¬§ô º±®½»­ ¿®» »¨»®¬»¼º®±³ ±²» °¿®¬ ±º ¬¸» ¾«·´¼·²¹ ¬± ¿²±¬¸»®ò ̸» ²»¬ ®»­«´¬ ±º ¿´´ ¬¸»­»º±®½»­ ·­ «­«¿´´§ ®±¬¿¬·±²¿´ò ̸·­ ®»­«´¬¿²¬ º±®½» ±º¬»² ½±³°´·½¿¬»­ ¬¸»¼·¿¹²±­·­ ¾»½¿«­» ¬¸» ª·­·¾´» ­§³°¬±³­ ¼± ²±¬ ­·³°´§ ®»º´»½¬ ¬¸»±®·¹·²¿´ ½¿«­»ò ß ½±³³±² ­§³°¬±³ ·­ ¾·²¼·²¹ ±º ¼±±®­ ±² ¬¸»ª»®¬·½¿´ ³»³¾»® ±º ¬¸» º®¿³»ò

Ûºº»½¬­ ±² º«´´ ³¿­±²®§ ­¬®«½¬«®»­Þ®·½µ©±®µ ©·´´ ®»­·­¬ ½®¿½µ·²¹ ©¸»®» ·¬ ½¿²ò ׬ ©·´´ ¿¬¬»³°¬ ¬± ­°¿²¿®»¿­ ¬¸¿¬ ´±­» ­«°°±®¬ ¾»½¿«­» ±º ­«¾­·¼»¼ º±«²¼¿¬·±²­ ±® ®¿·­»¼°±·²¬­ò ׬ ·­ ¬¸»®»º±®» «­«¿´ ¬± ­»» ½®¿½µ·²¹ ¿¬ ©»¿µ °±·²¬­ô ­«½¸ ¿­±°»²·²¹­ º±® ©·²¼±©­ ±® ¼±±®­ò

ײ ¬¸» »ª»²¬ ±º ½±²­¬®«½¬·±² ­»¬¬´»³»²¬ô ½®¿½µ·²¹ ©·´´ «­«¿´´§ ®»³¿·²«²½¸¿²¹»¼ ¿º¬»® ¬¸» °®±½»­­ ±º ­»¬¬´»³»²¬ ¸¿­ ½»¿­»¼ò

É·¬¸ ´±½¿´ ­¸»¿® ±® »®±­·±²ô ½®¿½µ·²¹ ©·´´ «­«¿´´§ ½±²¬·²«» ¬± ¼»ª»´±°«²¬·´ ¬¸» ±®·¹·²¿´ ½¿«­» ¸¿­ ¾»»² ®»³»¼·»¼ô ±® «²¬·´ ¬¸» ­«¾­·¼»²½»¸¿­ ½±³°´»¬»´§ ²»«¬®¿´·­»¼ ¬¸» ¿ºº»½¬»¼ °±®¬·±² ±º º±±¬·²¹ ¿²¼ ¬¸»­¬®«½¬«®» ¸¿­ ­¬¿¾·´·­»¼ ±² ±¬¸»® º±±¬·²¹­ ¬¸¿¬ ®»³¿·² »ºº»½¬·ª»ò

ײ ¬¸» ½¿­» ±º ­©»´´ñ­¸®·²µ »ºº»½¬­ô ¬¸» ¾®·½µ©±®µ ©·´´ ·² ­±³» ½¿­»­®»¬«®² ¬± ·¬­ ±®·¹·²¿´ °±­·¬·±² ¿º¬»® ½±³°´»¬·±² ±º ¿ ½§½´»ô ¸±©»ª»® ·¬·­ ³±®» ´·µ»´§ ¬¸¿¬ ¬¸» ®±¬¿¬·±²¿´ »ºº»½¬ ©·´´ ²±¬ ¾» »¨¿½¬´§ ®»ª»®­»¼ô¿²¼ ·¬ ·­ ¿´­± «­«¿´ ¬¸¿¬ ¾®·½µ©±®µ ©·´´ ­»¬¬´» ·² ·¬­ ²»© °±­·¬·±² ¿²¼©·´´ ®»­·­¬ ¬¸» º±®½»­ ¬®§·²¹ ¬± ®»¬«®² ·¬ ¬± ·¬­ ±®·¹·²¿´ °±­·¬·±²ò ̸·­³»¿²­ ¬¸¿¬ ·² ¿ ½¿­» ©¸»®» ­©»´´·²¹ ¬¿µ»­ °´¿½» ¿º¬»® ½±²­¬®«½¬·±²¿²¼ ½®¿½µ·²¹ ±½½«®­ô ¬¸» ½®¿½µ·²¹ ·­ ´·µ»´§ ¬± ¿¬ ´»¿­¬ °¿®¬´§ ®»³¿·²¿º¬»® ¬¸» ­¸®·²µ ­»¹³»²¬ ±º ¬¸» ½§½´» ·­ ½±³°´»¬»ò ̸«­ô »¿½¸ ¬·³»¬¸» ½§½´» ·­ ®»°»¿¬»¼ô ¬¸» ´·µ»´·¸±±¼ ·­ ¬¸¿¬ ¬¸» ½®¿½µ·²¹ ©·´´ ¾»½±³»©·¼»® «²¬·´ ¬¸» ­»½¬·±²­ ±º ¾®·½µ©±®µ ¾»½±³» ª·®¬«¿´´§ ·²¼»°»²¼»²¬ò

É·¬¸ ®»°»¿¬»¼ ½§½´»­ô ±²½» ¬¸» ½®¿½µ·²¹ ·­ »­¬¿¾´·­¸»¼ô ·º ¬¸»®» ·­ ²±±¬¸»® ½±³°´·½¿¬·±²ô ·¬ ·­ ²±®³¿´ º±® ¬¸» ·²½·¼»²½» ±º ½®¿½µ·²¹ ¬±­¬¿¾·´·­»ô ¿­ ¬¸» ¾«·´¼·²¹ ¸¿­ ¬¸» ¿®¬·½«´¿¬·±² ·¬ ²»»¼­ ¬± ½±°» ©·¬¸¬¸» °®±¾´»³ò ̸·­ ·­ ¾§ ²± ³»¿²­ ¿´©¿§­ ¬¸» ½¿­»ô ¸±©»ª»®ô ¿²¼³±²·¬±®·²¹ ±º ½®¿½µ­ ·² ©¿´´­ ¿²¼ º´±±®­ ­¸±«´¼ ¿´©¿§­ ¾» ¬®»¿¬»¼­»®·±«­´§ò

Ë°¸»¿ª¿´ ½¿«­»¼ ¾§ ¹®±©¬¸ ±º ¬®»» ®±±¬­ «²¼»® º±±¬·²¹­ ·­ ²±¬ ¿­·³°´» ª»®¬·½¿´ ­¸»¿® ­¬®»­­ò ̸»®» ·­ ¿ ¬»²¼»²½§ º±® ¬¸» ®±±¬ ¬± ¿´­±»¨»®¬ ´¿¬»®¿´ º±®½»­ ¬¸¿¬ ¿¬¬»³°¬ ¬± ­»°¿®¿¬» ­»½¬·±²­ ±º ¾®·½µ©±®µ¿º¬»® ·²·¬·¿´ ½®¿½µ·²¹ ¸¿­ ±½½«®®»¼ò

Ì®»»­ ½¿² ½¿«­» ­¸®·²µ¿¹» ¿²¼ ¼¿³¿¹»

Page 53: SITE CLASSIFICATION REPORT SUMMARY...Douglas Partners (DP) has prepared this report for this project at Taylor 2- Stage 3, Taylor in accordance with DP’s proposal dated 15 September

̸» ²±®³¿´ ­¬®«½¬«®¿´ ¿®®¿²¹»³»²¬ ·­ ¬¸¿¬ ¬¸» ·²²»® ´»¿º ±º ¾®·½µó©±®µ ·² ¬¸» »¨¬»®²¿´ ©¿´´­ ¿²¼ ¿¬ ´»¿­¬ ­±³» ±º ¬¸» ·²¬»®²¿´ ©¿´´­ø¼»°»²¼·²¹ ±² ¬¸» ®±±º ¬§°»÷ ½±³°®·­» ¬¸» ´±¿¼ó¾»¿®·²¹ ­¬®«½¬«®» ±²©¸·½¸ ¿²§ «°°»® º´±±®­ô ½»·´·²¹­ ¿²¼ ¬¸» ®±±º ¿®» ­«°°±®¬»¼ò ײ ¬¸»­»½¿­»­ô ·¬ ·­ ·²¬»®²¿´´§ ª·­·¾´» ½®¿½µ·²¹ ¬¸¿¬ ­¸±«´¼ ¾» ¬¸» ³¿·² º±½«­±º ¿¬¬»²¬·±²ô ¸±©»ª»® ¬¸»®» ¿®» ¿ º»© »¨¿³°´»­ ±º ¼©»´´·²¹­ ©¸±­»»¨¬»®²¿´ ´»¿º ±º ³¿­±²®§ °´¿§­ ­±³» ­«°°±®¬·²¹ ®±´»ô ­± ¬¸·­ ­¸±«´¼¾» ½¸»½µ»¼ ·º ¬¸»®» ·­ ¿²§ ¼±«¾¬ò ײ ¿²§ ½¿­»ô »¨¬»®²¿´´§ ª·­·¾´»½®¿½µ·²¹ ·­ ·³°±®¬¿²¬ ¿­ ¿ ¹«·¼» ¬± ­¬®»­­»­ ±² ¬¸» ­¬®«½¬«®» ¹»²»®¿´´§ô¿²¼ ·¬ ­¸±«´¼ ¿´­± ¾» ®»³»³¾»®»¼ ¬¸¿¬ ¬¸» »¨¬»®²¿´ ©¿´´­ ³«­¬ ¾»½¿°¿¾´» ±º ­«°°±®¬·²¹ ¬¸»³­»´ª»­ò

Ûºº»½¬­ ±² º®¿³»¼ ­¬®«½¬«®»­Ì·³¾»® ±® ­¬»»´ º®¿³»¼ ¾«·´¼·²¹­ ¿®» ´»­­ ´·µ»´§ ¬± »¨¸·¾·¬ ½®¿½µ·²¹¼«» ¬± ­©»´´ñ­¸®·²µ ¬¸¿² ³¿­±²®§ ¾«·´¼·²¹­ ¾»½¿«­» ±º ¬¸»·®º´»¨·¾·´·¬§ò ß´­±ô ¬¸» ¼±³·²¹ñ¼·­¸·²¹ »ºº»½¬­ ¬»²¼ ¬± ¾» ´±©»® ¾»½¿«­»±º ¬¸» ´·¹¸¬»® ©»·¹¸¬ ±º ©¿´´­ò ̸» ³¿·² ®·­µ­ ¬± º®¿³»¼ ¾«·´¼·²¹­ ¿®»»²½±«²¬»®»¼ ¾»½¿«­» ±º ¬¸» ·­±´¿¬»¼ °·»® º±±¬·²¹­ «­»¼ «²¼»® ©¿´´­òɸ»®» »®±­·±² ±® ­¿¬«®¿¬·±² ½¿«­» ¿ º±±¬·²¹ ¬± º¿´´ ¿©¿§ô ¬¸·­ ½¿²¼±«¾´» ¬¸» ­°¿² ©¸·½¸ ¿ ©¿´´ ³«­¬ ¾®·¼¹»ò ̸·­ ¿¼¼·¬·±²¿´ ­¬®»­­ ½¿²½®»¿¬» ½®¿½µ·²¹ ·² ©¿´´ ´·²·²¹­ô °¿®¬·½«´¿®´§ ©¸»®» ¬¸»®» ·­ ¿ ©»¿µ°±·²¬ ·² ¬¸» ­¬®«½¬«®» ½¿«­»¼ ¾§ ¿ ¼±±® ±® ©·²¼±© ±°»²·²¹ò ׬ ·­ô¸±©»ª»®ô «²´·µ»´§ ¬¸¿¬ º®¿³»¼ ­¬®«½¬«®»­ ©·´´ ¾» ­± ­¬®»­­»¼ ¿­ ¬± ­«ºº»®­»®·±«­ ¼¿³¿¹» ©·¬¸±«¬ º·®­¬ »¨¸·¾·¬·²¹ ­±³» ±® ¿´´ ±º ¬¸» ¿¾±ª»­§³°¬±³­ º±® ¿ ½±²­·¼»®¿¾´» °»®·±¼ò ̸» ­¿³» ©¿®²·²¹ °»®·±¼ ­¸±«´¼¿°°´§ ·² ¬¸» ½¿­» ±º «°¸»¿ª¿´ò ׬ ­¸±«´¼ ¾» ²±¬»¼ô ¸±©»ª»®ô ¬¸¿¬ ©¸»®»º®¿³»¼ ¾«·´¼·²¹­ ¿®» ­«°°±®¬»¼ ¾§ ­¬®·° º±±¬·²¹­ ¬¸»®» ·­ ±²´§ ±²» ´»¿º±º ¾®·½µ©±®µ ¿²¼ ¬¸»®»º±®» ¬¸» »¨¬»®²¿´´§ ª·­·¾´» ©¿´´­ ¿®» ¬¸»­«°°±®¬·²¹ ­¬®«½¬«®» º±® ¬¸» ¾«·´¼·²¹ò ײ ¬¸·­ ½¿­»ô ¬¸» ­«¾º´±±®³¿­±²®§ ©¿´´­ ½¿² ¾» »¨°»½¬»¼ ¬± ¾»¸¿ª» ¿­ º«´´ ¾®·½µ©±®µ ©¿´´­ò

Ûºº»½¬­ ±² ¾®·½µ ª»²»»® ­¬®«½¬«®»­Þ»½¿«­» ¬¸» ´±¿¼ó¾»¿®·²¹ ­¬®«½¬«®» ±º ¿ ¾®·½µ ª»²»»® ¾«·´¼·²¹ ·­ ¬¸»º®¿³» ¬¸¿¬ ³¿µ»­ «° ¬¸» ·²¬»®·±® ´»¿º ±º ¬¸» »¨¬»®²¿´ ©¿´´­ °´«­°»®¸¿°­ ¬¸» ·²¬»®²¿´ ©¿´´­ô ¼»°»²¼·²¹ ±² ¬¸» ¬§°» ±º ®±±ºô ¬¸»¾«·´¼·²¹ ½¿² ¾» »¨°»½¬»¼ ¬± ¾»¸¿ª» ¿­ ¿ º®¿³»¼ ­¬®«½¬«®»ô »¨½»°¬ ¬¸¿¬¬¸» »¨¬»®²¿´ ³¿­±²®§ ©·´´ ¾»¸¿ª» ·² ¿ ­·³·´¿® ©¿§ ¬± ¬¸» »¨¬»®²¿´ ´»¿º±º ¿ º«´´ ³¿­±²®§ ­¬®«½¬«®»ò

É¿¬»® Í»®ª·½» ¿²¼ Ü®¿·²¿¹»

ɸ»®» ¿ ©¿¬»® ­»®ª·½» °·°»ô ¿ ­»©»® ±® ­¬±®³©¿¬»® ¼®¿·²¿¹» °·°» ·­ ·²¬¸» ª·½·²·¬§ ±º ¿ ¾«·´¼·²¹ô ¿ ©¿¬»® ´»¿µ ½¿² ½¿«­» »®±­·±²ô ­©»´´·²¹ ±®­¿¬«®¿¬·±² ±º ­«­½»°¬·¾´» ­±·´ò Ûª»² ¿ ³·²«­½«´» ´»¿µ ½¿² ¾» »²±«¹¸¬± ­¿¬«®¿¬» ¿ ½´¿§ º±«²¼¿¬·±²ò ß ´»¿µ·²¹ ¬¿° ²»¿® ¿ ¾«·´¼·²¹ ½¿² ¸¿ª»¬¸» ­¿³» »ºº»½¬ò ײ ¿¼¼·¬·±²ô ¬®»²½¸»­ ½±²¬¿·²·²¹ °·°»­ ½¿² ¾»½±³»©¿¬»®½±«®­»­ »ª»² ¬¸±«¹¸ ¾¿½µº·´´»¼ô °¿®¬·½«´¿®´§ ©¸»®» ¾®±µ»²®«¾¾´» ·­ «­»¼ ¿­ º·´´ò É¿¬»® ¬¸¿¬ ®«²­ ¿´±²¹ ¬¸»­» ¬®»²½¸»­ ½¿² ¾»®»­°±²­·¾´» º±® ­»®·±«­ »®±­·±²ô ·²¬»®­¬®¿¬¿ ­»»°¿¹» ·²¬± ­«¾º´±±® ¿®»¿­¿²¼ ­¿¬«®¿¬·±²ò

з°» ´»¿µ¿¹» ¿²¼ ¬®»²½¸ ©¿¬»® º´±©­ ¿´­± »²½±«®¿¹» ¬®»» ¿²¼ ­¸®«¾®±±¬­ ¬± ¬¸» ­±«®½» ±º ©¿¬»®ô ½±³°´·½¿¬·²¹ ¿²¼ »¨¿½»®¾¿¬·²¹ ¬¸»°®±¾´»³òб±® ®±±º °´«³¾·²¹ ½¿² ®»­«´¬ ·² ´¿®¹» ª±´«³»­ ±º ®¿·²©¿¬»® ¾»·²¹½±²½»²¬®¿¬»¼ ·² ¿ ­³¿´´ ¿®»¿ ±º ­±·´æ

{ ײ½±®®»½¬ º¿´´­ ·² ®±±º ¹«¬¬»®·²¹ ³¿§ ®»­«´¬ ·² ±ª»®º´±©­ô ¿­ ³¿§¹«¬¬»®­ ¾´±½µ»¼ ©·¬¸ ´»¿ª»­ »¬½ò

{ ݱ®®±¼»¼ ¹«¬¬»®·²¹ ±® ¼±©²°·°»­ ½¿² ­°·´´ ©¿¬»® ¬± ¹®±«²¼ò

{ ܱ©²°·°»­ ²±¬ °±­·¬·ª»´§ ½±²²»½¬»¼ ¬± ¿ °®±°»® ­¬±®³©¿¬»®½±´´»½¬·±² ­§­¬»³ ©·´´ ¼·®»½¬ ¿ ½±²½»²¬®¿¬·±² ±º ©¿¬»® ¬± ­±·´ ¬¸¿¬ ·­¼·®»½¬´§ ¿¼¶¿½»²¬ ¬± º±±¬·²¹­ô ­±³»¬·³»­ ½¿«­·²¹ ´¿®¹»ó­½¿´»°®±¾´»³­ ­«½¸ ¿­ »®±­·±²ô ­¿¬«®¿¬·±² ¿²¼ ³·¹®¿¬·±² ±º ©¿¬»® «²¼»®¬¸» ¾«·´¼·²¹ò

Í»®·±«­²»­­ ±º Ý®¿½µ·²¹

ײ ¹»²»®¿´ô ³±­¬ ½®¿½µ·²¹ º±«²¼ ·² ³¿­±²®§ ©¿´´­ ·­ ¿ ½±­³»¬·½²«·­¿²½» ±²´§ ¿²¼ ½¿² ¾» µ»°¬ ·² ®»°¿·® ±® »ª»² ·¹²±®»¼ò ̸» ¬¿¾´»¾»´±© ·­ ¿ ®»°®±¼«½¬·±² ±º Ì¿¾´» Ýï ±º ßÍ îèéðò

ßÍ îèéð ¿´­± °«¾´·­¸»­ º·¹«®»­ ®»´¿¬·²¹ ¬± ½®¿½µ·²¹ ·² ½±²½®»¬» º´±±®­ô¸±©»ª»® ¾»½¿«­» ©¿´´ ½®¿½µ·²¹ ©·´´ «­«¿´´§ ®»¿½¸ ¬¸» ½®·¬·½¿´ °±·²¬­·¹²·º·½¿²¬´§ »¿®´·»® ¬¸¿² ½®¿½µ·²¹ ·² ­´¿¾­ô ¬¸·­ ¬¿¾´» ·­ ²±¬®»°®±¼«½»¼ ¸»®»ò

Ю»ª»²¬·±²ñÝ«®»

д«³¾·²¹É¸»®» ¾«·´¼·²¹ ³±ª»³»²¬ ·­ ½¿«­»¼ ¾§ ©¿¬»® ­»®ª·½»ô ®±±º °´«³¾·²¹ô­»©»® ±® ­¬±®³©¿¬»® º¿·´«®»ô ¬¸» ®»³»¼§ ·­ ¬± ®»°¿·® ¬¸» °®±¾´»³ò ׬ ·­ °®«¼»²¬ô ¸±©»ª»®ô ¬± ½±²­·¼»® ¿´­± ®»®±«¬·²¹ °·°»­ ¿©¿§ º®±³¬¸» ¾«·´¼·²¹ ©¸»®» °±­­·¾´»ô ¿²¼ ®»´±½¿¬·²¹ ¬¿°­ ¬± °±­·¬·±²­ ©¸»®»¿²§ ´»¿µ¿¹» ©·´´ ²±¬ ¼·®»½¬ ©¿¬»® ¬± ¬¸» ¾«·´¼·²¹ ª·½·²·¬§ò Ûª»² ©¸»®»¹«´´§ ¬®¿°­ ¿®» °®»­»²¬ô ¬¸»®» ·­ ­±³»¬·³»­ ­«ºº·½·»²¬ ­°·´´ ¬± ½®»¿¬»»®±­·±² ±® ­¿¬«®¿¬·±²ô °¿®¬·½«´¿®´§ ·² ³±¼»®² ·²­¬¿´´¿¬·±²­ «­·²¹­³¿´´»® ¼·¿³»¬»® ÐÊÝ º·¨¬«®»­ò ײ¼»»¼ô ­±³» ¹«´´§ ¬®¿°­ ¿®» ²±¬­·¬«¿¬»¼ ¼·®»½¬´§ «²¼»® ¬¸» ¬¿°­ ¬¸¿¬ ¿®» ·²­¬¿´´»¼ ¬± ½¸¿®¹» ¬¸»³ô©·¬¸ ¬¸» ®»­«´¬ ¬¸¿¬ ©¿¬»® º®±³ ¬¸» ¬¿° ³¿§ »²¬»® ¬¸» ¾¿½µº·´´»¼¬®»²½¸ ¬¸¿¬ ¸±«­»­ ¬¸» ­»©»® °·°·²¹ò ׺ ¬¸» ¬®»²½¸ ¸¿­ ¾»»² °±±®´§¾¿½µº·´´»¼ô ¬¸» ©¿¬»® ©·´´ »·¬¸»® °±²¼ ±® º´±© ¿´±²¹ ¬¸» ¾±¬¬±³ ±º¬¸» ¬®»²½¸ò ß­ ¬¸»­» ¬®»²½¸»­ «­«¿´´§ ®«² ¿´±²¹­·¼» ¬¸» º±±¬·²¹­ ¿²¼½¿² ¾» ¿¬ ¿ ­·³·´¿® ¼»°¬¸ô ·¬ ·­ ²±¬ ¸¿®¼ ¬± ­»» ¸±© ¿²§ ©¿¬»® ¬¸¿¬ ·­¬¸«­ ¼·®»½¬»¼ ·²¬± ¿ ¬®»²½¸ ½¿² »¿­·´§ ¿ºº»½¬ ¬¸» º±«²¼¿¬·±²K­ ¿¾·´·¬§ ¬±­«°°±®¬ º±±¬·²¹­ ±® »ª»² ¹¿·² »²¬®§ ¬± ¬¸» ­«¾º´±±® ¿®»¿ò

Ù®±«²¼ ¼®¿·²¿¹»×² ¿´´ ­±·´­ ¬¸»®» ·­ ¬¸» ½¿°¿½·¬§ º±® ©¿¬»® ¬± ¬®¿ª»´ ±² ¬¸» ­«®º¿½» ¿²¼¾»´±© ·¬ò Í«®º¿½» ©¿¬»® º´±©­ ½¿² ¾» »­¬¿¾´·­¸»¼ ¾§ ·²­°»½¬·±² ¼«®·²¹¿²¼ ¿º¬»® ¸»¿ª§ ±® °®±´±²¹»¼ ®¿·²ò ׺ ²»½»­­¿®§ô ¿ ¹®¿¬»¼ ¼®¿·² ­§­¬»³½±²²»½¬»¼ ¬± ¬¸» ­¬±®³©¿¬»® ½±´´»½¬·±² ­§­¬»³ ·­ «­«¿´´§ ¿² »¿­§­±´«¬·±²ò

׬ ·­ô ¸±©»ª»®ô ­±³»¬·³»­ ²»½»­­¿®§ ©¸»² ¿¬¬»³°¬·²¹ ¬± °®»ª»²¬©¿¬»® ³·¹®¿¬·±² ¬¸¿¬ ¬»­¬·²¹ ¾» ½¿®®·»¼ ±«¬ ¬± »­¬¿¾´·­¸ ©¿¬»®¬¿¾´»¸»·¹¸¬ ¿²¼ ­«¾­±·´ ©¿¬»® º´±©­ò ̸·­ ­«¾¶»½¬ ·­ ®»º»®®»¼ ¬± ·² ÞÌÚ ï翲¼ ³¿§ °®±°»®´§ ¾» ®»¹¿®¼»¼ ¿­ ¿² ¿®»¿ º±® ¿² »¨°»®¬ ½±²­«´¬¿²¬ò

Ю±¬»½¬·±² ±º ¬¸» ¾«·´¼·²¹ °»®·³»¬»®×¬ ·­ »­­»²¬·¿´ ¬± ®»³»³¾»® ¬¸¿¬ ¬¸» ­±·´ ¬¸¿¬ ¿ºº»½¬­ º±±¬·²¹­ »¨¬»²¼­©»´´ ¾»§±²¼ ¬¸» ¿½¬«¿´ ¾«·´¼·²¹ ´·²»ò É¿¬»®·²¹ ±º ¹¿®¼»² °´¿²¬­ô­¸®«¾­ ¿²¼ ¬®»»­ ½¿«­»­ ­±³» ±º ¬¸» ³±­¬ ­»®·±«­ ©¿¬»® °®±¾´»³­ò

Ú±® ¬¸·­ ®»¿­±²ô °¿®¬·½«´¿®´§ ©¸»®» °®±¾´»³­ »¨·­¬ ±® ¿®» ´·µ»´§ ¬±±½½«®ô ·¬ ·­ ®»½±³³»²¼»¼ ¬¸¿¬ ¿² ¿°®±² ±º °¿ª·²¹ ¾» ·²­¬¿´´»¼¿®±«²¼ ¿­ ³«½¸ ±º ¬¸» ¾«·´¼·²¹ °»®·³»¬»® ¿­ ²»½»­­¿®§ò ̸·­ °¿ª·²¹

ÝÔßÍÍ×Ú×ÝßÌ×ÑÒ ÑÚ ÜßÓßÙÛ É×ÌØ ÎÛÚÛÎÛÒÝÛ ÌÑ ÉßÔÔÍ

Ü»­½®·°¬·±² ±º ¬§°·½¿´ ¼¿³¿¹» ¿²¼ ®»¯«·®»¼ ®»°¿·® ß°°®±¨·³¿¬» ½®¿½µ ©·¼¬¸ Ü¿³¿¹»´·³·¬ ø­»» Ò±¬» í÷ ½¿¬»¹±®§

Ø¿·®´·²» ½®¿½µ­ äðòï ³³ ð

Ú·²» ½®¿½µ­ ©¸·½¸ ¼± ²±¬ ²»»¼ ®»°¿·® äï ³³ ï

Ý®¿½µ­ ²±¬·½»¿¾´» ¾«¬ »¿­·´§ º·´´»¼ò ܱ±®­ ¿²¼ ©·²¼±©­ ­¬·½µ ­´·¹¸¬´§ äë ³³ î

Ý®¿½µ­ ½¿² ¾» ®»°¿·®»¼ ¿²¼ °±­­·¾´§ ¿ ­³¿´´ ¿³±«²¬ ±º ©¿´´ ©·´´ ²»»¼ ëPïë ³³ ø±® ¿ ²«³¾»® ±º ½®¿½µ­ í¬± ¾» ®»°´¿½»¼ò ܱ±®­ ¿²¼ ©·²¼±©­ ­¬·½µò Í»®ª·½» °·°»­ ½¿² º®¿½¬«®»ò í ³³ ±® ³±®» ·² ±²» ¹®±«°÷É»¿¬¸»®¬·¹¸¬²»­­ ±º¬»² ·³°¿·®»¼

Û¨¬»²­·ª» ®»°¿·® ©±®µ ·²ª±´ª·²¹ ¾®»¿µ·²¹ó±«¬ ¿²¼ ®»°´¿½·²¹ ­»½¬·±²­ ±º ©¿´´­ô ïëPîë ³³ ¾«¬ ¿´­± ¼»°»²¼ ì»­°»½·¿´´§ ±ª»® ¼±±®­ ¿²¼ ©·²¼±©­ò É·²¼±© ¿²¼ ¼±±® º®¿³»­ ¼·­¬±®¬ò É¿´´­ ´»¿² ±² ²«³¾»® ±º ½®¿½µ­±® ¾«´¹» ²±¬·½»¿¾´§ô ­±³» ´±­­ ±º ¾»¿®·²¹ ·² ¾»¿³­ò Í»®ª·½» °·°»­ ¼·­®«°¬»¼

Page 54: SITE CLASSIFICATION REPORT SUMMARY...Douglas Partners (DP) has prepared this report for this project at Taylor 2- Stage 3, Taylor in accordance with DP’s proposal dated 15 September

­¸±«´¼ »¨¬»²¼ ±«¬©¿®¼­ ¿ ³·²·³«³ ±º çðð ³³ ø³±®» ·² ¸·¹¸´§®»¿½¬·ª» ­±·´÷ ¿²¼ ­¸±«´¼ ¸¿ª» ¿ ³·²·³«³ º¿´´ ¿©¿§ º®±³ ¬¸»¾«·´¼·²¹ ±º ïæêðò ̸» º·²·­¸»¼ °¿ª·²¹ ­¸±«´¼ ¾» ²± ´»­­ ¬¸¿² ïðð³³ ¾»´±© ¾®·½µ ª»²¬ ¾¿­»­ò

׬ ·­ °®«¼»²¬ ¬± ®»´±½¿¬» ¼®¿·²¿¹» °·°»­ ¿©¿§ º®±³ ¬¸·­ °¿ª·²¹ô ·º°±­­·¾´»ô ¬± ¿ª±·¼ ½±³°´·½¿¬·±²­ º®±³ º«¬«®» ´»¿µ¿¹»ò ׺ ¬¸·­ ·­ ²±¬°®¿½¬·½¿´ô »¿®¬¸»²©¿®» °·°»­ ­¸±«´¼ ¾» ®»°´¿½»¼ ¾§ ÐÊÝ ¿²¼¾¿½µº·´´·²¹ ­¸±«´¼ ¾» ±º ¬¸» ­¿³» ­±·´ ¬§°» ¿­ ¬¸» ­«®®±«²¼·²¹ ­±·´¿²¼ ½±³°¿½¬»¼ ¬± ¬¸» ­¿³» ¼»²­·¬§ò

Û¨½»°¬ ·² ¿®»¿­ ©¸»®» º®»»¦·²¹ ±º ©¿¬»® ·­ ¿² ·­­«»ô ·¬ ·­ ©·­» ¬±®»³±ª» ¬¿°­ ·² ¬¸» ¾«·´¼·²¹ ¿®»¿ ¿²¼ ®»´±½¿¬» ¬¸»³ ©»´´ ¿©¿§ º®±³¬¸» ¾«·´¼·²¹ P °®»º»®¿¾´§ ²±¬ «°¸·´´ º®±³ ·¬ ø­»» ÞÌÚ ïç÷ò

׬ ³¿§ ¾» ¼»­·®¿¾´» ¬± ·²­¬¿´´ ¿ ¹®¿¬»¼ ¼®¿·² ¿¬ ¬¸» ±«¬­·¼» »¼¹» ±º ¬¸»°¿ª·²¹ ±² ¬¸» «°¸·´´ ­·¼» ±º ¬¸» ¾«·´¼·²¹ò ׺ ­«¾­±·´ ¼®¿·²¿¹» ·­²»»¼»¼ ¬¸·­ ½¿² ¾» ·²­¬¿´´»¼ «²¼»® ¬¸» ­«®º¿½» ¼®¿·²ò

ݱ²¼»²­¿¬·±²×² ¾«·´¼·²¹­ ©·¬¸ ¿ ­«¾º´±±® ª±·¼ ­«½¸ ¿­ ©¸»®» ¾»¿®»®­ ¿²¼ ¶±·­¬­­«°°±®¬ º´±±®·²¹ô ·²­«ºº·½·»²¬ ª»²¬·´¿¬·±² ½®»¿¬»­ ·¼»¿´ ½±²¼·¬·±²­ º±®½±²¼»²­¿¬·±²ô °¿®¬·½«´¿®´§ ©¸»®» ¬¸»®» ·­ ´·¬¬´» ½´»¿®¿²½» ¾»¬©»»² ¬¸»º´±±® ¿²¼ ¬¸» ¹®±«²¼ò ݱ²¼»²­¿¬·±² ¿¼¼­ ¬± ¬¸» ³±·­¬«®» ¿´®»¿¼§°®»­»²¬ ·² ¬¸» ­«¾º´±±® ¿²¼ ­·¹²·º·½¿²¬´§ ­´±©­ ¬¸» °®±½»­­ ±º ¼®§·²¹±«¬ò ײ­¬¿´´¿¬·±² ±º ¿² ¿¼»¯«¿¬» ­«¾º´±±® ª»²¬·´¿¬·±² ­§­¬»³ô »·¬¸»®²¿¬«®¿´ ±® ³»½¸¿²·½¿´ô ·­ ¼»­·®¿¾´»ò

É¿®²·²¹æ ß´¬¸±«¹¸ ¬¸·­ Þ«·´¼·²¹ Ì»½¸²±´±¹§ Ú·´» ¼»¿´­ ©·¬¸½®¿½µ·²¹ ·² ¾«·´¼·²¹­ô ·¬ ­¸±«´¼ ¾» ­¿·¼ ¬¸¿¬ ­«¾º´±±® ³±·­¬«®» ½¿²®»­«´¬ ·² ¬¸» ¼»ª»´±°³»²¬ ±º ±¬¸»® °®±¾´»³­ô ²±¬¿¾´§æ

{ É¿¬»® ¬¸¿¬ ·­ ¬®¿²­³·¬¬»¼ ·²¬± ³¿­±²®§ô ³»¬¿´ ±® ¬·³¾»® ¾«·´¼·²¹»´»³»²¬­ ½¿«­»­ ¼¿³¿¹» ¿²¼ñ±® ¼»½¿§ ¬± ¬¸±­» »´»³»²¬­ò

{ Ø·¹¸ ­«¾º´±±® ¸«³·¼·¬§ ¿²¼ ³±·­¬«®» ½±²¬»²¬ ½®»¿¬» ¿² ·¼»¿´»²ª·®±²³»²¬ º±® ª¿®·±«­ °»­¬­ô ·²½´«¼·²¹ ¬»®³·¬»­ ¿²¼ ­°·¼»®­ò

{ ɸ»®» ¸·¹¸ ³±·­¬«®» ´»ª»´­ ¿®» ¬®¿²­³·¬¬»¼ ¬± ¬¸» º´±±®·²¹ ¿²¼©¿´´­ô ¿² ·²½®»¿­» ·² ¬¸» ¼«­¬ ³·¬» ½±«²¬ ½¿² »²­«» ©·¬¸·² ¬¸»´·ª·²¹ ¿®»¿­ò Ü«­¬ ³·¬»­ô ¿­ ©»´´ ¿­ ¼¿³°²»­­ ·² ¹»²»®¿´ô ½¿² ¾» ¿¸»¿´¬¸ ¸¿¦¿®¼ ¬± ·²¸¿¾·¬¿²¬­ô °¿®¬·½«´¿®´§ ¬¸±­» ©¸± ¿®»¿¾²±®³¿´´§ ­«­½»°¬·¾´» ¬± ®»­°·®¿¬±®§ ¿·´³»²¬­ò

̸» ¹¿®¼»²Ì¸» ·¼»¿´ ª»¹»¬¿¬·±² ´¿§±«¬ ·­ ¬± ¸¿ª» ´¿©² ±® °´¿²¬­ ¬¸¿¬ ®»¯«·®»±²´§ ´·¹¸¬ ©¿¬»®·²¹ ·³³»¼·¿¬»´§ ¿¼¶¿½»²¬ ¬± ¬¸» ¼®¿·²¿¹» ±® °¿ª·²¹»¼¹»ô ¬¸»² ³±®» ¼»³¿²¼·²¹ °´¿²¬­ô ­¸®«¾­ ¿²¼ ¬®»»­ ­°®»¿¼ ±«¬ ·²¬¸¿¬ ±®¼»®ò

Ѫ»®©¿¬»®·²¹ ¼«» ¬± ³·­«­» ±º ¿«¬±³¿¬·½ ©¿¬»®·²¹ ­§­¬»³­ ·­ ¿½±³³±² ½¿«­» ±º ­¿¬«®¿¬·±² ¿²¼ ©¿¬»® ³·¹®¿¬·±² «²¼»® º±±¬·²¹­ò ׺·¬ ·­ ²»½»­­¿®§ ¬± «­» ¬¸»­» ­§­¬»³­ô ·¬ ·­ ·³°±®¬¿²¬ ¬± ®»³±ª» ¹¿®¼»²¾»¼­ ¬± ¿ ½±³°´»¬»´§ ­¿º» ¼·­¬¿²½» º®±³ ¾«·´¼·²¹­ò

Û¨·­¬·²¹ ¬®»»­É¸»®» ¿ ¬®»» ·­ ½¿«­·²¹ ¿ °®±¾´»³ ±º ­±·´ ¼®§·²¹ ±® ¬¸»®» ·­ ¬¸»»¨·­¬»²½» ±® ¬¸®»¿¬ ±º «°¸»¿ª¿´ ±º º±±¬·²¹­ô ·º ¬¸» ±ºº»²¼·²¹ ®±±¬­ ¿®»­«¾­·¼·¿®§ ¿²¼ ¬¸»·® ®»³±ª¿´ ©·´´ ²±¬ ­·¹²·º·½¿²¬´§ ¼¿³¿¹» ¬¸» ¬®»»ô¬¸»§ ­¸±«´¼ ¾» ­»ª»®»¼ ¿²¼ ¿ ½±²½®»¬» ±® ³»¬¿´ ¾¿®®·»® °´¿½»¼ª»®¬·½¿´´§ ·² ¬¸» ­±·´ ¬± °®»ª»²¬ º«¬«®» ®±±¬ ¹®±©¬¸ ·² ¬¸» ¼·®»½¬·±² ±º¬¸» ¾«·´¼·²¹ò ׺ ·¬ ·­ ²±¬ °±­­·¾´» ¬± ®»³±ª» ¬¸» ®»´»ª¿²¬ ®±±¬­©·¬¸±«¬ ¼¿³¿¹» ¬± ¬¸» ¬®»»ô ¿² ¿°°´·½¿¬·±² ¬± ®»³±ª» ¬¸» ¬®»» ­¸±«´¼¾» ³¿¼» ¬± ¬¸» ´±½¿´ ¿«¬¸±®·¬§ò ß °®«¼»²¬ °´¿² ·­ ¬± ¬®¿²­°´¿²¬ ´·µ»´§±ºº»²¼»®­ ¾»º±®» ¬¸»§ ¾»½±³» ¿ °®±¾´»³ò

ײº±®³¿¬·±² ±² ¬®»»­ô °´¿²¬­ ¿²¼ ­¸®«¾­Í¬¿¬» ¼»°¿®¬³»²¬­ ±ª»®­»»·²¹ ¿¹®·½«´¬«®» ½¿² ¹·ª» ·²º±®³¿¬·±²®»¹¿®¼·²¹ ®±±¬ °¿¬¬»®²­ô ª±´«³» ±º ©¿¬»® ²»»¼»¼ ¿²¼ ­¿º» ¼·­¬¿²½»º®±³ ¾«·´¼·²¹­ ±º ³±­¬ ­°»½·»­ò Þ±¬¿²·½ ¹¿®¼»²­ ¿®» ¿´­± ­±«®½»­ ±º·²º±®³¿¬·±²ò Ú±® ·²º±®³¿¬·±² ±² °´¿²¬ ®±±¬­ ¿²¼ ¼®¿·²­ô ­»» Þ«·´¼·²¹Ì»½¸²±´±¹§ Ú·´» ïéò

Û¨½¿ª¿¬·±²Û¨½¿ª¿¬·±² ¿®±«²¼ º±±¬·²¹­ ³«­¬ ¾» °®±°»®´§ »²¹·²»»®»¼ò ͱ·´­«°°±®¬·²¹ º±±¬·²¹­ ½¿² ±²´§ ¾» ­¿º»´§ »¨½¿ª¿¬»¼ ¿¬ ¿² ¿²¹´» ¬¸¿¬¿´´±©­ ¬¸» ­±·´ «²¼»® ¬¸» º±±¬·²¹ ¬± ®»³¿·² ­¬¿¾´»ò ̸·­ ¿²¹´» ·­½¿´´»¼ ¬¸» ¿²¹´» ±º ®»°±­» ø±® º®·½¬·±²÷ ¿²¼ ª¿®·»­ ­·¹²·º·½¿²¬´§¾»¬©»»² ­±·´ ¬§°»­ ¿²¼ ½±²¼·¬·±²­ò λ³±ª¿´ ±º ­±·´ ©·¬¸·² ¬¸» ¿²¹´»±º ®»°±­» ©·´´ ½¿«­» ­«¾­·¼»²½»ò

λ³»¼·¿¬·±²

ɸ»®» »®±­·±² ¸¿­ ±½½«®®»¼ ¬¸¿¬ ¸¿­ ©¿­¸»¼ ¿©¿§ ­±·´ ¿¼¶¿½»²¬ ¬±º±±¬·²¹­ô ­±·´ ±º ¬¸» ­¿³» ½´¿­­·º·½¿¬·±² ­¸±«´¼ ¾» ·²¬®±¼«½»¼ ¿²¼½±³°¿½¬»¼ ¬± ¬¸» ­¿³» ¼»²­·¬§ò ɸ»®» º±±¬·²¹­ ¸¿ª» ¾»»²«²¼»®³·²»¼ô ¿«¹³»²¬¿¬·±² ±® ±¬¸»® ­°»½·¿´·­¬ ©±®µ ³¿§ ¾» ®»¯«·®»¼òλ³»¼·¿¬·±² ±º º±±¬·²¹­ ¿²¼ º±«²¼¿¬·±²­ ·­ ¹»²»®¿´´§ ¬¸» ®»¿´³ ±º ¿­°»½·¿´·­¬ ½±²­«´¬¿²¬ò

ɸ»®» ·­±´¿¬»¼ º±±¬·²¹­ ®·­» ¿²¼ º¿´´ ¾»½¿«­» ±º ­©»´´ñ­¸®·²µ »ºº»½¬ô¬¸» ¸±³»±©²»® ³¿§ ¾» ¬»³°¬»¼ ¬± ¿´´»ª·¿¬» º´±±® ¾±«²½» ¾§ º·´´·²¹¬¸» ¹¿° ¬¸¿¬ ¸¿­ ¿°°»¿®»¼ ¾»¬©»»² ¬¸» ¾»¿®»® ¿²¼ ¬¸» °·»® ©·¬¸¾´±½µ·²¹ò ̸» ¼¿²¹»® ¸»®» ·­ ¬¸¿¬ ©¸»² ¬¸» ²»¨¬ ­©»´´ ­»¹³»²¬ ±º ¬¸»½§½´» ±½½«®­ô ¬¸» »¨¬®¿ ¾´±½µ·²¹ ©·´´ °«­¸ ¬¸» º´±±® «° ·²¬± ¿²¿½½»²¬«¿¬»¼ ¼±³» ¿²¼ ³¿§ ¿´­± ½¿«­» ´±½¿´ ­¸»¿® º¿·´«®» ·² ¬¸» ­±·´ò׺ ·¬ ·­ ²»½»­­¿®§ ¬± «­» ¾´±½µ·²¹ô ·¬ ­¸±«´¼ ¾» ¾§ ¿ °¿·® ±º º·²»©»¼¹»­ ¿²¼ ³±²·¬±®·²¹ ­¸±«´¼ ¾» ½¿®®·»¼ ±«¬ º±®¬²·¹¸¬´§ò

̸·­ ÞÌÚ ©¿­ °®»°¿®»¼ ¾§ Ö±¸² Ô»©»® Úß×Þô Ó×ßÓßô ﮬ²»®ô

ݱ²­¬®«½¬·±² Ü·¿¹²±­·­ò

̸» ·²º±®³¿¬·±² ·² ¬¸·­ ¿²¼ ±¬¸»® ·­­«»­ ·² ¬¸» ­»®·»­ ©¿­ ¼»®·ª»¼ º®±³ ª¿®·±«­ ­±«®½»­ ¿²¼ ©¿­ ¾»´·»ª»¼ ¬± ¾» ½±®®»½¬ ©¸»² °«¾´·­¸»¼ò

̸» ·²º±®³¿¬·±² ·­ ¿¼ª·­±®§ò ׬ ·­ °®±ª·¼»¼ ·² ¹±±¼ º¿·¬¸ ¿²¼ ²±¬ ½´¿·³»¼ ¬± ¾» ¿² »¨¸¿«­¬·ª» ¬®»¿¬³»²¬ ±º ¬¸» ®»´»ª¿²¬ ­«¾¶»½¬ò

Ú«®¬¸»® °®±º»­­·±²¿´ ¿¼ª·½» ²»»¼­ ¬± ¾» ±¾¬¿·²»¼ ¾»º±®» ¬¿µ·²¹ ¿²§ ¿½¬·±² ¾¿­»¼ ±² ¬¸» ·²º±®³¿¬·±² °®±ª·¼»¼ò

Ü·­¬®·¾«¬»¼ ¾§

ÝÍ×ÎÑ ÐËÞÔ ×ÍØ ×ÒÙ ÐÑ Þ±¨ ïïíçô ݱ´´·²¹©±±¼ íðêêô ß«­¬®¿´·¿

Ú®»»½¿´´ ïèðð êìë ðëï Ì»´ øðí÷ çêêî éêêê Ú¿¨ øðí÷ çêêî éëëë ©©©ò°«¾´·­¸ò½­·®±ò¿«

Û³¿·´æ °«¾´·­¸·²¹ò­¿´»­à½­·®±ò¿«

w ÝÍ×ÎÑ îððíò ˲¿«¬¸±®·­»¼ ½±°§·²¹ ±º ¬¸·­ Þ«·´¼·²¹ Ì»½¸²±´±¹§ º·´» ·­ °®±¸·¾·¬»¼

Ù¿®¼»²­ º±® ¿ ®»¿½¬·ª» ­·¬»

Page 55: SITE CLASSIFICATION REPORT SUMMARY...Douglas Partners (DP) has prepared this report for this project at Taylor 2- Stage 3, Taylor in accordance with DP’s proposal dated 15 September

TOPSOIL FILLING-dry to moist, brown silty sand

FILLING-generally comprising well compacted, dry tomoist, grey brown, low to medium plasticity silty sandyclay with some gravel and occasional cobbles

Pit discontinued at 1.7m-limit of investigation

0.2

1.7

SAMPLING & IN SITU TESTING LEGEND

TEST PIT LOG

Taylor 2 Estate, Stage 3, Taylor

A Auger sample G Gas sample PID Photo ionisation detector (ppm)B Bulk sample P Piston sample PL(A) Point load axial test Is(50) (MPa)BLK Block sample Ux Tube sample (x mm dia.) PL(D) Point load diametral test Is(50) (MPa)C Core drilling W Water sample pp Pocket penetrometer (kPa)D Disturbed sample Water seep S Standard penetration testE Environmental sample Water level V Shear vane (kPa)

Indesco Consulting Engineers Pty LtdSite Classifications

Results &Comments

LOGGED: JPM SURVEY DATUM: MGA94

CLIENT:PROJECT:LOCATION:

PIT No: 57PROJECT No: 77418.29DATE: 11/1/2019SHEET 1 OF 1

Sampling & In Situ Testing

1

2

Wat

er

Dep

th

Sam

ple

Description

of

Strata Gra

phic

Log

Typ

e

REMARKS: Surface Levels & Coordinates are approximate only and must not be relied upon

RIG: Kubota KX057-4 mini-excavator with 300mm wide bucket

WATER OBSERVATIONS: No free groundwater observed

SURFACE LEVEL: 666.0 AHDEASTING: 209106NORTHING: 618773

Dynamic Penetrometer Test(blows per mm)

5 10 15 20

Cone Penetrometer AS1289.6.3.2Sand Penetrometer AS1289.6.3.3

Depth(m) R

L

1

2

666

665

664

D

0.9

1.2

pp >400

Page 56: SITE CLASSIFICATION REPORT SUMMARY...Douglas Partners (DP) has prepared this report for this project at Taylor 2- Stage 3, Taylor in accordance with DP’s proposal dated 15 September

TOPSOIL FILLING-dry to moist, brown silty sand

FILLING-generally comprising well compacted, dry tomoist, orange brown, medium plasticity silty sandy claywith some gravel

Pit discontinued at 1.5m-limit of investigation

0.15

1.5

SAMPLING & IN SITU TESTING LEGEND

TEST PIT LOG

Taylor 2 Estate, Stage 3, Taylor

A Auger sample G Gas sample PID Photo ionisation detector (ppm)B Bulk sample P Piston sample PL(A) Point load axial test Is(50) (MPa)BLK Block sample Ux Tube sample (x mm dia.) PL(D) Point load diametral test Is(50) (MPa)C Core drilling W Water sample pp Pocket penetrometer (kPa)D Disturbed sample Water seep S Standard penetration testE Environmental sample Water level V Shear vane (kPa)

Indesco Consulting Engineers Pty LtdSite Classifications

Results &Comments

LOGGED: JPM SURVEY DATUM: MGA94

CLIENT:PROJECT:LOCATION:

PIT No: 58PROJECT No: 77418.29DATE: 11/1/2019SHEET 1 OF 1

Sampling & In Situ Testing

1

2

Wat

er

Dep

th

Sam

ple

Description

of

Strata Gra

phic

Log

Typ

e

REMARKS: Surface Levels & Coordinates are approximate only and must not be relied upon

RIG: Kubota KX057-4 mini-excavator with 300mm wide bucket

WATER OBSERVATIONS: No free groundwater observed

SURFACE LEVEL: 668.0 AHDEASTING: 209093NORTHING: 618793

Dynamic Penetrometer Test(blows per mm)

5 10 15 20

Cone Penetrometer AS1289.6.3.2Sand Penetrometer AS1289.6.3.3

Depth(m) R

L

1

2

668

667

666

D 1.2

Page 57: SITE CLASSIFICATION REPORT SUMMARY...Douglas Partners (DP) has prepared this report for this project at Taylor 2- Stage 3, Taylor in accordance with DP’s proposal dated 15 September
Page 58: SITE CLASSIFICATION REPORT SUMMARY...Douglas Partners (DP) has prepared this report for this project at Taylor 2- Stage 3, Taylor in accordance with DP’s proposal dated 15 September

SITE CLASSIFICATION REPORT SUMMARY

BLOCK: 4 SECTION: 64 SUBURB: Taylor

JOB No: 77418.29 DATE: March 2019

CLIENT: Indesco Consulting Engineers Pty Ltd

Classification Procedures: Existing Subsurface Conditions: Refer attached test pit log(s) – Pit(s) 56,57 and Drawing 1. Bulk Earthworks: Filling within the block placed under Level 1 control as defined in AS 3798 – 2007 (Ref 1). Laboratory Results: Previous laboratory testing results indicated liquid limit ranging from 25-66%, plasticity index ranging from 6-49% and linear shrinkage ranging from 3-20.5%.

Site Classification: Class M* (moderately reactive/filled) based on the current profile / state on limited subsurface information and determined in general accordance with the requirements of AS2870-2011 (Ref 2). The classification must be reassessed should the soil profile change either by adding fill or removing soil from the block and/or if the presence of service trenches or retaining walls are within the zone of influence of the block. Reference should be made to the comments provided below.

Footing Systems: Reference must be made to AS2870-2011 (Ref 2) which indicates footing systems that are appropriate for each site classification. All footings must found within a uniform bearing stratum of suitable strength/material, below the zone of influence of any service trenches, backfill zones, retaining walls or underground structures. Masonry walls should be articulated in accordance with current best practice. Dwelling design must ensure uniform moisture conditions are maintained in the vicinity of footings. Footing systems must be confirmed by a structural engineer taking into consideration any onsite or offsite constraints.

Maintenance Guidelines: Reference should be made to the attached CSIRO Sheet BTF 18 ‘Foundation Maintenance & Footing Performance’ to comments about gardens, landscaping and trees on the performance of foundation soils and in particular in respect to maintaining good surface drainage. It notes that minor cracking in most structures is inevitable, and it describes site maintenance practices aimed at minimising foundation movements that can lead to cracking damage.

Comments/ Limitations:

The successful purchaser must make their own interpretations, deductions and conclusions from the information made available and will need to accept full responsibility for such interpretations, deductions and conclusions.

Development specific geotechnical investigations must be undertaken.

Additional topsoils / filling may have been spread subsequent to the investigation.

Site preparation prior to the construction should include removal of all vegetation, topsoil and any uncontrolled filling.

All new filling must be placed under controlled conditions (AS 3798-2007), otherwise Class P conditions would be warranted.

Some variability in subsurface conditions must be anticipated.

Moisture condition of site soils and/or the presence of groundwater may vary considerably from time of investigation compared to at the time of construction.

Depending on the depth of site cut and trenches, rock excavation may be required.

It is recommended that footing excavations be inspected by a geotechnical engineer.

This report must be read in conjunction with the attached “Limitations” and notes “About this Report”.

References:

1.

2.

AS 3798-2007 ‘Guidelines on Earthworks for Commercial and Residential Developments’, Standards Association of Australia.

AS 2870-2011 ‘Residential Slabs and Footings,’ Standards Association of Australia.

Attachments:

Limitations & About this Report Explanatory Notes Test Pit Log(s) Pit(s) 56,57 Drawing 1

Page 59: SITE CLASSIFICATION REPORT SUMMARY...Douglas Partners (DP) has prepared this report for this project at Taylor 2- Stage 3, Taylor in accordance with DP’s proposal dated 15 September

FS 604853

Douglas Partners Pty Ltd ABN 75 053 980 117

www.douglaspartners.com.au Unit 2, 73 Sheppard Street

Hume ACT 2620 PO Box 1487

Fyshwick ACT 2609 Phone (02) 6260 2788

Fax (02) 6260 1147

Brisbane • Cairns • Canberra • Central Coast • Coffs Harbour • Darwin • Geelong • Gold Coast • Macarthur • Melbourne Newcastle • North West Sydney • Perth • Port Macquarie • Sunshine Coast • Sydney • Townsville • Wollongong

Limitations Douglas Partners (DP) has prepared this report for this project at Taylor 2 - Stage 3, Taylor in accordance with DP’s proposal dated 15 September 2017 and acceptance received from Indesco Consulting Engineers Pty Ltd dated 13 March 2019. The work was carried out under DP’s Conditions of Engagement. This report is provided for the exclusive use of Indesco Consulting Engineers Pty Ltd for this project only and for the purposes as described in the report. It should not be used by or relied upon for other projects or purposes on the same or other site or by a third party. Any party so relying upon this report beyond its exclusive use and purpose as stated above, and without the express written consent of DP, does so entirely at its own risk and without recourse to DP for any loss or damage. In preparing this report DP has necessarily relied upon information provided by the client and/or their agents. The results provided in the report are indicative of the sub-surface conditions on the site only at the specific sampling and/or testing locations, and then only to the depths investigated and at the time the work was carried out. Sub-surface conditions can change abruptly due to variable geological processes and also as a result of human influences. Such changes may occur after DP’s field testing has been completed. DP’s advice is based upon the conditions encountered during this investigation. The accuracy of the advice provided by DP in this report may be affected by undetected variations in ground conditions across the site between and beyond the sampling and/or testing locations. The advice may also be limited by budget constraints imposed by others or by site accessibility. This report must be read in conjunction with all of the attached and should be kept in its entirety without separation of individual pages or sections. DP cannot be held responsible for interpretations or conclusions made by others unless they are supported by an expressed statement, interpretation, outcome or conclusion stated in this report. This report, or sections from this report, should not be used as part of a specification for a project, without review and agreement by DP. This is because this report has been written as advice and opinion rather than instructions for construction. The scope for work for this investigation/report did not include the assessment of surface or sub-surface materials or groundwater for contaminants, within or adjacent to the site. Should evidence of filling of unknown origin be noted in the report, and in particular the presence of building demolition materials, it should be recognised that there may be some risk that such filling may contain contaminants and hazardous building materials. The contents of this report do not constitute formal design components such as are required, by the Health and Safety Legislation and Regulations, to be included in a Safety Report specifying the hazards likely to be encountered during construction and the controls required to mitigate risk. This design process requires risk assessment to be undertaken, with such assessment being dependent upon factors relating to likelihood of occurrence and consequences of damage to property and to life. This, in turn, requires project data and analysis presently beyond the knowledge and project role respectively of DP. DP may be able, however, to assist the client in carrying out a risk assessment of potential hazards contained in the Comments section of this report, as an extension to the current scope of works, if so requested, and provided that suitable additional information is made available to DP. Any such risk assessment would, however, be necessarily restricted to the geotechnical components set out in this report and to their application by the project designers to project design, construction, maintenance and demolition.

Page 60: SITE CLASSIFICATION REPORT SUMMARY...Douglas Partners (DP) has prepared this report for this project at Taylor 2- Stage 3, Taylor in accordance with DP’s proposal dated 15 September

July 2010

Introduction These notes have been provided to amplify DP's report in regard to classification methods, field procedures and the comments section. Not all are necessarily relevant to all reports. DP's reports are based on information gained from limited subsurface excavations and sampling, supplemented by knowledge of local geology and experience. For this reason, they must be regarded as interpretive rather than factual documents, limited to some extent by the scope of information on which they rely. Copyright This report is the property of Douglas Partners Pty Ltd. The report may only be used for the purpose for which it was commissioned and in accordance with the Conditions of Engagement for the commission supplied at the time of proposal. Unauthorised use of this report in any form whatsoever is prohibited. Borehole and Test Pit Logs The borehole and test pit logs presented in this report are an engineering and/or geological interpretation of the subsurface conditions, and their reliability will depend to some extent on frequency of sampling and the method of drilling or excavation. Ideally, continuous undisturbed sampling or core drilling will provide the most reliable assessment, but this is not always practicable or possible to justify on economic grounds. In any case the boreholes and test pits represent only a very small sample of the total subsurface profile. Interpretation of the information and its application to design and construction should therefore take into account the spacing of boreholes or pits, the frequency of sampling, and the possibility of other than 'straight line' variations between the test locations. Groundwater Where groundwater levels are measured in boreholes there are several potential problems, namely: • In low permeability soils groundwater may

enter the hole very slowly or perhaps not at all during the time the hole is left open;

• A localised, perched water table may lead to an erroneous indication of the true water table;

• Water table levels will vary from time to time with seasons or recent weather changes. They may not be the same at the time of construction as are indicated in the report; and

• The use of water or mud as a drilling fluid will mask any groundwater inflow. Water has to be blown out of the hole and drilling mud must first be washed out of the hole if water measurements are to be made.

More reliable measurements can be made by installing standpipes which are read at intervals over several days, or perhaps weeks for low permeability soils. Piezometers, sealed in a particular stratum, may be advisable in low permeability soils or where there may be interference from a perched water table. Reports The report has been prepared by qualified personnel, is based on the information obtained from field and laboratory testing, and has been undertaken to current engineering standards of interpretation and analysis. Where the report has been prepared for a specific design proposal, the information and interpretation may not be relevant if the design proposal is changed. If this happens, DP will be pleased to review the report and the sufficiency of the investigation work. Every care is taken with the report as it relates to interpretation of subsurface conditions, discussion of geotechnical and environmental aspects, and recommendations or suggestions for design and construction. However, DP cannot always anticipate or assume responsibility for: • Unexpected variations in ground conditions.

The potential for this will depend partly on borehole or pit spacing and sampling frequency;

• Changes in policy or interpretations of policy by statutory authorities; or

• The actions of contractors responding to commercial pressures.

If these occur, DP will be pleased to assist with investigations or advice to resolve the matter.

Page 61: SITE CLASSIFICATION REPORT SUMMARY...Douglas Partners (DP) has prepared this report for this project at Taylor 2- Stage 3, Taylor in accordance with DP’s proposal dated 15 September

July 2010

Site Anomalies In the event that conditions encountered on site during construction appear to vary from those which were expected from the information contained in the report, DP requests that it be immediately notified. Most problems are much more readily resolved when conditions are exposed rather than at some later stage, well after the event. Information for Contractual Purposes Where information obtained from this report is provided for tendering purposes, it is recommended that all information, including the written report and discussion, be made available. In circumstances where the discussion or comments section is not relevant to the contractual situation, it may be appropriate to prepare a specially edited document. DP would be pleased to assist in this regard and/or to make additional report copies available for contract purposes at a nominal charge. Site Inspection The company will always be pleased to provide engineering inspection services for geotechnical and environmental aspects of work to which this report is related. This could range from a site visit to confirm that conditions exposed are as expected, to full time engineering presence on site.

Page 62: SITE CLASSIFICATION REPORT SUMMARY...Douglas Partners (DP) has prepared this report for this project at Taylor 2- Stage 3, Taylor in accordance with DP’s proposal dated 15 September

July 2010

Sampling Sampling is carried out during drilling or test pitting to allow engineering examination (and laboratory testing where required) of the soil or rock. Disturbed samples taken during drilling provide information on colour, type, inclusions and, depending upon the degree of disturbance, some information on strength and structure. Undisturbed samples are taken by pushing a thin-walled sample tube into the soil and withdrawing it to obtain a sample of the soil in a relatively undisturbed state. Such samples yield information on structure and strength, and are necessary for laboratory determination of shear strength and compressibility. Undisturbed sampling is generally effective only in cohesive soils. Test Pits Test pits are usually excavated with a backhoe or an excavator, allowing close examination of the in-situ soil if it is safe to enter into the pit. The depth of excavation is limited to about 3 m for a backhoe and up to 6 m for a large excavator. A potential disadvantage of this investigation method is the larger area of disturbance to the site. Large Diameter Augers Boreholes can be drilled using a rotating plate or short spiral auger, generally 300 mm or larger in diameter commonly mounted on a standard piling rig. The cuttings are returned to the surface at intervals (generally not more than 0.5 m) and are disturbed but usually unchanged in moisture content. Identification of soil strata is generally much more reliable than with continuous spiral flight augers, and is usually supplemented by occasional undisturbed tube samples. Continuous Spiral Flight Augers The borehole is advanced using 90-115 mm diameter continuous spiral flight augers which are withdrawn at intervals to allow sampling or in-situ testing. This is a relatively economical means of drilling in clays and sands above the water table. Samples are returned to the surface, or may be collected after withdrawal of the auger flights, but they are disturbed and may be mixed with soils from the sides of the hole. Information from the drilling (as distinct from specific sampling by SPTs or undisturbed samples) is of relatively low

reliability, due to the remoulding, possible mixing or softening of samples by groundwater. Non-core Rotary Drilling The borehole is advanced using a rotary bit, with water or drilling mud being pumped down the drill rods and returned up the annulus, carrying the drill cuttings. Only major changes in stratification can be determined from the cuttings, together with some information from the rate of penetration. Where drilling mud is used this can mask the cuttings and reliable identification is only possible from separate sampling such as SPTs. Continuous Core Drilling A continuous core sample can be obtained using a diamond tipped core barrel, usually with a 50 mm internal diameter. Provided full core recovery is achieved (which is not always possible in weak rocks and granular soils), this technique provides a very reliable method of investigation. Standard Penetration Tests Standard penetration tests (SPT) are used as a means of estimating the density or strength of soils and also of obtaining a relatively undisturbed sample. The test procedure is described in Australian Standard 1289, Methods of Testing Soils for Engineering Purposes - Test 6.3.1. The test is carried out in a borehole by driving a 50 mm diameter split sample tube under the impact of a 63 kg hammer with a free fall of 760 mm. It is normal for the tube to be driven in three successive 150 mm increments and the 'N' value is taken as the number of blows for the last 300 mm. In dense sands, very hard clays or weak rock, the full 450 mm penetration may not be practicable and the test is discontinued. The test results are reported in the following form. • In the case where full penetration is obtained

with successive blow counts for each 150 mm of, say, 4, 6 and 7 as:

4,6,7 N=13

• In the case where the test is discontinued before the full penetration depth, say after 15 blows for the first 150 mm and 30 blows for the next 40 mm as:

15, 30/40 mm

Page 63: SITE CLASSIFICATION REPORT SUMMARY...Douglas Partners (DP) has prepared this report for this project at Taylor 2- Stage 3, Taylor in accordance with DP’s proposal dated 15 September

July 2010

The results of the SPT tests can be related empirically to the engineering properties of the soils. Dynamic Cone Penetrometer Tests / Perth Sand Penetrometer Tests Dynamic penetrometer tests (DCP or PSP) are carried out by driving a steel rod into the ground using a standard weight of hammer falling a specified distance. As the rod penetrates the soil the number of blows required to penetrate each successive 150 mm depth are recorded. Normally there is a depth limitation of 1.2 m, but this may be extended in certain conditions by the use of extension rods. Two types of penetrometer are commonly used. • Perth sand penetrometer - a 16 mm diameter

flat ended rod is driven using a 9 kg hammer dropping 600 mm (AS 1289, Test 6.3.3). This test was developed for testing the density of sands and is mainly used in granular soils and filling.

• Cone penetrometer - a 16 mm diameter rod with a 20 mm diameter cone end is driven using a 9 kg hammer dropping 510 mm (AS 1289, Test 6.3.2). This test was developed initially for pavement subgrade investigations, and correlations of the test results with California Bearing Ratio have been published by various road authorities.

Page 64: SITE CLASSIFICATION REPORT SUMMARY...Douglas Partners (DP) has prepared this report for this project at Taylor 2- Stage 3, Taylor in accordance with DP’s proposal dated 15 September

May 2017

Description and Classification Methods The methods of description and classification of

soils and rocks used in this report are based on

Australian Standard AS 1726-1993, Geotechnical

Site Investigations Code. In general, the

descriptions include strength or density, colour,

structure, soil or rock type and inclusions.

Soil Types Soil types are described according to the

predominant particle size, qualified by the grading

of other particles present:

Type Particle size (mm)

Boulder >200

Cobble 63 - 200

Gravel 2.36 - 63

Sand 0.075 - 2.36

Silt 0.002 - 0.075

Clay <0.002

The sand and gravel sizes can be further

subdivided as follows:

Type Particle size (mm)

Coarse gravel 20 - 63

Medium gravel 6 - 20

Fine gravel 2.36 - 6

Coarse sand 0.6 - 2.36

Medium sand 0.2 - 0.6

Fine sand 0.075 - 0.2

The proportions of secondary constituents of soils

are described as:

Term Proportion Example

And Specify Clay (60%) and

Sand (40%)

Adjective 20 - 35% Sandy Clay

Slightly 12 - 20% Slightly Sandy

Clay

With some 5 - 12% Clay with some

sand

With a trace of 0 - 5% Clay with a trace

of sand

Definitions of grading terms used are:

• Well graded - a good representation of all

particle sizes

• Poorly graded - an excess or deficiency of

particular sizes within the specified range

• Uniformly graded - an excess of a particular

particle size

• Gap graded - a deficiency of a particular

particle size with the range

Cohesive Soils Cohesive soils, such as clays, are classified on the

basis of undrained shear strength. The strength

may be measured by laboratory testing, or

estimated by field tests or engineering

examination. The strength terms are defined as

follows:

Description Abbreviation Undrained shear strength

(kPa)

Very soft vs <12

Soft s 12 - 25

Firm f 25 - 50

Stiff st 50 - 100

Very stiff vst 100 - 200

Hard h >200

Cohesionless Soils Cohesionless soils, such as clean sands, are

classified on the basis of relative density, generally

from the results of standard penetration tests

(SPT), cone penetration tests (CPT) or dynamic

penetrometers (PSP). The relative density terms

are given below:

Relative Density

Abbreviation SPT N value

CPT qc value (MPa)

Very loose vl <4 <2

Loose l 4 - 10 2 -5

Medium

dense

md 10 - 30 5 - 15

Dense d 30 - 50 15 - 25

Very

dense

vd >50 >25

Page 65: SITE CLASSIFICATION REPORT SUMMARY...Douglas Partners (DP) has prepared this report for this project at Taylor 2- Stage 3, Taylor in accordance with DP’s proposal dated 15 September

May 2017

Soil Origin It is often difficult to accurately determine the origin

of a soil. Soils can generally be classified as:

• Residual soil - derived from in-situ weathering

of the underlying rock;

• Transported soils - formed somewhere else

and transported by nature to the site; or

• Filling - moved by man.

Transported soils may be further subdivided into:

• Alluvium - river deposits

• Lacustrine - lake deposits

• Aeolian - wind deposits

• Littoral - beach deposits

• Estuarine - tidal river deposits

• Talus - scree or coarse colluvium

• Slopewash or Colluvium - transported

downslope by gravity assisted by water.

Often includes angular rock fragments and

boulders.

Page 66: SITE CLASSIFICATION REPORT SUMMARY...Douglas Partners (DP) has prepared this report for this project at Taylor 2- Stage 3, Taylor in accordance with DP’s proposal dated 15 September

May 2017

Rock Strength Rock strength is defined by the Point Load Strength Index (Is(50)) and refers to the strength of the rock

substance and not the strength of the overall rock mass, which may be considerably weaker due to defects.

The test procedure is described by Australian Standard 4133.4.1 - 2007. The terms used to describe rock

strength are as follows:

Term Abbreviation Point Load Index

Is(50) MPa

Approximate Unconfined Compressive Strength MPa*

Extremely low EL <0.03 <0.6

Very low VL 0.03 - 0.1 0.6 - 2

Low L 0.1 - 0.3 2 - 6

Medium M 0.3 - 1.0 6 - 20

High H 1 - 3 20 - 60

Very high VH 3 - 10 60 - 200

Extremely high EH >10 >200

* Assumes a ratio of 20:1 for UCS to Is(50). It should be noted that the UCS to Is(50) ratio varies significantly

for different rock types and specific ratios should be determined for each site.

Degree of Weathering The degree of weathering of rock is classified as follows:

Term Abbreviation Description

Extremely weathered EW Rock substance has soil properties, i.e. it can be remoulded and classified as a soil but the texture of the original rock is still evident.

Highly weathered HW Limonite staining or bleaching affects whole of rock substance and other signs of decomposition are evident. Porosity and strength may be altered as a result of iron leaching or deposition. Colour and strength of original fresh rock is not recognisable

Moderately weathered

MW Staining and discolouration of rock substance has taken place

Slightly weathered SW Rock substance is slightly discoloured but shows little or no change of strength from fresh rock

Fresh stained Fs Rock substance unaffected by weathering but staining visible along defects

Fresh Fr No signs of decomposition or staining

Degree of Fracturing The following classification applies to the spacing of natural fractures in diamond drill cores. It includes

bedding plane partings, joints and other defects, but excludes drilling breaks.

Term Description

Fragmented Fragments of <20 mm

Highly Fractured Core lengths of 20-40 mm with some fragments

Fractured Core lengths of 40-200 mm with some shorter and longer sections

Slightly Fractured Core lengths of 200-1000 mm with some shorter and longer sections

Unbroken Core lengths mostly > 1000 mm

Page 67: SITE CLASSIFICATION REPORT SUMMARY...Douglas Partners (DP) has prepared this report for this project at Taylor 2- Stage 3, Taylor in accordance with DP’s proposal dated 15 September

May 2017

Rock Quality Designation The quality of the cored rock can be measured using the Rock Quality Designation (RQD) index, defined

as:

RQD % = cumulative length of 'sound' core sections ≥ 100 mm long

total drilled length of section being assessed

where 'sound' rock is assessed to be rock of low strength or better. The RQD applies only to natural

fractures. If the core is broken by drilling or handling (i.e. drilling breaks) then the broken pieces are fitted

back together and are not included in the calculation of RQD.

Stratification Spacing For sedimentary rocks the following terms may be used to describe the spacing of bedding partings:

Term Separation of Stratification Planes

Thinly laminated < 6 mm

Laminated 6 mm to 20 mm

Very thinly bedded 20 mm to 60 mm

Thinly bedded 60 mm to 0.2 m

Medium bedded 0.2 m to 0.6 m

Thickly bedded 0.6 m to 2 m

Very thickly bedded > 2 m

Page 68: SITE CLASSIFICATION REPORT SUMMARY...Douglas Partners (DP) has prepared this report for this project at Taylor 2- Stage 3, Taylor in accordance with DP’s proposal dated 15 September

May 2017

Introduction These notes summarise abbreviations commonly

used on borehole logs and test pit reports.

Drilling or Excavation Methods C Core drilling

R Rotary drilling

SFA Spiral flight augers

NMLC Diamond core - 52 mm dia

NQ Diamond core - 47 mm dia

HQ Diamond core - 63 mm dia

PQ Diamond core - 81 mm dia

Water � Water seep

� Water level

Sampling and Testing A Auger sample

B Bulk sample

D Disturbed sample

E Environmental sample

U50 Undisturbed tube sample (50mm)

W Water sample

pp Pocket penetrometer (kPa)

PID Photo ionisation detector

PL Point load strength Is(50) MPa

S Standard Penetration Test

V Shear vane (kPa)

Description of Defects in Rock The abbreviated descriptions of the defects should

be in the following order: Depth, Type, Orientation,

Coating, Shape, Roughness and Other. Drilling

and handling breaks are not usually included on

the logs.

Defect Type

B Bedding plane

Cs Clay seam

Cv Cleavage

Cz Crushed zone

Ds Decomposed seam

F Fault

J Joint

Lam Lamination

Pt Parting

Sz Sheared Zone

V Vein

Orientation

The inclination of defects is always measured from

the perpendicular to the core axis.

h horizontal

v vertical

sh sub-horizontal

sv sub-vertical

Coating or Infilling Term

cln clean

co coating

he healed

inf infilled

stn stained

ti tight

vn veneer

Coating Descriptor

ca calcite

cbs carbonaceous

cly clay

fe iron oxide

mn manganese

slt silty

Shape

cu curved

ir irregular

pl planar

st stepped

un undulating

Roughness

po polished

ro rough

sl slickensided

sm smooth

vr very rough

Other

fg fragmented

bnd band

qtz quartz

Page 69: SITE CLASSIFICATION REPORT SUMMARY...Douglas Partners (DP) has prepared this report for this project at Taylor 2- Stage 3, Taylor in accordance with DP’s proposal dated 15 September

May 2017

Graphic Symbols for Soil and Rock General

Soils

Sedimentary Rocks

Metamorphic Rocks

Igneous Rocks

Road base

Filling

Concrete

Asphalt

Topsoil

Peat

Clay

Conglomeratic sandstone

Conglomerate

Boulder conglomerate

Sandstone

Slate, phyllite, schist

Siltstone

Mudstone, claystone, shale

Coal

Limestone

Porphyry

Cobbles, boulders

Sandy gravel

Laminite

Silty sand

Clayey sand

Silty clay

Sandy clay

Gravelly clay

Shaly clay

Silt

Clayey silt

Sandy silt

Sand

Gravel

Talus

Gneiss

Quartzite

Dolerite, basalt, andesite

Granite

Tuff, breccia

Dacite, epidote

Page 70: SITE CLASSIFICATION REPORT SUMMARY...Douglas Partners (DP) has prepared this report for this project at Taylor 2- Stage 3, Taylor in accordance with DP’s proposal dated 15 September

ͱ·´ ̧°»­

̸» ¬§°»­ ±º ­±·´­ «­«¿´´§ °®»­»²¬ «²¼»® ¬¸» ¬±°­±·´ ·² ´¿²¼ ¦±²»¼ º±®®»­·¼»²¬·¿´ ¾«·´¼·²¹­ ½¿² ¾» ­°´·¬ ·²¬± ¬©± ¿°°®±¨·³¿¬» ¹®±«°­ P¹®¿²«´¿® ¿²¼ ½´¿§ò Ï«·¬» ±º¬»²ô º±«²¼¿¬·±² ­±·´ ·­ ¿ ³·¨¬«®» ±º ¾±¬¸¬§°»­ò ̸» ¹»²»®¿´ °®±¾´»³­ ¿­­±½·¿¬»¼ ©·¬¸ ­±·´­ ¸¿ª·²¹ ¹®¿²«´¿®½±²¬»²¬ ¿®» «­«¿´´§ ½¿«­»¼ ¾§ »®±­·±²ò Ý´¿§ ­±·´­ ¿®» ­«¾¶»½¬ ¬±­¿¬«®¿¬·±² ¿²¼ ­©»´´ñ­¸®·²µ °®±¾´»³­ò

Ý´¿­­·º·½¿¬·±²­ º±® ¿ ¹·ª»² ¿®»¿ ½¿² ¹»²»®¿´´§ ¾» ±¾¬¿·²»¼ ¾§¿°°´·½¿¬·±² ¬± ¬¸» ´±½¿´ ¿«¬¸±®·¬§ô ¾«¬ ¬¸»­» ¿®» ­±³»¬·³»­ «²®»´·¿¾´»¿²¼ ·º ¬¸»®» ·­ ¼±«¾¬ô ¿ ¹»±¬»½¸²·½¿´ ®»°±®¬ ­¸±«´¼ ¾» ½±³³·­­·±²»¼òß­ ³±­¬ ¾«·´¼·²¹­ ­«ºº»®·²¹ ³±ª»³»²¬ °®±¾´»³­ ¿®» º±«²¼»¼ ±² ½´¿§­±·´­ô ¬¸»®» ·­ ¿² »³°¸¿­·­ ±² ½´¿­­·º·½¿¬·±² ±º ­±·´­ ¿½½±®¼·²¹ ¬± ¬¸»¿³±«²¬ ±º ­©»´´ ¿²¼ ­¸®·²µ¿¹» ¬¸»§ »¨°»®·»²½» ©·¬¸ ª¿®·¿¬·±²­ ±º©¿¬»® ½±²¬»²¬ò ̸» ¬¿¾´» ¾»´±© ·­ Ì¿¾´» îòï º®±³ ßÍ îèéðô ¬¸»Î»­·¼»²¬·¿´ Í´¿¾ ¿²¼ Ú±±¬·²¹ ݱ¼»ò

Ý¿«­»­ ±º Ó±ª»³»²¬

Í»¬¬´»³»²¬ ¼«» ¬± ½±²­¬®«½¬·±²Ì¸»®» ¿®» ¬©± ¬§°»­ ±º ­»¬¬´»³»²¬ ¬¸¿¬ ±½½«® ¿­ ¿ ®»­«´¬ ±º½±²­¬®«½¬·±²æ{ ׳³»¼·¿¬» ­»¬¬´»³»²¬ ±½½«®­ ©¸»² ¿ ¾«·´¼·²¹ ·­ º·®­¬ °´¿½»¼ ±² ·¬­

º±«²¼¿¬·±² ­±·´ô ¿­ ¿ ®»­«´¬ ±º ½±³°¿½¬·±² ±º ¬¸» ­±·´ «²¼»® ¬¸»©»·¹¸¬ ±º ¬¸» ­¬®«½¬«®»ò ̸» ½±¸»­·ª» ¯«¿´·¬§ ±º ½´¿§ ­±·´ ³·¬·¹¿¬»­¿¹¿·²­¬ ¬¸·­ô ¾«¬ ¹®¿²«´¿® ø°¿®¬·½«´¿®´§ ­¿²¼§÷ ­±·´ ·­ ­«­½»°¬·¾´»ò

{ ݱ²­±´·¼¿¬·±² ­»¬¬´»³»²¬ ·­ ¿ º»¿¬«®» ±º ½´¿§ ­±·´ ¿²¼ ³¿§ ¬¿µ»°´¿½» ¾»½¿«­» ±º ¬¸» »¨°«´­·±² ±º ³±·­¬«®» º®±³ ¬¸» ­±·´ ±® ¾»½¿«­»±º ¬¸» ­±·´K­ ´¿½µ ±º ®»­·­¬¿²½» ¬± ´±½¿´ ½±³°®»­­·ª» ±® ­¸»¿® ­¬®»­­»­ò̸·­ ©·´´ «­«¿´´§ ¬¿µ» °´¿½» ¼«®·²¹ ¬¸» º·®­¬ º»© ³±²¬¸­ ¿º¬»®½±²­¬®«½¬·±²ô ¾«¬ ¸¿­ ¾»»² µ²±©² ¬± ¬¿µ» ³¿²§ §»¿®­ ·²»¨½»°¬·±²¿´ ½¿­»­ò

̸»­» °®±¾´»³­ ¿®» ¬¸» °®±ª·²½» ±º ¬¸» ¾«·´¼»® ¿²¼ ­¸±«´¼ ¾» ¬¿µ»²·²¬± ½±²­·¼»®¿¬·±² ¿­ °¿®¬ ±º ¬¸» °®»°¿®¿¬·±² ±º ¬¸» ­·¬» º±® ½±²­¬®«½ó¬·±²ò Þ«·´¼·²¹ Ì»½¸²±´±¹§ Ú·´» ïç øÞÌÚ ïç÷ ¼»¿´­ ©·¬¸ ¬¸»­»°®±¾´»³­ò

Û®±­·±²ß´´ ­±·´­ ¿®» °®±²» ¬± »®±­·±²ô ¾«¬ ­¿²¼§ ­±·´ ·­ °¿®¬·½«´¿®´§ ­«­½»°¬·¾´»¬± ¾»·²¹ ©¿­¸»¼ ¿©¿§ò Ûª»² ½´¿§ ©·¬¸ ¿ ­¿²¼ ½±³°±²»²¬ ±º ­¿§ ïðû±® ³±®» ½¿² ­«ºº»® º®±³ »®±­·±²ò

Í¿¬«®¿¬·±²Ì¸·­ ·­ °¿®¬·½«´¿®´§ ¿ °®±¾´»³ ·² ½´¿§ ­±·´­ò Í¿¬«®¿¬·±² ½®»¿¬»­ ¿ ¾±¹ó´·µ» ­«­°»²­·±² ±º ¬¸» ­±·´ ¬¸¿¬ ½¿«­»­ ·¬ ¬± ´±­» ª·®¬«¿´´§ ¿´´ ±º ·¬­¾»¿®·²¹ ½¿°¿½·¬§ò ̱ ¿ ´»­­»® ¼»¹®»»ô ­¿²¼ ·­ ¿ºº»½¬»¼ ¾§ ­¿¬«®¿¬·±²¾»½¿«­» ­¿¬«®¿¬»¼ ­¿²¼ ³¿§ «²¼»®¹± ¿ ®»¼«½¬·±² ·² ª±´«³» P°¿®¬·½«´¿®´§ ·³°±®¬»¼ ­¿²¼ º·´´ º±® ¾»¼¼·²¹ ¿²¼ ¾´·²¼·²¹ ´¿§»®­òر©»ª»®ô ¬¸·­ «­«¿´´§ ±½½«®­ ¿­ ·³³»¼·¿¬» ­»¬¬´»³»²¬ ¿²¼ ­¸±«´¼²±®³¿´´§ ¾» ¬¸» °®±ª·²½» ±º ¬¸» ¾«·´¼»®ò

Í»¿­±²¿´ ­©»´´·²¹ ¿²¼ ­¸®·²µ¿¹» ±º ­±·´ß´´ ½´¿§­ ®»¿½¬ ¬± ¬¸» °®»­»²½» ±º ©¿¬»® ¾§ ­´±©´§ ¿¾­±®¾·²¹ ·¬ô ³¿µ·²¹¬¸» ­±·´ ·²½®»¿­» ·² ª±´«³» ø­»» ¬¿¾´» ¾»´±©÷ò ̸» ¼»¹®»» ±º ·²½®»¿­»ª¿®·»­ ½±²­·¼»®¿¾´§ ¾»¬©»»² ¼·ºº»®»²¬ ½´¿§­ô ¿­ ¼±»­ ¬¸» ¼»¹®»» ±º¼»½®»¿­» ¼«®·²¹ ¬¸» ­«¾­»¯«»²¬ ¼®§·²¹ ±«¬ ½¿«­»¼ ¾§ º¿·® ©»¿¬¸»®°»®·±¼­ò Þ»½¿«­» ±º ¬¸» ´±© ¿¾­±®°¬·±² ¿²¼ »¨°«´­·±² ®¿¬»ô ¬¸·­°¸»²±³»²±² ©·´´ ²±¬ «­«¿´´§ ¾» ²±¬·½»¿¾´» «²´»­­ ¬¸»®» ¿®»°®±´±²¹»¼ ®¿·²§ ±® ¼®§ °»®·±¼­ô «­«¿´´§ ±º ©»»µ­ ±® ³±²¬¸­ô¼»°»²¼·²¹ ±² ¬¸» ´¿²¼ ¿²¼ ­±·´ ½¸¿®¿½¬»®·­¬·½­ò

̸» ­©»´´·²¹ ±º ­±·´ ½®»¿¬»­ ¿² «°©¿®¼ º±®½» ±² ¬¸» º±±¬·²¹­ ±º ¬¸»¾«·´¼·²¹ô ¿²¼ ­¸®·²µ¿¹» ½®»¿¬»­ ­«¾­·¼»²½» ¬¸¿¬ ¬¿µ»­ ¿©¿§ ¬¸»­«°°±®¬ ²»»¼»¼ ¾§ ¬¸» º±±¬·²¹ ¬± ®»¬¿·² »¯«·´·¾®·«³ò

͸»¿® º¿·´«®»Ì¸·­ °¸»²±³»²±² ±½½«®­ ©¸»² ¬¸» º±«²¼¿¬·±² ­±·´ ¼±»­ ²±¬ ¸¿ª»­«ºº·½·»²¬ ­¬®»²¹¬¸ ¬± ­«°°±®¬ ¬¸» ©»·¹¸¬ ±º ¬¸» º±±¬·²¹ò ̸»®» ¿®»¬©± ³¿¶±® °±­¬ó½±²­¬®«½¬·±² ½¿«­»­æ

{ Í·¹²·º·½¿²¬ ´±¿¼ ·²½®»¿­»ò{ λ¼«½¬·±² ±º ´¿¬»®¿´ ­«°°±®¬ ±º ¬¸» ­±·´ «²¼»® ¬¸» º±±¬·²¹ ¼«» ¬±

»®±­·±² ±® »¨½¿ª¿¬·±²ò{ ײ ½´¿§ ­±·´ô ­¸»¿® º¿·´«®» ½¿² ¾» ½¿«­»¼ ¾§ ­¿¬«®¿¬·±² ±º ¬¸» ­±·´

¿¼¶¿½»²¬ ¬± ±® «²¼»® ¬¸» º±±¬·²¹ò

Þ«·´¼·²¹­ ½¿² ¿²¼ ±º¬»² ¼± ³±ª»ò ̸·­ ³±ª»³»²¬ ½¿² ¾» «°ô ¼±©²ô ´¿¬»®¿´ ±® ®±¬¿¬·±²¿´ò ̸» º«²¼¿³»²¬¿´ ½¿«­»±º ³±ª»³»²¬ ·² ¾«·´¼·²¹­ ½¿² «­«¿´´§ ¾» ®»´¿¬»¼ ¬± ±²» ±® ³±®» °®±¾´»³­ ·² ¬¸» º±«²¼¿¬·±² ­±·´ò ׬ ·­ ·³°±®¬¿²¬ º±®¬¸» ¸±³»±©²»® ¬± ·¼»²¬·º§ ¬¸» ­±·´ ¬§°» ·² ±®¼»® ¬± ¿­½»®¬¿·² ¬¸» ³»¿­«®»­ ¬¸¿¬ ­¸±«´¼ ¾» °«¬ ·² °´¿½» ·² ±®¼»® ¬±»²­«®» ¬¸¿¬ °®±¾´»³­ ·² ¬¸» º±«²¼¿¬·±² ­±·´ ½¿² ¾» °®»ª»²¬»¼ô ¬¸«­ °®±¬»½¬·²¹ ¿¹¿·²­¬ ¾«·´¼·²¹ ³±ª»³»²¬ò

̸·­ Þ«·´¼·²¹ Ì»½¸²±´±¹§ Ú·´» ·­ ¼»­·¹²»¼ ¬± ·¼»²¬·º§ ½¿«­»­ ±º ­±·´ó®»´¿¬»¼ ¾«·´¼·²¹ ³±ª»³»²¬ô ¿²¼ ¬± ­«¹¹»­¬³»¬¸±¼­ ±º °®»ª»²¬·±² ±º ®»­«´¬¿²¬ ½®¿½µ·²¹ ·² ¾«·´¼·²¹­ò

Ú±«²¼¿¬·±² Ó¿·²¬»²¿²½»¿²¼ Ú±±¬·²¹ л®º±®³¿²½»æß Ø±³»±©²»®K­ Ù«·¼»

ÙÛÒÛÎßÔ ÜÛÚ×Ò×Ì×ÑÒÍ ÑÚ Í×ÌÛ ÝÔßÍÍÛÍ

Ý´¿­­ Ú±«²¼¿¬·±²

ß Ó±­¬ ­¿²¼ ¿²¼ ®±½µ ­·¬»­ ©·¬¸ ´·¬¬´» ±® ²± ¹®±«²¼ ³±ª»³»²¬ º®±³ ³±·­¬«®» ½¸¿²¹»­

Í Í´·¹¸¬´§ ®»¿½¬·ª» ½´¿§ ­·¬»­ ©·¬¸ ±²´§ ­´·¹¸¬ ¹®±«²¼ ³±ª»³»²¬ º®±³ ³±·­¬«®» ½¸¿²¹»­

Ó Ó±¼»®¿¬»´§ ®»¿½¬·ª» ½´¿§ ±® ­·´¬ ­·¬»­ô ©¸·½¸ ½¿² »¨°»®·»²½» ³±¼»®¿¬» ¹®±«²¼ ³±ª»³»²¬ º®±³ ³±·­¬«®» ½¸¿²¹»­

Ø Ø·¹¸´§ ®»¿½¬·ª» ½´¿§ ­·¬»­ô ©¸·½¸ ½¿² »¨°»®·»²½» ¸·¹¸ ¹®±«²¼ ³±ª»³»²¬ º®±³ ³±·­¬«®» ½¸¿²¹»­

Û Û¨¬®»³»´§ ®»¿½¬·ª» ­·¬»­ô ©¸·½¸ ½¿² »¨°»®·»²½» »¨¬®»³» ¹®±«²¼ ³±ª»³»²¬ º®±³ ³±·­¬«®» ½¸¿²¹»­

ß ¬± Ð Ú·´´»¼ ­·¬»­

Ð Í·¬»­ ©¸·½¸ ·²½´«¼» ­±º¬ ­±·´­ô ­«½¸ ¿­ ­±º¬ ½´¿§ ±® ­·´¬ ±® ´±±­» ­¿²¼­å ´¿²¼­´·°å ³·²» ­«¾­·¼»²½»å ½±´´¿°­·²¹ ­±·´­å ­±·´­ ­«¾¶»½¬¬± »®±­·±²å ®»¿½¬·ª» ­·¬»­ ­«¾¶»½¬ ¬± ¿¾²±®³¿´ ³±·­¬«®» ½±²¼·¬·±²­ ±® ­·¬»­ ©¸·½¸ ½¿²²±¬ ¾» ½´¿­­·º·»¼ ±¬¸»®©·­»

ÞÌÚ ïè®»°´¿½»­

ײº±®³¿¬·±²Í¸»»¬ ïðñçï

Page 71: SITE CLASSIFICATION REPORT SUMMARY...Douglas Partners (DP) has prepared this report for this project at Taylor 2- Stage 3, Taylor in accordance with DP’s proposal dated 15 September

Ì®»» ®±±¬ ¹®±©¬¸Ì®»»­ ¿²¼ ­¸®«¾­ ¬¸¿¬ ¿®» ¿´´±©»¼ ¬± ¹®±© ·² ¬¸» ª·½·²·¬§ ±º º±±¬·²¹­½¿² ½¿«­» º±«²¼¿¬·±² ­±·´ ³±ª»³»²¬ ·² ¬©± ©¿§­æ

{ ᱬ­ ¬¸¿¬ ¹®±© «²¼»® º±±¬·²¹­ ³¿§ ·²½®»¿­» ·² ½®±­­ó­»½¬·±²¿´­·¦»ô »¨»®¬·²¹ «°©¿®¼ °®»­­«®» ±² º±±¬·²¹­ò

{ ᱬ­ ·² ¬¸» ª·½·²·¬§ ±º º±±¬·²¹­ ©·´´ ¿¾­±®¾ ³«½¸ ±º ¬¸» ³±·­¬«®»·² ¬¸» º±«²¼¿¬·±² ­±·´ô ½¿«­·²¹ ­¸®·²µ¿¹» ±® ­«¾­·¼»²½»ò

˲»ª»²²»­­ ±º Ó±ª»³»²¬

̸» ¬§°»­ ±º ¹®±«²¼ ³±ª»³»²¬ ¼»­½®·¾»¼ ¿¾±ª» «­«¿´´§ ±½½«®«²»ª»²´§ ¬¸®±«¹¸±«¬ ¬¸» ¾«·´¼·²¹K­ º±«²¼¿¬·±² ­±·´ò Í»¬¬´»³»²¬ ¼«»¬± ½±²­¬®«½¬·±² ¬»²¼­ ¬± ¾» «²»ª»² ¾»½¿«­» ±ºæ

{ Ü·ºº»®·²¹ ½±³°¿½¬·±² ±º º±«²¼¿¬·±² ­±·´ °®·±® ¬± ½±²­¬®«½¬·±²ò

{ Ü·ºº»®·²¹ ³±·­¬«®» ½±²¬»²¬ ±º º±«²¼¿¬·±² ­±·´ °®·±® ¬± ½±²­¬®«½¬·±²ò

Ó±ª»³»²¬ ¼«» ¬± ²±²ó½±²­¬®«½¬·±² ½¿«­»­ ·­ «­«¿´´§ ³±®» «²»ª»²­¬·´´ò Û®±­·±² ½¿² «²¼»®³·²» ¿ º±±¬·²¹ ¬¸¿¬ ¬®¿ª»®­»­ ¬¸» º´±© ±® ½¿²½®»¿¬» ¬¸» ½±²¼·¬·±²­ º±® ­¸»¿® º¿·´«®» ¾§ »®±¼·²¹ ­±·´ ¿¼¶¿½»²¬ ¬± ¿º±±¬·²¹ ¬¸¿¬ ®«²­ ·² ¬¸» ­¿³» ¼·®»½¬·±² ¿­ ¬¸» º´±©ò

Í¿¬«®¿¬·±² ±º ½´¿§ º±«²¼¿¬·±² ­±·´ ³¿§ ±½½«® ©¸»®» ­«¾º´±±® ©¿´´­½®»¿¬» ¿ ¼¿³ ¬¸¿¬ ³¿µ»­ ©¿¬»® °±²¼ò ׬ ½¿² ¿´­± ±½½«® ©¸»®»ª»® ¬¸»®»·­ ¿ ­±«®½» ±º ©¿¬»® ²»¿® º±±¬·²¹­ ·² ½´¿§ ­±·´ò ̸·­ ´»¿¼­ ¬± ¿ ­»ª»®»®»¼«½¬·±² ·² ¬¸» ­¬®»²¹¬¸ ±º ¬¸» ­±·´ ©¸·½¸ ³¿§ ½®»¿¬» ´±½¿´ ­¸»¿®º¿·´«®»ò

Í»¿­±²¿´ ­©»´´·²¹ ¿²¼ ­¸®·²µ¿¹» ±º ½´¿§ ­±·´ ¿ºº»½¬­ ¬¸» °»®·³»¬»® ±º¬¸» ¾«·´¼·²¹ º·®­¬ô ¬¸»² ¹®¿¼«¿´´§ ­°®»¿¼­ ¬± ¬¸» ·²¬»®·±®ò ̸» ­©»´´·²¹°®±½»­­ ©·´´ «­«¿´´§ ¾»¹·² ¿¬ ¬¸» «°¸·´´ »¨¬®»³» ±º ¬¸» ¾«·´¼·²¹ô ±® ±²¬¸» ©»¿¬¸»® ­·¼» ©¸»®» ¬¸» ´¿²¼ ·­ º´¿¬ò Í©»´´·²¹ ¹®¿¼«¿´´§ ®»¿½¸»­ ¬¸»·²¬»®·±® ­±·´ ¿­ ¿¾­±®°¬·±² ½±²¬·²«»­ò ͸®·²µ¿¹» «­«¿´´§ ¾»¹·²­ ©¸»®»¬¸» ­«²K­ ¸»¿¬ ·­ ¹®»¿¬»­¬ò

Ûºº»½¬­ ±º ˲»ª»² ͱ·´ Ó±ª»³»²¬ ±² ͬ®«½¬«®»­

Û®±­·±² ¿²¼ ­¿¬«®¿¬·±²Û®±­·±² ®»³±ª»­ ¬¸» ­«°°±®¬ º®±³ «²¼»® º±±¬·²¹­ô ¬»²¼·²¹ ¬± ½®»¿¬»­«¾­·¼»²½» ±º ¬¸» °¿®¬ ±º ¬¸» ­¬®«½¬«®» «²¼»® ©¸·½¸ ·¬ ±½½«®­òÞ®·½µ©±®µ ©¿´´­ ©·´´ ®»­·­¬ ¬¸» ­¬®»­­ ½®»¿¬»¼ ¾§ ¬¸·­ ®»³±ª¿´ ±º­«°°±®¬ ¾§ ¾®·¼¹·²¹ ¬¸» ¹¿° ±® ½¿²¬·´»ª»®·²¹ «²¬·´ ¬¸» ¾®·½µ­ ±® ¬¸»³±®¬¿® ¾»¼¼·²¹ º¿·´ò Ñ´¼»® ³¿­±²®§ ¸¿­ ´·¬¬´» ®»­·­¬¿²½»ò Ûª·¼»²½» ±ºº¿·´«®» ª¿®·»­ ¿½½±®¼·²¹ ¬± ½·®½«³­¬¿²½»­ ¿²¼ ­§³°¬±³­ ³¿§ ·²½´«¼»æ

{ ͬ»° ½®¿½µ·²¹ ·² ¬¸» ³±®¬¿® ¾»¼­ ·² ¬¸» ¾±¼§ ±º ¬¸» ©¿´´ ±®¿¾±ª»ñ¾»´±© ±°»²·²¹­ ­«½¸ ¿­ ¼±±®­ ±® ©·²¼±©­ò

{ Ê»®¬·½¿´ ½®¿½µ·²¹ ·² ¬¸» ¾®·½µ­ ø«­«¿´´§ ¾«¬ ²±¬ ²»½»­­¿®·´§ ·² ´·²»©·¬¸ ¬¸» ª»®¬·½¿´ ¾»¼­ ±® °»®°»²¼­÷ò

×­±´¿¬»¼ °·»®­ ¿ºº»½¬»¼ ¾§ »®±­·±² ±® ­¿¬«®¿¬·±² ±º º±«²¼¿¬·±²­ ©·´´»ª»²¬«¿´´§ ´±­» ½±²¬¿½¬ ©·¬¸ ¬¸» ¾»¿®»®­ ¬¸»§ ­«°°±®¬ ¿²¼ ³¿§ ¬·´¬ ±®º¿´´ ±ª»®ò ̸» º´±±®­ ¬¸¿¬ ¸¿ª» ´±­¬ ¬¸·­ ­«°°±®¬ ©·´´ ¾»½±³» ¾±«²½§ô­±³»¬·³»­ ®¿¬¬´·²¹ ±®²¿³»²¬­ »¬½ò

Í»¿­±²¿´ ­©»´´·²¹ñ­¸®·²µ¿¹» ·² ½´¿§Í©»´´·²¹ º±«²¼¿¬·±² ­±·´ ¼«» ¬± ®¿·²§ °»®·±¼­ º·®­¬ ´·º¬­ ¬¸» ³±­¬»¨°±­»¼ »¨¬®»³·¬·»­ ±º ¬¸» º±±¬·²¹ ­§­¬»³ô ¬¸»² ¬¸» ®»³¿·²¼»® ±º ¬¸»°»®·³»¬»® º±±¬·²¹­ ©¸·´» ¹®¿¼«¿´´§ °»®³»¿¬·²¹ ·²­·¼» ¬¸» ¾«·´¼·²¹º±±¬°®·²¬ ¬± ´·º¬ ·²¬»®²¿´ º±±¬·²¹­ò ̸·­ ­©»´´·²¹ º·®­¬ ¬»²¼­ ¬± ½®»¿¬» ¿¼·­¸ »ºº»½¬ô ¾»½¿«­» ¬¸» »¨¬»®²¿´ º±±¬·²¹­ ¿®» °«­¸»¼ ¸·¹¸»® ¬¸¿² ¬¸»·²¬»®²¿´ ±²»­ò

̸» º·®­¬ ²±¬·½»¿¾´» ­§³°¬±³ ³¿§ ¾» ¬¸¿¬ ¬¸» º´±±® ¿°°»¿®­ ­´·¹¸¬´§¼·­¸»¼ò ̸·­ ·­ ±º¬»² ¿½½±³°¿²·»¼ ¾§ ­±³» ¼±±®­ ¾·²¼·²¹ ±² ¬¸»º´±±® ±® ¬¸» ¼±±® ¸»¿¼ô ¬±¹»¬¸»® ©·¬¸ ­±³» ½®¿½µ·²¹ ±º ½±®²·½»³·¬®»­ò ײ ¾«·´¼·²¹­ ©·¬¸ ¬·³¾»® º´±±®·²¹ ­«°°±®¬»¼ ¾§ ¾»¿®»®­ ¿²¼¶±·­¬­ô ¬¸» º´±±® ½¿² ¾» ¾±«²½§ò Û¨¬»®²¿´´§ ¬¸»®» ³¿§ ¾» ª·­·¾´»¼·­¸·²¹ ±º ¬¸» ¸·° ±® ®·¼¹» ´·²»­ò

ß­ ¬¸» ³±·­¬«®» ¿¾­±®°¬·±² °®±½»­­ ½±³°´»¬»­ ·¬­ ¶±«®²»§ ¬± ¬¸»·²²»®³±­¬ ¿®»¿­ ±º ¬¸» ¾«·´¼·²¹ô ¬¸» ·²¬»®²¿´ º±±¬·²¹­ ©·´´ ®·­»ò ׺ ¬¸»­°®»¿¼ ±º ³±·­¬«®» ·­ ®±«¹¸´§ »ª»²ô ·¬ ³¿§ ¾» ¬¸¿¬ ¬¸» ­§³°¬±³­ ©·´´¬»³°±®¿®·´§ ¼·­¿°°»¿®ô ¾«¬ ·¬ ·­ ³±®» ´·µ»´§ ¬¸¿¬ ­©»´´·²¹ ©·´´ ¾»«²»ª»²ô ½®»¿¬·²¹ ¿ ¼·ºº»®»²½» ®¿¬¸»® ¬¸¿² ¿ ¼·­¿°°»¿®¿²½» ·²­§³°¬±³­ò ײ ¾«·´¼·²¹­ ©·¬¸ ¬·³¾»® º´±±®·²¹ ­«°°±®¬»¼ ¾§ ¾»¿®»®­¿²¼ ¶±·­¬­ô ¬¸» ·­±´¿¬»¼ °·»®­ ©·´´ ®·­» ³±®» »¿­·´§ ¬¸¿² ¬¸» ­¬®·°º±±¬·²¹­ ±® °·»®­ «²¼»® ©¿´´­ô ½®»¿¬·²¹ ²±¬·½»¿¾´» ¼±³·²¹ ±º º´±±®·²¹ò

ß­ ¬¸» ©»¿¬¸»® °¿¬¬»®² ½¸¿²¹»­ ¿²¼ ¬¸» ­±·´ ¾»¹·²­ ¬± ¼®§ ±«¬ô ¬¸»»¨¬»®²¿´ º±±¬·²¹­ ©·´´ ¾» º·®­¬ ¿ºº»½¬»¼ô ¾»¹·²²·²¹ ©·¬¸ ¬¸» ´±½¿¬·±²­©¸»®» ¬¸» ­«²K­ »ºº»½¬ ·­ ­¬®±²¹»­¬ò ̸·­ ¸¿­ ¬¸» »ºº»½¬ ±º ´±©»®·²¹ ¬¸»»¨¬»®²¿´ º±±¬·²¹­ò ̸» ¼±³·²¹ ·­ ¿½½»²¬«¿¬»¼ ¿²¼ ½®¿½µ·²¹ ®»¼«½»­±® ¼·­¿°°»¿®­ ©¸»®» ·¬ ±½½«®®»¼ ¾»½¿«­» ±º ¼·­¸·²¹ô ¾«¬ ±¬¸»® ½®¿½µ­±°»² «°ò ̸» ®±±º ´·²»­ ³¿§ ¾»½±³» ½±²ª»¨ò

ܱ³·²¹ ¿²¼ ¼·­¸·²¹ ¿®» ¿´­± ¿ºº»½¬»¼ ¾§ ©»¿¬¸»® ·² ±¬¸»® ©¿§­ò ײ¿®»¿­ ©¸»®» ©¿®³ô ©»¬ ­«³³»®­ ¿²¼ ½±±´»® ¼®§ ©·²¬»®­ °®»ª¿·´ô©¿¬»® ³·¹®¿¬·±² ¬»²¼­ ¬± ¾» ¬±©¿®¼ ¬¸» ·²¬»®·±® ¿²¼ ¼±³·²¹ ©·´´ ¾»¿½½»²¬«¿¬»¼ô ©¸»®»¿­ ©¸»®» ­«³³»®­ ¿®» ¼®§ ¿²¼ ©·²¬»®­ ¿®» ½±´¼¿²¼ ©»¬ô ³·¹®¿¬·±² ¬»²¼­ ¬± ¾» ¬±©¿®¼ ¬¸» »¨¬»®·±® ¿²¼ ¬¸»«²¼»®´§·²¹ °®±°»²­·¬§ ·­ ¬±©¿®¼ ¼·­¸·²¹ò

Ó±ª»³»²¬ ½¿«­»¼ ¾§ ¬®»» ®±±¬­×² ¹»²»®¿´ô ¹®±©·²¹ ®±±¬­ ©·´´ »¨»®¬ ¿² «°©¿®¼ °®»­­«®» ±² º±±¬·²¹­ô©¸»®»¿­ ­±·´ ­«¾¶»½¬ ¬± ¼®§·²¹ ¾»½¿«­» ±º ¬®»» ±® ­¸®«¾ ®±±¬­ ©·´´ ¬»²¼¬± ®»³±ª» ­«°°±®¬ º®±³ «²¼»® º±±¬·²¹­ ¾§ ·²¼«½·²¹ ­¸®·²µ¿¹»ò

ݱ³°´·½¿¬·±²­ ½¿«­»¼ ¾§ ¬¸» ­¬®«½¬«®» ·¬­»´ºÓ±­¬ º±®½»­ ¬¸¿¬ ¬¸» ­±·´ ½¿«­»­ ¬± ¾» »¨»®¬»¼ ±² ­¬®«½¬«®»­ ¿®»ª»®¬·½¿´ P ·ò»ò »·¬¸»® «° ±® ¼±©²ò ر©»ª»®ô ¾»½¿«­» ¬¸»­» º±®½»­ ¿®»­»´¼±³ ­°®»¿¼ »ª»²´§ ¿®±«²¼ ¬¸» º±±¬·²¹­ô ¿²¼ ¾»½¿«­» ¬¸» ¾«·´¼·²¹®»­·­¬­ «²»ª»² ³±ª»³»²¬ ¾»½¿«­» ±º ·¬­ ®·¹·¼·¬§ô º±®½»­ ¿®» »¨»®¬»¼º®±³ ±²» °¿®¬ ±º ¬¸» ¾«·´¼·²¹ ¬± ¿²±¬¸»®ò ̸» ²»¬ ®»­«´¬ ±º ¿´´ ¬¸»­»º±®½»­ ·­ «­«¿´´§ ®±¬¿¬·±²¿´ò ̸·­ ®»­«´¬¿²¬ º±®½» ±º¬»² ½±³°´·½¿¬»­ ¬¸»¼·¿¹²±­·­ ¾»½¿«­» ¬¸» ª·­·¾´» ­§³°¬±³­ ¼± ²±¬ ­·³°´§ ®»º´»½¬ ¬¸»±®·¹·²¿´ ½¿«­»ò ß ½±³³±² ­§³°¬±³ ·­ ¾·²¼·²¹ ±º ¼±±®­ ±² ¬¸»ª»®¬·½¿´ ³»³¾»® ±º ¬¸» º®¿³»ò

Ûºº»½¬­ ±² º«´´ ³¿­±²®§ ­¬®«½¬«®»­Þ®·½µ©±®µ ©·´´ ®»­·­¬ ½®¿½µ·²¹ ©¸»®» ·¬ ½¿²ò ׬ ©·´´ ¿¬¬»³°¬ ¬± ­°¿²¿®»¿­ ¬¸¿¬ ´±­» ­«°°±®¬ ¾»½¿«­» ±º ­«¾­·¼»¼ º±«²¼¿¬·±²­ ±® ®¿·­»¼°±·²¬­ò ׬ ·­ ¬¸»®»º±®» «­«¿´ ¬± ­»» ½®¿½µ·²¹ ¿¬ ©»¿µ °±·²¬­ô ­«½¸ ¿­±°»²·²¹­ º±® ©·²¼±©­ ±® ¼±±®­ò

ײ ¬¸» »ª»²¬ ±º ½±²­¬®«½¬·±² ­»¬¬´»³»²¬ô ½®¿½µ·²¹ ©·´´ «­«¿´´§ ®»³¿·²«²½¸¿²¹»¼ ¿º¬»® ¬¸» °®±½»­­ ±º ­»¬¬´»³»²¬ ¸¿­ ½»¿­»¼ò

É·¬¸ ´±½¿´ ­¸»¿® ±® »®±­·±²ô ½®¿½µ·²¹ ©·´´ «­«¿´´§ ½±²¬·²«» ¬± ¼»ª»´±°«²¬·´ ¬¸» ±®·¹·²¿´ ½¿«­» ¸¿­ ¾»»² ®»³»¼·»¼ô ±® «²¬·´ ¬¸» ­«¾­·¼»²½»¸¿­ ½±³°´»¬»´§ ²»«¬®¿´·­»¼ ¬¸» ¿ºº»½¬»¼ °±®¬·±² ±º º±±¬·²¹ ¿²¼ ¬¸»­¬®«½¬«®» ¸¿­ ­¬¿¾·´·­»¼ ±² ±¬¸»® º±±¬·²¹­ ¬¸¿¬ ®»³¿·² »ºº»½¬·ª»ò

ײ ¬¸» ½¿­» ±º ­©»´´ñ­¸®·²µ »ºº»½¬­ô ¬¸» ¾®·½µ©±®µ ©·´´ ·² ­±³» ½¿­»­®»¬«®² ¬± ·¬­ ±®·¹·²¿´ °±­·¬·±² ¿º¬»® ½±³°´»¬·±² ±º ¿ ½§½´»ô ¸±©»ª»® ·¬·­ ³±®» ´·µ»´§ ¬¸¿¬ ¬¸» ®±¬¿¬·±²¿´ »ºº»½¬ ©·´´ ²±¬ ¾» »¨¿½¬´§ ®»ª»®­»¼ô¿²¼ ·¬ ·­ ¿´­± «­«¿´ ¬¸¿¬ ¾®·½µ©±®µ ©·´´ ­»¬¬´» ·² ·¬­ ²»© °±­·¬·±² ¿²¼©·´´ ®»­·­¬ ¬¸» º±®½»­ ¬®§·²¹ ¬± ®»¬«®² ·¬ ¬± ·¬­ ±®·¹·²¿´ °±­·¬·±²ò ̸·­³»¿²­ ¬¸¿¬ ·² ¿ ½¿­» ©¸»®» ­©»´´·²¹ ¬¿µ»­ °´¿½» ¿º¬»® ½±²­¬®«½¬·±²¿²¼ ½®¿½µ·²¹ ±½½«®­ô ¬¸» ½®¿½µ·²¹ ·­ ´·µ»´§ ¬± ¿¬ ´»¿­¬ °¿®¬´§ ®»³¿·²¿º¬»® ¬¸» ­¸®·²µ ­»¹³»²¬ ±º ¬¸» ½§½´» ·­ ½±³°´»¬»ò ̸«­ô »¿½¸ ¬·³»¬¸» ½§½´» ·­ ®»°»¿¬»¼ô ¬¸» ´·µ»´·¸±±¼ ·­ ¬¸¿¬ ¬¸» ½®¿½µ·²¹ ©·´´ ¾»½±³»©·¼»® «²¬·´ ¬¸» ­»½¬·±²­ ±º ¾®·½µ©±®µ ¾»½±³» ª·®¬«¿´´§ ·²¼»°»²¼»²¬ò

É·¬¸ ®»°»¿¬»¼ ½§½´»­ô ±²½» ¬¸» ½®¿½µ·²¹ ·­ »­¬¿¾´·­¸»¼ô ·º ¬¸»®» ·­ ²±±¬¸»® ½±³°´·½¿¬·±²ô ·¬ ·­ ²±®³¿´ º±® ¬¸» ·²½·¼»²½» ±º ½®¿½µ·²¹ ¬±­¬¿¾·´·­»ô ¿­ ¬¸» ¾«·´¼·²¹ ¸¿­ ¬¸» ¿®¬·½«´¿¬·±² ·¬ ²»»¼­ ¬± ½±°» ©·¬¸¬¸» °®±¾´»³ò ̸·­ ·­ ¾§ ²± ³»¿²­ ¿´©¿§­ ¬¸» ½¿­»ô ¸±©»ª»®ô ¿²¼³±²·¬±®·²¹ ±º ½®¿½µ­ ·² ©¿´´­ ¿²¼ º´±±®­ ­¸±«´¼ ¿´©¿§­ ¾» ¬®»¿¬»¼­»®·±«­´§ò

Ë°¸»¿ª¿´ ½¿«­»¼ ¾§ ¹®±©¬¸ ±º ¬®»» ®±±¬­ «²¼»® º±±¬·²¹­ ·­ ²±¬ ¿­·³°´» ª»®¬·½¿´ ­¸»¿® ­¬®»­­ò ̸»®» ·­ ¿ ¬»²¼»²½§ º±® ¬¸» ®±±¬ ¬± ¿´­±»¨»®¬ ´¿¬»®¿´ º±®½»­ ¬¸¿¬ ¿¬¬»³°¬ ¬± ­»°¿®¿¬» ­»½¬·±²­ ±º ¾®·½µ©±®µ¿º¬»® ·²·¬·¿´ ½®¿½µ·²¹ ¸¿­ ±½½«®®»¼ò

Ì®»»­ ½¿² ½¿«­» ­¸®·²µ¿¹» ¿²¼ ¼¿³¿¹»

Page 72: SITE CLASSIFICATION REPORT SUMMARY...Douglas Partners (DP) has prepared this report for this project at Taylor 2- Stage 3, Taylor in accordance with DP’s proposal dated 15 September

̸» ²±®³¿´ ­¬®«½¬«®¿´ ¿®®¿²¹»³»²¬ ·­ ¬¸¿¬ ¬¸» ·²²»® ´»¿º ±º ¾®·½µó©±®µ ·² ¬¸» »¨¬»®²¿´ ©¿´´­ ¿²¼ ¿¬ ´»¿­¬ ­±³» ±º ¬¸» ·²¬»®²¿´ ©¿´´­ø¼»°»²¼·²¹ ±² ¬¸» ®±±º ¬§°»÷ ½±³°®·­» ¬¸» ´±¿¼ó¾»¿®·²¹ ­¬®«½¬«®» ±²©¸·½¸ ¿²§ «°°»® º´±±®­ô ½»·´·²¹­ ¿²¼ ¬¸» ®±±º ¿®» ­«°°±®¬»¼ò ײ ¬¸»­»½¿­»­ô ·¬ ·­ ·²¬»®²¿´´§ ª·­·¾´» ½®¿½µ·²¹ ¬¸¿¬ ­¸±«´¼ ¾» ¬¸» ³¿·² º±½«­±º ¿¬¬»²¬·±²ô ¸±©»ª»® ¬¸»®» ¿®» ¿ º»© »¨¿³°´»­ ±º ¼©»´´·²¹­ ©¸±­»»¨¬»®²¿´ ´»¿º ±º ³¿­±²®§ °´¿§­ ­±³» ­«°°±®¬·²¹ ®±´»ô ­± ¬¸·­ ­¸±«´¼¾» ½¸»½µ»¼ ·º ¬¸»®» ·­ ¿²§ ¼±«¾¬ò ײ ¿²§ ½¿­»ô »¨¬»®²¿´´§ ª·­·¾´»½®¿½µ·²¹ ·­ ·³°±®¬¿²¬ ¿­ ¿ ¹«·¼» ¬± ­¬®»­­»­ ±² ¬¸» ­¬®«½¬«®» ¹»²»®¿´´§ô¿²¼ ·¬ ­¸±«´¼ ¿´­± ¾» ®»³»³¾»®»¼ ¬¸¿¬ ¬¸» »¨¬»®²¿´ ©¿´´­ ³«­¬ ¾»½¿°¿¾´» ±º ­«°°±®¬·²¹ ¬¸»³­»´ª»­ò

Ûºº»½¬­ ±² º®¿³»¼ ­¬®«½¬«®»­Ì·³¾»® ±® ­¬»»´ º®¿³»¼ ¾«·´¼·²¹­ ¿®» ´»­­ ´·µ»´§ ¬± »¨¸·¾·¬ ½®¿½µ·²¹¼«» ¬± ­©»´´ñ­¸®·²µ ¬¸¿² ³¿­±²®§ ¾«·´¼·²¹­ ¾»½¿«­» ±º ¬¸»·®º´»¨·¾·´·¬§ò ß´­±ô ¬¸» ¼±³·²¹ñ¼·­¸·²¹ »ºº»½¬­ ¬»²¼ ¬± ¾» ´±©»® ¾»½¿«­»±º ¬¸» ´·¹¸¬»® ©»·¹¸¬ ±º ©¿´´­ò ̸» ³¿·² ®·­µ­ ¬± º®¿³»¼ ¾«·´¼·²¹­ ¿®»»²½±«²¬»®»¼ ¾»½¿«­» ±º ¬¸» ·­±´¿¬»¼ °·»® º±±¬·²¹­ «­»¼ «²¼»® ©¿´´­òɸ»®» »®±­·±² ±® ­¿¬«®¿¬·±² ½¿«­» ¿ º±±¬·²¹ ¬± º¿´´ ¿©¿§ô ¬¸·­ ½¿²¼±«¾´» ¬¸» ­°¿² ©¸·½¸ ¿ ©¿´´ ³«­¬ ¾®·¼¹»ò ̸·­ ¿¼¼·¬·±²¿´ ­¬®»­­ ½¿²½®»¿¬» ½®¿½µ·²¹ ·² ©¿´´ ´·²·²¹­ô °¿®¬·½«´¿®´§ ©¸»®» ¬¸»®» ·­ ¿ ©»¿µ°±·²¬ ·² ¬¸» ­¬®«½¬«®» ½¿«­»¼ ¾§ ¿ ¼±±® ±® ©·²¼±© ±°»²·²¹ò ׬ ·­ô¸±©»ª»®ô «²´·µ»´§ ¬¸¿¬ º®¿³»¼ ­¬®«½¬«®»­ ©·´´ ¾» ­± ­¬®»­­»¼ ¿­ ¬± ­«ºº»®­»®·±«­ ¼¿³¿¹» ©·¬¸±«¬ º·®­¬ »¨¸·¾·¬·²¹ ­±³» ±® ¿´´ ±º ¬¸» ¿¾±ª»­§³°¬±³­ º±® ¿ ½±²­·¼»®¿¾´» °»®·±¼ò ̸» ­¿³» ©¿®²·²¹ °»®·±¼ ­¸±«´¼¿°°´§ ·² ¬¸» ½¿­» ±º «°¸»¿ª¿´ò ׬ ­¸±«´¼ ¾» ²±¬»¼ô ¸±©»ª»®ô ¬¸¿¬ ©¸»®»º®¿³»¼ ¾«·´¼·²¹­ ¿®» ­«°°±®¬»¼ ¾§ ­¬®·° º±±¬·²¹­ ¬¸»®» ·­ ±²´§ ±²» ´»¿º±º ¾®·½µ©±®µ ¿²¼ ¬¸»®»º±®» ¬¸» »¨¬»®²¿´´§ ª·­·¾´» ©¿´´­ ¿®» ¬¸»­«°°±®¬·²¹ ­¬®«½¬«®» º±® ¬¸» ¾«·´¼·²¹ò ײ ¬¸·­ ½¿­»ô ¬¸» ­«¾º´±±®³¿­±²®§ ©¿´´­ ½¿² ¾» »¨°»½¬»¼ ¬± ¾»¸¿ª» ¿­ º«´´ ¾®·½µ©±®µ ©¿´´­ò

Ûºº»½¬­ ±² ¾®·½µ ª»²»»® ­¬®«½¬«®»­Þ»½¿«­» ¬¸» ´±¿¼ó¾»¿®·²¹ ­¬®«½¬«®» ±º ¿ ¾®·½µ ª»²»»® ¾«·´¼·²¹ ·­ ¬¸»º®¿³» ¬¸¿¬ ³¿µ»­ «° ¬¸» ·²¬»®·±® ´»¿º ±º ¬¸» »¨¬»®²¿´ ©¿´´­ °´«­°»®¸¿°­ ¬¸» ·²¬»®²¿´ ©¿´´­ô ¼»°»²¼·²¹ ±² ¬¸» ¬§°» ±º ®±±ºô ¬¸»¾«·´¼·²¹ ½¿² ¾» »¨°»½¬»¼ ¬± ¾»¸¿ª» ¿­ ¿ º®¿³»¼ ­¬®«½¬«®»ô »¨½»°¬ ¬¸¿¬¬¸» »¨¬»®²¿´ ³¿­±²®§ ©·´´ ¾»¸¿ª» ·² ¿ ­·³·´¿® ©¿§ ¬± ¬¸» »¨¬»®²¿´ ´»¿º±º ¿ º«´´ ³¿­±²®§ ­¬®«½¬«®»ò

É¿¬»® Í»®ª·½» ¿²¼ Ü®¿·²¿¹»

ɸ»®» ¿ ©¿¬»® ­»®ª·½» °·°»ô ¿ ­»©»® ±® ­¬±®³©¿¬»® ¼®¿·²¿¹» °·°» ·­ ·²¬¸» ª·½·²·¬§ ±º ¿ ¾«·´¼·²¹ô ¿ ©¿¬»® ´»¿µ ½¿² ½¿«­» »®±­·±²ô ­©»´´·²¹ ±®­¿¬«®¿¬·±² ±º ­«­½»°¬·¾´» ­±·´ò Ûª»² ¿ ³·²«­½«´» ´»¿µ ½¿² ¾» »²±«¹¸¬± ­¿¬«®¿¬» ¿ ½´¿§ º±«²¼¿¬·±²ò ß ´»¿µ·²¹ ¬¿° ²»¿® ¿ ¾«·´¼·²¹ ½¿² ¸¿ª»¬¸» ­¿³» »ºº»½¬ò ײ ¿¼¼·¬·±²ô ¬®»²½¸»­ ½±²¬¿·²·²¹ °·°»­ ½¿² ¾»½±³»©¿¬»®½±«®­»­ »ª»² ¬¸±«¹¸ ¾¿½µº·´´»¼ô °¿®¬·½«´¿®´§ ©¸»®» ¾®±µ»²®«¾¾´» ·­ «­»¼ ¿­ º·´´ò É¿¬»® ¬¸¿¬ ®«²­ ¿´±²¹ ¬¸»­» ¬®»²½¸»­ ½¿² ¾»®»­°±²­·¾´» º±® ­»®·±«­ »®±­·±²ô ·²¬»®­¬®¿¬¿ ­»»°¿¹» ·²¬± ­«¾º´±±® ¿®»¿­¿²¼ ­¿¬«®¿¬·±²ò

з°» ´»¿µ¿¹» ¿²¼ ¬®»²½¸ ©¿¬»® º´±©­ ¿´­± »²½±«®¿¹» ¬®»» ¿²¼ ­¸®«¾®±±¬­ ¬± ¬¸» ­±«®½» ±º ©¿¬»®ô ½±³°´·½¿¬·²¹ ¿²¼ »¨¿½»®¾¿¬·²¹ ¬¸»°®±¾´»³òб±® ®±±º °´«³¾·²¹ ½¿² ®»­«´¬ ·² ´¿®¹» ª±´«³»­ ±º ®¿·²©¿¬»® ¾»·²¹½±²½»²¬®¿¬»¼ ·² ¿ ­³¿´´ ¿®»¿ ±º ­±·´æ

{ ײ½±®®»½¬ º¿´´­ ·² ®±±º ¹«¬¬»®·²¹ ³¿§ ®»­«´¬ ·² ±ª»®º´±©­ô ¿­ ³¿§¹«¬¬»®­ ¾´±½µ»¼ ©·¬¸ ´»¿ª»­ »¬½ò

{ ݱ®®±¼»¼ ¹«¬¬»®·²¹ ±® ¼±©²°·°»­ ½¿² ­°·´´ ©¿¬»® ¬± ¹®±«²¼ò

{ ܱ©²°·°»­ ²±¬ °±­·¬·ª»´§ ½±²²»½¬»¼ ¬± ¿ °®±°»® ­¬±®³©¿¬»®½±´´»½¬·±² ­§­¬»³ ©·´´ ¼·®»½¬ ¿ ½±²½»²¬®¿¬·±² ±º ©¿¬»® ¬± ­±·´ ¬¸¿¬ ·­¼·®»½¬´§ ¿¼¶¿½»²¬ ¬± º±±¬·²¹­ô ­±³»¬·³»­ ½¿«­·²¹ ´¿®¹»ó­½¿´»°®±¾´»³­ ­«½¸ ¿­ »®±­·±²ô ­¿¬«®¿¬·±² ¿²¼ ³·¹®¿¬·±² ±º ©¿¬»® «²¼»®¬¸» ¾«·´¼·²¹ò

Í»®·±«­²»­­ ±º Ý®¿½µ·²¹

ײ ¹»²»®¿´ô ³±­¬ ½®¿½µ·²¹ º±«²¼ ·² ³¿­±²®§ ©¿´´­ ·­ ¿ ½±­³»¬·½²«·­¿²½» ±²´§ ¿²¼ ½¿² ¾» µ»°¬ ·² ®»°¿·® ±® »ª»² ·¹²±®»¼ò ̸» ¬¿¾´»¾»´±© ·­ ¿ ®»°®±¼«½¬·±² ±º Ì¿¾´» Ýï ±º ßÍ îèéðò

ßÍ îèéð ¿´­± °«¾´·­¸»­ º·¹«®»­ ®»´¿¬·²¹ ¬± ½®¿½µ·²¹ ·² ½±²½®»¬» º´±±®­ô¸±©»ª»® ¾»½¿«­» ©¿´´ ½®¿½µ·²¹ ©·´´ «­«¿´´§ ®»¿½¸ ¬¸» ½®·¬·½¿´ °±·²¬­·¹²·º·½¿²¬´§ »¿®´·»® ¬¸¿² ½®¿½µ·²¹ ·² ­´¿¾­ô ¬¸·­ ¬¿¾´» ·­ ²±¬®»°®±¼«½»¼ ¸»®»ò

Ю»ª»²¬·±²ñÝ«®»

д«³¾·²¹É¸»®» ¾«·´¼·²¹ ³±ª»³»²¬ ·­ ½¿«­»¼ ¾§ ©¿¬»® ­»®ª·½»ô ®±±º °´«³¾·²¹ô­»©»® ±® ­¬±®³©¿¬»® º¿·´«®»ô ¬¸» ®»³»¼§ ·­ ¬± ®»°¿·® ¬¸» °®±¾´»³ò ׬ ·­ °®«¼»²¬ô ¸±©»ª»®ô ¬± ½±²­·¼»® ¿´­± ®»®±«¬·²¹ °·°»­ ¿©¿§ º®±³¬¸» ¾«·´¼·²¹ ©¸»®» °±­­·¾´»ô ¿²¼ ®»´±½¿¬·²¹ ¬¿°­ ¬± °±­·¬·±²­ ©¸»®»¿²§ ´»¿µ¿¹» ©·´´ ²±¬ ¼·®»½¬ ©¿¬»® ¬± ¬¸» ¾«·´¼·²¹ ª·½·²·¬§ò Ûª»² ©¸»®»¹«´´§ ¬®¿°­ ¿®» °®»­»²¬ô ¬¸»®» ·­ ­±³»¬·³»­ ­«ºº·½·»²¬ ­°·´´ ¬± ½®»¿¬»»®±­·±² ±® ­¿¬«®¿¬·±²ô °¿®¬·½«´¿®´§ ·² ³±¼»®² ·²­¬¿´´¿¬·±²­ «­·²¹­³¿´´»® ¼·¿³»¬»® ÐÊÝ º·¨¬«®»­ò ײ¼»»¼ô ­±³» ¹«´´§ ¬®¿°­ ¿®» ²±¬­·¬«¿¬»¼ ¼·®»½¬´§ «²¼»® ¬¸» ¬¿°­ ¬¸¿¬ ¿®» ·²­¬¿´´»¼ ¬± ½¸¿®¹» ¬¸»³ô©·¬¸ ¬¸» ®»­«´¬ ¬¸¿¬ ©¿¬»® º®±³ ¬¸» ¬¿° ³¿§ »²¬»® ¬¸» ¾¿½µº·´´»¼¬®»²½¸ ¬¸¿¬ ¸±«­»­ ¬¸» ­»©»® °·°·²¹ò ׺ ¬¸» ¬®»²½¸ ¸¿­ ¾»»² °±±®´§¾¿½µº·´´»¼ô ¬¸» ©¿¬»® ©·´´ »·¬¸»® °±²¼ ±® º´±© ¿´±²¹ ¬¸» ¾±¬¬±³ ±º¬¸» ¬®»²½¸ò ß­ ¬¸»­» ¬®»²½¸»­ «­«¿´´§ ®«² ¿´±²¹­·¼» ¬¸» º±±¬·²¹­ ¿²¼½¿² ¾» ¿¬ ¿ ­·³·´¿® ¼»°¬¸ô ·¬ ·­ ²±¬ ¸¿®¼ ¬± ­»» ¸±© ¿²§ ©¿¬»® ¬¸¿¬ ·­¬¸«­ ¼·®»½¬»¼ ·²¬± ¿ ¬®»²½¸ ½¿² »¿­·´§ ¿ºº»½¬ ¬¸» º±«²¼¿¬·±²K­ ¿¾·´·¬§ ¬±­«°°±®¬ º±±¬·²¹­ ±® »ª»² ¹¿·² »²¬®§ ¬± ¬¸» ­«¾º´±±® ¿®»¿ò

Ù®±«²¼ ¼®¿·²¿¹»×² ¿´´ ­±·´­ ¬¸»®» ·­ ¬¸» ½¿°¿½·¬§ º±® ©¿¬»® ¬± ¬®¿ª»´ ±² ¬¸» ­«®º¿½» ¿²¼¾»´±© ·¬ò Í«®º¿½» ©¿¬»® º´±©­ ½¿² ¾» »­¬¿¾´·­¸»¼ ¾§ ·²­°»½¬·±² ¼«®·²¹¿²¼ ¿º¬»® ¸»¿ª§ ±® °®±´±²¹»¼ ®¿·²ò ׺ ²»½»­­¿®§ô ¿ ¹®¿¬»¼ ¼®¿·² ­§­¬»³½±²²»½¬»¼ ¬± ¬¸» ­¬±®³©¿¬»® ½±´´»½¬·±² ­§­¬»³ ·­ «­«¿´´§ ¿² »¿­§­±´«¬·±²ò

׬ ·­ô ¸±©»ª»®ô ­±³»¬·³»­ ²»½»­­¿®§ ©¸»² ¿¬¬»³°¬·²¹ ¬± °®»ª»²¬©¿¬»® ³·¹®¿¬·±² ¬¸¿¬ ¬»­¬·²¹ ¾» ½¿®®·»¼ ±«¬ ¬± »­¬¿¾´·­¸ ©¿¬»®¬¿¾´»¸»·¹¸¬ ¿²¼ ­«¾­±·´ ©¿¬»® º´±©­ò ̸·­ ­«¾¶»½¬ ·­ ®»º»®®»¼ ¬± ·² ÞÌÚ ï翲¼ ³¿§ °®±°»®´§ ¾» ®»¹¿®¼»¼ ¿­ ¿² ¿®»¿ º±® ¿² »¨°»®¬ ½±²­«´¬¿²¬ò

Ю±¬»½¬·±² ±º ¬¸» ¾«·´¼·²¹ °»®·³»¬»®×¬ ·­ »­­»²¬·¿´ ¬± ®»³»³¾»® ¬¸¿¬ ¬¸» ­±·´ ¬¸¿¬ ¿ºº»½¬­ º±±¬·²¹­ »¨¬»²¼­©»´´ ¾»§±²¼ ¬¸» ¿½¬«¿´ ¾«·´¼·²¹ ´·²»ò É¿¬»®·²¹ ±º ¹¿®¼»² °´¿²¬­ô­¸®«¾­ ¿²¼ ¬®»»­ ½¿«­»­ ­±³» ±º ¬¸» ³±­¬ ­»®·±«­ ©¿¬»® °®±¾´»³­ò

Ú±® ¬¸·­ ®»¿­±²ô °¿®¬·½«´¿®´§ ©¸»®» °®±¾´»³­ »¨·­¬ ±® ¿®» ´·µ»´§ ¬±±½½«®ô ·¬ ·­ ®»½±³³»²¼»¼ ¬¸¿¬ ¿² ¿°®±² ±º °¿ª·²¹ ¾» ·²­¬¿´´»¼¿®±«²¼ ¿­ ³«½¸ ±º ¬¸» ¾«·´¼·²¹ °»®·³»¬»® ¿­ ²»½»­­¿®§ò ̸·­ °¿ª·²¹

ÝÔßÍÍ×Ú×ÝßÌ×ÑÒ ÑÚ ÜßÓßÙÛ É×ÌØ ÎÛÚÛÎÛÒÝÛ ÌÑ ÉßÔÔÍ

Ü»­½®·°¬·±² ±º ¬§°·½¿´ ¼¿³¿¹» ¿²¼ ®»¯«·®»¼ ®»°¿·® ß°°®±¨·³¿¬» ½®¿½µ ©·¼¬¸ Ü¿³¿¹»´·³·¬ ø­»» Ò±¬» í÷ ½¿¬»¹±®§

Ø¿·®´·²» ½®¿½µ­ äðòï ³³ ð

Ú·²» ½®¿½µ­ ©¸·½¸ ¼± ²±¬ ²»»¼ ®»°¿·® äï ³³ ï

Ý®¿½µ­ ²±¬·½»¿¾´» ¾«¬ »¿­·´§ º·´´»¼ò ܱ±®­ ¿²¼ ©·²¼±©­ ­¬·½µ ­´·¹¸¬´§ äë ³³ î

Ý®¿½µ­ ½¿² ¾» ®»°¿·®»¼ ¿²¼ °±­­·¾´§ ¿ ­³¿´´ ¿³±«²¬ ±º ©¿´´ ©·´´ ²»»¼ ëPïë ³³ ø±® ¿ ²«³¾»® ±º ½®¿½µ­ í¬± ¾» ®»°´¿½»¼ò ܱ±®­ ¿²¼ ©·²¼±©­ ­¬·½µò Í»®ª·½» °·°»­ ½¿² º®¿½¬«®»ò í ³³ ±® ³±®» ·² ±²» ¹®±«°÷É»¿¬¸»®¬·¹¸¬²»­­ ±º¬»² ·³°¿·®»¼

Û¨¬»²­·ª» ®»°¿·® ©±®µ ·²ª±´ª·²¹ ¾®»¿µ·²¹ó±«¬ ¿²¼ ®»°´¿½·²¹ ­»½¬·±²­ ±º ©¿´´­ô ïëPîë ³³ ¾«¬ ¿´­± ¼»°»²¼ ì»­°»½·¿´´§ ±ª»® ¼±±®­ ¿²¼ ©·²¼±©­ò É·²¼±© ¿²¼ ¼±±® º®¿³»­ ¼·­¬±®¬ò É¿´´­ ´»¿² ±² ²«³¾»® ±º ½®¿½µ­±® ¾«´¹» ²±¬·½»¿¾´§ô ­±³» ´±­­ ±º ¾»¿®·²¹ ·² ¾»¿³­ò Í»®ª·½» °·°»­ ¼·­®«°¬»¼

Page 73: SITE CLASSIFICATION REPORT SUMMARY...Douglas Partners (DP) has prepared this report for this project at Taylor 2- Stage 3, Taylor in accordance with DP’s proposal dated 15 September

­¸±«´¼ »¨¬»²¼ ±«¬©¿®¼­ ¿ ³·²·³«³ ±º çðð ³³ ø³±®» ·² ¸·¹¸´§®»¿½¬·ª» ­±·´÷ ¿²¼ ­¸±«´¼ ¸¿ª» ¿ ³·²·³«³ º¿´´ ¿©¿§ º®±³ ¬¸»¾«·´¼·²¹ ±º ïæêðò ̸» º·²·­¸»¼ °¿ª·²¹ ­¸±«´¼ ¾» ²± ´»­­ ¬¸¿² ïðð³³ ¾»´±© ¾®·½µ ª»²¬ ¾¿­»­ò

׬ ·­ °®«¼»²¬ ¬± ®»´±½¿¬» ¼®¿·²¿¹» °·°»­ ¿©¿§ º®±³ ¬¸·­ °¿ª·²¹ô ·º°±­­·¾´»ô ¬± ¿ª±·¼ ½±³°´·½¿¬·±²­ º®±³ º«¬«®» ´»¿µ¿¹»ò ׺ ¬¸·­ ·­ ²±¬°®¿½¬·½¿´ô »¿®¬¸»²©¿®» °·°»­ ­¸±«´¼ ¾» ®»°´¿½»¼ ¾§ ÐÊÝ ¿²¼¾¿½µº·´´·²¹ ­¸±«´¼ ¾» ±º ¬¸» ­¿³» ­±·´ ¬§°» ¿­ ¬¸» ­«®®±«²¼·²¹ ­±·´¿²¼ ½±³°¿½¬»¼ ¬± ¬¸» ­¿³» ¼»²­·¬§ò

Û¨½»°¬ ·² ¿®»¿­ ©¸»®» º®»»¦·²¹ ±º ©¿¬»® ·­ ¿² ·­­«»ô ·¬ ·­ ©·­» ¬±®»³±ª» ¬¿°­ ·² ¬¸» ¾«·´¼·²¹ ¿®»¿ ¿²¼ ®»´±½¿¬» ¬¸»³ ©»´´ ¿©¿§ º®±³¬¸» ¾«·´¼·²¹ P °®»º»®¿¾´§ ²±¬ «°¸·´´ º®±³ ·¬ ø­»» ÞÌÚ ïç÷ò

׬ ³¿§ ¾» ¼»­·®¿¾´» ¬± ·²­¬¿´´ ¿ ¹®¿¬»¼ ¼®¿·² ¿¬ ¬¸» ±«¬­·¼» »¼¹» ±º ¬¸»°¿ª·²¹ ±² ¬¸» «°¸·´´ ­·¼» ±º ¬¸» ¾«·´¼·²¹ò ׺ ­«¾­±·´ ¼®¿·²¿¹» ·­²»»¼»¼ ¬¸·­ ½¿² ¾» ·²­¬¿´´»¼ «²¼»® ¬¸» ­«®º¿½» ¼®¿·²ò

ݱ²¼»²­¿¬·±²×² ¾«·´¼·²¹­ ©·¬¸ ¿ ­«¾º´±±® ª±·¼ ­«½¸ ¿­ ©¸»®» ¾»¿®»®­ ¿²¼ ¶±·­¬­­«°°±®¬ º´±±®·²¹ô ·²­«ºº·½·»²¬ ª»²¬·´¿¬·±² ½®»¿¬»­ ·¼»¿´ ½±²¼·¬·±²­ º±®½±²¼»²­¿¬·±²ô °¿®¬·½«´¿®´§ ©¸»®» ¬¸»®» ·­ ´·¬¬´» ½´»¿®¿²½» ¾»¬©»»² ¬¸»º´±±® ¿²¼ ¬¸» ¹®±«²¼ò ݱ²¼»²­¿¬·±² ¿¼¼­ ¬± ¬¸» ³±·­¬«®» ¿´®»¿¼§°®»­»²¬ ·² ¬¸» ­«¾º´±±® ¿²¼ ­·¹²·º·½¿²¬´§ ­´±©­ ¬¸» °®±½»­­ ±º ¼®§·²¹±«¬ò ײ­¬¿´´¿¬·±² ±º ¿² ¿¼»¯«¿¬» ­«¾º´±±® ª»²¬·´¿¬·±² ­§­¬»³ô »·¬¸»®²¿¬«®¿´ ±® ³»½¸¿²·½¿´ô ·­ ¼»­·®¿¾´»ò

É¿®²·²¹æ ß´¬¸±«¹¸ ¬¸·­ Þ«·´¼·²¹ Ì»½¸²±´±¹§ Ú·´» ¼»¿´­ ©·¬¸½®¿½µ·²¹ ·² ¾«·´¼·²¹­ô ·¬ ­¸±«´¼ ¾» ­¿·¼ ¬¸¿¬ ­«¾º´±±® ³±·­¬«®» ½¿²®»­«´¬ ·² ¬¸» ¼»ª»´±°³»²¬ ±º ±¬¸»® °®±¾´»³­ô ²±¬¿¾´§æ

{ É¿¬»® ¬¸¿¬ ·­ ¬®¿²­³·¬¬»¼ ·²¬± ³¿­±²®§ô ³»¬¿´ ±® ¬·³¾»® ¾«·´¼·²¹»´»³»²¬­ ½¿«­»­ ¼¿³¿¹» ¿²¼ñ±® ¼»½¿§ ¬± ¬¸±­» »´»³»²¬­ò

{ Ø·¹¸ ­«¾º´±±® ¸«³·¼·¬§ ¿²¼ ³±·­¬«®» ½±²¬»²¬ ½®»¿¬» ¿² ·¼»¿´»²ª·®±²³»²¬ º±® ª¿®·±«­ °»­¬­ô ·²½´«¼·²¹ ¬»®³·¬»­ ¿²¼ ­°·¼»®­ò

{ ɸ»®» ¸·¹¸ ³±·­¬«®» ´»ª»´­ ¿®» ¬®¿²­³·¬¬»¼ ¬± ¬¸» º´±±®·²¹ ¿²¼©¿´´­ô ¿² ·²½®»¿­» ·² ¬¸» ¼«­¬ ³·¬» ½±«²¬ ½¿² »²­«» ©·¬¸·² ¬¸»´·ª·²¹ ¿®»¿­ò Ü«­¬ ³·¬»­ô ¿­ ©»´´ ¿­ ¼¿³°²»­­ ·² ¹»²»®¿´ô ½¿² ¾» ¿¸»¿´¬¸ ¸¿¦¿®¼ ¬± ·²¸¿¾·¬¿²¬­ô °¿®¬·½«´¿®´§ ¬¸±­» ©¸± ¿®»¿¾²±®³¿´´§ ­«­½»°¬·¾´» ¬± ®»­°·®¿¬±®§ ¿·´³»²¬­ò

̸» ¹¿®¼»²Ì¸» ·¼»¿´ ª»¹»¬¿¬·±² ´¿§±«¬ ·­ ¬± ¸¿ª» ´¿©² ±® °´¿²¬­ ¬¸¿¬ ®»¯«·®»±²´§ ´·¹¸¬ ©¿¬»®·²¹ ·³³»¼·¿¬»´§ ¿¼¶¿½»²¬ ¬± ¬¸» ¼®¿·²¿¹» ±® °¿ª·²¹»¼¹»ô ¬¸»² ³±®» ¼»³¿²¼·²¹ °´¿²¬­ô ­¸®«¾­ ¿²¼ ¬®»»­ ­°®»¿¼ ±«¬ ·²¬¸¿¬ ±®¼»®ò

Ѫ»®©¿¬»®·²¹ ¼«» ¬± ³·­«­» ±º ¿«¬±³¿¬·½ ©¿¬»®·²¹ ­§­¬»³­ ·­ ¿½±³³±² ½¿«­» ±º ­¿¬«®¿¬·±² ¿²¼ ©¿¬»® ³·¹®¿¬·±² «²¼»® º±±¬·²¹­ò ׺·¬ ·­ ²»½»­­¿®§ ¬± «­» ¬¸»­» ­§­¬»³­ô ·¬ ·­ ·³°±®¬¿²¬ ¬± ®»³±ª» ¹¿®¼»²¾»¼­ ¬± ¿ ½±³°´»¬»´§ ­¿º» ¼·­¬¿²½» º®±³ ¾«·´¼·²¹­ò

Û¨·­¬·²¹ ¬®»»­É¸»®» ¿ ¬®»» ·­ ½¿«­·²¹ ¿ °®±¾´»³ ±º ­±·´ ¼®§·²¹ ±® ¬¸»®» ·­ ¬¸»»¨·­¬»²½» ±® ¬¸®»¿¬ ±º «°¸»¿ª¿´ ±º º±±¬·²¹­ô ·º ¬¸» ±ºº»²¼·²¹ ®±±¬­ ¿®»­«¾­·¼·¿®§ ¿²¼ ¬¸»·® ®»³±ª¿´ ©·´´ ²±¬ ­·¹²·º·½¿²¬´§ ¼¿³¿¹» ¬¸» ¬®»»ô¬¸»§ ­¸±«´¼ ¾» ­»ª»®»¼ ¿²¼ ¿ ½±²½®»¬» ±® ³»¬¿´ ¾¿®®·»® °´¿½»¼ª»®¬·½¿´´§ ·² ¬¸» ­±·´ ¬± °®»ª»²¬ º«¬«®» ®±±¬ ¹®±©¬¸ ·² ¬¸» ¼·®»½¬·±² ±º¬¸» ¾«·´¼·²¹ò ׺ ·¬ ·­ ²±¬ °±­­·¾´» ¬± ®»³±ª» ¬¸» ®»´»ª¿²¬ ®±±¬­©·¬¸±«¬ ¼¿³¿¹» ¬± ¬¸» ¬®»»ô ¿² ¿°°´·½¿¬·±² ¬± ®»³±ª» ¬¸» ¬®»» ­¸±«´¼¾» ³¿¼» ¬± ¬¸» ´±½¿´ ¿«¬¸±®·¬§ò ß °®«¼»²¬ °´¿² ·­ ¬± ¬®¿²­°´¿²¬ ´·µ»´§±ºº»²¼»®­ ¾»º±®» ¬¸»§ ¾»½±³» ¿ °®±¾´»³ò

ײº±®³¿¬·±² ±² ¬®»»­ô °´¿²¬­ ¿²¼ ­¸®«¾­Í¬¿¬» ¼»°¿®¬³»²¬­ ±ª»®­»»·²¹ ¿¹®·½«´¬«®» ½¿² ¹·ª» ·²º±®³¿¬·±²®»¹¿®¼·²¹ ®±±¬ °¿¬¬»®²­ô ª±´«³» ±º ©¿¬»® ²»»¼»¼ ¿²¼ ­¿º» ¼·­¬¿²½»º®±³ ¾«·´¼·²¹­ ±º ³±­¬ ­°»½·»­ò Þ±¬¿²·½ ¹¿®¼»²­ ¿®» ¿´­± ­±«®½»­ ±º·²º±®³¿¬·±²ò Ú±® ·²º±®³¿¬·±² ±² °´¿²¬ ®±±¬­ ¿²¼ ¼®¿·²­ô ­»» Þ«·´¼·²¹Ì»½¸²±´±¹§ Ú·´» ïéò

Û¨½¿ª¿¬·±²Û¨½¿ª¿¬·±² ¿®±«²¼ º±±¬·²¹­ ³«­¬ ¾» °®±°»®´§ »²¹·²»»®»¼ò ͱ·´­«°°±®¬·²¹ º±±¬·²¹­ ½¿² ±²´§ ¾» ­¿º»´§ »¨½¿ª¿¬»¼ ¿¬ ¿² ¿²¹´» ¬¸¿¬¿´´±©­ ¬¸» ­±·´ «²¼»® ¬¸» º±±¬·²¹ ¬± ®»³¿·² ­¬¿¾´»ò ̸·­ ¿²¹´» ·­½¿´´»¼ ¬¸» ¿²¹´» ±º ®»°±­» ø±® º®·½¬·±²÷ ¿²¼ ª¿®·»­ ­·¹²·º·½¿²¬´§¾»¬©»»² ­±·´ ¬§°»­ ¿²¼ ½±²¼·¬·±²­ò λ³±ª¿´ ±º ­±·´ ©·¬¸·² ¬¸» ¿²¹´»±º ®»°±­» ©·´´ ½¿«­» ­«¾­·¼»²½»ò

λ³»¼·¿¬·±²

ɸ»®» »®±­·±² ¸¿­ ±½½«®®»¼ ¬¸¿¬ ¸¿­ ©¿­¸»¼ ¿©¿§ ­±·´ ¿¼¶¿½»²¬ ¬±º±±¬·²¹­ô ­±·´ ±º ¬¸» ­¿³» ½´¿­­·º·½¿¬·±² ­¸±«´¼ ¾» ·²¬®±¼«½»¼ ¿²¼½±³°¿½¬»¼ ¬± ¬¸» ­¿³» ¼»²­·¬§ò ɸ»®» º±±¬·²¹­ ¸¿ª» ¾»»²«²¼»®³·²»¼ô ¿«¹³»²¬¿¬·±² ±® ±¬¸»® ­°»½·¿´·­¬ ©±®µ ³¿§ ¾» ®»¯«·®»¼òλ³»¼·¿¬·±² ±º º±±¬·²¹­ ¿²¼ º±«²¼¿¬·±²­ ·­ ¹»²»®¿´´§ ¬¸» ®»¿´³ ±º ¿­°»½·¿´·­¬ ½±²­«´¬¿²¬ò

ɸ»®» ·­±´¿¬»¼ º±±¬·²¹­ ®·­» ¿²¼ º¿´´ ¾»½¿«­» ±º ­©»´´ñ­¸®·²µ »ºº»½¬ô¬¸» ¸±³»±©²»® ³¿§ ¾» ¬»³°¬»¼ ¬± ¿´´»ª·¿¬» º´±±® ¾±«²½» ¾§ º·´´·²¹¬¸» ¹¿° ¬¸¿¬ ¸¿­ ¿°°»¿®»¼ ¾»¬©»»² ¬¸» ¾»¿®»® ¿²¼ ¬¸» °·»® ©·¬¸¾´±½µ·²¹ò ̸» ¼¿²¹»® ¸»®» ·­ ¬¸¿¬ ©¸»² ¬¸» ²»¨¬ ­©»´´ ­»¹³»²¬ ±º ¬¸»½§½´» ±½½«®­ô ¬¸» »¨¬®¿ ¾´±½µ·²¹ ©·´´ °«­¸ ¬¸» º´±±® «° ·²¬± ¿²¿½½»²¬«¿¬»¼ ¼±³» ¿²¼ ³¿§ ¿´­± ½¿«­» ´±½¿´ ­¸»¿® º¿·´«®» ·² ¬¸» ­±·´ò׺ ·¬ ·­ ²»½»­­¿®§ ¬± «­» ¾´±½µ·²¹ô ·¬ ­¸±«´¼ ¾» ¾§ ¿ °¿·® ±º º·²»©»¼¹»­ ¿²¼ ³±²·¬±®·²¹ ­¸±«´¼ ¾» ½¿®®·»¼ ±«¬ º±®¬²·¹¸¬´§ò

̸·­ ÞÌÚ ©¿­ °®»°¿®»¼ ¾§ Ö±¸² Ô»©»® Úß×Þô Ó×ßÓßô ﮬ²»®ô

ݱ²­¬®«½¬·±² Ü·¿¹²±­·­ò

̸» ·²º±®³¿¬·±² ·² ¬¸·­ ¿²¼ ±¬¸»® ·­­«»­ ·² ¬¸» ­»®·»­ ©¿­ ¼»®·ª»¼ º®±³ ª¿®·±«­ ­±«®½»­ ¿²¼ ©¿­ ¾»´·»ª»¼ ¬± ¾» ½±®®»½¬ ©¸»² °«¾´·­¸»¼ò

̸» ·²º±®³¿¬·±² ·­ ¿¼ª·­±®§ò ׬ ·­ °®±ª·¼»¼ ·² ¹±±¼ º¿·¬¸ ¿²¼ ²±¬ ½´¿·³»¼ ¬± ¾» ¿² »¨¸¿«­¬·ª» ¬®»¿¬³»²¬ ±º ¬¸» ®»´»ª¿²¬ ­«¾¶»½¬ò

Ú«®¬¸»® °®±º»­­·±²¿´ ¿¼ª·½» ²»»¼­ ¬± ¾» ±¾¬¿·²»¼ ¾»º±®» ¬¿µ·²¹ ¿²§ ¿½¬·±² ¾¿­»¼ ±² ¬¸» ·²º±®³¿¬·±² °®±ª·¼»¼ò

Ü·­¬®·¾«¬»¼ ¾§

ÝÍ×ÎÑ ÐËÞÔ ×ÍØ ×ÒÙ ÐÑ Þ±¨ ïïíçô ݱ´´·²¹©±±¼ íðêêô ß«­¬®¿´·¿

Ú®»»½¿´´ ïèðð êìë ðëï Ì»´ øðí÷ çêêî éêêê Ú¿¨ øðí÷ çêêî éëëë ©©©ò°«¾´·­¸ò½­·®±ò¿«

Û³¿·´æ °«¾´·­¸·²¹ò­¿´»­à½­·®±ò¿«

w ÝÍ×ÎÑ îððíò ˲¿«¬¸±®·­»¼ ½±°§·²¹ ±º ¬¸·­ Þ«·´¼·²¹ Ì»½¸²±´±¹§ º·´» ·­ °®±¸·¾·¬»¼

Ù¿®¼»²­ º±® ¿ ®»¿½¬·ª» ­·¬»

Page 74: SITE CLASSIFICATION REPORT SUMMARY...Douglas Partners (DP) has prepared this report for this project at Taylor 2- Stage 3, Taylor in accordance with DP’s proposal dated 15 September

TOPSOIL FILLING-dry to moist, brown silty sand

FILLING-generally comprising well compacted, dry tomoist, orange yellow brown, medium plasticity silty sandyclay with some gravel

SILTY SAND-very stiff, dry to moist, grey brown, lowplasticity silty sand with some rootlets

SILTY SANDY CLAY-very stiff, dry to moist, light red greybrown, low plasticity silty sandy clay

Pit discontinued at 1.9m-limit of investigation

0.2

1.3

1.4

1.9

SAMPLING & IN SITU TESTING LEGEND

TEST PIT LOG

Taylor 2 Estate, Stage 3, Taylor

A Auger sample G Gas sample PID Photo ionisation detector (ppm)B Bulk sample P Piston sample PL(A) Point load axial test Is(50) (MPa)BLK Block sample Ux Tube sample (x mm dia.) PL(D) Point load diametral test Is(50) (MPa)C Core drilling W Water sample pp Pocket penetrometer (kPa)D Disturbed sample Water seep S Standard penetration testE Environmental sample Water level V Shear vane (kPa)

Indesco Consulting Engineers Pty LtdSite Classifications

Results &Comments

LOGGED: JPM SURVEY DATUM: MGA94

CLIENT:PROJECT:LOCATION:

PIT No: 56PROJECT No: 77418.29DATE: 11/1/2019SHEET 1 OF 1

Sampling & In Situ Testing

1

2

Wat

er

Dep

th

Sam

ple

Description

of

Strata Gra

phic

Log

Typ

e

REMARKS: Surface Levels & Coordinates are approximate only and must not be relied upon

RIG: Kubota KX057-4 mini-excavator with 300mm wide bucket

WATER OBSERVATIONS: No free groundwater observed

SURFACE LEVEL: 665.6 AHDEASTING: 209127NORTHING: 618786

Dynamic Penetrometer Test(blows per mm)

5 10 15 20

Cone Penetrometer AS1289.6.3.2Sand Penetrometer AS1289.6.3.3

Depth(m) R

L

1

2

665

664

D

D

1.35

1.6 pp = 300-350

Page 75: SITE CLASSIFICATION REPORT SUMMARY...Douglas Partners (DP) has prepared this report for this project at Taylor 2- Stage 3, Taylor in accordance with DP’s proposal dated 15 September

TOPSOIL FILLING-dry to moist, brown silty sand

FILLING-generally comprising well compacted, dry tomoist, grey brown, low to medium plasticity silty sandyclay with some gravel and occasional cobbles

Pit discontinued at 1.7m-limit of investigation

0.2

1.7

SAMPLING & IN SITU TESTING LEGEND

TEST PIT LOG

Taylor 2 Estate, Stage 3, Taylor

A Auger sample G Gas sample PID Photo ionisation detector (ppm)B Bulk sample P Piston sample PL(A) Point load axial test Is(50) (MPa)BLK Block sample Ux Tube sample (x mm dia.) PL(D) Point load diametral test Is(50) (MPa)C Core drilling W Water sample pp Pocket penetrometer (kPa)D Disturbed sample Water seep S Standard penetration testE Environmental sample Water level V Shear vane (kPa)

Indesco Consulting Engineers Pty LtdSite Classifications

Results &Comments

LOGGED: JPM SURVEY DATUM: MGA94

CLIENT:PROJECT:LOCATION:

PIT No: 57PROJECT No: 77418.29DATE: 11/1/2019SHEET 1 OF 1

Sampling & In Situ Testing

1

2

Wat

er

Dep

th

Sam

ple

Description

of

Strata Gra

phic

Log

Typ

e

REMARKS: Surface Levels & Coordinates are approximate only and must not be relied upon

RIG: Kubota KX057-4 mini-excavator with 300mm wide bucket

WATER OBSERVATIONS: No free groundwater observed

SURFACE LEVEL: 666.0 AHDEASTING: 209106NORTHING: 618773

Dynamic Penetrometer Test(blows per mm)

5 10 15 20

Cone Penetrometer AS1289.6.3.2Sand Penetrometer AS1289.6.3.3

Depth(m) R

L

1

2

666

665

664

D

0.9

1.2

pp >400

Page 76: SITE CLASSIFICATION REPORT SUMMARY...Douglas Partners (DP) has prepared this report for this project at Taylor 2- Stage 3, Taylor in accordance with DP’s proposal dated 15 September
Page 77: SITE CLASSIFICATION REPORT SUMMARY...Douglas Partners (DP) has prepared this report for this project at Taylor 2- Stage 3, Taylor in accordance with DP’s proposal dated 15 September

SITE CLASSIFICATION REPORT SUMMARY

BLOCK: 5 SECTION: 64 SUBURB: Taylor

JOB No: 77418.29 DATE: March 2019

CLIENT: Indesco Consulting Engineers Pty Ltd

Classification Procedures: Existing Subsurface Conditions: Refer attached test pit log(s) – Pit(s) 54,56 and Drawing 1. Bulk Earthworks: Filling within the block placed under Level 1 control as defined in AS 3798 – 2007 (Ref 1). Laboratory Results: Previous laboratory testing results indicated liquid limit ranging from 25-66%, plasticity index ranging from 6-49% and linear shrinkage ranging from 3-20.5%.

Site Classification: Class M* (moderately reactive/filled) based on the current profile / state on limited subsurface information and determined in general accordance with the requirements of AS2870-2011 (Ref 2). The classification must be reassessed should the soil profile change either by adding fill or removing soil from the block and/or if the presence of service trenches or retaining walls are within the zone of influence of the block. Reference should be made to the comments provided below.

Footing Systems: Reference must be made to AS2870-2011 (Ref 2) which indicates footing systems that are appropriate for each site classification. All footings must found within a uniform bearing stratum of suitable strength/material, below the zone of influence of any service trenches, backfill zones, retaining walls or underground structures. Masonry walls should be articulated in accordance with current best practice. Dwelling design must ensure uniform moisture conditions are maintained in the vicinity of footings. Footing systems must be confirmed by a structural engineer taking into consideration any onsite or offsite constraints.

Maintenance Guidelines: Reference should be made to the attached CSIRO Sheet BTF 18 ‘Foundation Maintenance & Footing Performance’ to comments about gardens, landscaping and trees on the performance of foundation soils and in particular in respect to maintaining good surface drainage. It notes that minor cracking in most structures is inevitable, and it describes site maintenance practices aimed at minimising foundation movements that can lead to cracking damage.

Comments/ Limitations:

The successful purchaser must make their own interpretations, deductions and conclusions from the information made available and will need to accept full responsibility for such interpretations, deductions and conclusions.

Development specific geotechnical investigations must be undertaken.

Additional topsoils / filling may have been spread subsequent to the investigation.

Site preparation prior to the construction should include removal of all vegetation, topsoil and any uncontrolled filling.

All new filling must be placed under controlled conditions (AS 3798-2007), otherwise Class P conditions would be warranted.

Some variability in subsurface conditions must be anticipated.

Moisture condition of site soils and/or the presence of groundwater may vary considerably from time of investigation compared to at the time of construction.

Depending on the depth of site cut and trenches, rock excavation may be required.

It is recommended that footing excavations be inspected by a geotechnical engineer.

This report must be read in conjunction with the attached “Limitations” and notes “About this Report”.

References:

1. 2.

AS 3798-2007 ‘Guidelines on Earthworks for Commercial and Residential Developments’, Standards Association of Australia. AS 2870-2011 ‘Residential Slabs and Footings,’ Standards Association of Australia.

Attachments:

Limitations & About this Report Explanatory Notes Test Pit Log(s) Pit(s) 54,56 Drawing 1

Page 78: SITE CLASSIFICATION REPORT SUMMARY...Douglas Partners (DP) has prepared this report for this project at Taylor 2- Stage 3, Taylor in accordance with DP’s proposal dated 15 September

FS 604853

Douglas Partners Pty Ltd ABN 75 053 980 117

www.douglaspartners.com.au Unit 2, 73 Sheppard Street

Hume ACT 2620 PO Box 1487

Fyshwick ACT 2609 Phone (02) 6260 2788

Fax (02) 6260 1147

Brisbane • Cairns • Canberra • Central Coast • Coffs Harbour • Darwin • Geelong • Gold Coast • Macarthur • Melbourne Newcastle • North West Sydney • Perth • Port Macquarie • Sunshine Coast • Sydney • Townsville • Wollongong

Limitations Douglas Partners (DP) has prepared this report for this project at Taylor 2 - Stage 3, Taylor in accordance with DP’s proposal dated 15 September 2017 and acceptance received from Indesco Consulting Engineers Pty Ltd dated 13 March 2019. The work was carried out under DP’s Conditions of Engagement. This report is provided for the exclusive use of Indesco Consulting Engineers Pty Ltd for this project only and for the purposes as described in the report. It should not be used by or relied upon for other projects or purposes on the same or other site or by a third party. Any party so relying upon this report beyond its exclusive use and purpose as stated above, and without the express written consent of DP, does so entirely at its own risk and without recourse to DP for any loss or damage. In preparing this report DP has necessarily relied upon information provided by the client and/or their agents. The results provided in the report are indicative of the sub-surface conditions on the site only at the specific sampling and/or testing locations, and then only to the depths investigated and at the time the work was carried out. Sub-surface conditions can change abruptly due to variable geological processes and also as a result of human influences. Such changes may occur after DP’s field testing has been completed. DP’s advice is based upon the conditions encountered during this investigation. The accuracy of the advice provided by DP in this report may be affected by undetected variations in ground conditions across the site between and beyond the sampling and/or testing locations. The advice may also be limited by budget constraints imposed by others or by site accessibility. This report must be read in conjunction with all of the attached and should be kept in its entirety without separation of individual pages or sections. DP cannot be held responsible for interpretations or conclusions made by others unless they are supported by an expressed statement, interpretation, outcome or conclusion stated in this report. This report, or sections from this report, should not be used as part of a specification for a project, without review and agreement by DP. This is because this report has been written as advice and opinion rather than instructions for construction. The scope for work for this investigation/report did not include the assessment of surface or sub-surface materials or groundwater for contaminants, within or adjacent to the site. Should evidence of filling of unknown origin be noted in the report, and in particular the presence of building demolition materials, it should be recognised that there may be some risk that such filling may contain contaminants and hazardous building materials. The contents of this report do not constitute formal design components such as are required, by the Health and Safety Legislation and Regulations, to be included in a Safety Report specifying the hazards likely to be encountered during construction and the controls required to mitigate risk. This design process requires risk assessment to be undertaken, with such assessment being dependent upon factors relating to likelihood of occurrence and consequences of damage to property and to life. This, in turn, requires project data and analysis presently beyond the knowledge and project role respectively of DP. DP may be able, however, to assist the client in carrying out a risk assessment of potential hazards contained in the Comments section of this report, as an extension to the current scope of works, if so requested, and provided that suitable additional information is made available to DP. Any such risk assessment would, however, be necessarily restricted to the geotechnical components set out in this report and to their application by the project designers to project design, construction, maintenance and demolition.

Page 79: SITE CLASSIFICATION REPORT SUMMARY...Douglas Partners (DP) has prepared this report for this project at Taylor 2- Stage 3, Taylor in accordance with DP’s proposal dated 15 September

July 2010

Introduction These notes have been provided to amplify DP's report in regard to classification methods, field procedures and the comments section. Not all are necessarily relevant to all reports. DP's reports are based on information gained from limited subsurface excavations and sampling, supplemented by knowledge of local geology and experience. For this reason, they must be regarded as interpretive rather than factual documents, limited to some extent by the scope of information on which they rely. Copyright This report is the property of Douglas Partners Pty Ltd. The report may only be used for the purpose for which it was commissioned and in accordance with the Conditions of Engagement for the commission supplied at the time of proposal. Unauthorised use of this report in any form whatsoever is prohibited. Borehole and Test Pit Logs The borehole and test pit logs presented in this report are an engineering and/or geological interpretation of the subsurface conditions, and their reliability will depend to some extent on frequency of sampling and the method of drilling or excavation. Ideally, continuous undisturbed sampling or core drilling will provide the most reliable assessment, but this is not always practicable or possible to justify on economic grounds. In any case the boreholes and test pits represent only a very small sample of the total subsurface profile. Interpretation of the information and its application to design and construction should therefore take into account the spacing of boreholes or pits, the frequency of sampling, and the possibility of other than 'straight line' variations between the test locations. Groundwater Where groundwater levels are measured in boreholes there are several potential problems, namely: • In low permeability soils groundwater may

enter the hole very slowly or perhaps not at all during the time the hole is left open;

• A localised, perched water table may lead to an erroneous indication of the true water table;

• Water table levels will vary from time to time with seasons or recent weather changes. They may not be the same at the time of construction as are indicated in the report; and

• The use of water or mud as a drilling fluid will mask any groundwater inflow. Water has to be blown out of the hole and drilling mud must first be washed out of the hole if water measurements are to be made.

More reliable measurements can be made by installing standpipes which are read at intervals over several days, or perhaps weeks for low permeability soils. Piezometers, sealed in a particular stratum, may be advisable in low permeability soils or where there may be interference from a perched water table. Reports The report has been prepared by qualified personnel, is based on the information obtained from field and laboratory testing, and has been undertaken to current engineering standards of interpretation and analysis. Where the report has been prepared for a specific design proposal, the information and interpretation may not be relevant if the design proposal is changed. If this happens, DP will be pleased to review the report and the sufficiency of the investigation work. Every care is taken with the report as it relates to interpretation of subsurface conditions, discussion of geotechnical and environmental aspects, and recommendations or suggestions for design and construction. However, DP cannot always anticipate or assume responsibility for: • Unexpected variations in ground conditions.

The potential for this will depend partly on borehole or pit spacing and sampling frequency;

• Changes in policy or interpretations of policy by statutory authorities; or

• The actions of contractors responding to commercial pressures.

If these occur, DP will be pleased to assist with investigations or advice to resolve the matter.

Page 80: SITE CLASSIFICATION REPORT SUMMARY...Douglas Partners (DP) has prepared this report for this project at Taylor 2- Stage 3, Taylor in accordance with DP’s proposal dated 15 September

July 2010

Site Anomalies In the event that conditions encountered on site during construction appear to vary from those which were expected from the information contained in the report, DP requests that it be immediately notified. Most problems are much more readily resolved when conditions are exposed rather than at some later stage, well after the event. Information for Contractual Purposes Where information obtained from this report is provided for tendering purposes, it is recommended that all information, including the written report and discussion, be made available. In circumstances where the discussion or comments section is not relevant to the contractual situation, it may be appropriate to prepare a specially edited document. DP would be pleased to assist in this regard and/or to make additional report copies available for contract purposes at a nominal charge. Site Inspection The company will always be pleased to provide engineering inspection services for geotechnical and environmental aspects of work to which this report is related. This could range from a site visit to confirm that conditions exposed are as expected, to full time engineering presence on site.

Page 81: SITE CLASSIFICATION REPORT SUMMARY...Douglas Partners (DP) has prepared this report for this project at Taylor 2- Stage 3, Taylor in accordance with DP’s proposal dated 15 September

July 2010

Sampling Sampling is carried out during drilling or test pitting to allow engineering examination (and laboratory testing where required) of the soil or rock. Disturbed samples taken during drilling provide information on colour, type, inclusions and, depending upon the degree of disturbance, some information on strength and structure. Undisturbed samples are taken by pushing a thin-walled sample tube into the soil and withdrawing it to obtain a sample of the soil in a relatively undisturbed state. Such samples yield information on structure and strength, and are necessary for laboratory determination of shear strength and compressibility. Undisturbed sampling is generally effective only in cohesive soils. Test Pits Test pits are usually excavated with a backhoe or an excavator, allowing close examination of the in-situ soil if it is safe to enter into the pit. The depth of excavation is limited to about 3 m for a backhoe and up to 6 m for a large excavator. A potential disadvantage of this investigation method is the larger area of disturbance to the site. Large Diameter Augers Boreholes can be drilled using a rotating plate or short spiral auger, generally 300 mm or larger in diameter commonly mounted on a standard piling rig. The cuttings are returned to the surface at intervals (generally not more than 0.5 m) and are disturbed but usually unchanged in moisture content. Identification of soil strata is generally much more reliable than with continuous spiral flight augers, and is usually supplemented by occasional undisturbed tube samples. Continuous Spiral Flight Augers The borehole is advanced using 90-115 mm diameter continuous spiral flight augers which are withdrawn at intervals to allow sampling or in-situ testing. This is a relatively economical means of drilling in clays and sands above the water table. Samples are returned to the surface, or may be collected after withdrawal of the auger flights, but they are disturbed and may be mixed with soils from the sides of the hole. Information from the drilling (as distinct from specific sampling by SPTs or undisturbed samples) is of relatively low

reliability, due to the remoulding, possible mixing or softening of samples by groundwater. Non-core Rotary Drilling The borehole is advanced using a rotary bit, with water or drilling mud being pumped down the drill rods and returned up the annulus, carrying the drill cuttings. Only major changes in stratification can be determined from the cuttings, together with some information from the rate of penetration. Where drilling mud is used this can mask the cuttings and reliable identification is only possible from separate sampling such as SPTs. Continuous Core Drilling A continuous core sample can be obtained using a diamond tipped core barrel, usually with a 50 mm internal diameter. Provided full core recovery is achieved (which is not always possible in weak rocks and granular soils), this technique provides a very reliable method of investigation. Standard Penetration Tests Standard penetration tests (SPT) are used as a means of estimating the density or strength of soils and also of obtaining a relatively undisturbed sample. The test procedure is described in Australian Standard 1289, Methods of Testing Soils for Engineering Purposes - Test 6.3.1. The test is carried out in a borehole by driving a 50 mm diameter split sample tube under the impact of a 63 kg hammer with a free fall of 760 mm. It is normal for the tube to be driven in three successive 150 mm increments and the 'N' value is taken as the number of blows for the last 300 mm. In dense sands, very hard clays or weak rock, the full 450 mm penetration may not be practicable and the test is discontinued. The test results are reported in the following form. • In the case where full penetration is obtained

with successive blow counts for each 150 mm of, say, 4, 6 and 7 as:

4,6,7 N=13

• In the case where the test is discontinued before the full penetration depth, say after 15 blows for the first 150 mm and 30 blows for the next 40 mm as:

15, 30/40 mm

Page 82: SITE CLASSIFICATION REPORT SUMMARY...Douglas Partners (DP) has prepared this report for this project at Taylor 2- Stage 3, Taylor in accordance with DP’s proposal dated 15 September

July 2010

The results of the SPT tests can be related empirically to the engineering properties of the soils. Dynamic Cone Penetrometer Tests / Perth Sand Penetrometer Tests Dynamic penetrometer tests (DCP or PSP) are carried out by driving a steel rod into the ground using a standard weight of hammer falling a specified distance. As the rod penetrates the soil the number of blows required to penetrate each successive 150 mm depth are recorded. Normally there is a depth limitation of 1.2 m, but this may be extended in certain conditions by the use of extension rods. Two types of penetrometer are commonly used. • Perth sand penetrometer - a 16 mm diameter

flat ended rod is driven using a 9 kg hammer dropping 600 mm (AS 1289, Test 6.3.3). This test was developed for testing the density of sands and is mainly used in granular soils and filling.

• Cone penetrometer - a 16 mm diameter rod with a 20 mm diameter cone end is driven using a 9 kg hammer dropping 510 mm (AS 1289, Test 6.3.2). This test was developed initially for pavement subgrade investigations, and correlations of the test results with California Bearing Ratio have been published by various road authorities.

Page 83: SITE CLASSIFICATION REPORT SUMMARY...Douglas Partners (DP) has prepared this report for this project at Taylor 2- Stage 3, Taylor in accordance with DP’s proposal dated 15 September

May 2017

Description and Classification Methods The methods of description and classification of

soils and rocks used in this report are based on

Australian Standard AS 1726-1993, Geotechnical

Site Investigations Code. In general, the

descriptions include strength or density, colour,

structure, soil or rock type and inclusions.

Soil Types Soil types are described according to the

predominant particle size, qualified by the grading

of other particles present:

Type Particle size (mm)

Boulder >200

Cobble 63 - 200

Gravel 2.36 - 63

Sand 0.075 - 2.36

Silt 0.002 - 0.075

Clay <0.002

The sand and gravel sizes can be further

subdivided as follows:

Type Particle size (mm)

Coarse gravel 20 - 63

Medium gravel 6 - 20

Fine gravel 2.36 - 6

Coarse sand 0.6 - 2.36

Medium sand 0.2 - 0.6

Fine sand 0.075 - 0.2

The proportions of secondary constituents of soils

are described as:

Term Proportion Example

And Specify Clay (60%) and

Sand (40%)

Adjective 20 - 35% Sandy Clay

Slightly 12 - 20% Slightly Sandy

Clay

With some 5 - 12% Clay with some

sand

With a trace of 0 - 5% Clay with a trace

of sand

Definitions of grading terms used are:

• Well graded - a good representation of all

particle sizes

• Poorly graded - an excess or deficiency of

particular sizes within the specified range

• Uniformly graded - an excess of a particular

particle size

• Gap graded - a deficiency of a particular

particle size with the range

Cohesive Soils Cohesive soils, such as clays, are classified on the

basis of undrained shear strength. The strength

may be measured by laboratory testing, or

estimated by field tests or engineering

examination. The strength terms are defined as

follows:

Description Abbreviation Undrained shear strength

(kPa)

Very soft vs <12

Soft s 12 - 25

Firm f 25 - 50

Stiff st 50 - 100

Very stiff vst 100 - 200

Hard h >200

Cohesionless Soils Cohesionless soils, such as clean sands, are

classified on the basis of relative density, generally

from the results of standard penetration tests

(SPT), cone penetration tests (CPT) or dynamic

penetrometers (PSP). The relative density terms

are given below:

Relative Density

Abbreviation SPT N value

CPT qc value (MPa)

Very loose vl <4 <2

Loose l 4 - 10 2 -5

Medium

dense

md 10 - 30 5 - 15

Dense d 30 - 50 15 - 25

Very

dense

vd >50 >25

Page 84: SITE CLASSIFICATION REPORT SUMMARY...Douglas Partners (DP) has prepared this report for this project at Taylor 2- Stage 3, Taylor in accordance with DP’s proposal dated 15 September

May 2017

Soil Origin It is often difficult to accurately determine the origin

of a soil. Soils can generally be classified as:

• Residual soil - derived from in-situ weathering

of the underlying rock;

• Transported soils - formed somewhere else

and transported by nature to the site; or

• Filling - moved by man.

Transported soils may be further subdivided into:

• Alluvium - river deposits

• Lacustrine - lake deposits

• Aeolian - wind deposits

• Littoral - beach deposits

• Estuarine - tidal river deposits

• Talus - scree or coarse colluvium

• Slopewash or Colluvium - transported

downslope by gravity assisted by water.

Often includes angular rock fragments and

boulders.

Page 85: SITE CLASSIFICATION REPORT SUMMARY...Douglas Partners (DP) has prepared this report for this project at Taylor 2- Stage 3, Taylor in accordance with DP’s proposal dated 15 September

May 2017

Rock Strength Rock strength is defined by the Point Load Strength Index (Is(50)) and refers to the strength of the rock

substance and not the strength of the overall rock mass, which may be considerably weaker due to defects.

The test procedure is described by Australian Standard 4133.4.1 - 2007. The terms used to describe rock

strength are as follows:

Term Abbreviation Point Load Index

Is(50) MPa

Approximate Unconfined Compressive Strength MPa*

Extremely low EL <0.03 <0.6

Very low VL 0.03 - 0.1 0.6 - 2

Low L 0.1 - 0.3 2 - 6

Medium M 0.3 - 1.0 6 - 20

High H 1 - 3 20 - 60

Very high VH 3 - 10 60 - 200

Extremely high EH >10 >200

* Assumes a ratio of 20:1 for UCS to Is(50). It should be noted that the UCS to Is(50) ratio varies significantly

for different rock types and specific ratios should be determined for each site.

Degree of Weathering The degree of weathering of rock is classified as follows:

Term Abbreviation Description

Extremely weathered EW Rock substance has soil properties, i.e. it can be remoulded and classified as a soil but the texture of the original rock is still evident.

Highly weathered HW Limonite staining or bleaching affects whole of rock substance and other signs of decomposition are evident. Porosity and strength may be altered as a result of iron leaching or deposition. Colour and strength of original fresh rock is not recognisable

Moderately weathered

MW Staining and discolouration of rock substance has taken place

Slightly weathered SW Rock substance is slightly discoloured but shows little or no change of strength from fresh rock

Fresh stained Fs Rock substance unaffected by weathering but staining visible along defects

Fresh Fr No signs of decomposition or staining

Degree of Fracturing The following classification applies to the spacing of natural fractures in diamond drill cores. It includes

bedding plane partings, joints and other defects, but excludes drilling breaks.

Term Description

Fragmented Fragments of <20 mm

Highly Fractured Core lengths of 20-40 mm with some fragments

Fractured Core lengths of 40-200 mm with some shorter and longer sections

Slightly Fractured Core lengths of 200-1000 mm with some shorter and longer sections

Unbroken Core lengths mostly > 1000 mm

Page 86: SITE CLASSIFICATION REPORT SUMMARY...Douglas Partners (DP) has prepared this report for this project at Taylor 2- Stage 3, Taylor in accordance with DP’s proposal dated 15 September

May 2017

Rock Quality Designation The quality of the cored rock can be measured using the Rock Quality Designation (RQD) index, defined

as:

RQD % = cumulative length of 'sound' core sections ≥ 100 mm long

total drilled length of section being assessed

where 'sound' rock is assessed to be rock of low strength or better. The RQD applies only to natural

fractures. If the core is broken by drilling or handling (i.e. drilling breaks) then the broken pieces are fitted

back together and are not included in the calculation of RQD.

Stratification Spacing For sedimentary rocks the following terms may be used to describe the spacing of bedding partings:

Term Separation of Stratification Planes

Thinly laminated < 6 mm

Laminated 6 mm to 20 mm

Very thinly bedded 20 mm to 60 mm

Thinly bedded 60 mm to 0.2 m

Medium bedded 0.2 m to 0.6 m

Thickly bedded 0.6 m to 2 m

Very thickly bedded > 2 m

Page 87: SITE CLASSIFICATION REPORT SUMMARY...Douglas Partners (DP) has prepared this report for this project at Taylor 2- Stage 3, Taylor in accordance with DP’s proposal dated 15 September

May 2017

Introduction These notes summarise abbreviations commonly

used on borehole logs and test pit reports.

Drilling or Excavation Methods C Core drilling

R Rotary drilling

SFA Spiral flight augers

NMLC Diamond core - 52 mm dia

NQ Diamond core - 47 mm dia

HQ Diamond core - 63 mm dia

PQ Diamond core - 81 mm dia

Water � Water seep

� Water level

Sampling and Testing A Auger sample

B Bulk sample

D Disturbed sample

E Environmental sample

U50 Undisturbed tube sample (50mm)

W Water sample

pp Pocket penetrometer (kPa)

PID Photo ionisation detector

PL Point load strength Is(50) MPa

S Standard Penetration Test

V Shear vane (kPa)

Description of Defects in Rock The abbreviated descriptions of the defects should

be in the following order: Depth, Type, Orientation,

Coating, Shape, Roughness and Other. Drilling

and handling breaks are not usually included on

the logs.

Defect Type

B Bedding plane

Cs Clay seam

Cv Cleavage

Cz Crushed zone

Ds Decomposed seam

F Fault

J Joint

Lam Lamination

Pt Parting

Sz Sheared Zone

V Vein

Orientation

The inclination of defects is always measured from

the perpendicular to the core axis.

h horizontal

v vertical

sh sub-horizontal

sv sub-vertical

Coating or Infilling Term

cln clean

co coating

he healed

inf infilled

stn stained

ti tight

vn veneer

Coating Descriptor

ca calcite

cbs carbonaceous

cly clay

fe iron oxide

mn manganese

slt silty

Shape

cu curved

ir irregular

pl planar

st stepped

un undulating

Roughness

po polished

ro rough

sl slickensided

sm smooth

vr very rough

Other

fg fragmented

bnd band

qtz quartz

Page 88: SITE CLASSIFICATION REPORT SUMMARY...Douglas Partners (DP) has prepared this report for this project at Taylor 2- Stage 3, Taylor in accordance with DP’s proposal dated 15 September

May 2017

Graphic Symbols for Soil and Rock General

Soils

Sedimentary Rocks

Metamorphic Rocks

Igneous Rocks

Road base

Filling

Concrete

Asphalt

Topsoil

Peat

Clay

Conglomeratic sandstone

Conglomerate

Boulder conglomerate

Sandstone

Slate, phyllite, schist

Siltstone

Mudstone, claystone, shale

Coal

Limestone

Porphyry

Cobbles, boulders

Sandy gravel

Laminite

Silty sand

Clayey sand

Silty clay

Sandy clay

Gravelly clay

Shaly clay

Silt

Clayey silt

Sandy silt

Sand

Gravel

Talus

Gneiss

Quartzite

Dolerite, basalt, andesite

Granite

Tuff, breccia

Dacite, epidote

Page 89: SITE CLASSIFICATION REPORT SUMMARY...Douglas Partners (DP) has prepared this report for this project at Taylor 2- Stage 3, Taylor in accordance with DP’s proposal dated 15 September

ͱ·´ ̧°»­

̸» ¬§°»­ ±º ­±·´­ «­«¿´´§ °®»­»²¬ «²¼»® ¬¸» ¬±°­±·´ ·² ´¿²¼ ¦±²»¼ º±®®»­·¼»²¬·¿´ ¾«·´¼·²¹­ ½¿² ¾» ­°´·¬ ·²¬± ¬©± ¿°°®±¨·³¿¬» ¹®±«°­ P¹®¿²«´¿® ¿²¼ ½´¿§ò Ï«·¬» ±º¬»²ô º±«²¼¿¬·±² ­±·´ ·­ ¿ ³·¨¬«®» ±º ¾±¬¸¬§°»­ò ̸» ¹»²»®¿´ °®±¾´»³­ ¿­­±½·¿¬»¼ ©·¬¸ ­±·´­ ¸¿ª·²¹ ¹®¿²«´¿®½±²¬»²¬ ¿®» «­«¿´´§ ½¿«­»¼ ¾§ »®±­·±²ò Ý´¿§ ­±·´­ ¿®» ­«¾¶»½¬ ¬±­¿¬«®¿¬·±² ¿²¼ ­©»´´ñ­¸®·²µ °®±¾´»³­ò

Ý´¿­­·º·½¿¬·±²­ º±® ¿ ¹·ª»² ¿®»¿ ½¿² ¹»²»®¿´´§ ¾» ±¾¬¿·²»¼ ¾§¿°°´·½¿¬·±² ¬± ¬¸» ´±½¿´ ¿«¬¸±®·¬§ô ¾«¬ ¬¸»­» ¿®» ­±³»¬·³»­ «²®»´·¿¾´»¿²¼ ·º ¬¸»®» ·­ ¼±«¾¬ô ¿ ¹»±¬»½¸²·½¿´ ®»°±®¬ ­¸±«´¼ ¾» ½±³³·­­·±²»¼òß­ ³±­¬ ¾«·´¼·²¹­ ­«ºº»®·²¹ ³±ª»³»²¬ °®±¾´»³­ ¿®» º±«²¼»¼ ±² ½´¿§­±·´­ô ¬¸»®» ·­ ¿² »³°¸¿­·­ ±² ½´¿­­·º·½¿¬·±² ±º ­±·´­ ¿½½±®¼·²¹ ¬± ¬¸»¿³±«²¬ ±º ­©»´´ ¿²¼ ­¸®·²µ¿¹» ¬¸»§ »¨°»®·»²½» ©·¬¸ ª¿®·¿¬·±²­ ±º©¿¬»® ½±²¬»²¬ò ̸» ¬¿¾´» ¾»´±© ·­ Ì¿¾´» îòï º®±³ ßÍ îèéðô ¬¸»Î»­·¼»²¬·¿´ Í´¿¾ ¿²¼ Ú±±¬·²¹ ݱ¼»ò

Ý¿«­»­ ±º Ó±ª»³»²¬

Í»¬¬´»³»²¬ ¼«» ¬± ½±²­¬®«½¬·±²Ì¸»®» ¿®» ¬©± ¬§°»­ ±º ­»¬¬´»³»²¬ ¬¸¿¬ ±½½«® ¿­ ¿ ®»­«´¬ ±º½±²­¬®«½¬·±²æ{ ׳³»¼·¿¬» ­»¬¬´»³»²¬ ±½½«®­ ©¸»² ¿ ¾«·´¼·²¹ ·­ º·®­¬ °´¿½»¼ ±² ·¬­

º±«²¼¿¬·±² ­±·´ô ¿­ ¿ ®»­«´¬ ±º ½±³°¿½¬·±² ±º ¬¸» ­±·´ «²¼»® ¬¸»©»·¹¸¬ ±º ¬¸» ­¬®«½¬«®»ò ̸» ½±¸»­·ª» ¯«¿´·¬§ ±º ½´¿§ ­±·´ ³·¬·¹¿¬»­¿¹¿·²­¬ ¬¸·­ô ¾«¬ ¹®¿²«´¿® ø°¿®¬·½«´¿®´§ ­¿²¼§÷ ­±·´ ·­ ­«­½»°¬·¾´»ò

{ ݱ²­±´·¼¿¬·±² ­»¬¬´»³»²¬ ·­ ¿ º»¿¬«®» ±º ½´¿§ ­±·´ ¿²¼ ³¿§ ¬¿µ»°´¿½» ¾»½¿«­» ±º ¬¸» »¨°«´­·±² ±º ³±·­¬«®» º®±³ ¬¸» ­±·´ ±® ¾»½¿«­»±º ¬¸» ­±·´K­ ´¿½µ ±º ®»­·­¬¿²½» ¬± ´±½¿´ ½±³°®»­­·ª» ±® ­¸»¿® ­¬®»­­»­ò̸·­ ©·´´ «­«¿´´§ ¬¿µ» °´¿½» ¼«®·²¹ ¬¸» º·®­¬ º»© ³±²¬¸­ ¿º¬»®½±²­¬®«½¬·±²ô ¾«¬ ¸¿­ ¾»»² µ²±©² ¬± ¬¿µ» ³¿²§ §»¿®­ ·²»¨½»°¬·±²¿´ ½¿­»­ò

̸»­» °®±¾´»³­ ¿®» ¬¸» °®±ª·²½» ±º ¬¸» ¾«·´¼»® ¿²¼ ­¸±«´¼ ¾» ¬¿µ»²·²¬± ½±²­·¼»®¿¬·±² ¿­ °¿®¬ ±º ¬¸» °®»°¿®¿¬·±² ±º ¬¸» ­·¬» º±® ½±²­¬®«½ó¬·±²ò Þ«·´¼·²¹ Ì»½¸²±´±¹§ Ú·´» ïç øÞÌÚ ïç÷ ¼»¿´­ ©·¬¸ ¬¸»­»°®±¾´»³­ò

Û®±­·±²ß´´ ­±·´­ ¿®» °®±²» ¬± »®±­·±²ô ¾«¬ ­¿²¼§ ­±·´ ·­ °¿®¬·½«´¿®´§ ­«­½»°¬·¾´»¬± ¾»·²¹ ©¿­¸»¼ ¿©¿§ò Ûª»² ½´¿§ ©·¬¸ ¿ ­¿²¼ ½±³°±²»²¬ ±º ­¿§ ïðû±® ³±®» ½¿² ­«ºº»® º®±³ »®±­·±²ò

Í¿¬«®¿¬·±²Ì¸·­ ·­ °¿®¬·½«´¿®´§ ¿ °®±¾´»³ ·² ½´¿§ ­±·´­ò Í¿¬«®¿¬·±² ½®»¿¬»­ ¿ ¾±¹ó´·µ» ­«­°»²­·±² ±º ¬¸» ­±·´ ¬¸¿¬ ½¿«­»­ ·¬ ¬± ´±­» ª·®¬«¿´´§ ¿´´ ±º ·¬­¾»¿®·²¹ ½¿°¿½·¬§ò ̱ ¿ ´»­­»® ¼»¹®»»ô ­¿²¼ ·­ ¿ºº»½¬»¼ ¾§ ­¿¬«®¿¬·±²¾»½¿«­» ­¿¬«®¿¬»¼ ­¿²¼ ³¿§ «²¼»®¹± ¿ ®»¼«½¬·±² ·² ª±´«³» P°¿®¬·½«´¿®´§ ·³°±®¬»¼ ­¿²¼ º·´´ º±® ¾»¼¼·²¹ ¿²¼ ¾´·²¼·²¹ ´¿§»®­òر©»ª»®ô ¬¸·­ «­«¿´´§ ±½½«®­ ¿­ ·³³»¼·¿¬» ­»¬¬´»³»²¬ ¿²¼ ­¸±«´¼²±®³¿´´§ ¾» ¬¸» °®±ª·²½» ±º ¬¸» ¾«·´¼»®ò

Í»¿­±²¿´ ­©»´´·²¹ ¿²¼ ­¸®·²µ¿¹» ±º ­±·´ß´´ ½´¿§­ ®»¿½¬ ¬± ¬¸» °®»­»²½» ±º ©¿¬»® ¾§ ­´±©´§ ¿¾­±®¾·²¹ ·¬ô ³¿µ·²¹¬¸» ­±·´ ·²½®»¿­» ·² ª±´«³» ø­»» ¬¿¾´» ¾»´±©÷ò ̸» ¼»¹®»» ±º ·²½®»¿­»ª¿®·»­ ½±²­·¼»®¿¾´§ ¾»¬©»»² ¼·ºº»®»²¬ ½´¿§­ô ¿­ ¼±»­ ¬¸» ¼»¹®»» ±º¼»½®»¿­» ¼«®·²¹ ¬¸» ­«¾­»¯«»²¬ ¼®§·²¹ ±«¬ ½¿«­»¼ ¾§ º¿·® ©»¿¬¸»®°»®·±¼­ò Þ»½¿«­» ±º ¬¸» ´±© ¿¾­±®°¬·±² ¿²¼ »¨°«´­·±² ®¿¬»ô ¬¸·­°¸»²±³»²±² ©·´´ ²±¬ «­«¿´´§ ¾» ²±¬·½»¿¾´» «²´»­­ ¬¸»®» ¿®»°®±´±²¹»¼ ®¿·²§ ±® ¼®§ °»®·±¼­ô «­«¿´´§ ±º ©»»µ­ ±® ³±²¬¸­ô¼»°»²¼·²¹ ±² ¬¸» ´¿²¼ ¿²¼ ­±·´ ½¸¿®¿½¬»®·­¬·½­ò

̸» ­©»´´·²¹ ±º ­±·´ ½®»¿¬»­ ¿² «°©¿®¼ º±®½» ±² ¬¸» º±±¬·²¹­ ±º ¬¸»¾«·´¼·²¹ô ¿²¼ ­¸®·²µ¿¹» ½®»¿¬»­ ­«¾­·¼»²½» ¬¸¿¬ ¬¿µ»­ ¿©¿§ ¬¸»­«°°±®¬ ²»»¼»¼ ¾§ ¬¸» º±±¬·²¹ ¬± ®»¬¿·² »¯«·´·¾®·«³ò

͸»¿® º¿·´«®»Ì¸·­ °¸»²±³»²±² ±½½«®­ ©¸»² ¬¸» º±«²¼¿¬·±² ­±·´ ¼±»­ ²±¬ ¸¿ª»­«ºº·½·»²¬ ­¬®»²¹¬¸ ¬± ­«°°±®¬ ¬¸» ©»·¹¸¬ ±º ¬¸» º±±¬·²¹ò ̸»®» ¿®»¬©± ³¿¶±® °±­¬ó½±²­¬®«½¬·±² ½¿«­»­æ

{ Í·¹²·º·½¿²¬ ´±¿¼ ·²½®»¿­»ò{ λ¼«½¬·±² ±º ´¿¬»®¿´ ­«°°±®¬ ±º ¬¸» ­±·´ «²¼»® ¬¸» º±±¬·²¹ ¼«» ¬±

»®±­·±² ±® »¨½¿ª¿¬·±²ò{ ײ ½´¿§ ­±·´ô ­¸»¿® º¿·´«®» ½¿² ¾» ½¿«­»¼ ¾§ ­¿¬«®¿¬·±² ±º ¬¸» ­±·´

¿¼¶¿½»²¬ ¬± ±® «²¼»® ¬¸» º±±¬·²¹ò

Þ«·´¼·²¹­ ½¿² ¿²¼ ±º¬»² ¼± ³±ª»ò ̸·­ ³±ª»³»²¬ ½¿² ¾» «°ô ¼±©²ô ´¿¬»®¿´ ±® ®±¬¿¬·±²¿´ò ̸» º«²¼¿³»²¬¿´ ½¿«­»±º ³±ª»³»²¬ ·² ¾«·´¼·²¹­ ½¿² «­«¿´´§ ¾» ®»´¿¬»¼ ¬± ±²» ±® ³±®» °®±¾´»³­ ·² ¬¸» º±«²¼¿¬·±² ­±·´ò ׬ ·­ ·³°±®¬¿²¬ º±®¬¸» ¸±³»±©²»® ¬± ·¼»²¬·º§ ¬¸» ­±·´ ¬§°» ·² ±®¼»® ¬± ¿­½»®¬¿·² ¬¸» ³»¿­«®»­ ¬¸¿¬ ­¸±«´¼ ¾» °«¬ ·² °´¿½» ·² ±®¼»® ¬±»²­«®» ¬¸¿¬ °®±¾´»³­ ·² ¬¸» º±«²¼¿¬·±² ­±·´ ½¿² ¾» °®»ª»²¬»¼ô ¬¸«­ °®±¬»½¬·²¹ ¿¹¿·²­¬ ¾«·´¼·²¹ ³±ª»³»²¬ò

̸·­ Þ«·´¼·²¹ Ì»½¸²±´±¹§ Ú·´» ·­ ¼»­·¹²»¼ ¬± ·¼»²¬·º§ ½¿«­»­ ±º ­±·´ó®»´¿¬»¼ ¾«·´¼·²¹ ³±ª»³»²¬ô ¿²¼ ¬± ­«¹¹»­¬³»¬¸±¼­ ±º °®»ª»²¬·±² ±º ®»­«´¬¿²¬ ½®¿½µ·²¹ ·² ¾«·´¼·²¹­ò

Ú±«²¼¿¬·±² Ó¿·²¬»²¿²½»¿²¼ Ú±±¬·²¹ л®º±®³¿²½»æß Ø±³»±©²»®K­ Ù«·¼»

ÙÛÒÛÎßÔ ÜÛÚ×Ò×Ì×ÑÒÍ ÑÚ Í×ÌÛ ÝÔßÍÍÛÍ

Ý´¿­­ Ú±«²¼¿¬·±²

ß Ó±­¬ ­¿²¼ ¿²¼ ®±½µ ­·¬»­ ©·¬¸ ´·¬¬´» ±® ²± ¹®±«²¼ ³±ª»³»²¬ º®±³ ³±·­¬«®» ½¸¿²¹»­

Í Í´·¹¸¬´§ ®»¿½¬·ª» ½´¿§ ­·¬»­ ©·¬¸ ±²´§ ­´·¹¸¬ ¹®±«²¼ ³±ª»³»²¬ º®±³ ³±·­¬«®» ½¸¿²¹»­

Ó Ó±¼»®¿¬»´§ ®»¿½¬·ª» ½´¿§ ±® ­·´¬ ­·¬»­ô ©¸·½¸ ½¿² »¨°»®·»²½» ³±¼»®¿¬» ¹®±«²¼ ³±ª»³»²¬ º®±³ ³±·­¬«®» ½¸¿²¹»­

Ø Ø·¹¸´§ ®»¿½¬·ª» ½´¿§ ­·¬»­ô ©¸·½¸ ½¿² »¨°»®·»²½» ¸·¹¸ ¹®±«²¼ ³±ª»³»²¬ º®±³ ³±·­¬«®» ½¸¿²¹»­

Û Û¨¬®»³»´§ ®»¿½¬·ª» ­·¬»­ô ©¸·½¸ ½¿² »¨°»®·»²½» »¨¬®»³» ¹®±«²¼ ³±ª»³»²¬ º®±³ ³±·­¬«®» ½¸¿²¹»­

ß ¬± Ð Ú·´´»¼ ­·¬»­

Ð Í·¬»­ ©¸·½¸ ·²½´«¼» ­±º¬ ­±·´­ô ­«½¸ ¿­ ­±º¬ ½´¿§ ±® ­·´¬ ±® ´±±­» ­¿²¼­å ´¿²¼­´·°å ³·²» ­«¾­·¼»²½»å ½±´´¿°­·²¹ ­±·´­å ­±·´­ ­«¾¶»½¬¬± »®±­·±²å ®»¿½¬·ª» ­·¬»­ ­«¾¶»½¬ ¬± ¿¾²±®³¿´ ³±·­¬«®» ½±²¼·¬·±²­ ±® ­·¬»­ ©¸·½¸ ½¿²²±¬ ¾» ½´¿­­·º·»¼ ±¬¸»®©·­»

ÞÌÚ ïè®»°´¿½»­

ײº±®³¿¬·±²Í¸»»¬ ïðñçï

Page 90: SITE CLASSIFICATION REPORT SUMMARY...Douglas Partners (DP) has prepared this report for this project at Taylor 2- Stage 3, Taylor in accordance with DP’s proposal dated 15 September

Ì®»» ®±±¬ ¹®±©¬¸Ì®»»­ ¿²¼ ­¸®«¾­ ¬¸¿¬ ¿®» ¿´´±©»¼ ¬± ¹®±© ·² ¬¸» ª·½·²·¬§ ±º º±±¬·²¹­½¿² ½¿«­» º±«²¼¿¬·±² ­±·´ ³±ª»³»²¬ ·² ¬©± ©¿§­æ

{ ᱬ­ ¬¸¿¬ ¹®±© «²¼»® º±±¬·²¹­ ³¿§ ·²½®»¿­» ·² ½®±­­ó­»½¬·±²¿´­·¦»ô »¨»®¬·²¹ «°©¿®¼ °®»­­«®» ±² º±±¬·²¹­ò

{ ᱬ­ ·² ¬¸» ª·½·²·¬§ ±º º±±¬·²¹­ ©·´´ ¿¾­±®¾ ³«½¸ ±º ¬¸» ³±·­¬«®»·² ¬¸» º±«²¼¿¬·±² ­±·´ô ½¿«­·²¹ ­¸®·²µ¿¹» ±® ­«¾­·¼»²½»ò

˲»ª»²²»­­ ±º Ó±ª»³»²¬

̸» ¬§°»­ ±º ¹®±«²¼ ³±ª»³»²¬ ¼»­½®·¾»¼ ¿¾±ª» «­«¿´´§ ±½½«®«²»ª»²´§ ¬¸®±«¹¸±«¬ ¬¸» ¾«·´¼·²¹K­ º±«²¼¿¬·±² ­±·´ò Í»¬¬´»³»²¬ ¼«»¬± ½±²­¬®«½¬·±² ¬»²¼­ ¬± ¾» «²»ª»² ¾»½¿«­» ±ºæ

{ Ü·ºº»®·²¹ ½±³°¿½¬·±² ±º º±«²¼¿¬·±² ­±·´ °®·±® ¬± ½±²­¬®«½¬·±²ò

{ Ü·ºº»®·²¹ ³±·­¬«®» ½±²¬»²¬ ±º º±«²¼¿¬·±² ­±·´ °®·±® ¬± ½±²­¬®«½¬·±²ò

Ó±ª»³»²¬ ¼«» ¬± ²±²ó½±²­¬®«½¬·±² ½¿«­»­ ·­ «­«¿´´§ ³±®» «²»ª»²­¬·´´ò Û®±­·±² ½¿² «²¼»®³·²» ¿ º±±¬·²¹ ¬¸¿¬ ¬®¿ª»®­»­ ¬¸» º´±© ±® ½¿²½®»¿¬» ¬¸» ½±²¼·¬·±²­ º±® ­¸»¿® º¿·´«®» ¾§ »®±¼·²¹ ­±·´ ¿¼¶¿½»²¬ ¬± ¿º±±¬·²¹ ¬¸¿¬ ®«²­ ·² ¬¸» ­¿³» ¼·®»½¬·±² ¿­ ¬¸» º´±©ò

Í¿¬«®¿¬·±² ±º ½´¿§ º±«²¼¿¬·±² ­±·´ ³¿§ ±½½«® ©¸»®» ­«¾º´±±® ©¿´´­½®»¿¬» ¿ ¼¿³ ¬¸¿¬ ³¿µ»­ ©¿¬»® °±²¼ò ׬ ½¿² ¿´­± ±½½«® ©¸»®»ª»® ¬¸»®»·­ ¿ ­±«®½» ±º ©¿¬»® ²»¿® º±±¬·²¹­ ·² ½´¿§ ­±·´ò ̸·­ ´»¿¼­ ¬± ¿ ­»ª»®»®»¼«½¬·±² ·² ¬¸» ­¬®»²¹¬¸ ±º ¬¸» ­±·´ ©¸·½¸ ³¿§ ½®»¿¬» ´±½¿´ ­¸»¿®º¿·´«®»ò

Í»¿­±²¿´ ­©»´´·²¹ ¿²¼ ­¸®·²µ¿¹» ±º ½´¿§ ­±·´ ¿ºº»½¬­ ¬¸» °»®·³»¬»® ±º¬¸» ¾«·´¼·²¹ º·®­¬ô ¬¸»² ¹®¿¼«¿´´§ ­°®»¿¼­ ¬± ¬¸» ·²¬»®·±®ò ̸» ­©»´´·²¹°®±½»­­ ©·´´ «­«¿´´§ ¾»¹·² ¿¬ ¬¸» «°¸·´´ »¨¬®»³» ±º ¬¸» ¾«·´¼·²¹ô ±® ±²¬¸» ©»¿¬¸»® ­·¼» ©¸»®» ¬¸» ´¿²¼ ·­ º´¿¬ò Í©»´´·²¹ ¹®¿¼«¿´´§ ®»¿½¸»­ ¬¸»·²¬»®·±® ­±·´ ¿­ ¿¾­±®°¬·±² ½±²¬·²«»­ò ͸®·²µ¿¹» «­«¿´´§ ¾»¹·²­ ©¸»®»¬¸» ­«²K­ ¸»¿¬ ·­ ¹®»¿¬»­¬ò

Ûºº»½¬­ ±º ˲»ª»² ͱ·´ Ó±ª»³»²¬ ±² ͬ®«½¬«®»­

Û®±­·±² ¿²¼ ­¿¬«®¿¬·±²Û®±­·±² ®»³±ª»­ ¬¸» ­«°°±®¬ º®±³ «²¼»® º±±¬·²¹­ô ¬»²¼·²¹ ¬± ½®»¿¬»­«¾­·¼»²½» ±º ¬¸» °¿®¬ ±º ¬¸» ­¬®«½¬«®» «²¼»® ©¸·½¸ ·¬ ±½½«®­òÞ®·½µ©±®µ ©¿´´­ ©·´´ ®»­·­¬ ¬¸» ­¬®»­­ ½®»¿¬»¼ ¾§ ¬¸·­ ®»³±ª¿´ ±º­«°°±®¬ ¾§ ¾®·¼¹·²¹ ¬¸» ¹¿° ±® ½¿²¬·´»ª»®·²¹ «²¬·´ ¬¸» ¾®·½µ­ ±® ¬¸»³±®¬¿® ¾»¼¼·²¹ º¿·´ò Ñ´¼»® ³¿­±²®§ ¸¿­ ´·¬¬´» ®»­·­¬¿²½»ò Ûª·¼»²½» ±ºº¿·´«®» ª¿®·»­ ¿½½±®¼·²¹ ¬± ½·®½«³­¬¿²½»­ ¿²¼ ­§³°¬±³­ ³¿§ ·²½´«¼»æ

{ ͬ»° ½®¿½µ·²¹ ·² ¬¸» ³±®¬¿® ¾»¼­ ·² ¬¸» ¾±¼§ ±º ¬¸» ©¿´´ ±®¿¾±ª»ñ¾»´±© ±°»²·²¹­ ­«½¸ ¿­ ¼±±®­ ±® ©·²¼±©­ò

{ Ê»®¬·½¿´ ½®¿½µ·²¹ ·² ¬¸» ¾®·½µ­ ø«­«¿´´§ ¾«¬ ²±¬ ²»½»­­¿®·´§ ·² ´·²»©·¬¸ ¬¸» ª»®¬·½¿´ ¾»¼­ ±® °»®°»²¼­÷ò

×­±´¿¬»¼ °·»®­ ¿ºº»½¬»¼ ¾§ »®±­·±² ±® ­¿¬«®¿¬·±² ±º º±«²¼¿¬·±²­ ©·´´»ª»²¬«¿´´§ ´±­» ½±²¬¿½¬ ©·¬¸ ¬¸» ¾»¿®»®­ ¬¸»§ ­«°°±®¬ ¿²¼ ³¿§ ¬·´¬ ±®º¿´´ ±ª»®ò ̸» º´±±®­ ¬¸¿¬ ¸¿ª» ´±­¬ ¬¸·­ ­«°°±®¬ ©·´´ ¾»½±³» ¾±«²½§ô­±³»¬·³»­ ®¿¬¬´·²¹ ±®²¿³»²¬­ »¬½ò

Í»¿­±²¿´ ­©»´´·²¹ñ­¸®·²µ¿¹» ·² ½´¿§Í©»´´·²¹ º±«²¼¿¬·±² ­±·´ ¼«» ¬± ®¿·²§ °»®·±¼­ º·®­¬ ´·º¬­ ¬¸» ³±­¬»¨°±­»¼ »¨¬®»³·¬·»­ ±º ¬¸» º±±¬·²¹ ­§­¬»³ô ¬¸»² ¬¸» ®»³¿·²¼»® ±º ¬¸»°»®·³»¬»® º±±¬·²¹­ ©¸·´» ¹®¿¼«¿´´§ °»®³»¿¬·²¹ ·²­·¼» ¬¸» ¾«·´¼·²¹º±±¬°®·²¬ ¬± ´·º¬ ·²¬»®²¿´ º±±¬·²¹­ò ̸·­ ­©»´´·²¹ º·®­¬ ¬»²¼­ ¬± ½®»¿¬» ¿¼·­¸ »ºº»½¬ô ¾»½¿«­» ¬¸» »¨¬»®²¿´ º±±¬·²¹­ ¿®» °«­¸»¼ ¸·¹¸»® ¬¸¿² ¬¸»·²¬»®²¿´ ±²»­ò

̸» º·®­¬ ²±¬·½»¿¾´» ­§³°¬±³ ³¿§ ¾» ¬¸¿¬ ¬¸» º´±±® ¿°°»¿®­ ­´·¹¸¬´§¼·­¸»¼ò ̸·­ ·­ ±º¬»² ¿½½±³°¿²·»¼ ¾§ ­±³» ¼±±®­ ¾·²¼·²¹ ±² ¬¸»º´±±® ±® ¬¸» ¼±±® ¸»¿¼ô ¬±¹»¬¸»® ©·¬¸ ­±³» ½®¿½µ·²¹ ±º ½±®²·½»³·¬®»­ò ײ ¾«·´¼·²¹­ ©·¬¸ ¬·³¾»® º´±±®·²¹ ­«°°±®¬»¼ ¾§ ¾»¿®»®­ ¿²¼¶±·­¬­ô ¬¸» º´±±® ½¿² ¾» ¾±«²½§ò Û¨¬»®²¿´´§ ¬¸»®» ³¿§ ¾» ª·­·¾´»¼·­¸·²¹ ±º ¬¸» ¸·° ±® ®·¼¹» ´·²»­ò

ß­ ¬¸» ³±·­¬«®» ¿¾­±®°¬·±² °®±½»­­ ½±³°´»¬»­ ·¬­ ¶±«®²»§ ¬± ¬¸»·²²»®³±­¬ ¿®»¿­ ±º ¬¸» ¾«·´¼·²¹ô ¬¸» ·²¬»®²¿´ º±±¬·²¹­ ©·´´ ®·­»ò ׺ ¬¸»­°®»¿¼ ±º ³±·­¬«®» ·­ ®±«¹¸´§ »ª»²ô ·¬ ³¿§ ¾» ¬¸¿¬ ¬¸» ­§³°¬±³­ ©·´´¬»³°±®¿®·´§ ¼·­¿°°»¿®ô ¾«¬ ·¬ ·­ ³±®» ´·µ»´§ ¬¸¿¬ ­©»´´·²¹ ©·´´ ¾»«²»ª»²ô ½®»¿¬·²¹ ¿ ¼·ºº»®»²½» ®¿¬¸»® ¬¸¿² ¿ ¼·­¿°°»¿®¿²½» ·²­§³°¬±³­ò ײ ¾«·´¼·²¹­ ©·¬¸ ¬·³¾»® º´±±®·²¹ ­«°°±®¬»¼ ¾§ ¾»¿®»®­¿²¼ ¶±·­¬­ô ¬¸» ·­±´¿¬»¼ °·»®­ ©·´´ ®·­» ³±®» »¿­·´§ ¬¸¿² ¬¸» ­¬®·°º±±¬·²¹­ ±® °·»®­ «²¼»® ©¿´´­ô ½®»¿¬·²¹ ²±¬·½»¿¾´» ¼±³·²¹ ±º º´±±®·²¹ò

ß­ ¬¸» ©»¿¬¸»® °¿¬¬»®² ½¸¿²¹»­ ¿²¼ ¬¸» ­±·´ ¾»¹·²­ ¬± ¼®§ ±«¬ô ¬¸»»¨¬»®²¿´ º±±¬·²¹­ ©·´´ ¾» º·®­¬ ¿ºº»½¬»¼ô ¾»¹·²²·²¹ ©·¬¸ ¬¸» ´±½¿¬·±²­©¸»®» ¬¸» ­«²K­ »ºº»½¬ ·­ ­¬®±²¹»­¬ò ̸·­ ¸¿­ ¬¸» »ºº»½¬ ±º ´±©»®·²¹ ¬¸»»¨¬»®²¿´ º±±¬·²¹­ò ̸» ¼±³·²¹ ·­ ¿½½»²¬«¿¬»¼ ¿²¼ ½®¿½µ·²¹ ®»¼«½»­±® ¼·­¿°°»¿®­ ©¸»®» ·¬ ±½½«®®»¼ ¾»½¿«­» ±º ¼·­¸·²¹ô ¾«¬ ±¬¸»® ½®¿½µ­±°»² «°ò ̸» ®±±º ´·²»­ ³¿§ ¾»½±³» ½±²ª»¨ò

ܱ³·²¹ ¿²¼ ¼·­¸·²¹ ¿®» ¿´­± ¿ºº»½¬»¼ ¾§ ©»¿¬¸»® ·² ±¬¸»® ©¿§­ò ײ¿®»¿­ ©¸»®» ©¿®³ô ©»¬ ­«³³»®­ ¿²¼ ½±±´»® ¼®§ ©·²¬»®­ °®»ª¿·´ô©¿¬»® ³·¹®¿¬·±² ¬»²¼­ ¬± ¾» ¬±©¿®¼ ¬¸» ·²¬»®·±® ¿²¼ ¼±³·²¹ ©·´´ ¾»¿½½»²¬«¿¬»¼ô ©¸»®»¿­ ©¸»®» ­«³³»®­ ¿®» ¼®§ ¿²¼ ©·²¬»®­ ¿®» ½±´¼¿²¼ ©»¬ô ³·¹®¿¬·±² ¬»²¼­ ¬± ¾» ¬±©¿®¼ ¬¸» »¨¬»®·±® ¿²¼ ¬¸»«²¼»®´§·²¹ °®±°»²­·¬§ ·­ ¬±©¿®¼ ¼·­¸·²¹ò

Ó±ª»³»²¬ ½¿«­»¼ ¾§ ¬®»» ®±±¬­×² ¹»²»®¿´ô ¹®±©·²¹ ®±±¬­ ©·´´ »¨»®¬ ¿² «°©¿®¼ °®»­­«®» ±² º±±¬·²¹­ô©¸»®»¿­ ­±·´ ­«¾¶»½¬ ¬± ¼®§·²¹ ¾»½¿«­» ±º ¬®»» ±® ­¸®«¾ ®±±¬­ ©·´´ ¬»²¼¬± ®»³±ª» ­«°°±®¬ º®±³ «²¼»® º±±¬·²¹­ ¾§ ·²¼«½·²¹ ­¸®·²µ¿¹»ò

ݱ³°´·½¿¬·±²­ ½¿«­»¼ ¾§ ¬¸» ­¬®«½¬«®» ·¬­»´ºÓ±­¬ º±®½»­ ¬¸¿¬ ¬¸» ­±·´ ½¿«­»­ ¬± ¾» »¨»®¬»¼ ±² ­¬®«½¬«®»­ ¿®»ª»®¬·½¿´ P ·ò»ò »·¬¸»® «° ±® ¼±©²ò ر©»ª»®ô ¾»½¿«­» ¬¸»­» º±®½»­ ¿®»­»´¼±³ ­°®»¿¼ »ª»²´§ ¿®±«²¼ ¬¸» º±±¬·²¹­ô ¿²¼ ¾»½¿«­» ¬¸» ¾«·´¼·²¹®»­·­¬­ «²»ª»² ³±ª»³»²¬ ¾»½¿«­» ±º ·¬­ ®·¹·¼·¬§ô º±®½»­ ¿®» »¨»®¬»¼º®±³ ±²» °¿®¬ ±º ¬¸» ¾«·´¼·²¹ ¬± ¿²±¬¸»®ò ̸» ²»¬ ®»­«´¬ ±º ¿´´ ¬¸»­»º±®½»­ ·­ «­«¿´´§ ®±¬¿¬·±²¿´ò ̸·­ ®»­«´¬¿²¬ º±®½» ±º¬»² ½±³°´·½¿¬»­ ¬¸»¼·¿¹²±­·­ ¾»½¿«­» ¬¸» ª·­·¾´» ­§³°¬±³­ ¼± ²±¬ ­·³°´§ ®»º´»½¬ ¬¸»±®·¹·²¿´ ½¿«­»ò ß ½±³³±² ­§³°¬±³ ·­ ¾·²¼·²¹ ±º ¼±±®­ ±² ¬¸»ª»®¬·½¿´ ³»³¾»® ±º ¬¸» º®¿³»ò

Ûºº»½¬­ ±² º«´´ ³¿­±²®§ ­¬®«½¬«®»­Þ®·½µ©±®µ ©·´´ ®»­·­¬ ½®¿½µ·²¹ ©¸»®» ·¬ ½¿²ò ׬ ©·´´ ¿¬¬»³°¬ ¬± ­°¿²¿®»¿­ ¬¸¿¬ ´±­» ­«°°±®¬ ¾»½¿«­» ±º ­«¾­·¼»¼ º±«²¼¿¬·±²­ ±® ®¿·­»¼°±·²¬­ò ׬ ·­ ¬¸»®»º±®» «­«¿´ ¬± ­»» ½®¿½µ·²¹ ¿¬ ©»¿µ °±·²¬­ô ­«½¸ ¿­±°»²·²¹­ º±® ©·²¼±©­ ±® ¼±±®­ò

ײ ¬¸» »ª»²¬ ±º ½±²­¬®«½¬·±² ­»¬¬´»³»²¬ô ½®¿½µ·²¹ ©·´´ «­«¿´´§ ®»³¿·²«²½¸¿²¹»¼ ¿º¬»® ¬¸» °®±½»­­ ±º ­»¬¬´»³»²¬ ¸¿­ ½»¿­»¼ò

É·¬¸ ´±½¿´ ­¸»¿® ±® »®±­·±²ô ½®¿½µ·²¹ ©·´´ «­«¿´´§ ½±²¬·²«» ¬± ¼»ª»´±°«²¬·´ ¬¸» ±®·¹·²¿´ ½¿«­» ¸¿­ ¾»»² ®»³»¼·»¼ô ±® «²¬·´ ¬¸» ­«¾­·¼»²½»¸¿­ ½±³°´»¬»´§ ²»«¬®¿´·­»¼ ¬¸» ¿ºº»½¬»¼ °±®¬·±² ±º º±±¬·²¹ ¿²¼ ¬¸»­¬®«½¬«®» ¸¿­ ­¬¿¾·´·­»¼ ±² ±¬¸»® º±±¬·²¹­ ¬¸¿¬ ®»³¿·² »ºº»½¬·ª»ò

ײ ¬¸» ½¿­» ±º ­©»´´ñ­¸®·²µ »ºº»½¬­ô ¬¸» ¾®·½µ©±®µ ©·´´ ·² ­±³» ½¿­»­®»¬«®² ¬± ·¬­ ±®·¹·²¿´ °±­·¬·±² ¿º¬»® ½±³°´»¬·±² ±º ¿ ½§½´»ô ¸±©»ª»® ·¬·­ ³±®» ´·µ»´§ ¬¸¿¬ ¬¸» ®±¬¿¬·±²¿´ »ºº»½¬ ©·´´ ²±¬ ¾» »¨¿½¬´§ ®»ª»®­»¼ô¿²¼ ·¬ ·­ ¿´­± «­«¿´ ¬¸¿¬ ¾®·½µ©±®µ ©·´´ ­»¬¬´» ·² ·¬­ ²»© °±­·¬·±² ¿²¼©·´´ ®»­·­¬ ¬¸» º±®½»­ ¬®§·²¹ ¬± ®»¬«®² ·¬ ¬± ·¬­ ±®·¹·²¿´ °±­·¬·±²ò ̸·­³»¿²­ ¬¸¿¬ ·² ¿ ½¿­» ©¸»®» ­©»´´·²¹ ¬¿µ»­ °´¿½» ¿º¬»® ½±²­¬®«½¬·±²¿²¼ ½®¿½µ·²¹ ±½½«®­ô ¬¸» ½®¿½µ·²¹ ·­ ´·µ»´§ ¬± ¿¬ ´»¿­¬ °¿®¬´§ ®»³¿·²¿º¬»® ¬¸» ­¸®·²µ ­»¹³»²¬ ±º ¬¸» ½§½´» ·­ ½±³°´»¬»ò ̸«­ô »¿½¸ ¬·³»¬¸» ½§½´» ·­ ®»°»¿¬»¼ô ¬¸» ´·µ»´·¸±±¼ ·­ ¬¸¿¬ ¬¸» ½®¿½µ·²¹ ©·´´ ¾»½±³»©·¼»® «²¬·´ ¬¸» ­»½¬·±²­ ±º ¾®·½µ©±®µ ¾»½±³» ª·®¬«¿´´§ ·²¼»°»²¼»²¬ò

É·¬¸ ®»°»¿¬»¼ ½§½´»­ô ±²½» ¬¸» ½®¿½µ·²¹ ·­ »­¬¿¾´·­¸»¼ô ·º ¬¸»®» ·­ ²±±¬¸»® ½±³°´·½¿¬·±²ô ·¬ ·­ ²±®³¿´ º±® ¬¸» ·²½·¼»²½» ±º ½®¿½µ·²¹ ¬±­¬¿¾·´·­»ô ¿­ ¬¸» ¾«·´¼·²¹ ¸¿­ ¬¸» ¿®¬·½«´¿¬·±² ·¬ ²»»¼­ ¬± ½±°» ©·¬¸¬¸» °®±¾´»³ò ̸·­ ·­ ¾§ ²± ³»¿²­ ¿´©¿§­ ¬¸» ½¿­»ô ¸±©»ª»®ô ¿²¼³±²·¬±®·²¹ ±º ½®¿½µ­ ·² ©¿´´­ ¿²¼ º´±±®­ ­¸±«´¼ ¿´©¿§­ ¾» ¬®»¿¬»¼­»®·±«­´§ò

Ë°¸»¿ª¿´ ½¿«­»¼ ¾§ ¹®±©¬¸ ±º ¬®»» ®±±¬­ «²¼»® º±±¬·²¹­ ·­ ²±¬ ¿­·³°´» ª»®¬·½¿´ ­¸»¿® ­¬®»­­ò ̸»®» ·­ ¿ ¬»²¼»²½§ º±® ¬¸» ®±±¬ ¬± ¿´­±»¨»®¬ ´¿¬»®¿´ º±®½»­ ¬¸¿¬ ¿¬¬»³°¬ ¬± ­»°¿®¿¬» ­»½¬·±²­ ±º ¾®·½µ©±®µ¿º¬»® ·²·¬·¿´ ½®¿½µ·²¹ ¸¿­ ±½½«®®»¼ò

Ì®»»­ ½¿² ½¿«­» ­¸®·²µ¿¹» ¿²¼ ¼¿³¿¹»

Page 91: SITE CLASSIFICATION REPORT SUMMARY...Douglas Partners (DP) has prepared this report for this project at Taylor 2- Stage 3, Taylor in accordance with DP’s proposal dated 15 September

̸» ²±®³¿´ ­¬®«½¬«®¿´ ¿®®¿²¹»³»²¬ ·­ ¬¸¿¬ ¬¸» ·²²»® ´»¿º ±º ¾®·½µó©±®µ ·² ¬¸» »¨¬»®²¿´ ©¿´´­ ¿²¼ ¿¬ ´»¿­¬ ­±³» ±º ¬¸» ·²¬»®²¿´ ©¿´´­ø¼»°»²¼·²¹ ±² ¬¸» ®±±º ¬§°»÷ ½±³°®·­» ¬¸» ´±¿¼ó¾»¿®·²¹ ­¬®«½¬«®» ±²©¸·½¸ ¿²§ «°°»® º´±±®­ô ½»·´·²¹­ ¿²¼ ¬¸» ®±±º ¿®» ­«°°±®¬»¼ò ײ ¬¸»­»½¿­»­ô ·¬ ·­ ·²¬»®²¿´´§ ª·­·¾´» ½®¿½µ·²¹ ¬¸¿¬ ­¸±«´¼ ¾» ¬¸» ³¿·² º±½«­±º ¿¬¬»²¬·±²ô ¸±©»ª»® ¬¸»®» ¿®» ¿ º»© »¨¿³°´»­ ±º ¼©»´´·²¹­ ©¸±­»»¨¬»®²¿´ ´»¿º ±º ³¿­±²®§ °´¿§­ ­±³» ­«°°±®¬·²¹ ®±´»ô ­± ¬¸·­ ­¸±«´¼¾» ½¸»½µ»¼ ·º ¬¸»®» ·­ ¿²§ ¼±«¾¬ò ײ ¿²§ ½¿­»ô »¨¬»®²¿´´§ ª·­·¾´»½®¿½µ·²¹ ·­ ·³°±®¬¿²¬ ¿­ ¿ ¹«·¼» ¬± ­¬®»­­»­ ±² ¬¸» ­¬®«½¬«®» ¹»²»®¿´´§ô¿²¼ ·¬ ­¸±«´¼ ¿´­± ¾» ®»³»³¾»®»¼ ¬¸¿¬ ¬¸» »¨¬»®²¿´ ©¿´´­ ³«­¬ ¾»½¿°¿¾´» ±º ­«°°±®¬·²¹ ¬¸»³­»´ª»­ò

Ûºº»½¬­ ±² º®¿³»¼ ­¬®«½¬«®»­Ì·³¾»® ±® ­¬»»´ º®¿³»¼ ¾«·´¼·²¹­ ¿®» ´»­­ ´·µ»´§ ¬± »¨¸·¾·¬ ½®¿½µ·²¹¼«» ¬± ­©»´´ñ­¸®·²µ ¬¸¿² ³¿­±²®§ ¾«·´¼·²¹­ ¾»½¿«­» ±º ¬¸»·®º´»¨·¾·´·¬§ò ß´­±ô ¬¸» ¼±³·²¹ñ¼·­¸·²¹ »ºº»½¬­ ¬»²¼ ¬± ¾» ´±©»® ¾»½¿«­»±º ¬¸» ´·¹¸¬»® ©»·¹¸¬ ±º ©¿´´­ò ̸» ³¿·² ®·­µ­ ¬± º®¿³»¼ ¾«·´¼·²¹­ ¿®»»²½±«²¬»®»¼ ¾»½¿«­» ±º ¬¸» ·­±´¿¬»¼ °·»® º±±¬·²¹­ «­»¼ «²¼»® ©¿´´­òɸ»®» »®±­·±² ±® ­¿¬«®¿¬·±² ½¿«­» ¿ º±±¬·²¹ ¬± º¿´´ ¿©¿§ô ¬¸·­ ½¿²¼±«¾´» ¬¸» ­°¿² ©¸·½¸ ¿ ©¿´´ ³«­¬ ¾®·¼¹»ò ̸·­ ¿¼¼·¬·±²¿´ ­¬®»­­ ½¿²½®»¿¬» ½®¿½µ·²¹ ·² ©¿´´ ´·²·²¹­ô °¿®¬·½«´¿®´§ ©¸»®» ¬¸»®» ·­ ¿ ©»¿µ°±·²¬ ·² ¬¸» ­¬®«½¬«®» ½¿«­»¼ ¾§ ¿ ¼±±® ±® ©·²¼±© ±°»²·²¹ò ׬ ·­ô¸±©»ª»®ô «²´·µ»´§ ¬¸¿¬ º®¿³»¼ ­¬®«½¬«®»­ ©·´´ ¾» ­± ­¬®»­­»¼ ¿­ ¬± ­«ºº»®­»®·±«­ ¼¿³¿¹» ©·¬¸±«¬ º·®­¬ »¨¸·¾·¬·²¹ ­±³» ±® ¿´´ ±º ¬¸» ¿¾±ª»­§³°¬±³­ º±® ¿ ½±²­·¼»®¿¾´» °»®·±¼ò ̸» ­¿³» ©¿®²·²¹ °»®·±¼ ­¸±«´¼¿°°´§ ·² ¬¸» ½¿­» ±º «°¸»¿ª¿´ò ׬ ­¸±«´¼ ¾» ²±¬»¼ô ¸±©»ª»®ô ¬¸¿¬ ©¸»®»º®¿³»¼ ¾«·´¼·²¹­ ¿®» ­«°°±®¬»¼ ¾§ ­¬®·° º±±¬·²¹­ ¬¸»®» ·­ ±²´§ ±²» ´»¿º±º ¾®·½µ©±®µ ¿²¼ ¬¸»®»º±®» ¬¸» »¨¬»®²¿´´§ ª·­·¾´» ©¿´´­ ¿®» ¬¸»­«°°±®¬·²¹ ­¬®«½¬«®» º±® ¬¸» ¾«·´¼·²¹ò ײ ¬¸·­ ½¿­»ô ¬¸» ­«¾º´±±®³¿­±²®§ ©¿´´­ ½¿² ¾» »¨°»½¬»¼ ¬± ¾»¸¿ª» ¿­ º«´´ ¾®·½µ©±®µ ©¿´´­ò

Ûºº»½¬­ ±² ¾®·½µ ª»²»»® ­¬®«½¬«®»­Þ»½¿«­» ¬¸» ´±¿¼ó¾»¿®·²¹ ­¬®«½¬«®» ±º ¿ ¾®·½µ ª»²»»® ¾«·´¼·²¹ ·­ ¬¸»º®¿³» ¬¸¿¬ ³¿µ»­ «° ¬¸» ·²¬»®·±® ´»¿º ±º ¬¸» »¨¬»®²¿´ ©¿´´­ °´«­°»®¸¿°­ ¬¸» ·²¬»®²¿´ ©¿´´­ô ¼»°»²¼·²¹ ±² ¬¸» ¬§°» ±º ®±±ºô ¬¸»¾«·´¼·²¹ ½¿² ¾» »¨°»½¬»¼ ¬± ¾»¸¿ª» ¿­ ¿ º®¿³»¼ ­¬®«½¬«®»ô »¨½»°¬ ¬¸¿¬¬¸» »¨¬»®²¿´ ³¿­±²®§ ©·´´ ¾»¸¿ª» ·² ¿ ­·³·´¿® ©¿§ ¬± ¬¸» »¨¬»®²¿´ ´»¿º±º ¿ º«´´ ³¿­±²®§ ­¬®«½¬«®»ò

É¿¬»® Í»®ª·½» ¿²¼ Ü®¿·²¿¹»

ɸ»®» ¿ ©¿¬»® ­»®ª·½» °·°»ô ¿ ­»©»® ±® ­¬±®³©¿¬»® ¼®¿·²¿¹» °·°» ·­ ·²¬¸» ª·½·²·¬§ ±º ¿ ¾«·´¼·²¹ô ¿ ©¿¬»® ´»¿µ ½¿² ½¿«­» »®±­·±²ô ­©»´´·²¹ ±®­¿¬«®¿¬·±² ±º ­«­½»°¬·¾´» ­±·´ò Ûª»² ¿ ³·²«­½«´» ´»¿µ ½¿² ¾» »²±«¹¸¬± ­¿¬«®¿¬» ¿ ½´¿§ º±«²¼¿¬·±²ò ß ´»¿µ·²¹ ¬¿° ²»¿® ¿ ¾«·´¼·²¹ ½¿² ¸¿ª»¬¸» ­¿³» »ºº»½¬ò ײ ¿¼¼·¬·±²ô ¬®»²½¸»­ ½±²¬¿·²·²¹ °·°»­ ½¿² ¾»½±³»©¿¬»®½±«®­»­ »ª»² ¬¸±«¹¸ ¾¿½µº·´´»¼ô °¿®¬·½«´¿®´§ ©¸»®» ¾®±µ»²®«¾¾´» ·­ «­»¼ ¿­ º·´´ò É¿¬»® ¬¸¿¬ ®«²­ ¿´±²¹ ¬¸»­» ¬®»²½¸»­ ½¿² ¾»®»­°±²­·¾´» º±® ­»®·±«­ »®±­·±²ô ·²¬»®­¬®¿¬¿ ­»»°¿¹» ·²¬± ­«¾º´±±® ¿®»¿­¿²¼ ­¿¬«®¿¬·±²ò

з°» ´»¿µ¿¹» ¿²¼ ¬®»²½¸ ©¿¬»® º´±©­ ¿´­± »²½±«®¿¹» ¬®»» ¿²¼ ­¸®«¾®±±¬­ ¬± ¬¸» ­±«®½» ±º ©¿¬»®ô ½±³°´·½¿¬·²¹ ¿²¼ »¨¿½»®¾¿¬·²¹ ¬¸»°®±¾´»³òб±® ®±±º °´«³¾·²¹ ½¿² ®»­«´¬ ·² ´¿®¹» ª±´«³»­ ±º ®¿·²©¿¬»® ¾»·²¹½±²½»²¬®¿¬»¼ ·² ¿ ­³¿´´ ¿®»¿ ±º ­±·´æ

{ ײ½±®®»½¬ º¿´´­ ·² ®±±º ¹«¬¬»®·²¹ ³¿§ ®»­«´¬ ·² ±ª»®º´±©­ô ¿­ ³¿§¹«¬¬»®­ ¾´±½µ»¼ ©·¬¸ ´»¿ª»­ »¬½ò

{ ݱ®®±¼»¼ ¹«¬¬»®·²¹ ±® ¼±©²°·°»­ ½¿² ­°·´´ ©¿¬»® ¬± ¹®±«²¼ò

{ ܱ©²°·°»­ ²±¬ °±­·¬·ª»´§ ½±²²»½¬»¼ ¬± ¿ °®±°»® ­¬±®³©¿¬»®½±´´»½¬·±² ­§­¬»³ ©·´´ ¼·®»½¬ ¿ ½±²½»²¬®¿¬·±² ±º ©¿¬»® ¬± ­±·´ ¬¸¿¬ ·­¼·®»½¬´§ ¿¼¶¿½»²¬ ¬± º±±¬·²¹­ô ­±³»¬·³»­ ½¿«­·²¹ ´¿®¹»ó­½¿´»°®±¾´»³­ ­«½¸ ¿­ »®±­·±²ô ­¿¬«®¿¬·±² ¿²¼ ³·¹®¿¬·±² ±º ©¿¬»® «²¼»®¬¸» ¾«·´¼·²¹ò

Í»®·±«­²»­­ ±º Ý®¿½µ·²¹

ײ ¹»²»®¿´ô ³±­¬ ½®¿½µ·²¹ º±«²¼ ·² ³¿­±²®§ ©¿´´­ ·­ ¿ ½±­³»¬·½²«·­¿²½» ±²´§ ¿²¼ ½¿² ¾» µ»°¬ ·² ®»°¿·® ±® »ª»² ·¹²±®»¼ò ̸» ¬¿¾´»¾»´±© ·­ ¿ ®»°®±¼«½¬·±² ±º Ì¿¾´» Ýï ±º ßÍ îèéðò

ßÍ îèéð ¿´­± °«¾´·­¸»­ º·¹«®»­ ®»´¿¬·²¹ ¬± ½®¿½µ·²¹ ·² ½±²½®»¬» º´±±®­ô¸±©»ª»® ¾»½¿«­» ©¿´´ ½®¿½µ·²¹ ©·´´ «­«¿´´§ ®»¿½¸ ¬¸» ½®·¬·½¿´ °±·²¬­·¹²·º·½¿²¬´§ »¿®´·»® ¬¸¿² ½®¿½µ·²¹ ·² ­´¿¾­ô ¬¸·­ ¬¿¾´» ·­ ²±¬®»°®±¼«½»¼ ¸»®»ò

Ю»ª»²¬·±²ñÝ«®»

д«³¾·²¹É¸»®» ¾«·´¼·²¹ ³±ª»³»²¬ ·­ ½¿«­»¼ ¾§ ©¿¬»® ­»®ª·½»ô ®±±º °´«³¾·²¹ô­»©»® ±® ­¬±®³©¿¬»® º¿·´«®»ô ¬¸» ®»³»¼§ ·­ ¬± ®»°¿·® ¬¸» °®±¾´»³ò ׬ ·­ °®«¼»²¬ô ¸±©»ª»®ô ¬± ½±²­·¼»® ¿´­± ®»®±«¬·²¹ °·°»­ ¿©¿§ º®±³¬¸» ¾«·´¼·²¹ ©¸»®» °±­­·¾´»ô ¿²¼ ®»´±½¿¬·²¹ ¬¿°­ ¬± °±­·¬·±²­ ©¸»®»¿²§ ´»¿µ¿¹» ©·´´ ²±¬ ¼·®»½¬ ©¿¬»® ¬± ¬¸» ¾«·´¼·²¹ ª·½·²·¬§ò Ûª»² ©¸»®»¹«´´§ ¬®¿°­ ¿®» °®»­»²¬ô ¬¸»®» ·­ ­±³»¬·³»­ ­«ºº·½·»²¬ ­°·´´ ¬± ½®»¿¬»»®±­·±² ±® ­¿¬«®¿¬·±²ô °¿®¬·½«´¿®´§ ·² ³±¼»®² ·²­¬¿´´¿¬·±²­ «­·²¹­³¿´´»® ¼·¿³»¬»® ÐÊÝ º·¨¬«®»­ò ײ¼»»¼ô ­±³» ¹«´´§ ¬®¿°­ ¿®» ²±¬­·¬«¿¬»¼ ¼·®»½¬´§ «²¼»® ¬¸» ¬¿°­ ¬¸¿¬ ¿®» ·²­¬¿´´»¼ ¬± ½¸¿®¹» ¬¸»³ô©·¬¸ ¬¸» ®»­«´¬ ¬¸¿¬ ©¿¬»® º®±³ ¬¸» ¬¿° ³¿§ »²¬»® ¬¸» ¾¿½µº·´´»¼¬®»²½¸ ¬¸¿¬ ¸±«­»­ ¬¸» ­»©»® °·°·²¹ò ׺ ¬¸» ¬®»²½¸ ¸¿­ ¾»»² °±±®´§¾¿½µº·´´»¼ô ¬¸» ©¿¬»® ©·´´ »·¬¸»® °±²¼ ±® º´±© ¿´±²¹ ¬¸» ¾±¬¬±³ ±º¬¸» ¬®»²½¸ò ß­ ¬¸»­» ¬®»²½¸»­ «­«¿´´§ ®«² ¿´±²¹­·¼» ¬¸» º±±¬·²¹­ ¿²¼½¿² ¾» ¿¬ ¿ ­·³·´¿® ¼»°¬¸ô ·¬ ·­ ²±¬ ¸¿®¼ ¬± ­»» ¸±© ¿²§ ©¿¬»® ¬¸¿¬ ·­¬¸«­ ¼·®»½¬»¼ ·²¬± ¿ ¬®»²½¸ ½¿² »¿­·´§ ¿ºº»½¬ ¬¸» º±«²¼¿¬·±²K­ ¿¾·´·¬§ ¬±­«°°±®¬ º±±¬·²¹­ ±® »ª»² ¹¿·² »²¬®§ ¬± ¬¸» ­«¾º´±±® ¿®»¿ò

Ù®±«²¼ ¼®¿·²¿¹»×² ¿´´ ­±·´­ ¬¸»®» ·­ ¬¸» ½¿°¿½·¬§ º±® ©¿¬»® ¬± ¬®¿ª»´ ±² ¬¸» ­«®º¿½» ¿²¼¾»´±© ·¬ò Í«®º¿½» ©¿¬»® º´±©­ ½¿² ¾» »­¬¿¾´·­¸»¼ ¾§ ·²­°»½¬·±² ¼«®·²¹¿²¼ ¿º¬»® ¸»¿ª§ ±® °®±´±²¹»¼ ®¿·²ò ׺ ²»½»­­¿®§ô ¿ ¹®¿¬»¼ ¼®¿·² ­§­¬»³½±²²»½¬»¼ ¬± ¬¸» ­¬±®³©¿¬»® ½±´´»½¬·±² ­§­¬»³ ·­ «­«¿´´§ ¿² »¿­§­±´«¬·±²ò

׬ ·­ô ¸±©»ª»®ô ­±³»¬·³»­ ²»½»­­¿®§ ©¸»² ¿¬¬»³°¬·²¹ ¬± °®»ª»²¬©¿¬»® ³·¹®¿¬·±² ¬¸¿¬ ¬»­¬·²¹ ¾» ½¿®®·»¼ ±«¬ ¬± »­¬¿¾´·­¸ ©¿¬»®¬¿¾´»¸»·¹¸¬ ¿²¼ ­«¾­±·´ ©¿¬»® º´±©­ò ̸·­ ­«¾¶»½¬ ·­ ®»º»®®»¼ ¬± ·² ÞÌÚ ï翲¼ ³¿§ °®±°»®´§ ¾» ®»¹¿®¼»¼ ¿­ ¿² ¿®»¿ º±® ¿² »¨°»®¬ ½±²­«´¬¿²¬ò

Ю±¬»½¬·±² ±º ¬¸» ¾«·´¼·²¹ °»®·³»¬»®×¬ ·­ »­­»²¬·¿´ ¬± ®»³»³¾»® ¬¸¿¬ ¬¸» ­±·´ ¬¸¿¬ ¿ºº»½¬­ º±±¬·²¹­ »¨¬»²¼­©»´´ ¾»§±²¼ ¬¸» ¿½¬«¿´ ¾«·´¼·²¹ ´·²»ò É¿¬»®·²¹ ±º ¹¿®¼»² °´¿²¬­ô­¸®«¾­ ¿²¼ ¬®»»­ ½¿«­»­ ­±³» ±º ¬¸» ³±­¬ ­»®·±«­ ©¿¬»® °®±¾´»³­ò

Ú±® ¬¸·­ ®»¿­±²ô °¿®¬·½«´¿®´§ ©¸»®» °®±¾´»³­ »¨·­¬ ±® ¿®» ´·µ»´§ ¬±±½½«®ô ·¬ ·­ ®»½±³³»²¼»¼ ¬¸¿¬ ¿² ¿°®±² ±º °¿ª·²¹ ¾» ·²­¬¿´´»¼¿®±«²¼ ¿­ ³«½¸ ±º ¬¸» ¾«·´¼·²¹ °»®·³»¬»® ¿­ ²»½»­­¿®§ò ̸·­ °¿ª·²¹

ÝÔßÍÍ×Ú×ÝßÌ×ÑÒ ÑÚ ÜßÓßÙÛ É×ÌØ ÎÛÚÛÎÛÒÝÛ ÌÑ ÉßÔÔÍ

Ü»­½®·°¬·±² ±º ¬§°·½¿´ ¼¿³¿¹» ¿²¼ ®»¯«·®»¼ ®»°¿·® ß°°®±¨·³¿¬» ½®¿½µ ©·¼¬¸ Ü¿³¿¹»´·³·¬ ø­»» Ò±¬» í÷ ½¿¬»¹±®§

Ø¿·®´·²» ½®¿½µ­ äðòï ³³ ð

Ú·²» ½®¿½µ­ ©¸·½¸ ¼± ²±¬ ²»»¼ ®»°¿·® äï ³³ ï

Ý®¿½µ­ ²±¬·½»¿¾´» ¾«¬ »¿­·´§ º·´´»¼ò ܱ±®­ ¿²¼ ©·²¼±©­ ­¬·½µ ­´·¹¸¬´§ äë ³³ î

Ý®¿½µ­ ½¿² ¾» ®»°¿·®»¼ ¿²¼ °±­­·¾´§ ¿ ­³¿´´ ¿³±«²¬ ±º ©¿´´ ©·´´ ²»»¼ ëPïë ³³ ø±® ¿ ²«³¾»® ±º ½®¿½µ­ í¬± ¾» ®»°´¿½»¼ò ܱ±®­ ¿²¼ ©·²¼±©­ ­¬·½µò Í»®ª·½» °·°»­ ½¿² º®¿½¬«®»ò í ³³ ±® ³±®» ·² ±²» ¹®±«°÷É»¿¬¸»®¬·¹¸¬²»­­ ±º¬»² ·³°¿·®»¼

Û¨¬»²­·ª» ®»°¿·® ©±®µ ·²ª±´ª·²¹ ¾®»¿µ·²¹ó±«¬ ¿²¼ ®»°´¿½·²¹ ­»½¬·±²­ ±º ©¿´´­ô ïëPîë ³³ ¾«¬ ¿´­± ¼»°»²¼ ì»­°»½·¿´´§ ±ª»® ¼±±®­ ¿²¼ ©·²¼±©­ò É·²¼±© ¿²¼ ¼±±® º®¿³»­ ¼·­¬±®¬ò É¿´´­ ´»¿² ±² ²«³¾»® ±º ½®¿½µ­±® ¾«´¹» ²±¬·½»¿¾´§ô ­±³» ´±­­ ±º ¾»¿®·²¹ ·² ¾»¿³­ò Í»®ª·½» °·°»­ ¼·­®«°¬»¼

Page 92: SITE CLASSIFICATION REPORT SUMMARY...Douglas Partners (DP) has prepared this report for this project at Taylor 2- Stage 3, Taylor in accordance with DP’s proposal dated 15 September

­¸±«´¼ »¨¬»²¼ ±«¬©¿®¼­ ¿ ³·²·³«³ ±º çðð ³³ ø³±®» ·² ¸·¹¸´§®»¿½¬·ª» ­±·´÷ ¿²¼ ­¸±«´¼ ¸¿ª» ¿ ³·²·³«³ º¿´´ ¿©¿§ º®±³ ¬¸»¾«·´¼·²¹ ±º ïæêðò ̸» º·²·­¸»¼ °¿ª·²¹ ­¸±«´¼ ¾» ²± ´»­­ ¬¸¿² ïðð³³ ¾»´±© ¾®·½µ ª»²¬ ¾¿­»­ò

׬ ·­ °®«¼»²¬ ¬± ®»´±½¿¬» ¼®¿·²¿¹» °·°»­ ¿©¿§ º®±³ ¬¸·­ °¿ª·²¹ô ·º°±­­·¾´»ô ¬± ¿ª±·¼ ½±³°´·½¿¬·±²­ º®±³ º«¬«®» ´»¿µ¿¹»ò ׺ ¬¸·­ ·­ ²±¬°®¿½¬·½¿´ô »¿®¬¸»²©¿®» °·°»­ ­¸±«´¼ ¾» ®»°´¿½»¼ ¾§ ÐÊÝ ¿²¼¾¿½µº·´´·²¹ ­¸±«´¼ ¾» ±º ¬¸» ­¿³» ­±·´ ¬§°» ¿­ ¬¸» ­«®®±«²¼·²¹ ­±·´¿²¼ ½±³°¿½¬»¼ ¬± ¬¸» ­¿³» ¼»²­·¬§ò

Û¨½»°¬ ·² ¿®»¿­ ©¸»®» º®»»¦·²¹ ±º ©¿¬»® ·­ ¿² ·­­«»ô ·¬ ·­ ©·­» ¬±®»³±ª» ¬¿°­ ·² ¬¸» ¾«·´¼·²¹ ¿®»¿ ¿²¼ ®»´±½¿¬» ¬¸»³ ©»´´ ¿©¿§ º®±³¬¸» ¾«·´¼·²¹ P °®»º»®¿¾´§ ²±¬ «°¸·´´ º®±³ ·¬ ø­»» ÞÌÚ ïç÷ò

׬ ³¿§ ¾» ¼»­·®¿¾´» ¬± ·²­¬¿´´ ¿ ¹®¿¬»¼ ¼®¿·² ¿¬ ¬¸» ±«¬­·¼» »¼¹» ±º ¬¸»°¿ª·²¹ ±² ¬¸» «°¸·´´ ­·¼» ±º ¬¸» ¾«·´¼·²¹ò ׺ ­«¾­±·´ ¼®¿·²¿¹» ·­²»»¼»¼ ¬¸·­ ½¿² ¾» ·²­¬¿´´»¼ «²¼»® ¬¸» ­«®º¿½» ¼®¿·²ò

ݱ²¼»²­¿¬·±²×² ¾«·´¼·²¹­ ©·¬¸ ¿ ­«¾º´±±® ª±·¼ ­«½¸ ¿­ ©¸»®» ¾»¿®»®­ ¿²¼ ¶±·­¬­­«°°±®¬ º´±±®·²¹ô ·²­«ºº·½·»²¬ ª»²¬·´¿¬·±² ½®»¿¬»­ ·¼»¿´ ½±²¼·¬·±²­ º±®½±²¼»²­¿¬·±²ô °¿®¬·½«´¿®´§ ©¸»®» ¬¸»®» ·­ ´·¬¬´» ½´»¿®¿²½» ¾»¬©»»² ¬¸»º´±±® ¿²¼ ¬¸» ¹®±«²¼ò ݱ²¼»²­¿¬·±² ¿¼¼­ ¬± ¬¸» ³±·­¬«®» ¿´®»¿¼§°®»­»²¬ ·² ¬¸» ­«¾º´±±® ¿²¼ ­·¹²·º·½¿²¬´§ ­´±©­ ¬¸» °®±½»­­ ±º ¼®§·²¹±«¬ò ײ­¬¿´´¿¬·±² ±º ¿² ¿¼»¯«¿¬» ­«¾º´±±® ª»²¬·´¿¬·±² ­§­¬»³ô »·¬¸»®²¿¬«®¿´ ±® ³»½¸¿²·½¿´ô ·­ ¼»­·®¿¾´»ò

É¿®²·²¹æ ß´¬¸±«¹¸ ¬¸·­ Þ«·´¼·²¹ Ì»½¸²±´±¹§ Ú·´» ¼»¿´­ ©·¬¸½®¿½µ·²¹ ·² ¾«·´¼·²¹­ô ·¬ ­¸±«´¼ ¾» ­¿·¼ ¬¸¿¬ ­«¾º´±±® ³±·­¬«®» ½¿²®»­«´¬ ·² ¬¸» ¼»ª»´±°³»²¬ ±º ±¬¸»® °®±¾´»³­ô ²±¬¿¾´§æ

{ É¿¬»® ¬¸¿¬ ·­ ¬®¿²­³·¬¬»¼ ·²¬± ³¿­±²®§ô ³»¬¿´ ±® ¬·³¾»® ¾«·´¼·²¹»´»³»²¬­ ½¿«­»­ ¼¿³¿¹» ¿²¼ñ±® ¼»½¿§ ¬± ¬¸±­» »´»³»²¬­ò

{ Ø·¹¸ ­«¾º´±±® ¸«³·¼·¬§ ¿²¼ ³±·­¬«®» ½±²¬»²¬ ½®»¿¬» ¿² ·¼»¿´»²ª·®±²³»²¬ º±® ª¿®·±«­ °»­¬­ô ·²½´«¼·²¹ ¬»®³·¬»­ ¿²¼ ­°·¼»®­ò

{ ɸ»®» ¸·¹¸ ³±·­¬«®» ´»ª»´­ ¿®» ¬®¿²­³·¬¬»¼ ¬± ¬¸» º´±±®·²¹ ¿²¼©¿´´­ô ¿² ·²½®»¿­» ·² ¬¸» ¼«­¬ ³·¬» ½±«²¬ ½¿² »²­«» ©·¬¸·² ¬¸»´·ª·²¹ ¿®»¿­ò Ü«­¬ ³·¬»­ô ¿­ ©»´´ ¿­ ¼¿³°²»­­ ·² ¹»²»®¿´ô ½¿² ¾» ¿¸»¿´¬¸ ¸¿¦¿®¼ ¬± ·²¸¿¾·¬¿²¬­ô °¿®¬·½«´¿®´§ ¬¸±­» ©¸± ¿®»¿¾²±®³¿´´§ ­«­½»°¬·¾´» ¬± ®»­°·®¿¬±®§ ¿·´³»²¬­ò

̸» ¹¿®¼»²Ì¸» ·¼»¿´ ª»¹»¬¿¬·±² ´¿§±«¬ ·­ ¬± ¸¿ª» ´¿©² ±® °´¿²¬­ ¬¸¿¬ ®»¯«·®»±²´§ ´·¹¸¬ ©¿¬»®·²¹ ·³³»¼·¿¬»´§ ¿¼¶¿½»²¬ ¬± ¬¸» ¼®¿·²¿¹» ±® °¿ª·²¹»¼¹»ô ¬¸»² ³±®» ¼»³¿²¼·²¹ °´¿²¬­ô ­¸®«¾­ ¿²¼ ¬®»»­ ­°®»¿¼ ±«¬ ·²¬¸¿¬ ±®¼»®ò

Ѫ»®©¿¬»®·²¹ ¼«» ¬± ³·­«­» ±º ¿«¬±³¿¬·½ ©¿¬»®·²¹ ­§­¬»³­ ·­ ¿½±³³±² ½¿«­» ±º ­¿¬«®¿¬·±² ¿²¼ ©¿¬»® ³·¹®¿¬·±² «²¼»® º±±¬·²¹­ò ׺·¬ ·­ ²»½»­­¿®§ ¬± «­» ¬¸»­» ­§­¬»³­ô ·¬ ·­ ·³°±®¬¿²¬ ¬± ®»³±ª» ¹¿®¼»²¾»¼­ ¬± ¿ ½±³°´»¬»´§ ­¿º» ¼·­¬¿²½» º®±³ ¾«·´¼·²¹­ò

Û¨·­¬·²¹ ¬®»»­É¸»®» ¿ ¬®»» ·­ ½¿«­·²¹ ¿ °®±¾´»³ ±º ­±·´ ¼®§·²¹ ±® ¬¸»®» ·­ ¬¸»»¨·­¬»²½» ±® ¬¸®»¿¬ ±º «°¸»¿ª¿´ ±º º±±¬·²¹­ô ·º ¬¸» ±ºº»²¼·²¹ ®±±¬­ ¿®»­«¾­·¼·¿®§ ¿²¼ ¬¸»·® ®»³±ª¿´ ©·´´ ²±¬ ­·¹²·º·½¿²¬´§ ¼¿³¿¹» ¬¸» ¬®»»ô¬¸»§ ­¸±«´¼ ¾» ­»ª»®»¼ ¿²¼ ¿ ½±²½®»¬» ±® ³»¬¿´ ¾¿®®·»® °´¿½»¼ª»®¬·½¿´´§ ·² ¬¸» ­±·´ ¬± °®»ª»²¬ º«¬«®» ®±±¬ ¹®±©¬¸ ·² ¬¸» ¼·®»½¬·±² ±º¬¸» ¾«·´¼·²¹ò ׺ ·¬ ·­ ²±¬ °±­­·¾´» ¬± ®»³±ª» ¬¸» ®»´»ª¿²¬ ®±±¬­©·¬¸±«¬ ¼¿³¿¹» ¬± ¬¸» ¬®»»ô ¿² ¿°°´·½¿¬·±² ¬± ®»³±ª» ¬¸» ¬®»» ­¸±«´¼¾» ³¿¼» ¬± ¬¸» ´±½¿´ ¿«¬¸±®·¬§ò ß °®«¼»²¬ °´¿² ·­ ¬± ¬®¿²­°´¿²¬ ´·µ»´§±ºº»²¼»®­ ¾»º±®» ¬¸»§ ¾»½±³» ¿ °®±¾´»³ò

ײº±®³¿¬·±² ±² ¬®»»­ô °´¿²¬­ ¿²¼ ­¸®«¾­Í¬¿¬» ¼»°¿®¬³»²¬­ ±ª»®­»»·²¹ ¿¹®·½«´¬«®» ½¿² ¹·ª» ·²º±®³¿¬·±²®»¹¿®¼·²¹ ®±±¬ °¿¬¬»®²­ô ª±´«³» ±º ©¿¬»® ²»»¼»¼ ¿²¼ ­¿º» ¼·­¬¿²½»º®±³ ¾«·´¼·²¹­ ±º ³±­¬ ­°»½·»­ò Þ±¬¿²·½ ¹¿®¼»²­ ¿®» ¿´­± ­±«®½»­ ±º·²º±®³¿¬·±²ò Ú±® ·²º±®³¿¬·±² ±² °´¿²¬ ®±±¬­ ¿²¼ ¼®¿·²­ô ­»» Þ«·´¼·²¹Ì»½¸²±´±¹§ Ú·´» ïéò

Û¨½¿ª¿¬·±²Û¨½¿ª¿¬·±² ¿®±«²¼ º±±¬·²¹­ ³«­¬ ¾» °®±°»®´§ »²¹·²»»®»¼ò ͱ·´­«°°±®¬·²¹ º±±¬·²¹­ ½¿² ±²´§ ¾» ­¿º»´§ »¨½¿ª¿¬»¼ ¿¬ ¿² ¿²¹´» ¬¸¿¬¿´´±©­ ¬¸» ­±·´ «²¼»® ¬¸» º±±¬·²¹ ¬± ®»³¿·² ­¬¿¾´»ò ̸·­ ¿²¹´» ·­½¿´´»¼ ¬¸» ¿²¹´» ±º ®»°±­» ø±® º®·½¬·±²÷ ¿²¼ ª¿®·»­ ­·¹²·º·½¿²¬´§¾»¬©»»² ­±·´ ¬§°»­ ¿²¼ ½±²¼·¬·±²­ò λ³±ª¿´ ±º ­±·´ ©·¬¸·² ¬¸» ¿²¹´»±º ®»°±­» ©·´´ ½¿«­» ­«¾­·¼»²½»ò

λ³»¼·¿¬·±²

ɸ»®» »®±­·±² ¸¿­ ±½½«®®»¼ ¬¸¿¬ ¸¿­ ©¿­¸»¼ ¿©¿§ ­±·´ ¿¼¶¿½»²¬ ¬±º±±¬·²¹­ô ­±·´ ±º ¬¸» ­¿³» ½´¿­­·º·½¿¬·±² ­¸±«´¼ ¾» ·²¬®±¼«½»¼ ¿²¼½±³°¿½¬»¼ ¬± ¬¸» ­¿³» ¼»²­·¬§ò ɸ»®» º±±¬·²¹­ ¸¿ª» ¾»»²«²¼»®³·²»¼ô ¿«¹³»²¬¿¬·±² ±® ±¬¸»® ­°»½·¿´·­¬ ©±®µ ³¿§ ¾» ®»¯«·®»¼òλ³»¼·¿¬·±² ±º º±±¬·²¹­ ¿²¼ º±«²¼¿¬·±²­ ·­ ¹»²»®¿´´§ ¬¸» ®»¿´³ ±º ¿­°»½·¿´·­¬ ½±²­«´¬¿²¬ò

ɸ»®» ·­±´¿¬»¼ º±±¬·²¹­ ®·­» ¿²¼ º¿´´ ¾»½¿«­» ±º ­©»´´ñ­¸®·²µ »ºº»½¬ô¬¸» ¸±³»±©²»® ³¿§ ¾» ¬»³°¬»¼ ¬± ¿´´»ª·¿¬» º´±±® ¾±«²½» ¾§ º·´´·²¹¬¸» ¹¿° ¬¸¿¬ ¸¿­ ¿°°»¿®»¼ ¾»¬©»»² ¬¸» ¾»¿®»® ¿²¼ ¬¸» °·»® ©·¬¸¾´±½µ·²¹ò ̸» ¼¿²¹»® ¸»®» ·­ ¬¸¿¬ ©¸»² ¬¸» ²»¨¬ ­©»´´ ­»¹³»²¬ ±º ¬¸»½§½´» ±½½«®­ô ¬¸» »¨¬®¿ ¾´±½µ·²¹ ©·´´ °«­¸ ¬¸» º´±±® «° ·²¬± ¿²¿½½»²¬«¿¬»¼ ¼±³» ¿²¼ ³¿§ ¿´­± ½¿«­» ´±½¿´ ­¸»¿® º¿·´«®» ·² ¬¸» ­±·´ò׺ ·¬ ·­ ²»½»­­¿®§ ¬± «­» ¾´±½µ·²¹ô ·¬ ­¸±«´¼ ¾» ¾§ ¿ °¿·® ±º º·²»©»¼¹»­ ¿²¼ ³±²·¬±®·²¹ ­¸±«´¼ ¾» ½¿®®·»¼ ±«¬ º±®¬²·¹¸¬´§ò

̸·­ ÞÌÚ ©¿­ °®»°¿®»¼ ¾§ Ö±¸² Ô»©»® Úß×Þô Ó×ßÓßô ﮬ²»®ô

ݱ²­¬®«½¬·±² Ü·¿¹²±­·­ò

̸» ·²º±®³¿¬·±² ·² ¬¸·­ ¿²¼ ±¬¸»® ·­­«»­ ·² ¬¸» ­»®·»­ ©¿­ ¼»®·ª»¼ º®±³ ª¿®·±«­ ­±«®½»­ ¿²¼ ©¿­ ¾»´·»ª»¼ ¬± ¾» ½±®®»½¬ ©¸»² °«¾´·­¸»¼ò

̸» ·²º±®³¿¬·±² ·­ ¿¼ª·­±®§ò ׬ ·­ °®±ª·¼»¼ ·² ¹±±¼ º¿·¬¸ ¿²¼ ²±¬ ½´¿·³»¼ ¬± ¾» ¿² »¨¸¿«­¬·ª» ¬®»¿¬³»²¬ ±º ¬¸» ®»´»ª¿²¬ ­«¾¶»½¬ò

Ú«®¬¸»® °®±º»­­·±²¿´ ¿¼ª·½» ²»»¼­ ¬± ¾» ±¾¬¿·²»¼ ¾»º±®» ¬¿µ·²¹ ¿²§ ¿½¬·±² ¾¿­»¼ ±² ¬¸» ·²º±®³¿¬·±² °®±ª·¼»¼ò

Ü·­¬®·¾«¬»¼ ¾§

ÝÍ×ÎÑ ÐËÞÔ ×ÍØ ×ÒÙ ÐÑ Þ±¨ ïïíçô ݱ´´·²¹©±±¼ íðêêô ß«­¬®¿´·¿

Ú®»»½¿´´ ïèðð êìë ðëï Ì»´ øðí÷ çêêî éêêê Ú¿¨ øðí÷ çêêî éëëë ©©©ò°«¾´·­¸ò½­·®±ò¿«

Û³¿·´æ °«¾´·­¸·²¹ò­¿´»­à½­·®±ò¿«

w ÝÍ×ÎÑ îððíò ˲¿«¬¸±®·­»¼ ½±°§·²¹ ±º ¬¸·­ Þ«·´¼·²¹ Ì»½¸²±´±¹§ º·´» ·­ °®±¸·¾·¬»¼

Ù¿®¼»²­ º±® ¿ ®»¿½¬·ª» ­·¬»

Page 93: SITE CLASSIFICATION REPORT SUMMARY...Douglas Partners (DP) has prepared this report for this project at Taylor 2- Stage 3, Taylor in accordance with DP’s proposal dated 15 September

TOPSOIL FILLING-dry to moist, brown silty sand

FILLING-generally comprising well compacted, dry tomoist, orange red brown, medium plasticity sandy siltyclay

SILTY CLAY-very stiff, dry to moist, yellow brown, mediumplasticity silty clay with some fine grained gravel

SILTY SAND-hard, dry to moist, brown, fine to coarsegrained silty sand with some clay

SILTY SANDY CLAY-hard, dry to moist, yellow greybrown, low to medium plasticity silty sandy clay

Pit discontinued at 1.85m-limit of investigation

0.1

0.7

1.4

1.6

1.85

SAMPLING & IN SITU TESTING LEGEND

TEST PIT LOG

Taylor 2 Estate, Stage 3, Taylor

A Auger sample G Gas sample PID Photo ionisation detector (ppm)B Bulk sample P Piston sample PL(A) Point load axial test Is(50) (MPa)BLK Block sample Ux Tube sample (x mm dia.) PL(D) Point load diametral test Is(50) (MPa)C Core drilling W Water sample pp Pocket penetrometer (kPa)D Disturbed sample Water seep S Standard penetration testE Environmental sample Water level V Shear vane (kPa)

Indesco Consulting Engineers Pty LtdSite Classifications

Results &Comments

LOGGED: JPM SURVEY DATUM: MGA94

CLIENT:PROJECT:LOCATION:

PIT No: 54PROJECT No: 77418.29DATE: 11/1/2019SHEET 1 OF 1

Sampling & In Situ Testing

1

2

Wat

er

Dep

th

Sam

ple

Description

of

Strata Gra

phic

Log

Typ

e

REMARKS: Surface Levels & Coordinates are approximate only and must not be relied upon

RIG: Kubota KX057-4 mini-excavator with 300mm wide bucket

WATER OBSERVATIONS: No free groundwater observed

SURFACE LEVEL: 662.0 AHDEASTING: 209147NORTHING: 618759

Dynamic Penetrometer Test(blows per mm)

5 10 15 20

Cone Penetrometer AS1289.6.3.2Sand Penetrometer AS1289.6.3.3

Depth(m) R

L

1

2

662

661

660

D

D

D

0.8

1.5

1.7

pp = 370

Page 94: SITE CLASSIFICATION REPORT SUMMARY...Douglas Partners (DP) has prepared this report for this project at Taylor 2- Stage 3, Taylor in accordance with DP’s proposal dated 15 September

TOPSOIL FILLING-dry to moist, brown silty sand

FILLING-generally comprising well compacted, dry tomoist, orange yellow brown, medium plasticity silty sandyclay with some gravel

SILTY SAND-very stiff, dry to moist, grey brown, lowplasticity silty sand with some rootlets

SILTY SANDY CLAY-very stiff, dry to moist, light red greybrown, low plasticity silty sandy clay

Pit discontinued at 1.9m-limit of investigation

0.2

1.3

1.4

1.9

SAMPLING & IN SITU TESTING LEGEND

TEST PIT LOG

Taylor 2 Estate, Stage 3, Taylor

A Auger sample G Gas sample PID Photo ionisation detector (ppm)B Bulk sample P Piston sample PL(A) Point load axial test Is(50) (MPa)BLK Block sample Ux Tube sample (x mm dia.) PL(D) Point load diametral test Is(50) (MPa)C Core drilling W Water sample pp Pocket penetrometer (kPa)D Disturbed sample Water seep S Standard penetration testE Environmental sample Water level V Shear vane (kPa)

Indesco Consulting Engineers Pty LtdSite Classifications

Results &Comments

LOGGED: JPM SURVEY DATUM: MGA94

CLIENT:PROJECT:LOCATION:

PIT No: 56PROJECT No: 77418.29DATE: 11/1/2019SHEET 1 OF 1

Sampling & In Situ Testing

1

2

Wat

er

Dep

th

Sam

ple

Description

of

Strata Gra

phic

Log

Typ

e

REMARKS: Surface Levels & Coordinates are approximate only and must not be relied upon

RIG: Kubota KX057-4 mini-excavator with 300mm wide bucket

WATER OBSERVATIONS: No free groundwater observed

SURFACE LEVEL: 665.6 AHDEASTING: 209127NORTHING: 618786

Dynamic Penetrometer Test(blows per mm)

5 10 15 20

Cone Penetrometer AS1289.6.3.2Sand Penetrometer AS1289.6.3.3

Depth(m) R

L

1

2

665

664

D

D

1.35

1.6 pp = 300-350

Page 95: SITE CLASSIFICATION REPORT SUMMARY...Douglas Partners (DP) has prepared this report for this project at Taylor 2- Stage 3, Taylor in accordance with DP’s proposal dated 15 September
Page 96: SITE CLASSIFICATION REPORT SUMMARY...Douglas Partners (DP) has prepared this report for this project at Taylor 2- Stage 3, Taylor in accordance with DP’s proposal dated 15 September

SITE CLASSIFICATION REPORT SUMMARY

BLOCK: 6 SECTION: 64 SUBURB: Taylor

JOB No: 77418.29 DATE: March 2019

CLIENT: Indesco Consulting Engineers Pty Ltd

Classification Procedures: Existing Subsurface Conditions: Refer attached test pit log(s) – Pit(s) 54,55 and Drawing 1. Bulk Earthworks: Filling within the block placed under Level 1 control as defined in AS 3798 – 2007 (Ref 1). Laboratory Results: Previous laboratory testing results indicated liquid limit ranging from 25-66%, plasticity index ranging from 6-49% and linear shrinkage ranging from 3-20.5%.

Site Classification: Class M* (moderately reactive/filled) based on the current profile / state on limited subsurface information and determined in general accordance with the requirements of AS2870-2011 (Ref 2). The classification must be reassessed should the soil profile change either by adding fill or removing soil from the block and/or if the presence of service trenches or retaining walls are within the zone of influence of the block. Reference should be made to the comments provided below.

Footing Systems: Reference must be made to AS2870-2011 (Ref 2) which indicates footing systems that are appropriate for each site classification. All footings must found within a uniform bearing stratum of suitable strength/material, below the zone of influence of any service trenches, backfill zones, retaining walls or underground structures. Masonry walls should be articulated in accordance with current best practice. Dwelling design must ensure uniform moisture conditions are maintained in the vicinity of footings. Footing systems must be confirmed by a structural engineer taking into consideration any onsite or offsite constraints.

Maintenance Guidelines: Reference should be made to the attached CSIRO Sheet BTF 18 ‘Foundation Maintenance & Footing Performance’ to comments about gardens, landscaping and trees on the performance of foundation soils and in particular in respect to maintaining good surface drainage. It notes that minor cracking in most structures is inevitable, and it describes site maintenance practices aimed at minimising foundation movements that can lead to cracking damage.

Comments/ Limitations:

The successful purchaser must make their own interpretations, deductions and conclusions from the information made available and will need to accept full responsibility for such interpretations, deductions and conclusions.

Development specific geotechnical investigations must be undertaken.

Additional topsoils / filling may have been spread subsequent to the investigation.

Site preparation prior to the construction should include removal of all vegetation, topsoil and any uncontrolled filling.

All new filling must be placed under controlled conditions (AS 3798-2007), otherwise Class P conditions would be warranted.

Some variability in subsurface conditions must be anticipated.

Moisture condition of site soils and/or the presence of groundwater may vary considerably from time of investigation compared to at the time of construction.

Depending on the depth of site cut and trenches, rock excavation may be required.

It is recommended that footing excavations be inspected by a geotechnical engineer.

This report must be read in conjunction with the attached “Limitations” and notes “About this Report”.

References:

1. 2.

AS 3798-2007 ‘Guidelines on Earthworks for Commercial and Residential Developments’, Standards Association of Australia. AS 2870-2011 ‘Residential Slabs and Footings,’ Standards Association of Australia.

Attachments:

Limitations & About this Report Explanatory Notes Test Pit Log(s) Pit(s) 54,55 Drawing 1

Page 97: SITE CLASSIFICATION REPORT SUMMARY...Douglas Partners (DP) has prepared this report for this project at Taylor 2- Stage 3, Taylor in accordance with DP’s proposal dated 15 September

FS 604853

Douglas Partners Pty Ltd ABN 75 053 980 117

www.douglaspartners.com.au Unit 2, 73 Sheppard Street

Hume ACT 2620 PO Box 1487

Fyshwick ACT 2609 Phone (02) 6260 2788

Fax (02) 6260 1147

Brisbane • Cairns • Canberra • Central Coast • Coffs Harbour • Darwin • Geelong • Gold Coast • Macarthur • Melbourne Newcastle • North West Sydney • Perth • Port Macquarie • Sunshine Coast • Sydney • Townsville • Wollongong

Limitations Douglas Partners (DP) has prepared this report for this project at Taylor 2 - Stage 3, Taylor in accordance with DP’s proposal dated 15 September 2017 and acceptance received from Indesco Consulting Engineers Pty Ltd dated 13 March 2019. The work was carried out under DP’s Conditions of Engagement. This report is provided for the exclusive use of Indesco Consulting Engineers Pty Ltd for this project only and for the purposes as described in the report. It should not be used by or relied upon for other projects or purposes on the same or other site or by a third party. Any party so relying upon this report beyond its exclusive use and purpose as stated above, and without the express written consent of DP, does so entirely at its own risk and without recourse to DP for any loss or damage. In preparing this report DP has necessarily relied upon information provided by the client and/or their agents. The results provided in the report are indicative of the sub-surface conditions on the site only at the specific sampling and/or testing locations, and then only to the depths investigated and at the time the work was carried out. Sub-surface conditions can change abruptly due to variable geological processes and also as a result of human influences. Such changes may occur after DP’s field testing has been completed. DP’s advice is based upon the conditions encountered during this investigation. The accuracy of the advice provided by DP in this report may be affected by undetected variations in ground conditions across the site between and beyond the sampling and/or testing locations. The advice may also be limited by budget constraints imposed by others or by site accessibility. This report must be read in conjunction with all of the attached and should be kept in its entirety without separation of individual pages or sections. DP cannot be held responsible for interpretations or conclusions made by others unless they are supported by an expressed statement, interpretation, outcome or conclusion stated in this report. This report, or sections from this report, should not be used as part of a specification for a project, without review and agreement by DP. This is because this report has been written as advice and opinion rather than instructions for construction. The scope for work for this investigation/report did not include the assessment of surface or sub-surface materials or groundwater for contaminants, within or adjacent to the site. Should evidence of filling of unknown origin be noted in the report, and in particular the presence of building demolition materials, it should be recognised that there may be some risk that such filling may contain contaminants and hazardous building materials. The contents of this report do not constitute formal design components such as are required, by the Health and Safety Legislation and Regulations, to be included in a Safety Report specifying the hazards likely to be encountered during construction and the controls required to mitigate risk. This design process requires risk assessment to be undertaken, with such assessment being dependent upon factors relating to likelihood of occurrence and consequences of damage to property and to life. This, in turn, requires project data and analysis presently beyond the knowledge and project role respectively of DP. DP may be able, however, to assist the client in carrying out a risk assessment of potential hazards contained in the Comments section of this report, as an extension to the current scope of works, if so requested, and provided that suitable additional information is made available to DP. Any such risk assessment would, however, be necessarily restricted to the geotechnical components set out in this report and to their application by the project designers to project design, construction, maintenance and demolition.

Page 98: SITE CLASSIFICATION REPORT SUMMARY...Douglas Partners (DP) has prepared this report for this project at Taylor 2- Stage 3, Taylor in accordance with DP’s proposal dated 15 September

July 2010

Introduction These notes have been provided to amplify DP's report in regard to classification methods, field procedures and the comments section. Not all are necessarily relevant to all reports. DP's reports are based on information gained from limited subsurface excavations and sampling, supplemented by knowledge of local geology and experience. For this reason, they must be regarded as interpretive rather than factual documents, limited to some extent by the scope of information on which they rely. Copyright This report is the property of Douglas Partners Pty Ltd. The report may only be used for the purpose for which it was commissioned and in accordance with the Conditions of Engagement for the commission supplied at the time of proposal. Unauthorised use of this report in any form whatsoever is prohibited. Borehole and Test Pit Logs The borehole and test pit logs presented in this report are an engineering and/or geological interpretation of the subsurface conditions, and their reliability will depend to some extent on frequency of sampling and the method of drilling or excavation. Ideally, continuous undisturbed sampling or core drilling will provide the most reliable assessment, but this is not always practicable or possible to justify on economic grounds. In any case the boreholes and test pits represent only a very small sample of the total subsurface profile. Interpretation of the information and its application to design and construction should therefore take into account the spacing of boreholes or pits, the frequency of sampling, and the possibility of other than 'straight line' variations between the test locations. Groundwater Where groundwater levels are measured in boreholes there are several potential problems, namely: • In low permeability soils groundwater may

enter the hole very slowly or perhaps not at all during the time the hole is left open;

• A localised, perched water table may lead to an erroneous indication of the true water table;

• Water table levels will vary from time to time with seasons or recent weather changes. They may not be the same at the time of construction as are indicated in the report; and

• The use of water or mud as a drilling fluid will mask any groundwater inflow. Water has to be blown out of the hole and drilling mud must first be washed out of the hole if water measurements are to be made.

More reliable measurements can be made by installing standpipes which are read at intervals over several days, or perhaps weeks for low permeability soils. Piezometers, sealed in a particular stratum, may be advisable in low permeability soils or where there may be interference from a perched water table. Reports The report has been prepared by qualified personnel, is based on the information obtained from field and laboratory testing, and has been undertaken to current engineering standards of interpretation and analysis. Where the report has been prepared for a specific design proposal, the information and interpretation may not be relevant if the design proposal is changed. If this happens, DP will be pleased to review the report and the sufficiency of the investigation work. Every care is taken with the report as it relates to interpretation of subsurface conditions, discussion of geotechnical and environmental aspects, and recommendations or suggestions for design and construction. However, DP cannot always anticipate or assume responsibility for: • Unexpected variations in ground conditions.

The potential for this will depend partly on borehole or pit spacing and sampling frequency;

• Changes in policy or interpretations of policy by statutory authorities; or

• The actions of contractors responding to commercial pressures.

If these occur, DP will be pleased to assist with investigations or advice to resolve the matter.

Page 99: SITE CLASSIFICATION REPORT SUMMARY...Douglas Partners (DP) has prepared this report for this project at Taylor 2- Stage 3, Taylor in accordance with DP’s proposal dated 15 September

July 2010

Site Anomalies In the event that conditions encountered on site during construction appear to vary from those which were expected from the information contained in the report, DP requests that it be immediately notified. Most problems are much more readily resolved when conditions are exposed rather than at some later stage, well after the event. Information for Contractual Purposes Where information obtained from this report is provided for tendering purposes, it is recommended that all information, including the written report and discussion, be made available. In circumstances where the discussion or comments section is not relevant to the contractual situation, it may be appropriate to prepare a specially edited document. DP would be pleased to assist in this regard and/or to make additional report copies available for contract purposes at a nominal charge. Site Inspection The company will always be pleased to provide engineering inspection services for geotechnical and environmental aspects of work to which this report is related. This could range from a site visit to confirm that conditions exposed are as expected, to full time engineering presence on site.

Page 100: SITE CLASSIFICATION REPORT SUMMARY...Douglas Partners (DP) has prepared this report for this project at Taylor 2- Stage 3, Taylor in accordance with DP’s proposal dated 15 September

July 2010

Sampling Sampling is carried out during drilling or test pitting to allow engineering examination (and laboratory testing where required) of the soil or rock. Disturbed samples taken during drilling provide information on colour, type, inclusions and, depending upon the degree of disturbance, some information on strength and structure. Undisturbed samples are taken by pushing a thin-walled sample tube into the soil and withdrawing it to obtain a sample of the soil in a relatively undisturbed state. Such samples yield information on structure and strength, and are necessary for laboratory determination of shear strength and compressibility. Undisturbed sampling is generally effective only in cohesive soils. Test Pits Test pits are usually excavated with a backhoe or an excavator, allowing close examination of the in-situ soil if it is safe to enter into the pit. The depth of excavation is limited to about 3 m for a backhoe and up to 6 m for a large excavator. A potential disadvantage of this investigation method is the larger area of disturbance to the site. Large Diameter Augers Boreholes can be drilled using a rotating plate or short spiral auger, generally 300 mm or larger in diameter commonly mounted on a standard piling rig. The cuttings are returned to the surface at intervals (generally not more than 0.5 m) and are disturbed but usually unchanged in moisture content. Identification of soil strata is generally much more reliable than with continuous spiral flight augers, and is usually supplemented by occasional undisturbed tube samples. Continuous Spiral Flight Augers The borehole is advanced using 90-115 mm diameter continuous spiral flight augers which are withdrawn at intervals to allow sampling or in-situ testing. This is a relatively economical means of drilling in clays and sands above the water table. Samples are returned to the surface, or may be collected after withdrawal of the auger flights, but they are disturbed and may be mixed with soils from the sides of the hole. Information from the drilling (as distinct from specific sampling by SPTs or undisturbed samples) is of relatively low

reliability, due to the remoulding, possible mixing or softening of samples by groundwater. Non-core Rotary Drilling The borehole is advanced using a rotary bit, with water or drilling mud being pumped down the drill rods and returned up the annulus, carrying the drill cuttings. Only major changes in stratification can be determined from the cuttings, together with some information from the rate of penetration. Where drilling mud is used this can mask the cuttings and reliable identification is only possible from separate sampling such as SPTs. Continuous Core Drilling A continuous core sample can be obtained using a diamond tipped core barrel, usually with a 50 mm internal diameter. Provided full core recovery is achieved (which is not always possible in weak rocks and granular soils), this technique provides a very reliable method of investigation. Standard Penetration Tests Standard penetration tests (SPT) are used as a means of estimating the density or strength of soils and also of obtaining a relatively undisturbed sample. The test procedure is described in Australian Standard 1289, Methods of Testing Soils for Engineering Purposes - Test 6.3.1. The test is carried out in a borehole by driving a 50 mm diameter split sample tube under the impact of a 63 kg hammer with a free fall of 760 mm. It is normal for the tube to be driven in three successive 150 mm increments and the 'N' value is taken as the number of blows for the last 300 mm. In dense sands, very hard clays or weak rock, the full 450 mm penetration may not be practicable and the test is discontinued. The test results are reported in the following form. • In the case where full penetration is obtained

with successive blow counts for each 150 mm of, say, 4, 6 and 7 as:

4,6,7 N=13

• In the case where the test is discontinued before the full penetration depth, say after 15 blows for the first 150 mm and 30 blows for the next 40 mm as:

15, 30/40 mm

Page 101: SITE CLASSIFICATION REPORT SUMMARY...Douglas Partners (DP) has prepared this report for this project at Taylor 2- Stage 3, Taylor in accordance with DP’s proposal dated 15 September

July 2010

The results of the SPT tests can be related empirically to the engineering properties of the soils. Dynamic Cone Penetrometer Tests / Perth Sand Penetrometer Tests Dynamic penetrometer tests (DCP or PSP) are carried out by driving a steel rod into the ground using a standard weight of hammer falling a specified distance. As the rod penetrates the soil the number of blows required to penetrate each successive 150 mm depth are recorded. Normally there is a depth limitation of 1.2 m, but this may be extended in certain conditions by the use of extension rods. Two types of penetrometer are commonly used. • Perth sand penetrometer - a 16 mm diameter

flat ended rod is driven using a 9 kg hammer dropping 600 mm (AS 1289, Test 6.3.3). This test was developed for testing the density of sands and is mainly used in granular soils and filling.

• Cone penetrometer - a 16 mm diameter rod with a 20 mm diameter cone end is driven using a 9 kg hammer dropping 510 mm (AS 1289, Test 6.3.2). This test was developed initially for pavement subgrade investigations, and correlations of the test results with California Bearing Ratio have been published by various road authorities.

Page 102: SITE CLASSIFICATION REPORT SUMMARY...Douglas Partners (DP) has prepared this report for this project at Taylor 2- Stage 3, Taylor in accordance with DP’s proposal dated 15 September

May 2017

Description and Classification Methods The methods of description and classification of

soils and rocks used in this report are based on

Australian Standard AS 1726-1993, Geotechnical

Site Investigations Code. In general, the

descriptions include strength or density, colour,

structure, soil or rock type and inclusions.

Soil Types Soil types are described according to the

predominant particle size, qualified by the grading

of other particles present:

Type Particle size (mm)

Boulder >200

Cobble 63 - 200

Gravel 2.36 - 63

Sand 0.075 - 2.36

Silt 0.002 - 0.075

Clay <0.002

The sand and gravel sizes can be further

subdivided as follows:

Type Particle size (mm)

Coarse gravel 20 - 63

Medium gravel 6 - 20

Fine gravel 2.36 - 6

Coarse sand 0.6 - 2.36

Medium sand 0.2 - 0.6

Fine sand 0.075 - 0.2

The proportions of secondary constituents of soils

are described as:

Term Proportion Example

And Specify Clay (60%) and

Sand (40%)

Adjective 20 - 35% Sandy Clay

Slightly 12 - 20% Slightly Sandy

Clay

With some 5 - 12% Clay with some

sand

With a trace of 0 - 5% Clay with a trace

of sand

Definitions of grading terms used are:

• Well graded - a good representation of all

particle sizes

• Poorly graded - an excess or deficiency of

particular sizes within the specified range

• Uniformly graded - an excess of a particular

particle size

• Gap graded - a deficiency of a particular

particle size with the range

Cohesive Soils Cohesive soils, such as clays, are classified on the

basis of undrained shear strength. The strength

may be measured by laboratory testing, or

estimated by field tests or engineering

examination. The strength terms are defined as

follows:

Description Abbreviation Undrained shear strength

(kPa)

Very soft vs <12

Soft s 12 - 25

Firm f 25 - 50

Stiff st 50 - 100

Very stiff vst 100 - 200

Hard h >200

Cohesionless Soils Cohesionless soils, such as clean sands, are

classified on the basis of relative density, generally

from the results of standard penetration tests

(SPT), cone penetration tests (CPT) or dynamic

penetrometers (PSP). The relative density terms

are given below:

Relative Density

Abbreviation SPT N value

CPT qc value (MPa)

Very loose vl <4 <2

Loose l 4 - 10 2 -5

Medium

dense

md 10 - 30 5 - 15

Dense d 30 - 50 15 - 25

Very

dense

vd >50 >25

Page 103: SITE CLASSIFICATION REPORT SUMMARY...Douglas Partners (DP) has prepared this report for this project at Taylor 2- Stage 3, Taylor in accordance with DP’s proposal dated 15 September

May 2017

Soil Origin It is often difficult to accurately determine the origin

of a soil. Soils can generally be classified as:

• Residual soil - derived from in-situ weathering

of the underlying rock;

• Transported soils - formed somewhere else

and transported by nature to the site; or

• Filling - moved by man.

Transported soils may be further subdivided into:

• Alluvium - river deposits

• Lacustrine - lake deposits

• Aeolian - wind deposits

• Littoral - beach deposits

• Estuarine - tidal river deposits

• Talus - scree or coarse colluvium

• Slopewash or Colluvium - transported

downslope by gravity assisted by water.

Often includes angular rock fragments and

boulders.

Page 104: SITE CLASSIFICATION REPORT SUMMARY...Douglas Partners (DP) has prepared this report for this project at Taylor 2- Stage 3, Taylor in accordance with DP’s proposal dated 15 September

May 2017

Rock Strength Rock strength is defined by the Point Load Strength Index (Is(50)) and refers to the strength of the rock

substance and not the strength of the overall rock mass, which may be considerably weaker due to defects.

The test procedure is described by Australian Standard 4133.4.1 - 2007. The terms used to describe rock

strength are as follows:

Term Abbreviation Point Load Index

Is(50) MPa

Approximate Unconfined Compressive Strength MPa*

Extremely low EL <0.03 <0.6

Very low VL 0.03 - 0.1 0.6 - 2

Low L 0.1 - 0.3 2 - 6

Medium M 0.3 - 1.0 6 - 20

High H 1 - 3 20 - 60

Very high VH 3 - 10 60 - 200

Extremely high EH >10 >200

* Assumes a ratio of 20:1 for UCS to Is(50). It should be noted that the UCS to Is(50) ratio varies significantly

for different rock types and specific ratios should be determined for each site.

Degree of Weathering The degree of weathering of rock is classified as follows:

Term Abbreviation Description

Extremely weathered EW Rock substance has soil properties, i.e. it can be remoulded and classified as a soil but the texture of the original rock is still evident.

Highly weathered HW Limonite staining or bleaching affects whole of rock substance and other signs of decomposition are evident. Porosity and strength may be altered as a result of iron leaching or deposition. Colour and strength of original fresh rock is not recognisable

Moderately weathered

MW Staining and discolouration of rock substance has taken place

Slightly weathered SW Rock substance is slightly discoloured but shows little or no change of strength from fresh rock

Fresh stained Fs Rock substance unaffected by weathering but staining visible along defects

Fresh Fr No signs of decomposition or staining

Degree of Fracturing The following classification applies to the spacing of natural fractures in diamond drill cores. It includes

bedding plane partings, joints and other defects, but excludes drilling breaks.

Term Description

Fragmented Fragments of <20 mm

Highly Fractured Core lengths of 20-40 mm with some fragments

Fractured Core lengths of 40-200 mm with some shorter and longer sections

Slightly Fractured Core lengths of 200-1000 mm with some shorter and longer sections

Unbroken Core lengths mostly > 1000 mm

Page 105: SITE CLASSIFICATION REPORT SUMMARY...Douglas Partners (DP) has prepared this report for this project at Taylor 2- Stage 3, Taylor in accordance with DP’s proposal dated 15 September

May 2017

Rock Quality Designation The quality of the cored rock can be measured using the Rock Quality Designation (RQD) index, defined

as:

RQD % = cumulative length of 'sound' core sections ≥ 100 mm long

total drilled length of section being assessed

where 'sound' rock is assessed to be rock of low strength or better. The RQD applies only to natural

fractures. If the core is broken by drilling or handling (i.e. drilling breaks) then the broken pieces are fitted

back together and are not included in the calculation of RQD.

Stratification Spacing For sedimentary rocks the following terms may be used to describe the spacing of bedding partings:

Term Separation of Stratification Planes

Thinly laminated < 6 mm

Laminated 6 mm to 20 mm

Very thinly bedded 20 mm to 60 mm

Thinly bedded 60 mm to 0.2 m

Medium bedded 0.2 m to 0.6 m

Thickly bedded 0.6 m to 2 m

Very thickly bedded > 2 m

Page 106: SITE CLASSIFICATION REPORT SUMMARY...Douglas Partners (DP) has prepared this report for this project at Taylor 2- Stage 3, Taylor in accordance with DP’s proposal dated 15 September

May 2017

Introduction These notes summarise abbreviations commonly

used on borehole logs and test pit reports.

Drilling or Excavation Methods C Core drilling

R Rotary drilling

SFA Spiral flight augers

NMLC Diamond core - 52 mm dia

NQ Diamond core - 47 mm dia

HQ Diamond core - 63 mm dia

PQ Diamond core - 81 mm dia

Water � Water seep

� Water level

Sampling and Testing A Auger sample

B Bulk sample

D Disturbed sample

E Environmental sample

U50 Undisturbed tube sample (50mm)

W Water sample

pp Pocket penetrometer (kPa)

PID Photo ionisation detector

PL Point load strength Is(50) MPa

S Standard Penetration Test

V Shear vane (kPa)

Description of Defects in Rock The abbreviated descriptions of the defects should

be in the following order: Depth, Type, Orientation,

Coating, Shape, Roughness and Other. Drilling

and handling breaks are not usually included on

the logs.

Defect Type

B Bedding plane

Cs Clay seam

Cv Cleavage

Cz Crushed zone

Ds Decomposed seam

F Fault

J Joint

Lam Lamination

Pt Parting

Sz Sheared Zone

V Vein

Orientation

The inclination of defects is always measured from

the perpendicular to the core axis.

h horizontal

v vertical

sh sub-horizontal

sv sub-vertical

Coating or Infilling Term

cln clean

co coating

he healed

inf infilled

stn stained

ti tight

vn veneer

Coating Descriptor

ca calcite

cbs carbonaceous

cly clay

fe iron oxide

mn manganese

slt silty

Shape

cu curved

ir irregular

pl planar

st stepped

un undulating

Roughness

po polished

ro rough

sl slickensided

sm smooth

vr very rough

Other

fg fragmented

bnd band

qtz quartz

Page 107: SITE CLASSIFICATION REPORT SUMMARY...Douglas Partners (DP) has prepared this report for this project at Taylor 2- Stage 3, Taylor in accordance with DP’s proposal dated 15 September

May 2017

Graphic Symbols for Soil and Rock General

Soils

Sedimentary Rocks

Metamorphic Rocks

Igneous Rocks

Road base

Filling

Concrete

Asphalt

Topsoil

Peat

Clay

Conglomeratic sandstone

Conglomerate

Boulder conglomerate

Sandstone

Slate, phyllite, schist

Siltstone

Mudstone, claystone, shale

Coal

Limestone

Porphyry

Cobbles, boulders

Sandy gravel

Laminite

Silty sand

Clayey sand

Silty clay

Sandy clay

Gravelly clay

Shaly clay

Silt

Clayey silt

Sandy silt

Sand

Gravel

Talus

Gneiss

Quartzite

Dolerite, basalt, andesite

Granite

Tuff, breccia

Dacite, epidote

Page 108: SITE CLASSIFICATION REPORT SUMMARY...Douglas Partners (DP) has prepared this report for this project at Taylor 2- Stage 3, Taylor in accordance with DP’s proposal dated 15 September

ͱ·´ ̧°»­

̸» ¬§°»­ ±º ­±·´­ «­«¿´´§ °®»­»²¬ «²¼»® ¬¸» ¬±°­±·´ ·² ´¿²¼ ¦±²»¼ º±®®»­·¼»²¬·¿´ ¾«·´¼·²¹­ ½¿² ¾» ­°´·¬ ·²¬± ¬©± ¿°°®±¨·³¿¬» ¹®±«°­ P¹®¿²«´¿® ¿²¼ ½´¿§ò Ï«·¬» ±º¬»²ô º±«²¼¿¬·±² ­±·´ ·­ ¿ ³·¨¬«®» ±º ¾±¬¸¬§°»­ò ̸» ¹»²»®¿´ °®±¾´»³­ ¿­­±½·¿¬»¼ ©·¬¸ ­±·´­ ¸¿ª·²¹ ¹®¿²«´¿®½±²¬»²¬ ¿®» «­«¿´´§ ½¿«­»¼ ¾§ »®±­·±²ò Ý´¿§ ­±·´­ ¿®» ­«¾¶»½¬ ¬±­¿¬«®¿¬·±² ¿²¼ ­©»´´ñ­¸®·²µ °®±¾´»³­ò

Ý´¿­­·º·½¿¬·±²­ º±® ¿ ¹·ª»² ¿®»¿ ½¿² ¹»²»®¿´´§ ¾» ±¾¬¿·²»¼ ¾§¿°°´·½¿¬·±² ¬± ¬¸» ´±½¿´ ¿«¬¸±®·¬§ô ¾«¬ ¬¸»­» ¿®» ­±³»¬·³»­ «²®»´·¿¾´»¿²¼ ·º ¬¸»®» ·­ ¼±«¾¬ô ¿ ¹»±¬»½¸²·½¿´ ®»°±®¬ ­¸±«´¼ ¾» ½±³³·­­·±²»¼òß­ ³±­¬ ¾«·´¼·²¹­ ­«ºº»®·²¹ ³±ª»³»²¬ °®±¾´»³­ ¿®» º±«²¼»¼ ±² ½´¿§­±·´­ô ¬¸»®» ·­ ¿² »³°¸¿­·­ ±² ½´¿­­·º·½¿¬·±² ±º ­±·´­ ¿½½±®¼·²¹ ¬± ¬¸»¿³±«²¬ ±º ­©»´´ ¿²¼ ­¸®·²µ¿¹» ¬¸»§ »¨°»®·»²½» ©·¬¸ ª¿®·¿¬·±²­ ±º©¿¬»® ½±²¬»²¬ò ̸» ¬¿¾´» ¾»´±© ·­ Ì¿¾´» îòï º®±³ ßÍ îèéðô ¬¸»Î»­·¼»²¬·¿´ Í´¿¾ ¿²¼ Ú±±¬·²¹ ݱ¼»ò

Ý¿«­»­ ±º Ó±ª»³»²¬

Í»¬¬´»³»²¬ ¼«» ¬± ½±²­¬®«½¬·±²Ì¸»®» ¿®» ¬©± ¬§°»­ ±º ­»¬¬´»³»²¬ ¬¸¿¬ ±½½«® ¿­ ¿ ®»­«´¬ ±º½±²­¬®«½¬·±²æ{ ׳³»¼·¿¬» ­»¬¬´»³»²¬ ±½½«®­ ©¸»² ¿ ¾«·´¼·²¹ ·­ º·®­¬ °´¿½»¼ ±² ·¬­

º±«²¼¿¬·±² ­±·´ô ¿­ ¿ ®»­«´¬ ±º ½±³°¿½¬·±² ±º ¬¸» ­±·´ «²¼»® ¬¸»©»·¹¸¬ ±º ¬¸» ­¬®«½¬«®»ò ̸» ½±¸»­·ª» ¯«¿´·¬§ ±º ½´¿§ ­±·´ ³·¬·¹¿¬»­¿¹¿·²­¬ ¬¸·­ô ¾«¬ ¹®¿²«´¿® ø°¿®¬·½«´¿®´§ ­¿²¼§÷ ­±·´ ·­ ­«­½»°¬·¾´»ò

{ ݱ²­±´·¼¿¬·±² ­»¬¬´»³»²¬ ·­ ¿ º»¿¬«®» ±º ½´¿§ ­±·´ ¿²¼ ³¿§ ¬¿µ»°´¿½» ¾»½¿«­» ±º ¬¸» »¨°«´­·±² ±º ³±·­¬«®» º®±³ ¬¸» ­±·´ ±® ¾»½¿«­»±º ¬¸» ­±·´K­ ´¿½µ ±º ®»­·­¬¿²½» ¬± ´±½¿´ ½±³°®»­­·ª» ±® ­¸»¿® ­¬®»­­»­ò̸·­ ©·´´ «­«¿´´§ ¬¿µ» °´¿½» ¼«®·²¹ ¬¸» º·®­¬ º»© ³±²¬¸­ ¿º¬»®½±²­¬®«½¬·±²ô ¾«¬ ¸¿­ ¾»»² µ²±©² ¬± ¬¿µ» ³¿²§ §»¿®­ ·²»¨½»°¬·±²¿´ ½¿­»­ò

̸»­» °®±¾´»³­ ¿®» ¬¸» °®±ª·²½» ±º ¬¸» ¾«·´¼»® ¿²¼ ­¸±«´¼ ¾» ¬¿µ»²·²¬± ½±²­·¼»®¿¬·±² ¿­ °¿®¬ ±º ¬¸» °®»°¿®¿¬·±² ±º ¬¸» ­·¬» º±® ½±²­¬®«½ó¬·±²ò Þ«·´¼·²¹ Ì»½¸²±´±¹§ Ú·´» ïç øÞÌÚ ïç÷ ¼»¿´­ ©·¬¸ ¬¸»­»°®±¾´»³­ò

Û®±­·±²ß´´ ­±·´­ ¿®» °®±²» ¬± »®±­·±²ô ¾«¬ ­¿²¼§ ­±·´ ·­ °¿®¬·½«´¿®´§ ­«­½»°¬·¾´»¬± ¾»·²¹ ©¿­¸»¼ ¿©¿§ò Ûª»² ½´¿§ ©·¬¸ ¿ ­¿²¼ ½±³°±²»²¬ ±º ­¿§ ïðû±® ³±®» ½¿² ­«ºº»® º®±³ »®±­·±²ò

Í¿¬«®¿¬·±²Ì¸·­ ·­ °¿®¬·½«´¿®´§ ¿ °®±¾´»³ ·² ½´¿§ ­±·´­ò Í¿¬«®¿¬·±² ½®»¿¬»­ ¿ ¾±¹ó´·µ» ­«­°»²­·±² ±º ¬¸» ­±·´ ¬¸¿¬ ½¿«­»­ ·¬ ¬± ´±­» ª·®¬«¿´´§ ¿´´ ±º ·¬­¾»¿®·²¹ ½¿°¿½·¬§ò ̱ ¿ ´»­­»® ¼»¹®»»ô ­¿²¼ ·­ ¿ºº»½¬»¼ ¾§ ­¿¬«®¿¬·±²¾»½¿«­» ­¿¬«®¿¬»¼ ­¿²¼ ³¿§ «²¼»®¹± ¿ ®»¼«½¬·±² ·² ª±´«³» P°¿®¬·½«´¿®´§ ·³°±®¬»¼ ­¿²¼ º·´´ º±® ¾»¼¼·²¹ ¿²¼ ¾´·²¼·²¹ ´¿§»®­òر©»ª»®ô ¬¸·­ «­«¿´´§ ±½½«®­ ¿­ ·³³»¼·¿¬» ­»¬¬´»³»²¬ ¿²¼ ­¸±«´¼²±®³¿´´§ ¾» ¬¸» °®±ª·²½» ±º ¬¸» ¾«·´¼»®ò

Í»¿­±²¿´ ­©»´´·²¹ ¿²¼ ­¸®·²µ¿¹» ±º ­±·´ß´´ ½´¿§­ ®»¿½¬ ¬± ¬¸» °®»­»²½» ±º ©¿¬»® ¾§ ­´±©´§ ¿¾­±®¾·²¹ ·¬ô ³¿µ·²¹¬¸» ­±·´ ·²½®»¿­» ·² ª±´«³» ø­»» ¬¿¾´» ¾»´±©÷ò ̸» ¼»¹®»» ±º ·²½®»¿­»ª¿®·»­ ½±²­·¼»®¿¾´§ ¾»¬©»»² ¼·ºº»®»²¬ ½´¿§­ô ¿­ ¼±»­ ¬¸» ¼»¹®»» ±º¼»½®»¿­» ¼«®·²¹ ¬¸» ­«¾­»¯«»²¬ ¼®§·²¹ ±«¬ ½¿«­»¼ ¾§ º¿·® ©»¿¬¸»®°»®·±¼­ò Þ»½¿«­» ±º ¬¸» ´±© ¿¾­±®°¬·±² ¿²¼ »¨°«´­·±² ®¿¬»ô ¬¸·­°¸»²±³»²±² ©·´´ ²±¬ «­«¿´´§ ¾» ²±¬·½»¿¾´» «²´»­­ ¬¸»®» ¿®»°®±´±²¹»¼ ®¿·²§ ±® ¼®§ °»®·±¼­ô «­«¿´´§ ±º ©»»µ­ ±® ³±²¬¸­ô¼»°»²¼·²¹ ±² ¬¸» ´¿²¼ ¿²¼ ­±·´ ½¸¿®¿½¬»®·­¬·½­ò

̸» ­©»´´·²¹ ±º ­±·´ ½®»¿¬»­ ¿² «°©¿®¼ º±®½» ±² ¬¸» º±±¬·²¹­ ±º ¬¸»¾«·´¼·²¹ô ¿²¼ ­¸®·²µ¿¹» ½®»¿¬»­ ­«¾­·¼»²½» ¬¸¿¬ ¬¿µ»­ ¿©¿§ ¬¸»­«°°±®¬ ²»»¼»¼ ¾§ ¬¸» º±±¬·²¹ ¬± ®»¬¿·² »¯«·´·¾®·«³ò

͸»¿® º¿·´«®»Ì¸·­ °¸»²±³»²±² ±½½«®­ ©¸»² ¬¸» º±«²¼¿¬·±² ­±·´ ¼±»­ ²±¬ ¸¿ª»­«ºº·½·»²¬ ­¬®»²¹¬¸ ¬± ­«°°±®¬ ¬¸» ©»·¹¸¬ ±º ¬¸» º±±¬·²¹ò ̸»®» ¿®»¬©± ³¿¶±® °±­¬ó½±²­¬®«½¬·±² ½¿«­»­æ

{ Í·¹²·º·½¿²¬ ´±¿¼ ·²½®»¿­»ò{ λ¼«½¬·±² ±º ´¿¬»®¿´ ­«°°±®¬ ±º ¬¸» ­±·´ «²¼»® ¬¸» º±±¬·²¹ ¼«» ¬±

»®±­·±² ±® »¨½¿ª¿¬·±²ò{ ײ ½´¿§ ­±·´ô ­¸»¿® º¿·´«®» ½¿² ¾» ½¿«­»¼ ¾§ ­¿¬«®¿¬·±² ±º ¬¸» ­±·´

¿¼¶¿½»²¬ ¬± ±® «²¼»® ¬¸» º±±¬·²¹ò

Þ«·´¼·²¹­ ½¿² ¿²¼ ±º¬»² ¼± ³±ª»ò ̸·­ ³±ª»³»²¬ ½¿² ¾» «°ô ¼±©²ô ´¿¬»®¿´ ±® ®±¬¿¬·±²¿´ò ̸» º«²¼¿³»²¬¿´ ½¿«­»±º ³±ª»³»²¬ ·² ¾«·´¼·²¹­ ½¿² «­«¿´´§ ¾» ®»´¿¬»¼ ¬± ±²» ±® ³±®» °®±¾´»³­ ·² ¬¸» º±«²¼¿¬·±² ­±·´ò ׬ ·­ ·³°±®¬¿²¬ º±®¬¸» ¸±³»±©²»® ¬± ·¼»²¬·º§ ¬¸» ­±·´ ¬§°» ·² ±®¼»® ¬± ¿­½»®¬¿·² ¬¸» ³»¿­«®»­ ¬¸¿¬ ­¸±«´¼ ¾» °«¬ ·² °´¿½» ·² ±®¼»® ¬±»²­«®» ¬¸¿¬ °®±¾´»³­ ·² ¬¸» º±«²¼¿¬·±² ­±·´ ½¿² ¾» °®»ª»²¬»¼ô ¬¸«­ °®±¬»½¬·²¹ ¿¹¿·²­¬ ¾«·´¼·²¹ ³±ª»³»²¬ò

̸·­ Þ«·´¼·²¹ Ì»½¸²±´±¹§ Ú·´» ·­ ¼»­·¹²»¼ ¬± ·¼»²¬·º§ ½¿«­»­ ±º ­±·´ó®»´¿¬»¼ ¾«·´¼·²¹ ³±ª»³»²¬ô ¿²¼ ¬± ­«¹¹»­¬³»¬¸±¼­ ±º °®»ª»²¬·±² ±º ®»­«´¬¿²¬ ½®¿½µ·²¹ ·² ¾«·´¼·²¹­ò

Ú±«²¼¿¬·±² Ó¿·²¬»²¿²½»¿²¼ Ú±±¬·²¹ л®º±®³¿²½»æß Ø±³»±©²»®K­ Ù«·¼»

ÙÛÒÛÎßÔ ÜÛÚ×Ò×Ì×ÑÒÍ ÑÚ Í×ÌÛ ÝÔßÍÍÛÍ

Ý´¿­­ Ú±«²¼¿¬·±²

ß Ó±­¬ ­¿²¼ ¿²¼ ®±½µ ­·¬»­ ©·¬¸ ´·¬¬´» ±® ²± ¹®±«²¼ ³±ª»³»²¬ º®±³ ³±·­¬«®» ½¸¿²¹»­

Í Í´·¹¸¬´§ ®»¿½¬·ª» ½´¿§ ­·¬»­ ©·¬¸ ±²´§ ­´·¹¸¬ ¹®±«²¼ ³±ª»³»²¬ º®±³ ³±·­¬«®» ½¸¿²¹»­

Ó Ó±¼»®¿¬»´§ ®»¿½¬·ª» ½´¿§ ±® ­·´¬ ­·¬»­ô ©¸·½¸ ½¿² »¨°»®·»²½» ³±¼»®¿¬» ¹®±«²¼ ³±ª»³»²¬ º®±³ ³±·­¬«®» ½¸¿²¹»­

Ø Ø·¹¸´§ ®»¿½¬·ª» ½´¿§ ­·¬»­ô ©¸·½¸ ½¿² »¨°»®·»²½» ¸·¹¸ ¹®±«²¼ ³±ª»³»²¬ º®±³ ³±·­¬«®» ½¸¿²¹»­

Û Û¨¬®»³»´§ ®»¿½¬·ª» ­·¬»­ô ©¸·½¸ ½¿² »¨°»®·»²½» »¨¬®»³» ¹®±«²¼ ³±ª»³»²¬ º®±³ ³±·­¬«®» ½¸¿²¹»­

ß ¬± Ð Ú·´´»¼ ­·¬»­

Ð Í·¬»­ ©¸·½¸ ·²½´«¼» ­±º¬ ­±·´­ô ­«½¸ ¿­ ­±º¬ ½´¿§ ±® ­·´¬ ±® ´±±­» ­¿²¼­å ´¿²¼­´·°å ³·²» ­«¾­·¼»²½»å ½±´´¿°­·²¹ ­±·´­å ­±·´­ ­«¾¶»½¬¬± »®±­·±²å ®»¿½¬·ª» ­·¬»­ ­«¾¶»½¬ ¬± ¿¾²±®³¿´ ³±·­¬«®» ½±²¼·¬·±²­ ±® ­·¬»­ ©¸·½¸ ½¿²²±¬ ¾» ½´¿­­·º·»¼ ±¬¸»®©·­»

ÞÌÚ ïè®»°´¿½»­

ײº±®³¿¬·±²Í¸»»¬ ïðñçï

Page 109: SITE CLASSIFICATION REPORT SUMMARY...Douglas Partners (DP) has prepared this report for this project at Taylor 2- Stage 3, Taylor in accordance with DP’s proposal dated 15 September

Ì®»» ®±±¬ ¹®±©¬¸Ì®»»­ ¿²¼ ­¸®«¾­ ¬¸¿¬ ¿®» ¿´´±©»¼ ¬± ¹®±© ·² ¬¸» ª·½·²·¬§ ±º º±±¬·²¹­½¿² ½¿«­» º±«²¼¿¬·±² ­±·´ ³±ª»³»²¬ ·² ¬©± ©¿§­æ

{ ᱬ­ ¬¸¿¬ ¹®±© «²¼»® º±±¬·²¹­ ³¿§ ·²½®»¿­» ·² ½®±­­ó­»½¬·±²¿´­·¦»ô »¨»®¬·²¹ «°©¿®¼ °®»­­«®» ±² º±±¬·²¹­ò

{ ᱬ­ ·² ¬¸» ª·½·²·¬§ ±º º±±¬·²¹­ ©·´´ ¿¾­±®¾ ³«½¸ ±º ¬¸» ³±·­¬«®»·² ¬¸» º±«²¼¿¬·±² ­±·´ô ½¿«­·²¹ ­¸®·²µ¿¹» ±® ­«¾­·¼»²½»ò

˲»ª»²²»­­ ±º Ó±ª»³»²¬

̸» ¬§°»­ ±º ¹®±«²¼ ³±ª»³»²¬ ¼»­½®·¾»¼ ¿¾±ª» «­«¿´´§ ±½½«®«²»ª»²´§ ¬¸®±«¹¸±«¬ ¬¸» ¾«·´¼·²¹K­ º±«²¼¿¬·±² ­±·´ò Í»¬¬´»³»²¬ ¼«»¬± ½±²­¬®«½¬·±² ¬»²¼­ ¬± ¾» «²»ª»² ¾»½¿«­» ±ºæ

{ Ü·ºº»®·²¹ ½±³°¿½¬·±² ±º º±«²¼¿¬·±² ­±·´ °®·±® ¬± ½±²­¬®«½¬·±²ò

{ Ü·ºº»®·²¹ ³±·­¬«®» ½±²¬»²¬ ±º º±«²¼¿¬·±² ­±·´ °®·±® ¬± ½±²­¬®«½¬·±²ò

Ó±ª»³»²¬ ¼«» ¬± ²±²ó½±²­¬®«½¬·±² ½¿«­»­ ·­ «­«¿´´§ ³±®» «²»ª»²­¬·´´ò Û®±­·±² ½¿² «²¼»®³·²» ¿ º±±¬·²¹ ¬¸¿¬ ¬®¿ª»®­»­ ¬¸» º´±© ±® ½¿²½®»¿¬» ¬¸» ½±²¼·¬·±²­ º±® ­¸»¿® º¿·´«®» ¾§ »®±¼·²¹ ­±·´ ¿¼¶¿½»²¬ ¬± ¿º±±¬·²¹ ¬¸¿¬ ®«²­ ·² ¬¸» ­¿³» ¼·®»½¬·±² ¿­ ¬¸» º´±©ò

Í¿¬«®¿¬·±² ±º ½´¿§ º±«²¼¿¬·±² ­±·´ ³¿§ ±½½«® ©¸»®» ­«¾º´±±® ©¿´´­½®»¿¬» ¿ ¼¿³ ¬¸¿¬ ³¿µ»­ ©¿¬»® °±²¼ò ׬ ½¿² ¿´­± ±½½«® ©¸»®»ª»® ¬¸»®»·­ ¿ ­±«®½» ±º ©¿¬»® ²»¿® º±±¬·²¹­ ·² ½´¿§ ­±·´ò ̸·­ ´»¿¼­ ¬± ¿ ­»ª»®»®»¼«½¬·±² ·² ¬¸» ­¬®»²¹¬¸ ±º ¬¸» ­±·´ ©¸·½¸ ³¿§ ½®»¿¬» ´±½¿´ ­¸»¿®º¿·´«®»ò

Í»¿­±²¿´ ­©»´´·²¹ ¿²¼ ­¸®·²µ¿¹» ±º ½´¿§ ­±·´ ¿ºº»½¬­ ¬¸» °»®·³»¬»® ±º¬¸» ¾«·´¼·²¹ º·®­¬ô ¬¸»² ¹®¿¼«¿´´§ ­°®»¿¼­ ¬± ¬¸» ·²¬»®·±®ò ̸» ­©»´´·²¹°®±½»­­ ©·´´ «­«¿´´§ ¾»¹·² ¿¬ ¬¸» «°¸·´´ »¨¬®»³» ±º ¬¸» ¾«·´¼·²¹ô ±® ±²¬¸» ©»¿¬¸»® ­·¼» ©¸»®» ¬¸» ´¿²¼ ·­ º´¿¬ò Í©»´´·²¹ ¹®¿¼«¿´´§ ®»¿½¸»­ ¬¸»·²¬»®·±® ­±·´ ¿­ ¿¾­±®°¬·±² ½±²¬·²«»­ò ͸®·²µ¿¹» «­«¿´´§ ¾»¹·²­ ©¸»®»¬¸» ­«²K­ ¸»¿¬ ·­ ¹®»¿¬»­¬ò

Ûºº»½¬­ ±º ˲»ª»² ͱ·´ Ó±ª»³»²¬ ±² ͬ®«½¬«®»­

Û®±­·±² ¿²¼ ­¿¬«®¿¬·±²Û®±­·±² ®»³±ª»­ ¬¸» ­«°°±®¬ º®±³ «²¼»® º±±¬·²¹­ô ¬»²¼·²¹ ¬± ½®»¿¬»­«¾­·¼»²½» ±º ¬¸» °¿®¬ ±º ¬¸» ­¬®«½¬«®» «²¼»® ©¸·½¸ ·¬ ±½½«®­òÞ®·½µ©±®µ ©¿´´­ ©·´´ ®»­·­¬ ¬¸» ­¬®»­­ ½®»¿¬»¼ ¾§ ¬¸·­ ®»³±ª¿´ ±º­«°°±®¬ ¾§ ¾®·¼¹·²¹ ¬¸» ¹¿° ±® ½¿²¬·´»ª»®·²¹ «²¬·´ ¬¸» ¾®·½µ­ ±® ¬¸»³±®¬¿® ¾»¼¼·²¹ º¿·´ò Ñ´¼»® ³¿­±²®§ ¸¿­ ´·¬¬´» ®»­·­¬¿²½»ò Ûª·¼»²½» ±ºº¿·´«®» ª¿®·»­ ¿½½±®¼·²¹ ¬± ½·®½«³­¬¿²½»­ ¿²¼ ­§³°¬±³­ ³¿§ ·²½´«¼»æ

{ ͬ»° ½®¿½µ·²¹ ·² ¬¸» ³±®¬¿® ¾»¼­ ·² ¬¸» ¾±¼§ ±º ¬¸» ©¿´´ ±®¿¾±ª»ñ¾»´±© ±°»²·²¹­ ­«½¸ ¿­ ¼±±®­ ±® ©·²¼±©­ò

{ Ê»®¬·½¿´ ½®¿½µ·²¹ ·² ¬¸» ¾®·½µ­ ø«­«¿´´§ ¾«¬ ²±¬ ²»½»­­¿®·´§ ·² ´·²»©·¬¸ ¬¸» ª»®¬·½¿´ ¾»¼­ ±® °»®°»²¼­÷ò

×­±´¿¬»¼ °·»®­ ¿ºº»½¬»¼ ¾§ »®±­·±² ±® ­¿¬«®¿¬·±² ±º º±«²¼¿¬·±²­ ©·´´»ª»²¬«¿´´§ ´±­» ½±²¬¿½¬ ©·¬¸ ¬¸» ¾»¿®»®­ ¬¸»§ ­«°°±®¬ ¿²¼ ³¿§ ¬·´¬ ±®º¿´´ ±ª»®ò ̸» º´±±®­ ¬¸¿¬ ¸¿ª» ´±­¬ ¬¸·­ ­«°°±®¬ ©·´´ ¾»½±³» ¾±«²½§ô­±³»¬·³»­ ®¿¬¬´·²¹ ±®²¿³»²¬­ »¬½ò

Í»¿­±²¿´ ­©»´´·²¹ñ­¸®·²µ¿¹» ·² ½´¿§Í©»´´·²¹ º±«²¼¿¬·±² ­±·´ ¼«» ¬± ®¿·²§ °»®·±¼­ º·®­¬ ´·º¬­ ¬¸» ³±­¬»¨°±­»¼ »¨¬®»³·¬·»­ ±º ¬¸» º±±¬·²¹ ­§­¬»³ô ¬¸»² ¬¸» ®»³¿·²¼»® ±º ¬¸»°»®·³»¬»® º±±¬·²¹­ ©¸·´» ¹®¿¼«¿´´§ °»®³»¿¬·²¹ ·²­·¼» ¬¸» ¾«·´¼·²¹º±±¬°®·²¬ ¬± ´·º¬ ·²¬»®²¿´ º±±¬·²¹­ò ̸·­ ­©»´´·²¹ º·®­¬ ¬»²¼­ ¬± ½®»¿¬» ¿¼·­¸ »ºº»½¬ô ¾»½¿«­» ¬¸» »¨¬»®²¿´ º±±¬·²¹­ ¿®» °«­¸»¼ ¸·¹¸»® ¬¸¿² ¬¸»·²¬»®²¿´ ±²»­ò

̸» º·®­¬ ²±¬·½»¿¾´» ­§³°¬±³ ³¿§ ¾» ¬¸¿¬ ¬¸» º´±±® ¿°°»¿®­ ­´·¹¸¬´§¼·­¸»¼ò ̸·­ ·­ ±º¬»² ¿½½±³°¿²·»¼ ¾§ ­±³» ¼±±®­ ¾·²¼·²¹ ±² ¬¸»º´±±® ±® ¬¸» ¼±±® ¸»¿¼ô ¬±¹»¬¸»® ©·¬¸ ­±³» ½®¿½µ·²¹ ±º ½±®²·½»³·¬®»­ò ײ ¾«·´¼·²¹­ ©·¬¸ ¬·³¾»® º´±±®·²¹ ­«°°±®¬»¼ ¾§ ¾»¿®»®­ ¿²¼¶±·­¬­ô ¬¸» º´±±® ½¿² ¾» ¾±«²½§ò Û¨¬»®²¿´´§ ¬¸»®» ³¿§ ¾» ª·­·¾´»¼·­¸·²¹ ±º ¬¸» ¸·° ±® ®·¼¹» ´·²»­ò

ß­ ¬¸» ³±·­¬«®» ¿¾­±®°¬·±² °®±½»­­ ½±³°´»¬»­ ·¬­ ¶±«®²»§ ¬± ¬¸»·²²»®³±­¬ ¿®»¿­ ±º ¬¸» ¾«·´¼·²¹ô ¬¸» ·²¬»®²¿´ º±±¬·²¹­ ©·´´ ®·­»ò ׺ ¬¸»­°®»¿¼ ±º ³±·­¬«®» ·­ ®±«¹¸´§ »ª»²ô ·¬ ³¿§ ¾» ¬¸¿¬ ¬¸» ­§³°¬±³­ ©·´´¬»³°±®¿®·´§ ¼·­¿°°»¿®ô ¾«¬ ·¬ ·­ ³±®» ´·µ»´§ ¬¸¿¬ ­©»´´·²¹ ©·´´ ¾»«²»ª»²ô ½®»¿¬·²¹ ¿ ¼·ºº»®»²½» ®¿¬¸»® ¬¸¿² ¿ ¼·­¿°°»¿®¿²½» ·²­§³°¬±³­ò ײ ¾«·´¼·²¹­ ©·¬¸ ¬·³¾»® º´±±®·²¹ ­«°°±®¬»¼ ¾§ ¾»¿®»®­¿²¼ ¶±·­¬­ô ¬¸» ·­±´¿¬»¼ °·»®­ ©·´´ ®·­» ³±®» »¿­·´§ ¬¸¿² ¬¸» ­¬®·°º±±¬·²¹­ ±® °·»®­ «²¼»® ©¿´´­ô ½®»¿¬·²¹ ²±¬·½»¿¾´» ¼±³·²¹ ±º º´±±®·²¹ò

ß­ ¬¸» ©»¿¬¸»® °¿¬¬»®² ½¸¿²¹»­ ¿²¼ ¬¸» ­±·´ ¾»¹·²­ ¬± ¼®§ ±«¬ô ¬¸»»¨¬»®²¿´ º±±¬·²¹­ ©·´´ ¾» º·®­¬ ¿ºº»½¬»¼ô ¾»¹·²²·²¹ ©·¬¸ ¬¸» ´±½¿¬·±²­©¸»®» ¬¸» ­«²K­ »ºº»½¬ ·­ ­¬®±²¹»­¬ò ̸·­ ¸¿­ ¬¸» »ºº»½¬ ±º ´±©»®·²¹ ¬¸»»¨¬»®²¿´ º±±¬·²¹­ò ̸» ¼±³·²¹ ·­ ¿½½»²¬«¿¬»¼ ¿²¼ ½®¿½µ·²¹ ®»¼«½»­±® ¼·­¿°°»¿®­ ©¸»®» ·¬ ±½½«®®»¼ ¾»½¿«­» ±º ¼·­¸·²¹ô ¾«¬ ±¬¸»® ½®¿½µ­±°»² «°ò ̸» ®±±º ´·²»­ ³¿§ ¾»½±³» ½±²ª»¨ò

ܱ³·²¹ ¿²¼ ¼·­¸·²¹ ¿®» ¿´­± ¿ºº»½¬»¼ ¾§ ©»¿¬¸»® ·² ±¬¸»® ©¿§­ò ײ¿®»¿­ ©¸»®» ©¿®³ô ©»¬ ­«³³»®­ ¿²¼ ½±±´»® ¼®§ ©·²¬»®­ °®»ª¿·´ô©¿¬»® ³·¹®¿¬·±² ¬»²¼­ ¬± ¾» ¬±©¿®¼ ¬¸» ·²¬»®·±® ¿²¼ ¼±³·²¹ ©·´´ ¾»¿½½»²¬«¿¬»¼ô ©¸»®»¿­ ©¸»®» ­«³³»®­ ¿®» ¼®§ ¿²¼ ©·²¬»®­ ¿®» ½±´¼¿²¼ ©»¬ô ³·¹®¿¬·±² ¬»²¼­ ¬± ¾» ¬±©¿®¼ ¬¸» »¨¬»®·±® ¿²¼ ¬¸»«²¼»®´§·²¹ °®±°»²­·¬§ ·­ ¬±©¿®¼ ¼·­¸·²¹ò

Ó±ª»³»²¬ ½¿«­»¼ ¾§ ¬®»» ®±±¬­×² ¹»²»®¿´ô ¹®±©·²¹ ®±±¬­ ©·´´ »¨»®¬ ¿² «°©¿®¼ °®»­­«®» ±² º±±¬·²¹­ô©¸»®»¿­ ­±·´ ­«¾¶»½¬ ¬± ¼®§·²¹ ¾»½¿«­» ±º ¬®»» ±® ­¸®«¾ ®±±¬­ ©·´´ ¬»²¼¬± ®»³±ª» ­«°°±®¬ º®±³ «²¼»® º±±¬·²¹­ ¾§ ·²¼«½·²¹ ­¸®·²µ¿¹»ò

ݱ³°´·½¿¬·±²­ ½¿«­»¼ ¾§ ¬¸» ­¬®«½¬«®» ·¬­»´ºÓ±­¬ º±®½»­ ¬¸¿¬ ¬¸» ­±·´ ½¿«­»­ ¬± ¾» »¨»®¬»¼ ±² ­¬®«½¬«®»­ ¿®»ª»®¬·½¿´ P ·ò»ò »·¬¸»® «° ±® ¼±©²ò ر©»ª»®ô ¾»½¿«­» ¬¸»­» º±®½»­ ¿®»­»´¼±³ ­°®»¿¼ »ª»²´§ ¿®±«²¼ ¬¸» º±±¬·²¹­ô ¿²¼ ¾»½¿«­» ¬¸» ¾«·´¼·²¹®»­·­¬­ «²»ª»² ³±ª»³»²¬ ¾»½¿«­» ±º ·¬­ ®·¹·¼·¬§ô º±®½»­ ¿®» »¨»®¬»¼º®±³ ±²» °¿®¬ ±º ¬¸» ¾«·´¼·²¹ ¬± ¿²±¬¸»®ò ̸» ²»¬ ®»­«´¬ ±º ¿´´ ¬¸»­»º±®½»­ ·­ «­«¿´´§ ®±¬¿¬·±²¿´ò ̸·­ ®»­«´¬¿²¬ º±®½» ±º¬»² ½±³°´·½¿¬»­ ¬¸»¼·¿¹²±­·­ ¾»½¿«­» ¬¸» ª·­·¾´» ­§³°¬±³­ ¼± ²±¬ ­·³°´§ ®»º´»½¬ ¬¸»±®·¹·²¿´ ½¿«­»ò ß ½±³³±² ­§³°¬±³ ·­ ¾·²¼·²¹ ±º ¼±±®­ ±² ¬¸»ª»®¬·½¿´ ³»³¾»® ±º ¬¸» º®¿³»ò

Ûºº»½¬­ ±² º«´´ ³¿­±²®§ ­¬®«½¬«®»­Þ®·½µ©±®µ ©·´´ ®»­·­¬ ½®¿½µ·²¹ ©¸»®» ·¬ ½¿²ò ׬ ©·´´ ¿¬¬»³°¬ ¬± ­°¿²¿®»¿­ ¬¸¿¬ ´±­» ­«°°±®¬ ¾»½¿«­» ±º ­«¾­·¼»¼ º±«²¼¿¬·±²­ ±® ®¿·­»¼°±·²¬­ò ׬ ·­ ¬¸»®»º±®» «­«¿´ ¬± ­»» ½®¿½µ·²¹ ¿¬ ©»¿µ °±·²¬­ô ­«½¸ ¿­±°»²·²¹­ º±® ©·²¼±©­ ±® ¼±±®­ò

ײ ¬¸» »ª»²¬ ±º ½±²­¬®«½¬·±² ­»¬¬´»³»²¬ô ½®¿½µ·²¹ ©·´´ «­«¿´´§ ®»³¿·²«²½¸¿²¹»¼ ¿º¬»® ¬¸» °®±½»­­ ±º ­»¬¬´»³»²¬ ¸¿­ ½»¿­»¼ò

É·¬¸ ´±½¿´ ­¸»¿® ±® »®±­·±²ô ½®¿½µ·²¹ ©·´´ «­«¿´´§ ½±²¬·²«» ¬± ¼»ª»´±°«²¬·´ ¬¸» ±®·¹·²¿´ ½¿«­» ¸¿­ ¾»»² ®»³»¼·»¼ô ±® «²¬·´ ¬¸» ­«¾­·¼»²½»¸¿­ ½±³°´»¬»´§ ²»«¬®¿´·­»¼ ¬¸» ¿ºº»½¬»¼ °±®¬·±² ±º º±±¬·²¹ ¿²¼ ¬¸»­¬®«½¬«®» ¸¿­ ­¬¿¾·´·­»¼ ±² ±¬¸»® º±±¬·²¹­ ¬¸¿¬ ®»³¿·² »ºº»½¬·ª»ò

ײ ¬¸» ½¿­» ±º ­©»´´ñ­¸®·²µ »ºº»½¬­ô ¬¸» ¾®·½µ©±®µ ©·´´ ·² ­±³» ½¿­»­®»¬«®² ¬± ·¬­ ±®·¹·²¿´ °±­·¬·±² ¿º¬»® ½±³°´»¬·±² ±º ¿ ½§½´»ô ¸±©»ª»® ·¬·­ ³±®» ´·µ»´§ ¬¸¿¬ ¬¸» ®±¬¿¬·±²¿´ »ºº»½¬ ©·´´ ²±¬ ¾» »¨¿½¬´§ ®»ª»®­»¼ô¿²¼ ·¬ ·­ ¿´­± «­«¿´ ¬¸¿¬ ¾®·½µ©±®µ ©·´´ ­»¬¬´» ·² ·¬­ ²»© °±­·¬·±² ¿²¼©·´´ ®»­·­¬ ¬¸» º±®½»­ ¬®§·²¹ ¬± ®»¬«®² ·¬ ¬± ·¬­ ±®·¹·²¿´ °±­·¬·±²ò ̸·­³»¿²­ ¬¸¿¬ ·² ¿ ½¿­» ©¸»®» ­©»´´·²¹ ¬¿µ»­ °´¿½» ¿º¬»® ½±²­¬®«½¬·±²¿²¼ ½®¿½µ·²¹ ±½½«®­ô ¬¸» ½®¿½µ·²¹ ·­ ´·µ»´§ ¬± ¿¬ ´»¿­¬ °¿®¬´§ ®»³¿·²¿º¬»® ¬¸» ­¸®·²µ ­»¹³»²¬ ±º ¬¸» ½§½´» ·­ ½±³°´»¬»ò ̸«­ô »¿½¸ ¬·³»¬¸» ½§½´» ·­ ®»°»¿¬»¼ô ¬¸» ´·µ»´·¸±±¼ ·­ ¬¸¿¬ ¬¸» ½®¿½µ·²¹ ©·´´ ¾»½±³»©·¼»® «²¬·´ ¬¸» ­»½¬·±²­ ±º ¾®·½µ©±®µ ¾»½±³» ª·®¬«¿´´§ ·²¼»°»²¼»²¬ò

É·¬¸ ®»°»¿¬»¼ ½§½´»­ô ±²½» ¬¸» ½®¿½µ·²¹ ·­ »­¬¿¾´·­¸»¼ô ·º ¬¸»®» ·­ ²±±¬¸»® ½±³°´·½¿¬·±²ô ·¬ ·­ ²±®³¿´ º±® ¬¸» ·²½·¼»²½» ±º ½®¿½µ·²¹ ¬±­¬¿¾·´·­»ô ¿­ ¬¸» ¾«·´¼·²¹ ¸¿­ ¬¸» ¿®¬·½«´¿¬·±² ·¬ ²»»¼­ ¬± ½±°» ©·¬¸¬¸» °®±¾´»³ò ̸·­ ·­ ¾§ ²± ³»¿²­ ¿´©¿§­ ¬¸» ½¿­»ô ¸±©»ª»®ô ¿²¼³±²·¬±®·²¹ ±º ½®¿½µ­ ·² ©¿´´­ ¿²¼ º´±±®­ ­¸±«´¼ ¿´©¿§­ ¾» ¬®»¿¬»¼­»®·±«­´§ò

Ë°¸»¿ª¿´ ½¿«­»¼ ¾§ ¹®±©¬¸ ±º ¬®»» ®±±¬­ «²¼»® º±±¬·²¹­ ·­ ²±¬ ¿­·³°´» ª»®¬·½¿´ ­¸»¿® ­¬®»­­ò ̸»®» ·­ ¿ ¬»²¼»²½§ º±® ¬¸» ®±±¬ ¬± ¿´­±»¨»®¬ ´¿¬»®¿´ º±®½»­ ¬¸¿¬ ¿¬¬»³°¬ ¬± ­»°¿®¿¬» ­»½¬·±²­ ±º ¾®·½µ©±®µ¿º¬»® ·²·¬·¿´ ½®¿½µ·²¹ ¸¿­ ±½½«®®»¼ò

Ì®»»­ ½¿² ½¿«­» ­¸®·²µ¿¹» ¿²¼ ¼¿³¿¹»

Page 110: SITE CLASSIFICATION REPORT SUMMARY...Douglas Partners (DP) has prepared this report for this project at Taylor 2- Stage 3, Taylor in accordance with DP’s proposal dated 15 September

̸» ²±®³¿´ ­¬®«½¬«®¿´ ¿®®¿²¹»³»²¬ ·­ ¬¸¿¬ ¬¸» ·²²»® ´»¿º ±º ¾®·½µó©±®µ ·² ¬¸» »¨¬»®²¿´ ©¿´´­ ¿²¼ ¿¬ ´»¿­¬ ­±³» ±º ¬¸» ·²¬»®²¿´ ©¿´´­ø¼»°»²¼·²¹ ±² ¬¸» ®±±º ¬§°»÷ ½±³°®·­» ¬¸» ´±¿¼ó¾»¿®·²¹ ­¬®«½¬«®» ±²©¸·½¸ ¿²§ «°°»® º´±±®­ô ½»·´·²¹­ ¿²¼ ¬¸» ®±±º ¿®» ­«°°±®¬»¼ò ײ ¬¸»­»½¿­»­ô ·¬ ·­ ·²¬»®²¿´´§ ª·­·¾´» ½®¿½µ·²¹ ¬¸¿¬ ­¸±«´¼ ¾» ¬¸» ³¿·² º±½«­±º ¿¬¬»²¬·±²ô ¸±©»ª»® ¬¸»®» ¿®» ¿ º»© »¨¿³°´»­ ±º ¼©»´´·²¹­ ©¸±­»»¨¬»®²¿´ ´»¿º ±º ³¿­±²®§ °´¿§­ ­±³» ­«°°±®¬·²¹ ®±´»ô ­± ¬¸·­ ­¸±«´¼¾» ½¸»½µ»¼ ·º ¬¸»®» ·­ ¿²§ ¼±«¾¬ò ײ ¿²§ ½¿­»ô »¨¬»®²¿´´§ ª·­·¾´»½®¿½µ·²¹ ·­ ·³°±®¬¿²¬ ¿­ ¿ ¹«·¼» ¬± ­¬®»­­»­ ±² ¬¸» ­¬®«½¬«®» ¹»²»®¿´´§ô¿²¼ ·¬ ­¸±«´¼ ¿´­± ¾» ®»³»³¾»®»¼ ¬¸¿¬ ¬¸» »¨¬»®²¿´ ©¿´´­ ³«­¬ ¾»½¿°¿¾´» ±º ­«°°±®¬·²¹ ¬¸»³­»´ª»­ò

Ûºº»½¬­ ±² º®¿³»¼ ­¬®«½¬«®»­Ì·³¾»® ±® ­¬»»´ º®¿³»¼ ¾«·´¼·²¹­ ¿®» ´»­­ ´·µ»´§ ¬± »¨¸·¾·¬ ½®¿½µ·²¹¼«» ¬± ­©»´´ñ­¸®·²µ ¬¸¿² ³¿­±²®§ ¾«·´¼·²¹­ ¾»½¿«­» ±º ¬¸»·®º´»¨·¾·´·¬§ò ß´­±ô ¬¸» ¼±³·²¹ñ¼·­¸·²¹ »ºº»½¬­ ¬»²¼ ¬± ¾» ´±©»® ¾»½¿«­»±º ¬¸» ´·¹¸¬»® ©»·¹¸¬ ±º ©¿´´­ò ̸» ³¿·² ®·­µ­ ¬± º®¿³»¼ ¾«·´¼·²¹­ ¿®»»²½±«²¬»®»¼ ¾»½¿«­» ±º ¬¸» ·­±´¿¬»¼ °·»® º±±¬·²¹­ «­»¼ «²¼»® ©¿´´­òɸ»®» »®±­·±² ±® ­¿¬«®¿¬·±² ½¿«­» ¿ º±±¬·²¹ ¬± º¿´´ ¿©¿§ô ¬¸·­ ½¿²¼±«¾´» ¬¸» ­°¿² ©¸·½¸ ¿ ©¿´´ ³«­¬ ¾®·¼¹»ò ̸·­ ¿¼¼·¬·±²¿´ ­¬®»­­ ½¿²½®»¿¬» ½®¿½µ·²¹ ·² ©¿´´ ´·²·²¹­ô °¿®¬·½«´¿®´§ ©¸»®» ¬¸»®» ·­ ¿ ©»¿µ°±·²¬ ·² ¬¸» ­¬®«½¬«®» ½¿«­»¼ ¾§ ¿ ¼±±® ±® ©·²¼±© ±°»²·²¹ò ׬ ·­ô¸±©»ª»®ô «²´·µ»´§ ¬¸¿¬ º®¿³»¼ ­¬®«½¬«®»­ ©·´´ ¾» ­± ­¬®»­­»¼ ¿­ ¬± ­«ºº»®­»®·±«­ ¼¿³¿¹» ©·¬¸±«¬ º·®­¬ »¨¸·¾·¬·²¹ ­±³» ±® ¿´´ ±º ¬¸» ¿¾±ª»­§³°¬±³­ º±® ¿ ½±²­·¼»®¿¾´» °»®·±¼ò ̸» ­¿³» ©¿®²·²¹ °»®·±¼ ­¸±«´¼¿°°´§ ·² ¬¸» ½¿­» ±º «°¸»¿ª¿´ò ׬ ­¸±«´¼ ¾» ²±¬»¼ô ¸±©»ª»®ô ¬¸¿¬ ©¸»®»º®¿³»¼ ¾«·´¼·²¹­ ¿®» ­«°°±®¬»¼ ¾§ ­¬®·° º±±¬·²¹­ ¬¸»®» ·­ ±²´§ ±²» ´»¿º±º ¾®·½µ©±®µ ¿²¼ ¬¸»®»º±®» ¬¸» »¨¬»®²¿´´§ ª·­·¾´» ©¿´´­ ¿®» ¬¸»­«°°±®¬·²¹ ­¬®«½¬«®» º±® ¬¸» ¾«·´¼·²¹ò ײ ¬¸·­ ½¿­»ô ¬¸» ­«¾º´±±®³¿­±²®§ ©¿´´­ ½¿² ¾» »¨°»½¬»¼ ¬± ¾»¸¿ª» ¿­ º«´´ ¾®·½µ©±®µ ©¿´´­ò

Ûºº»½¬­ ±² ¾®·½µ ª»²»»® ­¬®«½¬«®»­Þ»½¿«­» ¬¸» ´±¿¼ó¾»¿®·²¹ ­¬®«½¬«®» ±º ¿ ¾®·½µ ª»²»»® ¾«·´¼·²¹ ·­ ¬¸»º®¿³» ¬¸¿¬ ³¿µ»­ «° ¬¸» ·²¬»®·±® ´»¿º ±º ¬¸» »¨¬»®²¿´ ©¿´´­ °´«­°»®¸¿°­ ¬¸» ·²¬»®²¿´ ©¿´´­ô ¼»°»²¼·²¹ ±² ¬¸» ¬§°» ±º ®±±ºô ¬¸»¾«·´¼·²¹ ½¿² ¾» »¨°»½¬»¼ ¬± ¾»¸¿ª» ¿­ ¿ º®¿³»¼ ­¬®«½¬«®»ô »¨½»°¬ ¬¸¿¬¬¸» »¨¬»®²¿´ ³¿­±²®§ ©·´´ ¾»¸¿ª» ·² ¿ ­·³·´¿® ©¿§ ¬± ¬¸» »¨¬»®²¿´ ´»¿º±º ¿ º«´´ ³¿­±²®§ ­¬®«½¬«®»ò

É¿¬»® Í»®ª·½» ¿²¼ Ü®¿·²¿¹»

ɸ»®» ¿ ©¿¬»® ­»®ª·½» °·°»ô ¿ ­»©»® ±® ­¬±®³©¿¬»® ¼®¿·²¿¹» °·°» ·­ ·²¬¸» ª·½·²·¬§ ±º ¿ ¾«·´¼·²¹ô ¿ ©¿¬»® ´»¿µ ½¿² ½¿«­» »®±­·±²ô ­©»´´·²¹ ±®­¿¬«®¿¬·±² ±º ­«­½»°¬·¾´» ­±·´ò Ûª»² ¿ ³·²«­½«´» ´»¿µ ½¿² ¾» »²±«¹¸¬± ­¿¬«®¿¬» ¿ ½´¿§ º±«²¼¿¬·±²ò ß ´»¿µ·²¹ ¬¿° ²»¿® ¿ ¾«·´¼·²¹ ½¿² ¸¿ª»¬¸» ­¿³» »ºº»½¬ò ײ ¿¼¼·¬·±²ô ¬®»²½¸»­ ½±²¬¿·²·²¹ °·°»­ ½¿² ¾»½±³»©¿¬»®½±«®­»­ »ª»² ¬¸±«¹¸ ¾¿½µº·´´»¼ô °¿®¬·½«´¿®´§ ©¸»®» ¾®±µ»²®«¾¾´» ·­ «­»¼ ¿­ º·´´ò É¿¬»® ¬¸¿¬ ®«²­ ¿´±²¹ ¬¸»­» ¬®»²½¸»­ ½¿² ¾»®»­°±²­·¾´» º±® ­»®·±«­ »®±­·±²ô ·²¬»®­¬®¿¬¿ ­»»°¿¹» ·²¬± ­«¾º´±±® ¿®»¿­¿²¼ ­¿¬«®¿¬·±²ò

з°» ´»¿µ¿¹» ¿²¼ ¬®»²½¸ ©¿¬»® º´±©­ ¿´­± »²½±«®¿¹» ¬®»» ¿²¼ ­¸®«¾®±±¬­ ¬± ¬¸» ­±«®½» ±º ©¿¬»®ô ½±³°´·½¿¬·²¹ ¿²¼ »¨¿½»®¾¿¬·²¹ ¬¸»°®±¾´»³òб±® ®±±º °´«³¾·²¹ ½¿² ®»­«´¬ ·² ´¿®¹» ª±´«³»­ ±º ®¿·²©¿¬»® ¾»·²¹½±²½»²¬®¿¬»¼ ·² ¿ ­³¿´´ ¿®»¿ ±º ­±·´æ

{ ײ½±®®»½¬ º¿´´­ ·² ®±±º ¹«¬¬»®·²¹ ³¿§ ®»­«´¬ ·² ±ª»®º´±©­ô ¿­ ³¿§¹«¬¬»®­ ¾´±½µ»¼ ©·¬¸ ´»¿ª»­ »¬½ò

{ ݱ®®±¼»¼ ¹«¬¬»®·²¹ ±® ¼±©²°·°»­ ½¿² ­°·´´ ©¿¬»® ¬± ¹®±«²¼ò

{ ܱ©²°·°»­ ²±¬ °±­·¬·ª»´§ ½±²²»½¬»¼ ¬± ¿ °®±°»® ­¬±®³©¿¬»®½±´´»½¬·±² ­§­¬»³ ©·´´ ¼·®»½¬ ¿ ½±²½»²¬®¿¬·±² ±º ©¿¬»® ¬± ­±·´ ¬¸¿¬ ·­¼·®»½¬´§ ¿¼¶¿½»²¬ ¬± º±±¬·²¹­ô ­±³»¬·³»­ ½¿«­·²¹ ´¿®¹»ó­½¿´»°®±¾´»³­ ­«½¸ ¿­ »®±­·±²ô ­¿¬«®¿¬·±² ¿²¼ ³·¹®¿¬·±² ±º ©¿¬»® «²¼»®¬¸» ¾«·´¼·²¹ò

Í»®·±«­²»­­ ±º Ý®¿½µ·²¹

ײ ¹»²»®¿´ô ³±­¬ ½®¿½µ·²¹ º±«²¼ ·² ³¿­±²®§ ©¿´´­ ·­ ¿ ½±­³»¬·½²«·­¿²½» ±²´§ ¿²¼ ½¿² ¾» µ»°¬ ·² ®»°¿·® ±® »ª»² ·¹²±®»¼ò ̸» ¬¿¾´»¾»´±© ·­ ¿ ®»°®±¼«½¬·±² ±º Ì¿¾´» Ýï ±º ßÍ îèéðò

ßÍ îèéð ¿´­± °«¾´·­¸»­ º·¹«®»­ ®»´¿¬·²¹ ¬± ½®¿½µ·²¹ ·² ½±²½®»¬» º´±±®­ô¸±©»ª»® ¾»½¿«­» ©¿´´ ½®¿½µ·²¹ ©·´´ «­«¿´´§ ®»¿½¸ ¬¸» ½®·¬·½¿´ °±·²¬­·¹²·º·½¿²¬´§ »¿®´·»® ¬¸¿² ½®¿½µ·²¹ ·² ­´¿¾­ô ¬¸·­ ¬¿¾´» ·­ ²±¬®»°®±¼«½»¼ ¸»®»ò

Ю»ª»²¬·±²ñÝ«®»

д«³¾·²¹É¸»®» ¾«·´¼·²¹ ³±ª»³»²¬ ·­ ½¿«­»¼ ¾§ ©¿¬»® ­»®ª·½»ô ®±±º °´«³¾·²¹ô­»©»® ±® ­¬±®³©¿¬»® º¿·´«®»ô ¬¸» ®»³»¼§ ·­ ¬± ®»°¿·® ¬¸» °®±¾´»³ò ׬ ·­ °®«¼»²¬ô ¸±©»ª»®ô ¬± ½±²­·¼»® ¿´­± ®»®±«¬·²¹ °·°»­ ¿©¿§ º®±³¬¸» ¾«·´¼·²¹ ©¸»®» °±­­·¾´»ô ¿²¼ ®»´±½¿¬·²¹ ¬¿°­ ¬± °±­·¬·±²­ ©¸»®»¿²§ ´»¿µ¿¹» ©·´´ ²±¬ ¼·®»½¬ ©¿¬»® ¬± ¬¸» ¾«·´¼·²¹ ª·½·²·¬§ò Ûª»² ©¸»®»¹«´´§ ¬®¿°­ ¿®» °®»­»²¬ô ¬¸»®» ·­ ­±³»¬·³»­ ­«ºº·½·»²¬ ­°·´´ ¬± ½®»¿¬»»®±­·±² ±® ­¿¬«®¿¬·±²ô °¿®¬·½«´¿®´§ ·² ³±¼»®² ·²­¬¿´´¿¬·±²­ «­·²¹­³¿´´»® ¼·¿³»¬»® ÐÊÝ º·¨¬«®»­ò ײ¼»»¼ô ­±³» ¹«´´§ ¬®¿°­ ¿®» ²±¬­·¬«¿¬»¼ ¼·®»½¬´§ «²¼»® ¬¸» ¬¿°­ ¬¸¿¬ ¿®» ·²­¬¿´´»¼ ¬± ½¸¿®¹» ¬¸»³ô©·¬¸ ¬¸» ®»­«´¬ ¬¸¿¬ ©¿¬»® º®±³ ¬¸» ¬¿° ³¿§ »²¬»® ¬¸» ¾¿½µº·´´»¼¬®»²½¸ ¬¸¿¬ ¸±«­»­ ¬¸» ­»©»® °·°·²¹ò ׺ ¬¸» ¬®»²½¸ ¸¿­ ¾»»² °±±®´§¾¿½µº·´´»¼ô ¬¸» ©¿¬»® ©·´´ »·¬¸»® °±²¼ ±® º´±© ¿´±²¹ ¬¸» ¾±¬¬±³ ±º¬¸» ¬®»²½¸ò ß­ ¬¸»­» ¬®»²½¸»­ «­«¿´´§ ®«² ¿´±²¹­·¼» ¬¸» º±±¬·²¹­ ¿²¼½¿² ¾» ¿¬ ¿ ­·³·´¿® ¼»°¬¸ô ·¬ ·­ ²±¬ ¸¿®¼ ¬± ­»» ¸±© ¿²§ ©¿¬»® ¬¸¿¬ ·­¬¸«­ ¼·®»½¬»¼ ·²¬± ¿ ¬®»²½¸ ½¿² »¿­·´§ ¿ºº»½¬ ¬¸» º±«²¼¿¬·±²K­ ¿¾·´·¬§ ¬±­«°°±®¬ º±±¬·²¹­ ±® »ª»² ¹¿·² »²¬®§ ¬± ¬¸» ­«¾º´±±® ¿®»¿ò

Ù®±«²¼ ¼®¿·²¿¹»×² ¿´´ ­±·´­ ¬¸»®» ·­ ¬¸» ½¿°¿½·¬§ º±® ©¿¬»® ¬± ¬®¿ª»´ ±² ¬¸» ­«®º¿½» ¿²¼¾»´±© ·¬ò Í«®º¿½» ©¿¬»® º´±©­ ½¿² ¾» »­¬¿¾´·­¸»¼ ¾§ ·²­°»½¬·±² ¼«®·²¹¿²¼ ¿º¬»® ¸»¿ª§ ±® °®±´±²¹»¼ ®¿·²ò ׺ ²»½»­­¿®§ô ¿ ¹®¿¬»¼ ¼®¿·² ­§­¬»³½±²²»½¬»¼ ¬± ¬¸» ­¬±®³©¿¬»® ½±´´»½¬·±² ­§­¬»³ ·­ «­«¿´´§ ¿² »¿­§­±´«¬·±²ò

׬ ·­ô ¸±©»ª»®ô ­±³»¬·³»­ ²»½»­­¿®§ ©¸»² ¿¬¬»³°¬·²¹ ¬± °®»ª»²¬©¿¬»® ³·¹®¿¬·±² ¬¸¿¬ ¬»­¬·²¹ ¾» ½¿®®·»¼ ±«¬ ¬± »­¬¿¾´·­¸ ©¿¬»®¬¿¾´»¸»·¹¸¬ ¿²¼ ­«¾­±·´ ©¿¬»® º´±©­ò ̸·­ ­«¾¶»½¬ ·­ ®»º»®®»¼ ¬± ·² ÞÌÚ ï翲¼ ³¿§ °®±°»®´§ ¾» ®»¹¿®¼»¼ ¿­ ¿² ¿®»¿ º±® ¿² »¨°»®¬ ½±²­«´¬¿²¬ò

Ю±¬»½¬·±² ±º ¬¸» ¾«·´¼·²¹ °»®·³»¬»®×¬ ·­ »­­»²¬·¿´ ¬± ®»³»³¾»® ¬¸¿¬ ¬¸» ­±·´ ¬¸¿¬ ¿ºº»½¬­ º±±¬·²¹­ »¨¬»²¼­©»´´ ¾»§±²¼ ¬¸» ¿½¬«¿´ ¾«·´¼·²¹ ´·²»ò É¿¬»®·²¹ ±º ¹¿®¼»² °´¿²¬­ô­¸®«¾­ ¿²¼ ¬®»»­ ½¿«­»­ ­±³» ±º ¬¸» ³±­¬ ­»®·±«­ ©¿¬»® °®±¾´»³­ò

Ú±® ¬¸·­ ®»¿­±²ô °¿®¬·½«´¿®´§ ©¸»®» °®±¾´»³­ »¨·­¬ ±® ¿®» ´·µ»´§ ¬±±½½«®ô ·¬ ·­ ®»½±³³»²¼»¼ ¬¸¿¬ ¿² ¿°®±² ±º °¿ª·²¹ ¾» ·²­¬¿´´»¼¿®±«²¼ ¿­ ³«½¸ ±º ¬¸» ¾«·´¼·²¹ °»®·³»¬»® ¿­ ²»½»­­¿®§ò ̸·­ °¿ª·²¹

ÝÔßÍÍ×Ú×ÝßÌ×ÑÒ ÑÚ ÜßÓßÙÛ É×ÌØ ÎÛÚÛÎÛÒÝÛ ÌÑ ÉßÔÔÍ

Ü»­½®·°¬·±² ±º ¬§°·½¿´ ¼¿³¿¹» ¿²¼ ®»¯«·®»¼ ®»°¿·® ß°°®±¨·³¿¬» ½®¿½µ ©·¼¬¸ Ü¿³¿¹»´·³·¬ ø­»» Ò±¬» í÷ ½¿¬»¹±®§

Ø¿·®´·²» ½®¿½µ­ äðòï ³³ ð

Ú·²» ½®¿½µ­ ©¸·½¸ ¼± ²±¬ ²»»¼ ®»°¿·® äï ³³ ï

Ý®¿½µ­ ²±¬·½»¿¾´» ¾«¬ »¿­·´§ º·´´»¼ò ܱ±®­ ¿²¼ ©·²¼±©­ ­¬·½µ ­´·¹¸¬´§ äë ³³ î

Ý®¿½µ­ ½¿² ¾» ®»°¿·®»¼ ¿²¼ °±­­·¾´§ ¿ ­³¿´´ ¿³±«²¬ ±º ©¿´´ ©·´´ ²»»¼ ëPïë ³³ ø±® ¿ ²«³¾»® ±º ½®¿½µ­ í¬± ¾» ®»°´¿½»¼ò ܱ±®­ ¿²¼ ©·²¼±©­ ­¬·½µò Í»®ª·½» °·°»­ ½¿² º®¿½¬«®»ò í ³³ ±® ³±®» ·² ±²» ¹®±«°÷É»¿¬¸»®¬·¹¸¬²»­­ ±º¬»² ·³°¿·®»¼

Û¨¬»²­·ª» ®»°¿·® ©±®µ ·²ª±´ª·²¹ ¾®»¿µ·²¹ó±«¬ ¿²¼ ®»°´¿½·²¹ ­»½¬·±²­ ±º ©¿´´­ô ïëPîë ³³ ¾«¬ ¿´­± ¼»°»²¼ ì»­°»½·¿´´§ ±ª»® ¼±±®­ ¿²¼ ©·²¼±©­ò É·²¼±© ¿²¼ ¼±±® º®¿³»­ ¼·­¬±®¬ò É¿´´­ ´»¿² ±² ²«³¾»® ±º ½®¿½µ­±® ¾«´¹» ²±¬·½»¿¾´§ô ­±³» ´±­­ ±º ¾»¿®·²¹ ·² ¾»¿³­ò Í»®ª·½» °·°»­ ¼·­®«°¬»¼

Page 111: SITE CLASSIFICATION REPORT SUMMARY...Douglas Partners (DP) has prepared this report for this project at Taylor 2- Stage 3, Taylor in accordance with DP’s proposal dated 15 September

­¸±«´¼ »¨¬»²¼ ±«¬©¿®¼­ ¿ ³·²·³«³ ±º çðð ³³ ø³±®» ·² ¸·¹¸´§®»¿½¬·ª» ­±·´÷ ¿²¼ ­¸±«´¼ ¸¿ª» ¿ ³·²·³«³ º¿´´ ¿©¿§ º®±³ ¬¸»¾«·´¼·²¹ ±º ïæêðò ̸» º·²·­¸»¼ °¿ª·²¹ ­¸±«´¼ ¾» ²± ´»­­ ¬¸¿² ïðð³³ ¾»´±© ¾®·½µ ª»²¬ ¾¿­»­ò

׬ ·­ °®«¼»²¬ ¬± ®»´±½¿¬» ¼®¿·²¿¹» °·°»­ ¿©¿§ º®±³ ¬¸·­ °¿ª·²¹ô ·º°±­­·¾´»ô ¬± ¿ª±·¼ ½±³°´·½¿¬·±²­ º®±³ º«¬«®» ´»¿µ¿¹»ò ׺ ¬¸·­ ·­ ²±¬°®¿½¬·½¿´ô »¿®¬¸»²©¿®» °·°»­ ­¸±«´¼ ¾» ®»°´¿½»¼ ¾§ ÐÊÝ ¿²¼¾¿½µº·´´·²¹ ­¸±«´¼ ¾» ±º ¬¸» ­¿³» ­±·´ ¬§°» ¿­ ¬¸» ­«®®±«²¼·²¹ ­±·´¿²¼ ½±³°¿½¬»¼ ¬± ¬¸» ­¿³» ¼»²­·¬§ò

Û¨½»°¬ ·² ¿®»¿­ ©¸»®» º®»»¦·²¹ ±º ©¿¬»® ·­ ¿² ·­­«»ô ·¬ ·­ ©·­» ¬±®»³±ª» ¬¿°­ ·² ¬¸» ¾«·´¼·²¹ ¿®»¿ ¿²¼ ®»´±½¿¬» ¬¸»³ ©»´´ ¿©¿§ º®±³¬¸» ¾«·´¼·²¹ P °®»º»®¿¾´§ ²±¬ «°¸·´´ º®±³ ·¬ ø­»» ÞÌÚ ïç÷ò

׬ ³¿§ ¾» ¼»­·®¿¾´» ¬± ·²­¬¿´´ ¿ ¹®¿¬»¼ ¼®¿·² ¿¬ ¬¸» ±«¬­·¼» »¼¹» ±º ¬¸»°¿ª·²¹ ±² ¬¸» «°¸·´´ ­·¼» ±º ¬¸» ¾«·´¼·²¹ò ׺ ­«¾­±·´ ¼®¿·²¿¹» ·­²»»¼»¼ ¬¸·­ ½¿² ¾» ·²­¬¿´´»¼ «²¼»® ¬¸» ­«®º¿½» ¼®¿·²ò

ݱ²¼»²­¿¬·±²×² ¾«·´¼·²¹­ ©·¬¸ ¿ ­«¾º´±±® ª±·¼ ­«½¸ ¿­ ©¸»®» ¾»¿®»®­ ¿²¼ ¶±·­¬­­«°°±®¬ º´±±®·²¹ô ·²­«ºº·½·»²¬ ª»²¬·´¿¬·±² ½®»¿¬»­ ·¼»¿´ ½±²¼·¬·±²­ º±®½±²¼»²­¿¬·±²ô °¿®¬·½«´¿®´§ ©¸»®» ¬¸»®» ·­ ´·¬¬´» ½´»¿®¿²½» ¾»¬©»»² ¬¸»º´±±® ¿²¼ ¬¸» ¹®±«²¼ò ݱ²¼»²­¿¬·±² ¿¼¼­ ¬± ¬¸» ³±·­¬«®» ¿´®»¿¼§°®»­»²¬ ·² ¬¸» ­«¾º´±±® ¿²¼ ­·¹²·º·½¿²¬´§ ­´±©­ ¬¸» °®±½»­­ ±º ¼®§·²¹±«¬ò ײ­¬¿´´¿¬·±² ±º ¿² ¿¼»¯«¿¬» ­«¾º´±±® ª»²¬·´¿¬·±² ­§­¬»³ô »·¬¸»®²¿¬«®¿´ ±® ³»½¸¿²·½¿´ô ·­ ¼»­·®¿¾´»ò

É¿®²·²¹æ ß´¬¸±«¹¸ ¬¸·­ Þ«·´¼·²¹ Ì»½¸²±´±¹§ Ú·´» ¼»¿´­ ©·¬¸½®¿½µ·²¹ ·² ¾«·´¼·²¹­ô ·¬ ­¸±«´¼ ¾» ­¿·¼ ¬¸¿¬ ­«¾º´±±® ³±·­¬«®» ½¿²®»­«´¬ ·² ¬¸» ¼»ª»´±°³»²¬ ±º ±¬¸»® °®±¾´»³­ô ²±¬¿¾´§æ

{ É¿¬»® ¬¸¿¬ ·­ ¬®¿²­³·¬¬»¼ ·²¬± ³¿­±²®§ô ³»¬¿´ ±® ¬·³¾»® ¾«·´¼·²¹»´»³»²¬­ ½¿«­»­ ¼¿³¿¹» ¿²¼ñ±® ¼»½¿§ ¬± ¬¸±­» »´»³»²¬­ò

{ Ø·¹¸ ­«¾º´±±® ¸«³·¼·¬§ ¿²¼ ³±·­¬«®» ½±²¬»²¬ ½®»¿¬» ¿² ·¼»¿´»²ª·®±²³»²¬ º±® ª¿®·±«­ °»­¬­ô ·²½´«¼·²¹ ¬»®³·¬»­ ¿²¼ ­°·¼»®­ò

{ ɸ»®» ¸·¹¸ ³±·­¬«®» ´»ª»´­ ¿®» ¬®¿²­³·¬¬»¼ ¬± ¬¸» º´±±®·²¹ ¿²¼©¿´´­ô ¿² ·²½®»¿­» ·² ¬¸» ¼«­¬ ³·¬» ½±«²¬ ½¿² »²­«» ©·¬¸·² ¬¸»´·ª·²¹ ¿®»¿­ò Ü«­¬ ³·¬»­ô ¿­ ©»´´ ¿­ ¼¿³°²»­­ ·² ¹»²»®¿´ô ½¿² ¾» ¿¸»¿´¬¸ ¸¿¦¿®¼ ¬± ·²¸¿¾·¬¿²¬­ô °¿®¬·½«´¿®´§ ¬¸±­» ©¸± ¿®»¿¾²±®³¿´´§ ­«­½»°¬·¾´» ¬± ®»­°·®¿¬±®§ ¿·´³»²¬­ò

̸» ¹¿®¼»²Ì¸» ·¼»¿´ ª»¹»¬¿¬·±² ´¿§±«¬ ·­ ¬± ¸¿ª» ´¿©² ±® °´¿²¬­ ¬¸¿¬ ®»¯«·®»±²´§ ´·¹¸¬ ©¿¬»®·²¹ ·³³»¼·¿¬»´§ ¿¼¶¿½»²¬ ¬± ¬¸» ¼®¿·²¿¹» ±® °¿ª·²¹»¼¹»ô ¬¸»² ³±®» ¼»³¿²¼·²¹ °´¿²¬­ô ­¸®«¾­ ¿²¼ ¬®»»­ ­°®»¿¼ ±«¬ ·²¬¸¿¬ ±®¼»®ò

Ѫ»®©¿¬»®·²¹ ¼«» ¬± ³·­«­» ±º ¿«¬±³¿¬·½ ©¿¬»®·²¹ ­§­¬»³­ ·­ ¿½±³³±² ½¿«­» ±º ­¿¬«®¿¬·±² ¿²¼ ©¿¬»® ³·¹®¿¬·±² «²¼»® º±±¬·²¹­ò ׺·¬ ·­ ²»½»­­¿®§ ¬± «­» ¬¸»­» ­§­¬»³­ô ·¬ ·­ ·³°±®¬¿²¬ ¬± ®»³±ª» ¹¿®¼»²¾»¼­ ¬± ¿ ½±³°´»¬»´§ ­¿º» ¼·­¬¿²½» º®±³ ¾«·´¼·²¹­ò

Û¨·­¬·²¹ ¬®»»­É¸»®» ¿ ¬®»» ·­ ½¿«­·²¹ ¿ °®±¾´»³ ±º ­±·´ ¼®§·²¹ ±® ¬¸»®» ·­ ¬¸»»¨·­¬»²½» ±® ¬¸®»¿¬ ±º «°¸»¿ª¿´ ±º º±±¬·²¹­ô ·º ¬¸» ±ºº»²¼·²¹ ®±±¬­ ¿®»­«¾­·¼·¿®§ ¿²¼ ¬¸»·® ®»³±ª¿´ ©·´´ ²±¬ ­·¹²·º·½¿²¬´§ ¼¿³¿¹» ¬¸» ¬®»»ô¬¸»§ ­¸±«´¼ ¾» ­»ª»®»¼ ¿²¼ ¿ ½±²½®»¬» ±® ³»¬¿´ ¾¿®®·»® °´¿½»¼ª»®¬·½¿´´§ ·² ¬¸» ­±·´ ¬± °®»ª»²¬ º«¬«®» ®±±¬ ¹®±©¬¸ ·² ¬¸» ¼·®»½¬·±² ±º¬¸» ¾«·´¼·²¹ò ׺ ·¬ ·­ ²±¬ °±­­·¾´» ¬± ®»³±ª» ¬¸» ®»´»ª¿²¬ ®±±¬­©·¬¸±«¬ ¼¿³¿¹» ¬± ¬¸» ¬®»»ô ¿² ¿°°´·½¿¬·±² ¬± ®»³±ª» ¬¸» ¬®»» ­¸±«´¼¾» ³¿¼» ¬± ¬¸» ´±½¿´ ¿«¬¸±®·¬§ò ß °®«¼»²¬ °´¿² ·­ ¬± ¬®¿²­°´¿²¬ ´·µ»´§±ºº»²¼»®­ ¾»º±®» ¬¸»§ ¾»½±³» ¿ °®±¾´»³ò

ײº±®³¿¬·±² ±² ¬®»»­ô °´¿²¬­ ¿²¼ ­¸®«¾­Í¬¿¬» ¼»°¿®¬³»²¬­ ±ª»®­»»·²¹ ¿¹®·½«´¬«®» ½¿² ¹·ª» ·²º±®³¿¬·±²®»¹¿®¼·²¹ ®±±¬ °¿¬¬»®²­ô ª±´«³» ±º ©¿¬»® ²»»¼»¼ ¿²¼ ­¿º» ¼·­¬¿²½»º®±³ ¾«·´¼·²¹­ ±º ³±­¬ ­°»½·»­ò Þ±¬¿²·½ ¹¿®¼»²­ ¿®» ¿´­± ­±«®½»­ ±º·²º±®³¿¬·±²ò Ú±® ·²º±®³¿¬·±² ±² °´¿²¬ ®±±¬­ ¿²¼ ¼®¿·²­ô ­»» Þ«·´¼·²¹Ì»½¸²±´±¹§ Ú·´» ïéò

Û¨½¿ª¿¬·±²Û¨½¿ª¿¬·±² ¿®±«²¼ º±±¬·²¹­ ³«­¬ ¾» °®±°»®´§ »²¹·²»»®»¼ò ͱ·´­«°°±®¬·²¹ º±±¬·²¹­ ½¿² ±²´§ ¾» ­¿º»´§ »¨½¿ª¿¬»¼ ¿¬ ¿² ¿²¹´» ¬¸¿¬¿´´±©­ ¬¸» ­±·´ «²¼»® ¬¸» º±±¬·²¹ ¬± ®»³¿·² ­¬¿¾´»ò ̸·­ ¿²¹´» ·­½¿´´»¼ ¬¸» ¿²¹´» ±º ®»°±­» ø±® º®·½¬·±²÷ ¿²¼ ª¿®·»­ ­·¹²·º·½¿²¬´§¾»¬©»»² ­±·´ ¬§°»­ ¿²¼ ½±²¼·¬·±²­ò λ³±ª¿´ ±º ­±·´ ©·¬¸·² ¬¸» ¿²¹´»±º ®»°±­» ©·´´ ½¿«­» ­«¾­·¼»²½»ò

λ³»¼·¿¬·±²

ɸ»®» »®±­·±² ¸¿­ ±½½«®®»¼ ¬¸¿¬ ¸¿­ ©¿­¸»¼ ¿©¿§ ­±·´ ¿¼¶¿½»²¬ ¬±º±±¬·²¹­ô ­±·´ ±º ¬¸» ­¿³» ½´¿­­·º·½¿¬·±² ­¸±«´¼ ¾» ·²¬®±¼«½»¼ ¿²¼½±³°¿½¬»¼ ¬± ¬¸» ­¿³» ¼»²­·¬§ò ɸ»®» º±±¬·²¹­ ¸¿ª» ¾»»²«²¼»®³·²»¼ô ¿«¹³»²¬¿¬·±² ±® ±¬¸»® ­°»½·¿´·­¬ ©±®µ ³¿§ ¾» ®»¯«·®»¼òλ³»¼·¿¬·±² ±º º±±¬·²¹­ ¿²¼ º±«²¼¿¬·±²­ ·­ ¹»²»®¿´´§ ¬¸» ®»¿´³ ±º ¿­°»½·¿´·­¬ ½±²­«´¬¿²¬ò

ɸ»®» ·­±´¿¬»¼ º±±¬·²¹­ ®·­» ¿²¼ º¿´´ ¾»½¿«­» ±º ­©»´´ñ­¸®·²µ »ºº»½¬ô¬¸» ¸±³»±©²»® ³¿§ ¾» ¬»³°¬»¼ ¬± ¿´´»ª·¿¬» º´±±® ¾±«²½» ¾§ º·´´·²¹¬¸» ¹¿° ¬¸¿¬ ¸¿­ ¿°°»¿®»¼ ¾»¬©»»² ¬¸» ¾»¿®»® ¿²¼ ¬¸» °·»® ©·¬¸¾´±½µ·²¹ò ̸» ¼¿²¹»® ¸»®» ·­ ¬¸¿¬ ©¸»² ¬¸» ²»¨¬ ­©»´´ ­»¹³»²¬ ±º ¬¸»½§½´» ±½½«®­ô ¬¸» »¨¬®¿ ¾´±½µ·²¹ ©·´´ °«­¸ ¬¸» º´±±® «° ·²¬± ¿²¿½½»²¬«¿¬»¼ ¼±³» ¿²¼ ³¿§ ¿´­± ½¿«­» ´±½¿´ ­¸»¿® º¿·´«®» ·² ¬¸» ­±·´ò׺ ·¬ ·­ ²»½»­­¿®§ ¬± «­» ¾´±½µ·²¹ô ·¬ ­¸±«´¼ ¾» ¾§ ¿ °¿·® ±º º·²»©»¼¹»­ ¿²¼ ³±²·¬±®·²¹ ­¸±«´¼ ¾» ½¿®®·»¼ ±«¬ º±®¬²·¹¸¬´§ò

̸·­ ÞÌÚ ©¿­ °®»°¿®»¼ ¾§ Ö±¸² Ô»©»® Úß×Þô Ó×ßÓßô ﮬ²»®ô

ݱ²­¬®«½¬·±² Ü·¿¹²±­·­ò

̸» ·²º±®³¿¬·±² ·² ¬¸·­ ¿²¼ ±¬¸»® ·­­«»­ ·² ¬¸» ­»®·»­ ©¿­ ¼»®·ª»¼ º®±³ ª¿®·±«­ ­±«®½»­ ¿²¼ ©¿­ ¾»´·»ª»¼ ¬± ¾» ½±®®»½¬ ©¸»² °«¾´·­¸»¼ò

̸» ·²º±®³¿¬·±² ·­ ¿¼ª·­±®§ò ׬ ·­ °®±ª·¼»¼ ·² ¹±±¼ º¿·¬¸ ¿²¼ ²±¬ ½´¿·³»¼ ¬± ¾» ¿² »¨¸¿«­¬·ª» ¬®»¿¬³»²¬ ±º ¬¸» ®»´»ª¿²¬ ­«¾¶»½¬ò

Ú«®¬¸»® °®±º»­­·±²¿´ ¿¼ª·½» ²»»¼­ ¬± ¾» ±¾¬¿·²»¼ ¾»º±®» ¬¿µ·²¹ ¿²§ ¿½¬·±² ¾¿­»¼ ±² ¬¸» ·²º±®³¿¬·±² °®±ª·¼»¼ò

Ü·­¬®·¾«¬»¼ ¾§

ÝÍ×ÎÑ ÐËÞÔ ×ÍØ ×ÒÙ ÐÑ Þ±¨ ïïíçô ݱ´´·²¹©±±¼ íðêêô ß«­¬®¿´·¿

Ú®»»½¿´´ ïèðð êìë ðëï Ì»´ øðí÷ çêêî éêêê Ú¿¨ øðí÷ çêêî éëëë ©©©ò°«¾´·­¸ò½­·®±ò¿«

Û³¿·´æ °«¾´·­¸·²¹ò­¿´»­à½­·®±ò¿«

w ÝÍ×ÎÑ îððíò ˲¿«¬¸±®·­»¼ ½±°§·²¹ ±º ¬¸·­ Þ«·´¼·²¹ Ì»½¸²±´±¹§ º·´» ·­ °®±¸·¾·¬»¼

Ù¿®¼»²­ º±® ¿ ®»¿½¬·ª» ­·¬»

Page 112: SITE CLASSIFICATION REPORT SUMMARY...Douglas Partners (DP) has prepared this report for this project at Taylor 2- Stage 3, Taylor in accordance with DP’s proposal dated 15 September

TOPSOIL FILLING-dry to moist, brown silty sand

FILLING-generally comprising well compacted, dry tomoist, orange red brown, medium plasticity sandy siltyclay

SILTY CLAY-very stiff, dry to moist, yellow brown, mediumplasticity silty clay with some fine grained gravel

SILTY SAND-hard, dry to moist, brown, fine to coarsegrained silty sand with some clay

SILTY SANDY CLAY-hard, dry to moist, yellow greybrown, low to medium plasticity silty sandy clay

Pit discontinued at 1.85m-limit of investigation

0.1

0.7

1.4

1.6

1.85

SAMPLING & IN SITU TESTING LEGEND

TEST PIT LOG

Taylor 2 Estate, Stage 3, Taylor

A Auger sample G Gas sample PID Photo ionisation detector (ppm)B Bulk sample P Piston sample PL(A) Point load axial test Is(50) (MPa)BLK Block sample Ux Tube sample (x mm dia.) PL(D) Point load diametral test Is(50) (MPa)C Core drilling W Water sample pp Pocket penetrometer (kPa)D Disturbed sample Water seep S Standard penetration testE Environmental sample Water level V Shear vane (kPa)

Indesco Consulting Engineers Pty LtdSite Classifications

Results &Comments

LOGGED: JPM SURVEY DATUM: MGA94

CLIENT:PROJECT:LOCATION:

PIT No: 54PROJECT No: 77418.29DATE: 11/1/2019SHEET 1 OF 1

Sampling & In Situ Testing

1

2

Wat

er

Dep

th

Sam

ple

Description

of

Strata Gra

phic

Log

Typ

e

REMARKS: Surface Levels & Coordinates are approximate only and must not be relied upon

RIG: Kubota KX057-4 mini-excavator with 300mm wide bucket

WATER OBSERVATIONS: No free groundwater observed

SURFACE LEVEL: 662.0 AHDEASTING: 209147NORTHING: 618759

Dynamic Penetrometer Test(blows per mm)

5 10 15 20

Cone Penetrometer AS1289.6.3.2Sand Penetrometer AS1289.6.3.3

Depth(m) R

L

1

2

662

661

660

D

D

D

0.8

1.5

1.7

pp = 370

Page 113: SITE CLASSIFICATION REPORT SUMMARY...Douglas Partners (DP) has prepared this report for this project at Taylor 2- Stage 3, Taylor in accordance with DP’s proposal dated 15 September

TOPSOIL FILLING-dry to moist, brown silty sand

FILLING-generally comprising well compacted, dry tomoist, orange brown, medium plasticity sandy silty clay

SILTY SANDY GRAVEL--medium dense, dry to moist,yellow brown, fine to coarse grained silty sandy gravel

SILTY SANDY CLAY-hard, dry to moist, orange brown,medium plasticity silty sandy clay

SILTSTONE-very low to low strength, highly weathered,grey red brown, fine grained siltstone, highly fractured

Pit discontinued at 1.9m-limit of investigation

0.1

0.5

0.8

1.4

1.9

SAMPLING & IN SITU TESTING LEGEND

TEST PIT LOG

Taylor 2 Estate, Stage 3, Taylor

A Auger sample G Gas sample PID Photo ionisation detector (ppm)B Bulk sample P Piston sample PL(A) Point load axial test Is(50) (MPa)BLK Block sample Ux Tube sample (x mm dia.) PL(D) Point load diametral test Is(50) (MPa)C Core drilling W Water sample pp Pocket penetrometer (kPa)D Disturbed sample Water seep S Standard penetration testE Environmental sample Water level V Shear vane (kPa)

Indesco Consulting Engineers Pty LtdSite Classifications

Results &Comments

LOGGED: JPM SURVEY DATUM: MGA94

CLIENT:PROJECT:LOCATION:

PIT No: 55PROJECT No: 77418.29DATE: 11/1/2019SHEET 1 OF 1

Sampling & In Situ Testing

1

2

Wat

er

Dep

th

Sam

ple

Description

of

Strata Gra

phic

Log

Typ

e

REMARKS: Surface Levels & Coordinates are approximate only and must not be relied upon

RIG: Kubota KX057-4 mini-excavator with 300mm wide bucket

WATER OBSERVATIONS: No free groundwater observed

SURFACE LEVEL: 663.0 AHDEASTING: 209167NORTHING: 618782

Dynamic Penetrometer Test(blows per mm)

5 10 15 20

Cone Penetrometer AS1289.6.3.2Sand Penetrometer AS1289.6.3.3

Depth(m) R

L

1

2

663

662

661

D

D

D

0.6

1.2

1.5

pp >400

Page 114: SITE CLASSIFICATION REPORT SUMMARY...Douglas Partners (DP) has prepared this report for this project at Taylor 2- Stage 3, Taylor in accordance with DP’s proposal dated 15 September
Page 115: SITE CLASSIFICATION REPORT SUMMARY...Douglas Partners (DP) has prepared this report for this project at Taylor 2- Stage 3, Taylor in accordance with DP’s proposal dated 15 September

SITE CLASSIFICATION REPORT SUMMARY

BLOCK: 7 SECTION: 64 SUBURB: Taylor

JOB No: 77418.29 DATE: March 2019

CLIENT: Indesco Consulting Engineers Pty Ltd

Classification Procedures: Existing Subsurface Conditions: Refer attached test pit log(s) – Pit(s) 54,55 and Drawing 1. Bulk Earthworks: Filling within the block placed under Level 1 control as defined in AS 3798 – 2007 (Ref 1). Laboratory Results: Previous laboratory testing results indicated liquid limit ranging from 25-66%, plasticity index ranging from 6-49% and linear shrinkage ranging from 3-20.5%.

Site Classification: Class M* (moderately reactive/filled) based on the current profile / state on limited subsurface information and determined in general accordance with the requirements of AS2870-2011 (Ref 2). The classification must be reassessed should the soil profile change either by adding fill or removing soil from the block and/or if the presence of service trenches or retaining walls are within the zone of influence of the block. Reference should be made to the comments provided below.

Footing Systems: Reference must be made to AS2870-2011 (Ref 2) which indicates footing systems that are appropriate for each site classification. All footings must found within a uniform bearing stratum of suitable strength/material, below the zone of influence of any service trenches, backfill zones, retaining walls or underground structures. Masonry walls should be articulated in accordance with current best practice. Dwelling design must ensure uniform moisture conditions are maintained in the vicinity of footings. Footing systems must be confirmed by a structural engineer taking into consideration any onsite or offsite constraints.

Maintenance Guidelines: Reference should be made to the attached CSIRO Sheet BTF 18 ‘Foundation Maintenance & Footing Performance’ to comments about gardens, landscaping and trees on the performance of foundation soils and in particular in respect to maintaining good surface drainage. It notes that minor cracking in most structures is inevitable, and it describes site maintenance practices aimed at minimising foundation movements that can lead to cracking damage.

Comments/ Limitations:

The successful purchaser must make their own interpretations, deductions and conclusions from the information made available and will need to accept full responsibility for such interpretations, deductions and conclusions.

Development specific geotechnical investigations must be undertaken.

Additional topsoils / filling may have been spread subsequent to the investigation.

Site preparation prior to the construction should include removal of all vegetation, topsoil and any uncontrolled filling.

All new filling must be placed under controlled conditions (AS 3798-2007), otherwise Class P conditions would be warranted.

Some variability in subsurface conditions must be anticipated.

Moisture condition of site soils and/or the presence of groundwater may vary considerably from time of investigation compared to at the time of construction.

Depending on the depth of site cut and trenches, rock excavation may be required.

It is recommended that footing excavations be inspected by a geotechnical engineer.

This report must be read in conjunction with the attached “Limitations” and notes “About this Report”.

References:

1. 2.

AS 3798-2007 ‘Guidelines on Earthworks for Commercial and Residential Developments’, Standards Association of Australia. AS 2870-2011 ‘Residential Slabs and Footings,’ Standards Association of Australia.

Attachments:

Limitations & About this Report Explanatory Notes Test Pit Log(s) Pit(s) 54,55 Drawing 1

Page 116: SITE CLASSIFICATION REPORT SUMMARY...Douglas Partners (DP) has prepared this report for this project at Taylor 2- Stage 3, Taylor in accordance with DP’s proposal dated 15 September

FS 604853

Douglas Partners Pty Ltd ABN 75 053 980 117

www.douglaspartners.com.au Unit 2, 73 Sheppard Street

Hume ACT 2620 PO Box 1487

Fyshwick ACT 2609 Phone (02) 6260 2788

Fax (02) 6260 1147

Brisbane • Cairns • Canberra • Central Coast • Coffs Harbour • Darwin • Geelong • Gold Coast • Macarthur • Melbourne Newcastle • North West Sydney • Perth • Port Macquarie • Sunshine Coast • Sydney • Townsville • Wollongong

Limitations Douglas Partners (DP) has prepared this report for this project at Taylor 2 - Stage 3, Taylor in accordance with DP’s proposal dated 15 September 2017 and acceptance received from Indesco Consulting Engineers Pty Ltd dated 13 March 2019. The work was carried out under DP’s Conditions of Engagement. This report is provided for the exclusive use of Indesco Consulting Engineers Pty Ltd for this project only and for the purposes as described in the report. It should not be used by or relied upon for other projects or purposes on the same or other site or by a third party. Any party so relying upon this report beyond its exclusive use and purpose as stated above, and without the express written consent of DP, does so entirely at its own risk and without recourse to DP for any loss or damage. In preparing this report DP has necessarily relied upon information provided by the client and/or their agents. The results provided in the report are indicative of the sub-surface conditions on the site only at the specific sampling and/or testing locations, and then only to the depths investigated and at the time the work was carried out. Sub-surface conditions can change abruptly due to variable geological processes and also as a result of human influences. Such changes may occur after DP’s field testing has been completed. DP’s advice is based upon the conditions encountered during this investigation. The accuracy of the advice provided by DP in this report may be affected by undetected variations in ground conditions across the site between and beyond the sampling and/or testing locations. The advice may also be limited by budget constraints imposed by others or by site accessibility. This report must be read in conjunction with all of the attached and should be kept in its entirety without separation of individual pages or sections. DP cannot be held responsible for interpretations or conclusions made by others unless they are supported by an expressed statement, interpretation, outcome or conclusion stated in this report. This report, or sections from this report, should not be used as part of a specification for a project, without review and agreement by DP. This is because this report has been written as advice and opinion rather than instructions for construction. The scope for work for this investigation/report did not include the assessment of surface or sub-surface materials or groundwater for contaminants, within or adjacent to the site. Should evidence of filling of unknown origin be noted in the report, and in particular the presence of building demolition materials, it should be recognised that there may be some risk that such filling may contain contaminants and hazardous building materials. The contents of this report do not constitute formal design components such as are required, by the Health and Safety Legislation and Regulations, to be included in a Safety Report specifying the hazards likely to be encountered during construction and the controls required to mitigate risk. This design process requires risk assessment to be undertaken, with such assessment being dependent upon factors relating to likelihood of occurrence and consequences of damage to property and to life. This, in turn, requires project data and analysis presently beyond the knowledge and project role respectively of DP. DP may be able, however, to assist the client in carrying out a risk assessment of potential hazards contained in the Comments section of this report, as an extension to the current scope of works, if so requested, and provided that suitable additional information is made available to DP. Any such risk assessment would, however, be necessarily restricted to the geotechnical components set out in this report and to their application by the project designers to project design, construction, maintenance and demolition.

Page 117: SITE CLASSIFICATION REPORT SUMMARY...Douglas Partners (DP) has prepared this report for this project at Taylor 2- Stage 3, Taylor in accordance with DP’s proposal dated 15 September

July 2010

Introduction These notes have been provided to amplify DP's report in regard to classification methods, field procedures and the comments section. Not all are necessarily relevant to all reports. DP's reports are based on information gained from limited subsurface excavations and sampling, supplemented by knowledge of local geology and experience. For this reason, they must be regarded as interpretive rather than factual documents, limited to some extent by the scope of information on which they rely. Copyright This report is the property of Douglas Partners Pty Ltd. The report may only be used for the purpose for which it was commissioned and in accordance with the Conditions of Engagement for the commission supplied at the time of proposal. Unauthorised use of this report in any form whatsoever is prohibited. Borehole and Test Pit Logs The borehole and test pit logs presented in this report are an engineering and/or geological interpretation of the subsurface conditions, and their reliability will depend to some extent on frequency of sampling and the method of drilling or excavation. Ideally, continuous undisturbed sampling or core drilling will provide the most reliable assessment, but this is not always practicable or possible to justify on economic grounds. In any case the boreholes and test pits represent only a very small sample of the total subsurface profile. Interpretation of the information and its application to design and construction should therefore take into account the spacing of boreholes or pits, the frequency of sampling, and the possibility of other than 'straight line' variations between the test locations. Groundwater Where groundwater levels are measured in boreholes there are several potential problems, namely: • In low permeability soils groundwater may

enter the hole very slowly or perhaps not at all during the time the hole is left open;

• A localised, perched water table may lead to an erroneous indication of the true water table;

• Water table levels will vary from time to time with seasons or recent weather changes. They may not be the same at the time of construction as are indicated in the report; and

• The use of water or mud as a drilling fluid will mask any groundwater inflow. Water has to be blown out of the hole and drilling mud must first be washed out of the hole if water measurements are to be made.

More reliable measurements can be made by installing standpipes which are read at intervals over several days, or perhaps weeks for low permeability soils. Piezometers, sealed in a particular stratum, may be advisable in low permeability soils or where there may be interference from a perched water table. Reports The report has been prepared by qualified personnel, is based on the information obtained from field and laboratory testing, and has been undertaken to current engineering standards of interpretation and analysis. Where the report has been prepared for a specific design proposal, the information and interpretation may not be relevant if the design proposal is changed. If this happens, DP will be pleased to review the report and the sufficiency of the investigation work. Every care is taken with the report as it relates to interpretation of subsurface conditions, discussion of geotechnical and environmental aspects, and recommendations or suggestions for design and construction. However, DP cannot always anticipate or assume responsibility for: • Unexpected variations in ground conditions.

The potential for this will depend partly on borehole or pit spacing and sampling frequency;

• Changes in policy or interpretations of policy by statutory authorities; or

• The actions of contractors responding to commercial pressures.

If these occur, DP will be pleased to assist with investigations or advice to resolve the matter.

Page 118: SITE CLASSIFICATION REPORT SUMMARY...Douglas Partners (DP) has prepared this report for this project at Taylor 2- Stage 3, Taylor in accordance with DP’s proposal dated 15 September

July 2010

Site Anomalies In the event that conditions encountered on site during construction appear to vary from those which were expected from the information contained in the report, DP requests that it be immediately notified. Most problems are much more readily resolved when conditions are exposed rather than at some later stage, well after the event. Information for Contractual Purposes Where information obtained from this report is provided for tendering purposes, it is recommended that all information, including the written report and discussion, be made available. In circumstances where the discussion or comments section is not relevant to the contractual situation, it may be appropriate to prepare a specially edited document. DP would be pleased to assist in this regard and/or to make additional report copies available for contract purposes at a nominal charge. Site Inspection The company will always be pleased to provide engineering inspection services for geotechnical and environmental aspects of work to which this report is related. This could range from a site visit to confirm that conditions exposed are as expected, to full time engineering presence on site.

Page 119: SITE CLASSIFICATION REPORT SUMMARY...Douglas Partners (DP) has prepared this report for this project at Taylor 2- Stage 3, Taylor in accordance with DP’s proposal dated 15 September

July 2010

Sampling Sampling is carried out during drilling or test pitting to allow engineering examination (and laboratory testing where required) of the soil or rock. Disturbed samples taken during drilling provide information on colour, type, inclusions and, depending upon the degree of disturbance, some information on strength and structure. Undisturbed samples are taken by pushing a thin-walled sample tube into the soil and withdrawing it to obtain a sample of the soil in a relatively undisturbed state. Such samples yield information on structure and strength, and are necessary for laboratory determination of shear strength and compressibility. Undisturbed sampling is generally effective only in cohesive soils. Test Pits Test pits are usually excavated with a backhoe or an excavator, allowing close examination of the in-situ soil if it is safe to enter into the pit. The depth of excavation is limited to about 3 m for a backhoe and up to 6 m for a large excavator. A potential disadvantage of this investigation method is the larger area of disturbance to the site. Large Diameter Augers Boreholes can be drilled using a rotating plate or short spiral auger, generally 300 mm or larger in diameter commonly mounted on a standard piling rig. The cuttings are returned to the surface at intervals (generally not more than 0.5 m) and are disturbed but usually unchanged in moisture content. Identification of soil strata is generally much more reliable than with continuous spiral flight augers, and is usually supplemented by occasional undisturbed tube samples. Continuous Spiral Flight Augers The borehole is advanced using 90-115 mm diameter continuous spiral flight augers which are withdrawn at intervals to allow sampling or in-situ testing. This is a relatively economical means of drilling in clays and sands above the water table. Samples are returned to the surface, or may be collected after withdrawal of the auger flights, but they are disturbed and may be mixed with soils from the sides of the hole. Information from the drilling (as distinct from specific sampling by SPTs or undisturbed samples) is of relatively low

reliability, due to the remoulding, possible mixing or softening of samples by groundwater. Non-core Rotary Drilling The borehole is advanced using a rotary bit, with water or drilling mud being pumped down the drill rods and returned up the annulus, carrying the drill cuttings. Only major changes in stratification can be determined from the cuttings, together with some information from the rate of penetration. Where drilling mud is used this can mask the cuttings and reliable identification is only possible from separate sampling such as SPTs. Continuous Core Drilling A continuous core sample can be obtained using a diamond tipped core barrel, usually with a 50 mm internal diameter. Provided full core recovery is achieved (which is not always possible in weak rocks and granular soils), this technique provides a very reliable method of investigation. Standard Penetration Tests Standard penetration tests (SPT) are used as a means of estimating the density or strength of soils and also of obtaining a relatively undisturbed sample. The test procedure is described in Australian Standard 1289, Methods of Testing Soils for Engineering Purposes - Test 6.3.1. The test is carried out in a borehole by driving a 50 mm diameter split sample tube under the impact of a 63 kg hammer with a free fall of 760 mm. It is normal for the tube to be driven in three successive 150 mm increments and the 'N' value is taken as the number of blows for the last 300 mm. In dense sands, very hard clays or weak rock, the full 450 mm penetration may not be practicable and the test is discontinued. The test results are reported in the following form. • In the case where full penetration is obtained

with successive blow counts for each 150 mm of, say, 4, 6 and 7 as:

4,6,7 N=13

• In the case where the test is discontinued before the full penetration depth, say after 15 blows for the first 150 mm and 30 blows for the next 40 mm as:

15, 30/40 mm

Page 120: SITE CLASSIFICATION REPORT SUMMARY...Douglas Partners (DP) has prepared this report for this project at Taylor 2- Stage 3, Taylor in accordance with DP’s proposal dated 15 September

July 2010

The results of the SPT tests can be related empirically to the engineering properties of the soils. Dynamic Cone Penetrometer Tests / Perth Sand Penetrometer Tests Dynamic penetrometer tests (DCP or PSP) are carried out by driving a steel rod into the ground using a standard weight of hammer falling a specified distance. As the rod penetrates the soil the number of blows required to penetrate each successive 150 mm depth are recorded. Normally there is a depth limitation of 1.2 m, but this may be extended in certain conditions by the use of extension rods. Two types of penetrometer are commonly used. • Perth sand penetrometer - a 16 mm diameter

flat ended rod is driven using a 9 kg hammer dropping 600 mm (AS 1289, Test 6.3.3). This test was developed for testing the density of sands and is mainly used in granular soils and filling.

• Cone penetrometer - a 16 mm diameter rod with a 20 mm diameter cone end is driven using a 9 kg hammer dropping 510 mm (AS 1289, Test 6.3.2). This test was developed initially for pavement subgrade investigations, and correlations of the test results with California Bearing Ratio have been published by various road authorities.

Page 121: SITE CLASSIFICATION REPORT SUMMARY...Douglas Partners (DP) has prepared this report for this project at Taylor 2- Stage 3, Taylor in accordance with DP’s proposal dated 15 September

May 2017

Description and Classification Methods The methods of description and classification of

soils and rocks used in this report are based on

Australian Standard AS 1726-1993, Geotechnical

Site Investigations Code. In general, the

descriptions include strength or density, colour,

structure, soil or rock type and inclusions.

Soil Types Soil types are described according to the

predominant particle size, qualified by the grading

of other particles present:

Type Particle size (mm)

Boulder >200

Cobble 63 - 200

Gravel 2.36 - 63

Sand 0.075 - 2.36

Silt 0.002 - 0.075

Clay <0.002

The sand and gravel sizes can be further

subdivided as follows:

Type Particle size (mm)

Coarse gravel 20 - 63

Medium gravel 6 - 20

Fine gravel 2.36 - 6

Coarse sand 0.6 - 2.36

Medium sand 0.2 - 0.6

Fine sand 0.075 - 0.2

The proportions of secondary constituents of soils

are described as:

Term Proportion Example

And Specify Clay (60%) and

Sand (40%)

Adjective 20 - 35% Sandy Clay

Slightly 12 - 20% Slightly Sandy

Clay

With some 5 - 12% Clay with some

sand

With a trace of 0 - 5% Clay with a trace

of sand

Definitions of grading terms used are:

• Well graded - a good representation of all

particle sizes

• Poorly graded - an excess or deficiency of

particular sizes within the specified range

• Uniformly graded - an excess of a particular

particle size

• Gap graded - a deficiency of a particular

particle size with the range

Cohesive Soils Cohesive soils, such as clays, are classified on the

basis of undrained shear strength. The strength

may be measured by laboratory testing, or

estimated by field tests or engineering

examination. The strength terms are defined as

follows:

Description Abbreviation Undrained shear strength

(kPa)

Very soft vs <12

Soft s 12 - 25

Firm f 25 - 50

Stiff st 50 - 100

Very stiff vst 100 - 200

Hard h >200

Cohesionless Soils Cohesionless soils, such as clean sands, are

classified on the basis of relative density, generally

from the results of standard penetration tests

(SPT), cone penetration tests (CPT) or dynamic

penetrometers (PSP). The relative density terms

are given below:

Relative Density

Abbreviation SPT N value

CPT qc value (MPa)

Very loose vl <4 <2

Loose l 4 - 10 2 -5

Medium

dense

md 10 - 30 5 - 15

Dense d 30 - 50 15 - 25

Very

dense

vd >50 >25

Page 122: SITE CLASSIFICATION REPORT SUMMARY...Douglas Partners (DP) has prepared this report for this project at Taylor 2- Stage 3, Taylor in accordance with DP’s proposal dated 15 September

May 2017

Soil Origin It is often difficult to accurately determine the origin

of a soil. Soils can generally be classified as:

• Residual soil - derived from in-situ weathering

of the underlying rock;

• Transported soils - formed somewhere else

and transported by nature to the site; or

• Filling - moved by man.

Transported soils may be further subdivided into:

• Alluvium - river deposits

• Lacustrine - lake deposits

• Aeolian - wind deposits

• Littoral - beach deposits

• Estuarine - tidal river deposits

• Talus - scree or coarse colluvium

• Slopewash or Colluvium - transported

downslope by gravity assisted by water.

Often includes angular rock fragments and

boulders.

Page 123: SITE CLASSIFICATION REPORT SUMMARY...Douglas Partners (DP) has prepared this report for this project at Taylor 2- Stage 3, Taylor in accordance with DP’s proposal dated 15 September

May 2017

Rock Strength Rock strength is defined by the Point Load Strength Index (Is(50)) and refers to the strength of the rock

substance and not the strength of the overall rock mass, which may be considerably weaker due to defects.

The test procedure is described by Australian Standard 4133.4.1 - 2007. The terms used to describe rock

strength are as follows:

Term Abbreviation Point Load Index

Is(50) MPa

Approximate Unconfined Compressive Strength MPa*

Extremely low EL <0.03 <0.6

Very low VL 0.03 - 0.1 0.6 - 2

Low L 0.1 - 0.3 2 - 6

Medium M 0.3 - 1.0 6 - 20

High H 1 - 3 20 - 60

Very high VH 3 - 10 60 - 200

Extremely high EH >10 >200

* Assumes a ratio of 20:1 for UCS to Is(50). It should be noted that the UCS to Is(50) ratio varies significantly

for different rock types and specific ratios should be determined for each site.

Degree of Weathering The degree of weathering of rock is classified as follows:

Term Abbreviation Description

Extremely weathered EW Rock substance has soil properties, i.e. it can be remoulded and classified as a soil but the texture of the original rock is still evident.

Highly weathered HW Limonite staining or bleaching affects whole of rock substance and other signs of decomposition are evident. Porosity and strength may be altered as a result of iron leaching or deposition. Colour and strength of original fresh rock is not recognisable

Moderately weathered

MW Staining and discolouration of rock substance has taken place

Slightly weathered SW Rock substance is slightly discoloured but shows little or no change of strength from fresh rock

Fresh stained Fs Rock substance unaffected by weathering but staining visible along defects

Fresh Fr No signs of decomposition or staining

Degree of Fracturing The following classification applies to the spacing of natural fractures in diamond drill cores. It includes

bedding plane partings, joints and other defects, but excludes drilling breaks.

Term Description

Fragmented Fragments of <20 mm

Highly Fractured Core lengths of 20-40 mm with some fragments

Fractured Core lengths of 40-200 mm with some shorter and longer sections

Slightly Fractured Core lengths of 200-1000 mm with some shorter and longer sections

Unbroken Core lengths mostly > 1000 mm

Page 124: SITE CLASSIFICATION REPORT SUMMARY...Douglas Partners (DP) has prepared this report for this project at Taylor 2- Stage 3, Taylor in accordance with DP’s proposal dated 15 September

May 2017

Rock Quality Designation The quality of the cored rock can be measured using the Rock Quality Designation (RQD) index, defined

as:

RQD % = cumulative length of 'sound' core sections ≥ 100 mm long

total drilled length of section being assessed

where 'sound' rock is assessed to be rock of low strength or better. The RQD applies only to natural

fractures. If the core is broken by drilling or handling (i.e. drilling breaks) then the broken pieces are fitted

back together and are not included in the calculation of RQD.

Stratification Spacing For sedimentary rocks the following terms may be used to describe the spacing of bedding partings:

Term Separation of Stratification Planes

Thinly laminated < 6 mm

Laminated 6 mm to 20 mm

Very thinly bedded 20 mm to 60 mm

Thinly bedded 60 mm to 0.2 m

Medium bedded 0.2 m to 0.6 m

Thickly bedded 0.6 m to 2 m

Very thickly bedded > 2 m

Page 125: SITE CLASSIFICATION REPORT SUMMARY...Douglas Partners (DP) has prepared this report for this project at Taylor 2- Stage 3, Taylor in accordance with DP’s proposal dated 15 September

May 2017

Introduction These notes summarise abbreviations commonly

used on borehole logs and test pit reports.

Drilling or Excavation Methods C Core drilling

R Rotary drilling

SFA Spiral flight augers

NMLC Diamond core - 52 mm dia

NQ Diamond core - 47 mm dia

HQ Diamond core - 63 mm dia

PQ Diamond core - 81 mm dia

Water � Water seep

� Water level

Sampling and Testing A Auger sample

B Bulk sample

D Disturbed sample

E Environmental sample

U50 Undisturbed tube sample (50mm)

W Water sample

pp Pocket penetrometer (kPa)

PID Photo ionisation detector

PL Point load strength Is(50) MPa

S Standard Penetration Test

V Shear vane (kPa)

Description of Defects in Rock The abbreviated descriptions of the defects should

be in the following order: Depth, Type, Orientation,

Coating, Shape, Roughness and Other. Drilling

and handling breaks are not usually included on

the logs.

Defect Type

B Bedding plane

Cs Clay seam

Cv Cleavage

Cz Crushed zone

Ds Decomposed seam

F Fault

J Joint

Lam Lamination

Pt Parting

Sz Sheared Zone

V Vein

Orientation

The inclination of defects is always measured from

the perpendicular to the core axis.

h horizontal

v vertical

sh sub-horizontal

sv sub-vertical

Coating or Infilling Term

cln clean

co coating

he healed

inf infilled

stn stained

ti tight

vn veneer

Coating Descriptor

ca calcite

cbs carbonaceous

cly clay

fe iron oxide

mn manganese

slt silty

Shape

cu curved

ir irregular

pl planar

st stepped

un undulating

Roughness

po polished

ro rough

sl slickensided

sm smooth

vr very rough

Other

fg fragmented

bnd band

qtz quartz

Page 126: SITE CLASSIFICATION REPORT SUMMARY...Douglas Partners (DP) has prepared this report for this project at Taylor 2- Stage 3, Taylor in accordance with DP’s proposal dated 15 September

May 2017

Graphic Symbols for Soil and Rock General

Soils

Sedimentary Rocks

Metamorphic Rocks

Igneous Rocks

Road base

Filling

Concrete

Asphalt

Topsoil

Peat

Clay

Conglomeratic sandstone

Conglomerate

Boulder conglomerate

Sandstone

Slate, phyllite, schist

Siltstone

Mudstone, claystone, shale

Coal

Limestone

Porphyry

Cobbles, boulders

Sandy gravel

Laminite

Silty sand

Clayey sand

Silty clay

Sandy clay

Gravelly clay

Shaly clay

Silt

Clayey silt

Sandy silt

Sand

Gravel

Talus

Gneiss

Quartzite

Dolerite, basalt, andesite

Granite

Tuff, breccia

Dacite, epidote

Page 127: SITE CLASSIFICATION REPORT SUMMARY...Douglas Partners (DP) has prepared this report for this project at Taylor 2- Stage 3, Taylor in accordance with DP’s proposal dated 15 September

ͱ·´ ̧°»­

̸» ¬§°»­ ±º ­±·´­ «­«¿´´§ °®»­»²¬ «²¼»® ¬¸» ¬±°­±·´ ·² ´¿²¼ ¦±²»¼ º±®®»­·¼»²¬·¿´ ¾«·´¼·²¹­ ½¿² ¾» ­°´·¬ ·²¬± ¬©± ¿°°®±¨·³¿¬» ¹®±«°­ P¹®¿²«´¿® ¿²¼ ½´¿§ò Ï«·¬» ±º¬»²ô º±«²¼¿¬·±² ­±·´ ·­ ¿ ³·¨¬«®» ±º ¾±¬¸¬§°»­ò ̸» ¹»²»®¿´ °®±¾´»³­ ¿­­±½·¿¬»¼ ©·¬¸ ­±·´­ ¸¿ª·²¹ ¹®¿²«´¿®½±²¬»²¬ ¿®» «­«¿´´§ ½¿«­»¼ ¾§ »®±­·±²ò Ý´¿§ ­±·´­ ¿®» ­«¾¶»½¬ ¬±­¿¬«®¿¬·±² ¿²¼ ­©»´´ñ­¸®·²µ °®±¾´»³­ò

Ý´¿­­·º·½¿¬·±²­ º±® ¿ ¹·ª»² ¿®»¿ ½¿² ¹»²»®¿´´§ ¾» ±¾¬¿·²»¼ ¾§¿°°´·½¿¬·±² ¬± ¬¸» ´±½¿´ ¿«¬¸±®·¬§ô ¾«¬ ¬¸»­» ¿®» ­±³»¬·³»­ «²®»´·¿¾´»¿²¼ ·º ¬¸»®» ·­ ¼±«¾¬ô ¿ ¹»±¬»½¸²·½¿´ ®»°±®¬ ­¸±«´¼ ¾» ½±³³·­­·±²»¼òß­ ³±­¬ ¾«·´¼·²¹­ ­«ºº»®·²¹ ³±ª»³»²¬ °®±¾´»³­ ¿®» º±«²¼»¼ ±² ½´¿§­±·´­ô ¬¸»®» ·­ ¿² »³°¸¿­·­ ±² ½´¿­­·º·½¿¬·±² ±º ­±·´­ ¿½½±®¼·²¹ ¬± ¬¸»¿³±«²¬ ±º ­©»´´ ¿²¼ ­¸®·²µ¿¹» ¬¸»§ »¨°»®·»²½» ©·¬¸ ª¿®·¿¬·±²­ ±º©¿¬»® ½±²¬»²¬ò ̸» ¬¿¾´» ¾»´±© ·­ Ì¿¾´» îòï º®±³ ßÍ îèéðô ¬¸»Î»­·¼»²¬·¿´ Í´¿¾ ¿²¼ Ú±±¬·²¹ ݱ¼»ò

Ý¿«­»­ ±º Ó±ª»³»²¬

Í»¬¬´»³»²¬ ¼«» ¬± ½±²­¬®«½¬·±²Ì¸»®» ¿®» ¬©± ¬§°»­ ±º ­»¬¬´»³»²¬ ¬¸¿¬ ±½½«® ¿­ ¿ ®»­«´¬ ±º½±²­¬®«½¬·±²æ{ ׳³»¼·¿¬» ­»¬¬´»³»²¬ ±½½«®­ ©¸»² ¿ ¾«·´¼·²¹ ·­ º·®­¬ °´¿½»¼ ±² ·¬­

º±«²¼¿¬·±² ­±·´ô ¿­ ¿ ®»­«´¬ ±º ½±³°¿½¬·±² ±º ¬¸» ­±·´ «²¼»® ¬¸»©»·¹¸¬ ±º ¬¸» ­¬®«½¬«®»ò ̸» ½±¸»­·ª» ¯«¿´·¬§ ±º ½´¿§ ­±·´ ³·¬·¹¿¬»­¿¹¿·²­¬ ¬¸·­ô ¾«¬ ¹®¿²«´¿® ø°¿®¬·½«´¿®´§ ­¿²¼§÷ ­±·´ ·­ ­«­½»°¬·¾´»ò

{ ݱ²­±´·¼¿¬·±² ­»¬¬´»³»²¬ ·­ ¿ º»¿¬«®» ±º ½´¿§ ­±·´ ¿²¼ ³¿§ ¬¿µ»°´¿½» ¾»½¿«­» ±º ¬¸» »¨°«´­·±² ±º ³±·­¬«®» º®±³ ¬¸» ­±·´ ±® ¾»½¿«­»±º ¬¸» ­±·´K­ ´¿½µ ±º ®»­·­¬¿²½» ¬± ´±½¿´ ½±³°®»­­·ª» ±® ­¸»¿® ­¬®»­­»­ò̸·­ ©·´´ «­«¿´´§ ¬¿µ» °´¿½» ¼«®·²¹ ¬¸» º·®­¬ º»© ³±²¬¸­ ¿º¬»®½±²­¬®«½¬·±²ô ¾«¬ ¸¿­ ¾»»² µ²±©² ¬± ¬¿µ» ³¿²§ §»¿®­ ·²»¨½»°¬·±²¿´ ½¿­»­ò

̸»­» °®±¾´»³­ ¿®» ¬¸» °®±ª·²½» ±º ¬¸» ¾«·´¼»® ¿²¼ ­¸±«´¼ ¾» ¬¿µ»²·²¬± ½±²­·¼»®¿¬·±² ¿­ °¿®¬ ±º ¬¸» °®»°¿®¿¬·±² ±º ¬¸» ­·¬» º±® ½±²­¬®«½ó¬·±²ò Þ«·´¼·²¹ Ì»½¸²±´±¹§ Ú·´» ïç øÞÌÚ ïç÷ ¼»¿´­ ©·¬¸ ¬¸»­»°®±¾´»³­ò

Û®±­·±²ß´´ ­±·´­ ¿®» °®±²» ¬± »®±­·±²ô ¾«¬ ­¿²¼§ ­±·´ ·­ °¿®¬·½«´¿®´§ ­«­½»°¬·¾´»¬± ¾»·²¹ ©¿­¸»¼ ¿©¿§ò Ûª»² ½´¿§ ©·¬¸ ¿ ­¿²¼ ½±³°±²»²¬ ±º ­¿§ ïðû±® ³±®» ½¿² ­«ºº»® º®±³ »®±­·±²ò

Í¿¬«®¿¬·±²Ì¸·­ ·­ °¿®¬·½«´¿®´§ ¿ °®±¾´»³ ·² ½´¿§ ­±·´­ò Í¿¬«®¿¬·±² ½®»¿¬»­ ¿ ¾±¹ó´·µ» ­«­°»²­·±² ±º ¬¸» ­±·´ ¬¸¿¬ ½¿«­»­ ·¬ ¬± ´±­» ª·®¬«¿´´§ ¿´´ ±º ·¬­¾»¿®·²¹ ½¿°¿½·¬§ò ̱ ¿ ´»­­»® ¼»¹®»»ô ­¿²¼ ·­ ¿ºº»½¬»¼ ¾§ ­¿¬«®¿¬·±²¾»½¿«­» ­¿¬«®¿¬»¼ ­¿²¼ ³¿§ «²¼»®¹± ¿ ®»¼«½¬·±² ·² ª±´«³» P°¿®¬·½«´¿®´§ ·³°±®¬»¼ ­¿²¼ º·´´ º±® ¾»¼¼·²¹ ¿²¼ ¾´·²¼·²¹ ´¿§»®­òر©»ª»®ô ¬¸·­ «­«¿´´§ ±½½«®­ ¿­ ·³³»¼·¿¬» ­»¬¬´»³»²¬ ¿²¼ ­¸±«´¼²±®³¿´´§ ¾» ¬¸» °®±ª·²½» ±º ¬¸» ¾«·´¼»®ò

Í»¿­±²¿´ ­©»´´·²¹ ¿²¼ ­¸®·²µ¿¹» ±º ­±·´ß´´ ½´¿§­ ®»¿½¬ ¬± ¬¸» °®»­»²½» ±º ©¿¬»® ¾§ ­´±©´§ ¿¾­±®¾·²¹ ·¬ô ³¿µ·²¹¬¸» ­±·´ ·²½®»¿­» ·² ª±´«³» ø­»» ¬¿¾´» ¾»´±©÷ò ̸» ¼»¹®»» ±º ·²½®»¿­»ª¿®·»­ ½±²­·¼»®¿¾´§ ¾»¬©»»² ¼·ºº»®»²¬ ½´¿§­ô ¿­ ¼±»­ ¬¸» ¼»¹®»» ±º¼»½®»¿­» ¼«®·²¹ ¬¸» ­«¾­»¯«»²¬ ¼®§·²¹ ±«¬ ½¿«­»¼ ¾§ º¿·® ©»¿¬¸»®°»®·±¼­ò Þ»½¿«­» ±º ¬¸» ´±© ¿¾­±®°¬·±² ¿²¼ »¨°«´­·±² ®¿¬»ô ¬¸·­°¸»²±³»²±² ©·´´ ²±¬ «­«¿´´§ ¾» ²±¬·½»¿¾´» «²´»­­ ¬¸»®» ¿®»°®±´±²¹»¼ ®¿·²§ ±® ¼®§ °»®·±¼­ô «­«¿´´§ ±º ©»»µ­ ±® ³±²¬¸­ô¼»°»²¼·²¹ ±² ¬¸» ´¿²¼ ¿²¼ ­±·´ ½¸¿®¿½¬»®·­¬·½­ò

̸» ­©»´´·²¹ ±º ­±·´ ½®»¿¬»­ ¿² «°©¿®¼ º±®½» ±² ¬¸» º±±¬·²¹­ ±º ¬¸»¾«·´¼·²¹ô ¿²¼ ­¸®·²µ¿¹» ½®»¿¬»­ ­«¾­·¼»²½» ¬¸¿¬ ¬¿µ»­ ¿©¿§ ¬¸»­«°°±®¬ ²»»¼»¼ ¾§ ¬¸» º±±¬·²¹ ¬± ®»¬¿·² »¯«·´·¾®·«³ò

͸»¿® º¿·´«®»Ì¸·­ °¸»²±³»²±² ±½½«®­ ©¸»² ¬¸» º±«²¼¿¬·±² ­±·´ ¼±»­ ²±¬ ¸¿ª»­«ºº·½·»²¬ ­¬®»²¹¬¸ ¬± ­«°°±®¬ ¬¸» ©»·¹¸¬ ±º ¬¸» º±±¬·²¹ò ̸»®» ¿®»¬©± ³¿¶±® °±­¬ó½±²­¬®«½¬·±² ½¿«­»­æ

{ Í·¹²·º·½¿²¬ ´±¿¼ ·²½®»¿­»ò{ λ¼«½¬·±² ±º ´¿¬»®¿´ ­«°°±®¬ ±º ¬¸» ­±·´ «²¼»® ¬¸» º±±¬·²¹ ¼«» ¬±

»®±­·±² ±® »¨½¿ª¿¬·±²ò{ ײ ½´¿§ ­±·´ô ­¸»¿® º¿·´«®» ½¿² ¾» ½¿«­»¼ ¾§ ­¿¬«®¿¬·±² ±º ¬¸» ­±·´

¿¼¶¿½»²¬ ¬± ±® «²¼»® ¬¸» º±±¬·²¹ò

Þ«·´¼·²¹­ ½¿² ¿²¼ ±º¬»² ¼± ³±ª»ò ̸·­ ³±ª»³»²¬ ½¿² ¾» «°ô ¼±©²ô ´¿¬»®¿´ ±® ®±¬¿¬·±²¿´ò ̸» º«²¼¿³»²¬¿´ ½¿«­»±º ³±ª»³»²¬ ·² ¾«·´¼·²¹­ ½¿² «­«¿´´§ ¾» ®»´¿¬»¼ ¬± ±²» ±® ³±®» °®±¾´»³­ ·² ¬¸» º±«²¼¿¬·±² ­±·´ò ׬ ·­ ·³°±®¬¿²¬ º±®¬¸» ¸±³»±©²»® ¬± ·¼»²¬·º§ ¬¸» ­±·´ ¬§°» ·² ±®¼»® ¬± ¿­½»®¬¿·² ¬¸» ³»¿­«®»­ ¬¸¿¬ ­¸±«´¼ ¾» °«¬ ·² °´¿½» ·² ±®¼»® ¬±»²­«®» ¬¸¿¬ °®±¾´»³­ ·² ¬¸» º±«²¼¿¬·±² ­±·´ ½¿² ¾» °®»ª»²¬»¼ô ¬¸«­ °®±¬»½¬·²¹ ¿¹¿·²­¬ ¾«·´¼·²¹ ³±ª»³»²¬ò

̸·­ Þ«·´¼·²¹ Ì»½¸²±´±¹§ Ú·´» ·­ ¼»­·¹²»¼ ¬± ·¼»²¬·º§ ½¿«­»­ ±º ­±·´ó®»´¿¬»¼ ¾«·´¼·²¹ ³±ª»³»²¬ô ¿²¼ ¬± ­«¹¹»­¬³»¬¸±¼­ ±º °®»ª»²¬·±² ±º ®»­«´¬¿²¬ ½®¿½µ·²¹ ·² ¾«·´¼·²¹­ò

Ú±«²¼¿¬·±² Ó¿·²¬»²¿²½»¿²¼ Ú±±¬·²¹ л®º±®³¿²½»æß Ø±³»±©²»®K­ Ù«·¼»

ÙÛÒÛÎßÔ ÜÛÚ×Ò×Ì×ÑÒÍ ÑÚ Í×ÌÛ ÝÔßÍÍÛÍ

Ý´¿­­ Ú±«²¼¿¬·±²

ß Ó±­¬ ­¿²¼ ¿²¼ ®±½µ ­·¬»­ ©·¬¸ ´·¬¬´» ±® ²± ¹®±«²¼ ³±ª»³»²¬ º®±³ ³±·­¬«®» ½¸¿²¹»­

Í Í´·¹¸¬´§ ®»¿½¬·ª» ½´¿§ ­·¬»­ ©·¬¸ ±²´§ ­´·¹¸¬ ¹®±«²¼ ³±ª»³»²¬ º®±³ ³±·­¬«®» ½¸¿²¹»­

Ó Ó±¼»®¿¬»´§ ®»¿½¬·ª» ½´¿§ ±® ­·´¬ ­·¬»­ô ©¸·½¸ ½¿² »¨°»®·»²½» ³±¼»®¿¬» ¹®±«²¼ ³±ª»³»²¬ º®±³ ³±·­¬«®» ½¸¿²¹»­

Ø Ø·¹¸´§ ®»¿½¬·ª» ½´¿§ ­·¬»­ô ©¸·½¸ ½¿² »¨°»®·»²½» ¸·¹¸ ¹®±«²¼ ³±ª»³»²¬ º®±³ ³±·­¬«®» ½¸¿²¹»­

Û Û¨¬®»³»´§ ®»¿½¬·ª» ­·¬»­ô ©¸·½¸ ½¿² »¨°»®·»²½» »¨¬®»³» ¹®±«²¼ ³±ª»³»²¬ º®±³ ³±·­¬«®» ½¸¿²¹»­

ß ¬± Ð Ú·´´»¼ ­·¬»­

Ð Í·¬»­ ©¸·½¸ ·²½´«¼» ­±º¬ ­±·´­ô ­«½¸ ¿­ ­±º¬ ½´¿§ ±® ­·´¬ ±® ´±±­» ­¿²¼­å ´¿²¼­´·°å ³·²» ­«¾­·¼»²½»å ½±´´¿°­·²¹ ­±·´­å ­±·´­ ­«¾¶»½¬¬± »®±­·±²å ®»¿½¬·ª» ­·¬»­ ­«¾¶»½¬ ¬± ¿¾²±®³¿´ ³±·­¬«®» ½±²¼·¬·±²­ ±® ­·¬»­ ©¸·½¸ ½¿²²±¬ ¾» ½´¿­­·º·»¼ ±¬¸»®©·­»

ÞÌÚ ïè®»°´¿½»­

ײº±®³¿¬·±²Í¸»»¬ ïðñçï

Page 128: SITE CLASSIFICATION REPORT SUMMARY...Douglas Partners (DP) has prepared this report for this project at Taylor 2- Stage 3, Taylor in accordance with DP’s proposal dated 15 September

Ì®»» ®±±¬ ¹®±©¬¸Ì®»»­ ¿²¼ ­¸®«¾­ ¬¸¿¬ ¿®» ¿´´±©»¼ ¬± ¹®±© ·² ¬¸» ª·½·²·¬§ ±º º±±¬·²¹­½¿² ½¿«­» º±«²¼¿¬·±² ­±·´ ³±ª»³»²¬ ·² ¬©± ©¿§­æ

{ ᱬ­ ¬¸¿¬ ¹®±© «²¼»® º±±¬·²¹­ ³¿§ ·²½®»¿­» ·² ½®±­­ó­»½¬·±²¿´­·¦»ô »¨»®¬·²¹ «°©¿®¼ °®»­­«®» ±² º±±¬·²¹­ò

{ ᱬ­ ·² ¬¸» ª·½·²·¬§ ±º º±±¬·²¹­ ©·´´ ¿¾­±®¾ ³«½¸ ±º ¬¸» ³±·­¬«®»·² ¬¸» º±«²¼¿¬·±² ­±·´ô ½¿«­·²¹ ­¸®·²µ¿¹» ±® ­«¾­·¼»²½»ò

˲»ª»²²»­­ ±º Ó±ª»³»²¬

̸» ¬§°»­ ±º ¹®±«²¼ ³±ª»³»²¬ ¼»­½®·¾»¼ ¿¾±ª» «­«¿´´§ ±½½«®«²»ª»²´§ ¬¸®±«¹¸±«¬ ¬¸» ¾«·´¼·²¹K­ º±«²¼¿¬·±² ­±·´ò Í»¬¬´»³»²¬ ¼«»¬± ½±²­¬®«½¬·±² ¬»²¼­ ¬± ¾» «²»ª»² ¾»½¿«­» ±ºæ

{ Ü·ºº»®·²¹ ½±³°¿½¬·±² ±º º±«²¼¿¬·±² ­±·´ °®·±® ¬± ½±²­¬®«½¬·±²ò

{ Ü·ºº»®·²¹ ³±·­¬«®» ½±²¬»²¬ ±º º±«²¼¿¬·±² ­±·´ °®·±® ¬± ½±²­¬®«½¬·±²ò

Ó±ª»³»²¬ ¼«» ¬± ²±²ó½±²­¬®«½¬·±² ½¿«­»­ ·­ «­«¿´´§ ³±®» «²»ª»²­¬·´´ò Û®±­·±² ½¿² «²¼»®³·²» ¿ º±±¬·²¹ ¬¸¿¬ ¬®¿ª»®­»­ ¬¸» º´±© ±® ½¿²½®»¿¬» ¬¸» ½±²¼·¬·±²­ º±® ­¸»¿® º¿·´«®» ¾§ »®±¼·²¹ ­±·´ ¿¼¶¿½»²¬ ¬± ¿º±±¬·²¹ ¬¸¿¬ ®«²­ ·² ¬¸» ­¿³» ¼·®»½¬·±² ¿­ ¬¸» º´±©ò

Í¿¬«®¿¬·±² ±º ½´¿§ º±«²¼¿¬·±² ­±·´ ³¿§ ±½½«® ©¸»®» ­«¾º´±±® ©¿´´­½®»¿¬» ¿ ¼¿³ ¬¸¿¬ ³¿µ»­ ©¿¬»® °±²¼ò ׬ ½¿² ¿´­± ±½½«® ©¸»®»ª»® ¬¸»®»·­ ¿ ­±«®½» ±º ©¿¬»® ²»¿® º±±¬·²¹­ ·² ½´¿§ ­±·´ò ̸·­ ´»¿¼­ ¬± ¿ ­»ª»®»®»¼«½¬·±² ·² ¬¸» ­¬®»²¹¬¸ ±º ¬¸» ­±·´ ©¸·½¸ ³¿§ ½®»¿¬» ´±½¿´ ­¸»¿®º¿·´«®»ò

Í»¿­±²¿´ ­©»´´·²¹ ¿²¼ ­¸®·²µ¿¹» ±º ½´¿§ ­±·´ ¿ºº»½¬­ ¬¸» °»®·³»¬»® ±º¬¸» ¾«·´¼·²¹ º·®­¬ô ¬¸»² ¹®¿¼«¿´´§ ­°®»¿¼­ ¬± ¬¸» ·²¬»®·±®ò ̸» ­©»´´·²¹°®±½»­­ ©·´´ «­«¿´´§ ¾»¹·² ¿¬ ¬¸» «°¸·´´ »¨¬®»³» ±º ¬¸» ¾«·´¼·²¹ô ±® ±²¬¸» ©»¿¬¸»® ­·¼» ©¸»®» ¬¸» ´¿²¼ ·­ º´¿¬ò Í©»´´·²¹ ¹®¿¼«¿´´§ ®»¿½¸»­ ¬¸»·²¬»®·±® ­±·´ ¿­ ¿¾­±®°¬·±² ½±²¬·²«»­ò ͸®·²µ¿¹» «­«¿´´§ ¾»¹·²­ ©¸»®»¬¸» ­«²K­ ¸»¿¬ ·­ ¹®»¿¬»­¬ò

Ûºº»½¬­ ±º ˲»ª»² ͱ·´ Ó±ª»³»²¬ ±² ͬ®«½¬«®»­

Û®±­·±² ¿²¼ ­¿¬«®¿¬·±²Û®±­·±² ®»³±ª»­ ¬¸» ­«°°±®¬ º®±³ «²¼»® º±±¬·²¹­ô ¬»²¼·²¹ ¬± ½®»¿¬»­«¾­·¼»²½» ±º ¬¸» °¿®¬ ±º ¬¸» ­¬®«½¬«®» «²¼»® ©¸·½¸ ·¬ ±½½«®­òÞ®·½µ©±®µ ©¿´´­ ©·´´ ®»­·­¬ ¬¸» ­¬®»­­ ½®»¿¬»¼ ¾§ ¬¸·­ ®»³±ª¿´ ±º­«°°±®¬ ¾§ ¾®·¼¹·²¹ ¬¸» ¹¿° ±® ½¿²¬·´»ª»®·²¹ «²¬·´ ¬¸» ¾®·½µ­ ±® ¬¸»³±®¬¿® ¾»¼¼·²¹ º¿·´ò Ñ´¼»® ³¿­±²®§ ¸¿­ ´·¬¬´» ®»­·­¬¿²½»ò Ûª·¼»²½» ±ºº¿·´«®» ª¿®·»­ ¿½½±®¼·²¹ ¬± ½·®½«³­¬¿²½»­ ¿²¼ ­§³°¬±³­ ³¿§ ·²½´«¼»æ

{ ͬ»° ½®¿½µ·²¹ ·² ¬¸» ³±®¬¿® ¾»¼­ ·² ¬¸» ¾±¼§ ±º ¬¸» ©¿´´ ±®¿¾±ª»ñ¾»´±© ±°»²·²¹­ ­«½¸ ¿­ ¼±±®­ ±® ©·²¼±©­ò

{ Ê»®¬·½¿´ ½®¿½µ·²¹ ·² ¬¸» ¾®·½µ­ ø«­«¿´´§ ¾«¬ ²±¬ ²»½»­­¿®·´§ ·² ´·²»©·¬¸ ¬¸» ª»®¬·½¿´ ¾»¼­ ±® °»®°»²¼­÷ò

×­±´¿¬»¼ °·»®­ ¿ºº»½¬»¼ ¾§ »®±­·±² ±® ­¿¬«®¿¬·±² ±º º±«²¼¿¬·±²­ ©·´´»ª»²¬«¿´´§ ´±­» ½±²¬¿½¬ ©·¬¸ ¬¸» ¾»¿®»®­ ¬¸»§ ­«°°±®¬ ¿²¼ ³¿§ ¬·´¬ ±®º¿´´ ±ª»®ò ̸» º´±±®­ ¬¸¿¬ ¸¿ª» ´±­¬ ¬¸·­ ­«°°±®¬ ©·´´ ¾»½±³» ¾±«²½§ô­±³»¬·³»­ ®¿¬¬´·²¹ ±®²¿³»²¬­ »¬½ò

Í»¿­±²¿´ ­©»´´·²¹ñ­¸®·²µ¿¹» ·² ½´¿§Í©»´´·²¹ º±«²¼¿¬·±² ­±·´ ¼«» ¬± ®¿·²§ °»®·±¼­ º·®­¬ ´·º¬­ ¬¸» ³±­¬»¨°±­»¼ »¨¬®»³·¬·»­ ±º ¬¸» º±±¬·²¹ ­§­¬»³ô ¬¸»² ¬¸» ®»³¿·²¼»® ±º ¬¸»°»®·³»¬»® º±±¬·²¹­ ©¸·´» ¹®¿¼«¿´´§ °»®³»¿¬·²¹ ·²­·¼» ¬¸» ¾«·´¼·²¹º±±¬°®·²¬ ¬± ´·º¬ ·²¬»®²¿´ º±±¬·²¹­ò ̸·­ ­©»´´·²¹ º·®­¬ ¬»²¼­ ¬± ½®»¿¬» ¿¼·­¸ »ºº»½¬ô ¾»½¿«­» ¬¸» »¨¬»®²¿´ º±±¬·²¹­ ¿®» °«­¸»¼ ¸·¹¸»® ¬¸¿² ¬¸»·²¬»®²¿´ ±²»­ò

̸» º·®­¬ ²±¬·½»¿¾´» ­§³°¬±³ ³¿§ ¾» ¬¸¿¬ ¬¸» º´±±® ¿°°»¿®­ ­´·¹¸¬´§¼·­¸»¼ò ̸·­ ·­ ±º¬»² ¿½½±³°¿²·»¼ ¾§ ­±³» ¼±±®­ ¾·²¼·²¹ ±² ¬¸»º´±±® ±® ¬¸» ¼±±® ¸»¿¼ô ¬±¹»¬¸»® ©·¬¸ ­±³» ½®¿½µ·²¹ ±º ½±®²·½»³·¬®»­ò ײ ¾«·´¼·²¹­ ©·¬¸ ¬·³¾»® º´±±®·²¹ ­«°°±®¬»¼ ¾§ ¾»¿®»®­ ¿²¼¶±·­¬­ô ¬¸» º´±±® ½¿² ¾» ¾±«²½§ò Û¨¬»®²¿´´§ ¬¸»®» ³¿§ ¾» ª·­·¾´»¼·­¸·²¹ ±º ¬¸» ¸·° ±® ®·¼¹» ´·²»­ò

ß­ ¬¸» ³±·­¬«®» ¿¾­±®°¬·±² °®±½»­­ ½±³°´»¬»­ ·¬­ ¶±«®²»§ ¬± ¬¸»·²²»®³±­¬ ¿®»¿­ ±º ¬¸» ¾«·´¼·²¹ô ¬¸» ·²¬»®²¿´ º±±¬·²¹­ ©·´´ ®·­»ò ׺ ¬¸»­°®»¿¼ ±º ³±·­¬«®» ·­ ®±«¹¸´§ »ª»²ô ·¬ ³¿§ ¾» ¬¸¿¬ ¬¸» ­§³°¬±³­ ©·´´¬»³°±®¿®·´§ ¼·­¿°°»¿®ô ¾«¬ ·¬ ·­ ³±®» ´·µ»´§ ¬¸¿¬ ­©»´´·²¹ ©·´´ ¾»«²»ª»²ô ½®»¿¬·²¹ ¿ ¼·ºº»®»²½» ®¿¬¸»® ¬¸¿² ¿ ¼·­¿°°»¿®¿²½» ·²­§³°¬±³­ò ײ ¾«·´¼·²¹­ ©·¬¸ ¬·³¾»® º´±±®·²¹ ­«°°±®¬»¼ ¾§ ¾»¿®»®­¿²¼ ¶±·­¬­ô ¬¸» ·­±´¿¬»¼ °·»®­ ©·´´ ®·­» ³±®» »¿­·´§ ¬¸¿² ¬¸» ­¬®·°º±±¬·²¹­ ±® °·»®­ «²¼»® ©¿´´­ô ½®»¿¬·²¹ ²±¬·½»¿¾´» ¼±³·²¹ ±º º´±±®·²¹ò

ß­ ¬¸» ©»¿¬¸»® °¿¬¬»®² ½¸¿²¹»­ ¿²¼ ¬¸» ­±·´ ¾»¹·²­ ¬± ¼®§ ±«¬ô ¬¸»»¨¬»®²¿´ º±±¬·²¹­ ©·´´ ¾» º·®­¬ ¿ºº»½¬»¼ô ¾»¹·²²·²¹ ©·¬¸ ¬¸» ´±½¿¬·±²­©¸»®» ¬¸» ­«²K­ »ºº»½¬ ·­ ­¬®±²¹»­¬ò ̸·­ ¸¿­ ¬¸» »ºº»½¬ ±º ´±©»®·²¹ ¬¸»»¨¬»®²¿´ º±±¬·²¹­ò ̸» ¼±³·²¹ ·­ ¿½½»²¬«¿¬»¼ ¿²¼ ½®¿½µ·²¹ ®»¼«½»­±® ¼·­¿°°»¿®­ ©¸»®» ·¬ ±½½«®®»¼ ¾»½¿«­» ±º ¼·­¸·²¹ô ¾«¬ ±¬¸»® ½®¿½µ­±°»² «°ò ̸» ®±±º ´·²»­ ³¿§ ¾»½±³» ½±²ª»¨ò

ܱ³·²¹ ¿²¼ ¼·­¸·²¹ ¿®» ¿´­± ¿ºº»½¬»¼ ¾§ ©»¿¬¸»® ·² ±¬¸»® ©¿§­ò ײ¿®»¿­ ©¸»®» ©¿®³ô ©»¬ ­«³³»®­ ¿²¼ ½±±´»® ¼®§ ©·²¬»®­ °®»ª¿·´ô©¿¬»® ³·¹®¿¬·±² ¬»²¼­ ¬± ¾» ¬±©¿®¼ ¬¸» ·²¬»®·±® ¿²¼ ¼±³·²¹ ©·´´ ¾»¿½½»²¬«¿¬»¼ô ©¸»®»¿­ ©¸»®» ­«³³»®­ ¿®» ¼®§ ¿²¼ ©·²¬»®­ ¿®» ½±´¼¿²¼ ©»¬ô ³·¹®¿¬·±² ¬»²¼­ ¬± ¾» ¬±©¿®¼ ¬¸» »¨¬»®·±® ¿²¼ ¬¸»«²¼»®´§·²¹ °®±°»²­·¬§ ·­ ¬±©¿®¼ ¼·­¸·²¹ò

Ó±ª»³»²¬ ½¿«­»¼ ¾§ ¬®»» ®±±¬­×² ¹»²»®¿´ô ¹®±©·²¹ ®±±¬­ ©·´´ »¨»®¬ ¿² «°©¿®¼ °®»­­«®» ±² º±±¬·²¹­ô©¸»®»¿­ ­±·´ ­«¾¶»½¬ ¬± ¼®§·²¹ ¾»½¿«­» ±º ¬®»» ±® ­¸®«¾ ®±±¬­ ©·´´ ¬»²¼¬± ®»³±ª» ­«°°±®¬ º®±³ «²¼»® º±±¬·²¹­ ¾§ ·²¼«½·²¹ ­¸®·²µ¿¹»ò

ݱ³°´·½¿¬·±²­ ½¿«­»¼ ¾§ ¬¸» ­¬®«½¬«®» ·¬­»´ºÓ±­¬ º±®½»­ ¬¸¿¬ ¬¸» ­±·´ ½¿«­»­ ¬± ¾» »¨»®¬»¼ ±² ­¬®«½¬«®»­ ¿®»ª»®¬·½¿´ P ·ò»ò »·¬¸»® «° ±® ¼±©²ò ر©»ª»®ô ¾»½¿«­» ¬¸»­» º±®½»­ ¿®»­»´¼±³ ­°®»¿¼ »ª»²´§ ¿®±«²¼ ¬¸» º±±¬·²¹­ô ¿²¼ ¾»½¿«­» ¬¸» ¾«·´¼·²¹®»­·­¬­ «²»ª»² ³±ª»³»²¬ ¾»½¿«­» ±º ·¬­ ®·¹·¼·¬§ô º±®½»­ ¿®» »¨»®¬»¼º®±³ ±²» °¿®¬ ±º ¬¸» ¾«·´¼·²¹ ¬± ¿²±¬¸»®ò ̸» ²»¬ ®»­«´¬ ±º ¿´´ ¬¸»­»º±®½»­ ·­ «­«¿´´§ ®±¬¿¬·±²¿´ò ̸·­ ®»­«´¬¿²¬ º±®½» ±º¬»² ½±³°´·½¿¬»­ ¬¸»¼·¿¹²±­·­ ¾»½¿«­» ¬¸» ª·­·¾´» ­§³°¬±³­ ¼± ²±¬ ­·³°´§ ®»º´»½¬ ¬¸»±®·¹·²¿´ ½¿«­»ò ß ½±³³±² ­§³°¬±³ ·­ ¾·²¼·²¹ ±º ¼±±®­ ±² ¬¸»ª»®¬·½¿´ ³»³¾»® ±º ¬¸» º®¿³»ò

Ûºº»½¬­ ±² º«´´ ³¿­±²®§ ­¬®«½¬«®»­Þ®·½µ©±®µ ©·´´ ®»­·­¬ ½®¿½µ·²¹ ©¸»®» ·¬ ½¿²ò ׬ ©·´´ ¿¬¬»³°¬ ¬± ­°¿²¿®»¿­ ¬¸¿¬ ´±­» ­«°°±®¬ ¾»½¿«­» ±º ­«¾­·¼»¼ º±«²¼¿¬·±²­ ±® ®¿·­»¼°±·²¬­ò ׬ ·­ ¬¸»®»º±®» «­«¿´ ¬± ­»» ½®¿½µ·²¹ ¿¬ ©»¿µ °±·²¬­ô ­«½¸ ¿­±°»²·²¹­ º±® ©·²¼±©­ ±® ¼±±®­ò

ײ ¬¸» »ª»²¬ ±º ½±²­¬®«½¬·±² ­»¬¬´»³»²¬ô ½®¿½µ·²¹ ©·´´ «­«¿´´§ ®»³¿·²«²½¸¿²¹»¼ ¿º¬»® ¬¸» °®±½»­­ ±º ­»¬¬´»³»²¬ ¸¿­ ½»¿­»¼ò

É·¬¸ ´±½¿´ ­¸»¿® ±® »®±­·±²ô ½®¿½µ·²¹ ©·´´ «­«¿´´§ ½±²¬·²«» ¬± ¼»ª»´±°«²¬·´ ¬¸» ±®·¹·²¿´ ½¿«­» ¸¿­ ¾»»² ®»³»¼·»¼ô ±® «²¬·´ ¬¸» ­«¾­·¼»²½»¸¿­ ½±³°´»¬»´§ ²»«¬®¿´·­»¼ ¬¸» ¿ºº»½¬»¼ °±®¬·±² ±º º±±¬·²¹ ¿²¼ ¬¸»­¬®«½¬«®» ¸¿­ ­¬¿¾·´·­»¼ ±² ±¬¸»® º±±¬·²¹­ ¬¸¿¬ ®»³¿·² »ºº»½¬·ª»ò

ײ ¬¸» ½¿­» ±º ­©»´´ñ­¸®·²µ »ºº»½¬­ô ¬¸» ¾®·½µ©±®µ ©·´´ ·² ­±³» ½¿­»­®»¬«®² ¬± ·¬­ ±®·¹·²¿´ °±­·¬·±² ¿º¬»® ½±³°´»¬·±² ±º ¿ ½§½´»ô ¸±©»ª»® ·¬·­ ³±®» ´·µ»´§ ¬¸¿¬ ¬¸» ®±¬¿¬·±²¿´ »ºº»½¬ ©·´´ ²±¬ ¾» »¨¿½¬´§ ®»ª»®­»¼ô¿²¼ ·¬ ·­ ¿´­± «­«¿´ ¬¸¿¬ ¾®·½µ©±®µ ©·´´ ­»¬¬´» ·² ·¬­ ²»© °±­·¬·±² ¿²¼©·´´ ®»­·­¬ ¬¸» º±®½»­ ¬®§·²¹ ¬± ®»¬«®² ·¬ ¬± ·¬­ ±®·¹·²¿´ °±­·¬·±²ò ̸·­³»¿²­ ¬¸¿¬ ·² ¿ ½¿­» ©¸»®» ­©»´´·²¹ ¬¿µ»­ °´¿½» ¿º¬»® ½±²­¬®«½¬·±²¿²¼ ½®¿½µ·²¹ ±½½«®­ô ¬¸» ½®¿½µ·²¹ ·­ ´·µ»´§ ¬± ¿¬ ´»¿­¬ °¿®¬´§ ®»³¿·²¿º¬»® ¬¸» ­¸®·²µ ­»¹³»²¬ ±º ¬¸» ½§½´» ·­ ½±³°´»¬»ò ̸«­ô »¿½¸ ¬·³»¬¸» ½§½´» ·­ ®»°»¿¬»¼ô ¬¸» ´·µ»´·¸±±¼ ·­ ¬¸¿¬ ¬¸» ½®¿½µ·²¹ ©·´´ ¾»½±³»©·¼»® «²¬·´ ¬¸» ­»½¬·±²­ ±º ¾®·½µ©±®µ ¾»½±³» ª·®¬«¿´´§ ·²¼»°»²¼»²¬ò

É·¬¸ ®»°»¿¬»¼ ½§½´»­ô ±²½» ¬¸» ½®¿½µ·²¹ ·­ »­¬¿¾´·­¸»¼ô ·º ¬¸»®» ·­ ²±±¬¸»® ½±³°´·½¿¬·±²ô ·¬ ·­ ²±®³¿´ º±® ¬¸» ·²½·¼»²½» ±º ½®¿½µ·²¹ ¬±­¬¿¾·´·­»ô ¿­ ¬¸» ¾«·´¼·²¹ ¸¿­ ¬¸» ¿®¬·½«´¿¬·±² ·¬ ²»»¼­ ¬± ½±°» ©·¬¸¬¸» °®±¾´»³ò ̸·­ ·­ ¾§ ²± ³»¿²­ ¿´©¿§­ ¬¸» ½¿­»ô ¸±©»ª»®ô ¿²¼³±²·¬±®·²¹ ±º ½®¿½µ­ ·² ©¿´´­ ¿²¼ º´±±®­ ­¸±«´¼ ¿´©¿§­ ¾» ¬®»¿¬»¼­»®·±«­´§ò

Ë°¸»¿ª¿´ ½¿«­»¼ ¾§ ¹®±©¬¸ ±º ¬®»» ®±±¬­ «²¼»® º±±¬·²¹­ ·­ ²±¬ ¿­·³°´» ª»®¬·½¿´ ­¸»¿® ­¬®»­­ò ̸»®» ·­ ¿ ¬»²¼»²½§ º±® ¬¸» ®±±¬ ¬± ¿´­±»¨»®¬ ´¿¬»®¿´ º±®½»­ ¬¸¿¬ ¿¬¬»³°¬ ¬± ­»°¿®¿¬» ­»½¬·±²­ ±º ¾®·½µ©±®µ¿º¬»® ·²·¬·¿´ ½®¿½µ·²¹ ¸¿­ ±½½«®®»¼ò

Ì®»»­ ½¿² ½¿«­» ­¸®·²µ¿¹» ¿²¼ ¼¿³¿¹»

Page 129: SITE CLASSIFICATION REPORT SUMMARY...Douglas Partners (DP) has prepared this report for this project at Taylor 2- Stage 3, Taylor in accordance with DP’s proposal dated 15 September

̸» ²±®³¿´ ­¬®«½¬«®¿´ ¿®®¿²¹»³»²¬ ·­ ¬¸¿¬ ¬¸» ·²²»® ´»¿º ±º ¾®·½µó©±®µ ·² ¬¸» »¨¬»®²¿´ ©¿´´­ ¿²¼ ¿¬ ´»¿­¬ ­±³» ±º ¬¸» ·²¬»®²¿´ ©¿´´­ø¼»°»²¼·²¹ ±² ¬¸» ®±±º ¬§°»÷ ½±³°®·­» ¬¸» ´±¿¼ó¾»¿®·²¹ ­¬®«½¬«®» ±²©¸·½¸ ¿²§ «°°»® º´±±®­ô ½»·´·²¹­ ¿²¼ ¬¸» ®±±º ¿®» ­«°°±®¬»¼ò ײ ¬¸»­»½¿­»­ô ·¬ ·­ ·²¬»®²¿´´§ ª·­·¾´» ½®¿½µ·²¹ ¬¸¿¬ ­¸±«´¼ ¾» ¬¸» ³¿·² º±½«­±º ¿¬¬»²¬·±²ô ¸±©»ª»® ¬¸»®» ¿®» ¿ º»© »¨¿³°´»­ ±º ¼©»´´·²¹­ ©¸±­»»¨¬»®²¿´ ´»¿º ±º ³¿­±²®§ °´¿§­ ­±³» ­«°°±®¬·²¹ ®±´»ô ­± ¬¸·­ ­¸±«´¼¾» ½¸»½µ»¼ ·º ¬¸»®» ·­ ¿²§ ¼±«¾¬ò ײ ¿²§ ½¿­»ô »¨¬»®²¿´´§ ª·­·¾´»½®¿½µ·²¹ ·­ ·³°±®¬¿²¬ ¿­ ¿ ¹«·¼» ¬± ­¬®»­­»­ ±² ¬¸» ­¬®«½¬«®» ¹»²»®¿´´§ô¿²¼ ·¬ ­¸±«´¼ ¿´­± ¾» ®»³»³¾»®»¼ ¬¸¿¬ ¬¸» »¨¬»®²¿´ ©¿´´­ ³«­¬ ¾»½¿°¿¾´» ±º ­«°°±®¬·²¹ ¬¸»³­»´ª»­ò

Ûºº»½¬­ ±² º®¿³»¼ ­¬®«½¬«®»­Ì·³¾»® ±® ­¬»»´ º®¿³»¼ ¾«·´¼·²¹­ ¿®» ´»­­ ´·µ»´§ ¬± »¨¸·¾·¬ ½®¿½µ·²¹¼«» ¬± ­©»´´ñ­¸®·²µ ¬¸¿² ³¿­±²®§ ¾«·´¼·²¹­ ¾»½¿«­» ±º ¬¸»·®º´»¨·¾·´·¬§ò ß´­±ô ¬¸» ¼±³·²¹ñ¼·­¸·²¹ »ºº»½¬­ ¬»²¼ ¬± ¾» ´±©»® ¾»½¿«­»±º ¬¸» ´·¹¸¬»® ©»·¹¸¬ ±º ©¿´´­ò ̸» ³¿·² ®·­µ­ ¬± º®¿³»¼ ¾«·´¼·²¹­ ¿®»»²½±«²¬»®»¼ ¾»½¿«­» ±º ¬¸» ·­±´¿¬»¼ °·»® º±±¬·²¹­ «­»¼ «²¼»® ©¿´´­òɸ»®» »®±­·±² ±® ­¿¬«®¿¬·±² ½¿«­» ¿ º±±¬·²¹ ¬± º¿´´ ¿©¿§ô ¬¸·­ ½¿²¼±«¾´» ¬¸» ­°¿² ©¸·½¸ ¿ ©¿´´ ³«­¬ ¾®·¼¹»ò ̸·­ ¿¼¼·¬·±²¿´ ­¬®»­­ ½¿²½®»¿¬» ½®¿½µ·²¹ ·² ©¿´´ ´·²·²¹­ô °¿®¬·½«´¿®´§ ©¸»®» ¬¸»®» ·­ ¿ ©»¿µ°±·²¬ ·² ¬¸» ­¬®«½¬«®» ½¿«­»¼ ¾§ ¿ ¼±±® ±® ©·²¼±© ±°»²·²¹ò ׬ ·­ô¸±©»ª»®ô «²´·µ»´§ ¬¸¿¬ º®¿³»¼ ­¬®«½¬«®»­ ©·´´ ¾» ­± ­¬®»­­»¼ ¿­ ¬± ­«ºº»®­»®·±«­ ¼¿³¿¹» ©·¬¸±«¬ º·®­¬ »¨¸·¾·¬·²¹ ­±³» ±® ¿´´ ±º ¬¸» ¿¾±ª»­§³°¬±³­ º±® ¿ ½±²­·¼»®¿¾´» °»®·±¼ò ̸» ­¿³» ©¿®²·²¹ °»®·±¼ ­¸±«´¼¿°°´§ ·² ¬¸» ½¿­» ±º «°¸»¿ª¿´ò ׬ ­¸±«´¼ ¾» ²±¬»¼ô ¸±©»ª»®ô ¬¸¿¬ ©¸»®»º®¿³»¼ ¾«·´¼·²¹­ ¿®» ­«°°±®¬»¼ ¾§ ­¬®·° º±±¬·²¹­ ¬¸»®» ·­ ±²´§ ±²» ´»¿º±º ¾®·½µ©±®µ ¿²¼ ¬¸»®»º±®» ¬¸» »¨¬»®²¿´´§ ª·­·¾´» ©¿´´­ ¿®» ¬¸»­«°°±®¬·²¹ ­¬®«½¬«®» º±® ¬¸» ¾«·´¼·²¹ò ײ ¬¸·­ ½¿­»ô ¬¸» ­«¾º´±±®³¿­±²®§ ©¿´´­ ½¿² ¾» »¨°»½¬»¼ ¬± ¾»¸¿ª» ¿­ º«´´ ¾®·½µ©±®µ ©¿´´­ò

Ûºº»½¬­ ±² ¾®·½µ ª»²»»® ­¬®«½¬«®»­Þ»½¿«­» ¬¸» ´±¿¼ó¾»¿®·²¹ ­¬®«½¬«®» ±º ¿ ¾®·½µ ª»²»»® ¾«·´¼·²¹ ·­ ¬¸»º®¿³» ¬¸¿¬ ³¿µ»­ «° ¬¸» ·²¬»®·±® ´»¿º ±º ¬¸» »¨¬»®²¿´ ©¿´´­ °´«­°»®¸¿°­ ¬¸» ·²¬»®²¿´ ©¿´´­ô ¼»°»²¼·²¹ ±² ¬¸» ¬§°» ±º ®±±ºô ¬¸»¾«·´¼·²¹ ½¿² ¾» »¨°»½¬»¼ ¬± ¾»¸¿ª» ¿­ ¿ º®¿³»¼ ­¬®«½¬«®»ô »¨½»°¬ ¬¸¿¬¬¸» »¨¬»®²¿´ ³¿­±²®§ ©·´´ ¾»¸¿ª» ·² ¿ ­·³·´¿® ©¿§ ¬± ¬¸» »¨¬»®²¿´ ´»¿º±º ¿ º«´´ ³¿­±²®§ ­¬®«½¬«®»ò

É¿¬»® Í»®ª·½» ¿²¼ Ü®¿·²¿¹»

ɸ»®» ¿ ©¿¬»® ­»®ª·½» °·°»ô ¿ ­»©»® ±® ­¬±®³©¿¬»® ¼®¿·²¿¹» °·°» ·­ ·²¬¸» ª·½·²·¬§ ±º ¿ ¾«·´¼·²¹ô ¿ ©¿¬»® ´»¿µ ½¿² ½¿«­» »®±­·±²ô ­©»´´·²¹ ±®­¿¬«®¿¬·±² ±º ­«­½»°¬·¾´» ­±·´ò Ûª»² ¿ ³·²«­½«´» ´»¿µ ½¿² ¾» »²±«¹¸¬± ­¿¬«®¿¬» ¿ ½´¿§ º±«²¼¿¬·±²ò ß ´»¿µ·²¹ ¬¿° ²»¿® ¿ ¾«·´¼·²¹ ½¿² ¸¿ª»¬¸» ­¿³» »ºº»½¬ò ײ ¿¼¼·¬·±²ô ¬®»²½¸»­ ½±²¬¿·²·²¹ °·°»­ ½¿² ¾»½±³»©¿¬»®½±«®­»­ »ª»² ¬¸±«¹¸ ¾¿½µº·´´»¼ô °¿®¬·½«´¿®´§ ©¸»®» ¾®±µ»²®«¾¾´» ·­ «­»¼ ¿­ º·´´ò É¿¬»® ¬¸¿¬ ®«²­ ¿´±²¹ ¬¸»­» ¬®»²½¸»­ ½¿² ¾»®»­°±²­·¾´» º±® ­»®·±«­ »®±­·±²ô ·²¬»®­¬®¿¬¿ ­»»°¿¹» ·²¬± ­«¾º´±±® ¿®»¿­¿²¼ ­¿¬«®¿¬·±²ò

з°» ´»¿µ¿¹» ¿²¼ ¬®»²½¸ ©¿¬»® º´±©­ ¿´­± »²½±«®¿¹» ¬®»» ¿²¼ ­¸®«¾®±±¬­ ¬± ¬¸» ­±«®½» ±º ©¿¬»®ô ½±³°´·½¿¬·²¹ ¿²¼ »¨¿½»®¾¿¬·²¹ ¬¸»°®±¾´»³òб±® ®±±º °´«³¾·²¹ ½¿² ®»­«´¬ ·² ´¿®¹» ª±´«³»­ ±º ®¿·²©¿¬»® ¾»·²¹½±²½»²¬®¿¬»¼ ·² ¿ ­³¿´´ ¿®»¿ ±º ­±·´æ

{ ײ½±®®»½¬ º¿´´­ ·² ®±±º ¹«¬¬»®·²¹ ³¿§ ®»­«´¬ ·² ±ª»®º´±©­ô ¿­ ³¿§¹«¬¬»®­ ¾´±½µ»¼ ©·¬¸ ´»¿ª»­ »¬½ò

{ ݱ®®±¼»¼ ¹«¬¬»®·²¹ ±® ¼±©²°·°»­ ½¿² ­°·´´ ©¿¬»® ¬± ¹®±«²¼ò

{ ܱ©²°·°»­ ²±¬ °±­·¬·ª»´§ ½±²²»½¬»¼ ¬± ¿ °®±°»® ­¬±®³©¿¬»®½±´´»½¬·±² ­§­¬»³ ©·´´ ¼·®»½¬ ¿ ½±²½»²¬®¿¬·±² ±º ©¿¬»® ¬± ­±·´ ¬¸¿¬ ·­¼·®»½¬´§ ¿¼¶¿½»²¬ ¬± º±±¬·²¹­ô ­±³»¬·³»­ ½¿«­·²¹ ´¿®¹»ó­½¿´»°®±¾´»³­ ­«½¸ ¿­ »®±­·±²ô ­¿¬«®¿¬·±² ¿²¼ ³·¹®¿¬·±² ±º ©¿¬»® «²¼»®¬¸» ¾«·´¼·²¹ò

Í»®·±«­²»­­ ±º Ý®¿½µ·²¹

ײ ¹»²»®¿´ô ³±­¬ ½®¿½µ·²¹ º±«²¼ ·² ³¿­±²®§ ©¿´´­ ·­ ¿ ½±­³»¬·½²«·­¿²½» ±²´§ ¿²¼ ½¿² ¾» µ»°¬ ·² ®»°¿·® ±® »ª»² ·¹²±®»¼ò ̸» ¬¿¾´»¾»´±© ·­ ¿ ®»°®±¼«½¬·±² ±º Ì¿¾´» Ýï ±º ßÍ îèéðò

ßÍ îèéð ¿´­± °«¾´·­¸»­ º·¹«®»­ ®»´¿¬·²¹ ¬± ½®¿½µ·²¹ ·² ½±²½®»¬» º´±±®­ô¸±©»ª»® ¾»½¿«­» ©¿´´ ½®¿½µ·²¹ ©·´´ «­«¿´´§ ®»¿½¸ ¬¸» ½®·¬·½¿´ °±·²¬­·¹²·º·½¿²¬´§ »¿®´·»® ¬¸¿² ½®¿½µ·²¹ ·² ­´¿¾­ô ¬¸·­ ¬¿¾´» ·­ ²±¬®»°®±¼«½»¼ ¸»®»ò

Ю»ª»²¬·±²ñÝ«®»

д«³¾·²¹É¸»®» ¾«·´¼·²¹ ³±ª»³»²¬ ·­ ½¿«­»¼ ¾§ ©¿¬»® ­»®ª·½»ô ®±±º °´«³¾·²¹ô­»©»® ±® ­¬±®³©¿¬»® º¿·´«®»ô ¬¸» ®»³»¼§ ·­ ¬± ®»°¿·® ¬¸» °®±¾´»³ò ׬ ·­ °®«¼»²¬ô ¸±©»ª»®ô ¬± ½±²­·¼»® ¿´­± ®»®±«¬·²¹ °·°»­ ¿©¿§ º®±³¬¸» ¾«·´¼·²¹ ©¸»®» °±­­·¾´»ô ¿²¼ ®»´±½¿¬·²¹ ¬¿°­ ¬± °±­·¬·±²­ ©¸»®»¿²§ ´»¿µ¿¹» ©·´´ ²±¬ ¼·®»½¬ ©¿¬»® ¬± ¬¸» ¾«·´¼·²¹ ª·½·²·¬§ò Ûª»² ©¸»®»¹«´´§ ¬®¿°­ ¿®» °®»­»²¬ô ¬¸»®» ·­ ­±³»¬·³»­ ­«ºº·½·»²¬ ­°·´´ ¬± ½®»¿¬»»®±­·±² ±® ­¿¬«®¿¬·±²ô °¿®¬·½«´¿®´§ ·² ³±¼»®² ·²­¬¿´´¿¬·±²­ «­·²¹­³¿´´»® ¼·¿³»¬»® ÐÊÝ º·¨¬«®»­ò ײ¼»»¼ô ­±³» ¹«´´§ ¬®¿°­ ¿®» ²±¬­·¬«¿¬»¼ ¼·®»½¬´§ «²¼»® ¬¸» ¬¿°­ ¬¸¿¬ ¿®» ·²­¬¿´´»¼ ¬± ½¸¿®¹» ¬¸»³ô©·¬¸ ¬¸» ®»­«´¬ ¬¸¿¬ ©¿¬»® º®±³ ¬¸» ¬¿° ³¿§ »²¬»® ¬¸» ¾¿½µº·´´»¼¬®»²½¸ ¬¸¿¬ ¸±«­»­ ¬¸» ­»©»® °·°·²¹ò ׺ ¬¸» ¬®»²½¸ ¸¿­ ¾»»² °±±®´§¾¿½µº·´´»¼ô ¬¸» ©¿¬»® ©·´´ »·¬¸»® °±²¼ ±® º´±© ¿´±²¹ ¬¸» ¾±¬¬±³ ±º¬¸» ¬®»²½¸ò ß­ ¬¸»­» ¬®»²½¸»­ «­«¿´´§ ®«² ¿´±²¹­·¼» ¬¸» º±±¬·²¹­ ¿²¼½¿² ¾» ¿¬ ¿ ­·³·´¿® ¼»°¬¸ô ·¬ ·­ ²±¬ ¸¿®¼ ¬± ­»» ¸±© ¿²§ ©¿¬»® ¬¸¿¬ ·­¬¸«­ ¼·®»½¬»¼ ·²¬± ¿ ¬®»²½¸ ½¿² »¿­·´§ ¿ºº»½¬ ¬¸» º±«²¼¿¬·±²K­ ¿¾·´·¬§ ¬±­«°°±®¬ º±±¬·²¹­ ±® »ª»² ¹¿·² »²¬®§ ¬± ¬¸» ­«¾º´±±® ¿®»¿ò

Ù®±«²¼ ¼®¿·²¿¹»×² ¿´´ ­±·´­ ¬¸»®» ·­ ¬¸» ½¿°¿½·¬§ º±® ©¿¬»® ¬± ¬®¿ª»´ ±² ¬¸» ­«®º¿½» ¿²¼¾»´±© ·¬ò Í«®º¿½» ©¿¬»® º´±©­ ½¿² ¾» »­¬¿¾´·­¸»¼ ¾§ ·²­°»½¬·±² ¼«®·²¹¿²¼ ¿º¬»® ¸»¿ª§ ±® °®±´±²¹»¼ ®¿·²ò ׺ ²»½»­­¿®§ô ¿ ¹®¿¬»¼ ¼®¿·² ­§­¬»³½±²²»½¬»¼ ¬± ¬¸» ­¬±®³©¿¬»® ½±´´»½¬·±² ­§­¬»³ ·­ «­«¿´´§ ¿² »¿­§­±´«¬·±²ò

׬ ·­ô ¸±©»ª»®ô ­±³»¬·³»­ ²»½»­­¿®§ ©¸»² ¿¬¬»³°¬·²¹ ¬± °®»ª»²¬©¿¬»® ³·¹®¿¬·±² ¬¸¿¬ ¬»­¬·²¹ ¾» ½¿®®·»¼ ±«¬ ¬± »­¬¿¾´·­¸ ©¿¬»®¬¿¾´»¸»·¹¸¬ ¿²¼ ­«¾­±·´ ©¿¬»® º´±©­ò ̸·­ ­«¾¶»½¬ ·­ ®»º»®®»¼ ¬± ·² ÞÌÚ ï翲¼ ³¿§ °®±°»®´§ ¾» ®»¹¿®¼»¼ ¿­ ¿² ¿®»¿ º±® ¿² »¨°»®¬ ½±²­«´¬¿²¬ò

Ю±¬»½¬·±² ±º ¬¸» ¾«·´¼·²¹ °»®·³»¬»®×¬ ·­ »­­»²¬·¿´ ¬± ®»³»³¾»® ¬¸¿¬ ¬¸» ­±·´ ¬¸¿¬ ¿ºº»½¬­ º±±¬·²¹­ »¨¬»²¼­©»´´ ¾»§±²¼ ¬¸» ¿½¬«¿´ ¾«·´¼·²¹ ´·²»ò É¿¬»®·²¹ ±º ¹¿®¼»² °´¿²¬­ô­¸®«¾­ ¿²¼ ¬®»»­ ½¿«­»­ ­±³» ±º ¬¸» ³±­¬ ­»®·±«­ ©¿¬»® °®±¾´»³­ò

Ú±® ¬¸·­ ®»¿­±²ô °¿®¬·½«´¿®´§ ©¸»®» °®±¾´»³­ »¨·­¬ ±® ¿®» ´·µ»´§ ¬±±½½«®ô ·¬ ·­ ®»½±³³»²¼»¼ ¬¸¿¬ ¿² ¿°®±² ±º °¿ª·²¹ ¾» ·²­¬¿´´»¼¿®±«²¼ ¿­ ³«½¸ ±º ¬¸» ¾«·´¼·²¹ °»®·³»¬»® ¿­ ²»½»­­¿®§ò ̸·­ °¿ª·²¹

ÝÔßÍÍ×Ú×ÝßÌ×ÑÒ ÑÚ ÜßÓßÙÛ É×ÌØ ÎÛÚÛÎÛÒÝÛ ÌÑ ÉßÔÔÍ

Ü»­½®·°¬·±² ±º ¬§°·½¿´ ¼¿³¿¹» ¿²¼ ®»¯«·®»¼ ®»°¿·® ß°°®±¨·³¿¬» ½®¿½µ ©·¼¬¸ Ü¿³¿¹»´·³·¬ ø­»» Ò±¬» í÷ ½¿¬»¹±®§

Ø¿·®´·²» ½®¿½µ­ äðòï ³³ ð

Ú·²» ½®¿½µ­ ©¸·½¸ ¼± ²±¬ ²»»¼ ®»°¿·® äï ³³ ï

Ý®¿½µ­ ²±¬·½»¿¾´» ¾«¬ »¿­·´§ º·´´»¼ò ܱ±®­ ¿²¼ ©·²¼±©­ ­¬·½µ ­´·¹¸¬´§ äë ³³ î

Ý®¿½µ­ ½¿² ¾» ®»°¿·®»¼ ¿²¼ °±­­·¾´§ ¿ ­³¿´´ ¿³±«²¬ ±º ©¿´´ ©·´´ ²»»¼ ëPïë ³³ ø±® ¿ ²«³¾»® ±º ½®¿½µ­ í¬± ¾» ®»°´¿½»¼ò ܱ±®­ ¿²¼ ©·²¼±©­ ­¬·½µò Í»®ª·½» °·°»­ ½¿² º®¿½¬«®»ò í ³³ ±® ³±®» ·² ±²» ¹®±«°÷É»¿¬¸»®¬·¹¸¬²»­­ ±º¬»² ·³°¿·®»¼

Û¨¬»²­·ª» ®»°¿·® ©±®µ ·²ª±´ª·²¹ ¾®»¿µ·²¹ó±«¬ ¿²¼ ®»°´¿½·²¹ ­»½¬·±²­ ±º ©¿´´­ô ïëPîë ³³ ¾«¬ ¿´­± ¼»°»²¼ ì»­°»½·¿´´§ ±ª»® ¼±±®­ ¿²¼ ©·²¼±©­ò É·²¼±© ¿²¼ ¼±±® º®¿³»­ ¼·­¬±®¬ò É¿´´­ ´»¿² ±² ²«³¾»® ±º ½®¿½µ­±® ¾«´¹» ²±¬·½»¿¾´§ô ­±³» ´±­­ ±º ¾»¿®·²¹ ·² ¾»¿³­ò Í»®ª·½» °·°»­ ¼·­®«°¬»¼

Page 130: SITE CLASSIFICATION REPORT SUMMARY...Douglas Partners (DP) has prepared this report for this project at Taylor 2- Stage 3, Taylor in accordance with DP’s proposal dated 15 September

­¸±«´¼ »¨¬»²¼ ±«¬©¿®¼­ ¿ ³·²·³«³ ±º çðð ³³ ø³±®» ·² ¸·¹¸´§®»¿½¬·ª» ­±·´÷ ¿²¼ ­¸±«´¼ ¸¿ª» ¿ ³·²·³«³ º¿´´ ¿©¿§ º®±³ ¬¸»¾«·´¼·²¹ ±º ïæêðò ̸» º·²·­¸»¼ °¿ª·²¹ ­¸±«´¼ ¾» ²± ´»­­ ¬¸¿² ïðð³³ ¾»´±© ¾®·½µ ª»²¬ ¾¿­»­ò

׬ ·­ °®«¼»²¬ ¬± ®»´±½¿¬» ¼®¿·²¿¹» °·°»­ ¿©¿§ º®±³ ¬¸·­ °¿ª·²¹ô ·º°±­­·¾´»ô ¬± ¿ª±·¼ ½±³°´·½¿¬·±²­ º®±³ º«¬«®» ´»¿µ¿¹»ò ׺ ¬¸·­ ·­ ²±¬°®¿½¬·½¿´ô »¿®¬¸»²©¿®» °·°»­ ­¸±«´¼ ¾» ®»°´¿½»¼ ¾§ ÐÊÝ ¿²¼¾¿½µº·´´·²¹ ­¸±«´¼ ¾» ±º ¬¸» ­¿³» ­±·´ ¬§°» ¿­ ¬¸» ­«®®±«²¼·²¹ ­±·´¿²¼ ½±³°¿½¬»¼ ¬± ¬¸» ­¿³» ¼»²­·¬§ò

Û¨½»°¬ ·² ¿®»¿­ ©¸»®» º®»»¦·²¹ ±º ©¿¬»® ·­ ¿² ·­­«»ô ·¬ ·­ ©·­» ¬±®»³±ª» ¬¿°­ ·² ¬¸» ¾«·´¼·²¹ ¿®»¿ ¿²¼ ®»´±½¿¬» ¬¸»³ ©»´´ ¿©¿§ º®±³¬¸» ¾«·´¼·²¹ P °®»º»®¿¾´§ ²±¬ «°¸·´´ º®±³ ·¬ ø­»» ÞÌÚ ïç÷ò

׬ ³¿§ ¾» ¼»­·®¿¾´» ¬± ·²­¬¿´´ ¿ ¹®¿¬»¼ ¼®¿·² ¿¬ ¬¸» ±«¬­·¼» »¼¹» ±º ¬¸»°¿ª·²¹ ±² ¬¸» «°¸·´´ ­·¼» ±º ¬¸» ¾«·´¼·²¹ò ׺ ­«¾­±·´ ¼®¿·²¿¹» ·­²»»¼»¼ ¬¸·­ ½¿² ¾» ·²­¬¿´´»¼ «²¼»® ¬¸» ­«®º¿½» ¼®¿·²ò

ݱ²¼»²­¿¬·±²×² ¾«·´¼·²¹­ ©·¬¸ ¿ ­«¾º´±±® ª±·¼ ­«½¸ ¿­ ©¸»®» ¾»¿®»®­ ¿²¼ ¶±·­¬­­«°°±®¬ º´±±®·²¹ô ·²­«ºº·½·»²¬ ª»²¬·´¿¬·±² ½®»¿¬»­ ·¼»¿´ ½±²¼·¬·±²­ º±®½±²¼»²­¿¬·±²ô °¿®¬·½«´¿®´§ ©¸»®» ¬¸»®» ·­ ´·¬¬´» ½´»¿®¿²½» ¾»¬©»»² ¬¸»º´±±® ¿²¼ ¬¸» ¹®±«²¼ò ݱ²¼»²­¿¬·±² ¿¼¼­ ¬± ¬¸» ³±·­¬«®» ¿´®»¿¼§°®»­»²¬ ·² ¬¸» ­«¾º´±±® ¿²¼ ­·¹²·º·½¿²¬´§ ­´±©­ ¬¸» °®±½»­­ ±º ¼®§·²¹±«¬ò ײ­¬¿´´¿¬·±² ±º ¿² ¿¼»¯«¿¬» ­«¾º´±±® ª»²¬·´¿¬·±² ­§­¬»³ô »·¬¸»®²¿¬«®¿´ ±® ³»½¸¿²·½¿´ô ·­ ¼»­·®¿¾´»ò

É¿®²·²¹æ ß´¬¸±«¹¸ ¬¸·­ Þ«·´¼·²¹ Ì»½¸²±´±¹§ Ú·´» ¼»¿´­ ©·¬¸½®¿½µ·²¹ ·² ¾«·´¼·²¹­ô ·¬ ­¸±«´¼ ¾» ­¿·¼ ¬¸¿¬ ­«¾º´±±® ³±·­¬«®» ½¿²®»­«´¬ ·² ¬¸» ¼»ª»´±°³»²¬ ±º ±¬¸»® °®±¾´»³­ô ²±¬¿¾´§æ

{ É¿¬»® ¬¸¿¬ ·­ ¬®¿²­³·¬¬»¼ ·²¬± ³¿­±²®§ô ³»¬¿´ ±® ¬·³¾»® ¾«·´¼·²¹»´»³»²¬­ ½¿«­»­ ¼¿³¿¹» ¿²¼ñ±® ¼»½¿§ ¬± ¬¸±­» »´»³»²¬­ò

{ Ø·¹¸ ­«¾º´±±® ¸«³·¼·¬§ ¿²¼ ³±·­¬«®» ½±²¬»²¬ ½®»¿¬» ¿² ·¼»¿´»²ª·®±²³»²¬ º±® ª¿®·±«­ °»­¬­ô ·²½´«¼·²¹ ¬»®³·¬»­ ¿²¼ ­°·¼»®­ò

{ ɸ»®» ¸·¹¸ ³±·­¬«®» ´»ª»´­ ¿®» ¬®¿²­³·¬¬»¼ ¬± ¬¸» º´±±®·²¹ ¿²¼©¿´´­ô ¿² ·²½®»¿­» ·² ¬¸» ¼«­¬ ³·¬» ½±«²¬ ½¿² »²­«» ©·¬¸·² ¬¸»´·ª·²¹ ¿®»¿­ò Ü«­¬ ³·¬»­ô ¿­ ©»´´ ¿­ ¼¿³°²»­­ ·² ¹»²»®¿´ô ½¿² ¾» ¿¸»¿´¬¸ ¸¿¦¿®¼ ¬± ·²¸¿¾·¬¿²¬­ô °¿®¬·½«´¿®´§ ¬¸±­» ©¸± ¿®»¿¾²±®³¿´´§ ­«­½»°¬·¾´» ¬± ®»­°·®¿¬±®§ ¿·´³»²¬­ò

̸» ¹¿®¼»²Ì¸» ·¼»¿´ ª»¹»¬¿¬·±² ´¿§±«¬ ·­ ¬± ¸¿ª» ´¿©² ±® °´¿²¬­ ¬¸¿¬ ®»¯«·®»±²´§ ´·¹¸¬ ©¿¬»®·²¹ ·³³»¼·¿¬»´§ ¿¼¶¿½»²¬ ¬± ¬¸» ¼®¿·²¿¹» ±® °¿ª·²¹»¼¹»ô ¬¸»² ³±®» ¼»³¿²¼·²¹ °´¿²¬­ô ­¸®«¾­ ¿²¼ ¬®»»­ ­°®»¿¼ ±«¬ ·²¬¸¿¬ ±®¼»®ò

Ѫ»®©¿¬»®·²¹ ¼«» ¬± ³·­«­» ±º ¿«¬±³¿¬·½ ©¿¬»®·²¹ ­§­¬»³­ ·­ ¿½±³³±² ½¿«­» ±º ­¿¬«®¿¬·±² ¿²¼ ©¿¬»® ³·¹®¿¬·±² «²¼»® º±±¬·²¹­ò ׺·¬ ·­ ²»½»­­¿®§ ¬± «­» ¬¸»­» ­§­¬»³­ô ·¬ ·­ ·³°±®¬¿²¬ ¬± ®»³±ª» ¹¿®¼»²¾»¼­ ¬± ¿ ½±³°´»¬»´§ ­¿º» ¼·­¬¿²½» º®±³ ¾«·´¼·²¹­ò

Û¨·­¬·²¹ ¬®»»­É¸»®» ¿ ¬®»» ·­ ½¿«­·²¹ ¿ °®±¾´»³ ±º ­±·´ ¼®§·²¹ ±® ¬¸»®» ·­ ¬¸»»¨·­¬»²½» ±® ¬¸®»¿¬ ±º «°¸»¿ª¿´ ±º º±±¬·²¹­ô ·º ¬¸» ±ºº»²¼·²¹ ®±±¬­ ¿®»­«¾­·¼·¿®§ ¿²¼ ¬¸»·® ®»³±ª¿´ ©·´´ ²±¬ ­·¹²·º·½¿²¬´§ ¼¿³¿¹» ¬¸» ¬®»»ô¬¸»§ ­¸±«´¼ ¾» ­»ª»®»¼ ¿²¼ ¿ ½±²½®»¬» ±® ³»¬¿´ ¾¿®®·»® °´¿½»¼ª»®¬·½¿´´§ ·² ¬¸» ­±·´ ¬± °®»ª»²¬ º«¬«®» ®±±¬ ¹®±©¬¸ ·² ¬¸» ¼·®»½¬·±² ±º¬¸» ¾«·´¼·²¹ò ׺ ·¬ ·­ ²±¬ °±­­·¾´» ¬± ®»³±ª» ¬¸» ®»´»ª¿²¬ ®±±¬­©·¬¸±«¬ ¼¿³¿¹» ¬± ¬¸» ¬®»»ô ¿² ¿°°´·½¿¬·±² ¬± ®»³±ª» ¬¸» ¬®»» ­¸±«´¼¾» ³¿¼» ¬± ¬¸» ´±½¿´ ¿«¬¸±®·¬§ò ß °®«¼»²¬ °´¿² ·­ ¬± ¬®¿²­°´¿²¬ ´·µ»´§±ºº»²¼»®­ ¾»º±®» ¬¸»§ ¾»½±³» ¿ °®±¾´»³ò

ײº±®³¿¬·±² ±² ¬®»»­ô °´¿²¬­ ¿²¼ ­¸®«¾­Í¬¿¬» ¼»°¿®¬³»²¬­ ±ª»®­»»·²¹ ¿¹®·½«´¬«®» ½¿² ¹·ª» ·²º±®³¿¬·±²®»¹¿®¼·²¹ ®±±¬ °¿¬¬»®²­ô ª±´«³» ±º ©¿¬»® ²»»¼»¼ ¿²¼ ­¿º» ¼·­¬¿²½»º®±³ ¾«·´¼·²¹­ ±º ³±­¬ ­°»½·»­ò Þ±¬¿²·½ ¹¿®¼»²­ ¿®» ¿´­± ­±«®½»­ ±º·²º±®³¿¬·±²ò Ú±® ·²º±®³¿¬·±² ±² °´¿²¬ ®±±¬­ ¿²¼ ¼®¿·²­ô ­»» Þ«·´¼·²¹Ì»½¸²±´±¹§ Ú·´» ïéò

Û¨½¿ª¿¬·±²Û¨½¿ª¿¬·±² ¿®±«²¼ º±±¬·²¹­ ³«­¬ ¾» °®±°»®´§ »²¹·²»»®»¼ò ͱ·´­«°°±®¬·²¹ º±±¬·²¹­ ½¿² ±²´§ ¾» ­¿º»´§ »¨½¿ª¿¬»¼ ¿¬ ¿² ¿²¹´» ¬¸¿¬¿´´±©­ ¬¸» ­±·´ «²¼»® ¬¸» º±±¬·²¹ ¬± ®»³¿·² ­¬¿¾´»ò ̸·­ ¿²¹´» ·­½¿´´»¼ ¬¸» ¿²¹´» ±º ®»°±­» ø±® º®·½¬·±²÷ ¿²¼ ª¿®·»­ ­·¹²·º·½¿²¬´§¾»¬©»»² ­±·´ ¬§°»­ ¿²¼ ½±²¼·¬·±²­ò λ³±ª¿´ ±º ­±·´ ©·¬¸·² ¬¸» ¿²¹´»±º ®»°±­» ©·´´ ½¿«­» ­«¾­·¼»²½»ò

λ³»¼·¿¬·±²

ɸ»®» »®±­·±² ¸¿­ ±½½«®®»¼ ¬¸¿¬ ¸¿­ ©¿­¸»¼ ¿©¿§ ­±·´ ¿¼¶¿½»²¬ ¬±º±±¬·²¹­ô ­±·´ ±º ¬¸» ­¿³» ½´¿­­·º·½¿¬·±² ­¸±«´¼ ¾» ·²¬®±¼«½»¼ ¿²¼½±³°¿½¬»¼ ¬± ¬¸» ­¿³» ¼»²­·¬§ò ɸ»®» º±±¬·²¹­ ¸¿ª» ¾»»²«²¼»®³·²»¼ô ¿«¹³»²¬¿¬·±² ±® ±¬¸»® ­°»½·¿´·­¬ ©±®µ ³¿§ ¾» ®»¯«·®»¼òλ³»¼·¿¬·±² ±º º±±¬·²¹­ ¿²¼ º±«²¼¿¬·±²­ ·­ ¹»²»®¿´´§ ¬¸» ®»¿´³ ±º ¿­°»½·¿´·­¬ ½±²­«´¬¿²¬ò

ɸ»®» ·­±´¿¬»¼ º±±¬·²¹­ ®·­» ¿²¼ º¿´´ ¾»½¿«­» ±º ­©»´´ñ­¸®·²µ »ºº»½¬ô¬¸» ¸±³»±©²»® ³¿§ ¾» ¬»³°¬»¼ ¬± ¿´´»ª·¿¬» º´±±® ¾±«²½» ¾§ º·´´·²¹¬¸» ¹¿° ¬¸¿¬ ¸¿­ ¿°°»¿®»¼ ¾»¬©»»² ¬¸» ¾»¿®»® ¿²¼ ¬¸» °·»® ©·¬¸¾´±½µ·²¹ò ̸» ¼¿²¹»® ¸»®» ·­ ¬¸¿¬ ©¸»² ¬¸» ²»¨¬ ­©»´´ ­»¹³»²¬ ±º ¬¸»½§½´» ±½½«®­ô ¬¸» »¨¬®¿ ¾´±½µ·²¹ ©·´´ °«­¸ ¬¸» º´±±® «° ·²¬± ¿²¿½½»²¬«¿¬»¼ ¼±³» ¿²¼ ³¿§ ¿´­± ½¿«­» ´±½¿´ ­¸»¿® º¿·´«®» ·² ¬¸» ­±·´ò׺ ·¬ ·­ ²»½»­­¿®§ ¬± «­» ¾´±½µ·²¹ô ·¬ ­¸±«´¼ ¾» ¾§ ¿ °¿·® ±º º·²»©»¼¹»­ ¿²¼ ³±²·¬±®·²¹ ­¸±«´¼ ¾» ½¿®®·»¼ ±«¬ º±®¬²·¹¸¬´§ò

̸·­ ÞÌÚ ©¿­ °®»°¿®»¼ ¾§ Ö±¸² Ô»©»® Úß×Þô Ó×ßÓßô ﮬ²»®ô

ݱ²­¬®«½¬·±² Ü·¿¹²±­·­ò

̸» ·²º±®³¿¬·±² ·² ¬¸·­ ¿²¼ ±¬¸»® ·­­«»­ ·² ¬¸» ­»®·»­ ©¿­ ¼»®·ª»¼ º®±³ ª¿®·±«­ ­±«®½»­ ¿²¼ ©¿­ ¾»´·»ª»¼ ¬± ¾» ½±®®»½¬ ©¸»² °«¾´·­¸»¼ò

̸» ·²º±®³¿¬·±² ·­ ¿¼ª·­±®§ò ׬ ·­ °®±ª·¼»¼ ·² ¹±±¼ º¿·¬¸ ¿²¼ ²±¬ ½´¿·³»¼ ¬± ¾» ¿² »¨¸¿«­¬·ª» ¬®»¿¬³»²¬ ±º ¬¸» ®»´»ª¿²¬ ­«¾¶»½¬ò

Ú«®¬¸»® °®±º»­­·±²¿´ ¿¼ª·½» ²»»¼­ ¬± ¾» ±¾¬¿·²»¼ ¾»º±®» ¬¿µ·²¹ ¿²§ ¿½¬·±² ¾¿­»¼ ±² ¬¸» ·²º±®³¿¬·±² °®±ª·¼»¼ò

Ü·­¬®·¾«¬»¼ ¾§

ÝÍ×ÎÑ ÐËÞÔ ×ÍØ ×ÒÙ ÐÑ Þ±¨ ïïíçô ݱ´´·²¹©±±¼ íðêêô ß«­¬®¿´·¿

Ú®»»½¿´´ ïèðð êìë ðëï Ì»´ øðí÷ çêêî éêêê Ú¿¨ øðí÷ çêêî éëëë ©©©ò°«¾´·­¸ò½­·®±ò¿«

Û³¿·´æ °«¾´·­¸·²¹ò­¿´»­à½­·®±ò¿«

w ÝÍ×ÎÑ îððíò ˲¿«¬¸±®·­»¼ ½±°§·²¹ ±º ¬¸·­ Þ«·´¼·²¹ Ì»½¸²±´±¹§ º·´» ·­ °®±¸·¾·¬»¼

Ù¿®¼»²­ º±® ¿ ®»¿½¬·ª» ­·¬»

Page 131: SITE CLASSIFICATION REPORT SUMMARY...Douglas Partners (DP) has prepared this report for this project at Taylor 2- Stage 3, Taylor in accordance with DP’s proposal dated 15 September

TOPSOIL FILLING-dry to moist, brown silty sand

FILLING-generally comprising well compacted, dry tomoist, orange red brown, medium plasticity sandy siltyclay

SILTY CLAY-very stiff, dry to moist, yellow brown, mediumplasticity silty clay with some fine grained gravel

SILTY SAND-hard, dry to moist, brown, fine to coarsegrained silty sand with some clay

SILTY SANDY CLAY-hard, dry to moist, yellow greybrown, low to medium plasticity silty sandy clay

Pit discontinued at 1.85m-limit of investigation

0.1

0.7

1.4

1.6

1.85

SAMPLING & IN SITU TESTING LEGEND

TEST PIT LOG

Taylor 2 Estate, Stage 3, Taylor

A Auger sample G Gas sample PID Photo ionisation detector (ppm)B Bulk sample P Piston sample PL(A) Point load axial test Is(50) (MPa)BLK Block sample Ux Tube sample (x mm dia.) PL(D) Point load diametral test Is(50) (MPa)C Core drilling W Water sample pp Pocket penetrometer (kPa)D Disturbed sample Water seep S Standard penetration testE Environmental sample Water level V Shear vane (kPa)

Indesco Consulting Engineers Pty LtdSite Classifications

Results &Comments

LOGGED: JPM SURVEY DATUM: MGA94

CLIENT:PROJECT:LOCATION:

PIT No: 54PROJECT No: 77418.29DATE: 11/1/2019SHEET 1 OF 1

Sampling & In Situ Testing

1

2

Wat

er

Dep

th

Sam

ple

Description

of

Strata Gra

phic

Log

Typ

e

REMARKS: Surface Levels & Coordinates are approximate only and must not be relied upon

RIG: Kubota KX057-4 mini-excavator with 300mm wide bucket

WATER OBSERVATIONS: No free groundwater observed

SURFACE LEVEL: 662.0 AHDEASTING: 209147NORTHING: 618759

Dynamic Penetrometer Test(blows per mm)

5 10 15 20

Cone Penetrometer AS1289.6.3.2Sand Penetrometer AS1289.6.3.3

Depth(m) R

L

1

2

662

661

660

D

D

D

0.8

1.5

1.7

pp = 370

Page 132: SITE CLASSIFICATION REPORT SUMMARY...Douglas Partners (DP) has prepared this report for this project at Taylor 2- Stage 3, Taylor in accordance with DP’s proposal dated 15 September

TOPSOIL FILLING-dry to moist, brown silty sand

FILLING-generally comprising well compacted, dry tomoist, orange brown, medium plasticity sandy silty clay

SILTY SANDY GRAVEL--medium dense, dry to moist,yellow brown, fine to coarse grained silty sandy gravel

SILTY SANDY CLAY-hard, dry to moist, orange brown,medium plasticity silty sandy clay

SILTSTONE-very low to low strength, highly weathered,grey red brown, fine grained siltstone, highly fractured

Pit discontinued at 1.9m-limit of investigation

0.1

0.5

0.8

1.4

1.9

SAMPLING & IN SITU TESTING LEGEND

TEST PIT LOG

Taylor 2 Estate, Stage 3, Taylor

A Auger sample G Gas sample PID Photo ionisation detector (ppm)B Bulk sample P Piston sample PL(A) Point load axial test Is(50) (MPa)BLK Block sample Ux Tube sample (x mm dia.) PL(D) Point load diametral test Is(50) (MPa)C Core drilling W Water sample pp Pocket penetrometer (kPa)D Disturbed sample Water seep S Standard penetration testE Environmental sample Water level V Shear vane (kPa)

Indesco Consulting Engineers Pty LtdSite Classifications

Results &Comments

LOGGED: JPM SURVEY DATUM: MGA94

CLIENT:PROJECT:LOCATION:

PIT No: 55PROJECT No: 77418.29DATE: 11/1/2019SHEET 1 OF 1

Sampling & In Situ Testing

1

2

Wat

er

Dep

th

Sam

ple

Description

of

Strata Gra

phic

Log

Typ

e

REMARKS: Surface Levels & Coordinates are approximate only and must not be relied upon

RIG: Kubota KX057-4 mini-excavator with 300mm wide bucket

WATER OBSERVATIONS: No free groundwater observed

SURFACE LEVEL: 663.0 AHDEASTING: 209167NORTHING: 618782

Dynamic Penetrometer Test(blows per mm)

5 10 15 20

Cone Penetrometer AS1289.6.3.2Sand Penetrometer AS1289.6.3.3

Depth(m) R

L

1

2

663

662

661

D

D

D

0.6

1.2

1.5

pp >400

Page 133: SITE CLASSIFICATION REPORT SUMMARY...Douglas Partners (DP) has prepared this report for this project at Taylor 2- Stage 3, Taylor in accordance with DP’s proposal dated 15 September
Page 134: SITE CLASSIFICATION REPORT SUMMARY...Douglas Partners (DP) has prepared this report for this project at Taylor 2- Stage 3, Taylor in accordance with DP’s proposal dated 15 September

SITE CLASSIFICATION REPORT SUMMARY

BLOCK: 9 SECTION: 64 SUBURB: Taylor

JOB No: 77418.29 DATE: March 2019

CLIENT: Indesco Consulting Engineers Pty Ltd

Classification Procedures: Existing Subsurface Conditions: Refer attached test pit log(s) – Pit(s) 53,54 and Drawing 1. Bulk Earthworks: Filling within the block placed under Level 1 control as defined in AS 3798 – 2007 (Ref 1). Laboratory Results: Previous laboratory testing results indicated liquid limit ranging from 25-66%, plasticity index ranging from 6-49% and linear shrinkage ranging from 3-20.5%.

Site Classification: Class M* (moderately reactive/filled) based on the current profile / state on limited subsurface information and determined in general accordance with the requirements of AS2870-2011 (Ref 2). The classification must be reassessed should the soil profile change either by adding fill or removing soil from the block and/or if the presence of service trenches or retaining walls are within the zone of influence of the block. Reference should be made to the comments provided below.

Footing Systems: Reference must be made to AS2870-2011 (Ref 2) which indicates footing systems that are appropriate for each site classification. All footings must found within a uniform bearing stratum of suitable strength/material, below the zone of influence of any service trenches, backfill zones, retaining walls or underground structures. Masonry walls should be articulated in accordance with current best practice. Dwelling design must ensure uniform moisture conditions are maintained in the vicinity of footings. Footing systems must be confirmed by a structural engineer taking into consideration any onsite or offsite constraints.

Maintenance Guidelines: Reference should be made to the attached CSIRO Sheet BTF 18 ‘Foundation Maintenance & Footing Performance’ to comments about gardens, landscaping and trees on the performance of foundation soils and in particular in respect to maintaining good surface drainage. It notes that minor cracking in most structures is inevitable, and it describes site maintenance practices aimed at minimising foundation movements that can lead to cracking damage.

Comments/ Limitations:

The successful purchaser must make their own interpretations, deductions and conclusions from the information made available and will need to accept full responsibility for such interpretations, deductions and conclusions.

Development specific geotechnical investigations must be undertaken.

Additional topsoils / filling may have been spread subsequent to the investigation.

Site preparation prior to the construction should include removal of all vegetation, topsoil and any uncontrolled filling.

All new filling must be placed under controlled conditions (AS 3798-2007), otherwise Class P conditions would be warranted.

Some variability in subsurface conditions must be anticipated.

Moisture condition of site soils and/or the presence of groundwater may vary considerably from time of investigation compared to at the time of construction.

Depending on the depth of site cut and trenches, rock excavation may be required.

It is recommended that footing excavations be inspected by a geotechnical engineer.

This report must be read in conjunction with the attached “Limitations” and notes “About this Report”.

References:

1. 2.

AS 3798-2007 ‘Guidelines on Earthworks for Commercial and Residential Developments’, Standards Association of Australia. AS 2870-2011 ‘Residential Slabs and Footings,’ Standards Association of Australia.

Attachments:

Limitations & About this Report Explanatory Notes Test Pit Log(s) Pit(s) 53,54 Drawing 1

Page 135: SITE CLASSIFICATION REPORT SUMMARY...Douglas Partners (DP) has prepared this report for this project at Taylor 2- Stage 3, Taylor in accordance with DP’s proposal dated 15 September

FS 604853

Douglas Partners Pty Ltd ABN 75 053 980 117

www.douglaspartners.com.au Unit 2, 73 Sheppard Street

Hume ACT 2620 PO Box 1487

Fyshwick ACT 2609 Phone (02) 6260 2788

Fax (02) 6260 1147

Brisbane • Cairns • Canberra • Central Coast • Coffs Harbour • Darwin • Geelong • Gold Coast • Macarthur • Melbourne Newcastle • North West Sydney • Perth • Port Macquarie • Sunshine Coast • Sydney • Townsville • Wollongong

Limitations Douglas Partners (DP) has prepared this report for this project at Taylor 2 - Stage 3, Taylor in accordance with DP’s proposal dated 15 September 2017 and acceptance received from Indesco Consulting Engineers Pty Ltd dated 13 March 2019. The work was carried out under DP’s Conditions of Engagement. This report is provided for the exclusive use of Indesco Consulting Engineers Pty Ltd for this project only and for the purposes as described in the report. It should not be used by or relied upon for other projects or purposes on the same or other site or by a third party. Any party so relying upon this report beyond its exclusive use and purpose as stated above, and without the express written consent of DP, does so entirely at its own risk and without recourse to DP for any loss or damage. In preparing this report DP has necessarily relied upon information provided by the client and/or their agents. The results provided in the report are indicative of the sub-surface conditions on the site only at the specific sampling and/or testing locations, and then only to the depths investigated and at the time the work was carried out. Sub-surface conditions can change abruptly due to variable geological processes and also as a result of human influences. Such changes may occur after DP’s field testing has been completed. DP’s advice is based upon the conditions encountered during this investigation. The accuracy of the advice provided by DP in this report may be affected by undetected variations in ground conditions across the site between and beyond the sampling and/or testing locations. The advice may also be limited by budget constraints imposed by others or by site accessibility. This report must be read in conjunction with all of the attached and should be kept in its entirety without separation of individual pages or sections. DP cannot be held responsible for interpretations or conclusions made by others unless they are supported by an expressed statement, interpretation, outcome or conclusion stated in this report. This report, or sections from this report, should not be used as part of a specification for a project, without review and agreement by DP. This is because this report has been written as advice and opinion rather than instructions for construction. The scope for work for this investigation/report did not include the assessment of surface or sub-surface materials or groundwater for contaminants, within or adjacent to the site. Should evidence of filling of unknown origin be noted in the report, and in particular the presence of building demolition materials, it should be recognised that there may be some risk that such filling may contain contaminants and hazardous building materials. The contents of this report do not constitute formal design components such as are required, by the Health and Safety Legislation and Regulations, to be included in a Safety Report specifying the hazards likely to be encountered during construction and the controls required to mitigate risk. This design process requires risk assessment to be undertaken, with such assessment being dependent upon factors relating to likelihood of occurrence and consequences of damage to property and to life. This, in turn, requires project data and analysis presently beyond the knowledge and project role respectively of DP. DP may be able, however, to assist the client in carrying out a risk assessment of potential hazards contained in the Comments section of this report, as an extension to the current scope of works, if so requested, and provided that suitable additional information is made available to DP. Any such risk assessment would, however, be necessarily restricted to the geotechnical components set out in this report and to their application by the project designers to project design, construction, maintenance and demolition.

Page 136: SITE CLASSIFICATION REPORT SUMMARY...Douglas Partners (DP) has prepared this report for this project at Taylor 2- Stage 3, Taylor in accordance with DP’s proposal dated 15 September

July 2010

Introduction These notes have been provided to amplify DP's report in regard to classification methods, field procedures and the comments section. Not all are necessarily relevant to all reports. DP's reports are based on information gained from limited subsurface excavations and sampling, supplemented by knowledge of local geology and experience. For this reason, they must be regarded as interpretive rather than factual documents, limited to some extent by the scope of information on which they rely. Copyright This report is the property of Douglas Partners Pty Ltd. The report may only be used for the purpose for which it was commissioned and in accordance with the Conditions of Engagement for the commission supplied at the time of proposal. Unauthorised use of this report in any form whatsoever is prohibited. Borehole and Test Pit Logs The borehole and test pit logs presented in this report are an engineering and/or geological interpretation of the subsurface conditions, and their reliability will depend to some extent on frequency of sampling and the method of drilling or excavation. Ideally, continuous undisturbed sampling or core drilling will provide the most reliable assessment, but this is not always practicable or possible to justify on economic grounds. In any case the boreholes and test pits represent only a very small sample of the total subsurface profile. Interpretation of the information and its application to design and construction should therefore take into account the spacing of boreholes or pits, the frequency of sampling, and the possibility of other than 'straight line' variations between the test locations. Groundwater Where groundwater levels are measured in boreholes there are several potential problems, namely: • In low permeability soils groundwater may

enter the hole very slowly or perhaps not at all during the time the hole is left open;

• A localised, perched water table may lead to an erroneous indication of the true water table;

• Water table levels will vary from time to time with seasons or recent weather changes. They may not be the same at the time of construction as are indicated in the report; and

• The use of water or mud as a drilling fluid will mask any groundwater inflow. Water has to be blown out of the hole and drilling mud must first be washed out of the hole if water measurements are to be made.

More reliable measurements can be made by installing standpipes which are read at intervals over several days, or perhaps weeks for low permeability soils. Piezometers, sealed in a particular stratum, may be advisable in low permeability soils or where there may be interference from a perched water table. Reports The report has been prepared by qualified personnel, is based on the information obtained from field and laboratory testing, and has been undertaken to current engineering standards of interpretation and analysis. Where the report has been prepared for a specific design proposal, the information and interpretation may not be relevant if the design proposal is changed. If this happens, DP will be pleased to review the report and the sufficiency of the investigation work. Every care is taken with the report as it relates to interpretation of subsurface conditions, discussion of geotechnical and environmental aspects, and recommendations or suggestions for design and construction. However, DP cannot always anticipate or assume responsibility for: • Unexpected variations in ground conditions.

The potential for this will depend partly on borehole or pit spacing and sampling frequency;

• Changes in policy or interpretations of policy by statutory authorities; or

• The actions of contractors responding to commercial pressures.

If these occur, DP will be pleased to assist with investigations or advice to resolve the matter.

Page 137: SITE CLASSIFICATION REPORT SUMMARY...Douglas Partners (DP) has prepared this report for this project at Taylor 2- Stage 3, Taylor in accordance with DP’s proposal dated 15 September

July 2010

Site Anomalies In the event that conditions encountered on site during construction appear to vary from those which were expected from the information contained in the report, DP requests that it be immediately notified. Most problems are much more readily resolved when conditions are exposed rather than at some later stage, well after the event. Information for Contractual Purposes Where information obtained from this report is provided for tendering purposes, it is recommended that all information, including the written report and discussion, be made available. In circumstances where the discussion or comments section is not relevant to the contractual situation, it may be appropriate to prepare a specially edited document. DP would be pleased to assist in this regard and/or to make additional report copies available for contract purposes at a nominal charge. Site Inspection The company will always be pleased to provide engineering inspection services for geotechnical and environmental aspects of work to which this report is related. This could range from a site visit to confirm that conditions exposed are as expected, to full time engineering presence on site.

Page 138: SITE CLASSIFICATION REPORT SUMMARY...Douglas Partners (DP) has prepared this report for this project at Taylor 2- Stage 3, Taylor in accordance with DP’s proposal dated 15 September

July 2010

Sampling Sampling is carried out during drilling or test pitting to allow engineering examination (and laboratory testing where required) of the soil or rock. Disturbed samples taken during drilling provide information on colour, type, inclusions and, depending upon the degree of disturbance, some information on strength and structure. Undisturbed samples are taken by pushing a thin-walled sample tube into the soil and withdrawing it to obtain a sample of the soil in a relatively undisturbed state. Such samples yield information on structure and strength, and are necessary for laboratory determination of shear strength and compressibility. Undisturbed sampling is generally effective only in cohesive soils. Test Pits Test pits are usually excavated with a backhoe or an excavator, allowing close examination of the in-situ soil if it is safe to enter into the pit. The depth of excavation is limited to about 3 m for a backhoe and up to 6 m for a large excavator. A potential disadvantage of this investigation method is the larger area of disturbance to the site. Large Diameter Augers Boreholes can be drilled using a rotating plate or short spiral auger, generally 300 mm or larger in diameter commonly mounted on a standard piling rig. The cuttings are returned to the surface at intervals (generally not more than 0.5 m) and are disturbed but usually unchanged in moisture content. Identification of soil strata is generally much more reliable than with continuous spiral flight augers, and is usually supplemented by occasional undisturbed tube samples. Continuous Spiral Flight Augers The borehole is advanced using 90-115 mm diameter continuous spiral flight augers which are withdrawn at intervals to allow sampling or in-situ testing. This is a relatively economical means of drilling in clays and sands above the water table. Samples are returned to the surface, or may be collected after withdrawal of the auger flights, but they are disturbed and may be mixed with soils from the sides of the hole. Information from the drilling (as distinct from specific sampling by SPTs or undisturbed samples) is of relatively low

reliability, due to the remoulding, possible mixing or softening of samples by groundwater. Non-core Rotary Drilling The borehole is advanced using a rotary bit, with water or drilling mud being pumped down the drill rods and returned up the annulus, carrying the drill cuttings. Only major changes in stratification can be determined from the cuttings, together with some information from the rate of penetration. Where drilling mud is used this can mask the cuttings and reliable identification is only possible from separate sampling such as SPTs. Continuous Core Drilling A continuous core sample can be obtained using a diamond tipped core barrel, usually with a 50 mm internal diameter. Provided full core recovery is achieved (which is not always possible in weak rocks and granular soils), this technique provides a very reliable method of investigation. Standard Penetration Tests Standard penetration tests (SPT) are used as a means of estimating the density or strength of soils and also of obtaining a relatively undisturbed sample. The test procedure is described in Australian Standard 1289, Methods of Testing Soils for Engineering Purposes - Test 6.3.1. The test is carried out in a borehole by driving a 50 mm diameter split sample tube under the impact of a 63 kg hammer with a free fall of 760 mm. It is normal for the tube to be driven in three successive 150 mm increments and the 'N' value is taken as the number of blows for the last 300 mm. In dense sands, very hard clays or weak rock, the full 450 mm penetration may not be practicable and the test is discontinued. The test results are reported in the following form. • In the case where full penetration is obtained

with successive blow counts for each 150 mm of, say, 4, 6 and 7 as:

4,6,7 N=13

• In the case where the test is discontinued before the full penetration depth, say after 15 blows for the first 150 mm and 30 blows for the next 40 mm as:

15, 30/40 mm

Page 139: SITE CLASSIFICATION REPORT SUMMARY...Douglas Partners (DP) has prepared this report for this project at Taylor 2- Stage 3, Taylor in accordance with DP’s proposal dated 15 September

July 2010

The results of the SPT tests can be related empirically to the engineering properties of the soils. Dynamic Cone Penetrometer Tests / Perth Sand Penetrometer Tests Dynamic penetrometer tests (DCP or PSP) are carried out by driving a steel rod into the ground using a standard weight of hammer falling a specified distance. As the rod penetrates the soil the number of blows required to penetrate each successive 150 mm depth are recorded. Normally there is a depth limitation of 1.2 m, but this may be extended in certain conditions by the use of extension rods. Two types of penetrometer are commonly used. • Perth sand penetrometer - a 16 mm diameter

flat ended rod is driven using a 9 kg hammer dropping 600 mm (AS 1289, Test 6.3.3). This test was developed for testing the density of sands and is mainly used in granular soils and filling.

• Cone penetrometer - a 16 mm diameter rod with a 20 mm diameter cone end is driven using a 9 kg hammer dropping 510 mm (AS 1289, Test 6.3.2). This test was developed initially for pavement subgrade investigations, and correlations of the test results with California Bearing Ratio have been published by various road authorities.

Page 140: SITE CLASSIFICATION REPORT SUMMARY...Douglas Partners (DP) has prepared this report for this project at Taylor 2- Stage 3, Taylor in accordance with DP’s proposal dated 15 September

May 2017

Description and Classification Methods The methods of description and classification of

soils and rocks used in this report are based on

Australian Standard AS 1726-1993, Geotechnical

Site Investigations Code. In general, the

descriptions include strength or density, colour,

structure, soil or rock type and inclusions.

Soil Types Soil types are described according to the

predominant particle size, qualified by the grading

of other particles present:

Type Particle size (mm)

Boulder >200

Cobble 63 - 200

Gravel 2.36 - 63

Sand 0.075 - 2.36

Silt 0.002 - 0.075

Clay <0.002

The sand and gravel sizes can be further

subdivided as follows:

Type Particle size (mm)

Coarse gravel 20 - 63

Medium gravel 6 - 20

Fine gravel 2.36 - 6

Coarse sand 0.6 - 2.36

Medium sand 0.2 - 0.6

Fine sand 0.075 - 0.2

The proportions of secondary constituents of soils

are described as:

Term Proportion Example

And Specify Clay (60%) and

Sand (40%)

Adjective 20 - 35% Sandy Clay

Slightly 12 - 20% Slightly Sandy

Clay

With some 5 - 12% Clay with some

sand

With a trace of 0 - 5% Clay with a trace

of sand

Definitions of grading terms used are:

• Well graded - a good representation of all

particle sizes

• Poorly graded - an excess or deficiency of

particular sizes within the specified range

• Uniformly graded - an excess of a particular

particle size

• Gap graded - a deficiency of a particular

particle size with the range

Cohesive Soils Cohesive soils, such as clays, are classified on the

basis of undrained shear strength. The strength

may be measured by laboratory testing, or

estimated by field tests or engineering

examination. The strength terms are defined as

follows:

Description Abbreviation Undrained shear strength

(kPa)

Very soft vs <12

Soft s 12 - 25

Firm f 25 - 50

Stiff st 50 - 100

Very stiff vst 100 - 200

Hard h >200

Cohesionless Soils Cohesionless soils, such as clean sands, are

classified on the basis of relative density, generally

from the results of standard penetration tests

(SPT), cone penetration tests (CPT) or dynamic

penetrometers (PSP). The relative density terms

are given below:

Relative Density

Abbreviation SPT N value

CPT qc value (MPa)

Very loose vl <4 <2

Loose l 4 - 10 2 -5

Medium

dense

md 10 - 30 5 - 15

Dense d 30 - 50 15 - 25

Very

dense

vd >50 >25

Page 141: SITE CLASSIFICATION REPORT SUMMARY...Douglas Partners (DP) has prepared this report for this project at Taylor 2- Stage 3, Taylor in accordance with DP’s proposal dated 15 September

May 2017

Soil Origin It is often difficult to accurately determine the origin

of a soil. Soils can generally be classified as:

• Residual soil - derived from in-situ weathering

of the underlying rock;

• Transported soils - formed somewhere else

and transported by nature to the site; or

• Filling - moved by man.

Transported soils may be further subdivided into:

• Alluvium - river deposits

• Lacustrine - lake deposits

• Aeolian - wind deposits

• Littoral - beach deposits

• Estuarine - tidal river deposits

• Talus - scree or coarse colluvium

• Slopewash or Colluvium - transported

downslope by gravity assisted by water.

Often includes angular rock fragments and

boulders.

Page 142: SITE CLASSIFICATION REPORT SUMMARY...Douglas Partners (DP) has prepared this report for this project at Taylor 2- Stage 3, Taylor in accordance with DP’s proposal dated 15 September

May 2017

Rock Strength Rock strength is defined by the Point Load Strength Index (Is(50)) and refers to the strength of the rock

substance and not the strength of the overall rock mass, which may be considerably weaker due to defects.

The test procedure is described by Australian Standard 4133.4.1 - 2007. The terms used to describe rock

strength are as follows:

Term Abbreviation Point Load Index

Is(50) MPa

Approximate Unconfined Compressive Strength MPa*

Extremely low EL <0.03 <0.6

Very low VL 0.03 - 0.1 0.6 - 2

Low L 0.1 - 0.3 2 - 6

Medium M 0.3 - 1.0 6 - 20

High H 1 - 3 20 - 60

Very high VH 3 - 10 60 - 200

Extremely high EH >10 >200

* Assumes a ratio of 20:1 for UCS to Is(50). It should be noted that the UCS to Is(50) ratio varies significantly

for different rock types and specific ratios should be determined for each site.

Degree of Weathering The degree of weathering of rock is classified as follows:

Term Abbreviation Description

Extremely weathered EW Rock substance has soil properties, i.e. it can be remoulded and classified as a soil but the texture of the original rock is still evident.

Highly weathered HW Limonite staining or bleaching affects whole of rock substance and other signs of decomposition are evident. Porosity and strength may be altered as a result of iron leaching or deposition. Colour and strength of original fresh rock is not recognisable

Moderately weathered

MW Staining and discolouration of rock substance has taken place

Slightly weathered SW Rock substance is slightly discoloured but shows little or no change of strength from fresh rock

Fresh stained Fs Rock substance unaffected by weathering but staining visible along defects

Fresh Fr No signs of decomposition or staining

Degree of Fracturing The following classification applies to the spacing of natural fractures in diamond drill cores. It includes

bedding plane partings, joints and other defects, but excludes drilling breaks.

Term Description

Fragmented Fragments of <20 mm

Highly Fractured Core lengths of 20-40 mm with some fragments

Fractured Core lengths of 40-200 mm with some shorter and longer sections

Slightly Fractured Core lengths of 200-1000 mm with some shorter and longer sections

Unbroken Core lengths mostly > 1000 mm

Page 143: SITE CLASSIFICATION REPORT SUMMARY...Douglas Partners (DP) has prepared this report for this project at Taylor 2- Stage 3, Taylor in accordance with DP’s proposal dated 15 September

May 2017

Rock Quality Designation The quality of the cored rock can be measured using the Rock Quality Designation (RQD) index, defined

as:

RQD % = cumulative length of 'sound' core sections ≥ 100 mm long

total drilled length of section being assessed

where 'sound' rock is assessed to be rock of low strength or better. The RQD applies only to natural

fractures. If the core is broken by drilling or handling (i.e. drilling breaks) then the broken pieces are fitted

back together and are not included in the calculation of RQD.

Stratification Spacing For sedimentary rocks the following terms may be used to describe the spacing of bedding partings:

Term Separation of Stratification Planes

Thinly laminated < 6 mm

Laminated 6 mm to 20 mm

Very thinly bedded 20 mm to 60 mm

Thinly bedded 60 mm to 0.2 m

Medium bedded 0.2 m to 0.6 m

Thickly bedded 0.6 m to 2 m

Very thickly bedded > 2 m

Page 144: SITE CLASSIFICATION REPORT SUMMARY...Douglas Partners (DP) has prepared this report for this project at Taylor 2- Stage 3, Taylor in accordance with DP’s proposal dated 15 September

May 2017

Introduction These notes summarise abbreviations commonly

used on borehole logs and test pit reports.

Drilling or Excavation Methods C Core drilling

R Rotary drilling

SFA Spiral flight augers

NMLC Diamond core - 52 mm dia

NQ Diamond core - 47 mm dia

HQ Diamond core - 63 mm dia

PQ Diamond core - 81 mm dia

Water � Water seep

� Water level

Sampling and Testing A Auger sample

B Bulk sample

D Disturbed sample

E Environmental sample

U50 Undisturbed tube sample (50mm)

W Water sample

pp Pocket penetrometer (kPa)

PID Photo ionisation detector

PL Point load strength Is(50) MPa

S Standard Penetration Test

V Shear vane (kPa)

Description of Defects in Rock The abbreviated descriptions of the defects should

be in the following order: Depth, Type, Orientation,

Coating, Shape, Roughness and Other. Drilling

and handling breaks are not usually included on

the logs.

Defect Type

B Bedding plane

Cs Clay seam

Cv Cleavage

Cz Crushed zone

Ds Decomposed seam

F Fault

J Joint

Lam Lamination

Pt Parting

Sz Sheared Zone

V Vein

Orientation

The inclination of defects is always measured from

the perpendicular to the core axis.

h horizontal

v vertical

sh sub-horizontal

sv sub-vertical

Coating or Infilling Term

cln clean

co coating

he healed

inf infilled

stn stained

ti tight

vn veneer

Coating Descriptor

ca calcite

cbs carbonaceous

cly clay

fe iron oxide

mn manganese

slt silty

Shape

cu curved

ir irregular

pl planar

st stepped

un undulating

Roughness

po polished

ro rough

sl slickensided

sm smooth

vr very rough

Other

fg fragmented

bnd band

qtz quartz

Page 145: SITE CLASSIFICATION REPORT SUMMARY...Douglas Partners (DP) has prepared this report for this project at Taylor 2- Stage 3, Taylor in accordance with DP’s proposal dated 15 September

May 2017

Graphic Symbols for Soil and Rock General

Soils

Sedimentary Rocks

Metamorphic Rocks

Igneous Rocks

Road base

Filling

Concrete

Asphalt

Topsoil

Peat

Clay

Conglomeratic sandstone

Conglomerate

Boulder conglomerate

Sandstone

Slate, phyllite, schist

Siltstone

Mudstone, claystone, shale

Coal

Limestone

Porphyry

Cobbles, boulders

Sandy gravel

Laminite

Silty sand

Clayey sand

Silty clay

Sandy clay

Gravelly clay

Shaly clay

Silt

Clayey silt

Sandy silt

Sand

Gravel

Talus

Gneiss

Quartzite

Dolerite, basalt, andesite

Granite

Tuff, breccia

Dacite, epidote

Page 146: SITE CLASSIFICATION REPORT SUMMARY...Douglas Partners (DP) has prepared this report for this project at Taylor 2- Stage 3, Taylor in accordance with DP’s proposal dated 15 September

ͱ·´ ̧°»­

̸» ¬§°»­ ±º ­±·´­ «­«¿´´§ °®»­»²¬ «²¼»® ¬¸» ¬±°­±·´ ·² ´¿²¼ ¦±²»¼ º±®®»­·¼»²¬·¿´ ¾«·´¼·²¹­ ½¿² ¾» ­°´·¬ ·²¬± ¬©± ¿°°®±¨·³¿¬» ¹®±«°­ P¹®¿²«´¿® ¿²¼ ½´¿§ò Ï«·¬» ±º¬»²ô º±«²¼¿¬·±² ­±·´ ·­ ¿ ³·¨¬«®» ±º ¾±¬¸¬§°»­ò ̸» ¹»²»®¿´ °®±¾´»³­ ¿­­±½·¿¬»¼ ©·¬¸ ­±·´­ ¸¿ª·²¹ ¹®¿²«´¿®½±²¬»²¬ ¿®» «­«¿´´§ ½¿«­»¼ ¾§ »®±­·±²ò Ý´¿§ ­±·´­ ¿®» ­«¾¶»½¬ ¬±­¿¬«®¿¬·±² ¿²¼ ­©»´´ñ­¸®·²µ °®±¾´»³­ò

Ý´¿­­·º·½¿¬·±²­ º±® ¿ ¹·ª»² ¿®»¿ ½¿² ¹»²»®¿´´§ ¾» ±¾¬¿·²»¼ ¾§¿°°´·½¿¬·±² ¬± ¬¸» ´±½¿´ ¿«¬¸±®·¬§ô ¾«¬ ¬¸»­» ¿®» ­±³»¬·³»­ «²®»´·¿¾´»¿²¼ ·º ¬¸»®» ·­ ¼±«¾¬ô ¿ ¹»±¬»½¸²·½¿´ ®»°±®¬ ­¸±«´¼ ¾» ½±³³·­­·±²»¼òß­ ³±­¬ ¾«·´¼·²¹­ ­«ºº»®·²¹ ³±ª»³»²¬ °®±¾´»³­ ¿®» º±«²¼»¼ ±² ½´¿§­±·´­ô ¬¸»®» ·­ ¿² »³°¸¿­·­ ±² ½´¿­­·º·½¿¬·±² ±º ­±·´­ ¿½½±®¼·²¹ ¬± ¬¸»¿³±«²¬ ±º ­©»´´ ¿²¼ ­¸®·²µ¿¹» ¬¸»§ »¨°»®·»²½» ©·¬¸ ª¿®·¿¬·±²­ ±º©¿¬»® ½±²¬»²¬ò ̸» ¬¿¾´» ¾»´±© ·­ Ì¿¾´» îòï º®±³ ßÍ îèéðô ¬¸»Î»­·¼»²¬·¿´ Í´¿¾ ¿²¼ Ú±±¬·²¹ ݱ¼»ò

Ý¿«­»­ ±º Ó±ª»³»²¬

Í»¬¬´»³»²¬ ¼«» ¬± ½±²­¬®«½¬·±²Ì¸»®» ¿®» ¬©± ¬§°»­ ±º ­»¬¬´»³»²¬ ¬¸¿¬ ±½½«® ¿­ ¿ ®»­«´¬ ±º½±²­¬®«½¬·±²æ{ ׳³»¼·¿¬» ­»¬¬´»³»²¬ ±½½«®­ ©¸»² ¿ ¾«·´¼·²¹ ·­ º·®­¬ °´¿½»¼ ±² ·¬­

º±«²¼¿¬·±² ­±·´ô ¿­ ¿ ®»­«´¬ ±º ½±³°¿½¬·±² ±º ¬¸» ­±·´ «²¼»® ¬¸»©»·¹¸¬ ±º ¬¸» ­¬®«½¬«®»ò ̸» ½±¸»­·ª» ¯«¿´·¬§ ±º ½´¿§ ­±·´ ³·¬·¹¿¬»­¿¹¿·²­¬ ¬¸·­ô ¾«¬ ¹®¿²«´¿® ø°¿®¬·½«´¿®´§ ­¿²¼§÷ ­±·´ ·­ ­«­½»°¬·¾´»ò

{ ݱ²­±´·¼¿¬·±² ­»¬¬´»³»²¬ ·­ ¿ º»¿¬«®» ±º ½´¿§ ­±·´ ¿²¼ ³¿§ ¬¿µ»°´¿½» ¾»½¿«­» ±º ¬¸» »¨°«´­·±² ±º ³±·­¬«®» º®±³ ¬¸» ­±·´ ±® ¾»½¿«­»±º ¬¸» ­±·´K­ ´¿½µ ±º ®»­·­¬¿²½» ¬± ´±½¿´ ½±³°®»­­·ª» ±® ­¸»¿® ­¬®»­­»­ò̸·­ ©·´´ «­«¿´´§ ¬¿µ» °´¿½» ¼«®·²¹ ¬¸» º·®­¬ º»© ³±²¬¸­ ¿º¬»®½±²­¬®«½¬·±²ô ¾«¬ ¸¿­ ¾»»² µ²±©² ¬± ¬¿µ» ³¿²§ §»¿®­ ·²»¨½»°¬·±²¿´ ½¿­»­ò

̸»­» °®±¾´»³­ ¿®» ¬¸» °®±ª·²½» ±º ¬¸» ¾«·´¼»® ¿²¼ ­¸±«´¼ ¾» ¬¿µ»²·²¬± ½±²­·¼»®¿¬·±² ¿­ °¿®¬ ±º ¬¸» °®»°¿®¿¬·±² ±º ¬¸» ­·¬» º±® ½±²­¬®«½ó¬·±²ò Þ«·´¼·²¹ Ì»½¸²±´±¹§ Ú·´» ïç øÞÌÚ ïç÷ ¼»¿´­ ©·¬¸ ¬¸»­»°®±¾´»³­ò

Û®±­·±²ß´´ ­±·´­ ¿®» °®±²» ¬± »®±­·±²ô ¾«¬ ­¿²¼§ ­±·´ ·­ °¿®¬·½«´¿®´§ ­«­½»°¬·¾´»¬± ¾»·²¹ ©¿­¸»¼ ¿©¿§ò Ûª»² ½´¿§ ©·¬¸ ¿ ­¿²¼ ½±³°±²»²¬ ±º ­¿§ ïðû±® ³±®» ½¿² ­«ºº»® º®±³ »®±­·±²ò

Í¿¬«®¿¬·±²Ì¸·­ ·­ °¿®¬·½«´¿®´§ ¿ °®±¾´»³ ·² ½´¿§ ­±·´­ò Í¿¬«®¿¬·±² ½®»¿¬»­ ¿ ¾±¹ó´·µ» ­«­°»²­·±² ±º ¬¸» ­±·´ ¬¸¿¬ ½¿«­»­ ·¬ ¬± ´±­» ª·®¬«¿´´§ ¿´´ ±º ·¬­¾»¿®·²¹ ½¿°¿½·¬§ò ̱ ¿ ´»­­»® ¼»¹®»»ô ­¿²¼ ·­ ¿ºº»½¬»¼ ¾§ ­¿¬«®¿¬·±²¾»½¿«­» ­¿¬«®¿¬»¼ ­¿²¼ ³¿§ «²¼»®¹± ¿ ®»¼«½¬·±² ·² ª±´«³» P°¿®¬·½«´¿®´§ ·³°±®¬»¼ ­¿²¼ º·´´ º±® ¾»¼¼·²¹ ¿²¼ ¾´·²¼·²¹ ´¿§»®­òر©»ª»®ô ¬¸·­ «­«¿´´§ ±½½«®­ ¿­ ·³³»¼·¿¬» ­»¬¬´»³»²¬ ¿²¼ ­¸±«´¼²±®³¿´´§ ¾» ¬¸» °®±ª·²½» ±º ¬¸» ¾«·´¼»®ò

Í»¿­±²¿´ ­©»´´·²¹ ¿²¼ ­¸®·²µ¿¹» ±º ­±·´ß´´ ½´¿§­ ®»¿½¬ ¬± ¬¸» °®»­»²½» ±º ©¿¬»® ¾§ ­´±©´§ ¿¾­±®¾·²¹ ·¬ô ³¿µ·²¹¬¸» ­±·´ ·²½®»¿­» ·² ª±´«³» ø­»» ¬¿¾´» ¾»´±©÷ò ̸» ¼»¹®»» ±º ·²½®»¿­»ª¿®·»­ ½±²­·¼»®¿¾´§ ¾»¬©»»² ¼·ºº»®»²¬ ½´¿§­ô ¿­ ¼±»­ ¬¸» ¼»¹®»» ±º¼»½®»¿­» ¼«®·²¹ ¬¸» ­«¾­»¯«»²¬ ¼®§·²¹ ±«¬ ½¿«­»¼ ¾§ º¿·® ©»¿¬¸»®°»®·±¼­ò Þ»½¿«­» ±º ¬¸» ´±© ¿¾­±®°¬·±² ¿²¼ »¨°«´­·±² ®¿¬»ô ¬¸·­°¸»²±³»²±² ©·´´ ²±¬ «­«¿´´§ ¾» ²±¬·½»¿¾´» «²´»­­ ¬¸»®» ¿®»°®±´±²¹»¼ ®¿·²§ ±® ¼®§ °»®·±¼­ô «­«¿´´§ ±º ©»»µ­ ±® ³±²¬¸­ô¼»°»²¼·²¹ ±² ¬¸» ´¿²¼ ¿²¼ ­±·´ ½¸¿®¿½¬»®·­¬·½­ò

̸» ­©»´´·²¹ ±º ­±·´ ½®»¿¬»­ ¿² «°©¿®¼ º±®½» ±² ¬¸» º±±¬·²¹­ ±º ¬¸»¾«·´¼·²¹ô ¿²¼ ­¸®·²µ¿¹» ½®»¿¬»­ ­«¾­·¼»²½» ¬¸¿¬ ¬¿µ»­ ¿©¿§ ¬¸»­«°°±®¬ ²»»¼»¼ ¾§ ¬¸» º±±¬·²¹ ¬± ®»¬¿·² »¯«·´·¾®·«³ò

͸»¿® º¿·´«®»Ì¸·­ °¸»²±³»²±² ±½½«®­ ©¸»² ¬¸» º±«²¼¿¬·±² ­±·´ ¼±»­ ²±¬ ¸¿ª»­«ºº·½·»²¬ ­¬®»²¹¬¸ ¬± ­«°°±®¬ ¬¸» ©»·¹¸¬ ±º ¬¸» º±±¬·²¹ò ̸»®» ¿®»¬©± ³¿¶±® °±­¬ó½±²­¬®«½¬·±² ½¿«­»­æ

{ Í·¹²·º·½¿²¬ ´±¿¼ ·²½®»¿­»ò{ λ¼«½¬·±² ±º ´¿¬»®¿´ ­«°°±®¬ ±º ¬¸» ­±·´ «²¼»® ¬¸» º±±¬·²¹ ¼«» ¬±

»®±­·±² ±® »¨½¿ª¿¬·±²ò{ ײ ½´¿§ ­±·´ô ­¸»¿® º¿·´«®» ½¿² ¾» ½¿«­»¼ ¾§ ­¿¬«®¿¬·±² ±º ¬¸» ­±·´

¿¼¶¿½»²¬ ¬± ±® «²¼»® ¬¸» º±±¬·²¹ò

Þ«·´¼·²¹­ ½¿² ¿²¼ ±º¬»² ¼± ³±ª»ò ̸·­ ³±ª»³»²¬ ½¿² ¾» «°ô ¼±©²ô ´¿¬»®¿´ ±® ®±¬¿¬·±²¿´ò ̸» º«²¼¿³»²¬¿´ ½¿«­»±º ³±ª»³»²¬ ·² ¾«·´¼·²¹­ ½¿² «­«¿´´§ ¾» ®»´¿¬»¼ ¬± ±²» ±® ³±®» °®±¾´»³­ ·² ¬¸» º±«²¼¿¬·±² ­±·´ò ׬ ·­ ·³°±®¬¿²¬ º±®¬¸» ¸±³»±©²»® ¬± ·¼»²¬·º§ ¬¸» ­±·´ ¬§°» ·² ±®¼»® ¬± ¿­½»®¬¿·² ¬¸» ³»¿­«®»­ ¬¸¿¬ ­¸±«´¼ ¾» °«¬ ·² °´¿½» ·² ±®¼»® ¬±»²­«®» ¬¸¿¬ °®±¾´»³­ ·² ¬¸» º±«²¼¿¬·±² ­±·´ ½¿² ¾» °®»ª»²¬»¼ô ¬¸«­ °®±¬»½¬·²¹ ¿¹¿·²­¬ ¾«·´¼·²¹ ³±ª»³»²¬ò

̸·­ Þ«·´¼·²¹ Ì»½¸²±´±¹§ Ú·´» ·­ ¼»­·¹²»¼ ¬± ·¼»²¬·º§ ½¿«­»­ ±º ­±·´ó®»´¿¬»¼ ¾«·´¼·²¹ ³±ª»³»²¬ô ¿²¼ ¬± ­«¹¹»­¬³»¬¸±¼­ ±º °®»ª»²¬·±² ±º ®»­«´¬¿²¬ ½®¿½µ·²¹ ·² ¾«·´¼·²¹­ò

Ú±«²¼¿¬·±² Ó¿·²¬»²¿²½»¿²¼ Ú±±¬·²¹ л®º±®³¿²½»æß Ø±³»±©²»®K­ Ù«·¼»

ÙÛÒÛÎßÔ ÜÛÚ×Ò×Ì×ÑÒÍ ÑÚ Í×ÌÛ ÝÔßÍÍÛÍ

Ý´¿­­ Ú±«²¼¿¬·±²

ß Ó±­¬ ­¿²¼ ¿²¼ ®±½µ ­·¬»­ ©·¬¸ ´·¬¬´» ±® ²± ¹®±«²¼ ³±ª»³»²¬ º®±³ ³±·­¬«®» ½¸¿²¹»­

Í Í´·¹¸¬´§ ®»¿½¬·ª» ½´¿§ ­·¬»­ ©·¬¸ ±²´§ ­´·¹¸¬ ¹®±«²¼ ³±ª»³»²¬ º®±³ ³±·­¬«®» ½¸¿²¹»­

Ó Ó±¼»®¿¬»´§ ®»¿½¬·ª» ½´¿§ ±® ­·´¬ ­·¬»­ô ©¸·½¸ ½¿² »¨°»®·»²½» ³±¼»®¿¬» ¹®±«²¼ ³±ª»³»²¬ º®±³ ³±·­¬«®» ½¸¿²¹»­

Ø Ø·¹¸´§ ®»¿½¬·ª» ½´¿§ ­·¬»­ô ©¸·½¸ ½¿² »¨°»®·»²½» ¸·¹¸ ¹®±«²¼ ³±ª»³»²¬ º®±³ ³±·­¬«®» ½¸¿²¹»­

Û Û¨¬®»³»´§ ®»¿½¬·ª» ­·¬»­ô ©¸·½¸ ½¿² »¨°»®·»²½» »¨¬®»³» ¹®±«²¼ ³±ª»³»²¬ º®±³ ³±·­¬«®» ½¸¿²¹»­

ß ¬± Ð Ú·´´»¼ ­·¬»­

Ð Í·¬»­ ©¸·½¸ ·²½´«¼» ­±º¬ ­±·´­ô ­«½¸ ¿­ ­±º¬ ½´¿§ ±® ­·´¬ ±® ´±±­» ­¿²¼­å ´¿²¼­´·°å ³·²» ­«¾­·¼»²½»å ½±´´¿°­·²¹ ­±·´­å ­±·´­ ­«¾¶»½¬¬± »®±­·±²å ®»¿½¬·ª» ­·¬»­ ­«¾¶»½¬ ¬± ¿¾²±®³¿´ ³±·­¬«®» ½±²¼·¬·±²­ ±® ­·¬»­ ©¸·½¸ ½¿²²±¬ ¾» ½´¿­­·º·»¼ ±¬¸»®©·­»

ÞÌÚ ïè®»°´¿½»­

ײº±®³¿¬·±²Í¸»»¬ ïðñçï

Page 147: SITE CLASSIFICATION REPORT SUMMARY...Douglas Partners (DP) has prepared this report for this project at Taylor 2- Stage 3, Taylor in accordance with DP’s proposal dated 15 September

Ì®»» ®±±¬ ¹®±©¬¸Ì®»»­ ¿²¼ ­¸®«¾­ ¬¸¿¬ ¿®» ¿´´±©»¼ ¬± ¹®±© ·² ¬¸» ª·½·²·¬§ ±º º±±¬·²¹­½¿² ½¿«­» º±«²¼¿¬·±² ­±·´ ³±ª»³»²¬ ·² ¬©± ©¿§­æ

{ ᱬ­ ¬¸¿¬ ¹®±© «²¼»® º±±¬·²¹­ ³¿§ ·²½®»¿­» ·² ½®±­­ó­»½¬·±²¿´­·¦»ô »¨»®¬·²¹ «°©¿®¼ °®»­­«®» ±² º±±¬·²¹­ò

{ ᱬ­ ·² ¬¸» ª·½·²·¬§ ±º º±±¬·²¹­ ©·´´ ¿¾­±®¾ ³«½¸ ±º ¬¸» ³±·­¬«®»·² ¬¸» º±«²¼¿¬·±² ­±·´ô ½¿«­·²¹ ­¸®·²µ¿¹» ±® ­«¾­·¼»²½»ò

˲»ª»²²»­­ ±º Ó±ª»³»²¬

̸» ¬§°»­ ±º ¹®±«²¼ ³±ª»³»²¬ ¼»­½®·¾»¼ ¿¾±ª» «­«¿´´§ ±½½«®«²»ª»²´§ ¬¸®±«¹¸±«¬ ¬¸» ¾«·´¼·²¹K­ º±«²¼¿¬·±² ­±·´ò Í»¬¬´»³»²¬ ¼«»¬± ½±²­¬®«½¬·±² ¬»²¼­ ¬± ¾» «²»ª»² ¾»½¿«­» ±ºæ

{ Ü·ºº»®·²¹ ½±³°¿½¬·±² ±º º±«²¼¿¬·±² ­±·´ °®·±® ¬± ½±²­¬®«½¬·±²ò

{ Ü·ºº»®·²¹ ³±·­¬«®» ½±²¬»²¬ ±º º±«²¼¿¬·±² ­±·´ °®·±® ¬± ½±²­¬®«½¬·±²ò

Ó±ª»³»²¬ ¼«» ¬± ²±²ó½±²­¬®«½¬·±² ½¿«­»­ ·­ «­«¿´´§ ³±®» «²»ª»²­¬·´´ò Û®±­·±² ½¿² «²¼»®³·²» ¿ º±±¬·²¹ ¬¸¿¬ ¬®¿ª»®­»­ ¬¸» º´±© ±® ½¿²½®»¿¬» ¬¸» ½±²¼·¬·±²­ º±® ­¸»¿® º¿·´«®» ¾§ »®±¼·²¹ ­±·´ ¿¼¶¿½»²¬ ¬± ¿º±±¬·²¹ ¬¸¿¬ ®«²­ ·² ¬¸» ­¿³» ¼·®»½¬·±² ¿­ ¬¸» º´±©ò

Í¿¬«®¿¬·±² ±º ½´¿§ º±«²¼¿¬·±² ­±·´ ³¿§ ±½½«® ©¸»®» ­«¾º´±±® ©¿´´­½®»¿¬» ¿ ¼¿³ ¬¸¿¬ ³¿µ»­ ©¿¬»® °±²¼ò ׬ ½¿² ¿´­± ±½½«® ©¸»®»ª»® ¬¸»®»·­ ¿ ­±«®½» ±º ©¿¬»® ²»¿® º±±¬·²¹­ ·² ½´¿§ ­±·´ò ̸·­ ´»¿¼­ ¬± ¿ ­»ª»®»®»¼«½¬·±² ·² ¬¸» ­¬®»²¹¬¸ ±º ¬¸» ­±·´ ©¸·½¸ ³¿§ ½®»¿¬» ´±½¿´ ­¸»¿®º¿·´«®»ò

Í»¿­±²¿´ ­©»´´·²¹ ¿²¼ ­¸®·²µ¿¹» ±º ½´¿§ ­±·´ ¿ºº»½¬­ ¬¸» °»®·³»¬»® ±º¬¸» ¾«·´¼·²¹ º·®­¬ô ¬¸»² ¹®¿¼«¿´´§ ­°®»¿¼­ ¬± ¬¸» ·²¬»®·±®ò ̸» ­©»´´·²¹°®±½»­­ ©·´´ «­«¿´´§ ¾»¹·² ¿¬ ¬¸» «°¸·´´ »¨¬®»³» ±º ¬¸» ¾«·´¼·²¹ô ±® ±²¬¸» ©»¿¬¸»® ­·¼» ©¸»®» ¬¸» ´¿²¼ ·­ º´¿¬ò Í©»´´·²¹ ¹®¿¼«¿´´§ ®»¿½¸»­ ¬¸»·²¬»®·±® ­±·´ ¿­ ¿¾­±®°¬·±² ½±²¬·²«»­ò ͸®·²µ¿¹» «­«¿´´§ ¾»¹·²­ ©¸»®»¬¸» ­«²K­ ¸»¿¬ ·­ ¹®»¿¬»­¬ò

Ûºº»½¬­ ±º ˲»ª»² ͱ·´ Ó±ª»³»²¬ ±² ͬ®«½¬«®»­

Û®±­·±² ¿²¼ ­¿¬«®¿¬·±²Û®±­·±² ®»³±ª»­ ¬¸» ­«°°±®¬ º®±³ «²¼»® º±±¬·²¹­ô ¬»²¼·²¹ ¬± ½®»¿¬»­«¾­·¼»²½» ±º ¬¸» °¿®¬ ±º ¬¸» ­¬®«½¬«®» «²¼»® ©¸·½¸ ·¬ ±½½«®­òÞ®·½µ©±®µ ©¿´´­ ©·´´ ®»­·­¬ ¬¸» ­¬®»­­ ½®»¿¬»¼ ¾§ ¬¸·­ ®»³±ª¿´ ±º­«°°±®¬ ¾§ ¾®·¼¹·²¹ ¬¸» ¹¿° ±® ½¿²¬·´»ª»®·²¹ «²¬·´ ¬¸» ¾®·½µ­ ±® ¬¸»³±®¬¿® ¾»¼¼·²¹ º¿·´ò Ñ´¼»® ³¿­±²®§ ¸¿­ ´·¬¬´» ®»­·­¬¿²½»ò Ûª·¼»²½» ±ºº¿·´«®» ª¿®·»­ ¿½½±®¼·²¹ ¬± ½·®½«³­¬¿²½»­ ¿²¼ ­§³°¬±³­ ³¿§ ·²½´«¼»æ

{ ͬ»° ½®¿½µ·²¹ ·² ¬¸» ³±®¬¿® ¾»¼­ ·² ¬¸» ¾±¼§ ±º ¬¸» ©¿´´ ±®¿¾±ª»ñ¾»´±© ±°»²·²¹­ ­«½¸ ¿­ ¼±±®­ ±® ©·²¼±©­ò

{ Ê»®¬·½¿´ ½®¿½µ·²¹ ·² ¬¸» ¾®·½µ­ ø«­«¿´´§ ¾«¬ ²±¬ ²»½»­­¿®·´§ ·² ´·²»©·¬¸ ¬¸» ª»®¬·½¿´ ¾»¼­ ±® °»®°»²¼­÷ò

×­±´¿¬»¼ °·»®­ ¿ºº»½¬»¼ ¾§ »®±­·±² ±® ­¿¬«®¿¬·±² ±º º±«²¼¿¬·±²­ ©·´´»ª»²¬«¿´´§ ´±­» ½±²¬¿½¬ ©·¬¸ ¬¸» ¾»¿®»®­ ¬¸»§ ­«°°±®¬ ¿²¼ ³¿§ ¬·´¬ ±®º¿´´ ±ª»®ò ̸» º´±±®­ ¬¸¿¬ ¸¿ª» ´±­¬ ¬¸·­ ­«°°±®¬ ©·´´ ¾»½±³» ¾±«²½§ô­±³»¬·³»­ ®¿¬¬´·²¹ ±®²¿³»²¬­ »¬½ò

Í»¿­±²¿´ ­©»´´·²¹ñ­¸®·²µ¿¹» ·² ½´¿§Í©»´´·²¹ º±«²¼¿¬·±² ­±·´ ¼«» ¬± ®¿·²§ °»®·±¼­ º·®­¬ ´·º¬­ ¬¸» ³±­¬»¨°±­»¼ »¨¬®»³·¬·»­ ±º ¬¸» º±±¬·²¹ ­§­¬»³ô ¬¸»² ¬¸» ®»³¿·²¼»® ±º ¬¸»°»®·³»¬»® º±±¬·²¹­ ©¸·´» ¹®¿¼«¿´´§ °»®³»¿¬·²¹ ·²­·¼» ¬¸» ¾«·´¼·²¹º±±¬°®·²¬ ¬± ´·º¬ ·²¬»®²¿´ º±±¬·²¹­ò ̸·­ ­©»´´·²¹ º·®­¬ ¬»²¼­ ¬± ½®»¿¬» ¿¼·­¸ »ºº»½¬ô ¾»½¿«­» ¬¸» »¨¬»®²¿´ º±±¬·²¹­ ¿®» °«­¸»¼ ¸·¹¸»® ¬¸¿² ¬¸»·²¬»®²¿´ ±²»­ò

̸» º·®­¬ ²±¬·½»¿¾´» ­§³°¬±³ ³¿§ ¾» ¬¸¿¬ ¬¸» º´±±® ¿°°»¿®­ ­´·¹¸¬´§¼·­¸»¼ò ̸·­ ·­ ±º¬»² ¿½½±³°¿²·»¼ ¾§ ­±³» ¼±±®­ ¾·²¼·²¹ ±² ¬¸»º´±±® ±® ¬¸» ¼±±® ¸»¿¼ô ¬±¹»¬¸»® ©·¬¸ ­±³» ½®¿½µ·²¹ ±º ½±®²·½»³·¬®»­ò ײ ¾«·´¼·²¹­ ©·¬¸ ¬·³¾»® º´±±®·²¹ ­«°°±®¬»¼ ¾§ ¾»¿®»®­ ¿²¼¶±·­¬­ô ¬¸» º´±±® ½¿² ¾» ¾±«²½§ò Û¨¬»®²¿´´§ ¬¸»®» ³¿§ ¾» ª·­·¾´»¼·­¸·²¹ ±º ¬¸» ¸·° ±® ®·¼¹» ´·²»­ò

ß­ ¬¸» ³±·­¬«®» ¿¾­±®°¬·±² °®±½»­­ ½±³°´»¬»­ ·¬­ ¶±«®²»§ ¬± ¬¸»·²²»®³±­¬ ¿®»¿­ ±º ¬¸» ¾«·´¼·²¹ô ¬¸» ·²¬»®²¿´ º±±¬·²¹­ ©·´´ ®·­»ò ׺ ¬¸»­°®»¿¼ ±º ³±·­¬«®» ·­ ®±«¹¸´§ »ª»²ô ·¬ ³¿§ ¾» ¬¸¿¬ ¬¸» ­§³°¬±³­ ©·´´¬»³°±®¿®·´§ ¼·­¿°°»¿®ô ¾«¬ ·¬ ·­ ³±®» ´·µ»´§ ¬¸¿¬ ­©»´´·²¹ ©·´´ ¾»«²»ª»²ô ½®»¿¬·²¹ ¿ ¼·ºº»®»²½» ®¿¬¸»® ¬¸¿² ¿ ¼·­¿°°»¿®¿²½» ·²­§³°¬±³­ò ײ ¾«·´¼·²¹­ ©·¬¸ ¬·³¾»® º´±±®·²¹ ­«°°±®¬»¼ ¾§ ¾»¿®»®­¿²¼ ¶±·­¬­ô ¬¸» ·­±´¿¬»¼ °·»®­ ©·´´ ®·­» ³±®» »¿­·´§ ¬¸¿² ¬¸» ­¬®·°º±±¬·²¹­ ±® °·»®­ «²¼»® ©¿´´­ô ½®»¿¬·²¹ ²±¬·½»¿¾´» ¼±³·²¹ ±º º´±±®·²¹ò

ß­ ¬¸» ©»¿¬¸»® °¿¬¬»®² ½¸¿²¹»­ ¿²¼ ¬¸» ­±·´ ¾»¹·²­ ¬± ¼®§ ±«¬ô ¬¸»»¨¬»®²¿´ º±±¬·²¹­ ©·´´ ¾» º·®­¬ ¿ºº»½¬»¼ô ¾»¹·²²·²¹ ©·¬¸ ¬¸» ´±½¿¬·±²­©¸»®» ¬¸» ­«²K­ »ºº»½¬ ·­ ­¬®±²¹»­¬ò ̸·­ ¸¿­ ¬¸» »ºº»½¬ ±º ´±©»®·²¹ ¬¸»»¨¬»®²¿´ º±±¬·²¹­ò ̸» ¼±³·²¹ ·­ ¿½½»²¬«¿¬»¼ ¿²¼ ½®¿½µ·²¹ ®»¼«½»­±® ¼·­¿°°»¿®­ ©¸»®» ·¬ ±½½«®®»¼ ¾»½¿«­» ±º ¼·­¸·²¹ô ¾«¬ ±¬¸»® ½®¿½µ­±°»² «°ò ̸» ®±±º ´·²»­ ³¿§ ¾»½±³» ½±²ª»¨ò

ܱ³·²¹ ¿²¼ ¼·­¸·²¹ ¿®» ¿´­± ¿ºº»½¬»¼ ¾§ ©»¿¬¸»® ·² ±¬¸»® ©¿§­ò ײ¿®»¿­ ©¸»®» ©¿®³ô ©»¬ ­«³³»®­ ¿²¼ ½±±´»® ¼®§ ©·²¬»®­ °®»ª¿·´ô©¿¬»® ³·¹®¿¬·±² ¬»²¼­ ¬± ¾» ¬±©¿®¼ ¬¸» ·²¬»®·±® ¿²¼ ¼±³·²¹ ©·´´ ¾»¿½½»²¬«¿¬»¼ô ©¸»®»¿­ ©¸»®» ­«³³»®­ ¿®» ¼®§ ¿²¼ ©·²¬»®­ ¿®» ½±´¼¿²¼ ©»¬ô ³·¹®¿¬·±² ¬»²¼­ ¬± ¾» ¬±©¿®¼ ¬¸» »¨¬»®·±® ¿²¼ ¬¸»«²¼»®´§·²¹ °®±°»²­·¬§ ·­ ¬±©¿®¼ ¼·­¸·²¹ò

Ó±ª»³»²¬ ½¿«­»¼ ¾§ ¬®»» ®±±¬­×² ¹»²»®¿´ô ¹®±©·²¹ ®±±¬­ ©·´´ »¨»®¬ ¿² «°©¿®¼ °®»­­«®» ±² º±±¬·²¹­ô©¸»®»¿­ ­±·´ ­«¾¶»½¬ ¬± ¼®§·²¹ ¾»½¿«­» ±º ¬®»» ±® ­¸®«¾ ®±±¬­ ©·´´ ¬»²¼¬± ®»³±ª» ­«°°±®¬ º®±³ «²¼»® º±±¬·²¹­ ¾§ ·²¼«½·²¹ ­¸®·²µ¿¹»ò

ݱ³°´·½¿¬·±²­ ½¿«­»¼ ¾§ ¬¸» ­¬®«½¬«®» ·¬­»´ºÓ±­¬ º±®½»­ ¬¸¿¬ ¬¸» ­±·´ ½¿«­»­ ¬± ¾» »¨»®¬»¼ ±² ­¬®«½¬«®»­ ¿®»ª»®¬·½¿´ P ·ò»ò »·¬¸»® «° ±® ¼±©²ò ر©»ª»®ô ¾»½¿«­» ¬¸»­» º±®½»­ ¿®»­»´¼±³ ­°®»¿¼ »ª»²´§ ¿®±«²¼ ¬¸» º±±¬·²¹­ô ¿²¼ ¾»½¿«­» ¬¸» ¾«·´¼·²¹®»­·­¬­ «²»ª»² ³±ª»³»²¬ ¾»½¿«­» ±º ·¬­ ®·¹·¼·¬§ô º±®½»­ ¿®» »¨»®¬»¼º®±³ ±²» °¿®¬ ±º ¬¸» ¾«·´¼·²¹ ¬± ¿²±¬¸»®ò ̸» ²»¬ ®»­«´¬ ±º ¿´´ ¬¸»­»º±®½»­ ·­ «­«¿´´§ ®±¬¿¬·±²¿´ò ̸·­ ®»­«´¬¿²¬ º±®½» ±º¬»² ½±³°´·½¿¬»­ ¬¸»¼·¿¹²±­·­ ¾»½¿«­» ¬¸» ª·­·¾´» ­§³°¬±³­ ¼± ²±¬ ­·³°´§ ®»º´»½¬ ¬¸»±®·¹·²¿´ ½¿«­»ò ß ½±³³±² ­§³°¬±³ ·­ ¾·²¼·²¹ ±º ¼±±®­ ±² ¬¸»ª»®¬·½¿´ ³»³¾»® ±º ¬¸» º®¿³»ò

Ûºº»½¬­ ±² º«´´ ³¿­±²®§ ­¬®«½¬«®»­Þ®·½µ©±®µ ©·´´ ®»­·­¬ ½®¿½µ·²¹ ©¸»®» ·¬ ½¿²ò ׬ ©·´´ ¿¬¬»³°¬ ¬± ­°¿²¿®»¿­ ¬¸¿¬ ´±­» ­«°°±®¬ ¾»½¿«­» ±º ­«¾­·¼»¼ º±«²¼¿¬·±²­ ±® ®¿·­»¼°±·²¬­ò ׬ ·­ ¬¸»®»º±®» «­«¿´ ¬± ­»» ½®¿½µ·²¹ ¿¬ ©»¿µ °±·²¬­ô ­«½¸ ¿­±°»²·²¹­ º±® ©·²¼±©­ ±® ¼±±®­ò

ײ ¬¸» »ª»²¬ ±º ½±²­¬®«½¬·±² ­»¬¬´»³»²¬ô ½®¿½µ·²¹ ©·´´ «­«¿´´§ ®»³¿·²«²½¸¿²¹»¼ ¿º¬»® ¬¸» °®±½»­­ ±º ­»¬¬´»³»²¬ ¸¿­ ½»¿­»¼ò

É·¬¸ ´±½¿´ ­¸»¿® ±® »®±­·±²ô ½®¿½µ·²¹ ©·´´ «­«¿´´§ ½±²¬·²«» ¬± ¼»ª»´±°«²¬·´ ¬¸» ±®·¹·²¿´ ½¿«­» ¸¿­ ¾»»² ®»³»¼·»¼ô ±® «²¬·´ ¬¸» ­«¾­·¼»²½»¸¿­ ½±³°´»¬»´§ ²»«¬®¿´·­»¼ ¬¸» ¿ºº»½¬»¼ °±®¬·±² ±º º±±¬·²¹ ¿²¼ ¬¸»­¬®«½¬«®» ¸¿­ ­¬¿¾·´·­»¼ ±² ±¬¸»® º±±¬·²¹­ ¬¸¿¬ ®»³¿·² »ºº»½¬·ª»ò

ײ ¬¸» ½¿­» ±º ­©»´´ñ­¸®·²µ »ºº»½¬­ô ¬¸» ¾®·½µ©±®µ ©·´´ ·² ­±³» ½¿­»­®»¬«®² ¬± ·¬­ ±®·¹·²¿´ °±­·¬·±² ¿º¬»® ½±³°´»¬·±² ±º ¿ ½§½´»ô ¸±©»ª»® ·¬·­ ³±®» ´·µ»´§ ¬¸¿¬ ¬¸» ®±¬¿¬·±²¿´ »ºº»½¬ ©·´´ ²±¬ ¾» »¨¿½¬´§ ®»ª»®­»¼ô¿²¼ ·¬ ·­ ¿´­± «­«¿´ ¬¸¿¬ ¾®·½µ©±®µ ©·´´ ­»¬¬´» ·² ·¬­ ²»© °±­·¬·±² ¿²¼©·´´ ®»­·­¬ ¬¸» º±®½»­ ¬®§·²¹ ¬± ®»¬«®² ·¬ ¬± ·¬­ ±®·¹·²¿´ °±­·¬·±²ò ̸·­³»¿²­ ¬¸¿¬ ·² ¿ ½¿­» ©¸»®» ­©»´´·²¹ ¬¿µ»­ °´¿½» ¿º¬»® ½±²­¬®«½¬·±²¿²¼ ½®¿½µ·²¹ ±½½«®­ô ¬¸» ½®¿½µ·²¹ ·­ ´·µ»´§ ¬± ¿¬ ´»¿­¬ °¿®¬´§ ®»³¿·²¿º¬»® ¬¸» ­¸®·²µ ­»¹³»²¬ ±º ¬¸» ½§½´» ·­ ½±³°´»¬»ò ̸«­ô »¿½¸ ¬·³»¬¸» ½§½´» ·­ ®»°»¿¬»¼ô ¬¸» ´·µ»´·¸±±¼ ·­ ¬¸¿¬ ¬¸» ½®¿½µ·²¹ ©·´´ ¾»½±³»©·¼»® «²¬·´ ¬¸» ­»½¬·±²­ ±º ¾®·½µ©±®µ ¾»½±³» ª·®¬«¿´´§ ·²¼»°»²¼»²¬ò

É·¬¸ ®»°»¿¬»¼ ½§½´»­ô ±²½» ¬¸» ½®¿½µ·²¹ ·­ »­¬¿¾´·­¸»¼ô ·º ¬¸»®» ·­ ²±±¬¸»® ½±³°´·½¿¬·±²ô ·¬ ·­ ²±®³¿´ º±® ¬¸» ·²½·¼»²½» ±º ½®¿½µ·²¹ ¬±­¬¿¾·´·­»ô ¿­ ¬¸» ¾«·´¼·²¹ ¸¿­ ¬¸» ¿®¬·½«´¿¬·±² ·¬ ²»»¼­ ¬± ½±°» ©·¬¸¬¸» °®±¾´»³ò ̸·­ ·­ ¾§ ²± ³»¿²­ ¿´©¿§­ ¬¸» ½¿­»ô ¸±©»ª»®ô ¿²¼³±²·¬±®·²¹ ±º ½®¿½µ­ ·² ©¿´´­ ¿²¼ º´±±®­ ­¸±«´¼ ¿´©¿§­ ¾» ¬®»¿¬»¼­»®·±«­´§ò

Ë°¸»¿ª¿´ ½¿«­»¼ ¾§ ¹®±©¬¸ ±º ¬®»» ®±±¬­ «²¼»® º±±¬·²¹­ ·­ ²±¬ ¿­·³°´» ª»®¬·½¿´ ­¸»¿® ­¬®»­­ò ̸»®» ·­ ¿ ¬»²¼»²½§ º±® ¬¸» ®±±¬ ¬± ¿´­±»¨»®¬ ´¿¬»®¿´ º±®½»­ ¬¸¿¬ ¿¬¬»³°¬ ¬± ­»°¿®¿¬» ­»½¬·±²­ ±º ¾®·½µ©±®µ¿º¬»® ·²·¬·¿´ ½®¿½µ·²¹ ¸¿­ ±½½«®®»¼ò

Ì®»»­ ½¿² ½¿«­» ­¸®·²µ¿¹» ¿²¼ ¼¿³¿¹»

Page 148: SITE CLASSIFICATION REPORT SUMMARY...Douglas Partners (DP) has prepared this report for this project at Taylor 2- Stage 3, Taylor in accordance with DP’s proposal dated 15 September

̸» ²±®³¿´ ­¬®«½¬«®¿´ ¿®®¿²¹»³»²¬ ·­ ¬¸¿¬ ¬¸» ·²²»® ´»¿º ±º ¾®·½µó©±®µ ·² ¬¸» »¨¬»®²¿´ ©¿´´­ ¿²¼ ¿¬ ´»¿­¬ ­±³» ±º ¬¸» ·²¬»®²¿´ ©¿´´­ø¼»°»²¼·²¹ ±² ¬¸» ®±±º ¬§°»÷ ½±³°®·­» ¬¸» ´±¿¼ó¾»¿®·²¹ ­¬®«½¬«®» ±²©¸·½¸ ¿²§ «°°»® º´±±®­ô ½»·´·²¹­ ¿²¼ ¬¸» ®±±º ¿®» ­«°°±®¬»¼ò ײ ¬¸»­»½¿­»­ô ·¬ ·­ ·²¬»®²¿´´§ ª·­·¾´» ½®¿½µ·²¹ ¬¸¿¬ ­¸±«´¼ ¾» ¬¸» ³¿·² º±½«­±º ¿¬¬»²¬·±²ô ¸±©»ª»® ¬¸»®» ¿®» ¿ º»© »¨¿³°´»­ ±º ¼©»´´·²¹­ ©¸±­»»¨¬»®²¿´ ´»¿º ±º ³¿­±²®§ °´¿§­ ­±³» ­«°°±®¬·²¹ ®±´»ô ­± ¬¸·­ ­¸±«´¼¾» ½¸»½µ»¼ ·º ¬¸»®» ·­ ¿²§ ¼±«¾¬ò ײ ¿²§ ½¿­»ô »¨¬»®²¿´´§ ª·­·¾´»½®¿½µ·²¹ ·­ ·³°±®¬¿²¬ ¿­ ¿ ¹«·¼» ¬± ­¬®»­­»­ ±² ¬¸» ­¬®«½¬«®» ¹»²»®¿´´§ô¿²¼ ·¬ ­¸±«´¼ ¿´­± ¾» ®»³»³¾»®»¼ ¬¸¿¬ ¬¸» »¨¬»®²¿´ ©¿´´­ ³«­¬ ¾»½¿°¿¾´» ±º ­«°°±®¬·²¹ ¬¸»³­»´ª»­ò

Ûºº»½¬­ ±² º®¿³»¼ ­¬®«½¬«®»­Ì·³¾»® ±® ­¬»»´ º®¿³»¼ ¾«·´¼·²¹­ ¿®» ´»­­ ´·µ»´§ ¬± »¨¸·¾·¬ ½®¿½µ·²¹¼«» ¬± ­©»´´ñ­¸®·²µ ¬¸¿² ³¿­±²®§ ¾«·´¼·²¹­ ¾»½¿«­» ±º ¬¸»·®º´»¨·¾·´·¬§ò ß´­±ô ¬¸» ¼±³·²¹ñ¼·­¸·²¹ »ºº»½¬­ ¬»²¼ ¬± ¾» ´±©»® ¾»½¿«­»±º ¬¸» ´·¹¸¬»® ©»·¹¸¬ ±º ©¿´´­ò ̸» ³¿·² ®·­µ­ ¬± º®¿³»¼ ¾«·´¼·²¹­ ¿®»»²½±«²¬»®»¼ ¾»½¿«­» ±º ¬¸» ·­±´¿¬»¼ °·»® º±±¬·²¹­ «­»¼ «²¼»® ©¿´´­òɸ»®» »®±­·±² ±® ­¿¬«®¿¬·±² ½¿«­» ¿ º±±¬·²¹ ¬± º¿´´ ¿©¿§ô ¬¸·­ ½¿²¼±«¾´» ¬¸» ­°¿² ©¸·½¸ ¿ ©¿´´ ³«­¬ ¾®·¼¹»ò ̸·­ ¿¼¼·¬·±²¿´ ­¬®»­­ ½¿²½®»¿¬» ½®¿½µ·²¹ ·² ©¿´´ ´·²·²¹­ô °¿®¬·½«´¿®´§ ©¸»®» ¬¸»®» ·­ ¿ ©»¿µ°±·²¬ ·² ¬¸» ­¬®«½¬«®» ½¿«­»¼ ¾§ ¿ ¼±±® ±® ©·²¼±© ±°»²·²¹ò ׬ ·­ô¸±©»ª»®ô «²´·µ»´§ ¬¸¿¬ º®¿³»¼ ­¬®«½¬«®»­ ©·´´ ¾» ­± ­¬®»­­»¼ ¿­ ¬± ­«ºº»®­»®·±«­ ¼¿³¿¹» ©·¬¸±«¬ º·®­¬ »¨¸·¾·¬·²¹ ­±³» ±® ¿´´ ±º ¬¸» ¿¾±ª»­§³°¬±³­ º±® ¿ ½±²­·¼»®¿¾´» °»®·±¼ò ̸» ­¿³» ©¿®²·²¹ °»®·±¼ ­¸±«´¼¿°°´§ ·² ¬¸» ½¿­» ±º «°¸»¿ª¿´ò ׬ ­¸±«´¼ ¾» ²±¬»¼ô ¸±©»ª»®ô ¬¸¿¬ ©¸»®»º®¿³»¼ ¾«·´¼·²¹­ ¿®» ­«°°±®¬»¼ ¾§ ­¬®·° º±±¬·²¹­ ¬¸»®» ·­ ±²´§ ±²» ´»¿º±º ¾®·½µ©±®µ ¿²¼ ¬¸»®»º±®» ¬¸» »¨¬»®²¿´´§ ª·­·¾´» ©¿´´­ ¿®» ¬¸»­«°°±®¬·²¹ ­¬®«½¬«®» º±® ¬¸» ¾«·´¼·²¹ò ײ ¬¸·­ ½¿­»ô ¬¸» ­«¾º´±±®³¿­±²®§ ©¿´´­ ½¿² ¾» »¨°»½¬»¼ ¬± ¾»¸¿ª» ¿­ º«´´ ¾®·½µ©±®µ ©¿´´­ò

Ûºº»½¬­ ±² ¾®·½µ ª»²»»® ­¬®«½¬«®»­Þ»½¿«­» ¬¸» ´±¿¼ó¾»¿®·²¹ ­¬®«½¬«®» ±º ¿ ¾®·½µ ª»²»»® ¾«·´¼·²¹ ·­ ¬¸»º®¿³» ¬¸¿¬ ³¿µ»­ «° ¬¸» ·²¬»®·±® ´»¿º ±º ¬¸» »¨¬»®²¿´ ©¿´´­ °´«­°»®¸¿°­ ¬¸» ·²¬»®²¿´ ©¿´´­ô ¼»°»²¼·²¹ ±² ¬¸» ¬§°» ±º ®±±ºô ¬¸»¾«·´¼·²¹ ½¿² ¾» »¨°»½¬»¼ ¬± ¾»¸¿ª» ¿­ ¿ º®¿³»¼ ­¬®«½¬«®»ô »¨½»°¬ ¬¸¿¬¬¸» »¨¬»®²¿´ ³¿­±²®§ ©·´´ ¾»¸¿ª» ·² ¿ ­·³·´¿® ©¿§ ¬± ¬¸» »¨¬»®²¿´ ´»¿º±º ¿ º«´´ ³¿­±²®§ ­¬®«½¬«®»ò

É¿¬»® Í»®ª·½» ¿²¼ Ü®¿·²¿¹»

ɸ»®» ¿ ©¿¬»® ­»®ª·½» °·°»ô ¿ ­»©»® ±® ­¬±®³©¿¬»® ¼®¿·²¿¹» °·°» ·­ ·²¬¸» ª·½·²·¬§ ±º ¿ ¾«·´¼·²¹ô ¿ ©¿¬»® ´»¿µ ½¿² ½¿«­» »®±­·±²ô ­©»´´·²¹ ±®­¿¬«®¿¬·±² ±º ­«­½»°¬·¾´» ­±·´ò Ûª»² ¿ ³·²«­½«´» ´»¿µ ½¿² ¾» »²±«¹¸¬± ­¿¬«®¿¬» ¿ ½´¿§ º±«²¼¿¬·±²ò ß ´»¿µ·²¹ ¬¿° ²»¿® ¿ ¾«·´¼·²¹ ½¿² ¸¿ª»¬¸» ­¿³» »ºº»½¬ò ײ ¿¼¼·¬·±²ô ¬®»²½¸»­ ½±²¬¿·²·²¹ °·°»­ ½¿² ¾»½±³»©¿¬»®½±«®­»­ »ª»² ¬¸±«¹¸ ¾¿½µº·´´»¼ô °¿®¬·½«´¿®´§ ©¸»®» ¾®±µ»²®«¾¾´» ·­ «­»¼ ¿­ º·´´ò É¿¬»® ¬¸¿¬ ®«²­ ¿´±²¹ ¬¸»­» ¬®»²½¸»­ ½¿² ¾»®»­°±²­·¾´» º±® ­»®·±«­ »®±­·±²ô ·²¬»®­¬®¿¬¿ ­»»°¿¹» ·²¬± ­«¾º´±±® ¿®»¿­¿²¼ ­¿¬«®¿¬·±²ò

з°» ´»¿µ¿¹» ¿²¼ ¬®»²½¸ ©¿¬»® º´±©­ ¿´­± »²½±«®¿¹» ¬®»» ¿²¼ ­¸®«¾®±±¬­ ¬± ¬¸» ­±«®½» ±º ©¿¬»®ô ½±³°´·½¿¬·²¹ ¿²¼ »¨¿½»®¾¿¬·²¹ ¬¸»°®±¾´»³òб±® ®±±º °´«³¾·²¹ ½¿² ®»­«´¬ ·² ´¿®¹» ª±´«³»­ ±º ®¿·²©¿¬»® ¾»·²¹½±²½»²¬®¿¬»¼ ·² ¿ ­³¿´´ ¿®»¿ ±º ­±·´æ

{ ײ½±®®»½¬ º¿´´­ ·² ®±±º ¹«¬¬»®·²¹ ³¿§ ®»­«´¬ ·² ±ª»®º´±©­ô ¿­ ³¿§¹«¬¬»®­ ¾´±½µ»¼ ©·¬¸ ´»¿ª»­ »¬½ò

{ ݱ®®±¼»¼ ¹«¬¬»®·²¹ ±® ¼±©²°·°»­ ½¿² ­°·´´ ©¿¬»® ¬± ¹®±«²¼ò

{ ܱ©²°·°»­ ²±¬ °±­·¬·ª»´§ ½±²²»½¬»¼ ¬± ¿ °®±°»® ­¬±®³©¿¬»®½±´´»½¬·±² ­§­¬»³ ©·´´ ¼·®»½¬ ¿ ½±²½»²¬®¿¬·±² ±º ©¿¬»® ¬± ­±·´ ¬¸¿¬ ·­¼·®»½¬´§ ¿¼¶¿½»²¬ ¬± º±±¬·²¹­ô ­±³»¬·³»­ ½¿«­·²¹ ´¿®¹»ó­½¿´»°®±¾´»³­ ­«½¸ ¿­ »®±­·±²ô ­¿¬«®¿¬·±² ¿²¼ ³·¹®¿¬·±² ±º ©¿¬»® «²¼»®¬¸» ¾«·´¼·²¹ò

Í»®·±«­²»­­ ±º Ý®¿½µ·²¹

ײ ¹»²»®¿´ô ³±­¬ ½®¿½µ·²¹ º±«²¼ ·² ³¿­±²®§ ©¿´´­ ·­ ¿ ½±­³»¬·½²«·­¿²½» ±²´§ ¿²¼ ½¿² ¾» µ»°¬ ·² ®»°¿·® ±® »ª»² ·¹²±®»¼ò ̸» ¬¿¾´»¾»´±© ·­ ¿ ®»°®±¼«½¬·±² ±º Ì¿¾´» Ýï ±º ßÍ îèéðò

ßÍ îèéð ¿´­± °«¾´·­¸»­ º·¹«®»­ ®»´¿¬·²¹ ¬± ½®¿½µ·²¹ ·² ½±²½®»¬» º´±±®­ô¸±©»ª»® ¾»½¿«­» ©¿´´ ½®¿½µ·²¹ ©·´´ «­«¿´´§ ®»¿½¸ ¬¸» ½®·¬·½¿´ °±·²¬­·¹²·º·½¿²¬´§ »¿®´·»® ¬¸¿² ½®¿½µ·²¹ ·² ­´¿¾­ô ¬¸·­ ¬¿¾´» ·­ ²±¬®»°®±¼«½»¼ ¸»®»ò

Ю»ª»²¬·±²ñÝ«®»

д«³¾·²¹É¸»®» ¾«·´¼·²¹ ³±ª»³»²¬ ·­ ½¿«­»¼ ¾§ ©¿¬»® ­»®ª·½»ô ®±±º °´«³¾·²¹ô­»©»® ±® ­¬±®³©¿¬»® º¿·´«®»ô ¬¸» ®»³»¼§ ·­ ¬± ®»°¿·® ¬¸» °®±¾´»³ò ׬ ·­ °®«¼»²¬ô ¸±©»ª»®ô ¬± ½±²­·¼»® ¿´­± ®»®±«¬·²¹ °·°»­ ¿©¿§ º®±³¬¸» ¾«·´¼·²¹ ©¸»®» °±­­·¾´»ô ¿²¼ ®»´±½¿¬·²¹ ¬¿°­ ¬± °±­·¬·±²­ ©¸»®»¿²§ ´»¿µ¿¹» ©·´´ ²±¬ ¼·®»½¬ ©¿¬»® ¬± ¬¸» ¾«·´¼·²¹ ª·½·²·¬§ò Ûª»² ©¸»®»¹«´´§ ¬®¿°­ ¿®» °®»­»²¬ô ¬¸»®» ·­ ­±³»¬·³»­ ­«ºº·½·»²¬ ­°·´´ ¬± ½®»¿¬»»®±­·±² ±® ­¿¬«®¿¬·±²ô °¿®¬·½«´¿®´§ ·² ³±¼»®² ·²­¬¿´´¿¬·±²­ «­·²¹­³¿´´»® ¼·¿³»¬»® ÐÊÝ º·¨¬«®»­ò ײ¼»»¼ô ­±³» ¹«´´§ ¬®¿°­ ¿®» ²±¬­·¬«¿¬»¼ ¼·®»½¬´§ «²¼»® ¬¸» ¬¿°­ ¬¸¿¬ ¿®» ·²­¬¿´´»¼ ¬± ½¸¿®¹» ¬¸»³ô©·¬¸ ¬¸» ®»­«´¬ ¬¸¿¬ ©¿¬»® º®±³ ¬¸» ¬¿° ³¿§ »²¬»® ¬¸» ¾¿½µº·´´»¼¬®»²½¸ ¬¸¿¬ ¸±«­»­ ¬¸» ­»©»® °·°·²¹ò ׺ ¬¸» ¬®»²½¸ ¸¿­ ¾»»² °±±®´§¾¿½µº·´´»¼ô ¬¸» ©¿¬»® ©·´´ »·¬¸»® °±²¼ ±® º´±© ¿´±²¹ ¬¸» ¾±¬¬±³ ±º¬¸» ¬®»²½¸ò ß­ ¬¸»­» ¬®»²½¸»­ «­«¿´´§ ®«² ¿´±²¹­·¼» ¬¸» º±±¬·²¹­ ¿²¼½¿² ¾» ¿¬ ¿ ­·³·´¿® ¼»°¬¸ô ·¬ ·­ ²±¬ ¸¿®¼ ¬± ­»» ¸±© ¿²§ ©¿¬»® ¬¸¿¬ ·­¬¸«­ ¼·®»½¬»¼ ·²¬± ¿ ¬®»²½¸ ½¿² »¿­·´§ ¿ºº»½¬ ¬¸» º±«²¼¿¬·±²K­ ¿¾·´·¬§ ¬±­«°°±®¬ º±±¬·²¹­ ±® »ª»² ¹¿·² »²¬®§ ¬± ¬¸» ­«¾º´±±® ¿®»¿ò

Ù®±«²¼ ¼®¿·²¿¹»×² ¿´´ ­±·´­ ¬¸»®» ·­ ¬¸» ½¿°¿½·¬§ º±® ©¿¬»® ¬± ¬®¿ª»´ ±² ¬¸» ­«®º¿½» ¿²¼¾»´±© ·¬ò Í«®º¿½» ©¿¬»® º´±©­ ½¿² ¾» »­¬¿¾´·­¸»¼ ¾§ ·²­°»½¬·±² ¼«®·²¹¿²¼ ¿º¬»® ¸»¿ª§ ±® °®±´±²¹»¼ ®¿·²ò ׺ ²»½»­­¿®§ô ¿ ¹®¿¬»¼ ¼®¿·² ­§­¬»³½±²²»½¬»¼ ¬± ¬¸» ­¬±®³©¿¬»® ½±´´»½¬·±² ­§­¬»³ ·­ «­«¿´´§ ¿² »¿­§­±´«¬·±²ò

׬ ·­ô ¸±©»ª»®ô ­±³»¬·³»­ ²»½»­­¿®§ ©¸»² ¿¬¬»³°¬·²¹ ¬± °®»ª»²¬©¿¬»® ³·¹®¿¬·±² ¬¸¿¬ ¬»­¬·²¹ ¾» ½¿®®·»¼ ±«¬ ¬± »­¬¿¾´·­¸ ©¿¬»®¬¿¾´»¸»·¹¸¬ ¿²¼ ­«¾­±·´ ©¿¬»® º´±©­ò ̸·­ ­«¾¶»½¬ ·­ ®»º»®®»¼ ¬± ·² ÞÌÚ ï翲¼ ³¿§ °®±°»®´§ ¾» ®»¹¿®¼»¼ ¿­ ¿² ¿®»¿ º±® ¿² »¨°»®¬ ½±²­«´¬¿²¬ò

Ю±¬»½¬·±² ±º ¬¸» ¾«·´¼·²¹ °»®·³»¬»®×¬ ·­ »­­»²¬·¿´ ¬± ®»³»³¾»® ¬¸¿¬ ¬¸» ­±·´ ¬¸¿¬ ¿ºº»½¬­ º±±¬·²¹­ »¨¬»²¼­©»´´ ¾»§±²¼ ¬¸» ¿½¬«¿´ ¾«·´¼·²¹ ´·²»ò É¿¬»®·²¹ ±º ¹¿®¼»² °´¿²¬­ô­¸®«¾­ ¿²¼ ¬®»»­ ½¿«­»­ ­±³» ±º ¬¸» ³±­¬ ­»®·±«­ ©¿¬»® °®±¾´»³­ò

Ú±® ¬¸·­ ®»¿­±²ô °¿®¬·½«´¿®´§ ©¸»®» °®±¾´»³­ »¨·­¬ ±® ¿®» ´·µ»´§ ¬±±½½«®ô ·¬ ·­ ®»½±³³»²¼»¼ ¬¸¿¬ ¿² ¿°®±² ±º °¿ª·²¹ ¾» ·²­¬¿´´»¼¿®±«²¼ ¿­ ³«½¸ ±º ¬¸» ¾«·´¼·²¹ °»®·³»¬»® ¿­ ²»½»­­¿®§ò ̸·­ °¿ª·²¹

ÝÔßÍÍ×Ú×ÝßÌ×ÑÒ ÑÚ ÜßÓßÙÛ É×ÌØ ÎÛÚÛÎÛÒÝÛ ÌÑ ÉßÔÔÍ

Ü»­½®·°¬·±² ±º ¬§°·½¿´ ¼¿³¿¹» ¿²¼ ®»¯«·®»¼ ®»°¿·® ß°°®±¨·³¿¬» ½®¿½µ ©·¼¬¸ Ü¿³¿¹»´·³·¬ ø­»» Ò±¬» í÷ ½¿¬»¹±®§

Ø¿·®´·²» ½®¿½µ­ äðòï ³³ ð

Ú·²» ½®¿½µ­ ©¸·½¸ ¼± ²±¬ ²»»¼ ®»°¿·® äï ³³ ï

Ý®¿½µ­ ²±¬·½»¿¾´» ¾«¬ »¿­·´§ º·´´»¼ò ܱ±®­ ¿²¼ ©·²¼±©­ ­¬·½µ ­´·¹¸¬´§ äë ³³ î

Ý®¿½µ­ ½¿² ¾» ®»°¿·®»¼ ¿²¼ °±­­·¾´§ ¿ ­³¿´´ ¿³±«²¬ ±º ©¿´´ ©·´´ ²»»¼ ëPïë ³³ ø±® ¿ ²«³¾»® ±º ½®¿½µ­ í¬± ¾» ®»°´¿½»¼ò ܱ±®­ ¿²¼ ©·²¼±©­ ­¬·½µò Í»®ª·½» °·°»­ ½¿² º®¿½¬«®»ò í ³³ ±® ³±®» ·² ±²» ¹®±«°÷É»¿¬¸»®¬·¹¸¬²»­­ ±º¬»² ·³°¿·®»¼

Û¨¬»²­·ª» ®»°¿·® ©±®µ ·²ª±´ª·²¹ ¾®»¿µ·²¹ó±«¬ ¿²¼ ®»°´¿½·²¹ ­»½¬·±²­ ±º ©¿´´­ô ïëPîë ³³ ¾«¬ ¿´­± ¼»°»²¼ ì»­°»½·¿´´§ ±ª»® ¼±±®­ ¿²¼ ©·²¼±©­ò É·²¼±© ¿²¼ ¼±±® º®¿³»­ ¼·­¬±®¬ò É¿´´­ ´»¿² ±² ²«³¾»® ±º ½®¿½µ­±® ¾«´¹» ²±¬·½»¿¾´§ô ­±³» ´±­­ ±º ¾»¿®·²¹ ·² ¾»¿³­ò Í»®ª·½» °·°»­ ¼·­®«°¬»¼

Page 149: SITE CLASSIFICATION REPORT SUMMARY...Douglas Partners (DP) has prepared this report for this project at Taylor 2- Stage 3, Taylor in accordance with DP’s proposal dated 15 September

­¸±«´¼ »¨¬»²¼ ±«¬©¿®¼­ ¿ ³·²·³«³ ±º çðð ³³ ø³±®» ·² ¸·¹¸´§®»¿½¬·ª» ­±·´÷ ¿²¼ ­¸±«´¼ ¸¿ª» ¿ ³·²·³«³ º¿´´ ¿©¿§ º®±³ ¬¸»¾«·´¼·²¹ ±º ïæêðò ̸» º·²·­¸»¼ °¿ª·²¹ ­¸±«´¼ ¾» ²± ´»­­ ¬¸¿² ïðð³³ ¾»´±© ¾®·½µ ª»²¬ ¾¿­»­ò

׬ ·­ °®«¼»²¬ ¬± ®»´±½¿¬» ¼®¿·²¿¹» °·°»­ ¿©¿§ º®±³ ¬¸·­ °¿ª·²¹ô ·º°±­­·¾´»ô ¬± ¿ª±·¼ ½±³°´·½¿¬·±²­ º®±³ º«¬«®» ´»¿µ¿¹»ò ׺ ¬¸·­ ·­ ²±¬°®¿½¬·½¿´ô »¿®¬¸»²©¿®» °·°»­ ­¸±«´¼ ¾» ®»°´¿½»¼ ¾§ ÐÊÝ ¿²¼¾¿½µº·´´·²¹ ­¸±«´¼ ¾» ±º ¬¸» ­¿³» ­±·´ ¬§°» ¿­ ¬¸» ­«®®±«²¼·²¹ ­±·´¿²¼ ½±³°¿½¬»¼ ¬± ¬¸» ­¿³» ¼»²­·¬§ò

Û¨½»°¬ ·² ¿®»¿­ ©¸»®» º®»»¦·²¹ ±º ©¿¬»® ·­ ¿² ·­­«»ô ·¬ ·­ ©·­» ¬±®»³±ª» ¬¿°­ ·² ¬¸» ¾«·´¼·²¹ ¿®»¿ ¿²¼ ®»´±½¿¬» ¬¸»³ ©»´´ ¿©¿§ º®±³¬¸» ¾«·´¼·²¹ P °®»º»®¿¾´§ ²±¬ «°¸·´´ º®±³ ·¬ ø­»» ÞÌÚ ïç÷ò

׬ ³¿§ ¾» ¼»­·®¿¾´» ¬± ·²­¬¿´´ ¿ ¹®¿¬»¼ ¼®¿·² ¿¬ ¬¸» ±«¬­·¼» »¼¹» ±º ¬¸»°¿ª·²¹ ±² ¬¸» «°¸·´´ ­·¼» ±º ¬¸» ¾«·´¼·²¹ò ׺ ­«¾­±·´ ¼®¿·²¿¹» ·­²»»¼»¼ ¬¸·­ ½¿² ¾» ·²­¬¿´´»¼ «²¼»® ¬¸» ­«®º¿½» ¼®¿·²ò

ݱ²¼»²­¿¬·±²×² ¾«·´¼·²¹­ ©·¬¸ ¿ ­«¾º´±±® ª±·¼ ­«½¸ ¿­ ©¸»®» ¾»¿®»®­ ¿²¼ ¶±·­¬­­«°°±®¬ º´±±®·²¹ô ·²­«ºº·½·»²¬ ª»²¬·´¿¬·±² ½®»¿¬»­ ·¼»¿´ ½±²¼·¬·±²­ º±®½±²¼»²­¿¬·±²ô °¿®¬·½«´¿®´§ ©¸»®» ¬¸»®» ·­ ´·¬¬´» ½´»¿®¿²½» ¾»¬©»»² ¬¸»º´±±® ¿²¼ ¬¸» ¹®±«²¼ò ݱ²¼»²­¿¬·±² ¿¼¼­ ¬± ¬¸» ³±·­¬«®» ¿´®»¿¼§°®»­»²¬ ·² ¬¸» ­«¾º´±±® ¿²¼ ­·¹²·º·½¿²¬´§ ­´±©­ ¬¸» °®±½»­­ ±º ¼®§·²¹±«¬ò ײ­¬¿´´¿¬·±² ±º ¿² ¿¼»¯«¿¬» ­«¾º´±±® ª»²¬·´¿¬·±² ­§­¬»³ô »·¬¸»®²¿¬«®¿´ ±® ³»½¸¿²·½¿´ô ·­ ¼»­·®¿¾´»ò

É¿®²·²¹æ ß´¬¸±«¹¸ ¬¸·­ Þ«·´¼·²¹ Ì»½¸²±´±¹§ Ú·´» ¼»¿´­ ©·¬¸½®¿½µ·²¹ ·² ¾«·´¼·²¹­ô ·¬ ­¸±«´¼ ¾» ­¿·¼ ¬¸¿¬ ­«¾º´±±® ³±·­¬«®» ½¿²®»­«´¬ ·² ¬¸» ¼»ª»´±°³»²¬ ±º ±¬¸»® °®±¾´»³­ô ²±¬¿¾´§æ

{ É¿¬»® ¬¸¿¬ ·­ ¬®¿²­³·¬¬»¼ ·²¬± ³¿­±²®§ô ³»¬¿´ ±® ¬·³¾»® ¾«·´¼·²¹»´»³»²¬­ ½¿«­»­ ¼¿³¿¹» ¿²¼ñ±® ¼»½¿§ ¬± ¬¸±­» »´»³»²¬­ò

{ Ø·¹¸ ­«¾º´±±® ¸«³·¼·¬§ ¿²¼ ³±·­¬«®» ½±²¬»²¬ ½®»¿¬» ¿² ·¼»¿´»²ª·®±²³»²¬ º±® ª¿®·±«­ °»­¬­ô ·²½´«¼·²¹ ¬»®³·¬»­ ¿²¼ ­°·¼»®­ò

{ ɸ»®» ¸·¹¸ ³±·­¬«®» ´»ª»´­ ¿®» ¬®¿²­³·¬¬»¼ ¬± ¬¸» º´±±®·²¹ ¿²¼©¿´´­ô ¿² ·²½®»¿­» ·² ¬¸» ¼«­¬ ³·¬» ½±«²¬ ½¿² »²­«» ©·¬¸·² ¬¸»´·ª·²¹ ¿®»¿­ò Ü«­¬ ³·¬»­ô ¿­ ©»´´ ¿­ ¼¿³°²»­­ ·² ¹»²»®¿´ô ½¿² ¾» ¿¸»¿´¬¸ ¸¿¦¿®¼ ¬± ·²¸¿¾·¬¿²¬­ô °¿®¬·½«´¿®´§ ¬¸±­» ©¸± ¿®»¿¾²±®³¿´´§ ­«­½»°¬·¾´» ¬± ®»­°·®¿¬±®§ ¿·´³»²¬­ò

̸» ¹¿®¼»²Ì¸» ·¼»¿´ ª»¹»¬¿¬·±² ´¿§±«¬ ·­ ¬± ¸¿ª» ´¿©² ±® °´¿²¬­ ¬¸¿¬ ®»¯«·®»±²´§ ´·¹¸¬ ©¿¬»®·²¹ ·³³»¼·¿¬»´§ ¿¼¶¿½»²¬ ¬± ¬¸» ¼®¿·²¿¹» ±® °¿ª·²¹»¼¹»ô ¬¸»² ³±®» ¼»³¿²¼·²¹ °´¿²¬­ô ­¸®«¾­ ¿²¼ ¬®»»­ ­°®»¿¼ ±«¬ ·²¬¸¿¬ ±®¼»®ò

Ѫ»®©¿¬»®·²¹ ¼«» ¬± ³·­«­» ±º ¿«¬±³¿¬·½ ©¿¬»®·²¹ ­§­¬»³­ ·­ ¿½±³³±² ½¿«­» ±º ­¿¬«®¿¬·±² ¿²¼ ©¿¬»® ³·¹®¿¬·±² «²¼»® º±±¬·²¹­ò ׺·¬ ·­ ²»½»­­¿®§ ¬± «­» ¬¸»­» ­§­¬»³­ô ·¬ ·­ ·³°±®¬¿²¬ ¬± ®»³±ª» ¹¿®¼»²¾»¼­ ¬± ¿ ½±³°´»¬»´§ ­¿º» ¼·­¬¿²½» º®±³ ¾«·´¼·²¹­ò

Û¨·­¬·²¹ ¬®»»­É¸»®» ¿ ¬®»» ·­ ½¿«­·²¹ ¿ °®±¾´»³ ±º ­±·´ ¼®§·²¹ ±® ¬¸»®» ·­ ¬¸»»¨·­¬»²½» ±® ¬¸®»¿¬ ±º «°¸»¿ª¿´ ±º º±±¬·²¹­ô ·º ¬¸» ±ºº»²¼·²¹ ®±±¬­ ¿®»­«¾­·¼·¿®§ ¿²¼ ¬¸»·® ®»³±ª¿´ ©·´´ ²±¬ ­·¹²·º·½¿²¬´§ ¼¿³¿¹» ¬¸» ¬®»»ô¬¸»§ ­¸±«´¼ ¾» ­»ª»®»¼ ¿²¼ ¿ ½±²½®»¬» ±® ³»¬¿´ ¾¿®®·»® °´¿½»¼ª»®¬·½¿´´§ ·² ¬¸» ­±·´ ¬± °®»ª»²¬ º«¬«®» ®±±¬ ¹®±©¬¸ ·² ¬¸» ¼·®»½¬·±² ±º¬¸» ¾«·´¼·²¹ò ׺ ·¬ ·­ ²±¬ °±­­·¾´» ¬± ®»³±ª» ¬¸» ®»´»ª¿²¬ ®±±¬­©·¬¸±«¬ ¼¿³¿¹» ¬± ¬¸» ¬®»»ô ¿² ¿°°´·½¿¬·±² ¬± ®»³±ª» ¬¸» ¬®»» ­¸±«´¼¾» ³¿¼» ¬± ¬¸» ´±½¿´ ¿«¬¸±®·¬§ò ß °®«¼»²¬ °´¿² ·­ ¬± ¬®¿²­°´¿²¬ ´·µ»´§±ºº»²¼»®­ ¾»º±®» ¬¸»§ ¾»½±³» ¿ °®±¾´»³ò

ײº±®³¿¬·±² ±² ¬®»»­ô °´¿²¬­ ¿²¼ ­¸®«¾­Í¬¿¬» ¼»°¿®¬³»²¬­ ±ª»®­»»·²¹ ¿¹®·½«´¬«®» ½¿² ¹·ª» ·²º±®³¿¬·±²®»¹¿®¼·²¹ ®±±¬ °¿¬¬»®²­ô ª±´«³» ±º ©¿¬»® ²»»¼»¼ ¿²¼ ­¿º» ¼·­¬¿²½»º®±³ ¾«·´¼·²¹­ ±º ³±­¬ ­°»½·»­ò Þ±¬¿²·½ ¹¿®¼»²­ ¿®» ¿´­± ­±«®½»­ ±º·²º±®³¿¬·±²ò Ú±® ·²º±®³¿¬·±² ±² °´¿²¬ ®±±¬­ ¿²¼ ¼®¿·²­ô ­»» Þ«·´¼·²¹Ì»½¸²±´±¹§ Ú·´» ïéò

Û¨½¿ª¿¬·±²Û¨½¿ª¿¬·±² ¿®±«²¼ º±±¬·²¹­ ³«­¬ ¾» °®±°»®´§ »²¹·²»»®»¼ò ͱ·´­«°°±®¬·²¹ º±±¬·²¹­ ½¿² ±²´§ ¾» ­¿º»´§ »¨½¿ª¿¬»¼ ¿¬ ¿² ¿²¹´» ¬¸¿¬¿´´±©­ ¬¸» ­±·´ «²¼»® ¬¸» º±±¬·²¹ ¬± ®»³¿·² ­¬¿¾´»ò ̸·­ ¿²¹´» ·­½¿´´»¼ ¬¸» ¿²¹´» ±º ®»°±­» ø±® º®·½¬·±²÷ ¿²¼ ª¿®·»­ ­·¹²·º·½¿²¬´§¾»¬©»»² ­±·´ ¬§°»­ ¿²¼ ½±²¼·¬·±²­ò λ³±ª¿´ ±º ­±·´ ©·¬¸·² ¬¸» ¿²¹´»±º ®»°±­» ©·´´ ½¿«­» ­«¾­·¼»²½»ò

λ³»¼·¿¬·±²

ɸ»®» »®±­·±² ¸¿­ ±½½«®®»¼ ¬¸¿¬ ¸¿­ ©¿­¸»¼ ¿©¿§ ­±·´ ¿¼¶¿½»²¬ ¬±º±±¬·²¹­ô ­±·´ ±º ¬¸» ­¿³» ½´¿­­·º·½¿¬·±² ­¸±«´¼ ¾» ·²¬®±¼«½»¼ ¿²¼½±³°¿½¬»¼ ¬± ¬¸» ­¿³» ¼»²­·¬§ò ɸ»®» º±±¬·²¹­ ¸¿ª» ¾»»²«²¼»®³·²»¼ô ¿«¹³»²¬¿¬·±² ±® ±¬¸»® ­°»½·¿´·­¬ ©±®µ ³¿§ ¾» ®»¯«·®»¼òλ³»¼·¿¬·±² ±º º±±¬·²¹­ ¿²¼ º±«²¼¿¬·±²­ ·­ ¹»²»®¿´´§ ¬¸» ®»¿´³ ±º ¿­°»½·¿´·­¬ ½±²­«´¬¿²¬ò

ɸ»®» ·­±´¿¬»¼ º±±¬·²¹­ ®·­» ¿²¼ º¿´´ ¾»½¿«­» ±º ­©»´´ñ­¸®·²µ »ºº»½¬ô¬¸» ¸±³»±©²»® ³¿§ ¾» ¬»³°¬»¼ ¬± ¿´´»ª·¿¬» º´±±® ¾±«²½» ¾§ º·´´·²¹¬¸» ¹¿° ¬¸¿¬ ¸¿­ ¿°°»¿®»¼ ¾»¬©»»² ¬¸» ¾»¿®»® ¿²¼ ¬¸» °·»® ©·¬¸¾´±½µ·²¹ò ̸» ¼¿²¹»® ¸»®» ·­ ¬¸¿¬ ©¸»² ¬¸» ²»¨¬ ­©»´´ ­»¹³»²¬ ±º ¬¸»½§½´» ±½½«®­ô ¬¸» »¨¬®¿ ¾´±½µ·²¹ ©·´´ °«­¸ ¬¸» º´±±® «° ·²¬± ¿²¿½½»²¬«¿¬»¼ ¼±³» ¿²¼ ³¿§ ¿´­± ½¿«­» ´±½¿´ ­¸»¿® º¿·´«®» ·² ¬¸» ­±·´ò׺ ·¬ ·­ ²»½»­­¿®§ ¬± «­» ¾´±½µ·²¹ô ·¬ ­¸±«´¼ ¾» ¾§ ¿ °¿·® ±º º·²»©»¼¹»­ ¿²¼ ³±²·¬±®·²¹ ­¸±«´¼ ¾» ½¿®®·»¼ ±«¬ º±®¬²·¹¸¬´§ò

̸·­ ÞÌÚ ©¿­ °®»°¿®»¼ ¾§ Ö±¸² Ô»©»® Úß×Þô Ó×ßÓßô ﮬ²»®ô

ݱ²­¬®«½¬·±² Ü·¿¹²±­·­ò

̸» ·²º±®³¿¬·±² ·² ¬¸·­ ¿²¼ ±¬¸»® ·­­«»­ ·² ¬¸» ­»®·»­ ©¿­ ¼»®·ª»¼ º®±³ ª¿®·±«­ ­±«®½»­ ¿²¼ ©¿­ ¾»´·»ª»¼ ¬± ¾» ½±®®»½¬ ©¸»² °«¾´·­¸»¼ò

̸» ·²º±®³¿¬·±² ·­ ¿¼ª·­±®§ò ׬ ·­ °®±ª·¼»¼ ·² ¹±±¼ º¿·¬¸ ¿²¼ ²±¬ ½´¿·³»¼ ¬± ¾» ¿² »¨¸¿«­¬·ª» ¬®»¿¬³»²¬ ±º ¬¸» ®»´»ª¿²¬ ­«¾¶»½¬ò

Ú«®¬¸»® °®±º»­­·±²¿´ ¿¼ª·½» ²»»¼­ ¬± ¾» ±¾¬¿·²»¼ ¾»º±®» ¬¿µ·²¹ ¿²§ ¿½¬·±² ¾¿­»¼ ±² ¬¸» ·²º±®³¿¬·±² °®±ª·¼»¼ò

Ü·­¬®·¾«¬»¼ ¾§

ÝÍ×ÎÑ ÐËÞÔ ×ÍØ ×ÒÙ ÐÑ Þ±¨ ïïíçô ݱ´´·²¹©±±¼ íðêêô ß«­¬®¿´·¿

Ú®»»½¿´´ ïèðð êìë ðëï Ì»´ øðí÷ çêêî éêêê Ú¿¨ øðí÷ çêêî éëëë ©©©ò°«¾´·­¸ò½­·®±ò¿«

Û³¿·´æ °«¾´·­¸·²¹ò­¿´»­à½­·®±ò¿«

w ÝÍ×ÎÑ îððíò ˲¿«¬¸±®·­»¼ ½±°§·²¹ ±º ¬¸·­ Þ«·´¼·²¹ Ì»½¸²±´±¹§ º·´» ·­ °®±¸·¾·¬»¼

Ù¿®¼»²­ º±® ¿ ®»¿½¬·ª» ­·¬»

Page 150: SITE CLASSIFICATION REPORT SUMMARY...Douglas Partners (DP) has prepared this report for this project at Taylor 2- Stage 3, Taylor in accordance with DP’s proposal dated 15 September

TOPSOIL FILLING-dry to moist, brown silty sand

FILLING-generally comprising well compacted, dry tomoist, orange red brown, medium plasticity sandy siltyclay

SANDY SILT-very stiff, dry to moist, grey, low plasticitysandy silt with some rootlets

SILTY CLAY-hard, dry to moist, brown orange, mediumplasticity silty clay with some sand

DACITE-extremely low strength, extremely weathered,orange grey, fine to coarse grained dacite, highlyfractured, with occasional clay seams

-from 1.5m, very low to low strength, highly weathered

Pit discontinued at 1.9m-limit of investigation

0.1

0.4

0.65

1.3

1.9

SAMPLING & IN SITU TESTING LEGEND

TEST PIT LOG

Taylor 2 Estate, Stage 3, Taylor

A Auger sample G Gas sample PID Photo ionisation detector (ppm)B Bulk sample P Piston sample PL(A) Point load axial test Is(50) (MPa)BLK Block sample Ux Tube sample (x mm dia.) PL(D) Point load diametral test Is(50) (MPa)C Core drilling W Water sample pp Pocket penetrometer (kPa)D Disturbed sample Water seep S Standard penetration testE Environmental sample Water level V Shear vane (kPa)

Indesco Consulting Engineers Pty LtdSite Classifications

Results &Comments

LOGGED: JPM SURVEY DATUM: MGA94

CLIENT:PROJECT:LOCATION:

PIT No: 53PROJECT No: 77418.29DATE: 11/1/2019SHEET 1 OF 1

Sampling & In Situ Testing

1

2

Wat

er

Dep

th

Sam

ple

Description

of

Strata Gra

phic

Log

Typ

e

REMARKS: Surface Levels & Coordinates are approximate only and must not be relied upon

RIG: Kubota KX057-4 mini-excavator with 300mm wide bucket

WATER OBSERVATIONS: No free groundwater observed

SURFACE LEVEL: 660.0 AHDEASTING: 209158NORTHING: 618731

Dynamic Penetrometer Test(blows per mm)

5 10 15 20

Cone Penetrometer AS1289.6.3.2Sand Penetrometer AS1289.6.3.3

Depth(m) R

L

1

2

660

659

658

D

D

D

0.5

0.9

1.8

pp >400

Page 151: SITE CLASSIFICATION REPORT SUMMARY...Douglas Partners (DP) has prepared this report for this project at Taylor 2- Stage 3, Taylor in accordance with DP’s proposal dated 15 September

TOPSOIL FILLING-dry to moist, brown silty sand

FILLING-generally comprising well compacted, dry tomoist, orange red brown, medium plasticity sandy siltyclay

SILTY CLAY-very stiff, dry to moist, yellow brown, mediumplasticity silty clay with some fine grained gravel

SILTY SAND-hard, dry to moist, brown, fine to coarsegrained silty sand with some clay

SILTY SANDY CLAY-hard, dry to moist, yellow greybrown, low to medium plasticity silty sandy clay

Pit discontinued at 1.85m-limit of investigation

0.1

0.7

1.4

1.6

1.85

SAMPLING & IN SITU TESTING LEGEND

TEST PIT LOG

Taylor 2 Estate, Stage 3, Taylor

A Auger sample G Gas sample PID Photo ionisation detector (ppm)B Bulk sample P Piston sample PL(A) Point load axial test Is(50) (MPa)BLK Block sample Ux Tube sample (x mm dia.) PL(D) Point load diametral test Is(50) (MPa)C Core drilling W Water sample pp Pocket penetrometer (kPa)D Disturbed sample Water seep S Standard penetration testE Environmental sample Water level V Shear vane (kPa)

Indesco Consulting Engineers Pty LtdSite Classifications

Results &Comments

LOGGED: JPM SURVEY DATUM: MGA94

CLIENT:PROJECT:LOCATION:

PIT No: 54PROJECT No: 77418.29DATE: 11/1/2019SHEET 1 OF 1

Sampling & In Situ Testing

1

2

Wat

er

Dep

th

Sam

ple

Description

of

Strata Gra

phic

Log

Typ

e

REMARKS: Surface Levels & Coordinates are approximate only and must not be relied upon

RIG: Kubota KX057-4 mini-excavator with 300mm wide bucket

WATER OBSERVATIONS: No free groundwater observed

SURFACE LEVEL: 662.0 AHDEASTING: 209147NORTHING: 618759

Dynamic Penetrometer Test(blows per mm)

5 10 15 20

Cone Penetrometer AS1289.6.3.2Sand Penetrometer AS1289.6.3.3

Depth(m) R

L

1

2

662

661

660

D

D

D

0.8

1.5

1.7

pp = 370

Page 152: SITE CLASSIFICATION REPORT SUMMARY...Douglas Partners (DP) has prepared this report for this project at Taylor 2- Stage 3, Taylor in accordance with DP’s proposal dated 15 September
Page 153: SITE CLASSIFICATION REPORT SUMMARY...Douglas Partners (DP) has prepared this report for this project at Taylor 2- Stage 3, Taylor in accordance with DP’s proposal dated 15 September

SITE CLASSIFICATION REPORT SUMMARY

BLOCK: 10 SECTION: 64 SUBURB: Taylor

JOB No: 77418.29 DATE: March 2019

CLIENT: Indesco Consulting Engineers Pty Ltd

Classification Procedures: Existing Subsurface Conditions: Refer attached test pit log(s) – Pit(s) 53,63 and Drawing 1. Bulk Earthworks: Filling within the block placed under Level 1 control as defined in AS 3798 – 2007 (Ref 1). Laboratory Results: Previous laboratory testing results indicated liquid limit ranging from 25-66%, plasticity index ranging from 6-49% and linear shrinkage ranging from 3-20.5%.

Site Classification: Class M* (moderately reactive/filled) based on the current profile / state on limited subsurface information and determined in general accordance with the requirements of AS2870-2011 (Ref 2). The classification must be reassessed should the soil profile change either by adding fill or removing soil from the block and/or if the presence of service trenches or retaining walls are within the zone of influence of the block. Reference should be made to the comments provided below.

Footing Systems: Reference must be made to AS2870-2011 (Ref 2) which indicates footing systems that are appropriate for each site classification. All footings must found within a uniform bearing stratum of suitable strength/material, below the zone of influence of any service trenches, backfill zones, retaining walls or underground structures. Masonry walls should be articulated in accordance with current best practice. Dwelling design must ensure uniform moisture conditions are maintained in the vicinity of footings. Footing systems must be confirmed by a structural engineer taking into consideration any onsite or offsite constraints.

Maintenance Guidelines: Reference should be made to the attached CSIRO Sheet BTF 18 ‘Foundation Maintenance & Footing Performance’ to comments about gardens, landscaping and trees on the performance of foundation soils and in particular in respect to maintaining good surface drainage. It notes that minor cracking in most structures is inevitable, and it describes site maintenance practices aimed at minimising foundation movements that can lead to cracking damage.

Comments/ Limitations:

The successful purchaser must make their own interpretations, deductions and conclusions from the information made available and will need to accept full responsibility for such interpretations, deductions and conclusions.

Development specific geotechnical investigations must be undertaken.

Additional topsoils / filling may have been spread subsequent to the investigation.

Site preparation prior to the construction should include removal of all vegetation, topsoil and any uncontrolled filling.

All new filling must be placed under controlled conditions (AS 3798-2007), otherwise Class P conditions would be warranted.

Some variability in subsurface conditions must be anticipated.

Moisture condition of site soils and/or the presence of groundwater may vary considerably from time of investigation compared to at the time of construction.

Depending on the depth of site cut and trenches, rock excavation may be required.

It is recommended that footing excavations be inspected by a geotechnical engineer.

This report must be read in conjunction with the attached “Limitations” and notes “About this Report”.

References:

1. 2.

AS 3798-2007 ‘Guidelines on Earthworks for Commercial and Residential Developments’, Standards Association of Australia. AS 2870-2011 ‘Residential Slabs and Footings,’ Standards Association of Australia.

Attachments:

Limitations & About this Report Explanatory Notes Test Pit Log(s) Pit(s) 53,63 Drawing 1

Page 154: SITE CLASSIFICATION REPORT SUMMARY...Douglas Partners (DP) has prepared this report for this project at Taylor 2- Stage 3, Taylor in accordance with DP’s proposal dated 15 September

FS 604853

Douglas Partners Pty Ltd ABN 75 053 980 117

www.douglaspartners.com.au Unit 2, 73 Sheppard Street

Hume ACT 2620 PO Box 1487

Fyshwick ACT 2609 Phone (02) 6260 2788

Fax (02) 6260 1147

Brisbane • Cairns • Canberra • Central Coast • Coffs Harbour • Darwin • Geelong • Gold Coast • Macarthur • Melbourne Newcastle • North West Sydney • Perth • Port Macquarie • Sunshine Coast • Sydney • Townsville • Wollongong

Limitations Douglas Partners (DP) has prepared this report for this project at Taylor 2 - Stage 3, Taylor in accordance with DP’s proposal dated 15 September 2017 and acceptance received from Indesco Consulting Engineers Pty Ltd dated 13 March 2019. The work was carried out under DP’s Conditions of Engagement. This report is provided for the exclusive use of Indesco Consulting Engineers Pty Ltd for this project only and for the purposes as described in the report. It should not be used by or relied upon for other projects or purposes on the same or other site or by a third party. Any party so relying upon this report beyond its exclusive use and purpose as stated above, and without the express written consent of DP, does so entirely at its own risk and without recourse to DP for any loss or damage. In preparing this report DP has necessarily relied upon information provided by the client and/or their agents. The results provided in the report are indicative of the sub-surface conditions on the site only at the specific sampling and/or testing locations, and then only to the depths investigated and at the time the work was carried out. Sub-surface conditions can change abruptly due to variable geological processes and also as a result of human influences. Such changes may occur after DP’s field testing has been completed. DP’s advice is based upon the conditions encountered during this investigation. The accuracy of the advice provided by DP in this report may be affected by undetected variations in ground conditions across the site between and beyond the sampling and/or testing locations. The advice may also be limited by budget constraints imposed by others or by site accessibility. This report must be read in conjunction with all of the attached and should be kept in its entirety without separation of individual pages or sections. DP cannot be held responsible for interpretations or conclusions made by others unless they are supported by an expressed statement, interpretation, outcome or conclusion stated in this report. This report, or sections from this report, should not be used as part of a specification for a project, without review and agreement by DP. This is because this report has been written as advice and opinion rather than instructions for construction. The scope for work for this investigation/report did not include the assessment of surface or sub-surface materials or groundwater for contaminants, within or adjacent to the site. Should evidence of filling of unknown origin be noted in the report, and in particular the presence of building demolition materials, it should be recognised that there may be some risk that such filling may contain contaminants and hazardous building materials. The contents of this report do not constitute formal design components such as are required, by the Health and Safety Legislation and Regulations, to be included in a Safety Report specifying the hazards likely to be encountered during construction and the controls required to mitigate risk. This design process requires risk assessment to be undertaken, with such assessment being dependent upon factors relating to likelihood of occurrence and consequences of damage to property and to life. This, in turn, requires project data and analysis presently beyond the knowledge and project role respectively of DP. DP may be able, however, to assist the client in carrying out a risk assessment of potential hazards contained in the Comments section of this report, as an extension to the current scope of works, if so requested, and provided that suitable additional information is made available to DP. Any such risk assessment would, however, be necessarily restricted to the geotechnical components set out in this report and to their application by the project designers to project design, construction, maintenance and demolition.

Page 155: SITE CLASSIFICATION REPORT SUMMARY...Douglas Partners (DP) has prepared this report for this project at Taylor 2- Stage 3, Taylor in accordance with DP’s proposal dated 15 September

July 2010

Introduction These notes have been provided to amplify DP's report in regard to classification methods, field procedures and the comments section. Not all are necessarily relevant to all reports. DP's reports are based on information gained from limited subsurface excavations and sampling, supplemented by knowledge of local geology and experience. For this reason, they must be regarded as interpretive rather than factual documents, limited to some extent by the scope of information on which they rely. Copyright This report is the property of Douglas Partners Pty Ltd. The report may only be used for the purpose for which it was commissioned and in accordance with the Conditions of Engagement for the commission supplied at the time of proposal. Unauthorised use of this report in any form whatsoever is prohibited. Borehole and Test Pit Logs The borehole and test pit logs presented in this report are an engineering and/or geological interpretation of the subsurface conditions, and their reliability will depend to some extent on frequency of sampling and the method of drilling or excavation. Ideally, continuous undisturbed sampling or core drilling will provide the most reliable assessment, but this is not always practicable or possible to justify on economic grounds. In any case the boreholes and test pits represent only a very small sample of the total subsurface profile. Interpretation of the information and its application to design and construction should therefore take into account the spacing of boreholes or pits, the frequency of sampling, and the possibility of other than 'straight line' variations between the test locations. Groundwater Where groundwater levels are measured in boreholes there are several potential problems, namely: • In low permeability soils groundwater may

enter the hole very slowly or perhaps not at all during the time the hole is left open;

• A localised, perched water table may lead to an erroneous indication of the true water table;

• Water table levels will vary from time to time with seasons or recent weather changes. They may not be the same at the time of construction as are indicated in the report; and

• The use of water or mud as a drilling fluid will mask any groundwater inflow. Water has to be blown out of the hole and drilling mud must first be washed out of the hole if water measurements are to be made.

More reliable measurements can be made by installing standpipes which are read at intervals over several days, or perhaps weeks for low permeability soils. Piezometers, sealed in a particular stratum, may be advisable in low permeability soils or where there may be interference from a perched water table. Reports The report has been prepared by qualified personnel, is based on the information obtained from field and laboratory testing, and has been undertaken to current engineering standards of interpretation and analysis. Where the report has been prepared for a specific design proposal, the information and interpretation may not be relevant if the design proposal is changed. If this happens, DP will be pleased to review the report and the sufficiency of the investigation work. Every care is taken with the report as it relates to interpretation of subsurface conditions, discussion of geotechnical and environmental aspects, and recommendations or suggestions for design and construction. However, DP cannot always anticipate or assume responsibility for: • Unexpected variations in ground conditions.

The potential for this will depend partly on borehole or pit spacing and sampling frequency;

• Changes in policy or interpretations of policy by statutory authorities; or

• The actions of contractors responding to commercial pressures.

If these occur, DP will be pleased to assist with investigations or advice to resolve the matter.

Page 156: SITE CLASSIFICATION REPORT SUMMARY...Douglas Partners (DP) has prepared this report for this project at Taylor 2- Stage 3, Taylor in accordance with DP’s proposal dated 15 September

July 2010

Site Anomalies In the event that conditions encountered on site during construction appear to vary from those which were expected from the information contained in the report, DP requests that it be immediately notified. Most problems are much more readily resolved when conditions are exposed rather than at some later stage, well after the event. Information for Contractual Purposes Where information obtained from this report is provided for tendering purposes, it is recommended that all information, including the written report and discussion, be made available. In circumstances where the discussion or comments section is not relevant to the contractual situation, it may be appropriate to prepare a specially edited document. DP would be pleased to assist in this regard and/or to make additional report copies available for contract purposes at a nominal charge. Site Inspection The company will always be pleased to provide engineering inspection services for geotechnical and environmental aspects of work to which this report is related. This could range from a site visit to confirm that conditions exposed are as expected, to full time engineering presence on site.

Page 157: SITE CLASSIFICATION REPORT SUMMARY...Douglas Partners (DP) has prepared this report for this project at Taylor 2- Stage 3, Taylor in accordance with DP’s proposal dated 15 September

July 2010

Sampling Sampling is carried out during drilling or test pitting to allow engineering examination (and laboratory testing where required) of the soil or rock. Disturbed samples taken during drilling provide information on colour, type, inclusions and, depending upon the degree of disturbance, some information on strength and structure. Undisturbed samples are taken by pushing a thin-walled sample tube into the soil and withdrawing it to obtain a sample of the soil in a relatively undisturbed state. Such samples yield information on structure and strength, and are necessary for laboratory determination of shear strength and compressibility. Undisturbed sampling is generally effective only in cohesive soils. Test Pits Test pits are usually excavated with a backhoe or an excavator, allowing close examination of the in-situ soil if it is safe to enter into the pit. The depth of excavation is limited to about 3 m for a backhoe and up to 6 m for a large excavator. A potential disadvantage of this investigation method is the larger area of disturbance to the site. Large Diameter Augers Boreholes can be drilled using a rotating plate or short spiral auger, generally 300 mm or larger in diameter commonly mounted on a standard piling rig. The cuttings are returned to the surface at intervals (generally not more than 0.5 m) and are disturbed but usually unchanged in moisture content. Identification of soil strata is generally much more reliable than with continuous spiral flight augers, and is usually supplemented by occasional undisturbed tube samples. Continuous Spiral Flight Augers The borehole is advanced using 90-115 mm diameter continuous spiral flight augers which are withdrawn at intervals to allow sampling or in-situ testing. This is a relatively economical means of drilling in clays and sands above the water table. Samples are returned to the surface, or may be collected after withdrawal of the auger flights, but they are disturbed and may be mixed with soils from the sides of the hole. Information from the drilling (as distinct from specific sampling by SPTs or undisturbed samples) is of relatively low

reliability, due to the remoulding, possible mixing or softening of samples by groundwater. Non-core Rotary Drilling The borehole is advanced using a rotary bit, with water or drilling mud being pumped down the drill rods and returned up the annulus, carrying the drill cuttings. Only major changes in stratification can be determined from the cuttings, together with some information from the rate of penetration. Where drilling mud is used this can mask the cuttings and reliable identification is only possible from separate sampling such as SPTs. Continuous Core Drilling A continuous core sample can be obtained using a diamond tipped core barrel, usually with a 50 mm internal diameter. Provided full core recovery is achieved (which is not always possible in weak rocks and granular soils), this technique provides a very reliable method of investigation. Standard Penetration Tests Standard penetration tests (SPT) are used as a means of estimating the density or strength of soils and also of obtaining a relatively undisturbed sample. The test procedure is described in Australian Standard 1289, Methods of Testing Soils for Engineering Purposes - Test 6.3.1. The test is carried out in a borehole by driving a 50 mm diameter split sample tube under the impact of a 63 kg hammer with a free fall of 760 mm. It is normal for the tube to be driven in three successive 150 mm increments and the 'N' value is taken as the number of blows for the last 300 mm. In dense sands, very hard clays or weak rock, the full 450 mm penetration may not be practicable and the test is discontinued. The test results are reported in the following form. • In the case where full penetration is obtained

with successive blow counts for each 150 mm of, say, 4, 6 and 7 as:

4,6,7 N=13

• In the case where the test is discontinued before the full penetration depth, say after 15 blows for the first 150 mm and 30 blows for the next 40 mm as:

15, 30/40 mm

Page 158: SITE CLASSIFICATION REPORT SUMMARY...Douglas Partners (DP) has prepared this report for this project at Taylor 2- Stage 3, Taylor in accordance with DP’s proposal dated 15 September

July 2010

The results of the SPT tests can be related empirically to the engineering properties of the soils. Dynamic Cone Penetrometer Tests / Perth Sand Penetrometer Tests Dynamic penetrometer tests (DCP or PSP) are carried out by driving a steel rod into the ground using a standard weight of hammer falling a specified distance. As the rod penetrates the soil the number of blows required to penetrate each successive 150 mm depth are recorded. Normally there is a depth limitation of 1.2 m, but this may be extended in certain conditions by the use of extension rods. Two types of penetrometer are commonly used. • Perth sand penetrometer - a 16 mm diameter

flat ended rod is driven using a 9 kg hammer dropping 600 mm (AS 1289, Test 6.3.3). This test was developed for testing the density of sands and is mainly used in granular soils and filling.

• Cone penetrometer - a 16 mm diameter rod with a 20 mm diameter cone end is driven using a 9 kg hammer dropping 510 mm (AS 1289, Test 6.3.2). This test was developed initially for pavement subgrade investigations, and correlations of the test results with California Bearing Ratio have been published by various road authorities.

Page 159: SITE CLASSIFICATION REPORT SUMMARY...Douglas Partners (DP) has prepared this report for this project at Taylor 2- Stage 3, Taylor in accordance with DP’s proposal dated 15 September

May 2017

Description and Classification Methods The methods of description and classification of

soils and rocks used in this report are based on

Australian Standard AS 1726-1993, Geotechnical

Site Investigations Code. In general, the

descriptions include strength or density, colour,

structure, soil or rock type and inclusions.

Soil Types Soil types are described according to the

predominant particle size, qualified by the grading

of other particles present:

Type Particle size (mm)

Boulder >200

Cobble 63 - 200

Gravel 2.36 - 63

Sand 0.075 - 2.36

Silt 0.002 - 0.075

Clay <0.002

The sand and gravel sizes can be further

subdivided as follows:

Type Particle size (mm)

Coarse gravel 20 - 63

Medium gravel 6 - 20

Fine gravel 2.36 - 6

Coarse sand 0.6 - 2.36

Medium sand 0.2 - 0.6

Fine sand 0.075 - 0.2

The proportions of secondary constituents of soils

are described as:

Term Proportion Example

And Specify Clay (60%) and

Sand (40%)

Adjective 20 - 35% Sandy Clay

Slightly 12 - 20% Slightly Sandy

Clay

With some 5 - 12% Clay with some

sand

With a trace of 0 - 5% Clay with a trace

of sand

Definitions of grading terms used are:

• Well graded - a good representation of all

particle sizes

• Poorly graded - an excess or deficiency of

particular sizes within the specified range

• Uniformly graded - an excess of a particular

particle size

• Gap graded - a deficiency of a particular

particle size with the range

Cohesive Soils Cohesive soils, such as clays, are classified on the

basis of undrained shear strength. The strength

may be measured by laboratory testing, or

estimated by field tests or engineering

examination. The strength terms are defined as

follows:

Description Abbreviation Undrained shear strength

(kPa)

Very soft vs <12

Soft s 12 - 25

Firm f 25 - 50

Stiff st 50 - 100

Very stiff vst 100 - 200

Hard h >200

Cohesionless Soils Cohesionless soils, such as clean sands, are

classified on the basis of relative density, generally

from the results of standard penetration tests

(SPT), cone penetration tests (CPT) or dynamic

penetrometers (PSP). The relative density terms

are given below:

Relative Density

Abbreviation SPT N value

CPT qc value (MPa)

Very loose vl <4 <2

Loose l 4 - 10 2 -5

Medium

dense

md 10 - 30 5 - 15

Dense d 30 - 50 15 - 25

Very

dense

vd >50 >25

Page 160: SITE CLASSIFICATION REPORT SUMMARY...Douglas Partners (DP) has prepared this report for this project at Taylor 2- Stage 3, Taylor in accordance with DP’s proposal dated 15 September

May 2017

Soil Origin It is often difficult to accurately determine the origin

of a soil. Soils can generally be classified as:

• Residual soil - derived from in-situ weathering

of the underlying rock;

• Transported soils - formed somewhere else

and transported by nature to the site; or

• Filling - moved by man.

Transported soils may be further subdivided into:

• Alluvium - river deposits

• Lacustrine - lake deposits

• Aeolian - wind deposits

• Littoral - beach deposits

• Estuarine - tidal river deposits

• Talus - scree or coarse colluvium

• Slopewash or Colluvium - transported

downslope by gravity assisted by water.

Often includes angular rock fragments and

boulders.

Page 161: SITE CLASSIFICATION REPORT SUMMARY...Douglas Partners (DP) has prepared this report for this project at Taylor 2- Stage 3, Taylor in accordance with DP’s proposal dated 15 September

May 2017

Rock Strength Rock strength is defined by the Point Load Strength Index (Is(50)) and refers to the strength of the rock

substance and not the strength of the overall rock mass, which may be considerably weaker due to defects.

The test procedure is described by Australian Standard 4133.4.1 - 2007. The terms used to describe rock

strength are as follows:

Term Abbreviation Point Load Index

Is(50) MPa

Approximate Unconfined Compressive Strength MPa*

Extremely low EL <0.03 <0.6

Very low VL 0.03 - 0.1 0.6 - 2

Low L 0.1 - 0.3 2 - 6

Medium M 0.3 - 1.0 6 - 20

High H 1 - 3 20 - 60

Very high VH 3 - 10 60 - 200

Extremely high EH >10 >200

* Assumes a ratio of 20:1 for UCS to Is(50). It should be noted that the UCS to Is(50) ratio varies significantly

for different rock types and specific ratios should be determined for each site.

Degree of Weathering The degree of weathering of rock is classified as follows:

Term Abbreviation Description

Extremely weathered EW Rock substance has soil properties, i.e. it can be remoulded and classified as a soil but the texture of the original rock is still evident.

Highly weathered HW Limonite staining or bleaching affects whole of rock substance and other signs of decomposition are evident. Porosity and strength may be altered as a result of iron leaching or deposition. Colour and strength of original fresh rock is not recognisable

Moderately weathered

MW Staining and discolouration of rock substance has taken place

Slightly weathered SW Rock substance is slightly discoloured but shows little or no change of strength from fresh rock

Fresh stained Fs Rock substance unaffected by weathering but staining visible along defects

Fresh Fr No signs of decomposition or staining

Degree of Fracturing The following classification applies to the spacing of natural fractures in diamond drill cores. It includes

bedding plane partings, joints and other defects, but excludes drilling breaks.

Term Description

Fragmented Fragments of <20 mm

Highly Fractured Core lengths of 20-40 mm with some fragments

Fractured Core lengths of 40-200 mm with some shorter and longer sections

Slightly Fractured Core lengths of 200-1000 mm with some shorter and longer sections

Unbroken Core lengths mostly > 1000 mm

Page 162: SITE CLASSIFICATION REPORT SUMMARY...Douglas Partners (DP) has prepared this report for this project at Taylor 2- Stage 3, Taylor in accordance with DP’s proposal dated 15 September

May 2017

Rock Quality Designation The quality of the cored rock can be measured using the Rock Quality Designation (RQD) index, defined

as:

RQD % = cumulative length of 'sound' core sections ≥ 100 mm long

total drilled length of section being assessed

where 'sound' rock is assessed to be rock of low strength or better. The RQD applies only to natural

fractures. If the core is broken by drilling or handling (i.e. drilling breaks) then the broken pieces are fitted

back together and are not included in the calculation of RQD.

Stratification Spacing For sedimentary rocks the following terms may be used to describe the spacing of bedding partings:

Term Separation of Stratification Planes

Thinly laminated < 6 mm

Laminated 6 mm to 20 mm

Very thinly bedded 20 mm to 60 mm

Thinly bedded 60 mm to 0.2 m

Medium bedded 0.2 m to 0.6 m

Thickly bedded 0.6 m to 2 m

Very thickly bedded > 2 m

Page 163: SITE CLASSIFICATION REPORT SUMMARY...Douglas Partners (DP) has prepared this report for this project at Taylor 2- Stage 3, Taylor in accordance with DP’s proposal dated 15 September

May 2017

Introduction These notes summarise abbreviations commonly

used on borehole logs and test pit reports.

Drilling or Excavation Methods C Core drilling

R Rotary drilling

SFA Spiral flight augers

NMLC Diamond core - 52 mm dia

NQ Diamond core - 47 mm dia

HQ Diamond core - 63 mm dia

PQ Diamond core - 81 mm dia

Water � Water seep

� Water level

Sampling and Testing A Auger sample

B Bulk sample

D Disturbed sample

E Environmental sample

U50 Undisturbed tube sample (50mm)

W Water sample

pp Pocket penetrometer (kPa)

PID Photo ionisation detector

PL Point load strength Is(50) MPa

S Standard Penetration Test

V Shear vane (kPa)

Description of Defects in Rock The abbreviated descriptions of the defects should

be in the following order: Depth, Type, Orientation,

Coating, Shape, Roughness and Other. Drilling

and handling breaks are not usually included on

the logs.

Defect Type

B Bedding plane

Cs Clay seam

Cv Cleavage

Cz Crushed zone

Ds Decomposed seam

F Fault

J Joint

Lam Lamination

Pt Parting

Sz Sheared Zone

V Vein

Orientation

The inclination of defects is always measured from

the perpendicular to the core axis.

h horizontal

v vertical

sh sub-horizontal

sv sub-vertical

Coating or Infilling Term

cln clean

co coating

he healed

inf infilled

stn stained

ti tight

vn veneer

Coating Descriptor

ca calcite

cbs carbonaceous

cly clay

fe iron oxide

mn manganese

slt silty

Shape

cu curved

ir irregular

pl planar

st stepped

un undulating

Roughness

po polished

ro rough

sl slickensided

sm smooth

vr very rough

Other

fg fragmented

bnd band

qtz quartz

Page 164: SITE CLASSIFICATION REPORT SUMMARY...Douglas Partners (DP) has prepared this report for this project at Taylor 2- Stage 3, Taylor in accordance with DP’s proposal dated 15 September

May 2017

Graphic Symbols for Soil and Rock General

Soils

Sedimentary Rocks

Metamorphic Rocks

Igneous Rocks

Road base

Filling

Concrete

Asphalt

Topsoil

Peat

Clay

Conglomeratic sandstone

Conglomerate

Boulder conglomerate

Sandstone

Slate, phyllite, schist

Siltstone

Mudstone, claystone, shale

Coal

Limestone

Porphyry

Cobbles, boulders

Sandy gravel

Laminite

Silty sand

Clayey sand

Silty clay

Sandy clay

Gravelly clay

Shaly clay

Silt

Clayey silt

Sandy silt

Sand

Gravel

Talus

Gneiss

Quartzite

Dolerite, basalt, andesite

Granite

Tuff, breccia

Dacite, epidote

Page 165: SITE CLASSIFICATION REPORT SUMMARY...Douglas Partners (DP) has prepared this report for this project at Taylor 2- Stage 3, Taylor in accordance with DP’s proposal dated 15 September

ͱ·´ ̧°»­

̸» ¬§°»­ ±º ­±·´­ «­«¿´´§ °®»­»²¬ «²¼»® ¬¸» ¬±°­±·´ ·² ´¿²¼ ¦±²»¼ º±®®»­·¼»²¬·¿´ ¾«·´¼·²¹­ ½¿² ¾» ­°´·¬ ·²¬± ¬©± ¿°°®±¨·³¿¬» ¹®±«°­ P¹®¿²«´¿® ¿²¼ ½´¿§ò Ï«·¬» ±º¬»²ô º±«²¼¿¬·±² ­±·´ ·­ ¿ ³·¨¬«®» ±º ¾±¬¸¬§°»­ò ̸» ¹»²»®¿´ °®±¾´»³­ ¿­­±½·¿¬»¼ ©·¬¸ ­±·´­ ¸¿ª·²¹ ¹®¿²«´¿®½±²¬»²¬ ¿®» «­«¿´´§ ½¿«­»¼ ¾§ »®±­·±²ò Ý´¿§ ­±·´­ ¿®» ­«¾¶»½¬ ¬±­¿¬«®¿¬·±² ¿²¼ ­©»´´ñ­¸®·²µ °®±¾´»³­ò

Ý´¿­­·º·½¿¬·±²­ º±® ¿ ¹·ª»² ¿®»¿ ½¿² ¹»²»®¿´´§ ¾» ±¾¬¿·²»¼ ¾§¿°°´·½¿¬·±² ¬± ¬¸» ´±½¿´ ¿«¬¸±®·¬§ô ¾«¬ ¬¸»­» ¿®» ­±³»¬·³»­ «²®»´·¿¾´»¿²¼ ·º ¬¸»®» ·­ ¼±«¾¬ô ¿ ¹»±¬»½¸²·½¿´ ®»°±®¬ ­¸±«´¼ ¾» ½±³³·­­·±²»¼òß­ ³±­¬ ¾«·´¼·²¹­ ­«ºº»®·²¹ ³±ª»³»²¬ °®±¾´»³­ ¿®» º±«²¼»¼ ±² ½´¿§­±·´­ô ¬¸»®» ·­ ¿² »³°¸¿­·­ ±² ½´¿­­·º·½¿¬·±² ±º ­±·´­ ¿½½±®¼·²¹ ¬± ¬¸»¿³±«²¬ ±º ­©»´´ ¿²¼ ­¸®·²µ¿¹» ¬¸»§ »¨°»®·»²½» ©·¬¸ ª¿®·¿¬·±²­ ±º©¿¬»® ½±²¬»²¬ò ̸» ¬¿¾´» ¾»´±© ·­ Ì¿¾´» îòï º®±³ ßÍ îèéðô ¬¸»Î»­·¼»²¬·¿´ Í´¿¾ ¿²¼ Ú±±¬·²¹ ݱ¼»ò

Ý¿«­»­ ±º Ó±ª»³»²¬

Í»¬¬´»³»²¬ ¼«» ¬± ½±²­¬®«½¬·±²Ì¸»®» ¿®» ¬©± ¬§°»­ ±º ­»¬¬´»³»²¬ ¬¸¿¬ ±½½«® ¿­ ¿ ®»­«´¬ ±º½±²­¬®«½¬·±²æ{ ׳³»¼·¿¬» ­»¬¬´»³»²¬ ±½½«®­ ©¸»² ¿ ¾«·´¼·²¹ ·­ º·®­¬ °´¿½»¼ ±² ·¬­

º±«²¼¿¬·±² ­±·´ô ¿­ ¿ ®»­«´¬ ±º ½±³°¿½¬·±² ±º ¬¸» ­±·´ «²¼»® ¬¸»©»·¹¸¬ ±º ¬¸» ­¬®«½¬«®»ò ̸» ½±¸»­·ª» ¯«¿´·¬§ ±º ½´¿§ ­±·´ ³·¬·¹¿¬»­¿¹¿·²­¬ ¬¸·­ô ¾«¬ ¹®¿²«´¿® ø°¿®¬·½«´¿®´§ ­¿²¼§÷ ­±·´ ·­ ­«­½»°¬·¾´»ò

{ ݱ²­±´·¼¿¬·±² ­»¬¬´»³»²¬ ·­ ¿ º»¿¬«®» ±º ½´¿§ ­±·´ ¿²¼ ³¿§ ¬¿µ»°´¿½» ¾»½¿«­» ±º ¬¸» »¨°«´­·±² ±º ³±·­¬«®» º®±³ ¬¸» ­±·´ ±® ¾»½¿«­»±º ¬¸» ­±·´K­ ´¿½µ ±º ®»­·­¬¿²½» ¬± ´±½¿´ ½±³°®»­­·ª» ±® ­¸»¿® ­¬®»­­»­ò̸·­ ©·´´ «­«¿´´§ ¬¿µ» °´¿½» ¼«®·²¹ ¬¸» º·®­¬ º»© ³±²¬¸­ ¿º¬»®½±²­¬®«½¬·±²ô ¾«¬ ¸¿­ ¾»»² µ²±©² ¬± ¬¿µ» ³¿²§ §»¿®­ ·²»¨½»°¬·±²¿´ ½¿­»­ò

̸»­» °®±¾´»³­ ¿®» ¬¸» °®±ª·²½» ±º ¬¸» ¾«·´¼»® ¿²¼ ­¸±«´¼ ¾» ¬¿µ»²·²¬± ½±²­·¼»®¿¬·±² ¿­ °¿®¬ ±º ¬¸» °®»°¿®¿¬·±² ±º ¬¸» ­·¬» º±® ½±²­¬®«½ó¬·±²ò Þ«·´¼·²¹ Ì»½¸²±´±¹§ Ú·´» ïç øÞÌÚ ïç÷ ¼»¿´­ ©·¬¸ ¬¸»­»°®±¾´»³­ò

Û®±­·±²ß´´ ­±·´­ ¿®» °®±²» ¬± »®±­·±²ô ¾«¬ ­¿²¼§ ­±·´ ·­ °¿®¬·½«´¿®´§ ­«­½»°¬·¾´»¬± ¾»·²¹ ©¿­¸»¼ ¿©¿§ò Ûª»² ½´¿§ ©·¬¸ ¿ ­¿²¼ ½±³°±²»²¬ ±º ­¿§ ïðû±® ³±®» ½¿² ­«ºº»® º®±³ »®±­·±²ò

Í¿¬«®¿¬·±²Ì¸·­ ·­ °¿®¬·½«´¿®´§ ¿ °®±¾´»³ ·² ½´¿§ ­±·´­ò Í¿¬«®¿¬·±² ½®»¿¬»­ ¿ ¾±¹ó´·µ» ­«­°»²­·±² ±º ¬¸» ­±·´ ¬¸¿¬ ½¿«­»­ ·¬ ¬± ´±­» ª·®¬«¿´´§ ¿´´ ±º ·¬­¾»¿®·²¹ ½¿°¿½·¬§ò ̱ ¿ ´»­­»® ¼»¹®»»ô ­¿²¼ ·­ ¿ºº»½¬»¼ ¾§ ­¿¬«®¿¬·±²¾»½¿«­» ­¿¬«®¿¬»¼ ­¿²¼ ³¿§ «²¼»®¹± ¿ ®»¼«½¬·±² ·² ª±´«³» P°¿®¬·½«´¿®´§ ·³°±®¬»¼ ­¿²¼ º·´´ º±® ¾»¼¼·²¹ ¿²¼ ¾´·²¼·²¹ ´¿§»®­òر©»ª»®ô ¬¸·­ «­«¿´´§ ±½½«®­ ¿­ ·³³»¼·¿¬» ­»¬¬´»³»²¬ ¿²¼ ­¸±«´¼²±®³¿´´§ ¾» ¬¸» °®±ª·²½» ±º ¬¸» ¾«·´¼»®ò

Í»¿­±²¿´ ­©»´´·²¹ ¿²¼ ­¸®·²µ¿¹» ±º ­±·´ß´´ ½´¿§­ ®»¿½¬ ¬± ¬¸» °®»­»²½» ±º ©¿¬»® ¾§ ­´±©´§ ¿¾­±®¾·²¹ ·¬ô ³¿µ·²¹¬¸» ­±·´ ·²½®»¿­» ·² ª±´«³» ø­»» ¬¿¾´» ¾»´±©÷ò ̸» ¼»¹®»» ±º ·²½®»¿­»ª¿®·»­ ½±²­·¼»®¿¾´§ ¾»¬©»»² ¼·ºº»®»²¬ ½´¿§­ô ¿­ ¼±»­ ¬¸» ¼»¹®»» ±º¼»½®»¿­» ¼«®·²¹ ¬¸» ­«¾­»¯«»²¬ ¼®§·²¹ ±«¬ ½¿«­»¼ ¾§ º¿·® ©»¿¬¸»®°»®·±¼­ò Þ»½¿«­» ±º ¬¸» ´±© ¿¾­±®°¬·±² ¿²¼ »¨°«´­·±² ®¿¬»ô ¬¸·­°¸»²±³»²±² ©·´´ ²±¬ «­«¿´´§ ¾» ²±¬·½»¿¾´» «²´»­­ ¬¸»®» ¿®»°®±´±²¹»¼ ®¿·²§ ±® ¼®§ °»®·±¼­ô «­«¿´´§ ±º ©»»µ­ ±® ³±²¬¸­ô¼»°»²¼·²¹ ±² ¬¸» ´¿²¼ ¿²¼ ­±·´ ½¸¿®¿½¬»®·­¬·½­ò

̸» ­©»´´·²¹ ±º ­±·´ ½®»¿¬»­ ¿² «°©¿®¼ º±®½» ±² ¬¸» º±±¬·²¹­ ±º ¬¸»¾«·´¼·²¹ô ¿²¼ ­¸®·²µ¿¹» ½®»¿¬»­ ­«¾­·¼»²½» ¬¸¿¬ ¬¿µ»­ ¿©¿§ ¬¸»­«°°±®¬ ²»»¼»¼ ¾§ ¬¸» º±±¬·²¹ ¬± ®»¬¿·² »¯«·´·¾®·«³ò

͸»¿® º¿·´«®»Ì¸·­ °¸»²±³»²±² ±½½«®­ ©¸»² ¬¸» º±«²¼¿¬·±² ­±·´ ¼±»­ ²±¬ ¸¿ª»­«ºº·½·»²¬ ­¬®»²¹¬¸ ¬± ­«°°±®¬ ¬¸» ©»·¹¸¬ ±º ¬¸» º±±¬·²¹ò ̸»®» ¿®»¬©± ³¿¶±® °±­¬ó½±²­¬®«½¬·±² ½¿«­»­æ

{ Í·¹²·º·½¿²¬ ´±¿¼ ·²½®»¿­»ò{ λ¼«½¬·±² ±º ´¿¬»®¿´ ­«°°±®¬ ±º ¬¸» ­±·´ «²¼»® ¬¸» º±±¬·²¹ ¼«» ¬±

»®±­·±² ±® »¨½¿ª¿¬·±²ò{ ײ ½´¿§ ­±·´ô ­¸»¿® º¿·´«®» ½¿² ¾» ½¿«­»¼ ¾§ ­¿¬«®¿¬·±² ±º ¬¸» ­±·´

¿¼¶¿½»²¬ ¬± ±® «²¼»® ¬¸» º±±¬·²¹ò

Þ«·´¼·²¹­ ½¿² ¿²¼ ±º¬»² ¼± ³±ª»ò ̸·­ ³±ª»³»²¬ ½¿² ¾» «°ô ¼±©²ô ´¿¬»®¿´ ±® ®±¬¿¬·±²¿´ò ̸» º«²¼¿³»²¬¿´ ½¿«­»±º ³±ª»³»²¬ ·² ¾«·´¼·²¹­ ½¿² «­«¿´´§ ¾» ®»´¿¬»¼ ¬± ±²» ±® ³±®» °®±¾´»³­ ·² ¬¸» º±«²¼¿¬·±² ­±·´ò ׬ ·­ ·³°±®¬¿²¬ º±®¬¸» ¸±³»±©²»® ¬± ·¼»²¬·º§ ¬¸» ­±·´ ¬§°» ·² ±®¼»® ¬± ¿­½»®¬¿·² ¬¸» ³»¿­«®»­ ¬¸¿¬ ­¸±«´¼ ¾» °«¬ ·² °´¿½» ·² ±®¼»® ¬±»²­«®» ¬¸¿¬ °®±¾´»³­ ·² ¬¸» º±«²¼¿¬·±² ­±·´ ½¿² ¾» °®»ª»²¬»¼ô ¬¸«­ °®±¬»½¬·²¹ ¿¹¿·²­¬ ¾«·´¼·²¹ ³±ª»³»²¬ò

̸·­ Þ«·´¼·²¹ Ì»½¸²±´±¹§ Ú·´» ·­ ¼»­·¹²»¼ ¬± ·¼»²¬·º§ ½¿«­»­ ±º ­±·´ó®»´¿¬»¼ ¾«·´¼·²¹ ³±ª»³»²¬ô ¿²¼ ¬± ­«¹¹»­¬³»¬¸±¼­ ±º °®»ª»²¬·±² ±º ®»­«´¬¿²¬ ½®¿½µ·²¹ ·² ¾«·´¼·²¹­ò

Ú±«²¼¿¬·±² Ó¿·²¬»²¿²½»¿²¼ Ú±±¬·²¹ л®º±®³¿²½»æß Ø±³»±©²»®K­ Ù«·¼»

ÙÛÒÛÎßÔ ÜÛÚ×Ò×Ì×ÑÒÍ ÑÚ Í×ÌÛ ÝÔßÍÍÛÍ

Ý´¿­­ Ú±«²¼¿¬·±²

ß Ó±­¬ ­¿²¼ ¿²¼ ®±½µ ­·¬»­ ©·¬¸ ´·¬¬´» ±® ²± ¹®±«²¼ ³±ª»³»²¬ º®±³ ³±·­¬«®» ½¸¿²¹»­

Í Í´·¹¸¬´§ ®»¿½¬·ª» ½´¿§ ­·¬»­ ©·¬¸ ±²´§ ­´·¹¸¬ ¹®±«²¼ ³±ª»³»²¬ º®±³ ³±·­¬«®» ½¸¿²¹»­

Ó Ó±¼»®¿¬»´§ ®»¿½¬·ª» ½´¿§ ±® ­·´¬ ­·¬»­ô ©¸·½¸ ½¿² »¨°»®·»²½» ³±¼»®¿¬» ¹®±«²¼ ³±ª»³»²¬ º®±³ ³±·­¬«®» ½¸¿²¹»­

Ø Ø·¹¸´§ ®»¿½¬·ª» ½´¿§ ­·¬»­ô ©¸·½¸ ½¿² »¨°»®·»²½» ¸·¹¸ ¹®±«²¼ ³±ª»³»²¬ º®±³ ³±·­¬«®» ½¸¿²¹»­

Û Û¨¬®»³»´§ ®»¿½¬·ª» ­·¬»­ô ©¸·½¸ ½¿² »¨°»®·»²½» »¨¬®»³» ¹®±«²¼ ³±ª»³»²¬ º®±³ ³±·­¬«®» ½¸¿²¹»­

ß ¬± Ð Ú·´´»¼ ­·¬»­

Ð Í·¬»­ ©¸·½¸ ·²½´«¼» ­±º¬ ­±·´­ô ­«½¸ ¿­ ­±º¬ ½´¿§ ±® ­·´¬ ±® ´±±­» ­¿²¼­å ´¿²¼­´·°å ³·²» ­«¾­·¼»²½»å ½±´´¿°­·²¹ ­±·´­å ­±·´­ ­«¾¶»½¬¬± »®±­·±²å ®»¿½¬·ª» ­·¬»­ ­«¾¶»½¬ ¬± ¿¾²±®³¿´ ³±·­¬«®» ½±²¼·¬·±²­ ±® ­·¬»­ ©¸·½¸ ½¿²²±¬ ¾» ½´¿­­·º·»¼ ±¬¸»®©·­»

ÞÌÚ ïè®»°´¿½»­

ײº±®³¿¬·±²Í¸»»¬ ïðñçï

Page 166: SITE CLASSIFICATION REPORT SUMMARY...Douglas Partners (DP) has prepared this report for this project at Taylor 2- Stage 3, Taylor in accordance with DP’s proposal dated 15 September

Ì®»» ®±±¬ ¹®±©¬¸Ì®»»­ ¿²¼ ­¸®«¾­ ¬¸¿¬ ¿®» ¿´´±©»¼ ¬± ¹®±© ·² ¬¸» ª·½·²·¬§ ±º º±±¬·²¹­½¿² ½¿«­» º±«²¼¿¬·±² ­±·´ ³±ª»³»²¬ ·² ¬©± ©¿§­æ

{ ᱬ­ ¬¸¿¬ ¹®±© «²¼»® º±±¬·²¹­ ³¿§ ·²½®»¿­» ·² ½®±­­ó­»½¬·±²¿´­·¦»ô »¨»®¬·²¹ «°©¿®¼ °®»­­«®» ±² º±±¬·²¹­ò

{ ᱬ­ ·² ¬¸» ª·½·²·¬§ ±º º±±¬·²¹­ ©·´´ ¿¾­±®¾ ³«½¸ ±º ¬¸» ³±·­¬«®»·² ¬¸» º±«²¼¿¬·±² ­±·´ô ½¿«­·²¹ ­¸®·²µ¿¹» ±® ­«¾­·¼»²½»ò

˲»ª»²²»­­ ±º Ó±ª»³»²¬

̸» ¬§°»­ ±º ¹®±«²¼ ³±ª»³»²¬ ¼»­½®·¾»¼ ¿¾±ª» «­«¿´´§ ±½½«®«²»ª»²´§ ¬¸®±«¹¸±«¬ ¬¸» ¾«·´¼·²¹K­ º±«²¼¿¬·±² ­±·´ò Í»¬¬´»³»²¬ ¼«»¬± ½±²­¬®«½¬·±² ¬»²¼­ ¬± ¾» «²»ª»² ¾»½¿«­» ±ºæ

{ Ü·ºº»®·²¹ ½±³°¿½¬·±² ±º º±«²¼¿¬·±² ­±·´ °®·±® ¬± ½±²­¬®«½¬·±²ò

{ Ü·ºº»®·²¹ ³±·­¬«®» ½±²¬»²¬ ±º º±«²¼¿¬·±² ­±·´ °®·±® ¬± ½±²­¬®«½¬·±²ò

Ó±ª»³»²¬ ¼«» ¬± ²±²ó½±²­¬®«½¬·±² ½¿«­»­ ·­ «­«¿´´§ ³±®» «²»ª»²­¬·´´ò Û®±­·±² ½¿² «²¼»®³·²» ¿ º±±¬·²¹ ¬¸¿¬ ¬®¿ª»®­»­ ¬¸» º´±© ±® ½¿²½®»¿¬» ¬¸» ½±²¼·¬·±²­ º±® ­¸»¿® º¿·´«®» ¾§ »®±¼·²¹ ­±·´ ¿¼¶¿½»²¬ ¬± ¿º±±¬·²¹ ¬¸¿¬ ®«²­ ·² ¬¸» ­¿³» ¼·®»½¬·±² ¿­ ¬¸» º´±©ò

Í¿¬«®¿¬·±² ±º ½´¿§ º±«²¼¿¬·±² ­±·´ ³¿§ ±½½«® ©¸»®» ­«¾º´±±® ©¿´´­½®»¿¬» ¿ ¼¿³ ¬¸¿¬ ³¿µ»­ ©¿¬»® °±²¼ò ׬ ½¿² ¿´­± ±½½«® ©¸»®»ª»® ¬¸»®»·­ ¿ ­±«®½» ±º ©¿¬»® ²»¿® º±±¬·²¹­ ·² ½´¿§ ­±·´ò ̸·­ ´»¿¼­ ¬± ¿ ­»ª»®»®»¼«½¬·±² ·² ¬¸» ­¬®»²¹¬¸ ±º ¬¸» ­±·´ ©¸·½¸ ³¿§ ½®»¿¬» ´±½¿´ ­¸»¿®º¿·´«®»ò

Í»¿­±²¿´ ­©»´´·²¹ ¿²¼ ­¸®·²µ¿¹» ±º ½´¿§ ­±·´ ¿ºº»½¬­ ¬¸» °»®·³»¬»® ±º¬¸» ¾«·´¼·²¹ º·®­¬ô ¬¸»² ¹®¿¼«¿´´§ ­°®»¿¼­ ¬± ¬¸» ·²¬»®·±®ò ̸» ­©»´´·²¹°®±½»­­ ©·´´ «­«¿´´§ ¾»¹·² ¿¬ ¬¸» «°¸·´´ »¨¬®»³» ±º ¬¸» ¾«·´¼·²¹ô ±® ±²¬¸» ©»¿¬¸»® ­·¼» ©¸»®» ¬¸» ´¿²¼ ·­ º´¿¬ò Í©»´´·²¹ ¹®¿¼«¿´´§ ®»¿½¸»­ ¬¸»·²¬»®·±® ­±·´ ¿­ ¿¾­±®°¬·±² ½±²¬·²«»­ò ͸®·²µ¿¹» «­«¿´´§ ¾»¹·²­ ©¸»®»¬¸» ­«²K­ ¸»¿¬ ·­ ¹®»¿¬»­¬ò

Ûºº»½¬­ ±º ˲»ª»² ͱ·´ Ó±ª»³»²¬ ±² ͬ®«½¬«®»­

Û®±­·±² ¿²¼ ­¿¬«®¿¬·±²Û®±­·±² ®»³±ª»­ ¬¸» ­«°°±®¬ º®±³ «²¼»® º±±¬·²¹­ô ¬»²¼·²¹ ¬± ½®»¿¬»­«¾­·¼»²½» ±º ¬¸» °¿®¬ ±º ¬¸» ­¬®«½¬«®» «²¼»® ©¸·½¸ ·¬ ±½½«®­òÞ®·½µ©±®µ ©¿´´­ ©·´´ ®»­·­¬ ¬¸» ­¬®»­­ ½®»¿¬»¼ ¾§ ¬¸·­ ®»³±ª¿´ ±º­«°°±®¬ ¾§ ¾®·¼¹·²¹ ¬¸» ¹¿° ±® ½¿²¬·´»ª»®·²¹ «²¬·´ ¬¸» ¾®·½µ­ ±® ¬¸»³±®¬¿® ¾»¼¼·²¹ º¿·´ò Ñ´¼»® ³¿­±²®§ ¸¿­ ´·¬¬´» ®»­·­¬¿²½»ò Ûª·¼»²½» ±ºº¿·´«®» ª¿®·»­ ¿½½±®¼·²¹ ¬± ½·®½«³­¬¿²½»­ ¿²¼ ­§³°¬±³­ ³¿§ ·²½´«¼»æ

{ ͬ»° ½®¿½µ·²¹ ·² ¬¸» ³±®¬¿® ¾»¼­ ·² ¬¸» ¾±¼§ ±º ¬¸» ©¿´´ ±®¿¾±ª»ñ¾»´±© ±°»²·²¹­ ­«½¸ ¿­ ¼±±®­ ±® ©·²¼±©­ò

{ Ê»®¬·½¿´ ½®¿½µ·²¹ ·² ¬¸» ¾®·½µ­ ø«­«¿´´§ ¾«¬ ²±¬ ²»½»­­¿®·´§ ·² ´·²»©·¬¸ ¬¸» ª»®¬·½¿´ ¾»¼­ ±® °»®°»²¼­÷ò

×­±´¿¬»¼ °·»®­ ¿ºº»½¬»¼ ¾§ »®±­·±² ±® ­¿¬«®¿¬·±² ±º º±«²¼¿¬·±²­ ©·´´»ª»²¬«¿´´§ ´±­» ½±²¬¿½¬ ©·¬¸ ¬¸» ¾»¿®»®­ ¬¸»§ ­«°°±®¬ ¿²¼ ³¿§ ¬·´¬ ±®º¿´´ ±ª»®ò ̸» º´±±®­ ¬¸¿¬ ¸¿ª» ´±­¬ ¬¸·­ ­«°°±®¬ ©·´´ ¾»½±³» ¾±«²½§ô­±³»¬·³»­ ®¿¬¬´·²¹ ±®²¿³»²¬­ »¬½ò

Í»¿­±²¿´ ­©»´´·²¹ñ­¸®·²µ¿¹» ·² ½´¿§Í©»´´·²¹ º±«²¼¿¬·±² ­±·´ ¼«» ¬± ®¿·²§ °»®·±¼­ º·®­¬ ´·º¬­ ¬¸» ³±­¬»¨°±­»¼ »¨¬®»³·¬·»­ ±º ¬¸» º±±¬·²¹ ­§­¬»³ô ¬¸»² ¬¸» ®»³¿·²¼»® ±º ¬¸»°»®·³»¬»® º±±¬·²¹­ ©¸·´» ¹®¿¼«¿´´§ °»®³»¿¬·²¹ ·²­·¼» ¬¸» ¾«·´¼·²¹º±±¬°®·²¬ ¬± ´·º¬ ·²¬»®²¿´ º±±¬·²¹­ò ̸·­ ­©»´´·²¹ º·®­¬ ¬»²¼­ ¬± ½®»¿¬» ¿¼·­¸ »ºº»½¬ô ¾»½¿«­» ¬¸» »¨¬»®²¿´ º±±¬·²¹­ ¿®» °«­¸»¼ ¸·¹¸»® ¬¸¿² ¬¸»·²¬»®²¿´ ±²»­ò

̸» º·®­¬ ²±¬·½»¿¾´» ­§³°¬±³ ³¿§ ¾» ¬¸¿¬ ¬¸» º´±±® ¿°°»¿®­ ­´·¹¸¬´§¼·­¸»¼ò ̸·­ ·­ ±º¬»² ¿½½±³°¿²·»¼ ¾§ ­±³» ¼±±®­ ¾·²¼·²¹ ±² ¬¸»º´±±® ±® ¬¸» ¼±±® ¸»¿¼ô ¬±¹»¬¸»® ©·¬¸ ­±³» ½®¿½µ·²¹ ±º ½±®²·½»³·¬®»­ò ײ ¾«·´¼·²¹­ ©·¬¸ ¬·³¾»® º´±±®·²¹ ­«°°±®¬»¼ ¾§ ¾»¿®»®­ ¿²¼¶±·­¬­ô ¬¸» º´±±® ½¿² ¾» ¾±«²½§ò Û¨¬»®²¿´´§ ¬¸»®» ³¿§ ¾» ª·­·¾´»¼·­¸·²¹ ±º ¬¸» ¸·° ±® ®·¼¹» ´·²»­ò

ß­ ¬¸» ³±·­¬«®» ¿¾­±®°¬·±² °®±½»­­ ½±³°´»¬»­ ·¬­ ¶±«®²»§ ¬± ¬¸»·²²»®³±­¬ ¿®»¿­ ±º ¬¸» ¾«·´¼·²¹ô ¬¸» ·²¬»®²¿´ º±±¬·²¹­ ©·´´ ®·­»ò ׺ ¬¸»­°®»¿¼ ±º ³±·­¬«®» ·­ ®±«¹¸´§ »ª»²ô ·¬ ³¿§ ¾» ¬¸¿¬ ¬¸» ­§³°¬±³­ ©·´´¬»³°±®¿®·´§ ¼·­¿°°»¿®ô ¾«¬ ·¬ ·­ ³±®» ´·µ»´§ ¬¸¿¬ ­©»´´·²¹ ©·´´ ¾»«²»ª»²ô ½®»¿¬·²¹ ¿ ¼·ºº»®»²½» ®¿¬¸»® ¬¸¿² ¿ ¼·­¿°°»¿®¿²½» ·²­§³°¬±³­ò ײ ¾«·´¼·²¹­ ©·¬¸ ¬·³¾»® º´±±®·²¹ ­«°°±®¬»¼ ¾§ ¾»¿®»®­¿²¼ ¶±·­¬­ô ¬¸» ·­±´¿¬»¼ °·»®­ ©·´´ ®·­» ³±®» »¿­·´§ ¬¸¿² ¬¸» ­¬®·°º±±¬·²¹­ ±® °·»®­ «²¼»® ©¿´´­ô ½®»¿¬·²¹ ²±¬·½»¿¾´» ¼±³·²¹ ±º º´±±®·²¹ò

ß­ ¬¸» ©»¿¬¸»® °¿¬¬»®² ½¸¿²¹»­ ¿²¼ ¬¸» ­±·´ ¾»¹·²­ ¬± ¼®§ ±«¬ô ¬¸»»¨¬»®²¿´ º±±¬·²¹­ ©·´´ ¾» º·®­¬ ¿ºº»½¬»¼ô ¾»¹·²²·²¹ ©·¬¸ ¬¸» ´±½¿¬·±²­©¸»®» ¬¸» ­«²K­ »ºº»½¬ ·­ ­¬®±²¹»­¬ò ̸·­ ¸¿­ ¬¸» »ºº»½¬ ±º ´±©»®·²¹ ¬¸»»¨¬»®²¿´ º±±¬·²¹­ò ̸» ¼±³·²¹ ·­ ¿½½»²¬«¿¬»¼ ¿²¼ ½®¿½µ·²¹ ®»¼«½»­±® ¼·­¿°°»¿®­ ©¸»®» ·¬ ±½½«®®»¼ ¾»½¿«­» ±º ¼·­¸·²¹ô ¾«¬ ±¬¸»® ½®¿½µ­±°»² «°ò ̸» ®±±º ´·²»­ ³¿§ ¾»½±³» ½±²ª»¨ò

ܱ³·²¹ ¿²¼ ¼·­¸·²¹ ¿®» ¿´­± ¿ºº»½¬»¼ ¾§ ©»¿¬¸»® ·² ±¬¸»® ©¿§­ò ײ¿®»¿­ ©¸»®» ©¿®³ô ©»¬ ­«³³»®­ ¿²¼ ½±±´»® ¼®§ ©·²¬»®­ °®»ª¿·´ô©¿¬»® ³·¹®¿¬·±² ¬»²¼­ ¬± ¾» ¬±©¿®¼ ¬¸» ·²¬»®·±® ¿²¼ ¼±³·²¹ ©·´´ ¾»¿½½»²¬«¿¬»¼ô ©¸»®»¿­ ©¸»®» ­«³³»®­ ¿®» ¼®§ ¿²¼ ©·²¬»®­ ¿®» ½±´¼¿²¼ ©»¬ô ³·¹®¿¬·±² ¬»²¼­ ¬± ¾» ¬±©¿®¼ ¬¸» »¨¬»®·±® ¿²¼ ¬¸»«²¼»®´§·²¹ °®±°»²­·¬§ ·­ ¬±©¿®¼ ¼·­¸·²¹ò

Ó±ª»³»²¬ ½¿«­»¼ ¾§ ¬®»» ®±±¬­×² ¹»²»®¿´ô ¹®±©·²¹ ®±±¬­ ©·´´ »¨»®¬ ¿² «°©¿®¼ °®»­­«®» ±² º±±¬·²¹­ô©¸»®»¿­ ­±·´ ­«¾¶»½¬ ¬± ¼®§·²¹ ¾»½¿«­» ±º ¬®»» ±® ­¸®«¾ ®±±¬­ ©·´´ ¬»²¼¬± ®»³±ª» ­«°°±®¬ º®±³ «²¼»® º±±¬·²¹­ ¾§ ·²¼«½·²¹ ­¸®·²µ¿¹»ò

ݱ³°´·½¿¬·±²­ ½¿«­»¼ ¾§ ¬¸» ­¬®«½¬«®» ·¬­»´ºÓ±­¬ º±®½»­ ¬¸¿¬ ¬¸» ­±·´ ½¿«­»­ ¬± ¾» »¨»®¬»¼ ±² ­¬®«½¬«®»­ ¿®»ª»®¬·½¿´ P ·ò»ò »·¬¸»® «° ±® ¼±©²ò ر©»ª»®ô ¾»½¿«­» ¬¸»­» º±®½»­ ¿®»­»´¼±³ ­°®»¿¼ »ª»²´§ ¿®±«²¼ ¬¸» º±±¬·²¹­ô ¿²¼ ¾»½¿«­» ¬¸» ¾«·´¼·²¹®»­·­¬­ «²»ª»² ³±ª»³»²¬ ¾»½¿«­» ±º ·¬­ ®·¹·¼·¬§ô º±®½»­ ¿®» »¨»®¬»¼º®±³ ±²» °¿®¬ ±º ¬¸» ¾«·´¼·²¹ ¬± ¿²±¬¸»®ò ̸» ²»¬ ®»­«´¬ ±º ¿´´ ¬¸»­»º±®½»­ ·­ «­«¿´´§ ®±¬¿¬·±²¿´ò ̸·­ ®»­«´¬¿²¬ º±®½» ±º¬»² ½±³°´·½¿¬»­ ¬¸»¼·¿¹²±­·­ ¾»½¿«­» ¬¸» ª·­·¾´» ­§³°¬±³­ ¼± ²±¬ ­·³°´§ ®»º´»½¬ ¬¸»±®·¹·²¿´ ½¿«­»ò ß ½±³³±² ­§³°¬±³ ·­ ¾·²¼·²¹ ±º ¼±±®­ ±² ¬¸»ª»®¬·½¿´ ³»³¾»® ±º ¬¸» º®¿³»ò

Ûºº»½¬­ ±² º«´´ ³¿­±²®§ ­¬®«½¬«®»­Þ®·½µ©±®µ ©·´´ ®»­·­¬ ½®¿½µ·²¹ ©¸»®» ·¬ ½¿²ò ׬ ©·´´ ¿¬¬»³°¬ ¬± ­°¿²¿®»¿­ ¬¸¿¬ ´±­» ­«°°±®¬ ¾»½¿«­» ±º ­«¾­·¼»¼ º±«²¼¿¬·±²­ ±® ®¿·­»¼°±·²¬­ò ׬ ·­ ¬¸»®»º±®» «­«¿´ ¬± ­»» ½®¿½µ·²¹ ¿¬ ©»¿µ °±·²¬­ô ­«½¸ ¿­±°»²·²¹­ º±® ©·²¼±©­ ±® ¼±±®­ò

ײ ¬¸» »ª»²¬ ±º ½±²­¬®«½¬·±² ­»¬¬´»³»²¬ô ½®¿½µ·²¹ ©·´´ «­«¿´´§ ®»³¿·²«²½¸¿²¹»¼ ¿º¬»® ¬¸» °®±½»­­ ±º ­»¬¬´»³»²¬ ¸¿­ ½»¿­»¼ò

É·¬¸ ´±½¿´ ­¸»¿® ±® »®±­·±²ô ½®¿½µ·²¹ ©·´´ «­«¿´´§ ½±²¬·²«» ¬± ¼»ª»´±°«²¬·´ ¬¸» ±®·¹·²¿´ ½¿«­» ¸¿­ ¾»»² ®»³»¼·»¼ô ±® «²¬·´ ¬¸» ­«¾­·¼»²½»¸¿­ ½±³°´»¬»´§ ²»«¬®¿´·­»¼ ¬¸» ¿ºº»½¬»¼ °±®¬·±² ±º º±±¬·²¹ ¿²¼ ¬¸»­¬®«½¬«®» ¸¿­ ­¬¿¾·´·­»¼ ±² ±¬¸»® º±±¬·²¹­ ¬¸¿¬ ®»³¿·² »ºº»½¬·ª»ò

ײ ¬¸» ½¿­» ±º ­©»´´ñ­¸®·²µ »ºº»½¬­ô ¬¸» ¾®·½µ©±®µ ©·´´ ·² ­±³» ½¿­»­®»¬«®² ¬± ·¬­ ±®·¹·²¿´ °±­·¬·±² ¿º¬»® ½±³°´»¬·±² ±º ¿ ½§½´»ô ¸±©»ª»® ·¬·­ ³±®» ´·µ»´§ ¬¸¿¬ ¬¸» ®±¬¿¬·±²¿´ »ºº»½¬ ©·´´ ²±¬ ¾» »¨¿½¬´§ ®»ª»®­»¼ô¿²¼ ·¬ ·­ ¿´­± «­«¿´ ¬¸¿¬ ¾®·½µ©±®µ ©·´´ ­»¬¬´» ·² ·¬­ ²»© °±­·¬·±² ¿²¼©·´´ ®»­·­¬ ¬¸» º±®½»­ ¬®§·²¹ ¬± ®»¬«®² ·¬ ¬± ·¬­ ±®·¹·²¿´ °±­·¬·±²ò ̸·­³»¿²­ ¬¸¿¬ ·² ¿ ½¿­» ©¸»®» ­©»´´·²¹ ¬¿µ»­ °´¿½» ¿º¬»® ½±²­¬®«½¬·±²¿²¼ ½®¿½µ·²¹ ±½½«®­ô ¬¸» ½®¿½µ·²¹ ·­ ´·µ»´§ ¬± ¿¬ ´»¿­¬ °¿®¬´§ ®»³¿·²¿º¬»® ¬¸» ­¸®·²µ ­»¹³»²¬ ±º ¬¸» ½§½´» ·­ ½±³°´»¬»ò ̸«­ô »¿½¸ ¬·³»¬¸» ½§½´» ·­ ®»°»¿¬»¼ô ¬¸» ´·µ»´·¸±±¼ ·­ ¬¸¿¬ ¬¸» ½®¿½µ·²¹ ©·´´ ¾»½±³»©·¼»® «²¬·´ ¬¸» ­»½¬·±²­ ±º ¾®·½µ©±®µ ¾»½±³» ª·®¬«¿´´§ ·²¼»°»²¼»²¬ò

É·¬¸ ®»°»¿¬»¼ ½§½´»­ô ±²½» ¬¸» ½®¿½µ·²¹ ·­ »­¬¿¾´·­¸»¼ô ·º ¬¸»®» ·­ ²±±¬¸»® ½±³°´·½¿¬·±²ô ·¬ ·­ ²±®³¿´ º±® ¬¸» ·²½·¼»²½» ±º ½®¿½µ·²¹ ¬±­¬¿¾·´·­»ô ¿­ ¬¸» ¾«·´¼·²¹ ¸¿­ ¬¸» ¿®¬·½«´¿¬·±² ·¬ ²»»¼­ ¬± ½±°» ©·¬¸¬¸» °®±¾´»³ò ̸·­ ·­ ¾§ ²± ³»¿²­ ¿´©¿§­ ¬¸» ½¿­»ô ¸±©»ª»®ô ¿²¼³±²·¬±®·²¹ ±º ½®¿½µ­ ·² ©¿´´­ ¿²¼ º´±±®­ ­¸±«´¼ ¿´©¿§­ ¾» ¬®»¿¬»¼­»®·±«­´§ò

Ë°¸»¿ª¿´ ½¿«­»¼ ¾§ ¹®±©¬¸ ±º ¬®»» ®±±¬­ «²¼»® º±±¬·²¹­ ·­ ²±¬ ¿­·³°´» ª»®¬·½¿´ ­¸»¿® ­¬®»­­ò ̸»®» ·­ ¿ ¬»²¼»²½§ º±® ¬¸» ®±±¬ ¬± ¿´­±»¨»®¬ ´¿¬»®¿´ º±®½»­ ¬¸¿¬ ¿¬¬»³°¬ ¬± ­»°¿®¿¬» ­»½¬·±²­ ±º ¾®·½µ©±®µ¿º¬»® ·²·¬·¿´ ½®¿½µ·²¹ ¸¿­ ±½½«®®»¼ò

Ì®»»­ ½¿² ½¿«­» ­¸®·²µ¿¹» ¿²¼ ¼¿³¿¹»

Page 167: SITE CLASSIFICATION REPORT SUMMARY...Douglas Partners (DP) has prepared this report for this project at Taylor 2- Stage 3, Taylor in accordance with DP’s proposal dated 15 September

̸» ²±®³¿´ ­¬®«½¬«®¿´ ¿®®¿²¹»³»²¬ ·­ ¬¸¿¬ ¬¸» ·²²»® ´»¿º ±º ¾®·½µó©±®µ ·² ¬¸» »¨¬»®²¿´ ©¿´´­ ¿²¼ ¿¬ ´»¿­¬ ­±³» ±º ¬¸» ·²¬»®²¿´ ©¿´´­ø¼»°»²¼·²¹ ±² ¬¸» ®±±º ¬§°»÷ ½±³°®·­» ¬¸» ´±¿¼ó¾»¿®·²¹ ­¬®«½¬«®» ±²©¸·½¸ ¿²§ «°°»® º´±±®­ô ½»·´·²¹­ ¿²¼ ¬¸» ®±±º ¿®» ­«°°±®¬»¼ò ײ ¬¸»­»½¿­»­ô ·¬ ·­ ·²¬»®²¿´´§ ª·­·¾´» ½®¿½µ·²¹ ¬¸¿¬ ­¸±«´¼ ¾» ¬¸» ³¿·² º±½«­±º ¿¬¬»²¬·±²ô ¸±©»ª»® ¬¸»®» ¿®» ¿ º»© »¨¿³°´»­ ±º ¼©»´´·²¹­ ©¸±­»»¨¬»®²¿´ ´»¿º ±º ³¿­±²®§ °´¿§­ ­±³» ­«°°±®¬·²¹ ®±´»ô ­± ¬¸·­ ­¸±«´¼¾» ½¸»½µ»¼ ·º ¬¸»®» ·­ ¿²§ ¼±«¾¬ò ײ ¿²§ ½¿­»ô »¨¬»®²¿´´§ ª·­·¾´»½®¿½µ·²¹ ·­ ·³°±®¬¿²¬ ¿­ ¿ ¹«·¼» ¬± ­¬®»­­»­ ±² ¬¸» ­¬®«½¬«®» ¹»²»®¿´´§ô¿²¼ ·¬ ­¸±«´¼ ¿´­± ¾» ®»³»³¾»®»¼ ¬¸¿¬ ¬¸» »¨¬»®²¿´ ©¿´´­ ³«­¬ ¾»½¿°¿¾´» ±º ­«°°±®¬·²¹ ¬¸»³­»´ª»­ò

Ûºº»½¬­ ±² º®¿³»¼ ­¬®«½¬«®»­Ì·³¾»® ±® ­¬»»´ º®¿³»¼ ¾«·´¼·²¹­ ¿®» ´»­­ ´·µ»´§ ¬± »¨¸·¾·¬ ½®¿½µ·²¹¼«» ¬± ­©»´´ñ­¸®·²µ ¬¸¿² ³¿­±²®§ ¾«·´¼·²¹­ ¾»½¿«­» ±º ¬¸»·®º´»¨·¾·´·¬§ò ß´­±ô ¬¸» ¼±³·²¹ñ¼·­¸·²¹ »ºº»½¬­ ¬»²¼ ¬± ¾» ´±©»® ¾»½¿«­»±º ¬¸» ´·¹¸¬»® ©»·¹¸¬ ±º ©¿´´­ò ̸» ³¿·² ®·­µ­ ¬± º®¿³»¼ ¾«·´¼·²¹­ ¿®»»²½±«²¬»®»¼ ¾»½¿«­» ±º ¬¸» ·­±´¿¬»¼ °·»® º±±¬·²¹­ «­»¼ «²¼»® ©¿´´­òɸ»®» »®±­·±² ±® ­¿¬«®¿¬·±² ½¿«­» ¿ º±±¬·²¹ ¬± º¿´´ ¿©¿§ô ¬¸·­ ½¿²¼±«¾´» ¬¸» ­°¿² ©¸·½¸ ¿ ©¿´´ ³«­¬ ¾®·¼¹»ò ̸·­ ¿¼¼·¬·±²¿´ ­¬®»­­ ½¿²½®»¿¬» ½®¿½µ·²¹ ·² ©¿´´ ´·²·²¹­ô °¿®¬·½«´¿®´§ ©¸»®» ¬¸»®» ·­ ¿ ©»¿µ°±·²¬ ·² ¬¸» ­¬®«½¬«®» ½¿«­»¼ ¾§ ¿ ¼±±® ±® ©·²¼±© ±°»²·²¹ò ׬ ·­ô¸±©»ª»®ô «²´·µ»´§ ¬¸¿¬ º®¿³»¼ ­¬®«½¬«®»­ ©·´´ ¾» ­± ­¬®»­­»¼ ¿­ ¬± ­«ºº»®­»®·±«­ ¼¿³¿¹» ©·¬¸±«¬ º·®­¬ »¨¸·¾·¬·²¹ ­±³» ±® ¿´´ ±º ¬¸» ¿¾±ª»­§³°¬±³­ º±® ¿ ½±²­·¼»®¿¾´» °»®·±¼ò ̸» ­¿³» ©¿®²·²¹ °»®·±¼ ­¸±«´¼¿°°´§ ·² ¬¸» ½¿­» ±º «°¸»¿ª¿´ò ׬ ­¸±«´¼ ¾» ²±¬»¼ô ¸±©»ª»®ô ¬¸¿¬ ©¸»®»º®¿³»¼ ¾«·´¼·²¹­ ¿®» ­«°°±®¬»¼ ¾§ ­¬®·° º±±¬·²¹­ ¬¸»®» ·­ ±²´§ ±²» ´»¿º±º ¾®·½µ©±®µ ¿²¼ ¬¸»®»º±®» ¬¸» »¨¬»®²¿´´§ ª·­·¾´» ©¿´´­ ¿®» ¬¸»­«°°±®¬·²¹ ­¬®«½¬«®» º±® ¬¸» ¾«·´¼·²¹ò ײ ¬¸·­ ½¿­»ô ¬¸» ­«¾º´±±®³¿­±²®§ ©¿´´­ ½¿² ¾» »¨°»½¬»¼ ¬± ¾»¸¿ª» ¿­ º«´´ ¾®·½µ©±®µ ©¿´´­ò

Ûºº»½¬­ ±² ¾®·½µ ª»²»»® ­¬®«½¬«®»­Þ»½¿«­» ¬¸» ´±¿¼ó¾»¿®·²¹ ­¬®«½¬«®» ±º ¿ ¾®·½µ ª»²»»® ¾«·´¼·²¹ ·­ ¬¸»º®¿³» ¬¸¿¬ ³¿µ»­ «° ¬¸» ·²¬»®·±® ´»¿º ±º ¬¸» »¨¬»®²¿´ ©¿´´­ °´«­°»®¸¿°­ ¬¸» ·²¬»®²¿´ ©¿´´­ô ¼»°»²¼·²¹ ±² ¬¸» ¬§°» ±º ®±±ºô ¬¸»¾«·´¼·²¹ ½¿² ¾» »¨°»½¬»¼ ¬± ¾»¸¿ª» ¿­ ¿ º®¿³»¼ ­¬®«½¬«®»ô »¨½»°¬ ¬¸¿¬¬¸» »¨¬»®²¿´ ³¿­±²®§ ©·´´ ¾»¸¿ª» ·² ¿ ­·³·´¿® ©¿§ ¬± ¬¸» »¨¬»®²¿´ ´»¿º±º ¿ º«´´ ³¿­±²®§ ­¬®«½¬«®»ò

É¿¬»® Í»®ª·½» ¿²¼ Ü®¿·²¿¹»

ɸ»®» ¿ ©¿¬»® ­»®ª·½» °·°»ô ¿ ­»©»® ±® ­¬±®³©¿¬»® ¼®¿·²¿¹» °·°» ·­ ·²¬¸» ª·½·²·¬§ ±º ¿ ¾«·´¼·²¹ô ¿ ©¿¬»® ´»¿µ ½¿² ½¿«­» »®±­·±²ô ­©»´´·²¹ ±®­¿¬«®¿¬·±² ±º ­«­½»°¬·¾´» ­±·´ò Ûª»² ¿ ³·²«­½«´» ´»¿µ ½¿² ¾» »²±«¹¸¬± ­¿¬«®¿¬» ¿ ½´¿§ º±«²¼¿¬·±²ò ß ´»¿µ·²¹ ¬¿° ²»¿® ¿ ¾«·´¼·²¹ ½¿² ¸¿ª»¬¸» ­¿³» »ºº»½¬ò ײ ¿¼¼·¬·±²ô ¬®»²½¸»­ ½±²¬¿·²·²¹ °·°»­ ½¿² ¾»½±³»©¿¬»®½±«®­»­ »ª»² ¬¸±«¹¸ ¾¿½µº·´´»¼ô °¿®¬·½«´¿®´§ ©¸»®» ¾®±µ»²®«¾¾´» ·­ «­»¼ ¿­ º·´´ò É¿¬»® ¬¸¿¬ ®«²­ ¿´±²¹ ¬¸»­» ¬®»²½¸»­ ½¿² ¾»®»­°±²­·¾´» º±® ­»®·±«­ »®±­·±²ô ·²¬»®­¬®¿¬¿ ­»»°¿¹» ·²¬± ­«¾º´±±® ¿®»¿­¿²¼ ­¿¬«®¿¬·±²ò

з°» ´»¿µ¿¹» ¿²¼ ¬®»²½¸ ©¿¬»® º´±©­ ¿´­± »²½±«®¿¹» ¬®»» ¿²¼ ­¸®«¾®±±¬­ ¬± ¬¸» ­±«®½» ±º ©¿¬»®ô ½±³°´·½¿¬·²¹ ¿²¼ »¨¿½»®¾¿¬·²¹ ¬¸»°®±¾´»³òб±® ®±±º °´«³¾·²¹ ½¿² ®»­«´¬ ·² ´¿®¹» ª±´«³»­ ±º ®¿·²©¿¬»® ¾»·²¹½±²½»²¬®¿¬»¼ ·² ¿ ­³¿´´ ¿®»¿ ±º ­±·´æ

{ ײ½±®®»½¬ º¿´´­ ·² ®±±º ¹«¬¬»®·²¹ ³¿§ ®»­«´¬ ·² ±ª»®º´±©­ô ¿­ ³¿§¹«¬¬»®­ ¾´±½µ»¼ ©·¬¸ ´»¿ª»­ »¬½ò

{ ݱ®®±¼»¼ ¹«¬¬»®·²¹ ±® ¼±©²°·°»­ ½¿² ­°·´´ ©¿¬»® ¬± ¹®±«²¼ò

{ ܱ©²°·°»­ ²±¬ °±­·¬·ª»´§ ½±²²»½¬»¼ ¬± ¿ °®±°»® ­¬±®³©¿¬»®½±´´»½¬·±² ­§­¬»³ ©·´´ ¼·®»½¬ ¿ ½±²½»²¬®¿¬·±² ±º ©¿¬»® ¬± ­±·´ ¬¸¿¬ ·­¼·®»½¬´§ ¿¼¶¿½»²¬ ¬± º±±¬·²¹­ô ­±³»¬·³»­ ½¿«­·²¹ ´¿®¹»ó­½¿´»°®±¾´»³­ ­«½¸ ¿­ »®±­·±²ô ­¿¬«®¿¬·±² ¿²¼ ³·¹®¿¬·±² ±º ©¿¬»® «²¼»®¬¸» ¾«·´¼·²¹ò

Í»®·±«­²»­­ ±º Ý®¿½µ·²¹

ײ ¹»²»®¿´ô ³±­¬ ½®¿½µ·²¹ º±«²¼ ·² ³¿­±²®§ ©¿´´­ ·­ ¿ ½±­³»¬·½²«·­¿²½» ±²´§ ¿²¼ ½¿² ¾» µ»°¬ ·² ®»°¿·® ±® »ª»² ·¹²±®»¼ò ̸» ¬¿¾´»¾»´±© ·­ ¿ ®»°®±¼«½¬·±² ±º Ì¿¾´» Ýï ±º ßÍ îèéðò

ßÍ îèéð ¿´­± °«¾´·­¸»­ º·¹«®»­ ®»´¿¬·²¹ ¬± ½®¿½µ·²¹ ·² ½±²½®»¬» º´±±®­ô¸±©»ª»® ¾»½¿«­» ©¿´´ ½®¿½µ·²¹ ©·´´ «­«¿´´§ ®»¿½¸ ¬¸» ½®·¬·½¿´ °±·²¬­·¹²·º·½¿²¬´§ »¿®´·»® ¬¸¿² ½®¿½µ·²¹ ·² ­´¿¾­ô ¬¸·­ ¬¿¾´» ·­ ²±¬®»°®±¼«½»¼ ¸»®»ò

Ю»ª»²¬·±²ñÝ«®»

д«³¾·²¹É¸»®» ¾«·´¼·²¹ ³±ª»³»²¬ ·­ ½¿«­»¼ ¾§ ©¿¬»® ­»®ª·½»ô ®±±º °´«³¾·²¹ô­»©»® ±® ­¬±®³©¿¬»® º¿·´«®»ô ¬¸» ®»³»¼§ ·­ ¬± ®»°¿·® ¬¸» °®±¾´»³ò ׬ ·­ °®«¼»²¬ô ¸±©»ª»®ô ¬± ½±²­·¼»® ¿´­± ®»®±«¬·²¹ °·°»­ ¿©¿§ º®±³¬¸» ¾«·´¼·²¹ ©¸»®» °±­­·¾´»ô ¿²¼ ®»´±½¿¬·²¹ ¬¿°­ ¬± °±­·¬·±²­ ©¸»®»¿²§ ´»¿µ¿¹» ©·´´ ²±¬ ¼·®»½¬ ©¿¬»® ¬± ¬¸» ¾«·´¼·²¹ ª·½·²·¬§ò Ûª»² ©¸»®»¹«´´§ ¬®¿°­ ¿®» °®»­»²¬ô ¬¸»®» ·­ ­±³»¬·³»­ ­«ºº·½·»²¬ ­°·´´ ¬± ½®»¿¬»»®±­·±² ±® ­¿¬«®¿¬·±²ô °¿®¬·½«´¿®´§ ·² ³±¼»®² ·²­¬¿´´¿¬·±²­ «­·²¹­³¿´´»® ¼·¿³»¬»® ÐÊÝ º·¨¬«®»­ò ײ¼»»¼ô ­±³» ¹«´´§ ¬®¿°­ ¿®» ²±¬­·¬«¿¬»¼ ¼·®»½¬´§ «²¼»® ¬¸» ¬¿°­ ¬¸¿¬ ¿®» ·²­¬¿´´»¼ ¬± ½¸¿®¹» ¬¸»³ô©·¬¸ ¬¸» ®»­«´¬ ¬¸¿¬ ©¿¬»® º®±³ ¬¸» ¬¿° ³¿§ »²¬»® ¬¸» ¾¿½µº·´´»¼¬®»²½¸ ¬¸¿¬ ¸±«­»­ ¬¸» ­»©»® °·°·²¹ò ׺ ¬¸» ¬®»²½¸ ¸¿­ ¾»»² °±±®´§¾¿½µº·´´»¼ô ¬¸» ©¿¬»® ©·´´ »·¬¸»® °±²¼ ±® º´±© ¿´±²¹ ¬¸» ¾±¬¬±³ ±º¬¸» ¬®»²½¸ò ß­ ¬¸»­» ¬®»²½¸»­ «­«¿´´§ ®«² ¿´±²¹­·¼» ¬¸» º±±¬·²¹­ ¿²¼½¿² ¾» ¿¬ ¿ ­·³·´¿® ¼»°¬¸ô ·¬ ·­ ²±¬ ¸¿®¼ ¬± ­»» ¸±© ¿²§ ©¿¬»® ¬¸¿¬ ·­¬¸«­ ¼·®»½¬»¼ ·²¬± ¿ ¬®»²½¸ ½¿² »¿­·´§ ¿ºº»½¬ ¬¸» º±«²¼¿¬·±²K­ ¿¾·´·¬§ ¬±­«°°±®¬ º±±¬·²¹­ ±® »ª»² ¹¿·² »²¬®§ ¬± ¬¸» ­«¾º´±±® ¿®»¿ò

Ù®±«²¼ ¼®¿·²¿¹»×² ¿´´ ­±·´­ ¬¸»®» ·­ ¬¸» ½¿°¿½·¬§ º±® ©¿¬»® ¬± ¬®¿ª»´ ±² ¬¸» ­«®º¿½» ¿²¼¾»´±© ·¬ò Í«®º¿½» ©¿¬»® º´±©­ ½¿² ¾» »­¬¿¾´·­¸»¼ ¾§ ·²­°»½¬·±² ¼«®·²¹¿²¼ ¿º¬»® ¸»¿ª§ ±® °®±´±²¹»¼ ®¿·²ò ׺ ²»½»­­¿®§ô ¿ ¹®¿¬»¼ ¼®¿·² ­§­¬»³½±²²»½¬»¼ ¬± ¬¸» ­¬±®³©¿¬»® ½±´´»½¬·±² ­§­¬»³ ·­ «­«¿´´§ ¿² »¿­§­±´«¬·±²ò

׬ ·­ô ¸±©»ª»®ô ­±³»¬·³»­ ²»½»­­¿®§ ©¸»² ¿¬¬»³°¬·²¹ ¬± °®»ª»²¬©¿¬»® ³·¹®¿¬·±² ¬¸¿¬ ¬»­¬·²¹ ¾» ½¿®®·»¼ ±«¬ ¬± »­¬¿¾´·­¸ ©¿¬»®¬¿¾´»¸»·¹¸¬ ¿²¼ ­«¾­±·´ ©¿¬»® º´±©­ò ̸·­ ­«¾¶»½¬ ·­ ®»º»®®»¼ ¬± ·² ÞÌÚ ï翲¼ ³¿§ °®±°»®´§ ¾» ®»¹¿®¼»¼ ¿­ ¿² ¿®»¿ º±® ¿² »¨°»®¬ ½±²­«´¬¿²¬ò

Ю±¬»½¬·±² ±º ¬¸» ¾«·´¼·²¹ °»®·³»¬»®×¬ ·­ »­­»²¬·¿´ ¬± ®»³»³¾»® ¬¸¿¬ ¬¸» ­±·´ ¬¸¿¬ ¿ºº»½¬­ º±±¬·²¹­ »¨¬»²¼­©»´´ ¾»§±²¼ ¬¸» ¿½¬«¿´ ¾«·´¼·²¹ ´·²»ò É¿¬»®·²¹ ±º ¹¿®¼»² °´¿²¬­ô­¸®«¾­ ¿²¼ ¬®»»­ ½¿«­»­ ­±³» ±º ¬¸» ³±­¬ ­»®·±«­ ©¿¬»® °®±¾´»³­ò

Ú±® ¬¸·­ ®»¿­±²ô °¿®¬·½«´¿®´§ ©¸»®» °®±¾´»³­ »¨·­¬ ±® ¿®» ´·µ»´§ ¬±±½½«®ô ·¬ ·­ ®»½±³³»²¼»¼ ¬¸¿¬ ¿² ¿°®±² ±º °¿ª·²¹ ¾» ·²­¬¿´´»¼¿®±«²¼ ¿­ ³«½¸ ±º ¬¸» ¾«·´¼·²¹ °»®·³»¬»® ¿­ ²»½»­­¿®§ò ̸·­ °¿ª·²¹

ÝÔßÍÍ×Ú×ÝßÌ×ÑÒ ÑÚ ÜßÓßÙÛ É×ÌØ ÎÛÚÛÎÛÒÝÛ ÌÑ ÉßÔÔÍ

Ü»­½®·°¬·±² ±º ¬§°·½¿´ ¼¿³¿¹» ¿²¼ ®»¯«·®»¼ ®»°¿·® ß°°®±¨·³¿¬» ½®¿½µ ©·¼¬¸ Ü¿³¿¹»´·³·¬ ø­»» Ò±¬» í÷ ½¿¬»¹±®§

Ø¿·®´·²» ½®¿½µ­ äðòï ³³ ð

Ú·²» ½®¿½µ­ ©¸·½¸ ¼± ²±¬ ²»»¼ ®»°¿·® äï ³³ ï

Ý®¿½µ­ ²±¬·½»¿¾´» ¾«¬ »¿­·´§ º·´´»¼ò ܱ±®­ ¿²¼ ©·²¼±©­ ­¬·½µ ­´·¹¸¬´§ äë ³³ î

Ý®¿½µ­ ½¿² ¾» ®»°¿·®»¼ ¿²¼ °±­­·¾´§ ¿ ­³¿´´ ¿³±«²¬ ±º ©¿´´ ©·´´ ²»»¼ ëPïë ³³ ø±® ¿ ²«³¾»® ±º ½®¿½µ­ í¬± ¾» ®»°´¿½»¼ò ܱ±®­ ¿²¼ ©·²¼±©­ ­¬·½µò Í»®ª·½» °·°»­ ½¿² º®¿½¬«®»ò í ³³ ±® ³±®» ·² ±²» ¹®±«°÷É»¿¬¸»®¬·¹¸¬²»­­ ±º¬»² ·³°¿·®»¼

Û¨¬»²­·ª» ®»°¿·® ©±®µ ·²ª±´ª·²¹ ¾®»¿µ·²¹ó±«¬ ¿²¼ ®»°´¿½·²¹ ­»½¬·±²­ ±º ©¿´´­ô ïëPîë ³³ ¾«¬ ¿´­± ¼»°»²¼ ì»­°»½·¿´´§ ±ª»® ¼±±®­ ¿²¼ ©·²¼±©­ò É·²¼±© ¿²¼ ¼±±® º®¿³»­ ¼·­¬±®¬ò É¿´´­ ´»¿² ±² ²«³¾»® ±º ½®¿½µ­±® ¾«´¹» ²±¬·½»¿¾´§ô ­±³» ´±­­ ±º ¾»¿®·²¹ ·² ¾»¿³­ò Í»®ª·½» °·°»­ ¼·­®«°¬»¼

Page 168: SITE CLASSIFICATION REPORT SUMMARY...Douglas Partners (DP) has prepared this report for this project at Taylor 2- Stage 3, Taylor in accordance with DP’s proposal dated 15 September

­¸±«´¼ »¨¬»²¼ ±«¬©¿®¼­ ¿ ³·²·³«³ ±º çðð ³³ ø³±®» ·² ¸·¹¸´§®»¿½¬·ª» ­±·´÷ ¿²¼ ­¸±«´¼ ¸¿ª» ¿ ³·²·³«³ º¿´´ ¿©¿§ º®±³ ¬¸»¾«·´¼·²¹ ±º ïæêðò ̸» º·²·­¸»¼ °¿ª·²¹ ­¸±«´¼ ¾» ²± ´»­­ ¬¸¿² ïðð³³ ¾»´±© ¾®·½µ ª»²¬ ¾¿­»­ò

׬ ·­ °®«¼»²¬ ¬± ®»´±½¿¬» ¼®¿·²¿¹» °·°»­ ¿©¿§ º®±³ ¬¸·­ °¿ª·²¹ô ·º°±­­·¾´»ô ¬± ¿ª±·¼ ½±³°´·½¿¬·±²­ º®±³ º«¬«®» ´»¿µ¿¹»ò ׺ ¬¸·­ ·­ ²±¬°®¿½¬·½¿´ô »¿®¬¸»²©¿®» °·°»­ ­¸±«´¼ ¾» ®»°´¿½»¼ ¾§ ÐÊÝ ¿²¼¾¿½µº·´´·²¹ ­¸±«´¼ ¾» ±º ¬¸» ­¿³» ­±·´ ¬§°» ¿­ ¬¸» ­«®®±«²¼·²¹ ­±·´¿²¼ ½±³°¿½¬»¼ ¬± ¬¸» ­¿³» ¼»²­·¬§ò

Û¨½»°¬ ·² ¿®»¿­ ©¸»®» º®»»¦·²¹ ±º ©¿¬»® ·­ ¿² ·­­«»ô ·¬ ·­ ©·­» ¬±®»³±ª» ¬¿°­ ·² ¬¸» ¾«·´¼·²¹ ¿®»¿ ¿²¼ ®»´±½¿¬» ¬¸»³ ©»´´ ¿©¿§ º®±³¬¸» ¾«·´¼·²¹ P °®»º»®¿¾´§ ²±¬ «°¸·´´ º®±³ ·¬ ø­»» ÞÌÚ ïç÷ò

׬ ³¿§ ¾» ¼»­·®¿¾´» ¬± ·²­¬¿´´ ¿ ¹®¿¬»¼ ¼®¿·² ¿¬ ¬¸» ±«¬­·¼» »¼¹» ±º ¬¸»°¿ª·²¹ ±² ¬¸» «°¸·´´ ­·¼» ±º ¬¸» ¾«·´¼·²¹ò ׺ ­«¾­±·´ ¼®¿·²¿¹» ·­²»»¼»¼ ¬¸·­ ½¿² ¾» ·²­¬¿´´»¼ «²¼»® ¬¸» ­«®º¿½» ¼®¿·²ò

ݱ²¼»²­¿¬·±²×² ¾«·´¼·²¹­ ©·¬¸ ¿ ­«¾º´±±® ª±·¼ ­«½¸ ¿­ ©¸»®» ¾»¿®»®­ ¿²¼ ¶±·­¬­­«°°±®¬ º´±±®·²¹ô ·²­«ºº·½·»²¬ ª»²¬·´¿¬·±² ½®»¿¬»­ ·¼»¿´ ½±²¼·¬·±²­ º±®½±²¼»²­¿¬·±²ô °¿®¬·½«´¿®´§ ©¸»®» ¬¸»®» ·­ ´·¬¬´» ½´»¿®¿²½» ¾»¬©»»² ¬¸»º´±±® ¿²¼ ¬¸» ¹®±«²¼ò ݱ²¼»²­¿¬·±² ¿¼¼­ ¬± ¬¸» ³±·­¬«®» ¿´®»¿¼§°®»­»²¬ ·² ¬¸» ­«¾º´±±® ¿²¼ ­·¹²·º·½¿²¬´§ ­´±©­ ¬¸» °®±½»­­ ±º ¼®§·²¹±«¬ò ײ­¬¿´´¿¬·±² ±º ¿² ¿¼»¯«¿¬» ­«¾º´±±® ª»²¬·´¿¬·±² ­§­¬»³ô »·¬¸»®²¿¬«®¿´ ±® ³»½¸¿²·½¿´ô ·­ ¼»­·®¿¾´»ò

É¿®²·²¹æ ß´¬¸±«¹¸ ¬¸·­ Þ«·´¼·²¹ Ì»½¸²±´±¹§ Ú·´» ¼»¿´­ ©·¬¸½®¿½µ·²¹ ·² ¾«·´¼·²¹­ô ·¬ ­¸±«´¼ ¾» ­¿·¼ ¬¸¿¬ ­«¾º´±±® ³±·­¬«®» ½¿²®»­«´¬ ·² ¬¸» ¼»ª»´±°³»²¬ ±º ±¬¸»® °®±¾´»³­ô ²±¬¿¾´§æ

{ É¿¬»® ¬¸¿¬ ·­ ¬®¿²­³·¬¬»¼ ·²¬± ³¿­±²®§ô ³»¬¿´ ±® ¬·³¾»® ¾«·´¼·²¹»´»³»²¬­ ½¿«­»­ ¼¿³¿¹» ¿²¼ñ±® ¼»½¿§ ¬± ¬¸±­» »´»³»²¬­ò

{ Ø·¹¸ ­«¾º´±±® ¸«³·¼·¬§ ¿²¼ ³±·­¬«®» ½±²¬»²¬ ½®»¿¬» ¿² ·¼»¿´»²ª·®±²³»²¬ º±® ª¿®·±«­ °»­¬­ô ·²½´«¼·²¹ ¬»®³·¬»­ ¿²¼ ­°·¼»®­ò

{ ɸ»®» ¸·¹¸ ³±·­¬«®» ´»ª»´­ ¿®» ¬®¿²­³·¬¬»¼ ¬± ¬¸» º´±±®·²¹ ¿²¼©¿´´­ô ¿² ·²½®»¿­» ·² ¬¸» ¼«­¬ ³·¬» ½±«²¬ ½¿² »²­«» ©·¬¸·² ¬¸»´·ª·²¹ ¿®»¿­ò Ü«­¬ ³·¬»­ô ¿­ ©»´´ ¿­ ¼¿³°²»­­ ·² ¹»²»®¿´ô ½¿² ¾» ¿¸»¿´¬¸ ¸¿¦¿®¼ ¬± ·²¸¿¾·¬¿²¬­ô °¿®¬·½«´¿®´§ ¬¸±­» ©¸± ¿®»¿¾²±®³¿´´§ ­«­½»°¬·¾´» ¬± ®»­°·®¿¬±®§ ¿·´³»²¬­ò

̸» ¹¿®¼»²Ì¸» ·¼»¿´ ª»¹»¬¿¬·±² ´¿§±«¬ ·­ ¬± ¸¿ª» ´¿©² ±® °´¿²¬­ ¬¸¿¬ ®»¯«·®»±²´§ ´·¹¸¬ ©¿¬»®·²¹ ·³³»¼·¿¬»´§ ¿¼¶¿½»²¬ ¬± ¬¸» ¼®¿·²¿¹» ±® °¿ª·²¹»¼¹»ô ¬¸»² ³±®» ¼»³¿²¼·²¹ °´¿²¬­ô ­¸®«¾­ ¿²¼ ¬®»»­ ­°®»¿¼ ±«¬ ·²¬¸¿¬ ±®¼»®ò

Ѫ»®©¿¬»®·²¹ ¼«» ¬± ³·­«­» ±º ¿«¬±³¿¬·½ ©¿¬»®·²¹ ­§­¬»³­ ·­ ¿½±³³±² ½¿«­» ±º ­¿¬«®¿¬·±² ¿²¼ ©¿¬»® ³·¹®¿¬·±² «²¼»® º±±¬·²¹­ò ׺·¬ ·­ ²»½»­­¿®§ ¬± «­» ¬¸»­» ­§­¬»³­ô ·¬ ·­ ·³°±®¬¿²¬ ¬± ®»³±ª» ¹¿®¼»²¾»¼­ ¬± ¿ ½±³°´»¬»´§ ­¿º» ¼·­¬¿²½» º®±³ ¾«·´¼·²¹­ò

Û¨·­¬·²¹ ¬®»»­É¸»®» ¿ ¬®»» ·­ ½¿«­·²¹ ¿ °®±¾´»³ ±º ­±·´ ¼®§·²¹ ±® ¬¸»®» ·­ ¬¸»»¨·­¬»²½» ±® ¬¸®»¿¬ ±º «°¸»¿ª¿´ ±º º±±¬·²¹­ô ·º ¬¸» ±ºº»²¼·²¹ ®±±¬­ ¿®»­«¾­·¼·¿®§ ¿²¼ ¬¸»·® ®»³±ª¿´ ©·´´ ²±¬ ­·¹²·º·½¿²¬´§ ¼¿³¿¹» ¬¸» ¬®»»ô¬¸»§ ­¸±«´¼ ¾» ­»ª»®»¼ ¿²¼ ¿ ½±²½®»¬» ±® ³»¬¿´ ¾¿®®·»® °´¿½»¼ª»®¬·½¿´´§ ·² ¬¸» ­±·´ ¬± °®»ª»²¬ º«¬«®» ®±±¬ ¹®±©¬¸ ·² ¬¸» ¼·®»½¬·±² ±º¬¸» ¾«·´¼·²¹ò ׺ ·¬ ·­ ²±¬ °±­­·¾´» ¬± ®»³±ª» ¬¸» ®»´»ª¿²¬ ®±±¬­©·¬¸±«¬ ¼¿³¿¹» ¬± ¬¸» ¬®»»ô ¿² ¿°°´·½¿¬·±² ¬± ®»³±ª» ¬¸» ¬®»» ­¸±«´¼¾» ³¿¼» ¬± ¬¸» ´±½¿´ ¿«¬¸±®·¬§ò ß °®«¼»²¬ °´¿² ·­ ¬± ¬®¿²­°´¿²¬ ´·µ»´§±ºº»²¼»®­ ¾»º±®» ¬¸»§ ¾»½±³» ¿ °®±¾´»³ò

ײº±®³¿¬·±² ±² ¬®»»­ô °´¿²¬­ ¿²¼ ­¸®«¾­Í¬¿¬» ¼»°¿®¬³»²¬­ ±ª»®­»»·²¹ ¿¹®·½«´¬«®» ½¿² ¹·ª» ·²º±®³¿¬·±²®»¹¿®¼·²¹ ®±±¬ °¿¬¬»®²­ô ª±´«³» ±º ©¿¬»® ²»»¼»¼ ¿²¼ ­¿º» ¼·­¬¿²½»º®±³ ¾«·´¼·²¹­ ±º ³±­¬ ­°»½·»­ò Þ±¬¿²·½ ¹¿®¼»²­ ¿®» ¿´­± ­±«®½»­ ±º·²º±®³¿¬·±²ò Ú±® ·²º±®³¿¬·±² ±² °´¿²¬ ®±±¬­ ¿²¼ ¼®¿·²­ô ­»» Þ«·´¼·²¹Ì»½¸²±´±¹§ Ú·´» ïéò

Û¨½¿ª¿¬·±²Û¨½¿ª¿¬·±² ¿®±«²¼ º±±¬·²¹­ ³«­¬ ¾» °®±°»®´§ »²¹·²»»®»¼ò ͱ·´­«°°±®¬·²¹ º±±¬·²¹­ ½¿² ±²´§ ¾» ­¿º»´§ »¨½¿ª¿¬»¼ ¿¬ ¿² ¿²¹´» ¬¸¿¬¿´´±©­ ¬¸» ­±·´ «²¼»® ¬¸» º±±¬·²¹ ¬± ®»³¿·² ­¬¿¾´»ò ̸·­ ¿²¹´» ·­½¿´´»¼ ¬¸» ¿²¹´» ±º ®»°±­» ø±® º®·½¬·±²÷ ¿²¼ ª¿®·»­ ­·¹²·º·½¿²¬´§¾»¬©»»² ­±·´ ¬§°»­ ¿²¼ ½±²¼·¬·±²­ò λ³±ª¿´ ±º ­±·´ ©·¬¸·² ¬¸» ¿²¹´»±º ®»°±­» ©·´´ ½¿«­» ­«¾­·¼»²½»ò

λ³»¼·¿¬·±²

ɸ»®» »®±­·±² ¸¿­ ±½½«®®»¼ ¬¸¿¬ ¸¿­ ©¿­¸»¼ ¿©¿§ ­±·´ ¿¼¶¿½»²¬ ¬±º±±¬·²¹­ô ­±·´ ±º ¬¸» ­¿³» ½´¿­­·º·½¿¬·±² ­¸±«´¼ ¾» ·²¬®±¼«½»¼ ¿²¼½±³°¿½¬»¼ ¬± ¬¸» ­¿³» ¼»²­·¬§ò ɸ»®» º±±¬·²¹­ ¸¿ª» ¾»»²«²¼»®³·²»¼ô ¿«¹³»²¬¿¬·±² ±® ±¬¸»® ­°»½·¿´·­¬ ©±®µ ³¿§ ¾» ®»¯«·®»¼òλ³»¼·¿¬·±² ±º º±±¬·²¹­ ¿²¼ º±«²¼¿¬·±²­ ·­ ¹»²»®¿´´§ ¬¸» ®»¿´³ ±º ¿­°»½·¿´·­¬ ½±²­«´¬¿²¬ò

ɸ»®» ·­±´¿¬»¼ º±±¬·²¹­ ®·­» ¿²¼ º¿´´ ¾»½¿«­» ±º ­©»´´ñ­¸®·²µ »ºº»½¬ô¬¸» ¸±³»±©²»® ³¿§ ¾» ¬»³°¬»¼ ¬± ¿´´»ª·¿¬» º´±±® ¾±«²½» ¾§ º·´´·²¹¬¸» ¹¿° ¬¸¿¬ ¸¿­ ¿°°»¿®»¼ ¾»¬©»»² ¬¸» ¾»¿®»® ¿²¼ ¬¸» °·»® ©·¬¸¾´±½µ·²¹ò ̸» ¼¿²¹»® ¸»®» ·­ ¬¸¿¬ ©¸»² ¬¸» ²»¨¬ ­©»´´ ­»¹³»²¬ ±º ¬¸»½§½´» ±½½«®­ô ¬¸» »¨¬®¿ ¾´±½µ·²¹ ©·´´ °«­¸ ¬¸» º´±±® «° ·²¬± ¿²¿½½»²¬«¿¬»¼ ¼±³» ¿²¼ ³¿§ ¿´­± ½¿«­» ´±½¿´ ­¸»¿® º¿·´«®» ·² ¬¸» ­±·´ò׺ ·¬ ·­ ²»½»­­¿®§ ¬± «­» ¾´±½µ·²¹ô ·¬ ­¸±«´¼ ¾» ¾§ ¿ °¿·® ±º º·²»©»¼¹»­ ¿²¼ ³±²·¬±®·²¹ ­¸±«´¼ ¾» ½¿®®·»¼ ±«¬ º±®¬²·¹¸¬´§ò

̸·­ ÞÌÚ ©¿­ °®»°¿®»¼ ¾§ Ö±¸² Ô»©»® Úß×Þô Ó×ßÓßô ﮬ²»®ô

ݱ²­¬®«½¬·±² Ü·¿¹²±­·­ò

̸» ·²º±®³¿¬·±² ·² ¬¸·­ ¿²¼ ±¬¸»® ·­­«»­ ·² ¬¸» ­»®·»­ ©¿­ ¼»®·ª»¼ º®±³ ª¿®·±«­ ­±«®½»­ ¿²¼ ©¿­ ¾»´·»ª»¼ ¬± ¾» ½±®®»½¬ ©¸»² °«¾´·­¸»¼ò

̸» ·²º±®³¿¬·±² ·­ ¿¼ª·­±®§ò ׬ ·­ °®±ª·¼»¼ ·² ¹±±¼ º¿·¬¸ ¿²¼ ²±¬ ½´¿·³»¼ ¬± ¾» ¿² »¨¸¿«­¬·ª» ¬®»¿¬³»²¬ ±º ¬¸» ®»´»ª¿²¬ ­«¾¶»½¬ò

Ú«®¬¸»® °®±º»­­·±²¿´ ¿¼ª·½» ²»»¼­ ¬± ¾» ±¾¬¿·²»¼ ¾»º±®» ¬¿µ·²¹ ¿²§ ¿½¬·±² ¾¿­»¼ ±² ¬¸» ·²º±®³¿¬·±² °®±ª·¼»¼ò

Ü·­¬®·¾«¬»¼ ¾§

ÝÍ×ÎÑ ÐËÞÔ ×ÍØ ×ÒÙ ÐÑ Þ±¨ ïïíçô ݱ´´·²¹©±±¼ íðêêô ß«­¬®¿´·¿

Ú®»»½¿´´ ïèðð êìë ðëï Ì»´ øðí÷ çêêî éêêê Ú¿¨ øðí÷ çêêî éëëë ©©©ò°«¾´·­¸ò½­·®±ò¿«

Û³¿·´æ °«¾´·­¸·²¹ò­¿´»­à½­·®±ò¿«

w ÝÍ×ÎÑ îððíò ˲¿«¬¸±®·­»¼ ½±°§·²¹ ±º ¬¸·­ Þ«·´¼·²¹ Ì»½¸²±´±¹§ º·´» ·­ °®±¸·¾·¬»¼

Ù¿®¼»²­ º±® ¿ ®»¿½¬·ª» ­·¬»

Page 169: SITE CLASSIFICATION REPORT SUMMARY...Douglas Partners (DP) has prepared this report for this project at Taylor 2- Stage 3, Taylor in accordance with DP’s proposal dated 15 September

TOPSOIL FILLING-dry to moist, brown silty sand

FILLING-generally comprising well compacted, dry tomoist, orange red brown, medium plasticity sandy siltyclay

SANDY SILT-very stiff, dry to moist, grey, low plasticitysandy silt with some rootlets

SILTY CLAY-hard, dry to moist, brown orange, mediumplasticity silty clay with some sand

DACITE-extremely low strength, extremely weathered,orange grey, fine to coarse grained dacite, highlyfractured, with occasional clay seams

-from 1.5m, very low to low strength, highly weathered

Pit discontinued at 1.9m-limit of investigation

0.1

0.4

0.65

1.3

1.9

SAMPLING & IN SITU TESTING LEGEND

TEST PIT LOG

Taylor 2 Estate, Stage 3, Taylor

A Auger sample G Gas sample PID Photo ionisation detector (ppm)B Bulk sample P Piston sample PL(A) Point load axial test Is(50) (MPa)BLK Block sample Ux Tube sample (x mm dia.) PL(D) Point load diametral test Is(50) (MPa)C Core drilling W Water sample pp Pocket penetrometer (kPa)D Disturbed sample Water seep S Standard penetration testE Environmental sample Water level V Shear vane (kPa)

Indesco Consulting Engineers Pty LtdSite Classifications

Results &Comments

LOGGED: JPM SURVEY DATUM: MGA94

CLIENT:PROJECT:LOCATION:

PIT No: 53PROJECT No: 77418.29DATE: 11/1/2019SHEET 1 OF 1

Sampling & In Situ Testing

1

2

Wat

er

Dep

th

Sam

ple

Description

of

Strata Gra

phic

Log

Typ

e

REMARKS: Surface Levels & Coordinates are approximate only and must not be relied upon

RIG: Kubota KX057-4 mini-excavator with 300mm wide bucket

WATER OBSERVATIONS: No free groundwater observed

SURFACE LEVEL: 660.0 AHDEASTING: 209158NORTHING: 618731

Dynamic Penetrometer Test(blows per mm)

5 10 15 20

Cone Penetrometer AS1289.6.3.2Sand Penetrometer AS1289.6.3.3

Depth(m) R

L

1

2

660

659

658

D

D

D

0.5

0.9

1.8

pp >400

Page 170: SITE CLASSIFICATION REPORT SUMMARY...Douglas Partners (DP) has prepared this report for this project at Taylor 2- Stage 3, Taylor in accordance with DP’s proposal dated 15 September

TOPSOIL FILLING-dry to moist, brown silty sand

FILLING-generally comprising well compacted, dry tomoist, orange brown, medium plasticity silty clay withsand and gravel

SILTY SAND-medium dense, dry to moist, grey brown,low plasticity, fine grained silty sand with some clay andgravel

Pit discontinued at 1.8m-limit of investigation

0.1

1.1

1.8

SAMPLING & IN SITU TESTING LEGEND

TEST PIT LOG

Taylor 2 Estate, Stage 3, Taylor

A Auger sample G Gas sample PID Photo ionisation detector (ppm)B Bulk sample P Piston sample PL(A) Point load axial test Is(50) (MPa)BLK Block sample Ux Tube sample (x mm dia.) PL(D) Point load diametral test Is(50) (MPa)C Core drilling W Water sample pp Pocket penetrometer (kPa)D Disturbed sample Water seep S Standard penetration testE Environmental sample Water level V Shear vane (kPa)

Indesco Consulting Engineers Pty LtdSite Classifications

Results &Comments

LOGGED: JPM SURVEY DATUM: MGA94

CLIENT:PROJECT:LOCATION:

PIT No: 63PROJECT No: 77418.29DATE: 11/1/2019SHEET 1 OF 1

Sampling & In Situ Testing

1

2

Wat

er

Dep

th

Sam

ple

Description

of

Strata Gra

phic

Log

Typ

e

REMARKS: Surface Levels & Coordinates are approximate only and must not be relied upon

RIG: Kubota KX057-4 mini-excavator with 300mm wide bucket

WATER OBSERVATIONS: No free groundwater observed

SURFACE LEVEL: 662.7 AHDEASTING: 209121NORTHING: 618752

Dynamic Penetrometer Test(blows per mm)

5 10 15 20

Cone Penetrometer AS1289.6.3.2Sand Penetrometer AS1289.6.3.3

Depth(m) R

L

1

2

662

661

D 1.4

Page 171: SITE CLASSIFICATION REPORT SUMMARY...Douglas Partners (DP) has prepared this report for this project at Taylor 2- Stage 3, Taylor in accordance with DP’s proposal dated 15 September
Page 172: SITE CLASSIFICATION REPORT SUMMARY...Douglas Partners (DP) has prepared this report for this project at Taylor 2- Stage 3, Taylor in accordance with DP’s proposal dated 15 September

SITE CLASSIFICATION REPORT SUMMARY

BLOCK: 8 SECTION: 64 SUBURB: Taylor

JOB No: 77418.29 DATE: March 2019

CLIENT: Indesco Consulting Engineers Pty Ltd

Classification Procedures: Existing Subsurface Conditions: Refer attached test pit log(s) – Pit(s) 53,54 and Drawing 1. Bulk Earthworks: Filling within the block placed under Level 1 control as defined in AS 3798 – 2007 (Ref 1). Laboratory Results: Previous laboratory testing results indicated liquid limit ranging from 25-66%, plasticity index ranging from 6-49% and linear shrinkage ranging from 3-20.5%.

Site Classification: Class M* (moderately reactive/filled) based on the current profile / state on limited subsurface information and determined in general accordance with the requirements of AS2870-2011 (Ref 2). The classification must be reassessed should the soil profile change either by adding fill or removing soil from the block and/or if the presence of service trenches or retaining walls are within the zone of influence of the block. Reference should be made to the comments provided below.

Footing Systems: Reference must be made to AS2870-2011 (Ref 2) which indicates footing systems that are appropriate for each site classification. All footings must found within a uniform bearing stratum of suitable strength/material, below the zone of influence of any service trenches, backfill zones, retaining walls or underground structures. Masonry walls should be articulated in accordance with current best practice. Dwelling design must ensure uniform moisture conditions are maintained in the vicinity of footings. Footing systems must be confirmed by a structural engineer taking into consideration any onsite or offsite constraints.

Maintenance Guidelines: Reference should be made to the attached CSIRO Sheet BTF 18 ‘Foundation Maintenance & Footing Performance’ to comments about gardens, landscaping and trees on the performance of foundation soils and in particular in respect to maintaining good surface drainage. It notes that minor cracking in most structures is inevitable, and it describes site maintenance practices aimed at minimising foundation movements that can lead to cracking damage.

Comments/ Limitations:

The successful purchaser must make their own interpretations, deductions and conclusions from the information made available and will need to accept full responsibility for such interpretations, deductions and conclusions.

Development specific geotechnical investigations must be undertaken.

Additional topsoils / filling may have been spread subsequent to the investigation.

Site preparation prior to the construction should include removal of all vegetation, topsoil and any uncontrolled filling.

All new filling must be placed under controlled conditions (AS 3798-2007), otherwise Class P conditions would be warranted.

Some variability in subsurface conditions must be anticipated.

Moisture condition of site soils and/or the presence of groundwater may vary considerably from time of investigation compared to at the time of construction.

Depending on the depth of site cut and trenches, rock excavation may be required.

It is recommended that footing excavations be inspected by a geotechnical engineer.

This report must be read in conjunction with the attached “Limitations” and notes “About this Report”.

References:

1. 2.

AS 3798-2007 ‘Guidelines on Earthworks for Commercial and Residential Developments’, Standards Association of Australia. AS 2870-2011 ‘Residential Slabs and Footings,’ Standards Association of Australia.

Attachments:

Limitations & About this Report Explanatory Notes Test Pit Log(s) Pit(s) 53,54 Drawing 1

Page 173: SITE CLASSIFICATION REPORT SUMMARY...Douglas Partners (DP) has prepared this report for this project at Taylor 2- Stage 3, Taylor in accordance with DP’s proposal dated 15 September

FS 604853

Douglas Partners Pty Ltd ABN 75 053 980 117

www.douglaspartners.com.au Unit 2, 73 Sheppard Street

Hume ACT 2620 PO Box 1487

Fyshwick ACT 2609 Phone (02) 6260 2788

Fax (02) 6260 1147

Brisbane • Cairns • Canberra • Central Coast • Coffs Harbour • Darwin • Geelong • Gold Coast • Macarthur • Melbourne Newcastle • North West Sydney • Perth • Port Macquarie • Sunshine Coast • Sydney • Townsville • Wollongong

Limitations Douglas Partners (DP) has prepared this report for this project at Taylor 2 - Stage 3, Taylor in accordance with DP’s proposal dated 15 September 2017 and acceptance received from Indesco Consulting Engineers Pty Ltd dated 13 March 2019. The work was carried out under DP’s Conditions of Engagement. This report is provided for the exclusive use of Indesco Consulting Engineers Pty Ltd for this project only and for the purposes as described in the report. It should not be used by or relied upon for other projects or purposes on the same or other site or by a third party. Any party so relying upon this report beyond its exclusive use and purpose as stated above, and without the express written consent of DP, does so entirely at its own risk and without recourse to DP for any loss or damage. In preparing this report DP has necessarily relied upon information provided by the client and/or their agents. The results provided in the report are indicative of the sub-surface conditions on the site only at the specific sampling and/or testing locations, and then only to the depths investigated and at the time the work was carried out. Sub-surface conditions can change abruptly due to variable geological processes and also as a result of human influences. Such changes may occur after DP’s field testing has been completed. DP’s advice is based upon the conditions encountered during this investigation. The accuracy of the advice provided by DP in this report may be affected by undetected variations in ground conditions across the site between and beyond the sampling and/or testing locations. The advice may also be limited by budget constraints imposed by others or by site accessibility. This report must be read in conjunction with all of the attached and should be kept in its entirety without separation of individual pages or sections. DP cannot be held responsible for interpretations or conclusions made by others unless they are supported by an expressed statement, interpretation, outcome or conclusion stated in this report. This report, or sections from this report, should not be used as part of a specification for a project, without review and agreement by DP. This is because this report has been written as advice and opinion rather than instructions for construction. The scope for work for this investigation/report did not include the assessment of surface or sub-surface materials or groundwater for contaminants, within or adjacent to the site. Should evidence of filling of unknown origin be noted in the report, and in particular the presence of building demolition materials, it should be recognised that there may be some risk that such filling may contain contaminants and hazardous building materials. The contents of this report do not constitute formal design components such as are required, by the Health and Safety Legislation and Regulations, to be included in a Safety Report specifying the hazards likely to be encountered during construction and the controls required to mitigate risk. This design process requires risk assessment to be undertaken, with such assessment being dependent upon factors relating to likelihood of occurrence and consequences of damage to property and to life. This, in turn, requires project data and analysis presently beyond the knowledge and project role respectively of DP. DP may be able, however, to assist the client in carrying out a risk assessment of potential hazards contained in the Comments section of this report, as an extension to the current scope of works, if so requested, and provided that suitable additional information is made available to DP. Any such risk assessment would, however, be necessarily restricted to the geotechnical components set out in this report and to their application by the project designers to project design, construction, maintenance and demolition.

Page 174: SITE CLASSIFICATION REPORT SUMMARY...Douglas Partners (DP) has prepared this report for this project at Taylor 2- Stage 3, Taylor in accordance with DP’s proposal dated 15 September

July 2010

Introduction These notes have been provided to amplify DP's report in regard to classification methods, field procedures and the comments section. Not all are necessarily relevant to all reports. DP's reports are based on information gained from limited subsurface excavations and sampling, supplemented by knowledge of local geology and experience. For this reason, they must be regarded as interpretive rather than factual documents, limited to some extent by the scope of information on which they rely. Copyright This report is the property of Douglas Partners Pty Ltd. The report may only be used for the purpose for which it was commissioned and in accordance with the Conditions of Engagement for the commission supplied at the time of proposal. Unauthorised use of this report in any form whatsoever is prohibited. Borehole and Test Pit Logs The borehole and test pit logs presented in this report are an engineering and/or geological interpretation of the subsurface conditions, and their reliability will depend to some extent on frequency of sampling and the method of drilling or excavation. Ideally, continuous undisturbed sampling or core drilling will provide the most reliable assessment, but this is not always practicable or possible to justify on economic grounds. In any case the boreholes and test pits represent only a very small sample of the total subsurface profile. Interpretation of the information and its application to design and construction should therefore take into account the spacing of boreholes or pits, the frequency of sampling, and the possibility of other than 'straight line' variations between the test locations. Groundwater Where groundwater levels are measured in boreholes there are several potential problems, namely: • In low permeability soils groundwater may

enter the hole very slowly or perhaps not at all during the time the hole is left open;

• A localised, perched water table may lead to an erroneous indication of the true water table;

• Water table levels will vary from time to time with seasons or recent weather changes. They may not be the same at the time of construction as are indicated in the report; and

• The use of water or mud as a drilling fluid will mask any groundwater inflow. Water has to be blown out of the hole and drilling mud must first be washed out of the hole if water measurements are to be made.

More reliable measurements can be made by installing standpipes which are read at intervals over several days, or perhaps weeks for low permeability soils. Piezometers, sealed in a particular stratum, may be advisable in low permeability soils or where there may be interference from a perched water table. Reports The report has been prepared by qualified personnel, is based on the information obtained from field and laboratory testing, and has been undertaken to current engineering standards of interpretation and analysis. Where the report has been prepared for a specific design proposal, the information and interpretation may not be relevant if the design proposal is changed. If this happens, DP will be pleased to review the report and the sufficiency of the investigation work. Every care is taken with the report as it relates to interpretation of subsurface conditions, discussion of geotechnical and environmental aspects, and recommendations or suggestions for design and construction. However, DP cannot always anticipate or assume responsibility for: • Unexpected variations in ground conditions.

The potential for this will depend partly on borehole or pit spacing and sampling frequency;

• Changes in policy or interpretations of policy by statutory authorities; or

• The actions of contractors responding to commercial pressures.

If these occur, DP will be pleased to assist with investigations or advice to resolve the matter.

Page 175: SITE CLASSIFICATION REPORT SUMMARY...Douglas Partners (DP) has prepared this report for this project at Taylor 2- Stage 3, Taylor in accordance with DP’s proposal dated 15 September

July 2010

Site Anomalies In the event that conditions encountered on site during construction appear to vary from those which were expected from the information contained in the report, DP requests that it be immediately notified. Most problems are much more readily resolved when conditions are exposed rather than at some later stage, well after the event. Information for Contractual Purposes Where information obtained from this report is provided for tendering purposes, it is recommended that all information, including the written report and discussion, be made available. In circumstances where the discussion or comments section is not relevant to the contractual situation, it may be appropriate to prepare a specially edited document. DP would be pleased to assist in this regard and/or to make additional report copies available for contract purposes at a nominal charge. Site Inspection The company will always be pleased to provide engineering inspection services for geotechnical and environmental aspects of work to which this report is related. This could range from a site visit to confirm that conditions exposed are as expected, to full time engineering presence on site.

Page 176: SITE CLASSIFICATION REPORT SUMMARY...Douglas Partners (DP) has prepared this report for this project at Taylor 2- Stage 3, Taylor in accordance with DP’s proposal dated 15 September

July 2010

Sampling Sampling is carried out during drilling or test pitting to allow engineering examination (and laboratory testing where required) of the soil or rock. Disturbed samples taken during drilling provide information on colour, type, inclusions and, depending upon the degree of disturbance, some information on strength and structure. Undisturbed samples are taken by pushing a thin-walled sample tube into the soil and withdrawing it to obtain a sample of the soil in a relatively undisturbed state. Such samples yield information on structure and strength, and are necessary for laboratory determination of shear strength and compressibility. Undisturbed sampling is generally effective only in cohesive soils. Test Pits Test pits are usually excavated with a backhoe or an excavator, allowing close examination of the in-situ soil if it is safe to enter into the pit. The depth of excavation is limited to about 3 m for a backhoe and up to 6 m for a large excavator. A potential disadvantage of this investigation method is the larger area of disturbance to the site. Large Diameter Augers Boreholes can be drilled using a rotating plate or short spiral auger, generally 300 mm or larger in diameter commonly mounted on a standard piling rig. The cuttings are returned to the surface at intervals (generally not more than 0.5 m) and are disturbed but usually unchanged in moisture content. Identification of soil strata is generally much more reliable than with continuous spiral flight augers, and is usually supplemented by occasional undisturbed tube samples. Continuous Spiral Flight Augers The borehole is advanced using 90-115 mm diameter continuous spiral flight augers which are withdrawn at intervals to allow sampling or in-situ testing. This is a relatively economical means of drilling in clays and sands above the water table. Samples are returned to the surface, or may be collected after withdrawal of the auger flights, but they are disturbed and may be mixed with soils from the sides of the hole. Information from the drilling (as distinct from specific sampling by SPTs or undisturbed samples) is of relatively low

reliability, due to the remoulding, possible mixing or softening of samples by groundwater. Non-core Rotary Drilling The borehole is advanced using a rotary bit, with water or drilling mud being pumped down the drill rods and returned up the annulus, carrying the drill cuttings. Only major changes in stratification can be determined from the cuttings, together with some information from the rate of penetration. Where drilling mud is used this can mask the cuttings and reliable identification is only possible from separate sampling such as SPTs. Continuous Core Drilling A continuous core sample can be obtained using a diamond tipped core barrel, usually with a 50 mm internal diameter. Provided full core recovery is achieved (which is not always possible in weak rocks and granular soils), this technique provides a very reliable method of investigation. Standard Penetration Tests Standard penetration tests (SPT) are used as a means of estimating the density or strength of soils and also of obtaining a relatively undisturbed sample. The test procedure is described in Australian Standard 1289, Methods of Testing Soils for Engineering Purposes - Test 6.3.1. The test is carried out in a borehole by driving a 50 mm diameter split sample tube under the impact of a 63 kg hammer with a free fall of 760 mm. It is normal for the tube to be driven in three successive 150 mm increments and the 'N' value is taken as the number of blows for the last 300 mm. In dense sands, very hard clays or weak rock, the full 450 mm penetration may not be practicable and the test is discontinued. The test results are reported in the following form. • In the case where full penetration is obtained

with successive blow counts for each 150 mm of, say, 4, 6 and 7 as:

4,6,7 N=13

• In the case where the test is discontinued before the full penetration depth, say after 15 blows for the first 150 mm and 30 blows for the next 40 mm as:

15, 30/40 mm

Page 177: SITE CLASSIFICATION REPORT SUMMARY...Douglas Partners (DP) has prepared this report for this project at Taylor 2- Stage 3, Taylor in accordance with DP’s proposal dated 15 September

July 2010

The results of the SPT tests can be related empirically to the engineering properties of the soils. Dynamic Cone Penetrometer Tests / Perth Sand Penetrometer Tests Dynamic penetrometer tests (DCP or PSP) are carried out by driving a steel rod into the ground using a standard weight of hammer falling a specified distance. As the rod penetrates the soil the number of blows required to penetrate each successive 150 mm depth are recorded. Normally there is a depth limitation of 1.2 m, but this may be extended in certain conditions by the use of extension rods. Two types of penetrometer are commonly used. • Perth sand penetrometer - a 16 mm diameter

flat ended rod is driven using a 9 kg hammer dropping 600 mm (AS 1289, Test 6.3.3). This test was developed for testing the density of sands and is mainly used in granular soils and filling.

• Cone penetrometer - a 16 mm diameter rod with a 20 mm diameter cone end is driven using a 9 kg hammer dropping 510 mm (AS 1289, Test 6.3.2). This test was developed initially for pavement subgrade investigations, and correlations of the test results with California Bearing Ratio have been published by various road authorities.

Page 178: SITE CLASSIFICATION REPORT SUMMARY...Douglas Partners (DP) has prepared this report for this project at Taylor 2- Stage 3, Taylor in accordance with DP’s proposal dated 15 September

May 2017

Description and Classification Methods The methods of description and classification of

soils and rocks used in this report are based on

Australian Standard AS 1726-1993, Geotechnical

Site Investigations Code. In general, the

descriptions include strength or density, colour,

structure, soil or rock type and inclusions.

Soil Types Soil types are described according to the

predominant particle size, qualified by the grading

of other particles present:

Type Particle size (mm)

Boulder >200

Cobble 63 - 200

Gravel 2.36 - 63

Sand 0.075 - 2.36

Silt 0.002 - 0.075

Clay <0.002

The sand and gravel sizes can be further

subdivided as follows:

Type Particle size (mm)

Coarse gravel 20 - 63

Medium gravel 6 - 20

Fine gravel 2.36 - 6

Coarse sand 0.6 - 2.36

Medium sand 0.2 - 0.6

Fine sand 0.075 - 0.2

The proportions of secondary constituents of soils

are described as:

Term Proportion Example

And Specify Clay (60%) and

Sand (40%)

Adjective 20 - 35% Sandy Clay

Slightly 12 - 20% Slightly Sandy

Clay

With some 5 - 12% Clay with some

sand

With a trace of 0 - 5% Clay with a trace

of sand

Definitions of grading terms used are:

• Well graded - a good representation of all

particle sizes

• Poorly graded - an excess or deficiency of

particular sizes within the specified range

• Uniformly graded - an excess of a particular

particle size

• Gap graded - a deficiency of a particular

particle size with the range

Cohesive Soils Cohesive soils, such as clays, are classified on the

basis of undrained shear strength. The strength

may be measured by laboratory testing, or

estimated by field tests or engineering

examination. The strength terms are defined as

follows:

Description Abbreviation Undrained shear strength

(kPa)

Very soft vs <12

Soft s 12 - 25

Firm f 25 - 50

Stiff st 50 - 100

Very stiff vst 100 - 200

Hard h >200

Cohesionless Soils Cohesionless soils, such as clean sands, are

classified on the basis of relative density, generally

from the results of standard penetration tests

(SPT), cone penetration tests (CPT) or dynamic

penetrometers (PSP). The relative density terms

are given below:

Relative Density

Abbreviation SPT N value

CPT qc value (MPa)

Very loose vl <4 <2

Loose l 4 - 10 2 -5

Medium

dense

md 10 - 30 5 - 15

Dense d 30 - 50 15 - 25

Very

dense

vd >50 >25

Page 179: SITE CLASSIFICATION REPORT SUMMARY...Douglas Partners (DP) has prepared this report for this project at Taylor 2- Stage 3, Taylor in accordance with DP’s proposal dated 15 September

May 2017

Soil Origin It is often difficult to accurately determine the origin

of a soil. Soils can generally be classified as:

• Residual soil - derived from in-situ weathering

of the underlying rock;

• Transported soils - formed somewhere else

and transported by nature to the site; or

• Filling - moved by man.

Transported soils may be further subdivided into:

• Alluvium - river deposits

• Lacustrine - lake deposits

• Aeolian - wind deposits

• Littoral - beach deposits

• Estuarine - tidal river deposits

• Talus - scree or coarse colluvium

• Slopewash or Colluvium - transported

downslope by gravity assisted by water.

Often includes angular rock fragments and

boulders.

Page 180: SITE CLASSIFICATION REPORT SUMMARY...Douglas Partners (DP) has prepared this report for this project at Taylor 2- Stage 3, Taylor in accordance with DP’s proposal dated 15 September

May 2017

Rock Strength Rock strength is defined by the Point Load Strength Index (Is(50)) and refers to the strength of the rock

substance and not the strength of the overall rock mass, which may be considerably weaker due to defects.

The test procedure is described by Australian Standard 4133.4.1 - 2007. The terms used to describe rock

strength are as follows:

Term Abbreviation Point Load Index

Is(50) MPa

Approximate Unconfined Compressive Strength MPa*

Extremely low EL <0.03 <0.6

Very low VL 0.03 - 0.1 0.6 - 2

Low L 0.1 - 0.3 2 - 6

Medium M 0.3 - 1.0 6 - 20

High H 1 - 3 20 - 60

Very high VH 3 - 10 60 - 200

Extremely high EH >10 >200

* Assumes a ratio of 20:1 for UCS to Is(50). It should be noted that the UCS to Is(50) ratio varies significantly

for different rock types and specific ratios should be determined for each site.

Degree of Weathering The degree of weathering of rock is classified as follows:

Term Abbreviation Description

Extremely weathered EW Rock substance has soil properties, i.e. it can be remoulded and classified as a soil but the texture of the original rock is still evident.

Highly weathered HW Limonite staining or bleaching affects whole of rock substance and other signs of decomposition are evident. Porosity and strength may be altered as a result of iron leaching or deposition. Colour and strength of original fresh rock is not recognisable

Moderately weathered

MW Staining and discolouration of rock substance has taken place

Slightly weathered SW Rock substance is slightly discoloured but shows little or no change of strength from fresh rock

Fresh stained Fs Rock substance unaffected by weathering but staining visible along defects

Fresh Fr No signs of decomposition or staining

Degree of Fracturing The following classification applies to the spacing of natural fractures in diamond drill cores. It includes

bedding plane partings, joints and other defects, but excludes drilling breaks.

Term Description

Fragmented Fragments of <20 mm

Highly Fractured Core lengths of 20-40 mm with some fragments

Fractured Core lengths of 40-200 mm with some shorter and longer sections

Slightly Fractured Core lengths of 200-1000 mm with some shorter and longer sections

Unbroken Core lengths mostly > 1000 mm

Page 181: SITE CLASSIFICATION REPORT SUMMARY...Douglas Partners (DP) has prepared this report for this project at Taylor 2- Stage 3, Taylor in accordance with DP’s proposal dated 15 September

May 2017

Rock Quality Designation The quality of the cored rock can be measured using the Rock Quality Designation (RQD) index, defined

as:

RQD % = cumulative length of 'sound' core sections ≥ 100 mm long

total drilled length of section being assessed

where 'sound' rock is assessed to be rock of low strength or better. The RQD applies only to natural

fractures. If the core is broken by drilling or handling (i.e. drilling breaks) then the broken pieces are fitted

back together and are not included in the calculation of RQD.

Stratification Spacing For sedimentary rocks the following terms may be used to describe the spacing of bedding partings:

Term Separation of Stratification Planes

Thinly laminated < 6 mm

Laminated 6 mm to 20 mm

Very thinly bedded 20 mm to 60 mm

Thinly bedded 60 mm to 0.2 m

Medium bedded 0.2 m to 0.6 m

Thickly bedded 0.6 m to 2 m

Very thickly bedded > 2 m

Page 182: SITE CLASSIFICATION REPORT SUMMARY...Douglas Partners (DP) has prepared this report for this project at Taylor 2- Stage 3, Taylor in accordance with DP’s proposal dated 15 September

May 2017

Introduction These notes summarise abbreviations commonly

used on borehole logs and test pit reports.

Drilling or Excavation Methods C Core drilling

R Rotary drilling

SFA Spiral flight augers

NMLC Diamond core - 52 mm dia

NQ Diamond core - 47 mm dia

HQ Diamond core - 63 mm dia

PQ Diamond core - 81 mm dia

Water � Water seep

� Water level

Sampling and Testing A Auger sample

B Bulk sample

D Disturbed sample

E Environmental sample

U50 Undisturbed tube sample (50mm)

W Water sample

pp Pocket penetrometer (kPa)

PID Photo ionisation detector

PL Point load strength Is(50) MPa

S Standard Penetration Test

V Shear vane (kPa)

Description of Defects in Rock The abbreviated descriptions of the defects should

be in the following order: Depth, Type, Orientation,

Coating, Shape, Roughness and Other. Drilling

and handling breaks are not usually included on

the logs.

Defect Type

B Bedding plane

Cs Clay seam

Cv Cleavage

Cz Crushed zone

Ds Decomposed seam

F Fault

J Joint

Lam Lamination

Pt Parting

Sz Sheared Zone

V Vein

Orientation

The inclination of defects is always measured from

the perpendicular to the core axis.

h horizontal

v vertical

sh sub-horizontal

sv sub-vertical

Coating or Infilling Term

cln clean

co coating

he healed

inf infilled

stn stained

ti tight

vn veneer

Coating Descriptor

ca calcite

cbs carbonaceous

cly clay

fe iron oxide

mn manganese

slt silty

Shape

cu curved

ir irregular

pl planar

st stepped

un undulating

Roughness

po polished

ro rough

sl slickensided

sm smooth

vr very rough

Other

fg fragmented

bnd band

qtz quartz

Page 183: SITE CLASSIFICATION REPORT SUMMARY...Douglas Partners (DP) has prepared this report for this project at Taylor 2- Stage 3, Taylor in accordance with DP’s proposal dated 15 September

May 2017

Graphic Symbols for Soil and Rock General

Soils

Sedimentary Rocks

Metamorphic Rocks

Igneous Rocks

Road base

Filling

Concrete

Asphalt

Topsoil

Peat

Clay

Conglomeratic sandstone

Conglomerate

Boulder conglomerate

Sandstone

Slate, phyllite, schist

Siltstone

Mudstone, claystone, shale

Coal

Limestone

Porphyry

Cobbles, boulders

Sandy gravel

Laminite

Silty sand

Clayey sand

Silty clay

Sandy clay

Gravelly clay

Shaly clay

Silt

Clayey silt

Sandy silt

Sand

Gravel

Talus

Gneiss

Quartzite

Dolerite, basalt, andesite

Granite

Tuff, breccia

Dacite, epidote

Page 184: SITE CLASSIFICATION REPORT SUMMARY...Douglas Partners (DP) has prepared this report for this project at Taylor 2- Stage 3, Taylor in accordance with DP’s proposal dated 15 September

ͱ·´ ̧°»­

̸» ¬§°»­ ±º ­±·´­ «­«¿´´§ °®»­»²¬ «²¼»® ¬¸» ¬±°­±·´ ·² ´¿²¼ ¦±²»¼ º±®®»­·¼»²¬·¿´ ¾«·´¼·²¹­ ½¿² ¾» ­°´·¬ ·²¬± ¬©± ¿°°®±¨·³¿¬» ¹®±«°­ P¹®¿²«´¿® ¿²¼ ½´¿§ò Ï«·¬» ±º¬»²ô º±«²¼¿¬·±² ­±·´ ·­ ¿ ³·¨¬«®» ±º ¾±¬¸¬§°»­ò ̸» ¹»²»®¿´ °®±¾´»³­ ¿­­±½·¿¬»¼ ©·¬¸ ­±·´­ ¸¿ª·²¹ ¹®¿²«´¿®½±²¬»²¬ ¿®» «­«¿´´§ ½¿«­»¼ ¾§ »®±­·±²ò Ý´¿§ ­±·´­ ¿®» ­«¾¶»½¬ ¬±­¿¬«®¿¬·±² ¿²¼ ­©»´´ñ­¸®·²µ °®±¾´»³­ò

Ý´¿­­·º·½¿¬·±²­ º±® ¿ ¹·ª»² ¿®»¿ ½¿² ¹»²»®¿´´§ ¾» ±¾¬¿·²»¼ ¾§¿°°´·½¿¬·±² ¬± ¬¸» ´±½¿´ ¿«¬¸±®·¬§ô ¾«¬ ¬¸»­» ¿®» ­±³»¬·³»­ «²®»´·¿¾´»¿²¼ ·º ¬¸»®» ·­ ¼±«¾¬ô ¿ ¹»±¬»½¸²·½¿´ ®»°±®¬ ­¸±«´¼ ¾» ½±³³·­­·±²»¼òß­ ³±­¬ ¾«·´¼·²¹­ ­«ºº»®·²¹ ³±ª»³»²¬ °®±¾´»³­ ¿®» º±«²¼»¼ ±² ½´¿§­±·´­ô ¬¸»®» ·­ ¿² »³°¸¿­·­ ±² ½´¿­­·º·½¿¬·±² ±º ­±·´­ ¿½½±®¼·²¹ ¬± ¬¸»¿³±«²¬ ±º ­©»´´ ¿²¼ ­¸®·²µ¿¹» ¬¸»§ »¨°»®·»²½» ©·¬¸ ª¿®·¿¬·±²­ ±º©¿¬»® ½±²¬»²¬ò ̸» ¬¿¾´» ¾»´±© ·­ Ì¿¾´» îòï º®±³ ßÍ îèéðô ¬¸»Î»­·¼»²¬·¿´ Í´¿¾ ¿²¼ Ú±±¬·²¹ ݱ¼»ò

Ý¿«­»­ ±º Ó±ª»³»²¬

Í»¬¬´»³»²¬ ¼«» ¬± ½±²­¬®«½¬·±²Ì¸»®» ¿®» ¬©± ¬§°»­ ±º ­»¬¬´»³»²¬ ¬¸¿¬ ±½½«® ¿­ ¿ ®»­«´¬ ±º½±²­¬®«½¬·±²æ{ ׳³»¼·¿¬» ­»¬¬´»³»²¬ ±½½«®­ ©¸»² ¿ ¾«·´¼·²¹ ·­ º·®­¬ °´¿½»¼ ±² ·¬­

º±«²¼¿¬·±² ­±·´ô ¿­ ¿ ®»­«´¬ ±º ½±³°¿½¬·±² ±º ¬¸» ­±·´ «²¼»® ¬¸»©»·¹¸¬ ±º ¬¸» ­¬®«½¬«®»ò ̸» ½±¸»­·ª» ¯«¿´·¬§ ±º ½´¿§ ­±·´ ³·¬·¹¿¬»­¿¹¿·²­¬ ¬¸·­ô ¾«¬ ¹®¿²«´¿® ø°¿®¬·½«´¿®´§ ­¿²¼§÷ ­±·´ ·­ ­«­½»°¬·¾´»ò

{ ݱ²­±´·¼¿¬·±² ­»¬¬´»³»²¬ ·­ ¿ º»¿¬«®» ±º ½´¿§ ­±·´ ¿²¼ ³¿§ ¬¿µ»°´¿½» ¾»½¿«­» ±º ¬¸» »¨°«´­·±² ±º ³±·­¬«®» º®±³ ¬¸» ­±·´ ±® ¾»½¿«­»±º ¬¸» ­±·´K­ ´¿½µ ±º ®»­·­¬¿²½» ¬± ´±½¿´ ½±³°®»­­·ª» ±® ­¸»¿® ­¬®»­­»­ò̸·­ ©·´´ «­«¿´´§ ¬¿µ» °´¿½» ¼«®·²¹ ¬¸» º·®­¬ º»© ³±²¬¸­ ¿º¬»®½±²­¬®«½¬·±²ô ¾«¬ ¸¿­ ¾»»² µ²±©² ¬± ¬¿µ» ³¿²§ §»¿®­ ·²»¨½»°¬·±²¿´ ½¿­»­ò

̸»­» °®±¾´»³­ ¿®» ¬¸» °®±ª·²½» ±º ¬¸» ¾«·´¼»® ¿²¼ ­¸±«´¼ ¾» ¬¿µ»²·²¬± ½±²­·¼»®¿¬·±² ¿­ °¿®¬ ±º ¬¸» °®»°¿®¿¬·±² ±º ¬¸» ­·¬» º±® ½±²­¬®«½ó¬·±²ò Þ«·´¼·²¹ Ì»½¸²±´±¹§ Ú·´» ïç øÞÌÚ ïç÷ ¼»¿´­ ©·¬¸ ¬¸»­»°®±¾´»³­ò

Û®±­·±²ß´´ ­±·´­ ¿®» °®±²» ¬± »®±­·±²ô ¾«¬ ­¿²¼§ ­±·´ ·­ °¿®¬·½«´¿®´§ ­«­½»°¬·¾´»¬± ¾»·²¹ ©¿­¸»¼ ¿©¿§ò Ûª»² ½´¿§ ©·¬¸ ¿ ­¿²¼ ½±³°±²»²¬ ±º ­¿§ ïðû±® ³±®» ½¿² ­«ºº»® º®±³ »®±­·±²ò

Í¿¬«®¿¬·±²Ì¸·­ ·­ °¿®¬·½«´¿®´§ ¿ °®±¾´»³ ·² ½´¿§ ­±·´­ò Í¿¬«®¿¬·±² ½®»¿¬»­ ¿ ¾±¹ó´·µ» ­«­°»²­·±² ±º ¬¸» ­±·´ ¬¸¿¬ ½¿«­»­ ·¬ ¬± ´±­» ª·®¬«¿´´§ ¿´´ ±º ·¬­¾»¿®·²¹ ½¿°¿½·¬§ò ̱ ¿ ´»­­»® ¼»¹®»»ô ­¿²¼ ·­ ¿ºº»½¬»¼ ¾§ ­¿¬«®¿¬·±²¾»½¿«­» ­¿¬«®¿¬»¼ ­¿²¼ ³¿§ «²¼»®¹± ¿ ®»¼«½¬·±² ·² ª±´«³» P°¿®¬·½«´¿®´§ ·³°±®¬»¼ ­¿²¼ º·´´ º±® ¾»¼¼·²¹ ¿²¼ ¾´·²¼·²¹ ´¿§»®­òر©»ª»®ô ¬¸·­ «­«¿´´§ ±½½«®­ ¿­ ·³³»¼·¿¬» ­»¬¬´»³»²¬ ¿²¼ ­¸±«´¼²±®³¿´´§ ¾» ¬¸» °®±ª·²½» ±º ¬¸» ¾«·´¼»®ò

Í»¿­±²¿´ ­©»´´·²¹ ¿²¼ ­¸®·²µ¿¹» ±º ­±·´ß´´ ½´¿§­ ®»¿½¬ ¬± ¬¸» °®»­»²½» ±º ©¿¬»® ¾§ ­´±©´§ ¿¾­±®¾·²¹ ·¬ô ³¿µ·²¹¬¸» ­±·´ ·²½®»¿­» ·² ª±´«³» ø­»» ¬¿¾´» ¾»´±©÷ò ̸» ¼»¹®»» ±º ·²½®»¿­»ª¿®·»­ ½±²­·¼»®¿¾´§ ¾»¬©»»² ¼·ºº»®»²¬ ½´¿§­ô ¿­ ¼±»­ ¬¸» ¼»¹®»» ±º¼»½®»¿­» ¼«®·²¹ ¬¸» ­«¾­»¯«»²¬ ¼®§·²¹ ±«¬ ½¿«­»¼ ¾§ º¿·® ©»¿¬¸»®°»®·±¼­ò Þ»½¿«­» ±º ¬¸» ´±© ¿¾­±®°¬·±² ¿²¼ »¨°«´­·±² ®¿¬»ô ¬¸·­°¸»²±³»²±² ©·´´ ²±¬ «­«¿´´§ ¾» ²±¬·½»¿¾´» «²´»­­ ¬¸»®» ¿®»°®±´±²¹»¼ ®¿·²§ ±® ¼®§ °»®·±¼­ô «­«¿´´§ ±º ©»»µ­ ±® ³±²¬¸­ô¼»°»²¼·²¹ ±² ¬¸» ´¿²¼ ¿²¼ ­±·´ ½¸¿®¿½¬»®·­¬·½­ò

̸» ­©»´´·²¹ ±º ­±·´ ½®»¿¬»­ ¿² «°©¿®¼ º±®½» ±² ¬¸» º±±¬·²¹­ ±º ¬¸»¾«·´¼·²¹ô ¿²¼ ­¸®·²µ¿¹» ½®»¿¬»­ ­«¾­·¼»²½» ¬¸¿¬ ¬¿µ»­ ¿©¿§ ¬¸»­«°°±®¬ ²»»¼»¼ ¾§ ¬¸» º±±¬·²¹ ¬± ®»¬¿·² »¯«·´·¾®·«³ò

͸»¿® º¿·´«®»Ì¸·­ °¸»²±³»²±² ±½½«®­ ©¸»² ¬¸» º±«²¼¿¬·±² ­±·´ ¼±»­ ²±¬ ¸¿ª»­«ºº·½·»²¬ ­¬®»²¹¬¸ ¬± ­«°°±®¬ ¬¸» ©»·¹¸¬ ±º ¬¸» º±±¬·²¹ò ̸»®» ¿®»¬©± ³¿¶±® °±­¬ó½±²­¬®«½¬·±² ½¿«­»­æ

{ Í·¹²·º·½¿²¬ ´±¿¼ ·²½®»¿­»ò{ λ¼«½¬·±² ±º ´¿¬»®¿´ ­«°°±®¬ ±º ¬¸» ­±·´ «²¼»® ¬¸» º±±¬·²¹ ¼«» ¬±

»®±­·±² ±® »¨½¿ª¿¬·±²ò{ ײ ½´¿§ ­±·´ô ­¸»¿® º¿·´«®» ½¿² ¾» ½¿«­»¼ ¾§ ­¿¬«®¿¬·±² ±º ¬¸» ­±·´

¿¼¶¿½»²¬ ¬± ±® «²¼»® ¬¸» º±±¬·²¹ò

Þ«·´¼·²¹­ ½¿² ¿²¼ ±º¬»² ¼± ³±ª»ò ̸·­ ³±ª»³»²¬ ½¿² ¾» «°ô ¼±©²ô ´¿¬»®¿´ ±® ®±¬¿¬·±²¿´ò ̸» º«²¼¿³»²¬¿´ ½¿«­»±º ³±ª»³»²¬ ·² ¾«·´¼·²¹­ ½¿² «­«¿´´§ ¾» ®»´¿¬»¼ ¬± ±²» ±® ³±®» °®±¾´»³­ ·² ¬¸» º±«²¼¿¬·±² ­±·´ò ׬ ·­ ·³°±®¬¿²¬ º±®¬¸» ¸±³»±©²»® ¬± ·¼»²¬·º§ ¬¸» ­±·´ ¬§°» ·² ±®¼»® ¬± ¿­½»®¬¿·² ¬¸» ³»¿­«®»­ ¬¸¿¬ ­¸±«´¼ ¾» °«¬ ·² °´¿½» ·² ±®¼»® ¬±»²­«®» ¬¸¿¬ °®±¾´»³­ ·² ¬¸» º±«²¼¿¬·±² ­±·´ ½¿² ¾» °®»ª»²¬»¼ô ¬¸«­ °®±¬»½¬·²¹ ¿¹¿·²­¬ ¾«·´¼·²¹ ³±ª»³»²¬ò

̸·­ Þ«·´¼·²¹ Ì»½¸²±´±¹§ Ú·´» ·­ ¼»­·¹²»¼ ¬± ·¼»²¬·º§ ½¿«­»­ ±º ­±·´ó®»´¿¬»¼ ¾«·´¼·²¹ ³±ª»³»²¬ô ¿²¼ ¬± ­«¹¹»­¬³»¬¸±¼­ ±º °®»ª»²¬·±² ±º ®»­«´¬¿²¬ ½®¿½µ·²¹ ·² ¾«·´¼·²¹­ò

Ú±«²¼¿¬·±² Ó¿·²¬»²¿²½»¿²¼ Ú±±¬·²¹ л®º±®³¿²½»æß Ø±³»±©²»®K­ Ù«·¼»

ÙÛÒÛÎßÔ ÜÛÚ×Ò×Ì×ÑÒÍ ÑÚ Í×ÌÛ ÝÔßÍÍÛÍ

Ý´¿­­ Ú±«²¼¿¬·±²

ß Ó±­¬ ­¿²¼ ¿²¼ ®±½µ ­·¬»­ ©·¬¸ ´·¬¬´» ±® ²± ¹®±«²¼ ³±ª»³»²¬ º®±³ ³±·­¬«®» ½¸¿²¹»­

Í Í´·¹¸¬´§ ®»¿½¬·ª» ½´¿§ ­·¬»­ ©·¬¸ ±²´§ ­´·¹¸¬ ¹®±«²¼ ³±ª»³»²¬ º®±³ ³±·­¬«®» ½¸¿²¹»­

Ó Ó±¼»®¿¬»´§ ®»¿½¬·ª» ½´¿§ ±® ­·´¬ ­·¬»­ô ©¸·½¸ ½¿² »¨°»®·»²½» ³±¼»®¿¬» ¹®±«²¼ ³±ª»³»²¬ º®±³ ³±·­¬«®» ½¸¿²¹»­

Ø Ø·¹¸´§ ®»¿½¬·ª» ½´¿§ ­·¬»­ô ©¸·½¸ ½¿² »¨°»®·»²½» ¸·¹¸ ¹®±«²¼ ³±ª»³»²¬ º®±³ ³±·­¬«®» ½¸¿²¹»­

Û Û¨¬®»³»´§ ®»¿½¬·ª» ­·¬»­ô ©¸·½¸ ½¿² »¨°»®·»²½» »¨¬®»³» ¹®±«²¼ ³±ª»³»²¬ º®±³ ³±·­¬«®» ½¸¿²¹»­

ß ¬± Ð Ú·´´»¼ ­·¬»­

Ð Í·¬»­ ©¸·½¸ ·²½´«¼» ­±º¬ ­±·´­ô ­«½¸ ¿­ ­±º¬ ½´¿§ ±® ­·´¬ ±® ´±±­» ­¿²¼­å ´¿²¼­´·°å ³·²» ­«¾­·¼»²½»å ½±´´¿°­·²¹ ­±·´­å ­±·´­ ­«¾¶»½¬¬± »®±­·±²å ®»¿½¬·ª» ­·¬»­ ­«¾¶»½¬ ¬± ¿¾²±®³¿´ ³±·­¬«®» ½±²¼·¬·±²­ ±® ­·¬»­ ©¸·½¸ ½¿²²±¬ ¾» ½´¿­­·º·»¼ ±¬¸»®©·­»

ÞÌÚ ïè®»°´¿½»­

ײº±®³¿¬·±²Í¸»»¬ ïðñçï

Page 185: SITE CLASSIFICATION REPORT SUMMARY...Douglas Partners (DP) has prepared this report for this project at Taylor 2- Stage 3, Taylor in accordance with DP’s proposal dated 15 September

Ì®»» ®±±¬ ¹®±©¬¸Ì®»»­ ¿²¼ ­¸®«¾­ ¬¸¿¬ ¿®» ¿´´±©»¼ ¬± ¹®±© ·² ¬¸» ª·½·²·¬§ ±º º±±¬·²¹­½¿² ½¿«­» º±«²¼¿¬·±² ­±·´ ³±ª»³»²¬ ·² ¬©± ©¿§­æ

{ ᱬ­ ¬¸¿¬ ¹®±© «²¼»® º±±¬·²¹­ ³¿§ ·²½®»¿­» ·² ½®±­­ó­»½¬·±²¿´­·¦»ô »¨»®¬·²¹ «°©¿®¼ °®»­­«®» ±² º±±¬·²¹­ò

{ ᱬ­ ·² ¬¸» ª·½·²·¬§ ±º º±±¬·²¹­ ©·´´ ¿¾­±®¾ ³«½¸ ±º ¬¸» ³±·­¬«®»·² ¬¸» º±«²¼¿¬·±² ­±·´ô ½¿«­·²¹ ­¸®·²µ¿¹» ±® ­«¾­·¼»²½»ò

˲»ª»²²»­­ ±º Ó±ª»³»²¬

̸» ¬§°»­ ±º ¹®±«²¼ ³±ª»³»²¬ ¼»­½®·¾»¼ ¿¾±ª» «­«¿´´§ ±½½«®«²»ª»²´§ ¬¸®±«¹¸±«¬ ¬¸» ¾«·´¼·²¹K­ º±«²¼¿¬·±² ­±·´ò Í»¬¬´»³»²¬ ¼«»¬± ½±²­¬®«½¬·±² ¬»²¼­ ¬± ¾» «²»ª»² ¾»½¿«­» ±ºæ

{ Ü·ºº»®·²¹ ½±³°¿½¬·±² ±º º±«²¼¿¬·±² ­±·´ °®·±® ¬± ½±²­¬®«½¬·±²ò

{ Ü·ºº»®·²¹ ³±·­¬«®» ½±²¬»²¬ ±º º±«²¼¿¬·±² ­±·´ °®·±® ¬± ½±²­¬®«½¬·±²ò

Ó±ª»³»²¬ ¼«» ¬± ²±²ó½±²­¬®«½¬·±² ½¿«­»­ ·­ «­«¿´´§ ³±®» «²»ª»²­¬·´´ò Û®±­·±² ½¿² «²¼»®³·²» ¿ º±±¬·²¹ ¬¸¿¬ ¬®¿ª»®­»­ ¬¸» º´±© ±® ½¿²½®»¿¬» ¬¸» ½±²¼·¬·±²­ º±® ­¸»¿® º¿·´«®» ¾§ »®±¼·²¹ ­±·´ ¿¼¶¿½»²¬ ¬± ¿º±±¬·²¹ ¬¸¿¬ ®«²­ ·² ¬¸» ­¿³» ¼·®»½¬·±² ¿­ ¬¸» º´±©ò

Í¿¬«®¿¬·±² ±º ½´¿§ º±«²¼¿¬·±² ­±·´ ³¿§ ±½½«® ©¸»®» ­«¾º´±±® ©¿´´­½®»¿¬» ¿ ¼¿³ ¬¸¿¬ ³¿µ»­ ©¿¬»® °±²¼ò ׬ ½¿² ¿´­± ±½½«® ©¸»®»ª»® ¬¸»®»·­ ¿ ­±«®½» ±º ©¿¬»® ²»¿® º±±¬·²¹­ ·² ½´¿§ ­±·´ò ̸·­ ´»¿¼­ ¬± ¿ ­»ª»®»®»¼«½¬·±² ·² ¬¸» ­¬®»²¹¬¸ ±º ¬¸» ­±·´ ©¸·½¸ ³¿§ ½®»¿¬» ´±½¿´ ­¸»¿®º¿·´«®»ò

Í»¿­±²¿´ ­©»´´·²¹ ¿²¼ ­¸®·²µ¿¹» ±º ½´¿§ ­±·´ ¿ºº»½¬­ ¬¸» °»®·³»¬»® ±º¬¸» ¾«·´¼·²¹ º·®­¬ô ¬¸»² ¹®¿¼«¿´´§ ­°®»¿¼­ ¬± ¬¸» ·²¬»®·±®ò ̸» ­©»´´·²¹°®±½»­­ ©·´´ «­«¿´´§ ¾»¹·² ¿¬ ¬¸» «°¸·´´ »¨¬®»³» ±º ¬¸» ¾«·´¼·²¹ô ±® ±²¬¸» ©»¿¬¸»® ­·¼» ©¸»®» ¬¸» ´¿²¼ ·­ º´¿¬ò Í©»´´·²¹ ¹®¿¼«¿´´§ ®»¿½¸»­ ¬¸»·²¬»®·±® ­±·´ ¿­ ¿¾­±®°¬·±² ½±²¬·²«»­ò ͸®·²µ¿¹» «­«¿´´§ ¾»¹·²­ ©¸»®»¬¸» ­«²K­ ¸»¿¬ ·­ ¹®»¿¬»­¬ò

Ûºº»½¬­ ±º ˲»ª»² ͱ·´ Ó±ª»³»²¬ ±² ͬ®«½¬«®»­

Û®±­·±² ¿²¼ ­¿¬«®¿¬·±²Û®±­·±² ®»³±ª»­ ¬¸» ­«°°±®¬ º®±³ «²¼»® º±±¬·²¹­ô ¬»²¼·²¹ ¬± ½®»¿¬»­«¾­·¼»²½» ±º ¬¸» °¿®¬ ±º ¬¸» ­¬®«½¬«®» «²¼»® ©¸·½¸ ·¬ ±½½«®­òÞ®·½µ©±®µ ©¿´´­ ©·´´ ®»­·­¬ ¬¸» ­¬®»­­ ½®»¿¬»¼ ¾§ ¬¸·­ ®»³±ª¿´ ±º­«°°±®¬ ¾§ ¾®·¼¹·²¹ ¬¸» ¹¿° ±® ½¿²¬·´»ª»®·²¹ «²¬·´ ¬¸» ¾®·½µ­ ±® ¬¸»³±®¬¿® ¾»¼¼·²¹ º¿·´ò Ñ´¼»® ³¿­±²®§ ¸¿­ ´·¬¬´» ®»­·­¬¿²½»ò Ûª·¼»²½» ±ºº¿·´«®» ª¿®·»­ ¿½½±®¼·²¹ ¬± ½·®½«³­¬¿²½»­ ¿²¼ ­§³°¬±³­ ³¿§ ·²½´«¼»æ

{ ͬ»° ½®¿½µ·²¹ ·² ¬¸» ³±®¬¿® ¾»¼­ ·² ¬¸» ¾±¼§ ±º ¬¸» ©¿´´ ±®¿¾±ª»ñ¾»´±© ±°»²·²¹­ ­«½¸ ¿­ ¼±±®­ ±® ©·²¼±©­ò

{ Ê»®¬·½¿´ ½®¿½µ·²¹ ·² ¬¸» ¾®·½µ­ ø«­«¿´´§ ¾«¬ ²±¬ ²»½»­­¿®·´§ ·² ´·²»©·¬¸ ¬¸» ª»®¬·½¿´ ¾»¼­ ±® °»®°»²¼­÷ò

×­±´¿¬»¼ °·»®­ ¿ºº»½¬»¼ ¾§ »®±­·±² ±® ­¿¬«®¿¬·±² ±º º±«²¼¿¬·±²­ ©·´´»ª»²¬«¿´´§ ´±­» ½±²¬¿½¬ ©·¬¸ ¬¸» ¾»¿®»®­ ¬¸»§ ­«°°±®¬ ¿²¼ ³¿§ ¬·´¬ ±®º¿´´ ±ª»®ò ̸» º´±±®­ ¬¸¿¬ ¸¿ª» ´±­¬ ¬¸·­ ­«°°±®¬ ©·´´ ¾»½±³» ¾±«²½§ô­±³»¬·³»­ ®¿¬¬´·²¹ ±®²¿³»²¬­ »¬½ò

Í»¿­±²¿´ ­©»´´·²¹ñ­¸®·²µ¿¹» ·² ½´¿§Í©»´´·²¹ º±«²¼¿¬·±² ­±·´ ¼«» ¬± ®¿·²§ °»®·±¼­ º·®­¬ ´·º¬­ ¬¸» ³±­¬»¨°±­»¼ »¨¬®»³·¬·»­ ±º ¬¸» º±±¬·²¹ ­§­¬»³ô ¬¸»² ¬¸» ®»³¿·²¼»® ±º ¬¸»°»®·³»¬»® º±±¬·²¹­ ©¸·´» ¹®¿¼«¿´´§ °»®³»¿¬·²¹ ·²­·¼» ¬¸» ¾«·´¼·²¹º±±¬°®·²¬ ¬± ´·º¬ ·²¬»®²¿´ º±±¬·²¹­ò ̸·­ ­©»´´·²¹ º·®­¬ ¬»²¼­ ¬± ½®»¿¬» ¿¼·­¸ »ºº»½¬ô ¾»½¿«­» ¬¸» »¨¬»®²¿´ º±±¬·²¹­ ¿®» °«­¸»¼ ¸·¹¸»® ¬¸¿² ¬¸»·²¬»®²¿´ ±²»­ò

̸» º·®­¬ ²±¬·½»¿¾´» ­§³°¬±³ ³¿§ ¾» ¬¸¿¬ ¬¸» º´±±® ¿°°»¿®­ ­´·¹¸¬´§¼·­¸»¼ò ̸·­ ·­ ±º¬»² ¿½½±³°¿²·»¼ ¾§ ­±³» ¼±±®­ ¾·²¼·²¹ ±² ¬¸»º´±±® ±® ¬¸» ¼±±® ¸»¿¼ô ¬±¹»¬¸»® ©·¬¸ ­±³» ½®¿½µ·²¹ ±º ½±®²·½»³·¬®»­ò ײ ¾«·´¼·²¹­ ©·¬¸ ¬·³¾»® º´±±®·²¹ ­«°°±®¬»¼ ¾§ ¾»¿®»®­ ¿²¼¶±·­¬­ô ¬¸» º´±±® ½¿² ¾» ¾±«²½§ò Û¨¬»®²¿´´§ ¬¸»®» ³¿§ ¾» ª·­·¾´»¼·­¸·²¹ ±º ¬¸» ¸·° ±® ®·¼¹» ´·²»­ò

ß­ ¬¸» ³±·­¬«®» ¿¾­±®°¬·±² °®±½»­­ ½±³°´»¬»­ ·¬­ ¶±«®²»§ ¬± ¬¸»·²²»®³±­¬ ¿®»¿­ ±º ¬¸» ¾«·´¼·²¹ô ¬¸» ·²¬»®²¿´ º±±¬·²¹­ ©·´´ ®·­»ò ׺ ¬¸»­°®»¿¼ ±º ³±·­¬«®» ·­ ®±«¹¸´§ »ª»²ô ·¬ ³¿§ ¾» ¬¸¿¬ ¬¸» ­§³°¬±³­ ©·´´¬»³°±®¿®·´§ ¼·­¿°°»¿®ô ¾«¬ ·¬ ·­ ³±®» ´·µ»´§ ¬¸¿¬ ­©»´´·²¹ ©·´´ ¾»«²»ª»²ô ½®»¿¬·²¹ ¿ ¼·ºº»®»²½» ®¿¬¸»® ¬¸¿² ¿ ¼·­¿°°»¿®¿²½» ·²­§³°¬±³­ò ײ ¾«·´¼·²¹­ ©·¬¸ ¬·³¾»® º´±±®·²¹ ­«°°±®¬»¼ ¾§ ¾»¿®»®­¿²¼ ¶±·­¬­ô ¬¸» ·­±´¿¬»¼ °·»®­ ©·´´ ®·­» ³±®» »¿­·´§ ¬¸¿² ¬¸» ­¬®·°º±±¬·²¹­ ±® °·»®­ «²¼»® ©¿´´­ô ½®»¿¬·²¹ ²±¬·½»¿¾´» ¼±³·²¹ ±º º´±±®·²¹ò

ß­ ¬¸» ©»¿¬¸»® °¿¬¬»®² ½¸¿²¹»­ ¿²¼ ¬¸» ­±·´ ¾»¹·²­ ¬± ¼®§ ±«¬ô ¬¸»»¨¬»®²¿´ º±±¬·²¹­ ©·´´ ¾» º·®­¬ ¿ºº»½¬»¼ô ¾»¹·²²·²¹ ©·¬¸ ¬¸» ´±½¿¬·±²­©¸»®» ¬¸» ­«²K­ »ºº»½¬ ·­ ­¬®±²¹»­¬ò ̸·­ ¸¿­ ¬¸» »ºº»½¬ ±º ´±©»®·²¹ ¬¸»»¨¬»®²¿´ º±±¬·²¹­ò ̸» ¼±³·²¹ ·­ ¿½½»²¬«¿¬»¼ ¿²¼ ½®¿½µ·²¹ ®»¼«½»­±® ¼·­¿°°»¿®­ ©¸»®» ·¬ ±½½«®®»¼ ¾»½¿«­» ±º ¼·­¸·²¹ô ¾«¬ ±¬¸»® ½®¿½µ­±°»² «°ò ̸» ®±±º ´·²»­ ³¿§ ¾»½±³» ½±²ª»¨ò

ܱ³·²¹ ¿²¼ ¼·­¸·²¹ ¿®» ¿´­± ¿ºº»½¬»¼ ¾§ ©»¿¬¸»® ·² ±¬¸»® ©¿§­ò ײ¿®»¿­ ©¸»®» ©¿®³ô ©»¬ ­«³³»®­ ¿²¼ ½±±´»® ¼®§ ©·²¬»®­ °®»ª¿·´ô©¿¬»® ³·¹®¿¬·±² ¬»²¼­ ¬± ¾» ¬±©¿®¼ ¬¸» ·²¬»®·±® ¿²¼ ¼±³·²¹ ©·´´ ¾»¿½½»²¬«¿¬»¼ô ©¸»®»¿­ ©¸»®» ­«³³»®­ ¿®» ¼®§ ¿²¼ ©·²¬»®­ ¿®» ½±´¼¿²¼ ©»¬ô ³·¹®¿¬·±² ¬»²¼­ ¬± ¾» ¬±©¿®¼ ¬¸» »¨¬»®·±® ¿²¼ ¬¸»«²¼»®´§·²¹ °®±°»²­·¬§ ·­ ¬±©¿®¼ ¼·­¸·²¹ò

Ó±ª»³»²¬ ½¿«­»¼ ¾§ ¬®»» ®±±¬­×² ¹»²»®¿´ô ¹®±©·²¹ ®±±¬­ ©·´´ »¨»®¬ ¿² «°©¿®¼ °®»­­«®» ±² º±±¬·²¹­ô©¸»®»¿­ ­±·´ ­«¾¶»½¬ ¬± ¼®§·²¹ ¾»½¿«­» ±º ¬®»» ±® ­¸®«¾ ®±±¬­ ©·´´ ¬»²¼¬± ®»³±ª» ­«°°±®¬ º®±³ «²¼»® º±±¬·²¹­ ¾§ ·²¼«½·²¹ ­¸®·²µ¿¹»ò

ݱ³°´·½¿¬·±²­ ½¿«­»¼ ¾§ ¬¸» ­¬®«½¬«®» ·¬­»´ºÓ±­¬ º±®½»­ ¬¸¿¬ ¬¸» ­±·´ ½¿«­»­ ¬± ¾» »¨»®¬»¼ ±² ­¬®«½¬«®»­ ¿®»ª»®¬·½¿´ P ·ò»ò »·¬¸»® «° ±® ¼±©²ò ر©»ª»®ô ¾»½¿«­» ¬¸»­» º±®½»­ ¿®»­»´¼±³ ­°®»¿¼ »ª»²´§ ¿®±«²¼ ¬¸» º±±¬·²¹­ô ¿²¼ ¾»½¿«­» ¬¸» ¾«·´¼·²¹®»­·­¬­ «²»ª»² ³±ª»³»²¬ ¾»½¿«­» ±º ·¬­ ®·¹·¼·¬§ô º±®½»­ ¿®» »¨»®¬»¼º®±³ ±²» °¿®¬ ±º ¬¸» ¾«·´¼·²¹ ¬± ¿²±¬¸»®ò ̸» ²»¬ ®»­«´¬ ±º ¿´´ ¬¸»­»º±®½»­ ·­ «­«¿´´§ ®±¬¿¬·±²¿´ò ̸·­ ®»­«´¬¿²¬ º±®½» ±º¬»² ½±³°´·½¿¬»­ ¬¸»¼·¿¹²±­·­ ¾»½¿«­» ¬¸» ª·­·¾´» ­§³°¬±³­ ¼± ²±¬ ­·³°´§ ®»º´»½¬ ¬¸»±®·¹·²¿´ ½¿«­»ò ß ½±³³±² ­§³°¬±³ ·­ ¾·²¼·²¹ ±º ¼±±®­ ±² ¬¸»ª»®¬·½¿´ ³»³¾»® ±º ¬¸» º®¿³»ò

Ûºº»½¬­ ±² º«´´ ³¿­±²®§ ­¬®«½¬«®»­Þ®·½µ©±®µ ©·´´ ®»­·­¬ ½®¿½µ·²¹ ©¸»®» ·¬ ½¿²ò ׬ ©·´´ ¿¬¬»³°¬ ¬± ­°¿²¿®»¿­ ¬¸¿¬ ´±­» ­«°°±®¬ ¾»½¿«­» ±º ­«¾­·¼»¼ º±«²¼¿¬·±²­ ±® ®¿·­»¼°±·²¬­ò ׬ ·­ ¬¸»®»º±®» «­«¿´ ¬± ­»» ½®¿½µ·²¹ ¿¬ ©»¿µ °±·²¬­ô ­«½¸ ¿­±°»²·²¹­ º±® ©·²¼±©­ ±® ¼±±®­ò

ײ ¬¸» »ª»²¬ ±º ½±²­¬®«½¬·±² ­»¬¬´»³»²¬ô ½®¿½µ·²¹ ©·´´ «­«¿´´§ ®»³¿·²«²½¸¿²¹»¼ ¿º¬»® ¬¸» °®±½»­­ ±º ­»¬¬´»³»²¬ ¸¿­ ½»¿­»¼ò

É·¬¸ ´±½¿´ ­¸»¿® ±® »®±­·±²ô ½®¿½µ·²¹ ©·´´ «­«¿´´§ ½±²¬·²«» ¬± ¼»ª»´±°«²¬·´ ¬¸» ±®·¹·²¿´ ½¿«­» ¸¿­ ¾»»² ®»³»¼·»¼ô ±® «²¬·´ ¬¸» ­«¾­·¼»²½»¸¿­ ½±³°´»¬»´§ ²»«¬®¿´·­»¼ ¬¸» ¿ºº»½¬»¼ °±®¬·±² ±º º±±¬·²¹ ¿²¼ ¬¸»­¬®«½¬«®» ¸¿­ ­¬¿¾·´·­»¼ ±² ±¬¸»® º±±¬·²¹­ ¬¸¿¬ ®»³¿·² »ºº»½¬·ª»ò

ײ ¬¸» ½¿­» ±º ­©»´´ñ­¸®·²µ »ºº»½¬­ô ¬¸» ¾®·½µ©±®µ ©·´´ ·² ­±³» ½¿­»­®»¬«®² ¬± ·¬­ ±®·¹·²¿´ °±­·¬·±² ¿º¬»® ½±³°´»¬·±² ±º ¿ ½§½´»ô ¸±©»ª»® ·¬·­ ³±®» ´·µ»´§ ¬¸¿¬ ¬¸» ®±¬¿¬·±²¿´ »ºº»½¬ ©·´´ ²±¬ ¾» »¨¿½¬´§ ®»ª»®­»¼ô¿²¼ ·¬ ·­ ¿´­± «­«¿´ ¬¸¿¬ ¾®·½µ©±®µ ©·´´ ­»¬¬´» ·² ·¬­ ²»© °±­·¬·±² ¿²¼©·´´ ®»­·­¬ ¬¸» º±®½»­ ¬®§·²¹ ¬± ®»¬«®² ·¬ ¬± ·¬­ ±®·¹·²¿´ °±­·¬·±²ò ̸·­³»¿²­ ¬¸¿¬ ·² ¿ ½¿­» ©¸»®» ­©»´´·²¹ ¬¿µ»­ °´¿½» ¿º¬»® ½±²­¬®«½¬·±²¿²¼ ½®¿½µ·²¹ ±½½«®­ô ¬¸» ½®¿½µ·²¹ ·­ ´·µ»´§ ¬± ¿¬ ´»¿­¬ °¿®¬´§ ®»³¿·²¿º¬»® ¬¸» ­¸®·²µ ­»¹³»²¬ ±º ¬¸» ½§½´» ·­ ½±³°´»¬»ò ̸«­ô »¿½¸ ¬·³»¬¸» ½§½´» ·­ ®»°»¿¬»¼ô ¬¸» ´·µ»´·¸±±¼ ·­ ¬¸¿¬ ¬¸» ½®¿½µ·²¹ ©·´´ ¾»½±³»©·¼»® «²¬·´ ¬¸» ­»½¬·±²­ ±º ¾®·½µ©±®µ ¾»½±³» ª·®¬«¿´´§ ·²¼»°»²¼»²¬ò

É·¬¸ ®»°»¿¬»¼ ½§½´»­ô ±²½» ¬¸» ½®¿½µ·²¹ ·­ »­¬¿¾´·­¸»¼ô ·º ¬¸»®» ·­ ²±±¬¸»® ½±³°´·½¿¬·±²ô ·¬ ·­ ²±®³¿´ º±® ¬¸» ·²½·¼»²½» ±º ½®¿½µ·²¹ ¬±­¬¿¾·´·­»ô ¿­ ¬¸» ¾«·´¼·²¹ ¸¿­ ¬¸» ¿®¬·½«´¿¬·±² ·¬ ²»»¼­ ¬± ½±°» ©·¬¸¬¸» °®±¾´»³ò ̸·­ ·­ ¾§ ²± ³»¿²­ ¿´©¿§­ ¬¸» ½¿­»ô ¸±©»ª»®ô ¿²¼³±²·¬±®·²¹ ±º ½®¿½µ­ ·² ©¿´´­ ¿²¼ º´±±®­ ­¸±«´¼ ¿´©¿§­ ¾» ¬®»¿¬»¼­»®·±«­´§ò

Ë°¸»¿ª¿´ ½¿«­»¼ ¾§ ¹®±©¬¸ ±º ¬®»» ®±±¬­ «²¼»® º±±¬·²¹­ ·­ ²±¬ ¿­·³°´» ª»®¬·½¿´ ­¸»¿® ­¬®»­­ò ̸»®» ·­ ¿ ¬»²¼»²½§ º±® ¬¸» ®±±¬ ¬± ¿´­±»¨»®¬ ´¿¬»®¿´ º±®½»­ ¬¸¿¬ ¿¬¬»³°¬ ¬± ­»°¿®¿¬» ­»½¬·±²­ ±º ¾®·½µ©±®µ¿º¬»® ·²·¬·¿´ ½®¿½µ·²¹ ¸¿­ ±½½«®®»¼ò

Ì®»»­ ½¿² ½¿«­» ­¸®·²µ¿¹» ¿²¼ ¼¿³¿¹»

Page 186: SITE CLASSIFICATION REPORT SUMMARY...Douglas Partners (DP) has prepared this report for this project at Taylor 2- Stage 3, Taylor in accordance with DP’s proposal dated 15 September

̸» ²±®³¿´ ­¬®«½¬«®¿´ ¿®®¿²¹»³»²¬ ·­ ¬¸¿¬ ¬¸» ·²²»® ´»¿º ±º ¾®·½µó©±®µ ·² ¬¸» »¨¬»®²¿´ ©¿´´­ ¿²¼ ¿¬ ´»¿­¬ ­±³» ±º ¬¸» ·²¬»®²¿´ ©¿´´­ø¼»°»²¼·²¹ ±² ¬¸» ®±±º ¬§°»÷ ½±³°®·­» ¬¸» ´±¿¼ó¾»¿®·²¹ ­¬®«½¬«®» ±²©¸·½¸ ¿²§ «°°»® º´±±®­ô ½»·´·²¹­ ¿²¼ ¬¸» ®±±º ¿®» ­«°°±®¬»¼ò ײ ¬¸»­»½¿­»­ô ·¬ ·­ ·²¬»®²¿´´§ ª·­·¾´» ½®¿½µ·²¹ ¬¸¿¬ ­¸±«´¼ ¾» ¬¸» ³¿·² º±½«­±º ¿¬¬»²¬·±²ô ¸±©»ª»® ¬¸»®» ¿®» ¿ º»© »¨¿³°´»­ ±º ¼©»´´·²¹­ ©¸±­»»¨¬»®²¿´ ´»¿º ±º ³¿­±²®§ °´¿§­ ­±³» ­«°°±®¬·²¹ ®±´»ô ­± ¬¸·­ ­¸±«´¼¾» ½¸»½µ»¼ ·º ¬¸»®» ·­ ¿²§ ¼±«¾¬ò ײ ¿²§ ½¿­»ô »¨¬»®²¿´´§ ª·­·¾´»½®¿½µ·²¹ ·­ ·³°±®¬¿²¬ ¿­ ¿ ¹«·¼» ¬± ­¬®»­­»­ ±² ¬¸» ­¬®«½¬«®» ¹»²»®¿´´§ô¿²¼ ·¬ ­¸±«´¼ ¿´­± ¾» ®»³»³¾»®»¼ ¬¸¿¬ ¬¸» »¨¬»®²¿´ ©¿´´­ ³«­¬ ¾»½¿°¿¾´» ±º ­«°°±®¬·²¹ ¬¸»³­»´ª»­ò

Ûºº»½¬­ ±² º®¿³»¼ ­¬®«½¬«®»­Ì·³¾»® ±® ­¬»»´ º®¿³»¼ ¾«·´¼·²¹­ ¿®» ´»­­ ´·µ»´§ ¬± »¨¸·¾·¬ ½®¿½µ·²¹¼«» ¬± ­©»´´ñ­¸®·²µ ¬¸¿² ³¿­±²®§ ¾«·´¼·²¹­ ¾»½¿«­» ±º ¬¸»·®º´»¨·¾·´·¬§ò ß´­±ô ¬¸» ¼±³·²¹ñ¼·­¸·²¹ »ºº»½¬­ ¬»²¼ ¬± ¾» ´±©»® ¾»½¿«­»±º ¬¸» ´·¹¸¬»® ©»·¹¸¬ ±º ©¿´´­ò ̸» ³¿·² ®·­µ­ ¬± º®¿³»¼ ¾«·´¼·²¹­ ¿®»»²½±«²¬»®»¼ ¾»½¿«­» ±º ¬¸» ·­±´¿¬»¼ °·»® º±±¬·²¹­ «­»¼ «²¼»® ©¿´´­òɸ»®» »®±­·±² ±® ­¿¬«®¿¬·±² ½¿«­» ¿ º±±¬·²¹ ¬± º¿´´ ¿©¿§ô ¬¸·­ ½¿²¼±«¾´» ¬¸» ­°¿² ©¸·½¸ ¿ ©¿´´ ³«­¬ ¾®·¼¹»ò ̸·­ ¿¼¼·¬·±²¿´ ­¬®»­­ ½¿²½®»¿¬» ½®¿½µ·²¹ ·² ©¿´´ ´·²·²¹­ô °¿®¬·½«´¿®´§ ©¸»®» ¬¸»®» ·­ ¿ ©»¿µ°±·²¬ ·² ¬¸» ­¬®«½¬«®» ½¿«­»¼ ¾§ ¿ ¼±±® ±® ©·²¼±© ±°»²·²¹ò ׬ ·­ô¸±©»ª»®ô «²´·µ»´§ ¬¸¿¬ º®¿³»¼ ­¬®«½¬«®»­ ©·´´ ¾» ­± ­¬®»­­»¼ ¿­ ¬± ­«ºº»®­»®·±«­ ¼¿³¿¹» ©·¬¸±«¬ º·®­¬ »¨¸·¾·¬·²¹ ­±³» ±® ¿´´ ±º ¬¸» ¿¾±ª»­§³°¬±³­ º±® ¿ ½±²­·¼»®¿¾´» °»®·±¼ò ̸» ­¿³» ©¿®²·²¹ °»®·±¼ ­¸±«´¼¿°°´§ ·² ¬¸» ½¿­» ±º «°¸»¿ª¿´ò ׬ ­¸±«´¼ ¾» ²±¬»¼ô ¸±©»ª»®ô ¬¸¿¬ ©¸»®»º®¿³»¼ ¾«·´¼·²¹­ ¿®» ­«°°±®¬»¼ ¾§ ­¬®·° º±±¬·²¹­ ¬¸»®» ·­ ±²´§ ±²» ´»¿º±º ¾®·½µ©±®µ ¿²¼ ¬¸»®»º±®» ¬¸» »¨¬»®²¿´´§ ª·­·¾´» ©¿´´­ ¿®» ¬¸»­«°°±®¬·²¹ ­¬®«½¬«®» º±® ¬¸» ¾«·´¼·²¹ò ײ ¬¸·­ ½¿­»ô ¬¸» ­«¾º´±±®³¿­±²®§ ©¿´´­ ½¿² ¾» »¨°»½¬»¼ ¬± ¾»¸¿ª» ¿­ º«´´ ¾®·½µ©±®µ ©¿´´­ò

Ûºº»½¬­ ±² ¾®·½µ ª»²»»® ­¬®«½¬«®»­Þ»½¿«­» ¬¸» ´±¿¼ó¾»¿®·²¹ ­¬®«½¬«®» ±º ¿ ¾®·½µ ª»²»»® ¾«·´¼·²¹ ·­ ¬¸»º®¿³» ¬¸¿¬ ³¿µ»­ «° ¬¸» ·²¬»®·±® ´»¿º ±º ¬¸» »¨¬»®²¿´ ©¿´´­ °´«­°»®¸¿°­ ¬¸» ·²¬»®²¿´ ©¿´´­ô ¼»°»²¼·²¹ ±² ¬¸» ¬§°» ±º ®±±ºô ¬¸»¾«·´¼·²¹ ½¿² ¾» »¨°»½¬»¼ ¬± ¾»¸¿ª» ¿­ ¿ º®¿³»¼ ­¬®«½¬«®»ô »¨½»°¬ ¬¸¿¬¬¸» »¨¬»®²¿´ ³¿­±²®§ ©·´´ ¾»¸¿ª» ·² ¿ ­·³·´¿® ©¿§ ¬± ¬¸» »¨¬»®²¿´ ´»¿º±º ¿ º«´´ ³¿­±²®§ ­¬®«½¬«®»ò

É¿¬»® Í»®ª·½» ¿²¼ Ü®¿·²¿¹»

ɸ»®» ¿ ©¿¬»® ­»®ª·½» °·°»ô ¿ ­»©»® ±® ­¬±®³©¿¬»® ¼®¿·²¿¹» °·°» ·­ ·²¬¸» ª·½·²·¬§ ±º ¿ ¾«·´¼·²¹ô ¿ ©¿¬»® ´»¿µ ½¿² ½¿«­» »®±­·±²ô ­©»´´·²¹ ±®­¿¬«®¿¬·±² ±º ­«­½»°¬·¾´» ­±·´ò Ûª»² ¿ ³·²«­½«´» ´»¿µ ½¿² ¾» »²±«¹¸¬± ­¿¬«®¿¬» ¿ ½´¿§ º±«²¼¿¬·±²ò ß ´»¿µ·²¹ ¬¿° ²»¿® ¿ ¾«·´¼·²¹ ½¿² ¸¿ª»¬¸» ­¿³» »ºº»½¬ò ײ ¿¼¼·¬·±²ô ¬®»²½¸»­ ½±²¬¿·²·²¹ °·°»­ ½¿² ¾»½±³»©¿¬»®½±«®­»­ »ª»² ¬¸±«¹¸ ¾¿½µº·´´»¼ô °¿®¬·½«´¿®´§ ©¸»®» ¾®±µ»²®«¾¾´» ·­ «­»¼ ¿­ º·´´ò É¿¬»® ¬¸¿¬ ®«²­ ¿´±²¹ ¬¸»­» ¬®»²½¸»­ ½¿² ¾»®»­°±²­·¾´» º±® ­»®·±«­ »®±­·±²ô ·²¬»®­¬®¿¬¿ ­»»°¿¹» ·²¬± ­«¾º´±±® ¿®»¿­¿²¼ ­¿¬«®¿¬·±²ò

з°» ´»¿µ¿¹» ¿²¼ ¬®»²½¸ ©¿¬»® º´±©­ ¿´­± »²½±«®¿¹» ¬®»» ¿²¼ ­¸®«¾®±±¬­ ¬± ¬¸» ­±«®½» ±º ©¿¬»®ô ½±³°´·½¿¬·²¹ ¿²¼ »¨¿½»®¾¿¬·²¹ ¬¸»°®±¾´»³òб±® ®±±º °´«³¾·²¹ ½¿² ®»­«´¬ ·² ´¿®¹» ª±´«³»­ ±º ®¿·²©¿¬»® ¾»·²¹½±²½»²¬®¿¬»¼ ·² ¿ ­³¿´´ ¿®»¿ ±º ­±·´æ

{ ײ½±®®»½¬ º¿´´­ ·² ®±±º ¹«¬¬»®·²¹ ³¿§ ®»­«´¬ ·² ±ª»®º´±©­ô ¿­ ³¿§¹«¬¬»®­ ¾´±½µ»¼ ©·¬¸ ´»¿ª»­ »¬½ò

{ ݱ®®±¼»¼ ¹«¬¬»®·²¹ ±® ¼±©²°·°»­ ½¿² ­°·´´ ©¿¬»® ¬± ¹®±«²¼ò

{ ܱ©²°·°»­ ²±¬ °±­·¬·ª»´§ ½±²²»½¬»¼ ¬± ¿ °®±°»® ­¬±®³©¿¬»®½±´´»½¬·±² ­§­¬»³ ©·´´ ¼·®»½¬ ¿ ½±²½»²¬®¿¬·±² ±º ©¿¬»® ¬± ­±·´ ¬¸¿¬ ·­¼·®»½¬´§ ¿¼¶¿½»²¬ ¬± º±±¬·²¹­ô ­±³»¬·³»­ ½¿«­·²¹ ´¿®¹»ó­½¿´»°®±¾´»³­ ­«½¸ ¿­ »®±­·±²ô ­¿¬«®¿¬·±² ¿²¼ ³·¹®¿¬·±² ±º ©¿¬»® «²¼»®¬¸» ¾«·´¼·²¹ò

Í»®·±«­²»­­ ±º Ý®¿½µ·²¹

ײ ¹»²»®¿´ô ³±­¬ ½®¿½µ·²¹ º±«²¼ ·² ³¿­±²®§ ©¿´´­ ·­ ¿ ½±­³»¬·½²«·­¿²½» ±²´§ ¿²¼ ½¿² ¾» µ»°¬ ·² ®»°¿·® ±® »ª»² ·¹²±®»¼ò ̸» ¬¿¾´»¾»´±© ·­ ¿ ®»°®±¼«½¬·±² ±º Ì¿¾´» Ýï ±º ßÍ îèéðò

ßÍ îèéð ¿´­± °«¾´·­¸»­ º·¹«®»­ ®»´¿¬·²¹ ¬± ½®¿½µ·²¹ ·² ½±²½®»¬» º´±±®­ô¸±©»ª»® ¾»½¿«­» ©¿´´ ½®¿½µ·²¹ ©·´´ «­«¿´´§ ®»¿½¸ ¬¸» ½®·¬·½¿´ °±·²¬­·¹²·º·½¿²¬´§ »¿®´·»® ¬¸¿² ½®¿½µ·²¹ ·² ­´¿¾­ô ¬¸·­ ¬¿¾´» ·­ ²±¬®»°®±¼«½»¼ ¸»®»ò

Ю»ª»²¬·±²ñÝ«®»

д«³¾·²¹É¸»®» ¾«·´¼·²¹ ³±ª»³»²¬ ·­ ½¿«­»¼ ¾§ ©¿¬»® ­»®ª·½»ô ®±±º °´«³¾·²¹ô­»©»® ±® ­¬±®³©¿¬»® º¿·´«®»ô ¬¸» ®»³»¼§ ·­ ¬± ®»°¿·® ¬¸» °®±¾´»³ò ׬ ·­ °®«¼»²¬ô ¸±©»ª»®ô ¬± ½±²­·¼»® ¿´­± ®»®±«¬·²¹ °·°»­ ¿©¿§ º®±³¬¸» ¾«·´¼·²¹ ©¸»®» °±­­·¾´»ô ¿²¼ ®»´±½¿¬·²¹ ¬¿°­ ¬± °±­·¬·±²­ ©¸»®»¿²§ ´»¿µ¿¹» ©·´´ ²±¬ ¼·®»½¬ ©¿¬»® ¬± ¬¸» ¾«·´¼·²¹ ª·½·²·¬§ò Ûª»² ©¸»®»¹«´´§ ¬®¿°­ ¿®» °®»­»²¬ô ¬¸»®» ·­ ­±³»¬·³»­ ­«ºº·½·»²¬ ­°·´´ ¬± ½®»¿¬»»®±­·±² ±® ­¿¬«®¿¬·±²ô °¿®¬·½«´¿®´§ ·² ³±¼»®² ·²­¬¿´´¿¬·±²­ «­·²¹­³¿´´»® ¼·¿³»¬»® ÐÊÝ º·¨¬«®»­ò ײ¼»»¼ô ­±³» ¹«´´§ ¬®¿°­ ¿®» ²±¬­·¬«¿¬»¼ ¼·®»½¬´§ «²¼»® ¬¸» ¬¿°­ ¬¸¿¬ ¿®» ·²­¬¿´´»¼ ¬± ½¸¿®¹» ¬¸»³ô©·¬¸ ¬¸» ®»­«´¬ ¬¸¿¬ ©¿¬»® º®±³ ¬¸» ¬¿° ³¿§ »²¬»® ¬¸» ¾¿½µº·´´»¼¬®»²½¸ ¬¸¿¬ ¸±«­»­ ¬¸» ­»©»® °·°·²¹ò ׺ ¬¸» ¬®»²½¸ ¸¿­ ¾»»² °±±®´§¾¿½µº·´´»¼ô ¬¸» ©¿¬»® ©·´´ »·¬¸»® °±²¼ ±® º´±© ¿´±²¹ ¬¸» ¾±¬¬±³ ±º¬¸» ¬®»²½¸ò ß­ ¬¸»­» ¬®»²½¸»­ «­«¿´´§ ®«² ¿´±²¹­·¼» ¬¸» º±±¬·²¹­ ¿²¼½¿² ¾» ¿¬ ¿ ­·³·´¿® ¼»°¬¸ô ·¬ ·­ ²±¬ ¸¿®¼ ¬± ­»» ¸±© ¿²§ ©¿¬»® ¬¸¿¬ ·­¬¸«­ ¼·®»½¬»¼ ·²¬± ¿ ¬®»²½¸ ½¿² »¿­·´§ ¿ºº»½¬ ¬¸» º±«²¼¿¬·±²K­ ¿¾·´·¬§ ¬±­«°°±®¬ º±±¬·²¹­ ±® »ª»² ¹¿·² »²¬®§ ¬± ¬¸» ­«¾º´±±® ¿®»¿ò

Ù®±«²¼ ¼®¿·²¿¹»×² ¿´´ ­±·´­ ¬¸»®» ·­ ¬¸» ½¿°¿½·¬§ º±® ©¿¬»® ¬± ¬®¿ª»´ ±² ¬¸» ­«®º¿½» ¿²¼¾»´±© ·¬ò Í«®º¿½» ©¿¬»® º´±©­ ½¿² ¾» »­¬¿¾´·­¸»¼ ¾§ ·²­°»½¬·±² ¼«®·²¹¿²¼ ¿º¬»® ¸»¿ª§ ±® °®±´±²¹»¼ ®¿·²ò ׺ ²»½»­­¿®§ô ¿ ¹®¿¬»¼ ¼®¿·² ­§­¬»³½±²²»½¬»¼ ¬± ¬¸» ­¬±®³©¿¬»® ½±´´»½¬·±² ­§­¬»³ ·­ «­«¿´´§ ¿² »¿­§­±´«¬·±²ò

׬ ·­ô ¸±©»ª»®ô ­±³»¬·³»­ ²»½»­­¿®§ ©¸»² ¿¬¬»³°¬·²¹ ¬± °®»ª»²¬©¿¬»® ³·¹®¿¬·±² ¬¸¿¬ ¬»­¬·²¹ ¾» ½¿®®·»¼ ±«¬ ¬± »­¬¿¾´·­¸ ©¿¬»®¬¿¾´»¸»·¹¸¬ ¿²¼ ­«¾­±·´ ©¿¬»® º´±©­ò ̸·­ ­«¾¶»½¬ ·­ ®»º»®®»¼ ¬± ·² ÞÌÚ ï翲¼ ³¿§ °®±°»®´§ ¾» ®»¹¿®¼»¼ ¿­ ¿² ¿®»¿ º±® ¿² »¨°»®¬ ½±²­«´¬¿²¬ò

Ю±¬»½¬·±² ±º ¬¸» ¾«·´¼·²¹ °»®·³»¬»®×¬ ·­ »­­»²¬·¿´ ¬± ®»³»³¾»® ¬¸¿¬ ¬¸» ­±·´ ¬¸¿¬ ¿ºº»½¬­ º±±¬·²¹­ »¨¬»²¼­©»´´ ¾»§±²¼ ¬¸» ¿½¬«¿´ ¾«·´¼·²¹ ´·²»ò É¿¬»®·²¹ ±º ¹¿®¼»² °´¿²¬­ô­¸®«¾­ ¿²¼ ¬®»»­ ½¿«­»­ ­±³» ±º ¬¸» ³±­¬ ­»®·±«­ ©¿¬»® °®±¾´»³­ò

Ú±® ¬¸·­ ®»¿­±²ô °¿®¬·½«´¿®´§ ©¸»®» °®±¾´»³­ »¨·­¬ ±® ¿®» ´·µ»´§ ¬±±½½«®ô ·¬ ·­ ®»½±³³»²¼»¼ ¬¸¿¬ ¿² ¿°®±² ±º °¿ª·²¹ ¾» ·²­¬¿´´»¼¿®±«²¼ ¿­ ³«½¸ ±º ¬¸» ¾«·´¼·²¹ °»®·³»¬»® ¿­ ²»½»­­¿®§ò ̸·­ °¿ª·²¹

ÝÔßÍÍ×Ú×ÝßÌ×ÑÒ ÑÚ ÜßÓßÙÛ É×ÌØ ÎÛÚÛÎÛÒÝÛ ÌÑ ÉßÔÔÍ

Ü»­½®·°¬·±² ±º ¬§°·½¿´ ¼¿³¿¹» ¿²¼ ®»¯«·®»¼ ®»°¿·® ß°°®±¨·³¿¬» ½®¿½µ ©·¼¬¸ Ü¿³¿¹»´·³·¬ ø­»» Ò±¬» í÷ ½¿¬»¹±®§

Ø¿·®´·²» ½®¿½µ­ äðòï ³³ ð

Ú·²» ½®¿½µ­ ©¸·½¸ ¼± ²±¬ ²»»¼ ®»°¿·® äï ³³ ï

Ý®¿½µ­ ²±¬·½»¿¾´» ¾«¬ »¿­·´§ º·´´»¼ò ܱ±®­ ¿²¼ ©·²¼±©­ ­¬·½µ ­´·¹¸¬´§ äë ³³ î

Ý®¿½µ­ ½¿² ¾» ®»°¿·®»¼ ¿²¼ °±­­·¾´§ ¿ ­³¿´´ ¿³±«²¬ ±º ©¿´´ ©·´´ ²»»¼ ëPïë ³³ ø±® ¿ ²«³¾»® ±º ½®¿½µ­ í¬± ¾» ®»°´¿½»¼ò ܱ±®­ ¿²¼ ©·²¼±©­ ­¬·½µò Í»®ª·½» °·°»­ ½¿² º®¿½¬«®»ò í ³³ ±® ³±®» ·² ±²» ¹®±«°÷É»¿¬¸»®¬·¹¸¬²»­­ ±º¬»² ·³°¿·®»¼

Û¨¬»²­·ª» ®»°¿·® ©±®µ ·²ª±´ª·²¹ ¾®»¿µ·²¹ó±«¬ ¿²¼ ®»°´¿½·²¹ ­»½¬·±²­ ±º ©¿´´­ô ïëPîë ³³ ¾«¬ ¿´­± ¼»°»²¼ ì»­°»½·¿´´§ ±ª»® ¼±±®­ ¿²¼ ©·²¼±©­ò É·²¼±© ¿²¼ ¼±±® º®¿³»­ ¼·­¬±®¬ò É¿´´­ ´»¿² ±² ²«³¾»® ±º ½®¿½µ­±® ¾«´¹» ²±¬·½»¿¾´§ô ­±³» ´±­­ ±º ¾»¿®·²¹ ·² ¾»¿³­ò Í»®ª·½» °·°»­ ¼·­®«°¬»¼

Page 187: SITE CLASSIFICATION REPORT SUMMARY...Douglas Partners (DP) has prepared this report for this project at Taylor 2- Stage 3, Taylor in accordance with DP’s proposal dated 15 September

­¸±«´¼ »¨¬»²¼ ±«¬©¿®¼­ ¿ ³·²·³«³ ±º çðð ³³ ø³±®» ·² ¸·¹¸´§®»¿½¬·ª» ­±·´÷ ¿²¼ ­¸±«´¼ ¸¿ª» ¿ ³·²·³«³ º¿´´ ¿©¿§ º®±³ ¬¸»¾«·´¼·²¹ ±º ïæêðò ̸» º·²·­¸»¼ °¿ª·²¹ ­¸±«´¼ ¾» ²± ´»­­ ¬¸¿² ïðð³³ ¾»´±© ¾®·½µ ª»²¬ ¾¿­»­ò

׬ ·­ °®«¼»²¬ ¬± ®»´±½¿¬» ¼®¿·²¿¹» °·°»­ ¿©¿§ º®±³ ¬¸·­ °¿ª·²¹ô ·º°±­­·¾´»ô ¬± ¿ª±·¼ ½±³°´·½¿¬·±²­ º®±³ º«¬«®» ´»¿µ¿¹»ò ׺ ¬¸·­ ·­ ²±¬°®¿½¬·½¿´ô »¿®¬¸»²©¿®» °·°»­ ­¸±«´¼ ¾» ®»°´¿½»¼ ¾§ ÐÊÝ ¿²¼¾¿½µº·´´·²¹ ­¸±«´¼ ¾» ±º ¬¸» ­¿³» ­±·´ ¬§°» ¿­ ¬¸» ­«®®±«²¼·²¹ ­±·´¿²¼ ½±³°¿½¬»¼ ¬± ¬¸» ­¿³» ¼»²­·¬§ò

Û¨½»°¬ ·² ¿®»¿­ ©¸»®» º®»»¦·²¹ ±º ©¿¬»® ·­ ¿² ·­­«»ô ·¬ ·­ ©·­» ¬±®»³±ª» ¬¿°­ ·² ¬¸» ¾«·´¼·²¹ ¿®»¿ ¿²¼ ®»´±½¿¬» ¬¸»³ ©»´´ ¿©¿§ º®±³¬¸» ¾«·´¼·²¹ P °®»º»®¿¾´§ ²±¬ «°¸·´´ º®±³ ·¬ ø­»» ÞÌÚ ïç÷ò

׬ ³¿§ ¾» ¼»­·®¿¾´» ¬± ·²­¬¿´´ ¿ ¹®¿¬»¼ ¼®¿·² ¿¬ ¬¸» ±«¬­·¼» »¼¹» ±º ¬¸»°¿ª·²¹ ±² ¬¸» «°¸·´´ ­·¼» ±º ¬¸» ¾«·´¼·²¹ò ׺ ­«¾­±·´ ¼®¿·²¿¹» ·­²»»¼»¼ ¬¸·­ ½¿² ¾» ·²­¬¿´´»¼ «²¼»® ¬¸» ­«®º¿½» ¼®¿·²ò

ݱ²¼»²­¿¬·±²×² ¾«·´¼·²¹­ ©·¬¸ ¿ ­«¾º´±±® ª±·¼ ­«½¸ ¿­ ©¸»®» ¾»¿®»®­ ¿²¼ ¶±·­¬­­«°°±®¬ º´±±®·²¹ô ·²­«ºº·½·»²¬ ª»²¬·´¿¬·±² ½®»¿¬»­ ·¼»¿´ ½±²¼·¬·±²­ º±®½±²¼»²­¿¬·±²ô °¿®¬·½«´¿®´§ ©¸»®» ¬¸»®» ·­ ´·¬¬´» ½´»¿®¿²½» ¾»¬©»»² ¬¸»º´±±® ¿²¼ ¬¸» ¹®±«²¼ò ݱ²¼»²­¿¬·±² ¿¼¼­ ¬± ¬¸» ³±·­¬«®» ¿´®»¿¼§°®»­»²¬ ·² ¬¸» ­«¾º´±±® ¿²¼ ­·¹²·º·½¿²¬´§ ­´±©­ ¬¸» °®±½»­­ ±º ¼®§·²¹±«¬ò ײ­¬¿´´¿¬·±² ±º ¿² ¿¼»¯«¿¬» ­«¾º´±±® ª»²¬·´¿¬·±² ­§­¬»³ô »·¬¸»®²¿¬«®¿´ ±® ³»½¸¿²·½¿´ô ·­ ¼»­·®¿¾´»ò

É¿®²·²¹æ ß´¬¸±«¹¸ ¬¸·­ Þ«·´¼·²¹ Ì»½¸²±´±¹§ Ú·´» ¼»¿´­ ©·¬¸½®¿½µ·²¹ ·² ¾«·´¼·²¹­ô ·¬ ­¸±«´¼ ¾» ­¿·¼ ¬¸¿¬ ­«¾º´±±® ³±·­¬«®» ½¿²®»­«´¬ ·² ¬¸» ¼»ª»´±°³»²¬ ±º ±¬¸»® °®±¾´»³­ô ²±¬¿¾´§æ

{ É¿¬»® ¬¸¿¬ ·­ ¬®¿²­³·¬¬»¼ ·²¬± ³¿­±²®§ô ³»¬¿´ ±® ¬·³¾»® ¾«·´¼·²¹»´»³»²¬­ ½¿«­»­ ¼¿³¿¹» ¿²¼ñ±® ¼»½¿§ ¬± ¬¸±­» »´»³»²¬­ò

{ Ø·¹¸ ­«¾º´±±® ¸«³·¼·¬§ ¿²¼ ³±·­¬«®» ½±²¬»²¬ ½®»¿¬» ¿² ·¼»¿´»²ª·®±²³»²¬ º±® ª¿®·±«­ °»­¬­ô ·²½´«¼·²¹ ¬»®³·¬»­ ¿²¼ ­°·¼»®­ò

{ ɸ»®» ¸·¹¸ ³±·­¬«®» ´»ª»´­ ¿®» ¬®¿²­³·¬¬»¼ ¬± ¬¸» º´±±®·²¹ ¿²¼©¿´´­ô ¿² ·²½®»¿­» ·² ¬¸» ¼«­¬ ³·¬» ½±«²¬ ½¿² »²­«» ©·¬¸·² ¬¸»´·ª·²¹ ¿®»¿­ò Ü«­¬ ³·¬»­ô ¿­ ©»´´ ¿­ ¼¿³°²»­­ ·² ¹»²»®¿´ô ½¿² ¾» ¿¸»¿´¬¸ ¸¿¦¿®¼ ¬± ·²¸¿¾·¬¿²¬­ô °¿®¬·½«´¿®´§ ¬¸±­» ©¸± ¿®»¿¾²±®³¿´´§ ­«­½»°¬·¾´» ¬± ®»­°·®¿¬±®§ ¿·´³»²¬­ò

̸» ¹¿®¼»²Ì¸» ·¼»¿´ ª»¹»¬¿¬·±² ´¿§±«¬ ·­ ¬± ¸¿ª» ´¿©² ±® °´¿²¬­ ¬¸¿¬ ®»¯«·®»±²´§ ´·¹¸¬ ©¿¬»®·²¹ ·³³»¼·¿¬»´§ ¿¼¶¿½»²¬ ¬± ¬¸» ¼®¿·²¿¹» ±® °¿ª·²¹»¼¹»ô ¬¸»² ³±®» ¼»³¿²¼·²¹ °´¿²¬­ô ­¸®«¾­ ¿²¼ ¬®»»­ ­°®»¿¼ ±«¬ ·²¬¸¿¬ ±®¼»®ò

Ѫ»®©¿¬»®·²¹ ¼«» ¬± ³·­«­» ±º ¿«¬±³¿¬·½ ©¿¬»®·²¹ ­§­¬»³­ ·­ ¿½±³³±² ½¿«­» ±º ­¿¬«®¿¬·±² ¿²¼ ©¿¬»® ³·¹®¿¬·±² «²¼»® º±±¬·²¹­ò ׺·¬ ·­ ²»½»­­¿®§ ¬± «­» ¬¸»­» ­§­¬»³­ô ·¬ ·­ ·³°±®¬¿²¬ ¬± ®»³±ª» ¹¿®¼»²¾»¼­ ¬± ¿ ½±³°´»¬»´§ ­¿º» ¼·­¬¿²½» º®±³ ¾«·´¼·²¹­ò

Û¨·­¬·²¹ ¬®»»­É¸»®» ¿ ¬®»» ·­ ½¿«­·²¹ ¿ °®±¾´»³ ±º ­±·´ ¼®§·²¹ ±® ¬¸»®» ·­ ¬¸»»¨·­¬»²½» ±® ¬¸®»¿¬ ±º «°¸»¿ª¿´ ±º º±±¬·²¹­ô ·º ¬¸» ±ºº»²¼·²¹ ®±±¬­ ¿®»­«¾­·¼·¿®§ ¿²¼ ¬¸»·® ®»³±ª¿´ ©·´´ ²±¬ ­·¹²·º·½¿²¬´§ ¼¿³¿¹» ¬¸» ¬®»»ô¬¸»§ ­¸±«´¼ ¾» ­»ª»®»¼ ¿²¼ ¿ ½±²½®»¬» ±® ³»¬¿´ ¾¿®®·»® °´¿½»¼ª»®¬·½¿´´§ ·² ¬¸» ­±·´ ¬± °®»ª»²¬ º«¬«®» ®±±¬ ¹®±©¬¸ ·² ¬¸» ¼·®»½¬·±² ±º¬¸» ¾«·´¼·²¹ò ׺ ·¬ ·­ ²±¬ °±­­·¾´» ¬± ®»³±ª» ¬¸» ®»´»ª¿²¬ ®±±¬­©·¬¸±«¬ ¼¿³¿¹» ¬± ¬¸» ¬®»»ô ¿² ¿°°´·½¿¬·±² ¬± ®»³±ª» ¬¸» ¬®»» ­¸±«´¼¾» ³¿¼» ¬± ¬¸» ´±½¿´ ¿«¬¸±®·¬§ò ß °®«¼»²¬ °´¿² ·­ ¬± ¬®¿²­°´¿²¬ ´·µ»´§±ºº»²¼»®­ ¾»º±®» ¬¸»§ ¾»½±³» ¿ °®±¾´»³ò

ײº±®³¿¬·±² ±² ¬®»»­ô °´¿²¬­ ¿²¼ ­¸®«¾­Í¬¿¬» ¼»°¿®¬³»²¬­ ±ª»®­»»·²¹ ¿¹®·½«´¬«®» ½¿² ¹·ª» ·²º±®³¿¬·±²®»¹¿®¼·²¹ ®±±¬ °¿¬¬»®²­ô ª±´«³» ±º ©¿¬»® ²»»¼»¼ ¿²¼ ­¿º» ¼·­¬¿²½»º®±³ ¾«·´¼·²¹­ ±º ³±­¬ ­°»½·»­ò Þ±¬¿²·½ ¹¿®¼»²­ ¿®» ¿´­± ­±«®½»­ ±º·²º±®³¿¬·±²ò Ú±® ·²º±®³¿¬·±² ±² °´¿²¬ ®±±¬­ ¿²¼ ¼®¿·²­ô ­»» Þ«·´¼·²¹Ì»½¸²±´±¹§ Ú·´» ïéò

Û¨½¿ª¿¬·±²Û¨½¿ª¿¬·±² ¿®±«²¼ º±±¬·²¹­ ³«­¬ ¾» °®±°»®´§ »²¹·²»»®»¼ò ͱ·´­«°°±®¬·²¹ º±±¬·²¹­ ½¿² ±²´§ ¾» ­¿º»´§ »¨½¿ª¿¬»¼ ¿¬ ¿² ¿²¹´» ¬¸¿¬¿´´±©­ ¬¸» ­±·´ «²¼»® ¬¸» º±±¬·²¹ ¬± ®»³¿·² ­¬¿¾´»ò ̸·­ ¿²¹´» ·­½¿´´»¼ ¬¸» ¿²¹´» ±º ®»°±­» ø±® º®·½¬·±²÷ ¿²¼ ª¿®·»­ ­·¹²·º·½¿²¬´§¾»¬©»»² ­±·´ ¬§°»­ ¿²¼ ½±²¼·¬·±²­ò λ³±ª¿´ ±º ­±·´ ©·¬¸·² ¬¸» ¿²¹´»±º ®»°±­» ©·´´ ½¿«­» ­«¾­·¼»²½»ò

λ³»¼·¿¬·±²

ɸ»®» »®±­·±² ¸¿­ ±½½«®®»¼ ¬¸¿¬ ¸¿­ ©¿­¸»¼ ¿©¿§ ­±·´ ¿¼¶¿½»²¬ ¬±º±±¬·²¹­ô ­±·´ ±º ¬¸» ­¿³» ½´¿­­·º·½¿¬·±² ­¸±«´¼ ¾» ·²¬®±¼«½»¼ ¿²¼½±³°¿½¬»¼ ¬± ¬¸» ­¿³» ¼»²­·¬§ò ɸ»®» º±±¬·²¹­ ¸¿ª» ¾»»²«²¼»®³·²»¼ô ¿«¹³»²¬¿¬·±² ±® ±¬¸»® ­°»½·¿´·­¬ ©±®µ ³¿§ ¾» ®»¯«·®»¼òλ³»¼·¿¬·±² ±º º±±¬·²¹­ ¿²¼ º±«²¼¿¬·±²­ ·­ ¹»²»®¿´´§ ¬¸» ®»¿´³ ±º ¿­°»½·¿´·­¬ ½±²­«´¬¿²¬ò

ɸ»®» ·­±´¿¬»¼ º±±¬·²¹­ ®·­» ¿²¼ º¿´´ ¾»½¿«­» ±º ­©»´´ñ­¸®·²µ »ºº»½¬ô¬¸» ¸±³»±©²»® ³¿§ ¾» ¬»³°¬»¼ ¬± ¿´´»ª·¿¬» º´±±® ¾±«²½» ¾§ º·´´·²¹¬¸» ¹¿° ¬¸¿¬ ¸¿­ ¿°°»¿®»¼ ¾»¬©»»² ¬¸» ¾»¿®»® ¿²¼ ¬¸» °·»® ©·¬¸¾´±½µ·²¹ò ̸» ¼¿²¹»® ¸»®» ·­ ¬¸¿¬ ©¸»² ¬¸» ²»¨¬ ­©»´´ ­»¹³»²¬ ±º ¬¸»½§½´» ±½½«®­ô ¬¸» »¨¬®¿ ¾´±½µ·²¹ ©·´´ °«­¸ ¬¸» º´±±® «° ·²¬± ¿²¿½½»²¬«¿¬»¼ ¼±³» ¿²¼ ³¿§ ¿´­± ½¿«­» ´±½¿´ ­¸»¿® º¿·´«®» ·² ¬¸» ­±·´ò׺ ·¬ ·­ ²»½»­­¿®§ ¬± «­» ¾´±½µ·²¹ô ·¬ ­¸±«´¼ ¾» ¾§ ¿ °¿·® ±º º·²»©»¼¹»­ ¿²¼ ³±²·¬±®·²¹ ­¸±«´¼ ¾» ½¿®®·»¼ ±«¬ º±®¬²·¹¸¬´§ò

̸·­ ÞÌÚ ©¿­ °®»°¿®»¼ ¾§ Ö±¸² Ô»©»® Úß×Þô Ó×ßÓßô ﮬ²»®ô

ݱ²­¬®«½¬·±² Ü·¿¹²±­·­ò

̸» ·²º±®³¿¬·±² ·² ¬¸·­ ¿²¼ ±¬¸»® ·­­«»­ ·² ¬¸» ­»®·»­ ©¿­ ¼»®·ª»¼ º®±³ ª¿®·±«­ ­±«®½»­ ¿²¼ ©¿­ ¾»´·»ª»¼ ¬± ¾» ½±®®»½¬ ©¸»² °«¾´·­¸»¼ò

̸» ·²º±®³¿¬·±² ·­ ¿¼ª·­±®§ò ׬ ·­ °®±ª·¼»¼ ·² ¹±±¼ º¿·¬¸ ¿²¼ ²±¬ ½´¿·³»¼ ¬± ¾» ¿² »¨¸¿«­¬·ª» ¬®»¿¬³»²¬ ±º ¬¸» ®»´»ª¿²¬ ­«¾¶»½¬ò

Ú«®¬¸»® °®±º»­­·±²¿´ ¿¼ª·½» ²»»¼­ ¬± ¾» ±¾¬¿·²»¼ ¾»º±®» ¬¿µ·²¹ ¿²§ ¿½¬·±² ¾¿­»¼ ±² ¬¸» ·²º±®³¿¬·±² °®±ª·¼»¼ò

Ü·­¬®·¾«¬»¼ ¾§

ÝÍ×ÎÑ ÐËÞÔ ×ÍØ ×ÒÙ ÐÑ Þ±¨ ïïíçô ݱ´´·²¹©±±¼ íðêêô ß«­¬®¿´·¿

Ú®»»½¿´´ ïèðð êìë ðëï Ì»´ øðí÷ çêêî éêêê Ú¿¨ øðí÷ çêêî éëëë ©©©ò°«¾´·­¸ò½­·®±ò¿«

Û³¿·´æ °«¾´·­¸·²¹ò­¿´»­à½­·®±ò¿«

w ÝÍ×ÎÑ îððíò ˲¿«¬¸±®·­»¼ ½±°§·²¹ ±º ¬¸·­ Þ«·´¼·²¹ Ì»½¸²±´±¹§ º·´» ·­ °®±¸·¾·¬»¼

Ù¿®¼»²­ º±® ¿ ®»¿½¬·ª» ­·¬»

Page 188: SITE CLASSIFICATION REPORT SUMMARY...Douglas Partners (DP) has prepared this report for this project at Taylor 2- Stage 3, Taylor in accordance with DP’s proposal dated 15 September

TOPSOIL FILLING-dry to moist, brown silty sand

FILLING-generally comprising well compacted, dry tomoist, orange red brown, medium plasticity sandy siltyclay

SANDY SILT-very stiff, dry to moist, grey, low plasticitysandy silt with some rootlets

SILTY CLAY-hard, dry to moist, brown orange, mediumplasticity silty clay with some sand

DACITE-extremely low strength, extremely weathered,orange grey, fine to coarse grained dacite, highlyfractured, with occasional clay seams

-from 1.5m, very low to low strength, highly weathered

Pit discontinued at 1.9m-limit of investigation

0.1

0.4

0.65

1.3

1.9

SAMPLING & IN SITU TESTING LEGEND

TEST PIT LOG

Taylor 2 Estate, Stage 3, Taylor

A Auger sample G Gas sample PID Photo ionisation detector (ppm)B Bulk sample P Piston sample PL(A) Point load axial test Is(50) (MPa)BLK Block sample Ux Tube sample (x mm dia.) PL(D) Point load diametral test Is(50) (MPa)C Core drilling W Water sample pp Pocket penetrometer (kPa)D Disturbed sample Water seep S Standard penetration testE Environmental sample Water level V Shear vane (kPa)

Indesco Consulting Engineers Pty LtdSite Classifications

Results &Comments

LOGGED: JPM SURVEY DATUM: MGA94

CLIENT:PROJECT:LOCATION:

PIT No: 53PROJECT No: 77418.29DATE: 11/1/2019SHEET 1 OF 1

Sampling & In Situ Testing

1

2

Wat

er

Dep

th

Sam

ple

Description

of

Strata Gra

phic

Log

Typ

e

REMARKS: Surface Levels & Coordinates are approximate only and must not be relied upon

RIG: Kubota KX057-4 mini-excavator with 300mm wide bucket

WATER OBSERVATIONS: No free groundwater observed

SURFACE LEVEL: 660.0 AHDEASTING: 209158NORTHING: 618731

Dynamic Penetrometer Test(blows per mm)

5 10 15 20

Cone Penetrometer AS1289.6.3.2Sand Penetrometer AS1289.6.3.3

Depth(m) R

L

1

2

660

659

658

D

D

D

0.5

0.9

1.8

pp >400

Page 189: SITE CLASSIFICATION REPORT SUMMARY...Douglas Partners (DP) has prepared this report for this project at Taylor 2- Stage 3, Taylor in accordance with DP’s proposal dated 15 September

TOPSOIL FILLING-dry to moist, brown silty sand

FILLING-generally comprising well compacted, dry tomoist, orange red brown, medium plasticity sandy siltyclay

SILTY CLAY-very stiff, dry to moist, yellow brown, mediumplasticity silty clay with some fine grained gravel

SILTY SAND-hard, dry to moist, brown, fine to coarsegrained silty sand with some clay

SILTY SANDY CLAY-hard, dry to moist, yellow greybrown, low to medium plasticity silty sandy clay

Pit discontinued at 1.85m-limit of investigation

0.1

0.7

1.4

1.6

1.85

SAMPLING & IN SITU TESTING LEGEND

TEST PIT LOG

Taylor 2 Estate, Stage 3, Taylor

A Auger sample G Gas sample PID Photo ionisation detector (ppm)B Bulk sample P Piston sample PL(A) Point load axial test Is(50) (MPa)BLK Block sample Ux Tube sample (x mm dia.) PL(D) Point load diametral test Is(50) (MPa)C Core drilling W Water sample pp Pocket penetrometer (kPa)D Disturbed sample Water seep S Standard penetration testE Environmental sample Water level V Shear vane (kPa)

Indesco Consulting Engineers Pty LtdSite Classifications

Results &Comments

LOGGED: JPM SURVEY DATUM: MGA94

CLIENT:PROJECT:LOCATION:

PIT No: 54PROJECT No: 77418.29DATE: 11/1/2019SHEET 1 OF 1

Sampling & In Situ Testing

1

2

Wat

er

Dep

th

Sam

ple

Description

of

Strata Gra

phic

Log

Typ

e

REMARKS: Surface Levels & Coordinates are approximate only and must not be relied upon

RIG: Kubota KX057-4 mini-excavator with 300mm wide bucket

WATER OBSERVATIONS: No free groundwater observed

SURFACE LEVEL: 662.0 AHDEASTING: 209147NORTHING: 618759

Dynamic Penetrometer Test(blows per mm)

5 10 15 20

Cone Penetrometer AS1289.6.3.2Sand Penetrometer AS1289.6.3.3

Depth(m) R

L

1

2

662

661

660

D

D

D

0.8

1.5

1.7

pp = 370

Page 190: SITE CLASSIFICATION REPORT SUMMARY...Douglas Partners (DP) has prepared this report for this project at Taylor 2- Stage 3, Taylor in accordance with DP’s proposal dated 15 September
Page 191: SITE CLASSIFICATION REPORT SUMMARY...Douglas Partners (DP) has prepared this report for this project at Taylor 2- Stage 3, Taylor in accordance with DP’s proposal dated 15 September

SITE CLASSIFICATION REPORT SUMMARY

BLOCK: 11 SECTION: 64 SUBURB: Taylor

JOB No: 77418.29 DATE: March 2019

CLIENT: Indesco Consulting Engineers Pty Ltd

Classification Procedures: Existing Subsurface Conditions: Refer attached test pit log(s) – Pit(s) 62,63 and Drawing 1. Bulk Earthworks: Filling within the block placed under Level 1 control as defined in AS 3798 – 2007 (Ref 1). Laboratory Results: Previous laboratory testing results indicated liquid limit ranging from 25-66%, plasticity index ranging from 6-49% and linear shrinkage ranging from 3-20.5%.

Site Classification: Class M* (moderately reactive/filled) based on the current profile / state on limited subsurface information and determined in general accordance with the requirements of AS2870-2011 (Ref 2). The classification must be reassessed should the soil profile change either by adding fill or removing soil from the block and/or if the presence of service trenches or retaining walls are within the zone of influence of the block. Reference should be made to the comments provided below.

Footing Systems: Reference must be made to AS2870-2011 (Ref 2) which indicates footing systems that are appropriate for each site classification. All footings must found within a uniform bearing stratum of suitable strength/material, below the zone of influence of any service trenches, backfill zones, retaining walls or underground structures. Masonry walls should be articulated in accordance with current best practice. Dwelling design must ensure uniform moisture conditions are maintained in the vicinity of footings. Footing systems must be confirmed by a structural engineer taking into consideration any onsite or offsite constraints.

Maintenance Guidelines: Reference should be made to the attached CSIRO Sheet BTF 18 ‘Foundation Maintenance & Footing Performance’ to comments about gardens, landscaping and trees on the performance of foundation soils and in particular in respect to maintaining good surface drainage. It notes that minor cracking in most structures is inevitable, and it describes site maintenance practices aimed at minimising foundation movements that can lead to cracking damage.

Comments/ Limitations:

The successful purchaser must make their own interpretations, deductions and conclusions from the information made available and will need to accept full responsibility for such interpretations, deductions and conclusions.

Development specific geotechnical investigations must be undertaken.

Additional topsoils / filling may have been spread subsequent to the investigation.

Site preparation prior to the construction should include removal of all vegetation, topsoil and any uncontrolled filling.

All new filling must be placed under controlled conditions (AS 3798-2007), otherwise Class P conditions would be warranted.

Some variability in subsurface conditions must be anticipated.

Moisture condition of site soils and/or the presence of groundwater may vary considerably from time of investigation compared to at the time of construction.

Depending on the depth of site cut and trenches, rock excavation may be required.

It is recommended that footing excavations be inspected by a geotechnical engineer.

This report must be read in conjunction with the attached “Limitations” and notes “About this Report”.

References:

1. 2.

AS 3798-2007 ‘Guidelines on Earthworks for Commercial and Residential Developments’, Standards Association of Australia. AS 2870-2011 ‘Residential Slabs and Footings,’ Standards Association of Australia.

Attachments:

Limitations & About this Report Explanatory Notes Test Pit Log(s) Pit(s) 62,63 Drawing 1

Page 192: SITE CLASSIFICATION REPORT SUMMARY...Douglas Partners (DP) has prepared this report for this project at Taylor 2- Stage 3, Taylor in accordance with DP’s proposal dated 15 September

FS 604853

Douglas Partners Pty Ltd ABN 75 053 980 117

www.douglaspartners.com.au Unit 2, 73 Sheppard Street

Hume ACT 2620 PO Box 1487

Fyshwick ACT 2609 Phone (02) 6260 2788

Fax (02) 6260 1147

Brisbane • Cairns • Canberra • Central Coast • Coffs Harbour • Darwin • Geelong • Gold Coast • Macarthur • Melbourne Newcastle • North West Sydney • Perth • Port Macquarie • Sunshine Coast • Sydney • Townsville • Wollongong

Limitations Douglas Partners (DP) has prepared this report for this project at Taylor 2 - Stage 3, Taylor in accordance with DP’s proposal dated 15 September 2017 and acceptance received from Indesco Consulting Engineers Pty Ltd dated 13 March 2019. The work was carried out under DP’s Conditions of Engagement. This report is provided for the exclusive use of Indesco Consulting Engineers Pty Ltd for this project only and for the purposes as described in the report. It should not be used by or relied upon for other projects or purposes on the same or other site or by a third party. Any party so relying upon this report beyond its exclusive use and purpose as stated above, and without the express written consent of DP, does so entirely at its own risk and without recourse to DP for any loss or damage. In preparing this report DP has necessarily relied upon information provided by the client and/or their agents. The results provided in the report are indicative of the sub-surface conditions on the site only at the specific sampling and/or testing locations, and then only to the depths investigated and at the time the work was carried out. Sub-surface conditions can change abruptly due to variable geological processes and also as a result of human influences. Such changes may occur after DP’s field testing has been completed. DP’s advice is based upon the conditions encountered during this investigation. The accuracy of the advice provided by DP in this report may be affected by undetected variations in ground conditions across the site between and beyond the sampling and/or testing locations. The advice may also be limited by budget constraints imposed by others or by site accessibility. This report must be read in conjunction with all of the attached and should be kept in its entirety without separation of individual pages or sections. DP cannot be held responsible for interpretations or conclusions made by others unless they are supported by an expressed statement, interpretation, outcome or conclusion stated in this report. This report, or sections from this report, should not be used as part of a specification for a project, without review and agreement by DP. This is because this report has been written as advice and opinion rather than instructions for construction. The scope for work for this investigation/report did not include the assessment of surface or sub-surface materials or groundwater for contaminants, within or adjacent to the site. Should evidence of filling of unknown origin be noted in the report, and in particular the presence of building demolition materials, it should be recognised that there may be some risk that such filling may contain contaminants and hazardous building materials. The contents of this report do not constitute formal design components such as are required, by the Health and Safety Legislation and Regulations, to be included in a Safety Report specifying the hazards likely to be encountered during construction and the controls required to mitigate risk. This design process requires risk assessment to be undertaken, with such assessment being dependent upon factors relating to likelihood of occurrence and consequences of damage to property and to life. This, in turn, requires project data and analysis presently beyond the knowledge and project role respectively of DP. DP may be able, however, to assist the client in carrying out a risk assessment of potential hazards contained in the Comments section of this report, as an extension to the current scope of works, if so requested, and provided that suitable additional information is made available to DP. Any such risk assessment would, however, be necessarily restricted to the geotechnical components set out in this report and to their application by the project designers to project design, construction, maintenance and demolition.

Page 193: SITE CLASSIFICATION REPORT SUMMARY...Douglas Partners (DP) has prepared this report for this project at Taylor 2- Stage 3, Taylor in accordance with DP’s proposal dated 15 September

July 2010

Introduction These notes have been provided to amplify DP's report in regard to classification methods, field procedures and the comments section. Not all are necessarily relevant to all reports. DP's reports are based on information gained from limited subsurface excavations and sampling, supplemented by knowledge of local geology and experience. For this reason, they must be regarded as interpretive rather than factual documents, limited to some extent by the scope of information on which they rely. Copyright This report is the property of Douglas Partners Pty Ltd. The report may only be used for the purpose for which it was commissioned and in accordance with the Conditions of Engagement for the commission supplied at the time of proposal. Unauthorised use of this report in any form whatsoever is prohibited. Borehole and Test Pit Logs The borehole and test pit logs presented in this report are an engineering and/or geological interpretation of the subsurface conditions, and their reliability will depend to some extent on frequency of sampling and the method of drilling or excavation. Ideally, continuous undisturbed sampling or core drilling will provide the most reliable assessment, but this is not always practicable or possible to justify on economic grounds. In any case the boreholes and test pits represent only a very small sample of the total subsurface profile. Interpretation of the information and its application to design and construction should therefore take into account the spacing of boreholes or pits, the frequency of sampling, and the possibility of other than 'straight line' variations between the test locations. Groundwater Where groundwater levels are measured in boreholes there are several potential problems, namely: • In low permeability soils groundwater may

enter the hole very slowly or perhaps not at all during the time the hole is left open;

• A localised, perched water table may lead to an erroneous indication of the true water table;

• Water table levels will vary from time to time with seasons or recent weather changes. They may not be the same at the time of construction as are indicated in the report; and

• The use of water or mud as a drilling fluid will mask any groundwater inflow. Water has to be blown out of the hole and drilling mud must first be washed out of the hole if water measurements are to be made.

More reliable measurements can be made by installing standpipes which are read at intervals over several days, or perhaps weeks for low permeability soils. Piezometers, sealed in a particular stratum, may be advisable in low permeability soils or where there may be interference from a perched water table. Reports The report has been prepared by qualified personnel, is based on the information obtained from field and laboratory testing, and has been undertaken to current engineering standards of interpretation and analysis. Where the report has been prepared for a specific design proposal, the information and interpretation may not be relevant if the design proposal is changed. If this happens, DP will be pleased to review the report and the sufficiency of the investigation work. Every care is taken with the report as it relates to interpretation of subsurface conditions, discussion of geotechnical and environmental aspects, and recommendations or suggestions for design and construction. However, DP cannot always anticipate or assume responsibility for: • Unexpected variations in ground conditions.

The potential for this will depend partly on borehole or pit spacing and sampling frequency;

• Changes in policy or interpretations of policy by statutory authorities; or

• The actions of contractors responding to commercial pressures.

If these occur, DP will be pleased to assist with investigations or advice to resolve the matter.

Page 194: SITE CLASSIFICATION REPORT SUMMARY...Douglas Partners (DP) has prepared this report for this project at Taylor 2- Stage 3, Taylor in accordance with DP’s proposal dated 15 September

July 2010

Site Anomalies In the event that conditions encountered on site during construction appear to vary from those which were expected from the information contained in the report, DP requests that it be immediately notified. Most problems are much more readily resolved when conditions are exposed rather than at some later stage, well after the event. Information for Contractual Purposes Where information obtained from this report is provided for tendering purposes, it is recommended that all information, including the written report and discussion, be made available. In circumstances where the discussion or comments section is not relevant to the contractual situation, it may be appropriate to prepare a specially edited document. DP would be pleased to assist in this regard and/or to make additional report copies available for contract purposes at a nominal charge. Site Inspection The company will always be pleased to provide engineering inspection services for geotechnical and environmental aspects of work to which this report is related. This could range from a site visit to confirm that conditions exposed are as expected, to full time engineering presence on site.

Page 195: SITE CLASSIFICATION REPORT SUMMARY...Douglas Partners (DP) has prepared this report for this project at Taylor 2- Stage 3, Taylor in accordance with DP’s proposal dated 15 September

July 2010

Sampling Sampling is carried out during drilling or test pitting to allow engineering examination (and laboratory testing where required) of the soil or rock. Disturbed samples taken during drilling provide information on colour, type, inclusions and, depending upon the degree of disturbance, some information on strength and structure. Undisturbed samples are taken by pushing a thin-walled sample tube into the soil and withdrawing it to obtain a sample of the soil in a relatively undisturbed state. Such samples yield information on structure and strength, and are necessary for laboratory determination of shear strength and compressibility. Undisturbed sampling is generally effective only in cohesive soils. Test Pits Test pits are usually excavated with a backhoe or an excavator, allowing close examination of the in-situ soil if it is safe to enter into the pit. The depth of excavation is limited to about 3 m for a backhoe and up to 6 m for a large excavator. A potential disadvantage of this investigation method is the larger area of disturbance to the site. Large Diameter Augers Boreholes can be drilled using a rotating plate or short spiral auger, generally 300 mm or larger in diameter commonly mounted on a standard piling rig. The cuttings are returned to the surface at intervals (generally not more than 0.5 m) and are disturbed but usually unchanged in moisture content. Identification of soil strata is generally much more reliable than with continuous spiral flight augers, and is usually supplemented by occasional undisturbed tube samples. Continuous Spiral Flight Augers The borehole is advanced using 90-115 mm diameter continuous spiral flight augers which are withdrawn at intervals to allow sampling or in-situ testing. This is a relatively economical means of drilling in clays and sands above the water table. Samples are returned to the surface, or may be collected after withdrawal of the auger flights, but they are disturbed and may be mixed with soils from the sides of the hole. Information from the drilling (as distinct from specific sampling by SPTs or undisturbed samples) is of relatively low

reliability, due to the remoulding, possible mixing or softening of samples by groundwater. Non-core Rotary Drilling The borehole is advanced using a rotary bit, with water or drilling mud being pumped down the drill rods and returned up the annulus, carrying the drill cuttings. Only major changes in stratification can be determined from the cuttings, together with some information from the rate of penetration. Where drilling mud is used this can mask the cuttings and reliable identification is only possible from separate sampling such as SPTs. Continuous Core Drilling A continuous core sample can be obtained using a diamond tipped core barrel, usually with a 50 mm internal diameter. Provided full core recovery is achieved (which is not always possible in weak rocks and granular soils), this technique provides a very reliable method of investigation. Standard Penetration Tests Standard penetration tests (SPT) are used as a means of estimating the density or strength of soils and also of obtaining a relatively undisturbed sample. The test procedure is described in Australian Standard 1289, Methods of Testing Soils for Engineering Purposes - Test 6.3.1. The test is carried out in a borehole by driving a 50 mm diameter split sample tube under the impact of a 63 kg hammer with a free fall of 760 mm. It is normal for the tube to be driven in three successive 150 mm increments and the 'N' value is taken as the number of blows for the last 300 mm. In dense sands, very hard clays or weak rock, the full 450 mm penetration may not be practicable and the test is discontinued. The test results are reported in the following form. • In the case where full penetration is obtained

with successive blow counts for each 150 mm of, say, 4, 6 and 7 as:

4,6,7 N=13

• In the case where the test is discontinued before the full penetration depth, say after 15 blows for the first 150 mm and 30 blows for the next 40 mm as:

15, 30/40 mm

Page 196: SITE CLASSIFICATION REPORT SUMMARY...Douglas Partners (DP) has prepared this report for this project at Taylor 2- Stage 3, Taylor in accordance with DP’s proposal dated 15 September

July 2010

The results of the SPT tests can be related empirically to the engineering properties of the soils. Dynamic Cone Penetrometer Tests / Perth Sand Penetrometer Tests Dynamic penetrometer tests (DCP or PSP) are carried out by driving a steel rod into the ground using a standard weight of hammer falling a specified distance. As the rod penetrates the soil the number of blows required to penetrate each successive 150 mm depth are recorded. Normally there is a depth limitation of 1.2 m, but this may be extended in certain conditions by the use of extension rods. Two types of penetrometer are commonly used. • Perth sand penetrometer - a 16 mm diameter

flat ended rod is driven using a 9 kg hammer dropping 600 mm (AS 1289, Test 6.3.3). This test was developed for testing the density of sands and is mainly used in granular soils and filling.

• Cone penetrometer - a 16 mm diameter rod with a 20 mm diameter cone end is driven using a 9 kg hammer dropping 510 mm (AS 1289, Test 6.3.2). This test was developed initially for pavement subgrade investigations, and correlations of the test results with California Bearing Ratio have been published by various road authorities.

Page 197: SITE CLASSIFICATION REPORT SUMMARY...Douglas Partners (DP) has prepared this report for this project at Taylor 2- Stage 3, Taylor in accordance with DP’s proposal dated 15 September

May 2017

Description and Classification Methods The methods of description and classification of

soils and rocks used in this report are based on

Australian Standard AS 1726-1993, Geotechnical

Site Investigations Code. In general, the

descriptions include strength or density, colour,

structure, soil or rock type and inclusions.

Soil Types Soil types are described according to the

predominant particle size, qualified by the grading

of other particles present:

Type Particle size (mm)

Boulder >200

Cobble 63 - 200

Gravel 2.36 - 63

Sand 0.075 - 2.36

Silt 0.002 - 0.075

Clay <0.002

The sand and gravel sizes can be further

subdivided as follows:

Type Particle size (mm)

Coarse gravel 20 - 63

Medium gravel 6 - 20

Fine gravel 2.36 - 6

Coarse sand 0.6 - 2.36

Medium sand 0.2 - 0.6

Fine sand 0.075 - 0.2

The proportions of secondary constituents of soils

are described as:

Term Proportion Example

And Specify Clay (60%) and

Sand (40%)

Adjective 20 - 35% Sandy Clay

Slightly 12 - 20% Slightly Sandy

Clay

With some 5 - 12% Clay with some

sand

With a trace of 0 - 5% Clay with a trace

of sand

Definitions of grading terms used are:

• Well graded - a good representation of all

particle sizes

• Poorly graded - an excess or deficiency of

particular sizes within the specified range

• Uniformly graded - an excess of a particular

particle size

• Gap graded - a deficiency of a particular

particle size with the range

Cohesive Soils Cohesive soils, such as clays, are classified on the

basis of undrained shear strength. The strength

may be measured by laboratory testing, or

estimated by field tests or engineering

examination. The strength terms are defined as

follows:

Description Abbreviation Undrained shear strength

(kPa)

Very soft vs <12

Soft s 12 - 25

Firm f 25 - 50

Stiff st 50 - 100

Very stiff vst 100 - 200

Hard h >200

Cohesionless Soils Cohesionless soils, such as clean sands, are

classified on the basis of relative density, generally

from the results of standard penetration tests

(SPT), cone penetration tests (CPT) or dynamic

penetrometers (PSP). The relative density terms

are given below:

Relative Density

Abbreviation SPT N value

CPT qc value (MPa)

Very loose vl <4 <2

Loose l 4 - 10 2 -5

Medium

dense

md 10 - 30 5 - 15

Dense d 30 - 50 15 - 25

Very

dense

vd >50 >25

Page 198: SITE CLASSIFICATION REPORT SUMMARY...Douglas Partners (DP) has prepared this report for this project at Taylor 2- Stage 3, Taylor in accordance with DP’s proposal dated 15 September

May 2017

Soil Origin It is often difficult to accurately determine the origin

of a soil. Soils can generally be classified as:

• Residual soil - derived from in-situ weathering

of the underlying rock;

• Transported soils - formed somewhere else

and transported by nature to the site; or

• Filling - moved by man.

Transported soils may be further subdivided into:

• Alluvium - river deposits

• Lacustrine - lake deposits

• Aeolian - wind deposits

• Littoral - beach deposits

• Estuarine - tidal river deposits

• Talus - scree or coarse colluvium

• Slopewash or Colluvium - transported

downslope by gravity assisted by water.

Often includes angular rock fragments and

boulders.

Page 199: SITE CLASSIFICATION REPORT SUMMARY...Douglas Partners (DP) has prepared this report for this project at Taylor 2- Stage 3, Taylor in accordance with DP’s proposal dated 15 September

May 2017

Rock Strength Rock strength is defined by the Point Load Strength Index (Is(50)) and refers to the strength of the rock

substance and not the strength of the overall rock mass, which may be considerably weaker due to defects.

The test procedure is described by Australian Standard 4133.4.1 - 2007. The terms used to describe rock

strength are as follows:

Term Abbreviation Point Load Index

Is(50) MPa

Approximate Unconfined Compressive Strength MPa*

Extremely low EL <0.03 <0.6

Very low VL 0.03 - 0.1 0.6 - 2

Low L 0.1 - 0.3 2 - 6

Medium M 0.3 - 1.0 6 - 20

High H 1 - 3 20 - 60

Very high VH 3 - 10 60 - 200

Extremely high EH >10 >200

* Assumes a ratio of 20:1 for UCS to Is(50). It should be noted that the UCS to Is(50) ratio varies significantly

for different rock types and specific ratios should be determined for each site.

Degree of Weathering The degree of weathering of rock is classified as follows:

Term Abbreviation Description

Extremely weathered EW Rock substance has soil properties, i.e. it can be remoulded and classified as a soil but the texture of the original rock is still evident.

Highly weathered HW Limonite staining or bleaching affects whole of rock substance and other signs of decomposition are evident. Porosity and strength may be altered as a result of iron leaching or deposition. Colour and strength of original fresh rock is not recognisable

Moderately weathered

MW Staining and discolouration of rock substance has taken place

Slightly weathered SW Rock substance is slightly discoloured but shows little or no change of strength from fresh rock

Fresh stained Fs Rock substance unaffected by weathering but staining visible along defects

Fresh Fr No signs of decomposition or staining

Degree of Fracturing The following classification applies to the spacing of natural fractures in diamond drill cores. It includes

bedding plane partings, joints and other defects, but excludes drilling breaks.

Term Description

Fragmented Fragments of <20 mm

Highly Fractured Core lengths of 20-40 mm with some fragments

Fractured Core lengths of 40-200 mm with some shorter and longer sections

Slightly Fractured Core lengths of 200-1000 mm with some shorter and longer sections

Unbroken Core lengths mostly > 1000 mm

Page 200: SITE CLASSIFICATION REPORT SUMMARY...Douglas Partners (DP) has prepared this report for this project at Taylor 2- Stage 3, Taylor in accordance with DP’s proposal dated 15 September

May 2017

Rock Quality Designation The quality of the cored rock can be measured using the Rock Quality Designation (RQD) index, defined

as:

RQD % = cumulative length of 'sound' core sections ≥ 100 mm long

total drilled length of section being assessed

where 'sound' rock is assessed to be rock of low strength or better. The RQD applies only to natural

fractures. If the core is broken by drilling or handling (i.e. drilling breaks) then the broken pieces are fitted

back together and are not included in the calculation of RQD.

Stratification Spacing For sedimentary rocks the following terms may be used to describe the spacing of bedding partings:

Term Separation of Stratification Planes

Thinly laminated < 6 mm

Laminated 6 mm to 20 mm

Very thinly bedded 20 mm to 60 mm

Thinly bedded 60 mm to 0.2 m

Medium bedded 0.2 m to 0.6 m

Thickly bedded 0.6 m to 2 m

Very thickly bedded > 2 m

Page 201: SITE CLASSIFICATION REPORT SUMMARY...Douglas Partners (DP) has prepared this report for this project at Taylor 2- Stage 3, Taylor in accordance with DP’s proposal dated 15 September

May 2017

Introduction These notes summarise abbreviations commonly

used on borehole logs and test pit reports.

Drilling or Excavation Methods C Core drilling

R Rotary drilling

SFA Spiral flight augers

NMLC Diamond core - 52 mm dia

NQ Diamond core - 47 mm dia

HQ Diamond core - 63 mm dia

PQ Diamond core - 81 mm dia

Water � Water seep

� Water level

Sampling and Testing A Auger sample

B Bulk sample

D Disturbed sample

E Environmental sample

U50 Undisturbed tube sample (50mm)

W Water sample

pp Pocket penetrometer (kPa)

PID Photo ionisation detector

PL Point load strength Is(50) MPa

S Standard Penetration Test

V Shear vane (kPa)

Description of Defects in Rock The abbreviated descriptions of the defects should

be in the following order: Depth, Type, Orientation,

Coating, Shape, Roughness and Other. Drilling

and handling breaks are not usually included on

the logs.

Defect Type

B Bedding plane

Cs Clay seam

Cv Cleavage

Cz Crushed zone

Ds Decomposed seam

F Fault

J Joint

Lam Lamination

Pt Parting

Sz Sheared Zone

V Vein

Orientation

The inclination of defects is always measured from

the perpendicular to the core axis.

h horizontal

v vertical

sh sub-horizontal

sv sub-vertical

Coating or Infilling Term

cln clean

co coating

he healed

inf infilled

stn stained

ti tight

vn veneer

Coating Descriptor

ca calcite

cbs carbonaceous

cly clay

fe iron oxide

mn manganese

slt silty

Shape

cu curved

ir irregular

pl planar

st stepped

un undulating

Roughness

po polished

ro rough

sl slickensided

sm smooth

vr very rough

Other

fg fragmented

bnd band

qtz quartz

Page 202: SITE CLASSIFICATION REPORT SUMMARY...Douglas Partners (DP) has prepared this report for this project at Taylor 2- Stage 3, Taylor in accordance with DP’s proposal dated 15 September

May 2017

Graphic Symbols for Soil and Rock General

Soils

Sedimentary Rocks

Metamorphic Rocks

Igneous Rocks

Road base

Filling

Concrete

Asphalt

Topsoil

Peat

Clay

Conglomeratic sandstone

Conglomerate

Boulder conglomerate

Sandstone

Slate, phyllite, schist

Siltstone

Mudstone, claystone, shale

Coal

Limestone

Porphyry

Cobbles, boulders

Sandy gravel

Laminite

Silty sand

Clayey sand

Silty clay

Sandy clay

Gravelly clay

Shaly clay

Silt

Clayey silt

Sandy silt

Sand

Gravel

Talus

Gneiss

Quartzite

Dolerite, basalt, andesite

Granite

Tuff, breccia

Dacite, epidote

Page 203: SITE CLASSIFICATION REPORT SUMMARY...Douglas Partners (DP) has prepared this report for this project at Taylor 2- Stage 3, Taylor in accordance with DP’s proposal dated 15 September

ͱ·´ ̧°»­

̸» ¬§°»­ ±º ­±·´­ «­«¿´´§ °®»­»²¬ «²¼»® ¬¸» ¬±°­±·´ ·² ´¿²¼ ¦±²»¼ º±®®»­·¼»²¬·¿´ ¾«·´¼·²¹­ ½¿² ¾» ­°´·¬ ·²¬± ¬©± ¿°°®±¨·³¿¬» ¹®±«°­ P¹®¿²«´¿® ¿²¼ ½´¿§ò Ï«·¬» ±º¬»²ô º±«²¼¿¬·±² ­±·´ ·­ ¿ ³·¨¬«®» ±º ¾±¬¸¬§°»­ò ̸» ¹»²»®¿´ °®±¾´»³­ ¿­­±½·¿¬»¼ ©·¬¸ ­±·´­ ¸¿ª·²¹ ¹®¿²«´¿®½±²¬»²¬ ¿®» «­«¿´´§ ½¿«­»¼ ¾§ »®±­·±²ò Ý´¿§ ­±·´­ ¿®» ­«¾¶»½¬ ¬±­¿¬«®¿¬·±² ¿²¼ ­©»´´ñ­¸®·²µ °®±¾´»³­ò

Ý´¿­­·º·½¿¬·±²­ º±® ¿ ¹·ª»² ¿®»¿ ½¿² ¹»²»®¿´´§ ¾» ±¾¬¿·²»¼ ¾§¿°°´·½¿¬·±² ¬± ¬¸» ´±½¿´ ¿«¬¸±®·¬§ô ¾«¬ ¬¸»­» ¿®» ­±³»¬·³»­ «²®»´·¿¾´»¿²¼ ·º ¬¸»®» ·­ ¼±«¾¬ô ¿ ¹»±¬»½¸²·½¿´ ®»°±®¬ ­¸±«´¼ ¾» ½±³³·­­·±²»¼òß­ ³±­¬ ¾«·´¼·²¹­ ­«ºº»®·²¹ ³±ª»³»²¬ °®±¾´»³­ ¿®» º±«²¼»¼ ±² ½´¿§­±·´­ô ¬¸»®» ·­ ¿² »³°¸¿­·­ ±² ½´¿­­·º·½¿¬·±² ±º ­±·´­ ¿½½±®¼·²¹ ¬± ¬¸»¿³±«²¬ ±º ­©»´´ ¿²¼ ­¸®·²µ¿¹» ¬¸»§ »¨°»®·»²½» ©·¬¸ ª¿®·¿¬·±²­ ±º©¿¬»® ½±²¬»²¬ò ̸» ¬¿¾´» ¾»´±© ·­ Ì¿¾´» îòï º®±³ ßÍ îèéðô ¬¸»Î»­·¼»²¬·¿´ Í´¿¾ ¿²¼ Ú±±¬·²¹ ݱ¼»ò

Ý¿«­»­ ±º Ó±ª»³»²¬

Í»¬¬´»³»²¬ ¼«» ¬± ½±²­¬®«½¬·±²Ì¸»®» ¿®» ¬©± ¬§°»­ ±º ­»¬¬´»³»²¬ ¬¸¿¬ ±½½«® ¿­ ¿ ®»­«´¬ ±º½±²­¬®«½¬·±²æ{ ׳³»¼·¿¬» ­»¬¬´»³»²¬ ±½½«®­ ©¸»² ¿ ¾«·´¼·²¹ ·­ º·®­¬ °´¿½»¼ ±² ·¬­

º±«²¼¿¬·±² ­±·´ô ¿­ ¿ ®»­«´¬ ±º ½±³°¿½¬·±² ±º ¬¸» ­±·´ «²¼»® ¬¸»©»·¹¸¬ ±º ¬¸» ­¬®«½¬«®»ò ̸» ½±¸»­·ª» ¯«¿´·¬§ ±º ½´¿§ ­±·´ ³·¬·¹¿¬»­¿¹¿·²­¬ ¬¸·­ô ¾«¬ ¹®¿²«´¿® ø°¿®¬·½«´¿®´§ ­¿²¼§÷ ­±·´ ·­ ­«­½»°¬·¾´»ò

{ ݱ²­±´·¼¿¬·±² ­»¬¬´»³»²¬ ·­ ¿ º»¿¬«®» ±º ½´¿§ ­±·´ ¿²¼ ³¿§ ¬¿µ»°´¿½» ¾»½¿«­» ±º ¬¸» »¨°«´­·±² ±º ³±·­¬«®» º®±³ ¬¸» ­±·´ ±® ¾»½¿«­»±º ¬¸» ­±·´K­ ´¿½µ ±º ®»­·­¬¿²½» ¬± ´±½¿´ ½±³°®»­­·ª» ±® ­¸»¿® ­¬®»­­»­ò̸·­ ©·´´ «­«¿´´§ ¬¿µ» °´¿½» ¼«®·²¹ ¬¸» º·®­¬ º»© ³±²¬¸­ ¿º¬»®½±²­¬®«½¬·±²ô ¾«¬ ¸¿­ ¾»»² µ²±©² ¬± ¬¿µ» ³¿²§ §»¿®­ ·²»¨½»°¬·±²¿´ ½¿­»­ò

̸»­» °®±¾´»³­ ¿®» ¬¸» °®±ª·²½» ±º ¬¸» ¾«·´¼»® ¿²¼ ­¸±«´¼ ¾» ¬¿µ»²·²¬± ½±²­·¼»®¿¬·±² ¿­ °¿®¬ ±º ¬¸» °®»°¿®¿¬·±² ±º ¬¸» ­·¬» º±® ½±²­¬®«½ó¬·±²ò Þ«·´¼·²¹ Ì»½¸²±´±¹§ Ú·´» ïç øÞÌÚ ïç÷ ¼»¿´­ ©·¬¸ ¬¸»­»°®±¾´»³­ò

Û®±­·±²ß´´ ­±·´­ ¿®» °®±²» ¬± »®±­·±²ô ¾«¬ ­¿²¼§ ­±·´ ·­ °¿®¬·½«´¿®´§ ­«­½»°¬·¾´»¬± ¾»·²¹ ©¿­¸»¼ ¿©¿§ò Ûª»² ½´¿§ ©·¬¸ ¿ ­¿²¼ ½±³°±²»²¬ ±º ­¿§ ïðû±® ³±®» ½¿² ­«ºº»® º®±³ »®±­·±²ò

Í¿¬«®¿¬·±²Ì¸·­ ·­ °¿®¬·½«´¿®´§ ¿ °®±¾´»³ ·² ½´¿§ ­±·´­ò Í¿¬«®¿¬·±² ½®»¿¬»­ ¿ ¾±¹ó´·µ» ­«­°»²­·±² ±º ¬¸» ­±·´ ¬¸¿¬ ½¿«­»­ ·¬ ¬± ´±­» ª·®¬«¿´´§ ¿´´ ±º ·¬­¾»¿®·²¹ ½¿°¿½·¬§ò ̱ ¿ ´»­­»® ¼»¹®»»ô ­¿²¼ ·­ ¿ºº»½¬»¼ ¾§ ­¿¬«®¿¬·±²¾»½¿«­» ­¿¬«®¿¬»¼ ­¿²¼ ³¿§ «²¼»®¹± ¿ ®»¼«½¬·±² ·² ª±´«³» P°¿®¬·½«´¿®´§ ·³°±®¬»¼ ­¿²¼ º·´´ º±® ¾»¼¼·²¹ ¿²¼ ¾´·²¼·²¹ ´¿§»®­òر©»ª»®ô ¬¸·­ «­«¿´´§ ±½½«®­ ¿­ ·³³»¼·¿¬» ­»¬¬´»³»²¬ ¿²¼ ­¸±«´¼²±®³¿´´§ ¾» ¬¸» °®±ª·²½» ±º ¬¸» ¾«·´¼»®ò

Í»¿­±²¿´ ­©»´´·²¹ ¿²¼ ­¸®·²µ¿¹» ±º ­±·´ß´´ ½´¿§­ ®»¿½¬ ¬± ¬¸» °®»­»²½» ±º ©¿¬»® ¾§ ­´±©´§ ¿¾­±®¾·²¹ ·¬ô ³¿µ·²¹¬¸» ­±·´ ·²½®»¿­» ·² ª±´«³» ø­»» ¬¿¾´» ¾»´±©÷ò ̸» ¼»¹®»» ±º ·²½®»¿­»ª¿®·»­ ½±²­·¼»®¿¾´§ ¾»¬©»»² ¼·ºº»®»²¬ ½´¿§­ô ¿­ ¼±»­ ¬¸» ¼»¹®»» ±º¼»½®»¿­» ¼«®·²¹ ¬¸» ­«¾­»¯«»²¬ ¼®§·²¹ ±«¬ ½¿«­»¼ ¾§ º¿·® ©»¿¬¸»®°»®·±¼­ò Þ»½¿«­» ±º ¬¸» ´±© ¿¾­±®°¬·±² ¿²¼ »¨°«´­·±² ®¿¬»ô ¬¸·­°¸»²±³»²±² ©·´´ ²±¬ «­«¿´´§ ¾» ²±¬·½»¿¾´» «²´»­­ ¬¸»®» ¿®»°®±´±²¹»¼ ®¿·²§ ±® ¼®§ °»®·±¼­ô «­«¿´´§ ±º ©»»µ­ ±® ³±²¬¸­ô¼»°»²¼·²¹ ±² ¬¸» ´¿²¼ ¿²¼ ­±·´ ½¸¿®¿½¬»®·­¬·½­ò

̸» ­©»´´·²¹ ±º ­±·´ ½®»¿¬»­ ¿² «°©¿®¼ º±®½» ±² ¬¸» º±±¬·²¹­ ±º ¬¸»¾«·´¼·²¹ô ¿²¼ ­¸®·²µ¿¹» ½®»¿¬»­ ­«¾­·¼»²½» ¬¸¿¬ ¬¿µ»­ ¿©¿§ ¬¸»­«°°±®¬ ²»»¼»¼ ¾§ ¬¸» º±±¬·²¹ ¬± ®»¬¿·² »¯«·´·¾®·«³ò

͸»¿® º¿·´«®»Ì¸·­ °¸»²±³»²±² ±½½«®­ ©¸»² ¬¸» º±«²¼¿¬·±² ­±·´ ¼±»­ ²±¬ ¸¿ª»­«ºº·½·»²¬ ­¬®»²¹¬¸ ¬± ­«°°±®¬ ¬¸» ©»·¹¸¬ ±º ¬¸» º±±¬·²¹ò ̸»®» ¿®»¬©± ³¿¶±® °±­¬ó½±²­¬®«½¬·±² ½¿«­»­æ

{ Í·¹²·º·½¿²¬ ´±¿¼ ·²½®»¿­»ò{ λ¼«½¬·±² ±º ´¿¬»®¿´ ­«°°±®¬ ±º ¬¸» ­±·´ «²¼»® ¬¸» º±±¬·²¹ ¼«» ¬±

»®±­·±² ±® »¨½¿ª¿¬·±²ò{ ײ ½´¿§ ­±·´ô ­¸»¿® º¿·´«®» ½¿² ¾» ½¿«­»¼ ¾§ ­¿¬«®¿¬·±² ±º ¬¸» ­±·´

¿¼¶¿½»²¬ ¬± ±® «²¼»® ¬¸» º±±¬·²¹ò

Þ«·´¼·²¹­ ½¿² ¿²¼ ±º¬»² ¼± ³±ª»ò ̸·­ ³±ª»³»²¬ ½¿² ¾» «°ô ¼±©²ô ´¿¬»®¿´ ±® ®±¬¿¬·±²¿´ò ̸» º«²¼¿³»²¬¿´ ½¿«­»±º ³±ª»³»²¬ ·² ¾«·´¼·²¹­ ½¿² «­«¿´´§ ¾» ®»´¿¬»¼ ¬± ±²» ±® ³±®» °®±¾´»³­ ·² ¬¸» º±«²¼¿¬·±² ­±·´ò ׬ ·­ ·³°±®¬¿²¬ º±®¬¸» ¸±³»±©²»® ¬± ·¼»²¬·º§ ¬¸» ­±·´ ¬§°» ·² ±®¼»® ¬± ¿­½»®¬¿·² ¬¸» ³»¿­«®»­ ¬¸¿¬ ­¸±«´¼ ¾» °«¬ ·² °´¿½» ·² ±®¼»® ¬±»²­«®» ¬¸¿¬ °®±¾´»³­ ·² ¬¸» º±«²¼¿¬·±² ­±·´ ½¿² ¾» °®»ª»²¬»¼ô ¬¸«­ °®±¬»½¬·²¹ ¿¹¿·²­¬ ¾«·´¼·²¹ ³±ª»³»²¬ò

̸·­ Þ«·´¼·²¹ Ì»½¸²±´±¹§ Ú·´» ·­ ¼»­·¹²»¼ ¬± ·¼»²¬·º§ ½¿«­»­ ±º ­±·´ó®»´¿¬»¼ ¾«·´¼·²¹ ³±ª»³»²¬ô ¿²¼ ¬± ­«¹¹»­¬³»¬¸±¼­ ±º °®»ª»²¬·±² ±º ®»­«´¬¿²¬ ½®¿½µ·²¹ ·² ¾«·´¼·²¹­ò

Ú±«²¼¿¬·±² Ó¿·²¬»²¿²½»¿²¼ Ú±±¬·²¹ л®º±®³¿²½»æß Ø±³»±©²»®K­ Ù«·¼»

ÙÛÒÛÎßÔ ÜÛÚ×Ò×Ì×ÑÒÍ ÑÚ Í×ÌÛ ÝÔßÍÍÛÍ

Ý´¿­­ Ú±«²¼¿¬·±²

ß Ó±­¬ ­¿²¼ ¿²¼ ®±½µ ­·¬»­ ©·¬¸ ´·¬¬´» ±® ²± ¹®±«²¼ ³±ª»³»²¬ º®±³ ³±·­¬«®» ½¸¿²¹»­

Í Í´·¹¸¬´§ ®»¿½¬·ª» ½´¿§ ­·¬»­ ©·¬¸ ±²´§ ­´·¹¸¬ ¹®±«²¼ ³±ª»³»²¬ º®±³ ³±·­¬«®» ½¸¿²¹»­

Ó Ó±¼»®¿¬»´§ ®»¿½¬·ª» ½´¿§ ±® ­·´¬ ­·¬»­ô ©¸·½¸ ½¿² »¨°»®·»²½» ³±¼»®¿¬» ¹®±«²¼ ³±ª»³»²¬ º®±³ ³±·­¬«®» ½¸¿²¹»­

Ø Ø·¹¸´§ ®»¿½¬·ª» ½´¿§ ­·¬»­ô ©¸·½¸ ½¿² »¨°»®·»²½» ¸·¹¸ ¹®±«²¼ ³±ª»³»²¬ º®±³ ³±·­¬«®» ½¸¿²¹»­

Û Û¨¬®»³»´§ ®»¿½¬·ª» ­·¬»­ô ©¸·½¸ ½¿² »¨°»®·»²½» »¨¬®»³» ¹®±«²¼ ³±ª»³»²¬ º®±³ ³±·­¬«®» ½¸¿²¹»­

ß ¬± Ð Ú·´´»¼ ­·¬»­

Ð Í·¬»­ ©¸·½¸ ·²½´«¼» ­±º¬ ­±·´­ô ­«½¸ ¿­ ­±º¬ ½´¿§ ±® ­·´¬ ±® ´±±­» ­¿²¼­å ´¿²¼­´·°å ³·²» ­«¾­·¼»²½»å ½±´´¿°­·²¹ ­±·´­å ­±·´­ ­«¾¶»½¬¬± »®±­·±²å ®»¿½¬·ª» ­·¬»­ ­«¾¶»½¬ ¬± ¿¾²±®³¿´ ³±·­¬«®» ½±²¼·¬·±²­ ±® ­·¬»­ ©¸·½¸ ½¿²²±¬ ¾» ½´¿­­·º·»¼ ±¬¸»®©·­»

ÞÌÚ ïè®»°´¿½»­

ײº±®³¿¬·±²Í¸»»¬ ïðñçï

Page 204: SITE CLASSIFICATION REPORT SUMMARY...Douglas Partners (DP) has prepared this report for this project at Taylor 2- Stage 3, Taylor in accordance with DP’s proposal dated 15 September

Ì®»» ®±±¬ ¹®±©¬¸Ì®»»­ ¿²¼ ­¸®«¾­ ¬¸¿¬ ¿®» ¿´´±©»¼ ¬± ¹®±© ·² ¬¸» ª·½·²·¬§ ±º º±±¬·²¹­½¿² ½¿«­» º±«²¼¿¬·±² ­±·´ ³±ª»³»²¬ ·² ¬©± ©¿§­æ

{ ᱬ­ ¬¸¿¬ ¹®±© «²¼»® º±±¬·²¹­ ³¿§ ·²½®»¿­» ·² ½®±­­ó­»½¬·±²¿´­·¦»ô »¨»®¬·²¹ «°©¿®¼ °®»­­«®» ±² º±±¬·²¹­ò

{ ᱬ­ ·² ¬¸» ª·½·²·¬§ ±º º±±¬·²¹­ ©·´´ ¿¾­±®¾ ³«½¸ ±º ¬¸» ³±·­¬«®»·² ¬¸» º±«²¼¿¬·±² ­±·´ô ½¿«­·²¹ ­¸®·²µ¿¹» ±® ­«¾­·¼»²½»ò

˲»ª»²²»­­ ±º Ó±ª»³»²¬

̸» ¬§°»­ ±º ¹®±«²¼ ³±ª»³»²¬ ¼»­½®·¾»¼ ¿¾±ª» «­«¿´´§ ±½½«®«²»ª»²´§ ¬¸®±«¹¸±«¬ ¬¸» ¾«·´¼·²¹K­ º±«²¼¿¬·±² ­±·´ò Í»¬¬´»³»²¬ ¼«»¬± ½±²­¬®«½¬·±² ¬»²¼­ ¬± ¾» «²»ª»² ¾»½¿«­» ±ºæ

{ Ü·ºº»®·²¹ ½±³°¿½¬·±² ±º º±«²¼¿¬·±² ­±·´ °®·±® ¬± ½±²­¬®«½¬·±²ò

{ Ü·ºº»®·²¹ ³±·­¬«®» ½±²¬»²¬ ±º º±«²¼¿¬·±² ­±·´ °®·±® ¬± ½±²­¬®«½¬·±²ò

Ó±ª»³»²¬ ¼«» ¬± ²±²ó½±²­¬®«½¬·±² ½¿«­»­ ·­ «­«¿´´§ ³±®» «²»ª»²­¬·´´ò Û®±­·±² ½¿² «²¼»®³·²» ¿ º±±¬·²¹ ¬¸¿¬ ¬®¿ª»®­»­ ¬¸» º´±© ±® ½¿²½®»¿¬» ¬¸» ½±²¼·¬·±²­ º±® ­¸»¿® º¿·´«®» ¾§ »®±¼·²¹ ­±·´ ¿¼¶¿½»²¬ ¬± ¿º±±¬·²¹ ¬¸¿¬ ®«²­ ·² ¬¸» ­¿³» ¼·®»½¬·±² ¿­ ¬¸» º´±©ò

Í¿¬«®¿¬·±² ±º ½´¿§ º±«²¼¿¬·±² ­±·´ ³¿§ ±½½«® ©¸»®» ­«¾º´±±® ©¿´´­½®»¿¬» ¿ ¼¿³ ¬¸¿¬ ³¿µ»­ ©¿¬»® °±²¼ò ׬ ½¿² ¿´­± ±½½«® ©¸»®»ª»® ¬¸»®»·­ ¿ ­±«®½» ±º ©¿¬»® ²»¿® º±±¬·²¹­ ·² ½´¿§ ­±·´ò ̸·­ ´»¿¼­ ¬± ¿ ­»ª»®»®»¼«½¬·±² ·² ¬¸» ­¬®»²¹¬¸ ±º ¬¸» ­±·´ ©¸·½¸ ³¿§ ½®»¿¬» ´±½¿´ ­¸»¿®º¿·´«®»ò

Í»¿­±²¿´ ­©»´´·²¹ ¿²¼ ­¸®·²µ¿¹» ±º ½´¿§ ­±·´ ¿ºº»½¬­ ¬¸» °»®·³»¬»® ±º¬¸» ¾«·´¼·²¹ º·®­¬ô ¬¸»² ¹®¿¼«¿´´§ ­°®»¿¼­ ¬± ¬¸» ·²¬»®·±®ò ̸» ­©»´´·²¹°®±½»­­ ©·´´ «­«¿´´§ ¾»¹·² ¿¬ ¬¸» «°¸·´´ »¨¬®»³» ±º ¬¸» ¾«·´¼·²¹ô ±® ±²¬¸» ©»¿¬¸»® ­·¼» ©¸»®» ¬¸» ´¿²¼ ·­ º´¿¬ò Í©»´´·²¹ ¹®¿¼«¿´´§ ®»¿½¸»­ ¬¸»·²¬»®·±® ­±·´ ¿­ ¿¾­±®°¬·±² ½±²¬·²«»­ò ͸®·²µ¿¹» «­«¿´´§ ¾»¹·²­ ©¸»®»¬¸» ­«²K­ ¸»¿¬ ·­ ¹®»¿¬»­¬ò

Ûºº»½¬­ ±º ˲»ª»² ͱ·´ Ó±ª»³»²¬ ±² ͬ®«½¬«®»­

Û®±­·±² ¿²¼ ­¿¬«®¿¬·±²Û®±­·±² ®»³±ª»­ ¬¸» ­«°°±®¬ º®±³ «²¼»® º±±¬·²¹­ô ¬»²¼·²¹ ¬± ½®»¿¬»­«¾­·¼»²½» ±º ¬¸» °¿®¬ ±º ¬¸» ­¬®«½¬«®» «²¼»® ©¸·½¸ ·¬ ±½½«®­òÞ®·½µ©±®µ ©¿´´­ ©·´´ ®»­·­¬ ¬¸» ­¬®»­­ ½®»¿¬»¼ ¾§ ¬¸·­ ®»³±ª¿´ ±º­«°°±®¬ ¾§ ¾®·¼¹·²¹ ¬¸» ¹¿° ±® ½¿²¬·´»ª»®·²¹ «²¬·´ ¬¸» ¾®·½µ­ ±® ¬¸»³±®¬¿® ¾»¼¼·²¹ º¿·´ò Ñ´¼»® ³¿­±²®§ ¸¿­ ´·¬¬´» ®»­·­¬¿²½»ò Ûª·¼»²½» ±ºº¿·´«®» ª¿®·»­ ¿½½±®¼·²¹ ¬± ½·®½«³­¬¿²½»­ ¿²¼ ­§³°¬±³­ ³¿§ ·²½´«¼»æ

{ ͬ»° ½®¿½µ·²¹ ·² ¬¸» ³±®¬¿® ¾»¼­ ·² ¬¸» ¾±¼§ ±º ¬¸» ©¿´´ ±®¿¾±ª»ñ¾»´±© ±°»²·²¹­ ­«½¸ ¿­ ¼±±®­ ±® ©·²¼±©­ò

{ Ê»®¬·½¿´ ½®¿½µ·²¹ ·² ¬¸» ¾®·½µ­ ø«­«¿´´§ ¾«¬ ²±¬ ²»½»­­¿®·´§ ·² ´·²»©·¬¸ ¬¸» ª»®¬·½¿´ ¾»¼­ ±® °»®°»²¼­÷ò

×­±´¿¬»¼ °·»®­ ¿ºº»½¬»¼ ¾§ »®±­·±² ±® ­¿¬«®¿¬·±² ±º º±«²¼¿¬·±²­ ©·´´»ª»²¬«¿´´§ ´±­» ½±²¬¿½¬ ©·¬¸ ¬¸» ¾»¿®»®­ ¬¸»§ ­«°°±®¬ ¿²¼ ³¿§ ¬·´¬ ±®º¿´´ ±ª»®ò ̸» º´±±®­ ¬¸¿¬ ¸¿ª» ´±­¬ ¬¸·­ ­«°°±®¬ ©·´´ ¾»½±³» ¾±«²½§ô­±³»¬·³»­ ®¿¬¬´·²¹ ±®²¿³»²¬­ »¬½ò

Í»¿­±²¿´ ­©»´´·²¹ñ­¸®·²µ¿¹» ·² ½´¿§Í©»´´·²¹ º±«²¼¿¬·±² ­±·´ ¼«» ¬± ®¿·²§ °»®·±¼­ º·®­¬ ´·º¬­ ¬¸» ³±­¬»¨°±­»¼ »¨¬®»³·¬·»­ ±º ¬¸» º±±¬·²¹ ­§­¬»³ô ¬¸»² ¬¸» ®»³¿·²¼»® ±º ¬¸»°»®·³»¬»® º±±¬·²¹­ ©¸·´» ¹®¿¼«¿´´§ °»®³»¿¬·²¹ ·²­·¼» ¬¸» ¾«·´¼·²¹º±±¬°®·²¬ ¬± ´·º¬ ·²¬»®²¿´ º±±¬·²¹­ò ̸·­ ­©»´´·²¹ º·®­¬ ¬»²¼­ ¬± ½®»¿¬» ¿¼·­¸ »ºº»½¬ô ¾»½¿«­» ¬¸» »¨¬»®²¿´ º±±¬·²¹­ ¿®» °«­¸»¼ ¸·¹¸»® ¬¸¿² ¬¸»·²¬»®²¿´ ±²»­ò

̸» º·®­¬ ²±¬·½»¿¾´» ­§³°¬±³ ³¿§ ¾» ¬¸¿¬ ¬¸» º´±±® ¿°°»¿®­ ­´·¹¸¬´§¼·­¸»¼ò ̸·­ ·­ ±º¬»² ¿½½±³°¿²·»¼ ¾§ ­±³» ¼±±®­ ¾·²¼·²¹ ±² ¬¸»º´±±® ±® ¬¸» ¼±±® ¸»¿¼ô ¬±¹»¬¸»® ©·¬¸ ­±³» ½®¿½µ·²¹ ±º ½±®²·½»³·¬®»­ò ײ ¾«·´¼·²¹­ ©·¬¸ ¬·³¾»® º´±±®·²¹ ­«°°±®¬»¼ ¾§ ¾»¿®»®­ ¿²¼¶±·­¬­ô ¬¸» º´±±® ½¿² ¾» ¾±«²½§ò Û¨¬»®²¿´´§ ¬¸»®» ³¿§ ¾» ª·­·¾´»¼·­¸·²¹ ±º ¬¸» ¸·° ±® ®·¼¹» ´·²»­ò

ß­ ¬¸» ³±·­¬«®» ¿¾­±®°¬·±² °®±½»­­ ½±³°´»¬»­ ·¬­ ¶±«®²»§ ¬± ¬¸»·²²»®³±­¬ ¿®»¿­ ±º ¬¸» ¾«·´¼·²¹ô ¬¸» ·²¬»®²¿´ º±±¬·²¹­ ©·´´ ®·­»ò ׺ ¬¸»­°®»¿¼ ±º ³±·­¬«®» ·­ ®±«¹¸´§ »ª»²ô ·¬ ³¿§ ¾» ¬¸¿¬ ¬¸» ­§³°¬±³­ ©·´´¬»³°±®¿®·´§ ¼·­¿°°»¿®ô ¾«¬ ·¬ ·­ ³±®» ´·µ»´§ ¬¸¿¬ ­©»´´·²¹ ©·´´ ¾»«²»ª»²ô ½®»¿¬·²¹ ¿ ¼·ºº»®»²½» ®¿¬¸»® ¬¸¿² ¿ ¼·­¿°°»¿®¿²½» ·²­§³°¬±³­ò ײ ¾«·´¼·²¹­ ©·¬¸ ¬·³¾»® º´±±®·²¹ ­«°°±®¬»¼ ¾§ ¾»¿®»®­¿²¼ ¶±·­¬­ô ¬¸» ·­±´¿¬»¼ °·»®­ ©·´´ ®·­» ³±®» »¿­·´§ ¬¸¿² ¬¸» ­¬®·°º±±¬·²¹­ ±® °·»®­ «²¼»® ©¿´´­ô ½®»¿¬·²¹ ²±¬·½»¿¾´» ¼±³·²¹ ±º º´±±®·²¹ò

ß­ ¬¸» ©»¿¬¸»® °¿¬¬»®² ½¸¿²¹»­ ¿²¼ ¬¸» ­±·´ ¾»¹·²­ ¬± ¼®§ ±«¬ô ¬¸»»¨¬»®²¿´ º±±¬·²¹­ ©·´´ ¾» º·®­¬ ¿ºº»½¬»¼ô ¾»¹·²²·²¹ ©·¬¸ ¬¸» ´±½¿¬·±²­©¸»®» ¬¸» ­«²K­ »ºº»½¬ ·­ ­¬®±²¹»­¬ò ̸·­ ¸¿­ ¬¸» »ºº»½¬ ±º ´±©»®·²¹ ¬¸»»¨¬»®²¿´ º±±¬·²¹­ò ̸» ¼±³·²¹ ·­ ¿½½»²¬«¿¬»¼ ¿²¼ ½®¿½µ·²¹ ®»¼«½»­±® ¼·­¿°°»¿®­ ©¸»®» ·¬ ±½½«®®»¼ ¾»½¿«­» ±º ¼·­¸·²¹ô ¾«¬ ±¬¸»® ½®¿½µ­±°»² «°ò ̸» ®±±º ´·²»­ ³¿§ ¾»½±³» ½±²ª»¨ò

ܱ³·²¹ ¿²¼ ¼·­¸·²¹ ¿®» ¿´­± ¿ºº»½¬»¼ ¾§ ©»¿¬¸»® ·² ±¬¸»® ©¿§­ò ײ¿®»¿­ ©¸»®» ©¿®³ô ©»¬ ­«³³»®­ ¿²¼ ½±±´»® ¼®§ ©·²¬»®­ °®»ª¿·´ô©¿¬»® ³·¹®¿¬·±² ¬»²¼­ ¬± ¾» ¬±©¿®¼ ¬¸» ·²¬»®·±® ¿²¼ ¼±³·²¹ ©·´´ ¾»¿½½»²¬«¿¬»¼ô ©¸»®»¿­ ©¸»®» ­«³³»®­ ¿®» ¼®§ ¿²¼ ©·²¬»®­ ¿®» ½±´¼¿²¼ ©»¬ô ³·¹®¿¬·±² ¬»²¼­ ¬± ¾» ¬±©¿®¼ ¬¸» »¨¬»®·±® ¿²¼ ¬¸»«²¼»®´§·²¹ °®±°»²­·¬§ ·­ ¬±©¿®¼ ¼·­¸·²¹ò

Ó±ª»³»²¬ ½¿«­»¼ ¾§ ¬®»» ®±±¬­×² ¹»²»®¿´ô ¹®±©·²¹ ®±±¬­ ©·´´ »¨»®¬ ¿² «°©¿®¼ °®»­­«®» ±² º±±¬·²¹­ô©¸»®»¿­ ­±·´ ­«¾¶»½¬ ¬± ¼®§·²¹ ¾»½¿«­» ±º ¬®»» ±® ­¸®«¾ ®±±¬­ ©·´´ ¬»²¼¬± ®»³±ª» ­«°°±®¬ º®±³ «²¼»® º±±¬·²¹­ ¾§ ·²¼«½·²¹ ­¸®·²µ¿¹»ò

ݱ³°´·½¿¬·±²­ ½¿«­»¼ ¾§ ¬¸» ­¬®«½¬«®» ·¬­»´ºÓ±­¬ º±®½»­ ¬¸¿¬ ¬¸» ­±·´ ½¿«­»­ ¬± ¾» »¨»®¬»¼ ±² ­¬®«½¬«®»­ ¿®»ª»®¬·½¿´ P ·ò»ò »·¬¸»® «° ±® ¼±©²ò ر©»ª»®ô ¾»½¿«­» ¬¸»­» º±®½»­ ¿®»­»´¼±³ ­°®»¿¼ »ª»²´§ ¿®±«²¼ ¬¸» º±±¬·²¹­ô ¿²¼ ¾»½¿«­» ¬¸» ¾«·´¼·²¹®»­·­¬­ «²»ª»² ³±ª»³»²¬ ¾»½¿«­» ±º ·¬­ ®·¹·¼·¬§ô º±®½»­ ¿®» »¨»®¬»¼º®±³ ±²» °¿®¬ ±º ¬¸» ¾«·´¼·²¹ ¬± ¿²±¬¸»®ò ̸» ²»¬ ®»­«´¬ ±º ¿´´ ¬¸»­»º±®½»­ ·­ «­«¿´´§ ®±¬¿¬·±²¿´ò ̸·­ ®»­«´¬¿²¬ º±®½» ±º¬»² ½±³°´·½¿¬»­ ¬¸»¼·¿¹²±­·­ ¾»½¿«­» ¬¸» ª·­·¾´» ­§³°¬±³­ ¼± ²±¬ ­·³°´§ ®»º´»½¬ ¬¸»±®·¹·²¿´ ½¿«­»ò ß ½±³³±² ­§³°¬±³ ·­ ¾·²¼·²¹ ±º ¼±±®­ ±² ¬¸»ª»®¬·½¿´ ³»³¾»® ±º ¬¸» º®¿³»ò

Ûºº»½¬­ ±² º«´´ ³¿­±²®§ ­¬®«½¬«®»­Þ®·½µ©±®µ ©·´´ ®»­·­¬ ½®¿½µ·²¹ ©¸»®» ·¬ ½¿²ò ׬ ©·´´ ¿¬¬»³°¬ ¬± ­°¿²¿®»¿­ ¬¸¿¬ ´±­» ­«°°±®¬ ¾»½¿«­» ±º ­«¾­·¼»¼ º±«²¼¿¬·±²­ ±® ®¿·­»¼°±·²¬­ò ׬ ·­ ¬¸»®»º±®» «­«¿´ ¬± ­»» ½®¿½µ·²¹ ¿¬ ©»¿µ °±·²¬­ô ­«½¸ ¿­±°»²·²¹­ º±® ©·²¼±©­ ±® ¼±±®­ò

ײ ¬¸» »ª»²¬ ±º ½±²­¬®«½¬·±² ­»¬¬´»³»²¬ô ½®¿½µ·²¹ ©·´´ «­«¿´´§ ®»³¿·²«²½¸¿²¹»¼ ¿º¬»® ¬¸» °®±½»­­ ±º ­»¬¬´»³»²¬ ¸¿­ ½»¿­»¼ò

É·¬¸ ´±½¿´ ­¸»¿® ±® »®±­·±²ô ½®¿½µ·²¹ ©·´´ «­«¿´´§ ½±²¬·²«» ¬± ¼»ª»´±°«²¬·´ ¬¸» ±®·¹·²¿´ ½¿«­» ¸¿­ ¾»»² ®»³»¼·»¼ô ±® «²¬·´ ¬¸» ­«¾­·¼»²½»¸¿­ ½±³°´»¬»´§ ²»«¬®¿´·­»¼ ¬¸» ¿ºº»½¬»¼ °±®¬·±² ±º º±±¬·²¹ ¿²¼ ¬¸»­¬®«½¬«®» ¸¿­ ­¬¿¾·´·­»¼ ±² ±¬¸»® º±±¬·²¹­ ¬¸¿¬ ®»³¿·² »ºº»½¬·ª»ò

ײ ¬¸» ½¿­» ±º ­©»´´ñ­¸®·²µ »ºº»½¬­ô ¬¸» ¾®·½µ©±®µ ©·´´ ·² ­±³» ½¿­»­®»¬«®² ¬± ·¬­ ±®·¹·²¿´ °±­·¬·±² ¿º¬»® ½±³°´»¬·±² ±º ¿ ½§½´»ô ¸±©»ª»® ·¬·­ ³±®» ´·µ»´§ ¬¸¿¬ ¬¸» ®±¬¿¬·±²¿´ »ºº»½¬ ©·´´ ²±¬ ¾» »¨¿½¬´§ ®»ª»®­»¼ô¿²¼ ·¬ ·­ ¿´­± «­«¿´ ¬¸¿¬ ¾®·½µ©±®µ ©·´´ ­»¬¬´» ·² ·¬­ ²»© °±­·¬·±² ¿²¼©·´´ ®»­·­¬ ¬¸» º±®½»­ ¬®§·²¹ ¬± ®»¬«®² ·¬ ¬± ·¬­ ±®·¹·²¿´ °±­·¬·±²ò ̸·­³»¿²­ ¬¸¿¬ ·² ¿ ½¿­» ©¸»®» ­©»´´·²¹ ¬¿µ»­ °´¿½» ¿º¬»® ½±²­¬®«½¬·±²¿²¼ ½®¿½µ·²¹ ±½½«®­ô ¬¸» ½®¿½µ·²¹ ·­ ´·µ»´§ ¬± ¿¬ ´»¿­¬ °¿®¬´§ ®»³¿·²¿º¬»® ¬¸» ­¸®·²µ ­»¹³»²¬ ±º ¬¸» ½§½´» ·­ ½±³°´»¬»ò ̸«­ô »¿½¸ ¬·³»¬¸» ½§½´» ·­ ®»°»¿¬»¼ô ¬¸» ´·µ»´·¸±±¼ ·­ ¬¸¿¬ ¬¸» ½®¿½µ·²¹ ©·´´ ¾»½±³»©·¼»® «²¬·´ ¬¸» ­»½¬·±²­ ±º ¾®·½µ©±®µ ¾»½±³» ª·®¬«¿´´§ ·²¼»°»²¼»²¬ò

É·¬¸ ®»°»¿¬»¼ ½§½´»­ô ±²½» ¬¸» ½®¿½µ·²¹ ·­ »­¬¿¾´·­¸»¼ô ·º ¬¸»®» ·­ ²±±¬¸»® ½±³°´·½¿¬·±²ô ·¬ ·­ ²±®³¿´ º±® ¬¸» ·²½·¼»²½» ±º ½®¿½µ·²¹ ¬±­¬¿¾·´·­»ô ¿­ ¬¸» ¾«·´¼·²¹ ¸¿­ ¬¸» ¿®¬·½«´¿¬·±² ·¬ ²»»¼­ ¬± ½±°» ©·¬¸¬¸» °®±¾´»³ò ̸·­ ·­ ¾§ ²± ³»¿²­ ¿´©¿§­ ¬¸» ½¿­»ô ¸±©»ª»®ô ¿²¼³±²·¬±®·²¹ ±º ½®¿½µ­ ·² ©¿´´­ ¿²¼ º´±±®­ ­¸±«´¼ ¿´©¿§­ ¾» ¬®»¿¬»¼­»®·±«­´§ò

Ë°¸»¿ª¿´ ½¿«­»¼ ¾§ ¹®±©¬¸ ±º ¬®»» ®±±¬­ «²¼»® º±±¬·²¹­ ·­ ²±¬ ¿­·³°´» ª»®¬·½¿´ ­¸»¿® ­¬®»­­ò ̸»®» ·­ ¿ ¬»²¼»²½§ º±® ¬¸» ®±±¬ ¬± ¿´­±»¨»®¬ ´¿¬»®¿´ º±®½»­ ¬¸¿¬ ¿¬¬»³°¬ ¬± ­»°¿®¿¬» ­»½¬·±²­ ±º ¾®·½µ©±®µ¿º¬»® ·²·¬·¿´ ½®¿½µ·²¹ ¸¿­ ±½½«®®»¼ò

Ì®»»­ ½¿² ½¿«­» ­¸®·²µ¿¹» ¿²¼ ¼¿³¿¹»

Page 205: SITE CLASSIFICATION REPORT SUMMARY...Douglas Partners (DP) has prepared this report for this project at Taylor 2- Stage 3, Taylor in accordance with DP’s proposal dated 15 September

̸» ²±®³¿´ ­¬®«½¬«®¿´ ¿®®¿²¹»³»²¬ ·­ ¬¸¿¬ ¬¸» ·²²»® ´»¿º ±º ¾®·½µó©±®µ ·² ¬¸» »¨¬»®²¿´ ©¿´´­ ¿²¼ ¿¬ ´»¿­¬ ­±³» ±º ¬¸» ·²¬»®²¿´ ©¿´´­ø¼»°»²¼·²¹ ±² ¬¸» ®±±º ¬§°»÷ ½±³°®·­» ¬¸» ´±¿¼ó¾»¿®·²¹ ­¬®«½¬«®» ±²©¸·½¸ ¿²§ «°°»® º´±±®­ô ½»·´·²¹­ ¿²¼ ¬¸» ®±±º ¿®» ­«°°±®¬»¼ò ײ ¬¸»­»½¿­»­ô ·¬ ·­ ·²¬»®²¿´´§ ª·­·¾´» ½®¿½µ·²¹ ¬¸¿¬ ­¸±«´¼ ¾» ¬¸» ³¿·² º±½«­±º ¿¬¬»²¬·±²ô ¸±©»ª»® ¬¸»®» ¿®» ¿ º»© »¨¿³°´»­ ±º ¼©»´´·²¹­ ©¸±­»»¨¬»®²¿´ ´»¿º ±º ³¿­±²®§ °´¿§­ ­±³» ­«°°±®¬·²¹ ®±´»ô ­± ¬¸·­ ­¸±«´¼¾» ½¸»½µ»¼ ·º ¬¸»®» ·­ ¿²§ ¼±«¾¬ò ײ ¿²§ ½¿­»ô »¨¬»®²¿´´§ ª·­·¾´»½®¿½µ·²¹ ·­ ·³°±®¬¿²¬ ¿­ ¿ ¹«·¼» ¬± ­¬®»­­»­ ±² ¬¸» ­¬®«½¬«®» ¹»²»®¿´´§ô¿²¼ ·¬ ­¸±«´¼ ¿´­± ¾» ®»³»³¾»®»¼ ¬¸¿¬ ¬¸» »¨¬»®²¿´ ©¿´´­ ³«­¬ ¾»½¿°¿¾´» ±º ­«°°±®¬·²¹ ¬¸»³­»´ª»­ò

Ûºº»½¬­ ±² º®¿³»¼ ­¬®«½¬«®»­Ì·³¾»® ±® ­¬»»´ º®¿³»¼ ¾«·´¼·²¹­ ¿®» ´»­­ ´·µ»´§ ¬± »¨¸·¾·¬ ½®¿½µ·²¹¼«» ¬± ­©»´´ñ­¸®·²µ ¬¸¿² ³¿­±²®§ ¾«·´¼·²¹­ ¾»½¿«­» ±º ¬¸»·®º´»¨·¾·´·¬§ò ß´­±ô ¬¸» ¼±³·²¹ñ¼·­¸·²¹ »ºº»½¬­ ¬»²¼ ¬± ¾» ´±©»® ¾»½¿«­»±º ¬¸» ´·¹¸¬»® ©»·¹¸¬ ±º ©¿´´­ò ̸» ³¿·² ®·­µ­ ¬± º®¿³»¼ ¾«·´¼·²¹­ ¿®»»²½±«²¬»®»¼ ¾»½¿«­» ±º ¬¸» ·­±´¿¬»¼ °·»® º±±¬·²¹­ «­»¼ «²¼»® ©¿´´­òɸ»®» »®±­·±² ±® ­¿¬«®¿¬·±² ½¿«­» ¿ º±±¬·²¹ ¬± º¿´´ ¿©¿§ô ¬¸·­ ½¿²¼±«¾´» ¬¸» ­°¿² ©¸·½¸ ¿ ©¿´´ ³«­¬ ¾®·¼¹»ò ̸·­ ¿¼¼·¬·±²¿´ ­¬®»­­ ½¿²½®»¿¬» ½®¿½µ·²¹ ·² ©¿´´ ´·²·²¹­ô °¿®¬·½«´¿®´§ ©¸»®» ¬¸»®» ·­ ¿ ©»¿µ°±·²¬ ·² ¬¸» ­¬®«½¬«®» ½¿«­»¼ ¾§ ¿ ¼±±® ±® ©·²¼±© ±°»²·²¹ò ׬ ·­ô¸±©»ª»®ô «²´·µ»´§ ¬¸¿¬ º®¿³»¼ ­¬®«½¬«®»­ ©·´´ ¾» ­± ­¬®»­­»¼ ¿­ ¬± ­«ºº»®­»®·±«­ ¼¿³¿¹» ©·¬¸±«¬ º·®­¬ »¨¸·¾·¬·²¹ ­±³» ±® ¿´´ ±º ¬¸» ¿¾±ª»­§³°¬±³­ º±® ¿ ½±²­·¼»®¿¾´» °»®·±¼ò ̸» ­¿³» ©¿®²·²¹ °»®·±¼ ­¸±«´¼¿°°´§ ·² ¬¸» ½¿­» ±º «°¸»¿ª¿´ò ׬ ­¸±«´¼ ¾» ²±¬»¼ô ¸±©»ª»®ô ¬¸¿¬ ©¸»®»º®¿³»¼ ¾«·´¼·²¹­ ¿®» ­«°°±®¬»¼ ¾§ ­¬®·° º±±¬·²¹­ ¬¸»®» ·­ ±²´§ ±²» ´»¿º±º ¾®·½µ©±®µ ¿²¼ ¬¸»®»º±®» ¬¸» »¨¬»®²¿´´§ ª·­·¾´» ©¿´´­ ¿®» ¬¸»­«°°±®¬·²¹ ­¬®«½¬«®» º±® ¬¸» ¾«·´¼·²¹ò ײ ¬¸·­ ½¿­»ô ¬¸» ­«¾º´±±®³¿­±²®§ ©¿´´­ ½¿² ¾» »¨°»½¬»¼ ¬± ¾»¸¿ª» ¿­ º«´´ ¾®·½µ©±®µ ©¿´´­ò

Ûºº»½¬­ ±² ¾®·½µ ª»²»»® ­¬®«½¬«®»­Þ»½¿«­» ¬¸» ´±¿¼ó¾»¿®·²¹ ­¬®«½¬«®» ±º ¿ ¾®·½µ ª»²»»® ¾«·´¼·²¹ ·­ ¬¸»º®¿³» ¬¸¿¬ ³¿µ»­ «° ¬¸» ·²¬»®·±® ´»¿º ±º ¬¸» »¨¬»®²¿´ ©¿´´­ °´«­°»®¸¿°­ ¬¸» ·²¬»®²¿´ ©¿´´­ô ¼»°»²¼·²¹ ±² ¬¸» ¬§°» ±º ®±±ºô ¬¸»¾«·´¼·²¹ ½¿² ¾» »¨°»½¬»¼ ¬± ¾»¸¿ª» ¿­ ¿ º®¿³»¼ ­¬®«½¬«®»ô »¨½»°¬ ¬¸¿¬¬¸» »¨¬»®²¿´ ³¿­±²®§ ©·´´ ¾»¸¿ª» ·² ¿ ­·³·´¿® ©¿§ ¬± ¬¸» »¨¬»®²¿´ ´»¿º±º ¿ º«´´ ³¿­±²®§ ­¬®«½¬«®»ò

É¿¬»® Í»®ª·½» ¿²¼ Ü®¿·²¿¹»

ɸ»®» ¿ ©¿¬»® ­»®ª·½» °·°»ô ¿ ­»©»® ±® ­¬±®³©¿¬»® ¼®¿·²¿¹» °·°» ·­ ·²¬¸» ª·½·²·¬§ ±º ¿ ¾«·´¼·²¹ô ¿ ©¿¬»® ´»¿µ ½¿² ½¿«­» »®±­·±²ô ­©»´´·²¹ ±®­¿¬«®¿¬·±² ±º ­«­½»°¬·¾´» ­±·´ò Ûª»² ¿ ³·²«­½«´» ´»¿µ ½¿² ¾» »²±«¹¸¬± ­¿¬«®¿¬» ¿ ½´¿§ º±«²¼¿¬·±²ò ß ´»¿µ·²¹ ¬¿° ²»¿® ¿ ¾«·´¼·²¹ ½¿² ¸¿ª»¬¸» ­¿³» »ºº»½¬ò ײ ¿¼¼·¬·±²ô ¬®»²½¸»­ ½±²¬¿·²·²¹ °·°»­ ½¿² ¾»½±³»©¿¬»®½±«®­»­ »ª»² ¬¸±«¹¸ ¾¿½µº·´´»¼ô °¿®¬·½«´¿®´§ ©¸»®» ¾®±µ»²®«¾¾´» ·­ «­»¼ ¿­ º·´´ò É¿¬»® ¬¸¿¬ ®«²­ ¿´±²¹ ¬¸»­» ¬®»²½¸»­ ½¿² ¾»®»­°±²­·¾´» º±® ­»®·±«­ »®±­·±²ô ·²¬»®­¬®¿¬¿ ­»»°¿¹» ·²¬± ­«¾º´±±® ¿®»¿­¿²¼ ­¿¬«®¿¬·±²ò

з°» ´»¿µ¿¹» ¿²¼ ¬®»²½¸ ©¿¬»® º´±©­ ¿´­± »²½±«®¿¹» ¬®»» ¿²¼ ­¸®«¾®±±¬­ ¬± ¬¸» ­±«®½» ±º ©¿¬»®ô ½±³°´·½¿¬·²¹ ¿²¼ »¨¿½»®¾¿¬·²¹ ¬¸»°®±¾´»³òб±® ®±±º °´«³¾·²¹ ½¿² ®»­«´¬ ·² ´¿®¹» ª±´«³»­ ±º ®¿·²©¿¬»® ¾»·²¹½±²½»²¬®¿¬»¼ ·² ¿ ­³¿´´ ¿®»¿ ±º ­±·´æ

{ ײ½±®®»½¬ º¿´´­ ·² ®±±º ¹«¬¬»®·²¹ ³¿§ ®»­«´¬ ·² ±ª»®º´±©­ô ¿­ ³¿§¹«¬¬»®­ ¾´±½µ»¼ ©·¬¸ ´»¿ª»­ »¬½ò

{ ݱ®®±¼»¼ ¹«¬¬»®·²¹ ±® ¼±©²°·°»­ ½¿² ­°·´´ ©¿¬»® ¬± ¹®±«²¼ò

{ ܱ©²°·°»­ ²±¬ °±­·¬·ª»´§ ½±²²»½¬»¼ ¬± ¿ °®±°»® ­¬±®³©¿¬»®½±´´»½¬·±² ­§­¬»³ ©·´´ ¼·®»½¬ ¿ ½±²½»²¬®¿¬·±² ±º ©¿¬»® ¬± ­±·´ ¬¸¿¬ ·­¼·®»½¬´§ ¿¼¶¿½»²¬ ¬± º±±¬·²¹­ô ­±³»¬·³»­ ½¿«­·²¹ ´¿®¹»ó­½¿´»°®±¾´»³­ ­«½¸ ¿­ »®±­·±²ô ­¿¬«®¿¬·±² ¿²¼ ³·¹®¿¬·±² ±º ©¿¬»® «²¼»®¬¸» ¾«·´¼·²¹ò

Í»®·±«­²»­­ ±º Ý®¿½µ·²¹

ײ ¹»²»®¿´ô ³±­¬ ½®¿½µ·²¹ º±«²¼ ·² ³¿­±²®§ ©¿´´­ ·­ ¿ ½±­³»¬·½²«·­¿²½» ±²´§ ¿²¼ ½¿² ¾» µ»°¬ ·² ®»°¿·® ±® »ª»² ·¹²±®»¼ò ̸» ¬¿¾´»¾»´±© ·­ ¿ ®»°®±¼«½¬·±² ±º Ì¿¾´» Ýï ±º ßÍ îèéðò

ßÍ îèéð ¿´­± °«¾´·­¸»­ º·¹«®»­ ®»´¿¬·²¹ ¬± ½®¿½µ·²¹ ·² ½±²½®»¬» º´±±®­ô¸±©»ª»® ¾»½¿«­» ©¿´´ ½®¿½µ·²¹ ©·´´ «­«¿´´§ ®»¿½¸ ¬¸» ½®·¬·½¿´ °±·²¬­·¹²·º·½¿²¬´§ »¿®´·»® ¬¸¿² ½®¿½µ·²¹ ·² ­´¿¾­ô ¬¸·­ ¬¿¾´» ·­ ²±¬®»°®±¼«½»¼ ¸»®»ò

Ю»ª»²¬·±²ñÝ«®»

д«³¾·²¹É¸»®» ¾«·´¼·²¹ ³±ª»³»²¬ ·­ ½¿«­»¼ ¾§ ©¿¬»® ­»®ª·½»ô ®±±º °´«³¾·²¹ô­»©»® ±® ­¬±®³©¿¬»® º¿·´«®»ô ¬¸» ®»³»¼§ ·­ ¬± ®»°¿·® ¬¸» °®±¾´»³ò ׬ ·­ °®«¼»²¬ô ¸±©»ª»®ô ¬± ½±²­·¼»® ¿´­± ®»®±«¬·²¹ °·°»­ ¿©¿§ º®±³¬¸» ¾«·´¼·²¹ ©¸»®» °±­­·¾´»ô ¿²¼ ®»´±½¿¬·²¹ ¬¿°­ ¬± °±­·¬·±²­ ©¸»®»¿²§ ´»¿µ¿¹» ©·´´ ²±¬ ¼·®»½¬ ©¿¬»® ¬± ¬¸» ¾«·´¼·²¹ ª·½·²·¬§ò Ûª»² ©¸»®»¹«´´§ ¬®¿°­ ¿®» °®»­»²¬ô ¬¸»®» ·­ ­±³»¬·³»­ ­«ºº·½·»²¬ ­°·´´ ¬± ½®»¿¬»»®±­·±² ±® ­¿¬«®¿¬·±²ô °¿®¬·½«´¿®´§ ·² ³±¼»®² ·²­¬¿´´¿¬·±²­ «­·²¹­³¿´´»® ¼·¿³»¬»® ÐÊÝ º·¨¬«®»­ò ײ¼»»¼ô ­±³» ¹«´´§ ¬®¿°­ ¿®» ²±¬­·¬«¿¬»¼ ¼·®»½¬´§ «²¼»® ¬¸» ¬¿°­ ¬¸¿¬ ¿®» ·²­¬¿´´»¼ ¬± ½¸¿®¹» ¬¸»³ô©·¬¸ ¬¸» ®»­«´¬ ¬¸¿¬ ©¿¬»® º®±³ ¬¸» ¬¿° ³¿§ »²¬»® ¬¸» ¾¿½µº·´´»¼¬®»²½¸ ¬¸¿¬ ¸±«­»­ ¬¸» ­»©»® °·°·²¹ò ׺ ¬¸» ¬®»²½¸ ¸¿­ ¾»»² °±±®´§¾¿½µº·´´»¼ô ¬¸» ©¿¬»® ©·´´ »·¬¸»® °±²¼ ±® º´±© ¿´±²¹ ¬¸» ¾±¬¬±³ ±º¬¸» ¬®»²½¸ò ß­ ¬¸»­» ¬®»²½¸»­ «­«¿´´§ ®«² ¿´±²¹­·¼» ¬¸» º±±¬·²¹­ ¿²¼½¿² ¾» ¿¬ ¿ ­·³·´¿® ¼»°¬¸ô ·¬ ·­ ²±¬ ¸¿®¼ ¬± ­»» ¸±© ¿²§ ©¿¬»® ¬¸¿¬ ·­¬¸«­ ¼·®»½¬»¼ ·²¬± ¿ ¬®»²½¸ ½¿² »¿­·´§ ¿ºº»½¬ ¬¸» º±«²¼¿¬·±²K­ ¿¾·´·¬§ ¬±­«°°±®¬ º±±¬·²¹­ ±® »ª»² ¹¿·² »²¬®§ ¬± ¬¸» ­«¾º´±±® ¿®»¿ò

Ù®±«²¼ ¼®¿·²¿¹»×² ¿´´ ­±·´­ ¬¸»®» ·­ ¬¸» ½¿°¿½·¬§ º±® ©¿¬»® ¬± ¬®¿ª»´ ±² ¬¸» ­«®º¿½» ¿²¼¾»´±© ·¬ò Í«®º¿½» ©¿¬»® º´±©­ ½¿² ¾» »­¬¿¾´·­¸»¼ ¾§ ·²­°»½¬·±² ¼«®·²¹¿²¼ ¿º¬»® ¸»¿ª§ ±® °®±´±²¹»¼ ®¿·²ò ׺ ²»½»­­¿®§ô ¿ ¹®¿¬»¼ ¼®¿·² ­§­¬»³½±²²»½¬»¼ ¬± ¬¸» ­¬±®³©¿¬»® ½±´´»½¬·±² ­§­¬»³ ·­ «­«¿´´§ ¿² »¿­§­±´«¬·±²ò

׬ ·­ô ¸±©»ª»®ô ­±³»¬·³»­ ²»½»­­¿®§ ©¸»² ¿¬¬»³°¬·²¹ ¬± °®»ª»²¬©¿¬»® ³·¹®¿¬·±² ¬¸¿¬ ¬»­¬·²¹ ¾» ½¿®®·»¼ ±«¬ ¬± »­¬¿¾´·­¸ ©¿¬»®¬¿¾´»¸»·¹¸¬ ¿²¼ ­«¾­±·´ ©¿¬»® º´±©­ò ̸·­ ­«¾¶»½¬ ·­ ®»º»®®»¼ ¬± ·² ÞÌÚ ï翲¼ ³¿§ °®±°»®´§ ¾» ®»¹¿®¼»¼ ¿­ ¿² ¿®»¿ º±® ¿² »¨°»®¬ ½±²­«´¬¿²¬ò

Ю±¬»½¬·±² ±º ¬¸» ¾«·´¼·²¹ °»®·³»¬»®×¬ ·­ »­­»²¬·¿´ ¬± ®»³»³¾»® ¬¸¿¬ ¬¸» ­±·´ ¬¸¿¬ ¿ºº»½¬­ º±±¬·²¹­ »¨¬»²¼­©»´´ ¾»§±²¼ ¬¸» ¿½¬«¿´ ¾«·´¼·²¹ ´·²»ò É¿¬»®·²¹ ±º ¹¿®¼»² °´¿²¬­ô­¸®«¾­ ¿²¼ ¬®»»­ ½¿«­»­ ­±³» ±º ¬¸» ³±­¬ ­»®·±«­ ©¿¬»® °®±¾´»³­ò

Ú±® ¬¸·­ ®»¿­±²ô °¿®¬·½«´¿®´§ ©¸»®» °®±¾´»³­ »¨·­¬ ±® ¿®» ´·µ»´§ ¬±±½½«®ô ·¬ ·­ ®»½±³³»²¼»¼ ¬¸¿¬ ¿² ¿°®±² ±º °¿ª·²¹ ¾» ·²­¬¿´´»¼¿®±«²¼ ¿­ ³«½¸ ±º ¬¸» ¾«·´¼·²¹ °»®·³»¬»® ¿­ ²»½»­­¿®§ò ̸·­ °¿ª·²¹

ÝÔßÍÍ×Ú×ÝßÌ×ÑÒ ÑÚ ÜßÓßÙÛ É×ÌØ ÎÛÚÛÎÛÒÝÛ ÌÑ ÉßÔÔÍ

Ü»­½®·°¬·±² ±º ¬§°·½¿´ ¼¿³¿¹» ¿²¼ ®»¯«·®»¼ ®»°¿·® ß°°®±¨·³¿¬» ½®¿½µ ©·¼¬¸ Ü¿³¿¹»´·³·¬ ø­»» Ò±¬» í÷ ½¿¬»¹±®§

Ø¿·®´·²» ½®¿½µ­ äðòï ³³ ð

Ú·²» ½®¿½µ­ ©¸·½¸ ¼± ²±¬ ²»»¼ ®»°¿·® äï ³³ ï

Ý®¿½µ­ ²±¬·½»¿¾´» ¾«¬ »¿­·´§ º·´´»¼ò ܱ±®­ ¿²¼ ©·²¼±©­ ­¬·½µ ­´·¹¸¬´§ äë ³³ î

Ý®¿½µ­ ½¿² ¾» ®»°¿·®»¼ ¿²¼ °±­­·¾´§ ¿ ­³¿´´ ¿³±«²¬ ±º ©¿´´ ©·´´ ²»»¼ ëPïë ³³ ø±® ¿ ²«³¾»® ±º ½®¿½µ­ í¬± ¾» ®»°´¿½»¼ò ܱ±®­ ¿²¼ ©·²¼±©­ ­¬·½µò Í»®ª·½» °·°»­ ½¿² º®¿½¬«®»ò í ³³ ±® ³±®» ·² ±²» ¹®±«°÷É»¿¬¸»®¬·¹¸¬²»­­ ±º¬»² ·³°¿·®»¼

Û¨¬»²­·ª» ®»°¿·® ©±®µ ·²ª±´ª·²¹ ¾®»¿µ·²¹ó±«¬ ¿²¼ ®»°´¿½·²¹ ­»½¬·±²­ ±º ©¿´´­ô ïëPîë ³³ ¾«¬ ¿´­± ¼»°»²¼ ì»­°»½·¿´´§ ±ª»® ¼±±®­ ¿²¼ ©·²¼±©­ò É·²¼±© ¿²¼ ¼±±® º®¿³»­ ¼·­¬±®¬ò É¿´´­ ´»¿² ±² ²«³¾»® ±º ½®¿½µ­±® ¾«´¹» ²±¬·½»¿¾´§ô ­±³» ´±­­ ±º ¾»¿®·²¹ ·² ¾»¿³­ò Í»®ª·½» °·°»­ ¼·­®«°¬»¼

Page 206: SITE CLASSIFICATION REPORT SUMMARY...Douglas Partners (DP) has prepared this report for this project at Taylor 2- Stage 3, Taylor in accordance with DP’s proposal dated 15 September

­¸±«´¼ »¨¬»²¼ ±«¬©¿®¼­ ¿ ³·²·³«³ ±º çðð ³³ ø³±®» ·² ¸·¹¸´§®»¿½¬·ª» ­±·´÷ ¿²¼ ­¸±«´¼ ¸¿ª» ¿ ³·²·³«³ º¿´´ ¿©¿§ º®±³ ¬¸»¾«·´¼·²¹ ±º ïæêðò ̸» º·²·­¸»¼ °¿ª·²¹ ­¸±«´¼ ¾» ²± ´»­­ ¬¸¿² ïðð³³ ¾»´±© ¾®·½µ ª»²¬ ¾¿­»­ò

׬ ·­ °®«¼»²¬ ¬± ®»´±½¿¬» ¼®¿·²¿¹» °·°»­ ¿©¿§ º®±³ ¬¸·­ °¿ª·²¹ô ·º°±­­·¾´»ô ¬± ¿ª±·¼ ½±³°´·½¿¬·±²­ º®±³ º«¬«®» ´»¿µ¿¹»ò ׺ ¬¸·­ ·­ ²±¬°®¿½¬·½¿´ô »¿®¬¸»²©¿®» °·°»­ ­¸±«´¼ ¾» ®»°´¿½»¼ ¾§ ÐÊÝ ¿²¼¾¿½µº·´´·²¹ ­¸±«´¼ ¾» ±º ¬¸» ­¿³» ­±·´ ¬§°» ¿­ ¬¸» ­«®®±«²¼·²¹ ­±·´¿²¼ ½±³°¿½¬»¼ ¬± ¬¸» ­¿³» ¼»²­·¬§ò

Û¨½»°¬ ·² ¿®»¿­ ©¸»®» º®»»¦·²¹ ±º ©¿¬»® ·­ ¿² ·­­«»ô ·¬ ·­ ©·­» ¬±®»³±ª» ¬¿°­ ·² ¬¸» ¾«·´¼·²¹ ¿®»¿ ¿²¼ ®»´±½¿¬» ¬¸»³ ©»´´ ¿©¿§ º®±³¬¸» ¾«·´¼·²¹ P °®»º»®¿¾´§ ²±¬ «°¸·´´ º®±³ ·¬ ø­»» ÞÌÚ ïç÷ò

׬ ³¿§ ¾» ¼»­·®¿¾´» ¬± ·²­¬¿´´ ¿ ¹®¿¬»¼ ¼®¿·² ¿¬ ¬¸» ±«¬­·¼» »¼¹» ±º ¬¸»°¿ª·²¹ ±² ¬¸» «°¸·´´ ­·¼» ±º ¬¸» ¾«·´¼·²¹ò ׺ ­«¾­±·´ ¼®¿·²¿¹» ·­²»»¼»¼ ¬¸·­ ½¿² ¾» ·²­¬¿´´»¼ «²¼»® ¬¸» ­«®º¿½» ¼®¿·²ò

ݱ²¼»²­¿¬·±²×² ¾«·´¼·²¹­ ©·¬¸ ¿ ­«¾º´±±® ª±·¼ ­«½¸ ¿­ ©¸»®» ¾»¿®»®­ ¿²¼ ¶±·­¬­­«°°±®¬ º´±±®·²¹ô ·²­«ºº·½·»²¬ ª»²¬·´¿¬·±² ½®»¿¬»­ ·¼»¿´ ½±²¼·¬·±²­ º±®½±²¼»²­¿¬·±²ô °¿®¬·½«´¿®´§ ©¸»®» ¬¸»®» ·­ ´·¬¬´» ½´»¿®¿²½» ¾»¬©»»² ¬¸»º´±±® ¿²¼ ¬¸» ¹®±«²¼ò ݱ²¼»²­¿¬·±² ¿¼¼­ ¬± ¬¸» ³±·­¬«®» ¿´®»¿¼§°®»­»²¬ ·² ¬¸» ­«¾º´±±® ¿²¼ ­·¹²·º·½¿²¬´§ ­´±©­ ¬¸» °®±½»­­ ±º ¼®§·²¹±«¬ò ײ­¬¿´´¿¬·±² ±º ¿² ¿¼»¯«¿¬» ­«¾º´±±® ª»²¬·´¿¬·±² ­§­¬»³ô »·¬¸»®²¿¬«®¿´ ±® ³»½¸¿²·½¿´ô ·­ ¼»­·®¿¾´»ò

É¿®²·²¹æ ß´¬¸±«¹¸ ¬¸·­ Þ«·´¼·²¹ Ì»½¸²±´±¹§ Ú·´» ¼»¿´­ ©·¬¸½®¿½µ·²¹ ·² ¾«·´¼·²¹­ô ·¬ ­¸±«´¼ ¾» ­¿·¼ ¬¸¿¬ ­«¾º´±±® ³±·­¬«®» ½¿²®»­«´¬ ·² ¬¸» ¼»ª»´±°³»²¬ ±º ±¬¸»® °®±¾´»³­ô ²±¬¿¾´§æ

{ É¿¬»® ¬¸¿¬ ·­ ¬®¿²­³·¬¬»¼ ·²¬± ³¿­±²®§ô ³»¬¿´ ±® ¬·³¾»® ¾«·´¼·²¹»´»³»²¬­ ½¿«­»­ ¼¿³¿¹» ¿²¼ñ±® ¼»½¿§ ¬± ¬¸±­» »´»³»²¬­ò

{ Ø·¹¸ ­«¾º´±±® ¸«³·¼·¬§ ¿²¼ ³±·­¬«®» ½±²¬»²¬ ½®»¿¬» ¿² ·¼»¿´»²ª·®±²³»²¬ º±® ª¿®·±«­ °»­¬­ô ·²½´«¼·²¹ ¬»®³·¬»­ ¿²¼ ­°·¼»®­ò

{ ɸ»®» ¸·¹¸ ³±·­¬«®» ´»ª»´­ ¿®» ¬®¿²­³·¬¬»¼ ¬± ¬¸» º´±±®·²¹ ¿²¼©¿´´­ô ¿² ·²½®»¿­» ·² ¬¸» ¼«­¬ ³·¬» ½±«²¬ ½¿² »²­«» ©·¬¸·² ¬¸»´·ª·²¹ ¿®»¿­ò Ü«­¬ ³·¬»­ô ¿­ ©»´´ ¿­ ¼¿³°²»­­ ·² ¹»²»®¿´ô ½¿² ¾» ¿¸»¿´¬¸ ¸¿¦¿®¼ ¬± ·²¸¿¾·¬¿²¬­ô °¿®¬·½«´¿®´§ ¬¸±­» ©¸± ¿®»¿¾²±®³¿´´§ ­«­½»°¬·¾´» ¬± ®»­°·®¿¬±®§ ¿·´³»²¬­ò

̸» ¹¿®¼»²Ì¸» ·¼»¿´ ª»¹»¬¿¬·±² ´¿§±«¬ ·­ ¬± ¸¿ª» ´¿©² ±® °´¿²¬­ ¬¸¿¬ ®»¯«·®»±²´§ ´·¹¸¬ ©¿¬»®·²¹ ·³³»¼·¿¬»´§ ¿¼¶¿½»²¬ ¬± ¬¸» ¼®¿·²¿¹» ±® °¿ª·²¹»¼¹»ô ¬¸»² ³±®» ¼»³¿²¼·²¹ °´¿²¬­ô ­¸®«¾­ ¿²¼ ¬®»»­ ­°®»¿¼ ±«¬ ·²¬¸¿¬ ±®¼»®ò

Ѫ»®©¿¬»®·²¹ ¼«» ¬± ³·­«­» ±º ¿«¬±³¿¬·½ ©¿¬»®·²¹ ­§­¬»³­ ·­ ¿½±³³±² ½¿«­» ±º ­¿¬«®¿¬·±² ¿²¼ ©¿¬»® ³·¹®¿¬·±² «²¼»® º±±¬·²¹­ò ׺·¬ ·­ ²»½»­­¿®§ ¬± «­» ¬¸»­» ­§­¬»³­ô ·¬ ·­ ·³°±®¬¿²¬ ¬± ®»³±ª» ¹¿®¼»²¾»¼­ ¬± ¿ ½±³°´»¬»´§ ­¿º» ¼·­¬¿²½» º®±³ ¾«·´¼·²¹­ò

Û¨·­¬·²¹ ¬®»»­É¸»®» ¿ ¬®»» ·­ ½¿«­·²¹ ¿ °®±¾´»³ ±º ­±·´ ¼®§·²¹ ±® ¬¸»®» ·­ ¬¸»»¨·­¬»²½» ±® ¬¸®»¿¬ ±º «°¸»¿ª¿´ ±º º±±¬·²¹­ô ·º ¬¸» ±ºº»²¼·²¹ ®±±¬­ ¿®»­«¾­·¼·¿®§ ¿²¼ ¬¸»·® ®»³±ª¿´ ©·´´ ²±¬ ­·¹²·º·½¿²¬´§ ¼¿³¿¹» ¬¸» ¬®»»ô¬¸»§ ­¸±«´¼ ¾» ­»ª»®»¼ ¿²¼ ¿ ½±²½®»¬» ±® ³»¬¿´ ¾¿®®·»® °´¿½»¼ª»®¬·½¿´´§ ·² ¬¸» ­±·´ ¬± °®»ª»²¬ º«¬«®» ®±±¬ ¹®±©¬¸ ·² ¬¸» ¼·®»½¬·±² ±º¬¸» ¾«·´¼·²¹ò ׺ ·¬ ·­ ²±¬ °±­­·¾´» ¬± ®»³±ª» ¬¸» ®»´»ª¿²¬ ®±±¬­©·¬¸±«¬ ¼¿³¿¹» ¬± ¬¸» ¬®»»ô ¿² ¿°°´·½¿¬·±² ¬± ®»³±ª» ¬¸» ¬®»» ­¸±«´¼¾» ³¿¼» ¬± ¬¸» ´±½¿´ ¿«¬¸±®·¬§ò ß °®«¼»²¬ °´¿² ·­ ¬± ¬®¿²­°´¿²¬ ´·µ»´§±ºº»²¼»®­ ¾»º±®» ¬¸»§ ¾»½±³» ¿ °®±¾´»³ò

ײº±®³¿¬·±² ±² ¬®»»­ô °´¿²¬­ ¿²¼ ­¸®«¾­Í¬¿¬» ¼»°¿®¬³»²¬­ ±ª»®­»»·²¹ ¿¹®·½«´¬«®» ½¿² ¹·ª» ·²º±®³¿¬·±²®»¹¿®¼·²¹ ®±±¬ °¿¬¬»®²­ô ª±´«³» ±º ©¿¬»® ²»»¼»¼ ¿²¼ ­¿º» ¼·­¬¿²½»º®±³ ¾«·´¼·²¹­ ±º ³±­¬ ­°»½·»­ò Þ±¬¿²·½ ¹¿®¼»²­ ¿®» ¿´­± ­±«®½»­ ±º·²º±®³¿¬·±²ò Ú±® ·²º±®³¿¬·±² ±² °´¿²¬ ®±±¬­ ¿²¼ ¼®¿·²­ô ­»» Þ«·´¼·²¹Ì»½¸²±´±¹§ Ú·´» ïéò

Û¨½¿ª¿¬·±²Û¨½¿ª¿¬·±² ¿®±«²¼ º±±¬·²¹­ ³«­¬ ¾» °®±°»®´§ »²¹·²»»®»¼ò ͱ·´­«°°±®¬·²¹ º±±¬·²¹­ ½¿² ±²´§ ¾» ­¿º»´§ »¨½¿ª¿¬»¼ ¿¬ ¿² ¿²¹´» ¬¸¿¬¿´´±©­ ¬¸» ­±·´ «²¼»® ¬¸» º±±¬·²¹ ¬± ®»³¿·² ­¬¿¾´»ò ̸·­ ¿²¹´» ·­½¿´´»¼ ¬¸» ¿²¹´» ±º ®»°±­» ø±® º®·½¬·±²÷ ¿²¼ ª¿®·»­ ­·¹²·º·½¿²¬´§¾»¬©»»² ­±·´ ¬§°»­ ¿²¼ ½±²¼·¬·±²­ò λ³±ª¿´ ±º ­±·´ ©·¬¸·² ¬¸» ¿²¹´»±º ®»°±­» ©·´´ ½¿«­» ­«¾­·¼»²½»ò

λ³»¼·¿¬·±²

ɸ»®» »®±­·±² ¸¿­ ±½½«®®»¼ ¬¸¿¬ ¸¿­ ©¿­¸»¼ ¿©¿§ ­±·´ ¿¼¶¿½»²¬ ¬±º±±¬·²¹­ô ­±·´ ±º ¬¸» ­¿³» ½´¿­­·º·½¿¬·±² ­¸±«´¼ ¾» ·²¬®±¼«½»¼ ¿²¼½±³°¿½¬»¼ ¬± ¬¸» ­¿³» ¼»²­·¬§ò ɸ»®» º±±¬·²¹­ ¸¿ª» ¾»»²«²¼»®³·²»¼ô ¿«¹³»²¬¿¬·±² ±® ±¬¸»® ­°»½·¿´·­¬ ©±®µ ³¿§ ¾» ®»¯«·®»¼òλ³»¼·¿¬·±² ±º º±±¬·²¹­ ¿²¼ º±«²¼¿¬·±²­ ·­ ¹»²»®¿´´§ ¬¸» ®»¿´³ ±º ¿­°»½·¿´·­¬ ½±²­«´¬¿²¬ò

ɸ»®» ·­±´¿¬»¼ º±±¬·²¹­ ®·­» ¿²¼ º¿´´ ¾»½¿«­» ±º ­©»´´ñ­¸®·²µ »ºº»½¬ô¬¸» ¸±³»±©²»® ³¿§ ¾» ¬»³°¬»¼ ¬± ¿´´»ª·¿¬» º´±±® ¾±«²½» ¾§ º·´´·²¹¬¸» ¹¿° ¬¸¿¬ ¸¿­ ¿°°»¿®»¼ ¾»¬©»»² ¬¸» ¾»¿®»® ¿²¼ ¬¸» °·»® ©·¬¸¾´±½µ·²¹ò ̸» ¼¿²¹»® ¸»®» ·­ ¬¸¿¬ ©¸»² ¬¸» ²»¨¬ ­©»´´ ­»¹³»²¬ ±º ¬¸»½§½´» ±½½«®­ô ¬¸» »¨¬®¿ ¾´±½µ·²¹ ©·´´ °«­¸ ¬¸» º´±±® «° ·²¬± ¿²¿½½»²¬«¿¬»¼ ¼±³» ¿²¼ ³¿§ ¿´­± ½¿«­» ´±½¿´ ­¸»¿® º¿·´«®» ·² ¬¸» ­±·´ò׺ ·¬ ·­ ²»½»­­¿®§ ¬± «­» ¾´±½µ·²¹ô ·¬ ­¸±«´¼ ¾» ¾§ ¿ °¿·® ±º º·²»©»¼¹»­ ¿²¼ ³±²·¬±®·²¹ ­¸±«´¼ ¾» ½¿®®·»¼ ±«¬ º±®¬²·¹¸¬´§ò

̸·­ ÞÌÚ ©¿­ °®»°¿®»¼ ¾§ Ö±¸² Ô»©»® Úß×Þô Ó×ßÓßô ﮬ²»®ô

ݱ²­¬®«½¬·±² Ü·¿¹²±­·­ò

̸» ·²º±®³¿¬·±² ·² ¬¸·­ ¿²¼ ±¬¸»® ·­­«»­ ·² ¬¸» ­»®·»­ ©¿­ ¼»®·ª»¼ º®±³ ª¿®·±«­ ­±«®½»­ ¿²¼ ©¿­ ¾»´·»ª»¼ ¬± ¾» ½±®®»½¬ ©¸»² °«¾´·­¸»¼ò

̸» ·²º±®³¿¬·±² ·­ ¿¼ª·­±®§ò ׬ ·­ °®±ª·¼»¼ ·² ¹±±¼ º¿·¬¸ ¿²¼ ²±¬ ½´¿·³»¼ ¬± ¾» ¿² »¨¸¿«­¬·ª» ¬®»¿¬³»²¬ ±º ¬¸» ®»´»ª¿²¬ ­«¾¶»½¬ò

Ú«®¬¸»® °®±º»­­·±²¿´ ¿¼ª·½» ²»»¼­ ¬± ¾» ±¾¬¿·²»¼ ¾»º±®» ¬¿µ·²¹ ¿²§ ¿½¬·±² ¾¿­»¼ ±² ¬¸» ·²º±®³¿¬·±² °®±ª·¼»¼ò

Ü·­¬®·¾«¬»¼ ¾§

ÝÍ×ÎÑ ÐËÞÔ ×ÍØ ×ÒÙ ÐÑ Þ±¨ ïïíçô ݱ´´·²¹©±±¼ íðêêô ß«­¬®¿´·¿

Ú®»»½¿´´ ïèðð êìë ðëï Ì»´ øðí÷ çêêî éêêê Ú¿¨ øðí÷ çêêî éëëë ©©©ò°«¾´·­¸ò½­·®±ò¿«

Û³¿·´æ °«¾´·­¸·²¹ò­¿´»­à½­·®±ò¿«

w ÝÍ×ÎÑ îððíò ˲¿«¬¸±®·­»¼ ½±°§·²¹ ±º ¬¸·­ Þ«·´¼·²¹ Ì»½¸²±´±¹§ º·´» ·­ °®±¸·¾·¬»¼

Ù¿®¼»²­ º±® ¿ ®»¿½¬·ª» ­·¬»

Page 207: SITE CLASSIFICATION REPORT SUMMARY...Douglas Partners (DP) has prepared this report for this project at Taylor 2- Stage 3, Taylor in accordance with DP’s proposal dated 15 September

TOPSOIL FILLING-dry to moist, brown silty sand

FILLING-generally comprising well compacted, dry tomoist, grey brown, low plasticity silty gravelly clay

SILTY GRAVELLY SAND-medium dense, dry to moist,grey brown, fine to coarse grained silty gravelly sand

SILTY CLAYEY SAND-medium dense, dry to moist, redbrown, low plasticity, fine to coarse grained silty clayeysand

DACITE-low to medium strength, highly to moderatelyweathered, orange brown grey, fine to coarse graineddacite with some clay seams, highly fractured

Pit discontinued at 1.7m-limit of investigation

0.1

0.45

1.0

1.5

1.7

SAMPLING & IN SITU TESTING LEGEND

TEST PIT LOG

Taylor 2 Estate, Stage 3, Taylor

A Auger sample G Gas sample PID Photo ionisation detector (ppm)B Bulk sample P Piston sample PL(A) Point load axial test Is(50) (MPa)BLK Block sample Ux Tube sample (x mm dia.) PL(D) Point load diametral test Is(50) (MPa)C Core drilling W Water sample pp Pocket penetrometer (kPa)D Disturbed sample Water seep S Standard penetration testE Environmental sample Water level V Shear vane (kPa)

Indesco Consulting Engineers Pty LtdSite Classifications

Results &Comments

LOGGED: JPM SURVEY DATUM: MGA94

CLIENT:PROJECT:LOCATION:

PIT No: 62PROJECT No: 77418.29DATE: 11/1/2019SHEET 1 OF 1

Sampling & In Situ Testing

1

2

Wat

er

Dep

th

Sam

ple

Description

of

Strata Gra

phic

Log

Typ

e

REMARKS: Surface Levels & Coordinates are approximate only and must not be relied upon

RIG: Kubota KX057-4 mini-excavator with 300mm wide bucket

WATER OBSERVATIONS: No free groundwater observed

SURFACE LEVEL: 661.7 AHDEASTING: 209100NORTHING: 618736

Dynamic Penetrometer Test(blows per mm)

5 10 15 20

Cone Penetrometer AS1289.6.3.2Sand Penetrometer AS1289.6.3.3

Depth(m) R

L

1

2

661

660

D

D

0.7

1.6

Page 208: SITE CLASSIFICATION REPORT SUMMARY...Douglas Partners (DP) has prepared this report for this project at Taylor 2- Stage 3, Taylor in accordance with DP’s proposal dated 15 September

TOPSOIL FILLING-dry to moist, brown silty sand

FILLING-generally comprising well compacted, dry tomoist, orange brown, medium plasticity silty clay withsand and gravel

SILTY SAND-medium dense, dry to moist, grey brown,low plasticity, fine grained silty sand with some clay andgravel

Pit discontinued at 1.8m-limit of investigation

0.1

1.1

1.8

SAMPLING & IN SITU TESTING LEGEND

TEST PIT LOG

Taylor 2 Estate, Stage 3, Taylor

A Auger sample G Gas sample PID Photo ionisation detector (ppm)B Bulk sample P Piston sample PL(A) Point load axial test Is(50) (MPa)BLK Block sample Ux Tube sample (x mm dia.) PL(D) Point load diametral test Is(50) (MPa)C Core drilling W Water sample pp Pocket penetrometer (kPa)D Disturbed sample Water seep S Standard penetration testE Environmental sample Water level V Shear vane (kPa)

Indesco Consulting Engineers Pty LtdSite Classifications

Results &Comments

LOGGED: JPM SURVEY DATUM: MGA94

CLIENT:PROJECT:LOCATION:

PIT No: 63PROJECT No: 77418.29DATE: 11/1/2019SHEET 1 OF 1

Sampling & In Situ Testing

1

2

Wat

er

Dep

th

Sam

ple

Description

of

Strata Gra

phic

Log

Typ

e

REMARKS: Surface Levels & Coordinates are approximate only and must not be relied upon

RIG: Kubota KX057-4 mini-excavator with 300mm wide bucket

WATER OBSERVATIONS: No free groundwater observed

SURFACE LEVEL: 662.7 AHDEASTING: 209121NORTHING: 618752

Dynamic Penetrometer Test(blows per mm)

5 10 15 20

Cone Penetrometer AS1289.6.3.2Sand Penetrometer AS1289.6.3.3

Depth(m) R

L

1

2

662

661

D 1.4

Page 209: SITE CLASSIFICATION REPORT SUMMARY...Douglas Partners (DP) has prepared this report for this project at Taylor 2- Stage 3, Taylor in accordance with DP’s proposal dated 15 September
Page 210: SITE CLASSIFICATION REPORT SUMMARY...Douglas Partners (DP) has prepared this report for this project at Taylor 2- Stage 3, Taylor in accordance with DP’s proposal dated 15 September

SITE CLASSIFICATION REPORT SUMMARY

BLOCK: 12 SECTION: 64 SUBURB: Taylor

JOB No: 77418.29 DATE: March 2019

CLIENT: Indesco Consulting Engineers Pty Ltd

Classification Procedures: Existing Subsurface Conditions: Refer attached test pit log(s) – Pit(s) 61,62 and Drawing 1. Bulk Earthworks: Filling within the block placed under Level 1 control as defined in AS 3798 – 2007 (Ref 1). Laboratory Results: Previous laboratory testing results indicated liquid limit ranging from 25-66%, plasticity index ranging from 6-49% and linear shrinkage ranging from 3-20.5%.

Site Classification: Class M* (moderately reactive/filled) based on the current profile / state on limited subsurface information and determined in general accordance with the requirements of AS2870-2011 (Ref 2). The classification must be reassessed should the soil profile change either by adding fill or removing soil from the block and/or if the presence of service trenches or retaining walls are within the zone of influence of the block. Reference should be made to the comments provided below.

Footing Systems: Reference must be made to AS2870-2011 (Ref 2) which indicates footing systems that are appropriate for each site classification. All footings must found within a uniform bearing stratum of suitable strength/material, below the zone of influence of any service trenches, backfill zones, retaining walls or underground structures. Masonry walls should be articulated in accordance with current best practice. Dwelling design must ensure uniform moisture conditions are maintained in the vicinity of footings. Footing systems must be confirmed by a structural engineer taking into consideration any onsite or offsite constraints.

Maintenance Guidelines: Reference should be made to the attached CSIRO Sheet BTF 18 ‘Foundation Maintenance & Footing Performance’ to comments about gardens, landscaping and trees on the performance of foundation soils and in particular in respect to maintaining good surface drainage. It notes that minor cracking in most structures is inevitable, and it describes site maintenance practices aimed at minimising foundation movements that can lead to cracking damage.

Comments/ Limitations:

The successful purchaser must make their own interpretations, deductions and conclusions from the information made available and will need to accept full responsibility for such interpretations, deductions and conclusions.

Development specific geotechnical investigations must be undertaken.

Additional topsoils / filling may have been spread subsequent to the investigation.

Site preparation prior to the construction should include removal of all vegetation, topsoil and any uncontrolled filling.

All new filling must be placed under controlled conditions (AS 3798-2007), otherwise Class P conditions would be warranted.

Some variability in subsurface conditions must be anticipated.

Moisture condition of site soils and/or the presence of groundwater may vary considerably from time of investigation compared to at the time of construction.

Depending on the depth of site cut and trenches, rock excavation may be required.

It is recommended that footing excavations be inspected by a geotechnical engineer.

This report must be read in conjunction with the attached “Limitations” and notes “About this Report”.

References:

1. 2.

AS 3798-2007 ‘Guidelines on Earthworks for Commercial and Residential Developments’, Standards Association of Australia. AS 2870-2011 ‘Residential Slabs and Footings,’ Standards Association of Australia.

Attachments:

Limitations & About this Report Explanatory Notes Test Pit Log(s) Pit(s) 61,62 Drawing 1

Page 211: SITE CLASSIFICATION REPORT SUMMARY...Douglas Partners (DP) has prepared this report for this project at Taylor 2- Stage 3, Taylor in accordance with DP’s proposal dated 15 September

FS 604853

Douglas Partners Pty Ltd ABN 75 053 980 117

www.douglaspartners.com.au Unit 2, 73 Sheppard Street

Hume ACT 2620 PO Box 1487

Fyshwick ACT 2609 Phone (02) 6260 2788

Fax (02) 6260 1147

Brisbane • Cairns • Canberra • Central Coast • Coffs Harbour • Darwin • Geelong • Gold Coast • Macarthur • Melbourne Newcastle • North West Sydney • Perth • Port Macquarie • Sunshine Coast • Sydney • Townsville • Wollongong

Limitations Douglas Partners (DP) has prepared this report for this project at Taylor 2 - Stage 3, Taylor in accordance with DP’s proposal dated 15 September 2017 and acceptance received from Indesco Consulting Engineers Pty Ltd dated 13 March 2019. The work was carried out under DP’s Conditions of Engagement. This report is provided for the exclusive use of Indesco Consulting Engineers Pty Ltd for this project only and for the purposes as described in the report. It should not be used by or relied upon for other projects or purposes on the same or other site or by a third party. Any party so relying upon this report beyond its exclusive use and purpose as stated above, and without the express written consent of DP, does so entirely at its own risk and without recourse to DP for any loss or damage. In preparing this report DP has necessarily relied upon information provided by the client and/or their agents. The results provided in the report are indicative of the sub-surface conditions on the site only at the specific sampling and/or testing locations, and then only to the depths investigated and at the time the work was carried out. Sub-surface conditions can change abruptly due to variable geological processes and also as a result of human influences. Such changes may occur after DP’s field testing has been completed. DP’s advice is based upon the conditions encountered during this investigation. The accuracy of the advice provided by DP in this report may be affected by undetected variations in ground conditions across the site between and beyond the sampling and/or testing locations. The advice may also be limited by budget constraints imposed by others or by site accessibility. This report must be read in conjunction with all of the attached and should be kept in its entirety without separation of individual pages or sections. DP cannot be held responsible for interpretations or conclusions made by others unless they are supported by an expressed statement, interpretation, outcome or conclusion stated in this report. This report, or sections from this report, should not be used as part of a specification for a project, without review and agreement by DP. This is because this report has been written as advice and opinion rather than instructions for construction. The scope for work for this investigation/report did not include the assessment of surface or sub-surface materials or groundwater for contaminants, within or adjacent to the site. Should evidence of filling of unknown origin be noted in the report, and in particular the presence of building demolition materials, it should be recognised that there may be some risk that such filling may contain contaminants and hazardous building materials. The contents of this report do not constitute formal design components such as are required, by the Health and Safety Legislation and Regulations, to be included in a Safety Report specifying the hazards likely to be encountered during construction and the controls required to mitigate risk. This design process requires risk assessment to be undertaken, with such assessment being dependent upon factors relating to likelihood of occurrence and consequences of damage to property and to life. This, in turn, requires project data and analysis presently beyond the knowledge and project role respectively of DP. DP may be able, however, to assist the client in carrying out a risk assessment of potential hazards contained in the Comments section of this report, as an extension to the current scope of works, if so requested, and provided that suitable additional information is made available to DP. Any such risk assessment would, however, be necessarily restricted to the geotechnical components set out in this report and to their application by the project designers to project design, construction, maintenance and demolition.

Page 212: SITE CLASSIFICATION REPORT SUMMARY...Douglas Partners (DP) has prepared this report for this project at Taylor 2- Stage 3, Taylor in accordance with DP’s proposal dated 15 September

July 2010

Introduction These notes have been provided to amplify DP's report in regard to classification methods, field procedures and the comments section. Not all are necessarily relevant to all reports. DP's reports are based on information gained from limited subsurface excavations and sampling, supplemented by knowledge of local geology and experience. For this reason, they must be regarded as interpretive rather than factual documents, limited to some extent by the scope of information on which they rely. Copyright This report is the property of Douglas Partners Pty Ltd. The report may only be used for the purpose for which it was commissioned and in accordance with the Conditions of Engagement for the commission supplied at the time of proposal. Unauthorised use of this report in any form whatsoever is prohibited. Borehole and Test Pit Logs The borehole and test pit logs presented in this report are an engineering and/or geological interpretation of the subsurface conditions, and their reliability will depend to some extent on frequency of sampling and the method of drilling or excavation. Ideally, continuous undisturbed sampling or core drilling will provide the most reliable assessment, but this is not always practicable or possible to justify on economic grounds. In any case the boreholes and test pits represent only a very small sample of the total subsurface profile. Interpretation of the information and its application to design and construction should therefore take into account the spacing of boreholes or pits, the frequency of sampling, and the possibility of other than 'straight line' variations between the test locations. Groundwater Where groundwater levels are measured in boreholes there are several potential problems, namely: • In low permeability soils groundwater may

enter the hole very slowly or perhaps not at all during the time the hole is left open;

• A localised, perched water table may lead to an erroneous indication of the true water table;

• Water table levels will vary from time to time with seasons or recent weather changes. They may not be the same at the time of construction as are indicated in the report; and

• The use of water or mud as a drilling fluid will mask any groundwater inflow. Water has to be blown out of the hole and drilling mud must first be washed out of the hole if water measurements are to be made.

More reliable measurements can be made by installing standpipes which are read at intervals over several days, or perhaps weeks for low permeability soils. Piezometers, sealed in a particular stratum, may be advisable in low permeability soils or where there may be interference from a perched water table. Reports The report has been prepared by qualified personnel, is based on the information obtained from field and laboratory testing, and has been undertaken to current engineering standards of interpretation and analysis. Where the report has been prepared for a specific design proposal, the information and interpretation may not be relevant if the design proposal is changed. If this happens, DP will be pleased to review the report and the sufficiency of the investigation work. Every care is taken with the report as it relates to interpretation of subsurface conditions, discussion of geotechnical and environmental aspects, and recommendations or suggestions for design and construction. However, DP cannot always anticipate or assume responsibility for: • Unexpected variations in ground conditions.

The potential for this will depend partly on borehole or pit spacing and sampling frequency;

• Changes in policy or interpretations of policy by statutory authorities; or

• The actions of contractors responding to commercial pressures.

If these occur, DP will be pleased to assist with investigations or advice to resolve the matter.

Page 213: SITE CLASSIFICATION REPORT SUMMARY...Douglas Partners (DP) has prepared this report for this project at Taylor 2- Stage 3, Taylor in accordance with DP’s proposal dated 15 September

July 2010

Site Anomalies In the event that conditions encountered on site during construction appear to vary from those which were expected from the information contained in the report, DP requests that it be immediately notified. Most problems are much more readily resolved when conditions are exposed rather than at some later stage, well after the event. Information for Contractual Purposes Where information obtained from this report is provided for tendering purposes, it is recommended that all information, including the written report and discussion, be made available. In circumstances where the discussion or comments section is not relevant to the contractual situation, it may be appropriate to prepare a specially edited document. DP would be pleased to assist in this regard and/or to make additional report copies available for contract purposes at a nominal charge. Site Inspection The company will always be pleased to provide engineering inspection services for geotechnical and environmental aspects of work to which this report is related. This could range from a site visit to confirm that conditions exposed are as expected, to full time engineering presence on site.

Page 214: SITE CLASSIFICATION REPORT SUMMARY...Douglas Partners (DP) has prepared this report for this project at Taylor 2- Stage 3, Taylor in accordance with DP’s proposal dated 15 September

July 2010

Sampling Sampling is carried out during drilling or test pitting to allow engineering examination (and laboratory testing where required) of the soil or rock. Disturbed samples taken during drilling provide information on colour, type, inclusions and, depending upon the degree of disturbance, some information on strength and structure. Undisturbed samples are taken by pushing a thin-walled sample tube into the soil and withdrawing it to obtain a sample of the soil in a relatively undisturbed state. Such samples yield information on structure and strength, and are necessary for laboratory determination of shear strength and compressibility. Undisturbed sampling is generally effective only in cohesive soils. Test Pits Test pits are usually excavated with a backhoe or an excavator, allowing close examination of the in-situ soil if it is safe to enter into the pit. The depth of excavation is limited to about 3 m for a backhoe and up to 6 m for a large excavator. A potential disadvantage of this investigation method is the larger area of disturbance to the site. Large Diameter Augers Boreholes can be drilled using a rotating plate or short spiral auger, generally 300 mm or larger in diameter commonly mounted on a standard piling rig. The cuttings are returned to the surface at intervals (generally not more than 0.5 m) and are disturbed but usually unchanged in moisture content. Identification of soil strata is generally much more reliable than with continuous spiral flight augers, and is usually supplemented by occasional undisturbed tube samples. Continuous Spiral Flight Augers The borehole is advanced using 90-115 mm diameter continuous spiral flight augers which are withdrawn at intervals to allow sampling or in-situ testing. This is a relatively economical means of drilling in clays and sands above the water table. Samples are returned to the surface, or may be collected after withdrawal of the auger flights, but they are disturbed and may be mixed with soils from the sides of the hole. Information from the drilling (as distinct from specific sampling by SPTs or undisturbed samples) is of relatively low

reliability, due to the remoulding, possible mixing or softening of samples by groundwater. Non-core Rotary Drilling The borehole is advanced using a rotary bit, with water or drilling mud being pumped down the drill rods and returned up the annulus, carrying the drill cuttings. Only major changes in stratification can be determined from the cuttings, together with some information from the rate of penetration. Where drilling mud is used this can mask the cuttings and reliable identification is only possible from separate sampling such as SPTs. Continuous Core Drilling A continuous core sample can be obtained using a diamond tipped core barrel, usually with a 50 mm internal diameter. Provided full core recovery is achieved (which is not always possible in weak rocks and granular soils), this technique provides a very reliable method of investigation. Standard Penetration Tests Standard penetration tests (SPT) are used as a means of estimating the density or strength of soils and also of obtaining a relatively undisturbed sample. The test procedure is described in Australian Standard 1289, Methods of Testing Soils for Engineering Purposes - Test 6.3.1. The test is carried out in a borehole by driving a 50 mm diameter split sample tube under the impact of a 63 kg hammer with a free fall of 760 mm. It is normal for the tube to be driven in three successive 150 mm increments and the 'N' value is taken as the number of blows for the last 300 mm. In dense sands, very hard clays or weak rock, the full 450 mm penetration may not be practicable and the test is discontinued. The test results are reported in the following form. • In the case where full penetration is obtained

with successive blow counts for each 150 mm of, say, 4, 6 and 7 as:

4,6,7 N=13

• In the case where the test is discontinued before the full penetration depth, say after 15 blows for the first 150 mm and 30 blows for the next 40 mm as:

15, 30/40 mm

Page 215: SITE CLASSIFICATION REPORT SUMMARY...Douglas Partners (DP) has prepared this report for this project at Taylor 2- Stage 3, Taylor in accordance with DP’s proposal dated 15 September

July 2010

The results of the SPT tests can be related empirically to the engineering properties of the soils. Dynamic Cone Penetrometer Tests / Perth Sand Penetrometer Tests Dynamic penetrometer tests (DCP or PSP) are carried out by driving a steel rod into the ground using a standard weight of hammer falling a specified distance. As the rod penetrates the soil the number of blows required to penetrate each successive 150 mm depth are recorded. Normally there is a depth limitation of 1.2 m, but this may be extended in certain conditions by the use of extension rods. Two types of penetrometer are commonly used. • Perth sand penetrometer - a 16 mm diameter

flat ended rod is driven using a 9 kg hammer dropping 600 mm (AS 1289, Test 6.3.3). This test was developed for testing the density of sands and is mainly used in granular soils and filling.

• Cone penetrometer - a 16 mm diameter rod with a 20 mm diameter cone end is driven using a 9 kg hammer dropping 510 mm (AS 1289, Test 6.3.2). This test was developed initially for pavement subgrade investigations, and correlations of the test results with California Bearing Ratio have been published by various road authorities.

Page 216: SITE CLASSIFICATION REPORT SUMMARY...Douglas Partners (DP) has prepared this report for this project at Taylor 2- Stage 3, Taylor in accordance with DP’s proposal dated 15 September

May 2017

Description and Classification Methods The methods of description and classification of

soils and rocks used in this report are based on

Australian Standard AS 1726-1993, Geotechnical

Site Investigations Code. In general, the

descriptions include strength or density, colour,

structure, soil or rock type and inclusions.

Soil Types Soil types are described according to the

predominant particle size, qualified by the grading

of other particles present:

Type Particle size (mm)

Boulder >200

Cobble 63 - 200

Gravel 2.36 - 63

Sand 0.075 - 2.36

Silt 0.002 - 0.075

Clay <0.002

The sand and gravel sizes can be further

subdivided as follows:

Type Particle size (mm)

Coarse gravel 20 - 63

Medium gravel 6 - 20

Fine gravel 2.36 - 6

Coarse sand 0.6 - 2.36

Medium sand 0.2 - 0.6

Fine sand 0.075 - 0.2

The proportions of secondary constituents of soils

are described as:

Term Proportion Example

And Specify Clay (60%) and

Sand (40%)

Adjective 20 - 35% Sandy Clay

Slightly 12 - 20% Slightly Sandy

Clay

With some 5 - 12% Clay with some

sand

With a trace of 0 - 5% Clay with a trace

of sand

Definitions of grading terms used are:

• Well graded - a good representation of all

particle sizes

• Poorly graded - an excess or deficiency of

particular sizes within the specified range

• Uniformly graded - an excess of a particular

particle size

• Gap graded - a deficiency of a particular

particle size with the range

Cohesive Soils Cohesive soils, such as clays, are classified on the

basis of undrained shear strength. The strength

may be measured by laboratory testing, or

estimated by field tests or engineering

examination. The strength terms are defined as

follows:

Description Abbreviation Undrained shear strength

(kPa)

Very soft vs <12

Soft s 12 - 25

Firm f 25 - 50

Stiff st 50 - 100

Very stiff vst 100 - 200

Hard h >200

Cohesionless Soils Cohesionless soils, such as clean sands, are

classified on the basis of relative density, generally

from the results of standard penetration tests

(SPT), cone penetration tests (CPT) or dynamic

penetrometers (PSP). The relative density terms

are given below:

Relative Density

Abbreviation SPT N value

CPT qc value (MPa)

Very loose vl <4 <2

Loose l 4 - 10 2 -5

Medium

dense

md 10 - 30 5 - 15

Dense d 30 - 50 15 - 25

Very

dense

vd >50 >25

Page 217: SITE CLASSIFICATION REPORT SUMMARY...Douglas Partners (DP) has prepared this report for this project at Taylor 2- Stage 3, Taylor in accordance with DP’s proposal dated 15 September

May 2017

Soil Origin It is often difficult to accurately determine the origin

of a soil. Soils can generally be classified as:

• Residual soil - derived from in-situ weathering

of the underlying rock;

• Transported soils - formed somewhere else

and transported by nature to the site; or

• Filling - moved by man.

Transported soils may be further subdivided into:

• Alluvium - river deposits

• Lacustrine - lake deposits

• Aeolian - wind deposits

• Littoral - beach deposits

• Estuarine - tidal river deposits

• Talus - scree or coarse colluvium

• Slopewash or Colluvium - transported

downslope by gravity assisted by water.

Often includes angular rock fragments and

boulders.

Page 218: SITE CLASSIFICATION REPORT SUMMARY...Douglas Partners (DP) has prepared this report for this project at Taylor 2- Stage 3, Taylor in accordance with DP’s proposal dated 15 September

May 2017

Rock Strength Rock strength is defined by the Point Load Strength Index (Is(50)) and refers to the strength of the rock

substance and not the strength of the overall rock mass, which may be considerably weaker due to defects.

The test procedure is described by Australian Standard 4133.4.1 - 2007. The terms used to describe rock

strength are as follows:

Term Abbreviation Point Load Index

Is(50) MPa

Approximate Unconfined Compressive Strength MPa*

Extremely low EL <0.03 <0.6

Very low VL 0.03 - 0.1 0.6 - 2

Low L 0.1 - 0.3 2 - 6

Medium M 0.3 - 1.0 6 - 20

High H 1 - 3 20 - 60

Very high VH 3 - 10 60 - 200

Extremely high EH >10 >200

* Assumes a ratio of 20:1 for UCS to Is(50). It should be noted that the UCS to Is(50) ratio varies significantly

for different rock types and specific ratios should be determined for each site.

Degree of Weathering The degree of weathering of rock is classified as follows:

Term Abbreviation Description

Extremely weathered EW Rock substance has soil properties, i.e. it can be remoulded and classified as a soil but the texture of the original rock is still evident.

Highly weathered HW Limonite staining or bleaching affects whole of rock substance and other signs of decomposition are evident. Porosity and strength may be altered as a result of iron leaching or deposition. Colour and strength of original fresh rock is not recognisable

Moderately weathered

MW Staining and discolouration of rock substance has taken place

Slightly weathered SW Rock substance is slightly discoloured but shows little or no change of strength from fresh rock

Fresh stained Fs Rock substance unaffected by weathering but staining visible along defects

Fresh Fr No signs of decomposition or staining

Degree of Fracturing The following classification applies to the spacing of natural fractures in diamond drill cores. It includes

bedding plane partings, joints and other defects, but excludes drilling breaks.

Term Description

Fragmented Fragments of <20 mm

Highly Fractured Core lengths of 20-40 mm with some fragments

Fractured Core lengths of 40-200 mm with some shorter and longer sections

Slightly Fractured Core lengths of 200-1000 mm with some shorter and longer sections

Unbroken Core lengths mostly > 1000 mm

Page 219: SITE CLASSIFICATION REPORT SUMMARY...Douglas Partners (DP) has prepared this report for this project at Taylor 2- Stage 3, Taylor in accordance with DP’s proposal dated 15 September

May 2017

Rock Quality Designation The quality of the cored rock can be measured using the Rock Quality Designation (RQD) index, defined

as:

RQD % = cumulative length of 'sound' core sections ≥ 100 mm long

total drilled length of section being assessed

where 'sound' rock is assessed to be rock of low strength or better. The RQD applies only to natural

fractures. If the core is broken by drilling or handling (i.e. drilling breaks) then the broken pieces are fitted

back together and are not included in the calculation of RQD.

Stratification Spacing For sedimentary rocks the following terms may be used to describe the spacing of bedding partings:

Term Separation of Stratification Planes

Thinly laminated < 6 mm

Laminated 6 mm to 20 mm

Very thinly bedded 20 mm to 60 mm

Thinly bedded 60 mm to 0.2 m

Medium bedded 0.2 m to 0.6 m

Thickly bedded 0.6 m to 2 m

Very thickly bedded > 2 m

Page 220: SITE CLASSIFICATION REPORT SUMMARY...Douglas Partners (DP) has prepared this report for this project at Taylor 2- Stage 3, Taylor in accordance with DP’s proposal dated 15 September

May 2017

Introduction These notes summarise abbreviations commonly

used on borehole logs and test pit reports.

Drilling or Excavation Methods C Core drilling

R Rotary drilling

SFA Spiral flight augers

NMLC Diamond core - 52 mm dia

NQ Diamond core - 47 mm dia

HQ Diamond core - 63 mm dia

PQ Diamond core - 81 mm dia

Water � Water seep

� Water level

Sampling and Testing A Auger sample

B Bulk sample

D Disturbed sample

E Environmental sample

U50 Undisturbed tube sample (50mm)

W Water sample

pp Pocket penetrometer (kPa)

PID Photo ionisation detector

PL Point load strength Is(50) MPa

S Standard Penetration Test

V Shear vane (kPa)

Description of Defects in Rock The abbreviated descriptions of the defects should

be in the following order: Depth, Type, Orientation,

Coating, Shape, Roughness and Other. Drilling

and handling breaks are not usually included on

the logs.

Defect Type

B Bedding plane

Cs Clay seam

Cv Cleavage

Cz Crushed zone

Ds Decomposed seam

F Fault

J Joint

Lam Lamination

Pt Parting

Sz Sheared Zone

V Vein

Orientation

The inclination of defects is always measured from

the perpendicular to the core axis.

h horizontal

v vertical

sh sub-horizontal

sv sub-vertical

Coating or Infilling Term

cln clean

co coating

he healed

inf infilled

stn stained

ti tight

vn veneer

Coating Descriptor

ca calcite

cbs carbonaceous

cly clay

fe iron oxide

mn manganese

slt silty

Shape

cu curved

ir irregular

pl planar

st stepped

un undulating

Roughness

po polished

ro rough

sl slickensided

sm smooth

vr very rough

Other

fg fragmented

bnd band

qtz quartz

Page 221: SITE CLASSIFICATION REPORT SUMMARY...Douglas Partners (DP) has prepared this report for this project at Taylor 2- Stage 3, Taylor in accordance with DP’s proposal dated 15 September

May 2017

Graphic Symbols for Soil and Rock General

Soils

Sedimentary Rocks

Metamorphic Rocks

Igneous Rocks

Road base

Filling

Concrete

Asphalt

Topsoil

Peat

Clay

Conglomeratic sandstone

Conglomerate

Boulder conglomerate

Sandstone

Slate, phyllite, schist

Siltstone

Mudstone, claystone, shale

Coal

Limestone

Porphyry

Cobbles, boulders

Sandy gravel

Laminite

Silty sand

Clayey sand

Silty clay

Sandy clay

Gravelly clay

Shaly clay

Silt

Clayey silt

Sandy silt

Sand

Gravel

Talus

Gneiss

Quartzite

Dolerite, basalt, andesite

Granite

Tuff, breccia

Dacite, epidote

Page 222: SITE CLASSIFICATION REPORT SUMMARY...Douglas Partners (DP) has prepared this report for this project at Taylor 2- Stage 3, Taylor in accordance with DP’s proposal dated 15 September

ͱ·´ ̧°»­

̸» ¬§°»­ ±º ­±·´­ «­«¿´´§ °®»­»²¬ «²¼»® ¬¸» ¬±°­±·´ ·² ´¿²¼ ¦±²»¼ º±®®»­·¼»²¬·¿´ ¾«·´¼·²¹­ ½¿² ¾» ­°´·¬ ·²¬± ¬©± ¿°°®±¨·³¿¬» ¹®±«°­ P¹®¿²«´¿® ¿²¼ ½´¿§ò Ï«·¬» ±º¬»²ô º±«²¼¿¬·±² ­±·´ ·­ ¿ ³·¨¬«®» ±º ¾±¬¸¬§°»­ò ̸» ¹»²»®¿´ °®±¾´»³­ ¿­­±½·¿¬»¼ ©·¬¸ ­±·´­ ¸¿ª·²¹ ¹®¿²«´¿®½±²¬»²¬ ¿®» «­«¿´´§ ½¿«­»¼ ¾§ »®±­·±²ò Ý´¿§ ­±·´­ ¿®» ­«¾¶»½¬ ¬±­¿¬«®¿¬·±² ¿²¼ ­©»´´ñ­¸®·²µ °®±¾´»³­ò

Ý´¿­­·º·½¿¬·±²­ º±® ¿ ¹·ª»² ¿®»¿ ½¿² ¹»²»®¿´´§ ¾» ±¾¬¿·²»¼ ¾§¿°°´·½¿¬·±² ¬± ¬¸» ´±½¿´ ¿«¬¸±®·¬§ô ¾«¬ ¬¸»­» ¿®» ­±³»¬·³»­ «²®»´·¿¾´»¿²¼ ·º ¬¸»®» ·­ ¼±«¾¬ô ¿ ¹»±¬»½¸²·½¿´ ®»°±®¬ ­¸±«´¼ ¾» ½±³³·­­·±²»¼òß­ ³±­¬ ¾«·´¼·²¹­ ­«ºº»®·²¹ ³±ª»³»²¬ °®±¾´»³­ ¿®» º±«²¼»¼ ±² ½´¿§­±·´­ô ¬¸»®» ·­ ¿² »³°¸¿­·­ ±² ½´¿­­·º·½¿¬·±² ±º ­±·´­ ¿½½±®¼·²¹ ¬± ¬¸»¿³±«²¬ ±º ­©»´´ ¿²¼ ­¸®·²µ¿¹» ¬¸»§ »¨°»®·»²½» ©·¬¸ ª¿®·¿¬·±²­ ±º©¿¬»® ½±²¬»²¬ò ̸» ¬¿¾´» ¾»´±© ·­ Ì¿¾´» îòï º®±³ ßÍ îèéðô ¬¸»Î»­·¼»²¬·¿´ Í´¿¾ ¿²¼ Ú±±¬·²¹ ݱ¼»ò

Ý¿«­»­ ±º Ó±ª»³»²¬

Í»¬¬´»³»²¬ ¼«» ¬± ½±²­¬®«½¬·±²Ì¸»®» ¿®» ¬©± ¬§°»­ ±º ­»¬¬´»³»²¬ ¬¸¿¬ ±½½«® ¿­ ¿ ®»­«´¬ ±º½±²­¬®«½¬·±²æ{ ׳³»¼·¿¬» ­»¬¬´»³»²¬ ±½½«®­ ©¸»² ¿ ¾«·´¼·²¹ ·­ º·®­¬ °´¿½»¼ ±² ·¬­

º±«²¼¿¬·±² ­±·´ô ¿­ ¿ ®»­«´¬ ±º ½±³°¿½¬·±² ±º ¬¸» ­±·´ «²¼»® ¬¸»©»·¹¸¬ ±º ¬¸» ­¬®«½¬«®»ò ̸» ½±¸»­·ª» ¯«¿´·¬§ ±º ½´¿§ ­±·´ ³·¬·¹¿¬»­¿¹¿·²­¬ ¬¸·­ô ¾«¬ ¹®¿²«´¿® ø°¿®¬·½«´¿®´§ ­¿²¼§÷ ­±·´ ·­ ­«­½»°¬·¾´»ò

{ ݱ²­±´·¼¿¬·±² ­»¬¬´»³»²¬ ·­ ¿ º»¿¬«®» ±º ½´¿§ ­±·´ ¿²¼ ³¿§ ¬¿µ»°´¿½» ¾»½¿«­» ±º ¬¸» »¨°«´­·±² ±º ³±·­¬«®» º®±³ ¬¸» ­±·´ ±® ¾»½¿«­»±º ¬¸» ­±·´K­ ´¿½µ ±º ®»­·­¬¿²½» ¬± ´±½¿´ ½±³°®»­­·ª» ±® ­¸»¿® ­¬®»­­»­ò̸·­ ©·´´ «­«¿´´§ ¬¿µ» °´¿½» ¼«®·²¹ ¬¸» º·®­¬ º»© ³±²¬¸­ ¿º¬»®½±²­¬®«½¬·±²ô ¾«¬ ¸¿­ ¾»»² µ²±©² ¬± ¬¿µ» ³¿²§ §»¿®­ ·²»¨½»°¬·±²¿´ ½¿­»­ò

̸»­» °®±¾´»³­ ¿®» ¬¸» °®±ª·²½» ±º ¬¸» ¾«·´¼»® ¿²¼ ­¸±«´¼ ¾» ¬¿µ»²·²¬± ½±²­·¼»®¿¬·±² ¿­ °¿®¬ ±º ¬¸» °®»°¿®¿¬·±² ±º ¬¸» ­·¬» º±® ½±²­¬®«½ó¬·±²ò Þ«·´¼·²¹ Ì»½¸²±´±¹§ Ú·´» ïç øÞÌÚ ïç÷ ¼»¿´­ ©·¬¸ ¬¸»­»°®±¾´»³­ò

Û®±­·±²ß´´ ­±·´­ ¿®» °®±²» ¬± »®±­·±²ô ¾«¬ ­¿²¼§ ­±·´ ·­ °¿®¬·½«´¿®´§ ­«­½»°¬·¾´»¬± ¾»·²¹ ©¿­¸»¼ ¿©¿§ò Ûª»² ½´¿§ ©·¬¸ ¿ ­¿²¼ ½±³°±²»²¬ ±º ­¿§ ïðû±® ³±®» ½¿² ­«ºº»® º®±³ »®±­·±²ò

Í¿¬«®¿¬·±²Ì¸·­ ·­ °¿®¬·½«´¿®´§ ¿ °®±¾´»³ ·² ½´¿§ ­±·´­ò Í¿¬«®¿¬·±² ½®»¿¬»­ ¿ ¾±¹ó´·µ» ­«­°»²­·±² ±º ¬¸» ­±·´ ¬¸¿¬ ½¿«­»­ ·¬ ¬± ´±­» ª·®¬«¿´´§ ¿´´ ±º ·¬­¾»¿®·²¹ ½¿°¿½·¬§ò ̱ ¿ ´»­­»® ¼»¹®»»ô ­¿²¼ ·­ ¿ºº»½¬»¼ ¾§ ­¿¬«®¿¬·±²¾»½¿«­» ­¿¬«®¿¬»¼ ­¿²¼ ³¿§ «²¼»®¹± ¿ ®»¼«½¬·±² ·² ª±´«³» P°¿®¬·½«´¿®´§ ·³°±®¬»¼ ­¿²¼ º·´´ º±® ¾»¼¼·²¹ ¿²¼ ¾´·²¼·²¹ ´¿§»®­òر©»ª»®ô ¬¸·­ «­«¿´´§ ±½½«®­ ¿­ ·³³»¼·¿¬» ­»¬¬´»³»²¬ ¿²¼ ­¸±«´¼²±®³¿´´§ ¾» ¬¸» °®±ª·²½» ±º ¬¸» ¾«·´¼»®ò

Í»¿­±²¿´ ­©»´´·²¹ ¿²¼ ­¸®·²µ¿¹» ±º ­±·´ß´´ ½´¿§­ ®»¿½¬ ¬± ¬¸» °®»­»²½» ±º ©¿¬»® ¾§ ­´±©´§ ¿¾­±®¾·²¹ ·¬ô ³¿µ·²¹¬¸» ­±·´ ·²½®»¿­» ·² ª±´«³» ø­»» ¬¿¾´» ¾»´±©÷ò ̸» ¼»¹®»» ±º ·²½®»¿­»ª¿®·»­ ½±²­·¼»®¿¾´§ ¾»¬©»»² ¼·ºº»®»²¬ ½´¿§­ô ¿­ ¼±»­ ¬¸» ¼»¹®»» ±º¼»½®»¿­» ¼«®·²¹ ¬¸» ­«¾­»¯«»²¬ ¼®§·²¹ ±«¬ ½¿«­»¼ ¾§ º¿·® ©»¿¬¸»®°»®·±¼­ò Þ»½¿«­» ±º ¬¸» ´±© ¿¾­±®°¬·±² ¿²¼ »¨°«´­·±² ®¿¬»ô ¬¸·­°¸»²±³»²±² ©·´´ ²±¬ «­«¿´´§ ¾» ²±¬·½»¿¾´» «²´»­­ ¬¸»®» ¿®»°®±´±²¹»¼ ®¿·²§ ±® ¼®§ °»®·±¼­ô «­«¿´´§ ±º ©»»µ­ ±® ³±²¬¸­ô¼»°»²¼·²¹ ±² ¬¸» ´¿²¼ ¿²¼ ­±·´ ½¸¿®¿½¬»®·­¬·½­ò

̸» ­©»´´·²¹ ±º ­±·´ ½®»¿¬»­ ¿² «°©¿®¼ º±®½» ±² ¬¸» º±±¬·²¹­ ±º ¬¸»¾«·´¼·²¹ô ¿²¼ ­¸®·²µ¿¹» ½®»¿¬»­ ­«¾­·¼»²½» ¬¸¿¬ ¬¿µ»­ ¿©¿§ ¬¸»­«°°±®¬ ²»»¼»¼ ¾§ ¬¸» º±±¬·²¹ ¬± ®»¬¿·² »¯«·´·¾®·«³ò

͸»¿® º¿·´«®»Ì¸·­ °¸»²±³»²±² ±½½«®­ ©¸»² ¬¸» º±«²¼¿¬·±² ­±·´ ¼±»­ ²±¬ ¸¿ª»­«ºº·½·»²¬ ­¬®»²¹¬¸ ¬± ­«°°±®¬ ¬¸» ©»·¹¸¬ ±º ¬¸» º±±¬·²¹ò ̸»®» ¿®»¬©± ³¿¶±® °±­¬ó½±²­¬®«½¬·±² ½¿«­»­æ

{ Í·¹²·º·½¿²¬ ´±¿¼ ·²½®»¿­»ò{ λ¼«½¬·±² ±º ´¿¬»®¿´ ­«°°±®¬ ±º ¬¸» ­±·´ «²¼»® ¬¸» º±±¬·²¹ ¼«» ¬±

»®±­·±² ±® »¨½¿ª¿¬·±²ò{ ײ ½´¿§ ­±·´ô ­¸»¿® º¿·´«®» ½¿² ¾» ½¿«­»¼ ¾§ ­¿¬«®¿¬·±² ±º ¬¸» ­±·´

¿¼¶¿½»²¬ ¬± ±® «²¼»® ¬¸» º±±¬·²¹ò

Þ«·´¼·²¹­ ½¿² ¿²¼ ±º¬»² ¼± ³±ª»ò ̸·­ ³±ª»³»²¬ ½¿² ¾» «°ô ¼±©²ô ´¿¬»®¿´ ±® ®±¬¿¬·±²¿´ò ̸» º«²¼¿³»²¬¿´ ½¿«­»±º ³±ª»³»²¬ ·² ¾«·´¼·²¹­ ½¿² «­«¿´´§ ¾» ®»´¿¬»¼ ¬± ±²» ±® ³±®» °®±¾´»³­ ·² ¬¸» º±«²¼¿¬·±² ­±·´ò ׬ ·­ ·³°±®¬¿²¬ º±®¬¸» ¸±³»±©²»® ¬± ·¼»²¬·º§ ¬¸» ­±·´ ¬§°» ·² ±®¼»® ¬± ¿­½»®¬¿·² ¬¸» ³»¿­«®»­ ¬¸¿¬ ­¸±«´¼ ¾» °«¬ ·² °´¿½» ·² ±®¼»® ¬±»²­«®» ¬¸¿¬ °®±¾´»³­ ·² ¬¸» º±«²¼¿¬·±² ­±·´ ½¿² ¾» °®»ª»²¬»¼ô ¬¸«­ °®±¬»½¬·²¹ ¿¹¿·²­¬ ¾«·´¼·²¹ ³±ª»³»²¬ò

̸·­ Þ«·´¼·²¹ Ì»½¸²±´±¹§ Ú·´» ·­ ¼»­·¹²»¼ ¬± ·¼»²¬·º§ ½¿«­»­ ±º ­±·´ó®»´¿¬»¼ ¾«·´¼·²¹ ³±ª»³»²¬ô ¿²¼ ¬± ­«¹¹»­¬³»¬¸±¼­ ±º °®»ª»²¬·±² ±º ®»­«´¬¿²¬ ½®¿½µ·²¹ ·² ¾«·´¼·²¹­ò

Ú±«²¼¿¬·±² Ó¿·²¬»²¿²½»¿²¼ Ú±±¬·²¹ л®º±®³¿²½»æß Ø±³»±©²»®K­ Ù«·¼»

ÙÛÒÛÎßÔ ÜÛÚ×Ò×Ì×ÑÒÍ ÑÚ Í×ÌÛ ÝÔßÍÍÛÍ

Ý´¿­­ Ú±«²¼¿¬·±²

ß Ó±­¬ ­¿²¼ ¿²¼ ®±½µ ­·¬»­ ©·¬¸ ´·¬¬´» ±® ²± ¹®±«²¼ ³±ª»³»²¬ º®±³ ³±·­¬«®» ½¸¿²¹»­

Í Í´·¹¸¬´§ ®»¿½¬·ª» ½´¿§ ­·¬»­ ©·¬¸ ±²´§ ­´·¹¸¬ ¹®±«²¼ ³±ª»³»²¬ º®±³ ³±·­¬«®» ½¸¿²¹»­

Ó Ó±¼»®¿¬»´§ ®»¿½¬·ª» ½´¿§ ±® ­·´¬ ­·¬»­ô ©¸·½¸ ½¿² »¨°»®·»²½» ³±¼»®¿¬» ¹®±«²¼ ³±ª»³»²¬ º®±³ ³±·­¬«®» ½¸¿²¹»­

Ø Ø·¹¸´§ ®»¿½¬·ª» ½´¿§ ­·¬»­ô ©¸·½¸ ½¿² »¨°»®·»²½» ¸·¹¸ ¹®±«²¼ ³±ª»³»²¬ º®±³ ³±·­¬«®» ½¸¿²¹»­

Û Û¨¬®»³»´§ ®»¿½¬·ª» ­·¬»­ô ©¸·½¸ ½¿² »¨°»®·»²½» »¨¬®»³» ¹®±«²¼ ³±ª»³»²¬ º®±³ ³±·­¬«®» ½¸¿²¹»­

ß ¬± Ð Ú·´´»¼ ­·¬»­

Ð Í·¬»­ ©¸·½¸ ·²½´«¼» ­±º¬ ­±·´­ô ­«½¸ ¿­ ­±º¬ ½´¿§ ±® ­·´¬ ±® ´±±­» ­¿²¼­å ´¿²¼­´·°å ³·²» ­«¾­·¼»²½»å ½±´´¿°­·²¹ ­±·´­å ­±·´­ ­«¾¶»½¬¬± »®±­·±²å ®»¿½¬·ª» ­·¬»­ ­«¾¶»½¬ ¬± ¿¾²±®³¿´ ³±·­¬«®» ½±²¼·¬·±²­ ±® ­·¬»­ ©¸·½¸ ½¿²²±¬ ¾» ½´¿­­·º·»¼ ±¬¸»®©·­»

ÞÌÚ ïè®»°´¿½»­

ײº±®³¿¬·±²Í¸»»¬ ïðñçï

Page 223: SITE CLASSIFICATION REPORT SUMMARY...Douglas Partners (DP) has prepared this report for this project at Taylor 2- Stage 3, Taylor in accordance with DP’s proposal dated 15 September

Ì®»» ®±±¬ ¹®±©¬¸Ì®»»­ ¿²¼ ­¸®«¾­ ¬¸¿¬ ¿®» ¿´´±©»¼ ¬± ¹®±© ·² ¬¸» ª·½·²·¬§ ±º º±±¬·²¹­½¿² ½¿«­» º±«²¼¿¬·±² ­±·´ ³±ª»³»²¬ ·² ¬©± ©¿§­æ

{ ᱬ­ ¬¸¿¬ ¹®±© «²¼»® º±±¬·²¹­ ³¿§ ·²½®»¿­» ·² ½®±­­ó­»½¬·±²¿´­·¦»ô »¨»®¬·²¹ «°©¿®¼ °®»­­«®» ±² º±±¬·²¹­ò

{ ᱬ­ ·² ¬¸» ª·½·²·¬§ ±º º±±¬·²¹­ ©·´´ ¿¾­±®¾ ³«½¸ ±º ¬¸» ³±·­¬«®»·² ¬¸» º±«²¼¿¬·±² ­±·´ô ½¿«­·²¹ ­¸®·²µ¿¹» ±® ­«¾­·¼»²½»ò

˲»ª»²²»­­ ±º Ó±ª»³»²¬

̸» ¬§°»­ ±º ¹®±«²¼ ³±ª»³»²¬ ¼»­½®·¾»¼ ¿¾±ª» «­«¿´´§ ±½½«®«²»ª»²´§ ¬¸®±«¹¸±«¬ ¬¸» ¾«·´¼·²¹K­ º±«²¼¿¬·±² ­±·´ò Í»¬¬´»³»²¬ ¼«»¬± ½±²­¬®«½¬·±² ¬»²¼­ ¬± ¾» «²»ª»² ¾»½¿«­» ±ºæ

{ Ü·ºº»®·²¹ ½±³°¿½¬·±² ±º º±«²¼¿¬·±² ­±·´ °®·±® ¬± ½±²­¬®«½¬·±²ò

{ Ü·ºº»®·²¹ ³±·­¬«®» ½±²¬»²¬ ±º º±«²¼¿¬·±² ­±·´ °®·±® ¬± ½±²­¬®«½¬·±²ò

Ó±ª»³»²¬ ¼«» ¬± ²±²ó½±²­¬®«½¬·±² ½¿«­»­ ·­ «­«¿´´§ ³±®» «²»ª»²­¬·´´ò Û®±­·±² ½¿² «²¼»®³·²» ¿ º±±¬·²¹ ¬¸¿¬ ¬®¿ª»®­»­ ¬¸» º´±© ±® ½¿²½®»¿¬» ¬¸» ½±²¼·¬·±²­ º±® ­¸»¿® º¿·´«®» ¾§ »®±¼·²¹ ­±·´ ¿¼¶¿½»²¬ ¬± ¿º±±¬·²¹ ¬¸¿¬ ®«²­ ·² ¬¸» ­¿³» ¼·®»½¬·±² ¿­ ¬¸» º´±©ò

Í¿¬«®¿¬·±² ±º ½´¿§ º±«²¼¿¬·±² ­±·´ ³¿§ ±½½«® ©¸»®» ­«¾º´±±® ©¿´´­½®»¿¬» ¿ ¼¿³ ¬¸¿¬ ³¿µ»­ ©¿¬»® °±²¼ò ׬ ½¿² ¿´­± ±½½«® ©¸»®»ª»® ¬¸»®»·­ ¿ ­±«®½» ±º ©¿¬»® ²»¿® º±±¬·²¹­ ·² ½´¿§ ­±·´ò ̸·­ ´»¿¼­ ¬± ¿ ­»ª»®»®»¼«½¬·±² ·² ¬¸» ­¬®»²¹¬¸ ±º ¬¸» ­±·´ ©¸·½¸ ³¿§ ½®»¿¬» ´±½¿´ ­¸»¿®º¿·´«®»ò

Í»¿­±²¿´ ­©»´´·²¹ ¿²¼ ­¸®·²µ¿¹» ±º ½´¿§ ­±·´ ¿ºº»½¬­ ¬¸» °»®·³»¬»® ±º¬¸» ¾«·´¼·²¹ º·®­¬ô ¬¸»² ¹®¿¼«¿´´§ ­°®»¿¼­ ¬± ¬¸» ·²¬»®·±®ò ̸» ­©»´´·²¹°®±½»­­ ©·´´ «­«¿´´§ ¾»¹·² ¿¬ ¬¸» «°¸·´´ »¨¬®»³» ±º ¬¸» ¾«·´¼·²¹ô ±® ±²¬¸» ©»¿¬¸»® ­·¼» ©¸»®» ¬¸» ´¿²¼ ·­ º´¿¬ò Í©»´´·²¹ ¹®¿¼«¿´´§ ®»¿½¸»­ ¬¸»·²¬»®·±® ­±·´ ¿­ ¿¾­±®°¬·±² ½±²¬·²«»­ò ͸®·²µ¿¹» «­«¿´´§ ¾»¹·²­ ©¸»®»¬¸» ­«²K­ ¸»¿¬ ·­ ¹®»¿¬»­¬ò

Ûºº»½¬­ ±º ˲»ª»² ͱ·´ Ó±ª»³»²¬ ±² ͬ®«½¬«®»­

Û®±­·±² ¿²¼ ­¿¬«®¿¬·±²Û®±­·±² ®»³±ª»­ ¬¸» ­«°°±®¬ º®±³ «²¼»® º±±¬·²¹­ô ¬»²¼·²¹ ¬± ½®»¿¬»­«¾­·¼»²½» ±º ¬¸» °¿®¬ ±º ¬¸» ­¬®«½¬«®» «²¼»® ©¸·½¸ ·¬ ±½½«®­òÞ®·½µ©±®µ ©¿´´­ ©·´´ ®»­·­¬ ¬¸» ­¬®»­­ ½®»¿¬»¼ ¾§ ¬¸·­ ®»³±ª¿´ ±º­«°°±®¬ ¾§ ¾®·¼¹·²¹ ¬¸» ¹¿° ±® ½¿²¬·´»ª»®·²¹ «²¬·´ ¬¸» ¾®·½µ­ ±® ¬¸»³±®¬¿® ¾»¼¼·²¹ º¿·´ò Ñ´¼»® ³¿­±²®§ ¸¿­ ´·¬¬´» ®»­·­¬¿²½»ò Ûª·¼»²½» ±ºº¿·´«®» ª¿®·»­ ¿½½±®¼·²¹ ¬± ½·®½«³­¬¿²½»­ ¿²¼ ­§³°¬±³­ ³¿§ ·²½´«¼»æ

{ ͬ»° ½®¿½µ·²¹ ·² ¬¸» ³±®¬¿® ¾»¼­ ·² ¬¸» ¾±¼§ ±º ¬¸» ©¿´´ ±®¿¾±ª»ñ¾»´±© ±°»²·²¹­ ­«½¸ ¿­ ¼±±®­ ±® ©·²¼±©­ò

{ Ê»®¬·½¿´ ½®¿½µ·²¹ ·² ¬¸» ¾®·½µ­ ø«­«¿´´§ ¾«¬ ²±¬ ²»½»­­¿®·´§ ·² ´·²»©·¬¸ ¬¸» ª»®¬·½¿´ ¾»¼­ ±® °»®°»²¼­÷ò

×­±´¿¬»¼ °·»®­ ¿ºº»½¬»¼ ¾§ »®±­·±² ±® ­¿¬«®¿¬·±² ±º º±«²¼¿¬·±²­ ©·´´»ª»²¬«¿´´§ ´±­» ½±²¬¿½¬ ©·¬¸ ¬¸» ¾»¿®»®­ ¬¸»§ ­«°°±®¬ ¿²¼ ³¿§ ¬·´¬ ±®º¿´´ ±ª»®ò ̸» º´±±®­ ¬¸¿¬ ¸¿ª» ´±­¬ ¬¸·­ ­«°°±®¬ ©·´´ ¾»½±³» ¾±«²½§ô­±³»¬·³»­ ®¿¬¬´·²¹ ±®²¿³»²¬­ »¬½ò

Í»¿­±²¿´ ­©»´´·²¹ñ­¸®·²µ¿¹» ·² ½´¿§Í©»´´·²¹ º±«²¼¿¬·±² ­±·´ ¼«» ¬± ®¿·²§ °»®·±¼­ º·®­¬ ´·º¬­ ¬¸» ³±­¬»¨°±­»¼ »¨¬®»³·¬·»­ ±º ¬¸» º±±¬·²¹ ­§­¬»³ô ¬¸»² ¬¸» ®»³¿·²¼»® ±º ¬¸»°»®·³»¬»® º±±¬·²¹­ ©¸·´» ¹®¿¼«¿´´§ °»®³»¿¬·²¹ ·²­·¼» ¬¸» ¾«·´¼·²¹º±±¬°®·²¬ ¬± ´·º¬ ·²¬»®²¿´ º±±¬·²¹­ò ̸·­ ­©»´´·²¹ º·®­¬ ¬»²¼­ ¬± ½®»¿¬» ¿¼·­¸ »ºº»½¬ô ¾»½¿«­» ¬¸» »¨¬»®²¿´ º±±¬·²¹­ ¿®» °«­¸»¼ ¸·¹¸»® ¬¸¿² ¬¸»·²¬»®²¿´ ±²»­ò

̸» º·®­¬ ²±¬·½»¿¾´» ­§³°¬±³ ³¿§ ¾» ¬¸¿¬ ¬¸» º´±±® ¿°°»¿®­ ­´·¹¸¬´§¼·­¸»¼ò ̸·­ ·­ ±º¬»² ¿½½±³°¿²·»¼ ¾§ ­±³» ¼±±®­ ¾·²¼·²¹ ±² ¬¸»º´±±® ±® ¬¸» ¼±±® ¸»¿¼ô ¬±¹»¬¸»® ©·¬¸ ­±³» ½®¿½µ·²¹ ±º ½±®²·½»³·¬®»­ò ײ ¾«·´¼·²¹­ ©·¬¸ ¬·³¾»® º´±±®·²¹ ­«°°±®¬»¼ ¾§ ¾»¿®»®­ ¿²¼¶±·­¬­ô ¬¸» º´±±® ½¿² ¾» ¾±«²½§ò Û¨¬»®²¿´´§ ¬¸»®» ³¿§ ¾» ª·­·¾´»¼·­¸·²¹ ±º ¬¸» ¸·° ±® ®·¼¹» ´·²»­ò

ß­ ¬¸» ³±·­¬«®» ¿¾­±®°¬·±² °®±½»­­ ½±³°´»¬»­ ·¬­ ¶±«®²»§ ¬± ¬¸»·²²»®³±­¬ ¿®»¿­ ±º ¬¸» ¾«·´¼·²¹ô ¬¸» ·²¬»®²¿´ º±±¬·²¹­ ©·´´ ®·­»ò ׺ ¬¸»­°®»¿¼ ±º ³±·­¬«®» ·­ ®±«¹¸´§ »ª»²ô ·¬ ³¿§ ¾» ¬¸¿¬ ¬¸» ­§³°¬±³­ ©·´´¬»³°±®¿®·´§ ¼·­¿°°»¿®ô ¾«¬ ·¬ ·­ ³±®» ´·µ»´§ ¬¸¿¬ ­©»´´·²¹ ©·´´ ¾»«²»ª»²ô ½®»¿¬·²¹ ¿ ¼·ºº»®»²½» ®¿¬¸»® ¬¸¿² ¿ ¼·­¿°°»¿®¿²½» ·²­§³°¬±³­ò ײ ¾«·´¼·²¹­ ©·¬¸ ¬·³¾»® º´±±®·²¹ ­«°°±®¬»¼ ¾§ ¾»¿®»®­¿²¼ ¶±·­¬­ô ¬¸» ·­±´¿¬»¼ °·»®­ ©·´´ ®·­» ³±®» »¿­·´§ ¬¸¿² ¬¸» ­¬®·°º±±¬·²¹­ ±® °·»®­ «²¼»® ©¿´´­ô ½®»¿¬·²¹ ²±¬·½»¿¾´» ¼±³·²¹ ±º º´±±®·²¹ò

ß­ ¬¸» ©»¿¬¸»® °¿¬¬»®² ½¸¿²¹»­ ¿²¼ ¬¸» ­±·´ ¾»¹·²­ ¬± ¼®§ ±«¬ô ¬¸»»¨¬»®²¿´ º±±¬·²¹­ ©·´´ ¾» º·®­¬ ¿ºº»½¬»¼ô ¾»¹·²²·²¹ ©·¬¸ ¬¸» ´±½¿¬·±²­©¸»®» ¬¸» ­«²K­ »ºº»½¬ ·­ ­¬®±²¹»­¬ò ̸·­ ¸¿­ ¬¸» »ºº»½¬ ±º ´±©»®·²¹ ¬¸»»¨¬»®²¿´ º±±¬·²¹­ò ̸» ¼±³·²¹ ·­ ¿½½»²¬«¿¬»¼ ¿²¼ ½®¿½µ·²¹ ®»¼«½»­±® ¼·­¿°°»¿®­ ©¸»®» ·¬ ±½½«®®»¼ ¾»½¿«­» ±º ¼·­¸·²¹ô ¾«¬ ±¬¸»® ½®¿½µ­±°»² «°ò ̸» ®±±º ´·²»­ ³¿§ ¾»½±³» ½±²ª»¨ò

ܱ³·²¹ ¿²¼ ¼·­¸·²¹ ¿®» ¿´­± ¿ºº»½¬»¼ ¾§ ©»¿¬¸»® ·² ±¬¸»® ©¿§­ò ײ¿®»¿­ ©¸»®» ©¿®³ô ©»¬ ­«³³»®­ ¿²¼ ½±±´»® ¼®§ ©·²¬»®­ °®»ª¿·´ô©¿¬»® ³·¹®¿¬·±² ¬»²¼­ ¬± ¾» ¬±©¿®¼ ¬¸» ·²¬»®·±® ¿²¼ ¼±³·²¹ ©·´´ ¾»¿½½»²¬«¿¬»¼ô ©¸»®»¿­ ©¸»®» ­«³³»®­ ¿®» ¼®§ ¿²¼ ©·²¬»®­ ¿®» ½±´¼¿²¼ ©»¬ô ³·¹®¿¬·±² ¬»²¼­ ¬± ¾» ¬±©¿®¼ ¬¸» »¨¬»®·±® ¿²¼ ¬¸»«²¼»®´§·²¹ °®±°»²­·¬§ ·­ ¬±©¿®¼ ¼·­¸·²¹ò

Ó±ª»³»²¬ ½¿«­»¼ ¾§ ¬®»» ®±±¬­×² ¹»²»®¿´ô ¹®±©·²¹ ®±±¬­ ©·´´ »¨»®¬ ¿² «°©¿®¼ °®»­­«®» ±² º±±¬·²¹­ô©¸»®»¿­ ­±·´ ­«¾¶»½¬ ¬± ¼®§·²¹ ¾»½¿«­» ±º ¬®»» ±® ­¸®«¾ ®±±¬­ ©·´´ ¬»²¼¬± ®»³±ª» ­«°°±®¬ º®±³ «²¼»® º±±¬·²¹­ ¾§ ·²¼«½·²¹ ­¸®·²µ¿¹»ò

ݱ³°´·½¿¬·±²­ ½¿«­»¼ ¾§ ¬¸» ­¬®«½¬«®» ·¬­»´ºÓ±­¬ º±®½»­ ¬¸¿¬ ¬¸» ­±·´ ½¿«­»­ ¬± ¾» »¨»®¬»¼ ±² ­¬®«½¬«®»­ ¿®»ª»®¬·½¿´ P ·ò»ò »·¬¸»® «° ±® ¼±©²ò ر©»ª»®ô ¾»½¿«­» ¬¸»­» º±®½»­ ¿®»­»´¼±³ ­°®»¿¼ »ª»²´§ ¿®±«²¼ ¬¸» º±±¬·²¹­ô ¿²¼ ¾»½¿«­» ¬¸» ¾«·´¼·²¹®»­·­¬­ «²»ª»² ³±ª»³»²¬ ¾»½¿«­» ±º ·¬­ ®·¹·¼·¬§ô º±®½»­ ¿®» »¨»®¬»¼º®±³ ±²» °¿®¬ ±º ¬¸» ¾«·´¼·²¹ ¬± ¿²±¬¸»®ò ̸» ²»¬ ®»­«´¬ ±º ¿´´ ¬¸»­»º±®½»­ ·­ «­«¿´´§ ®±¬¿¬·±²¿´ò ̸·­ ®»­«´¬¿²¬ º±®½» ±º¬»² ½±³°´·½¿¬»­ ¬¸»¼·¿¹²±­·­ ¾»½¿«­» ¬¸» ª·­·¾´» ­§³°¬±³­ ¼± ²±¬ ­·³°´§ ®»º´»½¬ ¬¸»±®·¹·²¿´ ½¿«­»ò ß ½±³³±² ­§³°¬±³ ·­ ¾·²¼·²¹ ±º ¼±±®­ ±² ¬¸»ª»®¬·½¿´ ³»³¾»® ±º ¬¸» º®¿³»ò

Ûºº»½¬­ ±² º«´´ ³¿­±²®§ ­¬®«½¬«®»­Þ®·½µ©±®µ ©·´´ ®»­·­¬ ½®¿½µ·²¹ ©¸»®» ·¬ ½¿²ò ׬ ©·´´ ¿¬¬»³°¬ ¬± ­°¿²¿®»¿­ ¬¸¿¬ ´±­» ­«°°±®¬ ¾»½¿«­» ±º ­«¾­·¼»¼ º±«²¼¿¬·±²­ ±® ®¿·­»¼°±·²¬­ò ׬ ·­ ¬¸»®»º±®» «­«¿´ ¬± ­»» ½®¿½µ·²¹ ¿¬ ©»¿µ °±·²¬­ô ­«½¸ ¿­±°»²·²¹­ º±® ©·²¼±©­ ±® ¼±±®­ò

ײ ¬¸» »ª»²¬ ±º ½±²­¬®«½¬·±² ­»¬¬´»³»²¬ô ½®¿½µ·²¹ ©·´´ «­«¿´´§ ®»³¿·²«²½¸¿²¹»¼ ¿º¬»® ¬¸» °®±½»­­ ±º ­»¬¬´»³»²¬ ¸¿­ ½»¿­»¼ò

É·¬¸ ´±½¿´ ­¸»¿® ±® »®±­·±²ô ½®¿½µ·²¹ ©·´´ «­«¿´´§ ½±²¬·²«» ¬± ¼»ª»´±°«²¬·´ ¬¸» ±®·¹·²¿´ ½¿«­» ¸¿­ ¾»»² ®»³»¼·»¼ô ±® «²¬·´ ¬¸» ­«¾­·¼»²½»¸¿­ ½±³°´»¬»´§ ²»«¬®¿´·­»¼ ¬¸» ¿ºº»½¬»¼ °±®¬·±² ±º º±±¬·²¹ ¿²¼ ¬¸»­¬®«½¬«®» ¸¿­ ­¬¿¾·´·­»¼ ±² ±¬¸»® º±±¬·²¹­ ¬¸¿¬ ®»³¿·² »ºº»½¬·ª»ò

ײ ¬¸» ½¿­» ±º ­©»´´ñ­¸®·²µ »ºº»½¬­ô ¬¸» ¾®·½µ©±®µ ©·´´ ·² ­±³» ½¿­»­®»¬«®² ¬± ·¬­ ±®·¹·²¿´ °±­·¬·±² ¿º¬»® ½±³°´»¬·±² ±º ¿ ½§½´»ô ¸±©»ª»® ·¬·­ ³±®» ´·µ»´§ ¬¸¿¬ ¬¸» ®±¬¿¬·±²¿´ »ºº»½¬ ©·´´ ²±¬ ¾» »¨¿½¬´§ ®»ª»®­»¼ô¿²¼ ·¬ ·­ ¿´­± «­«¿´ ¬¸¿¬ ¾®·½µ©±®µ ©·´´ ­»¬¬´» ·² ·¬­ ²»© °±­·¬·±² ¿²¼©·´´ ®»­·­¬ ¬¸» º±®½»­ ¬®§·²¹ ¬± ®»¬«®² ·¬ ¬± ·¬­ ±®·¹·²¿´ °±­·¬·±²ò ̸·­³»¿²­ ¬¸¿¬ ·² ¿ ½¿­» ©¸»®» ­©»´´·²¹ ¬¿µ»­ °´¿½» ¿º¬»® ½±²­¬®«½¬·±²¿²¼ ½®¿½µ·²¹ ±½½«®­ô ¬¸» ½®¿½µ·²¹ ·­ ´·µ»´§ ¬± ¿¬ ´»¿­¬ °¿®¬´§ ®»³¿·²¿º¬»® ¬¸» ­¸®·²µ ­»¹³»²¬ ±º ¬¸» ½§½´» ·­ ½±³°´»¬»ò ̸«­ô »¿½¸ ¬·³»¬¸» ½§½´» ·­ ®»°»¿¬»¼ô ¬¸» ´·µ»´·¸±±¼ ·­ ¬¸¿¬ ¬¸» ½®¿½µ·²¹ ©·´´ ¾»½±³»©·¼»® «²¬·´ ¬¸» ­»½¬·±²­ ±º ¾®·½µ©±®µ ¾»½±³» ª·®¬«¿´´§ ·²¼»°»²¼»²¬ò

É·¬¸ ®»°»¿¬»¼ ½§½´»­ô ±²½» ¬¸» ½®¿½µ·²¹ ·­ »­¬¿¾´·­¸»¼ô ·º ¬¸»®» ·­ ²±±¬¸»® ½±³°´·½¿¬·±²ô ·¬ ·­ ²±®³¿´ º±® ¬¸» ·²½·¼»²½» ±º ½®¿½µ·²¹ ¬±­¬¿¾·´·­»ô ¿­ ¬¸» ¾«·´¼·²¹ ¸¿­ ¬¸» ¿®¬·½«´¿¬·±² ·¬ ²»»¼­ ¬± ½±°» ©·¬¸¬¸» °®±¾´»³ò ̸·­ ·­ ¾§ ²± ³»¿²­ ¿´©¿§­ ¬¸» ½¿­»ô ¸±©»ª»®ô ¿²¼³±²·¬±®·²¹ ±º ½®¿½µ­ ·² ©¿´´­ ¿²¼ º´±±®­ ­¸±«´¼ ¿´©¿§­ ¾» ¬®»¿¬»¼­»®·±«­´§ò

Ë°¸»¿ª¿´ ½¿«­»¼ ¾§ ¹®±©¬¸ ±º ¬®»» ®±±¬­ «²¼»® º±±¬·²¹­ ·­ ²±¬ ¿­·³°´» ª»®¬·½¿´ ­¸»¿® ­¬®»­­ò ̸»®» ·­ ¿ ¬»²¼»²½§ º±® ¬¸» ®±±¬ ¬± ¿´­±»¨»®¬ ´¿¬»®¿´ º±®½»­ ¬¸¿¬ ¿¬¬»³°¬ ¬± ­»°¿®¿¬» ­»½¬·±²­ ±º ¾®·½µ©±®µ¿º¬»® ·²·¬·¿´ ½®¿½µ·²¹ ¸¿­ ±½½«®®»¼ò

Ì®»»­ ½¿² ½¿«­» ­¸®·²µ¿¹» ¿²¼ ¼¿³¿¹»

Page 224: SITE CLASSIFICATION REPORT SUMMARY...Douglas Partners (DP) has prepared this report for this project at Taylor 2- Stage 3, Taylor in accordance with DP’s proposal dated 15 September

̸» ²±®³¿´ ­¬®«½¬«®¿´ ¿®®¿²¹»³»²¬ ·­ ¬¸¿¬ ¬¸» ·²²»® ´»¿º ±º ¾®·½µó©±®µ ·² ¬¸» »¨¬»®²¿´ ©¿´´­ ¿²¼ ¿¬ ´»¿­¬ ­±³» ±º ¬¸» ·²¬»®²¿´ ©¿´´­ø¼»°»²¼·²¹ ±² ¬¸» ®±±º ¬§°»÷ ½±³°®·­» ¬¸» ´±¿¼ó¾»¿®·²¹ ­¬®«½¬«®» ±²©¸·½¸ ¿²§ «°°»® º´±±®­ô ½»·´·²¹­ ¿²¼ ¬¸» ®±±º ¿®» ­«°°±®¬»¼ò ײ ¬¸»­»½¿­»­ô ·¬ ·­ ·²¬»®²¿´´§ ª·­·¾´» ½®¿½µ·²¹ ¬¸¿¬ ­¸±«´¼ ¾» ¬¸» ³¿·² º±½«­±º ¿¬¬»²¬·±²ô ¸±©»ª»® ¬¸»®» ¿®» ¿ º»© »¨¿³°´»­ ±º ¼©»´´·²¹­ ©¸±­»»¨¬»®²¿´ ´»¿º ±º ³¿­±²®§ °´¿§­ ­±³» ­«°°±®¬·²¹ ®±´»ô ­± ¬¸·­ ­¸±«´¼¾» ½¸»½µ»¼ ·º ¬¸»®» ·­ ¿²§ ¼±«¾¬ò ײ ¿²§ ½¿­»ô »¨¬»®²¿´´§ ª·­·¾´»½®¿½µ·²¹ ·­ ·³°±®¬¿²¬ ¿­ ¿ ¹«·¼» ¬± ­¬®»­­»­ ±² ¬¸» ­¬®«½¬«®» ¹»²»®¿´´§ô¿²¼ ·¬ ­¸±«´¼ ¿´­± ¾» ®»³»³¾»®»¼ ¬¸¿¬ ¬¸» »¨¬»®²¿´ ©¿´´­ ³«­¬ ¾»½¿°¿¾´» ±º ­«°°±®¬·²¹ ¬¸»³­»´ª»­ò

Ûºº»½¬­ ±² º®¿³»¼ ­¬®«½¬«®»­Ì·³¾»® ±® ­¬»»´ º®¿³»¼ ¾«·´¼·²¹­ ¿®» ´»­­ ´·µ»´§ ¬± »¨¸·¾·¬ ½®¿½µ·²¹¼«» ¬± ­©»´´ñ­¸®·²µ ¬¸¿² ³¿­±²®§ ¾«·´¼·²¹­ ¾»½¿«­» ±º ¬¸»·®º´»¨·¾·´·¬§ò ß´­±ô ¬¸» ¼±³·²¹ñ¼·­¸·²¹ »ºº»½¬­ ¬»²¼ ¬± ¾» ´±©»® ¾»½¿«­»±º ¬¸» ´·¹¸¬»® ©»·¹¸¬ ±º ©¿´´­ò ̸» ³¿·² ®·­µ­ ¬± º®¿³»¼ ¾«·´¼·²¹­ ¿®»»²½±«²¬»®»¼ ¾»½¿«­» ±º ¬¸» ·­±´¿¬»¼ °·»® º±±¬·²¹­ «­»¼ «²¼»® ©¿´´­òɸ»®» »®±­·±² ±® ­¿¬«®¿¬·±² ½¿«­» ¿ º±±¬·²¹ ¬± º¿´´ ¿©¿§ô ¬¸·­ ½¿²¼±«¾´» ¬¸» ­°¿² ©¸·½¸ ¿ ©¿´´ ³«­¬ ¾®·¼¹»ò ̸·­ ¿¼¼·¬·±²¿´ ­¬®»­­ ½¿²½®»¿¬» ½®¿½µ·²¹ ·² ©¿´´ ´·²·²¹­ô °¿®¬·½«´¿®´§ ©¸»®» ¬¸»®» ·­ ¿ ©»¿µ°±·²¬ ·² ¬¸» ­¬®«½¬«®» ½¿«­»¼ ¾§ ¿ ¼±±® ±® ©·²¼±© ±°»²·²¹ò ׬ ·­ô¸±©»ª»®ô «²´·µ»´§ ¬¸¿¬ º®¿³»¼ ­¬®«½¬«®»­ ©·´´ ¾» ­± ­¬®»­­»¼ ¿­ ¬± ­«ºº»®­»®·±«­ ¼¿³¿¹» ©·¬¸±«¬ º·®­¬ »¨¸·¾·¬·²¹ ­±³» ±® ¿´´ ±º ¬¸» ¿¾±ª»­§³°¬±³­ º±® ¿ ½±²­·¼»®¿¾´» °»®·±¼ò ̸» ­¿³» ©¿®²·²¹ °»®·±¼ ­¸±«´¼¿°°´§ ·² ¬¸» ½¿­» ±º «°¸»¿ª¿´ò ׬ ­¸±«´¼ ¾» ²±¬»¼ô ¸±©»ª»®ô ¬¸¿¬ ©¸»®»º®¿³»¼ ¾«·´¼·²¹­ ¿®» ­«°°±®¬»¼ ¾§ ­¬®·° º±±¬·²¹­ ¬¸»®» ·­ ±²´§ ±²» ´»¿º±º ¾®·½µ©±®µ ¿²¼ ¬¸»®»º±®» ¬¸» »¨¬»®²¿´´§ ª·­·¾´» ©¿´´­ ¿®» ¬¸»­«°°±®¬·²¹ ­¬®«½¬«®» º±® ¬¸» ¾«·´¼·²¹ò ײ ¬¸·­ ½¿­»ô ¬¸» ­«¾º´±±®³¿­±²®§ ©¿´´­ ½¿² ¾» »¨°»½¬»¼ ¬± ¾»¸¿ª» ¿­ º«´´ ¾®·½µ©±®µ ©¿´´­ò

Ûºº»½¬­ ±² ¾®·½µ ª»²»»® ­¬®«½¬«®»­Þ»½¿«­» ¬¸» ´±¿¼ó¾»¿®·²¹ ­¬®«½¬«®» ±º ¿ ¾®·½µ ª»²»»® ¾«·´¼·²¹ ·­ ¬¸»º®¿³» ¬¸¿¬ ³¿µ»­ «° ¬¸» ·²¬»®·±® ´»¿º ±º ¬¸» »¨¬»®²¿´ ©¿´´­ °´«­°»®¸¿°­ ¬¸» ·²¬»®²¿´ ©¿´´­ô ¼»°»²¼·²¹ ±² ¬¸» ¬§°» ±º ®±±ºô ¬¸»¾«·´¼·²¹ ½¿² ¾» »¨°»½¬»¼ ¬± ¾»¸¿ª» ¿­ ¿ º®¿³»¼ ­¬®«½¬«®»ô »¨½»°¬ ¬¸¿¬¬¸» »¨¬»®²¿´ ³¿­±²®§ ©·´´ ¾»¸¿ª» ·² ¿ ­·³·´¿® ©¿§ ¬± ¬¸» »¨¬»®²¿´ ´»¿º±º ¿ º«´´ ³¿­±²®§ ­¬®«½¬«®»ò

É¿¬»® Í»®ª·½» ¿²¼ Ü®¿·²¿¹»

ɸ»®» ¿ ©¿¬»® ­»®ª·½» °·°»ô ¿ ­»©»® ±® ­¬±®³©¿¬»® ¼®¿·²¿¹» °·°» ·­ ·²¬¸» ª·½·²·¬§ ±º ¿ ¾«·´¼·²¹ô ¿ ©¿¬»® ´»¿µ ½¿² ½¿«­» »®±­·±²ô ­©»´´·²¹ ±®­¿¬«®¿¬·±² ±º ­«­½»°¬·¾´» ­±·´ò Ûª»² ¿ ³·²«­½«´» ´»¿µ ½¿² ¾» »²±«¹¸¬± ­¿¬«®¿¬» ¿ ½´¿§ º±«²¼¿¬·±²ò ß ´»¿µ·²¹ ¬¿° ²»¿® ¿ ¾«·´¼·²¹ ½¿² ¸¿ª»¬¸» ­¿³» »ºº»½¬ò ײ ¿¼¼·¬·±²ô ¬®»²½¸»­ ½±²¬¿·²·²¹ °·°»­ ½¿² ¾»½±³»©¿¬»®½±«®­»­ »ª»² ¬¸±«¹¸ ¾¿½µº·´´»¼ô °¿®¬·½«´¿®´§ ©¸»®» ¾®±µ»²®«¾¾´» ·­ «­»¼ ¿­ º·´´ò É¿¬»® ¬¸¿¬ ®«²­ ¿´±²¹ ¬¸»­» ¬®»²½¸»­ ½¿² ¾»®»­°±²­·¾´» º±® ­»®·±«­ »®±­·±²ô ·²¬»®­¬®¿¬¿ ­»»°¿¹» ·²¬± ­«¾º´±±® ¿®»¿­¿²¼ ­¿¬«®¿¬·±²ò

з°» ´»¿µ¿¹» ¿²¼ ¬®»²½¸ ©¿¬»® º´±©­ ¿´­± »²½±«®¿¹» ¬®»» ¿²¼ ­¸®«¾®±±¬­ ¬± ¬¸» ­±«®½» ±º ©¿¬»®ô ½±³°´·½¿¬·²¹ ¿²¼ »¨¿½»®¾¿¬·²¹ ¬¸»°®±¾´»³òб±® ®±±º °´«³¾·²¹ ½¿² ®»­«´¬ ·² ´¿®¹» ª±´«³»­ ±º ®¿·²©¿¬»® ¾»·²¹½±²½»²¬®¿¬»¼ ·² ¿ ­³¿´´ ¿®»¿ ±º ­±·´æ

{ ײ½±®®»½¬ º¿´´­ ·² ®±±º ¹«¬¬»®·²¹ ³¿§ ®»­«´¬ ·² ±ª»®º´±©­ô ¿­ ³¿§¹«¬¬»®­ ¾´±½µ»¼ ©·¬¸ ´»¿ª»­ »¬½ò

{ ݱ®®±¼»¼ ¹«¬¬»®·²¹ ±® ¼±©²°·°»­ ½¿² ­°·´´ ©¿¬»® ¬± ¹®±«²¼ò

{ ܱ©²°·°»­ ²±¬ °±­·¬·ª»´§ ½±²²»½¬»¼ ¬± ¿ °®±°»® ­¬±®³©¿¬»®½±´´»½¬·±² ­§­¬»³ ©·´´ ¼·®»½¬ ¿ ½±²½»²¬®¿¬·±² ±º ©¿¬»® ¬± ­±·´ ¬¸¿¬ ·­¼·®»½¬´§ ¿¼¶¿½»²¬ ¬± º±±¬·²¹­ô ­±³»¬·³»­ ½¿«­·²¹ ´¿®¹»ó­½¿´»°®±¾´»³­ ­«½¸ ¿­ »®±­·±²ô ­¿¬«®¿¬·±² ¿²¼ ³·¹®¿¬·±² ±º ©¿¬»® «²¼»®¬¸» ¾«·´¼·²¹ò

Í»®·±«­²»­­ ±º Ý®¿½µ·²¹

ײ ¹»²»®¿´ô ³±­¬ ½®¿½µ·²¹ º±«²¼ ·² ³¿­±²®§ ©¿´´­ ·­ ¿ ½±­³»¬·½²«·­¿²½» ±²´§ ¿²¼ ½¿² ¾» µ»°¬ ·² ®»°¿·® ±® »ª»² ·¹²±®»¼ò ̸» ¬¿¾´»¾»´±© ·­ ¿ ®»°®±¼«½¬·±² ±º Ì¿¾´» Ýï ±º ßÍ îèéðò

ßÍ îèéð ¿´­± °«¾´·­¸»­ º·¹«®»­ ®»´¿¬·²¹ ¬± ½®¿½µ·²¹ ·² ½±²½®»¬» º´±±®­ô¸±©»ª»® ¾»½¿«­» ©¿´´ ½®¿½µ·²¹ ©·´´ «­«¿´´§ ®»¿½¸ ¬¸» ½®·¬·½¿´ °±·²¬­·¹²·º·½¿²¬´§ »¿®´·»® ¬¸¿² ½®¿½µ·²¹ ·² ­´¿¾­ô ¬¸·­ ¬¿¾´» ·­ ²±¬®»°®±¼«½»¼ ¸»®»ò

Ю»ª»²¬·±²ñÝ«®»

д«³¾·²¹É¸»®» ¾«·´¼·²¹ ³±ª»³»²¬ ·­ ½¿«­»¼ ¾§ ©¿¬»® ­»®ª·½»ô ®±±º °´«³¾·²¹ô­»©»® ±® ­¬±®³©¿¬»® º¿·´«®»ô ¬¸» ®»³»¼§ ·­ ¬± ®»°¿·® ¬¸» °®±¾´»³ò ׬ ·­ °®«¼»²¬ô ¸±©»ª»®ô ¬± ½±²­·¼»® ¿´­± ®»®±«¬·²¹ °·°»­ ¿©¿§ º®±³¬¸» ¾«·´¼·²¹ ©¸»®» °±­­·¾´»ô ¿²¼ ®»´±½¿¬·²¹ ¬¿°­ ¬± °±­·¬·±²­ ©¸»®»¿²§ ´»¿µ¿¹» ©·´´ ²±¬ ¼·®»½¬ ©¿¬»® ¬± ¬¸» ¾«·´¼·²¹ ª·½·²·¬§ò Ûª»² ©¸»®»¹«´´§ ¬®¿°­ ¿®» °®»­»²¬ô ¬¸»®» ·­ ­±³»¬·³»­ ­«ºº·½·»²¬ ­°·´´ ¬± ½®»¿¬»»®±­·±² ±® ­¿¬«®¿¬·±²ô °¿®¬·½«´¿®´§ ·² ³±¼»®² ·²­¬¿´´¿¬·±²­ «­·²¹­³¿´´»® ¼·¿³»¬»® ÐÊÝ º·¨¬«®»­ò ײ¼»»¼ô ­±³» ¹«´´§ ¬®¿°­ ¿®» ²±¬­·¬«¿¬»¼ ¼·®»½¬´§ «²¼»® ¬¸» ¬¿°­ ¬¸¿¬ ¿®» ·²­¬¿´´»¼ ¬± ½¸¿®¹» ¬¸»³ô©·¬¸ ¬¸» ®»­«´¬ ¬¸¿¬ ©¿¬»® º®±³ ¬¸» ¬¿° ³¿§ »²¬»® ¬¸» ¾¿½µº·´´»¼¬®»²½¸ ¬¸¿¬ ¸±«­»­ ¬¸» ­»©»® °·°·²¹ò ׺ ¬¸» ¬®»²½¸ ¸¿­ ¾»»² °±±®´§¾¿½µº·´´»¼ô ¬¸» ©¿¬»® ©·´´ »·¬¸»® °±²¼ ±® º´±© ¿´±²¹ ¬¸» ¾±¬¬±³ ±º¬¸» ¬®»²½¸ò ß­ ¬¸»­» ¬®»²½¸»­ «­«¿´´§ ®«² ¿´±²¹­·¼» ¬¸» º±±¬·²¹­ ¿²¼½¿² ¾» ¿¬ ¿ ­·³·´¿® ¼»°¬¸ô ·¬ ·­ ²±¬ ¸¿®¼ ¬± ­»» ¸±© ¿²§ ©¿¬»® ¬¸¿¬ ·­¬¸«­ ¼·®»½¬»¼ ·²¬± ¿ ¬®»²½¸ ½¿² »¿­·´§ ¿ºº»½¬ ¬¸» º±«²¼¿¬·±²K­ ¿¾·´·¬§ ¬±­«°°±®¬ º±±¬·²¹­ ±® »ª»² ¹¿·² »²¬®§ ¬± ¬¸» ­«¾º´±±® ¿®»¿ò

Ù®±«²¼ ¼®¿·²¿¹»×² ¿´´ ­±·´­ ¬¸»®» ·­ ¬¸» ½¿°¿½·¬§ º±® ©¿¬»® ¬± ¬®¿ª»´ ±² ¬¸» ­«®º¿½» ¿²¼¾»´±© ·¬ò Í«®º¿½» ©¿¬»® º´±©­ ½¿² ¾» »­¬¿¾´·­¸»¼ ¾§ ·²­°»½¬·±² ¼«®·²¹¿²¼ ¿º¬»® ¸»¿ª§ ±® °®±´±²¹»¼ ®¿·²ò ׺ ²»½»­­¿®§ô ¿ ¹®¿¬»¼ ¼®¿·² ­§­¬»³½±²²»½¬»¼ ¬± ¬¸» ­¬±®³©¿¬»® ½±´´»½¬·±² ­§­¬»³ ·­ «­«¿´´§ ¿² »¿­§­±´«¬·±²ò

׬ ·­ô ¸±©»ª»®ô ­±³»¬·³»­ ²»½»­­¿®§ ©¸»² ¿¬¬»³°¬·²¹ ¬± °®»ª»²¬©¿¬»® ³·¹®¿¬·±² ¬¸¿¬ ¬»­¬·²¹ ¾» ½¿®®·»¼ ±«¬ ¬± »­¬¿¾´·­¸ ©¿¬»®¬¿¾´»¸»·¹¸¬ ¿²¼ ­«¾­±·´ ©¿¬»® º´±©­ò ̸·­ ­«¾¶»½¬ ·­ ®»º»®®»¼ ¬± ·² ÞÌÚ ï翲¼ ³¿§ °®±°»®´§ ¾» ®»¹¿®¼»¼ ¿­ ¿² ¿®»¿ º±® ¿² »¨°»®¬ ½±²­«´¬¿²¬ò

Ю±¬»½¬·±² ±º ¬¸» ¾«·´¼·²¹ °»®·³»¬»®×¬ ·­ »­­»²¬·¿´ ¬± ®»³»³¾»® ¬¸¿¬ ¬¸» ­±·´ ¬¸¿¬ ¿ºº»½¬­ º±±¬·²¹­ »¨¬»²¼­©»´´ ¾»§±²¼ ¬¸» ¿½¬«¿´ ¾«·´¼·²¹ ´·²»ò É¿¬»®·²¹ ±º ¹¿®¼»² °´¿²¬­ô­¸®«¾­ ¿²¼ ¬®»»­ ½¿«­»­ ­±³» ±º ¬¸» ³±­¬ ­»®·±«­ ©¿¬»® °®±¾´»³­ò

Ú±® ¬¸·­ ®»¿­±²ô °¿®¬·½«´¿®´§ ©¸»®» °®±¾´»³­ »¨·­¬ ±® ¿®» ´·µ»´§ ¬±±½½«®ô ·¬ ·­ ®»½±³³»²¼»¼ ¬¸¿¬ ¿² ¿°®±² ±º °¿ª·²¹ ¾» ·²­¬¿´´»¼¿®±«²¼ ¿­ ³«½¸ ±º ¬¸» ¾«·´¼·²¹ °»®·³»¬»® ¿­ ²»½»­­¿®§ò ̸·­ °¿ª·²¹

ÝÔßÍÍ×Ú×ÝßÌ×ÑÒ ÑÚ ÜßÓßÙÛ É×ÌØ ÎÛÚÛÎÛÒÝÛ ÌÑ ÉßÔÔÍ

Ü»­½®·°¬·±² ±º ¬§°·½¿´ ¼¿³¿¹» ¿²¼ ®»¯«·®»¼ ®»°¿·® ß°°®±¨·³¿¬» ½®¿½µ ©·¼¬¸ Ü¿³¿¹»´·³·¬ ø­»» Ò±¬» í÷ ½¿¬»¹±®§

Ø¿·®´·²» ½®¿½µ­ äðòï ³³ ð

Ú·²» ½®¿½µ­ ©¸·½¸ ¼± ²±¬ ²»»¼ ®»°¿·® äï ³³ ï

Ý®¿½µ­ ²±¬·½»¿¾´» ¾«¬ »¿­·´§ º·´´»¼ò ܱ±®­ ¿²¼ ©·²¼±©­ ­¬·½µ ­´·¹¸¬´§ äë ³³ î

Ý®¿½µ­ ½¿² ¾» ®»°¿·®»¼ ¿²¼ °±­­·¾´§ ¿ ­³¿´´ ¿³±«²¬ ±º ©¿´´ ©·´´ ²»»¼ ëPïë ³³ ø±® ¿ ²«³¾»® ±º ½®¿½µ­ í¬± ¾» ®»°´¿½»¼ò ܱ±®­ ¿²¼ ©·²¼±©­ ­¬·½µò Í»®ª·½» °·°»­ ½¿² º®¿½¬«®»ò í ³³ ±® ³±®» ·² ±²» ¹®±«°÷É»¿¬¸»®¬·¹¸¬²»­­ ±º¬»² ·³°¿·®»¼

Û¨¬»²­·ª» ®»°¿·® ©±®µ ·²ª±´ª·²¹ ¾®»¿µ·²¹ó±«¬ ¿²¼ ®»°´¿½·²¹ ­»½¬·±²­ ±º ©¿´´­ô ïëPîë ³³ ¾«¬ ¿´­± ¼»°»²¼ ì»­°»½·¿´´§ ±ª»® ¼±±®­ ¿²¼ ©·²¼±©­ò É·²¼±© ¿²¼ ¼±±® º®¿³»­ ¼·­¬±®¬ò É¿´´­ ´»¿² ±² ²«³¾»® ±º ½®¿½µ­±® ¾«´¹» ²±¬·½»¿¾´§ô ­±³» ´±­­ ±º ¾»¿®·²¹ ·² ¾»¿³­ò Í»®ª·½» °·°»­ ¼·­®«°¬»¼

Page 225: SITE CLASSIFICATION REPORT SUMMARY...Douglas Partners (DP) has prepared this report for this project at Taylor 2- Stage 3, Taylor in accordance with DP’s proposal dated 15 September

­¸±«´¼ »¨¬»²¼ ±«¬©¿®¼­ ¿ ³·²·³«³ ±º çðð ³³ ø³±®» ·² ¸·¹¸´§®»¿½¬·ª» ­±·´÷ ¿²¼ ­¸±«´¼ ¸¿ª» ¿ ³·²·³«³ º¿´´ ¿©¿§ º®±³ ¬¸»¾«·´¼·²¹ ±º ïæêðò ̸» º·²·­¸»¼ °¿ª·²¹ ­¸±«´¼ ¾» ²± ´»­­ ¬¸¿² ïðð³³ ¾»´±© ¾®·½µ ª»²¬ ¾¿­»­ò

׬ ·­ °®«¼»²¬ ¬± ®»´±½¿¬» ¼®¿·²¿¹» °·°»­ ¿©¿§ º®±³ ¬¸·­ °¿ª·²¹ô ·º°±­­·¾´»ô ¬± ¿ª±·¼ ½±³°´·½¿¬·±²­ º®±³ º«¬«®» ´»¿µ¿¹»ò ׺ ¬¸·­ ·­ ²±¬°®¿½¬·½¿´ô »¿®¬¸»²©¿®» °·°»­ ­¸±«´¼ ¾» ®»°´¿½»¼ ¾§ ÐÊÝ ¿²¼¾¿½µº·´´·²¹ ­¸±«´¼ ¾» ±º ¬¸» ­¿³» ­±·´ ¬§°» ¿­ ¬¸» ­«®®±«²¼·²¹ ­±·´¿²¼ ½±³°¿½¬»¼ ¬± ¬¸» ­¿³» ¼»²­·¬§ò

Û¨½»°¬ ·² ¿®»¿­ ©¸»®» º®»»¦·²¹ ±º ©¿¬»® ·­ ¿² ·­­«»ô ·¬ ·­ ©·­» ¬±®»³±ª» ¬¿°­ ·² ¬¸» ¾«·´¼·²¹ ¿®»¿ ¿²¼ ®»´±½¿¬» ¬¸»³ ©»´´ ¿©¿§ º®±³¬¸» ¾«·´¼·²¹ P °®»º»®¿¾´§ ²±¬ «°¸·´´ º®±³ ·¬ ø­»» ÞÌÚ ïç÷ò

׬ ³¿§ ¾» ¼»­·®¿¾´» ¬± ·²­¬¿´´ ¿ ¹®¿¬»¼ ¼®¿·² ¿¬ ¬¸» ±«¬­·¼» »¼¹» ±º ¬¸»°¿ª·²¹ ±² ¬¸» «°¸·´´ ­·¼» ±º ¬¸» ¾«·´¼·²¹ò ׺ ­«¾­±·´ ¼®¿·²¿¹» ·­²»»¼»¼ ¬¸·­ ½¿² ¾» ·²­¬¿´´»¼ «²¼»® ¬¸» ­«®º¿½» ¼®¿·²ò

ݱ²¼»²­¿¬·±²×² ¾«·´¼·²¹­ ©·¬¸ ¿ ­«¾º´±±® ª±·¼ ­«½¸ ¿­ ©¸»®» ¾»¿®»®­ ¿²¼ ¶±·­¬­­«°°±®¬ º´±±®·²¹ô ·²­«ºº·½·»²¬ ª»²¬·´¿¬·±² ½®»¿¬»­ ·¼»¿´ ½±²¼·¬·±²­ º±®½±²¼»²­¿¬·±²ô °¿®¬·½«´¿®´§ ©¸»®» ¬¸»®» ·­ ´·¬¬´» ½´»¿®¿²½» ¾»¬©»»² ¬¸»º´±±® ¿²¼ ¬¸» ¹®±«²¼ò ݱ²¼»²­¿¬·±² ¿¼¼­ ¬± ¬¸» ³±·­¬«®» ¿´®»¿¼§°®»­»²¬ ·² ¬¸» ­«¾º´±±® ¿²¼ ­·¹²·º·½¿²¬´§ ­´±©­ ¬¸» °®±½»­­ ±º ¼®§·²¹±«¬ò ײ­¬¿´´¿¬·±² ±º ¿² ¿¼»¯«¿¬» ­«¾º´±±® ª»²¬·´¿¬·±² ­§­¬»³ô »·¬¸»®²¿¬«®¿´ ±® ³»½¸¿²·½¿´ô ·­ ¼»­·®¿¾´»ò

É¿®²·²¹æ ß´¬¸±«¹¸ ¬¸·­ Þ«·´¼·²¹ Ì»½¸²±´±¹§ Ú·´» ¼»¿´­ ©·¬¸½®¿½µ·²¹ ·² ¾«·´¼·²¹­ô ·¬ ­¸±«´¼ ¾» ­¿·¼ ¬¸¿¬ ­«¾º´±±® ³±·­¬«®» ½¿²®»­«´¬ ·² ¬¸» ¼»ª»´±°³»²¬ ±º ±¬¸»® °®±¾´»³­ô ²±¬¿¾´§æ

{ É¿¬»® ¬¸¿¬ ·­ ¬®¿²­³·¬¬»¼ ·²¬± ³¿­±²®§ô ³»¬¿´ ±® ¬·³¾»® ¾«·´¼·²¹»´»³»²¬­ ½¿«­»­ ¼¿³¿¹» ¿²¼ñ±® ¼»½¿§ ¬± ¬¸±­» »´»³»²¬­ò

{ Ø·¹¸ ­«¾º´±±® ¸«³·¼·¬§ ¿²¼ ³±·­¬«®» ½±²¬»²¬ ½®»¿¬» ¿² ·¼»¿´»²ª·®±²³»²¬ º±® ª¿®·±«­ °»­¬­ô ·²½´«¼·²¹ ¬»®³·¬»­ ¿²¼ ­°·¼»®­ò

{ ɸ»®» ¸·¹¸ ³±·­¬«®» ´»ª»´­ ¿®» ¬®¿²­³·¬¬»¼ ¬± ¬¸» º´±±®·²¹ ¿²¼©¿´´­ô ¿² ·²½®»¿­» ·² ¬¸» ¼«­¬ ³·¬» ½±«²¬ ½¿² »²­«» ©·¬¸·² ¬¸»´·ª·²¹ ¿®»¿­ò Ü«­¬ ³·¬»­ô ¿­ ©»´´ ¿­ ¼¿³°²»­­ ·² ¹»²»®¿´ô ½¿² ¾» ¿¸»¿´¬¸ ¸¿¦¿®¼ ¬± ·²¸¿¾·¬¿²¬­ô °¿®¬·½«´¿®´§ ¬¸±­» ©¸± ¿®»¿¾²±®³¿´´§ ­«­½»°¬·¾´» ¬± ®»­°·®¿¬±®§ ¿·´³»²¬­ò

̸» ¹¿®¼»²Ì¸» ·¼»¿´ ª»¹»¬¿¬·±² ´¿§±«¬ ·­ ¬± ¸¿ª» ´¿©² ±® °´¿²¬­ ¬¸¿¬ ®»¯«·®»±²´§ ´·¹¸¬ ©¿¬»®·²¹ ·³³»¼·¿¬»´§ ¿¼¶¿½»²¬ ¬± ¬¸» ¼®¿·²¿¹» ±® °¿ª·²¹»¼¹»ô ¬¸»² ³±®» ¼»³¿²¼·²¹ °´¿²¬­ô ­¸®«¾­ ¿²¼ ¬®»»­ ­°®»¿¼ ±«¬ ·²¬¸¿¬ ±®¼»®ò

Ѫ»®©¿¬»®·²¹ ¼«» ¬± ³·­«­» ±º ¿«¬±³¿¬·½ ©¿¬»®·²¹ ­§­¬»³­ ·­ ¿½±³³±² ½¿«­» ±º ­¿¬«®¿¬·±² ¿²¼ ©¿¬»® ³·¹®¿¬·±² «²¼»® º±±¬·²¹­ò ׺·¬ ·­ ²»½»­­¿®§ ¬± «­» ¬¸»­» ­§­¬»³­ô ·¬ ·­ ·³°±®¬¿²¬ ¬± ®»³±ª» ¹¿®¼»²¾»¼­ ¬± ¿ ½±³°´»¬»´§ ­¿º» ¼·­¬¿²½» º®±³ ¾«·´¼·²¹­ò

Û¨·­¬·²¹ ¬®»»­É¸»®» ¿ ¬®»» ·­ ½¿«­·²¹ ¿ °®±¾´»³ ±º ­±·´ ¼®§·²¹ ±® ¬¸»®» ·­ ¬¸»»¨·­¬»²½» ±® ¬¸®»¿¬ ±º «°¸»¿ª¿´ ±º º±±¬·²¹­ô ·º ¬¸» ±ºº»²¼·²¹ ®±±¬­ ¿®»­«¾­·¼·¿®§ ¿²¼ ¬¸»·® ®»³±ª¿´ ©·´´ ²±¬ ­·¹²·º·½¿²¬´§ ¼¿³¿¹» ¬¸» ¬®»»ô¬¸»§ ­¸±«´¼ ¾» ­»ª»®»¼ ¿²¼ ¿ ½±²½®»¬» ±® ³»¬¿´ ¾¿®®·»® °´¿½»¼ª»®¬·½¿´´§ ·² ¬¸» ­±·´ ¬± °®»ª»²¬ º«¬«®» ®±±¬ ¹®±©¬¸ ·² ¬¸» ¼·®»½¬·±² ±º¬¸» ¾«·´¼·²¹ò ׺ ·¬ ·­ ²±¬ °±­­·¾´» ¬± ®»³±ª» ¬¸» ®»´»ª¿²¬ ®±±¬­©·¬¸±«¬ ¼¿³¿¹» ¬± ¬¸» ¬®»»ô ¿² ¿°°´·½¿¬·±² ¬± ®»³±ª» ¬¸» ¬®»» ­¸±«´¼¾» ³¿¼» ¬± ¬¸» ´±½¿´ ¿«¬¸±®·¬§ò ß °®«¼»²¬ °´¿² ·­ ¬± ¬®¿²­°´¿²¬ ´·µ»´§±ºº»²¼»®­ ¾»º±®» ¬¸»§ ¾»½±³» ¿ °®±¾´»³ò

ײº±®³¿¬·±² ±² ¬®»»­ô °´¿²¬­ ¿²¼ ­¸®«¾­Í¬¿¬» ¼»°¿®¬³»²¬­ ±ª»®­»»·²¹ ¿¹®·½«´¬«®» ½¿² ¹·ª» ·²º±®³¿¬·±²®»¹¿®¼·²¹ ®±±¬ °¿¬¬»®²­ô ª±´«³» ±º ©¿¬»® ²»»¼»¼ ¿²¼ ­¿º» ¼·­¬¿²½»º®±³ ¾«·´¼·²¹­ ±º ³±­¬ ­°»½·»­ò Þ±¬¿²·½ ¹¿®¼»²­ ¿®» ¿´­± ­±«®½»­ ±º·²º±®³¿¬·±²ò Ú±® ·²º±®³¿¬·±² ±² °´¿²¬ ®±±¬­ ¿²¼ ¼®¿·²­ô ­»» Þ«·´¼·²¹Ì»½¸²±´±¹§ Ú·´» ïéò

Û¨½¿ª¿¬·±²Û¨½¿ª¿¬·±² ¿®±«²¼ º±±¬·²¹­ ³«­¬ ¾» °®±°»®´§ »²¹·²»»®»¼ò ͱ·´­«°°±®¬·²¹ º±±¬·²¹­ ½¿² ±²´§ ¾» ­¿º»´§ »¨½¿ª¿¬»¼ ¿¬ ¿² ¿²¹´» ¬¸¿¬¿´´±©­ ¬¸» ­±·´ «²¼»® ¬¸» º±±¬·²¹ ¬± ®»³¿·² ­¬¿¾´»ò ̸·­ ¿²¹´» ·­½¿´´»¼ ¬¸» ¿²¹´» ±º ®»°±­» ø±® º®·½¬·±²÷ ¿²¼ ª¿®·»­ ­·¹²·º·½¿²¬´§¾»¬©»»² ­±·´ ¬§°»­ ¿²¼ ½±²¼·¬·±²­ò λ³±ª¿´ ±º ­±·´ ©·¬¸·² ¬¸» ¿²¹´»±º ®»°±­» ©·´´ ½¿«­» ­«¾­·¼»²½»ò

λ³»¼·¿¬·±²

ɸ»®» »®±­·±² ¸¿­ ±½½«®®»¼ ¬¸¿¬ ¸¿­ ©¿­¸»¼ ¿©¿§ ­±·´ ¿¼¶¿½»²¬ ¬±º±±¬·²¹­ô ­±·´ ±º ¬¸» ­¿³» ½´¿­­·º·½¿¬·±² ­¸±«´¼ ¾» ·²¬®±¼«½»¼ ¿²¼½±³°¿½¬»¼ ¬± ¬¸» ­¿³» ¼»²­·¬§ò ɸ»®» º±±¬·²¹­ ¸¿ª» ¾»»²«²¼»®³·²»¼ô ¿«¹³»²¬¿¬·±² ±® ±¬¸»® ­°»½·¿´·­¬ ©±®µ ³¿§ ¾» ®»¯«·®»¼òλ³»¼·¿¬·±² ±º º±±¬·²¹­ ¿²¼ º±«²¼¿¬·±²­ ·­ ¹»²»®¿´´§ ¬¸» ®»¿´³ ±º ¿­°»½·¿´·­¬ ½±²­«´¬¿²¬ò

ɸ»®» ·­±´¿¬»¼ º±±¬·²¹­ ®·­» ¿²¼ º¿´´ ¾»½¿«­» ±º ­©»´´ñ­¸®·²µ »ºº»½¬ô¬¸» ¸±³»±©²»® ³¿§ ¾» ¬»³°¬»¼ ¬± ¿´´»ª·¿¬» º´±±® ¾±«²½» ¾§ º·´´·²¹¬¸» ¹¿° ¬¸¿¬ ¸¿­ ¿°°»¿®»¼ ¾»¬©»»² ¬¸» ¾»¿®»® ¿²¼ ¬¸» °·»® ©·¬¸¾´±½µ·²¹ò ̸» ¼¿²¹»® ¸»®» ·­ ¬¸¿¬ ©¸»² ¬¸» ²»¨¬ ­©»´´ ­»¹³»²¬ ±º ¬¸»½§½´» ±½½«®­ô ¬¸» »¨¬®¿ ¾´±½µ·²¹ ©·´´ °«­¸ ¬¸» º´±±® «° ·²¬± ¿²¿½½»²¬«¿¬»¼ ¼±³» ¿²¼ ³¿§ ¿´­± ½¿«­» ´±½¿´ ­¸»¿® º¿·´«®» ·² ¬¸» ­±·´ò׺ ·¬ ·­ ²»½»­­¿®§ ¬± «­» ¾´±½µ·²¹ô ·¬ ­¸±«´¼ ¾» ¾§ ¿ °¿·® ±º º·²»©»¼¹»­ ¿²¼ ³±²·¬±®·²¹ ­¸±«´¼ ¾» ½¿®®·»¼ ±«¬ º±®¬²·¹¸¬´§ò

̸·­ ÞÌÚ ©¿­ °®»°¿®»¼ ¾§ Ö±¸² Ô»©»® Úß×Þô Ó×ßÓßô ﮬ²»®ô

ݱ²­¬®«½¬·±² Ü·¿¹²±­·­ò

̸» ·²º±®³¿¬·±² ·² ¬¸·­ ¿²¼ ±¬¸»® ·­­«»­ ·² ¬¸» ­»®·»­ ©¿­ ¼»®·ª»¼ º®±³ ª¿®·±«­ ­±«®½»­ ¿²¼ ©¿­ ¾»´·»ª»¼ ¬± ¾» ½±®®»½¬ ©¸»² °«¾´·­¸»¼ò

̸» ·²º±®³¿¬·±² ·­ ¿¼ª·­±®§ò ׬ ·­ °®±ª·¼»¼ ·² ¹±±¼ º¿·¬¸ ¿²¼ ²±¬ ½´¿·³»¼ ¬± ¾» ¿² »¨¸¿«­¬·ª» ¬®»¿¬³»²¬ ±º ¬¸» ®»´»ª¿²¬ ­«¾¶»½¬ò

Ú«®¬¸»® °®±º»­­·±²¿´ ¿¼ª·½» ²»»¼­ ¬± ¾» ±¾¬¿·²»¼ ¾»º±®» ¬¿µ·²¹ ¿²§ ¿½¬·±² ¾¿­»¼ ±² ¬¸» ·²º±®³¿¬·±² °®±ª·¼»¼ò

Ü·­¬®·¾«¬»¼ ¾§

ÝÍ×ÎÑ ÐËÞÔ ×ÍØ ×ÒÙ ÐÑ Þ±¨ ïïíçô ݱ´´·²¹©±±¼ íðêêô ß«­¬®¿´·¿

Ú®»»½¿´´ ïèðð êìë ðëï Ì»´ øðí÷ çêêî éêêê Ú¿¨ øðí÷ çêêî éëëë ©©©ò°«¾´·­¸ò½­·®±ò¿«

Û³¿·´æ °«¾´·­¸·²¹ò­¿´»­à½­·®±ò¿«

w ÝÍ×ÎÑ îððíò ˲¿«¬¸±®·­»¼ ½±°§·²¹ ±º ¬¸·­ Þ«·´¼·²¹ Ì»½¸²±´±¹§ º·´» ·­ °®±¸·¾·¬»¼

Ù¿®¼»²­ º±® ¿ ®»¿½¬·ª» ­·¬»

Page 226: SITE CLASSIFICATION REPORT SUMMARY...Douglas Partners (DP) has prepared this report for this project at Taylor 2- Stage 3, Taylor in accordance with DP’s proposal dated 15 September

TOPSOIL FILLING-dry to moist, brown silty sand

FILLING-generally comprising well compacted, dry tomoist, orange brown, medium plasticity gravelly sandyclay

SILTY SANDY CLAY-hard, dry to moist, yellow brown, lowto medium plasticity silty sandy clay

SILTY SAND-dense, dry to moist, yellow orange brown,fine to coarse grained silty sand

DACITE-low to medium strength, highly to moderatelyweathered, yellow brown, fine grained dacite, fractured

Pit discontinued at 1.2m-slow progress

0.1

0.2

0.9

1.05

1.2

SAMPLING & IN SITU TESTING LEGEND

TEST PIT LOG

Taylor 2 Estate, Stage 3, Taylor

A Auger sample G Gas sample PID Photo ionisation detector (ppm)B Bulk sample P Piston sample PL(A) Point load axial test Is(50) (MPa)BLK Block sample Ux Tube sample (x mm dia.) PL(D) Point load diametral test Is(50) (MPa)C Core drilling W Water sample pp Pocket penetrometer (kPa)D Disturbed sample Water seep S Standard penetration testE Environmental sample Water level V Shear vane (kPa)

Indesco Consulting Engineers Pty LtdSite Classifications

Results &Comments

LOGGED: JPM SURVEY DATUM: MGA94

CLIENT:PROJECT:LOCATION:

PIT No: 61PROJECT No: 77418.29DATE: 11/1/2019SHEET 1 OF 1

Sampling & In Situ Testing

1

2

Wat

er

Dep

th

Sam

ple

Description

of

Strata Gra

phic

Log

Typ

e

REMARKS: Surface Levels & Coordinates are approximate only and must not be relied upon

RIG: Kubota KX057-4 mini-excavator with 300mm wide bucket

WATER OBSERVATIONS: No free groundwater observed

SURFACE LEVEL: 662.0 AHDEASTING: 209083NORTHING: 618732

Dynamic Penetrometer Test(blows per mm)

5 10 15 20

Cone Penetrometer AS1289.6.3.2Sand Penetrometer AS1289.6.3.3

Depth(m) R

L

1

2

662

661

660

D

D

D

0.4

1.0

1.1

pp >400

Page 227: SITE CLASSIFICATION REPORT SUMMARY...Douglas Partners (DP) has prepared this report for this project at Taylor 2- Stage 3, Taylor in accordance with DP’s proposal dated 15 September

TOPSOIL FILLING-dry to moist, brown silty sand

FILLING-generally comprising well compacted, dry tomoist, grey brown, low plasticity silty gravelly clay

SILTY GRAVELLY SAND-medium dense, dry to moist,grey brown, fine to coarse grained silty gravelly sand

SILTY CLAYEY SAND-medium dense, dry to moist, redbrown, low plasticity, fine to coarse grained silty clayeysand

DACITE-low to medium strength, highly to moderatelyweathered, orange brown grey, fine to coarse graineddacite with some clay seams, highly fractured

Pit discontinued at 1.7m-limit of investigation

0.1

0.45

1.0

1.5

1.7

SAMPLING & IN SITU TESTING LEGEND

TEST PIT LOG

Taylor 2 Estate, Stage 3, Taylor

A Auger sample G Gas sample PID Photo ionisation detector (ppm)B Bulk sample P Piston sample PL(A) Point load axial test Is(50) (MPa)BLK Block sample Ux Tube sample (x mm dia.) PL(D) Point load diametral test Is(50) (MPa)C Core drilling W Water sample pp Pocket penetrometer (kPa)D Disturbed sample Water seep S Standard penetration testE Environmental sample Water level V Shear vane (kPa)

Indesco Consulting Engineers Pty LtdSite Classifications

Results &Comments

LOGGED: JPM SURVEY DATUM: MGA94

CLIENT:PROJECT:LOCATION:

PIT No: 62PROJECT No: 77418.29DATE: 11/1/2019SHEET 1 OF 1

Sampling & In Situ Testing

1

2

Wat

er

Dep

th

Sam

ple

Description

of

Strata Gra

phic

Log

Typ

e

REMARKS: Surface Levels & Coordinates are approximate only and must not be relied upon

RIG: Kubota KX057-4 mini-excavator with 300mm wide bucket

WATER OBSERVATIONS: No free groundwater observed

SURFACE LEVEL: 661.7 AHDEASTING: 209100NORTHING: 618736

Dynamic Penetrometer Test(blows per mm)

5 10 15 20

Cone Penetrometer AS1289.6.3.2Sand Penetrometer AS1289.6.3.3

Depth(m) R

L

1

2

661

660

D

D

0.7

1.6

Page 228: SITE CLASSIFICATION REPORT SUMMARY...Douglas Partners (DP) has prepared this report for this project at Taylor 2- Stage 3, Taylor in accordance with DP’s proposal dated 15 September
Page 229: SITE CLASSIFICATION REPORT SUMMARY...Douglas Partners (DP) has prepared this report for this project at Taylor 2- Stage 3, Taylor in accordance with DP’s proposal dated 15 September

SITE CLASSIFICATION REPORT SUMMARY

BLOCK: 13 SECTION: 64 SUBURB: Taylor

JOB No: 77418.29 DATE: March 2019

CLIENT: Indesco Consulting Engineers Pty Ltd

Classification Procedures: Existing Subsurface Conditions: Refer attached test pit log(s) – Pit(s) 60,61 and Drawing 1.

Bulk Earthworks: Filling within the block placed under Level 1 control as defined in AS 3798 – 2007 (Ref 1). Laboratory Results: Previous laboratory testing results indicated liquid limit ranging from 25-66%, plasticity index ranging from 6-49% and linear shrinkage ranging from 3-20.5%.

Site Classification: Based on the worst case current soil profile obtained from limited subsurface information and determined in general accordance with the requirements of AS2870-2001 (Ref 2), the overall block would be classified as Class M* (moderately reactive/filled). The deeper soil profile was encountered in the majority of the block. It is noted however, the south eastern portion of the block would be equivalent to Class S conditions. Therefore the classification must be reassessed should the soil profile change either by adding fill or removing soil from the block and/or if the presence of service trenches or retaining walls are within the zone of influence of the block. Reference should be made to the comments provided below..

Footing Systems: Reference must be made to AS2870-2011 (Ref 2) which indicates footing systems that are appropriate for each site classification. All footings must found within a uniform bearing stratum of suitable strength/material, below the zone of influence of any service trenches, backfill zones, retaining walls or underground structures. Masonry walls should be articulated in accordance with current best practice. Dwelling design must ensure uniform moisture conditions are maintained in the vicinity of footings. Footing systems must be confirmed by a structural engineer taking into consideration any onsite or offsite constraints.

Maintenance Guidelines: Reference should be made to the attached CSIRO Sheet BTF 18 ‘Foundation Maintenance & Footing Performance’ to comments about gardens, landscaping and trees on the performance of foundation soils and in particular in respect to maintaining good surface drainage. It notes that minor cracking in most structures is inevitable, and it describes site maintenance practices aimed at minimising foundation movements that can lead to cracking damage.

Comments/ Limitations:

The successful purchaser must make their own interpretations, deductions and conclusions from the information made available and will need to accept full responsibility for such interpretations, deductions and conclusions. Development specific geotechnical investigations must be undertaken. Additional topsoils / filling may have been spread subsequent to the investigation. Site preparation prior to the construction should include removal of all vegetation, topsoil and any uncontrolled filling. All new filling must be placed under controlled conditions (AS 3798-2007), otherwise Class P conditions would be warranted. Some variability in subsurface conditions must be anticipated. Moisture condition of site soils and/or the presence of groundwater may vary considerably from time of investigation compared to at the time of construction. Depending on the depth of site cut and trenches, rock excavation may be required. It is recommended that footing excavations be inspected by a geotechnical engineer. This report must be read in conjunction with the attached “Limitations” and notes “About this Report”.

References: 1.

2.

AS 3798-2007 ‘Guidelines on Earthworks for Commercial and Residential Developments’, Standards Association of Australia. AS 2870-2011 ‘Residential Slabs and Footings,’ Standards Association of Australia.

Attachments:

Limitations & About this Report Explanatory Notes Test Pit Log(s) Pit(s) 60,61 Drawing 1

Page 230: SITE CLASSIFICATION REPORT SUMMARY...Douglas Partners (DP) has prepared this report for this project at Taylor 2- Stage 3, Taylor in accordance with DP’s proposal dated 15 September

FS 604853

Douglas Partners Pty Ltd ABN 75 053 980 117

www.douglaspartners.com.au Unit 2, 73 Sheppard Street

Hume ACT 2620 PO Box 1487

Fyshwick ACT 2609 Phone (02) 6260 2788

Fax (02) 6260 1147

Brisbane • Cairns • Canberra • Central Coast • Coffs Harbour • Darwin • Geelong • Gold Coast • Macarthur • Melbourne Newcastle • North West Sydney • Perth • Port Macquarie • Sunshine Coast • Sydney • Townsville • Wollongong

Limitations Douglas Partners (DP) has prepared this report for this project at Taylor 2 - Stage 3, Taylor in accordance with DP’s proposal dated 15 September 2017 and acceptance received from Indesco Consulting Engineers Pty Ltd dated 13 March 2019. The work was carried out under DP’s Conditions of Engagement. This report is provided for the exclusive use of Indesco Consulting Engineers Pty Ltd for this project only and for the purposes as described in the report. It should not be used by or relied upon for other projects or purposes on the same or other site or by a third party. Any party so relying upon this report beyond its exclusive use and purpose as stated above, and without the express written consent of DP, does so entirely at its own risk and without recourse to DP for any loss or damage. In preparing this report DP has necessarily relied upon information provided by the client and/or their agents. The results provided in the report are indicative of the sub-surface conditions on the site only at the specific sampling and/or testing locations, and then only to the depths investigated and at the time the work was carried out. Sub-surface conditions can change abruptly due to variable geological processes and also as a result of human influences. Such changes may occur after DP’s field testing has been completed. DP’s advice is based upon the conditions encountered during this investigation. The accuracy of the advice provided by DP in this report may be affected by undetected variations in ground conditions across the site between and beyond the sampling and/or testing locations. The advice may also be limited by budget constraints imposed by others or by site accessibility. This report must be read in conjunction with all of the attached and should be kept in its entirety without separation of individual pages or sections. DP cannot be held responsible for interpretations or conclusions made by others unless they are supported by an expressed statement, interpretation, outcome or conclusion stated in this report. This report, or sections from this report, should not be used as part of a specification for a project, without review and agreement by DP. This is because this report has been written as advice and opinion rather than instructions for construction. The scope for work for this investigation/report did not include the assessment of surface or sub-surface materials or groundwater for contaminants, within or adjacent to the site. Should evidence of filling of unknown origin be noted in the report, and in particular the presence of building demolition materials, it should be recognised that there may be some risk that such filling may contain contaminants and hazardous building materials. The contents of this report do not constitute formal design components such as are required, by the Health and Safety Legislation and Regulations, to be included in a Safety Report specifying the hazards likely to be encountered during construction and the controls required to mitigate risk. This design process requires risk assessment to be undertaken, with such assessment being dependent upon factors relating to likelihood of occurrence and consequences of damage to property and to life. This, in turn, requires project data and analysis presently beyond the knowledge and project role respectively of DP. DP may be able, however, to assist the client in carrying out a risk assessment of potential hazards contained in the Comments section of this report, as an extension to the current scope of works, if so requested, and provided that suitable additional information is made available to DP. Any such risk assessment would, however, be necessarily restricted to the geotechnical components set out in this report and to their application by the project designers to project design, construction, maintenance and demolition.

Page 231: SITE CLASSIFICATION REPORT SUMMARY...Douglas Partners (DP) has prepared this report for this project at Taylor 2- Stage 3, Taylor in accordance with DP’s proposal dated 15 September

July 2010

Introduction These notes have been provided to amplify DP's report in regard to classification methods, field procedures and the comments section. Not all are necessarily relevant to all reports. DP's reports are based on information gained from limited subsurface excavations and sampling, supplemented by knowledge of local geology and experience. For this reason, they must be regarded as interpretive rather than factual documents, limited to some extent by the scope of information on which they rely. Copyright This report is the property of Douglas Partners Pty Ltd. The report may only be used for the purpose for which it was commissioned and in accordance with the Conditions of Engagement for the commission supplied at the time of proposal. Unauthorised use of this report in any form whatsoever is prohibited. Borehole and Test Pit Logs The borehole and test pit logs presented in this report are an engineering and/or geological interpretation of the subsurface conditions, and their reliability will depend to some extent on frequency of sampling and the method of drilling or excavation. Ideally, continuous undisturbed sampling or core drilling will provide the most reliable assessment, but this is not always practicable or possible to justify on economic grounds. In any case the boreholes and test pits represent only a very small sample of the total subsurface profile. Interpretation of the information and its application to design and construction should therefore take into account the spacing of boreholes or pits, the frequency of sampling, and the possibility of other than 'straight line' variations between the test locations. Groundwater Where groundwater levels are measured in boreholes there are several potential problems, namely: • In low permeability soils groundwater may

enter the hole very slowly or perhaps not at all during the time the hole is left open;

• A localised, perched water table may lead to an erroneous indication of the true water table;

• Water table levels will vary from time to time with seasons or recent weather changes. They may not be the same at the time of construction as are indicated in the report; and

• The use of water or mud as a drilling fluid will mask any groundwater inflow. Water has to be blown out of the hole and drilling mud must first be washed out of the hole if water measurements are to be made.

More reliable measurements can be made by installing standpipes which are read at intervals over several days, or perhaps weeks for low permeability soils. Piezometers, sealed in a particular stratum, may be advisable in low permeability soils or where there may be interference from a perched water table. Reports The report has been prepared by qualified personnel, is based on the information obtained from field and laboratory testing, and has been undertaken to current engineering standards of interpretation and analysis. Where the report has been prepared for a specific design proposal, the information and interpretation may not be relevant if the design proposal is changed. If this happens, DP will be pleased to review the report and the sufficiency of the investigation work. Every care is taken with the report as it relates to interpretation of subsurface conditions, discussion of geotechnical and environmental aspects, and recommendations or suggestions for design and construction. However, DP cannot always anticipate or assume responsibility for: • Unexpected variations in ground conditions.

The potential for this will depend partly on borehole or pit spacing and sampling frequency;

• Changes in policy or interpretations of policy by statutory authorities; or

• The actions of contractors responding to commercial pressures.

If these occur, DP will be pleased to assist with investigations or advice to resolve the matter.

Page 232: SITE CLASSIFICATION REPORT SUMMARY...Douglas Partners (DP) has prepared this report for this project at Taylor 2- Stage 3, Taylor in accordance with DP’s proposal dated 15 September

July 2010

Site Anomalies In the event that conditions encountered on site during construction appear to vary from those which were expected from the information contained in the report, DP requests that it be immediately notified. Most problems are much more readily resolved when conditions are exposed rather than at some later stage, well after the event. Information for Contractual Purposes Where information obtained from this report is provided for tendering purposes, it is recommended that all information, including the written report and discussion, be made available. In circumstances where the discussion or comments section is not relevant to the contractual situation, it may be appropriate to prepare a specially edited document. DP would be pleased to assist in this regard and/or to make additional report copies available for contract purposes at a nominal charge. Site Inspection The company will always be pleased to provide engineering inspection services for geotechnical and environmental aspects of work to which this report is related. This could range from a site visit to confirm that conditions exposed are as expected, to full time engineering presence on site.

Page 233: SITE CLASSIFICATION REPORT SUMMARY...Douglas Partners (DP) has prepared this report for this project at Taylor 2- Stage 3, Taylor in accordance with DP’s proposal dated 15 September

July 2010

Sampling Sampling is carried out during drilling or test pitting to allow engineering examination (and laboratory testing where required) of the soil or rock. Disturbed samples taken during drilling provide information on colour, type, inclusions and, depending upon the degree of disturbance, some information on strength and structure. Undisturbed samples are taken by pushing a thin-walled sample tube into the soil and withdrawing it to obtain a sample of the soil in a relatively undisturbed state. Such samples yield information on structure and strength, and are necessary for laboratory determination of shear strength and compressibility. Undisturbed sampling is generally effective only in cohesive soils. Test Pits Test pits are usually excavated with a backhoe or an excavator, allowing close examination of the in-situ soil if it is safe to enter into the pit. The depth of excavation is limited to about 3 m for a backhoe and up to 6 m for a large excavator. A potential disadvantage of this investigation method is the larger area of disturbance to the site. Large Diameter Augers Boreholes can be drilled using a rotating plate or short spiral auger, generally 300 mm or larger in diameter commonly mounted on a standard piling rig. The cuttings are returned to the surface at intervals (generally not more than 0.5 m) and are disturbed but usually unchanged in moisture content. Identification of soil strata is generally much more reliable than with continuous spiral flight augers, and is usually supplemented by occasional undisturbed tube samples. Continuous Spiral Flight Augers The borehole is advanced using 90-115 mm diameter continuous spiral flight augers which are withdrawn at intervals to allow sampling or in-situ testing. This is a relatively economical means of drilling in clays and sands above the water table. Samples are returned to the surface, or may be collected after withdrawal of the auger flights, but they are disturbed and may be mixed with soils from the sides of the hole. Information from the drilling (as distinct from specific sampling by SPTs or undisturbed samples) is of relatively low

reliability, due to the remoulding, possible mixing or softening of samples by groundwater. Non-core Rotary Drilling The borehole is advanced using a rotary bit, with water or drilling mud being pumped down the drill rods and returned up the annulus, carrying the drill cuttings. Only major changes in stratification can be determined from the cuttings, together with some information from the rate of penetration. Where drilling mud is used this can mask the cuttings and reliable identification is only possible from separate sampling such as SPTs. Continuous Core Drilling A continuous core sample can be obtained using a diamond tipped core barrel, usually with a 50 mm internal diameter. Provided full core recovery is achieved (which is not always possible in weak rocks and granular soils), this technique provides a very reliable method of investigation. Standard Penetration Tests Standard penetration tests (SPT) are used as a means of estimating the density or strength of soils and also of obtaining a relatively undisturbed sample. The test procedure is described in Australian Standard 1289, Methods of Testing Soils for Engineering Purposes - Test 6.3.1. The test is carried out in a borehole by driving a 50 mm diameter split sample tube under the impact of a 63 kg hammer with a free fall of 760 mm. It is normal for the tube to be driven in three successive 150 mm increments and the 'N' value is taken as the number of blows for the last 300 mm. In dense sands, very hard clays or weak rock, the full 450 mm penetration may not be practicable and the test is discontinued. The test results are reported in the following form. • In the case where full penetration is obtained

with successive blow counts for each 150 mm of, say, 4, 6 and 7 as:

4,6,7 N=13

• In the case where the test is discontinued before the full penetration depth, say after 15 blows for the first 150 mm and 30 blows for the next 40 mm as:

15, 30/40 mm

Page 234: SITE CLASSIFICATION REPORT SUMMARY...Douglas Partners (DP) has prepared this report for this project at Taylor 2- Stage 3, Taylor in accordance with DP’s proposal dated 15 September

July 2010

The results of the SPT tests can be related empirically to the engineering properties of the soils. Dynamic Cone Penetrometer Tests / Perth Sand Penetrometer Tests Dynamic penetrometer tests (DCP or PSP) are carried out by driving a steel rod into the ground using a standard weight of hammer falling a specified distance. As the rod penetrates the soil the number of blows required to penetrate each successive 150 mm depth are recorded. Normally there is a depth limitation of 1.2 m, but this may be extended in certain conditions by the use of extension rods. Two types of penetrometer are commonly used. • Perth sand penetrometer - a 16 mm diameter

flat ended rod is driven using a 9 kg hammer dropping 600 mm (AS 1289, Test 6.3.3). This test was developed for testing the density of sands and is mainly used in granular soils and filling.

• Cone penetrometer - a 16 mm diameter rod with a 20 mm diameter cone end is driven using a 9 kg hammer dropping 510 mm (AS 1289, Test 6.3.2). This test was developed initially for pavement subgrade investigations, and correlations of the test results with California Bearing Ratio have been published by various road authorities.

Page 235: SITE CLASSIFICATION REPORT SUMMARY...Douglas Partners (DP) has prepared this report for this project at Taylor 2- Stage 3, Taylor in accordance with DP’s proposal dated 15 September

May 2017

Description and Classification Methods The methods of description and classification of

soils and rocks used in this report are based on

Australian Standard AS 1726-1993, Geotechnical

Site Investigations Code. In general, the

descriptions include strength or density, colour,

structure, soil or rock type and inclusions.

Soil Types Soil types are described according to the

predominant particle size, qualified by the grading

of other particles present:

Type Particle size (mm)

Boulder >200

Cobble 63 - 200

Gravel 2.36 - 63

Sand 0.075 - 2.36

Silt 0.002 - 0.075

Clay <0.002

The sand and gravel sizes can be further

subdivided as follows:

Type Particle size (mm)

Coarse gravel 20 - 63

Medium gravel 6 - 20

Fine gravel 2.36 - 6

Coarse sand 0.6 - 2.36

Medium sand 0.2 - 0.6

Fine sand 0.075 - 0.2

The proportions of secondary constituents of soils

are described as:

Term Proportion Example

And Specify Clay (60%) and

Sand (40%)

Adjective 20 - 35% Sandy Clay

Slightly 12 - 20% Slightly Sandy

Clay

With some 5 - 12% Clay with some

sand

With a trace of 0 - 5% Clay with a trace

of sand

Definitions of grading terms used are:

• Well graded - a good representation of all

particle sizes

• Poorly graded - an excess or deficiency of

particular sizes within the specified range

• Uniformly graded - an excess of a particular

particle size

• Gap graded - a deficiency of a particular

particle size with the range

Cohesive Soils Cohesive soils, such as clays, are classified on the

basis of undrained shear strength. The strength

may be measured by laboratory testing, or

estimated by field tests or engineering

examination. The strength terms are defined as

follows:

Description Abbreviation Undrained shear strength

(kPa)

Very soft vs <12

Soft s 12 - 25

Firm f 25 - 50

Stiff st 50 - 100

Very stiff vst 100 - 200

Hard h >200

Cohesionless Soils Cohesionless soils, such as clean sands, are

classified on the basis of relative density, generally

from the results of standard penetration tests

(SPT), cone penetration tests (CPT) or dynamic

penetrometers (PSP). The relative density terms

are given below:

Relative Density

Abbreviation SPT N value

CPT qc value (MPa)

Very loose vl <4 <2

Loose l 4 - 10 2 -5

Medium

dense

md 10 - 30 5 - 15

Dense d 30 - 50 15 - 25

Very

dense

vd >50 >25

Page 236: SITE CLASSIFICATION REPORT SUMMARY...Douglas Partners (DP) has prepared this report for this project at Taylor 2- Stage 3, Taylor in accordance with DP’s proposal dated 15 September

May 2017

Soil Origin It is often difficult to accurately determine the origin

of a soil. Soils can generally be classified as:

• Residual soil - derived from in-situ weathering

of the underlying rock;

• Transported soils - formed somewhere else

and transported by nature to the site; or

• Filling - moved by man.

Transported soils may be further subdivided into:

• Alluvium - river deposits

• Lacustrine - lake deposits

• Aeolian - wind deposits

• Littoral - beach deposits

• Estuarine - tidal river deposits

• Talus - scree or coarse colluvium

• Slopewash or Colluvium - transported

downslope by gravity assisted by water.

Often includes angular rock fragments and

boulders.

Page 237: SITE CLASSIFICATION REPORT SUMMARY...Douglas Partners (DP) has prepared this report for this project at Taylor 2- Stage 3, Taylor in accordance with DP’s proposal dated 15 September

May 2017

Rock Strength Rock strength is defined by the Point Load Strength Index (Is(50)) and refers to the strength of the rock

substance and not the strength of the overall rock mass, which may be considerably weaker due to defects.

The test procedure is described by Australian Standard 4133.4.1 - 2007. The terms used to describe rock

strength are as follows:

Term Abbreviation Point Load Index

Is(50) MPa

Approximate Unconfined Compressive Strength MPa*

Extremely low EL <0.03 <0.6

Very low VL 0.03 - 0.1 0.6 - 2

Low L 0.1 - 0.3 2 - 6

Medium M 0.3 - 1.0 6 - 20

High H 1 - 3 20 - 60

Very high VH 3 - 10 60 - 200

Extremely high EH >10 >200

* Assumes a ratio of 20:1 for UCS to Is(50). It should be noted that the UCS to Is(50) ratio varies significantly

for different rock types and specific ratios should be determined for each site.

Degree of Weathering The degree of weathering of rock is classified as follows:

Term Abbreviation Description

Extremely weathered EW Rock substance has soil properties, i.e. it can be remoulded and classified as a soil but the texture of the original rock is still evident.

Highly weathered HW Limonite staining or bleaching affects whole of rock substance and other signs of decomposition are evident. Porosity and strength may be altered as a result of iron leaching or deposition. Colour and strength of original fresh rock is not recognisable

Moderately weathered

MW Staining and discolouration of rock substance has taken place

Slightly weathered SW Rock substance is slightly discoloured but shows little or no change of strength from fresh rock

Fresh stained Fs Rock substance unaffected by weathering but staining visible along defects

Fresh Fr No signs of decomposition or staining

Degree of Fracturing The following classification applies to the spacing of natural fractures in diamond drill cores. It includes

bedding plane partings, joints and other defects, but excludes drilling breaks.

Term Description

Fragmented Fragments of <20 mm

Highly Fractured Core lengths of 20-40 mm with some fragments

Fractured Core lengths of 40-200 mm with some shorter and longer sections

Slightly Fractured Core lengths of 200-1000 mm with some shorter and longer sections

Unbroken Core lengths mostly > 1000 mm

Page 238: SITE CLASSIFICATION REPORT SUMMARY...Douglas Partners (DP) has prepared this report for this project at Taylor 2- Stage 3, Taylor in accordance with DP’s proposal dated 15 September

May 2017

Rock Quality Designation The quality of the cored rock can be measured using the Rock Quality Designation (RQD) index, defined

as:

RQD % = cumulative length of 'sound' core sections ≥ 100 mm long

total drilled length of section being assessed

where 'sound' rock is assessed to be rock of low strength or better. The RQD applies only to natural

fractures. If the core is broken by drilling or handling (i.e. drilling breaks) then the broken pieces are fitted

back together and are not included in the calculation of RQD.

Stratification Spacing For sedimentary rocks the following terms may be used to describe the spacing of bedding partings:

Term Separation of Stratification Planes

Thinly laminated < 6 mm

Laminated 6 mm to 20 mm

Very thinly bedded 20 mm to 60 mm

Thinly bedded 60 mm to 0.2 m

Medium bedded 0.2 m to 0.6 m

Thickly bedded 0.6 m to 2 m

Very thickly bedded > 2 m

Page 239: SITE CLASSIFICATION REPORT SUMMARY...Douglas Partners (DP) has prepared this report for this project at Taylor 2- Stage 3, Taylor in accordance with DP’s proposal dated 15 September

May 2017

Introduction These notes summarise abbreviations commonly

used on borehole logs and test pit reports.

Drilling or Excavation Methods C Core drilling

R Rotary drilling

SFA Spiral flight augers

NMLC Diamond core - 52 mm dia

NQ Diamond core - 47 mm dia

HQ Diamond core - 63 mm dia

PQ Diamond core - 81 mm dia

Water � Water seep

� Water level

Sampling and Testing A Auger sample

B Bulk sample

D Disturbed sample

E Environmental sample

U50 Undisturbed tube sample (50mm)

W Water sample

pp Pocket penetrometer (kPa)

PID Photo ionisation detector

PL Point load strength Is(50) MPa

S Standard Penetration Test

V Shear vane (kPa)

Description of Defects in Rock The abbreviated descriptions of the defects should

be in the following order: Depth, Type, Orientation,

Coating, Shape, Roughness and Other. Drilling

and handling breaks are not usually included on

the logs.

Defect Type

B Bedding plane

Cs Clay seam

Cv Cleavage

Cz Crushed zone

Ds Decomposed seam

F Fault

J Joint

Lam Lamination

Pt Parting

Sz Sheared Zone

V Vein

Orientation

The inclination of defects is always measured from

the perpendicular to the core axis.

h horizontal

v vertical

sh sub-horizontal

sv sub-vertical

Coating or Infilling Term

cln clean

co coating

he healed

inf infilled

stn stained

ti tight

vn veneer

Coating Descriptor

ca calcite

cbs carbonaceous

cly clay

fe iron oxide

mn manganese

slt silty

Shape

cu curved

ir irregular

pl planar

st stepped

un undulating

Roughness

po polished

ro rough

sl slickensided

sm smooth

vr very rough

Other

fg fragmented

bnd band

qtz quartz

Page 240: SITE CLASSIFICATION REPORT SUMMARY...Douglas Partners (DP) has prepared this report for this project at Taylor 2- Stage 3, Taylor in accordance with DP’s proposal dated 15 September

May 2017

Graphic Symbols for Soil and Rock General

Soils

Sedimentary Rocks

Metamorphic Rocks

Igneous Rocks

Road base

Filling

Concrete

Asphalt

Topsoil

Peat

Clay

Conglomeratic sandstone

Conglomerate

Boulder conglomerate

Sandstone

Slate, phyllite, schist

Siltstone

Mudstone, claystone, shale

Coal

Limestone

Porphyry

Cobbles, boulders

Sandy gravel

Laminite

Silty sand

Clayey sand

Silty clay

Sandy clay

Gravelly clay

Shaly clay

Silt

Clayey silt

Sandy silt

Sand

Gravel

Talus

Gneiss

Quartzite

Dolerite, basalt, andesite

Granite

Tuff, breccia

Dacite, epidote

Page 241: SITE CLASSIFICATION REPORT SUMMARY...Douglas Partners (DP) has prepared this report for this project at Taylor 2- Stage 3, Taylor in accordance with DP’s proposal dated 15 September

ͱ·´ ̧°»­

̸» ¬§°»­ ±º ­±·´­ «­«¿´´§ °®»­»²¬ «²¼»® ¬¸» ¬±°­±·´ ·² ´¿²¼ ¦±²»¼ º±®®»­·¼»²¬·¿´ ¾«·´¼·²¹­ ½¿² ¾» ­°´·¬ ·²¬± ¬©± ¿°°®±¨·³¿¬» ¹®±«°­ P¹®¿²«´¿® ¿²¼ ½´¿§ò Ï«·¬» ±º¬»²ô º±«²¼¿¬·±² ­±·´ ·­ ¿ ³·¨¬«®» ±º ¾±¬¸¬§°»­ò ̸» ¹»²»®¿´ °®±¾´»³­ ¿­­±½·¿¬»¼ ©·¬¸ ­±·´­ ¸¿ª·²¹ ¹®¿²«´¿®½±²¬»²¬ ¿®» «­«¿´´§ ½¿«­»¼ ¾§ »®±­·±²ò Ý´¿§ ­±·´­ ¿®» ­«¾¶»½¬ ¬±­¿¬«®¿¬·±² ¿²¼ ­©»´´ñ­¸®·²µ °®±¾´»³­ò

Ý´¿­­·º·½¿¬·±²­ º±® ¿ ¹·ª»² ¿®»¿ ½¿² ¹»²»®¿´´§ ¾» ±¾¬¿·²»¼ ¾§¿°°´·½¿¬·±² ¬± ¬¸» ´±½¿´ ¿«¬¸±®·¬§ô ¾«¬ ¬¸»­» ¿®» ­±³»¬·³»­ «²®»´·¿¾´»¿²¼ ·º ¬¸»®» ·­ ¼±«¾¬ô ¿ ¹»±¬»½¸²·½¿´ ®»°±®¬ ­¸±«´¼ ¾» ½±³³·­­·±²»¼òß­ ³±­¬ ¾«·´¼·²¹­ ­«ºº»®·²¹ ³±ª»³»²¬ °®±¾´»³­ ¿®» º±«²¼»¼ ±² ½´¿§­±·´­ô ¬¸»®» ·­ ¿² »³°¸¿­·­ ±² ½´¿­­·º·½¿¬·±² ±º ­±·´­ ¿½½±®¼·²¹ ¬± ¬¸»¿³±«²¬ ±º ­©»´´ ¿²¼ ­¸®·²µ¿¹» ¬¸»§ »¨°»®·»²½» ©·¬¸ ª¿®·¿¬·±²­ ±º©¿¬»® ½±²¬»²¬ò ̸» ¬¿¾´» ¾»´±© ·­ Ì¿¾´» îòï º®±³ ßÍ îèéðô ¬¸»Î»­·¼»²¬·¿´ Í´¿¾ ¿²¼ Ú±±¬·²¹ ݱ¼»ò

Ý¿«­»­ ±º Ó±ª»³»²¬

Í»¬¬´»³»²¬ ¼«» ¬± ½±²­¬®«½¬·±²Ì¸»®» ¿®» ¬©± ¬§°»­ ±º ­»¬¬´»³»²¬ ¬¸¿¬ ±½½«® ¿­ ¿ ®»­«´¬ ±º½±²­¬®«½¬·±²æ{ ׳³»¼·¿¬» ­»¬¬´»³»²¬ ±½½«®­ ©¸»² ¿ ¾«·´¼·²¹ ·­ º·®­¬ °´¿½»¼ ±² ·¬­

º±«²¼¿¬·±² ­±·´ô ¿­ ¿ ®»­«´¬ ±º ½±³°¿½¬·±² ±º ¬¸» ­±·´ «²¼»® ¬¸»©»·¹¸¬ ±º ¬¸» ­¬®«½¬«®»ò ̸» ½±¸»­·ª» ¯«¿´·¬§ ±º ½´¿§ ­±·´ ³·¬·¹¿¬»­¿¹¿·²­¬ ¬¸·­ô ¾«¬ ¹®¿²«´¿® ø°¿®¬·½«´¿®´§ ­¿²¼§÷ ­±·´ ·­ ­«­½»°¬·¾´»ò

{ ݱ²­±´·¼¿¬·±² ­»¬¬´»³»²¬ ·­ ¿ º»¿¬«®» ±º ½´¿§ ­±·´ ¿²¼ ³¿§ ¬¿µ»°´¿½» ¾»½¿«­» ±º ¬¸» »¨°«´­·±² ±º ³±·­¬«®» º®±³ ¬¸» ­±·´ ±® ¾»½¿«­»±º ¬¸» ­±·´K­ ´¿½µ ±º ®»­·­¬¿²½» ¬± ´±½¿´ ½±³°®»­­·ª» ±® ­¸»¿® ­¬®»­­»­ò̸·­ ©·´´ «­«¿´´§ ¬¿µ» °´¿½» ¼«®·²¹ ¬¸» º·®­¬ º»© ³±²¬¸­ ¿º¬»®½±²­¬®«½¬·±²ô ¾«¬ ¸¿­ ¾»»² µ²±©² ¬± ¬¿µ» ³¿²§ §»¿®­ ·²»¨½»°¬·±²¿´ ½¿­»­ò

̸»­» °®±¾´»³­ ¿®» ¬¸» °®±ª·²½» ±º ¬¸» ¾«·´¼»® ¿²¼ ­¸±«´¼ ¾» ¬¿µ»²·²¬± ½±²­·¼»®¿¬·±² ¿­ °¿®¬ ±º ¬¸» °®»°¿®¿¬·±² ±º ¬¸» ­·¬» º±® ½±²­¬®«½ó¬·±²ò Þ«·´¼·²¹ Ì»½¸²±´±¹§ Ú·´» ïç øÞÌÚ ïç÷ ¼»¿´­ ©·¬¸ ¬¸»­»°®±¾´»³­ò

Û®±­·±²ß´´ ­±·´­ ¿®» °®±²» ¬± »®±­·±²ô ¾«¬ ­¿²¼§ ­±·´ ·­ °¿®¬·½«´¿®´§ ­«­½»°¬·¾´»¬± ¾»·²¹ ©¿­¸»¼ ¿©¿§ò Ûª»² ½´¿§ ©·¬¸ ¿ ­¿²¼ ½±³°±²»²¬ ±º ­¿§ ïðû±® ³±®» ½¿² ­«ºº»® º®±³ »®±­·±²ò

Í¿¬«®¿¬·±²Ì¸·­ ·­ °¿®¬·½«´¿®´§ ¿ °®±¾´»³ ·² ½´¿§ ­±·´­ò Í¿¬«®¿¬·±² ½®»¿¬»­ ¿ ¾±¹ó´·µ» ­«­°»²­·±² ±º ¬¸» ­±·´ ¬¸¿¬ ½¿«­»­ ·¬ ¬± ´±­» ª·®¬«¿´´§ ¿´´ ±º ·¬­¾»¿®·²¹ ½¿°¿½·¬§ò ̱ ¿ ´»­­»® ¼»¹®»»ô ­¿²¼ ·­ ¿ºº»½¬»¼ ¾§ ­¿¬«®¿¬·±²¾»½¿«­» ­¿¬«®¿¬»¼ ­¿²¼ ³¿§ «²¼»®¹± ¿ ®»¼«½¬·±² ·² ª±´«³» P°¿®¬·½«´¿®´§ ·³°±®¬»¼ ­¿²¼ º·´´ º±® ¾»¼¼·²¹ ¿²¼ ¾´·²¼·²¹ ´¿§»®­òر©»ª»®ô ¬¸·­ «­«¿´´§ ±½½«®­ ¿­ ·³³»¼·¿¬» ­»¬¬´»³»²¬ ¿²¼ ­¸±«´¼²±®³¿´´§ ¾» ¬¸» °®±ª·²½» ±º ¬¸» ¾«·´¼»®ò

Í»¿­±²¿´ ­©»´´·²¹ ¿²¼ ­¸®·²µ¿¹» ±º ­±·´ß´´ ½´¿§­ ®»¿½¬ ¬± ¬¸» °®»­»²½» ±º ©¿¬»® ¾§ ­´±©´§ ¿¾­±®¾·²¹ ·¬ô ³¿µ·²¹¬¸» ­±·´ ·²½®»¿­» ·² ª±´«³» ø­»» ¬¿¾´» ¾»´±©÷ò ̸» ¼»¹®»» ±º ·²½®»¿­»ª¿®·»­ ½±²­·¼»®¿¾´§ ¾»¬©»»² ¼·ºº»®»²¬ ½´¿§­ô ¿­ ¼±»­ ¬¸» ¼»¹®»» ±º¼»½®»¿­» ¼«®·²¹ ¬¸» ­«¾­»¯«»²¬ ¼®§·²¹ ±«¬ ½¿«­»¼ ¾§ º¿·® ©»¿¬¸»®°»®·±¼­ò Þ»½¿«­» ±º ¬¸» ´±© ¿¾­±®°¬·±² ¿²¼ »¨°«´­·±² ®¿¬»ô ¬¸·­°¸»²±³»²±² ©·´´ ²±¬ «­«¿´´§ ¾» ²±¬·½»¿¾´» «²´»­­ ¬¸»®» ¿®»°®±´±²¹»¼ ®¿·²§ ±® ¼®§ °»®·±¼­ô «­«¿´´§ ±º ©»»µ­ ±® ³±²¬¸­ô¼»°»²¼·²¹ ±² ¬¸» ´¿²¼ ¿²¼ ­±·´ ½¸¿®¿½¬»®·­¬·½­ò

̸» ­©»´´·²¹ ±º ­±·´ ½®»¿¬»­ ¿² «°©¿®¼ º±®½» ±² ¬¸» º±±¬·²¹­ ±º ¬¸»¾«·´¼·²¹ô ¿²¼ ­¸®·²µ¿¹» ½®»¿¬»­ ­«¾­·¼»²½» ¬¸¿¬ ¬¿µ»­ ¿©¿§ ¬¸»­«°°±®¬ ²»»¼»¼ ¾§ ¬¸» º±±¬·²¹ ¬± ®»¬¿·² »¯«·´·¾®·«³ò

͸»¿® º¿·´«®»Ì¸·­ °¸»²±³»²±² ±½½«®­ ©¸»² ¬¸» º±«²¼¿¬·±² ­±·´ ¼±»­ ²±¬ ¸¿ª»­«ºº·½·»²¬ ­¬®»²¹¬¸ ¬± ­«°°±®¬ ¬¸» ©»·¹¸¬ ±º ¬¸» º±±¬·²¹ò ̸»®» ¿®»¬©± ³¿¶±® °±­¬ó½±²­¬®«½¬·±² ½¿«­»­æ

{ Í·¹²·º·½¿²¬ ´±¿¼ ·²½®»¿­»ò{ λ¼«½¬·±² ±º ´¿¬»®¿´ ­«°°±®¬ ±º ¬¸» ­±·´ «²¼»® ¬¸» º±±¬·²¹ ¼«» ¬±

»®±­·±² ±® »¨½¿ª¿¬·±²ò{ ײ ½´¿§ ­±·´ô ­¸»¿® º¿·´«®» ½¿² ¾» ½¿«­»¼ ¾§ ­¿¬«®¿¬·±² ±º ¬¸» ­±·´

¿¼¶¿½»²¬ ¬± ±® «²¼»® ¬¸» º±±¬·²¹ò

Þ«·´¼·²¹­ ½¿² ¿²¼ ±º¬»² ¼± ³±ª»ò ̸·­ ³±ª»³»²¬ ½¿² ¾» «°ô ¼±©²ô ´¿¬»®¿´ ±® ®±¬¿¬·±²¿´ò ̸» º«²¼¿³»²¬¿´ ½¿«­»±º ³±ª»³»²¬ ·² ¾«·´¼·²¹­ ½¿² «­«¿´´§ ¾» ®»´¿¬»¼ ¬± ±²» ±® ³±®» °®±¾´»³­ ·² ¬¸» º±«²¼¿¬·±² ­±·´ò ׬ ·­ ·³°±®¬¿²¬ º±®¬¸» ¸±³»±©²»® ¬± ·¼»²¬·º§ ¬¸» ­±·´ ¬§°» ·² ±®¼»® ¬± ¿­½»®¬¿·² ¬¸» ³»¿­«®»­ ¬¸¿¬ ­¸±«´¼ ¾» °«¬ ·² °´¿½» ·² ±®¼»® ¬±»²­«®» ¬¸¿¬ °®±¾´»³­ ·² ¬¸» º±«²¼¿¬·±² ­±·´ ½¿² ¾» °®»ª»²¬»¼ô ¬¸«­ °®±¬»½¬·²¹ ¿¹¿·²­¬ ¾«·´¼·²¹ ³±ª»³»²¬ò

̸·­ Þ«·´¼·²¹ Ì»½¸²±´±¹§ Ú·´» ·­ ¼»­·¹²»¼ ¬± ·¼»²¬·º§ ½¿«­»­ ±º ­±·´ó®»´¿¬»¼ ¾«·´¼·²¹ ³±ª»³»²¬ô ¿²¼ ¬± ­«¹¹»­¬³»¬¸±¼­ ±º °®»ª»²¬·±² ±º ®»­«´¬¿²¬ ½®¿½µ·²¹ ·² ¾«·´¼·²¹­ò

Ú±«²¼¿¬·±² Ó¿·²¬»²¿²½»¿²¼ Ú±±¬·²¹ л®º±®³¿²½»æß Ø±³»±©²»®K­ Ù«·¼»

ÙÛÒÛÎßÔ ÜÛÚ×Ò×Ì×ÑÒÍ ÑÚ Í×ÌÛ ÝÔßÍÍÛÍ

Ý´¿­­ Ú±«²¼¿¬·±²

ß Ó±­¬ ­¿²¼ ¿²¼ ®±½µ ­·¬»­ ©·¬¸ ´·¬¬´» ±® ²± ¹®±«²¼ ³±ª»³»²¬ º®±³ ³±·­¬«®» ½¸¿²¹»­

Í Í´·¹¸¬´§ ®»¿½¬·ª» ½´¿§ ­·¬»­ ©·¬¸ ±²´§ ­´·¹¸¬ ¹®±«²¼ ³±ª»³»²¬ º®±³ ³±·­¬«®» ½¸¿²¹»­

Ó Ó±¼»®¿¬»´§ ®»¿½¬·ª» ½´¿§ ±® ­·´¬ ­·¬»­ô ©¸·½¸ ½¿² »¨°»®·»²½» ³±¼»®¿¬» ¹®±«²¼ ³±ª»³»²¬ º®±³ ³±·­¬«®» ½¸¿²¹»­

Ø Ø·¹¸´§ ®»¿½¬·ª» ½´¿§ ­·¬»­ô ©¸·½¸ ½¿² »¨°»®·»²½» ¸·¹¸ ¹®±«²¼ ³±ª»³»²¬ º®±³ ³±·­¬«®» ½¸¿²¹»­

Û Û¨¬®»³»´§ ®»¿½¬·ª» ­·¬»­ô ©¸·½¸ ½¿² »¨°»®·»²½» »¨¬®»³» ¹®±«²¼ ³±ª»³»²¬ º®±³ ³±·­¬«®» ½¸¿²¹»­

ß ¬± Ð Ú·´´»¼ ­·¬»­

Ð Í·¬»­ ©¸·½¸ ·²½´«¼» ­±º¬ ­±·´­ô ­«½¸ ¿­ ­±º¬ ½´¿§ ±® ­·´¬ ±® ´±±­» ­¿²¼­å ´¿²¼­´·°å ³·²» ­«¾­·¼»²½»å ½±´´¿°­·²¹ ­±·´­å ­±·´­ ­«¾¶»½¬¬± »®±­·±²å ®»¿½¬·ª» ­·¬»­ ­«¾¶»½¬ ¬± ¿¾²±®³¿´ ³±·­¬«®» ½±²¼·¬·±²­ ±® ­·¬»­ ©¸·½¸ ½¿²²±¬ ¾» ½´¿­­·º·»¼ ±¬¸»®©·­»

ÞÌÚ ïè®»°´¿½»­

ײº±®³¿¬·±²Í¸»»¬ ïðñçï

Page 242: SITE CLASSIFICATION REPORT SUMMARY...Douglas Partners (DP) has prepared this report for this project at Taylor 2- Stage 3, Taylor in accordance with DP’s proposal dated 15 September

Ì®»» ®±±¬ ¹®±©¬¸Ì®»»­ ¿²¼ ­¸®«¾­ ¬¸¿¬ ¿®» ¿´´±©»¼ ¬± ¹®±© ·² ¬¸» ª·½·²·¬§ ±º º±±¬·²¹­½¿² ½¿«­» º±«²¼¿¬·±² ­±·´ ³±ª»³»²¬ ·² ¬©± ©¿§­æ

{ ᱬ­ ¬¸¿¬ ¹®±© «²¼»® º±±¬·²¹­ ³¿§ ·²½®»¿­» ·² ½®±­­ó­»½¬·±²¿´­·¦»ô »¨»®¬·²¹ «°©¿®¼ °®»­­«®» ±² º±±¬·²¹­ò

{ ᱬ­ ·² ¬¸» ª·½·²·¬§ ±º º±±¬·²¹­ ©·´´ ¿¾­±®¾ ³«½¸ ±º ¬¸» ³±·­¬«®»·² ¬¸» º±«²¼¿¬·±² ­±·´ô ½¿«­·²¹ ­¸®·²µ¿¹» ±® ­«¾­·¼»²½»ò

˲»ª»²²»­­ ±º Ó±ª»³»²¬

̸» ¬§°»­ ±º ¹®±«²¼ ³±ª»³»²¬ ¼»­½®·¾»¼ ¿¾±ª» «­«¿´´§ ±½½«®«²»ª»²´§ ¬¸®±«¹¸±«¬ ¬¸» ¾«·´¼·²¹K­ º±«²¼¿¬·±² ­±·´ò Í»¬¬´»³»²¬ ¼«»¬± ½±²­¬®«½¬·±² ¬»²¼­ ¬± ¾» «²»ª»² ¾»½¿«­» ±ºæ

{ Ü·ºº»®·²¹ ½±³°¿½¬·±² ±º º±«²¼¿¬·±² ­±·´ °®·±® ¬± ½±²­¬®«½¬·±²ò

{ Ü·ºº»®·²¹ ³±·­¬«®» ½±²¬»²¬ ±º º±«²¼¿¬·±² ­±·´ °®·±® ¬± ½±²­¬®«½¬·±²ò

Ó±ª»³»²¬ ¼«» ¬± ²±²ó½±²­¬®«½¬·±² ½¿«­»­ ·­ «­«¿´´§ ³±®» «²»ª»²­¬·´´ò Û®±­·±² ½¿² «²¼»®³·²» ¿ º±±¬·²¹ ¬¸¿¬ ¬®¿ª»®­»­ ¬¸» º´±© ±® ½¿²½®»¿¬» ¬¸» ½±²¼·¬·±²­ º±® ­¸»¿® º¿·´«®» ¾§ »®±¼·²¹ ­±·´ ¿¼¶¿½»²¬ ¬± ¿º±±¬·²¹ ¬¸¿¬ ®«²­ ·² ¬¸» ­¿³» ¼·®»½¬·±² ¿­ ¬¸» º´±©ò

Í¿¬«®¿¬·±² ±º ½´¿§ º±«²¼¿¬·±² ­±·´ ³¿§ ±½½«® ©¸»®» ­«¾º´±±® ©¿´´­½®»¿¬» ¿ ¼¿³ ¬¸¿¬ ³¿µ»­ ©¿¬»® °±²¼ò ׬ ½¿² ¿´­± ±½½«® ©¸»®»ª»® ¬¸»®»·­ ¿ ­±«®½» ±º ©¿¬»® ²»¿® º±±¬·²¹­ ·² ½´¿§ ­±·´ò ̸·­ ´»¿¼­ ¬± ¿ ­»ª»®»®»¼«½¬·±² ·² ¬¸» ­¬®»²¹¬¸ ±º ¬¸» ­±·´ ©¸·½¸ ³¿§ ½®»¿¬» ´±½¿´ ­¸»¿®º¿·´«®»ò

Í»¿­±²¿´ ­©»´´·²¹ ¿²¼ ­¸®·²µ¿¹» ±º ½´¿§ ­±·´ ¿ºº»½¬­ ¬¸» °»®·³»¬»® ±º¬¸» ¾«·´¼·²¹ º·®­¬ô ¬¸»² ¹®¿¼«¿´´§ ­°®»¿¼­ ¬± ¬¸» ·²¬»®·±®ò ̸» ­©»´´·²¹°®±½»­­ ©·´´ «­«¿´´§ ¾»¹·² ¿¬ ¬¸» «°¸·´´ »¨¬®»³» ±º ¬¸» ¾«·´¼·²¹ô ±® ±²¬¸» ©»¿¬¸»® ­·¼» ©¸»®» ¬¸» ´¿²¼ ·­ º´¿¬ò Í©»´´·²¹ ¹®¿¼«¿´´§ ®»¿½¸»­ ¬¸»·²¬»®·±® ­±·´ ¿­ ¿¾­±®°¬·±² ½±²¬·²«»­ò ͸®·²µ¿¹» «­«¿´´§ ¾»¹·²­ ©¸»®»¬¸» ­«²K­ ¸»¿¬ ·­ ¹®»¿¬»­¬ò

Ûºº»½¬­ ±º ˲»ª»² ͱ·´ Ó±ª»³»²¬ ±² ͬ®«½¬«®»­

Û®±­·±² ¿²¼ ­¿¬«®¿¬·±²Û®±­·±² ®»³±ª»­ ¬¸» ­«°°±®¬ º®±³ «²¼»® º±±¬·²¹­ô ¬»²¼·²¹ ¬± ½®»¿¬»­«¾­·¼»²½» ±º ¬¸» °¿®¬ ±º ¬¸» ­¬®«½¬«®» «²¼»® ©¸·½¸ ·¬ ±½½«®­òÞ®·½µ©±®µ ©¿´´­ ©·´´ ®»­·­¬ ¬¸» ­¬®»­­ ½®»¿¬»¼ ¾§ ¬¸·­ ®»³±ª¿´ ±º­«°°±®¬ ¾§ ¾®·¼¹·²¹ ¬¸» ¹¿° ±® ½¿²¬·´»ª»®·²¹ «²¬·´ ¬¸» ¾®·½µ­ ±® ¬¸»³±®¬¿® ¾»¼¼·²¹ º¿·´ò Ñ´¼»® ³¿­±²®§ ¸¿­ ´·¬¬´» ®»­·­¬¿²½»ò Ûª·¼»²½» ±ºº¿·´«®» ª¿®·»­ ¿½½±®¼·²¹ ¬± ½·®½«³­¬¿²½»­ ¿²¼ ­§³°¬±³­ ³¿§ ·²½´«¼»æ

{ ͬ»° ½®¿½µ·²¹ ·² ¬¸» ³±®¬¿® ¾»¼­ ·² ¬¸» ¾±¼§ ±º ¬¸» ©¿´´ ±®¿¾±ª»ñ¾»´±© ±°»²·²¹­ ­«½¸ ¿­ ¼±±®­ ±® ©·²¼±©­ò

{ Ê»®¬·½¿´ ½®¿½µ·²¹ ·² ¬¸» ¾®·½µ­ ø«­«¿´´§ ¾«¬ ²±¬ ²»½»­­¿®·´§ ·² ´·²»©·¬¸ ¬¸» ª»®¬·½¿´ ¾»¼­ ±® °»®°»²¼­÷ò

×­±´¿¬»¼ °·»®­ ¿ºº»½¬»¼ ¾§ »®±­·±² ±® ­¿¬«®¿¬·±² ±º º±«²¼¿¬·±²­ ©·´´»ª»²¬«¿´´§ ´±­» ½±²¬¿½¬ ©·¬¸ ¬¸» ¾»¿®»®­ ¬¸»§ ­«°°±®¬ ¿²¼ ³¿§ ¬·´¬ ±®º¿´´ ±ª»®ò ̸» º´±±®­ ¬¸¿¬ ¸¿ª» ´±­¬ ¬¸·­ ­«°°±®¬ ©·´´ ¾»½±³» ¾±«²½§ô­±³»¬·³»­ ®¿¬¬´·²¹ ±®²¿³»²¬­ »¬½ò

Í»¿­±²¿´ ­©»´´·²¹ñ­¸®·²µ¿¹» ·² ½´¿§Í©»´´·²¹ º±«²¼¿¬·±² ­±·´ ¼«» ¬± ®¿·²§ °»®·±¼­ º·®­¬ ´·º¬­ ¬¸» ³±­¬»¨°±­»¼ »¨¬®»³·¬·»­ ±º ¬¸» º±±¬·²¹ ­§­¬»³ô ¬¸»² ¬¸» ®»³¿·²¼»® ±º ¬¸»°»®·³»¬»® º±±¬·²¹­ ©¸·´» ¹®¿¼«¿´´§ °»®³»¿¬·²¹ ·²­·¼» ¬¸» ¾«·´¼·²¹º±±¬°®·²¬ ¬± ´·º¬ ·²¬»®²¿´ º±±¬·²¹­ò ̸·­ ­©»´´·²¹ º·®­¬ ¬»²¼­ ¬± ½®»¿¬» ¿¼·­¸ »ºº»½¬ô ¾»½¿«­» ¬¸» »¨¬»®²¿´ º±±¬·²¹­ ¿®» °«­¸»¼ ¸·¹¸»® ¬¸¿² ¬¸»·²¬»®²¿´ ±²»­ò

̸» º·®­¬ ²±¬·½»¿¾´» ­§³°¬±³ ³¿§ ¾» ¬¸¿¬ ¬¸» º´±±® ¿°°»¿®­ ­´·¹¸¬´§¼·­¸»¼ò ̸·­ ·­ ±º¬»² ¿½½±³°¿²·»¼ ¾§ ­±³» ¼±±®­ ¾·²¼·²¹ ±² ¬¸»º´±±® ±® ¬¸» ¼±±® ¸»¿¼ô ¬±¹»¬¸»® ©·¬¸ ­±³» ½®¿½µ·²¹ ±º ½±®²·½»³·¬®»­ò ײ ¾«·´¼·²¹­ ©·¬¸ ¬·³¾»® º´±±®·²¹ ­«°°±®¬»¼ ¾§ ¾»¿®»®­ ¿²¼¶±·­¬­ô ¬¸» º´±±® ½¿² ¾» ¾±«²½§ò Û¨¬»®²¿´´§ ¬¸»®» ³¿§ ¾» ª·­·¾´»¼·­¸·²¹ ±º ¬¸» ¸·° ±® ®·¼¹» ´·²»­ò

ß­ ¬¸» ³±·­¬«®» ¿¾­±®°¬·±² °®±½»­­ ½±³°´»¬»­ ·¬­ ¶±«®²»§ ¬± ¬¸»·²²»®³±­¬ ¿®»¿­ ±º ¬¸» ¾«·´¼·²¹ô ¬¸» ·²¬»®²¿´ º±±¬·²¹­ ©·´´ ®·­»ò ׺ ¬¸»­°®»¿¼ ±º ³±·­¬«®» ·­ ®±«¹¸´§ »ª»²ô ·¬ ³¿§ ¾» ¬¸¿¬ ¬¸» ­§³°¬±³­ ©·´´¬»³°±®¿®·´§ ¼·­¿°°»¿®ô ¾«¬ ·¬ ·­ ³±®» ´·µ»´§ ¬¸¿¬ ­©»´´·²¹ ©·´´ ¾»«²»ª»²ô ½®»¿¬·²¹ ¿ ¼·ºº»®»²½» ®¿¬¸»® ¬¸¿² ¿ ¼·­¿°°»¿®¿²½» ·²­§³°¬±³­ò ײ ¾«·´¼·²¹­ ©·¬¸ ¬·³¾»® º´±±®·²¹ ­«°°±®¬»¼ ¾§ ¾»¿®»®­¿²¼ ¶±·­¬­ô ¬¸» ·­±´¿¬»¼ °·»®­ ©·´´ ®·­» ³±®» »¿­·´§ ¬¸¿² ¬¸» ­¬®·°º±±¬·²¹­ ±® °·»®­ «²¼»® ©¿´´­ô ½®»¿¬·²¹ ²±¬·½»¿¾´» ¼±³·²¹ ±º º´±±®·²¹ò

ß­ ¬¸» ©»¿¬¸»® °¿¬¬»®² ½¸¿²¹»­ ¿²¼ ¬¸» ­±·´ ¾»¹·²­ ¬± ¼®§ ±«¬ô ¬¸»»¨¬»®²¿´ º±±¬·²¹­ ©·´´ ¾» º·®­¬ ¿ºº»½¬»¼ô ¾»¹·²²·²¹ ©·¬¸ ¬¸» ´±½¿¬·±²­©¸»®» ¬¸» ­«²K­ »ºº»½¬ ·­ ­¬®±²¹»­¬ò ̸·­ ¸¿­ ¬¸» »ºº»½¬ ±º ´±©»®·²¹ ¬¸»»¨¬»®²¿´ º±±¬·²¹­ò ̸» ¼±³·²¹ ·­ ¿½½»²¬«¿¬»¼ ¿²¼ ½®¿½µ·²¹ ®»¼«½»­±® ¼·­¿°°»¿®­ ©¸»®» ·¬ ±½½«®®»¼ ¾»½¿«­» ±º ¼·­¸·²¹ô ¾«¬ ±¬¸»® ½®¿½µ­±°»² «°ò ̸» ®±±º ´·²»­ ³¿§ ¾»½±³» ½±²ª»¨ò

ܱ³·²¹ ¿²¼ ¼·­¸·²¹ ¿®» ¿´­± ¿ºº»½¬»¼ ¾§ ©»¿¬¸»® ·² ±¬¸»® ©¿§­ò ײ¿®»¿­ ©¸»®» ©¿®³ô ©»¬ ­«³³»®­ ¿²¼ ½±±´»® ¼®§ ©·²¬»®­ °®»ª¿·´ô©¿¬»® ³·¹®¿¬·±² ¬»²¼­ ¬± ¾» ¬±©¿®¼ ¬¸» ·²¬»®·±® ¿²¼ ¼±³·²¹ ©·´´ ¾»¿½½»²¬«¿¬»¼ô ©¸»®»¿­ ©¸»®» ­«³³»®­ ¿®» ¼®§ ¿²¼ ©·²¬»®­ ¿®» ½±´¼¿²¼ ©»¬ô ³·¹®¿¬·±² ¬»²¼­ ¬± ¾» ¬±©¿®¼ ¬¸» »¨¬»®·±® ¿²¼ ¬¸»«²¼»®´§·²¹ °®±°»²­·¬§ ·­ ¬±©¿®¼ ¼·­¸·²¹ò

Ó±ª»³»²¬ ½¿«­»¼ ¾§ ¬®»» ®±±¬­×² ¹»²»®¿´ô ¹®±©·²¹ ®±±¬­ ©·´´ »¨»®¬ ¿² «°©¿®¼ °®»­­«®» ±² º±±¬·²¹­ô©¸»®»¿­ ­±·´ ­«¾¶»½¬ ¬± ¼®§·²¹ ¾»½¿«­» ±º ¬®»» ±® ­¸®«¾ ®±±¬­ ©·´´ ¬»²¼¬± ®»³±ª» ­«°°±®¬ º®±³ «²¼»® º±±¬·²¹­ ¾§ ·²¼«½·²¹ ­¸®·²µ¿¹»ò

ݱ³°´·½¿¬·±²­ ½¿«­»¼ ¾§ ¬¸» ­¬®«½¬«®» ·¬­»´ºÓ±­¬ º±®½»­ ¬¸¿¬ ¬¸» ­±·´ ½¿«­»­ ¬± ¾» »¨»®¬»¼ ±² ­¬®«½¬«®»­ ¿®»ª»®¬·½¿´ P ·ò»ò »·¬¸»® «° ±® ¼±©²ò ر©»ª»®ô ¾»½¿«­» ¬¸»­» º±®½»­ ¿®»­»´¼±³ ­°®»¿¼ »ª»²´§ ¿®±«²¼ ¬¸» º±±¬·²¹­ô ¿²¼ ¾»½¿«­» ¬¸» ¾«·´¼·²¹®»­·­¬­ «²»ª»² ³±ª»³»²¬ ¾»½¿«­» ±º ·¬­ ®·¹·¼·¬§ô º±®½»­ ¿®» »¨»®¬»¼º®±³ ±²» °¿®¬ ±º ¬¸» ¾«·´¼·²¹ ¬± ¿²±¬¸»®ò ̸» ²»¬ ®»­«´¬ ±º ¿´´ ¬¸»­»º±®½»­ ·­ «­«¿´´§ ®±¬¿¬·±²¿´ò ̸·­ ®»­«´¬¿²¬ º±®½» ±º¬»² ½±³°´·½¿¬»­ ¬¸»¼·¿¹²±­·­ ¾»½¿«­» ¬¸» ª·­·¾´» ­§³°¬±³­ ¼± ²±¬ ­·³°´§ ®»º´»½¬ ¬¸»±®·¹·²¿´ ½¿«­»ò ß ½±³³±² ­§³°¬±³ ·­ ¾·²¼·²¹ ±º ¼±±®­ ±² ¬¸»ª»®¬·½¿´ ³»³¾»® ±º ¬¸» º®¿³»ò

Ûºº»½¬­ ±² º«´´ ³¿­±²®§ ­¬®«½¬«®»­Þ®·½µ©±®µ ©·´´ ®»­·­¬ ½®¿½µ·²¹ ©¸»®» ·¬ ½¿²ò ׬ ©·´´ ¿¬¬»³°¬ ¬± ­°¿²¿®»¿­ ¬¸¿¬ ´±­» ­«°°±®¬ ¾»½¿«­» ±º ­«¾­·¼»¼ º±«²¼¿¬·±²­ ±® ®¿·­»¼°±·²¬­ò ׬ ·­ ¬¸»®»º±®» «­«¿´ ¬± ­»» ½®¿½µ·²¹ ¿¬ ©»¿µ °±·²¬­ô ­«½¸ ¿­±°»²·²¹­ º±® ©·²¼±©­ ±® ¼±±®­ò

ײ ¬¸» »ª»²¬ ±º ½±²­¬®«½¬·±² ­»¬¬´»³»²¬ô ½®¿½µ·²¹ ©·´´ «­«¿´´§ ®»³¿·²«²½¸¿²¹»¼ ¿º¬»® ¬¸» °®±½»­­ ±º ­»¬¬´»³»²¬ ¸¿­ ½»¿­»¼ò

É·¬¸ ´±½¿´ ­¸»¿® ±® »®±­·±²ô ½®¿½µ·²¹ ©·´´ «­«¿´´§ ½±²¬·²«» ¬± ¼»ª»´±°«²¬·´ ¬¸» ±®·¹·²¿´ ½¿«­» ¸¿­ ¾»»² ®»³»¼·»¼ô ±® «²¬·´ ¬¸» ­«¾­·¼»²½»¸¿­ ½±³°´»¬»´§ ²»«¬®¿´·­»¼ ¬¸» ¿ºº»½¬»¼ °±®¬·±² ±º º±±¬·²¹ ¿²¼ ¬¸»­¬®«½¬«®» ¸¿­ ­¬¿¾·´·­»¼ ±² ±¬¸»® º±±¬·²¹­ ¬¸¿¬ ®»³¿·² »ºº»½¬·ª»ò

ײ ¬¸» ½¿­» ±º ­©»´´ñ­¸®·²µ »ºº»½¬­ô ¬¸» ¾®·½µ©±®µ ©·´´ ·² ­±³» ½¿­»­®»¬«®² ¬± ·¬­ ±®·¹·²¿´ °±­·¬·±² ¿º¬»® ½±³°´»¬·±² ±º ¿ ½§½´»ô ¸±©»ª»® ·¬·­ ³±®» ´·µ»´§ ¬¸¿¬ ¬¸» ®±¬¿¬·±²¿´ »ºº»½¬ ©·´´ ²±¬ ¾» »¨¿½¬´§ ®»ª»®­»¼ô¿²¼ ·¬ ·­ ¿´­± «­«¿´ ¬¸¿¬ ¾®·½µ©±®µ ©·´´ ­»¬¬´» ·² ·¬­ ²»© °±­·¬·±² ¿²¼©·´´ ®»­·­¬ ¬¸» º±®½»­ ¬®§·²¹ ¬± ®»¬«®² ·¬ ¬± ·¬­ ±®·¹·²¿´ °±­·¬·±²ò ̸·­³»¿²­ ¬¸¿¬ ·² ¿ ½¿­» ©¸»®» ­©»´´·²¹ ¬¿µ»­ °´¿½» ¿º¬»® ½±²­¬®«½¬·±²¿²¼ ½®¿½µ·²¹ ±½½«®­ô ¬¸» ½®¿½µ·²¹ ·­ ´·µ»´§ ¬± ¿¬ ´»¿­¬ °¿®¬´§ ®»³¿·²¿º¬»® ¬¸» ­¸®·²µ ­»¹³»²¬ ±º ¬¸» ½§½´» ·­ ½±³°´»¬»ò ̸«­ô »¿½¸ ¬·³»¬¸» ½§½´» ·­ ®»°»¿¬»¼ô ¬¸» ´·µ»´·¸±±¼ ·­ ¬¸¿¬ ¬¸» ½®¿½µ·²¹ ©·´´ ¾»½±³»©·¼»® «²¬·´ ¬¸» ­»½¬·±²­ ±º ¾®·½µ©±®µ ¾»½±³» ª·®¬«¿´´§ ·²¼»°»²¼»²¬ò

É·¬¸ ®»°»¿¬»¼ ½§½´»­ô ±²½» ¬¸» ½®¿½µ·²¹ ·­ »­¬¿¾´·­¸»¼ô ·º ¬¸»®» ·­ ²±±¬¸»® ½±³°´·½¿¬·±²ô ·¬ ·­ ²±®³¿´ º±® ¬¸» ·²½·¼»²½» ±º ½®¿½µ·²¹ ¬±­¬¿¾·´·­»ô ¿­ ¬¸» ¾«·´¼·²¹ ¸¿­ ¬¸» ¿®¬·½«´¿¬·±² ·¬ ²»»¼­ ¬± ½±°» ©·¬¸¬¸» °®±¾´»³ò ̸·­ ·­ ¾§ ²± ³»¿²­ ¿´©¿§­ ¬¸» ½¿­»ô ¸±©»ª»®ô ¿²¼³±²·¬±®·²¹ ±º ½®¿½µ­ ·² ©¿´´­ ¿²¼ º´±±®­ ­¸±«´¼ ¿´©¿§­ ¾» ¬®»¿¬»¼­»®·±«­´§ò

Ë°¸»¿ª¿´ ½¿«­»¼ ¾§ ¹®±©¬¸ ±º ¬®»» ®±±¬­ «²¼»® º±±¬·²¹­ ·­ ²±¬ ¿­·³°´» ª»®¬·½¿´ ­¸»¿® ­¬®»­­ò ̸»®» ·­ ¿ ¬»²¼»²½§ º±® ¬¸» ®±±¬ ¬± ¿´­±»¨»®¬ ´¿¬»®¿´ º±®½»­ ¬¸¿¬ ¿¬¬»³°¬ ¬± ­»°¿®¿¬» ­»½¬·±²­ ±º ¾®·½µ©±®µ¿º¬»® ·²·¬·¿´ ½®¿½µ·²¹ ¸¿­ ±½½«®®»¼ò

Ì®»»­ ½¿² ½¿«­» ­¸®·²µ¿¹» ¿²¼ ¼¿³¿¹»

Page 243: SITE CLASSIFICATION REPORT SUMMARY...Douglas Partners (DP) has prepared this report for this project at Taylor 2- Stage 3, Taylor in accordance with DP’s proposal dated 15 September

̸» ²±®³¿´ ­¬®«½¬«®¿´ ¿®®¿²¹»³»²¬ ·­ ¬¸¿¬ ¬¸» ·²²»® ´»¿º ±º ¾®·½µó©±®µ ·² ¬¸» »¨¬»®²¿´ ©¿´´­ ¿²¼ ¿¬ ´»¿­¬ ­±³» ±º ¬¸» ·²¬»®²¿´ ©¿´´­ø¼»°»²¼·²¹ ±² ¬¸» ®±±º ¬§°»÷ ½±³°®·­» ¬¸» ´±¿¼ó¾»¿®·²¹ ­¬®«½¬«®» ±²©¸·½¸ ¿²§ «°°»® º´±±®­ô ½»·´·²¹­ ¿²¼ ¬¸» ®±±º ¿®» ­«°°±®¬»¼ò ײ ¬¸»­»½¿­»­ô ·¬ ·­ ·²¬»®²¿´´§ ª·­·¾´» ½®¿½µ·²¹ ¬¸¿¬ ­¸±«´¼ ¾» ¬¸» ³¿·² º±½«­±º ¿¬¬»²¬·±²ô ¸±©»ª»® ¬¸»®» ¿®» ¿ º»© »¨¿³°´»­ ±º ¼©»´´·²¹­ ©¸±­»»¨¬»®²¿´ ´»¿º ±º ³¿­±²®§ °´¿§­ ­±³» ­«°°±®¬·²¹ ®±´»ô ­± ¬¸·­ ­¸±«´¼¾» ½¸»½µ»¼ ·º ¬¸»®» ·­ ¿²§ ¼±«¾¬ò ײ ¿²§ ½¿­»ô »¨¬»®²¿´´§ ª·­·¾´»½®¿½µ·²¹ ·­ ·³°±®¬¿²¬ ¿­ ¿ ¹«·¼» ¬± ­¬®»­­»­ ±² ¬¸» ­¬®«½¬«®» ¹»²»®¿´´§ô¿²¼ ·¬ ­¸±«´¼ ¿´­± ¾» ®»³»³¾»®»¼ ¬¸¿¬ ¬¸» »¨¬»®²¿´ ©¿´´­ ³«­¬ ¾»½¿°¿¾´» ±º ­«°°±®¬·²¹ ¬¸»³­»´ª»­ò

Ûºº»½¬­ ±² º®¿³»¼ ­¬®«½¬«®»­Ì·³¾»® ±® ­¬»»´ º®¿³»¼ ¾«·´¼·²¹­ ¿®» ´»­­ ´·µ»´§ ¬± »¨¸·¾·¬ ½®¿½µ·²¹¼«» ¬± ­©»´´ñ­¸®·²µ ¬¸¿² ³¿­±²®§ ¾«·´¼·²¹­ ¾»½¿«­» ±º ¬¸»·®º´»¨·¾·´·¬§ò ß´­±ô ¬¸» ¼±³·²¹ñ¼·­¸·²¹ »ºº»½¬­ ¬»²¼ ¬± ¾» ´±©»® ¾»½¿«­»±º ¬¸» ´·¹¸¬»® ©»·¹¸¬ ±º ©¿´´­ò ̸» ³¿·² ®·­µ­ ¬± º®¿³»¼ ¾«·´¼·²¹­ ¿®»»²½±«²¬»®»¼ ¾»½¿«­» ±º ¬¸» ·­±´¿¬»¼ °·»® º±±¬·²¹­ «­»¼ «²¼»® ©¿´´­òɸ»®» »®±­·±² ±® ­¿¬«®¿¬·±² ½¿«­» ¿ º±±¬·²¹ ¬± º¿´´ ¿©¿§ô ¬¸·­ ½¿²¼±«¾´» ¬¸» ­°¿² ©¸·½¸ ¿ ©¿´´ ³«­¬ ¾®·¼¹»ò ̸·­ ¿¼¼·¬·±²¿´ ­¬®»­­ ½¿²½®»¿¬» ½®¿½µ·²¹ ·² ©¿´´ ´·²·²¹­ô °¿®¬·½«´¿®´§ ©¸»®» ¬¸»®» ·­ ¿ ©»¿µ°±·²¬ ·² ¬¸» ­¬®«½¬«®» ½¿«­»¼ ¾§ ¿ ¼±±® ±® ©·²¼±© ±°»²·²¹ò ׬ ·­ô¸±©»ª»®ô «²´·µ»´§ ¬¸¿¬ º®¿³»¼ ­¬®«½¬«®»­ ©·´´ ¾» ­± ­¬®»­­»¼ ¿­ ¬± ­«ºº»®­»®·±«­ ¼¿³¿¹» ©·¬¸±«¬ º·®­¬ »¨¸·¾·¬·²¹ ­±³» ±® ¿´´ ±º ¬¸» ¿¾±ª»­§³°¬±³­ º±® ¿ ½±²­·¼»®¿¾´» °»®·±¼ò ̸» ­¿³» ©¿®²·²¹ °»®·±¼ ­¸±«´¼¿°°´§ ·² ¬¸» ½¿­» ±º «°¸»¿ª¿´ò ׬ ­¸±«´¼ ¾» ²±¬»¼ô ¸±©»ª»®ô ¬¸¿¬ ©¸»®»º®¿³»¼ ¾«·´¼·²¹­ ¿®» ­«°°±®¬»¼ ¾§ ­¬®·° º±±¬·²¹­ ¬¸»®» ·­ ±²´§ ±²» ´»¿º±º ¾®·½µ©±®µ ¿²¼ ¬¸»®»º±®» ¬¸» »¨¬»®²¿´´§ ª·­·¾´» ©¿´´­ ¿®» ¬¸»­«°°±®¬·²¹ ­¬®«½¬«®» º±® ¬¸» ¾«·´¼·²¹ò ײ ¬¸·­ ½¿­»ô ¬¸» ­«¾º´±±®³¿­±²®§ ©¿´´­ ½¿² ¾» »¨°»½¬»¼ ¬± ¾»¸¿ª» ¿­ º«´´ ¾®·½µ©±®µ ©¿´´­ò

Ûºº»½¬­ ±² ¾®·½µ ª»²»»® ­¬®«½¬«®»­Þ»½¿«­» ¬¸» ´±¿¼ó¾»¿®·²¹ ­¬®«½¬«®» ±º ¿ ¾®·½µ ª»²»»® ¾«·´¼·²¹ ·­ ¬¸»º®¿³» ¬¸¿¬ ³¿µ»­ «° ¬¸» ·²¬»®·±® ´»¿º ±º ¬¸» »¨¬»®²¿´ ©¿´´­ °´«­°»®¸¿°­ ¬¸» ·²¬»®²¿´ ©¿´´­ô ¼»°»²¼·²¹ ±² ¬¸» ¬§°» ±º ®±±ºô ¬¸»¾«·´¼·²¹ ½¿² ¾» »¨°»½¬»¼ ¬± ¾»¸¿ª» ¿­ ¿ º®¿³»¼ ­¬®«½¬«®»ô »¨½»°¬ ¬¸¿¬¬¸» »¨¬»®²¿´ ³¿­±²®§ ©·´´ ¾»¸¿ª» ·² ¿ ­·³·´¿® ©¿§ ¬± ¬¸» »¨¬»®²¿´ ´»¿º±º ¿ º«´´ ³¿­±²®§ ­¬®«½¬«®»ò

É¿¬»® Í»®ª·½» ¿²¼ Ü®¿·²¿¹»

ɸ»®» ¿ ©¿¬»® ­»®ª·½» °·°»ô ¿ ­»©»® ±® ­¬±®³©¿¬»® ¼®¿·²¿¹» °·°» ·­ ·²¬¸» ª·½·²·¬§ ±º ¿ ¾«·´¼·²¹ô ¿ ©¿¬»® ´»¿µ ½¿² ½¿«­» »®±­·±²ô ­©»´´·²¹ ±®­¿¬«®¿¬·±² ±º ­«­½»°¬·¾´» ­±·´ò Ûª»² ¿ ³·²«­½«´» ´»¿µ ½¿² ¾» »²±«¹¸¬± ­¿¬«®¿¬» ¿ ½´¿§ º±«²¼¿¬·±²ò ß ´»¿µ·²¹ ¬¿° ²»¿® ¿ ¾«·´¼·²¹ ½¿² ¸¿ª»¬¸» ­¿³» »ºº»½¬ò ײ ¿¼¼·¬·±²ô ¬®»²½¸»­ ½±²¬¿·²·²¹ °·°»­ ½¿² ¾»½±³»©¿¬»®½±«®­»­ »ª»² ¬¸±«¹¸ ¾¿½µº·´´»¼ô °¿®¬·½«´¿®´§ ©¸»®» ¾®±µ»²®«¾¾´» ·­ «­»¼ ¿­ º·´´ò É¿¬»® ¬¸¿¬ ®«²­ ¿´±²¹ ¬¸»­» ¬®»²½¸»­ ½¿² ¾»®»­°±²­·¾´» º±® ­»®·±«­ »®±­·±²ô ·²¬»®­¬®¿¬¿ ­»»°¿¹» ·²¬± ­«¾º´±±® ¿®»¿­¿²¼ ­¿¬«®¿¬·±²ò

з°» ´»¿µ¿¹» ¿²¼ ¬®»²½¸ ©¿¬»® º´±©­ ¿´­± »²½±«®¿¹» ¬®»» ¿²¼ ­¸®«¾®±±¬­ ¬± ¬¸» ­±«®½» ±º ©¿¬»®ô ½±³°´·½¿¬·²¹ ¿²¼ »¨¿½»®¾¿¬·²¹ ¬¸»°®±¾´»³òб±® ®±±º °´«³¾·²¹ ½¿² ®»­«´¬ ·² ´¿®¹» ª±´«³»­ ±º ®¿·²©¿¬»® ¾»·²¹½±²½»²¬®¿¬»¼ ·² ¿ ­³¿´´ ¿®»¿ ±º ­±·´æ

{ ײ½±®®»½¬ º¿´´­ ·² ®±±º ¹«¬¬»®·²¹ ³¿§ ®»­«´¬ ·² ±ª»®º´±©­ô ¿­ ³¿§¹«¬¬»®­ ¾´±½µ»¼ ©·¬¸ ´»¿ª»­ »¬½ò

{ ݱ®®±¼»¼ ¹«¬¬»®·²¹ ±® ¼±©²°·°»­ ½¿² ­°·´´ ©¿¬»® ¬± ¹®±«²¼ò

{ ܱ©²°·°»­ ²±¬ °±­·¬·ª»´§ ½±²²»½¬»¼ ¬± ¿ °®±°»® ­¬±®³©¿¬»®½±´´»½¬·±² ­§­¬»³ ©·´´ ¼·®»½¬ ¿ ½±²½»²¬®¿¬·±² ±º ©¿¬»® ¬± ­±·´ ¬¸¿¬ ·­¼·®»½¬´§ ¿¼¶¿½»²¬ ¬± º±±¬·²¹­ô ­±³»¬·³»­ ½¿«­·²¹ ´¿®¹»ó­½¿´»°®±¾´»³­ ­«½¸ ¿­ »®±­·±²ô ­¿¬«®¿¬·±² ¿²¼ ³·¹®¿¬·±² ±º ©¿¬»® «²¼»®¬¸» ¾«·´¼·²¹ò

Í»®·±«­²»­­ ±º Ý®¿½µ·²¹

ײ ¹»²»®¿´ô ³±­¬ ½®¿½µ·²¹ º±«²¼ ·² ³¿­±²®§ ©¿´´­ ·­ ¿ ½±­³»¬·½²«·­¿²½» ±²´§ ¿²¼ ½¿² ¾» µ»°¬ ·² ®»°¿·® ±® »ª»² ·¹²±®»¼ò ̸» ¬¿¾´»¾»´±© ·­ ¿ ®»°®±¼«½¬·±² ±º Ì¿¾´» Ýï ±º ßÍ îèéðò

ßÍ îèéð ¿´­± °«¾´·­¸»­ º·¹«®»­ ®»´¿¬·²¹ ¬± ½®¿½µ·²¹ ·² ½±²½®»¬» º´±±®­ô¸±©»ª»® ¾»½¿«­» ©¿´´ ½®¿½µ·²¹ ©·´´ «­«¿´´§ ®»¿½¸ ¬¸» ½®·¬·½¿´ °±·²¬­·¹²·º·½¿²¬´§ »¿®´·»® ¬¸¿² ½®¿½µ·²¹ ·² ­´¿¾­ô ¬¸·­ ¬¿¾´» ·­ ²±¬®»°®±¼«½»¼ ¸»®»ò

Ю»ª»²¬·±²ñÝ«®»

д«³¾·²¹É¸»®» ¾«·´¼·²¹ ³±ª»³»²¬ ·­ ½¿«­»¼ ¾§ ©¿¬»® ­»®ª·½»ô ®±±º °´«³¾·²¹ô­»©»® ±® ­¬±®³©¿¬»® º¿·´«®»ô ¬¸» ®»³»¼§ ·­ ¬± ®»°¿·® ¬¸» °®±¾´»³ò ׬ ·­ °®«¼»²¬ô ¸±©»ª»®ô ¬± ½±²­·¼»® ¿´­± ®»®±«¬·²¹ °·°»­ ¿©¿§ º®±³¬¸» ¾«·´¼·²¹ ©¸»®» °±­­·¾´»ô ¿²¼ ®»´±½¿¬·²¹ ¬¿°­ ¬± °±­·¬·±²­ ©¸»®»¿²§ ´»¿µ¿¹» ©·´´ ²±¬ ¼·®»½¬ ©¿¬»® ¬± ¬¸» ¾«·´¼·²¹ ª·½·²·¬§ò Ûª»² ©¸»®»¹«´´§ ¬®¿°­ ¿®» °®»­»²¬ô ¬¸»®» ·­ ­±³»¬·³»­ ­«ºº·½·»²¬ ­°·´´ ¬± ½®»¿¬»»®±­·±² ±® ­¿¬«®¿¬·±²ô °¿®¬·½«´¿®´§ ·² ³±¼»®² ·²­¬¿´´¿¬·±²­ «­·²¹­³¿´´»® ¼·¿³»¬»® ÐÊÝ º·¨¬«®»­ò ײ¼»»¼ô ­±³» ¹«´´§ ¬®¿°­ ¿®» ²±¬­·¬«¿¬»¼ ¼·®»½¬´§ «²¼»® ¬¸» ¬¿°­ ¬¸¿¬ ¿®» ·²­¬¿´´»¼ ¬± ½¸¿®¹» ¬¸»³ô©·¬¸ ¬¸» ®»­«´¬ ¬¸¿¬ ©¿¬»® º®±³ ¬¸» ¬¿° ³¿§ »²¬»® ¬¸» ¾¿½µº·´´»¼¬®»²½¸ ¬¸¿¬ ¸±«­»­ ¬¸» ­»©»® °·°·²¹ò ׺ ¬¸» ¬®»²½¸ ¸¿­ ¾»»² °±±®´§¾¿½µº·´´»¼ô ¬¸» ©¿¬»® ©·´´ »·¬¸»® °±²¼ ±® º´±© ¿´±²¹ ¬¸» ¾±¬¬±³ ±º¬¸» ¬®»²½¸ò ß­ ¬¸»­» ¬®»²½¸»­ «­«¿´´§ ®«² ¿´±²¹­·¼» ¬¸» º±±¬·²¹­ ¿²¼½¿² ¾» ¿¬ ¿ ­·³·´¿® ¼»°¬¸ô ·¬ ·­ ²±¬ ¸¿®¼ ¬± ­»» ¸±© ¿²§ ©¿¬»® ¬¸¿¬ ·­¬¸«­ ¼·®»½¬»¼ ·²¬± ¿ ¬®»²½¸ ½¿² »¿­·´§ ¿ºº»½¬ ¬¸» º±«²¼¿¬·±²K­ ¿¾·´·¬§ ¬±­«°°±®¬ º±±¬·²¹­ ±® »ª»² ¹¿·² »²¬®§ ¬± ¬¸» ­«¾º´±±® ¿®»¿ò

Ù®±«²¼ ¼®¿·²¿¹»×² ¿´´ ­±·´­ ¬¸»®» ·­ ¬¸» ½¿°¿½·¬§ º±® ©¿¬»® ¬± ¬®¿ª»´ ±² ¬¸» ­«®º¿½» ¿²¼¾»´±© ·¬ò Í«®º¿½» ©¿¬»® º´±©­ ½¿² ¾» »­¬¿¾´·­¸»¼ ¾§ ·²­°»½¬·±² ¼«®·²¹¿²¼ ¿º¬»® ¸»¿ª§ ±® °®±´±²¹»¼ ®¿·²ò ׺ ²»½»­­¿®§ô ¿ ¹®¿¬»¼ ¼®¿·² ­§­¬»³½±²²»½¬»¼ ¬± ¬¸» ­¬±®³©¿¬»® ½±´´»½¬·±² ­§­¬»³ ·­ «­«¿´´§ ¿² »¿­§­±´«¬·±²ò

׬ ·­ô ¸±©»ª»®ô ­±³»¬·³»­ ²»½»­­¿®§ ©¸»² ¿¬¬»³°¬·²¹ ¬± °®»ª»²¬©¿¬»® ³·¹®¿¬·±² ¬¸¿¬ ¬»­¬·²¹ ¾» ½¿®®·»¼ ±«¬ ¬± »­¬¿¾´·­¸ ©¿¬»®¬¿¾´»¸»·¹¸¬ ¿²¼ ­«¾­±·´ ©¿¬»® º´±©­ò ̸·­ ­«¾¶»½¬ ·­ ®»º»®®»¼ ¬± ·² ÞÌÚ ï翲¼ ³¿§ °®±°»®´§ ¾» ®»¹¿®¼»¼ ¿­ ¿² ¿®»¿ º±® ¿² »¨°»®¬ ½±²­«´¬¿²¬ò

Ю±¬»½¬·±² ±º ¬¸» ¾«·´¼·²¹ °»®·³»¬»®×¬ ·­ »­­»²¬·¿´ ¬± ®»³»³¾»® ¬¸¿¬ ¬¸» ­±·´ ¬¸¿¬ ¿ºº»½¬­ º±±¬·²¹­ »¨¬»²¼­©»´´ ¾»§±²¼ ¬¸» ¿½¬«¿´ ¾«·´¼·²¹ ´·²»ò É¿¬»®·²¹ ±º ¹¿®¼»² °´¿²¬­ô­¸®«¾­ ¿²¼ ¬®»»­ ½¿«­»­ ­±³» ±º ¬¸» ³±­¬ ­»®·±«­ ©¿¬»® °®±¾´»³­ò

Ú±® ¬¸·­ ®»¿­±²ô °¿®¬·½«´¿®´§ ©¸»®» °®±¾´»³­ »¨·­¬ ±® ¿®» ´·µ»´§ ¬±±½½«®ô ·¬ ·­ ®»½±³³»²¼»¼ ¬¸¿¬ ¿² ¿°®±² ±º °¿ª·²¹ ¾» ·²­¬¿´´»¼¿®±«²¼ ¿­ ³«½¸ ±º ¬¸» ¾«·´¼·²¹ °»®·³»¬»® ¿­ ²»½»­­¿®§ò ̸·­ °¿ª·²¹

ÝÔßÍÍ×Ú×ÝßÌ×ÑÒ ÑÚ ÜßÓßÙÛ É×ÌØ ÎÛÚÛÎÛÒÝÛ ÌÑ ÉßÔÔÍ

Ü»­½®·°¬·±² ±º ¬§°·½¿´ ¼¿³¿¹» ¿²¼ ®»¯«·®»¼ ®»°¿·® ß°°®±¨·³¿¬» ½®¿½µ ©·¼¬¸ Ü¿³¿¹»´·³·¬ ø­»» Ò±¬» í÷ ½¿¬»¹±®§

Ø¿·®´·²» ½®¿½µ­ äðòï ³³ ð

Ú·²» ½®¿½µ­ ©¸·½¸ ¼± ²±¬ ²»»¼ ®»°¿·® äï ³³ ï

Ý®¿½µ­ ²±¬·½»¿¾´» ¾«¬ »¿­·´§ º·´´»¼ò ܱ±®­ ¿²¼ ©·²¼±©­ ­¬·½µ ­´·¹¸¬´§ äë ³³ î

Ý®¿½µ­ ½¿² ¾» ®»°¿·®»¼ ¿²¼ °±­­·¾´§ ¿ ­³¿´´ ¿³±«²¬ ±º ©¿´´ ©·´´ ²»»¼ ëPïë ³³ ø±® ¿ ²«³¾»® ±º ½®¿½µ­ í¬± ¾» ®»°´¿½»¼ò ܱ±®­ ¿²¼ ©·²¼±©­ ­¬·½µò Í»®ª·½» °·°»­ ½¿² º®¿½¬«®»ò í ³³ ±® ³±®» ·² ±²» ¹®±«°÷É»¿¬¸»®¬·¹¸¬²»­­ ±º¬»² ·³°¿·®»¼

Û¨¬»²­·ª» ®»°¿·® ©±®µ ·²ª±´ª·²¹ ¾®»¿µ·²¹ó±«¬ ¿²¼ ®»°´¿½·²¹ ­»½¬·±²­ ±º ©¿´´­ô ïëPîë ³³ ¾«¬ ¿´­± ¼»°»²¼ ì»­°»½·¿´´§ ±ª»® ¼±±®­ ¿²¼ ©·²¼±©­ò É·²¼±© ¿²¼ ¼±±® º®¿³»­ ¼·­¬±®¬ò É¿´´­ ´»¿² ±² ²«³¾»® ±º ½®¿½µ­±® ¾«´¹» ²±¬·½»¿¾´§ô ­±³» ´±­­ ±º ¾»¿®·²¹ ·² ¾»¿³­ò Í»®ª·½» °·°»­ ¼·­®«°¬»¼

Page 244: SITE CLASSIFICATION REPORT SUMMARY...Douglas Partners (DP) has prepared this report for this project at Taylor 2- Stage 3, Taylor in accordance with DP’s proposal dated 15 September

­¸±«´¼ »¨¬»²¼ ±«¬©¿®¼­ ¿ ³·²·³«³ ±º çðð ³³ ø³±®» ·² ¸·¹¸´§®»¿½¬·ª» ­±·´÷ ¿²¼ ­¸±«´¼ ¸¿ª» ¿ ³·²·³«³ º¿´´ ¿©¿§ º®±³ ¬¸»¾«·´¼·²¹ ±º ïæêðò ̸» º·²·­¸»¼ °¿ª·²¹ ­¸±«´¼ ¾» ²± ´»­­ ¬¸¿² ïðð³³ ¾»´±© ¾®·½µ ª»²¬ ¾¿­»­ò

׬ ·­ °®«¼»²¬ ¬± ®»´±½¿¬» ¼®¿·²¿¹» °·°»­ ¿©¿§ º®±³ ¬¸·­ °¿ª·²¹ô ·º°±­­·¾´»ô ¬± ¿ª±·¼ ½±³°´·½¿¬·±²­ º®±³ º«¬«®» ´»¿µ¿¹»ò ׺ ¬¸·­ ·­ ²±¬°®¿½¬·½¿´ô »¿®¬¸»²©¿®» °·°»­ ­¸±«´¼ ¾» ®»°´¿½»¼ ¾§ ÐÊÝ ¿²¼¾¿½µº·´´·²¹ ­¸±«´¼ ¾» ±º ¬¸» ­¿³» ­±·´ ¬§°» ¿­ ¬¸» ­«®®±«²¼·²¹ ­±·´¿²¼ ½±³°¿½¬»¼ ¬± ¬¸» ­¿³» ¼»²­·¬§ò

Û¨½»°¬ ·² ¿®»¿­ ©¸»®» º®»»¦·²¹ ±º ©¿¬»® ·­ ¿² ·­­«»ô ·¬ ·­ ©·­» ¬±®»³±ª» ¬¿°­ ·² ¬¸» ¾«·´¼·²¹ ¿®»¿ ¿²¼ ®»´±½¿¬» ¬¸»³ ©»´´ ¿©¿§ º®±³¬¸» ¾«·´¼·²¹ P °®»º»®¿¾´§ ²±¬ «°¸·´´ º®±³ ·¬ ø­»» ÞÌÚ ïç÷ò

׬ ³¿§ ¾» ¼»­·®¿¾´» ¬± ·²­¬¿´´ ¿ ¹®¿¬»¼ ¼®¿·² ¿¬ ¬¸» ±«¬­·¼» »¼¹» ±º ¬¸»°¿ª·²¹ ±² ¬¸» «°¸·´´ ­·¼» ±º ¬¸» ¾«·´¼·²¹ò ׺ ­«¾­±·´ ¼®¿·²¿¹» ·­²»»¼»¼ ¬¸·­ ½¿² ¾» ·²­¬¿´´»¼ «²¼»® ¬¸» ­«®º¿½» ¼®¿·²ò

ݱ²¼»²­¿¬·±²×² ¾«·´¼·²¹­ ©·¬¸ ¿ ­«¾º´±±® ª±·¼ ­«½¸ ¿­ ©¸»®» ¾»¿®»®­ ¿²¼ ¶±·­¬­­«°°±®¬ º´±±®·²¹ô ·²­«ºº·½·»²¬ ª»²¬·´¿¬·±² ½®»¿¬»­ ·¼»¿´ ½±²¼·¬·±²­ º±®½±²¼»²­¿¬·±²ô °¿®¬·½«´¿®´§ ©¸»®» ¬¸»®» ·­ ´·¬¬´» ½´»¿®¿²½» ¾»¬©»»² ¬¸»º´±±® ¿²¼ ¬¸» ¹®±«²¼ò ݱ²¼»²­¿¬·±² ¿¼¼­ ¬± ¬¸» ³±·­¬«®» ¿´®»¿¼§°®»­»²¬ ·² ¬¸» ­«¾º´±±® ¿²¼ ­·¹²·º·½¿²¬´§ ­´±©­ ¬¸» °®±½»­­ ±º ¼®§·²¹±«¬ò ײ­¬¿´´¿¬·±² ±º ¿² ¿¼»¯«¿¬» ­«¾º´±±® ª»²¬·´¿¬·±² ­§­¬»³ô »·¬¸»®²¿¬«®¿´ ±® ³»½¸¿²·½¿´ô ·­ ¼»­·®¿¾´»ò

É¿®²·²¹æ ß´¬¸±«¹¸ ¬¸·­ Þ«·´¼·²¹ Ì»½¸²±´±¹§ Ú·´» ¼»¿´­ ©·¬¸½®¿½µ·²¹ ·² ¾«·´¼·²¹­ô ·¬ ­¸±«´¼ ¾» ­¿·¼ ¬¸¿¬ ­«¾º´±±® ³±·­¬«®» ½¿²®»­«´¬ ·² ¬¸» ¼»ª»´±°³»²¬ ±º ±¬¸»® °®±¾´»³­ô ²±¬¿¾´§æ

{ É¿¬»® ¬¸¿¬ ·­ ¬®¿²­³·¬¬»¼ ·²¬± ³¿­±²®§ô ³»¬¿´ ±® ¬·³¾»® ¾«·´¼·²¹»´»³»²¬­ ½¿«­»­ ¼¿³¿¹» ¿²¼ñ±® ¼»½¿§ ¬± ¬¸±­» »´»³»²¬­ò

{ Ø·¹¸ ­«¾º´±±® ¸«³·¼·¬§ ¿²¼ ³±·­¬«®» ½±²¬»²¬ ½®»¿¬» ¿² ·¼»¿´»²ª·®±²³»²¬ º±® ª¿®·±«­ °»­¬­ô ·²½´«¼·²¹ ¬»®³·¬»­ ¿²¼ ­°·¼»®­ò

{ ɸ»®» ¸·¹¸ ³±·­¬«®» ´»ª»´­ ¿®» ¬®¿²­³·¬¬»¼ ¬± ¬¸» º´±±®·²¹ ¿²¼©¿´´­ô ¿² ·²½®»¿­» ·² ¬¸» ¼«­¬ ³·¬» ½±«²¬ ½¿² »²­«» ©·¬¸·² ¬¸»´·ª·²¹ ¿®»¿­ò Ü«­¬ ³·¬»­ô ¿­ ©»´´ ¿­ ¼¿³°²»­­ ·² ¹»²»®¿´ô ½¿² ¾» ¿¸»¿´¬¸ ¸¿¦¿®¼ ¬± ·²¸¿¾·¬¿²¬­ô °¿®¬·½«´¿®´§ ¬¸±­» ©¸± ¿®»¿¾²±®³¿´´§ ­«­½»°¬·¾´» ¬± ®»­°·®¿¬±®§ ¿·´³»²¬­ò

̸» ¹¿®¼»²Ì¸» ·¼»¿´ ª»¹»¬¿¬·±² ´¿§±«¬ ·­ ¬± ¸¿ª» ´¿©² ±® °´¿²¬­ ¬¸¿¬ ®»¯«·®»±²´§ ´·¹¸¬ ©¿¬»®·²¹ ·³³»¼·¿¬»´§ ¿¼¶¿½»²¬ ¬± ¬¸» ¼®¿·²¿¹» ±® °¿ª·²¹»¼¹»ô ¬¸»² ³±®» ¼»³¿²¼·²¹ °´¿²¬­ô ­¸®«¾­ ¿²¼ ¬®»»­ ­°®»¿¼ ±«¬ ·²¬¸¿¬ ±®¼»®ò

Ѫ»®©¿¬»®·²¹ ¼«» ¬± ³·­«­» ±º ¿«¬±³¿¬·½ ©¿¬»®·²¹ ­§­¬»³­ ·­ ¿½±³³±² ½¿«­» ±º ­¿¬«®¿¬·±² ¿²¼ ©¿¬»® ³·¹®¿¬·±² «²¼»® º±±¬·²¹­ò ׺·¬ ·­ ²»½»­­¿®§ ¬± «­» ¬¸»­» ­§­¬»³­ô ·¬ ·­ ·³°±®¬¿²¬ ¬± ®»³±ª» ¹¿®¼»²¾»¼­ ¬± ¿ ½±³°´»¬»´§ ­¿º» ¼·­¬¿²½» º®±³ ¾«·´¼·²¹­ò

Û¨·­¬·²¹ ¬®»»­É¸»®» ¿ ¬®»» ·­ ½¿«­·²¹ ¿ °®±¾´»³ ±º ­±·´ ¼®§·²¹ ±® ¬¸»®» ·­ ¬¸»»¨·­¬»²½» ±® ¬¸®»¿¬ ±º «°¸»¿ª¿´ ±º º±±¬·²¹­ô ·º ¬¸» ±ºº»²¼·²¹ ®±±¬­ ¿®»­«¾­·¼·¿®§ ¿²¼ ¬¸»·® ®»³±ª¿´ ©·´´ ²±¬ ­·¹²·º·½¿²¬´§ ¼¿³¿¹» ¬¸» ¬®»»ô¬¸»§ ­¸±«´¼ ¾» ­»ª»®»¼ ¿²¼ ¿ ½±²½®»¬» ±® ³»¬¿´ ¾¿®®·»® °´¿½»¼ª»®¬·½¿´´§ ·² ¬¸» ­±·´ ¬± °®»ª»²¬ º«¬«®» ®±±¬ ¹®±©¬¸ ·² ¬¸» ¼·®»½¬·±² ±º¬¸» ¾«·´¼·²¹ò ׺ ·¬ ·­ ²±¬ °±­­·¾´» ¬± ®»³±ª» ¬¸» ®»´»ª¿²¬ ®±±¬­©·¬¸±«¬ ¼¿³¿¹» ¬± ¬¸» ¬®»»ô ¿² ¿°°´·½¿¬·±² ¬± ®»³±ª» ¬¸» ¬®»» ­¸±«´¼¾» ³¿¼» ¬± ¬¸» ´±½¿´ ¿«¬¸±®·¬§ò ß °®«¼»²¬ °´¿² ·­ ¬± ¬®¿²­°´¿²¬ ´·µ»´§±ºº»²¼»®­ ¾»º±®» ¬¸»§ ¾»½±³» ¿ °®±¾´»³ò

ײº±®³¿¬·±² ±² ¬®»»­ô °´¿²¬­ ¿²¼ ­¸®«¾­Í¬¿¬» ¼»°¿®¬³»²¬­ ±ª»®­»»·²¹ ¿¹®·½«´¬«®» ½¿² ¹·ª» ·²º±®³¿¬·±²®»¹¿®¼·²¹ ®±±¬ °¿¬¬»®²­ô ª±´«³» ±º ©¿¬»® ²»»¼»¼ ¿²¼ ­¿º» ¼·­¬¿²½»º®±³ ¾«·´¼·²¹­ ±º ³±­¬ ­°»½·»­ò Þ±¬¿²·½ ¹¿®¼»²­ ¿®» ¿´­± ­±«®½»­ ±º·²º±®³¿¬·±²ò Ú±® ·²º±®³¿¬·±² ±² °´¿²¬ ®±±¬­ ¿²¼ ¼®¿·²­ô ­»» Þ«·´¼·²¹Ì»½¸²±´±¹§ Ú·´» ïéò

Û¨½¿ª¿¬·±²Û¨½¿ª¿¬·±² ¿®±«²¼ º±±¬·²¹­ ³«­¬ ¾» °®±°»®´§ »²¹·²»»®»¼ò ͱ·´­«°°±®¬·²¹ º±±¬·²¹­ ½¿² ±²´§ ¾» ­¿º»´§ »¨½¿ª¿¬»¼ ¿¬ ¿² ¿²¹´» ¬¸¿¬¿´´±©­ ¬¸» ­±·´ «²¼»® ¬¸» º±±¬·²¹ ¬± ®»³¿·² ­¬¿¾´»ò ̸·­ ¿²¹´» ·­½¿´´»¼ ¬¸» ¿²¹´» ±º ®»°±­» ø±® º®·½¬·±²÷ ¿²¼ ª¿®·»­ ­·¹²·º·½¿²¬´§¾»¬©»»² ­±·´ ¬§°»­ ¿²¼ ½±²¼·¬·±²­ò λ³±ª¿´ ±º ­±·´ ©·¬¸·² ¬¸» ¿²¹´»±º ®»°±­» ©·´´ ½¿«­» ­«¾­·¼»²½»ò

λ³»¼·¿¬·±²

ɸ»®» »®±­·±² ¸¿­ ±½½«®®»¼ ¬¸¿¬ ¸¿­ ©¿­¸»¼ ¿©¿§ ­±·´ ¿¼¶¿½»²¬ ¬±º±±¬·²¹­ô ­±·´ ±º ¬¸» ­¿³» ½´¿­­·º·½¿¬·±² ­¸±«´¼ ¾» ·²¬®±¼«½»¼ ¿²¼½±³°¿½¬»¼ ¬± ¬¸» ­¿³» ¼»²­·¬§ò ɸ»®» º±±¬·²¹­ ¸¿ª» ¾»»²«²¼»®³·²»¼ô ¿«¹³»²¬¿¬·±² ±® ±¬¸»® ­°»½·¿´·­¬ ©±®µ ³¿§ ¾» ®»¯«·®»¼òλ³»¼·¿¬·±² ±º º±±¬·²¹­ ¿²¼ º±«²¼¿¬·±²­ ·­ ¹»²»®¿´´§ ¬¸» ®»¿´³ ±º ¿­°»½·¿´·­¬ ½±²­«´¬¿²¬ò

ɸ»®» ·­±´¿¬»¼ º±±¬·²¹­ ®·­» ¿²¼ º¿´´ ¾»½¿«­» ±º ­©»´´ñ­¸®·²µ »ºº»½¬ô¬¸» ¸±³»±©²»® ³¿§ ¾» ¬»³°¬»¼ ¬± ¿´´»ª·¿¬» º´±±® ¾±«²½» ¾§ º·´´·²¹¬¸» ¹¿° ¬¸¿¬ ¸¿­ ¿°°»¿®»¼ ¾»¬©»»² ¬¸» ¾»¿®»® ¿²¼ ¬¸» °·»® ©·¬¸¾´±½µ·²¹ò ̸» ¼¿²¹»® ¸»®» ·­ ¬¸¿¬ ©¸»² ¬¸» ²»¨¬ ­©»´´ ­»¹³»²¬ ±º ¬¸»½§½´» ±½½«®­ô ¬¸» »¨¬®¿ ¾´±½µ·²¹ ©·´´ °«­¸ ¬¸» º´±±® «° ·²¬± ¿²¿½½»²¬«¿¬»¼ ¼±³» ¿²¼ ³¿§ ¿´­± ½¿«­» ´±½¿´ ­¸»¿® º¿·´«®» ·² ¬¸» ­±·´ò׺ ·¬ ·­ ²»½»­­¿®§ ¬± «­» ¾´±½µ·²¹ô ·¬ ­¸±«´¼ ¾» ¾§ ¿ °¿·® ±º º·²»©»¼¹»­ ¿²¼ ³±²·¬±®·²¹ ­¸±«´¼ ¾» ½¿®®·»¼ ±«¬ º±®¬²·¹¸¬´§ò

̸·­ ÞÌÚ ©¿­ °®»°¿®»¼ ¾§ Ö±¸² Ô»©»® Úß×Þô Ó×ßÓßô ﮬ²»®ô

ݱ²­¬®«½¬·±² Ü·¿¹²±­·­ò

̸» ·²º±®³¿¬·±² ·² ¬¸·­ ¿²¼ ±¬¸»® ·­­«»­ ·² ¬¸» ­»®·»­ ©¿­ ¼»®·ª»¼ º®±³ ª¿®·±«­ ­±«®½»­ ¿²¼ ©¿­ ¾»´·»ª»¼ ¬± ¾» ½±®®»½¬ ©¸»² °«¾´·­¸»¼ò

̸» ·²º±®³¿¬·±² ·­ ¿¼ª·­±®§ò ׬ ·­ °®±ª·¼»¼ ·² ¹±±¼ º¿·¬¸ ¿²¼ ²±¬ ½´¿·³»¼ ¬± ¾» ¿² »¨¸¿«­¬·ª» ¬®»¿¬³»²¬ ±º ¬¸» ®»´»ª¿²¬ ­«¾¶»½¬ò

Ú«®¬¸»® °®±º»­­·±²¿´ ¿¼ª·½» ²»»¼­ ¬± ¾» ±¾¬¿·²»¼ ¾»º±®» ¬¿µ·²¹ ¿²§ ¿½¬·±² ¾¿­»¼ ±² ¬¸» ·²º±®³¿¬·±² °®±ª·¼»¼ò

Ü·­¬®·¾«¬»¼ ¾§

ÝÍ×ÎÑ ÐËÞÔ ×ÍØ ×ÒÙ ÐÑ Þ±¨ ïïíçô ݱ´´·²¹©±±¼ íðêêô ß«­¬®¿´·¿

Ú®»»½¿´´ ïèðð êìë ðëï Ì»´ øðí÷ çêêî éêêê Ú¿¨ øðí÷ çêêî éëëë ©©©ò°«¾´·­¸ò½­·®±ò¿«

Û³¿·´æ °«¾´·­¸·²¹ò­¿´»­à½­·®±ò¿«

w ÝÍ×ÎÑ îððíò ˲¿«¬¸±®·­»¼ ½±°§·²¹ ±º ¬¸·­ Þ«·´¼·²¹ Ì»½¸²±´±¹§ º·´» ·­ °®±¸·¾·¬»¼

Ù¿®¼»²­ º±® ¿ ®»¿½¬·ª» ­·¬»

Page 245: SITE CLASSIFICATION REPORT SUMMARY...Douglas Partners (DP) has prepared this report for this project at Taylor 2- Stage 3, Taylor in accordance with DP’s proposal dated 15 September

TOPSOIL FILLING-dry to moist, brown silty sand

FILLING-generally comprising well compacted, dry tomoist, orange brown, medium plasticity gravelly sandyclay with some silt

Pit discontinued at 1.7m-limit of investigation

0.17

1.7

SAMPLING & IN SITU TESTING LEGEND

TEST PIT LOG

Taylor 2 Estate, Stage 3, Taylor

A Auger sample G Gas sample PID Photo ionisation detector (ppm)B Bulk sample P Piston sample PL(A) Point load axial test Is(50) (MPa)BLK Block sample Ux Tube sample (x mm dia.) PL(D) Point load diametral test Is(50) (MPa)C Core drilling W Water sample pp Pocket penetrometer (kPa)D Disturbed sample Water seep S Standard penetration testE Environmental sample Water level V Shear vane (kPa)

Indesco Consulting Engineers Pty LtdSite Classifications

Results &Comments

LOGGED: JPM SURVEY DATUM: MGA94

CLIENT:PROJECT:LOCATION:

PIT No: 60PROJECT No: 77418.29DATE: 11/1/2019SHEET 1 OF 1

Sampling & In Situ Testing

1

2

Wat

er

Dep

th

Sam

ple

Description

of

Strata Gra

phic

Log

Typ

e

REMARKS: Surface Levels & Coordinates are approximate only and must not be relied upon

RIG: Kubota KX057-4 mini-excavator with 300mm wide bucket

WATER OBSERVATIONS: No free groundwater observed

SURFACE LEVEL: 667.0 AHDEASTING: 209057NORTHING: 618752

Dynamic Penetrometer Test(blows per mm)

5 10 15 20

Cone Penetrometer AS1289.6.3.2Sand Penetrometer AS1289.6.3.3

Depth(m) R

L

1

2

667

666

665

D

D

0.4

1.5

Page 246: SITE CLASSIFICATION REPORT SUMMARY...Douglas Partners (DP) has prepared this report for this project at Taylor 2- Stage 3, Taylor in accordance with DP’s proposal dated 15 September

TOPSOIL FILLING-dry to moist, brown silty sand

FILLING-generally comprising well compacted, dry tomoist, orange brown, medium plasticity gravelly sandyclay

SILTY SANDY CLAY-hard, dry to moist, yellow brown, lowto medium plasticity silty sandy clay

SILTY SAND-dense, dry to moist, yellow orange brown,fine to coarse grained silty sand

DACITE-low to medium strength, highly to moderatelyweathered, yellow brown, fine grained dacite, fractured

Pit discontinued at 1.2m-slow progress

0.1

0.2

0.9

1.05

1.2

SAMPLING & IN SITU TESTING LEGEND

TEST PIT LOG

Taylor 2 Estate, Stage 3, Taylor

A Auger sample G Gas sample PID Photo ionisation detector (ppm)B Bulk sample P Piston sample PL(A) Point load axial test Is(50) (MPa)BLK Block sample Ux Tube sample (x mm dia.) PL(D) Point load diametral test Is(50) (MPa)C Core drilling W Water sample pp Pocket penetrometer (kPa)D Disturbed sample Water seep S Standard penetration testE Environmental sample Water level V Shear vane (kPa)

Indesco Consulting Engineers Pty LtdSite Classifications

Results &Comments

LOGGED: JPM SURVEY DATUM: MGA94

CLIENT:PROJECT:LOCATION:

PIT No: 61PROJECT No: 77418.29DATE: 11/1/2019SHEET 1 OF 1

Sampling & In Situ Testing

1

2

Wat

er

Dep

th

Sam

ple

Description

of

Strata Gra

phic

Log

Typ

e

REMARKS: Surface Levels & Coordinates are approximate only and must not be relied upon

RIG: Kubota KX057-4 mini-excavator with 300mm wide bucket

WATER OBSERVATIONS: No free groundwater observed

SURFACE LEVEL: 662.0 AHDEASTING: 209083NORTHING: 618732

Dynamic Penetrometer Test(blows per mm)

5 10 15 20

Cone Penetrometer AS1289.6.3.2Sand Penetrometer AS1289.6.3.3

Depth(m) R

L

1

2

662

661

660

D

D

D

0.4

1.0

1.1

pp >400

Page 247: SITE CLASSIFICATION REPORT SUMMARY...Douglas Partners (DP) has prepared this report for this project at Taylor 2- Stage 3, Taylor in accordance with DP’s proposal dated 15 September
Page 248: SITE CLASSIFICATION REPORT SUMMARY...Douglas Partners (DP) has prepared this report for this project at Taylor 2- Stage 3, Taylor in accordance with DP’s proposal dated 15 September

SITE CLASSIFICATION REPORT SUMMARY

BLOCK: 14 SECTION: 64 SUBURB: Taylor

JOB No: 77418.29 DATE: March 2019

CLIENT: Indesco Consulting Engineers Pty Ltd

Classification Procedures: Existing Subsurface Conditions: Refer attached test pit log(s) – Pit(s) 59,60 and Drawing 1. Bulk Earthworks: Filling within the block placed under Level 1 control as defined in AS 3798 – 2007 (Ref 1). Laboratory Results: Previous laboratory testing results indicated liquid limit ranging from 25-66%, plasticity index ranging from 6-49% and linear shrinkage ranging from 3-20.5%.

Site Classification: Class M* (moderately reactive/filled) based on the current profile / state on limited subsurface information and determined in general accordance with the requirements of AS2870-2011 (Ref 2). The classification must be reassessed should the soil profile change either by adding fill or removing soil from the block and/or if the presence of service trenches or retaining walls are within the zone of influence of the block. Reference should be made to the comments provided below.

Footing Systems: Reference must be made to AS2870-2011 (Ref 2) which indicates footing systems that are appropriate for each site classification. All footings must found within a uniform bearing stratum of suitable strength/material, below the zone of influence of any service trenches, backfill zones, retaining walls or underground structures. Masonry walls should be articulated in accordance with current best practice. Dwelling design must ensure uniform moisture conditions are maintained in the vicinity of footings. Footing systems must be confirmed by a structural engineer taking into consideration any onsite or offsite constraints.

Maintenance Guidelines: Reference should be made to the attached CSIRO Sheet BTF 18 ‘Foundation Maintenance & Footing Performance’ to comments about gardens, landscaping and trees on the performance of foundation soils and in particular in respect to maintaining good surface drainage. It notes that minor cracking in most structures is inevitable, and it describes site maintenance practices aimed at minimising foundation movements that can lead to cracking damage.

Comments/ Limitations:

The successful purchaser must make their own interpretations, deductions and conclusions from the information made available and will need to accept full responsibility for such interpretations, deductions and conclusions.

Development specific geotechnical investigations must be undertaken.

Additional topsoils / filling may have been spread subsequent to the investigation.

Site preparation prior to the construction should include removal of all vegetation, topsoil and any uncontrolled filling.

All new filling must be placed under controlled conditions (AS 3798-2007), otherwise Class P conditions would be warranted.

Some variability in subsurface conditions must be anticipated.

Moisture condition of site soils and/or the presence of groundwater may vary considerably from time of investigation compared to at the time of construction.

Depending on the depth of site cut and trenches, rock excavation may be required.

It is recommended that footing excavations be inspected by a geotechnical engineer.

This report must be read in conjunction with the attached “Limitations” and notes “About this Report”.

References:

1. 2.

AS 3798-2007 ‘Guidelines on Earthworks for Commercial and Residential Developments’, Standards Association of Australia. AS 2870-2011 ‘Residential Slabs and Footings,’ Standards Association of Australia.

Attachments:

Limitations & About this Report Explanatory Notes Test Pit Log(s) Pit(s) 59,60 Drawing 1

Page 249: SITE CLASSIFICATION REPORT SUMMARY...Douglas Partners (DP) has prepared this report for this project at Taylor 2- Stage 3, Taylor in accordance with DP’s proposal dated 15 September

FS 604853

Douglas Partners Pty Ltd ABN 75 053 980 117

www.douglaspartners.com.au Unit 2, 73 Sheppard Street

Hume ACT 2620 PO Box 1487

Fyshwick ACT 2609 Phone (02) 6260 2788

Fax (02) 6260 1147

Brisbane • Cairns • Canberra • Central Coast • Coffs Harbour • Darwin • Geelong • Gold Coast • Macarthur • Melbourne Newcastle • North West Sydney • Perth • Port Macquarie • Sunshine Coast • Sydney • Townsville • Wollongong

Limitations Douglas Partners (DP) has prepared this report for this project at Taylor 2 - Stage 3, Taylor in accordance with DP’s proposal dated 15 September 2017 and acceptance received from Indesco Consulting Engineers Pty Ltd dated 13 March 2019. The work was carried out under DP’s Conditions of Engagement. This report is provided for the exclusive use of Indesco Consulting Engineers Pty Ltd for this project only and for the purposes as described in the report. It should not be used by or relied upon for other projects or purposes on the same or other site or by a third party. Any party so relying upon this report beyond its exclusive use and purpose as stated above, and without the express written consent of DP, does so entirely at its own risk and without recourse to DP for any loss or damage. In preparing this report DP has necessarily relied upon information provided by the client and/or their agents. The results provided in the report are indicative of the sub-surface conditions on the site only at the specific sampling and/or testing locations, and then only to the depths investigated and at the time the work was carried out. Sub-surface conditions can change abruptly due to variable geological processes and also as a result of human influences. Such changes may occur after DP’s field testing has been completed. DP’s advice is based upon the conditions encountered during this investigation. The accuracy of the advice provided by DP in this report may be affected by undetected variations in ground conditions across the site between and beyond the sampling and/or testing locations. The advice may also be limited by budget constraints imposed by others or by site accessibility. This report must be read in conjunction with all of the attached and should be kept in its entirety without separation of individual pages or sections. DP cannot be held responsible for interpretations or conclusions made by others unless they are supported by an expressed statement, interpretation, outcome or conclusion stated in this report. This report, or sections from this report, should not be used as part of a specification for a project, without review and agreement by DP. This is because this report has been written as advice and opinion rather than instructions for construction. The scope for work for this investigation/report did not include the assessment of surface or sub-surface materials or groundwater for contaminants, within or adjacent to the site. Should evidence of filling of unknown origin be noted in the report, and in particular the presence of building demolition materials, it should be recognised that there may be some risk that such filling may contain contaminants and hazardous building materials. The contents of this report do not constitute formal design components such as are required, by the Health and Safety Legislation and Regulations, to be included in a Safety Report specifying the hazards likely to be encountered during construction and the controls required to mitigate risk. This design process requires risk assessment to be undertaken, with such assessment being dependent upon factors relating to likelihood of occurrence and consequences of damage to property and to life. This, in turn, requires project data and analysis presently beyond the knowledge and project role respectively of DP. DP may be able, however, to assist the client in carrying out a risk assessment of potential hazards contained in the Comments section of this report, as an extension to the current scope of works, if so requested, and provided that suitable additional information is made available to DP. Any such risk assessment would, however, be necessarily restricted to the geotechnical components set out in this report and to their application by the project designers to project design, construction, maintenance and demolition.

Page 250: SITE CLASSIFICATION REPORT SUMMARY...Douglas Partners (DP) has prepared this report for this project at Taylor 2- Stage 3, Taylor in accordance with DP’s proposal dated 15 September

July 2010

Introduction These notes have been provided to amplify DP's report in regard to classification methods, field procedures and the comments section. Not all are necessarily relevant to all reports. DP's reports are based on information gained from limited subsurface excavations and sampling, supplemented by knowledge of local geology and experience. For this reason, they must be regarded as interpretive rather than factual documents, limited to some extent by the scope of information on which they rely. Copyright This report is the property of Douglas Partners Pty Ltd. The report may only be used for the purpose for which it was commissioned and in accordance with the Conditions of Engagement for the commission supplied at the time of proposal. Unauthorised use of this report in any form whatsoever is prohibited. Borehole and Test Pit Logs The borehole and test pit logs presented in this report are an engineering and/or geological interpretation of the subsurface conditions, and their reliability will depend to some extent on frequency of sampling and the method of drilling or excavation. Ideally, continuous undisturbed sampling or core drilling will provide the most reliable assessment, but this is not always practicable or possible to justify on economic grounds. In any case the boreholes and test pits represent only a very small sample of the total subsurface profile. Interpretation of the information and its application to design and construction should therefore take into account the spacing of boreholes or pits, the frequency of sampling, and the possibility of other than 'straight line' variations between the test locations. Groundwater Where groundwater levels are measured in boreholes there are several potential problems, namely: • In low permeability soils groundwater may

enter the hole very slowly or perhaps not at all during the time the hole is left open;

• A localised, perched water table may lead to an erroneous indication of the true water table;

• Water table levels will vary from time to time with seasons or recent weather changes. They may not be the same at the time of construction as are indicated in the report; and

• The use of water or mud as a drilling fluid will mask any groundwater inflow. Water has to be blown out of the hole and drilling mud must first be washed out of the hole if water measurements are to be made.

More reliable measurements can be made by installing standpipes which are read at intervals over several days, or perhaps weeks for low permeability soils. Piezometers, sealed in a particular stratum, may be advisable in low permeability soils or where there may be interference from a perched water table. Reports The report has been prepared by qualified personnel, is based on the information obtained from field and laboratory testing, and has been undertaken to current engineering standards of interpretation and analysis. Where the report has been prepared for a specific design proposal, the information and interpretation may not be relevant if the design proposal is changed. If this happens, DP will be pleased to review the report and the sufficiency of the investigation work. Every care is taken with the report as it relates to interpretation of subsurface conditions, discussion of geotechnical and environmental aspects, and recommendations or suggestions for design and construction. However, DP cannot always anticipate or assume responsibility for: • Unexpected variations in ground conditions.

The potential for this will depend partly on borehole or pit spacing and sampling frequency;

• Changes in policy or interpretations of policy by statutory authorities; or

• The actions of contractors responding to commercial pressures.

If these occur, DP will be pleased to assist with investigations or advice to resolve the matter.

Page 251: SITE CLASSIFICATION REPORT SUMMARY...Douglas Partners (DP) has prepared this report for this project at Taylor 2- Stage 3, Taylor in accordance with DP’s proposal dated 15 September

July 2010

Site Anomalies In the event that conditions encountered on site during construction appear to vary from those which were expected from the information contained in the report, DP requests that it be immediately notified. Most problems are much more readily resolved when conditions are exposed rather than at some later stage, well after the event. Information for Contractual Purposes Where information obtained from this report is provided for tendering purposes, it is recommended that all information, including the written report and discussion, be made available. In circumstances where the discussion or comments section is not relevant to the contractual situation, it may be appropriate to prepare a specially edited document. DP would be pleased to assist in this regard and/or to make additional report copies available for contract purposes at a nominal charge. Site Inspection The company will always be pleased to provide engineering inspection services for geotechnical and environmental aspects of work to which this report is related. This could range from a site visit to confirm that conditions exposed are as expected, to full time engineering presence on site.

Page 252: SITE CLASSIFICATION REPORT SUMMARY...Douglas Partners (DP) has prepared this report for this project at Taylor 2- Stage 3, Taylor in accordance with DP’s proposal dated 15 September

July 2010

Sampling Sampling is carried out during drilling or test pitting to allow engineering examination (and laboratory testing where required) of the soil or rock. Disturbed samples taken during drilling provide information on colour, type, inclusions and, depending upon the degree of disturbance, some information on strength and structure. Undisturbed samples are taken by pushing a thin-walled sample tube into the soil and withdrawing it to obtain a sample of the soil in a relatively undisturbed state. Such samples yield information on structure and strength, and are necessary for laboratory determination of shear strength and compressibility. Undisturbed sampling is generally effective only in cohesive soils. Test Pits Test pits are usually excavated with a backhoe or an excavator, allowing close examination of the in-situ soil if it is safe to enter into the pit. The depth of excavation is limited to about 3 m for a backhoe and up to 6 m for a large excavator. A potential disadvantage of this investigation method is the larger area of disturbance to the site. Large Diameter Augers Boreholes can be drilled using a rotating plate or short spiral auger, generally 300 mm or larger in diameter commonly mounted on a standard piling rig. The cuttings are returned to the surface at intervals (generally not more than 0.5 m) and are disturbed but usually unchanged in moisture content. Identification of soil strata is generally much more reliable than with continuous spiral flight augers, and is usually supplemented by occasional undisturbed tube samples. Continuous Spiral Flight Augers The borehole is advanced using 90-115 mm diameter continuous spiral flight augers which are withdrawn at intervals to allow sampling or in-situ testing. This is a relatively economical means of drilling in clays and sands above the water table. Samples are returned to the surface, or may be collected after withdrawal of the auger flights, but they are disturbed and may be mixed with soils from the sides of the hole. Information from the drilling (as distinct from specific sampling by SPTs or undisturbed samples) is of relatively low

reliability, due to the remoulding, possible mixing or softening of samples by groundwater. Non-core Rotary Drilling The borehole is advanced using a rotary bit, with water or drilling mud being pumped down the drill rods and returned up the annulus, carrying the drill cuttings. Only major changes in stratification can be determined from the cuttings, together with some information from the rate of penetration. Where drilling mud is used this can mask the cuttings and reliable identification is only possible from separate sampling such as SPTs. Continuous Core Drilling A continuous core sample can be obtained using a diamond tipped core barrel, usually with a 50 mm internal diameter. Provided full core recovery is achieved (which is not always possible in weak rocks and granular soils), this technique provides a very reliable method of investigation. Standard Penetration Tests Standard penetration tests (SPT) are used as a means of estimating the density or strength of soils and also of obtaining a relatively undisturbed sample. The test procedure is described in Australian Standard 1289, Methods of Testing Soils for Engineering Purposes - Test 6.3.1. The test is carried out in a borehole by driving a 50 mm diameter split sample tube under the impact of a 63 kg hammer with a free fall of 760 mm. It is normal for the tube to be driven in three successive 150 mm increments and the 'N' value is taken as the number of blows for the last 300 mm. In dense sands, very hard clays or weak rock, the full 450 mm penetration may not be practicable and the test is discontinued. The test results are reported in the following form. • In the case where full penetration is obtained

with successive blow counts for each 150 mm of, say, 4, 6 and 7 as:

4,6,7 N=13

• In the case where the test is discontinued before the full penetration depth, say after 15 blows for the first 150 mm and 30 blows for the next 40 mm as:

15, 30/40 mm

Page 253: SITE CLASSIFICATION REPORT SUMMARY...Douglas Partners (DP) has prepared this report for this project at Taylor 2- Stage 3, Taylor in accordance with DP’s proposal dated 15 September

July 2010

The results of the SPT tests can be related empirically to the engineering properties of the soils. Dynamic Cone Penetrometer Tests / Perth Sand Penetrometer Tests Dynamic penetrometer tests (DCP or PSP) are carried out by driving a steel rod into the ground using a standard weight of hammer falling a specified distance. As the rod penetrates the soil the number of blows required to penetrate each successive 150 mm depth are recorded. Normally there is a depth limitation of 1.2 m, but this may be extended in certain conditions by the use of extension rods. Two types of penetrometer are commonly used. • Perth sand penetrometer - a 16 mm diameter

flat ended rod is driven using a 9 kg hammer dropping 600 mm (AS 1289, Test 6.3.3). This test was developed for testing the density of sands and is mainly used in granular soils and filling.

• Cone penetrometer - a 16 mm diameter rod with a 20 mm diameter cone end is driven using a 9 kg hammer dropping 510 mm (AS 1289, Test 6.3.2). This test was developed initially for pavement subgrade investigations, and correlations of the test results with California Bearing Ratio have been published by various road authorities.

Page 254: SITE CLASSIFICATION REPORT SUMMARY...Douglas Partners (DP) has prepared this report for this project at Taylor 2- Stage 3, Taylor in accordance with DP’s proposal dated 15 September

May 2017

Description and Classification Methods The methods of description and classification of

soils and rocks used in this report are based on

Australian Standard AS 1726-1993, Geotechnical

Site Investigations Code. In general, the

descriptions include strength or density, colour,

structure, soil or rock type and inclusions.

Soil Types Soil types are described according to the

predominant particle size, qualified by the grading

of other particles present:

Type Particle size (mm)

Boulder >200

Cobble 63 - 200

Gravel 2.36 - 63

Sand 0.075 - 2.36

Silt 0.002 - 0.075

Clay <0.002

The sand and gravel sizes can be further

subdivided as follows:

Type Particle size (mm)

Coarse gravel 20 - 63

Medium gravel 6 - 20

Fine gravel 2.36 - 6

Coarse sand 0.6 - 2.36

Medium sand 0.2 - 0.6

Fine sand 0.075 - 0.2

The proportions of secondary constituents of soils

are described as:

Term Proportion Example

And Specify Clay (60%) and

Sand (40%)

Adjective 20 - 35% Sandy Clay

Slightly 12 - 20% Slightly Sandy

Clay

With some 5 - 12% Clay with some

sand

With a trace of 0 - 5% Clay with a trace

of sand

Definitions of grading terms used are:

• Well graded - a good representation of all

particle sizes

• Poorly graded - an excess or deficiency of

particular sizes within the specified range

• Uniformly graded - an excess of a particular

particle size

• Gap graded - a deficiency of a particular

particle size with the range

Cohesive Soils Cohesive soils, such as clays, are classified on the

basis of undrained shear strength. The strength

may be measured by laboratory testing, or

estimated by field tests or engineering

examination. The strength terms are defined as

follows:

Description Abbreviation Undrained shear strength

(kPa)

Very soft vs <12

Soft s 12 - 25

Firm f 25 - 50

Stiff st 50 - 100

Very stiff vst 100 - 200

Hard h >200

Cohesionless Soils Cohesionless soils, such as clean sands, are

classified on the basis of relative density, generally

from the results of standard penetration tests

(SPT), cone penetration tests (CPT) or dynamic

penetrometers (PSP). The relative density terms

are given below:

Relative Density

Abbreviation SPT N value

CPT qc value (MPa)

Very loose vl <4 <2

Loose l 4 - 10 2 -5

Medium

dense

md 10 - 30 5 - 15

Dense d 30 - 50 15 - 25

Very

dense

vd >50 >25

Page 255: SITE CLASSIFICATION REPORT SUMMARY...Douglas Partners (DP) has prepared this report for this project at Taylor 2- Stage 3, Taylor in accordance with DP’s proposal dated 15 September

May 2017

Soil Origin It is often difficult to accurately determine the origin

of a soil. Soils can generally be classified as:

• Residual soil - derived from in-situ weathering

of the underlying rock;

• Transported soils - formed somewhere else

and transported by nature to the site; or

• Filling - moved by man.

Transported soils may be further subdivided into:

• Alluvium - river deposits

• Lacustrine - lake deposits

• Aeolian - wind deposits

• Littoral - beach deposits

• Estuarine - tidal river deposits

• Talus - scree or coarse colluvium

• Slopewash or Colluvium - transported

downslope by gravity assisted by water.

Often includes angular rock fragments and

boulders.

Page 256: SITE CLASSIFICATION REPORT SUMMARY...Douglas Partners (DP) has prepared this report for this project at Taylor 2- Stage 3, Taylor in accordance with DP’s proposal dated 15 September

May 2017

Rock Strength Rock strength is defined by the Point Load Strength Index (Is(50)) and refers to the strength of the rock

substance and not the strength of the overall rock mass, which may be considerably weaker due to defects.

The test procedure is described by Australian Standard 4133.4.1 - 2007. The terms used to describe rock

strength are as follows:

Term Abbreviation Point Load Index

Is(50) MPa

Approximate Unconfined Compressive Strength MPa*

Extremely low EL <0.03 <0.6

Very low VL 0.03 - 0.1 0.6 - 2

Low L 0.1 - 0.3 2 - 6

Medium M 0.3 - 1.0 6 - 20

High H 1 - 3 20 - 60

Very high VH 3 - 10 60 - 200

Extremely high EH >10 >200

* Assumes a ratio of 20:1 for UCS to Is(50). It should be noted that the UCS to Is(50) ratio varies significantly

for different rock types and specific ratios should be determined for each site.

Degree of Weathering The degree of weathering of rock is classified as follows:

Term Abbreviation Description

Extremely weathered EW Rock substance has soil properties, i.e. it can be remoulded and classified as a soil but the texture of the original rock is still evident.

Highly weathered HW Limonite staining or bleaching affects whole of rock substance and other signs of decomposition are evident. Porosity and strength may be altered as a result of iron leaching or deposition. Colour and strength of original fresh rock is not recognisable

Moderately weathered

MW Staining and discolouration of rock substance has taken place

Slightly weathered SW Rock substance is slightly discoloured but shows little or no change of strength from fresh rock

Fresh stained Fs Rock substance unaffected by weathering but staining visible along defects

Fresh Fr No signs of decomposition or staining

Degree of Fracturing The following classification applies to the spacing of natural fractures in diamond drill cores. It includes

bedding plane partings, joints and other defects, but excludes drilling breaks.

Term Description

Fragmented Fragments of <20 mm

Highly Fractured Core lengths of 20-40 mm with some fragments

Fractured Core lengths of 40-200 mm with some shorter and longer sections

Slightly Fractured Core lengths of 200-1000 mm with some shorter and longer sections

Unbroken Core lengths mostly > 1000 mm

Page 257: SITE CLASSIFICATION REPORT SUMMARY...Douglas Partners (DP) has prepared this report for this project at Taylor 2- Stage 3, Taylor in accordance with DP’s proposal dated 15 September

May 2017

Rock Quality Designation The quality of the cored rock can be measured using the Rock Quality Designation (RQD) index, defined

as:

RQD % = cumulative length of 'sound' core sections ≥ 100 mm long

total drilled length of section being assessed

where 'sound' rock is assessed to be rock of low strength or better. The RQD applies only to natural

fractures. If the core is broken by drilling or handling (i.e. drilling breaks) then the broken pieces are fitted

back together and are not included in the calculation of RQD.

Stratification Spacing For sedimentary rocks the following terms may be used to describe the spacing of bedding partings:

Term Separation of Stratification Planes

Thinly laminated < 6 mm

Laminated 6 mm to 20 mm

Very thinly bedded 20 mm to 60 mm

Thinly bedded 60 mm to 0.2 m

Medium bedded 0.2 m to 0.6 m

Thickly bedded 0.6 m to 2 m

Very thickly bedded > 2 m

Page 258: SITE CLASSIFICATION REPORT SUMMARY...Douglas Partners (DP) has prepared this report for this project at Taylor 2- Stage 3, Taylor in accordance with DP’s proposal dated 15 September

May 2017

Introduction These notes summarise abbreviations commonly

used on borehole logs and test pit reports.

Drilling or Excavation Methods C Core drilling

R Rotary drilling

SFA Spiral flight augers

NMLC Diamond core - 52 mm dia

NQ Diamond core - 47 mm dia

HQ Diamond core - 63 mm dia

PQ Diamond core - 81 mm dia

Water � Water seep

� Water level

Sampling and Testing A Auger sample

B Bulk sample

D Disturbed sample

E Environmental sample

U50 Undisturbed tube sample (50mm)

W Water sample

pp Pocket penetrometer (kPa)

PID Photo ionisation detector

PL Point load strength Is(50) MPa

S Standard Penetration Test

V Shear vane (kPa)

Description of Defects in Rock The abbreviated descriptions of the defects should

be in the following order: Depth, Type, Orientation,

Coating, Shape, Roughness and Other. Drilling

and handling breaks are not usually included on

the logs.

Defect Type

B Bedding plane

Cs Clay seam

Cv Cleavage

Cz Crushed zone

Ds Decomposed seam

F Fault

J Joint

Lam Lamination

Pt Parting

Sz Sheared Zone

V Vein

Orientation

The inclination of defects is always measured from

the perpendicular to the core axis.

h horizontal

v vertical

sh sub-horizontal

sv sub-vertical

Coating or Infilling Term

cln clean

co coating

he healed

inf infilled

stn stained

ti tight

vn veneer

Coating Descriptor

ca calcite

cbs carbonaceous

cly clay

fe iron oxide

mn manganese

slt silty

Shape

cu curved

ir irregular

pl planar

st stepped

un undulating

Roughness

po polished

ro rough

sl slickensided

sm smooth

vr very rough

Other

fg fragmented

bnd band

qtz quartz

Page 259: SITE CLASSIFICATION REPORT SUMMARY...Douglas Partners (DP) has prepared this report for this project at Taylor 2- Stage 3, Taylor in accordance with DP’s proposal dated 15 September

May 2017

Graphic Symbols for Soil and Rock General

Soils

Sedimentary Rocks

Metamorphic Rocks

Igneous Rocks

Road base

Filling

Concrete

Asphalt

Topsoil

Peat

Clay

Conglomeratic sandstone

Conglomerate

Boulder conglomerate

Sandstone

Slate, phyllite, schist

Siltstone

Mudstone, claystone, shale

Coal

Limestone

Porphyry

Cobbles, boulders

Sandy gravel

Laminite

Silty sand

Clayey sand

Silty clay

Sandy clay

Gravelly clay

Shaly clay

Silt

Clayey silt

Sandy silt

Sand

Gravel

Talus

Gneiss

Quartzite

Dolerite, basalt, andesite

Granite

Tuff, breccia

Dacite, epidote

Page 260: SITE CLASSIFICATION REPORT SUMMARY...Douglas Partners (DP) has prepared this report for this project at Taylor 2- Stage 3, Taylor in accordance with DP’s proposal dated 15 September

ͱ·´ ̧°»­

̸» ¬§°»­ ±º ­±·´­ «­«¿´´§ °®»­»²¬ «²¼»® ¬¸» ¬±°­±·´ ·² ´¿²¼ ¦±²»¼ º±®®»­·¼»²¬·¿´ ¾«·´¼·²¹­ ½¿² ¾» ­°´·¬ ·²¬± ¬©± ¿°°®±¨·³¿¬» ¹®±«°­ P¹®¿²«´¿® ¿²¼ ½´¿§ò Ï«·¬» ±º¬»²ô º±«²¼¿¬·±² ­±·´ ·­ ¿ ³·¨¬«®» ±º ¾±¬¸¬§°»­ò ̸» ¹»²»®¿´ °®±¾´»³­ ¿­­±½·¿¬»¼ ©·¬¸ ­±·´­ ¸¿ª·²¹ ¹®¿²«´¿®½±²¬»²¬ ¿®» «­«¿´´§ ½¿«­»¼ ¾§ »®±­·±²ò Ý´¿§ ­±·´­ ¿®» ­«¾¶»½¬ ¬±­¿¬«®¿¬·±² ¿²¼ ­©»´´ñ­¸®·²µ °®±¾´»³­ò

Ý´¿­­·º·½¿¬·±²­ º±® ¿ ¹·ª»² ¿®»¿ ½¿² ¹»²»®¿´´§ ¾» ±¾¬¿·²»¼ ¾§¿°°´·½¿¬·±² ¬± ¬¸» ´±½¿´ ¿«¬¸±®·¬§ô ¾«¬ ¬¸»­» ¿®» ­±³»¬·³»­ «²®»´·¿¾´»¿²¼ ·º ¬¸»®» ·­ ¼±«¾¬ô ¿ ¹»±¬»½¸²·½¿´ ®»°±®¬ ­¸±«´¼ ¾» ½±³³·­­·±²»¼òß­ ³±­¬ ¾«·´¼·²¹­ ­«ºº»®·²¹ ³±ª»³»²¬ °®±¾´»³­ ¿®» º±«²¼»¼ ±² ½´¿§­±·´­ô ¬¸»®» ·­ ¿² »³°¸¿­·­ ±² ½´¿­­·º·½¿¬·±² ±º ­±·´­ ¿½½±®¼·²¹ ¬± ¬¸»¿³±«²¬ ±º ­©»´´ ¿²¼ ­¸®·²µ¿¹» ¬¸»§ »¨°»®·»²½» ©·¬¸ ª¿®·¿¬·±²­ ±º©¿¬»® ½±²¬»²¬ò ̸» ¬¿¾´» ¾»´±© ·­ Ì¿¾´» îòï º®±³ ßÍ îèéðô ¬¸»Î»­·¼»²¬·¿´ Í´¿¾ ¿²¼ Ú±±¬·²¹ ݱ¼»ò

Ý¿«­»­ ±º Ó±ª»³»²¬

Í»¬¬´»³»²¬ ¼«» ¬± ½±²­¬®«½¬·±²Ì¸»®» ¿®» ¬©± ¬§°»­ ±º ­»¬¬´»³»²¬ ¬¸¿¬ ±½½«® ¿­ ¿ ®»­«´¬ ±º½±²­¬®«½¬·±²æ{ ׳³»¼·¿¬» ­»¬¬´»³»²¬ ±½½«®­ ©¸»² ¿ ¾«·´¼·²¹ ·­ º·®­¬ °´¿½»¼ ±² ·¬­

º±«²¼¿¬·±² ­±·´ô ¿­ ¿ ®»­«´¬ ±º ½±³°¿½¬·±² ±º ¬¸» ­±·´ «²¼»® ¬¸»©»·¹¸¬ ±º ¬¸» ­¬®«½¬«®»ò ̸» ½±¸»­·ª» ¯«¿´·¬§ ±º ½´¿§ ­±·´ ³·¬·¹¿¬»­¿¹¿·²­¬ ¬¸·­ô ¾«¬ ¹®¿²«´¿® ø°¿®¬·½«´¿®´§ ­¿²¼§÷ ­±·´ ·­ ­«­½»°¬·¾´»ò

{ ݱ²­±´·¼¿¬·±² ­»¬¬´»³»²¬ ·­ ¿ º»¿¬«®» ±º ½´¿§ ­±·´ ¿²¼ ³¿§ ¬¿µ»°´¿½» ¾»½¿«­» ±º ¬¸» »¨°«´­·±² ±º ³±·­¬«®» º®±³ ¬¸» ­±·´ ±® ¾»½¿«­»±º ¬¸» ­±·´K­ ´¿½µ ±º ®»­·­¬¿²½» ¬± ´±½¿´ ½±³°®»­­·ª» ±® ­¸»¿® ­¬®»­­»­ò̸·­ ©·´´ «­«¿´´§ ¬¿µ» °´¿½» ¼«®·²¹ ¬¸» º·®­¬ º»© ³±²¬¸­ ¿º¬»®½±²­¬®«½¬·±²ô ¾«¬ ¸¿­ ¾»»² µ²±©² ¬± ¬¿µ» ³¿²§ §»¿®­ ·²»¨½»°¬·±²¿´ ½¿­»­ò

̸»­» °®±¾´»³­ ¿®» ¬¸» °®±ª·²½» ±º ¬¸» ¾«·´¼»® ¿²¼ ­¸±«´¼ ¾» ¬¿µ»²·²¬± ½±²­·¼»®¿¬·±² ¿­ °¿®¬ ±º ¬¸» °®»°¿®¿¬·±² ±º ¬¸» ­·¬» º±® ½±²­¬®«½ó¬·±²ò Þ«·´¼·²¹ Ì»½¸²±´±¹§ Ú·´» ïç øÞÌÚ ïç÷ ¼»¿´­ ©·¬¸ ¬¸»­»°®±¾´»³­ò

Û®±­·±²ß´´ ­±·´­ ¿®» °®±²» ¬± »®±­·±²ô ¾«¬ ­¿²¼§ ­±·´ ·­ °¿®¬·½«´¿®´§ ­«­½»°¬·¾´»¬± ¾»·²¹ ©¿­¸»¼ ¿©¿§ò Ûª»² ½´¿§ ©·¬¸ ¿ ­¿²¼ ½±³°±²»²¬ ±º ­¿§ ïðû±® ³±®» ½¿² ­«ºº»® º®±³ »®±­·±²ò

Í¿¬«®¿¬·±²Ì¸·­ ·­ °¿®¬·½«´¿®´§ ¿ °®±¾´»³ ·² ½´¿§ ­±·´­ò Í¿¬«®¿¬·±² ½®»¿¬»­ ¿ ¾±¹ó´·µ» ­«­°»²­·±² ±º ¬¸» ­±·´ ¬¸¿¬ ½¿«­»­ ·¬ ¬± ´±­» ª·®¬«¿´´§ ¿´´ ±º ·¬­¾»¿®·²¹ ½¿°¿½·¬§ò ̱ ¿ ´»­­»® ¼»¹®»»ô ­¿²¼ ·­ ¿ºº»½¬»¼ ¾§ ­¿¬«®¿¬·±²¾»½¿«­» ­¿¬«®¿¬»¼ ­¿²¼ ³¿§ «²¼»®¹± ¿ ®»¼«½¬·±² ·² ª±´«³» P°¿®¬·½«´¿®´§ ·³°±®¬»¼ ­¿²¼ º·´´ º±® ¾»¼¼·²¹ ¿²¼ ¾´·²¼·²¹ ´¿§»®­òر©»ª»®ô ¬¸·­ «­«¿´´§ ±½½«®­ ¿­ ·³³»¼·¿¬» ­»¬¬´»³»²¬ ¿²¼ ­¸±«´¼²±®³¿´´§ ¾» ¬¸» °®±ª·²½» ±º ¬¸» ¾«·´¼»®ò

Í»¿­±²¿´ ­©»´´·²¹ ¿²¼ ­¸®·²µ¿¹» ±º ­±·´ß´´ ½´¿§­ ®»¿½¬ ¬± ¬¸» °®»­»²½» ±º ©¿¬»® ¾§ ­´±©´§ ¿¾­±®¾·²¹ ·¬ô ³¿µ·²¹¬¸» ­±·´ ·²½®»¿­» ·² ª±´«³» ø­»» ¬¿¾´» ¾»´±©÷ò ̸» ¼»¹®»» ±º ·²½®»¿­»ª¿®·»­ ½±²­·¼»®¿¾´§ ¾»¬©»»² ¼·ºº»®»²¬ ½´¿§­ô ¿­ ¼±»­ ¬¸» ¼»¹®»» ±º¼»½®»¿­» ¼«®·²¹ ¬¸» ­«¾­»¯«»²¬ ¼®§·²¹ ±«¬ ½¿«­»¼ ¾§ º¿·® ©»¿¬¸»®°»®·±¼­ò Þ»½¿«­» ±º ¬¸» ´±© ¿¾­±®°¬·±² ¿²¼ »¨°«´­·±² ®¿¬»ô ¬¸·­°¸»²±³»²±² ©·´´ ²±¬ «­«¿´´§ ¾» ²±¬·½»¿¾´» «²´»­­ ¬¸»®» ¿®»°®±´±²¹»¼ ®¿·²§ ±® ¼®§ °»®·±¼­ô «­«¿´´§ ±º ©»»µ­ ±® ³±²¬¸­ô¼»°»²¼·²¹ ±² ¬¸» ´¿²¼ ¿²¼ ­±·´ ½¸¿®¿½¬»®·­¬·½­ò

̸» ­©»´´·²¹ ±º ­±·´ ½®»¿¬»­ ¿² «°©¿®¼ º±®½» ±² ¬¸» º±±¬·²¹­ ±º ¬¸»¾«·´¼·²¹ô ¿²¼ ­¸®·²µ¿¹» ½®»¿¬»­ ­«¾­·¼»²½» ¬¸¿¬ ¬¿µ»­ ¿©¿§ ¬¸»­«°°±®¬ ²»»¼»¼ ¾§ ¬¸» º±±¬·²¹ ¬± ®»¬¿·² »¯«·´·¾®·«³ò

͸»¿® º¿·´«®»Ì¸·­ °¸»²±³»²±² ±½½«®­ ©¸»² ¬¸» º±«²¼¿¬·±² ­±·´ ¼±»­ ²±¬ ¸¿ª»­«ºº·½·»²¬ ­¬®»²¹¬¸ ¬± ­«°°±®¬ ¬¸» ©»·¹¸¬ ±º ¬¸» º±±¬·²¹ò ̸»®» ¿®»¬©± ³¿¶±® °±­¬ó½±²­¬®«½¬·±² ½¿«­»­æ

{ Í·¹²·º·½¿²¬ ´±¿¼ ·²½®»¿­»ò{ λ¼«½¬·±² ±º ´¿¬»®¿´ ­«°°±®¬ ±º ¬¸» ­±·´ «²¼»® ¬¸» º±±¬·²¹ ¼«» ¬±

»®±­·±² ±® »¨½¿ª¿¬·±²ò{ ײ ½´¿§ ­±·´ô ­¸»¿® º¿·´«®» ½¿² ¾» ½¿«­»¼ ¾§ ­¿¬«®¿¬·±² ±º ¬¸» ­±·´

¿¼¶¿½»²¬ ¬± ±® «²¼»® ¬¸» º±±¬·²¹ò

Þ«·´¼·²¹­ ½¿² ¿²¼ ±º¬»² ¼± ³±ª»ò ̸·­ ³±ª»³»²¬ ½¿² ¾» «°ô ¼±©²ô ´¿¬»®¿´ ±® ®±¬¿¬·±²¿´ò ̸» º«²¼¿³»²¬¿´ ½¿«­»±º ³±ª»³»²¬ ·² ¾«·´¼·²¹­ ½¿² «­«¿´´§ ¾» ®»´¿¬»¼ ¬± ±²» ±® ³±®» °®±¾´»³­ ·² ¬¸» º±«²¼¿¬·±² ­±·´ò ׬ ·­ ·³°±®¬¿²¬ º±®¬¸» ¸±³»±©²»® ¬± ·¼»²¬·º§ ¬¸» ­±·´ ¬§°» ·² ±®¼»® ¬± ¿­½»®¬¿·² ¬¸» ³»¿­«®»­ ¬¸¿¬ ­¸±«´¼ ¾» °«¬ ·² °´¿½» ·² ±®¼»® ¬±»²­«®» ¬¸¿¬ °®±¾´»³­ ·² ¬¸» º±«²¼¿¬·±² ­±·´ ½¿² ¾» °®»ª»²¬»¼ô ¬¸«­ °®±¬»½¬·²¹ ¿¹¿·²­¬ ¾«·´¼·²¹ ³±ª»³»²¬ò

̸·­ Þ«·´¼·²¹ Ì»½¸²±´±¹§ Ú·´» ·­ ¼»­·¹²»¼ ¬± ·¼»²¬·º§ ½¿«­»­ ±º ­±·´ó®»´¿¬»¼ ¾«·´¼·²¹ ³±ª»³»²¬ô ¿²¼ ¬± ­«¹¹»­¬³»¬¸±¼­ ±º °®»ª»²¬·±² ±º ®»­«´¬¿²¬ ½®¿½µ·²¹ ·² ¾«·´¼·²¹­ò

Ú±«²¼¿¬·±² Ó¿·²¬»²¿²½»¿²¼ Ú±±¬·²¹ л®º±®³¿²½»æß Ø±³»±©²»®K­ Ù«·¼»

ÙÛÒÛÎßÔ ÜÛÚ×Ò×Ì×ÑÒÍ ÑÚ Í×ÌÛ ÝÔßÍÍÛÍ

Ý´¿­­ Ú±«²¼¿¬·±²

ß Ó±­¬ ­¿²¼ ¿²¼ ®±½µ ­·¬»­ ©·¬¸ ´·¬¬´» ±® ²± ¹®±«²¼ ³±ª»³»²¬ º®±³ ³±·­¬«®» ½¸¿²¹»­

Í Í´·¹¸¬´§ ®»¿½¬·ª» ½´¿§ ­·¬»­ ©·¬¸ ±²´§ ­´·¹¸¬ ¹®±«²¼ ³±ª»³»²¬ º®±³ ³±·­¬«®» ½¸¿²¹»­

Ó Ó±¼»®¿¬»´§ ®»¿½¬·ª» ½´¿§ ±® ­·´¬ ­·¬»­ô ©¸·½¸ ½¿² »¨°»®·»²½» ³±¼»®¿¬» ¹®±«²¼ ³±ª»³»²¬ º®±³ ³±·­¬«®» ½¸¿²¹»­

Ø Ø·¹¸´§ ®»¿½¬·ª» ½´¿§ ­·¬»­ô ©¸·½¸ ½¿² »¨°»®·»²½» ¸·¹¸ ¹®±«²¼ ³±ª»³»²¬ º®±³ ³±·­¬«®» ½¸¿²¹»­

Û Û¨¬®»³»´§ ®»¿½¬·ª» ­·¬»­ô ©¸·½¸ ½¿² »¨°»®·»²½» »¨¬®»³» ¹®±«²¼ ³±ª»³»²¬ º®±³ ³±·­¬«®» ½¸¿²¹»­

ß ¬± Ð Ú·´´»¼ ­·¬»­

Ð Í·¬»­ ©¸·½¸ ·²½´«¼» ­±º¬ ­±·´­ô ­«½¸ ¿­ ­±º¬ ½´¿§ ±® ­·´¬ ±® ´±±­» ­¿²¼­å ´¿²¼­´·°å ³·²» ­«¾­·¼»²½»å ½±´´¿°­·²¹ ­±·´­å ­±·´­ ­«¾¶»½¬¬± »®±­·±²å ®»¿½¬·ª» ­·¬»­ ­«¾¶»½¬ ¬± ¿¾²±®³¿´ ³±·­¬«®» ½±²¼·¬·±²­ ±® ­·¬»­ ©¸·½¸ ½¿²²±¬ ¾» ½´¿­­·º·»¼ ±¬¸»®©·­»

ÞÌÚ ïè®»°´¿½»­

ײº±®³¿¬·±²Í¸»»¬ ïðñçï

Page 261: SITE CLASSIFICATION REPORT SUMMARY...Douglas Partners (DP) has prepared this report for this project at Taylor 2- Stage 3, Taylor in accordance with DP’s proposal dated 15 September

Ì®»» ®±±¬ ¹®±©¬¸Ì®»»­ ¿²¼ ­¸®«¾­ ¬¸¿¬ ¿®» ¿´´±©»¼ ¬± ¹®±© ·² ¬¸» ª·½·²·¬§ ±º º±±¬·²¹­½¿² ½¿«­» º±«²¼¿¬·±² ­±·´ ³±ª»³»²¬ ·² ¬©± ©¿§­æ

{ ᱬ­ ¬¸¿¬ ¹®±© «²¼»® º±±¬·²¹­ ³¿§ ·²½®»¿­» ·² ½®±­­ó­»½¬·±²¿´­·¦»ô »¨»®¬·²¹ «°©¿®¼ °®»­­«®» ±² º±±¬·²¹­ò

{ ᱬ­ ·² ¬¸» ª·½·²·¬§ ±º º±±¬·²¹­ ©·´´ ¿¾­±®¾ ³«½¸ ±º ¬¸» ³±·­¬«®»·² ¬¸» º±«²¼¿¬·±² ­±·´ô ½¿«­·²¹ ­¸®·²µ¿¹» ±® ­«¾­·¼»²½»ò

˲»ª»²²»­­ ±º Ó±ª»³»²¬

̸» ¬§°»­ ±º ¹®±«²¼ ³±ª»³»²¬ ¼»­½®·¾»¼ ¿¾±ª» «­«¿´´§ ±½½«®«²»ª»²´§ ¬¸®±«¹¸±«¬ ¬¸» ¾«·´¼·²¹K­ º±«²¼¿¬·±² ­±·´ò Í»¬¬´»³»²¬ ¼«»¬± ½±²­¬®«½¬·±² ¬»²¼­ ¬± ¾» «²»ª»² ¾»½¿«­» ±ºæ

{ Ü·ºº»®·²¹ ½±³°¿½¬·±² ±º º±«²¼¿¬·±² ­±·´ °®·±® ¬± ½±²­¬®«½¬·±²ò

{ Ü·ºº»®·²¹ ³±·­¬«®» ½±²¬»²¬ ±º º±«²¼¿¬·±² ­±·´ °®·±® ¬± ½±²­¬®«½¬·±²ò

Ó±ª»³»²¬ ¼«» ¬± ²±²ó½±²­¬®«½¬·±² ½¿«­»­ ·­ «­«¿´´§ ³±®» «²»ª»²­¬·´´ò Û®±­·±² ½¿² «²¼»®³·²» ¿ º±±¬·²¹ ¬¸¿¬ ¬®¿ª»®­»­ ¬¸» º´±© ±® ½¿²½®»¿¬» ¬¸» ½±²¼·¬·±²­ º±® ­¸»¿® º¿·´«®» ¾§ »®±¼·²¹ ­±·´ ¿¼¶¿½»²¬ ¬± ¿º±±¬·²¹ ¬¸¿¬ ®«²­ ·² ¬¸» ­¿³» ¼·®»½¬·±² ¿­ ¬¸» º´±©ò

Í¿¬«®¿¬·±² ±º ½´¿§ º±«²¼¿¬·±² ­±·´ ³¿§ ±½½«® ©¸»®» ­«¾º´±±® ©¿´´­½®»¿¬» ¿ ¼¿³ ¬¸¿¬ ³¿µ»­ ©¿¬»® °±²¼ò ׬ ½¿² ¿´­± ±½½«® ©¸»®»ª»® ¬¸»®»·­ ¿ ­±«®½» ±º ©¿¬»® ²»¿® º±±¬·²¹­ ·² ½´¿§ ­±·´ò ̸·­ ´»¿¼­ ¬± ¿ ­»ª»®»®»¼«½¬·±² ·² ¬¸» ­¬®»²¹¬¸ ±º ¬¸» ­±·´ ©¸·½¸ ³¿§ ½®»¿¬» ´±½¿´ ­¸»¿®º¿·´«®»ò

Í»¿­±²¿´ ­©»´´·²¹ ¿²¼ ­¸®·²µ¿¹» ±º ½´¿§ ­±·´ ¿ºº»½¬­ ¬¸» °»®·³»¬»® ±º¬¸» ¾«·´¼·²¹ º·®­¬ô ¬¸»² ¹®¿¼«¿´´§ ­°®»¿¼­ ¬± ¬¸» ·²¬»®·±®ò ̸» ­©»´´·²¹°®±½»­­ ©·´´ «­«¿´´§ ¾»¹·² ¿¬ ¬¸» «°¸·´´ »¨¬®»³» ±º ¬¸» ¾«·´¼·²¹ô ±® ±²¬¸» ©»¿¬¸»® ­·¼» ©¸»®» ¬¸» ´¿²¼ ·­ º´¿¬ò Í©»´´·²¹ ¹®¿¼«¿´´§ ®»¿½¸»­ ¬¸»·²¬»®·±® ­±·´ ¿­ ¿¾­±®°¬·±² ½±²¬·²«»­ò ͸®·²µ¿¹» «­«¿´´§ ¾»¹·²­ ©¸»®»¬¸» ­«²K­ ¸»¿¬ ·­ ¹®»¿¬»­¬ò

Ûºº»½¬­ ±º ˲»ª»² ͱ·´ Ó±ª»³»²¬ ±² ͬ®«½¬«®»­

Û®±­·±² ¿²¼ ­¿¬«®¿¬·±²Û®±­·±² ®»³±ª»­ ¬¸» ­«°°±®¬ º®±³ «²¼»® º±±¬·²¹­ô ¬»²¼·²¹ ¬± ½®»¿¬»­«¾­·¼»²½» ±º ¬¸» °¿®¬ ±º ¬¸» ­¬®«½¬«®» «²¼»® ©¸·½¸ ·¬ ±½½«®­òÞ®·½µ©±®µ ©¿´´­ ©·´´ ®»­·­¬ ¬¸» ­¬®»­­ ½®»¿¬»¼ ¾§ ¬¸·­ ®»³±ª¿´ ±º­«°°±®¬ ¾§ ¾®·¼¹·²¹ ¬¸» ¹¿° ±® ½¿²¬·´»ª»®·²¹ «²¬·´ ¬¸» ¾®·½µ­ ±® ¬¸»³±®¬¿® ¾»¼¼·²¹ º¿·´ò Ñ´¼»® ³¿­±²®§ ¸¿­ ´·¬¬´» ®»­·­¬¿²½»ò Ûª·¼»²½» ±ºº¿·´«®» ª¿®·»­ ¿½½±®¼·²¹ ¬± ½·®½«³­¬¿²½»­ ¿²¼ ­§³°¬±³­ ³¿§ ·²½´«¼»æ

{ ͬ»° ½®¿½µ·²¹ ·² ¬¸» ³±®¬¿® ¾»¼­ ·² ¬¸» ¾±¼§ ±º ¬¸» ©¿´´ ±®¿¾±ª»ñ¾»´±© ±°»²·²¹­ ­«½¸ ¿­ ¼±±®­ ±® ©·²¼±©­ò

{ Ê»®¬·½¿´ ½®¿½µ·²¹ ·² ¬¸» ¾®·½µ­ ø«­«¿´´§ ¾«¬ ²±¬ ²»½»­­¿®·´§ ·² ´·²»©·¬¸ ¬¸» ª»®¬·½¿´ ¾»¼­ ±® °»®°»²¼­÷ò

×­±´¿¬»¼ °·»®­ ¿ºº»½¬»¼ ¾§ »®±­·±² ±® ­¿¬«®¿¬·±² ±º º±«²¼¿¬·±²­ ©·´´»ª»²¬«¿´´§ ´±­» ½±²¬¿½¬ ©·¬¸ ¬¸» ¾»¿®»®­ ¬¸»§ ­«°°±®¬ ¿²¼ ³¿§ ¬·´¬ ±®º¿´´ ±ª»®ò ̸» º´±±®­ ¬¸¿¬ ¸¿ª» ´±­¬ ¬¸·­ ­«°°±®¬ ©·´´ ¾»½±³» ¾±«²½§ô­±³»¬·³»­ ®¿¬¬´·²¹ ±®²¿³»²¬­ »¬½ò

Í»¿­±²¿´ ­©»´´·²¹ñ­¸®·²µ¿¹» ·² ½´¿§Í©»´´·²¹ º±«²¼¿¬·±² ­±·´ ¼«» ¬± ®¿·²§ °»®·±¼­ º·®­¬ ´·º¬­ ¬¸» ³±­¬»¨°±­»¼ »¨¬®»³·¬·»­ ±º ¬¸» º±±¬·²¹ ­§­¬»³ô ¬¸»² ¬¸» ®»³¿·²¼»® ±º ¬¸»°»®·³»¬»® º±±¬·²¹­ ©¸·´» ¹®¿¼«¿´´§ °»®³»¿¬·²¹ ·²­·¼» ¬¸» ¾«·´¼·²¹º±±¬°®·²¬ ¬± ´·º¬ ·²¬»®²¿´ º±±¬·²¹­ò ̸·­ ­©»´´·²¹ º·®­¬ ¬»²¼­ ¬± ½®»¿¬» ¿¼·­¸ »ºº»½¬ô ¾»½¿«­» ¬¸» »¨¬»®²¿´ º±±¬·²¹­ ¿®» °«­¸»¼ ¸·¹¸»® ¬¸¿² ¬¸»·²¬»®²¿´ ±²»­ò

̸» º·®­¬ ²±¬·½»¿¾´» ­§³°¬±³ ³¿§ ¾» ¬¸¿¬ ¬¸» º´±±® ¿°°»¿®­ ­´·¹¸¬´§¼·­¸»¼ò ̸·­ ·­ ±º¬»² ¿½½±³°¿²·»¼ ¾§ ­±³» ¼±±®­ ¾·²¼·²¹ ±² ¬¸»º´±±® ±® ¬¸» ¼±±® ¸»¿¼ô ¬±¹»¬¸»® ©·¬¸ ­±³» ½®¿½µ·²¹ ±º ½±®²·½»³·¬®»­ò ײ ¾«·´¼·²¹­ ©·¬¸ ¬·³¾»® º´±±®·²¹ ­«°°±®¬»¼ ¾§ ¾»¿®»®­ ¿²¼¶±·­¬­ô ¬¸» º´±±® ½¿² ¾» ¾±«²½§ò Û¨¬»®²¿´´§ ¬¸»®» ³¿§ ¾» ª·­·¾´»¼·­¸·²¹ ±º ¬¸» ¸·° ±® ®·¼¹» ´·²»­ò

ß­ ¬¸» ³±·­¬«®» ¿¾­±®°¬·±² °®±½»­­ ½±³°´»¬»­ ·¬­ ¶±«®²»§ ¬± ¬¸»·²²»®³±­¬ ¿®»¿­ ±º ¬¸» ¾«·´¼·²¹ô ¬¸» ·²¬»®²¿´ º±±¬·²¹­ ©·´´ ®·­»ò ׺ ¬¸»­°®»¿¼ ±º ³±·­¬«®» ·­ ®±«¹¸´§ »ª»²ô ·¬ ³¿§ ¾» ¬¸¿¬ ¬¸» ­§³°¬±³­ ©·´´¬»³°±®¿®·´§ ¼·­¿°°»¿®ô ¾«¬ ·¬ ·­ ³±®» ´·µ»´§ ¬¸¿¬ ­©»´´·²¹ ©·´´ ¾»«²»ª»²ô ½®»¿¬·²¹ ¿ ¼·ºº»®»²½» ®¿¬¸»® ¬¸¿² ¿ ¼·­¿°°»¿®¿²½» ·²­§³°¬±³­ò ײ ¾«·´¼·²¹­ ©·¬¸ ¬·³¾»® º´±±®·²¹ ­«°°±®¬»¼ ¾§ ¾»¿®»®­¿²¼ ¶±·­¬­ô ¬¸» ·­±´¿¬»¼ °·»®­ ©·´´ ®·­» ³±®» »¿­·´§ ¬¸¿² ¬¸» ­¬®·°º±±¬·²¹­ ±® °·»®­ «²¼»® ©¿´´­ô ½®»¿¬·²¹ ²±¬·½»¿¾´» ¼±³·²¹ ±º º´±±®·²¹ò

ß­ ¬¸» ©»¿¬¸»® °¿¬¬»®² ½¸¿²¹»­ ¿²¼ ¬¸» ­±·´ ¾»¹·²­ ¬± ¼®§ ±«¬ô ¬¸»»¨¬»®²¿´ º±±¬·²¹­ ©·´´ ¾» º·®­¬ ¿ºº»½¬»¼ô ¾»¹·²²·²¹ ©·¬¸ ¬¸» ´±½¿¬·±²­©¸»®» ¬¸» ­«²K­ »ºº»½¬ ·­ ­¬®±²¹»­¬ò ̸·­ ¸¿­ ¬¸» »ºº»½¬ ±º ´±©»®·²¹ ¬¸»»¨¬»®²¿´ º±±¬·²¹­ò ̸» ¼±³·²¹ ·­ ¿½½»²¬«¿¬»¼ ¿²¼ ½®¿½µ·²¹ ®»¼«½»­±® ¼·­¿°°»¿®­ ©¸»®» ·¬ ±½½«®®»¼ ¾»½¿«­» ±º ¼·­¸·²¹ô ¾«¬ ±¬¸»® ½®¿½µ­±°»² «°ò ̸» ®±±º ´·²»­ ³¿§ ¾»½±³» ½±²ª»¨ò

ܱ³·²¹ ¿²¼ ¼·­¸·²¹ ¿®» ¿´­± ¿ºº»½¬»¼ ¾§ ©»¿¬¸»® ·² ±¬¸»® ©¿§­ò ײ¿®»¿­ ©¸»®» ©¿®³ô ©»¬ ­«³³»®­ ¿²¼ ½±±´»® ¼®§ ©·²¬»®­ °®»ª¿·´ô©¿¬»® ³·¹®¿¬·±² ¬»²¼­ ¬± ¾» ¬±©¿®¼ ¬¸» ·²¬»®·±® ¿²¼ ¼±³·²¹ ©·´´ ¾»¿½½»²¬«¿¬»¼ô ©¸»®»¿­ ©¸»®» ­«³³»®­ ¿®» ¼®§ ¿²¼ ©·²¬»®­ ¿®» ½±´¼¿²¼ ©»¬ô ³·¹®¿¬·±² ¬»²¼­ ¬± ¾» ¬±©¿®¼ ¬¸» »¨¬»®·±® ¿²¼ ¬¸»«²¼»®´§·²¹ °®±°»²­·¬§ ·­ ¬±©¿®¼ ¼·­¸·²¹ò

Ó±ª»³»²¬ ½¿«­»¼ ¾§ ¬®»» ®±±¬­×² ¹»²»®¿´ô ¹®±©·²¹ ®±±¬­ ©·´´ »¨»®¬ ¿² «°©¿®¼ °®»­­«®» ±² º±±¬·²¹­ô©¸»®»¿­ ­±·´ ­«¾¶»½¬ ¬± ¼®§·²¹ ¾»½¿«­» ±º ¬®»» ±® ­¸®«¾ ®±±¬­ ©·´´ ¬»²¼¬± ®»³±ª» ­«°°±®¬ º®±³ «²¼»® º±±¬·²¹­ ¾§ ·²¼«½·²¹ ­¸®·²µ¿¹»ò

ݱ³°´·½¿¬·±²­ ½¿«­»¼ ¾§ ¬¸» ­¬®«½¬«®» ·¬­»´ºÓ±­¬ º±®½»­ ¬¸¿¬ ¬¸» ­±·´ ½¿«­»­ ¬± ¾» »¨»®¬»¼ ±² ­¬®«½¬«®»­ ¿®»ª»®¬·½¿´ P ·ò»ò »·¬¸»® «° ±® ¼±©²ò ر©»ª»®ô ¾»½¿«­» ¬¸»­» º±®½»­ ¿®»­»´¼±³ ­°®»¿¼ »ª»²´§ ¿®±«²¼ ¬¸» º±±¬·²¹­ô ¿²¼ ¾»½¿«­» ¬¸» ¾«·´¼·²¹®»­·­¬­ «²»ª»² ³±ª»³»²¬ ¾»½¿«­» ±º ·¬­ ®·¹·¼·¬§ô º±®½»­ ¿®» »¨»®¬»¼º®±³ ±²» °¿®¬ ±º ¬¸» ¾«·´¼·²¹ ¬± ¿²±¬¸»®ò ̸» ²»¬ ®»­«´¬ ±º ¿´´ ¬¸»­»º±®½»­ ·­ «­«¿´´§ ®±¬¿¬·±²¿´ò ̸·­ ®»­«´¬¿²¬ º±®½» ±º¬»² ½±³°´·½¿¬»­ ¬¸»¼·¿¹²±­·­ ¾»½¿«­» ¬¸» ª·­·¾´» ­§³°¬±³­ ¼± ²±¬ ­·³°´§ ®»º´»½¬ ¬¸»±®·¹·²¿´ ½¿«­»ò ß ½±³³±² ­§³°¬±³ ·­ ¾·²¼·²¹ ±º ¼±±®­ ±² ¬¸»ª»®¬·½¿´ ³»³¾»® ±º ¬¸» º®¿³»ò

Ûºº»½¬­ ±² º«´´ ³¿­±²®§ ­¬®«½¬«®»­Þ®·½µ©±®µ ©·´´ ®»­·­¬ ½®¿½µ·²¹ ©¸»®» ·¬ ½¿²ò ׬ ©·´´ ¿¬¬»³°¬ ¬± ­°¿²¿®»¿­ ¬¸¿¬ ´±­» ­«°°±®¬ ¾»½¿«­» ±º ­«¾­·¼»¼ º±«²¼¿¬·±²­ ±® ®¿·­»¼°±·²¬­ò ׬ ·­ ¬¸»®»º±®» «­«¿´ ¬± ­»» ½®¿½µ·²¹ ¿¬ ©»¿µ °±·²¬­ô ­«½¸ ¿­±°»²·²¹­ º±® ©·²¼±©­ ±® ¼±±®­ò

ײ ¬¸» »ª»²¬ ±º ½±²­¬®«½¬·±² ­»¬¬´»³»²¬ô ½®¿½µ·²¹ ©·´´ «­«¿´´§ ®»³¿·²«²½¸¿²¹»¼ ¿º¬»® ¬¸» °®±½»­­ ±º ­»¬¬´»³»²¬ ¸¿­ ½»¿­»¼ò

É·¬¸ ´±½¿´ ­¸»¿® ±® »®±­·±²ô ½®¿½µ·²¹ ©·´´ «­«¿´´§ ½±²¬·²«» ¬± ¼»ª»´±°«²¬·´ ¬¸» ±®·¹·²¿´ ½¿«­» ¸¿­ ¾»»² ®»³»¼·»¼ô ±® «²¬·´ ¬¸» ­«¾­·¼»²½»¸¿­ ½±³°´»¬»´§ ²»«¬®¿´·­»¼ ¬¸» ¿ºº»½¬»¼ °±®¬·±² ±º º±±¬·²¹ ¿²¼ ¬¸»­¬®«½¬«®» ¸¿­ ­¬¿¾·´·­»¼ ±² ±¬¸»® º±±¬·²¹­ ¬¸¿¬ ®»³¿·² »ºº»½¬·ª»ò

ײ ¬¸» ½¿­» ±º ­©»´´ñ­¸®·²µ »ºº»½¬­ô ¬¸» ¾®·½µ©±®µ ©·´´ ·² ­±³» ½¿­»­®»¬«®² ¬± ·¬­ ±®·¹·²¿´ °±­·¬·±² ¿º¬»® ½±³°´»¬·±² ±º ¿ ½§½´»ô ¸±©»ª»® ·¬·­ ³±®» ´·µ»´§ ¬¸¿¬ ¬¸» ®±¬¿¬·±²¿´ »ºº»½¬ ©·´´ ²±¬ ¾» »¨¿½¬´§ ®»ª»®­»¼ô¿²¼ ·¬ ·­ ¿´­± «­«¿´ ¬¸¿¬ ¾®·½µ©±®µ ©·´´ ­»¬¬´» ·² ·¬­ ²»© °±­·¬·±² ¿²¼©·´´ ®»­·­¬ ¬¸» º±®½»­ ¬®§·²¹ ¬± ®»¬«®² ·¬ ¬± ·¬­ ±®·¹·²¿´ °±­·¬·±²ò ̸·­³»¿²­ ¬¸¿¬ ·² ¿ ½¿­» ©¸»®» ­©»´´·²¹ ¬¿µ»­ °´¿½» ¿º¬»® ½±²­¬®«½¬·±²¿²¼ ½®¿½µ·²¹ ±½½«®­ô ¬¸» ½®¿½µ·²¹ ·­ ´·µ»´§ ¬± ¿¬ ´»¿­¬ °¿®¬´§ ®»³¿·²¿º¬»® ¬¸» ­¸®·²µ ­»¹³»²¬ ±º ¬¸» ½§½´» ·­ ½±³°´»¬»ò ̸«­ô »¿½¸ ¬·³»¬¸» ½§½´» ·­ ®»°»¿¬»¼ô ¬¸» ´·µ»´·¸±±¼ ·­ ¬¸¿¬ ¬¸» ½®¿½µ·²¹ ©·´´ ¾»½±³»©·¼»® «²¬·´ ¬¸» ­»½¬·±²­ ±º ¾®·½µ©±®µ ¾»½±³» ª·®¬«¿´´§ ·²¼»°»²¼»²¬ò

É·¬¸ ®»°»¿¬»¼ ½§½´»­ô ±²½» ¬¸» ½®¿½µ·²¹ ·­ »­¬¿¾´·­¸»¼ô ·º ¬¸»®» ·­ ²±±¬¸»® ½±³°´·½¿¬·±²ô ·¬ ·­ ²±®³¿´ º±® ¬¸» ·²½·¼»²½» ±º ½®¿½µ·²¹ ¬±­¬¿¾·´·­»ô ¿­ ¬¸» ¾«·´¼·²¹ ¸¿­ ¬¸» ¿®¬·½«´¿¬·±² ·¬ ²»»¼­ ¬± ½±°» ©·¬¸¬¸» °®±¾´»³ò ̸·­ ·­ ¾§ ²± ³»¿²­ ¿´©¿§­ ¬¸» ½¿­»ô ¸±©»ª»®ô ¿²¼³±²·¬±®·²¹ ±º ½®¿½µ­ ·² ©¿´´­ ¿²¼ º´±±®­ ­¸±«´¼ ¿´©¿§­ ¾» ¬®»¿¬»¼­»®·±«­´§ò

Ë°¸»¿ª¿´ ½¿«­»¼ ¾§ ¹®±©¬¸ ±º ¬®»» ®±±¬­ «²¼»® º±±¬·²¹­ ·­ ²±¬ ¿­·³°´» ª»®¬·½¿´ ­¸»¿® ­¬®»­­ò ̸»®» ·­ ¿ ¬»²¼»²½§ º±® ¬¸» ®±±¬ ¬± ¿´­±»¨»®¬ ´¿¬»®¿´ º±®½»­ ¬¸¿¬ ¿¬¬»³°¬ ¬± ­»°¿®¿¬» ­»½¬·±²­ ±º ¾®·½µ©±®µ¿º¬»® ·²·¬·¿´ ½®¿½µ·²¹ ¸¿­ ±½½«®®»¼ò

Ì®»»­ ½¿² ½¿«­» ­¸®·²µ¿¹» ¿²¼ ¼¿³¿¹»

Page 262: SITE CLASSIFICATION REPORT SUMMARY...Douglas Partners (DP) has prepared this report for this project at Taylor 2- Stage 3, Taylor in accordance with DP’s proposal dated 15 September

̸» ²±®³¿´ ­¬®«½¬«®¿´ ¿®®¿²¹»³»²¬ ·­ ¬¸¿¬ ¬¸» ·²²»® ´»¿º ±º ¾®·½µó©±®µ ·² ¬¸» »¨¬»®²¿´ ©¿´´­ ¿²¼ ¿¬ ´»¿­¬ ­±³» ±º ¬¸» ·²¬»®²¿´ ©¿´´­ø¼»°»²¼·²¹ ±² ¬¸» ®±±º ¬§°»÷ ½±³°®·­» ¬¸» ´±¿¼ó¾»¿®·²¹ ­¬®«½¬«®» ±²©¸·½¸ ¿²§ «°°»® º´±±®­ô ½»·´·²¹­ ¿²¼ ¬¸» ®±±º ¿®» ­«°°±®¬»¼ò ײ ¬¸»­»½¿­»­ô ·¬ ·­ ·²¬»®²¿´´§ ª·­·¾´» ½®¿½µ·²¹ ¬¸¿¬ ­¸±«´¼ ¾» ¬¸» ³¿·² º±½«­±º ¿¬¬»²¬·±²ô ¸±©»ª»® ¬¸»®» ¿®» ¿ º»© »¨¿³°´»­ ±º ¼©»´´·²¹­ ©¸±­»»¨¬»®²¿´ ´»¿º ±º ³¿­±²®§ °´¿§­ ­±³» ­«°°±®¬·²¹ ®±´»ô ­± ¬¸·­ ­¸±«´¼¾» ½¸»½µ»¼ ·º ¬¸»®» ·­ ¿²§ ¼±«¾¬ò ײ ¿²§ ½¿­»ô »¨¬»®²¿´´§ ª·­·¾´»½®¿½µ·²¹ ·­ ·³°±®¬¿²¬ ¿­ ¿ ¹«·¼» ¬± ­¬®»­­»­ ±² ¬¸» ­¬®«½¬«®» ¹»²»®¿´´§ô¿²¼ ·¬ ­¸±«´¼ ¿´­± ¾» ®»³»³¾»®»¼ ¬¸¿¬ ¬¸» »¨¬»®²¿´ ©¿´´­ ³«­¬ ¾»½¿°¿¾´» ±º ­«°°±®¬·²¹ ¬¸»³­»´ª»­ò

Ûºº»½¬­ ±² º®¿³»¼ ­¬®«½¬«®»­Ì·³¾»® ±® ­¬»»´ º®¿³»¼ ¾«·´¼·²¹­ ¿®» ´»­­ ´·µ»´§ ¬± »¨¸·¾·¬ ½®¿½µ·²¹¼«» ¬± ­©»´´ñ­¸®·²µ ¬¸¿² ³¿­±²®§ ¾«·´¼·²¹­ ¾»½¿«­» ±º ¬¸»·®º´»¨·¾·´·¬§ò ß´­±ô ¬¸» ¼±³·²¹ñ¼·­¸·²¹ »ºº»½¬­ ¬»²¼ ¬± ¾» ´±©»® ¾»½¿«­»±º ¬¸» ´·¹¸¬»® ©»·¹¸¬ ±º ©¿´´­ò ̸» ³¿·² ®·­µ­ ¬± º®¿³»¼ ¾«·´¼·²¹­ ¿®»»²½±«²¬»®»¼ ¾»½¿«­» ±º ¬¸» ·­±´¿¬»¼ °·»® º±±¬·²¹­ «­»¼ «²¼»® ©¿´´­òɸ»®» »®±­·±² ±® ­¿¬«®¿¬·±² ½¿«­» ¿ º±±¬·²¹ ¬± º¿´´ ¿©¿§ô ¬¸·­ ½¿²¼±«¾´» ¬¸» ­°¿² ©¸·½¸ ¿ ©¿´´ ³«­¬ ¾®·¼¹»ò ̸·­ ¿¼¼·¬·±²¿´ ­¬®»­­ ½¿²½®»¿¬» ½®¿½µ·²¹ ·² ©¿´´ ´·²·²¹­ô °¿®¬·½«´¿®´§ ©¸»®» ¬¸»®» ·­ ¿ ©»¿µ°±·²¬ ·² ¬¸» ­¬®«½¬«®» ½¿«­»¼ ¾§ ¿ ¼±±® ±® ©·²¼±© ±°»²·²¹ò ׬ ·­ô¸±©»ª»®ô «²´·µ»´§ ¬¸¿¬ º®¿³»¼ ­¬®«½¬«®»­ ©·´´ ¾» ­± ­¬®»­­»¼ ¿­ ¬± ­«ºº»®­»®·±«­ ¼¿³¿¹» ©·¬¸±«¬ º·®­¬ »¨¸·¾·¬·²¹ ­±³» ±® ¿´´ ±º ¬¸» ¿¾±ª»­§³°¬±³­ º±® ¿ ½±²­·¼»®¿¾´» °»®·±¼ò ̸» ­¿³» ©¿®²·²¹ °»®·±¼ ­¸±«´¼¿°°´§ ·² ¬¸» ½¿­» ±º «°¸»¿ª¿´ò ׬ ­¸±«´¼ ¾» ²±¬»¼ô ¸±©»ª»®ô ¬¸¿¬ ©¸»®»º®¿³»¼ ¾«·´¼·²¹­ ¿®» ­«°°±®¬»¼ ¾§ ­¬®·° º±±¬·²¹­ ¬¸»®» ·­ ±²´§ ±²» ´»¿º±º ¾®·½µ©±®µ ¿²¼ ¬¸»®»º±®» ¬¸» »¨¬»®²¿´´§ ª·­·¾´» ©¿´´­ ¿®» ¬¸»­«°°±®¬·²¹ ­¬®«½¬«®» º±® ¬¸» ¾«·´¼·²¹ò ײ ¬¸·­ ½¿­»ô ¬¸» ­«¾º´±±®³¿­±²®§ ©¿´´­ ½¿² ¾» »¨°»½¬»¼ ¬± ¾»¸¿ª» ¿­ º«´´ ¾®·½µ©±®µ ©¿´´­ò

Ûºº»½¬­ ±² ¾®·½µ ª»²»»® ­¬®«½¬«®»­Þ»½¿«­» ¬¸» ´±¿¼ó¾»¿®·²¹ ­¬®«½¬«®» ±º ¿ ¾®·½µ ª»²»»® ¾«·´¼·²¹ ·­ ¬¸»º®¿³» ¬¸¿¬ ³¿µ»­ «° ¬¸» ·²¬»®·±® ´»¿º ±º ¬¸» »¨¬»®²¿´ ©¿´´­ °´«­°»®¸¿°­ ¬¸» ·²¬»®²¿´ ©¿´´­ô ¼»°»²¼·²¹ ±² ¬¸» ¬§°» ±º ®±±ºô ¬¸»¾«·´¼·²¹ ½¿² ¾» »¨°»½¬»¼ ¬± ¾»¸¿ª» ¿­ ¿ º®¿³»¼ ­¬®«½¬«®»ô »¨½»°¬ ¬¸¿¬¬¸» »¨¬»®²¿´ ³¿­±²®§ ©·´´ ¾»¸¿ª» ·² ¿ ­·³·´¿® ©¿§ ¬± ¬¸» »¨¬»®²¿´ ´»¿º±º ¿ º«´´ ³¿­±²®§ ­¬®«½¬«®»ò

É¿¬»® Í»®ª·½» ¿²¼ Ü®¿·²¿¹»

ɸ»®» ¿ ©¿¬»® ­»®ª·½» °·°»ô ¿ ­»©»® ±® ­¬±®³©¿¬»® ¼®¿·²¿¹» °·°» ·­ ·²¬¸» ª·½·²·¬§ ±º ¿ ¾«·´¼·²¹ô ¿ ©¿¬»® ´»¿µ ½¿² ½¿«­» »®±­·±²ô ­©»´´·²¹ ±®­¿¬«®¿¬·±² ±º ­«­½»°¬·¾´» ­±·´ò Ûª»² ¿ ³·²«­½«´» ´»¿µ ½¿² ¾» »²±«¹¸¬± ­¿¬«®¿¬» ¿ ½´¿§ º±«²¼¿¬·±²ò ß ´»¿µ·²¹ ¬¿° ²»¿® ¿ ¾«·´¼·²¹ ½¿² ¸¿ª»¬¸» ­¿³» »ºº»½¬ò ײ ¿¼¼·¬·±²ô ¬®»²½¸»­ ½±²¬¿·²·²¹ °·°»­ ½¿² ¾»½±³»©¿¬»®½±«®­»­ »ª»² ¬¸±«¹¸ ¾¿½µº·´´»¼ô °¿®¬·½«´¿®´§ ©¸»®» ¾®±µ»²®«¾¾´» ·­ «­»¼ ¿­ º·´´ò É¿¬»® ¬¸¿¬ ®«²­ ¿´±²¹ ¬¸»­» ¬®»²½¸»­ ½¿² ¾»®»­°±²­·¾´» º±® ­»®·±«­ »®±­·±²ô ·²¬»®­¬®¿¬¿ ­»»°¿¹» ·²¬± ­«¾º´±±® ¿®»¿­¿²¼ ­¿¬«®¿¬·±²ò

з°» ´»¿µ¿¹» ¿²¼ ¬®»²½¸ ©¿¬»® º´±©­ ¿´­± »²½±«®¿¹» ¬®»» ¿²¼ ­¸®«¾®±±¬­ ¬± ¬¸» ­±«®½» ±º ©¿¬»®ô ½±³°´·½¿¬·²¹ ¿²¼ »¨¿½»®¾¿¬·²¹ ¬¸»°®±¾´»³òб±® ®±±º °´«³¾·²¹ ½¿² ®»­«´¬ ·² ´¿®¹» ª±´«³»­ ±º ®¿·²©¿¬»® ¾»·²¹½±²½»²¬®¿¬»¼ ·² ¿ ­³¿´´ ¿®»¿ ±º ­±·´æ

{ ײ½±®®»½¬ º¿´´­ ·² ®±±º ¹«¬¬»®·²¹ ³¿§ ®»­«´¬ ·² ±ª»®º´±©­ô ¿­ ³¿§¹«¬¬»®­ ¾´±½µ»¼ ©·¬¸ ´»¿ª»­ »¬½ò

{ ݱ®®±¼»¼ ¹«¬¬»®·²¹ ±® ¼±©²°·°»­ ½¿² ­°·´´ ©¿¬»® ¬± ¹®±«²¼ò

{ ܱ©²°·°»­ ²±¬ °±­·¬·ª»´§ ½±²²»½¬»¼ ¬± ¿ °®±°»® ­¬±®³©¿¬»®½±´´»½¬·±² ­§­¬»³ ©·´´ ¼·®»½¬ ¿ ½±²½»²¬®¿¬·±² ±º ©¿¬»® ¬± ­±·´ ¬¸¿¬ ·­¼·®»½¬´§ ¿¼¶¿½»²¬ ¬± º±±¬·²¹­ô ­±³»¬·³»­ ½¿«­·²¹ ´¿®¹»ó­½¿´»°®±¾´»³­ ­«½¸ ¿­ »®±­·±²ô ­¿¬«®¿¬·±² ¿²¼ ³·¹®¿¬·±² ±º ©¿¬»® «²¼»®¬¸» ¾«·´¼·²¹ò

Í»®·±«­²»­­ ±º Ý®¿½µ·²¹

ײ ¹»²»®¿´ô ³±­¬ ½®¿½µ·²¹ º±«²¼ ·² ³¿­±²®§ ©¿´´­ ·­ ¿ ½±­³»¬·½²«·­¿²½» ±²´§ ¿²¼ ½¿² ¾» µ»°¬ ·² ®»°¿·® ±® »ª»² ·¹²±®»¼ò ̸» ¬¿¾´»¾»´±© ·­ ¿ ®»°®±¼«½¬·±² ±º Ì¿¾´» Ýï ±º ßÍ îèéðò

ßÍ îèéð ¿´­± °«¾´·­¸»­ º·¹«®»­ ®»´¿¬·²¹ ¬± ½®¿½µ·²¹ ·² ½±²½®»¬» º´±±®­ô¸±©»ª»® ¾»½¿«­» ©¿´´ ½®¿½µ·²¹ ©·´´ «­«¿´´§ ®»¿½¸ ¬¸» ½®·¬·½¿´ °±·²¬­·¹²·º·½¿²¬´§ »¿®´·»® ¬¸¿² ½®¿½µ·²¹ ·² ­´¿¾­ô ¬¸·­ ¬¿¾´» ·­ ²±¬®»°®±¼«½»¼ ¸»®»ò

Ю»ª»²¬·±²ñÝ«®»

д«³¾·²¹É¸»®» ¾«·´¼·²¹ ³±ª»³»²¬ ·­ ½¿«­»¼ ¾§ ©¿¬»® ­»®ª·½»ô ®±±º °´«³¾·²¹ô­»©»® ±® ­¬±®³©¿¬»® º¿·´«®»ô ¬¸» ®»³»¼§ ·­ ¬± ®»°¿·® ¬¸» °®±¾´»³ò ׬ ·­ °®«¼»²¬ô ¸±©»ª»®ô ¬± ½±²­·¼»® ¿´­± ®»®±«¬·²¹ °·°»­ ¿©¿§ º®±³¬¸» ¾«·´¼·²¹ ©¸»®» °±­­·¾´»ô ¿²¼ ®»´±½¿¬·²¹ ¬¿°­ ¬± °±­·¬·±²­ ©¸»®»¿²§ ´»¿µ¿¹» ©·´´ ²±¬ ¼·®»½¬ ©¿¬»® ¬± ¬¸» ¾«·´¼·²¹ ª·½·²·¬§ò Ûª»² ©¸»®»¹«´´§ ¬®¿°­ ¿®» °®»­»²¬ô ¬¸»®» ·­ ­±³»¬·³»­ ­«ºº·½·»²¬ ­°·´´ ¬± ½®»¿¬»»®±­·±² ±® ­¿¬«®¿¬·±²ô °¿®¬·½«´¿®´§ ·² ³±¼»®² ·²­¬¿´´¿¬·±²­ «­·²¹­³¿´´»® ¼·¿³»¬»® ÐÊÝ º·¨¬«®»­ò ײ¼»»¼ô ­±³» ¹«´´§ ¬®¿°­ ¿®» ²±¬­·¬«¿¬»¼ ¼·®»½¬´§ «²¼»® ¬¸» ¬¿°­ ¬¸¿¬ ¿®» ·²­¬¿´´»¼ ¬± ½¸¿®¹» ¬¸»³ô©·¬¸ ¬¸» ®»­«´¬ ¬¸¿¬ ©¿¬»® º®±³ ¬¸» ¬¿° ³¿§ »²¬»® ¬¸» ¾¿½µº·´´»¼¬®»²½¸ ¬¸¿¬ ¸±«­»­ ¬¸» ­»©»® °·°·²¹ò ׺ ¬¸» ¬®»²½¸ ¸¿­ ¾»»² °±±®´§¾¿½µº·´´»¼ô ¬¸» ©¿¬»® ©·´´ »·¬¸»® °±²¼ ±® º´±© ¿´±²¹ ¬¸» ¾±¬¬±³ ±º¬¸» ¬®»²½¸ò ß­ ¬¸»­» ¬®»²½¸»­ «­«¿´´§ ®«² ¿´±²¹­·¼» ¬¸» º±±¬·²¹­ ¿²¼½¿² ¾» ¿¬ ¿ ­·³·´¿® ¼»°¬¸ô ·¬ ·­ ²±¬ ¸¿®¼ ¬± ­»» ¸±© ¿²§ ©¿¬»® ¬¸¿¬ ·­¬¸«­ ¼·®»½¬»¼ ·²¬± ¿ ¬®»²½¸ ½¿² »¿­·´§ ¿ºº»½¬ ¬¸» º±«²¼¿¬·±²K­ ¿¾·´·¬§ ¬±­«°°±®¬ º±±¬·²¹­ ±® »ª»² ¹¿·² »²¬®§ ¬± ¬¸» ­«¾º´±±® ¿®»¿ò

Ù®±«²¼ ¼®¿·²¿¹»×² ¿´´ ­±·´­ ¬¸»®» ·­ ¬¸» ½¿°¿½·¬§ º±® ©¿¬»® ¬± ¬®¿ª»´ ±² ¬¸» ­«®º¿½» ¿²¼¾»´±© ·¬ò Í«®º¿½» ©¿¬»® º´±©­ ½¿² ¾» »­¬¿¾´·­¸»¼ ¾§ ·²­°»½¬·±² ¼«®·²¹¿²¼ ¿º¬»® ¸»¿ª§ ±® °®±´±²¹»¼ ®¿·²ò ׺ ²»½»­­¿®§ô ¿ ¹®¿¬»¼ ¼®¿·² ­§­¬»³½±²²»½¬»¼ ¬± ¬¸» ­¬±®³©¿¬»® ½±´´»½¬·±² ­§­¬»³ ·­ «­«¿´´§ ¿² »¿­§­±´«¬·±²ò

׬ ·­ô ¸±©»ª»®ô ­±³»¬·³»­ ²»½»­­¿®§ ©¸»² ¿¬¬»³°¬·²¹ ¬± °®»ª»²¬©¿¬»® ³·¹®¿¬·±² ¬¸¿¬ ¬»­¬·²¹ ¾» ½¿®®·»¼ ±«¬ ¬± »­¬¿¾´·­¸ ©¿¬»®¬¿¾´»¸»·¹¸¬ ¿²¼ ­«¾­±·´ ©¿¬»® º´±©­ò ̸·­ ­«¾¶»½¬ ·­ ®»º»®®»¼ ¬± ·² ÞÌÚ ï翲¼ ³¿§ °®±°»®´§ ¾» ®»¹¿®¼»¼ ¿­ ¿² ¿®»¿ º±® ¿² »¨°»®¬ ½±²­«´¬¿²¬ò

Ю±¬»½¬·±² ±º ¬¸» ¾«·´¼·²¹ °»®·³»¬»®×¬ ·­ »­­»²¬·¿´ ¬± ®»³»³¾»® ¬¸¿¬ ¬¸» ­±·´ ¬¸¿¬ ¿ºº»½¬­ º±±¬·²¹­ »¨¬»²¼­©»´´ ¾»§±²¼ ¬¸» ¿½¬«¿´ ¾«·´¼·²¹ ´·²»ò É¿¬»®·²¹ ±º ¹¿®¼»² °´¿²¬­ô­¸®«¾­ ¿²¼ ¬®»»­ ½¿«­»­ ­±³» ±º ¬¸» ³±­¬ ­»®·±«­ ©¿¬»® °®±¾´»³­ò

Ú±® ¬¸·­ ®»¿­±²ô °¿®¬·½«´¿®´§ ©¸»®» °®±¾´»³­ »¨·­¬ ±® ¿®» ´·µ»´§ ¬±±½½«®ô ·¬ ·­ ®»½±³³»²¼»¼ ¬¸¿¬ ¿² ¿°®±² ±º °¿ª·²¹ ¾» ·²­¬¿´´»¼¿®±«²¼ ¿­ ³«½¸ ±º ¬¸» ¾«·´¼·²¹ °»®·³»¬»® ¿­ ²»½»­­¿®§ò ̸·­ °¿ª·²¹

ÝÔßÍÍ×Ú×ÝßÌ×ÑÒ ÑÚ ÜßÓßÙÛ É×ÌØ ÎÛÚÛÎÛÒÝÛ ÌÑ ÉßÔÔÍ

Ü»­½®·°¬·±² ±º ¬§°·½¿´ ¼¿³¿¹» ¿²¼ ®»¯«·®»¼ ®»°¿·® ß°°®±¨·³¿¬» ½®¿½µ ©·¼¬¸ Ü¿³¿¹»´·³·¬ ø­»» Ò±¬» í÷ ½¿¬»¹±®§

Ø¿·®´·²» ½®¿½µ­ äðòï ³³ ð

Ú·²» ½®¿½µ­ ©¸·½¸ ¼± ²±¬ ²»»¼ ®»°¿·® äï ³³ ï

Ý®¿½µ­ ²±¬·½»¿¾´» ¾«¬ »¿­·´§ º·´´»¼ò ܱ±®­ ¿²¼ ©·²¼±©­ ­¬·½µ ­´·¹¸¬´§ äë ³³ î

Ý®¿½µ­ ½¿² ¾» ®»°¿·®»¼ ¿²¼ °±­­·¾´§ ¿ ­³¿´´ ¿³±«²¬ ±º ©¿´´ ©·´´ ²»»¼ ëPïë ³³ ø±® ¿ ²«³¾»® ±º ½®¿½µ­ í¬± ¾» ®»°´¿½»¼ò ܱ±®­ ¿²¼ ©·²¼±©­ ­¬·½µò Í»®ª·½» °·°»­ ½¿² º®¿½¬«®»ò í ³³ ±® ³±®» ·² ±²» ¹®±«°÷É»¿¬¸»®¬·¹¸¬²»­­ ±º¬»² ·³°¿·®»¼

Û¨¬»²­·ª» ®»°¿·® ©±®µ ·²ª±´ª·²¹ ¾®»¿µ·²¹ó±«¬ ¿²¼ ®»°´¿½·²¹ ­»½¬·±²­ ±º ©¿´´­ô ïëPîë ³³ ¾«¬ ¿´­± ¼»°»²¼ ì»­°»½·¿´´§ ±ª»® ¼±±®­ ¿²¼ ©·²¼±©­ò É·²¼±© ¿²¼ ¼±±® º®¿³»­ ¼·­¬±®¬ò É¿´´­ ´»¿² ±² ²«³¾»® ±º ½®¿½µ­±® ¾«´¹» ²±¬·½»¿¾´§ô ­±³» ´±­­ ±º ¾»¿®·²¹ ·² ¾»¿³­ò Í»®ª·½» °·°»­ ¼·­®«°¬»¼

Page 263: SITE CLASSIFICATION REPORT SUMMARY...Douglas Partners (DP) has prepared this report for this project at Taylor 2- Stage 3, Taylor in accordance with DP’s proposal dated 15 September

­¸±«´¼ »¨¬»²¼ ±«¬©¿®¼­ ¿ ³·²·³«³ ±º çðð ³³ ø³±®» ·² ¸·¹¸´§®»¿½¬·ª» ­±·´÷ ¿²¼ ­¸±«´¼ ¸¿ª» ¿ ³·²·³«³ º¿´´ ¿©¿§ º®±³ ¬¸»¾«·´¼·²¹ ±º ïæêðò ̸» º·²·­¸»¼ °¿ª·²¹ ­¸±«´¼ ¾» ²± ´»­­ ¬¸¿² ïðð³³ ¾»´±© ¾®·½µ ª»²¬ ¾¿­»­ò

׬ ·­ °®«¼»²¬ ¬± ®»´±½¿¬» ¼®¿·²¿¹» °·°»­ ¿©¿§ º®±³ ¬¸·­ °¿ª·²¹ô ·º°±­­·¾´»ô ¬± ¿ª±·¼ ½±³°´·½¿¬·±²­ º®±³ º«¬«®» ´»¿µ¿¹»ò ׺ ¬¸·­ ·­ ²±¬°®¿½¬·½¿´ô »¿®¬¸»²©¿®» °·°»­ ­¸±«´¼ ¾» ®»°´¿½»¼ ¾§ ÐÊÝ ¿²¼¾¿½µº·´´·²¹ ­¸±«´¼ ¾» ±º ¬¸» ­¿³» ­±·´ ¬§°» ¿­ ¬¸» ­«®®±«²¼·²¹ ­±·´¿²¼ ½±³°¿½¬»¼ ¬± ¬¸» ­¿³» ¼»²­·¬§ò

Û¨½»°¬ ·² ¿®»¿­ ©¸»®» º®»»¦·²¹ ±º ©¿¬»® ·­ ¿² ·­­«»ô ·¬ ·­ ©·­» ¬±®»³±ª» ¬¿°­ ·² ¬¸» ¾«·´¼·²¹ ¿®»¿ ¿²¼ ®»´±½¿¬» ¬¸»³ ©»´´ ¿©¿§ º®±³¬¸» ¾«·´¼·²¹ P °®»º»®¿¾´§ ²±¬ «°¸·´´ º®±³ ·¬ ø­»» ÞÌÚ ïç÷ò

׬ ³¿§ ¾» ¼»­·®¿¾´» ¬± ·²­¬¿´´ ¿ ¹®¿¬»¼ ¼®¿·² ¿¬ ¬¸» ±«¬­·¼» »¼¹» ±º ¬¸»°¿ª·²¹ ±² ¬¸» «°¸·´´ ­·¼» ±º ¬¸» ¾«·´¼·²¹ò ׺ ­«¾­±·´ ¼®¿·²¿¹» ·­²»»¼»¼ ¬¸·­ ½¿² ¾» ·²­¬¿´´»¼ «²¼»® ¬¸» ­«®º¿½» ¼®¿·²ò

ݱ²¼»²­¿¬·±²×² ¾«·´¼·²¹­ ©·¬¸ ¿ ­«¾º´±±® ª±·¼ ­«½¸ ¿­ ©¸»®» ¾»¿®»®­ ¿²¼ ¶±·­¬­­«°°±®¬ º´±±®·²¹ô ·²­«ºº·½·»²¬ ª»²¬·´¿¬·±² ½®»¿¬»­ ·¼»¿´ ½±²¼·¬·±²­ º±®½±²¼»²­¿¬·±²ô °¿®¬·½«´¿®´§ ©¸»®» ¬¸»®» ·­ ´·¬¬´» ½´»¿®¿²½» ¾»¬©»»² ¬¸»º´±±® ¿²¼ ¬¸» ¹®±«²¼ò ݱ²¼»²­¿¬·±² ¿¼¼­ ¬± ¬¸» ³±·­¬«®» ¿´®»¿¼§°®»­»²¬ ·² ¬¸» ­«¾º´±±® ¿²¼ ­·¹²·º·½¿²¬´§ ­´±©­ ¬¸» °®±½»­­ ±º ¼®§·²¹±«¬ò ײ­¬¿´´¿¬·±² ±º ¿² ¿¼»¯«¿¬» ­«¾º´±±® ª»²¬·´¿¬·±² ­§­¬»³ô »·¬¸»®²¿¬«®¿´ ±® ³»½¸¿²·½¿´ô ·­ ¼»­·®¿¾´»ò

É¿®²·²¹æ ß´¬¸±«¹¸ ¬¸·­ Þ«·´¼·²¹ Ì»½¸²±´±¹§ Ú·´» ¼»¿´­ ©·¬¸½®¿½µ·²¹ ·² ¾«·´¼·²¹­ô ·¬ ­¸±«´¼ ¾» ­¿·¼ ¬¸¿¬ ­«¾º´±±® ³±·­¬«®» ½¿²®»­«´¬ ·² ¬¸» ¼»ª»´±°³»²¬ ±º ±¬¸»® °®±¾´»³­ô ²±¬¿¾´§æ

{ É¿¬»® ¬¸¿¬ ·­ ¬®¿²­³·¬¬»¼ ·²¬± ³¿­±²®§ô ³»¬¿´ ±® ¬·³¾»® ¾«·´¼·²¹»´»³»²¬­ ½¿«­»­ ¼¿³¿¹» ¿²¼ñ±® ¼»½¿§ ¬± ¬¸±­» »´»³»²¬­ò

{ Ø·¹¸ ­«¾º´±±® ¸«³·¼·¬§ ¿²¼ ³±·­¬«®» ½±²¬»²¬ ½®»¿¬» ¿² ·¼»¿´»²ª·®±²³»²¬ º±® ª¿®·±«­ °»­¬­ô ·²½´«¼·²¹ ¬»®³·¬»­ ¿²¼ ­°·¼»®­ò

{ ɸ»®» ¸·¹¸ ³±·­¬«®» ´»ª»´­ ¿®» ¬®¿²­³·¬¬»¼ ¬± ¬¸» º´±±®·²¹ ¿²¼©¿´´­ô ¿² ·²½®»¿­» ·² ¬¸» ¼«­¬ ³·¬» ½±«²¬ ½¿² »²­«» ©·¬¸·² ¬¸»´·ª·²¹ ¿®»¿­ò Ü«­¬ ³·¬»­ô ¿­ ©»´´ ¿­ ¼¿³°²»­­ ·² ¹»²»®¿´ô ½¿² ¾» ¿¸»¿´¬¸ ¸¿¦¿®¼ ¬± ·²¸¿¾·¬¿²¬­ô °¿®¬·½«´¿®´§ ¬¸±­» ©¸± ¿®»¿¾²±®³¿´´§ ­«­½»°¬·¾´» ¬± ®»­°·®¿¬±®§ ¿·´³»²¬­ò

̸» ¹¿®¼»²Ì¸» ·¼»¿´ ª»¹»¬¿¬·±² ´¿§±«¬ ·­ ¬± ¸¿ª» ´¿©² ±® °´¿²¬­ ¬¸¿¬ ®»¯«·®»±²´§ ´·¹¸¬ ©¿¬»®·²¹ ·³³»¼·¿¬»´§ ¿¼¶¿½»²¬ ¬± ¬¸» ¼®¿·²¿¹» ±® °¿ª·²¹»¼¹»ô ¬¸»² ³±®» ¼»³¿²¼·²¹ °´¿²¬­ô ­¸®«¾­ ¿²¼ ¬®»»­ ­°®»¿¼ ±«¬ ·²¬¸¿¬ ±®¼»®ò

Ѫ»®©¿¬»®·²¹ ¼«» ¬± ³·­«­» ±º ¿«¬±³¿¬·½ ©¿¬»®·²¹ ­§­¬»³­ ·­ ¿½±³³±² ½¿«­» ±º ­¿¬«®¿¬·±² ¿²¼ ©¿¬»® ³·¹®¿¬·±² «²¼»® º±±¬·²¹­ò ׺·¬ ·­ ²»½»­­¿®§ ¬± «­» ¬¸»­» ­§­¬»³­ô ·¬ ·­ ·³°±®¬¿²¬ ¬± ®»³±ª» ¹¿®¼»²¾»¼­ ¬± ¿ ½±³°´»¬»´§ ­¿º» ¼·­¬¿²½» º®±³ ¾«·´¼·²¹­ò

Û¨·­¬·²¹ ¬®»»­É¸»®» ¿ ¬®»» ·­ ½¿«­·²¹ ¿ °®±¾´»³ ±º ­±·´ ¼®§·²¹ ±® ¬¸»®» ·­ ¬¸»»¨·­¬»²½» ±® ¬¸®»¿¬ ±º «°¸»¿ª¿´ ±º º±±¬·²¹­ô ·º ¬¸» ±ºº»²¼·²¹ ®±±¬­ ¿®»­«¾­·¼·¿®§ ¿²¼ ¬¸»·® ®»³±ª¿´ ©·´´ ²±¬ ­·¹²·º·½¿²¬´§ ¼¿³¿¹» ¬¸» ¬®»»ô¬¸»§ ­¸±«´¼ ¾» ­»ª»®»¼ ¿²¼ ¿ ½±²½®»¬» ±® ³»¬¿´ ¾¿®®·»® °´¿½»¼ª»®¬·½¿´´§ ·² ¬¸» ­±·´ ¬± °®»ª»²¬ º«¬«®» ®±±¬ ¹®±©¬¸ ·² ¬¸» ¼·®»½¬·±² ±º¬¸» ¾«·´¼·²¹ò ׺ ·¬ ·­ ²±¬ °±­­·¾´» ¬± ®»³±ª» ¬¸» ®»´»ª¿²¬ ®±±¬­©·¬¸±«¬ ¼¿³¿¹» ¬± ¬¸» ¬®»»ô ¿² ¿°°´·½¿¬·±² ¬± ®»³±ª» ¬¸» ¬®»» ­¸±«´¼¾» ³¿¼» ¬± ¬¸» ´±½¿´ ¿«¬¸±®·¬§ò ß °®«¼»²¬ °´¿² ·­ ¬± ¬®¿²­°´¿²¬ ´·µ»´§±ºº»²¼»®­ ¾»º±®» ¬¸»§ ¾»½±³» ¿ °®±¾´»³ò

ײº±®³¿¬·±² ±² ¬®»»­ô °´¿²¬­ ¿²¼ ­¸®«¾­Í¬¿¬» ¼»°¿®¬³»²¬­ ±ª»®­»»·²¹ ¿¹®·½«´¬«®» ½¿² ¹·ª» ·²º±®³¿¬·±²®»¹¿®¼·²¹ ®±±¬ °¿¬¬»®²­ô ª±´«³» ±º ©¿¬»® ²»»¼»¼ ¿²¼ ­¿º» ¼·­¬¿²½»º®±³ ¾«·´¼·²¹­ ±º ³±­¬ ­°»½·»­ò Þ±¬¿²·½ ¹¿®¼»²­ ¿®» ¿´­± ­±«®½»­ ±º·²º±®³¿¬·±²ò Ú±® ·²º±®³¿¬·±² ±² °´¿²¬ ®±±¬­ ¿²¼ ¼®¿·²­ô ­»» Þ«·´¼·²¹Ì»½¸²±´±¹§ Ú·´» ïéò

Û¨½¿ª¿¬·±²Û¨½¿ª¿¬·±² ¿®±«²¼ º±±¬·²¹­ ³«­¬ ¾» °®±°»®´§ »²¹·²»»®»¼ò ͱ·´­«°°±®¬·²¹ º±±¬·²¹­ ½¿² ±²´§ ¾» ­¿º»´§ »¨½¿ª¿¬»¼ ¿¬ ¿² ¿²¹´» ¬¸¿¬¿´´±©­ ¬¸» ­±·´ «²¼»® ¬¸» º±±¬·²¹ ¬± ®»³¿·² ­¬¿¾´»ò ̸·­ ¿²¹´» ·­½¿´´»¼ ¬¸» ¿²¹´» ±º ®»°±­» ø±® º®·½¬·±²÷ ¿²¼ ª¿®·»­ ­·¹²·º·½¿²¬´§¾»¬©»»² ­±·´ ¬§°»­ ¿²¼ ½±²¼·¬·±²­ò λ³±ª¿´ ±º ­±·´ ©·¬¸·² ¬¸» ¿²¹´»±º ®»°±­» ©·´´ ½¿«­» ­«¾­·¼»²½»ò

λ³»¼·¿¬·±²

ɸ»®» »®±­·±² ¸¿­ ±½½«®®»¼ ¬¸¿¬ ¸¿­ ©¿­¸»¼ ¿©¿§ ­±·´ ¿¼¶¿½»²¬ ¬±º±±¬·²¹­ô ­±·´ ±º ¬¸» ­¿³» ½´¿­­·º·½¿¬·±² ­¸±«´¼ ¾» ·²¬®±¼«½»¼ ¿²¼½±³°¿½¬»¼ ¬± ¬¸» ­¿³» ¼»²­·¬§ò ɸ»®» º±±¬·²¹­ ¸¿ª» ¾»»²«²¼»®³·²»¼ô ¿«¹³»²¬¿¬·±² ±® ±¬¸»® ­°»½·¿´·­¬ ©±®µ ³¿§ ¾» ®»¯«·®»¼òλ³»¼·¿¬·±² ±º º±±¬·²¹­ ¿²¼ º±«²¼¿¬·±²­ ·­ ¹»²»®¿´´§ ¬¸» ®»¿´³ ±º ¿­°»½·¿´·­¬ ½±²­«´¬¿²¬ò

ɸ»®» ·­±´¿¬»¼ º±±¬·²¹­ ®·­» ¿²¼ º¿´´ ¾»½¿«­» ±º ­©»´´ñ­¸®·²µ »ºº»½¬ô¬¸» ¸±³»±©²»® ³¿§ ¾» ¬»³°¬»¼ ¬± ¿´´»ª·¿¬» º´±±® ¾±«²½» ¾§ º·´´·²¹¬¸» ¹¿° ¬¸¿¬ ¸¿­ ¿°°»¿®»¼ ¾»¬©»»² ¬¸» ¾»¿®»® ¿²¼ ¬¸» °·»® ©·¬¸¾´±½µ·²¹ò ̸» ¼¿²¹»® ¸»®» ·­ ¬¸¿¬ ©¸»² ¬¸» ²»¨¬ ­©»´´ ­»¹³»²¬ ±º ¬¸»½§½´» ±½½«®­ô ¬¸» »¨¬®¿ ¾´±½µ·²¹ ©·´´ °«­¸ ¬¸» º´±±® «° ·²¬± ¿²¿½½»²¬«¿¬»¼ ¼±³» ¿²¼ ³¿§ ¿´­± ½¿«­» ´±½¿´ ­¸»¿® º¿·´«®» ·² ¬¸» ­±·´ò׺ ·¬ ·­ ²»½»­­¿®§ ¬± «­» ¾´±½µ·²¹ô ·¬ ­¸±«´¼ ¾» ¾§ ¿ °¿·® ±º º·²»©»¼¹»­ ¿²¼ ³±²·¬±®·²¹ ­¸±«´¼ ¾» ½¿®®·»¼ ±«¬ º±®¬²·¹¸¬´§ò

̸·­ ÞÌÚ ©¿­ °®»°¿®»¼ ¾§ Ö±¸² Ô»©»® Úß×Þô Ó×ßÓßô ﮬ²»®ô

ݱ²­¬®«½¬·±² Ü·¿¹²±­·­ò

̸» ·²º±®³¿¬·±² ·² ¬¸·­ ¿²¼ ±¬¸»® ·­­«»­ ·² ¬¸» ­»®·»­ ©¿­ ¼»®·ª»¼ º®±³ ª¿®·±«­ ­±«®½»­ ¿²¼ ©¿­ ¾»´·»ª»¼ ¬± ¾» ½±®®»½¬ ©¸»² °«¾´·­¸»¼ò

̸» ·²º±®³¿¬·±² ·­ ¿¼ª·­±®§ò ׬ ·­ °®±ª·¼»¼ ·² ¹±±¼ º¿·¬¸ ¿²¼ ²±¬ ½´¿·³»¼ ¬± ¾» ¿² »¨¸¿«­¬·ª» ¬®»¿¬³»²¬ ±º ¬¸» ®»´»ª¿²¬ ­«¾¶»½¬ò

Ú«®¬¸»® °®±º»­­·±²¿´ ¿¼ª·½» ²»»¼­ ¬± ¾» ±¾¬¿·²»¼ ¾»º±®» ¬¿µ·²¹ ¿²§ ¿½¬·±² ¾¿­»¼ ±² ¬¸» ·²º±®³¿¬·±² °®±ª·¼»¼ò

Ü·­¬®·¾«¬»¼ ¾§

ÝÍ×ÎÑ ÐËÞÔ ×ÍØ ×ÒÙ ÐÑ Þ±¨ ïïíçô ݱ´´·²¹©±±¼ íðêêô ß«­¬®¿´·¿

Ú®»»½¿´´ ïèðð êìë ðëï Ì»´ øðí÷ çêêî éêêê Ú¿¨ øðí÷ çêêî éëëë ©©©ò°«¾´·­¸ò½­·®±ò¿«

Û³¿·´æ °«¾´·­¸·²¹ò­¿´»­à½­·®±ò¿«

w ÝÍ×ÎÑ îððíò ˲¿«¬¸±®·­»¼ ½±°§·²¹ ±º ¬¸·­ Þ«·´¼·²¹ Ì»½¸²±´±¹§ º·´» ·­ °®±¸·¾·¬»¼

Ù¿®¼»²­ º±® ¿ ®»¿½¬·ª» ­·¬»

Page 264: SITE CLASSIFICATION REPORT SUMMARY...Douglas Partners (DP) has prepared this report for this project at Taylor 2- Stage 3, Taylor in accordance with DP’s proposal dated 15 September

TOPSOIL FILLING-dry to moist, brown silty sand

FILLING-generally comprising well compacted, dry tomoist, yellow brown grey, medium plasticity silty sandyclay with some gravel and high plasticity portions between1.0m and 1.2m

Pit discontinued at 1.7m-limit of investigation

0.15

1.7

SAMPLING & IN SITU TESTING LEGEND

TEST PIT LOG

Taylor 2 Estate, Stage 3, Taylor

A Auger sample G Gas sample PID Photo ionisation detector (ppm)B Bulk sample P Piston sample PL(A) Point load axial test Is(50) (MPa)BLK Block sample Ux Tube sample (x mm dia.) PL(D) Point load diametral test Is(50) (MPa)C Core drilling W Water sample pp Pocket penetrometer (kPa)D Disturbed sample Water seep S Standard penetration testE Environmental sample Water level V Shear vane (kPa)

Indesco Consulting Engineers Pty LtdSite Classifications

Results &Comments

LOGGED: JPM SURVEY DATUM: MGA94

CLIENT:PROJECT:LOCATION:

PIT No: 59PROJECT No: 77418.29DATE: 11/1/2019SHEET 1 OF 1

Sampling & In Situ Testing

1

2

Wat

er

Dep

th

Sam

ple

Description

of

Strata Gra

phic

Log

Typ

e

REMARKS: Surface Levels & Coordinates are approximate only and must not be relied upon

RIG: Kubota KX057-4 mini-excavator with 300mm wide bucket

WATER OBSERVATIONS: No free groundwater observed

SURFACE LEVEL: 667.0 AHDEASTING: 209076NORTHING: 618774

Dynamic Penetrometer Test(blows per mm)

5 10 15 20

Cone Penetrometer AS1289.6.3.2Sand Penetrometer AS1289.6.3.3

Depth(m) R

L

1

2

667

666

665

D

D

0.5

1.1 pp >400

Page 265: SITE CLASSIFICATION REPORT SUMMARY...Douglas Partners (DP) has prepared this report for this project at Taylor 2- Stage 3, Taylor in accordance with DP’s proposal dated 15 September

TOPSOIL FILLING-dry to moist, brown silty sand

FILLING-generally comprising well compacted, dry tomoist, orange brown, medium plasticity gravelly sandyclay with some silt

Pit discontinued at 1.7m-limit of investigation

0.17

1.7

SAMPLING & IN SITU TESTING LEGEND

TEST PIT LOG

Taylor 2 Estate, Stage 3, Taylor

A Auger sample G Gas sample PID Photo ionisation detector (ppm)B Bulk sample P Piston sample PL(A) Point load axial test Is(50) (MPa)BLK Block sample Ux Tube sample (x mm dia.) PL(D) Point load diametral test Is(50) (MPa)C Core drilling W Water sample pp Pocket penetrometer (kPa)D Disturbed sample Water seep S Standard penetration testE Environmental sample Water level V Shear vane (kPa)

Indesco Consulting Engineers Pty LtdSite Classifications

Results &Comments

LOGGED: JPM SURVEY DATUM: MGA94

CLIENT:PROJECT:LOCATION:

PIT No: 60PROJECT No: 77418.29DATE: 11/1/2019SHEET 1 OF 1

Sampling & In Situ Testing

1

2

Wat

er

Dep

th

Sam

ple

Description

of

Strata Gra

phic

Log

Typ

e

REMARKS: Surface Levels & Coordinates are approximate only and must not be relied upon

RIG: Kubota KX057-4 mini-excavator with 300mm wide bucket

WATER OBSERVATIONS: No free groundwater observed

SURFACE LEVEL: 667.0 AHDEASTING: 209057NORTHING: 618752

Dynamic Penetrometer Test(blows per mm)

5 10 15 20

Cone Penetrometer AS1289.6.3.2Sand Penetrometer AS1289.6.3.3

Depth(m) R

L

1

2

667

666

665

D

D

0.4

1.5

Page 266: SITE CLASSIFICATION REPORT SUMMARY...Douglas Partners (DP) has prepared this report for this project at Taylor 2- Stage 3, Taylor in accordance with DP’s proposal dated 15 September