8/13/2019 Site B Site Analysis 45-75
1/31
EXISTINGSTRUC
TURE
LOCATION OF EXISTING STRUCTURES
(site plan)
8/13/2019 Site B Site Analysis 45-75
2/31
EXISTINGSTRUC
TURE
LOCATION OF EXISTING STRUCTURES
(location plan)
8/13/2019 Site B Site Analysis 45-75
3/31
EXISTINGSTRUC
TURE
LOCATION OF EXISTING STRUCTURES
(location plan)
8/13/2019 Site B Site Analysis 45-75
4/31
EXISTINGSTRUC
TURE
LOCATION OF EXISTING STRUCTURES
(location plan)
8/13/2019 Site B Site Analysis 45-75
5/31EXISTINGSTRUC
TURE
MEASUREMENTSSuspension Bridge
PLAN SCALE 1:100
SIDE ELEVATION SCALE 1:100
FRONT ELEVATION SCALE 1:100
8/13/2019 Site B Site Analysis 45-75
6/31EXISTINGSTRUC
TURE
MEASUREMENTSShelter
PLAN SCALE 1:20 SIDE ELEVATION SCALE 1:20
8/13/2019 Site B Site Analysis 45-75
7/31EXISTINGSTRUC
TURE
PURPOSE OF EXISTENCESuspension Bridge
To connect forest and Pantai Kerachut
To provide an extensive view of Tasik Meromiktik
To act as a clear border between the sea and the lake
8/13/2019 Site B Site Analysis 45-75
8/31EXISTINGSTRUC
RURE
REASON OF CHOICE
Difference in height between the
two lands.
Less hassle during construction.
Suspension Bridge
MATERIALS USED
8/13/2019 Site B Site Analysis 45-75
9/31EXISTINGSTRUC
TURE
MATERIALS USEDSuspension Bridge
Platform
Fibre Cement Board
Handle
Polyvinyl Chloride
Base
Concrete
Columns
Concrete
Supporting Cables
Steel Cable
Supporting Ibeams
Galvanized Mild Steel
REASON OF CHOICE
8/13/2019 Site B Site Analysis 45-75
10/31EXISTINGSTRUC
TURE
REASON OF CHOICESuspension Bridge
PURPOSE OF EXISTENCE
8/13/2019 Site B Site Analysis 45-75
11/31
EXISTINGSTRUC
TURE
PURPOSE OF EXISTENCEShelter
Acts as a shelter during sunny or rainy days
To allow mountain hikers and beach lovers to have a nice place to rest
To bring the Malay traditional flavours to Pantai Kerachut
MATERIALS USED
8/13/2019 Site B Site Analysis 45-75
12/31
EXISTINGSTRUC
TURE
MATERIALS USEDShelter
Kapur WoodShellac coated
PURPOSE OF EXISTENCE
8/13/2019 Site B Site Analysis 45-75
13/31
EXISTINGSTRUC
TURE
PURPOSE OF EXISTENCEGuard Post
To provide security
To ensure cleanliness
To carry out registration
MATERIALS USED
8/13/2019 Site B Site Analysis 45-75
14/31
EXISTINGSTRUC
TURE
MATERIALS USEDGuard Post
Kapur Wood
Shellac coated
PURPOSE OF EXISTENCE
8/13/2019 Site B Site Analysis 45-75
15/31
EXISTINGSTRUC
TURE
PURPOSE OF EXISTENCESign Boards
SITE ANALYSIS
8/13/2019 Site B Site Analysis 45-75
16/31
VIEWSA
NDSENSORY
SITE ANALYSIS
WIND
8/13/2019 Site B Site Analysis 45-75
17/31
VIEWSA
NDSENSORY
WIND
NOISE
8/13/2019 Site B Site Analysis 45-75
18/31
VIEWSA
NDSENSORY
NOISE
Sound of sea breeze
and sea waves
Sound of waves
splashing onto the
rocks
Sound of the nature
and insects from the
forest
Sound of the wind
and sea breeze
Sound of the insects
and birds from the
forest
Sound of the insects and
birds from the forest
VIEWS FROM THE SITE
8/13/2019 Site B Site Analysis 45-75
19/31
VIEWSA
NDSENSORY
VIEWS FROM THE SITE
VIEWS
8/13/2019 Site B Site Analysis 45-75
20/31
VIEWSA
NDSENSORY
VIEWS
Point A
Point B
Point C
VIEW QUALITIES FROM SITE
8/13/2019 Site B Site Analysis 45-75
21/31
VIEWSA
NDSENSORY
VIEW QUALITIES FROM SITE
POINT A (VIEWS FROM BRIDGE)
8/13/2019 Site B Site Analysis 45-75
22/31
VIEWSA
NDSENSORY
O ( S O G )
POINT B (VIEWS FROM LAKESIDE)
8/13/2019 Site B Site Analysis 45-75
23/31
VIEWSA
NDSENSORY
( )
POINT C
8/13/2019 Site B Site Analysis 45-75
24/31
VIEWSA
NDSEN
SORY
VIEWS THROUGH THE SITE
8/13/2019 Site B Site Analysis 45-75
25/31
VIEWSA
NDSEN
SORY
VIEWS TO THE SITE
8/13/2019 Site B Site Analysis 45-75
26/31
VIEWSA
NDSEN
SORY
VIEWS TO THE SITE
8/13/2019 Site B Site Analysis 45-75
27/31
VIEWSA
NDSEN
SORY
BEST VIEWS
8/13/2019 Site B Site Analysis 45-75
28/31
VIEWSA
NDSEN
SORY
BEST VIEWS (EAST)
8/13/2019 Site B Site Analysis 45-75
29/31
VIEWSA
NDSEN
SORY
One of the best nature view during 6.45am-7.25am, when the sunrises.
BEST VIEWS (WEST)
8/13/2019 Site B Site Analysis 45-75
30/31
VIEWSA
NDSEN
SORY
One of the best nature view during 5.45pm-7.15pm, when the sunrises.
Site Plan ( 1:1500 )
8/13/2019 Site B Site Analysis 45-75
31/31
Site Plan ( 1:1500 )