270

SIR issued by the MoEF&CC · Form 1 Proposed Mandal Becharaji Special Investment Region in Ahmedabad and Mehsana District, Gujarat ===== May 2018 Page 1 of 2

  • Upload
    others

  • View
    5

  • Download
    0

Embed Size (px)

Citation preview

Page 1: SIR issued by the MoEF&CC · Form 1 Proposed Mandal Becharaji Special Investment Region in Ahmedabad and Mehsana District, Gujarat ===== May 2018 Page 1 of 2
Page 2: SIR issued by the MoEF&CC · Form 1 Proposed Mandal Becharaji Special Investment Region in Ahmedabad and Mehsana District, Gujarat ===== May 2018 Page 1 of 2

Form 1   Proposed Mandal Becharaji Special Investment Region in Ahmedabad and Mehsana District, Gujarat ============================================================================================= 

 

 

May 2018      Page 1 of 2   

(IV). Proposed Terms of Reference for EIA studies   The Terms of Reference  (ToR) proposed for preparation of Environmental  Impact Assessment Report  includes Environmental Management Plan for grant of Environmental Clearance under EIA Notification, 2006 is as under:  1. General 

a. Impact area of 10 km around the Project from the boundaries of the two clusters of the      SIR b. One season environmental baseline monitoring  c. Adherence to the Sector Specific EIA Guidance Manual, and standard ToR                       issued by the MoEF&CC  d. The EIA Report will follow generic structure of EIA Document as in Appendix III, 

EIA Notification, 2006 (amended), and other relevant OM’s and Circulars issued       by the MoEF&CC  

 2. Project Description 

a. Type, Need and Location of the project. b. Size and process description of the project with aspects which may affect the      environment c. Relevant maps/plates showing various details 

 3. Description of the Environment 

a. Study area, period, components and methodology b. Description of the study area w.r.t its environmental settings as under: 

Physico‐chemical  settings  –  comprising of meteorological  and air  environment; noise environment; land environment and water environment 

Ecological settings – comprising of terrestrial and aquatic flora‐fauna 

Demographic settings – comprising socio‐economic status, infrastructure, etc. c. Environmental Monitoring – one season environmental baseline data  

 4. Anticipated Environmental Impacts and Mitigation Measures 

a. Assessment of impact on the baseline due to size, location, operation of the      project b. Measures for minimizing the anticipated impacts c. Assessment of importance of various impacts and parameters d. Mitigative measures 

    

Page 3: SIR issued by the MoEF&CC · Form 1 Proposed Mandal Becharaji Special Investment Region in Ahmedabad and Mehsana District, Gujarat ===== May 2018 Page 1 of 2

Form 1   Proposed Mandal Becharaji Special Investment Region in Ahmedabad and Mehsana District, Gujarat ============================================================================================= 

 

 

May 2018      Page 2 of 2   

Sr.  Attribute  Parameters  

1.  Meteorology  Wind speed, direction, temperature, humidity, rainfall. etc. 

2.  Land Use  Land use and Land cover (LULC) map of different components 

3.  Ambient air quality  PM10, PM2.5, SO2, NO2, Pb, CO, and NH3 

4.  Noise levels  Noise levels in dB(A)  

5.  Water Quality (both surface water) and ground water) 

Physico‐chemical and Biological parameters  

6.  Soil Quality  Parameters related to agricultural and afforestation potential 

7.  Terrestrial Environment 

Flora and fauna of the impact area 

8.  Socio‐economic Status 

Socio economic status, demographic, and social impact etc. 

 5. Environmental monitoring programme 

a. Periodical monitoring of the environment during construction and operation phase        of the project b. Identify and analyze crucial parameters (air, water environment) for monitoring 

 6. Additional Studies 

a. Risk assessment and disaster management plan for the proposed activities in the SIR  b. Corporate social responsibility (CSR) plan 

 7. Environment Management Plan 

a. Proposed mitigation measures and their implementation b. Structure of environment management cell c. Administrative and cost control of implementation schedule 

 

Page 4: SIR issued by the MoEF&CC · Form 1 Proposed Mandal Becharaji Special Investment Region in Ahmedabad and Mehsana District, Gujarat ===== May 2018 Page 1 of 2

Mandal Becharaji Special Investment Region

(MBSIR)

Report 1 - Draft Development Plan Report

Mandal Becharaji Special Investment Regional

Development Authority, Gandhinagar

C/O: DSIRDA, Block No. 11/12, 3rd Floor, Udyog Bhavan, Sector 11, Gandhinagar - 382017

DRAFT DEVELOPMENT PLAN SUBMITTED U/S 15 (3)(ii) AND 17 OF THE GSIR ACT 2009 AND U/S 16 OF THE GTP & UD ACT 1976

Page 5: SIR issued by the MoEF&CC · Form 1 Proposed Mandal Becharaji Special Investment Region in Ahmedabad and Mehsana District, Gujarat ===== May 2018 Page 1 of 2

Mandal Becharaji Special Investment Region

(MBSIR)

Report 1 - Draft Development Plan Report

Mandal Becharaji Special Investment Regional

Development Authority, Gandhinagar

C/O: DSIRDA, Block No. 11/12, 3rd Floor, Udyog Bhavan, Sector 11, Gandhinagar - 382017

DRAFT DEVELOPMENT PLAN SUBMITTED U/S 15 (3)(ii) AND 17 OF THE GSIR ACT 2009 AND U/S 16 OF THE GTP & UD ACT 1976

Page 6: SIR issued by the MoEF&CC · Form 1 Proposed Mandal Becharaji Special Investment Region in Ahmedabad and Mehsana District, Gujarat ===== May 2018 Page 1 of 2

MBSIR Draft Development Plan

MBSIRDA iii|P a g e

Contents

Contents............................................................................................................................................... iii

List of Figures ......................................................................................................................................... v

List of Tables ......................................................................................................................................... vi

Abbreviation ........................................................................................................................................ vii

CHAPTER 1 ........................................................................................................................................... 1

1. Introduction ............................................................................................................................................ 2

1.1. Overview ......................................................................................................................................... 2

1.2. Notification of Mandal Becharaji Special Investment Region ........................................................ 3

1.3. Constitution of ‘Authority’ and ‘Committee Members’ of MBSIRDA ............................................ 4

1.4. Powers and Functions of MBSIRDA ................................................................................................ 5

CHAPTER 2 ............................................................................................................................................. 7

2. MBSIR - Existing Situation ...................................................................................................................... 8

2.1. Location & Connectivity ................................................................................................................. 8

2.2. Existing Major Road network ......................................................................................................... 9

2.3. Location with respect to Environmentally Sensitive Areas .......................................................... 10

2.4. Existing land use ........................................................................................................................... 11

2.5. Rivers, Tributaries, Canal and Water Tanks in the region ............................................................ 14

2.6. Demography ................................................................................................................................. 15

2.7. Social Infrastructure ..................................................................................................................... 18

2.8. Physical Infrastructure .................................................................................................................. 19

CHAPTER 3 ........................................................................................................................................... 20

3. Development Plan Proposal ................................................................................................................. 21

3.1. Preparation of Base map & Existing land use map ...................................................................... 21

3.2. Target Sector Identification .......................................................................................................... 24

3.3. Sustainable Population ................................................................................................................. 26

3.4. Vision ............................................................................................................................................ 27

3.5. Planning Principles ....................................................................................................................... 27

3.6. Land Use Proposal ........................................................................................................................ 29

3.7. Road and Rail proposals ............................................................................................................... 41

3.8. Infrastructure Proposals ............................................................................................................... 46

CHAPTER 4 ........................................................................................................................................... 56

4. Implementation Strategy ..................................................................................................................... 57

4.1. Comprehensive guidelines for implementing the DP .................................................................. 57

4.2. Provision of various facilities in Development Plan through TP Schemes ................................... 58

Page 7: SIR issued by the MoEF&CC · Form 1 Proposed Mandal Becharaji Special Investment Region in Ahmedabad and Mehsana District, Gujarat ===== May 2018 Page 1 of 2

MBSIR Draft Development Plan

MBSIRDA iv|P a g e

CHAPTER 5 ........................................................................................................................................... 61

5. Broad Cost Estimates ............................................................................................................................ 62

5.1. External Infrastructure components ............................................................................................ 62

5.2. Internal Infrastructure components ............................................................................................. 63

5.3. Comprehensive Infrastructure ..................................................................................................... 65

Page 8: SIR issued by the MoEF&CC · Form 1 Proposed Mandal Becharaji Special Investment Region in Ahmedabad and Mehsana District, Gujarat ===== May 2018 Page 1 of 2

MBSIR Draft Development Plan

MBSIRDA v|P a g e

List of Figures

1-1, DMIC influential area, India 1-2, DMIC influential area, Gujarat .......................................................... 2

2-1, Location & Connectivity - MBSIR ................................................................................................................. 8

2-2, Existing Major Road Network within MBSIR ............................................................................................... 9

2-3, SH 133 connecting Ughroj with Ughrojpura 2-4, SH 19 connecting Hansalpur with Becharaji ............ 10

2-5, Location with respect to Environmentally Sensitive areas ....................................................................... 10

2-6, Existing Land Use, MBSIR .......................................................................................................................... 12

2-7, Water bodies in MBSIR ............................................................................................................................. 14

2-8, Sitapur Lake ............................................................................................................................................... 14

2-9, Zinzuwada Branch Canal 2-10, Kharaghoda Branch Canal ......................................................... 15

2-11, Average Annual Growth Rate .................................................................................................................. 16

2-12, Sex ratio ................................................................................................................................................... 16

2-13, Literacy Rate ............................................................................................................................................ 17

2-14, Work Participation Rate .......................................................................................................................... 17

2-15, Worker's Distribution .............................................................................................................................. 18

3-1, Satellite Image of MBSIR ........................................................................................................................... 21

3-2, Base Map, MBSIR ...................................................................................................................................... 23

3-3, Industrial zone ........................................................................................................................................... 30

3-4, Logistic zone .............................................................................................................................................. 31

3-5, Knowledge and IT zone ............................................................................................................................. 32

3-6, Residential zone ........................................................................................................................................ 33

3-7, Affordable housing zone ........................................................................................................................... 34

3-8, High Access Corridor ................................................................................................................................. 35

3-9, Mixed Use.................................................................................................................................................. 36

3-10, Recreation, Sports and Entertainment zone ........................................................................................... 37

3-11, Village Buffer zone .................................................................................................................................. 38

3-12, Proposed Landuse plan, MBSIR ............................................................................................................... 39

3-13, 90 mt. Row, Road Section ....................................................................................................................... 42

3-14, 60 mt. Row, Road Section ....................................................................................................................... 42

3-15, 45 mt. Row, Road Section ....................................................................................................................... 43

3-16, 30 mt. Row, Road Section ....................................................................................................................... 43

3-17, Proposed Road Network, MBSIR ............................................................................................................. 45

3-18, Water Supply Network ............................................................................................................................ 49

3-19, Sewage Network ..................................................................................................................................... 51

3-20, Recyle Water Network ............................................................................................................................ 52

3-21, Storm Water Disposal Scheme ................................................................................................................ 53

Page 9: SIR issued by the MoEF&CC · Form 1 Proposed Mandal Becharaji Special Investment Region in Ahmedabad and Mehsana District, Gujarat ===== May 2018 Page 1 of 2

MBSIR Draft Development Plan

MBSIRDA vi|P a g e

List of Tables

Table 1-1, List of notified villages ....................................................................................................................... 4

Table 1-2, MBSIRDA Board Members................................................................................................................. 4

Table 2-1, Area Statement, Existing Land Use MBSIR ...................................................................................... 13

Table 2-2, Demographic Information, MBSIR................................................................................................... 15

Table 2-3, Education facilities in MBSIR ........................................................................................................... 18

Table 2-4, Health Facilities in MBSIR ................................................................................................................ 19

Table 3-1, Employment generation in MBSIR .................................................................................................. 26

Table 3-2, Floating Employment ...................................................................................................................... 26

Table 3-3, Total Population supported by MBSIR ............................................................................................ 26

Table 3-4, Major Industrial Nodes .................................................................................................................... 30

Table 3-5, Location of Logistic zone ................................................................................................................. 31

Table 3-6, Area Statement MBSIR .................................................................................................................... 40

Table 3-7, Proposed Road Network ................................................................................................................. 44

Table 3-8, Proposed Rail Network .................................................................................................................... 46

Table 3-9, Treatment units for Water Supply .................................................................................................. 47

Table 3-10, Sewage pumping station units ...................................................................................................... 50

Table 4-1, Requirement of community facility for MBSIR ............................................................................... 59

Table 4-2, Standards for Community Facility ................................................................................................... 59

Table 4-3, Requirement of commercial facility for MBSIR ............................................................................... 60

Table 5-1, External Road Infrastructure ........................................................................................................... 62

Table 5-2, External Rail Infrastructure ............................................................................................................. 62

Table 5-3, Comprehensive - External Infrastructure ........................................................................................ 62

Table 5-4, Internal Road Infrastructure ............................................................................................................ 63

Table 5-5, Internal Rail Infrastructure .............................................................................................................. 63

Table 5-6, Water Supply ................................................................................................................................... 64

Table 5-7, Sewage System ................................................................................................................................ 64

Table 5-9, Storm Water Disposal System ......................................................................................................... 65

Table 5-10, Solid Waste .................................................................................................................................... 65

Table 5-11, Internal Infrastructure Costing ...................................................................................................... 65

Table 5-12, Comprehensive Infrastructure Costing ......................................................................................... 65

Page 10: SIR issued by the MoEF&CC · Form 1 Proposed Mandal Becharaji Special Investment Region in Ahmedabad and Mehsana District, Gujarat ===== May 2018 Page 1 of 2

MBSIR Draft Development Plan

MBSIRDA vii|P a g e

Abbreviation

DFC Dedicated Freight Corridor

DMIC Delhi-Mumbai Industrial Corridor

SIR Special Investment Region

MBSIR Mandal Becharaji Special Investment Region

MBSIRDA Mandal Becharaji Special Investment Regional Development Authority

DP Development Plan

GDCR General Development Control Regulations

Acts

GTP & UD Gujarat Town Planning & Urban Development GSIR Gujarat Special Investment Region

State and Central Government Organisations

CPHEEO Central Public Health and Environmental Engineering Organisation

CPCB Central Pollution Control Board

GETCO Gujarat Energy Transmission Company

GIDB Gujarat Infrastructure Development Board

GPCB Gujarat Pollution Control Board

SSNNL Sardar Sarovar Narmada Nigam Limited

DILR District Inspector of Land Records

GSRDC Gujarat State Road Development Corporation

MoEF Ministry of Environment and Forests

PCCF Principal Chief Conservator of Forest

GWSSB Gujarat Water Supply and Sanitation Board

GWIL Gujarat Water Infrastructure Limited

Utility Infrastructure Terms

CETP Common Effluent Treatment Plant

DCS Distribution Control System

STP Sewage Treatment Plant

SWM Solid Waste Management

TSE Treated Sewage Effluent

Financial and Economic Terms

CAPEX Capital Expenditure

ERR Economic Rate of Return

ENPV Economic Net Present Value

OPEX Operating Expenditure

Page 11: SIR issued by the MoEF&CC · Form 1 Proposed Mandal Becharaji Special Investment Region in Ahmedabad and Mehsana District, Gujarat ===== May 2018 Page 1 of 2

MBSIR Draft Development Plan

MBSIRDA viii|P a g e

Terms Related to Transportation

NH National Highway

SH State Highway

MDR Major District Road

ODR Other District Road

TOD Transit Oriented Development

PCU Passenger Car Equivalent

ROW Right of Way

Page 12: SIR issued by the MoEF&CC · Form 1 Proposed Mandal Becharaji Special Investment Region in Ahmedabad and Mehsana District, Gujarat ===== May 2018 Page 1 of 2

1

CHAPTER 1

INTRODUCTION

Page 13: SIR issued by the MoEF&CC · Form 1 Proposed Mandal Becharaji Special Investment Region in Ahmedabad and Mehsana District, Gujarat ===== May 2018 Page 1 of 2

MBSIR Draft Development Plan

MBSIRDA 2|P a g e

1. Introduction

1.1. Overview

Spread over more than 102 Sq.km, Mandal Bechraji Special Investment Region (MBSIR) is a new industrial

hub being planned about 90km from Ahmedabad and 85 km from Gandhinagar near Becharaji town.

Envisaged by the government of Gujarat, MBSIR is one of its kind industrial hubs and will comprise

automobile, manufacturing and auxiliary industries. The SIR is strategically located, well connected with

trade gateways and falls in the influence zone of proposed Delhi – Mumbai Industrial Corridor project

(DMIC), a joint initiative by the Government of India and Japan.

The dedicated freight corridor (DFC) passes through six different states. Distribution of its length in these

states is mentioned below

Delhi NCR – 1.5%

Haryana – 10%

Uttar Pradesh – 1.5%

Rajasthan – 39%

Gujarat – 38%

Maharashtra – 10%

1-1, DMIC influential area, India 1-2, DMIC influential area, Gujarat

Govt. of Gujarat has been pro active to take advantage of proposed DMIC Project. It has declared around

10 Special Investment Regions in the area of influence of DMIC. For Mandal Becharaji Special Investment

Region, a concept plan has been prepared which consist of

Delineation of SIR region

Basic physiographic studies of region

Target sectors for SIR and market analysis

Proposed

MBSIR

Page 14: SIR issued by the MoEF&CC · Form 1 Proposed Mandal Becharaji Special Investment Region in Ahmedabad and Mehsana District, Gujarat ===== May 2018 Page 1 of 2

MBSIR Draft Development Plan

MBSIRDA 3|P a g e

Conceptual land use and infrastructure proposals

Block cost estimates

For implementation of concept plan, the state govt. has decided to prepare a development plan for the

region. The overall process for preparation of development plan comprises of following stages:

1. Declaration of special investment region u/s 3 read with section 4 of the Gujarat Special

Investment Region Act, 2009

2. Establishment of apex authority – The Gujarat Infrastructure Development Board (GIDB),

established u/s 17 of Gujarat Infrastructure Development Act, 1999 is declared and designated as

the Special Investment Region Apex Authority u/s 5 of GSIR Act, 2009

3. Constitution of a regional development authority as per sub-section (1) of sections 8, 9, 10 and 15

of the Gujarat Special Investment Region Act, 2009

4. Preparation of draft development plan u/s 15 of GSIR Act 2009 and u/s 9 of GTP & UD Act 1976

5. Publication of draft development plan u/s 17 of GSIR Act 2009 and u/s 13 of GTP & UD Act, 1976

6. Receive/consider objections and suggestions u/s 17 of GSIR Act 2009 and u/s 14 of GTP & UD Act,

1976

7. Publication of modifications done in development plan after receiving objections and suggestions,

u /s 17 of GSIR Act 2009 and u/s 15 of GTP & UD Act, 1976

8. Submission of draft development plan to State Government for sanction u/s 17 of GSIR Act 2009

and u/s 16 of GTP & UD Act, 1976

This publication addresses stage 7 of the above process and comprises of modified draft development plan

after receiving objections and suggestions, u/s 15(3)(ii) u/s 17 of GSIR Act 2009 and u/s 15 of GTP & UD Act

1976.

The publication comprises of two reports. Report 1 covers the proposal on land use, infrastructure,

implementation and block cost estimates and Report 2 covers the Draft General Development Control

Regulations (DGDCR) for the proposed SIR.

1.2. Notification of Mandal Becharaji Special Investment Region

In exercise of the powers conferred by section 3 read with section 4 of the Gujarat Special Investment

Region Act, 2009 (Guj. 2 of 2009), the Industries and Mines Dept. of Government of Gujarat and the

Government of Gujarat declared Mandal Becharaji Special Investment Region (MBSIR) vide Notification No.

GHU/2012/22/SIR/112012/1276/I on 24th September 2012 published in Government Gazette. Notification

comprises 44 villages of district Ahmedababd taluka Mandal and Detroj, District Surendranager taluka

dasada-patadi and District Mahesana taluka bechraji.

Vide Notification No. GHU/2013/16/SIR/112012/1276/I on 14th August 2013 published in Government

Gazette, Industries and Mines Department, Government of Gujarat, deleted 36 villages from the earlier

declared “Mandal Bechraji Special Investment Region”.

As per notification Mandal Becharaji Special Investment Region comprises of 2 villages of Detroj Taluka

and5 villages of Mandal Taluka from Ahmedabad district and 1 village from Becharaji Taluka of Mehsana

Page 15: SIR issued by the MoEF&CC · Form 1 Proposed Mandal Becharaji Special Investment Region in Ahmedabad and Mehsana District, Gujarat ===== May 2018 Page 1 of 2

MBSIR Draft Development Plan

MBSIRDA 4|P a g e

District. The total area spread over 8 villages, about 101.72 sq.km. as per notification and as per measured

on base map 102.10 sq km.

SR. NO.

NAME OF DISTRICT

NAME OF TALUKA

NAME OF REVENUE VILLAGES

1 2 3 4

Sr. No.

Name of Village Total survey nos.

Total Area of land in sq. km.

2 Ahmedabad

Mandal

1 Hansalpur Becharaji

Complete 8.63

2 Sitapur Complete 36.72

3 Ughroj Complete 14.24

4 Ughroj nu Paru Complete 6.37

5 Ukardi Complete 8.56

Detroj 6 Bhagapura Complete 12.43

7 Shihor Complete 9.53

3 Mehsana Becharaji 8 Chandanki Complete 5.24

Total Area 101.72 Table 1-1, List of notified villages

Source: notification Dated 24th

September 2012.

1.3. Constitution of ‘Authority’ and ‘Committee Members’ of MBSIRDA

In exercise of the powers conferred by sub-section (1) of sections 8, u/s 9, 10 and 15 of the Gujarat Special

Investment Region Act, 2009 (Guj. 2 of 2009), the Industries and Mines Dept. of Gujarat and the

Government of Gujarat constituted Mandal Becharaji Special Investment Regional Development Authority

(MBSIRDA) vide Notification No. GHU/12/23/SIR/112012/1276/I on 1st October 2012, published in

Government Gazette. MBSIRDA shall consist of the following members, namely:-

Sr. No. Member Designation

1 Principal Secretary Industries and Mines Department

Chairperson

2 Industries Commissioner Vice Chairperson

3 Chief Executive Officer, Gujarat Infrastructure Development Board

Member ex-officio

4 Collector, Ahmedabad, Member ex-officio

5 District Development Officer, Ahmedabad Member

6 Collector, Mehsana, Member

7 Collector, Surendranagar, Member

8 Director, School of Planning, Centre of Environmental Planning and Technology (CEPT), Ahmedabad

Member

9 Shri U.S. Mehta (Retired Town Planner) Member

10 President, Gujarat Chamber of Commerce and Industries Member

11 Chief Executive Officer, Mandal Becharaji Special Investment Regional Development Authority

Member Secretary

Table 1-2, MBSIRDA Board Members

Source: Form notification Dated 1st October 2012.

Page 16: SIR issued by the MoEF&CC · Form 1 Proposed Mandal Becharaji Special Investment Region in Ahmedabad and Mehsana District, Gujarat ===== May 2018 Page 1 of 2

MBSIR Draft Development Plan

MBSIRDA 5|P a g e

1.4. Powers and Functions of MBSIRDA

The powers and functions of the Mandal Becharaji Special Investment Regional Development Authority will be according to section 15 of ‘The Gujarat Special Investment Region Act, 2009. It is thus listed as below:

1) The Regional Development Authority shall secure planned development of the Special Investment

Region and shall take steps for its effective regulation and efficient management so as to bring and

enhance general welfare, convenience, productivity and excellence.

2) Without prejudice to the generality of foregoing provisions, the Regional Development Authority shall

undertake the management and planning of land resource and infrastructure of the Special Investment

Region (SIR).

3) The Regional Development Authority shall, in particular, exercise the following powers and perform the

following functions namely:-

i. To classify and earmark the area of the Special Investment Region for various purposes and usages

including economic activities, amenities and community services as it deems fit;

ii. To prepare the Draft Development plan for whole or part of the area of the Special Investment

Region;

iii. To undertake preparation and executing of town planning scheme for whole or part of the Special

Investment Region;

iv. To regulate the development of the periphery area of the Special Investment Region,

v. To acquire, hold and manage moveable or immoveable property as it may deem necessary subject

to general or specific directions of the State Government in this regard;

vi. To acquire land in the Special Investment Region, by sale, lease, grant, allocation, donation, Town

Planning Scheme, consent agreement or through proceedings under the Land Acquisition Act,

1894 for the purposes of this Act,

vii. To sale, lease, transfer or dispose of any land or building belonging to it subject to the regulations

made by the Apex Authority;

viii. To carry out surveys in the Mandal Becharaji Special Investment Region for the preparation of Draft

Development Plans and Town Planning Schemes;

ix. To prepare, issue and implement the directions, the standards and the norms for building

structures, infrastructure development and other construction activities in the Special Investment

Region;

x. To enter into contracts, agreements or concession agreement with any person, entity, developer or

organization as it may deem necessary for performing its functions;

xi. To execute, co-ordinate and supervise works in connection with infrastructure or provision of other

services and amenities in the Special Investment Region;

xii. To provide for disaster management and mitigation in the Special Investment Region;

xiii. To levy and collect such fees, development charges, or user charges as may be ascertained and

fixed by the Apex Authority under clause (vii) of sub-section (2) of section 6;

xiv. To remove encroachments and constructions not duly authorized or made in violation of the

regulations, directions and norms laid down by the Regional Development Authority;

Page 17: SIR issued by the MoEF&CC · Form 1 Proposed Mandal Becharaji Special Investment Region in Ahmedabad and Mehsana District, Gujarat ===== May 2018 Page 1 of 2

MBSIR Draft Development Plan

MBSIRDA 6|P a g e

xv. To make arrangements for observance and promotion of safety, order, health and environmental

safeguards within the Special Investment Region;

xvi. To guide, assist and co-ordinate with other authorities functioning in the Special Investment Region

in matters pertaining to planning and use of land and development of the Special Investment

Region;

xvii. To control the development activities in accordance with the Development plan and to bring

aesthetics, efficiency and economy in the process of development;

xviii. To ensure and make provisions for sufficient civic amenities and services including hospitals and

medical services, schools, fire services, public parks, markets and shopping places, playgrounds,

entertainment areas and disposal of waste and provisions of drainage;

xix. The make sustainable arrangements for providing and maintaining the highest standards in civic

amenities and services particularly for cleanliness, aesthetics, health and hygiene;

xx. To make enquiry, inspection, examination or measurement of any land and building in any part of

the Special Investment Region;

xxi. To exercise such other powers and discharge such other functions as may be prescribed by the

rules or regulations.

4) (a) Notwithstanding anything contained in the relevant State Acts, rules or any existing instructions

of the State Government, the Regional Development Authority my frame its own General

Development Control Regulations (GDCR) and the same shall prevail for developments in the

Special Investment Region.

b) Every person, unit or developer or any other stakeholder in Special Investment Region shall

be required to get the plans of the building approved by the Regional Development Authority

before commencing any construction and shall obtain the approval of the Regional Development

Authority necessary and incidental thereto, after the completion and before the use of such

premises.

c) For the purpose of this section and with any other requirement for proper planning,

management and development of the Special Investment Region, the Regional Development

Authority may issue such direction or instruction as it may consider necessary to any person, unit,

entity, developer or any other stakeholder in the Special Investment Region and the person, unit,

entity, developer or, as the case may be, the stakeholder shall be bound by such directions

Page 18: SIR issued by the MoEF&CC · Form 1 Proposed Mandal Becharaji Special Investment Region in Ahmedabad and Mehsana District, Gujarat ===== May 2018 Page 1 of 2

7

CHAPTER 2 MBSIR - EXISTING SITUATION

Page 19: SIR issued by the MoEF&CC · Form 1 Proposed Mandal Becharaji Special Investment Region in Ahmedabad and Mehsana District, Gujarat ===== May 2018 Page 1 of 2

MBSIR Draft Development Plan

MBSIRDA 8|P a g e

2. MBSIR - Existing Situation

2.1. Location & Connectivity

Mandal Bechraji Special Investment Region (MBSIR) is located about 90 km from Ahmedabad and 85 km

from Gandhinagar on north-west and near Becharaji town.

2-1, Location & Connectivity - MBSIR

The SIR is regionally well connected through National and State highways as well as railways. National

highway 14- 15 connecting Kandla with Palanpur passes through north of the proposed SIR. NH-8 and State

highway no. 7 passes from south, and State highway no. 41 connecting Ahmedabad and Mehsana passes

along eastern edge of the SIR. The five major roads directly connecting SIR with the National and state

highways include:

SH-133 – Connecting Ahmedabad via Detroj, Kadi, Kalol and Adalaj

MDR - Connecting Mehsana via Becharaji and Modhera is a 2-lane undivided road

SH-7- Connecting Viramgam

SH-135- Connecting Sanand via Kadi and Thol

SH-55 connecting Mundra via Radhanpur, Harij and Becharaji

A broad gauge railway line connecting Viramgam with Mehsana passes through the SIR at Detroj. Apart

from this the SIR is in proximity to a meter gauge line connecting Katosan Road to Ranuj via Becharaji.

Page 20: SIR issued by the MoEF&CC · Form 1 Proposed Mandal Becharaji Special Investment Region in Ahmedabad and Mehsana District, Gujarat ===== May 2018 Page 1 of 2

MBSIR Draft Development Plan

MBSIRDA 9|P a g e

2.2. Existing Major Road network

Currently three state highways pass through the proposed SIR. SH 7 connecting Becharaji with Ukardi

village. SH 133 providing connectivity between Ughroj and Ughrojpura and SH 19 connecting Hansalpur

with Becharaji. These three state highways form a triangular loop within SIR and also provide major entry

and exit points.

2-2, Existing Major Road Network within MBSIR

Page 21: SIR issued by the MoEF&CC · Form 1 Proposed Mandal Becharaji Special Investment Region in Ahmedabad and Mehsana District, Gujarat ===== May 2018 Page 1 of 2

MBSIR Draft Development Plan

MBSIRDA 10|P a g e

2-3, SH 133 connecting Ughroj with Ughrojpura 2-4, SH 19 connecting Hansalpur with Becharaji

2.3. Location with respect to Environmentally Sensitive Areas

2-5, Location with respect to Environmentally Sensitive areas

There are three notified sanctuaries around proposed SIR, namely Wild Ass sanctuary in Little Rann of

Kachchh, Nal sarovar birds sanctuary and Thol lake birds sanctuary. However all of them are more than 10

km. from the notified SIR boundary. The Wild Ass sanctuary in Little Rann of Kachchh is located on east of

notified MBSIR region and is around 35 km. away. It spreads over an area of appx. 4900 sq. km. Little Rann

of Kachchh is also listed under UNESCO World Heritage Sites. Spread over an area of appx. 120 sq. km., Nal

sarovar birds sanctuary is located to the south of SIR and is around 45 km. away. It is a natural lake with

shallow waters and muddy lagoons, dotted by 360 islets. Thol bird sanctuary covering an area of around 7

Sq.Km is a manmade lake and is located towards south east of MBSIR around 35 km. away.

Page 22: SIR issued by the MoEF&CC · Form 1 Proposed Mandal Becharaji Special Investment Region in Ahmedabad and Mehsana District, Gujarat ===== May 2018 Page 1 of 2

MBSIR Draft Development Plan

MBSIRDA 11|P a g e

2.4. Existing land use

Of the total area only 1.29 % is under Habitation. Around 82.84 sq. km. of land area is under Agriculture

land use. Various river tributaries, water tanks and canals account for 3.43 sq. km. (3.36%) of land in MBSIR.

Page 23: SIR issued by the MoEF&CC · Form 1 Proposed Mandal Becharaji Special Investment Region in Ahmedabad and Mehsana District, Gujarat ===== May 2018 Page 1 of 2

MBSIR Draft Development Plan

MBSIRDA 12|P a g e

2-6, Existing Land Use, MBSIR

Page 24: SIR issued by the MoEF&CC · Form 1 Proposed Mandal Becharaji Special Investment Region in Ahmedabad and Mehsana District, Gujarat ===== May 2018 Page 1 of 2

MBSIR Draft Development Plan

MBSIRDA 13|P a g e

Sr. No. Land Use Area (Sq. Km.) %

1 Agriculture 82.84 81.14

2 Habitation 1.32 1.29

3 Brick Kiln 0.14 0.14

4 Open Scrub 13.17 12.91

5 Roads 1.18 1.16

6 Canals 0.83 0.82

7 Water Tanks (Talav) 2.07 2.03

8 River 0.52 0.52

102.10 100

Table 2-1, Area Statement, Existing Land Use MBSIR

Page 25: SIR issued by the MoEF&CC · Form 1 Proposed Mandal Becharaji Special Investment Region in Ahmedabad and Mehsana District, Gujarat ===== May 2018 Page 1 of 2

MBSIR Draft Development Plan

MBSIRDA 14|P a g e

2.5. Rivers, Tributaries, Canal and Water Tanks in the region

2-7, Water bodies in MBSIR

There are four major tributaries and many water tanks in the region covering an area of appx. 3.43 sq.km.

(3.36% of total land). One of the major water bodies present in the nearby region is “Saran Lake” near

Vanod village. It is a man made water body developed for facilitating irrigation. Its area is appx. 8 sq. km.

However it has water only for around six month between August and January. Entire MBSIR area falls

within SSNNL command area. There are two branch canals namely Kharaghoda and Zinzuwada which pass

through the SIR. Length of these branch canals is around 10 km. Total area occupied by canal network is

around 4.5 sq. km.

2-8, Sitapur Lake

Page 26: SIR issued by the MoEF&CC · Form 1 Proposed Mandal Becharaji Special Investment Region in Ahmedabad and Mehsana District, Gujarat ===== May 2018 Page 1 of 2

MBSIR Draft Development Plan

MBSIRDA 15|P a g e

2-9, Zinzuwada Branch Canal 2-10, Kharaghoda Branch Canal

2.6. Demography

Demographic profiling of the 8 Villages within SIR is carried out. This includes Population growth, literacy

rate, sex ratio, work participation and workers distribution.

District Taluka Village Name

Population Literacy

Working Population

Total Male Female

Ahmedabad Detroj Bhagapura 1052 531 521 627 389

Shihor 1384 705 679 775 519

Mandal Hansalpur Becharaji

1464 761 703 630 799

Sitapur 4161 2210 1951 2273 2166

Ughroj 1686 883 803 659 458

Ughrojpura 1152 594 558 749 269

Ukardi 1299 612 687 555 458

Mehsana Becharaji Chandanki 318 149 169 195 121

MBSIR 12516 6445 6071 6463 5179

Table 2-2, Demographic Information, MBSIR

Source: Census of India 2001

Page 27: SIR issued by the MoEF&CC · Form 1 Proposed Mandal Becharaji Special Investment Region in Ahmedabad and Mehsana District, Gujarat ===== May 2018 Page 1 of 2

MBSIR Draft Development Plan

MBSIRDA 16|P a g e

2.6.1. Average Annual Growth Rate (%)

Average annual growth rate is the rate at which population of a region increases in a given time period as a

fraction of the initial population. Between 1981 and 1991 the average annual growth rate of population

within MBSIR has been negative (-1.6 %) as compared to the positive growth rates of state and districts.

However from 1991 to 2001 the growth rate has improved, but remained lower in comparison to state and

district averages.

2-11, Average Annual Growth Rate

2.6.2. Sex ratio

2-12, Sex ratio

Sex ratio is number of females per 1000 males. Sex ratio in MBSIR region is higher as compared to district

and state averages.

Low population growth rate and high sex ratio as compared to District and State figures are indicative of

major out migration from the villages within the SIR. Better work opportunities on development of the SIR

may reverse the trends.

Page 28: SIR issued by the MoEF&CC · Form 1 Proposed Mandal Becharaji Special Investment Region in Ahmedabad and Mehsana District, Gujarat ===== May 2018 Page 1 of 2

MBSIR Draft Development Plan

MBSIRDA 17|P a g e

2.6.3. Literacy Rate (%)

2-13, Literacy Rate

As per the census 2001, the average literacy rate within the SIR is 52%. This is lower than average rates of

Ahmedabad district (69%) and Gujarat State (59%) indicates the need for education facilities and

infrastructure through planned development in proposed SIR.

2.6.4. Work Participation Rate (%)

2-14, Work Participation Rate

Work participation rate is defined as the percentage of total workers (main and marginal) to total

population. Almost 41% of total population residing in MBSIR is working population. Work participation

rate of the region has been increased in last two decades. It is almost near to state averages.

Page 29: SIR issued by the MoEF&CC · Form 1 Proposed Mandal Becharaji Special Investment Region in Ahmedabad and Mehsana District, Gujarat ===== May 2018 Page 1 of 2

MBSIR Draft Development Plan

MBSIRDA 18|P a g e

2-15, Worker's Distribution

As per Census of India, workers are divided in four major categories i.e. cultivators, agriculture labourers,

household industry workers and other workers. Out of these, cultivators and agriculture labourers

comprise of workers involved in agriculture (primary economic activity). The other two categories of

workers are involved in secondary and tertiary economic activities.

In MBSIR almost 80% of working population is involved in primary economic activities and the rest 20%

involved in secondary and tertiary economic activities. Ahmedabad district has around 20% of working

population involved in primary and rest 80% involved in secondary and tertiary economic activities. High

dependency of working population in MBSIR on primary economic activities along with high number of

agriculture labourers (50 %) indicates lack of economic opportunities in other sectors.

2.7. Social Infrastructure

2.7.1. Education Facilities

Sr. No. Educational Facility Number

1 Primary School 10

2 Secondary School 4

3 Senior Secondary School 0

4 College 0

5 Industrial School 0

6 Training School 0

7 Adult literacy Class/Centre 0

8 Other educational facilities 0 Table 2-3, Education facilities in MBSIR

Source: Census of India 2001

Page 30: SIR issued by the MoEF&CC · Form 1 Proposed Mandal Becharaji Special Investment Region in Ahmedabad and Mehsana District, Gujarat ===== May 2018 Page 1 of 2

MBSIR Draft Development Plan

MBSIRDA 19|P a g e

There are 10 primary schools in the region, suggesting that almost each village has a primary school.

However there are only 4 secondary schools and no senior secondary schools between 8 villages, spread

over an area of 102.10 sq. km.

There are no colleges, training schools or other education facilities available in the region. Nearest towns

with these facilities are Kadi, Mehsana, and Ahmedabad on eastern side of MBSIR. Villagers on the western

side of the SIR (Surendranagar district) travel around 20 – 25 km. to avail these facilities.

2.7.2. Health facilities

Health Facility Number

Primary Health Sub Centre 2

Registered Private Medical Practitioners 1

Primary Health Centre 1

Family Welfare Centre 1

Child Welfare Centre 0

Allopathic Hospital 0

Maternity Home 0

Ayurvedic, Unani, Homeopathic Hospital 0

Ayurvedic, Unani, Homeopathic Dispensary 0

Health Centre 0

Nursing Home 0 Table 2-4, Health Facilities in MBSIR

Source: Census of India 2001

The region has only 2 primary health sub centers and 1 primary health centre and family welfare centres.

There is no maternity home and allopathic hospital in the entire region of 102.10 sq. km.

2.8. Physical Infrastructure

2.8.1. Water Supply

Domestic water demand of the existing settlements is catered by GWSSB, from GWIL off-take point,

Zinzuwada Branch Canal at Chainage+ 552.0.Km. from this branch canal about 18 mLd. of water is drawn

for supplying to Mandal & Detroj Taluka villages. Water supply to Becharaji Taluka villages is through water

drawn from Narmada Main Canal Off-take Point at Chainage + 313.63 Km.

2.8.2. Storm water and Sewerage

There is no major sewerage and storm water infrastructure in the region. The villages falling in the

delineated region either have community level soak pits or very basic Sewage network. The villages do not

have any Storm Water drainage infrastructure. The Storm Water runs through natural drains into the

ponds and other water bodies.

It is observed that area under MBSIR is characterized by high outmigration, over dependency on agriculture

and high number of agricultural laborers as compared to adjoining districts and Gujarat State. Development

of new industrial areas can bring about change in overall well being for the people of the region while

creating more economic opportunities along with quality social and physical infrastructure.

Page 31: SIR issued by the MoEF&CC · Form 1 Proposed Mandal Becharaji Special Investment Region in Ahmedabad and Mehsana District, Gujarat ===== May 2018 Page 1 of 2

20

CHAPTER 3 DEVELOPMENT PLAN PROPOSAL

Page 32: SIR issued by the MoEF&CC · Form 1 Proposed Mandal Becharaji Special Investment Region in Ahmedabad and Mehsana District, Gujarat ===== May 2018 Page 1 of 2

MBSIR Draft Development Plan

MBSIRDA 21|P a g e

3. Development Plan Proposal

The purpose of the Draft Development plan is to set out the framework for the growth of MBSIR over a

period of 25 years. Major components covered by the Draft Development Plan include:

Preparation of Base map & Existing land use map

Proposal for Land Use

Proposal for Infrastructure development

General Development Control Regulations

Implementation strategy & Broad cost estimates

3.1. Preparation of Base map & Existing land use map

Preparation of accurate Base Map is one of the most critical components while preparing Development

Plan. Latest (Dec 2012 – Jan 2013) satellite image of 6 Mt. resolution is acquired from National Remote

Sensing Centre, Hyderabad to create an accurate Base map of MBSIR.

3-1, Satellite Image of MBSIR

Source: National Remote Sensing Centre, Hyderabad

MBSIR

Boundary

Page 33: SIR issued by the MoEF&CC · Form 1 Proposed Mandal Becharaji Special Investment Region in Ahmedabad and Mehsana District, Gujarat ===== May 2018 Page 1 of 2

MBSIR Draft Development Plan

MBSIRDA 22|P a g e

Village Revenue maps (Tikka sheets) of all 8 villages within SIR limits were acquired from District Land

Inspector of Records (DILR) Departments of various districts. The revenue maps were scanned, scaled and

then digitized. In the process of digitization, some of the inherent mistakes in Tikka sheets like duplicate or

missing survey numbers were identified, cross checked with other available data and updated. The map

was further updated with information received from various concerned government departments. Each

digitized village revenue map was then geo referenced over satellite image to create a combined base map.

Site visits were carried out to acquire ground control points for exact superimposition of digitized village

maps.

The final base map of MBSIR shows an area of 102.10 sq. km. which is more than the notified area (101.77

sq. km.) of MBSIR. The reference for area under notification of MBSIR is taken from Form 1A of all the

villages, which is primarily a revenue record. One of the reasons for variation in area could be because of

out dated revenue records.

Page 34: SIR issued by the MoEF&CC · Form 1 Proposed Mandal Becharaji Special Investment Region in Ahmedabad and Mehsana District, Gujarat ===== May 2018 Page 1 of 2

MBSIR Draft Development Plan

MBSIRDA 23|P a g e

3-2, Base Map, MBSIR

Page 35: SIR issued by the MoEF&CC · Form 1 Proposed Mandal Becharaji Special Investment Region in Ahmedabad and Mehsana District, Gujarat ===== May 2018 Page 1 of 2

MBSIR Draft Development Plan

MBSIRDA 24|P a g e

3.2. Target Sector Identification

GIDB has been proactive to develop MBSIR as a world class automobile and manufacturing hub with well

supported infrastructure and civic amenities. In the initial stages, GIDB undertook an exercise to access

industrial development potential along with conceptual planning. The concept plan prepared focused on

following components:

Identification of the target sector and market assessment for industrial development

Preliminary environmental and social assessment of the region

Development needs and conceptual planning

Development strategy in sync with the vision of SIR

Infrastructure Master Plan

Implementation model

Based on the market assessment of industrial scenario and Industrial Manufacturing Zone Policy by GIDB,

potential industrial sector for MBSIR have been identified. Aiming to reduce the SIR’s carbon footprint the

proposed mix is of non-polluting and non-hazardous industries as per standards set by Ministry of

Environment & Forests, Government of India.

3.2.1. Parameters for identification of sectors for SIR

Potential sectors have been identified based the below mentioned parameters:

Prominent presence of industrial sector

Anchor tenant and its supplier

Resource availability

Expression of interests

Environmental considerations

Prominent presence of industrial sector

The region is primarily based on agriculture and does not show prominent presence of any industrial

sectors, except proposed MSIL plant. The considerations related to proposed automobile plant will be

taken care of under the head of anchor tenant and its suppliers.

Anchor tenant and its suppliers

MSIL is one of the automobile anchor tenants in the region. Cluster of its suppliers linking to different

sectors hold position in the hierarchy. Technical heavy engineering and Light engineering including metal &

alloy product form a direct link with the anchor unit and form an integral part of the chain. Electronics

products are a part of the assembly line and are directly related to the design element of the vehicle. The

auto components produced under this sector are specifically designed, keeping in mind the end product.

Rubber products and Glass & fiber suppliers have a wide range of products for various Tier 1 or auto

manufacturers. The product supply chain is spread over the country and has several market links. Hence

dedicated rubber and glass units for MSIL have been considered to come up under service and ancillary

industries. Logistics is directly linked to the supply chain and plays a key role.

Page 36: SIR issued by the MoEF&CC · Form 1 Proposed Mandal Becharaji Special Investment Region in Ahmedabad and Mehsana District, Gujarat ===== May 2018 Page 1 of 2

MBSIR Draft Development Plan

MBSIRDA 25|P a g e

Resource availability

Sectors with focus on the available local raw material from the natural resource base have advantage to

bring benefit to the local economy. These sectors not only induce growth in the local economy, but hold

potential to expand as export oriented industries.

Expression of interests

MOUs have been signed during Vibrant Gujarat 2011 for Ahmedabad, Mehsana and Surendranagar districts

wherein investments of Rs. 1,17,057 crore have been proposed with an estimated employment generation

of more than 7 lakh. Sectors such as automobile, engineering, knowledge & skill development and tourism

have relative potential investment interest in the region which may be channelised to the proposed SIR.

Environmental considerations

Aiming to reduce the SIR’s carbon footprint and promote primary economic sectors; land under agriculture

is considered as one of the economic activities in the SIR. Proposed industrial mix should be non polluting

or less polluting as per standards set by Ministry of Environment & Forests, Government of India.

3.2.2. Identified sectors

Based on the potential of the region, the investment scenario and thrust of the Automobile sector the

following sectors have been identified in the proposed SIR:

Automobile industry

Auto-component Vendor park consisting-

o Heavy engineering

o Light engineering including metal & alloy product

o Electronics

o Service & Ancillary

o Non Polluting industries including Information Technology

Logistics

Further based on the key stakeholder suggestions and reference to the National Manufacturing Zone

Policy, following sectors have also been included in the:

Precision engineering

Wind power equipment manufacturing

Solar power equipment manufacturing

Emerging sector in Automobile sector viz. Electronic Systems Design and Manufacturing (ESDM)

Apart from above Information Technology sectors have also been proposed.

In accordance with the SIR policy and Market assessment for industrial development undertaken during

concept plan preparation it was suggested that around 35 to 40 % of total land area under SIR will be

required for industrial activities.

Page 37: SIR issued by the MoEF&CC · Form 1 Proposed Mandal Becharaji Special Investment Region in Ahmedabad and Mehsana District, Gujarat ===== May 2018 Page 1 of 2

MBSIR Draft Development Plan

MBSIRDA 26|P a g e

3.3. Sustainable Population

3.3.1. Employment generation

Direct employment to be engaged in industries is calculated from sector wise ratios for workers per

hectare. SIR based non industrial components of area are also expected to generate employment to serve

the city population. This indirect employment from commercial, institutional and informal sectors is

assumed to be 1:1.44 (as per UDPFI) of the direct employment. Direct employment generated from

Industries proposed is around 1.25 lakh employees. The total employment (both direct & indirect), by the

proposed industrial area and non industrial setups is projected to be about 3.04 lakhs.

Sr. No Parameter Estimated Number

1 Direct Employment 1,25,000

2 Indirect Employment 1,79,500

3 Total Employment 3,04,500

Table 3-1, Employment generation in MBSIR

3.3.2. Floating Employment

Out of the total employment generated in Special Investment Region, 80% is proposed to reside within SIR

developed residential area, while the rest 20% is assumed as the floating population. Existing urban hubs

such as Mehsana, Kadi, Sanand and Ahmedabad are residential towns which will provide human resource

to the SIR. The residing population % has been proposed to be on higher side considering the fact that

infrastructure shall be developed for catering to maximum requirement.

Sr. No Parameter Estimated Number

1 Floating Employment (20%) 60,900

2 Residing Employment (80%) 2,43,600

3 Total Employment (100%) 3,04,500

Table 3-2, Floating Employment

3.3.3. Population supported by MBSIR

The residing employment is proposed to settle in the SIR. An average family size of 3 has been considered

for each employment generated (considering Gujarat Dependency ratio of 1:2). It is assumed that the

existing Gamtal population (0.12 Lakhs as per census 2001) will increase at a faster growth rate due to the

induced economic growth by the SIR. Rural population projected for 2040 is about 0.17lakh (annual growth

rate of 0.82% is considered as per Concept Report for MBSIR). While the residing population calculated

from total employment in the SIR is assumed to be around 7.29 lakh. Total population that will be

supported by employment generation from SIR will be around 9.11 lakh for 2040.

Sr. No Parameter Estimated Number

1 Residing Population (2040) 7,29,200

2 Gamtal Population (2040) 17,000

3 Floating Population dependent on MBSIR (2040) 1,82,300

4 Total Population supported by MBSIR (2040) 9,11,500

Table 3-3, Total Population supported by MBSIR

Page 38: SIR issued by the MoEF&CC · Form 1 Proposed Mandal Becharaji Special Investment Region in Ahmedabad and Mehsana District, Gujarat ===== May 2018 Page 1 of 2

MBSIR Draft Development Plan

MBSIRDA 27|P a g e

3.4. Vision

“To develop a smart industrial city with concepts of reduce, recycle, reuse and efficient transportation

network”

3.5. Planning Principles

The Draft Development plan is based on the application of spatial planning principles that ensure a consistent and coherent urban structure while providing flexible and economic development.

The specific concerns that MBSIR plan addresses include:

Response to site topography & Environmental features

Land use integration

Integration of the canal network

Integration of the existing village settlement

Road network to facilitate efficient freight and public transportation movement

3.5.1. Response to Site topography & Environmental features

The site of MBSIR is predominantly flat. The natural ground slope is from North East to South West

direction. Existing natural drains also follow the same slopes. As a response towards site topography major

road network has been aligned along the direction of slopes. For developing the storm water drainage,

catchment areas have been analyzed. This will economies the infrastructure costs while minimizing the

impact on environment. For environmental conservation, it is proposed that recreation, sports and

entrainment zones are developed around water bodies allowing development of public parks and gardens.

3.5.2. Land use integration

The Plan proposes that all industrial areas are located relatively close and accessible from residential areas,

to minimise the home to work daily commute. The main industrial and logistics zones are all located

centrally on either side of the truck priority road and the proposed expressway. Development of Knowledge

and IT zone along side Recreation, Sports and Entertainment zone further integrates the land uses.

3.5.3. Integration of Canal Network

The region being within the SSNL command area has extensive network of SSNNL canals. With respect to

the large industrial development in the SIR it becomes imperative to integrate the network of the branch

canals with the planned development. MBSIR has 2 SSNNL branch canal passing through it that have a

potential to be developed as public places. It is proposed to develop roads along the branch canals while

promoting mixed use activities along with linear greens. Mixed use development comprising commercial

facilities, recreation, residential will facilitate development of vibrant public spaces. In order to develop

coherent public realm along the canal, urban design guidelines have been proposed in the plan.

3.5.4. Integration of existing village settlements

MBSIR includes 8 village settlements within its boundary. In order to allow each village to expand naturally

at its own pace buffer zones have been proposed around each settlement. The role of the buffer is to allow

development while creating a transition zone between Village settlement and High intensity urban

development adjoining it.

Page 39: SIR issued by the MoEF&CC · Form 1 Proposed Mandal Becharaji Special Investment Region in Ahmedabad and Mehsana District, Gujarat ===== May 2018 Page 1 of 2

MBSIR Draft Development Plan

MBSIRDA 28|P a g e

3.5.5. Road network to facilitate efficient freight and public transportation movement

The regional connectivity in the MBSIR is strengthened through the provision of 90m wide express corridor

with grade separated interchanges at key locations. The expressway to the SIR will allow speedy movement

of cargo. The road network in the SIR is a combination of rectangular grid and loop roads. The grids are

planned on a size of 800 Mt. x 1200 Mt. to promote development of walkable and cycle able

neighborhoods.

Page 40: SIR issued by the MoEF&CC · Form 1 Proposed Mandal Becharaji Special Investment Region in Ahmedabad and Mehsana District, Gujarat ===== May 2018 Page 1 of 2

MBSIR Draft Development Plan

MBSIRDA 29|P a g e

3.6. Land Use Proposal

The Land use proposal is envisioned to promote economically vibrant and environmentally sustainable

Industrial city with a good quality of life. The land use proposals area spread across below mentioned zones

Industrial

Logistics

Knowledge & IT

Residential

Affordable Housing

High Access Corridor

Mixed Use

Village Buffer

Recreation, Sports and Entertainment

Page 41: SIR issued by the MoEF&CC · Form 1 Proposed Mandal Becharaji Special Investment Region in Ahmedabad and Mehsana District, Gujarat ===== May 2018 Page 1 of 2

MBSIR Draft Development Plan

MBSIRDA 30|P a g e

3.6.1. Industrial

3-3, Industrial zone

The industrial zones are planned strategically along the express corridor to ensure smooth movement of

freight within the SIR. The industrial zones are flanked by Residential, Mixed use, Knowledge and IT zones

on both sides. In context with regional connectivity and the proposed road network one interconnected

industrial nodes is envisaged within the SIR. A total of 28.58 sq. km. (27.99%) is been proposed to be

developed as the industrial zone in the MBSIR.

Sr.No. Industrial Nodes near Anchor industry

Regional Connectivity (roads)

Railways

1 Near Hansalpur Intersection of SH 7 and SH 19 near Hansalpur

Meter gauge railway connecting Patan and Kadi passes through Bechraji

(Proposal for converting it to broad gauge already passed in railway budget 2013)

Table 3-4, Major Industrial Nodes

Page 42: SIR issued by the MoEF&CC · Form 1 Proposed Mandal Becharaji Special Investment Region in Ahmedabad and Mehsana District, Gujarat ===== May 2018 Page 1 of 2

MBSIR Draft Development Plan

MBSIRDA 31|P a g e

3.6.2. Logistics

3-4, Logistic zone

Industrial zones are supported by strategically located logistics parks in the SIR. The value enhancement

due to presence of Logistic parks within the Industrial zones will be in terms storage and handling of freight.

The logistics parks are located along Express corridor and proposed Railway sidings.

Within the MBSIR two logistic zones are planned along the main express highway.

Sr. No. Logistics park AREA (Sq, Km,))

Location

1 L1 1.10 Intersection of SH 7 and the broad gauge railway line from Mehsana and Ahmedabad (proximity to Hansalpur)

2 L2 1.00 Proposed express corridor near SH-133(Proximity to Ughroj)

Table 3-5, Location of Logistic zone

L1

L2

Page 43: SIR issued by the MoEF&CC · Form 1 Proposed Mandal Becharaji Special Investment Region in Ahmedabad and Mehsana District, Gujarat ===== May 2018 Page 1 of 2

MBSIR Draft Development Plan

MBSIRDA 32|P a g e

3.6.3. Knowledge and IT

3-5, Knowledge and IT zone

A Knowledge and IT zone has been proposed within SIR with a view to facilitate development of research

centres, Educational Institutes and Universities along with IT industries. The Knowledge and IT zone is

planned in surrounding of a non perennial water body in Sitapur village. The total land area allocated for

the Knowledge and IT zone is around 3.69 sq. km. (3.61%). The area proposed for Knowledge and IT has

been envisaged to support all the industrial centres proposed in the state with skilled labour force.

Page 44: SIR issued by the MoEF&CC · Form 1 Proposed Mandal Becharaji Special Investment Region in Ahmedabad and Mehsana District, Gujarat ===== May 2018 Page 1 of 2

MBSIR Draft Development Plan

MBSIRDA 33|P a g e

3.6.4. Residential

3-6, Residential zone

The residential zones within the MBSIR are planned along mix use & industrial zones. Residential

development will also be allowed in knowledge and IT Zone and Mixed use zones. The total land area

allocated for the Residential is around 31.31 sq. km. (30.67%).In addition to this around 0.60 sq. km.

(0.59%) land will be occupied by existing villages.

Page 45: SIR issued by the MoEF&CC · Form 1 Proposed Mandal Becharaji Special Investment Region in Ahmedabad and Mehsana District, Gujarat ===== May 2018 Page 1 of 2

MBSIR Draft Development Plan

MBSIRDA 34|P a g e

3.6.5. Affordable Housing

3-7, Affordable housing zone

The Affordable Housing zones are proposed in the village of Hansalpur and Sitapur of MBSIR. The total land

area allocated for the Affordable housing Zone is around 3.82 sq. km. (3.75%).

Page 46: SIR issued by the MoEF&CC · Form 1 Proposed Mandal Becharaji Special Investment Region in Ahmedabad and Mehsana District, Gujarat ===== May 2018 Page 1 of 2

MBSIR Draft Development Plan

MBSIRDA 35|P a g e

3.6.6. High Access Corridor

3-8, High Access Corridor

With a view to support higher densities and transit oriented development in MBSIR it is proposed to

develop mixed use corridor along the 60 & 45 m RoW. This zone is predominantly planned between

residential and industrial zones and will facilitate mixed uses including commercial, offices, recreation,

community and residential. A total of 9.46 sq. km. (9.27%) is proposed under this zone.

Page 47: SIR issued by the MoEF&CC · Form 1 Proposed Mandal Becharaji Special Investment Region in Ahmedabad and Mehsana District, Gujarat ===== May 2018 Page 1 of 2

MBSIR Draft Development Plan

MBSIRDA 36|P a g e

3.6.7. Mixed Use

3-9, Mixed Use

There are two SSNNL branch canal passing through the proposed MBSIR. The areas along the branch canals

have a potential to be developed as large public spaces. Mixed land use zone has been proposed along the

two branch canals. Mixed use development comprising commercial facilities, recreation, residential along

with linear green zone will facilitate development of vibrant public spaces. Around 3.76 sq.km (3.68%) of

area is proposed under mixed use zone along the branch canals.

Page 48: SIR issued by the MoEF&CC · Form 1 Proposed Mandal Becharaji Special Investment Region in Ahmedabad and Mehsana District, Gujarat ===== May 2018 Page 1 of 2

MBSIR Draft Development Plan

MBSIRDA 37|P a g e

3.6.8. Recreation, Sports and Entertainment

3-10, Recreation, Sports and Entertainment zone

Around 5.79 % of total land area is proposed for development under recreation, sports and entertainment

zone. This zone will allow development of botanical gardens, nature parks, sports complexes etc. It is

strategically planned along the periphery of lake, natural drain and canal. This zone will benefit from the

presence of institutional development in knowledge and IT zone.

Page 49: SIR issued by the MoEF&CC · Form 1 Proposed Mandal Becharaji Special Investment Region in Ahmedabad and Mehsana District, Gujarat ===== May 2018 Page 1 of 2

MBSIR Draft Development Plan

MBSIRDA 38|P a g e

3.6.9. Provision of village buffer

3-11, Village Buffer zone

MBSIR has 8 villages within the SIR. The Draft Development plan makes a provision for village integration to

accommodate the growth in these settlements by constituting village buffer zones of 100m and 200m

around each settlement. The buffer has specific regulations as per the GDCR. Residential, commercial and

public facilities will be allowed in this zone.

Page 50: SIR issued by the MoEF&CC · Form 1 Proposed Mandal Becharaji Special Investment Region in Ahmedabad and Mehsana District, Gujarat ===== May 2018 Page 1 of 2

MBSIR Draft Development Plan

MBSIRDA 39|P a g e

3-12, Proposed Landuse plan, MBSIR

Page 51: SIR issued by the MoEF&CC · Form 1 Proposed Mandal Becharaji Special Investment Region in Ahmedabad and Mehsana District, Gujarat ===== May 2018 Page 1 of 2

MBSIR Draft Development Plan

MBSIRDA 40|P a g e

Table 3-6, Area Statement MBSIR

Proposed Land Use Comprehensive

Area (sq km) Area %

Industrial 28.58 27.99

Logistics 2.10 2.05

Knowledge & IT 3.69 3.61

Residential 31.31 30.67

Affordable Housing 3.82 3.75

High Access Corridor 9.46 9.27

Mixed Use 3.76 3.68

Village Buffer 1.91 1.88

Recreation, Sports and Entertainment 5.91 5.79

Proposed Roads and Rail 7.17 7.02

Total Urbanizable Area (A) 97.71 95.70

River 0.27 0.27

SSNL Branch Canal 0.28 0.27

Water bodies 3.24 3.17

Gamtal 0.60 0.59

Total Non Urbanizable Area (B) 4.39 4.30

Total SIR Area (A + B) 102.10 100.00

Page 52: SIR issued by the MoEF&CC · Form 1 Proposed Mandal Becharaji Special Investment Region in Ahmedabad and Mehsana District, Gujarat ===== May 2018 Page 1 of 2

MBSIR Draft Development Plan

MBSIRDA 41|P a g e

3.7. Road and Rail proposals

3.7.1. Proposed Road network

The road network in the SIR is a combination of rectangular grid and loop roads. The grids are planned on a

size of 800 Mt. x 1200 Mt. to promote development of walkable and cycleable neighbourhoods.

The proposed road hierarchy in the Draft Development Plan is:

90 Mt ROW - Express corridor

60, 45 & 30 Mt ROW - Arterial roads

Roads lower than 30 Mt. ROW in the SIR will be proposed during preparation of town planning schemes.

90 m ROW Express Corridor

The Plan intends to develop a transport corridor that contain a high capacity, limited access expressway,

with grade separated interchanges at key locations. The proposed expressway would commence from

Ughroj in the South East of the proposed SIR boundary on SH-133 and meet SH-7 at Sitapur Village and then

head toward Hansalpur - Becharaji in the North. The proposed expressway would be of 90m Right of Way

(RoW) having 3-lane carriageway whereas the remaining width of the proposed RoW would be utilized for

other road infrastructure network.

Page 53: SIR issued by the MoEF&CC · Form 1 Proposed Mandal Becharaji Special Investment Region in Ahmedabad and Mehsana District, Gujarat ===== May 2018 Page 1 of 2

MBSIR Draft Development Plan

MBSIRDA 42|P a g e

3-13, 90 mt. Row, Road Section

3-14, 60 mt. Row, Road Section

Page 54: SIR issued by the MoEF&CC · Form 1 Proposed Mandal Becharaji Special Investment Region in Ahmedabad and Mehsana District, Gujarat ===== May 2018 Page 1 of 2

MBSIR Draft Development Plan

MBSIRDA 43|P a g e

3-15, 45 mt. Row, Road Section

3-16, 30 mt. Row, Road Section

Page 55: SIR issued by the MoEF&CC · Form 1 Proposed Mandal Becharaji Special Investment Region in Ahmedabad and Mehsana District, Gujarat ===== May 2018 Page 1 of 2

MBSIR Draft Development Plan

MBSIRDA 44|P a g e

Arterial Road (60m RoW):

These roads have been proposed with 3-lanes consisting of service road on both sides with cycle track &

pedestrian path along with necessary supporting infrastructure. The proposed road may be strengthened

and widened to 6-lanes in the future as the traffic grows with time.

Arterial Road (45m RoW):

These roads have been proposed as a loop road with 3-lane carriageway and may be strengthened and

widened up to 6-lanes at a later stage. This road is planned to function as a public transit corridor with

mixed use development along if and connecting various residential and industrial sectors.

Sub Arterial (30, m RoW):

These roads would be proposed at detailed planning stage would be the key roads for local traffic

movement. They would primarily serve the non-processing area traffic and act as a feeder to the proposed

45m RoW.

Internal roads shall be planned & designed in such a way that maximum of existing alignment of VR, MDR,

ODR category roads get utilized while preparing Town Planning schemes for the proposed SIR or during

detail planning of the region.

Sr.No Road Type RoW (Mt.) Total Length (km)

1 Express Way 90 14.6

2 Arterial road 60 23.9

3 Arterial road 45 42.8

4 Sub Arterial road 30 88.0

Total 170.0

Table 3-7, Proposed Road Network

Page 56: SIR issued by the MoEF&CC · Form 1 Proposed Mandal Becharaji Special Investment Region in Ahmedabad and Mehsana District, Gujarat ===== May 2018 Page 1 of 2

MBSIR Draft Development Plan

MBSIRDA 45|P a g e

3-17, Proposed Road Network, MBSIR

Page 57: SIR issued by the MoEF&CC · Form 1 Proposed Mandal Becharaji Special Investment Region in Ahmedabad and Mehsana District, Gujarat ===== May 2018 Page 1 of 2

MBSIR Draft Development Plan

MBSIRDA 46|P a g e

3.7.2. Cross Drainage Works & Flyovers

Along all the proposed roads, careful consideration has been given to planning of cross drainage works and

flyovers. Minor bridges and Major bridges have been considered at water crossing (Canals, minor rivers,

etc.) along the express highway. Pipe culverts, minor bridges have been considered for other roads at

suitable intervals as per standard requirements. Types of bridges, culverts and flyovers shall be worked out

during detail engineering based on detail soil investigation, hydraulic requirements, performance

requirement, and techno economic feasibility as per the prevailing/related standard codes of practice.

3.7.3. Proposed Railway Siding Infrastructure

It is assumed that considerable passenger traffic would be generated with the development of the

proposed SIR. Also, the proposed SIR would be primarily developed as an Auto and Auto-ancillary Hub, as a

result there would be tremendous freight traffic and appropriate number of railway sidings would be

required. Detailed studies need to be carried out to understand and assess the required amount of railway

sidings and supporting infrastructure. A tentative railway siding plan is laid on the Development Plan and

accordingly the lengths are derived and considered for cost estimations.

Sr. No. Description Length (km) Cost

Rs (Crores)

1 Railway Line 1- North 8.3 83

2 Railway Line 2 – South 13.6 136

Total 21.9 219

Table 3-8, Proposed Rail Network

3.8. Infrastructure Proposals

3.8.1. Proposal for Water Supply Scheme

The total water demand by the end of the proposed SIR would be 269 mLd & fresh water demand is 161

mLd. The source for the estimated water demand is proposed from the existing Narmada canal. The Water

demand is worked out as per norms laid down by Central Public Health & Environmental Engineering

Organization, Ministry of Urban Development, GoI, (CPHEEO). The Off-take point is proposed on Zinzuwada

Branch of Narmada Main Canal. A detailed water supply scheme with water treatment plants, clear water

pumping station, water distribution system and network is proposed in the Draft Development Plan.

Off-take point on Zinzuwada Branch of Narmada Main Canal

Off-take point shall be near the first cross-regulator on Zinzuwada Branch Canal. The full drawing capacity

of this off-take point may be kept as 269 mLd. The RCC duct with screen & gates will be constructed near

canal for drawing 269 mLd capacity of Water.

Raw Water Pumping Station

Raw Water Sump and Pump house for 2 hrs. Storage Capacity (civil work) for 269 mLd water requirement will be constructed near off-take point for pumping water into Water Treatment Plant. Pumping machineries and all related Electrical-Mechanical provision will be installed as per requirement with stand by provisions.

Page 58: SIR issued by the MoEF&CC · Form 1 Proposed Mandal Becharaji Special Investment Region in Ahmedabad and Mehsana District, Gujarat ===== May 2018 Page 1 of 2

MBSIR Draft Development Plan

MBSIRDA 47|P a g e

Water Treatment Plant

The Raw Water from Canal will be conveyed to the proposed Conventional Treatment Plant. 161 mLd capacity conventional WTP will be constructed at Canal for Phase 1 & 220 mLd capacity for Phase-2 as and when required.

The type of treatment process usually depends on the quality of raw water required quality after treatment. Detail of treatment Unit & its process is given as under:

Sr. No. Treatment Unit Process

1 Cascade Aerator To add oxygen to water for imparting freshness. Expulsion of CO2, H2S for removal of taste & odour. For Removal of impurities like Iron & Manganese etc.

2 Flash Mixer For rapid mixing of coagulant in water to help in formation of micro- flocks.

3 Sedimentation Tank To remove readily settling sediments such as sand, silt, turbidity, iron etc.

4 Rapid Sand Filter Unit

To remove suspended & colloidal impurities such as microorganisms, silt clay etc.

5 Chlorination Unit For destruction or inactivation of pathogens, bacteria, helminthic etc.

Table 3-9, Treatment units for Water Supply

Flow Diagram for Conventional Water Treatment Plant for SIR is as under:

Clear Water Pumping Station: After providing necessary treatment, treated Water will be stored in

underground RCC Storage Reservoir. RCC reservoir shall be provided with compartment with necessary

gate / valve arrangement & it will be constructed as per phase-wise requirement. Necessary pumping

machinery and all related Electrical & Mechanical equipments with necessary stand by provisions shall

be provided to pump treated water to various water distribution stations.

Page 59: SIR issued by the MoEF&CC · Form 1 Proposed Mandal Becharaji Special Investment Region in Ahmedabad and Mehsana District, Gujarat ===== May 2018 Page 1 of 2

MBSIR Draft Development Plan

MBSIRDA 48|P a g e

Clear Water Trunk Main: Clear Water Trunk Main of Ductile Iron Pipe (DI K-9) will be laid from clear

water pumping station to various distribution stations. Ductile Iron pipe of required size with inside

lining & outside coating will be laid along with sluice valve/ butterfly valve for inspection purpose, scour

valve for maintenance purpose & air valve to control surge pressure as per design. Proper encasing for

minor/major crossings & Thrust block at deviation angles will be provided for proper functioning of the

pipeline.

Water Distribution Stations: Water will be pumped from clear water pumping station to various water

distribution stations in 22 hrs. & water will be supplied to each distribution zone 24 x 7. RCC sump with

pump house to accommodate pumping m/c & related E&M equipments will be constructed. The

pumping Head of machinery will be kept to maintain minimum 7 to 12 Mt. residual head at consumer

end.

Distribution Network: The purpose of distribution system is to convey whole some water to the

consumer at adequate residual pressure in sufficient quantity at convenient points. Water is made

available to consumer either by continuous system or through intermittent system.

In SIR region water supply distribution will be 24x7, and all connections will be metered. Continuous

water supply is proposed for following reasons.

In intermittent water supply investment for constructing storage, pumping machinery distribution

pipeline network will be more.

No water from an intermittent water supply system is safe to drink, because under vacuum

conditions foul water can be drawn into the pipes. Hence higher dues of chlorine are needed.

Compared with 24 hours supply, intermittent supply uses more water.

In intermittent supply, in case of fire, immediate supply is unavailable.

Due to frequent operations of valves for intermittent supply frequent wear & tear on valves.

For proper operation & maintenance more manpower is needed in intermittent supply.

In the proposed SIR, Ductile Iron pipe will be laid for proper water supply distribution with all valve &

fittings etc. supply enough quantity of water to each consumer with required residual head & pressure.

Page 60: SIR issued by the MoEF&CC · Form 1 Proposed Mandal Becharaji Special Investment Region in Ahmedabad and Mehsana District, Gujarat ===== May 2018 Page 1 of 2

MBSIR Draft Development Plan

MBSIRDA 49|P a g e

3-18, Water Supply Network

3.8.2. Proposal for Sewerage Scheme

At Present there is no underground sewerage System in the SIR area and the general practice is of on-site

disposal through either soak-pit or release in open drains leading to contamination of ground water & the

environment. As calculated, 94 mLd of sewage flow will be generated at the end of complete development

of proposed SIR. For proper collection & disposal of sewage, proper sewerage Network will be laid. A

detailed sewerage and drainage scheme is designed keeping in mind the CPHEEO guidelines.

Sewage Collection Network

The pipe line is designed for pipe running 80% full capacity from consideration of ventilation in sewers. The

flow velocity in the sewers is such that the suspended materials in sewage do not get silted up i.e. the

velocity will be such as cause automatic self cleaning effect. Hence, sufficient gradient is provided in

Sewage Collection Network. Manholes i.e. Junction Manholes & Scrapper Manholes are provided for

Page 61: SIR issued by the MoEF&CC · Form 1 Proposed Mandal Becharaji Special Investment Region in Ahmedabad and Mehsana District, Gujarat ===== May 2018 Page 1 of 2

MBSIR Draft Development Plan

MBSIRDA 50|P a g e

inspection, cleaning & other maintenance at 30 m. to 45 m. c/c. with a removable cover to with stand

traffic loads in sewers. Hence approximately 172 Km. length of Sewerage Network is proposed.

Sewage Pumping Stations

Sewage Pumping Stations is proposed for pumping the sewage from a deeper sewer to a shallow sewer or

for conveying Sewage to Sewage Treatment Plant. With respect to the large area of SIR, a numbers of

intermediates sewage pumping stations are proposed constructed. It is proposed to have 17 sewage

pumping stations based on the topography, depth of sewer & Sewage flow.

Sewage Pumping Stations comprises of following units:

Units Purpose

Screen Chamber To trap the flooding matters which otherwise can lump in the impeller of the pump.

Grit Chamber Removal of grit at the sewage pumping station to safe guard the same from causing wearing of the pump impeller. Detroiters or grab-bucket is planned to be installed for removal of Grit.

Wet Well It is provided in order to accommodate pumping machineries with enough working & stand by. Proper detention time in wet well should be provided. i.e. 5 to 30 min. of average flow.

Table 3-10, Sewage pumping station units

Sewage pumping stations is constructed in RCC with proper floor slopes, interior lining & water proofing for

resistance against H25, lighting & ventilation. All Electrical & Mechanical work including lifting

arrangement, D. G. Set etc. are installed for proper working of sewage pumping station. Pumping

machinery is planned to be installed in such a way that, sewage will be pumped in peak & lean period

Pumping Main

The economic size of pumping mains are worked out on peak flow volumes Pumping Main from Pumping

Station to Sewage Treatment Plant are laid for transporting the sewage in the inlet chamber of STP and D.I.

/ GRP pipe are provided with proper in lining & out-coating to prevent corrosion. Size of pipe depends on

length of pipe, depth of SPS, capital & Capitalized cost of pipe & pumping machinery. Pipe is provided with

proper cushion with air valves, sluice valves etc. for proper maintenance encasing are provided at major

crossing.

Sewage Treatment Plant

In MBSIR region, sewage is treated & reused after proper treatment. The waste water reuse will be applied

for various beneficial as stated:

Flushing, Washing, Gardening

Irrigation

Industrial process, washing etc.

Wastewater treatment processes can be categorized into the following three:

Physical process: Impurities are removed physically by screening, sedimentation, filtration, flotation,

absorption or adsorption or both, and centrifugation;

Page 62: SIR issued by the MoEF&CC · Form 1 Proposed Mandal Becharaji Special Investment Region in Ahmedabad and Mehsana District, Gujarat ===== May 2018 Page 1 of 2

MBSIR Draft Development Plan

MBSIRDA 51|P a g e

Chemical process: impurities are removed chemically through coagulation, absorption, oxidation-

reduction, disinfection, and ion-exchange;

Biological process: pollutants are removed using biological mechanisms, such as aerobic treatment,

anaerobic treatment and photosynthetic process (oxidation pond).

Conventional wastewater treatment consists of the following stages: Municipal wastewater treatment

facilities use combinations of physical, biological and chemical treatment technologies.

Preliminary and primary treatment: Preliminary and primary treatments are usually associated to

screening for the removal of debris and large solids, and sedimentation.

A secondary treatment: may utilize biological processes, such as stabilization ponds, trickling filter,

oxidation ditch, and activated sludge, which is then followed by sedimentation of biomass (sludge).

Tertiary treatment: It is ced treatment is an additional treatment for higher-level removal of

specific pollutants, such as nitrogen or phosphorus etc.

In SIR, the Total Sewage Generation will be 94 mLd. Two Sewage Treatment Plants are proposed for the

Scheme.

3-19, Sewage Network

Page 63: SIR issued by the MoEF&CC · Form 1 Proposed Mandal Becharaji Special Investment Region in Ahmedabad and Mehsana District, Gujarat ===== May 2018 Page 1 of 2

MBSIR Draft Development Plan

MBSIRDA 52|P a g e

3.8.3. Recycled Water System

The treated waste water through recycled pumping station is planned to be transferred to various recycled

water distribution stations that are constructed in same campus of fresh water distribution stations so that

operation & maintenance is easier. Recycled water pumping stations will be constructed with pump house

and pumping machinery will be installed to match with capacity of STPS.

Recycle water is supplied 24 x 7 same as fresh water supply. D. I. pipeline network is to be laid separately

with valves, valve chambers, encasing & thrust block etc. as per requirement.

Electrical & Mechanical work will be installed as per requirements

3-20, Recyle Water Network

Page 64: SIR issued by the MoEF&CC · Form 1 Proposed Mandal Becharaji Special Investment Region in Ahmedabad and Mehsana District, Gujarat ===== May 2018 Page 1 of 2

MBSIR Draft Development Plan

MBSIRDA 53|P a g e

3.8.4. Proposal for Storm Water Disposal System

In order to plan an effective design of storm water drainage system, several aspects are considered and the

entire region is evaluated with respect to storm water on parameters including topography & rainfall

pattern.

Based on catchment area, co-efficient of run-off & rainfall intensity the storm flow is worked out to siphon

the storm flow from SIR. It is planned to provide Catch pit with pre-cast perforated Jali to catch the storm

water. Also 300 mm/450 mm dia. pipe are laid from catch pit to main storm water line at 30 to 45 m c/c.

R.C.C. storm water network are laid with Manholes at 30 m. /45 m. c/c for proper functioning &

maintenance of system. It is planned to dispose the storm water drain in natural drains/lakes and provide

recharge wells or rainwater harvesting structures, which results in the rise of ground water level of the

area. Other than recharging well, it is made compulsory that each building / industry should collect roof-

top rain water in the underground tank in their premises.

The capacity of underground tank should be kept based on roof-top area & annual rainfall of the area. This

collected rainwater can be used as fresh water after proper treatment & in rainy days which reduces the

fresh water demand.

3-21, Storm Water Disposal Scheme

Page 65: SIR issued by the MoEF&CC · Form 1 Proposed Mandal Becharaji Special Investment Region in Ahmedabad and Mehsana District, Gujarat ===== May 2018 Page 1 of 2

MBSIR Draft Development Plan

MBSIRDA 54|P a g e

3.8.5. Solid Waste Management Proposal

It is proposed to provide sanitary landfill site as a necessary and integral part of the solid waste

management solution for the proposed SIR area. Total land required for land.

Potential Landfill Site Identification

The selection criterion of landfill site is prima facie based on guidelines developed by Management of

Municipal waste as a first step of site assessment and investigation.

Accordingly, after stakeholder consultation, a site is planned to be identified for proposed landfill, which

includes area for engineered landfill operations, compost plant including segregation area and buffer zone.

Total tentative estimated cost of proposed solid waste management is around INR 68.14 Crores, including

collection storage, transportation, treatment and disposal facilities along with infrastructure cost.

3.8.6. Power

From the power demand projections, it is estimated that approximately 300 MW power is required for

industrial purpose whereas about 110 MW power is planned to be required for residential purpose. The

total estimated cost of the proposed power supply infrastructure is approximately INR 660 Crores. The

block cost is based on the preliminary information available and will be revised during detailed engineering

design stage. Cost estimation is done on the basis of details provided by GETCO and ball park costs.

Page 66: SIR issued by the MoEF&CC · Form 1 Proposed Mandal Becharaji Special Investment Region in Ahmedabad and Mehsana District, Gujarat ===== May 2018 Page 1 of 2

MBSIR Draft Development Plan

MBSIRDA 55|P a g e

3.8.7. Gas & Telecommunication

Following broad aspects related to the Gas infrastructure have been broadly discussed with the

Government of Gujarat.

Gujarat State Petroleum Corporation (GSPC) network runs in the vicinity of the proposed SIR.

In Phase – 1, GSPC network shall be extended from Mehsana to Becharaji to serve the Auto

Industries proposed in the SIR.

In Phase – 2, GSPC network shall be extended from Kadi to Ughrojpura to serve the Auto Industries

and residential townships that would be developed in the proposed SIR.

Gas Supply Restrictions shall also be webbed by GSPC in above mentioned phases.

A Telecommunication and ICT Master Plan for the entire SIR area will be prepared separately. This will

include provision of the passive infrastructure like Optical Fibre Network and Mobile communication

towers along with the required Control Facilities. The ICT Master Plan will include the use of Information

technology for Public safety and security services, Education Services, Transportation services, Health care

and Municipal services.

Page 67: SIR issued by the MoEF&CC · Form 1 Proposed Mandal Becharaji Special Investment Region in Ahmedabad and Mehsana District, Gujarat ===== May 2018 Page 1 of 2

56

CHAPTER 4 IMPLEMENTATION STRATEGY

Page 68: SIR issued by the MoEF&CC · Form 1 Proposed Mandal Becharaji Special Investment Region in Ahmedabad and Mehsana District, Gujarat ===== May 2018 Page 1 of 2

MBSIR Draft Development Plan

MBSIRDA 57|P a g e

4. Implementation Strategy

4.1. Comprehensive guidelines for implementing the DP

Land is the key component of urban development and the formulation of an effective and equitable land

procurement strategy is critical to the successful implementation of the Draft Development plan. There are,

very broadly, two approaches to land procurement; one through compulsory purchase with compensation

under the Land Acquisition Act, 1894 and the other through Town Planning Schemes under the Gujarat

Town Planning and Urban Development (GTPUD) Act, 1976.

4.1.1. Town Planning Schemes

The Government of Gujarat is preparing a Town Planning Schemes as per the Gujarat Town Planning &

Urban Development Act. 1976. Under this model, the development authority brings together a group of

landowners for the purpose of planning and a Town Planning Scheme for the area is prepared, laying out

the roads and plots for public and social amenities. The remaining land is reconstituted into final plots for

the original owners, with the size of the final plot in proportion to the size of the original plot, and its

location as close as possible to the original plot.

A town planning scheme under the provision of GTPUD Act, 1976 may be made in respect of any land which

is –

1. In the course of development

2. Likely to be used for development of residential commercial, industrial etc.

3. Already built upon

Town Planning Scheme provides legislative support and finance for implementation. The fundamental

objective of the readjustment technique is to make land available for development at least cost to

development authorities and improve the environment effectively.

Town Planning Scheme is used to make a group of land holding in a planned manner. This is essentially

achieved by providing each unit with a public road access and regularizing the shape of each plot.

Compensation is paid to land owner of the land taken away for roads and public facilities. At the same

time, betterment charges known as incremental contribution are collected from each owner to the

maximum of 50 percent of the estimated increase in the land value after plot reconstitution. The funds so

generated are utilized for the development of infrastructure and common facilities within the scheme area.

The local planning agencies would be able to attain the dual objective of controlling haphazard growth as

well as the timely provision of physical infrastructure such as roads, sewers, water supply etc. and social

infrastructure like schools, hospitals, parks, open spaces etc., and social infrastructure burden. Because of

its self financing nature, Town Planning Schemes are also implemented in areas already developed, but

with lack of adequate infrastructure.

The increase in the land value resulting from the development accrues to the original owner whenever the

land is sold and developed for urban use. The advantages of this method from the development agency’s

point of view is that it does not have to acquire any land or bear the cost of infrastructure provision in the

long term.

Pooling models similar to the Gujarat Town Planning Scheme have been used in other countries, notably

Australia and Korea. Major benefits of this model are

Page 69: SIR issued by the MoEF&CC · Form 1 Proposed Mandal Becharaji Special Investment Region in Ahmedabad and Mehsana District, Gujarat ===== May 2018 Page 1 of 2

MBSIR Draft Development Plan

MBSIRDA 58|P a g e

It is a proven model in Gujarat

All the urban centres in the state are developed by this model

Minimum investment is required for development with this model

It is a win-win situation for both owners and administration

Land owners get maximum benefit in this model

Minimum litigations have been received in this model, in a span of 90 years since its first

implementation in the state

The model has a provision for development of physical as well as social infrastructure

Land owners will receive a finished land parcel with all physical and social infrastructure over a

period of time

It is a democratic approach for development of land

4.1.2. The Role of the Regional Development Authority

MBSIRDA will be responsible for the land management process. Specialist departments will be established

within the MBSIR to prepare Town Planning Schemes for the development of the MBSIR according to the

Draft Development plan. There have been a number of large urban development schemes undertaken

elsewhere in India over recent decades and a vast store of experience and expertise has been built up.

MBSIRDA will call upon this body of knowledge and pool of talent in putting together their team to

implement the MBSIR project.

4.1.3. Public Consultation and Participation

A participatory approach to development is proposed to ensure that land development in the MBSIR

proceeds smoothly and is equitable to all sections of the community. Village Panchayats, land owners and

land-less labourers all need to be consulted and involved in the process of development through

participatory forums. Experienced and reputable development organizations and NGOs should be invited to

advise and facilitate the land procurement process.

Public consultation needs to be commenced at the earliest opportunity in order to inform the population of

the MBSIR of the Draft Development plan and the process of urban development. They should be informed

on how they can be involved in decision making and their rights as land owners, residents and agricultural

workers.

MBSIRDA will prepare a phased land development programme. A committee comprising members of

MBSIRDA, State bodies such as land revenue department, infrastructure companies and village panchayats

representatives will be formed to oversee the land management process. The precise make up of this

committee and its rules and regulations will be determined by the Government of Gujarat in consultation

with project stakeholders, including industrial bodies and land owners.

4.2. Provision of various facilities in Development Plan through TP Schemes

4.2.1. Provision of Community Facilities

Provision of land for educational and amenities through TP Scheme mechanism should be as per the stated

norm of UDPFI for the required planned population of sector and neighborhood level.

Page 70: SIR issued by the MoEF&CC · Form 1 Proposed Mandal Becharaji Special Investment Region in Ahmedabad and Mehsana District, Gujarat ===== May 2018 Page 1 of 2

MBSIR Draft Development Plan

MBSIRDA 59|P a g e

In order to meet the demand for the projected population of 9.12 lakhs residing in MBSIR an extensive

range of community facilities are developed. MBSIR will largely be self contained in terms of health,

education, cultural, Government, sports and open space facilities. It will also support the existing village

settlements with the needed social infrastructure. The proposed land demand for community facilities

within the MBSIR as indicated in Table below

Facility Total Area Requirement (Ha)

Education 491

Health care facilities 72

Socio cultural centre 14

Other services 18

Table 4-1, Requirement of community facility for MBSIR

The provision norms are summarized in table given below,

Facility One Unit /

Population (as per UDPFI)

Area Requirement per unit (Ha.)

Requirement of Facility (Number)

Pre Primary / Nursery School 2500 0.08 365

Primary School 2500 0.4 365

Senior Secondary School 7500 1.6 122

Integrated School without Hostel Facilities 100000 3.5 9

Integrated School with Hostel Facilities 100000 3.9 9

School for Handicapped 45000 0.5 20

College 125000 4 7

Technical Education Institutions

(considering industrial oriented city)

250000 4 4

TOTAL

General Hospital 250000 6 4

Intermediate Hospital (Category A) 100000 3.7 9

Intermediate Hospital (Category B) 1000000 1 1

Polyclinic 100000 0.3 9

Nursing Home 50000 0.3 18

Dispensary 15000 0.12 61

TOTAL

Socio Cultural Centre 1000000 15 1

Park / Garden etc. 1 0.0012

Police Station, Jail, Police line etc. 100000 1.5 9

Fire Station 200000 1 5 Table 4-2, Standards for Community Facility

Source: UDPFI Norms

Page 71: SIR issued by the MoEF&CC · Form 1 Proposed Mandal Becharaji Special Investment Region in Ahmedabad and Mehsana District, Gujarat ===== May 2018 Page 1 of 2

MBSIR Draft Development Plan

MBSIRDA 60|P a g e

4.2.2. Provision of Open spaces

The provision of sector and neighbourhood level parks and open spaces is to be taken care of through Town

Planning Scheme mechanism.

4.2.3. Developing public squares

In order to generate vibrant public realm in the city, it is recommended that the provision of amenities,

commercial and education facilities to be located near the junctions of 30m and 45m ROW arterial road or

major arterial nodes as public places in TP Scheme. It is also planned to develop and generate the public

service plots accommodating Bus stand, auto rickshaw and IPT at every 500m along the public transit

routes on main arterial roads.

4.2.4. Provision of Commercial

Provision of commercial retail and office facilities at sector and neighbourhood level in residential, mixed

use and knowledge & IT within MBSIR should be through TP Scheme mechanism. The provision norms are

summarized in table below, which indicates the various scales, intensity and type of commercial required

based on the population and sector size

Facility One Unit / Population (as per UDPFI)

Area Requirement per unit (Ha.)

Cluster centre 1000 0.022

Sector centre 1000 0.03

Community centre 1000 0.05

District centre 1000 0.088

Table 4-3, Requirement of commercial facility for MBSIR

Source: UDPFI Norms

4.2.5. Provision of pedestrian and bicycle routes and public transit system

1. It is proposed that the provision of adequate pedestrian, bicycle routes to be accommodated on

major arterials and sub arterials with road width above 15 m ROW in TP scheme.

2. Provision of non-vehicular access accommodating pedestrian and bicycle routes within the green

buffer space along the natural drains and canals in TP Scheme thus generating accessible green

network across the SIR.

3. It is proposed to provide service roads in the industrial area for all roads above 30m in TP Scheme.

4. It is proposed that the FAR norms and permissible uses along the proposed new roads and service

roads in the TP Scheme should adhere to the development control regulations provided in the DP.

5. Public Transit system in form of BRTS and Metro will be introduced as traffic demand increases.

Necessary provisions have been made in the plan in terms of road widths and sector sizes for the

same.

Page 72: SIR issued by the MoEF&CC · Form 1 Proposed Mandal Becharaji Special Investment Region in Ahmedabad and Mehsana District, Gujarat ===== May 2018 Page 1 of 2

61

CHAPTER 5 BROAD COST ESTIMATES

Page 73: SIR issued by the MoEF&CC · Form 1 Proposed Mandal Becharaji Special Investment Region in Ahmedabad and Mehsana District, Gujarat ===== May 2018 Page 1 of 2

MBSIR Draft Development Plan

MBSIRDA 62|P a g e

5. Broad Cost Estimates

Various infrastructure components like road, rail, water supply, sewage etc. have been proposed within and

outside proposed SIR. Schedule of rates (SORs) of GWSSB 2011-12 and R & B 2012-13 have been followed

to estimate cost of proposed infrastructure components. Overall cost of estimates are divided in two major

categories

External infrastructure components

Internal infrastructure components

5.1. External Infrastructure components

5.1.1. External Road Infrastructure

Sr. No.

Description Proposed Length

(Km.)

Service Lanes

(Nos.)

Block Cost (Crores)

1. SH-133 & SH-41 (Detroj to Adalaj via Kadi and Kalol) 49.70 6 (min.) 331.00

2. MDR (Becharaji to Mehsana) 31.00 6 206.46

3. SH-7 (Vithalapur to Viramgam) 27.00 4 43.20

4. SH-135 (Kadi to Sanand via Thol) 37.30 4 59.68

5. SH-55 (Becharaji to Radhanpur for direct connectivity to Mundra via Harij))

74.10 4 118.56

6. Proposed 90Mt. road for connectivity Sitapur to Ughroj

11.27 39.00

Total 230.37 797.90

Table 5-1, External Road Infrastructure

5.1.2. External Rail Infrastructure

Sr. No. Description Rail Length (Km.) Block Cost (Rs. Crores)

1. Becharaji- Katosan Gauge Conversion 24.70 247.00

Table 5-2, External Rail Infrastructure

5.1.3. Comprehensive - External Infrastructure

Sr. No. Description Block Cost

(Rs. Crores)

1 Proposed External Road Infrastructure 797.90

2 Proposed External railway Infrastructure 247.00

3 Water Supply 18.00

Total Cost 1062.90

Table 5-3, Comprehensive - External Infrastructure

Page 74: SIR issued by the MoEF&CC · Form 1 Proposed Mandal Becharaji Special Investment Region in Ahmedabad and Mehsana District, Gujarat ===== May 2018 Page 1 of 2

MBSIR Draft Development Plan

MBSIRDA 63|P a g e

5.2. Internal Infrastructure components

5.2.1. Internal Road Infrastructure

Sr. No Road Width (R.O.W) in

Mt.

Total Length

(km)

Total Cost of Roads (Rs Cr)

Total Cost of ROB /Waterway Bridges/

Flyover (Rs Cr)

Total Cost

(Rs Cr)

1 90 15 141 760 901

2 60 24 120 60 180

3 45 43 216 120 336

5 30 88 381 280 661

Total 170 858 1220 2078

Table 5-4, Internal Road Infrastructure

5.2.2. Internal Rail Infrastructure

Sr. No.

Description Length (km) Cost

(Rs Crores)

1 Railway Line 1- North 8.3 83

2 Railway Line 2 – South 13.6 136

Total 21.9 219

Table 5-5, Internal Rail Infrastructure

Page 75: SIR issued by the MoEF&CC · Form 1 Proposed Mandal Becharaji Special Investment Region in Ahmedabad and Mehsana District, Gujarat ===== May 2018 Page 1 of 2

MBSIR Draft Development Plan

MBSIRDA 64|P a g e

5.2.3. Water Supply

SR. NO. COMPONENT CAPACITY COST (RS. IN LACS)

1 Head Work at Narmada Main Canal Rs. 200 lacs

2 Water Treatment Plant 161 mld Rs. 4830 lacs

3 Clear Water Pumping Station 161 mld Rs. 878 lacs

4 Clear Water Trunk Main From WTP at Narmada Canal To Boundary Of Each Phase (MS Pipe)

1600 mm dia (161 mld capacity) (L-22KM)

Rs. 8313 lacs

5 Clear Water Trunk Main To Various WDS Rs. 10047 lacs

6 Water Distribution Stations 27 NOS. Rs. 2970 lacs

7 Water Distribution Network (DI K-7) 170 Km Rs. 4522 lacs

Total Rs. 31760 lacs

Rs. 317.60 Crore

Table 5-6, Water Supply

5.2.4. Sewage System

NO. COMPONENT CAPACITY COST (RS. IN LACS)

Sewage collection network Rs. 4898 lacs

2 Sewage pumping station 17 Nos. Rs. 4204 lacs

3 Rising main upto STP 93 KM Rs. 15142 lacs

4 Sewage treatment plant

STP-1 50 MLD (1 Module) Rs. 7000 lacs

STP-2 50 MLD (1 Module) Rs. 7000 lacs

Total Rs. 38244 lacs

Rs. 382.44 Crore

Table 5-7, Sewage System

5.2.5. Water Recycling

SR. NO. COMPONENT CAPACITY COST (RS. IN LACS)

1 Recycle water pumping station

At STP-1 41 mld Rs. 221 lacs

At STP-2 47 mld Rs. 260 lacs

2 Recycle water trunk main from recycle water pumping station to various WDS (DI K-9 pipe)

55.3 Km Rs. 6077 lacs

3 Recycle water distribution stations 17 NOS. Rs. 1608 lacs

4 Recycle water distribution network (DI K-7) 170 KM Rs. 3971 lacs

Total Rs. 12137 lacs

Rs. 121.37 Crore Table 5-8, Water Recycling

Page 76: SIR issued by the MoEF&CC · Form 1 Proposed Mandal Becharaji Special Investment Region in Ahmedabad and Mehsana District, Gujarat ===== May 2018 Page 1 of 2

MBSIR Draft Development Plan

MBSIRDA 65|P a g e

5.2.6. Storm Water Disposal System

Component

Storm Water Network

No. of outlets Length (km) Cost (Crores)

Storm water disposal network 44 170 222.73

Table 5-9, Storm Water Disposal System

5.2.7. Solid Waste Collection

Domestic waste (Rs. Crores) Industrial waste (Rs. Crores) Total

Rs. 55.14 Cr Rs. 13 Cr Rs. 68.14 Cr.

Table 5-10, Solid Waste

5.2.8. Comprehensive - Internal Infrastructure

Sr. No. Description Total Cost(Cr)

1 Roads and Bridges 2078

2 Rail 219

3 Water 317.60

4 Sewerage 382.44

5 Water Recycling 121.37

6 Storm Water 222.73

7 Solid Waste 68.14

8 Power (as per Concept Report) 660

Total 4069.28

Table 5-11, Internal Infrastructure Costing

5.3. Comprehensive Infrastructure

Sr. No. Component Cost (Crores)

1 External Infrastructure 1063

2 Internal Infrastructure 4069

Total 5132

Table 5-12, Comprehensive Infrastructure Costing

Page 77: SIR issued by the MoEF&CC · Form 1 Proposed Mandal Becharaji Special Investment Region in Ahmedabad and Mehsana District, Gujarat ===== May 2018 Page 1 of 2

8/7/2019 Report Part 1

environmentclearance.nic.in/auth/FORM_A_PDF.aspx?cat_id=IA/GJ/NCP/75764/2018&pid=New 1/10

APPENDIX I(See Paragraph-6)

FORM 1

Note : If space provided against any parameter is inadequate, Kindly upload supporting document under'Additional Attachments if any' at the last part of the Form1. Please note that all such Annexures mustbe part of single pdf document.

(I) Basic InformationS.No. Item Details

Whether it is a violation case and applicationis being submitted under Notification No.S.O.804(E) dated 14.03.2017 ?

No

1.

Name of the Project/s Mandal Becharaji Special Investment RegionBrief summary of project Annexure-Brief summary of projectProposal Number IA/GJ/NCP/75764/2018Project Cost (in lacs) 1119900

2.S. No. in the schedule 7(c) Industrial estates/ parks/ complexes/ areas, export

processing ZonesProject Sector New Construction Projects and Industrial Estates

3.Proposed capacity/area/length/tonnage to behandled/command area/lease area/numberor wells to be drilled

Total area: 10200 ha (102 sq.km) Two clusters: Cluster A -approx. 5060 ha (revenue lands of 3 villages, falling inAhmedabad and Mehsana districts) Cluster B - approx. 5150ha (revenue lands of 5 villages, falling in Ahmedabaddistrict) ha.

4. New/Expansion/Modernization New

5. Existing Capacity/Area etc. 0 ha.

6. Category of project i.e. 'A' or 'B' A

7. Does it attract the general condition? If yes,please specify No

8. Does it attract the specific condition? If yes,please specify No

9. Location of the project Mandal and BecharajiShape of the project land Block (Polygon)

Uploaded GPS file Annexure-GPS file Uploaded copy of survey of India Toposheet Annexure-Survey of india toposheet

Plot/Survey/Khasra No.

Several, distributed under Town Planning schemes vide’Notification No. GHU/2013/16/SIR/112012/1276/I on 14thAugust, 2013 published in Government Gazette, Industriesand Mines Department, Government of Gujarat

Town / Village Annex I of Form 1 - list of villages under SIR NotificationState of the project Gujarat

Details of State of the project

S.no State Name District Name Tehsil Name

Page 78: SIR issued by the MoEF&CC · Form 1 Proposed Mandal Becharaji Special Investment Region in Ahmedabad and Mehsana District, Gujarat ===== May 2018 Page 1 of 2

8/7/2019 Report Part 1

environmentclearance.nic.in/auth/FORM_A_PDF.aspx?cat_id=IA/GJ/NCP/75764/2018&pid=New 2/10

(1.) Gujarat Mahesana Becharaji

(2.) Gujarat Ahmedabad Mandal

10.

Nearest railway station along with distancein kms Sankhalpur, 7 km

Nearest airport along with distance in kms Sardar Vallabhbhai Patel International Airport,Ahmedabad, 80 km

11. Nearest Town/City/District Headquartersalong with distance in kms Bechrajii , 7 km

12.Village Panchayats, Zila Parishad, MuncipalCorporation, Local body (Complete postaladdress with telephone nos. to be given)

a. District Collector Office Block No. MS Building RajmahalRoad, Mehsana, Gujarat – 384001 +91 2762 222203, =912762 222202 [email protected] b. Office of theCollector & District Magistrate, Near Subhash Bridge Circle,RTO, Ashram Ro

13. Name of the Applicant Jai Prakash

14. Registered Address 6th Floor, Block 1-2, Udyog Bhavan, Sector 11, GH 4 Circle,Gandhinagar, Gujarat

15.

Address for correspondance:Name of the Company GUJARAT INDUSTRIAL CORRIDOR CORPORATIONName of the Applicant Jai PrakashDesignation (Owner/ Partner/ CEO) CEOPin code 382017E-mail [email protected] No. 79-23226015Fax No. 79-Copy of documents in support of thecompetence/authority of the person makingthis application to make application on behalfof the User Agency .

Annexure-Uploaded Copy of documents in support of thecompetence/authority

16. Details of Alternative Sites examined, if any.Location of these sites should be shown on atoposheet

No

17. Whether part of Interlinked projects? No

18. Whether separate application of Interlinkedproject has been submitted? N/A

19. If Yes, MoEF file number N/ADate of submission N/A

20. If No, Reason N/A

21. Whether the proposal involves Approval/ Clearance under: if yes, details of the same and theirstatus to be given(i) Whether the proposal involvesapproval/clearance under the Forest(Conservation) Act,1980?

No

(ii) Whether the proposal involvesapproval/clearance under the wildlife(Protection) Act,1972?

No

(iii) Whether the proposal involvesapproval/clearance under the C.R.Znotification, 2011?

No

Page 79: SIR issued by the MoEF&CC · Form 1 Proposed Mandal Becharaji Special Investment Region in Ahmedabad and Mehsana District, Gujarat ===== May 2018 Page 1 of 2

8/7/2019 Report Part 1

environmentclearance.nic.in/auth/FORM_A_PDF.aspx?cat_id=IA/GJ/NCP/75764/2018&pid=New 3/10

22. Whether there is any GovernmentOrder/Policy relevant/relating to the site?

No

23. Whether any Forest Land Involved? NoArea of Forest land Involved (hectares) N/A

24. Whether there is any litigation pendingagainst the project and/or land in which theproject is proposed to be set up?

No

(a) Name of the Court N/A(b) Name of the Sub court N/A(c) Case No. N/A(d) Orders/directions of the court, if any andrelevance with the proposed project N/A

(II) Activity

1 Construction, operation or decommissioning of the Project involving actions, which will causephysical changes in the locality (topography, land use, changes in water bodies, etc.)

S.NoInformation/Checklist confirmation Yes/No

Details there of (with approximatequantities/rates, wherever possible) with

source of information data

1.1

Permanent or temporary change in land use,land cover or topography including increasein intensity of land use (with respect to localland use plan)

Yes

Of the total area, only 1.29% is under habitation. Thevillage habitations are not proposed under developmentfootprint. A 300 m buffer is proposed around thehabitation boundary. No easement are disturbed in thedevelopment plan. About 82.84 sq. km of the land areais under agricultural land use. Various river tributaries,water tanks and canals account for 3.43 kms (3.36%) ofland proposed for MBSIR. The proposed land use isenvisaged to promote economically vibrant andenvironmentally

1.2 Clearance of existing land, vegetation andbuildings? Yes

Existing, sparce vegetation will be cleared and replacedby a systematically developed greenbelt and soft/hardlandscape with thick vegetative elements

1.3 Creation of new land uses? YesLand in the MBSIR will be developed for industrial,commercial and residential usage in accordance with the5 TP schemes.

1.4 Pre-construction investigations e.g. borehouses, soil testing? Yes

Suitable pre-construction investigations will be carriedout for all civil engineering elements of the proposalrequiring a foundation.

1.5 Construction works? Yes

Construction activities in scope of the MBSIRDA will bethe public infrastructure and utilities required for theSIR. Buildings and other necessary features will bedeveloped by the re-distributed plot owners.

1.6 Demolition works? No

1.7 Temporary sites used for construction worksor housing of construction workers? Yes

Temporary sites for the accommodation of laborers willbe developed in a planned way to ensure basic amenitiesand hygiene as part of contracture obligation of therespective construction contractors, and shall be undersupervision and corrective control of theSIDRA/designated relevant authority.

Page 80: SIR issued by the MoEF&CC · Form 1 Proposed Mandal Becharaji Special Investment Region in Ahmedabad and Mehsana District, Gujarat ===== May 2018 Page 1 of 2

8/7/2019 Report Part 1

environmentclearance.nic.in/auth/FORM_A_PDF.aspx?cat_id=IA/GJ/NCP/75764/2018&pid=New 4/10

1.8 Above ground buildings, structures orearthworks including linear structures, cutand fill or excavations and fill or excavations

Yes Excavations and site grading will be carried out as partof the development in the scope of the SIR includinglinear utilities.

1.9 Underground works including mining ortunnelling? Yes

Road crossing of linear utilities will require someunderground work including cut and cover structures,box pushing or trenching and covering.

1.10 Reclamation works? No

1.11 Dredging? No

1.12 Offshore structures? No

1.13 Production and manufacturing processes? NoNo production or manufacturing process is part of thepresent proposal. The present proposal is fordevelopment of infrastructure in the SIR.

1.14 Facilities for storage of goods or materials? YesInfrastructure for storage of goods and material will bepart of individual tenant industrial/ commercialmanufacturing units.

1.15 Facilities for treatment or disposal of solidwaste or liquid effluents? Yes

Municipal solid waste collection, tipping, transportation,treatment, reprocessing, materials and energy recoveryand sanitary landfilling will be developed in phases in theSIR in a distributed fashion. A CETP will be developed ina centralized/distributed fashion for treatment ofindustrial effluents, treating to ground disposalstandards. The reclaimed water will be sold to industriesper requirement and/or utilized for irrigation ofvegetation.

1.16 Facilities for long term housing ofoperational workers? Yes Residential development including affordable housing is

a part of the individual TP schemes.

1.17 New road, rail or sea traffic duringconstruction or operation? Yes

Arterial, sub-arterial and feeder roads of respective lanewidth (calculated in accordance with traffic demandprojection, modal spit and axle load) provided withsuitable shoulders, medians, storm water evacuation,illumination, road side vegetation and street furniture ispart of the TP schemes. Construction and operationtraffic will operate on the roads which will be among thefirst utilities to be developed as part of the TP schemedevelopment. The SIR is strategically located, wellconnect

1.18

New road, rail, air water borne or othertransport infrastructure including new oraltered routes and stations, ports, airportsetc?

Yes

90 m ROW (express corridor), 60, 45 and 30 m widearterial roads will be developed. As a part of MasterPlan, new roads along 2 SSNNL canals, loop roads andrectangular grids within the MBSIR as arterial roads willalso be developed.

1.19Closure or diversion of existing transportroutes or infrastructure leading to changesin traffic movements?

No

1.20 New or diverted transmission lines orpipelines? No

1.21Impoundment, damming, culverting,realignment or other changes to thehydrology of watercourses or aquifers?

Yes

The existing storm water drains in the development areawill be re-aligned and channelized with adequate depthcalculated in accordance with the respective micro-catchments and peak rainfall intensity.

1.22 Stream crossings? YesSeasonal streams of river Rupen pass through the area,which will be trained for effective discharge of stormwater and for linear utility cross over.

Page 81: SIR issued by the MoEF&CC · Form 1 Proposed Mandal Becharaji Special Investment Region in Ahmedabad and Mehsana District, Gujarat ===== May 2018 Page 1 of 2

8/7/2019 Report Part 1

environmentclearance.nic.in/auth/FORM_A_PDF.aspx?cat_id=IA/GJ/NCP/75764/2018&pid=New 5/10

1.23 Abstraction or transfers of water fromground or surface waters?

Yes Water will be abstracted from the existing Narmadacanal. The off take point is proposed on ZinzuwadaBranch of Narmada Main Canal.

1.24 Changes in water bodies or the land surfaceaffecting drainage or run-off? Yes

Seasonal streams of river Rupen pass through the area,which will be trained for effective discharge of stormwater.

1.25 Transport of personnel or materials forconstruction, operation or decommissioning? Yes

Construction and operation traffic will operate on theroads which will be among the first utilities to bedeveloped as part of the TP scheme development.

1.26 Long-term dismantling or decommissioningor restoration works? No

1.27Ongoing activity during decommissioningwhich could have an impact on theenvironment?

No

1.28 Influx of people to an area in eithertemporarily or permanently? Yes Local migration of industrial workers is expected.

1.29 Introduction of alien species? No

1.30 Loss of native species or genetic diversity? No

1.31 Any other actions? No

2 Use of Natural resources for construction or operation of the Project (such as land, water, materialsor energy, especially any resources which are non-renewable or in short supply):

S.NoInformation/Checklist confirmation Yes/No

Details thereof (with approximatequantities/rates, wherever possible) with

source of information data

2.1 Land especially undeveloped or agriculturalland (ha) Yes 82.84 sq.km (81.14 %) area is under Agriculture land

use.

2.2 Water (expected source & competing users)unit: KLD Yes

Total Requirement: Approx. 269 MLD FreshwaterRequirement: approx. 161 MLD Source of water-Narmada main canal about 16 km on the east

2.3 Minerals (MT) No

2.4 Construction material – stone, aggregates,sand / soil (expected source – MT) Yes

Nearby local source. The quantity of the construction willbe known after the built up is finalized. It will beaddressed in the EIA report.

2.5 Forests and timber (source – MT) No

2.6Energy including electricity and fuels(source, competing users) Unit: fuel(MT),energy (MW)

Yes

Estimated power demand for industrial development willbe around 300 MW and 110 MW for residential.Electricity supply to the project will be from UttarGujarat Vij Company Ltd. (UGVCL)

2.7 Any other natural resources (use appropriatestandard units) No

3Use, storage, transport, handling or production of substances or materials, which could be harmfulto human health or the environment or raise concerns about actual or perceived risks to humanhealth

Page 82: SIR issued by the MoEF&CC · Form 1 Proposed Mandal Becharaji Special Investment Region in Ahmedabad and Mehsana District, Gujarat ===== May 2018 Page 1 of 2

8/7/2019 Report Part 1

environmentclearance.nic.in/auth/FORM_A_PDF.aspx?cat_id=IA/GJ/NCP/75764/2018&pid=New 6/10

S.No Information/Checklist confirmation Yes/No Details thereof (with approximatequantities/rates, wherever possible) with

source of information data

3.1

Use of substances or materials, which arehazardous (as per MSIHC rules) to humanhealth or the environment (flora, fauna, andwater supplies

Yes

Chemicals and substances such as chlorine gas, etc.might be required in operation of the CETP. Allhazardous material will be handled per best practices inline with applicable statutory requirements andguidelines.

3.2Changes in occurrence of disease or affectdisease vectors (e.g. insect or water bornediseases)

No

3.3 Affect the welfare of people e.g. by changingliving conditions? Yes

Additional opportunity for occupation will lead toincreased spending power for the people working in theSIR and surrounding area outside SIR boundary. Landowners will get better price of land after pooling andamalgamation of land in the TP schemes. Better andplanned social infrastructure will lead to better socialservice delivery in the area.

3.4Vulnerable groups of people who could beaffected by the project e.g. hospital patients,children, the elderly etc.

Yes

Lands have been earmarked in the TP schemes inaccordance with established planning principals toensure least industrial/commercial/urban impact on thevulnerable population.

3.5 Any other causes No

4 Production of solid wastes during construction or operation or decommissioning (MT/month)

S.NoInformation/Checklist confirmation Yes/No

Details thereof (with approximatequantities/rates, wherever possible) with

source of information data

4.1 Spoil, overburden or mine wastes No

4.2 Municipal waste (domestic and orcommercial wastes) Yes

Municipal solid waste will be generated from theindustrial, commercial and residential operations withinthe SIR area. Municipal solid waste collection, tipping,transportation, treatment, reprocessing, materials andenergy recovery and sanitary landfilling will bedeveloped in phases in the SIR in a distributed fashion.

4.3 Hazardous wastes (as per Hazardous WasteManagement Rules) Yes

Hazardous waste, predominately Used Oil from DGs andmachinery gearboxes will be generated at the CMWTFand CETP. Primary treatment sludge will be another bulkhazardous waste stream. Hazardous wastes will behandled and disposed after obtaining authorization fromGPCB under H&OW(M&TM) Rules, 2016.

4.4 Other industrial process wastes No

4.5 Surplus product No

4.6 Sewage sludge or other sludge from effluenttreatment Yes

Secondary treatment sludges from the operation of STPsand CETP(s) will be dewatered by mechanical means andwill be manured by mechanical composting into gardenmanure in the CMWTF.

4.7 Construction or demolition wastes Yes Construction wastes will be reused at the constructionsite for compaction under road sub-base and/or localgrade corrections. A Debris Management Plan for the

Page 83: SIR issued by the MoEF&CC · Form 1 Proposed Mandal Becharaji Special Investment Region in Ahmedabad and Mehsana District, Gujarat ===== May 2018 Page 1 of 2

8/7/2019 Report Part 1

environmentclearance.nic.in/auth/FORM_A_PDF.aspx?cat_id=IA/GJ/NCP/75764/2018&pid=New 7/10

MBSIR development will be framed and the disposal willbe as per the guidelines mentioned in the Plan.

4.8 Redundant machinery or equipment No

4.9 Contaminated soils or other materials No

4.10 Agricultural wastes Yes Agricultural wastes will be cleared before areadevelopment and given to the villagers for manuring.

4.11 Other solid wastes No

5 Release of pollutants or any hazardous, toxic or noxious substances to air(Kg/hr)

S.NoInformation/Checklist confirmation Yes/No

Details thereof (with approximatequantities/rates, wherever possible) with

source of information data

5.1 Emissions from combustion of fossil fuelsfrom stationary or mobile sources Yes Insignificant emission from construction machineries.

5.2 Emissions from production processes No

5.3 Emissions from materials handling includingstorage or transport Yes Insignificant as all development will not be at the same

time.

5.4 Emissions from construction activitiesincluding plant and equipment Yes

Insignificant as the habitation is far from thedevelopment. Only 1.3% of the total area is under

habitation.

5.5Dust or odours from handling of materialsincluding construction materials, sewage andwaste

YesInsignificant emission except for particulate matterduring construction. Sewage and solid waste during theconstruction phase will be treated and disposed.

5.6 Emissions from incineration of waste No

5.7 Emissions from burning of waste in open air(e.g. slash materials, construction debris) No

5.8 Emissions from any other sources No

6 Generation of Noise and Vibration, and Emissions of Light and Heat:

S.NoInformation/Checklist confirmation Yes/No

Details thereof (with approximatequantities/rates, wherever possible) with

source of information data

6.1 From operation of equipment e.g. engines,ventilation plant, crushers Yes

Noise will be generated due to vehicular movement,construction activities, DG sets, industrial machineries,etc.

6.2 From industrial or similar processes No

6.3 From construction or demolition YesDuring the construction phase of the project, excavation,drilling and welding works for certain activities willgenerate noise, vibration and dust emissions.

6.4 From blasting or piling No

Page 84: SIR issued by the MoEF&CC · Form 1 Proposed Mandal Becharaji Special Investment Region in Ahmedabad and Mehsana District, Gujarat ===== May 2018 Page 1 of 2

8/7/2019 Report Part 1

environmentclearance.nic.in/auth/FORM_A_PDF.aspx?cat_id=IA/GJ/NCP/75764/2018&pid=New 8/10

6.5 From construction or operational traffic Yes Noise will be generated from vehicular movement duringthe construction and operational phases.

6.6 From lighting or cooling systems Yes Noise and vibration is likely from operation of CMWTFand CETP.

6.7 From any other sources No

7 Risks of contamination of land or water from releases of pollutants into the ground or into sewers,surface waters, groundwater, coastal waters or the sea:

S.NoInformation/Checklist confirmation Yes/No

Details thereof (with approximatequantities/rates, wherever possible) with

source of information data

7.1 From handling, storage, use or spillage ofhazardous materials Yes Care will be taken in handling of hazardous materials

and wastes in the CETP and CMWTF operations.

7.2From discharge of sewage or other effluentsto water or the land (expected mode andplace of discharge)

No

7.3 By deposition of pollutants emitted to air intothe land or into water No

7.4 From any other sources No

7.5Is there a risk of long term build up ofpollutants in the environment from thesesources?

No

8 Risk of accidents during construction or operation of the Project, which could affect human healthor the environment

S.NoInformation/Checklist confirmation Yes/No

Details thereof (with approximatequantities/rates, wherever possible) with

source of information data

8.1From explosions, spillages, fires etc fromstorage, handling, use or production ofhazardous substances

Yes

Accidents during construction and operation phase ispossible. Safety training and good construction andoperation practices will be imparted either by theconstruction agency or by the employer. Riskassessment due to storage, spillages and fire will becarried out by trained professionals and theirrecommendations will be followed.

8.2 From any other causes No

8.3

Could the project be affected by naturaldisasters causing environmental damage(e.g. floods, earthquakes, landslides,cloudburst etc)?

No

Cloudburst and Flood: Less likely. Flood management byconstructing storm water networking and rainwaterharvesting structures will be designed. Earth Quake: Thearea under study falls in Zone III. Construction ofbuildings will be as per the IS standards specifiedLandslides: No

9Factors which should be considered (such as consequential development) which could lead toenvironmental effects or the potential for cumulative impacts with other existing or plannedactivities in the locality

S.No Information/Checklist confirmation Yes/No Details thereof (with approximate

Page 85: SIR issued by the MoEF&CC · Form 1 Proposed Mandal Becharaji Special Investment Region in Ahmedabad and Mehsana District, Gujarat ===== May 2018 Page 1 of 2

8/7/2019 Report Part 1

environmentclearance.nic.in/auth/FORM_A_PDF.aspx?cat_id=IA/GJ/NCP/75764/2018&pid=New 9/10

quantities/rates, wherever possible) withsource of information data

9.1

Lead to development of supporting utilities,ancillary development or developmentstimulated by the project which could haveimpact on the environment e.g.:

Supporting infrastructure (roads, powersupply,waste or waste water treatment,etc.)housing developmentextractive industriessupply industriesOther

Yes

The proposed project is about development of a worldclass special investment zone with all supportinginfrastructure such as roads, water and other utilities,waste disposal facilities, entertainment facilities, housingand associated amenities.

9.2 Lead to after-use of the site, which couldhave an impact on the environment No

9.3 Set a precedent for later developments Yes

The proposed project will set a precedent for organizeddevelopmental activity. The proposed development willimprove the existing socio economic background of thesurrounding area.

9.4Have cumulative effects due to proximity toother existing or planned projectswith similar effects

Yes Positive effects will be generated from this project.

(III) Environmental Sensitivity

S.No Areas Name/Identity Aerial distance (within 15km.) Proposedproject location boundary

1

Areas protected under internationalconventions, national or local legislation for their ecological, landscape, cultural or otherrelated value

No

2

Areas which are important or sensitive forecological reasons - Wetlands, watercoursesor other water bodies, coastal zone,biospheres, mountains, forests

No

3

Areas used by protected, important orsensitive species of flora or fauna forbreeding, nesting, foraging, resting, overwintering, migration

No

4 Inland, coastal, marine or undergroundwaters No

5 State, National boundaries No

6Routes or facilities used by the public foraccess to recreation or other tourist, pilgrimareas

No

7 Defence installations No

8 Densely populated or built-up area No

9 Areas occupied by sensitive man-made landuses (hospitals, schools, places of worship,

Yes Mandal and Bechraji towns have hospitals, schoolsand other social infrastructure

Page 86: SIR issued by the MoEF&CC · Form 1 Proposed Mandal Becharaji Special Investment Region in Ahmedabad and Mehsana District, Gujarat ===== May 2018 Page 1 of 2

8/7/2019 Report Part 1

environmentclearance.nic.in/auth/FORM_A_PDF.aspx?cat_id=IA/GJ/NCP/75764/2018&pid=New 10/10

Additional Attachments, if any

Attached File

EDS reply 041018

ADS Letter

community facilities)

10Areas containing important, high quality or scarceresources.(ground water resources,surfaceresources,forestry,agriculture,fisheries,tourism,minerals)

No

11Areas already subjected to pollution orenvironmental damage.(those where existinglegal environmental standards are exceeded)

No

12

Areas susceptible to natural hazard whichcould cause the project to presentenvironmental problems (earthquakes,subsidence, landslides, erosion, flooding orextreme or adverse climatic conditions)similar effects

No

(IV) Proposed Terms of Reference for EIA studies

1 Uploaded Proposed TOR File Annexure-TOR file

2 Uploaded scanned copy of coveringletter Annexure-scanned copy of covering letter

3 Uploaded Pre-Feasibility report(PFR) Annexure-PFR

4 Uploaded additional attachments(onlysingle pdf file) Annexure-Additional attachments

(V) UndertakingI hereby give undertaking that the data and information given in the application and enclosures aretrue to be best of my knowledge and belief and I am aware that if any part of the data andinformation found to be false or misleading at any stage, the project will be rejected and clearancegiven, if any to the project will be revoked at our risk and cost.

V.(i)

Name of Applicant Jai PrakashDesignation CEOName of Company (Applicant Nameshould not be given here) GUJARAT INDUSTRIAL CORRIDOR CORPORATION

Address 6th Floor, Block 1-2, Udyog Bhavan, Sector 11, GH 4 Circle,Gandhinagar, Gujarat

Page 87: SIR issued by the MoEF&CC · Form 1 Proposed Mandal Becharaji Special Investment Region in Ahmedabad and Mehsana District, Gujarat ===== May 2018 Page 1 of 2

EDS Query: In form 1, the proposal is applied under two schedules 7© and 8(b). Please clearly mention the S.No. of the Schedule in which the proposal is submitted.

Reply: The application has been submitted in Category 7c. Necessary changes to this effect have been made in the Form 1.

4th October, 2018, 2058 hrs

Page 88: SIR issued by the MoEF&CC · Form 1 Proposed Mandal Becharaji Special Investment Region in Ahmedabad and Mehsana District, Gujarat ===== May 2018 Page 1 of 2
Page 89: SIR issued by the MoEF&CC · Form 1 Proposed Mandal Becharaji Special Investment Region in Ahmedabad and Mehsana District, Gujarat ===== May 2018 Page 1 of 2

Reply to EDS Query dated 13th November, 2018 Proposed Mandal Becharaji Special Investment Region in Ahmedabad and Mehsana District, Gujarat (IA/GJ/NCP/75764/2018) ============================================================================================================

============================================================================================================ November, 2018

Annex I --------------------------------------------------------------- Screen-capture of the EDS query uploaded

on the Parivesh portal on 13th November, 2018

---------------------------------------------------------------

Page 90: SIR issued by the MoEF&CC · Form 1 Proposed Mandal Becharaji Special Investment Region in Ahmedabad and Mehsana District, Gujarat ===== May 2018 Page 1 of 2

Powered by TCPDF (www.tcpdf.org)

Page 91: SIR issued by the MoEF&CC · Form 1 Proposed Mandal Becharaji Special Investment Region in Ahmedabad and Mehsana District, Gujarat ===== May 2018 Page 1 of 2

������������ ��������������������������������������������������� �!������!��������"#$%�&'()#* $+(',- .$,/�012�34/�35�6��2��3756�8.9$7��:�')(�,+* ��'&(1$�;17�#$%�&'()#* $+(',/��$,'2$)', <�1*,'1(', =�������������>�>�����?������@?������������������ ���� �A�B���@���������������������@��������� ������������>�>� ������=�C��������9D����'%�E)$E$��&�D���,$2�:��,��11�E2�%�$,��11$F,2�$G�2D��H%%'2'$,�&�%�2�'&���$F D2���E�)�2D���2�2���,2�FE&$�%�%�$,�2D��E$)2�&�$G�.','�2)I(�8&�����FE&$�%�2D��H%%'2'$,�&%�2�'&���$F D2�:I�.��:�)�J�1)�2�)I(K$&&$L', ��D$F&%�:����,2'$,�%�',�GF)2D�)�1$))��E$,%�,1�M����>� ���N�� 7OHPQRPS;8PTUTVWP35�6X��C�����@�����B����>� �� 7S�L�;$,�2)F12'$,�8)$Y�12���,%��O,%F�2)'�&�Z�2�2��[����\���]�������@��>>������� 7T̂1_�O,%F�2)'�&���2�2��P�E�)#�P�1$�E&�̀��P��)���/�̀E$)2�E)$1���', �a$,���b��N��������B��>�>� �� 7.�,%�&�c�1D�)�Y'�JE�1'�&�O,+��2��,2�d� '$,e��f������� A��� �������ghi75W�012�35�6j��f����� ���A�B� 7O,�+'�L�$G��:$+�/�2D��ZH;/��G2�)���%�2�'&�%%�&':�)�2'$,�%F)', ��442D����2', �D�&%�$,��U2D012$:�)/�35�6/�%�G�))�%�2D��E)$E$��&�G$)�L�,2�$GG$&&$L', �',G$)��2'$,�G$)�GF)2D�)�1$,�'%�)�2'$,7'̂_�k$, '2F%���,%�k�2'2F%��$G�1&F�2�)�H��,%;&F�2�)�c���E�)�2�&I(�̂''_�l�2�'&��$G�&�,%F���$GE)$E$��%��'2���,%��)$F,%��5�#��)�%'F��G$)1&F�2�)�H��,%�;&F�2�)�c���E�)�2�&I(�̂'''_8)$E$��%�&�I$F2�%�2�'&��G$)�1&F�2�)�H��,%;&F�2�)�c���E�)�2�&I(�̂'+_�8)$+'%��',G$)��2'$,�:$F2�1�2� $)I�H��,%�;�2� $)I�c�E)$Y�12��G$):$2D�2D��1&F�2�)����E�)�2�&I(�̂+_�8)$E$,�,2�2$%�+�&$E��,%�E)$+'%��.��2�)�E&�,�$G�2D��JE�1'�&O,+��2��,2�d� '$,�̂JOd_�G$)�:$2D�2D��1&F�2�)�

Page 92: SIR issued by the MoEF&CC · Form 1 Proposed Mandal Becharaji Special Investment Region in Ahmedabad and Mehsana District, Gujarat ===== May 2018 Page 1 of 2

������������ ��������� �������� ����� ����������� ��� ���������� ������������������ ���������������������������������������� ����������� !"#$%&'#()$*#+&,)$,$-#-&!.$-/01&'+$-&!+&2#&!1.3!4 !"#$%&'#,)$,$-#-& 56789:9;�<=7>;:�9?@A::�=A:@A:BA:9;�A<C4D$C1.# $� 5EFGHIFHJKF+4L&!&# 56�M����24N13&)1+& 56���� �����#4(1-+$2# 5OFGIPK

Page 93: SIR issued by the MoEF&CC · Form 1 Proposed Mandal Becharaji Special Investment Region in Ahmedabad and Mehsana District, Gujarat ===== May 2018 Page 1 of 2

Reply to EDS Query dated 13 November, 2018 Proposed Mandal Becharaji Special Investment Region in Ahmedabad and Mehsana District, Gujarat (IA/GJ/NCP/75764/2018) ============================================================================================================

============================================================================================================ November, 2018

Annex II ---------------------------------------------------------------

Submissions on EDS Queries ---------------------------------------------------------------

Page 94: SIR issued by the MoEF&CC · Form 1 Proposed Mandal Becharaji Special Investment Region in Ahmedabad and Mehsana District, Gujarat ===== May 2018 Page 1 of 2

Reply to EDS Query dated 13 November, 2018 Proposed Mandal Becharaji Special Investment Region in Ahmedabad and Mehsana District, Gujarat (IA/GJ/NCP/75764/2018) ============================================================================================================

Annex II Reply to EDS Queries

============================================================================================================ November, 2018

Application for Environmental Clearance for the proposed Mandal Becharaji Special Investment Region (MBSIR), near Villages Mandal and Becharaji, Dist. Ahmedabad and Mehsana, Gujarat Reply to query on EDS raised on 'Parivesh' portal on 24 September, 2018

EDS Q. 1

Longitude and Latitude of Cluster A and B separately

Reply Five boundary coordinates (Latitude and Longitude) of Cluster A (Bechraji) and B (Mandal) each are given in enclosed Appendix A.

EDS Q. 2

Details of Land use of proposed site and around 10 km radius for cluster A and B separately

Reply Land use of the proposed Site (pre (as of present) and post development (proposed, after development) land use) Cluster A and B is separately given in enclosed Appendix B and Appendix C. Land use of 10 km impact area around the cluster A and B are separately given in Appendix D.

EDS Q. 3

Proposed layout details of Cluster A and Cluster B separately

Reply Layout of the Clusters A and B with proposed facilities duly labeled/demarcated is given in Appendix E.

EDS Q. 4

Provide information about Category A and Category B projects for both the clusters separately.

Reply Industrial areas duly demarcated for Category A and Category B industries separately in both the clusters A and B are given in Appendix F.

EDS Q. 5

Proponent to develop Master Plan of the Special Investment Region (SIR) for both the clusters separately.

Reply Master Plan for Cluster A (Bechraji) and Cluster B (Mandal) are enclosed as Appendix G and Appendix H respectively.

EDS Q. 6

Information regarding National Parks/Wildlife Sanctuaries, Forest patches, Village settlements and water sources should be given for both the clusters separately.

Reply Names of the National Parks/Wildlife Sanctuaries closest to the Clusters A and B are listed and their distances have been given on a map in the enclosed Appendix I. There are no forest patches in both Cluster A and B. Village settlements falling within both the clusters of the SIR are given in enclosed Appendix J and Appendix K.

Page 95: SIR issued by the MoEF&CC · Form 1 Proposed Mandal Becharaji Special Investment Region in Ahmedabad and Mehsana District, Gujarat ===== May 2018 Page 1 of 2

Reply to EDS Query dated 13 November, 2018 Proposed Mandal Becharaji Special Investment Region in Ahmedabad and Mehsana District, Gujarat (IA/GJ/NCP/75764/2018) ============================================================================================================

============================================================================================================ November, 2018

Appendix A ---------------------------------------------------------------

Coordinates of Cluster A (Bechraji) and Cluster B (Mandal)

---------------------------------------------------------------

Page 96: SIR issued by the MoEF&CC · Form 1 Proposed Mandal Becharaji Special Investment Region in Ahmedabad and Mehsana District, Gujarat ===== May 2018 Page 1 of 2

Reply to EDS Query dated 13 November, 2018Proposed Mandal Becharaji Special Investment Region in Ahmedabad and Mehsana District, Gujarat (IA/GJ/NCP/75764/2018)============================================================================================================================================================

Appendix A Coordinates of Cluster A (Bechraji) and Cluster B (Mandal)

============================================================================================================================================================November, 2018 Page 1 of 2

Appendix A Coordinates of MBSIR Cluster A (Bechraji)

23°30'27.63"N

72° 2'1.21"E

B

23°28'36.10"N

72° 3'11.27"E

C

23°25'13.51"N

72° 1'27.60"E

D

23°28'43.16"N

71°58'49.51"E

A

23°25'44.90"N

71°58'15.14"E

E

N

Page 97: SIR issued by the MoEF&CC · Form 1 Proposed Mandal Becharaji Special Investment Region in Ahmedabad and Mehsana District, Gujarat ===== May 2018 Page 1 of 2

Reply to EDS Query dated 13 November, 2018Proposed Mandal Becharaji Special Investment Region in Ahmedabad and Mehsana District, Gujarat (IA/GJ/NCP/75764/2018)============================================================================================================================================================

Appendix A Coordinates of Cluster A (Bechraji) and Cluster B (Mandal)

============================================================================================================================================================November, 2018 Page 2 of 2

Appendix A Coordinates of MBSIR Cluster B (Mandal)

23°23'36.61"N

72° 6'20.84"E

A

23°21'35.11"N

72° 7'19.15"E

B

23°19'53.03"N

72° 7'25.94"E

C

23°17'21.13"N

72° 4'4.02"E

D

23°20'55.17"N

72° 3'25.05"E

E

N

Page 98: SIR issued by the MoEF&CC · Form 1 Proposed Mandal Becharaji Special Investment Region in Ahmedabad and Mehsana District, Gujarat ===== May 2018 Page 1 of 2

Reply to EDS Query dated 13 November, 2018 Proposed Mandal Becharaji Special Investment Region in Ahmedabad and Mehsana District, Gujarat (IA/GJ/NCP/75764/2018) ============================================================================================================

============================================================================================================ November, 2018

Appendix B ---------------------------------------------------------------

Pre and Post Development Land use of Cluster A (Bechraji)

---------------------------------------------------------------

Page 99: SIR issued by the MoEF&CC · Form 1 Proposed Mandal Becharaji Special Investment Region in Ahmedabad and Mehsana District, Gujarat ===== May 2018 Page 1 of 2

Reply to EDS Query dated 13 November, 2018Proposed Mandal Becharaji Special Investment Region in Ahmedabad and Mehsana District, Gujarat (IA/GJ/NCP/75764/2018)============================================================================================================================================================

Appendix B Pre and Post Development Land use of Cluster A (Bechraji)

============================================================================================================================================================November, 2018 Page 1 of 2

Appendix B Pre Development Landuse of MBSIR Cluster A (Bechraji)

Page 100: SIR issued by the MoEF&CC · Form 1 Proposed Mandal Becharaji Special Investment Region in Ahmedabad and Mehsana District, Gujarat ===== May 2018 Page 1 of 2

Reply to EDS Query dated 13 November, 2018Proposed Mandal Becharaji Special Investment Region in Ahmedabad and Mehsana District, Gujarat (IA/GJ/NCP/75764/2018)============================================================================================================================================================

Appendix B Pre and Post Development Land use of Cluster A (Bechraji)

============================================================================================================================================================November, 2018 Page 2 of 2

Appendix B Post Development Landuse of MBSIR Cluster A (Bechraji)

Page 101: SIR issued by the MoEF&CC · Form 1 Proposed Mandal Becharaji Special Investment Region in Ahmedabad and Mehsana District, Gujarat ===== May 2018 Page 1 of 2

Reply to EDS Query dated 13 November, 2018 Proposed Mandal Becharaji Special Investment Region in Ahmedabad and Mehsana District, Gujarat (IA/GJ/NCP/75764/2018) ============================================================================================================

============================================================================================================ November, 2018

Appendix C ---------------------------------------------------------------

Pre and Post Development Land use of Cluster B (Mandal)

---------------------------------------------------------------

Page 102: SIR issued by the MoEF&CC · Form 1 Proposed Mandal Becharaji Special Investment Region in Ahmedabad and Mehsana District, Gujarat ===== May 2018 Page 1 of 2

Reply to EDS Query dated 13 November, 2018Proposed Mandal Becharaji Special Investment Region in Ahmedabad and Mehsana District, Gujarat (IA/GJ/NCP/75764/2018)============================================================================================================================================================

Appendix C Pre and Post Development Land use of Cluster B (Mandal)

============================================================================================================================================================November, 2018 Page 1of 2

Appendix C Pre Development Landuse of MBSIR Cluster B (Mandal)

Page 103: SIR issued by the MoEF&CC · Form 1 Proposed Mandal Becharaji Special Investment Region in Ahmedabad and Mehsana District, Gujarat ===== May 2018 Page 1 of 2

Reply to EDS Query dated 13 November, 2018Proposed Mandal Becharaji Special Investment Region in Ahmedabad and Mehsana District, Gujarat (IA/GJ/NCP/75764/2018)============================================================================================================================================================

Appendix C Pre and Post Development Land use of Cluster B (Mandal)

============================================================================================================================================================November, 2018 Page 2 of 2

Appendix C Post Development Landuse of MBSIR Cluster B (Mandal)

Page 104: SIR issued by the MoEF&CC · Form 1 Proposed Mandal Becharaji Special Investment Region in Ahmedabad and Mehsana District, Gujarat ===== May 2018 Page 1 of 2

Reply to EDS Query dated 13 November, 2018 Proposed Mandal Becharaji Special Investment Region in Ahmedabad and Mehsana District, Gujarat (IA/GJ/NCP/75764/2018) ============================================================================================================

============================================================================================================ November, 2018

Appendix D ---------------------------------------------------------------

Land use of 10 km impact area around cluster A and B

---------------------------------------------------------------

Page 105: SIR issued by the MoEF&CC · Form 1 Proposed Mandal Becharaji Special Investment Region in Ahmedabad and Mehsana District, Gujarat ===== May 2018 Page 1 of 2

Reply to EDS Query dated 13 November, 2018Proposed Mandal Becharaji Special Investment Region in Ahmedabad and Mehsana District, Gujarat (IA/GJ/NCP/75764/2018)============================================================================================================================================================

Appendix D Land use of 10 km impact area around cluster A and B

============================================================================================================================================================November, 2018 Page 1 of 4

Appendix D Land use of 10 km Impact Area Around Cluster A (Bechraji)

Page 106: SIR issued by the MoEF&CC · Form 1 Proposed Mandal Becharaji Special Investment Region in Ahmedabad and Mehsana District, Gujarat ===== May 2018 Page 1 of 2

Reply to EDS Query dated 13 November, 2018Proposed Mandal Becharaji Special Investment Region in Ahmedabad and Mehsana District, Gujarat (IA/GJ/NCP/75764/2018)============================================================================================================================================================

Appendix D Land use of 10 km impact area around cluster A and B

============================================================================================================================================================November, 2018 Page 2 of 4

Appendix D Land use of 10 km Impact Area Around Cluster A (Bechraji)

SL No LULC_Class Area (Ha) Area (%)

1 WaterBodies 8100.31 12%

2 Agricultural Fallow Land 27002.00 40%

3 Open Scrub 2760.13 4%

4 Dense Scrub 2900.12 4%

5 BuiltUp 4834.13 7%

6 Forest 2600.12 4%

7 Plantation 2601.44 4%

8 Railways 6301.00 9.37%

9 Roads 10137.75 15%

Total 67236.99 100%

Page 107: SIR issued by the MoEF&CC · Form 1 Proposed Mandal Becharaji Special Investment Region in Ahmedabad and Mehsana District, Gujarat ===== May 2018 Page 1 of 2

Reply to EDS Query dated 13 November, 2018Proposed Mandal Becharaji Special Investment Region in Ahmedabad and Mehsana District, Gujarat (IA/GJ/NCP/75764/2018)============================================================================================================================================================

Appendix D Land use of 10 km impact area around cluster A and B

============================================================================================================================================================November, 2018 Page 3 of 4

Appendix D Land use of 10 km Impact Area Around Cluster B (Mandal)

Page 108: SIR issued by the MoEF&CC · Form 1 Proposed Mandal Becharaji Special Investment Region in Ahmedabad and Mehsana District, Gujarat ===== May 2018 Page 1 of 2

Reply to EDS Query dated 13 November, 2018Proposed Mandal Becharaji Special Investment Region in Ahmedabad and Mehsana District, Gujarat (IA/GJ/NCP/75764/2018)============================================================================================================================================================

Appendix D Land use of 10 km impact area around cluster A and B

============================================================================================================================================================November, 2018 Page 4 of 4

Appendix D Land use of 10 km Impact Area Around Cluster A (Bechraji)

SL No LULC_Class Area (Ha) Area (%)

1 WaterBodies 6100.31 9%

2 Agricultural Fallow Land 29002.00 42%

3 Open Scrub 3260.13 5%

4 Dense Scrub 1900.12 3%

5 BuiltUp 4134.13 6%

7 Plantation 1601.44 2%

8 Railways 8301.00 12.11%

9 Roads 14249.75 21%

Total 68548.87 100%

Page 109: SIR issued by the MoEF&CC · Form 1 Proposed Mandal Becharaji Special Investment Region in Ahmedabad and Mehsana District, Gujarat ===== May 2018 Page 1 of 2

Reply to EDS Query dated 13 November, 2018 Proposed Mandal Becharaji Special Investment Region in Ahmedabad and Mehsana District, Gujarat (IA/GJ/NCP/75764/2018) ============================================================================================================

============================================================================================================ November, 2018

Appendix E ---------------------------------------------------------------

Layout of the Clusters A and B with proposed facilities

duly labeled/demarcated

---------------------------------------------------------------

Page 110: SIR issued by the MoEF&CC · Form 1 Proposed Mandal Becharaji Special Investment Region in Ahmedabad and Mehsana District, Gujarat ===== May 2018 Page 1 of 2

Reply to EDS Query dated 13 November, 2018Proposed Mandal Becharaji Special Investment Region in Ahmedabad and Mehsana District, Gujarat (IA/GJ/NCP/75764/2018)============================================================================================================================================================

Appendix E Layout of Clusters A and B with proposed facilities duly labeled/demarcated

============================================================================================================================================================November, 2018 Page 1 of 2

Appendix E Layout of the Clusters A (Bechraji) with proposed facilities duly labeled/demarcated

Page 111: SIR issued by the MoEF&CC · Form 1 Proposed Mandal Becharaji Special Investment Region in Ahmedabad and Mehsana District, Gujarat ===== May 2018 Page 1 of 2

Reply to EDS Query dated 13 November, 2018Proposed Mandal Becharaji Special Investment Region in Ahmedabad and Mehsana District, Gujarat (IA/GJ/NCP/75764/2018)============================================================================================================================================================

Appendix E Layout of Clusters A and B with proposed facilities duly labeled/demarcated

============================================================================================================================================================November, 2018 Page 2 of 2

Appendix E Layout of the Clusters B (mandal) with proposed facilities duly labeled/demarcated

Page 112: SIR issued by the MoEF&CC · Form 1 Proposed Mandal Becharaji Special Investment Region in Ahmedabad and Mehsana District, Gujarat ===== May 2018 Page 1 of 2

Reply to EDS Query dated 13 November, 2018 Proposed Mandal Becharaji Special Investment Region in Ahmedabad and Mehsana District, Gujarat (IA/GJ/NCP/75764/2018) ============================================================================================================

============================================================================================================ November, 2018

Appendix F ---------------------------------------------------------------

Industrial areas demarcated for Category A and Category B industries

in Cluster A and B

---------------------------------------------------------------

Page 113: SIR issued by the MoEF&CC · Form 1 Proposed Mandal Becharaji Special Investment Region in Ahmedabad and Mehsana District, Gujarat ===== May 2018 Page 1 of 2

Reply to EDS Query dated 13 November, 2018Proposed Mandal Becharaji Special Investment Region in Ahmedabad and Mehsana District, Gujarat (IA/GJ/NCP/75764/2018)============================================================================================================================================================

Appendix F Industrial areas demarcated for Category A and Category B industries in Cluster A (Bechraji) and Cluster B (Mandal)

============================================================================================================================================================November, 2018 Page 1 of 3

Appendix F Industrial areas demarcated for Category A and Category B industries

in Cluster A (Bechraji)

Reserved for Non Category A or B Industries

Reserved for Category B Industries

Industrial area

Page 114: SIR issued by the MoEF&CC · Form 1 Proposed Mandal Becharaji Special Investment Region in Ahmedabad and Mehsana District, Gujarat ===== May 2018 Page 1 of 2

Reply to EDS Query dated 13 November, 2018Proposed Mandal Becharaji Special Investment Region in Ahmedabad and Mehsana District, Gujarat (IA/GJ/NCP/75764/2018)============================================================================================================================================================

Appendix F Industrial areas demarcated for Category A and Category B industries in Cluster A (Bechraji) and Cluster B (Mandal)

============================================================================================================================================================November, 2018 Page 2 of 3

Reserved for Non Category A or B Industries

Reserved for Category B Industries

Industrial area

Appendix F Industrial areas demarcated for Category A and Category B industries

in Cluster B (Mandal)

Page 115: SIR issued by the MoEF&CC · Form 1 Proposed Mandal Becharaji Special Investment Region in Ahmedabad and Mehsana District, Gujarat ===== May 2018 Page 1 of 2

Reply to EDS Query dated 13 November, 2018Proposed Mandal Becharaji Special Investment Region in Ahmedabad and Mehsana District, Gujarat (IA/GJ/NCP/75764/2018)============================================================================================================================================================

Appendix F Industrial areas demarcated for Category A and Category B industries in Cluster A (Bechraji) and Cluster B (Mandal)

============================================================================================================================================================November, 2018 Page 3 of 3

Appendix F Industrial areas demarcated for Category A and Category B industries

Category A Industry No Category A industry will be housed in the MB SIR

Category B Industry One Industrial Area each has been designated for Category B Industries in both the clusters.

Industrial sectors : EIA Notification 2006 (amended),

Schedule Sr. 3(a), Metallurgical industries (ferrous & non ferrous), Category B - i.) All toxic

and heavy metal producing units 5000 tonnes/annum – applicable to automotive or auto

ancillaries involve forging process,

Sr. 5(f), Synthetic organic chemicals industry (dyes & dye intermediates; bulk drugs and

intermediates excluding drug formulations; synthetic rubbers; basic organic chemicals, other

synthetic organic chemicals and chemical intermediates), Category B - Located in a notified

industrial area/ estate – applicable to auto ancillaries involving production of polymer/

plastic components, e.g. PE foam for vehicle trims, buffers, noise deadening,

insulation and packaging applications, etc.,

Page 116: SIR issued by the MoEF&CC · Form 1 Proposed Mandal Becharaji Special Investment Region in Ahmedabad and Mehsana District, Gujarat ===== May 2018 Page 1 of 2

Reply to EDS Query dated 13 November, 2018 Proposed Mandal Becharaji Special Investment Region in Ahmedabad and Mehsana District, Gujarat (IA/GJ/NCP/75764/2018) ============================================================================================================

============================================================================================================ November, 2018

Appendix G ---------------------------------------------------------------

Master Plan of Cluster A (Bechraji)

---------------------------------------------------------------

Page 117: SIR issued by the MoEF&CC · Form 1 Proposed Mandal Becharaji Special Investment Region in Ahmedabad and Mehsana District, Gujarat ===== May 2018 Page 1 of 2

Mandal Becharaji Special Investment Region

(MBSIR)

Master Plan (Cluster A – Bechraji)

Mandal Becharaji Special Investment Region (MBSIR)

Master Plan

(Cluster A - Bechraji)

Mandal Becharaji Special Investment Region

Development Authority, Gandhinagar

C/O: DSIRDA, Block No. 11/12, 3rd Floor, Udyog Bhavan, Sector 11, Gandhinagar - 382017

Page 118: SIR issued by the MoEF&CC · Form 1 Proposed Mandal Becharaji Special Investment Region in Ahmedabad and Mehsana District, Gujarat ===== May 2018 Page 1 of 2

Mandal Becharaji Special Investment Region

(MBSIR)

Master Plan (Cluster A – Bechraji)

Page 119: SIR issued by the MoEF&CC · Form 1 Proposed Mandal Becharaji Special Investment Region in Ahmedabad and Mehsana District, Gujarat ===== May 2018 Page 1 of 2

Mandal Becharaji Special Investment Region

(MBSIR)

Master Plan (Cluster A – Bechraji)

\

Mandal Becharaji Special Investment Region

Development Authority, Gandhinagar

C/O: DSIRDA, Block No. 11/12, 3rd Floor, Udyog Bhavan, Sector 11, Gandhinagar -

382017

Page 120: SIR issued by the MoEF&CC · Form 1 Proposed Mandal Becharaji Special Investment Region in Ahmedabad and Mehsana District, Gujarat ===== May 2018 Page 1 of 2

Master Plan – MBSIR Cluster B Development Plan

MBSIRDA 3|P a g e

Contents

Contents .............................................................................................................................................. iii

List of Figures ......................................................................................................................................... v

List of Tables ......................................................................................................................................... vi

Abbreviation ........................................................................................................................................ vii

CHAPTER 1 .......................................................................................................................................... 1

1. Introduction ........................................................................................................................................... 2

1.1. Overview........................................................................................................................................ 2

1.2. Notification of Mandal Becharaji Special Investment Region ....................................................... 3

1.3. Constitution of ‘Authority’ and ‘Committee Members’ of MBSIRDA............................................ 4

1.4. Powers and Functions of MBSIRDA ............................................................................................... 5

CHAPTER 2 ............................................................................................................................................. 7

2. MBSIR - Existing Situation...................................................................................................................... 8

2.1. Location & Connectivity................................................................................................................. 8

2.2. Existing Major Road network ........................................................................................................ 9

2.3. Location with respect to Environmentally Sensitive Areas ......................................................... 10

2.4. Existing land use .......................................................................................................................... 11

2.5. Rivers, Tributaries, Canal and Water Tanks in the region ........................................................... 14

2.6. Demography ................................................................................................................................ 15

2.7. Social Infrastructure .................................................................................................................... 18

2.8. Physical Infrastructure ................................................................................................................. 19

CHAPTER 3 ........................................................................................................................................... 20

3. Master Plan Proposal ................................................................................................................ 21

3.1. Preparation of Base map & Existing land use map...................................................................... 21

3.2. Target Sector Identification ......................................................................................................... 24

3.3. Sustainable Population ................................................................................................................ 26

3.4. Vision ........................................................................................................................................... 27

3.5. Planning Principles....................................................................................................................... 27

3.6. Land Use Proposal ....................................................................................................................... 29

3.7. Road and Rail proposals .............................................................................................................. 41

3.8. Infrastructure Proposals .............................................................................................................. 46

CHAPTER 4 ........................................................................................................................................... 56

4. Implementation Strategy..................................................................................................................... 57

4.1. Comprehensive guidelines for implementing the DP.................................................................. 57

4.2. Provision of various facilities in Master Plan through TP Schemes .................................. 58

Page 121: SIR issued by the MoEF&CC · Form 1 Proposed Mandal Becharaji Special Investment Region in Ahmedabad and Mehsana District, Gujarat ===== May 2018 Page 1 of 2

Master Plan – MBSIR Cluster B Development Plan

MBSIRDA 4|P a g e

CHAPTER 5 ........................................................................................................................................... 61

5. Broad Cost Estimates........................................................................................................................... 62

5.1. External Infrastructure components ........................................................................................... 62

5.2. Internal Infrastructure components ............................................................................................ 63

5.3. Comprehensive Infrastructure .................................................................................................... 65

Page 122: SIR issued by the MoEF&CC · Form 1 Proposed Mandal Becharaji Special Investment Region in Ahmedabad and Mehsana District, Gujarat ===== May 2018 Page 1 of 2

MBSIRDA 5|P a g e

Master Plan – MBSIR Cluster A Development Plan

List of F igures

1-1, DMIC influential area, India 1-2, DMIC influential area, Gujarat ......................................................... 2

2-1, Location & Connectivity - MBSIR................................................................................................................ 8

2-2, Existing Major Road Network within MBSIR .............................................................................................. 9

2-3, SH 133 connecting Ughroj with Ughrojpura 2-4, SH 19 connecting Hansalpur with Becharaji ........... 10

2-5, Location with respect to Environmentally Sensitive areas ...................................................................... 10

2-6, Existing Land Use, MBSIR ......................................................................................................................... 12

2-7, Water bodies in MBSIR............................................................................................................................. 14

2-8, Sitapur Lake .............................................................................................................................................. 14

2-9, Zinzuwada Branch Canal, 2-10, Kharaghoda Branch Canal ……………......................................................... 15

2-11, Average Annual Growth Rate ................................................................................................................. 16

2-12, Sex ratio.................................................................................................................................................. 16

2-13, Literacy Rate ........................................................................................................................................... 17

2-14, Work Participation Rate ......................................................................................................................... 17

2-15, Worker's Distribution ............................................................................................................................. 18

3-1, Satellite Image of MBSIR .......................................................................................................................... 21

3-2, Base Map, MBSIR ..................................................................................................................................... 23

3-3, Industrial zone .......................................................................................................................................... 30

3-4, Logistic zone ............................................................................................................................................. 31

3-5, Knowledge and IT zone ............................................................................................................................ 32

3-6, Residential zone ....................................................................................................................................... 33

3-7, Affordable housing zone .......................................................................................................................... 34

3-8, High Access Corridor ................................................................................................................................ 35

3-9, Mixed Use................................................................................................................................................. 36

3-10, Recreation, Sports and Entertainment zone .......................................................................................... 37

3-11, Village Buffer zone ................................................................................................................................. 38

3-12, Proposed Landuse plan, MBSIR.............................................................................................................. 39

3-13, 90 mt. Row, Road Section ...................................................................................................................... 42

3-14, 60 mt. Row, Road Section ...................................................................................................................... 42

3-15, 45 mt. Row, Road Section ...................................................................................................................... 43

3-16, 30 mt. Row, Road Section ...................................................................................................................... 43

3-17, Proposed Road Network, MBSIR ............................................................................................................ 45

3-18, Water Supply Network ........................................................................................................................... 49

3-19, Sewage Network .................................................................................................................................... 51

3-20, Recyle Water Network ........................................................................................................................... 52

3-21, Storm Water Disposal Scheme ............................................................................................................... 53

Page 123: SIR issued by the MoEF&CC · Form 1 Proposed Mandal Becharaji Special Investment Region in Ahmedabad and Mehsana District, Gujarat ===== May 2018 Page 1 of 2

MBSIRDA 6|P a g e

Master Plan – MBSIR Cluster A Development Plan

List of Tables

Table 1-1, List of notified villages ...................................................................................................................... 4

Table 1-2, MBSIRDA Board Members................................................................................................................ 4

Table 2-1, Area Statement, Existing Land Use MBSIR ..................................................................................... 13

Table 2-2, Demographic Information, MBSIR.................................................................................................. 15

Table 2-3, Education facilities in MBSIR .......................................................................................................... 18

Table 2-4, Health Facilities in MBSIR ............................................................................................................... 19

Table 3-1, Employment generation in MBSIR ................................................................................................. 26

Table 3-2, Floating Employment...................................................................................................................... 26

Table 3-3, Total Population supported by MBSIR ........................................................................................... 26

Table 3-4, Major Industrial Nodes ................................................................................................................... 30

Table 3-5, Location of Logistic zone ................................................................................................................ 31

Table 3-6, Area Statement MBSIR ................................................................................................................... 40

Table 3-7, Proposed Road Network................................................................................................................. 44

Table 3-8, Proposed Rail Network ................................................................................................................... 46

Table 3-9, Treatment units for Water Supply.................................................................................................. 47

Table 3-10, Sewage pumping station units ..................................................................................................... 50

Table 4-1, Requirement of community facility for MBSIR............................................................................... 59

Table 4-2, Standards for Community Facility .................................................................................................. 59

Table 4-3, Requirement of commercial facility for MBSIR .............................................................................. 60

Table 5-1, External Road Infrastructure .......................................................................................................... 62

Table 5-2, External Rail Infrastructure............................................................................................................. 62

Table 5-3, Comprehensive - External Infrastructure ....................................................................................... 62

Table 5-4, Internal Road Infrastructure ........................................................................................................... 63

Table 5-5, Internal Rail Infrastructure ............................................................................................................. 63

Table 5-6, Water Supply .................................................................................................................................. 64

Table 5-7, Sewage System ............................................................................................................................... 64

Table 5-9, Storm Water Disposal System ........................................................................................................ 65

Table 5-10, Solid Waste ................................................................................................................................... 65

Table 5-11, Internal Infrastructure Costing ..................................................................................................... 65

Table 5-12, Comprehensive Infrastructure Costing ........................................................................................ 65

Page 124: SIR issued by the MoEF&CC · Form 1 Proposed Mandal Becharaji Special Investment Region in Ahmedabad and Mehsana District, Gujarat ===== May 2018 Page 1 of 2

MBSIRDA 7|P a g e

Master Plan – MBSIR Cluster A Development Plan

Abbreviation

DFC Dedicated Freight Corridor

DMIC Delhi-Mumbai Industrial Corridor

SIR Special Investment Region

MBSIR Mandal Becharaji Special Investment Region

MBSIRDA Mandal Becharaji Special Investment Regional Development Authority

DP Development Plan

GDCR General Development Control Regulations

Acts

GTP & UD Gujarat Town Planning & Urban Development GSIR Gujarat Special Investment Region

State and Central Government Organisations

CPHEEO Central Public Health and Environmental Engineering Organisation

CPCB Central Pollution Control Board

GETCO Gujarat Energy Transmission Company

GIDB Gujarat Infrastructure Development Board

GPCB Gujarat Pollution Control Board

SSNNL Sardar Sarovar Narmada Nigam Limited

DILR District Inspector of Land Records

GSRDC Gujarat State Road Development Corporation

MoEF Ministry of Environment and Forests PCCF

Principal Chief Conservator of Forest

GWSSB Gujarat Water Supply and Sanitation Board

GWIL Gujarat Water Infrastructure Limited

Utility Infrastructure Terms

CETP Common Effluent Treatment Plant

DCS Distribution Control System

STP Sewage Treatment Plant

SWM Solid Waste Management

TSE Treated Sewage Effluent

Financial and Economic Terms

CAPEX Capital Expenditure

ERR Economic Rate of Return

ENPV Economic Net Present Value

OPEX Operating Expenditure

Page 125: SIR issued by the MoEF&CC · Form 1 Proposed Mandal Becharaji Special Investment Region in Ahmedabad and Mehsana District, Gujarat ===== May 2018 Page 1 of 2

MBSIRDA viii|P a g e

Master Plan – MBSIR Cluster A Development Plan

Terms Related to Transportation

NH National Highway

SH State Highway

MDR Major District Road

ODR Other District Road

TOD Transit Oriented Development

PCU Passenger Car Equivalent

ROW Right of Way

Page 126: SIR issued by the MoEF&CC · Form 1 Proposed Mandal Becharaji Special Investment Region in Ahmedabad and Mehsana District, Gujarat ===== May 2018 Page 1 of 2

CHAPTER 1

INTRODUCTION

1

Page 127: SIR issued by the MoEF&CC · Form 1 Proposed Mandal Becharaji Special Investment Region in Ahmedabad and Mehsana District, Gujarat ===== May 2018 Page 1 of 2

MBSIRDA 2|P a g e

Master Plan – MBSIR Cluster A Development Plan

1. Introduction

1.1. Overview

Spread over more than 102 Sq.km, Mandal Bechraji Special Investment Region (MBSIR) is a new industrial

hub being planned about 90km from Ahmedabad and 85 km from Gandhinagar near Becharaji town.

Envisaged by the government of Gujarat, MBSIR is one of its kind industrial hubs and will comprise

automobile, manufacturing and auxiliary industries. The SIR is strategically located, well connected with

trade gateways and falls in the influence zone of proposed Delhi – Mumbai Industrial Corridor project

(DMIC), a joint initiative by the Government of India and Japan.

The dedicated freight corridor (DFC) passes through six different states. Distribution of its length in these

states is mentioned below

Delhi NCR – 1.5%

Haryana – 10%

Uttar Pradesh – 1.5%

Rajasthan – 39%

Gujarat – 38%

Maharashtra – 10%

Proposed

MBSIR

1-1, DMIC influential area, India 1-2, DMIC influential area, Gujarat

Govt. of Gujarat has been pro active to take advantage of proposed DMIC Project. It has declared around

10 Special Investment Regions in the area of influence of DMIC. For Mandal Becharaji Special Investment

Region, a concept plan has been prepared which consist of

Delineation of SIR region

Basic physiographic studies of region

Target sectors for SIR and market analysis

Page 128: SIR issued by the MoEF&CC · Form 1 Proposed Mandal Becharaji Special Investment Region in Ahmedabad and Mehsana District, Gujarat ===== May 2018 Page 1 of 2

MBSIRDA 3|P a g e

Master Plan – MBSIR Cluster A Development Plan

Conceptual land use and infrastructure proposals

Block cost estimates

For implementation of concept plan, the state govt. has decided to prepare a master plan for the

region. The overall process for preparation of master plan comprises of following stages:

1. Declaration of special investment region u/s 3 read with section 4 of the Gujarat Special

Investment Region Act, 2009

2. Establishment of apex authority – The Gujarat Infrastructure Development Board (GIDB),

established u/s 17 of Gujarat Infrastructure Development Act, 1999 is declared and designated as

the Special Investment Region Apex Authority u/s 5 of GSIR Act, 2009

3. Constitution of a regional development authority as per sub-section (1) of sections 8, 9, 10 and 15

of the Gujarat Special Investment Region Act, 2009

4. Preparation of draft master plan u/s 15 of GSIR Act 2009 and u/s 9 of GTP & UD Act 1976

5. Publication of draft master plan u/s 17 of GSIR Act 2009 and u/s 13 of GTP & UD Act, 1976

6. Receive/consider objections and suggestions u/s 17 of GSIR Act 2009 and u/s 14 of GTP & UD Act,

1976

7. Publication of modifications done in master plan after receiving objections and suggestions, u

/s 17 of GSIR Act 2009 and u/s 15 of GTP & UD Act, 1976

8. Submission of draft master plan to State Government for sanction u/s 17 of GSIR Act 2009 and

u/s 16 of GTP & UD Act, 1976

This publication addresses stage 7 of the above process and comprises of modified draft master plan after

receiving objections and suggestions, u/s 15(3)(ii) u/s 17 of GSIR Act 2009 and u/s 15 of GTP & UD Act

1976.

The publication comprises of two reports. Report 1 covers the proposal on land use, infrastructure,

implementation and block cost estimates and Report 2 covers the Draft General Development Control

Regulations (DGDCR) for the proposed SIR.

1.2. Notification of Mandal Becharaji Special Investment Region

In exercise of the powers conferred by section 3 read with section 4 of the Gujarat Special Investment

Region Act, 2009 (Guj. 2 of 2009), the Industries and Mines Dept. of Government of Gujarat and the

Government of Gujarat declared Mandal Becharaji Special Investment Region (MBSIR) vide Notification No.

GHU/2012/22/SIR/112012/1276/I on 24th September 2012 published in Government Gazette. Notification

comprises 44 villages of district Ahmedababd taluka Mandal and Detroj, District Surendranager taluka

dasada-patadi and District Mahesana taluka bechraji.

Vide Notification No. GHU/2013/16/SIR/112012/1276/I on 14th August 2013 published in Government

Gazette, Industries and Mines Department, Government of Gujarat, deleted 36 villages from the earlier

declared “Mandal Bechraji Special Investment Region”.

As per notification Mandal Becharaji Special Investment Region comprises of 2 villages of Detroj Taluka

and5 villages of Mandal Taluka from Ahmedabad district and 1 village from Becharaji Taluka of Mehsana

Page 129: SIR issued by the MoEF&CC · Form 1 Proposed Mandal Becharaji Special Investment Region in Ahmedabad and Mehsana District, Gujarat ===== May 2018 Page 1 of 2

MBSIRDA 4|P a g e

Master Plan – MBSIR Cluster A Development Plan

District. The total area spread over 8 villages, about 101.72 sq.km. as per notification and as per measured

on base map 102.10 sq km.

Name of District

Name of Taluka Name of Revenue Villages

Sr.no. Name of Village Total Survey Nos. Total area of sq.km Ahmedabad Mandal 1. Hansalpur Becharaji Complete 8.63

2. Sitapur Complete 36.72 Mehsana Bechraji 3. Chandanki Complete 5.24

Total 50.60 Table 1-1, List of notified villages

Source: notification Dated 24th September 2012.

1.3. Constitution of ‘Authority’ and ‘Committee Members’ of MBSIRDA

In exercise of the powers conferred by sub-section (1) of sections 8, u/s 9, 10 and 15 of the Gujarat Special

Investment Region Act, 2009 (Guj. 2 of 2009), the Industries and Mines Dept. of Gujarat and the

Government of Gujarat constituted Mandal Becharaji Special Investment Regional Development Authority

(MBSIRDA) vide Notification No. GHU/12/23/SIR/112012/1276/I on 1st October 2012, published in

Government Gazette. MBSIRDA shall consist of the following members, namely:-

Sr. No. Member Designation

1 Principal Secretary

Chairperson Industries and Mines Department

2 Industries Commissioner Vice Chairperson

3 Chief Executive Officer,

Member ex-officio Gujarat Infrastructure Development Board

4 Collector, Ahmedabad, Member ex-officio

5 District Development Officer, Ahmedabad Member

6 Collector, Mehsana, Member

7 Collector, Surendranagar, Member

8 Director, School of Planning, Centre of Environmental

Member Planning and Technology (CEPT), Ahmedabad

9 Shri U.S. Mehta (Retired Town Planner) Member

10 President, Gujarat Chamber of Commerce and Industries Member

11 Chief Executive Officer, Mandal Becharaji Special

Member Secretary Investment Regional Development Authority

Table 1-2, MBSIRDA Board Members

Source: Form notification Dated 1st October 2012.

Page 130: SIR issued by the MoEF&CC · Form 1 Proposed Mandal Becharaji Special Investment Region in Ahmedabad and Mehsana District, Gujarat ===== May 2018 Page 1 of 2

MBSIRDA 5|P a g e

Master Plan – MBSIR Cluster A Development Plan

1.4. Powers and Functions of MBSIRDA

The powers and functions of the Mandal Becharaji Special Investment Regional Development Authority will be according to section 15 of ‘The Gujarat Special Investment Region Act, 2009. It is thus listed as below:

1) The Regional Development Authority shall secure planned development of the Special Investment

Region and shall take steps for its effective regulation and efficient management so as to bring and

enhance general welfare, convenience, productivity and excellence.

2) Without prejudice to the generality of foregoing provisions, the Regional Development Authority shall

undertake the management and planning of land resource and infrastructure of the Special Investment

Region (SIR).

3) The Regional Development Authority shall, in particular, exercise the following powers and perform the

following functions namely:-

i. To classify and earmark the area of the Special Investment Region for various purposes and usages

including economic activities, amenities and community services as it deems fit;

ii. To prepare the Draft master plan for whole or part of the area of the Special Investment

Region;

iii. To undertake preparation and executing of town planning scheme for whole or part of the Special

Investment Region;

iv. To regulate the development of the periphery area of the Special Investment Region,

v. To acquire, hold and manage moveable or immoveable property as it may deem necessary subject

to general or specific directions of the State Government in this regard;

vi. To acquire land in the Special Investment Region, by sale, lease, grant, allocation, donation, Town

Planning Scheme, consent agreement or through proceedings under the Land Acquisition Act,

1894 for the purposes of this Act,

vii. To sale, lease, transfer or dispose of any land or building belonging to it subject to the regulations

made by the Apex Authority;

viii. To carry out surveys in the Mandal Becharaji Special Investment Region for the preparation of Draft

master Plans and Town Planning Schemes;

ix. To prepare, issue and implement the directions, the standards and the norms for building

structures, infrastructure development and other construction activities in the Special Investment

Region;

x. To enter into contracts, agreements or concession agreement with any person, entity, developer or

organization as it may deem necessary for performing its functions;

xi. To execute, co-ordinate and supervise works in connection with infrastructure or provision of other

services and amenities in the Special Investment Region;

xii. To provide for disaster management and mitigation in the Special Investment Region;

xiii. To levy and collect such fees, development charges, or user charges as may be ascertained and

fixed by the Apex Authority under clause (vii) of sub-section (2) of section 6;

xiv. To remove encroachments and constructions not duly authorized or made in violation of the

regulations, directions and norms laid down by the Regional Development Authority;

Page 131: SIR issued by the MoEF&CC · Form 1 Proposed Mandal Becharaji Special Investment Region in Ahmedabad and Mehsana District, Gujarat ===== May 2018 Page 1 of 2

MBSIRDA 6|P a g e

Master Plan – MBSIR Cluster A Development Plan

xv. To make arrangements for observance and promotion of safety, order, health and environmental

safeguards within the Special Investment Region;

xvi. To guide, assist and co-ordinate with other authorities functioning in the Special Investment Region

in matters pertaining to planning and use of land and development of the Special Investment

Region;

xvii.To control the development activities in accordance with the Master plan and to bring aesthetics,

efficiency and economy in the process of development;

xviii. To ensure and make provisions for sufficient civic amenities and services including hospitals and

medical services, schools, fire services, public parks, markets and shopping places, playgrounds,

entertainment areas and disposal of waste and provisions of drainage;

xix. The make sustainable arrangements for providing and maintaining the highest standards in civic

amenities and services particularly for cleanliness, aesthetics, health and hygiene;

xx. To make enquiry, inspection, examination or measurement of any land and building in any part of

the Special Investment Region;

xxi. To exercise such other powers and discharge such other functions as may be prescribed by the

rules or regulations.

4) (a) Notwithstanding anything contained in the relevant State Acts, rules or any existing instructions

of the State Government, the Regional Development Authority my frame its own General

Development Control Regulations (GDCR) and the same shall prevail for developments in the

Special Investment Region.

b) Every person, unit or developer or any other stakeholder in Special Investment Region shall

be required to get the plans of the building approved by the Regional Development Authority

before commencing any construction and shall obtain the approval of the Regional Development

Authority necessary and incidental thereto, after the completion and before the use of such

premises.

c) For the purpose of this section and with any other requirement for proper planning,

management and development of the Special Investment Region, the Regional Development

Authority may issue such direction or instruction as it may consider necessary to any person, unit,

entity, developer or any other stakeholder in the Special Investment Region and the person, unit,

entity, developer or, as the case may be, the stakeholder shall be bound by such directions

Page 132: SIR issued by the MoEF&CC · Form 1 Proposed Mandal Becharaji Special Investment Region in Ahmedabad and Mehsana District, Gujarat ===== May 2018 Page 1 of 2

Master Plan – MBSIR Cluster A Development Plan

CHAPTER 2 MBSIR - EXISTING SITUATION

7

Page 133: SIR issued by the MoEF&CC · Form 1 Proposed Mandal Becharaji Special Investment Region in Ahmedabad and Mehsana District, Gujarat ===== May 2018 Page 1 of 2

MBSIRDA 8|P a g e

Master Plan – MBSIR Cluster A Development Plan

2. MBSIR - Existing Situation

2.1. Location & Connectivity

Mandal Bechraji Special Investment Region (MBSIR) is located about 90 km from Ahmedabad and 85 km

from Gandhinagar on north-west and near Becharaji town.

2-1, Location & Connectivity - MBSIR

The SIR is regionally well connected through National and State highways as well as railways. National

highway 14- 15 connecting Kandla with Palanpur passes through north of the proposed SIR. NH-8 and State

highway no. 7 passes from south, and State highway no. 41 connecting Ahmedabad and Mehsana passes

along eastern edge of the SIR. The five major roads directly connecting SIR with the National and state

highways include:

SH-133 – Connecting Ahmedabad via Detroj, Kadi, Kalol and Adalaj

MDR - Connecting Mehsana via Becharaji and Modhera is a 2-lane undivided road

SH-7- Connecting Viramgam

SH-135- Connecting Sanand via Kadi and Thol

SH-55 connecting Mundra via Radhanpur, Harij and Becharaji

A broad gauge railway line connecting Viramgam with Mehsana passes through the SIR at Detroj. Apart

from this the SIR is in proximity to a meter gauge line connecting Katosan Road to Ranuj via Becharaji.

Page 134: SIR issued by the MoEF&CC · Form 1 Proposed Mandal Becharaji Special Investment Region in Ahmedabad and Mehsana District, Gujarat ===== May 2018 Page 1 of 2

MBSIRDA 9|P a g e

Master Plan – MBSIR Cluster A Development Plan

2.2. Existing Major Road network

Currently three state highways pass through the proposed SIR. SH 7 connecting Becharaji with Ukardi

village. SH 133 providing connectivity between Ughroj and Ughrojpura and SH 19 connecting Hansalpur

with Becharaji. These three state highways form a triangular loop within SIR and also provide major entry

and exit points.

2-2, Existing Major Road Network within MBSIR

Page 135: SIR issued by the MoEF&CC · Form 1 Proposed Mandal Becharaji Special Investment Region in Ahmedabad and Mehsana District, Gujarat ===== May 2018 Page 1 of 2

MBSIRDA 10|P a g e

Master Plan – MBSIR Cluster A Development Plan

2-3, SH 133 connecting Ughroj with Ughrojpura 2-4, SH 19 connecting Hansalpur with Becharaji

2.3. Location with respect to Environmentally Sensitive Areas

2-5, Location with respect to Environmentally Sensitive areas

There are three notified sanctuaries around proposed SIR, namely Wild Ass sanctuary in Little Rann of

Kachchh, Nal sarovar birds sanctuary and Thol lake birds sanctuary. However all of them are more than 10

km. from the notified SIR boundary. The Wild Ass sanctuary in Little Rann of Kachchh is located on east of

notified MBSIR region and is around 35 km. away. It spreads over an area of appx. 4900 sq. km. Little Rann

of Kachchh is also listed under UNESCO World Heritage Sites. Spread over an area of appx. 120 sq. km., Nal

sarovar birds sanctuary is located to the south of SIR and is around 45 km. away. It is a natural lake with

shallow waters and muddy lagoons, dotted by 360 islets. Thol bird sanctuary covering an area of around 7

Sq.Km is a manmade lake and is located towards south east of MBSIR around 35 km. away.

Page 136: SIR issued by the MoEF&CC · Form 1 Proposed Mandal Becharaji Special Investment Region in Ahmedabad and Mehsana District, Gujarat ===== May 2018 Page 1 of 2

MBSIRDA 11|P a g e

Master Plan – MBSIR Cluster A Development Plan

2.4. Existing land use

Of the total area only 1.29 % is under Habitation. Around 82.84 sq. km. of land area is under Agriculture

land use. Various river tributaries, water tanks and canals account for 3.43 sq. km. (3.36%) of land in MBSIR.

Page 137: SIR issued by the MoEF&CC · Form 1 Proposed Mandal Becharaji Special Investment Region in Ahmedabad and Mehsana District, Gujarat ===== May 2018 Page 1 of 2

MBSIRDA 121 Page

Master Plan

MANDAL-BECHARAJISPECIAL INVESTMENT REGIONAL DEVELOPMENT AUTHORITY, GANDHINAGAR DRAFT MASTER PLAN

EXISTING LANDUSE PLAN

DRAFT MAS TE R PLAN (DDP) SUBMITTED U/S 15

(3XIi) AND 17 OF THE GSIR ACT-2009 AND UIS 16

OF THE GTP & UDACT-1976

MANDAL- BECHARAJISPECIAL INVESTMENT

REGIONAL DEVELOPMENT AUTHORITY,

GANDHNI AGAR

MBSIRDA

LEGEND

r::=-- MBSIR BOUNDARY

- EXISTING ROADS

EXISTING CANAL

EXISTING RAILWAY LINE

AGRICULTURE

- OPENSCRUB

- ISLAND

- BRICK KLIN

- VILLAGE HABITATION

- WATERBODY RIVER I

DRAIN

Nl

NOT TO SCALE

Senior Toomr Chlelf:wwti ve Offlc :e r Chairman MBSIRDA MBSRDA MBSIROA

No part of this plan/document may be reproduced without prior permsi sionInwrtiing from MBSIRDA.This plan should not be used for measurements.

2-6,Existing Land Use,MBSIR

Page 138: SIR issued by the MoEF&CC · Form 1 Proposed Mandal Becharaji Special Investment Region in Ahmedabad and Mehsana District, Gujarat ===== May 2018 Page 1 of 2

MBSIRDA 13|P a g e

Master Plan – MBSIR Cluster A Development Plan

Sr. No. Land Use Area (Sq. Km.) %

1 Agriculture 82.84 81.14

2 Habitation 1.32 1.29 3 Brick Kiln 0.14 0.14

4 Open Scrub 13.17 12.91

5 Roads 1.18 1.16

6 Canals 0.83 0.82

7 Water Tanks (Talav) 2.07 2.03

8 River 0.52 0.52

102.10 100

Table 2-1, Area Statement, Existing Land Use MBSIR

Page 139: SIR issued by the MoEF&CC · Form 1 Proposed Mandal Becharaji Special Investment Region in Ahmedabad and Mehsana District, Gujarat ===== May 2018 Page 1 of 2

MBSIRDA 14|P a g e

Master Plan – MBSIR Cluster A Development Plan

2.5. Rivers, Tributaries, Canal and Water Tanks in the region

2-7, Water bodies in MBSIR

There are four major tributaries and many water tanks in the region covering an area of appx. 3.43 sq.km.

(3.36% of total land). One of the major water bodies present in the nearby region is “Saran Lake” near

Vanod village. It is a man made water body developed for facilitating irrigation. Its area is appx. 8 sq. km.

However it has water only for around six month between August and January. Entire MBSIR area falls

within SSNNL command area. There are two branch canals namely Kharaghoda and Zinzuwada which pass

through the SIR. Length of these branch canals is around 10 km. Total area occupied by canal network is

around 4.5 sq. km.

2-8, Sitapur Lake

Page 140: SIR issued by the MoEF&CC · Form 1 Proposed Mandal Becharaji Special Investment Region in Ahmedabad and Mehsana District, Gujarat ===== May 2018 Page 1 of 2

MBSIRDA 15|P a g e

Master Plan – MBSIR Cluster A Development Plan

2-9, Zinzuwada Branch Canal 2-10, Kharaghoda Branch Canal

2.6. Demography

Demographic profiling of the 8 Villages within SIR is carried out. This includes Population growth, literacy

rate, sex ratio, work participation and workers distribution.

District

Taluka

Village Name

Population

Literacy

Working

Population Total Male Female

Ahmedabad Detroj Bhagapura 1052 531 521 627 389

Shihor 1384 705 679 775 519

Mandal Hansalpur Becharaji

1464 761 703 630 799

Sitapur 4161 2210 1951 2273 2166

Ughroj 1686 883 803 659 458

Ughrojpura 1152 594 558 749 269

Ukardi 1299 612 687 555 458

Mehsana Becharaji Chandanki 318 149 169 195 121

MBSIR 12516 6445 6071 6463 5179

Table 2-2, Demographic Information, MBSIR

Source: Census of India 2001

Page 141: SIR issued by the MoEF&CC · Form 1 Proposed Mandal Becharaji Special Investment Region in Ahmedabad and Mehsana District, Gujarat ===== May 2018 Page 1 of 2

MBSIRDA 16|P a g e

Master Plan – MBSIR Cluster A Development Plan

2.6.1. Average Annual Growth Rate (%)

Average annual growth rate is the rate at which population of a region increases in a given time period as a

fraction of the initial population. Between 1981 and 1991 the average annual growth rate of population

within MBSIR has been negative (-1.6 %) as compared to the positive growth rates of state and districts.

However from 1991 to 2001 the growth rate has improved, but remained lower in comparison to state and

district averages.

2-11, Average Annual Growth Rate

2.6.2. Sex ratio

2-12, Sex ratio

Sex ratio is number of females per 1000 males. Sex ratio in MBSIR region is higher as compared to district

and state averages.

Low population growth rate and high sex ratio as compared to District and State figures are indicative of

major out migration from the villages within the SIR. Better work opportunities on development of the SIR

may reverse the trends.

Page 142: SIR issued by the MoEF&CC · Form 1 Proposed Mandal Becharaji Special Investment Region in Ahmedabad and Mehsana District, Gujarat ===== May 2018 Page 1 of 2

MBSIRDA 17|P a g e

Master Plan – MBSIR Cluster A Development Plan

2.6.3. Literacy Rate (%)

2-13, Literacy Rate

As per the census 2001, the average literacy rate within the SIR is 52%. This is lower than average rates of

Ahmedabad district (69%) and Gujarat State (59%) indicates the need for education facilities and

infrastructure through planned development in proposed SIR.

2.6.4. Work Participation Rate (%)

2-14, Work Participation Rate

Work participation rate is defined as the percentage of total workers (main and marginal) to total

population. Almost 41% of total population residing in MBSIR is working population. Work participation

rate of the region has been increased in last two decades. It is almost near to state averages.

Page 143: SIR issued by the MoEF&CC · Form 1 Proposed Mandal Becharaji Special Investment Region in Ahmedabad and Mehsana District, Gujarat ===== May 2018 Page 1 of 2

MBSIRDA 18|P a g e

Master Plan – MBSIR Cluster A Development Plan

2-15, Worker's Distribution

As per Census of India, workers are divided in four major categories i.e. cultivators, agriculture labourers,

household industry workers and other workers. Out of these, cultivators and agriculture labourers

comprise of workers involved in agriculture (primary economic activity). The other two categories of

workers are involved in secondary and tertiary economic activities.

In MBSIR almost 80% of working population is involved in primary economic activities and the rest 20%

involved in secondary and tertiary economic activities. Ahmedabad district has around 20% of working

population involved in primary and rest 80% involved in secondary and tertiary economic activities. High

dependency of working population in MBSIR on primary economic activities along with high number of

agriculture labourers (50 %) indicates lack of economic opportunities in other sectors.

2.7. Social Infrastructure

2.7.1. Education Facilities

Sr. No. Educational Facility Number

1 Primary School 10

2 Secondary School 4

3 Senior Secondary School 0

4 College 0

5 Industrial School 0

6 Training School 0

7 Adult literacy Class/Centre 0

8 Other educational facilities 0 Table 2-3, Education facilities in MBSIR

Source: Census of India 2001

Page 144: SIR issued by the MoEF&CC · Form 1 Proposed Mandal Becharaji Special Investment Region in Ahmedabad and Mehsana District, Gujarat ===== May 2018 Page 1 of 2

MBSIRDA 19|P a g e

Master Plan – MBSIR Cluster A Development Plan

There are 10 primary schools in the region, suggesting that almost each village has a primary school.

However there are only 4 secondary schools and no senior secondary schools between 8 villages, spread

over an area of 102.10 sq. km.

There are no colleges, training schools or other education facilities available in the region. Nearest towns

with these facilities are Kadi, Mehsana, and Ahmedabad on eastern side of MBSIR. Villagers on the western

side of the SIR (Surendranagar district) travel around 20 – 25 km. to avail these facilities.

2.7.2. Health facilities

Health Facility Number

Primary Health Sub Centre 2

Registered Private Medical Practitioners 1

Primary Health Centre 1

Family Welfare Centre 1

Child Welfare Centre 0

Allopathic Hospital 0

Maternity Home 0

Ayurvedic, Unani, Homeopathic Hospital 0

Ayurvedic, Unani, Homeopathic Dispensary 0

Health Centre 0

Nursing Home 0 Table 2-4, Health Facilities in MBSIR

Source: Census of India 2001

The region has only 2 primary health sub centers and 1 primary health centre and family welfare centres.

There is no maternity home and allopathic hospital in the entire region of 102.10 sq. km.

2.8. Physical Infrastructure

2.8.1. Water Supply

Domestic water demand of the existing settlements is catered by GWSSB, from GWIL off-take point,

Zinzuwada Branch Canal at Chainage+ 552.0.Km. from this branch canal about 18 mLd. of water is drawn

for supplying to Mandal & Detroj Taluka villages. Water supply to Becharaji Taluka villages is through water

drawn from Narmada Main Canal Off-take Point at Chainage + 313.63 Km.

2.8.2. Storm water and Sewerage

There is no major sewerage and storm water infrastructure in the region. The villages falling in the

delineated region either have community level soak pits or very basic Sewage network. The villages do not

have any Storm Water drainage infrastructure. The Storm Water runs through natural drains into the

ponds and other water bodies.

It is observed that area under MBSIR is characterized by high outmigration, over dependency on agriculture

and high number of agricultural laborers as compared to adjoining districts and Gujarat State. Development

of new industrial areas can bring about change in overall well being for the people of the region while

creating more economic opportunities along with quality social and physical infrastructure.

Page 145: SIR issued by the MoEF&CC · Form 1 Proposed Mandal Becharaji Special Investment Region in Ahmedabad and Mehsana District, Gujarat ===== May 2018 Page 1 of 2

Master Plan – MBSIR Cluster A Development Plan

CHAPTER 3 MASTER PLAN PROPOSAL

20

Page 146: SIR issued by the MoEF&CC · Form 1 Proposed Mandal Becharaji Special Investment Region in Ahmedabad and Mehsana District, Gujarat ===== May 2018 Page 1 of 2

MBSIRDA 21|P a g e

Master Plan – MBSIR Cluster A Development Plan

3. M a s t e r Plan Proposal

The purpose of the Draft Master plan is to set out the framework for the growth of MBSIR over a period of

25 years. Major components covered by the Draft Master Plan include:

Preparation of Base map & Existing land use map

Proposal for Land Use

Proposal for Infrastructure development

General Development Control Regulations

Implementation strategy & Broad cost estimates

3.1. Preparation of Base map & Existing land use map

Preparation of accurate Base Map is one of the most critical components while preparing Master Plan.

Latest (Dec 2012 – Jan 2013) satellite image of 6 Mt. resolution is acquired from National Remote

Sensing Centre, Hyderabad to create an accurate Base map of MBSIR.

MBSIR

Boundary

3-1, Satellite Image of MBSIR

Source: National Remote Sensing Centre, Hyderabad

Page 147: SIR issued by the MoEF&CC · Form 1 Proposed Mandal Becharaji Special Investment Region in Ahmedabad and Mehsana District, Gujarat ===== May 2018 Page 1 of 2

MBSIRDA 22|P a g e

Master Plan – MBSIR Cluster A Development Plan

Village Revenue maps (Tikka sheets) of all 8 villages within SIR limits were acquired from District Land

Inspector of Records (DILR) Departments of various districts. The revenue maps were scanned, scaled and

then digitized. In the process of digitization, some of the inherent mistakes in Tikka sheets like duplicate or

missing survey numbers were identified, cross checked with other available data and updated. The map

was further updated with information received from various concerned government departments. Each

digitized village revenue map was then geo referenced over satellite image to create a combined base map.

Site visits were carried out to acquire ground control points for exact superimposition of digitized village

maps.

The final base map of MBSIR shows an area of 102.10 sq. km. which is more than the notified area (101.77

sq. km.) of MBSIR. The reference for area under notification of MBSIR is taken from Form 1A of all the

villages, which is primarily a revenue record. One of the reasons for variation in area could be because of

out dated revenue records.

Page 148: SIR issued by the MoEF&CC · Form 1 Proposed Mandal Becharaji Special Investment Region in Ahmedabad and Mehsana District, Gujarat ===== May 2018 Page 1 of 2

Master Plan

MANDAL-BECHARAJI SPECIAL INVESTMENT REGIONAL DEVELOPMENT AUTHORITY, GANDHINAGAR DRAFT MASTER PLAN

BASE MAP

DRAFT MASTER PLAN (COP) SUBMITTED U/S 15 (J)(ii) AND 17 OF THE GSIR ACT-2009 AND U/S 16

OF THE GTP & UD ACT-1976

MANDALB· ECHARAJISPECIAL INVESTMENT

REGIONAL DEVELOPMENT AUTHORITY.

GANDHINAGAR

MBSIRDA

LEGEND

MBSIR BOUNDARY

..... ..........j DISTRICT BOUNDARY

E--- J TALUKABOUNDARY

...............J VILLAGE BOUNDARY

GAMTAL

l1J SURVEY NUMBER BOUNDARY

STATE HIGHWAY

RIVER

.. JWATERBODY

EXISTING RAILWAY LINE

l--=:::J MAJOR DISTRICT ROAD (MDR)

OTHER DISTRICT ROAD (OCR)

f=3OTHER VILLAGE ROAD

NARMADA BRANCH CANAL

L NATURAL DRAIN

NOT TO SCALE

No part of this plarv'document may be reproduced without prior permissOO in writing from MBSIRDA. This plan should not be used for measurements.

3-2, Base Map, MBSIR

MBSIRDA 231 Page

Page 149: SIR issued by the MoEF&CC · Form 1 Proposed Mandal Becharaji Special Investment Region in Ahmedabad and Mehsana District, Gujarat ===== May 2018 Page 1 of 2

MBSIRDA 24|P a g e

Master Plan – MBSIR Cluster A Development Plan

3.2. Target Sector Identification

GIDB has been proactive to develop MBSIR as a world class automobile and manufacturing hub with well

supported infrastructure and civic amenities. In the initial stages, GIDB undertook an exercise to access

industrial development potential along with conceptual planning. The concept plan prepared focused on

following components:

Identification of the target sector and market assessment for industrial development

Preliminary environmental and social assessment of the region

Development needs and conceptual planning

Development strategy in sync with the vision of SIR

Infrastructure Master Plan

Implementation model

Based on the market assessment of industrial scenario and Industrial Manufacturing Zone Policy by GIDB,

potential industrial sector for MBSIR have been identified. Aiming to reduce the SIR’s carbon footprint the

proposed mix is of non-polluting and non-hazardous industries as per standards set by Ministry of

Environment & Forests, Government of India.

3.2.1. Parameters for identification of sectors for SIR

Potential sectors have been identified based the below mentioned parameters:

Prominent presence of industrial sector

Anchor tenant and its supplier

Resource availability

Expression of interests

Environmental considerations

Prominent presence of industrial sector

The region is primarily based on agriculture and does not show prominent presence of any industrial

sectors, except proposed MSIL plant. The considerations related to proposed automobile plant will be

taken care of under the head of anchor tenant and its suppliers.

Anchor tenant and its suppliers

MSIL is one of the automobile anchor tenants in the region. Cluster of its suppliers linking to different

sectors hold position in the hierarchy. Technical heavy engineering and Light engineering including metal &

alloy product form a direct link with the anchor unit and form an integral part of the chain. Electronics

products are a part of the assembly line and are directly related to the design element of the vehicle. The

auto components produced under this sector are specifically designed, keeping in mind the end product.

Rubber products and Glass & fiber suppliers have a wide range of products for various Tier 1 or auto

manufacturers. The product supply chain is spread over the country and has several market links. Hence

dedicated rubber and glass units for MSIL have been considered to come up under service and ancillary

industries. Logistics is directly linked to the supply chain and plays a key role.

Page 150: SIR issued by the MoEF&CC · Form 1 Proposed Mandal Becharaji Special Investment Region in Ahmedabad and Mehsana District, Gujarat ===== May 2018 Page 1 of 2

MBSIRDA 25|P a g e

Master Plan – MBSIR Cluster A Development Plan

Resource availability

Sectors with focus on the available local raw material from the natural resource base have advantage to

bring benefit to the local economy. These sectors not only induce growth in the local economy, but hold

potential to expand as export oriented industries.

Expression of interests

MOUs have been signed during Vibrant Gujarat 2011 for Ahmedabad, Mehsana and Surendranagar districts

wherein investments of Rs. 1,17,057 crore have been proposed with an estimated employment generation

of more than 7 lakh. Sectors such as automobile, engineering, knowledge & skill development and tourism

have relative potential investment interest in the region which may be channelised to the proposed SIR.

Environmental considerations

Aiming to reduce the SIR’s carbon footprint and promote primary economic sectors; land under agriculture

is considered as one of the economic activities in the SIR. Proposed industrial mix should be non polluting

or less polluting as per standards set by Ministry of Environment & Forests, Government of India.

3.2.2. Identified sectors

Based on the potential of the region, the investment scenario and thrust of the Automobile sector the

following sectors have been identified in the proposed SIR:

Automobile industry

Auto-component Vendor park consisting-

o Heavy engineering

o Light engineering including metal & alloy product

o Electronics

o Service & Ancillary

o Non Polluting industries including Information Technology

Logistics

Further based on the key stakeholder suggestions and reference to the National Manufacturing Zone

Policy, following sectors have also been included in the:

Precision engineering

Wind power equipment manufacturing

Solar power equipment manufacturing

Emerging sector in Automobile sector viz. Electronic Systems Design and Manufacturing (ESDM)

Apart from above Information Technology sectors have also been proposed.

In accordance with the SIR policy and Market assessment for industrial development undertaken during

concept plan preparation it was suggested that around 35 to 40 % of total land area under SIR will be

required for industrial activities.

Page 151: SIR issued by the MoEF&CC · Form 1 Proposed Mandal Becharaji Special Investment Region in Ahmedabad and Mehsana District, Gujarat ===== May 2018 Page 1 of 2

MBSIRDA 26|P a g e

Master Plan – MBSIR Cluster A Development Plan

3.3. Sustainable Population

3.3.1. Employment generation

Direct employment to be engaged in industries is calculated from sector wise ratios for workers per

hectare. SIR based non industrial components of area are also expected to generate employment to serve

the city population. This indirect employment from commercial, institutional and informal sectors is

assumed to be 1:1.44 (as per UDPFI) of the direct employment. Direct employment generated from

Industries proposed is around 1.25 lakh employees. The total employment (both direct & indirect), by the

proposed industrial area and non industrial setups is projected to be about 3.04 lakhs.

Sr. No Parameter Estimated Number

1 Direct Employment 1,25,000

2 Indirect Employment 1,79,500

3 Total Employment 3,04,500

Table 3-1, Employment generation in MBSIR

3.3.2. Floating Employment

Out of the total employment generated in Special Investment Region, 80% is proposed to reside within SIR

developed residential area, while the rest 20% is assumed as the floating population. Existing urban hubs

such as Mehsana, Kadi, Sanand and Ahmedabad are residential towns which will provide human resource

to the SIR. The residing population % has been proposed to be on higher side considering the fact that

infrastructure shall be developed for catering to maximum requirement.

Sr. No Parameter Estimated Number

1 Floating Employment (20%) 60,900

2 Residing Employment (80%) 2,43,600

3 Total Employment (100%) 3,04,500

Table 3-2, Floating Employment

3.3.3. Population supported by MBSIR

The residing employment is proposed to settle in the SIR. An average family size of 3 has been considered

for each employment generated (considering Gujarat Dependency ratio of 1:2). It is assumed that the

existing Gamtal population (0.12 Lakhs as per census 2001) will increase at a faster growth rate due to the

induced economic growth by the SIR. Rural population projected for 2040 is about 0.17lakh (annual growth

rate of 0.82% is considered as per Concept Report for MBSIR). While the residing population calculated

from total employment in the SIR is assumed to be around 7.29 lakh. Total population that will be

supported by employment generation from SIR will be around 9.11 lakh for 2040.

Sr. No Parameter Estimated Number

1 Residing Population (2040) 7,29,200

2 Gamtal Population (2040) 17,000

3 Floating Population dependent on MBSIR (2040) 1,82,300

4 Total Population supported by MBSIR (2040) 9,11,500

Table 3-3, Total Population supported by MBSIR

Page 152: SIR issued by the MoEF&CC · Form 1 Proposed Mandal Becharaji Special Investment Region in Ahmedabad and Mehsana District, Gujarat ===== May 2018 Page 1 of 2

MBSIRDA 27|P a g e

Master Plan – MBSIR Cluster A Development Plan

3.4. Vision

“To develop a smart industrial city with concepts of reduce, recycle, reuse and efficient transportation

network”

3.5. Planning Principles

The Draft Master plan is based on the application of spatial planning principles that ensure a consistent and coherent urban structure while providing flexible and economic development.

The specific concerns that MBSIR plan addresses include:

Response to site topography & Environmental features

Land use integration

Integration of the canal network

Integration of the existing village settlement

Road network to facilitate efficient freight and public transportation movement

3.5.1. Response to Site topography & Environmental features

The site of MBSIR is predominantly flat. The natural ground slope is from North East to South West

direction. Existing natural drains also follow the same slopes. As a response towards site topography major

road network has been aligned along the direction of slopes. For developing the storm water drainage,

catchment areas have been analyzed. This will economies the infrastructure costs while minimizing the

impact on environment. For environmental conservation, it is proposed that recreation, sports and

entrainment zones are developed around water bodies allowing development of public parks and gardens.

3.5.2. Land use integration

The Plan proposes that all industrial areas are located relatively close and accessible from residential areas,

to minimise the home to work daily commute. The main industrial and logistics zones are all located

centrally on either side of the truck priority road and the proposed expressway. Development of Knowledge

and IT zone along side Recreation, Sports and Entertainment zone further integrates the land uses.

3.5.3. Integration of Canal Network

The region being within the SSNL command area has extensive network of SSNNL canals. With respect to

the large industrial development in the SIR it becomes imperative to integrate the network of the branch

canals with the planned development. MBSIR has 2 SSNNL branch canal passing through it that have a

potential to be developed as public places. It is proposed to develop roads along the branch canals while

promoting mixed use activities along with linear greens. Mixed use development comprising commercial

facilities, recreation, residential will facilitate development of vibrant public spaces. In order to develop

coherent public realm along the canal, urban design guidelines have been proposed in the plan.

3.5.4. Integration of existing village settlements

MBSIR includes 8 village settlements within its boundary. In order to allow each village to expand naturally

at its own pace buffer zones have been proposed around each settlement. The role of the buffer is to allow

development while creating a transition zone between Village settlement and High intensity urban

development adjoining it.

Page 153: SIR issued by the MoEF&CC · Form 1 Proposed Mandal Becharaji Special Investment Region in Ahmedabad and Mehsana District, Gujarat ===== May 2018 Page 1 of 2

MBSIRDA 28|P a g e

Master Plan – MBSIR Cluster A Development Plan

3.5.5. Road network to facilitate efficient freight and public transportation movement

The regional connectivity in the MBSIR is strengthened through the provision of 90m wide express corridor

with grade separated interchanges at key locations. The expressway to the SIR will allow speedy movement

of cargo. The road network in the SIR is a combination of rectangular grid and loop roads. The grids are

planned on a size of 800 Mt. x 1200 Mt. to promote development of walkable and cycle able

neighborhoods.

Page 154: SIR issued by the MoEF&CC · Form 1 Proposed Mandal Becharaji Special Investment Region in Ahmedabad and Mehsana District, Gujarat ===== May 2018 Page 1 of 2

MBSIRDA 29|P a g e

Master Plan – MBSIR Cluster A Development Plan

3.6. Land Use Proposal

The Land use proposal is envisioned to promote economically vibrant and environmentally sustainable

Industrial city with a good quality of life. The land use proposals area spread across below mentioned zones

Industrial

Logistics

Knowledge & IT

Residential

Affordable Housing

High Access Corridor

Mixed Use

Village Buffer

Recreation, Sports and Entertainment

Page 155: SIR issued by the MoEF&CC · Form 1 Proposed Mandal Becharaji Special Investment Region in Ahmedabad and Mehsana District, Gujarat ===== May 2018 Page 1 of 2

MBSIRDA 30|P a g e

Master Plan – MBSIR Cluster A Development Plan

3.6.1. Industrial

3-3, Industrial zone

The industrial zones are planned strategically along the express corridor to ensure smooth movement of

freight within the SIR. The industrial zones are flanked by Residential, Mixed use, Knowledge and IT zones

on both sides. In context with regional connectivity and the proposed road network one interconnected

industrial nodes is envisaged within the SIR. A total of 28.58 sq. km. (27.99%) is been proposed to be

developed as the industrial zone in the MBSIR.

Sr.No. Industrial Nodes near Anchor industry

Regional Connectivity (roads)

Railways

1 Near Hansalpur Intersection of SH 7 and SH 19 near Hansalpur

Meter gauge railway connecting Patan and Kadi passes through Bechraji

(Proposal for converting it to broad gauge already passed in railway budget 2013)

Table 3-4, Major Industrial Nodes

Page 156: SIR issued by the MoEF&CC · Form 1 Proposed Mandal Becharaji Special Investment Region in Ahmedabad and Mehsana District, Gujarat ===== May 2018 Page 1 of 2

MBSIRDA 31|P a g e

Master Plan – MBSIR Cluster A Development Plan

3.6.2. Logistics

L1

L2

3-4, Logistic zone

Industrial zones are supported by strategically located logistics parks in the SIR. The value enhancement

due to presence of Logistic parks within the Industrial zones will be in terms storage and handling of freight.

The logistics parks are located along Express corridor and proposed Railway sidings.

Within the MBSIR two logistic zones are planned along the main express highway.

Sr. No. Logistics park AREA (Sq, Km,))

Location

1 L1 1.10 Intersection of SH 7 and the broad gauge railway line from Mehsana and Ahmedabad (proximity to Hansalpur)

Table 3-5, Location of Logistic zone

Page 157: SIR issued by the MoEF&CC · Form 1 Proposed Mandal Becharaji Special Investment Region in Ahmedabad and Mehsana District, Gujarat ===== May 2018 Page 1 of 2

MBSIRDA 32|P a g e

Master Plan – MBSIR Cluster A Development Plan

3.6.3. Knowledge and IT

3-5, Knowledge and IT zone

A Knowledge and IT zone has been proposed within SIR with a view to facilitate development of research

centres, Educational Institutes and Universities along with IT industries. The Knowledge and IT zone is

planned in surrounding of a non perennial water body in Sitapur village. The total land area allocated for

the Knowledge and IT zone is around 3.69 sq. km. (3.61%). The area proposed for Knowledge and IT has

been envisaged to support all the industrial centres proposed in the state with skilled labour force.

Page 158: SIR issued by the MoEF&CC · Form 1 Proposed Mandal Becharaji Special Investment Region in Ahmedabad and Mehsana District, Gujarat ===== May 2018 Page 1 of 2

MBSIRDA 33|P a g e

Master Plan – MBSIR Cluster A Development Plan

3.6.4. Residential

3-6, Residential zone

The residential zones within the MBSIR are planned along mix use & industrial zones. Residential

development will also be allowed in knowledge and IT Zone and Mixed use zones. The total land area

allocated for the Residential is around 31.31 sq. km. (30.67%).In addition to this around 0.60 sq. km.

(0.59%) land will be occupied by existing villages.

Page 159: SIR issued by the MoEF&CC · Form 1 Proposed Mandal Becharaji Special Investment Region in Ahmedabad and Mehsana District, Gujarat ===== May 2018 Page 1 of 2

MBSIRDA 34|P a g e

Master Plan – MBSIR Cluster A Development Plan

3.6.5. Affordable Housing

3-7, Affordable housing zone

The Affordable Housing zones are proposed in the village of Hansalpur and Sitapur of MBSIR. The total land

area allocated for the Affordable housing Zone is around 3.82 sq. km. (3.75%).

Page 160: SIR issued by the MoEF&CC · Form 1 Proposed Mandal Becharaji Special Investment Region in Ahmedabad and Mehsana District, Gujarat ===== May 2018 Page 1 of 2

MBSIRDA 35|P a g e

Master Plan – MBSIR Cluster A Development Plan

3.6.6. High Access Corridor

3-8, High Access Corridor

With a view to support higher densities and transit oriented development in MBSIR it is proposed to

develop mixed use corridor along the 60 & 45 m RoW. This zone is predominantly planned between

residential and industrial zones and will facilitate mixed uses including commercial, offices, recreation,

community and residential. A total of 9.46 sq. km. (9.27%) is proposed under this zone.

Page 161: SIR issued by the MoEF&CC · Form 1 Proposed Mandal Becharaji Special Investment Region in Ahmedabad and Mehsana District, Gujarat ===== May 2018 Page 1 of 2

MBSIRDA 36|P a g e

Master Plan – MBSIR Cluster A Development Plan

3.6.7. Mixed Use

3-9, Mixed Use

There are two SSNNL branch canal passing through the proposed MBSIR. The areas along the branch canals

have a potential to be developed as large public spaces. Mixed land use zone has been proposed along the

two branch canals. Mixed use development comprising commercial facilities, recreation, residential along

with linear green zone will facilitate development of vibrant public spaces. Around 3.76 sq.km (3.68%) of

area is proposed under mixed use zone along the branch canals.

Page 162: SIR issued by the MoEF&CC · Form 1 Proposed Mandal Becharaji Special Investment Region in Ahmedabad and Mehsana District, Gujarat ===== May 2018 Page 1 of 2

MBSIRDA 37|P a g e

Master Plan – MBSIR Cluster A Development Plan

3.6.8. Recreation, Sports and Entertainment

3-10, Recreation, Sports and Entertainment zone

Around 5.79 % of total land area is proposed for development under recreation, sports and entertainment

zone. This zone will allow development of botanical gardens, nature parks, sports complexes etc. It is

strategically planned along the periphery of lake, natural drain and canal. This zone will benefit from the

presence of institutional development in knowledge and IT zone.

Page 163: SIR issued by the MoEF&CC · Form 1 Proposed Mandal Becharaji Special Investment Region in Ahmedabad and Mehsana District, Gujarat ===== May 2018 Page 1 of 2

MBSIRDA 38|P a g e

Master Plan – MBSIR Cluster A Development Plan

3.6.9. Provision of village buffer

3-11, Village Buffer zone

MBSIR has 8 villages within the SIR. The Draft Master plan makes a provision for village integration to

accommodate the growth in these settlements by constituting village buffer zones of 100m and 200m

around each settlement. The buffer has specific regulations as per the GDCR. Residential, commercial and

public facilities will be allowed in this zone.

Page 164: SIR issued by the MoEF&CC · Form 1 Proposed Mandal Becharaji Special Investment Region in Ahmedabad and Mehsana District, Gujarat ===== May 2018 Page 1 of 2

(

J

M a s t e r Plan

MANDAL-BECHARAJISPECIAL INVESTMENT REGIONAL DEVELOPMENT AUTHORITY, GANDHINAGAR DRAFT M A S T E R PLAN

r-- MBSRI BOUNDARY

f------- ------- DISTRICT BOUNDARY

TALUKA BOUNDARY

L--------- VILLAGE BOUNDARY

• GAMTAL

SURVEY NUMBER BOUNDARY

"i:J WATERBODY

EXISTING RAILWAY LINE

PROPOSED RAILWAY LINE

PROPOSED ROAD

MAJOR DISTRICT ROAD (MDR)

OTHER DISTRICT ROAD (ODR)

OTHER VILLAGE ROAD

-- -NARMADA BRANCH CANAL

NATURAL DRAIN

MSIL & AUTOMOBILE ANCHOR

- VILLAGE BUFFER

- % Z Se"$rRTs RESIDENTIAL

N

-$ NOT TO SCALE

Selllor T-nPtannar CIIMMfMCUtive0100er MBS ROA MBSRI DA

Ct.alrman MBSIR: Oo!l

No part of this plan/document may be reproducedwithout prior permissionInwriting from MBSIRDA.This planshould not b& used for measurements.

3-12,Proposed Landuse plan,MBSIR

MBSIRDA 391 Page

Page 165: SIR issued by the MoEF&CC · Form 1 Proposed Mandal Becharaji Special Investment Region in Ahmedabad and Mehsana District, Gujarat ===== May 2018 Page 1 of 2

MBSIRDA 40|P a g e

Master Plan – MBSIR Cluster A Development Plan

Table 3-6, Area Statement MBSIR

Proposed Land Use Comprehensive

Area (sq km) Area (%)

Industrial 28.58 27.99

Logistics 2.10 2.05

Knowledge & IT 3.69 3.61

Residential 31.31 30.67

Affordable Housing 3.82 3.75

High Access Corridor 9.46 9.27

Mixed Use 3.76 3.68

Village Buffer 1.91 1.88

Recreation, Sports and Entertainment 5.91 5.79

Proposed Roads and Rail 7.17 7.02

Total Urbanizable Area (A) 97.71 95.70

River 0.27 0.27

SSNL Branch Canal 0.28 0.27

Water bodies 3.24 3.17

Gamtal 0.60 0.59

Total Non Urbanizable Area (B) 4.39 4.30

Total SIR Area (A + B) 102.10 100.00

Page 166: SIR issued by the MoEF&CC · Form 1 Proposed Mandal Becharaji Special Investment Region in Ahmedabad and Mehsana District, Gujarat ===== May 2018 Page 1 of 2

MBSIRDA 41|P a g e

Master Plan – MBSIR Cluster A Development Plan

3.7. Road and Rail proposals

3.7.1. Proposed Road network

The road network in the SIR is a combination of rectangular grid and loop roads. The grids are planned on a

size of 800 Mt. x 1200 Mt. to promote development of walkable and cycleable neighbourhoods.

The proposed road hierarchy in the Draft Master Plan is:

90 Mt ROW - Express corridor

60, 45 & 30 Mt ROW - Arterial roads

Roads lower than 30 Mt. ROW in the SIR will be proposed during preparation of town planning schemes.

90 m ROW Express Corridor

The Plan intends to develop a transport corridor that contain a high capacity, limited access expressway,

with grade separated interchanges at key locations. The proposed expressway would commence from

Ughroj in the South East of the proposed SIR boundary on SH-133 and meet SH-7 at Sitapur Village and then

head toward Hansalpur - Becharaji in the North. The proposed expressway would be of 90m Right of Way

(RoW) having 3-lane carriageway whereas the remaining width of the proposed RoW would be utilized for

other road infrastructure network.

Page 167: SIR issued by the MoEF&CC · Form 1 Proposed Mandal Becharaji Special Investment Region in Ahmedabad and Mehsana District, Gujarat ===== May 2018 Page 1 of 2

Master Plan

MBSIRDA 42|P a g e

3-13, 90 mt. Row, Road Section

3-14, 60 mt. Row, Road Section

Page 168: SIR issued by the MoEF&CC · Form 1 Proposed Mandal Becharaji Special Investment Region in Ahmedabad and Mehsana District, Gujarat ===== May 2018 Page 1 of 2

Master Plan

MBSIRDA 43|P a g e

3-15, 45 mt. Row, Road Section

3-16, 30 mt. Row, Road Section

Page 169: SIR issued by the MoEF&CC · Form 1 Proposed Mandal Becharaji Special Investment Region in Ahmedabad and Mehsana District, Gujarat ===== May 2018 Page 1 of 2

MBSIRDA 44|P a g e

Master Plan

Arterial Road (60m RoW):

These roads have been proposed with 3-lanes consisting of service road on both sides with cycle track &

pedestrian path along with necessary supporting infrastructure. The proposed road may be strengthened

and widened to 6-lanes in the future as the traffic grows with time.

Arterial Road (45m RoW):

These roads have been proposed as a loop road with 3-lane carriageway and may be strengthened and

widened up to 6-lanes at a later stage. This road is planned to function as a public transit corridor with

mixed use development along if and connecting various residential and industrial sectors.

Sub Arterial (30, m RoW):

These roads would be proposed at detailed planning stage would be the key roads for local traffic

movement. They would primarily serve the non-processing area traffic and act as a feeder to the proposed

45m RoW.

Internal roads shall be planned & designed in such a way that maximum of existing alignment of VR, MDR,

ODR category roads get utilized while preparing Town Planning schemes for the proposed SIR or during

detail planning of the region.

Sr.No Road Type RoW (Mt.) Total Length (km)

1 Express Way 90 14.6

2 Arterial road 60 23.9

3 Arterial road 45 42.8

4 Sub Arterial road 30 88.0

Total 170.0

Table 3-7, Proposed Road Network

Page 170: SIR issued by the MoEF&CC · Form 1 Proposed Mandal Becharaji Special Investment Region in Ahmedabad and Mehsana District, Gujarat ===== May 2018 Page 1 of 2

Master Plan

MANDAL-BECHARAJI SPECIAL INVESTMENT REGIONAL DEVELOPMENT AUTHORITY, GANDHINAGAR DRAFT MASTER PLAN

PROPOSED ROAD NETWORK

PLAN-2040

LEGEN D

MBSIR BOUNDARY

t::::=j 90 MT. PROPOSED ROAD

E::::::3 60 MT. PROPOSED ROAD

E::::::3 45 MT. PROPOSED ROAD

E::::::3 30 MT. PROPOSED ROAD

----- -

N

* NOT TO SCALE

SeruorTowi\ PIIMel' CNeff.JiecotwoiOMcef Cnalmoan

MBSIRDA MBSIROA !.IBSIRDA

MANDAL - BECHARAJISPECIAL INVESTMENT

REGIONAL DEVELOPMENT AUTHORITY.

GANDHINAGAR

MBSIRDA

No part of this plan/document may be reJ)f"oduced withovt pn.,..- pennissiOI"' in writinc from MBSIROA This plan should not be used f or- meuur-ements

3-17, Proposed Road Network, MBSIR

MBSIRDA 4SI Page

Page 171: SIR issued by the MoEF&CC · Form 1 Proposed Mandal Becharaji Special Investment Region in Ahmedabad and Mehsana District, Gujarat ===== May 2018 Page 1 of 2

MBSIRDA 46|P a g e

Master Plan – MBSIR Cluster A Development Plan

3.7.2. Cross Drainage Works & Flyovers

Along all the proposed roads, careful consideration has been given to planning of cross drainage works and

flyovers. Minor bridges and Major bridges have been considered at water crossing (Canals, minor rivers,

etc.) along the express highway. Pipe culverts, minor bridges have been considered for other roads at

suitable intervals as per standard requirements. Types of bridges, culverts and flyovers shall be worked out

during detail engineering based on detail soil investigation, hydraulic requirements, performance

requirement, and techno economic feasibility as per the prevailing/related standard codes of practice.

3.7.3. Proposed Railway Siding Infrastructure

It is assumed that considerable passenger traffic would be generated with the development of the

proposed SIR. Also, the proposed SIR would be primarily developed as an Auto and Auto-ancillary Hub, as a

result there would be tremendous freight traffic and appropriate number of railway sidings would be

required. Detailed studies need to be carried out to understand and assess the required amount of railway

sidings and supporting infrastructure. A tentative railway siding plan is laid on the Master Plan and

accordingly the lengths are derived and considered for cost estimations.

Sr. No.

Description

Length (km) Cost

Rs (Crores)

1 Railway Line 1- North 8.3 83

2 Railway Line 2 – South 13.6 136

Total 21.9 219

Table 3-8, Proposed Rail Network

3.8. Infrastructure Proposals

3.8.1. Proposal for Water Supply Scheme

The total water demand by the end of the proposed SIR would be 269 mLd & fresh water demand is 161

mLd. The source for the estimated water demand is proposed from the existing Narmada canal. The Water

demand is worked out as per norms laid down by Central Public Health & Environmental Engineering

Organization, Ministry of Urban Development, GoI, (CPHEEO). The Off-take point is proposed on Zinzuwada

Branch of Narmada Main Canal. A detailed water supply scheme with water treatment plants, clear water

pumping station, water distribution system and network is proposed in the Draft Master Plan.

Off-take point on Zinzuwada Branch of Narmada Main Canal

Off-take point shall be near the first cross-regulator on Zinzuwada Branch Canal. The full drawing capacity

of this off-take point may be kept as 269 mLd. The RCC duct with screen & gates will be constructed near

canal for drawing 269 mLd capacity of Water.

Raw Water Pumping Station

Raw Water Sump and Pump house for 2 hrs. Storage Capacity (civil work) for 269 mLd water requirement will be constructed near off-take point for pumping water into Water Treatment Plant. Pumping machineries and all related Electrical-Mechanical provision will be installed as per requirement with stand by provisions.

Page 172: SIR issued by the MoEF&CC · Form 1 Proposed Mandal Becharaji Special Investment Region in Ahmedabad and Mehsana District, Gujarat ===== May 2018 Page 1 of 2

MBSIRDA 47|P a g e

Master Plan – MBSIR Cluster A Development Plan

Water Treatment Plant

The Raw Water from Canal will be conveyed to the proposed Conventional Treatment Plant. 161 mLd capacity conventional WTP will be constructed at Canal for Phase 1 as when required.

The type of treatment process usually depends on the quality of raw water required quality after treatment. Detail of treatment Unit & its process is given as under:

Sr. No. Treatment Unit Process

1 Cascade Aerator To add oxygen to water for imparting freshness. Expulsion of CO2, H2S for removal of taste & odour. For Removal of impurities like Iron & Manganese etc.

2 Flash Mixer For rapid mixing of coagulant in water to help in formation of micro- flocks.

3 Sedimentation Tank To remove readily settling sediments such as sand, silt, turbidity, iron etc.

4 Rapid Sand Filter Unit

To remove suspended & colloidal impurities such as microorganisms, silt clay etc.

5 Chlorination Unit For destruction or inactivation of pathogens, bacteria, helminthic etc.

Table 3-9, Treatment units for Water Supply

Flow Diagram for Conventional Water Treatment Plant for SIR is as under: Clear Water Pumping Station: After providing necessary treatment, treated Water will be stored in

underground RCC Storage Reservoir. RCC reservoir shall be provided with compartment with necessary

gate / valve arrangement & it will be constructed as per phase-wise requirement. Necessary pumping

machinery and all related Electrical & Mechanical equipments with necessary stand by provisions shall

be provided to pump treated water to various water distribution stations.

Page 173: SIR issued by the MoEF&CC · Form 1 Proposed Mandal Becharaji Special Investment Region in Ahmedabad and Mehsana District, Gujarat ===== May 2018 Page 1 of 2

MBSIRDA 48|P a g e

Master Plan – MBSIR Cluster A Development Plan

Clear Water Trunk Main: Clear Water Trunk Main of Ductile Iron Pipe (DI K-9) will be laid from clear

water pumping station to various distribution stations. Ductile Iron pipe of required size with inside

lining & outside coating will be laid along with sluice valve/ butterfly valve for inspection purpose, scour

valve for maintenance purpose & air valve to control surge pressure as per design. Proper encasing for

minor/major crossings & Thrust block at deviation angles will be provided for proper functioning of the

pipeline.

Water Distribution Stations: Water will be pumped from clear water pumping station to various water

distribution stations in 22 hrs. & water will be supplied to each distribution zone 24 x 7. RCC sump with

pump house to accommodate pumping m/c & related E&M equipments will be constructed. The

pumping Head of machinery will be kept to maintain minimum 7 to 12 Mt. residual head at consumer

end.

Distribution Network: The purpose of distribution system is to convey whole some water to the

consumer at adequate residual pressure in sufficient quantity at convenient points. Water is made

available to consumer either by continuous system or through intermittent system.

In SIR region water supply distribution will be 24x7, and all connections will be metered. Continuous

water supply is proposed for following reasons.

In intermittent water supply investment for constructing storage, pumping machinery distribution

pipeline network will be more.

No water from an intermittent water supply system is safe to drink, because under vacuum

conditions foul water can be drawn into the pipes. Hence higher dues of chlorine are needed.

Compared with 24 hours supply, intermittent supply uses more water.

In intermittent supply, in case of fire, immediate supply is unavailable.

Due to frequent operations of valves for intermittent supply frequent wear & tear on valves.

For proper operation & maintenance more manpower is needed in intermittent supply.

In the proposed SIR, Ductile Iron pipe will be laid for proper water supply distribution with all valve &

fittings etc. supply enough quantity of water to each consumer with required residual head & pressure.

Page 174: SIR issued by the MoEF&CC · Form 1 Proposed Mandal Becharaji Special Investment Region in Ahmedabad and Mehsana District, Gujarat ===== May 2018 Page 1 of 2

MBSIRDA 49|P a g e

Master Plan – MBSIR Cluster A Development Plan

3-18, Water Supply Network

3.8.2. Proposal for Sewerage Scheme

At Present there is no underground sewerage System in the SIR area and the general practice is of on-site

disposal through either soak-pit or release in open drains leading to contamination of ground water & the

environment. As calculated, 94 mLd of sewage flow will be generated at the end of complete development

of proposed SIR. For proper collection & disposal of sewage, proper sewerage Network will be laid. A

detailed sewerage and drainage scheme is designed keeping in mind the CPHEEO guidelines.

Sewage Collection Network

The pipe line is designed for pipe running 80% full capacity from consideration of ventilation in sewers. The

flow velocity in the sewers is such that the suspended materials in sewage do not get silted up i.e. the

velocity will be such as cause automatic self cleaning effect. Hence, sufficient gradient is provided in

Sewage Collection Network. Manholes i.e. Junction Manholes & Scrapper Manholes are provided for

Page 175: SIR issued by the MoEF&CC · Form 1 Proposed Mandal Becharaji Special Investment Region in Ahmedabad and Mehsana District, Gujarat ===== May 2018 Page 1 of 2

MBSIRDA 50|P a g e

Master Plan – MBSIR Cluster A Development Plan

inspection, cleaning & other maintenance at 30 m. to 45 m. c/c. with a removable cover to with stand

traffic loads in sewers. Hence approximately 172 Km. length of Sewerage Network is proposed.

Sewage Pumping Stations

Sewage Pumping Stations is proposed for pumping the sewage from a deeper sewer to a shallow sewer or

for conveying Sewage to Sewage Treatment Plant. With respect to the large area of SIR, a numbers of

intermediates sewage pumping stations are proposed constructed. It is proposed to have 17 sewage

pumping stations based on the topography, depth of sewer & Sewage flow.

Sewage Pumping Stations comprises of following units:

Units Purpose

Screen Chamber To trap the flooding matters which otherwise can lump in the impeller of the pump.

Grit Chamber

Removal of grit at the sewage pumping station to safe guard the same from causing wearing of the pump impeller. Detroiters or grab-bucket is planned to be installed for removal of Grit.

Wet Well

It is provided in order to accommodate pumping machineries with enough working & stand by. Proper detention time in wet well should be provided. i.e. 5 to 30 min. of average flow.

Table 3-10, Sewage pumping station units

Sewage pumping stations is constructed in RCC with proper floor slopes, interior lining & water proofing for

resistance against H25, lighting & ventilation. All Electrical & Mechanical work including lifting

arrangement, D. G. Set etc. are installed for proper working of sewage pumping station. Pumping

machinery is planned to be installed in such a way that, sewage will be pumped in peak & lean period

Pumping Main

The economic size of pumping mains are worked out on peak flow volumes Pumping Main from Pumping

Station to Sewage Treatment Plant are laid for transporting the sewage in the inlet chamber of STP and D.I.

/ GRP pipe are provided with proper in lining & out-coating to prevent corrosion. Size of pipe depends on

length of pipe, depth of SPS, capital & Capitalized cost of pipe & pumping machinery. Pipe is provided with

proper cushion with air valves, sluice valves etc. for proper maintenance encasing are provided at major

crossing.

Sewage Treatment Plant

In MBSIR region, sewage is treated & reused after proper treatment. The waste water reuse will be applied

for various beneficial as stated:

Flushing, Washing, Gardening

Irrigation

Industrial process, washing etc.

Wastewater treatment processes can be categorized into the following three:

Physical process: Impurities are removed physically by screening, sedimentation, filtration, flotation,

absorption or adsorption or both, and centrifugation;

Page 176: SIR issued by the MoEF&CC · Form 1 Proposed Mandal Becharaji Special Investment Region in Ahmedabad and Mehsana District, Gujarat ===== May 2018 Page 1 of 2

MBSIRDA 51|P a g e

Master Plan – MBSIR Cluster A Development Plan

Chemical process: impurities are removed chemically through coagulation, absorption, oxidation-

reduction, disinfection, and ion-exchange;

Biological process: pollutants are removed using biological mechanisms, such as aerobic treatment,

anaerobic treatment and photosynthetic process (oxidation pond).

Conventional wastewater treatment consists of the following stages: Municipal wastewater treatment

facilities use combinations of physical, biological and chemical treatment technologies.

Preliminary and primary treatment: Preliminary and primary treatments are usually associated to

screening for the removal of debris and large solids, and sedimentation.

A secondary treatment: may utilize biological processes, such as stabilization ponds, trickling filter,

oxidation ditch, and activated sludge, which is then followed by sedimentation of biomass (sludge).

Tertiary treatment: It is ced treatment is an additional treatment for higher-level removal of

specific pollutants, such as nitrogen or phosphorus etc.

In SIR, the Total Sewage Generation will be 94 mLd. Two Sewage Treatment Plants are proposed for the

Scheme.

3-19, Sewage Network

Page 177: SIR issued by the MoEF&CC · Form 1 Proposed Mandal Becharaji Special Investment Region in Ahmedabad and Mehsana District, Gujarat ===== May 2018 Page 1 of 2

MBSIRDA 52|P a g e

Master Plan – MBSIR Cluster A Development Plan

3.8.3. Recycled Water System

The treated waste water through recycled pumping station is planned to be transferred to various recycled

water distribution stations that are constructed in same campus of fresh water distribution stations so that

operation & maintenance is easier. Recycled water pumping stations will be constructed with pump house

and pumping machinery will be installed to match with capacity of STPS.

Recycle water is supplied 24 x 7 same as fresh water supply. D. I. pipeline network is to be laid separately

with valves, valve chambers, encasing & thrust block etc. as per requirement.

Electrical & Mechanical work will be installed as per requirements

3-20, Recyle Water Network

Page 178: SIR issued by the MoEF&CC · Form 1 Proposed Mandal Becharaji Special Investment Region in Ahmedabad and Mehsana District, Gujarat ===== May 2018 Page 1 of 2

MBSIRDA 53|P a g e

Master Plan – MBSIR Cluster A Development Plan

3.8.4. Proposal for Storm Water Disposal System

In order to plan an effective design of storm water drainage system, several aspects are considered and the

entire region is evaluated with respect to storm water on parameters including topography & rainfall

pattern.

Based on catchment area, co-efficient of run-off & rainfall intensity the storm flow is worked out to siphon

the storm flow from SIR. It is planned to provide Catch pit with pre-cast perforated Jali to catch the storm

water. Also 300 mm/450 mm dia. pipe are laid from catch pit to main storm water line at 30 to 45 m c/c.

R.C.C. storm water network are laid with Manholes at 30 m. /45 m. c/c for proper functioning &

maintenance of system. It is planned to dispose the storm water drain in natural drains/lakes and provide

recharge wells or rainwater harvesting structures, which results in the rise of ground water level of the

area. Other than recharging well, it is made compulsory that each building / industry should collect roof-

top rain water in the underground tank in their premises.

The capacity of underground tank should be kept based on roof-top area & annual rainfall of the area. This

collected rainwater can be used as fresh water after proper treatment & in rainy days which reduces the

fresh water demand.

3-21, Storm Water Disposal Scheme

Page 179: SIR issued by the MoEF&CC · Form 1 Proposed Mandal Becharaji Special Investment Region in Ahmedabad and Mehsana District, Gujarat ===== May 2018 Page 1 of 2

MBSIRDA 54|P a g e

Master Plan – MBSIR Cluster A Development Plan

3.8.5. Solid Waste Management Proposal

It is proposed to provide sanitary landfill site as a necessary and integral part of the solid waste

management solution for the proposed SIR area. Total land required for land.

Potential Landfill Site Identification

The selection criterion of landfill site is prima facie based on guidelines developed by Management of

Municipal waste as a first step of site assessment and investigation.

Accordingly, after stakeholder consultation, a site is planned to be identified for proposed landfill, which

includes area for engineered landfill operations, compost plant including segregation area and buffer zone.

Total tentative estimated cost of proposed solid waste management is around INR 68.14 Crores, including

collection storage, transportation, treatment and disposal facilities along with infrastructure cost.

3.8.6. Power

From the power demand projections, it is estimated that approximately 300 MW power is required for

industrial purpose whereas about 110 MW power is planned to be required for residential purpose. The

total estimated cost of the proposed power supply infrastructure is approximately INR 660 Crores. The

block cost is based on the preliminary information available and will be revised during detailed engineering

design stage. Cost estimation is done on the basis of details provided by GETCO and ball park costs.

Page 180: SIR issued by the MoEF&CC · Form 1 Proposed Mandal Becharaji Special Investment Region in Ahmedabad and Mehsana District, Gujarat ===== May 2018 Page 1 of 2

MBSIRDA 55|P a g e

Master Plan – MBSIR Cluster A Development Plan

3.8.7. Gas & Telecommunication

Following broad aspects related to the Gas infrastructure have been broadly discussed with the

Government of Gujarat.

Gujarat State Petroleum Corporation (GSPC) network runs in the vicinity of the proposed SIR.

In Phase – 1, GSPC network shall be extended from Mehsana to Becharaji to serve the Auto

Industries proposed in the SIR.

Gas Supply Restrictions shall also be webbed by GSPC in above mentioned phases.

A Telecommunication and ICT Master Plan for the entire SIR area will be prepared separately. This will

include provision of the passive infrastructure like Optical Fibre Network and Mobile communication

towers along with the required Control Facilities. The ICT Master Plan will include the use of Information

technology for Public safety and security services, Education Services, Transportation services, Health care

and Municipal services.

Page 181: SIR issued by the MoEF&CC · Form 1 Proposed Mandal Becharaji Special Investment Region in Ahmedabad and Mehsana District, Gujarat ===== May 2018 Page 1 of 2

Master Plan – MBSIR Cluster A Development Plan

CHAPTER 4 IMPLEMENTATION STRATEGY

56

Page 182: SIR issued by the MoEF&CC · Form 1 Proposed Mandal Becharaji Special Investment Region in Ahmedabad and Mehsana District, Gujarat ===== May 2018 Page 1 of 2

MBSIRDA 57|P a g e

Master Plan – MBSIR Cluster A Development Plan

4. Implementation Strategy

4.1. Comprehensive guidelines for implementing the DP

Land is the key component of urban development and the formulation of an effective and equitable land

procurement strategy is critical to the successful implementation of the Draft Master plan. There are, very

broadly, two approaches to land procurement; one through compulsory purchase with compensation under

the Land Acquisition Act, 1894 and the other through Town Planning Schemes under the Gujarat Town

Planning and Urban Development (GTPUD) Act, 1976.

4.1.1. Town Planning Schemes

The Government of Gujarat is preparing a Town Planning Schemes as per the Gujarat Town Planning &

Urban Development Act. 1976. Under this model, the development authority brings together a group of

landowners for the purpose of planning and a Town Planning Scheme for the area is prepared, laying out

the roads and plots for public and social amenities. The remaining land is reconstituted into final plots for

the original owners, with the size of the final plot in proportion to the size of the original plot, and its

location as close as possible to the original plot.

A town planning scheme under the provision of GTPUD Act, 1976 may be made in respect of any land which

is –

1. In the course of development

2. Likely to be used for development of residential, commercial, industrial etc.

3. Already built upon

Town Planning Scheme provides legislative support and finance for implementation. The fundamental

objective of the readjustment technique is to make land available for development at least cost to

development authorities and improve the environment effectively.

Town Planning Scheme is used to make a group of land holding in a planned manner. This is essentially

achieved by providing each unit with a public road access and regularizing the shape of each plot.

Compensation is paid to land owner of the land taken away for roads and public facilities. At the same

time, betterment charges known as incremental contribution are collected from each owner to the

maximum of 50 percent of the estimated increase in the land value after plot reconstitution. The funds so

generated are utilized for the development of infrastructure and common facilities within the scheme area.

The local planning agencies would be able to attain the dual objective of controlling haphazard growth as

well as the timely provision of physical infrastructure such as roads, sewers, water supply etc. and social

infrastructure like schools, hospitals, parks, open spaces etc., and social infrastructure burden. Because of

its self financing nature, Town Planning Schemes are also implemented in areas already developed, but

with lack of adequate infrastructure.

The increase in the land value resulting from the development accrues to the original owner whenever the

land is sold and developed for urban use. The advantages of this method from the development agency’s

point of view is that it does not have to acquire any land or bear the cost of infrastructure provision in the

long term.

Pooling models similar to the Gujarat Town Planning Scheme have been used in other countries, notably

Australia and Korea. Major benefits of this model are

Page 183: SIR issued by the MoEF&CC · Form 1 Proposed Mandal Becharaji Special Investment Region in Ahmedabad and Mehsana District, Gujarat ===== May 2018 Page 1 of 2

MBSIRDA 58|P a g e

Master Plan – MBSIR Cluster A Development Plan

It is a proven model in Gujarat

All the urban centres in the state are developed by this model

Minimum investment is required for development with this model

It is a win-win situation for both owners and administration

Land owners get maximum benefit in this model

Minimum litigations have been received in this model, in a span of 90 years since its first

implementation in the state

The model has a provision for development of physical as well as social infrastructure

Land owners will receive a finished land parcel with all physical and social infrastructure over a

period of time

It is a democratic approach for development of land

4.1.2. The Role of the Regional Development Authority

MBSIRDA will be responsible for the land management process. Specialist departments will be established

within the MBSIR to prepare Town Planning Schemes for the development of the MBSIR according to the

Draft Master plan. There have been a number of large urban development schemes undertaken elsewhere

in India over recent decades and a vast store of experience and expertise has been built up. MBSIRDA will

call upon this body of knowledge and pool of talent in putting together their team to implement the MBSIR

project.

4.1.3. Public Consultation and Participation

A participatory approach to development is proposed to ensure that land development in the MBSIR

proceeds smoothly and is equitable to all sections of the community. Village Panchayats, land owners and

land-less labourers all need to be consulted and involved in the process of development through

participatory forums. Experienced and reputable development organizations and NGOs should be invited to

advise and facilitate the land procurement process.

Public consultation needs to be commenced at the earliest opportunity in order to inform the population of

the MBSIR of the Draft Master plan and the process of urban development. They should be informed on

how they can be involved in decision making and their rights as land owners, residents and agricultural

workers.

MBSIRDA will prepare a phased land development programme. A committee comprising members of

MBSIRDA, State bodies such as land revenue department, infrastructure companies and village panchayats

representatives will be formed to oversee the land management process. The precise make up of this

committee and its rules and regulations will be determined by the Government of Gujarat in consultation

with project stakeholders, including industrial bodies and land owners.

4.2. Provision of various facilities in Master Plan through TP Schemes

4.2.1. Provision of Community Facilities

Provision of land for educational and amenities through TP Scheme mechanism should be as per the stated

norm of UDPFI for the required planned population of sector and neighborhood level.

Page 184: SIR issued by the MoEF&CC · Form 1 Proposed Mandal Becharaji Special Investment Region in Ahmedabad and Mehsana District, Gujarat ===== May 2018 Page 1 of 2

MBSIRDA 59|P a g e

Master Plan – MBSIR Cluster A Development Plan

In order to meet the demand for the projected population of 9.12 lakhs residing in MBSIR an extensive

range of community facilities are developed. MBSIR will largely be self contained in terms of health,

education, cultural, Government, sports and open space facilities. It will also support the existing village

settlements with the needed social infrastructure. The proposed land demand for community facilities

within the MBSIR as indicated in Table below

Facility Total Area Requirement (Ha)

Education 491

Health care facilities 72

Socio cultural centre 14

Other services 18

Table 4-1, Requirement of community facility for MBSIR

The provision norms are summarized in table given below,

Facility One Unit /

Population (as per UDPFI)

Area Requirement

per unit (Ha.)

Requirement of Facility (Number)

Pre Primary / Nursery School 2500 0.08 365

Primary School 2500 0.4 365

Senior Secondary School 7500 1.6 122

Integrated School without Hostel Facilities 100000 3.5 9

Integrated School with Hostel Facilities 100000 3.9 9

School for Handicapped 45000 0.5 20

College 125000 4 7

Technical Education Institutions

(considering industrial oriented city)

250000 4 4

TOTAL

General Hospital 250000 6 4

Intermediate Hospital (Category A) 100000 3.7 9

Intermediate Hospital (Category B) 1000000 1 1

Polyclinic 100000 0.3 9

Nursing Home 50000 0.3 18

Dispensary 15000 0.12 61

TOTAL

Socio Cultural Centre 1000000 15 1

Park / Garden etc. 1 0.0012

Police Station, Jail, Police line etc. 100000 1.5 9

Fire Station 200000 1 5 Table 4-2, Standards for Community Facility

Source: UDPFI Norms

Page 185: SIR issued by the MoEF&CC · Form 1 Proposed Mandal Becharaji Special Investment Region in Ahmedabad and Mehsana District, Gujarat ===== May 2018 Page 1 of 2

MBSIRDA 60|P a g e

Master Plan – MBSIR Cluster A Development Plan

4.2.2. Provision of Open spaces

The provision of sector and neighbourhood level parks and open spaces is to be taken care of through Town

Planning Scheme mechanism.

4.2.3. Developing public squares

In order to generate vibrant public realm in the city, it is recommended that the provision of amenities,

commercial and education facilities to be located near the junctions of 30m and 45m ROW arterial road or

major arterial nodes as public places in TP Scheme. It is also planned to develop and generate the public

service plots accommodating Bus stand, auto rickshaw and IPT at every 500m along the public transit

routes on main arterial roads.

4.2.4. Provision of Commercial

Provision of commercial retail and office facilities at sector and neighbourhood level in residential, mixed

use and knowledge & IT within MBSIR should be through TP Scheme mechanism. The provision norms are

summarized in table below, which indicates the various scales, intensity and type of commercial required

based on the population and sector size

Facility One Unit / Population (as per UDPFI)

Area Requirement per unit (Ha.)

Cluster centre 1000 0.022

Sector centre 1000 0.03

Community centre 1000 0.05

District centre 1000 0.088

Table 4-3, Requirement of commercial facility for MBSIR

Source: UDPFI Norms

4.2.5. Provision of pedestrian and bicycle routes and public transit system

1. It is proposed that the provision of adequate pedestrian, bicycle routes to be accommodated on

major arterials and sub arterials with road width above 15 m ROW in TP scheme.

2. Provision of non-vehicular access accommodating pedestrian and bicycle routes within the green

buffer space along the natural drains and canals in TP Scheme thus generating accessible green

network across the SIR.

3. It is proposed to provide service roads in the industrial area for all roads above 30m in TP Scheme.

4. It is proposed that the FAR norms and permissible uses along the proposed new roads and service

roads in the TP Scheme should adhere to the development control regulations provided in the DP.

5. Public Transit system in form of BRTS and Metro will be introduced as traffic demand increases.

Necessary provisions have been made in the plan in terms of road widths and sector sizes for the

same.

Page 186: SIR issued by the MoEF&CC · Form 1 Proposed Mandal Becharaji Special Investment Region in Ahmedabad and Mehsana District, Gujarat ===== May 2018 Page 1 of 2

Master Plan – MBSIR Cluster A Development Plan

CHAPTER 5 BROAD COST ESTIMATES

61

Page 187: SIR issued by the MoEF&CC · Form 1 Proposed Mandal Becharaji Special Investment Region in Ahmedabad and Mehsana District, Gujarat ===== May 2018 Page 1 of 2

MBSIRDA 62|P a g e

Master Plan – MBSIR Cluster A Development Plan

5. Broad Cost Estimates

Various infrastructure components like road, rail, water supply, sewage etc. have been proposed within and

outside proposed SIR. Schedule of rates (SORs) of GWSSB 2011-12 and R & B 2012-13 have been followed

to estimate cost of proposed infrastructure components. Overall cost of estimates are divided in two major

categories

External infrastructure components

Internal infrastructure components

5.1. External Infrastructure components

5.1.1. External Road Infrastructure

Sr. No.

Description Proposed Length

(Km.)

Service Lanes

(Nos.)

Block Cost (Crores)

1. SH-133 & SH-41 (Detroj to Adalaj via Kadi and Kalol) 49.70 6 (min.) 331.00

2. MDR (Becharaji to Mehsana) 31.00 6 206.46

3. SH-7 (Vithalapur to Viramgam) 27.00 4 43.20

4. SH-135 (Kadi to Sanand via Thol) 37.30 4 59.68

5. SH-55 (Becharaji to Radhanpur for direct connectivity to Mundra via Harij))

74.10 4 118.56

6. Proposed 90Mt. road for connectivity Sitapur to Ughroj

11.27 39.00

Total 230.37 797.90

Table 5-1, External Road Infrastructure

5.1.2. External Rail Infrastructure

Sr. No. Description Rail Length (Km.) Block Cost (Rs. Crores)

1. Becharaji- Katosan Gauge Conversion 24.70 247.00

Table 5-2, External Rail Infrastructure

5.1.3. Comprehensive - External Infrastructure

Sr. No. Description Block Cost

(Rs. Crores)

1 Proposed External Road Infrastructure 797.90

2 Proposed External railway Infrastructure 247.00

3 Water Supply 18.00

Total Cost 1062.90

Table 5-3, Comprehensive - External Infrastructure

Page 188: SIR issued by the MoEF&CC · Form 1 Proposed Mandal Becharaji Special Investment Region in Ahmedabad and Mehsana District, Gujarat ===== May 2018 Page 1 of 2

MBSIRDA 63|P a g e

Master Plan – MBSIR Cluster A Development Plan

5.2. Internal Infrastructure components

5.2.1. Internal Road Infrastructure

Sr. No. Road Width (R.O.W) in

Mt.

Total Length

(km)

Total Cost of Roads (Rs Cr)

Total Cost of ROB /Waterway Bridges/

Flyover (Rs Cr)

Total Cost

(Rs Cr)

1 90 15 141 760 901

2 60 24 120 60 180

3 45 43 216 120 336

5 30 88 381 280 661

Total 170 858 1220 2078

Table 5-4, Internal Road Infrastructure

5.2.2. Internal Rail Infrastructure

Sr. No.

Description Length (km) Cost

(Rs Crores)

1 Railway Line 1- North 8.3 83

2 Railway Line 2 – South 13.6 136

Total 21.9 219

Table 5-5, Internal Rail Infrastructure

Page 189: SIR issued by the MoEF&CC · Form 1 Proposed Mandal Becharaji Special Investment Region in Ahmedabad and Mehsana District, Gujarat ===== May 2018 Page 1 of 2

MBSIRDA 64|P a g e

Master Plan – MBSIR Cluster A Development Plan

5.2.3. Water Supply

SR. NO. COMPONENT CAPACITY COST (RS. IN LACS)

1 Head Work at Narmada Main Canal Rs. 200 lacs

2 Water Treatment Plant 161 mld Rs. 4830 lacs

3 Clear Water Pumping Station 161 mld Rs. 878 lacs

4 Clear Water Trunk Main From WTP at Narmada Canal To Boundary Of Each Phase (MS Pipe)

1600 mm dia (161 mld capacity) (L-22KM)

Rs. 8313 lacs

5

Clear Water Trunk Main To Various WDS

Rs. 10047 lacs

6 Water Distribution Stations 27 NOS. Rs. 2970 lacs

7 Water Distribution Network (DI K-7) 170 Km Rs. 4522 lacs

Total Rs. 31760 lacs

Rs. 317.60 Crore Table 5-6, Water Supply

5.2.4. Sewage System

NO. COMPONENT CAPACITY COST (RS. IN LACS)

Sewage collection network Rs. 4898 lacs

2 Sewage pumping station 17 Nos. Rs. 4204 lacs

3 Rising main upto STP 93 KM Rs. 15142 lacs

4 Sewage treatment plant

STP-1 50 MLD (1 Module) Rs. 7000 lacs

STP-2 50 MLD (1 Module) Rs. 7000 lacs

Total Rs. 38244 lacs

Rs. 382.44 Crore Table 5-7, Sewage System

5.2.5. Water Recycling

SR. NO. COMPONENT CAPACITY COST (RS. IN LACS)

1 Recycle water pumping station

At STP-1 41 mld Rs. 221 lacs

At STP-2 47 mld Rs. 260 lacs

2 Recycle water trunk main from recycle water pumping station to various WDS (DI K-9 pipe)

55.3 Km Rs. 6077 lacs

3 Recycle water distribution stations 17 NOS. Rs. 1608 lacs

4 Recycle water distribution network (DI K-7) 170 KM Rs. 3971 lacs

Total Rs. 12137 lacs

Rs. 121.37 Crore Table 5-8, Water Recycling

Page 190: SIR issued by the MoEF&CC · Form 1 Proposed Mandal Becharaji Special Investment Region in Ahmedabad and Mehsana District, Gujarat ===== May 2018 Page 1 of 2

MBSIRDA 65|P a g e

Master Plan – MBSIR Cluster A Development Plan

5.2.6. Storm Water Disposal System

Component Storm Water Network

No. of outlets Length (km) Cost (Crores)

Storm water disposal network 44 170 222.73

Table 5-9, Storm Water Disposal System

5.2.7. Solid Waste Collection

Domestic waste (Rs. Crores) Industrial waste (Rs. Crores) Total

Rs. 55.14 Cr Rs. 13 Cr Rs. 68.14 Cr.

Table 5-10, Solid Waste

5.2.8. Comprehensive - Internal Infrastructure

Sr. No. Description Total Cost(Cr)

1 Roads and Bridges 2078

2 Rail 219

3 Water 317.60

4 Sewerage 382.44

5 Water Recycling 121.37

6 Storm Water 222.73

7 Solid Waste 68.14

8 Power (as per Concept Report) 660

Total 4069.28

Table 5-11, Internal Infrastructure Costing

5.3. Comprehensive Infrastructure

Sr. No. Component Cost (Crores)

1 External Infrastructure 1063

2 Internal Infrastructure 4069

Total 5132

Table 5-12, Comprehensive Infrastructure Costing

Page 191: SIR issued by the MoEF&CC · Form 1 Proposed Mandal Becharaji Special Investment Region in Ahmedabad and Mehsana District, Gujarat ===== May 2018 Page 1 of 2

Reply to EDS Query dated 13 November, 2018 Proposed Mandal Becharaji Special Investment Region in Ahmedabad and Mehsana District, Gujarat (IA/GJ/NCP/75764/2018) ============================================================================================================

============================================================================================================ November, 2018

Appendix H ---------------------------------------------------------------

Master Plan of Cluster B (Mandal)

---------------------------------------------------------------

Page 192: SIR issued by the MoEF&CC · Form 1 Proposed Mandal Becharaji Special Investment Region in Ahmedabad and Mehsana District, Gujarat ===== May 2018 Page 1 of 2

Mandal Becharaji Special Investment Region

(MBSIR)

Report 1 - FINAL Master Plan Report (Cluster B – Mandal)

Mandal Becharaji Special Investment Region (MBSIR)

Master Plan (Cluster B - Mandal)

Mandal Becharaji Special Investment Region

Development Authority, Gandhinagar

C/O: DSIRDA, Block No. 11/12, 3rd Floor, Udyog Bhavan, Sector 11, Gandhinagar - 382017

Page 193: SIR issued by the MoEF&CC · Form 1 Proposed Mandal Becharaji Special Investment Region in Ahmedabad and Mehsana District, Gujarat ===== May 2018 Page 1 of 2

Mandal Becharaji Special Investment Region

(MBSIR)

Report 1 - FINAL Master Plan Report (Cluster B – Mandal)

Mandal Becharaji Special Investment Regional

Development Authority, Gandhinagar

C/O: DSIRDA, Block No. 11/12, 3rd Floor, Udyog Bhavan, Sector 11, Gandhinagar - 382017

Page 194: SIR issued by the MoEF&CC · Form 1 Proposed Mandal Becharaji Special Investment Region in Ahmedabad and Mehsana District, Gujarat ===== May 2018 Page 1 of 2

MBSIRDA 3|P a g e

Master Plan – MBSIR Cluster B Development Plan

Contents

Contents .............................................................................................................................................. iii

List of Figures ......................................................................................................................................... v

List of Tables ......................................................................................................................................... vi

Abbreviation ........................................................................................................................................ vii

CHAPTER 1 .......................................................................................................................................... 1

1. Introduction ........................................................................................................................................... 2

1.1. Overview........................................................................................................................................ 2

1.2. Notification of Mandal Becharaji Special Investment Region ....................................................... 3

1.3. Constitution of ‘Authority’ and ‘Committee Members’ of MBSIRDA............................................ 4

1.4. Powers and Functions of MBSIRDA ............................................................................................... 5

CHAPTER 2 ............................................................................................................................................. 7

2. MBSIR - Existing Situation...................................................................................................................... 8

2.1. Location & Connectivity................................................................................................................. 8

2.2. Existing Major Road network ........................................................................................................ 9

2.3. Location with respect to Environmentally Sensitive Areas ......................................................... 10

2.4. Existing land use .......................................................................................................................... 11

2.5. Rivers, Tributaries, Canal and Water Tanks in the region ........................................................... 14

2.6. Demography ................................................................................................................................ 15

2.7. Social Infrastructure .................................................................................................................... 18

2.8. Physical Infrastructure ................................................................................................................. 19

CHAPTER 3 ........................................................................................................................................... 20

3. Master Plan Proposal ................................................................................................................ 21

3.1. Preparation of Base map & Existing land use map...................................................................... 21

3.2. Target Sector Identification ......................................................................................................... 24

3.3. Sustainable Population ................................................................................................................ 26

3.4. Vision ........................................................................................................................................... 27

3.5. Planning Principles....................................................................................................................... 27

3.6. Land Use Proposal ....................................................................................................................... 29

3.7. Road and Rail proposals .............................................................................................................. 41

3.8. Infrastructure Proposals .............................................................................................................. 46

CHAPTER 4 ........................................................................................................................................... 56

4. Implementation Strategy..................................................................................................................... 57

4.1. Comprehensive guidelines for implementing the DP.................................................................. 57

4.2. Provision of various facilities in Master Plan through TP Schemes .................................. 58

Page 195: SIR issued by the MoEF&CC · Form 1 Proposed Mandal Becharaji Special Investment Region in Ahmedabad and Mehsana District, Gujarat ===== May 2018 Page 1 of 2

MBSIRDA 4|P a g e

Master Plan – MBSIR Cluster B Development Plan

CHAPTER 5 ........................................................................................................................................... 61

5. Broad Cost Estimates........................................................................................................................... 62

5.1. External Infrastructure components ........................................................................................... 62

5.2. Internal Infrastructure components ............................................................................................ 63

5.3. Comprehensive Infrastructure .................................................................................................... 65

Page 196: SIR issued by the MoEF&CC · Form 1 Proposed Mandal Becharaji Special Investment Region in Ahmedabad and Mehsana District, Gujarat ===== May 2018 Page 1 of 2

MBSIRDA 5|P a g e

Master Plan – MBSIR Cluster B

List of F igures

1-1, DMIC influential area, India 1-2, DMIC influential area, Gujarat ......................................................... 2

2-1, Location & Connectivity - MBSIR................................................................................................................ 8

2-2, Existing Major Road Network within MBSIR .............................................................................................. 9

2-3, SH 133 connecting Ughroj with Ughrojpura 2-4, SH 19 connecting Hansalpur with Becharaji ........... 10

2-5, Location with respect to Environmentally Sensitive areas ...................................................................... 10

2-6, Existing Land Use, MBSIR ......................................................................................................................... 12

2-7, Water bodies in MBSIR............................................................................................................................. 14

2-8, Sitapur Lake .............................................................................................................................................. 14

2-9, Zinzuwada Branch Canal 2-10, Kharaghoda Branch Canal ........................................................ 15

2-11, Average Annual Growth Rate ................................................................................................................. 16

2-12, Sex ratio.................................................................................................................................................. 16

2-13, Literacy Rate ........................................................................................................................................... 17

2-14, Work Participation Rate ......................................................................................................................... 17

2-15, Worker's Distribution ............................................................................................................................. 18

3-1, Satellite Image of MBSIR .......................................................................................................................... 21

3-2, Base Map, MBSIR ..................................................................................................................................... 23

3-3, Industrial zone .......................................................................................................................................... 30

3-4, Logistic zone ............................................................................................................................................. 31

3-5, Knowledge and IT zone ............................................................................................................................ 32

3-6, Residential zone ....................................................................................................................................... 33

3-7, Affordable housing zone .......................................................................................................................... 34

3-8, High Access Corridor ................................................................................................................................ 35

3-9, Mixed Use................................................................................................................................................. 36

3-10, Recreation, Sports and Entertainment zone .......................................................................................... 37

3-11, Village Buffer zone ................................................................................................................................. 38

3-12, Proposed Landuse plan, MBSIR.............................................................................................................. 39

3-13, 90 mt. Row, Road Section ...................................................................................................................... 42

3-14, 60 mt. Row, Road Section ...................................................................................................................... 42

3-15, 45 mt. Row, Road Section ...................................................................................................................... 43

3-16, 30 mt. Row, Road Section ...................................................................................................................... 43

3-17, Proposed Road Network, MBSIR ............................................................................................................ 45

3-18, Water Supply Network ........................................................................................................................... 49

3-19, Sewage Network .................................................................................................................................... 51

3-20, Recyle Water Network ........................................................................................................................... 52

3-21, Storm Water Disposal Scheme ............................................................................................................... 53

Page 197: SIR issued by the MoEF&CC · Form 1 Proposed Mandal Becharaji Special Investment Region in Ahmedabad and Mehsana District, Gujarat ===== May 2018 Page 1 of 2

MBSIRDA 6|P a g e

Master Plan – MBSIR Cluster B

List of Tables

Table 1-1, List of notified villages ...................................................................................................................... 4

Table 1-2, MBSIRDA Board Members................................................................................................................ 4

Table 2-1, Area Statement, Existing Land Use MBSIR ..................................................................................... 13

Table 2-2, Demographic Information, MBSIR.................................................................................................. 15

Table 2-3, Education facilities in MBSIR .......................................................................................................... 18

Table 2-4, Health Facilities in MBSIR ............................................................................................................... 19

Table 3-1, Employment generation in MBSIR ................................................................................................. 26

Table 3-2, Floating Employment...................................................................................................................... 26

Table 3-3, Total Population supported by MBSIR ........................................................................................... 26

Table 3-4, Major Industrial Nodes ................................................................................................................... 30

Table 3-5, Location of Logistic zone ................................................................................................................ 31

Table 3-6, Area Statement MBSIR ................................................................................................................... 40

Table 3-7, Proposed Road Network................................................................................................................. 44

Table 3-8, Proposed Rail Network ................................................................................................................... 46

Table 3-9, Treatment units for Water Supply.................................................................................................. 47

Table 3-10, Sewage pumping station units ..................................................................................................... 50

Table 4-1, Requirement of community facility for MBSIR............................................................................... 59

Table 4-2, Standards for Community Facility .................................................................................................. 59

Table 4-3, Requirement of commercial facility for MBSIR .............................................................................. 60

Table 5-1, External Road Infrastructure .......................................................................................................... 62

Table 5-2, External Rail Infrastructure............................................................................................................. 62

Table 5-3, Comprehensive - External Infrastructure ....................................................................................... 62

Table 5-4, Internal Road Infrastructure ........................................................................................................... 63

Table 5-5, Internal Rail Infrastructure ............................................................................................................. 63

Table 5-6, Water Supply .................................................................................................................................. 64

Table 5-7, Sewage System ............................................................................................................................... 64

Table 5-9, Storm Water Disposal System ........................................................................................................ 65

Table 5-10, Solid Waste ................................................................................................................................... 65

Table 5-11, Internal Infrastructure Costing ..................................................................................................... 65

Table 5-12, Comprehensive Infrastructure Costing ........................................................................................ 65

Page 198: SIR issued by the MoEF&CC · Form 1 Proposed Mandal Becharaji Special Investment Region in Ahmedabad and Mehsana District, Gujarat ===== May 2018 Page 1 of 2

MBSIRDA 7|P a g e

Master Plan – MBSIR Cluster B

Abbreviation

DFC Dedicated Freight Corridor

DMIC Delhi-Mumbai Industrial Corridor

SIR Special Investment Region

MBSIR Mandal Becharaji Special Investment Region

MBSIRDA Mandal Becharaji Special Investment Regional Development Authority

DP Development Plan

GDCR General Development Control Regulations

Acts

GTP & UD Gujarat Town Planning & Urban Development GSIR Gujarat Special Investment Region

State and Central Government Organisations

CPHEEO Central Public Health and Environmental Engineering Organisation

CPCB Central Pollution Control Board

GETCO Gujarat Energy Transmission Company

GIDB Gujarat Infrastructure Development Board

GPCB Gujarat Pollution Control Board

SSNNL Sardar Sarovar Narmada Nigam Limited

DILR District Inspector of Land Records

GSRDC Gujarat State Road Development Corporation

MoEF Ministry of Environment and Forests PCCF

Principal Chief Conservator of Forest

GWSSB Gujarat Water Supply and Sanitation Board

GWIL Gujarat Water Infrastructure Limited

Utility Infrastructure Terms

CETP Common Effluent Treatment Plant

DCS Distribution Control System

STP Sewage Treatment Plant

SWM Solid Waste Management

TSE Treated Sewage Effluent

Financial and Economic Terms

CAPEX Capital Expenditure

ERR Economic Rate of Return

ENPV Economic Net Present Value

OPEX Operating Expenditure

Page 199: SIR issued by the MoEF&CC · Form 1 Proposed Mandal Becharaji Special Investment Region in Ahmedabad and Mehsana District, Gujarat ===== May 2018 Page 1 of 2

MBSIRDA viii|P a g e

Master Plan – MBSIR Cluster B

Terms Related to Transportation

NH National Highway

SH State Highway

MDR Major District Road

ODR Other District Road

TOD Transit Oriented Development

PCU Passenger Car Equivalent

ROW Right of Way

Page 200: SIR issued by the MoEF&CC · Form 1 Proposed Mandal Becharaji Special Investment Region in Ahmedabad and Mehsana District, Gujarat ===== May 2018 Page 1 of 2

CHAPTER 1

INTRODUCTION

1

Page 201: SIR issued by the MoEF&CC · Form 1 Proposed Mandal Becharaji Special Investment Region in Ahmedabad and Mehsana District, Gujarat ===== May 2018 Page 1 of 2

MBSIRDA 2|P a g e

Master Plan – MBSIR Cluster B Development Plan

1. Introduction

1.1. Overview

Spread over more than 102 Sq.km, Mandal Bechraji Special Investment Region (MBSIR) is a new industrial

hub being planned about 90km from Ahmedabad and 85 km from Gandhinagar near Becharaji town.

Envisaged by the government of Gujarat, MBSIR is one of its kind industrial hubs and will comprise automobile,

manufacturing and auxiliary industries. The SIR is strategically located, well connected with trade gateways

and falls in the influence zone of proposed Delhi – Mumbai Industrial Corridor project (DMIC), a joint initiative

by the Government of India and Japan.

The dedicated freight corridor (DFC) passes through six different states. Distribution of its length in these

states is mentioned below

Delhi NCR – 1.5%

Haryana – 10%

Uttar Pradesh – 1.5%

Rajasthan – 39%

Gujarat – 38%

Maharashtra – 10%

Proposed

MBSIR

1-1, DMIC influential area, India 1-2, DMIC influential area, Gujarat

Govt. of Gujarat has been pro active to take advantage of proposed DMIC Project. It has declared around

10 Special Investment Regions in the area of influence of DMIC. For Mandal Becharaji Special Investment

Region, a concept plan has been prepared which consist of

Delineation of SIR region

Basic physiographic studies of region

Target sectors for SIR and market analysis

Page 202: SIR issued by the MoEF&CC · Form 1 Proposed Mandal Becharaji Special Investment Region in Ahmedabad and Mehsana District, Gujarat ===== May 2018 Page 1 of 2

MBSIRDA 3|P a g e

Master Plan – MBSIR Cluster B Development Plan

Conceptual land use and infrastructure proposals

Block cost estimates

For implementation of concept plan, the state govt. has decided to prepare a master plan for the region.

The overall process for preparation of master plan comprises of following stages:

1. Declaration of special investment region u/s 3 read with section 4 of the Gujarat Special

Investment Region Act, 2009

2. Establishment of apex authority – The Gujarat Infrastructure Master Board (GIDB), established u/s

17 of Gujarat Infrastructure Development Act, 1999 is declared and designated as the Special

Investment Region Apex Authority u/s 5 of GSIR Act, 2009

3. Constitution of a regional development authority as per sub-section (1) of sections 8, 9, 10 and 15

of the Gujarat Special Investment Region Act, 2009

4. Preparation of draft master plan u/s 15 of GSIR Act 2009 and u/s 9 of GTP & UD Act 1976

5. Publication of draft master plan u/s 17 of GSIR Act 2009 and u/s 13 of GTP & UD Act, 1976

6. Receive/consider objections and suggestions u/s 17 of GSIR Act 2009 and u/s 14 of GTP & UD Act,

1976

7. Publication of modifications done in master plan after receiving objections and suggestions, u

/s 17 of GSIR Act 2009 and u/s 15 of GTP & UD Act, 1976

8. Submission of draft master plan to State Government for sanction u/s 17 of GSIR Act 2009 and

u/s 16 of GTP & UD Act, 1976

This publication addresses stage 7 of the above process and comprises of modified draft master plan after

receiving objections and suggestions, u/s 15(3)(ii) u/s 17 of GSIR Act 2009 and u/s 15 of GTP & UD Act

1976.

The publication comprises of two reports. Report 1 covers the proposal on land use, infrastructure,

implementation and block cost estimates and Report 2 covers the Draft General Development Control

Regulations (DGDCR) for the proposed SIR.

1.2. Notification of Mandal Becharaji Special Investment Region

In exercise of the powers conferred by section 3 read with section 4 of the Gujarat Special Investment Region

Act, 2009 (Guj. 2 of 2009), the Industries and Mines Dept. of Government of Gujarat and the Government of

Gujarat declared Mandal Becharaji Special Investment Region (MBSIR) vide Notification No.

GHU/2012/22/SIR/112012/1276/I on 24th September 2012 published in Government Gazette. Notification

comprises 44 villages of district Ahmedababd taluka Mandal and Detroj, District Surendranager taluka dasada-

patadi and District Mahesana taluka bechraji.

Vide Notification No. GHU/2013/16/SIR/112012/1276/I on 14th August 2013 published in Government

Gazette, Industries and Mines Department, Government of Gujarat, deleted 36 villages from the earlier

declared “Mandal Bechraji Special Investment Region”.

As per notification Mandal Becharaji Special Investment Region comprises of 2 villages of Detroj Taluka

and5 villages of Mandal Taluka from Ahmedabad district and 1 village from Becharaji Taluka of Mehsana

Page 203: SIR issued by the MoEF&CC · Form 1 Proposed Mandal Becharaji Special Investment Region in Ahmedabad and Mehsana District, Gujarat ===== May 2018 Page 1 of 2

MBSIRDA 4|P a g e

Master Plan – MBSIR Cluster B Development Plan

District. The total area spread over 8 villages, about 101.72 sq.km. as per notification and as per measured

on base map 102.10 sq km.

Name of District Name of Taluka

Name of Revenue Villages

Sr.no. Name of Village Total Survey Nos. Total area of sq.km Ahmedabad Mandal 1 Ughroj Complete 14.24

2 Ughroj nu Paru Complete 6.37 3 Ukardi Complete 8.56

Detroj 4 Bhagapura Complete 12.43 5 Shihor Complete 9.53

Total 51.50 Table 1-1, List of notified villages

Source: notification Dated 24th September 2012.

1.3. Constitution of ‘Authority’ and ‘Committee Members’ of MBSIRDA

In exercise of the powers conferred by sub-section (1) of sections 8, u/s 9, 10 and 15 of the Gujarat Special

Investment Region Act, 2009 (Guj. 2 of 2009), the Industries and Mines Dept. of Gujarat and the

Government of Gujarat constituted Mandal Becharaji Special Investment Regional Development Authority

(MBSIRDA) vide Notification No. GHU/12/23/SIR/112012/1276/I on 1st October 2012, published in

Government Gazette. MBSIRDA shall consist of the following members, namely:-

Sr. No. Member Designation

1 Principal Secretary

Chairperson Industries and Mines Department

2 Industries Commissioner Vice Chairperson

3 Chief Executive Officer,

Member ex-officio Gujarat Infrastructure Development Board

4 Collector, Ahmedabad, Member ex-officio

5 District Development Officer, Ahmedabad Member

6 Collector, Mehsana, Member

7 Collector, Surendranagar, Member

8 Director, School of Planning, Centre of Environmental

Member Planning and Technology (CEPT), Ahmedabad

9 Shri U.S. Mehta (Retired Town Planner) Member

10 President, Gujarat Chamber of Commerce and Industries Member

11 Chief Executive Officer, Mandal Becharaji Special

Member Secretary Investment Regional Development Authority

Table 1-2, MBSIRDA Board Members

Source: Form notification Dated 1st October 2012.

Page 204: SIR issued by the MoEF&CC · Form 1 Proposed Mandal Becharaji Special Investment Region in Ahmedabad and Mehsana District, Gujarat ===== May 2018 Page 1 of 2

MBSIRDA 5|P a g e

Master Plan – MBSIR Cluster B Development Plan

1.4. Powers and Functions of MBSIRDA

The powers and functions of the Mandal Becharaji Special Investment Regional Development Authority will be according to section 15 of ‘The Gujarat Special Investment Region Act, 2009. It is thus listed as below:

1) The Regional Development Authority shall secure planned development of the Special Investment

Region and shall take steps for its effective regulation and efficient management so as to bring and

enhance general welfare, convenience, productivity and excellence.

2) Without prejudice to the generality of foregoing provisions, the Regional Development Authority shall

undertake the management and planning of land resource and infrastructure of the Special Investment

Region (SIR).

3) The Regional Development Authority shall, in particular, exercise the following powers and perform the

following functions namely:-

i. To classify and earmark the area of the Special Investment Region for various purposes and usages

including economic activities, amenities and community services as it deems fit;

ii. To prepare the Draft Master plan for whole or part of the area of the Special Investment

Region;

iii. To undertake preparation and executing of town planning scheme for whole or part of the Special

Investment Region;

iv. To regulate the development of the periphery area of the Special Investment Region,

v. To acquire, hold and manage moveable or immoveable property as it may deem necessary subject

to general or specific directions of the State Government in this regard;

vi. To acquire land in the Special Investment Region, by sale, lease, grant, allocation, donation, Town

Planning Scheme, consent agreement or through proceedings under the Land Acquisition Act,

1894 for the purposes of this Act,

vii. To sale, lease, transfer or dispose of any land or building belonging to it subject to the regulations

made by the Apex Authority;

viii. To carry out surveys in the Mandal Becharaji Special Investment Region for the preparation of Draft

Master Plans and Town Planning Schemes;

ix. To prepare, issue and implement the directions, the standards and the norms for building

structures, infrastructure development and other construction activities in the Special Investment

Region;

x. To enter into contracts, agreements or concession agreement with any person, entity, developer or

organization as it may deem necessary for performing its functions;

xi. To execute, co-ordinate and supervise works in connection with infrastructure or provision of other

services and amenities in the Special Investment Region;

xii. To provide for disaster management and mitigation in the Special Investment Region;

xiii. To levy and collect such fees, development charges, or user charges as may be ascertained and

fixed by the Apex Authority under clause (vii) of sub-section (2) of section 6;

xiv. To remove encroachments and constructions not duly authorized or made in violation of the

regulations, directions and norms laid down by the Regional Development Authority;

Page 205: SIR issued by the MoEF&CC · Form 1 Proposed Mandal Becharaji Special Investment Region in Ahmedabad and Mehsana District, Gujarat ===== May 2018 Page 1 of 2

MBSIRDA 6|P a g e

Master Plan – MBSIR Cluster B Development Plan

xv. To make arrangements for observance and promotion of safety, order, health and environmental

safeguards within the Special Investment Region;

xvi. To guide, assist and co-ordinate with other authorities functioning in the Special Investment Region

in matters pertaining to planning and use of land and development of the Special Investment

Region;

xvii.To control the development activities in accordance with the Master plan and to bring aesthetics,

efficiency and economy in the process of development;

xviii. To ensure and make provisions for sufficient civic amenities and services including hospitals and

medical services, schools, fire services, public parks, markets and shopping places, playgrounds,

entertainment areas and disposal of waste and provisions of drainage;

xix. The make sustainable arrangements for providing and maintaining the highest standards in civic

amenities and services particularly for cleanliness, aesthetics, health and hygiene;

xx. To make enquiry, inspection, examination or measurement of any land and building in any part of the

Special Investment Region;

xxi. To exercise such other powers and discharge such other functions as may be prescribed by the

rules or regulations.

4) (a) Notwithstanding anything contained in the relevant State Acts, rules or any existing instructions

of the State Government, the Regional Development Authority my frame its own General

Development Control Regulations (GDCR) and the same shall prevail for developments in the Special

Investment Region.

b) Every person, unit or developer or any other stakeholder in Special Investment Region shall

be required to get the plans of the building approved by the Regional Development Authority before

commencing any construction and shall obtain the approval of the Regional Development Authority

necessary and incidental thereto, after the completion and before the use of such premises.

c) For the purpose of this section and with any other requirement for proper planning,

management and development of the Special Investment Region, the Regional Development

Authority may issue such direction or instruction as it may consider necessary to any person, unit,

entity, developer or any other stakeholder in the Special Investment Region and the person, unit,

entity, developer or, as the case may be, the stakeholder shall be bound by such directions

Page 206: SIR issued by the MoEF&CC · Form 1 Proposed Mandal Becharaji Special Investment Region in Ahmedabad and Mehsana District, Gujarat ===== May 2018 Page 1 of 2

Master Plan – MBSIR Cluster B Development Plan

Master Plan – MBSIR Cluster A Development Plan

CHAPTER 2 MBSIR - EXISTING SITUATION

7

Page 207: SIR issued by the MoEF&CC · Form 1 Proposed Mandal Becharaji Special Investment Region in Ahmedabad and Mehsana District, Gujarat ===== May 2018 Page 1 of 2

MBSIRDA 8|P a g e

Master Plan – MBSIR Cluster B Development Plan

Master Plan – MBSIR Cluster A Development Plan

2. MBSIR - Existing Situation

2.1. Location & Connectivity

Mandal Bechraji Special Investment Region (MBSIR) is located about 90 km from Ahmedabad and 85 km from

Gandhinagar on north-west and near Becharaji town.

2-1, Location & Connectivity - MBSIR

The SIR is regionally well connected through National and State highways as well as railways. National highway

14- 15 connecting Kandla with Palanpur passes through north of the proposed SIR. NH-8 and State highway

no. 7 passes from south, and State highway no. 41 connecting Ahmedabad and Mehsana passes along eastern

edge of the SIR. The five major roads directly connecting SIR with the National and state highways include:

SH-133 – Connecting Ahmedabad via Detroj, Kadi, Kalol and Adalaj

MDR - Connecting Mehsana via Becharaji and Modhera is a 2-lane undivided road

SH-7- Connecting Viramgam

SH-135- Connecting Sanand via Kadi and Thol

SH-55 connecting Mundra via Radhanpur, Harij and Becharaji

A broad gauge railway line connecting Viramgam with Mehsana passes through the SIR at Detroj. Apart

from this the SIR is in proximity to a meter gauge line connecting Katosan Road to Ranuj via Becharaji.

Page 208: SIR issued by the MoEF&CC · Form 1 Proposed Mandal Becharaji Special Investment Region in Ahmedabad and Mehsana District, Gujarat ===== May 2018 Page 1 of 2

MBSIRDA 9|P a g e

Master Plan – MBSIR Cluster B Development Plan

Master Plan – MBSIR Cluster A Development Plan

2.2. Existing Major Road network

Currently three state highways pass through the proposed SIR. SH 7 connecting Becharaji with Ukardi

village. SH 133 providing connectivity between Ughroj and Ughrojpura and SH 19 connecting Hansalpur

with Becharaji. These three state highways form a triangular loop within SIR and also provide major entry and

exit points.

2-2, Existing Major Road Network within MBSIR

Page 209: SIR issued by the MoEF&CC · Form 1 Proposed Mandal Becharaji Special Investment Region in Ahmedabad and Mehsana District, Gujarat ===== May 2018 Page 1 of 2

MBSIRDA 10|P a g e

Master Plan – MBSIR Cluster B Development Plan

Master Plan – MBSIR Cluster A Development Plan

2-3, SH 133 connecting Ughroj with Ughrojpura 2-4, SH 19 connecting Hansalpur with Becharaji

2.3. Location with respect to Environmentally Sensitive Areas

2-5, Location with respect to Environmentally Sensitive areas

There are three notified sanctuaries around proposed SIR, namely Wild Ass sanctuary in Little Rann of

Kachchh, Nal sarovar birds sanctuary and Thol lake birds sanctuary. However all of them are more than 10

km. from the notified SIR boundary. The Wild Ass sanctuary in Little Rann of Kachchh is located on east of

notified MBSIR region and is around 35 km. away. It spreads over an area of appx. 4900 sq. km. Little Rann

of Kachchh is also listed under UNESCO World Heritage Sites. Spread over an area of appx. 120 sq. km., Nal

sarovar birds sanctuary is located to the south of SIR and is around 45 km. away. It is a natural lake with

shallow waters and muddy lagoons, dotted by 360 islets. Thol bird sanctuary covering an area of around 7

Sq.Km is a manmade lake and is located towards south east of MBSIR around 35 km. away.

Page 210: SIR issued by the MoEF&CC · Form 1 Proposed Mandal Becharaji Special Investment Region in Ahmedabad and Mehsana District, Gujarat ===== May 2018 Page 1 of 2

MBSIRDA 11|P a g e

Master Plan – MBSIR Cluster B Development Plan

Master Plan – MBSIR Cluster A Development Plan

2.4. Existing land use

Of the total area only 1.29 % is under Habitation. Around 82.84 sq. km. of land area is under Agriculture

land use. Various river tributaries, water tanks and canals account for 3.43 sq. km. (3.36%) of land in MBSIR.

Page 211: SIR issued by the MoEF&CC · Form 1 Proposed Mandal Becharaji Special Investment Region in Ahmedabad and Mehsana District, Gujarat ===== May 2018 Page 1 of 2

MBSIRDA 121 Page

Plan

MANDAL-BECHARAJISPECIAL INVESTMENT REGIONAL DEVELOPMENT AUTHORITY, GANDHINAGAR DRAFT M A S T E R PLAN

EXISTING LANDUSE PLAN

DRAFT MAS TE R PLAN (DDP) SUBMITTED U/S 15

(3XIi) AND 17 OF THE GSIR ACT-2009 AND UIS 16

OF THE GTP & UDACT-1976

MANDAL- BECHARAJISPECIAL INVESTMENT

REGIONAL DEVELOPMENT AUTHORITY,

GANDHNI AGAR

MBSIRDA

LEGEND

r::=-- MBSIR BOUNDARY

- EXISTING ROADS

EXISTING CANAL

EXISTING RAILWAY LINE

AGRICULTURE

- OPENSCRUB

- ISLAND

- BRICK KLIN

- VILLAGE HABITATION

- WATERBODY RIVER I

DRAIN

Nl

NOT TO SCALE

Senior Toomr Chlelf:wwti ve Offlc :e r Chairman MBSIRDA MBSRDA MBSIROA

No part of this plan/document may be reproduced without prior permsi sionInwrtiing from MBSIRDA.This plan should not be used for measurements.

2-6,Existing Land Use,MBSIR

Page 212: SIR issued by the MoEF&CC · Form 1 Proposed Mandal Becharaji Special Investment Region in Ahmedabad and Mehsana District, Gujarat ===== May 2018 Page 1 of 2

MBSIRDA 13|P a g e

Master Plan – MBSIR Cluster B

Sr. No. Land Use Area (Sq. Km.) %

1 Agriculture 82.84 81.14

2 Habitation 1.32 1.29 3 Brick Kiln 0.14 0.14

4 Open Scrub 13.17 12.91

5 Roads 1.18 1.16

6 Canals 0.83 0.82

7 Water Tanks (Talav) 2.07 2.03

8 River 0.52 0.52

102.10 100

Table 2-1, Area Statement, Existing Land Use MBSIR

Page 213: SIR issued by the MoEF&CC · Form 1 Proposed Mandal Becharaji Special Investment Region in Ahmedabad and Mehsana District, Gujarat ===== May 2018 Page 1 of 2

MBSIRDA 14|P a g e

Master Plan – MBSIR Cluster B

2.5. Rivers, Tributaries, Canal and Water Tanks in the region

2-7, Water bodies in MBSIR

There are four major tributaries and many water tanks in the region covering an area of appx. 3.43 sq.km.

(3.36% of total land). One of the major water bodies present in the nearby region is “Saran Lake” near

Vanod village. It is a man made water body developed for facilitating irrigation. Its area is appx. 8 sq. km.

However it has water only for around six month between August and January. Entire MBSIR area falls

within SSNNL command area. There are two branch canals namely Kharaghoda and Zinzuwada which pass

through the SIR. Length of these branch canals is around 10 km. Total area occupied by canal network is

around 4.5 sq. km.

2-8, Sitapur Lake

Page 214: SIR issued by the MoEF&CC · Form 1 Proposed Mandal Becharaji Special Investment Region in Ahmedabad and Mehsana District, Gujarat ===== May 2018 Page 1 of 2

MBSIRDA 15|P a g e

Master Plan – MBSIR Cluster B

2-9, Zinzuwada Branch Canal 2-10, Kharaghoda Branch Canal

2.6. Demography

Demographic profiling of the 8 Villages within SIR is carried out. This includes Population growth, literacy

rate, sex ratio, work participation and workers distribution.

District

Taluka

Village Name

Population

Literacy

Working

Population Total Male Female

Ahmedabad Detroj Bhagapura 1052 531 521 627 389

Shihor 1384 705 679 775 519

Mandal Hansalpur Becharaji

1464 761 703 630 799

Sitapur 4161 2210 1951 2273 2166

Ughroj 1686 883 803 659 458

Ughrojpura 1152 594 558 749 269

Ukardi 1299 612 687 555 458

Mehsana Becharaji Chandanki 318 149 169 195 121

MBSIR 12516 6445 6071 6463 5179

Table 2-2, Demographic Information, MBSIR

Source: Census of India 2001

Page 215: SIR issued by the MoEF&CC · Form 1 Proposed Mandal Becharaji Special Investment Region in Ahmedabad and Mehsana District, Gujarat ===== May 2018 Page 1 of 2

MBSIRDA 16|P a g e

Master Plan – MBSIR Cluster B

2.6.1. Average Annual Growth Rate (%)

Average annual growth rate is the rate at which population of a region increases in a given time period as a

fraction of the initial population. Between 1981 and 1991 the average annual growth rate of population

within MBSIR has been negative (-1.6 %) as compared to the positive growth rates of state and districts.

However from 1991 to 2001 the growth rate has improved, but remained lower in comparison to state and

district averages.

2-11, Average Annual Growth Rate

2.6.2. Sex ratio

2-12, Sex ratio

Sex ratio is number of females per 1000 males. Sex ratio in MBSIR region is higher as compared to district and

state averages.

Low population growth rate and high sex ratio as compared to District and State figures are indicative of major

out migration from the villages within the SIR. Better work opportunities on development of the SIR may

reverse the trends.

Page 216: SIR issued by the MoEF&CC · Form 1 Proposed Mandal Becharaji Special Investment Region in Ahmedabad and Mehsana District, Gujarat ===== May 2018 Page 1 of 2

MBSIRDA 17|P a g e

Master Plan – MBSIR Cluster B

2.6.3. Literacy Rate (%)

2-13, Literacy Rate

As per the census 2001, the average literacy rate within the SIR is 52%. This is lower than average rates of

Ahmedabad district (69%) and Gujarat State (59%) indicates the need for education facilities and

infrastructure through planned development in proposed SIR.

2.6.4. Work Participation Rate (%)

2-14, Work Participation Rate

Work participation rate is defined as the percentage of total workers (main and marginal) to total population.

Almost 41% of total population residing in MBSIR is working population. Work participation rate of the

region has been increased in last two decades. It is almost near to state averages.

Page 217: SIR issued by the MoEF&CC · Form 1 Proposed Mandal Becharaji Special Investment Region in Ahmedabad and Mehsana District, Gujarat ===== May 2018 Page 1 of 2

MBSIRDA 18|P a g e

Master Plan – MBSIR Cluster B

2-15, Worker's Distribution

As per Census of India, workers are divided in four major categories i.e. cultivators, agriculture labourers,

household industry workers and other workers. Out of these, cultivators and agriculture labourers

comprise of workers involved in agriculture (primary economic activity). The other two categories of

workers are involved in secondary and tertiary economic activities.

In MBSIR almost 80% of working population is involved in primary economic activities and the rest 20%

involved in secondary and tertiary economic activities. Ahmedabad district has around 20% of working

population involved in primary and rest 80% involved in secondary and tertiary economic activities. High

dependency of working population in MBSIR on primary economic activities along with high number of

agriculture labourers (50 %) indicates lack of economic opportunities in other sectors.

2.7. Social Infrastructure

2.7.1. Education Facilities

Sr. No. Educational Facility Number

1 Primary School 10

2 Secondary School 4

3 Senior Secondary School 0

4 College 0

5 Industrial School 0

6 Training School 0

7 Adult literacy Class/Centre 0

8 Other educational facilities 0 Table 2-3, Education facilities in MBSIR

Source: Census of India 2001

Page 218: SIR issued by the MoEF&CC · Form 1 Proposed Mandal Becharaji Special Investment Region in Ahmedabad and Mehsana District, Gujarat ===== May 2018 Page 1 of 2

MBSIRDA 19|P a g e

Master Plan – MBSIR Cluster B

There are 10 primary schools in the region, suggesting that almost each village has a primary school. However

there are only 4 secondary schools and no senior secondary schools between 8 villages, spread over an area

of 102.10 sq. km.

There are no colleges, training schools or other education facilities available in the region. Nearest towns with

these facilities are Kadi, Mehsana, and Ahmedabad on eastern side of MBSIR. Villagers on the western side of

the SIR (Surendranagar district) travel around 20 – 25 km. to avail these facilities.

2.7.2. Health facilities

Health Facility Number

Primary Health Sub Centre 2

Registered Private Medical Practitioners 1

Primary Health Centre 1

Family Welfare Centre 1

Child Welfare Centre 0

Allopathic Hospital 0

Maternity Home 0

Ayurvedic, Unani, Homeopathic Hospital 0

Ayurvedic, Unani, Homeopathic Dispensary 0

Health Centre 0

Nursing Home 0 Table 2-4, Health Facilities in MBSIR

Source: Census of India 2001

The region has only 2 primary health sub centers and 1 primary health centre and family welfare centres.

There is no maternity home and allopathic hospital in the entire region of 102.10 sq. km.

2.8. Physical Infrastructure

2.8.1. Water Supply

Domestic water demand of the existing settlements is catered by GWSSB, from GWIL off-take point,

Zinzuwada Branch Canal at Chainage+ 552.0.Km. from this branch canal about 18 mLd. of water is drawn

for supplying to Mandal & Detroj Taluka villages. Water supply to Becharaji Taluka villages is through water

drawn from Narmada Main Canal Off-take Point at Chainage + 313.63 Km.

2.8.2. Storm water and Sewerage

There is no major sewerage and storm water infrastructure in the region. The villages falling in the delineated

region either have community level soak pits or very basic Sewage network. The villages do not have any

Storm Water drainage infrastructure. The Storm Water runs through natural drains into the ponds and

other water bodies.

It is observed that area under MBSIR is characterized by high outmigration, over dependency on agriculture

and high number of agricultural laborers as compared to adjoining districts and Gujarat State. Development

of new industrial areas can bring about change in overall well being for the people of the region while creating

more economic opportunities along with quality social and physical infrastructure.

Page 219: SIR issued by the MoEF&CC · Form 1 Proposed Mandal Becharaji Special Investment Region in Ahmedabad and Mehsana District, Gujarat ===== May 2018 Page 1 of 2

Master Plan – MBSIR Cluster B Development Plan

CHAPTER 3 MASTER PLAN PROPOSAL

20

Page 220: SIR issued by the MoEF&CC · Form 1 Proposed Mandal Becharaji Special Investment Region in Ahmedabad and Mehsana District, Gujarat ===== May 2018 Page 1 of 2

MBSIRDA 21|P a g e

Master Plan – MBSIR Cluster B Development Plan

3. Master Plan Proposal

The purpose of the Draft Master plan is to set out the framework for the growth of MBSIR over a period of

25 years. Major components covered by the Draft Master Plan include:

Preparation of Base map & Existing land use map

Proposal for Land Use

Proposal for Infrastructure development

General Development Control Regulations

Implementation strategy & Broad cost estimates

3.1. Preparation of Base map & Existing land use map

Preparation of accurate Base Map is one of the most critical components while preparing M a s t e r Plan.

Latest (Dec 2012 – Jan 2013) satellite image of 6 Mt. resolution is acquired from National Remote Sensing

Centre, Hyderabad to create an accurate Base map of MBSIR.

MBSIR

Boundary

3-1, Satellite Image of MBSIR

Source: National Remote Sensing Centre, Hyderabad

Page 221: SIR issued by the MoEF&CC · Form 1 Proposed Mandal Becharaji Special Investment Region in Ahmedabad and Mehsana District, Gujarat ===== May 2018 Page 1 of 2

MBSIRDA 22|P a g e

Master Plan – MBSIR Cluster B Development Plan

Village Revenue maps (Tikka sheets) of all 8 villages within SIR limits were acquired from District Land

Inspector of Records (DILR) Departments of various districts. The revenue maps were scanned, scaled and

then digitized. In the process of digitization, some of the inherent mistakes in Tikka sheets like duplicate or

missing survey numbers were identified, cross checked with other available data and updated. The map

was further updated with information received from various concerned government departments. Each

digitized village revenue map was then geo referenced over satellite image to create a combined base map.

Site visits were carried out to acquire ground control points for exact superimposition of digitized village maps.

The final base map of MBSIR shows an area of 102.10 sq. km. which is more than the notified area (101.77 sq.

km.) of MBSIR. The reference for area under notification of MBSIR is taken from Form 1A of all the

villages, which is primarily a revenue record. One of the reasons for variation in area could be because of

out dated revenue records.

Page 222: SIR issued by the MoEF&CC · Form 1 Proposed Mandal Becharaji Special Investment Region in Ahmedabad and Mehsana District, Gujarat ===== May 2018 Page 1 of 2

Development Plan

MANDAL-BECHARAJI SPECIAL INVESTMENT REGIONAL DEVELOPMENT AUTHORITY, GANDHINAGAR DRAFT MASTER PLAN

BASE MAP

DRAFT MASTER PLAN (COP) SUBMITTED U/S 15 (J)(ii) AND 17 OF THE GSIR ACT-2009 AND U/S 16

OF THE GTP & UD ACT-1976

MANDALB· ECHARAJISPECIAL INVESTMENT

REGIONAL DEVELOPMENT AUTHORITY.

GANDHINAGAR

MBSIRDA

LEGEND

MBSIR BOUNDARY

.. ..........j DISTRICT BOUNDARY

E--- J TALUKABOUNDARY

...............J VILLAGE BOUNDARY

GAMTAL

l1J SURVEY NUMBER BOUNDARY

STATE HIGHWAY

RIVER

.. JWATERBODY

EXISTING RAILWAY LINE

l--=:::J MAJOR DISTRICT ROAD (MDR)

OTHER DISTRICT ROAD (OCR)

f=3OTHER VILLAGE ROAD

NARMADA BRANCH CANAL

L NATURAL DRAIN

NOT TO SCALE

No part of this plarv'document may be reproduced without prior permissOO in writing from MBSIRDA. This plan should not be used for measurements.

3-2, Base Map, MBSIR

MBSIRDA 231 Page

Page 223: SIR issued by the MoEF&CC · Form 1 Proposed Mandal Becharaji Special Investment Region in Ahmedabad and Mehsana District, Gujarat ===== May 2018 Page 1 of 2

MBSIRDA 24|P a g e

Master Plan – MBSIR Cluster B Development Plan

3.2. Target Sector Identification

GIDB has been proactive to develop MBSIR as a world class automobile and manufacturing hub with well

supported infrastructure and civic amenities. In the initial stages, GIDB undertook an exercise to access

industrial development potential along with conceptual planning. The concept plan prepared focused on

following components:

Identification of the target sector and market assessment for industrial development

Preliminary environmental and social assessment of the region

Development needs and conceptual planning

Development strategy in sync with the vision of SIR

Infrastructure Master Plan

Implementation model

Based on the market assessment of industrial scenario and Industrial Manufacturing Zone Policy by GIDB,

potential industrial sector for MBSIR have been identified. Aiming to reduce the SIR’s carbon footprint the

proposed mix is of non-polluting and non-hazardous industries as per standards set by Ministry of

Environment & Forests, Government of India.

3.2.1. Parameters for identification of sectors for SIR

Potential sectors have been identified based the below mentioned parameters:

Prominent presence of industrial sector

Anchor tenant and its supplier

Resource availability

Expression of interests

Environmental considerations

Prominent presence of industrial sector

The region is primarily based on agriculture and does not show prominent presence of any industrial

sectors, except proposed MSIL plant. The considerations related to proposed automobile plant will be

taken care of under the head of anchor tenant and its suppliers.

Anchor tenant and its suppliers

MSIL is one of the automobile anchor tenants in the region. Cluster of its suppliers linking to different

sectors hold position in the hierarchy. Technical heavy engineering and Light engineering including metal &

alloy product form a direct link with the anchor unit and form an integral part of the chain. Electronics products

are a part of the assembly line and are directly related to the design element of the vehicle. The auto

components produced under this sector are specifically designed, keeping in mind the end product. Rubber

products and Glass & fiber suppliers have a wide range of products for various Tier 1 or auto manufacturers.

The product supply chain is spread over the country and has several market links. Hence dedicated rubber

and glass units for MSIL have been considered to come up under service and ancillary industries. Logistics

is directly linked to the supply chain and plays a key role.

Page 224: SIR issued by the MoEF&CC · Form 1 Proposed Mandal Becharaji Special Investment Region in Ahmedabad and Mehsana District, Gujarat ===== May 2018 Page 1 of 2

MBSIRDA 25|P a g e

Master Plan – MBSIR Cluster B Development Plan

Resource availability

Sectors with focus on the available local raw material from the natural resource base have advantage to bring

benefit to the local economy. These sectors not only induce growth in the local economy, but hold potential

to expand as export oriented industries.

Expression of interests

MOUs have been signed during Vibrant Gujarat 2011 for Ahmedabad, Mehsana and Surendranagar districts

wherein investments of Rs. 1,17,057 crore have been proposed with an estimated employment generation of

more than 7 lakh. Sectors such as automobile, engineering, knowledge & skill development and tourism have

relative potential investment interest in the region which may be channelised to the proposed SIR.

Environmental considerations

Aiming to reduce the SIR’s carbon footprint and promote primary economic sectors; land under agriculture

is considered as one of the economic activities in the SIR. Proposed industrial mix should be non polluting

or less polluting as per standards set by Ministry of Environment & Forests, Government of India.

3.2.2. Identified sectors

Based on the potential of the region, the investment scenario and thrust of the Automobile sector the

following sectors have been identified in the proposed SIR:

Automobile industry

Auto-component Vendor park consisting-

o Heavy engineering

o Light engineering including metal & alloy product

o Electronics

o Service & Ancillary

o Non Polluting industries including Information Technology

Logistics

Further based on the key stakeholder suggestions and reference to the National Manufacturing Zone

Policy, following sectors have also been included in the:

Precision engineering

Wind power equipment manufacturing

Solar power equipment manufacturing

Emerging sector in Automobile sector viz. Electronic Systems Design and Manufacturing (ESDM)

Apart from above Information Technology sectors have also been proposed.

In accordance with the SIR policy and Market assessment for industrial development undertaken during

concept plan preparation it was suggested that around 35 to 40 % of total land area under SIR will be required

for industrial activities.

Page 225: SIR issued by the MoEF&CC · Form 1 Proposed Mandal Becharaji Special Investment Region in Ahmedabad and Mehsana District, Gujarat ===== May 2018 Page 1 of 2

MBSIRDA 26|P a g e

Master Plan – MBSIR Cluster B Development Plan

3.3. Sustainable Population

3.3.1. Employment generation

Direct employment to be engaged in industries is calculated from sector wise ratios for workers per

hectare. SIR based non industrial components of area are also expected to generate employment to serve the

city population. This indirect employment from commercial, institutional and informal sectors is assumed

to be 1:1.44 (as per UDPFI) of the direct employment. Direct employment generated from Industries proposed

is around 1.25 lakh employees. The total employment (both direct & indirect), by the

proposed industrial area and non industrial setups is projected to be about 3.04 lakhs.

Sr. No Parameter Estimated Number

1 Direct Employment 1,25,000

2 Indirect Employment 1,79,500

3 Total Employment 3,04,500

Table 3-1, Employment generation in MBSIR

3.3.2. Floating Employment

Out of the total employment generated in Special Investment Region, 80% is proposed to reside within SIR

developed residential area, while the rest 20% is assumed as the floating population. Existing urban hubs such

as Mehsana, Kadi, Sanand and Ahmedabad are residential towns which will provide human resource to the

SIR. The residing population % has been proposed to be on higher side considering the fact that

infrastructure shall be developed for catering to maximum requirement.

Sr. No Parameter Estimated Number

1 Floating Employment (20%) 60,900

2 Residing Employment (80%) 2,43,600

3 Total Employment (100%) 3,04,500

Table 3-2, Floating Employment

3.3.3. Population supported by MBSIR

The residing employment is proposed to settle in the SIR. An average family size of 3 has been considered

for each employment generated (considering Gujarat Dependency ratio of 1:2). It is assumed that the existing

Gamtal population (0.12 Lakhs as per census 2001) will increase at a faster growth rate due to the induced

economic growth by the SIR. Rural population projected for 2040 is about 0.17lakh (annual growth rate of

0.82% is considered as per Concept Report for MBSIR). While the residing population calculated from

total employment in the SIR is assumed to be around 7.29 lakh. Total population that will be

supported by employment generation from SIR will be around 9.11 lakh for 2040.

Sr. No Parameter Estimated Number

1 Residing Population (2040) 7,29,200

2 Gamtal Population (2040) 17,000

3 Floating Population dependent on MBSIR (2040) 1,82,300

4 Total Population supported by MBSIR (2040) 9,11,500

Table 3-3, Total Population supported by MBSIR

Page 226: SIR issued by the MoEF&CC · Form 1 Proposed Mandal Becharaji Special Investment Region in Ahmedabad and Mehsana District, Gujarat ===== May 2018 Page 1 of 2

MBSIRDA 27|P a g e

Master Plan – MBSIR Cluster B Development Plan

3.4. Vision

“To develop a smart industrial city with concepts of reduce, recycle, reuse and efficient transportation

network”

3.5. Planning Principles

The Draft Master plan is based on the application of spatial planning principles that ensure a consistent and coherent urban structure while providing flexible and economic development.

The specific concerns that MBSIR plan addresses include:

Response to site topography & Environmental features

Land use integration

Integration of the canal network

Integration of the existing village settlement

Road network to facilitate efficient freight and public transportation movement

3.5.1. Response to Site topography & Environmental features

The site of MBSIR is predominantly flat. The natural ground slope is from North East to South West

direction. Existing natural drains also follow the same slopes. As a response towards site topography major

road network has been aligned along the direction of slopes. For developing the storm water drainage,

catchment areas have been analyzed. This will economies the infrastructure costs while minimizing the impact

on environment. For environmental conservation, it is proposed that recreation, sports and entrainment

zones are developed around water bodies allowing development of public parks and gardens.

3.5.2. Land use integration

The Plan proposes that all industrial areas are located relatively close and accessible from residential areas,

to minimise the home to work daily commute. The main industrial and logistics zones are all located centrally

on either side of the truck priority road and the proposed expressway. Development of Knowledge and IT zone

along side Recreation, Sports and Entertainment zone further integrates the land uses.

3.5.3. Integration of Canal Network

The region being within the SSNL command area has extensive network of SSNNL canals. With respect to

the large industrial development in the SIR it becomes imperative to integrate the network of the branch

canals with the planned development. MBSIR has 2 SSNNL branch canal passing through it that have a

potential to be developed as public places. It is proposed to develop roads along the branch canals while

promoting mixed use activities along with linear greens. Mixed use development comprising commercial

facilities, recreation, residential will facilitate development of vibrant public spaces. In order to develop

coherent public realm along the canal, urban design guidelines have been proposed in the plan.

3.5.4. Integration of existing village settlements

MBSIR includes 8 village settlements within its boundary. In order to allow each village to expand naturally

at its own pace buffer zones have been proposed around each settlement. The role of the buffer is to allow

development while creating a transition zone between Village settlement and High intensity urban

development adjoining it.

Page 227: SIR issued by the MoEF&CC · Form 1 Proposed Mandal Becharaji Special Investment Region in Ahmedabad and Mehsana District, Gujarat ===== May 2018 Page 1 of 2

MBSIRDA 28|P a g e

Master Plan – MBSIR Cluster B Development Plan

3.5.5. Road network to facilitate efficient freight and public transportation movement

The regional connectivity in the MBSIR is strengthened through the provision of 90m wide express corridor

with grade separated interchanges at key locations. The expressway to the SIR will allow speedy movement

of cargo. The road network in the SIR is a combination of rectangular grid and loop roads. The grids are

planned on a size of 800 Mt. x 1200 Mt. to promote development of walkable and cycle able

neighborhoods.

Page 228: SIR issued by the MoEF&CC · Form 1 Proposed Mandal Becharaji Special Investment Region in Ahmedabad and Mehsana District, Gujarat ===== May 2018 Page 1 of 2

MBSIRDA 29|P a g e

Master Plan – MBSIR Cluster B Development Plan

3.6. Land Use Proposal

The Land use proposal is envisioned to promote economically vibrant and environmentally sustainable

Industrial city with a good quality of life. The land use proposals area spread across below mentioned zones

Industrial

Logistics

Knowledge & IT

Residential

Affordable Housing

High Access Corridor

Mixed Use

Village Buffer

Recreation, Sports and Entertainment

Page 229: SIR issued by the MoEF&CC · Form 1 Proposed Mandal Becharaji Special Investment Region in Ahmedabad and Mehsana District, Gujarat ===== May 2018 Page 1 of 2

MBSIRDA 30|P a g e

Master Plan – MBSIR Cluster B Development Plan

3.6.1. Industrial

3-3, Industrial zone

The industrial zones are planned strategically along the express corridor to ensure smooth movement of

freight within the SIR. The industrial zones are flanked by Residential, Mixed use, Knowledge and IT zones

on both sides. In context with regional connectivity and the proposed road network one interconnected

industrial nodes is envisaged within the SIR. A total of 28.58 sq. km. (27.99%) is been proposed to be

developed as the industrial zone in the MBSIR.

Sr.No. Industrial Nodes near Anchor industry

Regional Connectivity (roads)

Railways

1 Near Hansalpur Intersection of SH 7 and SH 19 near Hansalpur

Meter gauge railway connecting Patan and Kadi passes through Bechraji

(Proposal for converting it to broad gauge already passed in railway budget 2013)

Table 3-4, Major Industrial Nodes

Page 230: SIR issued by the MoEF&CC · Form 1 Proposed Mandal Becharaji Special Investment Region in Ahmedabad and Mehsana District, Gujarat ===== May 2018 Page 1 of 2

MBSIRDA 31|P a g e

Master Plan – MBSIR Cluster B Development Plan

3.6.2. Logistics

L1

L2

3-4, Logistic zone

Industrial zones are supported by strategically located logistics parks in the SIR. The value enhancement

due to presence of Logistic parks within the Industrial zones will be in terms storage and handling of freight.

The logistics parks are located along Express corridor and proposed Railway sidings.

Within the MBSIR two logistic zones are planned along the main express highway.

Sr. No. Logistics park AREA (Sq, Km,))

Location

1 L2 1.00 Proposed express corridor near SH-133(Proximity to Ughroj)

Table 3-5, Location of Logistic zone

Page 231: SIR issued by the MoEF&CC · Form 1 Proposed Mandal Becharaji Special Investment Region in Ahmedabad and Mehsana District, Gujarat ===== May 2018 Page 1 of 2

MBSIRDA 32|P a g e

Master Plan – MBSIR Cluster B Development Plan

3.6.3. Knowledge and IT

3-5, Knowledge and IT zone

A Knowledge and IT zone has been proposed within SIR with a view to facilitate development of research

centres, Educational Institutes and Universities along with IT industries. The Knowledge and IT zone is planned

in surrounding of a non perennial water body in Sitapur village. The total land area allocated for the

Knowledge and IT zone is around 3.69 sq. km. (3.61%). The area proposed for Knowledge and IT has been

envisaged to support all the industrial centres proposed in the state with skilled labour force.

Page 232: SIR issued by the MoEF&CC · Form 1 Proposed Mandal Becharaji Special Investment Region in Ahmedabad and Mehsana District, Gujarat ===== May 2018 Page 1 of 2

MBSIRDA 33|P a g e

Master Plan – MBSIR Cluster B Development Plan

3.6.4. Residential

3-6, Residential zone

The residential zones within the MBSIR are planned along mix use & industrial zones. Residential development

will also be allowed in knowledge and IT Zone and Mixed use zones. The total land area allocated for the

Residential is around 31.31 sq. km. (30.67%).In addition to this around 0.60 sq. km. (0.59%) land will be

occupied by existing villages.

Page 233: SIR issued by the MoEF&CC · Form 1 Proposed Mandal Becharaji Special Investment Region in Ahmedabad and Mehsana District, Gujarat ===== May 2018 Page 1 of 2

MBSIRDA 34|P a g e

Master Plan – MBSIR Cluster B Development Plan

3.6.5. Affordable Housing

3-7, Affordable housing zone

The Affordable Housing zones are proposed in the village of Hansalpur and Sitapur of MBSIR. The total land

area allocated for the Affordable housing Zone is around 3.82 sq. km. (3.75%).

Page 234: SIR issued by the MoEF&CC · Form 1 Proposed Mandal Becharaji Special Investment Region in Ahmedabad and Mehsana District, Gujarat ===== May 2018 Page 1 of 2

MBSIRDA 35|P a g e

Master Plan – MBSIR Cluster B Development Plan

3.6.6. High Access Corridor

3-8, High Access Corridor

With a view to support higher densities and transit oriented development in MBSIR it is proposed to

develop mixed use corridor along the 60 & 45 m RoW. This zone is predominantly planned between residential

and industrial zones and will facilitate mixed uses including commercial, offices, recreation, community and

residential. A total of 9.46 sq. km. (9.27%) is proposed under this zone.

Page 235: SIR issued by the MoEF&CC · Form 1 Proposed Mandal Becharaji Special Investment Region in Ahmedabad and Mehsana District, Gujarat ===== May 2018 Page 1 of 2

MBSIRDA 36|P a g e

Master Plan – MBSIR Cluster B Development Plan

3.6.7. Mixed Use

3-9, Mixed Use

There are two SSNNL branch canal passing through the proposed MBSIR. The areas along the branch canals

have a potential to be developed as large public spaces. Mixed land use zone has been proposed along the

two branch canals. Mixed use development comprising commercial facilities, recreation, residential along

with linear green zone will facilitate development of vibrant public spaces. Around 3.76 sq.km (3.68%) of area

is proposed under mixed use zone along the branch canals.

Page 236: SIR issued by the MoEF&CC · Form 1 Proposed Mandal Becharaji Special Investment Region in Ahmedabad and Mehsana District, Gujarat ===== May 2018 Page 1 of 2

MBSIRDA 37|P a g e

Master Plan – MBSIR Cluster B Development Plan

3.6.8. Recreation, Sports and Entertainment

3-10, Recreation, Sports and Entertainment zone

Around 5.79 % of total land area is proposed for development under recreation, sports and entertainment

zone. This zone will allow development of botanical gardens, nature parks, sports complexes etc. It is

strategically planned along the periphery of lake, natural drain and canal. This zone will benefit from the

presence of institutional development in knowledge and IT zone.

Page 237: SIR issued by the MoEF&CC · Form 1 Proposed Mandal Becharaji Special Investment Region in Ahmedabad and Mehsana District, Gujarat ===== May 2018 Page 1 of 2

MBSIRDA 38|P a g e

Master Plan – MBSIR Cluster B Development Plan

3.6.9. Provision of village buffer

3-11, Village Buffer zone

MBSIR has 8 villages within the SIR. The Draft Master plan makes a provision for village integration to

accommodate the growth in these settlements by constituting village buffer zones of 100m and 200m around

each settlement. The buffer has specific regulations as per the GDCR. Residential, commercial and public

facilities will be allowed in this zone.

Page 238: SIR issued by the MoEF&CC · Form 1 Proposed Mandal Becharaji Special Investment Region in Ahmedabad and Mehsana District, Gujarat ===== May 2018 Page 1 of 2

(

J

M a s t e r Plan

MANDAL-BECHARAJISPECIAL INVESTMENT REGIONAL DEVELOPMENT AUTHORITY, GANDHINAGAR DRAFT M A S T E R PLAN

r-- MBSRI BOUNDARY

f------- ------- DISTRICT BOUNDARY

TALUKA BOUNDARY

L--------- VILLAGE BOUNDARY

• GAMTAL

SURVEY NUMBER BOUNDARY

"i:J WATERBODY

EXISTING RAILWAY LINE

PROPOSED RAILWAY LINE

PROPOSED ROAD

MAJOR DISTRICT ROAD (MDR)

OTHER DISTRICT ROAD (ODR)

OTHER VILLAGE ROAD

-- -NARMADA BRANCH CANAL

NATURAL DRAIN

MSIL & AUTOMOBILE ANCHOR

- VILLAGE BUFFER

- % Z Se"$rRTs RESIDENTIAL

N

-$ NOT TO SCALE

Selllor T-nPtannar CIIMMfMCUtive0100er MBS ROA MBSRI DA

Ct.alrman MBSIR: Oo!l

No part of this plan/document may be reproducedwithout prior permissionInwriting from MBSIRDA.This planshould not b& used for measurements.

3-12,Proposed Landuse plan,MBSIR

MBSIRDA 391 Page

Page 239: SIR issued by the MoEF&CC · Form 1 Proposed Mandal Becharaji Special Investment Region in Ahmedabad and Mehsana District, Gujarat ===== May 2018 Page 1 of 2

MBSIRDA 40|P a g e

Master Plan – MBSIR Cluster B Development Plan

Table 3-6, Area Statement MBSIR

Proposed Land Use Comprehensive

Area (sq km) Area (%)

Industrial 28.58 27.99

Logistics 2.10 2.05

Knowledge & IT 3.69 3.61

Residential 31.31 30.67

Affordable Housing 3.82 3.75

High Access Corridor 9.46 9.27

Mixed Use 3.76 3.68

Village Buffer 1.91 1.88

Recreation, Sports and Entertainment 5.91 5.79

Proposed Roads and Rail 7.17 7.02

Total Urbanizable Area (A) 97.71 95.70

River 0.27 0.27

SSNL Branch Canal 0.28 0.27

Water bodies 3.24 3.17

Gamtal 0.60 0.59

Total Non Urbanizable Area (B) 4.39 4.30

Total SIR Area (A + B) 102.10 100.00

Page 240: SIR issued by the MoEF&CC · Form 1 Proposed Mandal Becharaji Special Investment Region in Ahmedabad and Mehsana District, Gujarat ===== May 2018 Page 1 of 2

MBSIRDA 41|P a g e

Master Plan – MBSIR Cluster B Development Plan

3.7. Road and Rail proposals

3.7.1. Proposed Road network

The road network in the SIR is a combination of rectangular grid and loop roads. The grids are planned on a

size of 800 Mt. x 1200 Mt. to promote development of walkable and cycleable neighbourhoods.

The proposed road hierarchy in the Draft Master Plan is:

90 Mt ROW - Express corridor

60, 45 & 30 Mt ROW - Arterial roads

Roads lower than 30 Mt. ROW in the SIR will be proposed during preparation of town planning schemes.

90 m ROW Express Corridor

The Plan intends to develop a transport corridor that contain a high capacity, limited access expressway,

with grade separated interchanges at key locations. The proposed expressway would commence from

Ughroj in the South East of the proposed SIR boundary on SH-133 and meet SH-7 at Sitapur Village and then

head toward Hansalpur - Becharaji in the North. The proposed expressway would be of 90m Right of Way

(RoW) having 3-lane carriageway whereas the remaining width of the proposed RoW would be utilized for

other road infrastructure network.

Page 241: SIR issued by the MoEF&CC · Form 1 Proposed Mandal Becharaji Special Investment Region in Ahmedabad and Mehsana District, Gujarat ===== May 2018 Page 1 of 2

Master Plan

MBSIRDA 42|P a g e

3-13, 90 mt. Row, Road Section

3-14, 60 mt. Row, Road Section

Page 242: SIR issued by the MoEF&CC · Form 1 Proposed Mandal Becharaji Special Investment Region in Ahmedabad and Mehsana District, Gujarat ===== May 2018 Page 1 of 2

Master Plan

MBSIRDA 43|P a g e

3-15, 45 mt. Row, Road Section

3-16, 30 mt. Row, Road Section

Page 243: SIR issued by the MoEF&CC · Form 1 Proposed Mandal Becharaji Special Investment Region in Ahmedabad and Mehsana District, Gujarat ===== May 2018 Page 1 of 2

MBSIRDA 44|P a g e

Master Plan – MBSIR Cluster B Development Plan

Arterial Road (60m RoW):

These roads have been proposed with 3-lanes consisting of service road on both sides with cycle track &

pedestrian path along with necessary supporting infrastructure. The proposed road may be strengthened and

widened to 6-lanes in the future as the traffic grows with time.

Arterial Road (45m RoW):

These roads have been proposed as a loop road with 3-lane carriageway and may be strengthened and

widened up to 6-lanes at a later stage. This road is planned to function as a public transit corridor with

mixed use development along if and connecting various residential and industrial sectors.

Sub Arterial (30, m RoW):

These roads would be proposed at detailed planning stage would be the key roads for local traffic movement.

They would primarily serve the non-processing area traffic and act as a feeder to the proposed

45m RoW.

Internal roads shall be planned & designed in such a way that maximum of existing alignment of VR, MDR,

ODR category roads get utilized while preparing Town Planning schemes for the proposed SIR or during

detail planning of the region.

Sr.No Road Type RoW (Mt.) Total Length (km)

1 Express Way 90 14.6

2 Arterial road 60 23.9

3 Arterial road 45 42.8

4 Sub Arterial road 30 88.0

Total 170.0

Table 3-7, Proposed Road Network

Page 244: SIR issued by the MoEF&CC · Form 1 Proposed Mandal Becharaji Special Investment Region in Ahmedabad and Mehsana District, Gujarat ===== May 2018 Page 1 of 2

Master Plan

MANDAL-BECHARAJI SPECIAL INVESTMENT REGIONAL DEVELOPMENT AUTHORITY, GANDHINAGAR DRAFT MASTER PLAN

PROPOSED ROAD NETWORK

PLAN-2040

LEGEN D

MBSIR BOUNDARY

t::::=j 90 MT. PROPOSED ROAD

E::::::3 60 MT. PROPOSED ROAD

E::::::3 45 MT. PROPOSED ROAD

E::::::3 30 MT. PROPOSED ROAD

----- -

N

* NOT TO SCALE

SeruorTowi\ PIIMel' CNeff.JiecotwoiOMcef Cnalmoan

MBSIRDA MBSIROA !.IBSIRDA

MANDAL - BECHARAJISPECIAL INVESTMENT

REGIONAL DEVELOPMENT AUTHORITY.

GANDHINAGAR

MBSIRDA

No part of this plan/document may be reJ)f"oduced withovt pn.,..- pennissiOI"' in writinc from MBSIROA This plan should not be used f or- meuur-ements

3-17, Proposed Road Network, MBSIR

MBSIRDA 4SI Page

Page 245: SIR issued by the MoEF&CC · Form 1 Proposed Mandal Becharaji Special Investment Region in Ahmedabad and Mehsana District, Gujarat ===== May 2018 Page 1 of 2

MBSIRDA 46|P a g e

Master Plan – MBSIR Cluster B Development Plan

3.7.2. Cross Drainage Works & Flyovers

Along all the proposed roads, careful consideration has been given to planning of cross drainage works and

flyovers. Minor bridges and Major bridges have been considered at water crossing (Canals, minor rivers,

etc.) along the express highway. Pipe culverts, minor bridges have been considered for other roads at suitable

intervals as per standard requirements. Types of bridges, culverts and flyovers shall be worked out during

detail engineering based on detail soil investigation, hydraulic requirements, performance requirement, and

techno economic feasibility as per the prevailing/related standard codes of practice.

3.7.3. Proposed Railway Siding Infrastructure

It is assumed that considerable passenger traffic would be generated with the development of the

proposed SIR. Also, the proposed SIR would be primarily developed as an Auto and Auto-ancillary Hub, as a

result there would be tremendous freight traffic and appropriate number of railway sidings would be required.

Detailed studies need to be carried out to understand and assess the required amount of railway sidings and

supporting infrastructure. A tentative railway siding plan is laid on the Master Plan and

accordingly the lengths are derived and considered for cost estimations.

Sr. No.

Description

Length (km) Cost

Rs (Crores)

1 Railway Line 1- North 8.3 83

2 Railway Line 2 – South 13.6 136

Total 21.9 219

Table 3-8, Proposed Rail Network

3.8. Infrastructure Proposals

3.8.1. Proposal for Water Supply Scheme

The total water demand by the end of the proposed SIR would be 269 mLd & fresh water demand is 161 mLd.

The source for the estimated water demand is proposed from the existing Narmada canal. The Water demand

is worked out as per norms laid down by Central Public Health & Environmental Engineering Organization,

Ministry of Urban Development, GoI, (CPHEEO). The Off-take point is proposed on Zinzuwada Branch of

Narmada Main Canal. A detailed water supply scheme with water treatment plants, clear water pumping

station, water distribution system and network is proposed in the Draft Master Plan.

Off-take point on Zinzuwada Branch of Narmada Main Canal

Off-take point shall be near the first cross-regulator on Zinzuwada Branch Canal. The full drawing capacity

of this off-take point may be kept as 269 mLd. The RCC duct with screen & gates will be constructed near

canal for drawing 269 mLd capacity of Water.

Raw Water Pumping Station

Raw Water Sump and Pump house for 2 hrs. Storage Capacity (civil work) for 269 mLd water requirement will be constructed near off-take point for pumping water into Water Treatment Plant. Pumping machineries and all related Electrical-Mechanical provision will be installed as per requirement with stand by provisions.

Page 246: SIR issued by the MoEF&CC · Form 1 Proposed Mandal Becharaji Special Investment Region in Ahmedabad and Mehsana District, Gujarat ===== May 2018 Page 1 of 2

MBSIRDA 47|P a g e

Master Plan – MBSIR Cluster B Development Plan

Water Treatment Plant

The Raw Water from Canal will be conveyed to the proposed Conventional Treatment Plant. 161 mLd capacity conventional WTP will be constructed at Canal for Phase-2 as when required.

The type of treatment process usually depends on the quality of raw water required quality after treatment. Detail of treatment Unit & its process is given as under:

Sr. No. Treatment Unit Process

1 Cascade Aerator To add oxygen to water for imparting freshness. Expulsion of CO2, H2S for removal of taste & odour. For Removal of impurities like Iron & Manganese etc.

2 Flash Mixer For rapid mixing of coagulant in water to help in formation of micro- flocks.

3 Sedimentation Tank To remove readily settling sediments such as sand, silt, turbidity, iron etc.

4 Rapid Sand Filter Unit

To remove suspended & colloidal impurities such as microorganisms, silt clay etc.

5 Chlorination Unit For destruction or inactivation of pathogens, bacteria, helminthic etc.

Table 3-9, Treatment units for Water Supply

Flow Diagram for Conventional Water Treatment Plant for SIR is as under: Clear Water Pumping Station: After providing necessary treatment, treated Water will be stored in

underground RCC Storage Reservoir. RCC reservoir shall be provided with compartment with necessary

gate / valve arrangement & it will be constructed as per phase-wise requirement. Necessary pumping

machinery and all related Electrical & Mechanical equipments with necessary stand by provisions shall be

provided to pump treated water to various water distribution stations.

Page 247: SIR issued by the MoEF&CC · Form 1 Proposed Mandal Becharaji Special Investment Region in Ahmedabad and Mehsana District, Gujarat ===== May 2018 Page 1 of 2

MBSIRDA 48|P a g e

Master Plan – MBSIR Cluster B Development Plan

Clear Water Trunk Main: Clear Water Trunk Main of Ductile Iron Pipe (DI K-9) will be laid from clear

water pumping station to various distribution stations. Ductile Iron pipe of required size with inside

lining & outside coating will be laid along with sluice valve/ butterfly valve for inspection purpose, scour

valve for maintenance purpose & air valve to control surge pressure as per design. Proper encasing for

minor/major crossings & Thrust block at deviation angles will be provided for proper functioning of the

pipeline.

Water Distribution Stations: Water will be pumped from clear water pumping station to various water

distribution stations in 22 hrs. & water will be supplied to each distribution zone 24 x 7. RCC sump with

pump house to accommodate pumping m/c & related E&M equipments will be constructed. The

pumping Head of machinery will be kept to maintain minimum 7 to 12 Mt. residual head at consumer

end.

Distribution Network: The purpose of distribution system is to convey whole some water to the

consumer at adequate residual pressure in sufficient quantity at convenient points. Water is made

available to consumer either by continuous system or through intermittent system.

In SIR region water supply distribution will be 24x7, and all connections will be metered. Continuous

water supply is proposed for following reasons.

In intermittent water supply investment for constructing storage, pumping machinery distribution

pipeline network will be more.

No water from an intermittent water supply system is safe to drink, because under vacuum

conditions foul water can be drawn into the pipes. Hence higher dues of chlorine are needed.

Compared with 24 hours supply, intermittent supply uses more water.

In intermittent supply, in case of fire, immediate supply is unavailable.

Due to frequent operations of valves for intermittent supply frequent wear & tear on valves.

For proper operation & maintenance more manpower is needed in intermittent supply.

In the proposed SIR, Ductile Iron pipe will be laid for proper water supply distribution with all valve &

fittings etc. supply enough quantity of water to each consumer with required residual head & pressure.

Page 248: SIR issued by the MoEF&CC · Form 1 Proposed Mandal Becharaji Special Investment Region in Ahmedabad and Mehsana District, Gujarat ===== May 2018 Page 1 of 2

MBSIRDA 49|P a g e

Master Plan – MBSIR Cluster B Development Plan

3-18, Water Supply Network

3.8.2. Proposal for Sewerage Scheme

At Present there is no underground sewerage System in the SIR area and the general practice is of on-site

disposal through either soak-pit or release in open drains leading to contamination of ground water & the

environment. As calculated, 94 mLd of sewage flow will be generated at the end of complete development of

proposed SIR. For proper collection & disposal of sewage, proper sewerage Network will be laid. A detailed

sewerage and drainage scheme is designed keeping in mind the CPHEEO guidelines.

Sewage Collection Network

The pipe line is designed for pipe running 80% full capacity from consideration of ventilation in sewers. The

flow velocity in the sewers is such that the suspended materials in sewage do not get silted up i.e. the velocity

will be such as cause automatic self cleaning effect. Hence, sufficient gradient is provided in Sewage

Collection Network. Manholes i.e. Junction Manholes & Scrapper Manholes are provided for

Page 249: SIR issued by the MoEF&CC · Form 1 Proposed Mandal Becharaji Special Investment Region in Ahmedabad and Mehsana District, Gujarat ===== May 2018 Page 1 of 2

MBSIRDA 50|P a g e

Master Plan – MBSIR Cluster B Development Plan

inspection, cleaning & other maintenance at 30 m. to 45 m. c/c. with a removable cover to with stand

traffic loads in sewers. Hence approximately 172 Km. length of Sewerage Network is proposed.

Sewage Pumping Stations

Sewage Pumping Stations is proposed for pumping the sewage from a deeper sewer to a shallow sewer or for

conveying Sewage to Sewage Treatment Plant. With respect to the large area of SIR, a numbers of

intermediates sewage pumping stations are proposed constructed. It is proposed to have 17 sewage pumping

stations based on the topography, depth of sewer & Sewage flow.

Sewage Pumping Stations comprises of following units:

Units Purpose

Screen Chamber To trap the flooding matters which otherwise can lump in the impeller of the pump.

Grit Chamber

Removal of grit at the sewage pumping station to safe guard the same from causing wearing of the pump impeller. Detroiters or grab-bucket is planned to be installed for removal of Grit.

Wet Well

It is provided in order to accommodate pumping machineries with enough working & stand by. Proper detention time in wet well should be provided. i.e. 5 to 30 min. of average flow.

Table 3-10, Sewage pumping station units

Sewage pumping stations is constructed in RCC with proper floor slopes, interior lining & water proofing for

resistance against H25, lighting & ventilation. All Electrical & Mechanical work including lifting

arrangement, D. G. Set etc. are installed for proper working of sewage pumping station. Pumping

machinery is planned to be installed in such a way that, sewage will be pumped in peak & lean period

Pumping Main

The economic size of pumping mains are worked out on peak flow volumes Pumping Main from Pumping

Station to Sewage Treatment Plant are laid for transporting the sewage in the inlet chamber of STP and D.I.

/ GRP pipe are provided with proper in lining & out-coating to prevent corrosion. Size of pipe depends on

length of pipe, depth of SPS, capital & Capitalized cost of pipe & pumping machinery. Pipe is provided with

proper cushion with air valves, sluice valves etc. for proper maintenance encasing are provided at major

crossing.

Sewage Treatment Plant

In MBSIR region, sewage is treated & reused after proper treatment. The waste water reuse will be applied

for various beneficial as stated:

Flushing, Washing, Gardening

Irrigation

Industrial process, washing etc.

Wastewater treatment processes can be categorized into the following three:

Physical process: Impurities are removed physically by screening, sedimentation, filtration, flotation,

absorption or adsorption or both, and centrifugation;

Page 250: SIR issued by the MoEF&CC · Form 1 Proposed Mandal Becharaji Special Investment Region in Ahmedabad and Mehsana District, Gujarat ===== May 2018 Page 1 of 2

MBSIRDA 51|P a g e

Master Plan – MBSIR Cluster B Development Plan

Chemical process: impurities are removed chemically through coagulation, absorption, oxidation-

reduction, disinfection, and ion-exchange;

Biological process: pollutants are removed using biological mechanisms, such as aerobic treatment,

anaerobic treatment and photosynthetic process (oxidation pond).

Conventional wastewater treatment consists of the following stages: Municipal wastewater treatment

facilities use combinations of physical, biological and chemical treatment technologies.

Preliminary and primary treatment: Preliminary and primary treatments are usually associated to

screening for the removal of debris and large solids, and sedimentation.

A secondary treatment: may utilize biological processes, such as stabilization ponds, trickling filter,

oxidation ditch, and activated sludge, which is then followed by sedimentation of biomass (sludge).

Tertiary treatment: It is ced treatment is an additional treatment for higher-level removal of

specific pollutants, such as nitrogen or phosphorus etc.

In SIR, the Total Sewage Generation will be 94 mLd. Two Sewage Treatment Plants are proposed for the

Scheme.

3-19, Sewage Network

Page 251: SIR issued by the MoEF&CC · Form 1 Proposed Mandal Becharaji Special Investment Region in Ahmedabad and Mehsana District, Gujarat ===== May 2018 Page 1 of 2

MBSIRDA 52|P a g e

Master Plan – MBSIR Cluster B Development Plan

3.8.3. Recycled Water System

The treated waste water through recycled pumping station is planned to be transferred to various recycled

water distribution stations that are constructed in same campus of fresh water distribution stations so that

operation & maintenance is easier. Recycled water pumping stations will be constructed with pump house

and pumping machinery will be installed to match with capacity of STPS.

Recycle water is supplied 24 x 7 same as fresh water supply. D. I. pipeline network is to be laid separately

with valves, valve chambers, encasing & thrust block etc. as per requirement.

Electrical & Mechanical work will be installed as per requirements

3-20, Recyle Water Network

Page 252: SIR issued by the MoEF&CC · Form 1 Proposed Mandal Becharaji Special Investment Region in Ahmedabad and Mehsana District, Gujarat ===== May 2018 Page 1 of 2

MBSIRDA 53|P a g e

Master Plan – MBSIR Cluster B Development Plan

3.8.4. Proposal for Storm Water Disposal System

In order to plan an effective design of storm water drainage system, several aspects are considered and the

entire region is evaluated with respect to storm water on parameters including topography & rainfall pattern.

Based on catchment area, co-efficient of run-off & rainfall intensity the storm flow is worked out to siphon

the storm flow from SIR. It is planned to provide Catch pit with pre-cast perforated Jali to catch the storm

water. Also 300 mm/450 mm dia. pipe are laid from catch pit to main storm water line at 30 to 45 m c/c.

R.C.C. storm water network are laid with Manholes at 30 m. /45 m. c/c for proper functioning & maintenance

of system. It is planned to dispose the storm water drain in natural drains/lakes and provide recharge wells

or rainwater harvesting structures, which results in the rise of ground water level of the area. Other than

recharging well, it is made compulsory that each building / industry should collect roof- top rain water in

the underground tank in their premises.

The capacity of underground tank should be kept based on roof-top area & annual rainfall of the area. This

collected rainwater can be used as fresh water after proper treatment & in rainy days which reduces the fresh

water demand.

3-21, Storm Water Disposal Scheme

Page 253: SIR issued by the MoEF&CC · Form 1 Proposed Mandal Becharaji Special Investment Region in Ahmedabad and Mehsana District, Gujarat ===== May 2018 Page 1 of 2

MBSIRDA 54|P a g e

Master Plan – MBSIR Cluster B Development Plan

3.8.5. Solid Waste Management Proposal

It is proposed to provide sanitary landfill site as a necessary and integral part of the solid waste

management solution for the proposed SIR area. Total land required for land.

Potential Landfill Site Identification

The selection criterion of landfill site is prima facie based on guidelines developed by Management of

Municipal waste as a first step of site assessment and investigation.

Accordingly, after stakeholder consultation, a site is planned to be identified for proposed landfill, which

includes area for engineered landfill operations, compost plant including segregation area and buffer zone.

Total tentative estimated cost of proposed solid waste management is around INR 68.14 Crores, including

collection storage, transportation, treatment and disposal facilities along with infrastructure cost.

3.8.6. Power

From the power demand projections, it is estimated that approximately 300 MW power is required for

industrial purpose whereas about 110 MW power is planned to be required for residential purpose. The

total estimated cost of the proposed power supply infrastructure is approximately INR 660 Crores. The

block cost is based on the preliminary information available and will be revised during detailed engineering

design stage. Cost estimation is done on the basis of details provided by GETCO and ball park costs.

Page 254: SIR issued by the MoEF&CC · Form 1 Proposed Mandal Becharaji Special Investment Region in Ahmedabad and Mehsana District, Gujarat ===== May 2018 Page 1 of 2

MBSIRDA 55|P a g e

Master Plan – MBSIR Cluster B Development Plan

3.8.7. Gas & Telecommunication

Following broad aspects related to the Gas infrastructure have been broadly discussed with the

Government of Gujarat.

Gujarat State Petroleum Corporation (GSPC) network runs in the vicinity of the proposed SIR.

In Phase – 2, GSPC network shall be extended from Kadi to Ughrojpura to serve the Auto Industries

and residential townships that would be developed in the proposed SIR.

Gas Supply Restrictions shall also be webbed by GSPC in above mentioned phases.

A Telecommunication and ICT Master Plan for the entire SIR area will be prepared separately. This will include

provision of the passive infrastructure like Optical Fibre Network and Mobile communication towers

along with the required Control Facilities. The ICT Master Plan will include the use of Information technology

for Public safety and security services, Education Services, Transportation services, Health care and Municipal

services.

Page 255: SIR issued by the MoEF&CC · Form 1 Proposed Mandal Becharaji Special Investment Region in Ahmedabad and Mehsana District, Gujarat ===== May 2018 Page 1 of 2

Master Plan – MBSIR Cluster B Development Plan

CHAPTER 4 IMPLEMENTATION STRATEGY

56

Page 256: SIR issued by the MoEF&CC · Form 1 Proposed Mandal Becharaji Special Investment Region in Ahmedabad and Mehsana District, Gujarat ===== May 2018 Page 1 of 2

MBSIRDA 57|P a g e

Master Plan – MBSIR Cluster B Development Plan

4. Implementation Strategy

4.1. Comprehensive guidelines for implementing the DP

Land is the key component of urban development and the formulation of an effective and equitable land

procurement strategy is critical to the successful implementation of the Draft Master plan. There are, very

broadly, two approaches to land procurement; one through compulsory purchase with compensation under

the Land Acquisition Act, 1894 and the other through Town Planning Schemes under the Gujarat Town

Planning and Urban Development (GTPUD) Act, 1976.

4.1.1. Town Planning Schemes

The Government of Gujarat is preparing a Town Planning Schemes as per the Gujarat Town Planning & Urban

Development Act. 1976. Under this model, the development authority brings together a group of

landowners for the purpose of planning and a Town Planning Scheme for the area is prepared, laying out

the roads and plots for public and social amenities. The remaining land is reconstituted into final plots for the

original owners, with the size of the final plot in proportion to the size of the original plot, and its location as

close as possible to the original plot.

A town planning scheme under the provision of GTPUD Act, 1976 may be made in respect of any land which

is –

1. In the course of development

2. Likely to be used for development of residential, commercial, industrial etc.

3. Already built upon

Town Planning Scheme provides legislative support and finance for implementation. The fundamental

objective of the readjustment technique is to make land available for development at least cost to

development authorities and improve the environment effectively.

Town Planning Scheme is used to make a group of land holding in a planned manner. This is essentially

achieved by providing each unit with a public road access and regularizing the shape of each plot.

Compensation is paid to land owner of the land taken away for roads and public facilities. At the same

time, betterment charges known as incremental contribution are collected from each owner to the maximum

of 50 percent of the estimated increase in the land value after plot reconstitution. The funds so generated

are utilized for the development of infrastructure and common facilities within the scheme area.

The local planning agencies would be able to attain the dual objective of controlling haphazard growth as well

as the timely provision of physical infrastructure such as roads, sewers, water supply etc. and social

infrastructure like schools, hospitals, parks, open spaces etc., and social infrastructure burden. Because of

its self financing nature, Town Planning Schemes are also implemented in areas already developed, but

with lack of adequate infrastructure.

The increase in the land value resulting from the development accrues to the original owner whenever the

land is sold and developed for urban use. The advantages of this method from the development agency’s

point of view is that it does not have to acquire any land or bear the cost of infrastructure provision in the

long term.

Pooling models similar to the Gujarat Town Planning Scheme have been used in other countries, notably

Australia and Korea. Major benefits of this model are

Page 257: SIR issued by the MoEF&CC · Form 1 Proposed Mandal Becharaji Special Investment Region in Ahmedabad and Mehsana District, Gujarat ===== May 2018 Page 1 of 2

MBSIRDA 58|P a g e

Master Plan – MBSIR Cluster B Development Plan

It is a proven model in Gujarat

All the urban centres in the state are developed by this model

Minimum investment is required for development with this model

It is a win-win situation for both owners and administration

Land owners get maximum benefit in this model

Minimum litigations have been received in this model, in a span of 90 years since its first

implementation in the state

The model has a provision for development of physical as well as social infrastructure

Land owners will receive a finished land parcel with all physical and social infrastructure over a

period of time

It is a democratic approach for development of land

4.1.2. The Role of the Regional Development Authority

MBSIRDA will be responsible for the land management process. Specialist departments will be established

within the MBSIR to prepare Town Planning Schemes for the development of the MBSIR according to the Draft

Master plan. There have been a number of large urban development schemes undertaken elsewhere in India

over recent decades and a vast store of experience and expertise has been built up. MBSIRDA will call upon

this body of knowledge and pool of talent in putting together their team to implement the MBSIR project.

4.1.3. Public Consultation and Participation

A participatory approach to development is proposed to ensure that land development in the MBSIR proceeds

smoothly and is equitable to all sections of the community. Village Panchayats, land owners and land-less

labourers all need to be consulted and involved in the process of development through participatory forums.

Experienced and reputable development organizations and NGOs should be invited to advise and facilitate the

land procurement process.

Public consultation needs to be commenced at the earliest opportunity in order to inform the population of

the MBSIR of the Draft Master plan and the process of urban development. They should be informed on how

they can be involved in decision making and their rights as land owners, residents and agricultural workers.

MBSIRDA will prepare a phased land development programme. A committee comprising members of

MBSIRDA, State bodies such as land revenue department, infrastructure companies and village panchayats

representatives will be formed to oversee the land management process. The precise make up of this

committee and its rules and regulations will be determined by the Government of Gujarat in consultation with

project stakeholders, including industrial bodies and land owners.

4.2. Provision of various facilities in Master Plan through TP Schemes

4.2.1. Provision of Community Facilities

Provision of land for educational and amenities through TP Scheme mechanism should be as per the stated

norm of UDPFI for the required planned population of sector and neighborhood level.

Page 258: SIR issued by the MoEF&CC · Form 1 Proposed Mandal Becharaji Special Investment Region in Ahmedabad and Mehsana District, Gujarat ===== May 2018 Page 1 of 2

MBSIRDA 59|P a g e

Master Plan – MBSIR Cluster B Development Plan

In order to meet the demand for the projected population of 9.12 lakhs residing in MBSIR an extensive

range of community facilities are developed. MBSIR will largely be self contained in terms of health, education,

cultural, Government, sports and open space facilities. It will also support the existing village settlements

with the needed social infrastructure. The proposed land demand for community facilities

within the MBSIR as indicated in Table below

Facility Total Area Requirement (Ha)

Education 491

Health care facilities 72

Socio cultural centre 14

Other services 18

Table 4-1, Requirement of community facility for MBSIR

The provision norms are summarized in table given below,

Facility One Unit /

Population (as per UDPFI)

Area Requirement

per unit (Ha.)

Requirement of Facility (Number)

Pre Primary / Nursery School 2500 0.08 365

Primary School 2500 0.4 365

Senior Secondary School 7500 1.6 122

Integrated School without Hostel Facilities 100000 3.5 9

Integrated School with Hostel Facilities 100000 3.9 9

School for Handicapped 45000 0.5 20

College 125000 4 7

Technical Education Institutions

(considering industrial oriented city)

250000 4 4

TOTAL

General Hospital 250000 6 4

Intermediate Hospital (Category A) 100000 3.7 9

Intermediate Hospital (Category B) 1000000 1 1

Polyclinic 100000 0.3 9

Nursing Home 50000 0.3 18

Dispensary 15000 0.12 61

TOTAL

Socio Cultural Centre 1000000 15 1

Park / Garden etc. 1 0.0012

Police Station, Jail, Police line etc. 100000 1.5 9

Fire Station 200000 1 5 Table 4-2, Standards for Community Facility

Source: UDPFI Norms

Page 259: SIR issued by the MoEF&CC · Form 1 Proposed Mandal Becharaji Special Investment Region in Ahmedabad and Mehsana District, Gujarat ===== May 2018 Page 1 of 2

MBSIRDA 60|P a g e

Master Plan – MBSIR Cluster B Development Plan

4.2.2. Provision of Open spaces

The provision of sector and neighbourhood level parks and open spaces is to be taken care of through Town

Planning Scheme mechanism.

4.2.3. Developing public squares

In order to generate vibrant public realm in the city, it is recommended that the provision of amenities,

commercial and education facilities to be located near the junctions of 30m and 45m ROW arterial road or

major arterial nodes as public places in TP Scheme. It is also planned to develop and generate the public

service plots accommodating Bus stand, auto rickshaw and IPT at every 500m along the public transit

routes on main arterial roads.

4.2.4. Provision of Commercial

Provision of commercial retail and office facilities at sector and neighbourhood level in residential, mixed

use and knowledge & IT within MBSIR should be through TP Scheme mechanism. The provision norms are

summarized in table below, which indicates the various scales, intensity and type of commercial required

based on the population and sector size

Facility One Unit / Population (as per UDPFI)

Area Requirement per unit (Ha.)

Cluster centre 1000 0.022

Sector centre 1000 0.03

Community centre 1000 0.05

District centre 1000 0.088

Table 4-3, Requirement of commercial facility for MBSIR

Source: UDPFI Norms

4.2.5. Provision of pedestrian and bicycle routes and public transit system

1. It is proposed that the provision of adequate pedestrian, bicycle routes to be accommodated on

major arterials and sub arterials with road width above 15 m ROW in TP scheme.

2. Provision of non-vehicular access accommodating pedestrian and bicycle routes within the green

buffer space along the natural drains and canals in TP Scheme thus generating accessible green

network across the SIR.

3. It is proposed to provide service roads in the industrial area for all roads above 30m in TP Scheme.

4. It is proposed that the FAR norms and permissible uses along the proposed new roads and service

roads in the TP Scheme should adhere to the development control regulations provided in the DP.

5. Public Transit system in form of BRTS and Metro will be introduced as traffic demand increases.

Necessary provisions have been made in the plan in terms of road widths and sector sizes for the

same.

Page 260: SIR issued by the MoEF&CC · Form 1 Proposed Mandal Becharaji Special Investment Region in Ahmedabad and Mehsana District, Gujarat ===== May 2018 Page 1 of 2

Master Plan – MBSIR Cluster B Development Plan

CHAPTER 5 BROAD COST ESTIMATES

61

Page 261: SIR issued by the MoEF&CC · Form 1 Proposed Mandal Becharaji Special Investment Region in Ahmedabad and Mehsana District, Gujarat ===== May 2018 Page 1 of 2

MBSIRDA 62|P a g e

Master Plan – MBSIR Cluster B Development Plan

5. Broad Cost Estimates

Various infrastructure components like road, rail, water supply, sewage etc. have been proposed within and

outside proposed SIR. Schedule of rates (SORs) of GWSSB 2011-12 and R & B 2012-13 have been followed

to estimate cost of proposed infrastructure components. Overall cost of estimates are divided in two major

categories

External infrastructure components

Internal infrastructure components

5.1. External Infrastructure components

5.1.1. External Road Infrastructure

Sr. No.

Description Proposed Length

(Km.)

Service Lanes

(Nos.)

Block Cost (Crores)

1. SH-133 & SH-41 (Detroj to Adalaj via Kadi and Kalol) 49.70 6 (min.) 331.00

2. MDR (Becharaji to Mehsana) 31.00 6 206.46

3. SH-7 (Vithalapur to Viramgam) 27.00 4 43.20

4. SH-135 (Kadi to Sanand via Thol) 37.30 4 59.68

5. SH-55 (Becharaji to Radhanpur for direct connectivity to Mundra via Harij))

74.10 4 118.56

6. Proposed 90Mt. road for connectivity Sitapur to Ughroj

11.27 39.00

Total 230.37 797.90

Table 5-1, External Road Infrastructure

5.1.2. External Rail Infrastructure

Sr. No. Description Rail Length (Km.) Block Cost (Rs. Crores)

1. Becharaji- Katosan Gauge Conversion 24.70 247.00

Table 5-2, External Rail Infrastructure

5.1.3. Comprehensive - External Infrastructure

Sr. No. Description Block Cost

(Rs. Crores)

1 Proposed External Road Infrastructure 797.90

2 Proposed External railway Infrastructure 247.00

3 Water Supply 18.00

Total Cost 1062.90

Table 5-3, Comprehensive - External Infrastructure

Page 262: SIR issued by the MoEF&CC · Form 1 Proposed Mandal Becharaji Special Investment Region in Ahmedabad and Mehsana District, Gujarat ===== May 2018 Page 1 of 2

MBSIRDA 63|P a g e

Master Plan – MBSIR Cluster B Development Plan

5.2. Internal Infrastructure components

5.2.1. Internal Road Infrastructure

Sr. No. Road Width (R.O.W) in

Mt.

Total Length

(km)

Total Cost of Roads (Rs Cr)

Total Cost of ROB /Waterway Bridges/

Flyover (Rs Cr)

Total Cost

(Rs Cr)

1 90 15 141 760 901

2 60 24 120 60 180

3 45 43 216 120 336

5 30 88 381 280 661

Total 170 858 1220 2078

Table 5-4, Internal Road Infrastructure

5.2.2. Internal Rail Infrastructure

Sr. No.

Description Length (km) Cost

(Rs Crores)

1 Railway Line 1- North 8.3 83

2 Railway Line 2 – South 13.6 136

Total 21.9 219

Table 5-5, Internal Rail Infrastructure

Page 263: SIR issued by the MoEF&CC · Form 1 Proposed Mandal Becharaji Special Investment Region in Ahmedabad and Mehsana District, Gujarat ===== May 2018 Page 1 of 2

MBSIRDA 64|P a g e

Master Plan – MBSIR Cluster B Development Plan

5.2.3. Water Supply

SR. NO. COMPONENT CAPACITY COST (RS. IN LACS)

1 Head Work at Narmada Main Canal Rs. 200 lacs

2 Water Treatment Plant 161 mld Rs. 4830 lacs

3 Clear Water Pumping Station 161 mld Rs. 878 lacs

4 Clear Water Trunk Main From WTP at Narmada Canal To Boundary Of Each Phase (MS Pipe)

1600 mm dia (161 mld capacity) (L-22KM)

Rs. 8313 lacs

5

Clear Water Trunk Main To Various WDS

Rs. 10047 lacs

6 Water Distribution Stations 27 NOS. Rs. 2970 lacs

7 Water Distribution Network (DI K-7) 170 Km Rs. 4522 lacs

Total Rs. 31760 lacs

Rs. 317.60 Crore Table 5-6, Water Supply

5.2.4. Sewage System

NO. COMPONENT CAPACITY COST (RS. IN LACS)

Sewage collection network Rs. 4898 lacs

2 Sewage pumping station 17 Nos. Rs. 4204 lacs

3 Rising main upto STP 93 KM Rs. 15142 lacs

4 Sewage treatment plant

STP-1 50 MLD (1 Module) Rs. 7000 lacs

STP-2 50 MLD (1 Module) Rs. 7000 lacs

Total Rs. 38244 lacs

Rs. 382.44 Crore Table 5-7, Sewage System

5.2.5. Water Recycling

SR. NO. COMPONENT CAPACITY COST (RS. IN LACS)

1 Recycle water pumping station

At STP-1 41 mld Rs. 221 lacs

At STP-2 47 mld Rs. 260 lacs

2 Recycle water trunk main from recycle water pumping station to various WDS (DI K-9 pipe)

55.3 Km Rs. 6077 lacs

3 Recycle water distribution stations 17 NOS. Rs. 1608 lacs

4 Recycle water distribution network (DI K-7) 170 KM Rs. 3971 lacs

Total Rs. 12137 lacs

Rs. 121.37 Crore Table 5-8, Water Recycling

Page 264: SIR issued by the MoEF&CC · Form 1 Proposed Mandal Becharaji Special Investment Region in Ahmedabad and Mehsana District, Gujarat ===== May 2018 Page 1 of 2

MBSIRDA 65|P a g e

Master Plan – MBSIR Cluster B Development Plan

5.2.6. Storm Water Disposal System

Component Storm Water Network

No. of outlets Length (km) Cost (Crores)

Storm water disposal network 44 170 222.73

Table 5-9, Storm Water Disposal System

5.2.7. Solid Waste Collection

Domestic waste (Rs. Crores) Industrial waste (Rs. Crores) Total

Rs. 55.14 Cr Rs. 13 Cr Rs. 68.14 Cr.

Table 5-10, Solid Waste

5.2.8. Comprehensive - Internal Infrastructure

Sr. No. Description Total Cost(Cr)

1 Roads and Bridges 2078

2 Rail 219

3 Water 317.60

4 Sewerage 382.44

5 Water Recycling 121.37

6 Storm Water 222.73

7 Solid Waste 68.14

8 Power (as per Concept Report) 660

Total 4069.28

Table 5-11, Internal Infrastructure Costing

5.3. Comprehensive Infrastructure

Sr. No. Component Cost (Crores)

1 External Infrastructure 1063

2 Internal Infrastructure 4069

Total 5132

Table 5-12, Comprehensive Infrastructure Costing

Page 265: SIR issued by the MoEF&CC · Form 1 Proposed Mandal Becharaji Special Investment Region in Ahmedabad and Mehsana District, Gujarat ===== May 2018 Page 1 of 2

Reply to EDS Query dated 13 November, 2018 Proposed Mandal Becharaji Special Investment Region in Ahmedabad and Mehsana District, Gujarat (IA/GJ/NCP/75764/2018) ============================================================================================================

============================================================================================================ November, 2018

Appendix I ---------------------------------------------------------------

National Parks/Sanctuaries closest to Cluster A (Bechraji) and Cluster B (Mandal)

---------------------------------------------------------------

Page 266: SIR issued by the MoEF&CC · Form 1 Proposed Mandal Becharaji Special Investment Region in Ahmedabad and Mehsana District, Gujarat ===== May 2018 Page 1 of 2

Reply to EDS Query dated 13 November, 2018Proposed Mandal Becharaji Special Investment Region in Ahmedabad and Mehsana District, Gujarat (IA/GJ/NCP/75764/2018)============================================================================================================================================================

Appendix I National Parks / Sanctuaries close to Cluster A (Bechraji) and Cluster B (Mandal)

============================================================================================================================================================November, 2018 Page 1 of 1

Appendix I National Parks/Sanctuaries close to Cluster A (Bechraji) and Cluster B (Mandal)

Cluster A

Cluster B

Page 267: SIR issued by the MoEF&CC · Form 1 Proposed Mandal Becharaji Special Investment Region in Ahmedabad and Mehsana District, Gujarat ===== May 2018 Page 1 of 2

Reply to EDS Query dated 13 November, 2018 Proposed Mandal Becharaji Special Investment Region in Ahmedabad and Mehsana District, Gujarat (IA/GJ/NCP/75764/2018) ============================================================================================================

============================================================================================================ November, 2018

Appendix J ---------------------------------------------------------------

Village Settlements associated with Cluster A (Bechraji)

---------------------------------------------------------------

Page 268: SIR issued by the MoEF&CC · Form 1 Proposed Mandal Becharaji Special Investment Region in Ahmedabad and Mehsana District, Gujarat ===== May 2018 Page 1 of 2

Reply to EDS Query dated 13 November, 2018Proposed Mandal Becharaji Special Investment Region in Ahmedabad and Mehsana District, Gujarat (IA/GJ/NCP/75764/2018)============================================================================================================================================================

Appendix J Village settlements associated with Cluster A (Bechraji)

============================================================================================================================================================November, 2018 Page 1 of 1

Appendix J Village Settlements associated with Cluster A (Bechraji)

Hansalpur

Sitapur

Chandanki

Page 269: SIR issued by the MoEF&CC · Form 1 Proposed Mandal Becharaji Special Investment Region in Ahmedabad and Mehsana District, Gujarat ===== May 2018 Page 1 of 2

Reply to EDS Query dated 13 November, 2018 Proposed Mandal Becharaji Special Investment Region in Ahmedabad and Mehsana District, Gujarat (IA/GJ/NCP/75764/2018) ============================================================================================================

============================================================================================================ November, 2018

Appendix K ---------------------------------------------------------------

Village Settlements associated with Cluster B (Mandal)

---------------------------------------------------------------

Page 270: SIR issued by the MoEF&CC · Form 1 Proposed Mandal Becharaji Special Investment Region in Ahmedabad and Mehsana District, Gujarat ===== May 2018 Page 1 of 2

Reply to EDS Query dated 13 November, 2018Proposed Mandal Becharaji Special Investment Region in Ahmedabad and Mehsana District, Gujarat (IA/GJ/NCP/75764/2018)============================================================================================================================================================

Appendix K Village settlements associated with Cluster B (Mandal)

============================================================================================================================================================November, 2018 Page 1 of 1

Appendix J Village Settlements associated with Cluster B (Mandal)

Ughrojpura

Ughroj

Ukardi

Bhagapura

Shihor