Simplifying the Complex MULTI BILLION DOLLAR GREENFIELD CONSTRUCTION AND THE ROLE OF NETPOINT PRESENTED BY: Dan Molnar & Tim Mather

Simplifying the Complex - PMA Technologies · Simplifying the Complex MULTI‐BILLION DOLLAR GREENFIELD CONSTRUCTION ... MEET THE PRESENTER Dan has over 25 years in Capital Project

  • Upload
    others

  • View
    5

  • Download
    0

Embed Size (px)

Citation preview

Page 1: Simplifying the Complex - PMA Technologies · Simplifying the Complex MULTI‐BILLION DOLLAR GREENFIELD CONSTRUCTION ... MEET THE PRESENTER Dan has over 25 years in Capital Project

Simplifying the ComplexMULTI‐BILLION DOLLAR GREENFIELD CONSTRUCTION 

AND THE ROLE OF NETPOINT

PRESENTED  BY:

Dan Molnar & Tim Mather

Page 2: Simplifying the Complex - PMA Technologies · Simplifying the Complex MULTI‐BILLION DOLLAR GREENFIELD CONSTRUCTION ... MEET THE PRESENTER Dan has over 25 years in Capital Project

Dan Molnar, PMPProject Services Leader

Shire [email protected]

MEET THE PRESENTER

Dan has over 25 years in Capital Project and Program Management in the pharmaceutical industry. He has experience in phases of pharmaceutical capital management from concept development through licensure.  He has directly supported projects within the US, Puerto Rico, and Ireland.  He has also developed and maintain global portfolio management systems.  In many of his roles he has deployed innovative and effective tools to facilitate communication throughout the organization.  Currently, he is the Project Services Leader for a $1B+ biopharma greenfield program being constructed in Social Circle, Georgia.

2

Page 3: Simplifying the Complex - PMA Technologies · Simplifying the Complex MULTI‐BILLION DOLLAR GREENFIELD CONSTRUCTION ... MEET THE PRESENTER Dan has over 25 years in Capital Project

Tim Mather, PMPChief Technology OfficerPMA Technologies LLC

[email protected]

MEET THE PRESENTER

Tim Mather is the CTO of PMA Technologies LLC and in this role provides leadership in the design and development team as well as the intellectual property efforts surrounding NetPoint. Tim is a PMP with an extensive background in project management, software development, and software marketing. Tim holds a Bachelor’s degree from Michigan State University, and pursued postgraduate study of Project Management at the University of Chicago. Tim blogs about planning and scheduling at visualizetheplan.com.

3

Page 4: Simplifying the Complex - PMA Technologies · Simplifying the Complex MULTI‐BILLION DOLLAR GREENFIELD CONSTRUCTION ... MEET THE PRESENTER Dan has over 25 years in Capital Project

160 acre property comprised of 9 buildings arranged in a spine/node configuration encompassing over 1.2 million square feet of building area.

$1+ Billion Greenfield Plasma Protein Manufacturing Facility in Covington, GA

4

Page 5: Simplifying the Complex - PMA Technologies · Simplifying the Complex MULTI‐BILLION DOLLAR GREENFIELD CONSTRUCTION ... MEET THE PRESENTER Dan has over 25 years in Capital Project

Lifesaving MissionTo expand global supply of life saving plasma‐derived therapies, including Gammagard Liquid (Immune Globulin intravenous) and Flexbumin (human serum albumin)

5

Page 6: Simplifying the Complex - PMA Technologies · Simplifying the Complex MULTI‐BILLION DOLLAR GREENFIELD CONSTRUCTION ... MEET THE PRESENTER Dan has over 25 years in Capital Project

COVINGTON GEORGIA GREENFIELD

6

Page 7: Simplifying the Complex - PMA Technologies · Simplifying the Complex MULTI‐BILLION DOLLAR GREENFIELD CONSTRUCTION ... MEET THE PRESENTER Dan has over 25 years in Capital Project

COMPLETED FACILITY

7

Page 8: Simplifying the Complex - PMA Technologies · Simplifying the Complex MULTI‐BILLION DOLLAR GREENFIELD CONSTRUCTION ... MEET THE PRESENTER Dan has over 25 years in Capital Project

Completed Facility

Three separate buildings are dedicated to protein manufacturing, including upstream large scale human plasma fractionation, albumin purification to finished bulk, and immunoglobulin purification by chromatography with aseptic filling and packaging to final container.

Support facilities include a Central Utilities Building, warehouse with ambient storage, +5C final product storage, and ‐25C plasma freezer, wastewater pretreatment plant, and laboratory/administrative buildings.

8

Page 9: Simplifying the Complex - PMA Technologies · Simplifying the Complex MULTI‐BILLION DOLLAR GREENFIELD CONSTRUCTION ... MEET THE PRESENTER Dan has over 25 years in Capital Project

COMPLEX MEP

9

Page 10: Simplifying the Complex - PMA Technologies · Simplifying the Complex MULTI‐BILLION DOLLAR GREENFIELD CONSTRUCTION ... MEET THE PRESENTER Dan has over 25 years in Capital Project

DAN’S ROLE IN THE PROJECTProject Services Leader

01Member of Program Leadership TeamCustodian of Governance Contract/Program Scope

04Risk ManagementComprehensive Risk Management program maintained within start‐up teams. Periodic, Independent, Quantitative Analyses (via OPRA) 

02Schedule ManagementTeam of 8 Schedulers maintaining 12 integrated schedules (at peak) maintain via P6. Intensive start‐up planning and tracking of 6 startup teams. Program level reporting via NetPoint.

05Change ManagementCustodian of Change Management processes.

03Cost ManagementTeam of 5 cost engineers maintaining 10 sub‐projects. Monthly cost reporting and spend forecasting. Executive report‐out.

10

Page 11: Simplifying the Complex - PMA Technologies · Simplifying the Complex MULTI‐BILLION DOLLAR GREENFIELD CONSTRUCTION ... MEET THE PRESENTER Dan has over 25 years in Capital Project

Interactive planning for schedule development

Resource and portfolio planning

Program summarization and interface management

|

ROLE OF NETPOINT IN THE PROJECT

NetPoint was a valuable supplement to existing project controls processes and tools.  There is “value‐add” use for NetPoint in almost all aspects of project management including:

Quantitative risk analysis 

11

Page 12: Simplifying the Complex - PMA Technologies · Simplifying the Complex MULTI‐BILLION DOLLAR GREENFIELD CONSTRUCTION ... MEET THE PRESENTER Dan has over 25 years in Capital Project

INTERACTIVE PLANNING

Throughout the course of the program (as with a large program) there was a need to reassess or address scheduling conflicts. 

12

Page 13: Simplifying the Complex - PMA Technologies · Simplifying the Complex MULTI‐BILLION DOLLAR GREENFIELD CONSTRUCTION ... MEET THE PRESENTER Dan has over 25 years in Capital Project

PROGRAM SUMMARIZATION

|

Prior to Utilization of NetPoint

Prior to utilization of NetPoint, Leadership level schedule reports were bar graphs with no insight to interaction between projects.

01

02

Post‐introduction• Interactions were clear• A critical path evident• Informed decision‐making made much easier

13

Page 14: Simplifying the Complex - PMA Technologies · Simplifying the Complex MULTI‐BILLION DOLLAR GREENFIELD CONSTRUCTION ... MEET THE PRESENTER Dan has over 25 years in Capital Project

02PROGRAM SUMMARIZATION

14

Page 15: Simplifying the Complex - PMA Technologies · Simplifying the Complex MULTI‐BILLION DOLLAR GREENFIELD CONSTRUCTION ... MEET THE PRESENTER Dan has over 25 years in Capital Project

LEVEL 2 – PROGRAM EXAMPLE

03

15

Page 16: Simplifying the Complex - PMA Technologies · Simplifying the Complex MULTI‐BILLION DOLLAR GREENFIELD CONSTRUCTION ... MEET THE PRESENTER Dan has over 25 years in Capital Project

RESOURCE /PORTFOLIO PLANNING

04

Facility Start‐upFacility start‐up presented several challenges regarding resource prioritization• Readiness vs. Process Optimization• Site Initiatives vs. Corporate Initiatives

Assess Resource Impacts NetPoint was used to assess resource impacts and 

to facilitate timing decisions

05

16

Page 17: Simplifying the Complex - PMA Technologies · Simplifying the Complex MULTI‐BILLION DOLLAR GREENFIELD CONSTRUCTION ... MEET THE PRESENTER Dan has over 25 years in Capital Project

RESOURCE / PORTFOLIO PLANNING

05

17

Page 18: Simplifying the Complex - PMA Technologies · Simplifying the Complex MULTI‐BILLION DOLLAR GREENFIELD CONSTRUCTION ... MEET THE PRESENTER Dan has over 25 years in Capital Project

Risk Analyses brought “in‐house” at the beginning of CQV

Initial assessments were conducted by independent consultants with various methods of model development

NetPoint served as base schedule for several of the analyses. 

QUANTITATIVE RISK ANALYSIS

Program included periodic quantitative schedule risk analyses throughout its life‐cycle

Program has maintained its progress along the P50 schedule

• Activity IDs tied to P6 and Risk Register facilitated impact analyses  18

Page 19: Simplifying the Complex - PMA Technologies · Simplifying the Complex MULTI‐BILLION DOLLAR GREENFIELD CONSTRUCTION ... MEET THE PRESENTER Dan has over 25 years in Capital Project

SCHEDULE RISK ANALYSIS – METHOD DESCRIPTION

Risk Registers

NetPoint (Single License SCR)

PrimaveraRisk Analysis

19

Page 20: Simplifying the Complex - PMA Technologies · Simplifying the Complex MULTI‐BILLION DOLLAR GREENFIELD CONSTRUCTION ... MEET THE PRESENTER Dan has over 25 years in Capital Project

KEY IMPACTS OF NETPOINT

01Simplifying the ComplexConsolidation of logic‐driven data at a level easily understood  at the executive level

04Facilitated Risk AnalysesUpload to P6 and integration into OPRA simplify risk mapping (especially during Qualification/Validation phases) 

02Intuitive Analysis (even to scheduling novices)Visual float analysis helped team see impacts of schedule slippage and workarounds

05Expedited resource requirements assessments

03Easily Accessible via BYODQuestions on current status address quickly and accurately

20

Page 21: Simplifying the Complex - PMA Technologies · Simplifying the Complex MULTI‐BILLION DOLLAR GREENFIELD CONSTRUCTION ... MEET THE PRESENTER Dan has over 25 years in Capital Project

Questions?Thank you!

Page 22: Simplifying the Complex - PMA Technologies · Simplifying the Complex MULTI‐BILLION DOLLAR GREENFIELD CONSTRUCTION ... MEET THE PRESENTER Dan has over 25 years in Capital Project

Tim Mather, PMP Chief Technology Officer

PMA [email protected]

Dan Molnar, PMPProject Services Leader

Shire [email protected]