US 82 & FM 989 Widening Project Context Sensitive Solutions Workshop June 11, 2009

Simmons us 82 fm 989 txk 060909

Embed Size (px)

Citation preview

Page 1: Simmons   us 82 fm 989 txk 060909

US 82 & FM 989

Widening Project

Context Sensitive Solutions Workshop

June 11, 2009

Page 2: Simmons   us 82 fm 989 txk 060909

US 82 (New Boston Rd)From 0.1 mi west of US 59

To 0.7 mi west of FM 9892.5 miles

FM 989 (Kings Hwy)From 0.1 mi south of IH 30

To 0.1 mi south of US 820.9 mile

Page 3: Simmons   us 82 fm 989 txk 060909
Page 4: Simmons   us 82 fm 989 txk 060909

Goals of Project

Relieve congestion

– Add capacity to both roadways

Improve mobility

– Local and through traffic

Enhance safety

– Accommodate left turn movements

– Improve FM 989/US 82 intersection

Provide for pedestrian/bicycle use

Improve driveways/access management

Page 5: Simmons   us 82 fm 989 txk 060909

Existing US 82

Two lanes with center left turn lane

No shoulders (US 59 to FM 989)

Two lanes

No shoulders (west of FM 989)

Page 6: Simmons   us 82 fm 989 txk 060909
Page 7: Simmons   us 82 fm 989 txk 060909

Proposed US 82

Four lane divided urban section

14 ft. outside lanes

12 ft. inside lanes

14 ft. center left turn lane

6 ft. sidewalk

Curb and gutter section

Pecan Street/FM 2878 reconstruction

Future connection with University Avenue

Page 8: Simmons   us 82 fm 989 txk 060909

Proposed US 82Typical Section

Page 9: Simmons   us 82 fm 989 txk 060909
Page 10: Simmons   us 82 fm 989 txk 060909

Existing FM 989

Four 11 ft. lanes

No shoulders

Offset intersection with US 82

Page 11: Simmons   us 82 fm 989 txk 060909
Page 12: Simmons   us 82 fm 989 txk 060909
Page 13: Simmons   us 82 fm 989 txk 060909

Proposed FM 989

Six lane divided urban section14 ft. outside lanes (right turn lane)

12 ft. middle & inside lanes

Raised median with left turn bays

6 ft. sidewalk

Curb and gutter section

Possible 12 ft. multi-use path

Realign roadway at US 82 intersection

Page 14: Simmons   us 82 fm 989 txk 060909

Proposed FM 989

Typical Section

Page 15: Simmons   us 82 fm 989 txk 060909

Adjacent Land Use

Commercial

Residential

Undeveloped

– Wooded & Pasture

Several Churches

Nash Elementary School in close

proximity

T-Line Route

Wagner Creek

Page 16: Simmons   us 82 fm 989 txk 060909
Page 17: Simmons   us 82 fm 989 txk 060909
Page 18: Simmons   us 82 fm 989 txk 060909
Page 19: Simmons   us 82 fm 989 txk 060909
Page 20: Simmons   us 82 fm 989 txk 060909
Page 21: Simmons   us 82 fm 989 txk 060909
Page 22: Simmons   us 82 fm 989 txk 060909
Page 23: Simmons   us 82 fm 989 txk 060909
Page 24: Simmons   us 82 fm 989 txk 060909
Page 25: Simmons   us 82 fm 989 txk 060909
Page 26: Simmons   us 82 fm 989 txk 060909
Page 27: Simmons   us 82 fm 989 txk 060909
Page 28: Simmons   us 82 fm 989 txk 060909
Page 29: Simmons   us 82 fm 989 txk 060909
Page 30: Simmons   us 82 fm 989 txk 060909
Page 31: Simmons   us 82 fm 989 txk 060909

S

Nash Elementary School

Page 32: Simmons   us 82 fm 989 txk 060909
Page 33: Simmons   us 82 fm 989 txk 060909
Page 34: Simmons   us 82 fm 989 txk 060909
Page 35: Simmons   us 82 fm 989 txk 060909
Page 36: Simmons   us 82 fm 989 txk 060909
Page 37: Simmons   us 82 fm 989 txk 060909
Page 38: Simmons   us 82 fm 989 txk 060909
Page 39: Simmons   us 82 fm 989 txk 060909
Page 40: Simmons   us 82 fm 989 txk 060909
Page 41: Simmons   us 82 fm 989 txk 060909
Page 42: Simmons   us 82 fm 989 txk 060909
Page 43: Simmons   us 82 fm 989 txk 060909
Page 44: Simmons   us 82 fm 989 txk 060909
Page 45: Simmons   us 82 fm 989 txk 060909

StakeholdersAdjacent property owners

TxDOT

Cities of Nash and Texarkana

Bowie County

Texarkana MPO

Partnership for the Pathway

Texarkana Bicycle Club

T-Line Transit Agency and Riders

Nash Elementary School

Utility companies

General public

Page 46: Simmons   us 82 fm 989 txk 060909

Project Status

Planning stage

No funding identified for project

Preliminary schematics

Draft Environmental Assessment

One public meeting held in Nov. 2000

– US 82 segment only

– Favorable comments for widening roadway

– Concerns regarding right of way impacts

Page 47: Simmons   us 82 fm 989 txk 060909

Still to be done…

Identify Funding

Public involvement/Stakeholder input

–Public meetings

–Workshops

Design

Environmental Clearance

Right of Way Acquisition

Construction

Page 48: Simmons   us 82 fm 989 txk 060909

US 82 & FM 989

Widening Project

Context Sensitive Solutions Workshop

June 11, 2009