SIM 1, TMA pointing and tracking verified NAT on-TMA Install PROC-0066 NAT LT Alignment PROC-68 NAT Functional Tests PROC-0071 NAT Pointing Map Generation PROC-0073 TMA Pointing/ Tracking Verification PROC-0074 TAT and NAT Electrical Routing PROC-0070 SIM 1 Complete TCS & MCS running on temp setup ACS Ready TMA Operational Accurately pointing (milestone) TAT on-TMA Install PROC-0067 TAT LT Alignment PROC-0069 NAT Ready TAT Ready TAT Functional Tests (Daytime) PROC-0072 LT Install on TMA PROC-0079 TMA Ready

SIM 1, TMA pointing and tracking verified · Routing PROC-0108 Xbox Electrical Routing PROC-0107 GF SHWS Electrical Install (temp) GOS Frame Install PROC-0118 GF Heat Dump Facility

  • Upload
    others

  • View
    2

  • Download
    0

Embed Size (px)

Citation preview

Page 1: SIM 1, TMA pointing and tracking verified · Routing PROC-0108 Xbox Electrical Routing PROC-0107 GF SHWS Electrical Install (temp) GOS Frame Install PROC-0118 GF Heat Dump Facility

SIM 1, TMA pointing and tracking verified

NAT on-TMA Install

PROC-0066

NAT LT Alignment

PROC-68

NAT Functional Tests

PROC-0071

NAT Pointing Map Generation

PROC-0073

TMA Pointing/Tracking Verification

PROC-0074

TAT and NAT Electrical Routing

PROC-0070

SIM 1 Complete

TCS & MCS running on temp setup

ACS Ready

TMA Operational

Accurately pointing (milestone)

TAT on-TMA Install

PROC-0067

TAT LT Alignment

PROC-0069

NAT Ready TAT Ready

TAT Functional Tests(Daytime)

PROC-0072

LT Install on TMA

PROC-0079

TMA Ready

Page 2: SIM 1, TMA pointing and tracking verified · Routing PROC-0108 Xbox Electrical Routing PROC-0107 GF SHWS Electrical Install (temp) GOS Frame Install PROC-0118 GF Heat Dump Facility

M1 Assy Installation in TMA

PROC-0002

M1 OSS Rack Installation

PROC-0075

M1 Assy Installation(comm)

PROC-0002

M1 Assy LT Align(comm)

PROC-0080

M1 Assy ElectricalRouting

PROC-0085

M1 Assy FacilitiesRouting

PROC-0087

AP InstallationPROC-0063

AP LT Align

PROC-0089

AP Thermal Rack Installation

PROC-0076

AP FacilitiesRouting

PROC-0088

M1 Mirror Installation

(sci)

PROC-0082

M1 CellOn-site

M1 Mirror On-site

(sci)

M1 MirrorOn-site(comm)

M1 Assy Build (comm)

PROC-0046

PF Wavefront Measurements

PROC-0098

Control RackOn-site

AP EquipOn-site

M1 GIS integration

PROC-0091

M1CS testing

PROC-0090

M1CS integration

PROC-0077

M1 Mirror Removal(comm)

PROC-0081

SIM 2 Complete

AP ElectricalRouting

PROC-0086

Dummy M1 Cell Removal

PROC-0039

TEOA On-site

SIM 2 Flow Chart, M1 Complete

M1 Cell in place(milestone)

M1 Alignment Complete

(milestone)

PF SHWS Installation on TEOA

PROC-0093

TEOA/PF SHWS Installation on TMA

PROC-0096

M1 Assy LT Align (sci)

PROC-0083

M1 Assy RemovalPROC-0002

M1 Assy Installation in TMA

PROC-0002

M1 Assy RemovalPROC-0002

PF SHWS ElectricalRouting (temp)

PROC-0095

AP in place(milestone)

TEOA/PF SHWS LT Align

PROC-0097

TMA TEOA DummyRemoval

PROC-0064

TMA Balance

PROC-0078

TMA Balance

PROC-0078

TMA Balance

PROC-0078

S&R Area Ready

TMA accepted

TMA accepted

SIM 1 complete

Instrument Lab available

Mirror Coating(sci)

PROC-0001

Pointing Map Update (PF SHWS)

PROC-0099

PF SHWS Calibration

PROC-0092

Mirror Coating(comm)

PROC-0001

M1 LUT Improvement(milestone)

IWU Install andFit-up

PROC-0083

T-15K ready

T-4Kready

Comp airready

CASA (?)

CASA (?)

CASA (?)

TEOA Instrument Lab Checkout

TMA Servo Re-tune

TMA Servo Re-tune

SE2Einstalled

TEOA CS Integration

PROC-0109

OSS IT Infras in place

Summit IT infras in

place

Page 3: SIM 1, TMA pointing and tracking verified · Routing PROC-0108 Xbox Electrical Routing PROC-0107 GF SHWS Electrical Install (temp) GOS Frame Install PROC-0118 GF Heat Dump Facility

TEOA PF SHWS Removal

PROC-0100

TEOA Full Config Tele Floor Build

PROC-0101

TEOA Full Config on-TMA Install

PROC-0102

M2 and HS on-TMA LT Alignment

PROC-0103

GF SHWS Install

PROC-0051

TEOA PI Controller Rack Install

PROC-0104

TEOA Electrical Install

PROC-0105

TEOA GIS Integration

PROC-0110

TEOA Functional Tests

PROC-0112

Xbox Install

PROC-0106

GF Wavefront Measurements

PROC-0117

HS Facility Coolant Connect

PROC-0114

GF SHWS Removal

PROC-0052

GF Heat Dump Install

PROC-0053

Initial Day Time Test

PROC-0120

M1 AP Thermal Tuning

PROC-0122

M1 Thermal Control Tuning

PROC-0121

M2 Thermal Control Tuning

PROC-0123

M1/M2 Initial Thermal Tuning

Complete(Milestone)

SIM 2 Complete

M1/M2 Alignment Complete

(milestone)

Xbox Facilities Routing

PROC-0108

Xbox Electrical Routing

PROC-0107

GF SHWS Electrical Install (temp)

GOS Frame Install

PROC-0118

GF Heat Dump Facility Hookup

PROC-0119

TEOA CS Testing

PROC-0111

TMA Balance

PROC-0078

TMA Balance

PROC-0078

GOS Frame on site

TMA accepted

HS-closed loop

Ready

HS Coolant DI Loop Test

PROC-0113

SIM 3 Complete

SIM 3 Flow Chart, M1-M2 Complete

GF SHWS Calibration

PROC-0115

Comp airready

T-4Kready

CASA (?)

CASA (?)

Sun Sensor InstallOSS Rack

Ready

TMA Servo Re-tune

Summit IT infras in

place

SE2Einstalled

Page 4: SIM 1, TMA pointing and tracking verified · Routing PROC-0108 Xbox Electrical Routing PROC-0107 GF SHWS Electrical Install (temp) GOS Frame Install PROC-0118 GF Heat Dump Facility

M6 Assy Install

PROC-0129

M5 Surrogate alignment

PROC-0018

PROC-xxxx

M6 Alignment

PROC-0018

PROC-xxxx

Characterize ALT Axis

PROC-0018

M6 Assy Ready

FOCS/FOTCS testing

PROC-0128

FOCS Integration

PROC-0127

M5 surrogate installation

PROC-0134

SIM 4 Complete

M6 Assy Functional Test

PROC-0132

M5 Surrogate

Ready

Characterize AZ axis

PROC-0018

MCS/TCSRunning on temp setup

Characterize tower stability

PROC-0018

Characterize ALT-AZ rotation

PROC-0018

M6 tilt adjustment (beam pointing)

PROC-0018

M7 Assy Installation

PROC-0135

M7 Alignment

PROC-0018

AOS ref

M7 Assy Ready

Characterize Coudé rotation

PROC-0018

M3 Assy Installation

PROC-0136

M3 Alignment

PROC-0018

PROC-xxxx

M3 Assy Ready

M3 Assy Functional Testing

PROC-0139

M4 Assy Installation

PROC-0141

M4 Alignment

PROC-0018

PROC-xxxx

M4 Assy Ready

Data for TMA and WFC performance

(milestone)

Pin M6

PROC-0133

Daytime thermal testing/tuning

PROC-0149

M6 Electrical Routing

PROC-0130

M3 Electrical Routing

PROC-0137

M6 Facilities Routing

PROC-0131

M3 Facilities Routing

PROC-0138

M4 Facilities Routing

PROC-0143

M3-6 Thermal Tuning Complete

(milestone)

M1-6 Aligned (milestone)

.TMA Ready

TMA Ready

Instrument Lab Ready

Coudé Lab Ready

SIM 4 Flow Chart, Telescope Optics (M1-M6) Complete

FOT Rack Install (Nasmyth)

PROC-0125

FO Hardware Install Instr Lab

PROC-0124

FO Controller Install (OSS/AZ)

PROC-0126

T-4Kready

Data for TMA performance

CASA (?)

SIM 3 Complete

Summit IT Infras in

place

SE2Einstalled

M4 Initial Fit-up

PROC-XXXX

Page 5: SIM 1, TMA pointing and tracking verified · Routing PROC-0108 Xbox Electrical Routing PROC-0107 GF SHWS Electrical Install (temp) GOS Frame Install PROC-0118 GF Heat Dump Facility

Optical benches Install in Coudé

PROC-0152

M8 LT Align

PROC-0018

PROC-xxxx

Coudé benches on-

site

M9 Assy Installation

PROC-0158

M9 LT Align

PROC-0018

PROC-xxxx

M9 Assy Ready

Coudé Lab ready

Optical Bench Alignment

PROC--0153

M8 Assy Installation

PROC-0157

M8 Assy Ready

M10 Surrogate Installation

PROC-0155

M10 Surrogate CMM Align

PROC-0018

PROC-xxxx

M10 Surrogate

Ready

SIM 5 Complete

SHWS Installed and Aligned

PROC-0018

PROC-0156

Coudé Wavefront measurement

PROC-0018

Pointing Map(milestone)

M9a AssyInstall/Align

PROC-0018

PROC-0164

M9a Assy Ready

WFC-BS1 Assy Install/Align

PROC-0018

PROC-0163

WFC-BS1 Assy Ready

CL2a AssyInstall/Align

PROC-0018

PROC-0165

CL2a Assy

CL3a AssyInstall/Align

PROC-0018

PROC-0167

CL3a Assy

CL2 AssyInstall/Align

PROC-0018

PROC-0166

CL2 Assy

CL3 & CL4 AssyInstall/Align

PROC-0018

PROC--0168

CL3 & CL4 Assy

DL-FM1 AssyInstall/Align

PROC-0018

PROC-0169

DL-FM1 Assy Ready

Telescope Performance(milestone)

Seeing-limited

Alignment complete (milestone)

FIDO Beam Pointing verifications

PROC-0170

Coude Optics Day Time Thermal Test

PROC-0159

Surface Temp

Coude Optics Air knife tuning

PROC-0160

ISB Installation

PROC-0151

Pin benches

PROC-0154

Reconfiguration Testing

PROC-0171

SIM 4 Complete

SIM 5 Flow Chart, Coudé Optics and FIDO Complete

M9a Assy Control System Integration

and Test

M9a Assy Electrical Routing

DL-FM1 Assy Electrical Routing

DL-FM1 Assy System Integration and Test

Comp airready

CASA (?)

CASA (?)

Coude Servo Re-tune

Air Knife Ready

Page 6: SIM 1, TMA pointing and tracking verified · Routing PROC-0108 Xbox Electrical Routing PROC-0107 GF SHWS Electrical Install (temp) GOS Frame Install PROC-0118 GF Heat Dump Facility

VBI Filter Wheel Install and Align R&B

PROC-0045

SIM5 M10 Surrogate Aligned

VBI On-site

VBI Optics Mounting

PROC-0045

VBI FM1 (Mounted) WFE Test R&B

PROC-0185

VBI Optics Cleaning(if needed)

PROC-0184

VBI On-site

VBI IL Check Out

PROC-0177

VBI IC GUI

VBI Controller InstallPROC-0176

VBI Optics Installation and

Alignment

PROC-0045

VBI Alignment Setup R

PROC-0045

VBI Interferometric Alignment R

PROC-0045

VBI R WFE performance@ 632.8 nm

VBI Alignment Setup B

PROC-0045

VBI Interferometric Alignment B

PROC-0045

VBI B WFE performance@ 632.8 nm

VBI Functional TestPROC-0189

VBI R&B final performance

VBI Collimating Lens CS Assembly and

Test R&B

PROC-0186

VBI Camera installed and Aligned R

PROC-0045

VBI Camera Installed and Aligned B

PROC-0045

VBI Camera CS Assembly and Test R

PROC-0187

VBI Camera CS Assembly and Test B

PROC-0188

SIM 6a complete

TCS

OCS

ICS

VBI R&B Thermal system operational

DHS

Coudé ready

VBI IL Electrical/Rack Routing

PROC-0175

SIM 5 Complete

FTS Ready

Instru Lab Ready

VBI Daytime Test R&B

PROC-0190

VBI Filter Wheel Setup and Filter Alignment R&B

PROC-0045

VBI Software Testing(milestone)

VBI Electrical Routing

PROC-0179

VBI Facilities routingPROC-0180

VBI Rack Install in Coude

PROC-0178

VBI Transport to Coude

PROC-0181

SIM 6a: VBI

VBI connectivity at Coude ready

Summit End-to End

Simulator

Coude Engineering Workstation

VBI Alignment PrepPROC-0182

VBI Filter Wheel CS Assembly and Test

R&BPROC-0183

CASA 9

CASA 10

Page 7: SIM 1, TMA pointing and tracking verified · Routing PROC-0108 Xbox Electrical Routing PROC-0107 GF SHWS Electrical Install (temp) GOS Frame Install PROC-0118 GF Heat Dump Facility

Instrument Lab Ready

Coudé readyFTS/FMS

Ready

WFC Components IL Assembly and Test

PROC-0191

WFC Relay OpticsInstall

PROC-0205

Install M5 AssyPROC-0195

M10 Electrical Routing

PROC-0203

Context Viewer Install

PROC-0211

TMA Ready

LOWFS InstallPROC-0212

HOWFS InstallPROC-0213

LOWFS Test and CalibrationPROC-0215

HOWFS Test and CalibrationPROC-0216

Context Viewer Test and Calibration

PROC-0214

WCCS/TCS IntegrationPROC-0198

M10 Functional TestPROC-0207

Install M10 AssyPROC-0204

Non-common path measurement

PROC-0217

M5 Electrical Routing

PROC-0193

M5 Facility RoutingPROC-0194

M5 Rack InstallPROC-0192

SIM5: Optical Bench aligned

WFC Coude Electronics Racks

InstallPROC-0199

SIM8: Lower GOS Ready

WCCS/OCS IntegrationPROC-0218

Context viewer Electrical Routing

PROC-0208

HOWFS electrical Routing

PROC-0210

LOWFS Electrical Routing

PROC-0209

WFC Electronics Racks Cabling Install

and RoutingPROC-0200

WFC Coude Electronics Racks Electrical Routing

PROC-0201

WFC Coude Electronics Racks Facility Routing

PROC-0202

WFC Coude Optical Bench Facility

RoutingPROC-0206

SIM 5:BS1 Installed

SIM Completion

Post M5 Swap System Re-verificationPROC-0196

SIM 6b WFC Integration

M5 Assy Functional test

PROC-0197

WFC System Level Test

PROC-0219

CASA 11

CASA 12

WFC On-site

Page 8: SIM 1, TMA pointing and tracking verified · Routing PROC-0108 Xbox Electrical Routing PROC-0107 GF SHWS Electrical Install (temp) GOS Frame Install PROC-0118 GF Heat Dump Facility

SIM 7 First Light Initiative

SIM6a CompleteSIM6b Complete

VBI Context Viewer Telescope Co-

pointingPROC-0225

WFC Context Viewer Telescope Co-

pointingPROC-0226

VBIRed+WFC Measurement and

TuningPROC-0227

ICS Ready

Telescope Optics Thermal Control

TuningPROC-0228

VBIBlue+WFC Measurement and

TuningPROC-0229

FLI VerificationPROC-0230

VBI Red + Blue +WFC Measurement

and TuningPROC-0231

SIM Completion VerficationPROC-0232

FLI Achieved

Both VBIs working with WFC

SIM 7 Completion

TMA/Coude V&V (GIS)

PROC-0233

Coude Servo Re-tune

PROC-0224

Page 9: SIM 1, TMA pointing and tracking verified · Routing PROC-0108 Xbox Electrical Routing PROC-0107 GF SHWS Electrical Install (temp) GOS Frame Install PROC-0118 GF Heat Dump Facility

PA&C On-siteGOS frame install

PROC-0020

PA&C on site

PA&C IL Check Out

PROC-0023

PA&C Controller Install

PROC-0234

PA&C Functional Test

PROC-0023

PA&C final performance

Package X complete

TCS

OCS

GIS

PA&C – Other Systems TBD Testing

PROC-0240

TMA ready for GOS

install and align

GOS Electrical/Rack Temp Routing

PROC-0235

FTS Ready

Inst Lab Ready

PA&C Software Testing

(milestone)

PA&C Electrical routing

PROC-0237

PA&C Facilities routing

PROC-0236

PA&C rack install to OSS

PROC-0020

PA&C transport to OSS

PROC-0238

SIM 8: GOS Integration

PA&C GOS ready for interior assembly

Summit End-to End

Simulator

OSS Engineering Workstation

PA&C GUI

PA&C GOS thermal rack install to

NasmythPROC-0020

PA&C GOS ready for connectivity

Install Lower GOSPROC-0020

Align Lower GOSPROC-0036

GOS frame alignment

PROC-0036

Test Lower GOSPROC-0023

Lower GOS Available

Install GOS coversPROC-0020

Test GOS Thermal - Air

PROC-0023

Install Upper GOS level 1

PROC-0020

Align Upper GOS level 1

PROC-0036

Test Upper GOS level 1

PROC-0023

Install Upper GOS level 2

PROC-0020

Align Upper GOS level 2

PROC-0036

Test Upper GOS level 2

PROC-0023

Install Upper GOS level 3

PROC-0020

Align Upper GOS level 3

PROC-0036

Test Upper GOS level 3

PROC-0023

WFCS Limb Tracker Ready

Lower GOS Functional Test

PROC-0239

Page 10: SIM 1, TMA pointing and tracking verified · Routing PROC-0108 Xbox Electrical Routing PROC-0107 GF SHWS Electrical Install (temp) GOS Frame Install PROC-0118 GF Heat Dump Facility

ViSP Feed Optics Mounting

PROC-xxxxx

ViSPCS Ready

ViSP Feed Optics install and align

PROC-xxxx

ViSP Daytime Test

PROC-xxxx

ViSP final performance

ViSP system level alignment

SIM 9c complete

TCS

OCS

On-Sun focus tests and boresight

checks

PROC-xxxx

WFCS operational

ICS

DHS

ViSP Instrument system testing and

calibration

PROC-xxxx

ViSP Electrical Routing

ViSP Facilities routing

FTS Ready

Coudé readyInstr Lab

Ready

ViSP Sub-Assemblies IL integration

PROC-xxxx

Optical tests report

ViSP IL checkout

PROC-xxxx

ViSP Rack install

ViSPCP

ViSP Feed Optics testing

PROC-xxxxx

ViSP Rack IL install and Electrical

Routing

Integration and alignment of Slit

assembly

PROC-xxxx

Integration and alignment of FM3

and FM4

PROC-xxxx

Integration and alignment of Grating

assembly

PROC-xxxx

Integration and alignment of

Collimator lens and Modulator

PROC-xxxx

Integration and alignment of optical

carriages

PROC-xxxx

Camera Assembly and Test

PROC-xxxx

ViSP Instrument testing with VBI

PROC-xxxx

VBI operational

ViSPCS integration and test

Carriage Baseplate installed and aligned

ViSP On-site

Optical Bench

Aligned

ViSP IL hardware cleaning and

transport to Coude

Optics mounting in sub-assemblies

ViSP On-site

Lower GOS Ready

SIM9c ViSP integration