Sikumiut
Sikumiut Environmental
Management Ltd.
Bridging the Gap Shipping and Traditional Resource Use
March 2013
Overview
Sikumiut Background The Challenge The Solution The Benefits
Sikumiut Environmental Management Ltd.
♦ Four partners – 3 Inuit ♦ Aboriginal Business ♦ Nain, Happy Valley-Goose Bay, St. John’s; 25 - 50 staff ♦ Member of NEIA, NOIA PEG-NL ♦ Innovation Award Winner ♦ www.sikumiut.ca
“ combining scientific and technical
strengths with Inuit Knowledge””
Sikumiut Environmental Management Ltd.
Inuit Travel Resource Harvesting Community Interchange Connecting with the Environment
The Challenge – Shipping versus Environment
Voisey’s Bay Project Year-Round Shipments of
Concentrate
Radarsat Image shows the ships track in landfast ice
The Challenge
Mild Winter Conditions
increased re-freeze times for ships track travel delays, increased hazards for snowmobile travelers
Periods of unsafe conditions due to slow re-freeze
The Solution
Pontoon Crossings Concept Prototype Design Fabricate Operation – Deployment, Removal
Design Considerations (1 of 2) Length of Track (km) 70
Width of Track (m) 30
Ice Condition Near Track Crossings go from smooth, land fast ice on both sides of the track. Vessel traffic is confined to the first track of the season, with little or no disturbance to the sides during subsequent transits.
Ice Thickness 1 metre
Ice Formation Dec/Jan freeze up April/May break up
Shipping Restrictions 2 six week periods, Dec/Jan and April/May
Tide Conditions No tide or wave actions of design significance
Length of Ice Season (weeks) 16
Number of Voyages per Season 4
Number of Transits 8
Snowmobile Traffic Intensive around area
Number of Crossings Up to 8
Type/Number of Crossings 6 Smoothed Ice ( 3 to 5 typical) 2 Pontoon (Also a detour around Edward’s Cove)
Weather during Ice Season Variable but often clear to allow working on the track. Working conditions usually around -20 degrees C with light winds.
Design Considerations (2 of 2) Day Light (hrs) during Ice Season 8
Refreeze Rate 1 to 14 days
Communications Track and Crossing conditions are available from website, phone messages and local radio message
Safety Safety issues are addressed with detailed safety procedures and equipment. These include safety briefings, safe work determination, floatation vests, helmets, first aid kits, first aid training, snow mobile handling training, satellite phone, navigation equipment, tender vessel, load cells and a buddy system
Approvals NWPA not required
Communities Impacted by Track Nain
Total Population 1500
Cost per crossing type Smooth Ice Crossing $5000 per crossing
Pontoon Crossing $15000 per unit; $30,000 support equipment
Pontoon Crossing Operations Deployment Time 2 to 4 hrs
Removal Time 2 to 4 hrs
Personnel 2 x 3 man teams
“Bridge” Prototype
1. Floating Dock System 2. Adapted (as shown) for towing
on ice 3. Single Link Prototype
a. Fabricated b. Field tested
• 4. Full Design completed 5. Fabrication Summer 2007 6. Install 2008
Concept Evolution
Load Testing, Glovertown
Testing During Fabrication
Field Trials
Operation
Deployment across ship track
Operation
Completed Crossing with safety markers in place
Operation
Removal
“Through Sikumiut’s involvement in assisting key stakeholders to understand
concerns and explore mitigations around winter shipping, we were able to
address an issue central to Inuit approval for the Voisey’s Bay Nickel Project. Vale INCO
NL is now using an Inuit business to continually
improve its ability to conduct winter shipping safely and
effectively.”
Bob Cooper, President Vale INCO Newfoundland and Labrador Ltd.
Discovery Channel - Mighty Ships “UMIAK I” Video Clip ( Please see video , “Umiak Mighty Ships” if you have codec issues with this clip)
Sikumiut Environmental Management Ltd. Sikumiut Environmental Management Ltd.
Vale - Owner, Operator Voisey’s Bay Mine and Mill FedNav - Owner, Operator MV Umiak I MSI Marine Services International, St. John’s NL - Stability Analysis Fab-Tech Industries, Glovertown, NL - Fabrication Tiller Engineering Inc. St. John’s NL - Structural Certification NewTech Coatings (DFB Group) St. John’s NL - Low Friction Coating Sikumiut Project Manager - E. Fancey, P. Eng.