Basement Waterproofing with Sikaplan ® Case Study at the Golden Mile Project Palm Jumeirah, Dubai Sika at Work No. 06.08 - June 2008 Basement Waterproofing

Sika at Work Palm Jumeirah is one of the most exciting residential projects on earth. ... submit Sika’s system to the project consultants as a preferable and

  • Upload
    danganh

  • View
    214

  • Download
    0

Embed Size (px)

Citation preview

Page 1: Sika at Work Palm Jumeirah is one of the most exciting residential projects on earth. ... submit Sika’s system to the project consultants as a preferable and

Basement Waterproofing with Sikaplan® Case Study at the Golden Mile Project Palm Jumeirah, Dubai

Sika

at W

ork

No. 06.08 - June 2008 Basement Waterproofing

Page 2: Sika at Work Palm Jumeirah is one of the most exciting residential projects on earth. ... submit Sika’s system to the project consultants as a preferable and

Project DescriptionThe Palm Jumeirah is one of the most exciting residential projects on earth. A man-made island, it is being built off the shores of Dubai in the United Arab Emirates.The Palm shaped development extends 6.5 kilometres into the Arabian Gulf and is surrounded by an eleven kilometre-long cre-scent shaped breakwater, built with over seven million tons of rock and sand. It adds 60 kilometres of beachfront to the coast of the UAE – which is all now being developed for private beach residen-ces and some thirty five star luxury hotels. Project Location: The Palm ‘Golden Mile’ is located along the cen-tre of the ‘trunk’ of The Palm, Jumeirah, and will include an inter-national shopping, commercial and residential development cover-ing some 60,000 square metres. The Palm Golden Mile will provide a broad mix of luxury apartments, townhouses and penthouses, all offering prime waterfront living. Project Dimension: Project Golden Mile 1 / 2 consists of two build-ings, each 1000m long and 60m wide. Each structure has three basements and eight floors above ground level (Residential + Hotel + Shopping facilities)

Basement Waterproofing Requirementsn Salt water resistant n Hot climate resistantn Short construction periodn Secure water tightness long after the installation worksn Environmentally friendlyn Cost effectiven Technical assistance and supervision to be provided on site

Marketing Strategy – How Sika won this important projectTo win this project Sika UAE had to win real battles!In the original project documents for the Golden Mile, the water-proofing had been specified as a competitor’s membrane system.Sika UAE approached the project together with the appointed main contractor who had a very good previous relationship with Sika. Due to this relationship, together with Sika’s improved technical and more cost effective proposals, the main contractor decided to submit Sika’s system to the project consultants as a preferable and more reliable alternative. A joint presentation was made to the en-gineering consultants, the Sika proposals were assessed and then subsequently approved. Because of the size of the project and in order to demonstrate our expertise in a professional way, Sika provided a specialist - Sikaplan application instructor - to train and support the local con-tractor on site for the first four weeks of the project. Training cour-ses were held on the correct QA/QC and Installation procedures for the responsible engineers from the consultants, the main contractor and the specialist contractor.

Sika SolutionBasement waterproofing system: loose laid sheet waterproofing membrane with welded compartments for additional security and longevity (Sikaplan® WP 1100-20HL).

Sika products which were used in the project:Sikaplan® WP 1100-20HL (Sikaplan® 14.6) sheet waterproofing membraneSika® Waterbar® type AR for producing the welded compartments

Sika® Injectoflex® HP hose, cast in concrete for sealing of construction joints and allowing injection in case of any future leaks.Sikagard® 720 Epocem for sealing around details on the Pile CapsSikadur® 31 LP/42 LP epoxy adhesive and grouting mortars, plus Sikacrete® 114 cement grout around penetrationsSikaflex® sealants for all of the joint sealing works.

Golden Mile 1 / 2

Sika has provided the basement water-proofing solution in this project.

Page 3: Sika at Work Palm Jumeirah is one of the most exciting residential projects on earth. ... submit Sika’s system to the project consultants as a preferable and

Sika Services AGCorporate Business Unit ContractorsSpeckstrasse 22CH-8330 PfäffikonSwitzerlandPhone +41 58 436 23 64Fax +41 58 436 23 77www.sika.com

Our most current General Sales Conditions shall apply. Please consult the Product Data Sheet prior to any use and processing.

Corp

orat

e M

arke

ting

/ BU

Cont

ract

ors

/ 06.

08 /

06 /

gho

Project ParticipantsOwner: IFAConsulting Engineers: LC/DSAMain Contractor: Al Shafar General Contracting Contracting Specialist, Waterproofing Contractor: WatersealProject Management : Sika UAE, Hani Fikri, Rodney van Eck, Sika Services AGCMF Waterproofing: Hans-Joerg StichDate of construction: 2006/2007

Sika UAE’s Current Position in the local MarketToday, approximately two years after the start of the Palm Jumeirah project, Sika has become the market leader in the UAE for basement waterproofing with PVC sheet membranes. There are now three fully trained specialist waterproofing contractors and twenty eight success-fully completed major reference projects, with approximately 500,000 m² of membrane applied on these projects in total.

The key success factor during these two years has been the higher Sika technical competence, when compared to the competition, the overall Sika reputation and excellent customer service, including maintaining the confidentiality of our customers in their project negotiations.