siemens.com/energy
Service Experiences with the World Record Gas Turbine SGT-8000HJens Klingemann
May 20, 2015 – Oman Energy and Water Conference
May 2015Page 2 Jens Klingemann
SGT-8000H Introduction
Fleet Experience / Operational Status
Service-Friendly Design
Service Tools
Summary
Agenda
May 2015Page 3 Jens Klingemann
Heavy-duty gas turbines Industrial gas turbines
SGT5-8000H
SGT5-4000F
SGT5-2000E
50 Hz 295 MW
172 MW
375 MW
SGT6-8000H
112 MW
SGT6-5000F
SGT6-2000E
50 MW
33 MW
25 MW
8 MW
7 MW
5 MW
SGT-800
SGT-700
SGT-600
SGT-500
SGT-400
SGT-300
SGT-200
SGT-100
274 MW
232 MW60 Hz
37 MWSGT-750
19 MW
14 MW
Siemens Large Scale Gas Turbines:Product Portfolio for 50 Hz and 60 Hz
May 2015Page 4 Jens Klingemann
Siemens V Design Siemens W Design
Turbine cylinder Turbine vane carrier Exit housing
Front hollow shaft Bearings Compressor cylinder
Turbine features Turbine diffuser
Single tie bolt Compr. stat. design
The SGT-8000H concept uses proven features from Siemensand (former) Westinghouse engines and introduces new technology
Secondary Air System
ULN can-annular combustion systemHarmonized
Compressor
SGT5/6-8000H engine concept is based on harmonization and new technology
May 2015Page 5 Jens Klingemann
Technical innovation as the basis of power and efficiency increase
> 60% combined cycle efficiency
Designed for >60% efficiency in combined cycleand best in class operational flexibility
4 stages of fast acting variable-pitch guide vanes (VGV) allowing
for improved part load efficiency and high load transients
Proven rotor design (Hirth serration,
central tie rod, internal cooling air passages) for world class fast (cold) start and hot restart capability
High cycling capability due to fully internally air cooled
turbine section
Evolutionary 3D blading
3D Four stage turbine with advanced materials and thermal barrier coating
HCO for reduced clearance losses
Transient protection of clearances for reduced degradation with
hydraulic clearance optimization (HCO) active clearance control
Advanced Can Annular combustion system
Performance features
Flexibility features
May 2015Page 6 Jens Klingemann
15 15
1
3
42
6
60Hz
50Hz
• Siemens has sold 62 units* worldwide so far• H-class fleet has achieved more than 2.200 starts & 131.000 EOH*
88
Global Fleet Overview of SGT-8000H
* 50Hz and 60Hz combined
May 2015Page 7 Jens Klingemann
SGT-8000H Service-Friendly Design
Defined combustor handling tool envelope (blue frame)
Utilize engine symmetry to optimize maintenance tasks
Provides multi-task environment
Does not require cover lift for Combustion Inspection
Access under engine for tooling installation
One toolkit for burner and transition assembly
Easy-to-service design features
May 2015Page 8 Jens Klingemann
Simple and efficient service conceptwith three types of inspections
Combustor Inspection
Major Inspection (Rotor in Place)
Hot Gas Path Inspection (Rotor in Place)
May 2015Page 9 Jens Klingemann
SGT-8000H Core Engine Designed for easy and fast maintenance
All rotating blades including compressor are replaceable without a rotor lift.
Row 1 Turbine Blades/Vanes/Ring Segments & Row 4 Blades can be replaced with or without cover lift.
Roll out/in capability of the turbine vane carrier enables exchange of stationary turbine hardware without rotor lift.
Roll out/in capability also allows for optional assembled spare vane carrier exchange concept which further reduces outage durations.
May 2015Page 10 Jens Klingemann
Outage Naming and Duration
* Estimated outage durations for turnkey inspections depending on several conditions (labor, site, etc.)* Shift model: 6 days per week / 2 shifts per day / 10 hours per shift* It’s working days only, counted form turning gear off to turning gear on
Name GraphicDuration*
50HzDuration*
60Hz
Combustor Inspection 8 days 7 days
Hot Gas Path Inspection 21 days 21 days
Major Inspection / Outage 29 days 29 days
Major Inspection / Outage with Rotor Lift
35 days 35 days
Rotor Inspection - -
May 2015Page 11 Jens Klingemann
SGT- 8000H Service-Friendly Combustor Maintenance Concept
TLC 44 / TLC45 Single Shaft ConfigurationBenefits
No external crane or other support devices required
Easy access for Field Service personnel
Better protection of combustor components against handling issues
Pre-assembled burner system for fast installation
Optimized outage durations due to simultaneous work flow & packaging
Berlin Factory Test Installation and Container Concept
Combustor components pre-assembled prior to delivery to site!Similar baskets and similar assembly procedure for transition
May 2015Page 12 Jens Klingemann
Burner and Transition Handling Tool Test
Tool Test 10 / 2013 in Berlin, Germany
Purpose:
Dismantling and assembly of transitions and burners
Dealing with indoor environment
Designed for use of Mobile platform and support cranes
Tool 50Hz 60Hz
w/o TLC45 10 d 9 d
w/ TLC45 8 d 7 d
→ 20% reduction in Outage duration
May 2015Page 13 Jens Klingemann
SGT- 8000H Plant Platform Concept
3D Plant Design Model Power Plant Concepts with integrated Service Requirements
1. All power plant components included in the design model
2. Simulation of service activities
3. Optimization of overall power plant concept
May 2015Page 14 Jens Klingemann
SGT- 8000H Serviceability3D model supports service requirements
Destacking Service Option: upending fixture foundation installed during plant construction.
Based on the 3D model the best service concept will be developed and customized, e.g.1. Rotor Inspection can be conducted on site2. Upending fixture foundation installed during plant construction3. Lower cost and higher availability as repair possible without factory visit
May 2015Page 15 Jens Klingemann
Arial 16 pt., Line spacing 1.1 lines
Fast OutagesShort outage times due to innovative service tools
Summary: SGT-8000H benefits
ServiceabilityEasy maintenance on site
CostCost reduction programs and cost benefit for customer
Experience & QualityMarket leadership @ Siemens quality, proven in >131’000* EOH
Fast OutagesShort outage times with use of innovative service tools and concepts
*status December 2014
siemens.com/energy
Thank you!Jens KlingemannVice President Sales Siemens Power Generation Services Middle East & West Asia
Service Experiences with the World Record Gas Turbine SGT-8000H