3
PALM BEACH STATE COLLEGE PALM BEACH STATE COLLEGE Dr. Dennis P. Gallon Campus Dr. Dennis P. Gallon Campus DENTAL & MEDICAL SERVICES TECHNOLOGY BUILDING - SCOPING DOCUMENT DENTAL & MEDICAL SERVICES TECHNOLOGY BUILDING - SCOPING DOCUMENT D ecem b er 22, 2017 Southern Blvd. B Road Building 1 ExisƟng Parking ExisƟng Loop Road ExisƟng Main Entrance Si A i l Sit e A er i a l Sit A i l

Si A i lSitSit A i le Aerial - Palm Beach State College · PPALM BEACH STATE COLLEGEALM BEACH STATE COLLEGE Dr. Dennis P. Gallon Campus Dr. Dennis P. Gallon Campus December 22, 2017

  • Upload
    others

  • View
    2

  • Download
    0

Embed Size (px)

Citation preview

Page 1: Si A i lSitSit A i le Aerial - Palm Beach State College · PPALM BEACH STATE COLLEGEALM BEACH STATE COLLEGE Dr. Dennis P. Gallon Campus Dr. Dennis P. Gallon Campus December 22, 2017

PALM BEACH STATE COLLEGEPALM BEACH STATE COLLEGE Dr. Dennis P. Gallon Campus Dr. Dennis P. Gallon Campus

DENTAL & MEDICAL SERVICES TECHNOLOGY BUILDING - SCOPING DOCUMENTDENTAL & MEDICAL SERVICES TECHNOLOGY BUILDING - SCOPING DOCUMENTDecember 22, 2017

Southern Blvd.

B Ro

ad

Building 1

Exis ng Parking

Exis ng Loop Road

Exis ng Main Entrance

Si A i lSite AerialSit A i l

Page 2: Si A i lSitSit A i le Aerial - Palm Beach State College · PPALM BEACH STATE COLLEGEALM BEACH STATE COLLEGE Dr. Dennis P. Gallon Campus Dr. Dennis P. Gallon Campus December 22, 2017

PALM BEACH STATE COLLEGEPALM BEACH STATE COLLEGE Dr. Dennis P. Gallon Campus Dr. Dennis P. Gallon Campus

DENTAL & MEDICAL SERVICES TECHNOLOGY BUILDING - SCOPING DOCUMENTDENTAL & MEDICAL SERVICES TECHNOLOGY BUILDING - SCOPING DOCUMENTDecember 22, 2017

Design of Campus Overfl ow Parking Area (Including associated Landscape Design & Electrical Site Ligh ng - Supplemental)

Southern Blvd.

Design of Parking Area Expansion Lot(with Civil, Landscape and Ligh ng Design)

D&MST Bldg /Site Development

Basic Services

Design of Campus Loop Road Connec on(Including associated Landscape Design)Electrical Site Ligh ng - Supplemental)

Exclusions:Site Survey (Tree, Topographic and Boundary)Ground Penetra ng Radar and U lity SurveysSoil Borings, Percola on Tests and Geotechnical EngineeringSite Tests - Fire Hydrant Water Service FlowsUSGBC - Registra on and Cer fi ca on FeesTraffi c Signaliza on and Intersec on DesignThreshold Inspec onsFood Service DesignDental & Medical Equipment Systems DesignSpecialty Ligh ng Exterior DesignSite Plan Approval ProcessTransporta on AnalysisAccelerated Break Out Packages / Phasing

B Ro

ad

Design of new Dental & Medical Services Technology Building and required connec- on to Exis ng Phase 1 Building

No Environmental Impact An cipated or Included

Note:Current Site Aerial Image with Site En lement Plan shown for clarity.

Building 1

Exis ng Parking

Exis ng Loop Road

Exis ng Main Entrance

P li i P j g Diagramct ScopinPreliminary ProjecPreliminary ProjecPreliminary Projecct ScopP li i P j ct Scop

Page 3: Si A i lSitSit A i le Aerial - Palm Beach State College · PPALM BEACH STATE COLLEGEALM BEACH STATE COLLEGE Dr. Dennis P. Gallon Campus Dr. Dennis P. Gallon Campus December 22, 2017

December 22, 2017

Preell iimmmmmmmiiinary PProjjeeeecccccctt SSSSSScccccccccchhhhheeeeeeeddddddulle

PALM BEACH STATE COLLEGEPALM BEACH STATE COLLEGE Dr. Dennis P. Gallon Campus Dr. Dennis P. Gallon Campus

DENTAL & MEDICAL SERVICES TECHNOLOGY BUILDING - SCOPING DOCUMENTDENTAL & MEDICAL SERVICES TECHNOLOGY BUILDING - SCOPING DOCUMENT