SHRIMPTONS CREEK - PUBLIC ARTWORK #3: SABERTOOTH SEATS SK-01 SEAT CONFIGURATION 1 - 'SABERTOOTH SEATS' BY ARTSCAPE SCALE 1:35 @A3 2 JULY 2018 Class 2 concrete finish to all precast concrete forms and finished with a penetrating sealer. Tree planting and landscape mounding are intended to be integrated into the design and placement of the seats. One precast concrete form - when flipped and multiplied - creates a seating element. REO dowel entry points, designed into the modular system, enable fixing the individual forms to each other as well to ancillary concrete footings. SABERTOOTH SEATS ‘Sabertooth Seats’ consists of one modular precast concrete form, which - when flipped and multiplied - creates intriguing urban intrusions along the natural Shrimptons Creek corridor. Their intention is to conjure curiosity among those who interact with them, be they sit on them, climb on them or simply admire their modular assembly. Please be mindful that this is a concept only at this stage. It is anticipated that the final precast concrete form, fixing method and composition of forms would occur during the detailed design and documentation phase. ARMREST SEAT BACKREST Forms extend below ground, which - when combined with additional reinforcements acts as a stable footing - to Engineer specification. Ground ELEVATION COMPOSITIONAL DETAIL PLAN Typical 1200mm

SHRIMPTONS CREEK - PUBLIC ARTWORK #3: SABERTOOTH SEATS · SHRIMPTONS CREEK - PUBLIC ARTWORK #3: SABERTOOTH SEATS SK-01 SEAT CONFIGURATION 1 - 'SABERTOOTH SEATS' BY ARTSCAPE SCALE

  • Upload
    others

  • View
    9

  • Download
    0

Embed Size (px)

Citation preview

Page 1: SHRIMPTONS CREEK - PUBLIC ARTWORK #3: SABERTOOTH SEATS · SHRIMPTONS CREEK - PUBLIC ARTWORK #3: SABERTOOTH SEATS SK-01 SEAT CONFIGURATION 1 - 'SABERTOOTH SEATS' BY ARTSCAPE SCALE

SHRIMPTONS CREEK - PUBLIC ARTWORK #3: SABERTOOTH SEATS

SK-01 SEAT CONFIGURATION 1 - 'SABERTOOTH SEATS' BY ARTSCAPESCALE 1:35 @A32 JULY 2018

Class 2 concrete finish to all precast concrete forms and finished with a penetrating sealer.

Tree planting and landscape mounding are intended to be integrated into the design and placement of the seats.

One precast concrete form - when flipped and multiplied - creates a seating element.

REO dowel entry points, designed into the modular system, enable fixing the individual forms to each other as well to ancillary concrete footings.

SABERTOOTH SEATS

‘Sabertooth Seats’ consists of one modular precast concrete form, which - when flipped and multiplied - creates intriguing urban intrusions along the natural Shrimptons Creek corridor.

Their intention is to conjure curiosity among those who interact with them, be they sit on them, climb on them or simply admire their modular assembly.

Please be mindful that this is a concept only at this stage. It is anticipated that the final precast concrete form, fixing method and composition of forms would occur during the detailed design and documentation phase.

ARMREST

SEAT

BACKREST

Forms extend below ground, which - when combined with additional reinforcements acts as a stable footing - to Engineer specification.

Ground

ELEVATIONCOMPOSITIONAL DETAIL

PLAN

Typi

cal 1

200m

m

Page 2: SHRIMPTONS CREEK - PUBLIC ARTWORK #3: SABERTOOTH SEATS · SHRIMPTONS CREEK - PUBLIC ARTWORK #3: SABERTOOTH SEATS SK-01 SEAT CONFIGURATION 1 - 'SABERTOOTH SEATS' BY ARTSCAPE SCALE

SHRIMPTONS CREEK - PUBLIC ARTWORK #3: SABERTOOTH SEATS

SK-01 SEAT CONFIGURATION 2 - 'SABERTOOTH SEATS' BY ARTSCAPESCALE 1:35 @A32 JULY 2018

ELEVATION

PLAN

Ground

Class 2 concrete finish to all precast concrete forms and finished with a penetrating sealer.

Tree planting and landscape mounding are intended to be integrated into the design and placement of the seats.

Forms extend below ground, which - when combined with additional reinforcements acts as a stable footing - to Engineer specification.

Page 3: SHRIMPTONS CREEK - PUBLIC ARTWORK #3: SABERTOOTH SEATS · SHRIMPTONS CREEK - PUBLIC ARTWORK #3: SABERTOOTH SEATS SK-01 SEAT CONFIGURATION 1 - 'SABERTOOTH SEATS' BY ARTSCAPE SCALE

SHRIMPTONS CREEK - PUBLIC ARTWORK #3: SABERTOOTH SEATS

SK-01 SEAT CONFIGURATION 3 - 'SABERTOOTH SEATS' BY ARTSCAPESCALE 1:35 @A32 JULY 2018

Ground

ELEVATION

PLAN Class 2 concrete finish to all precast concrete forms and finished with a penetrating sealer.

Tree planting and landscape mounding are intended to be integrated into the design and placement of the seats.

Forms extend below ground, which - when combined with additional reinforcements acts as a stable footing - to Engineer specification.