5
Lb Ng Ng F I S S E O R P O N A L E N G I R E E N A I V I R O H F JUSTIN M. SHIMP Lic. No. 45183 N I G L A W O N E T C O M M EROSION & SEDIMENT CONTROL PLAN FOR Lake Monticello Fire and Rescue TAX MAP 18, SECTION A, PARCEL 38F FLUVANNA COUNTY, VIRGINIA SHEET INDEX SHEET C1 - COVER SHEET SHEET C2 - EROSION NARRATIVE SHEET C3 - EROSION CONTROL PLAN SHEET C4 - STORMWATER CONVERSION PLAN SHEET C5 - EROSION DETAILS SOILS LEGEND SOILS AND DRAINAGE PATTERN MAP FLUVANNA COUNTY, VIRGINIA ENGINEERING - LAND PLANNING - PROJECT MANAGEMENT SHIMP ENGINEERING, P.C. EROSION & SEDIMENT CONTROL PLAN FOR: LAKE MONTICELLO FIRE & RESCUE COVER SHEET F I S S E O R P O N A L E N G I R E E N A I V I R O H F JUSTIN M. SHIMP Lic. No. 45183 N I G L A W O N E T C O M M VICINITY MAP SCALE: 1"=1,000' IMAGE PROVIDED BY GOOGLE MAPS FOR REVIEW CONCEPT DRAWINGS FOR RFP PURPOSES ONLY. NOT FOR CONSTRUCTION.

SHEET C5 - EROSION DETAILS Lb Ng · f si s e o r p onalen gi r e n. a. i v i r ho f. justin m. shimp. lic. no. 45183. n i g al w on e. t c. o m. project narrative, general notes,

Embed Size (px)

Citation preview

Lb

Ng

Ng

FISSE

ORP

ONAL ENGI

REEN

AI

VIR

OH F

JUSTIN M. SHIMPLic. No. 45183

NIG

LAW

ON

E T

CO

MM

EROSION & SEDIMENT CONTROL PLAN FORLake Monticello Fire and Rescue

TAX MAP 18, SECTION A, PARCEL 38FFLUVANNA COUNTY, VIRGINIA

SHEET INDEXSHEET C1 - COVER SHEETSHEET C2 - EROSION NARRATIVESHEET C3 - EROSION CONTROL PLANSHEET C4 - STORMWATER CONVERSION PLANSHEET C5 - EROSION DETAILS

SOILS LEGEND

SOILS AND DRAINAGE PATTERN MAP

FLU

VA

NN

A C

OU

NT

Y,

VIR

GIN

IA

ENGI

NEER

ING

- LAN

D PL

ANNI

NG -

PROJ

ECT

MANA

GEME

NTSH

IMP E

NGIN

EERI

NG, P

.C.E

RO

SIO

N &

SE

DIM

EN

T C

ON

TR

OL P

LA

N F

OR

:

LAKE M

ONTIC

ELLO F

IRE & R

ESCUE

CO

VER

SHEE

T

FISSE

ORP

ONAL ENGI

REEN

AI

VI R

OH F

JUSTIN M. SHIMPLic. No. 45183

NIG

LAW

ON

E T

CO

MM

VICINITY MAP SCALE: 1"=1,000'

IMAGE PROVIDED BY GOOGLE MAPS

FOR REVIEW

CON

CEPT

DRA

WIN

GS F

OR

RFP

PURP

OSE

S O

NLY

. NO

T FO

R CO

NST

RUCT

ION

.

AutoCAD SHX Text
Relocated Underground Propane Tanks
AutoCAD SHX Text
UGGT
AutoCAD SHX Text
410
AutoCAD SHX Text
412
AutoCAD SHX Text
398
AutoCAD SHX Text
396
AutoCAD SHX Text
400
AutoCAD SHX Text
408
AutoCAD SHX Text
406
AutoCAD SHX Text
404
AutoCAD SHX Text
402
AutoCAD SHX Text
410
AutoCAD SHX Text
PP
AutoCAD SHX Text
PP
AutoCAD SHX Text
18" CMP
AutoCAD SHX Text
Inv.=399.98'
AutoCAD SHX Text
Inv.=398.28'
AutoCAD SHX Text
408
AutoCAD SHX Text
404
AutoCAD SHX Text
402
AutoCAD SHX Text
412
AutoCAD SHX Text
414
AutoCAD SHX Text
414
AutoCAD SHX Text
El: 402.7
AutoCAD SHX Text
El: 402.6
AutoCAD SHX Text
El: 405.0
AutoCAD SHX Text
El: 405.7
AutoCAD SHX Text
El: 403.1
AutoCAD SHX Text
El: 401.3
AutoCAD SHX Text
SSMH TOP=411.51'
AutoCAD SHX Text
CLEAN OUT
AutoCAD SHX Text
CLEAN OUT
AutoCAD SHX Text
SEWER PUMP
AutoCAD SHX Text
SEWER PUMP
AutoCAD SHX Text
Water Pipe
AutoCAD SHX Text
WM
AutoCAD SHX Text
WM
AutoCAD SHX Text
FH
AutoCAD SHX Text
WV
AutoCAD SHX Text
WM
AutoCAD SHX Text
UTILITY BOX
AutoCAD SHX Text
ELEC. BOX
AutoCAD SHX Text
PP
AutoCAD SHX Text
TRAFFIC BOX
AutoCAD SHX Text
408
AutoCAD SHX Text
404
AutoCAD SHX Text
408
AutoCAD SHX Text
402
AutoCAD SHX Text
400
AutoCAD SHX Text
406
AutoCAD SHX Text
408
AutoCAD SHX Text
408
AutoCAD SHX Text
406
AutoCAD SHX Text
404
AutoCAD SHX Text
404
AutoCAD SHX Text
406
AutoCAD SHX Text
408
AutoCAD SHX Text
412
AutoCAD SHX Text
6"x6"TEE AND VALVE
AutoCAD SHX Text
Ex. 8"X4" TS&V
AutoCAD SHX Text
EX 8" WL VIF
AutoCAD SHX Text
Ex. 6'' C900 PVC WATERLINE
AutoCAD SHX Text
EX FIRE HYDRANT
AutoCAD SHX Text
6" STUBOUT WITH CAP FOR FUTURE CONNECTION
AutoCAD SHX Text
Ex. Water Meter
AutoCAD SHX Text
25-LF 4" C900 PVC WL
AutoCAD SHX Text
DI TOP= 400.05'
AutoCAD SHX Text
18"PIPE FILLED WITH LEAVES
AutoCAD SHX Text
8"CPP
AutoCAD SHX Text
DI TOP=409.60'
AutoCAD SHX Text
DI TOP =407.40'
AutoCAD SHX Text
DI TOP =404.22'
AutoCAD SHX Text
8"CPP INV. 397.90'
AutoCAD SHX Text
8"CPP INV. 398.15'
AutoCAD SHX Text
INV.=394.89'
AutoCAD SHX Text
15" CMP INV=396.06'
AutoCAD SHX Text
INV=397.90'
AutoCAD SHX Text
18" CMP
AutoCAD SHX Text
INV.=391.35'
AutoCAD SHX Text
INV.=391.70'
AutoCAD SHX Text
18" CMP
AutoCAD SHX Text
Estimated Pipe
AutoCAD SHX Text
SOUTH BOSTON ROAD (ROUTE 600) - 40' R/W
AutoCAD SHX Text
Lot 14 Phase IV Lake Monticello Zoned: R-4
AutoCAD SHX Text
IF
AutoCAD SHX Text
PF
AutoCAD SHX Text
TM 18-38B Broadus L. Brown D. B. 93-228 Zoned: A-1
AutoCAD SHX Text
SLICE ROAD-50' R/W
AutoCAD SHX Text
TM 18-(A)-38E Gina Pervall et al WB 61-677 Zoned: A-1
AutoCAD SHX Text
TM 18-(A)-38F Lake Monticello Volunteer Fire Department DB 927-955 6.134 Ac. Zoned: A-1
AutoCAD SHX Text
50
AutoCAD SHX Text
0
AutoCAD SHX Text
50
AutoCAD SHX Text
100
AutoCAD SHX Text
150
AutoCAD SHX Text
SCALE: 1" = 50'
AutoCAD SHX Text
Lb - Lignum Silt Loam, 2 to 8% Slopes Ng - Nason Silt Loam, 2 to 8% Slopes
AutoCAD SHX Text
Soil Type Boundary
AutoCAD SHX Text
Drainage Divide
AutoCAD SHX Text
Plan Notes: : Owner Info:Lake Monticello Volunteer Fire and Lake Monticello Volunteer Fire and Rescue Squad 10 Slice Rd. Palmyra, VA 22963 Palmyra, VA 22963 Source of Topography: Stanley Land Surveys, PLC Source of Boundary: Stanley Land Surveys, PLC
AutoCAD SHX Text
AutoCAD SHX Text
PHONE: (434) 227-5140
AutoCAD SHX Text
CHARLOTTESVILLE, VA 22902
AutoCAD SHX Text
201 E MAIN ST, SUITE M
AutoCAD SHX Text
File No.
AutoCAD SHX Text
Sheet No.
AutoCAD SHX Text
Scale
AutoCAD SHX Text
Date
AutoCAD SHX Text
OF
AutoCAD SHX Text
5
AutoCAD SHX Text
12.026
AutoCAD SHX Text
C1
AutoCAD SHX Text
1"=40'
AutoCAD SHX Text
08/12/2016
AutoCAD SHX Text
Rev #
AutoCAD SHX Text
Date
AutoCAD SHX Text
Description
AutoCAD SHX Text
N
AutoCAD SHX Text
SITE
AutoCAD SHX Text
N

FISSE

ORP

ONAL ENGI

REEN

AI

VI R

OH F

JUSTIN M. SHIMPLic. No. 45183

NIG

LAW

ON

E T

CO

MM

PROJECT NARRATIVE, GENERAL NOTES, EROSION & SEDIMENT CONTROL NOTES, AND SEQUENCE OF CONSTRUCTION

FLU

VA

NN

A C

OU

NT

Y,

VIR

GIN

IA

ENGI

NEER

ING

- LAN

D PL

ANNI

NG -

PROJ

ECT

MANA

GEME

NTSH

IMP E

NGIN

EERI

NG, P

.C.E

RO

SIO

N &

SE

DIM

EN

T C

ON

TR

OL P

LA

N F

OR

:

LAKE M

ONTIC

ELLO F

IRE & R

ESCUE

ERO

SIO

N N

ARRATI

VE

FOR REVIEW

CON

CEPT

DRA

WIN

GS F

OR

RFP

PURP

OSE

S O

NLY

. NO

T FO

R CO

NST

RUCT

ION

.

AutoCAD SHX Text
AutoCAD SHX Text
PHONE: (434) 227-5140
AutoCAD SHX Text
CHARLOTTESVILLE, VA 22902
AutoCAD SHX Text
201 E MAIN ST, SUITE M
AutoCAD SHX Text
File No.
AutoCAD SHX Text
Sheet No.
AutoCAD SHX Text
Scale
AutoCAD SHX Text
Date
AutoCAD SHX Text
OF
AutoCAD SHX Text
5
AutoCAD SHX Text
12.026
AutoCAD SHX Text
C2
AutoCAD SHX Text
N/A
AutoCAD SHX Text
08/12/2016
AutoCAD SHX Text
Rev #
AutoCAD SHX Text
Date
AutoCAD SHX Text
Description
AutoCAD SHX Text
PROJECT DESCRIPTION THIS PROJECT IS A PROPOSED PARKING LOT AND BUILDING EXPANSION FOR AN EXISTING FIRE AND RESCUE SQUAD STATION. THE TOTAL AREA OF DISTURBANCE IS 1.85 ACRES THE PROJECT INVOLVES THE FOLLOWING WORK ACTIVITIES: 1.THE CONTRACTOR SHALL OBTAIN ALL LOCAL AND STATE EROSION AND THE CONTRACTOR SHALL OBTAIN ALL LOCAL AND STATE EROSION AND SEDIMENT PERMITTING REQUIREMENTS AND MAINTAIN ALL EROSION AND SEDIMENT CONTROLS IN ACCORDANCE WITH THE PERMIT REQUIREMENTS. 2.IF REQUIRED THE CONTRACTOR SHALL OBTAIN A TEMPORARY ENTRANCE IF REQUIRED THE CONTRACTOR SHALL OBTAIN A TEMPORARY ENTRANCE PERMIT FROM THE VIRGINIA DEPARTMENT OF TRANSPORTATION (VDOT). 3.INSTALLATION OF TEMPORARY AND PERMANENT EROSION AND SEDIMENT INSTALLATION OF TEMPORARY AND PERMANENT EROSION AND SEDIMENT CONTROL MEASURES AS SHOWN ON THE PLAN AND DETAILS. 4.CONSTRUCTION OF SITE IMPROVEMENTS AS SHOWN ON THE PLAN. CONSTRUCTION OF SITE IMPROVEMENTS AS SHOWN ON THE PLAN. EXISTING SITE CONDITIONS ALL WORK SHALL BE COMPLETED ON THE SUBJECT PARCELS, FLUVANNA COUNTY TAX MAP 18, SECTION A, PARCELS 38F AND 4-13B. SUBJECT PARCEL IS OWNED BY: LAKE MONTICELLO VOLUNTEER FIRE DEPARTMENT AND RESCUE SQUAD 10 SLICE RD.10 SLICE RD.PALMYRA, VA 22963 THE SITE IS CURRENTLY A FIREHOUSE, RESCUE SQUAD AND ADJACENT WOODED LOT. ADJACENT PROPERTIES THIS PROPERTY IS BORDERED TO THE NORTH BY SLICE ROAD, TO THE EAST BY SOUTH BOSTON ROAD, TO THE WEST BY ONE EXISTING RESIDENCE AND TWO VACANT PARCELS AND TO THE SOUTH BY ANOTHER SINGLE FAMILY RESIDENCE. THERE ARE TWO ADDITIONAL RESIDENCES TO THE EAST ADJACENT TO SOUTH BOSTON ROAD. SOILS THIS SITE CONTAINS THE FOLLOWING SOIL TYPES BASED ON NRCS SOIL MAPS FOR FLUVANNA COUNTY: Lb - LlGNUM SILT LOAM - 2% TO 8% SLOPES Ng - NASON SILT LOAM - 2% TO 8% SLOPES CRITICAL EROSION AREAS THERE ARE NO CRITICAL EROSION AREAS ON THIS SITE. SITE CONTROLS THE CONTRACTOR SHALL PROVIDE AND MAINTAIN SITE CONTROLS AND JOB SITE PROTECTION MEASURES AS SET FORTH IN THESE PLANS. ENVIRONMENTAL CONTROLS 1.CONTRACTOR SHALL PROVIDE AND MAINTAIN ALL ENVIRONMENTAL CONTRACTOR SHALL PROVIDE AND MAINTAIN ALL ENVIRONMENTAL CONTROL MEASURES SO AS TO COMPLY WITH LOCAL ORDINANCES, STATE AND FEDERAL LAWS AND REGULATIONS APPLICABLE TO WATER POLLUTION IN WATERS OF THE STATE AND IN INTERSTATE WATERS. 2.CONTRACTOR SHALL MINIMIZE THE POTENTIAL FOR AIR POLLUTION BY THE USE CONTRACTOR SHALL MINIMIZE THE POTENTIAL FOR AIR POLLUTION BY THE USE OF EMISSION CONTROL EQUIPMENT ON CONTRACTOR OPERATED EQUIPMENT, SHUT-DOWN OF MOTORIZED EQUIPMENT WHEN NOT IN USE, AND ACTIVELY CONTROLLING DUST EMISSIONS THROUGHOUT THE PROJECT. 3.ANY WASTE DISCOVERED DURING THE PROJECT SHALL NOT BE MOVED WITH ANY WASTE DISCOVERED DURING THE PROJECT SHALL NOT BE MOVED WITH OUT PRIOR AUTHORIZATION OF THE OWNER AND BE DIRECT-LOADED INTO COVERED ROLL-OFF CONTAINERS FOR TEMPORARY STORAGE PRIOR TO DISPOSAL IN A PERMITTED LANDFILL. EROSION & SEDIMENT CONTROL PERMITTING 1.CONTRACTOR SHALL BE RESPONSIBLE FOR OBTAINING ALL LOCAL AND STATE CONTRACTOR SHALL BE RESPONSIBLE FOR OBTAINING ALL LOCAL AND STATE EROSION AND SEDIMENT CONTROL PERMITS AND MAINTAINING ALL EROSION AND SEDIMENT CONTROLS IN ACCORDANCE WITH THE PERMIT REQUIREMENTS.
AutoCAD SHX Text
GENERAL NOTES 1.ALL ELEVATIONS INDICATED REFER TO SITE DATUM OF NAVD88. ALL ELEVATIONS INDICATED REFER TO SITE DATUM OF NAVD88. 2.THE INFORMATION AND DATA SHOWN OR INDICATED WITH RESPECT TO THE THE INFORMATION AND DATA SHOWN OR INDICATED WITH RESPECT TO THE EXISTING UNDERGROUND UTILITIES AT OR CONTIGUOUS TO THE SITE ARE BASED ON INFORMATION AND DATA FURNISHED TO THE OWNER AND ENGINEER BY THE OWNERS OF SUCH UNDERGROUND FACILITIES OR OTHERS. OTHERS. THE OWNER OR ENGINEER SHALL NOT BE RESPONSIBLE FOR THE ACCURACY OR COMPLETENESS OF SUCH INFORMATION OR DATA. THE CONTRACTOR SHALL HAVE FULL RESPONSIBILITY FOR CONFIRMING THE ACCURACY OF THE DATA, FOR LOCATING ALL UNDERGROUND UTILITIES, FOR UTILITIES, FOR COORDINATION OF THE WORK WITH OWNERS OF SUCH UNDERGROUND UTILITIES DURING CONSTRUCTION, FOR THE SAFETY AND PROTECTION PROTECTION THEREOF AND REPAIRING ANY DAMAGE THERETO RESULTING FROM THE WORK. ALL OF THESE CONDITIONS SHALL BE MET AT NO ADDITIONAL COST TO THE OWNER. THE CONTRACTOR SHALL CONTACT "MISS UTILITIES" UTILITIES" OF VIRGINIA AT 1-800-552-7001 PRIOR TO THE START OF WORK. OF WORK. WORK. 3.WHEN WORKING ADJACENT TO EXISTING STRUCTURES, POLES, ETC., THE WHEN WORKING ADJACENT TO EXISTING STRUCTURES, POLES, ETC., THE CONTRACTOR SHALL USE WHATEVER METHODS THAT ARE NECESSARY TO PROTECT STRUCTURES FROM DAMAGE. REPLACEMENT OF DAMAGED STRUCTURES SHALL BE AT THE CONTRACTOR'S EXPENSE. 4.THE CONTRACTOR SHALL BE RESPONSIBLE FOR PROTECTING ALL EXISTING THE CONTRACTOR SHALL BE RESPONSIBLE FOR PROTECTING ALL EXISTING SITE STRUCTURES FROM DAMAGE AND COORDINATING WORK SO THAT THE OWNER CAN MAKE NECESSARY ARRANGEMENTS TO MODIFY/PROTECT EXISTING STRUCTURES FROM DAMAGES. 5.THE CONTRACTOR SHALL BE RESPONSIBLE FOR NOTIFYING ALL UTILITY THE CONTRACTOR SHALL BE RESPONSIBLE FOR NOTIFYING ALL UTILITY OWNERS, ADJACENT LAND OWNERS WHOSE PROPERTY MAY BE IMPACTED AND AND THE VIRGINIA DEPARTMENT OF TRANSPORTATION PRIOR TO COMPLETING ANY OFF-SITE WORK. 6.CONTRACTOR SHALL NOTIFY AND COORDINATE ALL WORK INVOLVING CONTRACTOR SHALL NOTIFY AND COORDINATE ALL WORK INVOLVING EXISTING UTILITIES WITH UTILITY OWNERS, AT LEAST 72 HOURS PRIOR TO THE START OF CONSTRUCTION. 7.CONTRACTOR SHALL IMMEDIATELY REPORT ANY DISCREPANCIES BETWEEN CONTRACTOR SHALL IMMEDIATELY REPORT ANY DISCREPANCIES BETWEEN EXISTING CONDITIONS AND CONTRACT DOCUMENTS TO THE OWNER AND ENGINEER. 8. CONTRACTOR SHALL ADJUST ALL APPURTENANCES AS REQUIRED TO CONTRACTOR SHALL ADJUST ALL APPURTENANCES AS REQUIRED TO MATCH NEW GRADES. THE EXACT LOCATION OF APPURTENANCES SHALL BE BE COORDINATED WITH THE OWNER. 9.CONTRACTOR SHALL SUBMIT FOR THE APPROVAL OF THE OWNER CONTRACTOR SHALL SUBMIT FOR THE APPROVAL OF THE OWNER SUBMITTALS OF ALL SPECIFIED MATERIALS LISTED IN THE PLANS, TO INCLUDE SHOP DRAWINGS, MANUFACTURER'S SPECIFICATIONS AND LABORATORY REPORTS. THE OWNER'S APPROVAL OF SUBMITTALS WILL BE GENERAL AND WILL NOT RELIEVE THE THE CONTRACTOR FROM THE RESPONSIBILITY OF ADHERENCE TO THE CONTRACT AND FOR ANY ERROR ERROR THAT MAY EXIST. 10.FIELD DENSITY TESTS SHALL BE PERFORMED AT A FREQUENCY OF ONE FIELD DENSITY TESTS SHALL BE PERFORMED AT A FREQUENCY OF ONE TEST PER LIFT PER 10,000 SQ FT OF MATERIAL PLACED AND COMPACTED COMPACTED TO WITHIN 90 (%) PERCENT OF STANDARD PROCTOR USING A GRID PATTERN OF 100 FT PER LIFT. EROSION & SEDIMENT CONTROL NOTES: 1.ALL VEGETATIVE AND STRUCTURAL EROSION & SEDIMENT CONTROL (E&S) ALL VEGETATIVE AND STRUCTURAL EROSION & SEDIMENT CONTROL (E&S) PRACTICES WILL BE CONSTRUCTED AND MAINTAINED IN ACCORDANCE WITH THE MINIMUM SPECIFICATIONS OF THE VIRGINIA EROSION AND SEDIMENT CONTROL HANDBOOK AND VIRGINIA REGULATION 4VAC50-30. 2.THE PLAN APPROVING AUTHORITY MUST BE NOTIFIED ONE WEEK PRIOR TO THE PLAN APPROVING AUTHORITY MUST BE NOTIFIED ONE WEEK PRIOR TO THE PRE-CONSTRUCTION CONFERENCE, ONE WEEK PRIOR TO COMMENCEMENT OF LAND DISTURBING ACTIVITY AND ONE WEEK PRIOR TO FINAL INSPECTION. THIS REQUIREMENT CAN BE WAIVED AT THE DISCRETION OF THE PLAN APPROVING AUTHORITY. 3.ALL EROSION AND SEDIMENT CONTROL MEASURES ARE TO BE PLACED PRIOR ALL EROSION AND SEDIMENT CONTROL MEASURES ARE TO BE PLACED PRIOR TO OR AS THE FIRST STEP IN CLEARING. 4.A COPY OF THE APPROVED EROSION AND SEDIMENT CONTROL PLAN SHALL A COPY OF THE APPROVED EROSION AND SEDIMENT CONTROL PLAN SHALL BE MAINTAINED ONSITE AT ALL TIMES. 5.PRIOR TO COMMENCING LAND DISTURBING ACTIVITIES IN AREAS OTHER THAN PRIOR TO COMMENCING LAND DISTURBING ACTIVITIES IN AREAS OTHER THAN INDICATED ON THESE PLANS (INCLUDING BUT NOT LIMITED TO, OF-SITE BORROW OR WASTE AREAS), THE CONTRACTOR SHALL SUBMIT A SUPPLEMENTRY EROSION AND SEDIMENT CONTROL PLAN TO THE OWNER FOR REVIEW AND APPROVAL BY THE PLAN REVIEWING AUTHORTY. 6.THE CONTRACTOR IS RESPONSIBLE FOR INSTALLATION OF ANY ADDITIONAL THE CONTRACTOR IS RESPONSIBLE FOR INSTALLATION OF ANY ADDITIONAL EROSION AND SEDIMENT CONTROL MEASURES NECESSARY TO PREVENT EROSION AND SEDIMENTATION AS DETERMINED BY THE PLAN REVIEWING AUTHORITY. 7.ALL DISTURBED AREAS ARE TO DRAIN TO APPROVED SEDIMENT CONTROL ALL DISTURBED AREAS ARE TO DRAIN TO APPROVED SEDIMENT CONTROL MEASURES AT ALL TIMES DURING LAND DISTURBING ACTIVIES AND DURING SITE DEVELOPMENT UNTIL FINAL STABALIZATION IS ACHEIVED. 8.DURING DEWATERING OPERATIONS, WATER WILL BE PUMPED INTO AN DURING DEWATERING OPERATIONS, WATER WILL BE PUMPED INTO AN APPROVED FILTERING DEVICE. 9.THE CONTRACTOR SHALL INSPECT ALL EROSION CONTROL MEASURES THE CONTRACTOR SHALL INSPECT ALL EROSION CONTROL MEASURES PERIODICALY AND AFTER EACH RUN-OFF PRODUCING STORM EVENT. ANY NECESSARY REPARIS OR CLEANUP TO MAINTAIN THE EFFECTIVENESS OF THE EROSION CONTROL DEVICES SHALL BE MADE IMMEDIATELY. 10.INSTALL AND MAINTAIN CONSTRUCTION ENTRANCES FOR ENTIRE PROJECT INSTALL AND MAINTAIN CONSTRUCTION ENTRANCES FOR ENTIRE PROJECT AT ALL LOCATIONS WHERE VEHICLES ENTER/LEAVE THE WORK AREA AND WHERE SOIL IS STOCKPILED. 11.ESTABLISH PERMANENT VEGETATIVE COVER IN ALL DRAINAGE DITCHES AND ESTABLISH PERMANENT VEGETATIVE COVER IN ALL DRAINAGE DITCHES AND TO 15 FT ON BOTH SIDES OF ALL DRAINAGE DITCHES. 12.MAINTAIN ALL EROSION AND SEDIMENT CONTROL UNTIL THE COMPLETION OF MAINTAIN ALL EROSION AND SEDIMENT CONTROL UNTIL THE COMPLETION OF FINAL STABILIZATION. UNLESS OTHERWISE NOTED ON THE PLANS REMOVE ALL EROSION & SEDIMENT CONTROLS FOLLOWING THE ESTABLISHMENT OF A PERMANENT VEGETATIVE COVER AND COMPLETION OF FINAL STABILIZATION.
AutoCAD SHX Text
EROSION & SEDIMENT CONTROLS 1.CONSTRUCTION ENTRANCE:INSTALL AND MAINTAIN A CONSTRUCTION CONSTRUCTION ENTRANCE:INSTALL AND MAINTAIN A CONSTRUCTION :INSTALL AND MAINTAIN A CONSTRUCTION INSTALL AND MAINTAIN A CONSTRUCTION ENTRANCE, AS NECESSARY, THAT MEETS THE REQUIREMENTS OF STD. AND SPEC. 3.02 AND CONFORMS WITH THE REQUIREMENTS OF THE EROSION & SEDIMENT CONTROL PLAN. 2.SILT FENCE: INSTALL AND MAINTAIN SILT FENCE THAT MEETS THE SILT FENCE: INSTALL AND MAINTAIN SILT FENCE THAT MEETS THE : INSTALL AND MAINTAIN SILT FENCE THAT MEETS THE REQUIREMENTS OF STD. AND SPEC. 3.05. THIS SILT FENCE SHALL BE INSTALLED AS SHOWN ON THE EROSION & SEDIMENT CONTROL PLAN AND ACCOMPANYING DETAILS FOR THE PURPOSE OF INTERCEPTING SILT-LADEN RUNOFF BEFORE IT IS DISCHARGED FROM THE SITE. THE SILT FENCE SHALL BE INSPECTED AND MAINTAINED TO ENSURE CONTINUED PERFORMANCE. 3.SOIL/STONE STOCKPILE AREA: THE CONTRACTOR SHALL ONLY STOCKPILE SOIL/STONE STOCKPILE AREA: THE CONTRACTOR SHALL ONLY STOCKPILE : THE CONTRACTOR SHALL ONLY STOCKPILE SOIL/STONE AT LOCATIONS THAT HAVE BEEN APPROVED BY THE OWNER. MATERIALS SHALL BE PLACED IN DESIGNATED STOCKPILE AREAS ONLY AND TOPSOIL, COMMON FILL, AND STONE SHALL NOT BE MIXED. THE CONTRACTOR SHALL INSTALL SILT FENCE OR OTHER MEASURES AS SHOWN ON THE EROSION CONTROL PLAN AROUND THE ENTIRE PERIMETER OF ALL SOIL STOCKPILES AND ESTABLISH TEMPORARY VEGETATION ON THOSE STOCKPILES THAT WILL NOT BE WORKED FOR 15 DAYS. 4.SOIL STABILIZATION MATTING: EC-2 SOIL STABILIZATION BLANKETS SHALL SOIL STABILIZATION MATTING: EC-2 SOIL STABILIZATION BLANKETS SHALL EC-2 SOIL STABILIZATION BLANKETS SHALL BE INSTALLED IN ALL DRAINAGE DITCHES AS SHOWN IN THE EROSION & SEDIMENT PLAN AND IN CONFORMANCE WITH STD, & SPEC. 3.36 TO PROTECT AGAINST EROSION AND SEDIMENT TRANSPORT. 5.TEMPORARY SEDIMENT TRAP: TEMPORARY SEDIMENT TRAPS SHALL BE TEMPORARY SEDIMENT TRAP: TEMPORARY SEDIMENT TRAPS SHALL BE : TEMPORARY SEDIMENT TRAPS SHALL BE INSTALLED PER THE EROSION AND SEDIMENT CONTROL PLAN FOR THE PURPOSE OF DETAINING SEDIMENT AND SILT WITHIN STORM WATER RUNOFF. THE TRAPS SHALL REMAIN IN PLACE UNTIL THE SITE IS STABILIZED UNLESS OTHERWISE NOTED ON THE PLAN. 6.TEMPORARY SEEDING: TEMPORARY SEEDING SHALL BE APPLIED TO ALL TEMPORARY SEEDING: TEMPORARY SEEDING SHALL BE APPLIED TO ALL : TEMPORARY SEEDING SHALL BE APPLIED TO ALL DENUDED AREAS WITHIN SEVEN (7) DAYS TO DENUDED AREAS THAT MAY OR MAY NOT BE AT FINAL GRADE BUT WILL REMAIN DORMANT (UNDISTURBED) FOR LONGER THAN 30 DAYS. TEMPORARY SEEDING SHALL BE APPLIED IN CONFORMANCE WITH STD. AND SPEC. 3.31. 7.PERMANENT SEEDING: ALL DITCHES AND ADJACENT AREAS WITHIN 15 FT OF PERMANENT SEEDING: ALL DITCHES AND ADJACENT AREAS WITHIN 15 FT OF : ALL DITCHES AND ADJACENT AREAS WITHIN 15 FT OF THE EDGE OF THE DITCHES SHALL BE SEEDED IN CONFORMANCE WITH STD. AND SPEC. 3.32. PERMANENT SEEDING SHALL BE APPLIED TO AREAS DELINEATED ON THESE PLANS WITHIN SEVEN (7) DAYS AFTER FINAL GRADE IS REACHED ON ANY PORTION OF THE SITE. PERMANENT SEEDING STABILIZES DISTURBED AREAS AND ENHANCES THE BEAUTY OF THE SITE. 8.DUST CONTROL: CONDUCT DUST CONTROL OPERATIONS NECESSARY TO MET DUST CONTROL: CONDUCT DUST CONTROL OPERATIONS NECESSARY TO MET CONDUCT DUST CONTROL OPERATIONS NECESSARY TO MET THE REQUIREMENTS OF STD. & SPEC. 3.39 AS REQUIRED TO CONTROL SURFACE AND AIRBORNE MOVEMENT OF DUST. 9.TEMPORARY DIVERSION DIKE: TEMPORARY DIVERSION DIKES SHALL BE TEMPORARY DIVERSION DIKE: TEMPORARY DIVERSION DIKES SHALL BE TEMPORARY DIVERSION DIKES SHALL BE INSTALLED AS SHOWN ON THE EROSION AND SEDIMENT CONTROL PLAN AND DETAILS. THE DIVERSIONS SHALL BE INSTALLED PRIOR TO SIGNIFICANT LAND DISTURBING ACTIVITIES AND SHALL REMAIN IN PLACE UNTIL THE SITE IS STABILIZED UNLESS OTHERWISE NOTED ON THE PLAN. OFFSITE AREAS: NO OFFSITE AREAS ARE PROPOSED WITH THIS SUBMITTAL STORM WATER MANAGEMENT: STORMWATER MANAGEMENT WILL BE ADDRESSED DURING THE CONSTRUCTION PHASE BY CONSTRUCTION OF NEW SEDIMENT TRAP. AFTER THIS PHASE IS COMPLETE THE SEDIMENT TRAP WILL BE EXPANDED INTO A DETENTION POND. THE DEVELOPMENT WILL NOT CAUSE A SHARP INCREASE IN RUNOFF, AND THE EXCESS WILL BE MANAGED BY THE POND. THIS WILL PREVENT DOWNSTREAM EROSION. MANAGEMENT STRATEGY AND SEQUENCE OF CONSTRUCTION THE FOLLOWING ARE THE PROPOSED MANAGEMENT STRATEGIES AND DETAILED SEQUENCE OF CONSTRUCTION: PHASE 1: MAINTAIN EXISTING EROSION CONTROL MEASURES. MAINTAIN EXISTING EROSION CONTROL MEASURES. 1.INSTALL CONSTRUCTION ENTRANCE. INSTALL CONSTRUCTION ENTRANCE. 2.INSTALL INLET PROTECTIONS INSTALL INLET PROTECTIONS 3.INSTALL SILT FENCE AT THE LOCATIONS SHOWN ON THE EROSION & INSTALL SILT FENCE AT THE LOCATIONS SHOWN ON THE EROSION & SEDIMENT CONTROL PLAN. 4.EXPAND THE EXISTING DETENTION POND TO NEW DIMENSIONS SHOWN ON SITE EXPAND THE EXISTING DETENTION POND TO NEW DIMENSIONS SHOWN ON SITE PLAN. PHASE 2 1.CONTACT THE ENGINEER AND FLUVANNA COUNTY FOR INSPECTION AND CONTACT THE ENGINEER AND FLUVANNA COUNTY FOR INSPECTION AND APPROVAL OF ALL E&S CONTROL MEASURES. PHASE 3 1.UPON APPROVAL OF ALL E&S CONTROL MEASURES, BEGIN WHOLESALE UPON APPROVAL OF ALL E&S CONTROL MEASURES, BEGIN WHOLESALE CLEARING, GRADING AND STOCKPILING. 2.CONSTRUCT SITE IMPROVEMENTS PER PLAN. CONSTRUCT SITE IMPROVEMENTS PER PLAN. 3.MAINTAIN ALL E&S CONTROL MEASURES. MAINTAIN ALL E&S CONTROL MEASURES. STAGE 4 1.ESTABLISH AND MAINTAIN PERMANENT STABILIZATION FEATURES, AND CALL ESTABLISH AND MAINTAIN PERMANENT STABILIZATION FEATURES, AND CALL FOR FINAL INSPECTIONS. CONSTRUCTION MAINTENANCE THE FOLLOWING CONSTRUCTION MAINTENANCE PRACTICES SHALL BE FOLLOWED AT THE SITE. 1.ALL E&S CONTROL MEASURES WILL BE CHECKED DAILY AND AFTER EACH ALL E&S CONTROL MEASURES WILL BE CHECKED DAILY AND AFTER EACH SIGNIFICANT RAIN EVENT. ALL DEFICIENCIES IDENTIFIED DURING THESE INSPECTIONS SHALL BE CORRECTED AS SOON AS PRACTICABLE. 2.THE SILT FENCE BARRIER SHALL BE REGULARLY CHECKED FOR UNDERMINING, THE SILT FENCE BARRIER SHALL BE REGULARLY CHECKED FOR UNDERMINING, DETERIORATION OR SIGNIFICANT EROSION. SEDIMENT SHALL BE REMOVED AFTER EACH STORM EVENT AND WHEN THE LEVEL OF SEDIMENT DEPOSITION REACHES HALF THE HEIGHT OF THE CONTROL. 3.THE CONTRACTOR IS RESPONSIBLE FOR ADHERING TO ALL MAINTENANCE THE CONTRACTOR IS RESPONSIBLE FOR ADHERING TO ALL MAINTENANCE REQUIREMENTS SET FORTH IN THE CURRENT EDITION OF THE VIRGINIA SEDIMENT AND EROSION CONTROL MANUAL, OTHER APPLICABLE COMMONWEALTH OF VIRGINIA REGULATIONS AND THE PROJECT SPECIFICATIONS. 4.ALL SEEDED AREAS WILL BE REGULARLY CHECKED TO ENSURE THAT A GOOD ALL SEEDED AREAS WILL BE REGULARLY CHECKED TO ENSURE THAT A GOOD STAND OF GRASS IS MAINTAINED. 5. AREAS WITH RIP-RAP SHOULD BE REGULARLY INSPECTED TO DETERMINE IF HIGH FLOWS HAVE DAMAGED THESE CONTROLS OR CAUSED EXCESSIVE SEDIMENT DEPOSITION. ALL AREAS SHALL BE MAINTAINED IN ACCORDANCE WITH THE REQUIREMENTS OF THIS E&S CONTROL PLAN.
AutoCAD SHX Text
MINIMUM STANDARDS (MS): All applicable Virginia Erosion and Sediment Control Regulations and Minimum Standards shall be adhered to during all phases of construction. These include, but are not limited to the following: 1.STABLIZATION OF DENUDED AREAS: STABLIZATION OF DENUDED AREAS: Permanent or temporary soil stabilization shall be applied to bare areas within seven days after final grade is reached on any portion of the site. Temporary soil stabilization shall be applied within seven days to denuded areas that may not be at final grade, but will remain dormant or undisturbed for longer than 30 days. Permanent stabilization shall be applied at areas that are to be left dormant for more than 1 year. 2.STABILIZATION OF SOIL STOCKPILES: STABILIZATION OF SOIL STOCKPILES: During construction of the project, soil stockpiles shall be stabilized or protected with sediment trapping measures. The applicant is responsible for temporary protection and permanent stabilization of all soil stockpiles on site as well as soil intentionally transported from the project site. 3.PERMANENT VEGETATIVE COVER PERMANENT VEGETATIVE COVER A permanent vegetative cover shall be established on denuded areas not otherwise permanently stabilized. Permanent vegetation shall not be considered established until a ground cover is achieve that, in the opinion of the county Inspector, is uniform and mature enough to survive to inhibit erosion. 4.TIMING & STABILIZATION OF SILT TRAPPING MEASURES: TIMING & STABILIZATION OF SILT TRAPPING MEASURES: Sediment basins and traps, perimeter dikes, sediment barriers and other measures intended to trap sediment shall be constructed as a first step in any land disturbing activity and shall be made functional before upslope land disturbance takes place. 5.STABILIZATION OF EARTHEN STRUCTURES: STABILIZATION OF EARTHEN STRUCTURES: Stabilization measures shall be applied to earthen structures such as dams, dikes and diversions immediately after installation. 6.SEDIMENT TRAPS AND BASINS: SEDIMENT TRAPS AND BASINS: A sediment basin shall control surface runoff from disturbed areas that is comprised of flow from drainage areas greater than or equal to three acres. The sediment basin shall be designed and constructed to accommodate the anticipated sediment loading for the land disturbing activity. The outfall device or system device shall take into account the total drainage area flowing through the disturbed area to be served by the basin. 7.CUT AND FILL SLOPES: CUT AND FILL SLOPES: Cut and fill slopes shall be designed and constructed in a manner that will minimize erosion. Slopes that are found to be eroding excessively within one year of permanent stabilization shall be provided with additional slope stabilizing measures until the problem is corrected. 8.CONCENTRATED RUN-OFF DOWN CUT OR FILL SLOPES: CONCENTRATED RUN-OFF DOWN CUT OR FILL SLOPES: Concentrated runoff shall not flow down cut or fill slopes unless contained within an adequate temporary or permanent channel, flume, or slope drain structure. 9.WATER SEEPS FROM A SLOPE FACE: WATER SEEPS FROM A SLOPE FACE: Whenever water seeps from a slope face, adequate drainage or other protection shall be provided. 10.STORM SEWER INLET PROTECTION: STORM SEWER INLET PROTECTION: All storm sewer inlets that are made operable during construction shall be protected so that sediment-laden water cannot enter the conveyance system without first being filtered or otherwise treated to remove sediment. 11.STABILIZATION OF OUTLETS: STABILIZATION OF OUTLETS: Before newly constructed stormwater conveyance channels are made operational, adequate outlet protection and any required temporary or permanent channel lining shall be installed in both the conveyance channel and receiving channel. 12.WORK IN LIVE WATERCOURSES: WORK IN LIVE WATERCOURSES: When work in a live watercourse is performed, precautions shall be taken to minimize encroachment, control sediment transport and stabilize the work area to the greatest extent possible during construction. Nonerodible material shall be used for the construction of causeways and cofferdams. Earthen fill may be used for these structures if armored by nonerodible cover materials. 13.CROSSING A LIVE WATERCOURSE: CROSSING A LIVE WATERCOURSE: When a live watercourse must be crossed by construction vehicles more than twice in any six month period, a temporary stream crossing constructed of nonerodible materials shall be provided. 14.APPLICABLE REGULATIONS: APPLICABLE REGULATIONS: All applicable federal, state and local regulations pertaining to working in or crossing live watercourses shall be met. 15.STABILIZATION OF BED AND BANKS STABILIZATION OF BED AND BANKS The bed and banks of a watercourse shall be stabilized immediately after work in the watercourse is completed. 16.UNDERGROUND UTILITIES: UNDERGROUND UTILITIES: Underground utilities shall be installed in accordance with the following standards in addition to other criteria: a.No more than 500 linear feet of trench may be opened at one time. No more than 500 linear feet of trench may be opened at one time. b.Excavated material shall be placed on the uphill side of trenches Excavated material shall be placed on the uphill side of trenches c.Effluent for dewatering operations shall be filtered or passed through Effluent for dewatering operations shall be filtered or passed through approved sediment trapping device, or both, and discharged in a manner that does not adversely affect flowing streams or offsite property. d.Material used for backfilling trenches shall be properly compacted in order Material used for backfilling trenches shall be properly compacted in order to minimize erosion and promote stabilization. e.Restabilization shall be accomplished in accordance with these regulations. Restabilization shall be accomplished in accordance with these regulations. f.Applicable safety regulations shall be complied with. Applicable safety regulations shall be complied with. 17.CONSTRUCTION ACCESS ROUTES: CONSTRUCTION ACCESS ROUTES: Where construction vehicle access routes intersect paved public roads, provisions shall be made to minimize the transport of sediment by vehicular tracking onto paved surfaces. Where sediment is transported on to a public road surface, the road shall be cleaned thoroughly at the end of each day. Sediment shall be removed by shoveling or sweeping and transported to a sediment control disposal area. Street washing shall be allowed only after sediment is removed in this manner. This provision shall apply to individual lots as well as to larger land disturbing activities. 18.TEMPORARY E&S CONTROL MEASURE REMOVAL: TEMPORARY E&S CONTROL MEASURE REMOVAL: All temporary erosion and sediment control measures shall be removed within 30 days after final site stabilization or after temporary measures are no longer needed, unless otherwise authorized by the local program authority. Trapped sediment and the disturbed soil areas resulting from the disposition of temporary measures shall be permanently stabilized to prevent further erosion and sediment. 19.ADEQUACY OF RECEIVING CHANNELS: ADEQUACY OF RECEIVING CHANNELS: Properties and waterways downstream from the development site shall be protected from sediment deposition, erosion and damage, due to increases in volume, velocity and peak flow rates of stormwater runoff for the stated frequency storm of 24-hour duration.

FLU

VA

NN

A C

OU

NT

Y,

VIR

GIN

IA

ENGI

NEER

ING

- LAN

D PL

ANNI

NG -

PROJ

ECT

MANA

GEME

NTSH

IMP E

NGIN

EERI

NG, P

.C.E

RO

SIO

N &

SE

DIM

EN

T C

ON

TR

OL P

LA

N F

OR

:

LAKE M

ONTIC

ELLO F

IRE & R

ESCUE

ERO

SIO

N C

ONTR

OL

PLAN

FISSE

ORP

ONAL ENGI

REEN

AI

VI R

OH F

JUSTIN M. SHIMPLic. No. 45183

NIG

LAW

ON

E T

CO

MM

SOIL EROSION & SEDIMENT CONTROL SYMBOLS

X X X X

FOR REVIEW

CON

CEPT

DRA

WIN

GS F

OR

RFP

PURP

OSE

S O

NLY

. NO

T FO

R CO

NST

RUCT

ION

.

AutoCAD SHX Text
L.P.=408.02
AutoCAD SHX Text
+
AutoCAD SHX Text
H.P.=411.00
AutoCAD SHX Text
+
AutoCAD SHX Text
H.P.=409.54
AutoCAD SHX Text
+
AutoCAD SHX Text
DI Top=407.5 Inv. Out=405.0
AutoCAD SHX Text
NEW 8' SIDEWALK
AutoCAD SHX Text
x
AutoCAD SHX Text
40
AutoCAD SHX Text
08
AutoCAD SHX Text
x
AutoCAD SHX Text
30
AutoCAD SHX Text
01
AutoCAD SHX Text
x
AutoCAD SHX Text
30
AutoCAD SHX Text
01
AutoCAD SHX Text
x
AutoCAD SHX Text
50
AutoCAD SHX Text
09
AutoCAD SHX Text
FFE= 401.30
AutoCAD SHX Text
FFE= 409.30
AutoCAD SHX Text
x
AutoCAD SHX Text
90
AutoCAD SHX Text
08
AutoCAD SHX Text
x
AutoCAD SHX Text
30
AutoCAD SHX Text
08
AutoCAD SHX Text
x
AutoCAD SHX Text
60
AutoCAD SHX Text
09
AutoCAD SHX Text
x
AutoCAD SHX Text
00
AutoCAD SHX Text
08
AutoCAD SHX Text
x
AutoCAD SHX Text
00
AutoCAD SHX Text
09
AutoCAD SHX Text
x
AutoCAD SHX Text
00
AutoCAD SHX Text
09
AutoCAD SHX Text
768 SF LEVEL 2 INFILTRATION BED
AutoCAD SHX Text
04
AutoCAD SHX Text
6.0 % slope
AutoCAD SHX Text
2.0 % slope
AutoCAD SHX Text
PRETREATMENT CELLS
AutoCAD SHX Text
4" ROOF DRAIN
AutoCAD SHX Text
30 LF 6" PERFORATED PVC OVERFLOW DRAIN
AutoCAD SHX Text
04
AutoCAD SHX Text
08
AutoCAD SHX Text
Top: 09.2
AutoCAD SHX Text
08
AutoCAD SHX Text
08
AutoCAD SHX Text
08
AutoCAD SHX Text
08
AutoCAD SHX Text
410
AutoCAD SHX Text
412
AutoCAD SHX Text
400
AutoCAD SHX Text
408
AutoCAD SHX Text
406
AutoCAD SHX Text
404
AutoCAD SHX Text
402
AutoCAD SHX Text
410
AutoCAD SHX Text
PP
AutoCAD SHX Text
PP
AutoCAD SHX Text
18" CMP
AutoCAD SHX Text
Inv.=399.98'
AutoCAD SHX Text
Inv.=398.28'
AutoCAD SHX Text
408
AutoCAD SHX Text
404
AutoCAD SHX Text
402
AutoCAD SHX Text
412
AutoCAD SHX Text
414
AutoCAD SHX Text
414
AutoCAD SHX Text
CLEAN OUT
AutoCAD SHX Text
CLEAN OUT
AutoCAD SHX Text
PP
AutoCAD SHX Text
406
AutoCAD SHX Text
408
AutoCAD SHX Text
408
AutoCAD SHX Text
406
AutoCAD SHX Text
404
AutoCAD SHX Text
404
AutoCAD SHX Text
406
AutoCAD SHX Text
408
AutoCAD SHX Text
412
AutoCAD SHX Text
6"x6"TEE AND VALVE
AutoCAD SHX Text
Ex. 6'' C900 PVC WATERLINE
AutoCAD SHX Text
EX FIRE HYDRANT
AutoCAD SHX Text
6" STUBOUT WITH CAP FOR FUTURE CONNECTION
AutoCAD SHX Text
DI TOP= 400.05'
AutoCAD SHX Text
15" CMP INV=396.06'
AutoCAD SHX Text
Estimated Pipe
AutoCAD SHX Text
8
AutoCAD SHX Text
C5
AutoCAD SHX Text
DC
AutoCAD SHX Text
CE
AutoCAD SHX Text
5
AutoCAD SHX Text
IP
AutoCAD SHX Text
MU
AutoCAD SHX Text
TS
AutoCAD SHX Text
PS
AutoCAD SHX Text
6
AutoCAD SHX Text
4
AutoCAD SHX Text
3
AutoCAD SHX Text
C5
AutoCAD SHX Text
C5
AutoCAD SHX Text
C5
AutoCAD SHX Text
C5
AutoCAD SHX Text
9
AutoCAD SHX Text
C5
AutoCAD SHX Text
IP
AutoCAD SHX Text
GRAVEL PARKING LOT TO BE USED FOR STAGING AND CONSTRUCTION EQUIPMENT
AutoCAD SHX Text
HAY BALE DIVERSIONS FOR EXISTING ASPHALT
AutoCAD SHX Text
7
AutoCAD SHX Text
C5
AutoCAD SHX Text
SD
AutoCAD SHX Text
2
AutoCAD SHX Text
C5
AutoCAD SHX Text
SF
AutoCAD SHX Text
MU
AutoCAD SHX Text
TS
AutoCAD SHX Text
PS
AutoCAD SHX Text
WIDEN EXISTING BASIN BY 44'
AutoCAD SHX Text
20
AutoCAD SHX Text
0
AutoCAD SHX Text
20
AutoCAD SHX Text
40
AutoCAD SHX Text
60
AutoCAD SHX Text
Scale: 1"=20'
AutoCAD SHX Text
AutoCAD SHX Text
PHONE: (434) 227-5140
AutoCAD SHX Text
CHARLOTTESVILLE, VA 22902
AutoCAD SHX Text
201 E MAIN ST, SUITE M
AutoCAD SHX Text
File No.
AutoCAD SHX Text
Sheet No.
AutoCAD SHX Text
Scale
AutoCAD SHX Text
Date
AutoCAD SHX Text
OF
AutoCAD SHX Text
5
AutoCAD SHX Text
12.026
AutoCAD SHX Text
C3
AutoCAD SHX Text
1"=20'
AutoCAD SHX Text
08/12/2016
AutoCAD SHX Text
Rev #
AutoCAD SHX Text
Date
AutoCAD SHX Text
Description
AutoCAD SHX Text
3.02 CONSTRUCTION ENTRANCE
AutoCAD SHX Text
NO. TITLE KEY
AutoCAD SHX Text
3.07 INLET PROTECTION
AutoCAD SHX Text
3.05 SILT FENCE
AutoCAD SHX Text
SF
AutoCAD SHX Text
IP
AutoCAD SHX Text
3.31 TEMPORARY SEEDING
AutoCAD SHX Text
3.32 PERMANENT SEEDING
AutoCAD SHX Text
3.35 MULCH
AutoCAD SHX Text
PS
AutoCAD SHX Text
DC
AutoCAD SHX Text
TS
AutoCAD SHX Text
MU
AutoCAD SHX Text
CE
AutoCAD SHX Text
TS
AutoCAD SHX Text
PS
AutoCAD SHX Text
MU
AutoCAD SHX Text
3.09 TEMPORARY DIVERSION DIKE
AutoCAD SHX Text
DD
AutoCAD SHX Text
3.13 TEMPORARY SEDIMENT TRAP
AutoCAD SHX Text
ST
AutoCAD SHX Text
3.39 DUST CONTROL
AutoCAD SHX Text
DC
AutoCAD SHX Text
[DRAWN TO SCALE]
AutoCAD SHX Text
SYMBOL
AutoCAD SHX Text
SOIL DIVIDE
AutoCAD SHX Text
LIMITS OF DISTURBANCE
AutoCAD SHX Text
CW
AutoCAD SHX Text
DD
AutoCAD SHX Text
CLEAN WATER DIVERSION DIKE
AutoCAD SHX Text
N

FISSE

ORP

ONAL ENGI

REEN

AI

VIR

OH F

JUSTIN M. SHIMPLic. No. 45183

NIG

LAW

ON

E T

CO

MM

FLU

VA

NN

A C

OU

NT

Y,

VIR

GIN

IA

ENGI

NEER

ING

- LAN

D PL

ANNI

NG -

PROJ

ECT

MANA

GEME

NTSH

IMP E

NGIN

EERI

NG, P

.C.E

RO

SIO

N &

SE

DIM

EN

T C

ON

TR

OL P

LA

N F

OR

:

LAKE M

ONTIC

ELLO F

IRE & R

ESCUE

STO

RM

WATE

R C

ONVER

SIO

N P

LAN

FISSE

ORP

ONAL ENGI

REEN

AI

VI R

OH F

JUSTIN M. SHIMPLic. No. 45183

NIG

LAW

ON

E T

CO

MM

FOR REVIEW

CON

CEPT

DRA

WIN

GS F

OR

RFP

PURP

OSE

S O

NLY

. NO

T FO

R CO

NST

RUCT

ION

.

AutoCAD SHX Text
L.P.=408.02
AutoCAD SHX Text
+
AutoCAD SHX Text
H.P.=411.00
AutoCAD SHX Text
+
AutoCAD SHX Text
H.P.=409.54
AutoCAD SHX Text
+
AutoCAD SHX Text
DI Top=407.5 Inv. Out=405.0
AutoCAD SHX Text
NEW 8' SIDEWALK
AutoCAD SHX Text
x
AutoCAD SHX Text
40
AutoCAD SHX Text
08
AutoCAD SHX Text
x
AutoCAD SHX Text
30
AutoCAD SHX Text
01
AutoCAD SHX Text
x
AutoCAD SHX Text
30
AutoCAD SHX Text
01
AutoCAD SHX Text
x
AutoCAD SHX Text
50
AutoCAD SHX Text
09
AutoCAD SHX Text
FFE= 401.30
AutoCAD SHX Text
FFE= 409.30
AutoCAD SHX Text
x
AutoCAD SHX Text
90
AutoCAD SHX Text
08
AutoCAD SHX Text
x
AutoCAD SHX Text
30
AutoCAD SHX Text
08
AutoCAD SHX Text
x
AutoCAD SHX Text
60
AutoCAD SHX Text
09
AutoCAD SHX Text
x
AutoCAD SHX Text
00
AutoCAD SHX Text
08
AutoCAD SHX Text
x
AutoCAD SHX Text
00
AutoCAD SHX Text
09
AutoCAD SHX Text
x
AutoCAD SHX Text
00
AutoCAD SHX Text
09
AutoCAD SHX Text
768 SF LEVEL 2 INFILTRATION BED
AutoCAD SHX Text
04
AutoCAD SHX Text
6.0 % slope
AutoCAD SHX Text
2.0 % slope
AutoCAD SHX Text
Relocated Underground Propane Tanks
AutoCAD SHX Text
PRETREATMENT CELLS
AutoCAD SHX Text
4" ROOF DRAIN
AutoCAD SHX Text
30 LF 6" PERFORATED PVC OVERFLOW DRAIN
AutoCAD SHX Text
04
AutoCAD SHX Text
08
AutoCAD SHX Text
Top: 09.2
AutoCAD SHX Text
08
AutoCAD SHX Text
08
AutoCAD SHX Text
08
AutoCAD SHX Text
08
AutoCAD SHX Text
UGGT
AutoCAD SHX Text
410
AutoCAD SHX Text
412
AutoCAD SHX Text
400
AutoCAD SHX Text
408
AutoCAD SHX Text
406
AutoCAD SHX Text
404
AutoCAD SHX Text
402
AutoCAD SHX Text
410
AutoCAD SHX Text
PP
AutoCAD SHX Text
PP
AutoCAD SHX Text
18" CMP
AutoCAD SHX Text
Inv.=399.98'
AutoCAD SHX Text
Inv.=398.28'
AutoCAD SHX Text
408
AutoCAD SHX Text
404
AutoCAD SHX Text
402
AutoCAD SHX Text
412
AutoCAD SHX Text
414
AutoCAD SHX Text
414
AutoCAD SHX Text
CLEAN OUT
AutoCAD SHX Text
CLEAN OUT
AutoCAD SHX Text
PP
AutoCAD SHX Text
406
AutoCAD SHX Text
408
AutoCAD SHX Text
408
AutoCAD SHX Text
406
AutoCAD SHX Text
404
AutoCAD SHX Text
404
AutoCAD SHX Text
406
AutoCAD SHX Text
408
AutoCAD SHX Text
412
AutoCAD SHX Text
6"x6"TEE AND VALVE
AutoCAD SHX Text
Ex. 6'' C900 PVC WATERLINE
AutoCAD SHX Text
EX FIRE HYDRANT
AutoCAD SHX Text
6" STUBOUT WITH CAP FOR FUTURE CONNECTION
AutoCAD SHX Text
DI TOP= 400.05'
AutoCAD SHX Text
15" CMP INV=396.06'
AutoCAD SHX Text
Estimated Pipe
AutoCAD SHX Text
1
AutoCAD SHX Text
C5
AutoCAD SHX Text
IF
AutoCAD SHX Text
20
AutoCAD SHX Text
0
AutoCAD SHX Text
20
AutoCAD SHX Text
40
AutoCAD SHX Text
60
AutoCAD SHX Text
SCALE: 1" = 20'
AutoCAD SHX Text
AutoCAD SHX Text
PHONE: (434) 227-5140
AutoCAD SHX Text
CHARLOTTESVILLE, VA 22902
AutoCAD SHX Text
201 E MAIN ST, SUITE M
AutoCAD SHX Text
File No.
AutoCAD SHX Text
Sheet No.
AutoCAD SHX Text
Scale
AutoCAD SHX Text
Date
AutoCAD SHX Text
OF
AutoCAD SHX Text
5
AutoCAD SHX Text
12.026
AutoCAD SHX Text
C4
AutoCAD SHX Text
1"=20'
AutoCAD SHX Text
08/12/2016
AutoCAD SHX Text
Rev #
AutoCAD SHX Text
Date
AutoCAD SHX Text
Description
AutoCAD SHX Text
N
AutoCAD SHX Text
NEW ROOF AREA TO INFILTRATION
AutoCAD SHX Text
RUNOFF SHEETFLOW TO EX. DI'S
AutoCAD SHX Text
PHASE 1 RUNOFF TO LARGER DETENTION POND

5

12' MIN

FILTER CLOTH

OF INGRESS AND EGRESS

*MUST EXTEND FULL WIDTH

COARSE

VDOT #1

AGGREGATE

OPERATION

10

' M

IN

3" MIN

3" MIN

(OPTIONAL)

PAVEMENT

EXISTING

MOUNTABLE BERM

PAVEMENT

EXISTING

70' MIN

C

EXISTING

GROUND

12

" M

IN

FILTER

CLOTH

6" MIN.

A

10' MIN

C

10

' M

IN

70' MIN

A

3'

5:1

EXISTING PAVED SURFACE MAY BE USED AS CONSTRUCTION ENTRANCE ALONG EXISTING TRAVELWAY

7

3

6

4

MULCHES:RATES:

ORGANIC MULCH MATERIALS AND APPLICATION RATES

Per Acre Per 1000 sq. ft. NOTES:

Straw or Hay

Fiber Mulch

Corn Stalks

Wood Chips

Bark Chipsor

ShreddedBark

112 - 2 tons

(Minimum 2tons for

winter cover)

Minimum1500 lbs.

4 - 6 tons

4 - 6 tons

50 - 70 cu.yds.

70 - 90 lbs.

35 lbs.

185 - 275 lbs.

1-2 cu. yds.

185 - 275 lbs.

Free from weeds and coarsematter. Must be anchored.Spread with mulch blower orby hand.

Do not use as mulch forwinter cover or during hot,dry periods.* Apply asslurry.

Cut or shredded in 4-6"lengths. Air-dried. Do notuse in fine turf aeras. Applywith mulch blower or byhand.

Free of coarse matter. Air-dried. Treat with 12 lbsnitrogen per ton. Do notuse in fine turf areas. Applywith mulch blower, chiphandler, or by hand.

Free of coarse matter. Air-dried. Do not use in fineturf areas. Apply withmulch blower, chip handler,or by hand.

* When fiber mulch is the only available mulch during periods when strawshould be used, apply at a minimum rate of 2000 lbs./ac. or 45 lbs./1000 sq. ft.

Source: Va. DWSC

FLU

VA

NN

A C

OU

NT

Y,

VIR

GIN

IA

ENGI

NEER

ING

- LAN

D PL

ANNI

NG -

PROJ

ECT

MANA

GEME

NTSH

IMP E

NGIN

EERI

NG, P

.C.E

RO

SIO

N &

SE

DIM

EN

T C

ON

TR

OL P

LA

N F

OR

:

LAKE M

ONTIC

ELLO F

IRE & R

ESCUE

ERO

SIO

N C

ONTR

OL

DET

AIL

S

FISSE

ORP

ONAL ENGI

REEN

AI

VI R

OH F

JUSTIN M. SHIMPLic. No. 45183

NIG

LAW

ON

E T

CO

MM

2

8

C5

C5

C5

C5

C5

C5

C5

9

C5

ADHESIVES USED FOR DUST CONTROLTABLE 3.39-A

Adhesive (Adhesive: Water) Nozzle Gallons/Acre

ApplicationRateType of

WaterDilution

AnionicAsphalt Emulsion

Latex Emulsion

Resin in Water

Acrylic Emulsion(Non-Traffic)

Acrylic Emulsion(Traffic)

7:1

12.5:1

4:1

7:1

3.5:1

Coarse Spray

Coarse Spray

Coarse Spray

Fine Spray

Fine Spray

1,200

235

300

450

350

10

C5

La(ft)

Do (ft) 3Do (ft) d (in) W

ROOF DRAIN3.0 0.33 1.00 6.0 4.0

PVC

OVERFLOW

4.0 0.50 1.50 6.0 4.50

1

C2

FOR REVIEW

CON

CEPT

DRA

WIN

GS F

OR

RFP

PURP

OSE

S O

NLY

. NO

T FO

R CO

NST

RUCT

ION

.

AutoCAD SHX Text
Stone Construction Entrance (CE)
AutoCAD SHX Text
Not To Scale
AutoCAD SHX Text
Not To Scale
AutoCAD SHX Text
%%uSECTION A-A
AutoCAD SHX Text
%%uPLAN VIEW
AutoCAD SHX Text
%%USECTION C-C
AutoCAD SHX Text
STRAW BALE DIVERSION (SD)
AutoCAD SHX Text
Not To Scale
AutoCAD SHX Text
Not To Scale
AutoCAD SHX Text
PERMANENT SEEDING SPECIFICATIONS February 16 through April 30: Kentucky 31 Fescue - 128 lbs/acre; Red Top Grass - 2 lbs/acre; Annual Rye - 20 lbs/acre. Add 20 lbs/acre Indian grass when slopes are greater than 3:1. May 1 through August 15: Kentucky 31 Fescue - 128 lbs/acre; Red Top Grass - 2 lbs/acre; Foxtail Millet - 20 lbs/acre. Add 20 lbs/acre Indian grass when slopes are greater than 3:1. August 16 through October 31: Kentucky 31 Fescue - 128 lbs/acre; Red Top Grass - 2 lbs/acre; Annual Rye - 20 lbs/acre. Add 20 lbs/acre Indian grass on slopes greater than 3:1.
AutoCAD SHX Text
November 1 through February 15: Kentucky 31 Fescue - 128 lbs/acre; Red Top Grass - 2 lbs/acre; Winter Rye - 20 lbs/acre. Add 20 lbs/acre Indian grass on slopes greater than 3:1. MULCHING SPECIFICATIONS: Straw or hay at a rate of 2 tons/acre. Must be anchored. Spread with mulch blower or by hand. LIME AND FERTILIZER SPECIFICATIONS: Lime and fertilizer needs should be determined by soil tests. Soil tests may be preformed by the Cooperative Extension Service Soil Testing Laboratory at VPI&SU, or by a reputable commercial laboratory. Information concerning the State Soil Testing Laboratory is available from County Extension Agents. Under unusual conditions where it is not possible to obtain a soil test, the following soil amendments will be applied: For Permanent Seeding: Seeded areas shall be limed at a rate of 2 tons per acre, and fertilized at a rate of 1,000 lbs. per acre of 10-20-10 (10 lbs. per 1,000 square feet) or equivalent. For Temporary Seeding: Seeded areas shall be limed at a rate of 2 tons per acre, and fertilized at a rate of 600 lbs. per acre of 10-20-10 (10 lbs. per 1,000 square feet) or equivalent.
AutoCAD SHX Text
PERMANENT SEEDING (PS)
AutoCAD SHX Text
Not To Scale
AutoCAD SHX Text
Not To Scale
AutoCAD SHX Text
MULCHING (MU)
AutoCAD SHX Text
Not To Scale
AutoCAD SHX Text
Not To Scale
AutoCAD SHX Text
TEMPORARY SEEDING (TS)
AutoCAD SHX Text
Not To Scale
AutoCAD SHX Text
Not To Scale
AutoCAD SHX Text
AutoCAD SHX Text
PHONE: (434) 227-5140
AutoCAD SHX Text
CHARLOTTESVILLE, VA 22902
AutoCAD SHX Text
201 E MAIN ST, SUITE M
AutoCAD SHX Text
File No.
AutoCAD SHX Text
Sheet No.
AutoCAD SHX Text
Scale
AutoCAD SHX Text
Date
AutoCAD SHX Text
OF
AutoCAD SHX Text
5
AutoCAD SHX Text
12.026
AutoCAD SHX Text
C5
AutoCAD SHX Text
N/A
AutoCAD SHX Text
08/12/2016
AutoCAD SHX Text
Rev #
AutoCAD SHX Text
Date
AutoCAD SHX Text
Description
AutoCAD SHX Text
SHEET FLOW INSTALLATION
AutoCAD SHX Text
(PERSPECTIVE VIEW)
AutoCAD SHX Text
CONSTRUCTION OF A SILT FENCE
AutoCAD SHX Text
(WITHOUT WIRE SUPPORT)
AutoCAD SHX Text
POINTS A SHOULD BE HIGHER THAN POINT B.
AutoCAD SHX Text
DRAINAGEWAY INSTALLATION
AutoCAD SHX Text
(FRONT ELEVATION)
AutoCAD SHX Text
IT INTO THE TRENCH.
AutoCAD SHX Text
A
AutoCAD SHX Text
B
AutoCAD SHX Text
FLOW
AutoCAD SHX Text
FLOW
AutoCAD SHX Text
FLOW
AutoCAD SHX Text
3. STAPLE FILTER MATERIAL
AutoCAD SHX Text
TO STAKES AND EXTEND
AutoCAD SHX Text
1. SET THE STAKES.
AutoCAD SHX Text
FLOW
AutoCAD SHX Text
6'MAX.
AutoCAD SHX Text
A
AutoCAD SHX Text
3'MAX.
AutoCAD SHX Text
2. EXCAVATE A 4"X 4" TRENCH
AutoCAD SHX Text
UPSLOPE ALONG THE LINE OF
AutoCAD SHX Text
4"
AutoCAD SHX Text
4. BACKFILL AND COMPACT
AutoCAD SHX Text
THE EXCAVATED SOIL.
AutoCAD SHX Text
STAKES.
AutoCAD SHX Text
Silt Fence (Without Wire Support) (SF)
AutoCAD SHX Text
Not To Scale
AutoCAD SHX Text
Not To Scale
AutoCAD SHX Text
PROTECTION
AutoCAD SHX Text
SILT FENCE DROP INLET
AutoCAD SHX Text
SILT FENCE DROP INLET
AutoCAD SHX Text
PROTECTION
AutoCAD SHX Text
PERSPECTIVE VIEWS
AutoCAD SHX Text
PERSPECTIVE VIEWS
AutoCAD SHX Text
ELEVATION OF STAKE AND
AutoCAD SHX Text
ELEVATION OF STAKE AND
AutoCAD SHX Text
FABRIC ORIENTATION
AutoCAD SHX Text
FABRIC ORIENTATION
AutoCAD SHX Text
FABRIC
AutoCAD SHX Text
FABRIC
AutoCAD SHX Text
1
AutoCAD SHX Text
1
AutoCAD SHX Text
A
AutoCAD SHX Text
A
AutoCAD SHX Text
STAKE
AutoCAD SHX Text
STAKE
AutoCAD SHX Text
2 X 4" WOOD FRAME
AutoCAD SHX Text
1.5' MAX.
AutoCAD SHX Text
1.5' MAX.
AutoCAD SHX Text
3' MIN.
AutoCAD SHX Text
3' MIN.
AutoCAD SHX Text
DETAIL A
AutoCAD SHX Text
DETAIL A
AutoCAD SHX Text
1' MIN.
AutoCAD SHX Text
1' MIN.
AutoCAD SHX Text
AT CORNERS
AutoCAD SHX Text
AT CORNERS
AutoCAD SHX Text
WITH GRATE
AutoCAD SHX Text
WITH GRATE
AutoCAD SHX Text
DROP INLET
AutoCAD SHX Text
DROP INLET
AutoCAD SHX Text
GATHER
AutoCAD SHX Text
EXCESS
AutoCAD SHX Text
GATHER
AutoCAD SHX Text
EXCESS
AutoCAD SHX Text
FRAME
AutoCAD SHX Text
FRAME
AutoCAD SHX Text
INLET PROTECTION (IP)
AutoCAD SHX Text
Not To Scale
AutoCAD SHX Text
Not To Scale
AutoCAD SHX Text
DUST CONTROL DETAIL
AutoCAD SHX Text
Not To Scale
AutoCAD SHX Text
Not To Scale
AutoCAD SHX Text
OUTLET PROTECTION DETAIL
AutoCAD SHX Text
Not To Scale
AutoCAD SHX Text
Not To Scale
AutoCAD SHX Text
PIPE OUTLET CONDITIONS
AutoCAD SHX Text
KEY IN 6"-9"; RECOMMENDED FOR ENTIRE PERIMETER
AutoCAD SHX Text
SECTION A-A
AutoCAD SHX Text
Source: Va. DSWC
AutoCAD SHX Text
FILTER CLOTH
AutoCAD SHX Text
PLAN VIEW
AutoCAD SHX Text
A
AutoCAD SHX Text
o
AutoCAD SHX Text
d
AutoCAD SHX Text
o
AutoCAD SHX Text
3d
AutoCAD SHX Text
0 %
AutoCAD SHX Text
Plate 3.18-1
AutoCAD SHX Text
AREA WITH NO DEFINED
AutoCAD SHX Text
A
AutoCAD SHX Text
CHANNEL
AutoCAD SHX Text
PIPE OUTLET TO FLAT
AutoCAD SHX Text
L
AutoCAD SHX Text
a
AutoCAD SHX Text
d
AutoCAD SHX Text
L
AutoCAD SHX Text
a
AutoCAD SHX Text
W=
AutoCAD SHX Text
+
AutoCAD SHX Text
o
AutoCAD SHX Text
d
AutoCAD SHX Text
INFILTRATION DETAIL
AutoCAD SHX Text
Not To Scale
AutoCAD SHX Text
Not To Scale
AutoCAD SHX Text
INFILTRAITON TRENCH WILL REQUIRE 1900 CF OF # 3 WASHED STONE, 300 CF OF PEA GRAVEL, AND 384 CF OF CLEAN SAND
AutoCAD SHX Text
STAKED AND ENTRENCHED
AutoCAD SHX Text
STRAW BALE
AutoCAD SHX Text
BINDING WIRE
AutoCAD SHX Text
OR TWINE
AutoCAD SHX Text
COMPACTED SOIL TO
AutoCAD SHX Text
PREVENT PIPING
AutoCAD SHX Text
SEDIMENT LADEN
AutoCAD SHX Text
RUNOFF
AutoCAD SHX Text
FILTERED RUNOFF
AutoCAD SHX Text
PROPERLY INSTALLED STRAW BALE
AutoCAD SHX Text
(CROSS SECTION)
AutoCAD SHX Text
STRAW BALE BARRIER