1
UP E V E V E V E V E V E V UP 2 3 4 5 6 7 8 9 10 11 12 13 D D C C B B A A B.3 1 B.4 B.4 A.9 7.8 9.5 1 AC4.3.2 1 AC4.3.2 20' - 0" 30' - 0" 30' - 0" 30' - 0" 35' - 0" 15' - 0" 13' - 0" 11' - 9 5/8" 14' - 8 3/8" 14' - 8 3/8" 11' - 9 5/8" 13' - 0" 30' - 0" 30' - 0" 30' - 0" 30' - 0" 30' - 0" MAIN ELECTRICAL WORK ROOM AMH MED EVENT KITCHEN STORAGE KITCHEN LARGE EVENT LIB DISCARD STOR MPOE / TR FACILITY COORD STAFF ALL GENDER LOADING SERVICE CORRIDOR VESTIBULE AV BLDG ATTEND STORAGE ELEC AV/IT/TV CC STORAGE EVENT PRE-FUNCTION COUNCIL CHAMBERS STAIR 3 WATER PUMP FIRE PUMP CLERK PARK RECEPTION LOBBY SEATING JC STORAGE ONEWAY ONEWAY BIKE STORAGE STAFF ALL GENDER LOCKERS CHANGING CHANGING SITE STORAGE SERV LOADING ZONE ELEC RM VAN RESERVES 2 AC4.3.3 2 AC4.3.3 C2 C3 C4 C5 CD CC CB CA 3 AC4.3.3 3 AC4.3.3 1 AC4.3.3 1 AC4.3.3 4 AC4.3.2 4 AC4.3.2 A.2 A.2 7.2 3 AC4.3.2 3 AC4.3.2 7.5 ELEV SERVICE ELEV STAIR 02 7.4 7.6 DRY STORAGE 1 AC4.3.5 2 AC4.3.5 2 AC4.3.5 B.7 B.7 15' - 0" 15' - 0" 15' - 6" 32' - 0" 31' - 0" 12' - 0" 12' - 0" 8' - 0" 8' - 2" 22' - 10" 12' - 0" 30' - 0" 12' - 0" 8' - 0" 30' - 0" 8' - 0" MEZZ. STORAGE ABOVE PARKING GALLERY PARK LOBBY AC4.1.1 3 SHEET AC2.1.1A SHEET AC2.1.1B STAIR 04 2 AC4.3.1 2 AC4.3.1 CLOSED SESS AC4.2.22 4 AC1.2.2 2 AC1.2.2 3 5' - 0" 2 AC2.3.0 1 AC2.3.0 3 AC2.3.0 4 AC2.3.0 5 AC2.3.0 6 AC2.3.1 6 AC2.3.1 7 AC2.3.1 7 AC2.3.1 2' - 0"5' - 9" 5' - 9"2' - 0" M RESTROOM W RESTROOM 4 5 6 7 D C B.4 3 AC4.3.2 3 AC4.3.2 MEZZ. STORAGE MX1 B.7 SERVICE ELEVATOR ME1 ELEVATOR ME2 2 AC2.3.0 NORTH NORTH SHEET NUMBER PROJECT NUMBER SHEET TITLE KEYPLAN SEALS AND SIGNATURES ISSUED FOR REV DATE 301 BATTERY STREET 7TH FLOOR SAN FRANCISCO, CA 94111 415.227.0100 smithgroup.com Plot Date: A B COMMUNITY CIVIC CENTER CITY OF SOUTH SAN FRANCISCO EL CAMINO REAL & CHESTNUT AVE. SOUTH SAN FRANCISCO , CA 94080 PROJECT TRUE 9/3/2020 8:38:32 AM FLOOR PLAN - LEVEL1/1M AC2.0.1 START Sheet 10609.000 L. PAINT ALL EXPOSED SURFACES INCLUDING CEILINGS, HM DOOR, HM DOOR FRAMES, GRILLES, FIRE HOSE OR EXTINGUISHER CABINETS, EXPOSED PIPING, ETC. UON. TO MATCH WITH ADJACENT WALL OR CEILING WHERE IT OCCURS PER RCP, UON. M . ALL WALL BASE AT PARTITIONS TO BE AWB-2 UON. BASES SCHEDULED FOR PAINT SHALL MATCH WITH AWB-2 , UON. N. ALL CARPETED SURFACES SHALL RECEIVE STRAIGHT BASE. HARD SURFACES SUCH AS VINYL OR RUBBER FLOORING SHALL RECEIVE COVE BASE. O. COORDINATE CARPET DIRECTION WITH ARCHITECT PRIOR TO INSTALLATION. SUBMIT SEAMING DIAGRAM TO ARCHITECT PRIOR TO CARPET INSTALLATION. P. COORDINATE STARTING POINT OF FLOOR AND WALL TILE WITH ARCHITECT PRIOR TO INSTALLATION. SUBMIT DIAGRAM FOR REVIEW AND APPROVAL. Q. ALL INTERSECTIONS OF FLOOR FINISH MATERIALS SHALL BE LOCATED DIRECTLY UNDER CENTER OF DOOR, WHERE OCCURS, UON. R. SEALANTS AND CAULKING ARE TO MATCH THE SURFACE IN WHICH THEY APPEAR. GC TO COORDINATE WITH ARCHITECT PRIOR TO INSTALLATION. S. RECEPTACLE COVER PLATE TO BE WHITE TYP, STAINLESS STEEL ON NON WHITE FEATURE WALL INCLUDING WOOD VENEER AND PANTRY BACK SPLASH. T. ALIGN WALL REVEALS WITH ADJACENT FLOOR TRANSITION AND/ OR ADJACENT CEILING TRANSITION - REF. RCP, ELEVATIONS, WALL AND FLOOR FINISH PLANS FOR INFORMATION U. MECHANICAL ENCLOSURE AND MECHANICAL PENTHOUSE SHALL BE PAINTED WITH UPGRADED EXTERIOR PAINT AND COATINGS. V. ALL FINISH SHALL MEET OR EXCEED CLASS B FLAME SPREAD AND SMOKE DEVELOPED INDICES. A. REFER TO THE AC0.X SERIES SHEETS FOR ARCHITECTURAL GENERAL NOTES, DRAWING, REFERENCE AND MATERIAL SYMBOLS, ABBREVIATIONS, AS WELL AS DIMENSIONING CONVENTIONS USED ON THIS SHEET. B. REFER TO AND COORDINATE WITH STRUCTURAL, MECHANICAL, ELECTRICAL, PLUMBING, AV, AND SIGNAGE DRAWINGS FOR ADDITIONAL INFORMATION NOT SHOWN ON THIS SHEET. C. FOR BASIC LIFE SAFETY AND CODE INFORMATION APPLYING TO THIS PROJECT, REFER TO THE GC2.X.X SERIES SHEETS LOCATED PER THE PROJECT SHEET INDEX. D. REFER TO THE "REFERENCE ELEVATION DEFINITIONS" LOCATED IN THE AC0.X SERIES SHEETS FOR ROOF ELEVATION DEFINITIONS. E. REFER TO THE AC5.X SERIES SHEETS FOR ROOFING DETAILS. F. ROOF ASSEMBLIES SHALL BE MINIMUM OF CLASS B FIRE CLASSIFICATION, OR AS SPECIFIED IN THE PROJECT MANUAL. G. ROOFING TPO, TYP. SEE SPEC 075423 H. CONTRACTOR TO NOTIFY ARCHITECT OF ANY CONFLICTS WITH WALL MOUNTED DEVICES INCLUDING LIGHT SWITCHES AND FIRE ALARM STROBES WITH NON WHITE, ACCENT FINISH APPLIED WALLS. I. CONTRACTOR SHALL BE RESPONSIBLE FOR ALLOWING FOR DELIVERY LEADTIMES FOR ALL FABRICS AND OTHER CUSTOM FINISHES WITHIN THE CONSTRUCTION SCHEDULE. ALL DELIVERY TIMES MUST BE CONFIRMED AND ANY EXCESSIVE LEAD TIME MUST BE BROUGHT TO THE ARCHITECT'S ATTENTION IMMEDIATELY TO ALLOW FOR RESPECIFICATION IF NECESSARY. J. FOR SURFACES WITH MORE THAN ONE FINISH NOTES, REFER TO THE ELEVATION FOR EXTENT OF FINISH. K. ALL WALLS AND GWB SOFFITS TO BE PAINTED PNT-0 UON. GENERAL NOTES SCALE: 1/16" = 1'-0" 1 LEVEL 1 - FLOOR PLAN SCALE: 1/16" = 1'-0" 2 MEZZANINE LEVEL Spaces are numbered using a three (3) digit identifier. Front - of - house spaces are those used by the public or building users. Back - of - house spaces are those typcially accessed by facilities personnel. Explanation below represents the phylosophy for both space types. Numbers are assigned starting at main entrances (or elevators) and working in a clockwise rotation, or linearly from east to west. For front - of - house spaces 2 01 .A | | | | | Space or internal room option - 1 digit alpha | Space or suite number - 2 digit numeric Level number 1 digit numeric Ex. 110 111 112.A 112.B 201 202 203 311 312 For back - of - house spaces 2 X 6 | | | | | Space sequential number - 1 digit numeric | Room symbol - 1 digit alpha (see table below) Level number 1 digit numeric Room Symbol Table: Symbol Room Description C Circulation E Elevators F Telephone/Data, IDF J Janitorial Closets L Electrical rooms M Mechanical rooms P Enclosed Parking S Enclosed Stairs SS Major Mechanical Shafts T Toilets X Rooms that don t fit above, ie. Storage Ex. 1T1 1T2 1T3 1L1 1L2 1S1 1S2 ROOM # PROTOCOLS SSF PERMIT SET BC#3 / BID SET 1 2020-09-04

SHEET AC2.1.1A SHEET AC2.1 - Community Civic Campus

  • Upload
    others

  • View
    1

  • Download
    0

Embed Size (px)

Citation preview

UP

EVEV EV EV EVEV

UP

2 3 4 5 6 7 8 9 10 11 12 13

D D

C C

BB

A A

B.3

1

B.4B.4

A.9

7.8 9.5

1AC4.3.2

1AC4.3.2

20' - 0" 30' - 0" 30' - 0" 30' - 0" 35' - 0" 15' - 0" 13' - 0" 11' - 9 5/8" 14' - 8 3/8" 14' - 8 3/8" 11' - 9 5/8" 13' - 0" 30' - 0" 30' - 0" 30' - 0" 30' - 0" 30' - 0"

MAINELECTRICAL

WORKROOM

AMH

MED EVENT

KITCHENSTORAGE

KITCHEN

LARGEEVENT

LIB D

ISCA

RDST

OR

MPOE / TR

FACI

LITY

COOR

D

STAFF ALLGENDER

LOADING

SERVICECORRIDOR

VESTIBULE

AV

BLDG

ATTE

ND

STORAGEELEC

AV/IT/TVCCSTORAGE

EVENTPRE-FUNCTION

COUNCILCHAMBERS

STAIR 3

WAT

ERPU

MP

FIRE

PUM

P

CLERK

PARKRECEPTION

LOBBYSEATING

JC

STORAGE

ONEWAY ONEWAY

BIKE

STOR

AGE

STAF

F AL

LGE

NDER

LOCK

ERS CHANGING

CHANGINGSITE

STORAGE

SERV

LOAD

ING

ZONE

ELEC RM

VANRESERVES

2AC4.3.3

2AC4.3.3

C2C3

C4C5

CD

CC

CB

CA

3AC4.3.3

3AC4.3.3

1AC4.3.3

1AC4.3.3

4AC4.3.2

4AC4.3.2

A.2A.2

7.2

3AC4.3.2

3AC4.3.2

7.5

ELEV

SERVICEELEV

STAIR 02

7.4 7.6

DRYSTORAGE

1AC4.3.5

2AC4.3.5

2AC4.3.5

B.7 B.7

15' - 0" 15' - 0"

15' -

6"32

' - 0"

31' -

0"12

' - 0"

12' -

0"8'

- 0"

8' - 2

"22

' - 10

"

12' - 0"

30' - 0"

12' - 0"

8' - 0"

30' - 0"

8' - 0"

MEZZ. STORAGE ABOVE

PARKING

GALLERY

PARK LOBBY

AC4.1.1

3 SHEE

T AC

2.1.1A

SHEE

T AC

2.1.1B

STAIR 04

2AC4.3.1

2AC4.3.1

CLOSEDSESS

AC4.2.22

4

AC1.2.2

2

AC1.2.2 3

5' - 0

"

2AC2.3.01

AC2.3.0

3AC2.3.0

4AC2.3.0

5AC2.3.0

6AC2.3.1

6AC2.3.1

7AC2.3.1

7AC2.3.1

2' - 0"5' - 9" 5' - 9"2' - 0"

MRESTROOM

WRESTROOM

4 5 6 7

D

C

B.4

3AC4.3.2

3AC4.3.2

MEZZ. STORAGEMX1

B.7 SERVICE ELEVATORME1

ELEVATORME2

2AC2.3.0

NORTH NORTH

SHEET NUMBER

PROJECT NUMBER

SHEET TITLE

KEYPLAN

SEALS AND SIGNATURES

ISSUED FOR REV DATE

301 BATTERY STREET7TH FLOORSAN FRANCISCO, CA 94111415.227.0100smithgroup.com

Plot

Date:

A B

COMMUNITY CIVIC CENTERCITY OF SOUTH SAN FRANCISCO

EL CAMINO REAL & CHESTNUT AVE.SOUTH SAN FRANCISCO , CA 94080

PROJECT TRUE

9/3/20

20 8:

38:32

AM

FLOOR PLAN - LEVEL1/1M

AC2.0.1

STAR

T Sh

eet

10609.000

L. PAINT ALL EXPOSED SURFACES INCLUDING CEILINGS, HM DOOR, HMDOOR FRAMES, GRILLES, FIRE HOSE OR EXTINGUISHER CABINETS,EXPOSED PIPING, ETC. UON. TO MATCH WITH ADJACENT WALL ORCEILING WHERE IT OCCURS PER RCP, UON.

M.

ALL WALL BASE AT PARTITIONS TO BE AWB-2 UON. BASESSCHEDULED FOR PAINT SHALL MATCH WITH AWB-2 , UON.

N. ALL CARPETED SURFACES SHALL RECEIVE STRAIGHT BASE. HARDSURFACES SUCH AS VINYL OR RUBBER FLOORING SHALL RECEIVECOVE BASE.

O. COORDINATE CARPET DIRECTION WITH ARCHITECT PRIOR TOINSTALLATION. SUBMIT SEAMING DIAGRAM TO ARCHITECT PRIOR TOCARPET INSTALLATION.

P. COORDINATE STARTING POINT OF FLOOR AND WALL TILE WITHARCHITECT PRIOR TO INSTALLATION. SUBMIT DIAGRAM FOR REVIEWAND APPROVAL.

Q. ALL INTERSECTIONS OF FLOOR FINISH MATERIALS SHALL BELOCATED DIRECTLY UNDER CENTER OF DOOR, WHERE OCCURS,UON.

R. SEALANTS AND CAULKING ARE TO MATCH THE SURFACE IN WHICHTHEY APPEAR. GC TO COORDINATE WITH ARCHITECT PRIOR TOINSTALLATION.

S. RECEPTACLE COVER PLATE TO BE WHITE TYP, STAINLESS STEEL ONNON WHITE FEATURE WALL INCLUDING WOOD VENEER AND PANTRYBACK SPLASH.

T. ALIGN WALL REVEALS WITH ADJACENT FLOOR TRANSITION AND/ ORADJACENT CEILING TRANSITION - REF. RCP, ELEVATIONS, WALL ANDFLOOR FINISH PLANS FOR INFORMATION

U. MECHANICAL ENCLOSURE AND MECHANICAL PENTHOUSE SHALL BEPAINTED WITH UPGRADED EXTERIOR PAINT AND COATINGS.

V. ALL FINISH SHALL MEET OR EXCEED CLASS B FLAME SPREAD ANDSMOKE DEVELOPED INDICES.

A. REFER TO THE AC0.X SERIES SHEETS FOR ARCHITECTURALGENERAL NOTES, DRAWING, REFERENCE AND MATERIAL SYMBOLS,ABBREVIATIONS, AS WELL AS DIMENSIONING CONVENTIONS USEDON THIS SHEET.

B. REFER TO AND COORDINATE WITH STRUCTURAL, MECHANICAL,ELECTRICAL, PLUMBING, AV, AND SIGNAGE DRAWINGS FORADDITIONAL INFORMATION NOT SHOWN ON THIS SHEET.

C. FOR BASIC LIFE SAFETY AND CODE INFORMATION APPLYING TO THISPROJECT, REFER TO THE GC2.X.X SERIES SHEETS LOCATED PER THEPROJECT SHEET INDEX.

D. REFER TO THE "REFERENCE ELEVATION DEFINITIONS" LOCATED INTHE AC0.X SERIES SHEETS FOR ROOF ELEVATION DEFINITIONS.

E. REFER TO THE AC5.X SERIES SHEETS FOR ROOFING DETAILS.

F. ROOF ASSEMBLIES SHALL BE MINIMUM OF CLASS B FIRECLASSIFICATION, OR AS SPECIFIED IN THE PROJECT MANUAL.

G. ROOFING TPO, TYP. SEE SPEC 075423

H. CONTRACTOR TO NOTIFY ARCHITECT OF ANY CONFLICTS WITH WALLMOUNTED DEVICES INCLUDING LIGHT SWITCHES AND FIRE ALARMSTROBES WITH NON WHITE, ACCENT FINISH APPLIED WALLS.

I. CONTRACTOR SHALL BE RESPONSIBLE FOR ALLOWING FORDELIVERY LEADTIMES FOR ALL FABRICS AND OTHER CUSTOMFINISHES WITHIN THE CONSTRUCTION SCHEDULE. ALL DELIVERYTIMES MUST BE CONFIRMED AND ANY EXCESSIVE LEAD TIME MUSTBE BROUGHT TO THE ARCHITECT'S ATTENTION IMMEDIATELY TOALLOW FOR RESPECIFICATION IF NECESSARY.

J. FOR SURFACES WITH MORE THAN ONE FINISH NOTES, REFER TO THEELEVATION FOR EXTENT OF FINISH.

K. ALL WALLS AND GWB SOFFITS TO BE PAINTED PNT-0 UON.

GENERAL NOTES

SCALE: 1/16" = 1'-0"1 LEVEL 1 - FLOOR PLAN

SCALE: 1/16" = 1'-0"2 MEZZANINE LEVEL

Spaces are numbered using a three (3) digit identifier. Front-of-house spaces are those used by the public or building users. Back-of-house spaces are those typcially accessed by facilities personnel. Explanation below represents the phylosophy for both space types. Numbers are assigned starting at main entrances (or elevators) and working in a clockwise rotation, or linearly from east to west.

For front-of-house spaces2 01 .A| | || | Space or internal room option - 1 digit alpha| Space or suite number - 2 digit numericLevel number – 1 digit numeric

Ex. 110 111 112.A 112.B 201 202 203 311 312

For back-of-house spaces2 X 6| | || | Space sequential number - 1 digit numeric| Room symbol - 1 digit alpha (see table below)Level number – 1 digit numeric

Room Symbol Table:Symbol Room DescriptionC CirculationE ElevatorsF Telephone/Data, IDFJ Janitorial ClosetsL Electrical roomsM Mechanical roomsP Enclosed ParkingS Enclosed StairsSS Major Mechanical ShaftsT ToiletsX Rooms that don’t fit above, ie. Storage

Ex. 1T1 1T2 1T3 1L1 1L2 1S1 1S2

ROOM # PROTOCOLS

SSF PERMIT SET BC#3 / BID SET 1 2020-09-04