Upload
others
View
3
Download
0
Embed Size (px)
Citation preview
Making British gardens great
SHED INSTRUCTIONS LARGE SHEDS SINGLE DOOR (8x6)
Missing Something?Call our aftersales team on0333 777 7089
Need more information?Call our technical team on0333 321 3142
Visit our website for spare instructions and more informationwww.forestgarden.co.uk
FIXING PACKS CONTAIN:
4 x
50m
m S
crew
sQ
TY: 4
7
4 x
40m
m S
crew
sQ
TY: 1
5
4 x
45m
m S
crew
sQ
TY: 1
6
3.5
x 30
mm
Scr
ews
QTY
: 97
3.5
x 25
mm
Scr
ews
QTY
: 79
Felt TacksQTY: 124
Flush HingesQTY: 2
Hasp & StapleQTY: 1
E
Forest Garden, Oak Drive, Hartlebury Trading Estate, Hartlebury, Worcestershire, DY10 4JB
Thank you for purchasing your shed from Forest Garden. No matter what size garden, a shed is the most practical of garden structures. Simply follow these step by step instructions and our top tips and you’ll be enjoying your shed for many years to come. If you have any questions or need advice, our friendly team is here to help.
ISSUE: 0419
Z-Brackets(28mm)QTY: 8
U-Brackets(MSUB)QTY: 2
Truss Support Brackets(MSMTJB)QTY: 2
Support Bracket Hangers(MSTSB)QTY: 2
M6
x 60
mm
Bol
tsQ
TY: 4
M6 x 25mm Washer QTY: 4
M6 Nut QTY: 4
FIXING PACK CODE: MSFP5TRUSS FIXING PACK CODE: STPK27
50mm L-BracketsQTY: 8
BEFORE YOU START
Please read through these instructions to familiarise yourself with your shed. We recommend that you check all the components using the lists found on the front and back pages before you start to build.
All of our sheds are constructed in the same way. They simply come with different components depending on the type of shed you have. Don’t worry if your fixing pack contains some spare items at the end of the build (you haven’t missed a bit!) we have sent you a generic fixing pack to suit the shed range.
It’s vital that you build your new shed on a solid, level base. Timber or Plastic Shed Bases are ideal, as is solid concrete or concrete slabs.
We recommend using the following tools (not supplied):
If you have an existing base and think it’s suitable for your new shed to be sited on, it is important you check that it is level and doesn’t deviate by any more than 15mm from edge to edge. If this isn’t the case the building will twist, causing gaps to appear in the sections and the roof, doors and windows to misalign.
There’s more information on base preparation on our website www.forestgarden.co.uk
Assembly is relatively straightforward if your follow these step by step instructions. We recommend getting everything aligned properly before screwing together and that screw holes should be pre-drilled to avoid splitting the timber.
BASE PREPARATION
TOOLS NEEDED
Timber Base Self-constructed/
Buy pre-made
Tape Measure
Sharp Knife Pozidrive Screwdriver
Drill & 2mm Drill Bit
Hammer
ConcreteConcrete surface/
Concrete slabs
Pro Shed BaseInterlocking
eco-friendly base
SoilA base of soil
only
Broken Slabs/GapsUneven slab sizes with no cement
REMINDERAlways pre-drill before screwing.
IMPORTANTAssembly requires 2+ adults.
Ladder
2
Spirit Level
PLEASE KEEP PLASTIC BAGS AND SMALL PARTS AWAY FROM CHILDREN
MOVEMENT, TWISTING & WARPING
Wood contains a natural level of moisture so decreasing humidity levels in the surrounding air may cause panels to change their shape as the porous fibres shrink. This can be exaggerated during prolonged periods of dry weather. Movement and gaps in timber products are normal, in most cases the wood will revert to its original form once the high temperatures subside and there is more moisture content in the air. Similarly, in the winter months, the opposite may occur with wood swelling.
CARE & ATTENTION
To help you get the most out of our products it’s useful to know a little more about the properties of timber, what’s normal and how your shed may behave as the seasons change. Wood is an extremely durable material for construction but as a natural product when used outdoors it is susceptible to changes in the environment.
3
EXPANSION, CONTRACTION, SPLITS & CRACKS
All timber will expand and contract according to its environment. As a result of this expansion and contraction, it is very common to see splits and cracks developing in the wood. Splits are common during the spring and summer months as the wood begins to dry out. The outer surface dries first and contracts, contracting over a still expanded core of the wood. The result of this is that splits and cracks appear along the grain of wood. These splits are not a fault and do not affect the structural integrity of a product.
MOULD & BLUE STAIN
Mould is a surface-dwelling fungus that feeds on the nutrients and debris contained in the surface cells of timber. The most common problems associated with mould are discoloured timber and an increase in permeability of the timber. Blue stain is part of the same family but penetrates deeper into the surface layers of the timber. It stains the timber a dark blue, whereas mould is usually black. These do not cause the timber to rot. Keep the building well ventilated to avoid mould.
MAKE SURE YOU POSITION YOUR SHED IN THE BEST LOCATION IN YOUR GARDENAvoid areas where water pools and is constantly wet. Position away from trees and cut back any overhanging foliage which can cause moisture to be trapped against shed walls and debris to collect on the roof.
1
RAISE YOUR SHED OFF THE GROUNDIdeally any concrete base should be the same footprint as the shed to allow surface water to run off without pooling, a timber shed base can also be used. Raise 50mm above ground level.
2
SEAL THE BASEWe recommend a treatment containing wax or oil, paint the bearers that come into contact with the ground to prevent moisture coming up.
3
USE AN END-GRAIN PROTECTORTo protect the corners and panel joins, an end grain treatment can be applied.
4
SEAL THE PANELS & WINDOWSUse a flexible silicone sealant around windows to prevent water ingress. This can also be used where 2 sections of the shed joint together. Apply internally.
5
Treat your building annually, we advise the application of a high quality preservative that contains a mildewcide. For more information on the conditions of our guarantee see forestgarden.co.uk.
CONSIDER ADDING GUTTERSAdding guttering around the fascia of the shed will redirect rain water away from the shed’s foundation.
6
KEEP VENTILATEDGood airflow around the perimeter of the shed and regular ventilation inside the shed will help prevent mould and mildew.
7
CONSIDER A WEATHERPROOFING STAIN OR CLEAR TREATMENTWe recommend you paint your garden shed with a weatherproofing treatment at least once a year. This will help maintain the wood, stabilise timber movement and help prolong the life of your shed.
8
TREATED TIMBER CONTAINING A BIOCIDAL PRODUCTCONTROL OF WOOD DESTROYING ORGANISMS
Active Ingredients - Propiconazole, Tebuconazole, IPBC, Permethrine, Benzyl-C12-16-Alkyldimethyl Chlorides. (Dip Treated Sheds)Basic Copper Carbonate, DDA Carbonate, DDA Chloride. (Pressure Treated Sheds)
Wear gloves when handling. Avoid inhalation of sawdust. Do not use in contact with drinking water or food. Do not use for animal bedding or in fish ponds. Dispose of treated wood responsibly.
THINGS THAT YOU MIGHT SEE IN YOUR PRODUCT
8 TOP TIPS TO ENSURE YOUR SHED IS FULLY WATERPROOF
THE ROOF OF THIS BUILDING IS NOT A LOAD BEARING STRUCTURE
ADVICE ON FELT HANDLING & USAGE
Roofing felt is flexible at temperatures above 5°C. In cold temperatures extra care must be taken when handling and installing to prevent cracking and damage to the felt. The felt should not be rolled, folded or used in temperatures lower than 5° C. In cold temperatures the felt should be stored above 10°C (indoors) for 24 hours prior to use. Felt must be lifted, not dragged and should be stored on its end on a dry surface.
E
E
DD
E
C
C
CC
APEX
6’
8’
EE
EE
DD
C C
APEX
6’
8’
D
D
D
D
E
EE
AA
REVERSE APEX 6’
8’
A 1ft Panel (295 x 1603mm)
B 1.5ft Panel (442 x 1603mm)
C 2ft Panel (590 x 1603mm)(With & without windows)
D 3ft Panel (885 x 1603mm)(With & without windows)
E 4ft Panel (1180 x 1603mm)(With & without windows)
KEY
IDENTIFY YOUR SHED
From the section layout below, identify your shed based on the width and depth dimensions of your shed – eg 8x6. You’ll need this to identify the side panel positions.
PLEASE NOTEThe sheds are made up of multiple sections where same size panels are interchangeable.
4
The door is flexible for all shed types and can be hinged onto either side.
APEX SHED REVERSE APEX SHED
Indicates the panel orientation during construction. This will apply to all of the corners for your chosen shed.
EG. INSIDE CORNER
REVERSE APEX ROOF APEX ROOF
1a
1b
1c
CONSTRUCTION1
Start at a back corner. See the section layout on page 4 to confirm position. Secure the corner as shown below.
Repeat the process for remaining panels and secure panels together. Make sure that the
bottom frame of the wall panel rests on the outer edge of the floor.
Secure the panels into place by screwing into the floor. Screw the door batten down.
Start with the Apex section and work around, screwing the additional panels. Finish with the other Apex section.
Attach the Apex section by screwing to the wall panel and repeat for the other Apex section.
5
EG. INTO FLOOREG. SIDES
Layout the panels around your shed base.Position the floor in your desired location. Turn the floors upside down to secure the sections together
by screwing through the adjoining bearers.
We recommend to start in a back corner then work from the back panels
to the front panels for assembly.
FLOORS & SIDESPRE-DRILL
WITH 2MM BIT FOR ALL STEPS
BELOW.
SIDE PANEL
BACK PANEL
EG. DOOR BATTEN (28 x 28 x 590mm)
3
4
WINDOWS2Fix interior sills at the base of windows with L-brackets and screws at a
1002mm distance from the floor. Repeat this for multiple windows, as shown below.
Secure windows by screwing through the window cover strips and window into the panel frame. Screw into the bottom of the window
and into the interior sill to keep secure. Make sure the window is centralised for all window frames as shown below.
WINDOW POSITIONING
6
WINDOW
SITS ONTO INTERIOR SILL
OUTSIDE INSIDE
PRE-DRILL WITH 2MM BIT FOR ALL STEPS
BELOW.
1002
mm
INSIDE OUTSIDE
COVER AND DOOR STRIPSSecure the door weather strip
onto the side you want the hinges, and ensure it’s flush to the floor and against the face of the wall
panel framing.
SLAMMING STRIP(28 x 12 x 1637)COVER STRIPS(See pages 8-10 for measurement for chosen shed)
Attach the cover strips onto the corners. Ensuring they are
flush to the bottom edge of the panels as shown below.
Attach the cover strips onto the adjoining panels. Ensuring it is
flush to the bottom edge of the panels as shown below.
Attach the slamming strip onto the opposite side you want the hinges, onto the wall panel shown below.
DOOR WEATHER STRIP(38 x 12 x 1710)
OUTSIDE INSIDE INSIDE
PLEASE NOTE
Screwing the door weather strip onto the
wall panel determines the side of
your hinges.
PRE-DRILL WITH 2MM BIT FOR ALL STEPS
BELOW.
202mm
175mm
DOOR FIXINGS
TOP TIP: Line up the hasp & staple. Mark the edges with a
pencil for guidance.
Fix the Hasp and Staple as shown. Ensure the screws go into the framework behind.
FRAMEWORK
DOOR FACE
NOTCH IN LINE WITH DOOR FACE
DO
OR
Make sure the outer face of the notch on the hinge is in line with the door face.
HASP & STAPLE POSITIONING
PRE-DRILL WITH 2MM BIT FOR ALL STEPS
BELOW.
Attach 2 hinges onto the door frame with the measurements provided. Please take note
of the hinge position shown below.
Place the door into the opening, ensuring it’s level. Make sure the hinges
are up against the door weather strip face.
5mm
Allow a 5mm gap at the top when placing door.
HINGE POSITION
DOOR
OUTSIDE WALL PANEL FRAME
DOOR WEATHER
STRIP
482mm
1152mm
1152mm
5c
Before placing the OSB roof sheets onto the roof, screw the roof support strips along the edge of the
OSB roof sheets. Ensuring they are flush to the edges. Add one strip onto each sheet as shown below. The
strip will be the same length as one side of the sheet.
5b
5 ROOF
TOP TIP: Layout all the truss components.
50m
m
FOR ALL SHED TYPES
TOP TIP: Use measuring tape to measure out 3 equal lengths & cut with a sharp knife. Hammer the
tacks into the felt. Add the tacks at 150mm intervals.
PRE-DRILL WITH 2MM BIT FOR ALL STEPS
BELOW.
5a Assemble the truss and screw the U-brackets into the center of each beam as shown below. Ensure the truss support brackets are added first and flush to the
edge of the central beams to establish the correct angle.
Secure the support bracket hanger with screws into the center of your shed.
The measurements provided are from the internal timber on the Apex section.
There needs to be one at each side.
Screw the truss to the support bracket hangers. As a result the truss will be centralised inside your shed
and facing the Apex sections.
7
28mm
Z-BRACKET
U-BRACKET
PREPARATION: Attach the Z-brackets onto the face of one
end of each beam as shown below. The beam should be
flush to the Z-bracket.
ATTACHMENT: Secure the other end of the beams to the U-brackets on the
truss by screwing from the underside of the beam.
Screw the Z-brackets that are already attached to beams onto the apex
section frame.
PREPARATION
ATTACHMENT
Ensure the Z-brackets are in this position to screw onto the apex sections frame.
Screw the OSB roof sheets into position as shown below into the
shed frame and truss.
Measure out 3 equal lengths and overlap it on the top, around the edges and fold the corners;
tack to keep secure. Ensure 50mm at the bottom and work from the bottom to the top.
Secure the fascias and the finial (apex only) with screws as shown below based on your chosen
shed.
CAUTIONEnsure you screw into the truss/beams underneath.
ROOF SUPPORT STRIP(28 x 28 x 1196)
TOP TIP: Mark onto the OSB sheet and draw a line to ensure you drill and screw into the truss/beams.
PRE-DRILL WITH 5MM BIT
FOR BOLTS.
SELE
CT
YO
UR
CH
OSE
N S
HE
D &
CH
EC
K Y
OU
HA
VE
ALL
YO
UR
PA
RTS
.
8D
IP T
RE
ATE
D A
PE
X S
HE
DS
(The
par
ts d
o n
ot
have
co
des
on
them
. The
y ar
e lis
ted
ab
ove
sho
uld
yo
u ne
ed t
o o
rder
one
.)
Part
Cod
eD
escr
iptio
nN
o.
Part
Cod
eD
escr
iptio
nN
o.
Part
Cod
eD
escr
iptio
nN
o.
Part
Cod
eD
escr
iptio
nN
o.
Part
Cod
eD
escr
iptio
nN
o.
OD
M88
5PP
Sect
ion
D -
3ft P
anel
(885
x
1603
mm
) 2
OD
M88
5PP
Sect
ion
D -
3ft P
anel
(885
x
1603
mm
) 2
OD
M88
5PP
Sect
ion
D -
3ft P
anel
(885
x
1603
mm
) 2
OD
M88
5PP
Sect
ion
D -
3ft P
anel
(885
x
1603
mm
) 2
SDM
885P
PSe
ctio
n D
- 3f
t Pan
el (8
85 x
16
03m
m)
2
OD
M59
0PP
Sect
ion
C -
2ft P
anel
(590
x
1603
mm
)4
OD
M59
0PP
Sect
ion
C -
2ft P
anel
(590
x
1603
mm
)2
OD
M59
0PP
Sect
ion
C -
2ft P
anel
(590
x
1603
mm
)2
OD
M59
0PP
Sect
ion
C -
2ft P
anel
(590
x
1603
mm
)2
SDM
590P
PSe
ctio
n C
- 2f
t Pan
el (5
90 x
16
03m
m)
4
OD
M11
80W
PSe
ctio
n E
- 4ft
Win
dow
Pan
el
(118
0x16
03m
m)
1O
DM
1180
PPSe
ctio
n E
- 4ft
Pane
l (1
180x
1603
mm
)4
OD
M11
80W
PSe
ctio
n E
- 4ft
Win
dow
Pan
el
(118
0x16
03m
m)
1O
DM
1180
WP
Sect
ion
E - 4
ft W
indo
w P
anel
(1
180x
1603
mm
)2
SDM
1180
WP
Sect
ion
E - 4
ft W
indo
w P
anel
(1
180x
1603
)1
OD
M11
80PP
Sect
ion
E - 4
ft Pa
nel
(118
0x16
03m
m)
2O
DA
MPE
A6
Apex
Sec
tion
- Bac
k1
OD
M11
80PP
Sect
ion
E - 4
ft Pa
nel
(118
0x16
03m
m)
3O
DM
1180
PPSe
ctio
n E
- 4ft
Pane
l (1
180x
1603
mm
)2
SDM
1180
PPSe
ctio
n E
- 4ft
Pane
l (1
180x
1603
mm
)2
OD
AM
PEA
6Ap
ex S
ectio
n - B
ack
1O
DA
MD
EA6
Apex
Sec
tion
- Doo
r1
OD
AM
PEA
6Ap
ex S
ectio
n - B
ack
1O
DA
MPE
A6
Apex
Sec
tion
- Bac
k1
SDA
MPE
A6
Apex
Sec
tion
- Bac
k1
OD
AM
DEA
6Ap
ex S
ectio
n - D
oor
1M
SDD
RD
oor
1O
DA
MD
EA6
Apex
Sec
tion
- Doo
r1
OD
AM
DEA
6Ap
ex S
ectio
n - D
oor
1SD
AM
DEA
6Ap
ex S
ectio
n - D
oor
1M
SDD
RD
oor
1M
SBFL
46Fl
oor
2M
SDD
RD
oor
1M
SDD
RD
oor
1M
SDD
RD
oor
1
MSB
FL46
Floo
r2
2812
1637
PDT
Slam
min
g St
rip (2
8x12
x163
7mm
)1
MSB
FL46
Floo
r2
MSB
FL46
Floo
r2
MSB
FL46
Floo
r2
2812
1637
PDT
Slam
min
g St
rip (2
8x12
x163
7mm
)1
2828
0590
DT
Doo
r Bat
ten
(28x
28x5
90m
m)
128
1216
37PD
TSl
amm
ing
Strip
(28x
12x1
637m
m)
128
1216
37PD
TSl
amm
ing
Strip
(28x
12x1
637m
m)
128
1205
50PD
TW
indo
w C
over
Stri
p (2
8x12
x550
mm
)3
2816
0550
DT
Win
dow
Cov
er S
trip
(28x
16x5
50m
m)
328
2811
96R
oof S
uppo
rt St
rip (2
8x28
x119
6)4
2816
0550
DT
Win
dow
Cov
er S
trip
(28x
16x5
50m
m)
328
1605
50D
TW
indo
w C
over
Stri
p (2
8x16
x550
mm
)6
2812
1637
PDT
Slam
min
g St
rip (2
8x12
x163
7mm
)1
2828
0548
DT
Inte
rior S
ill (2
8x28
x548
mm
)2
3728
1124
KD
Bea
m -
Trus
s (3
7x28
x112
4)8
2828
0548
DT
Inte
rior S
ill (2
8x28
x548
mm
)2
2828
0548
DT
Inte
rior S
ill (2
8x28
x548
mm
)4
2828
0548
DT
Inte
rior S
ill (2
8x28
x548
mm
)2
2828
0590
DT
Doo
r Bat
ten
(28x
28x5
90m
m)
138
1217
10PD
TW
eath
er S
trip
(38x
12x1
710m
m)
128
2805
90D
TD
oor B
atte
n (2
8x28
x590
mm
)1
2828
0590
DT
Doo
r Bat
ten
(28x
28x5
90m
m)
128
2805
90D
TD
oor B
atte
n (2
8x28
x590
mm
)1
2828
1196
Roo
f Sup
port
Strip
(28x
28x1
196)
444
1615
83D
TC
over
Stri
p (4
4x16
x158
3mm
)7
2828
1196
Roo
f Sup
port
Strip
(28x
28x1
196)
428
2811
96R
oof S
uppo
rt St
rip (2
8x28
x119
6)4
2828
1196
Roo
f Sup
port
Strip
(28x
28x1
196)
4
3728
1124
KD
Bea
m -
Trus
s (3
7x28
x112
4)8
4545
1015
PAII6
3C
entra
l Bea
m -
Trus
s (4
5x45
x101
5)2
3728
1124
KD
Bea
m -
Trus
s (3
7x28
x112
4)8
3728
1124
KD
Bea
m -
Trus
s (3
7x28
x112
4)8
3728
1124
KD
Bea
m -
Trus
s (3
7x28
x112
4)8
3812
1710
PDT
Wea
ther
Stri
p (3
8x12
x171
0mm
)1
5912
1145
PAII6
3DT
Fasc
ia (5
9x12
x114
5)4
3812
1710
PDT
Wea
ther
Stri
p (3
8x12
x171
0mm
)1
3812
1710
PDT
Wea
ther
Stri
p (3
8x12
x171
0mm
)1
3812
1710
PDT
Wea
ther
Stri
p (3
8x12
x171
0mm
)1
4416
1583
DT
Cov
er S
trip
(44x
16x1
583m
m)
8O
SB11
9611
058
OSB
She
et -
Roo
f4
4416
1583
DT
Cov
er S
trip
(44x
16x1
583m
m)
744
1615
83D
TC
over
Stri
p (4
4x16
x158
3mm
)7
4012
1583
PDT
Cov
er S
trip
(40x
12x1
583m
m)
8
4545
1015
PAII6
3C
entra
l Bea
m -
Trus
s (4
5x45
x101
5)2
FIN
2001
0512
DT
Fini
al1
4545
1015
PAII6
3C
entra
l Bea
m -
Trus
s (4
5x45
x101
5)2
4545
1015
PAII6
3C
entra
l Bea
m -
Trus
s (4
5x45
x101
5)2
4545
1015
PAII6
3C
entra
l Bea
m -
Trus
s (4
5x45
x101
5)2
5912
1145
PAII6
3DT
Fasc
ia (5
9x12
x114
5)4
FELT
78B
LFe
lt1
5912
1145
PAII6
3DT
Fasc
ia (5
9x12
x114
5)4
5912
1145
PAII6
3DT
Fasc
ia (5
9x12
x114
5)4
5912
1145
PAII6
3DT
Fasc
ia (5
9x12
x114
5)4
RPE
T590
Win
dow
2R
PET5
90W
indo
w2
RPE
T590
Win
dow
4R
PET5
90W
indo
w2
OSB
1196
1105
8O
SB S
heet
- R
oof
4O
SB11
9611
058
OSB
She
et -
Roo
f4
OSB
1196
1105
8O
SB S
heet
- R
oof
4O
SB11
9611
058
OSB
She
et -
Roo
f4
FIN
2001
0512
DT
Fini
al1
FIN
2001
0512
DT
Fini
al1
FIN
2001
0512
DT
Fini
al1
FIN
2001
0512
DT
Fini
al1
FELT
78B
LFe
lt1
FELT
78B
LFe
lt1
FELT
78B
LFe
lt1
8501
4Fe
lt1
Ship
lap
Apex
8' x
6' -
2 W
indo
ws
(SD
A68M
)O
verla
p Ap
ex 8
' x 6
' - 2
Win
dow
s (O
DA6
8M)
Ove
rlap
Apex
8' x
6' -
2 W
indo
ws
(OD
A682
WM
)O
verla
p Ap
ex 8
' x 6
' - 4
Win
dow
s (O
DA6
84W
MF)
Ove
rlap
Apex
8' x
6' -
No
Win
dow
s (O
DA6
8NW
M)
Part
Cod
eD
escr
iptio
nN
o.
Part
Cod
eD
escr
iptio
nN
o.
Part
Cod
eD
escr
iptio
nN
o.
Part
Cod
eD
escr
iptio
nN
o.
Part
Cod
eD
escr
iptio
nN
o.
OD
M88
5PP
Sect
ion
D -
3ft P
anel
(885
x
1603
mm
) 2
OD
M88
5PP
Sect
ion
D -
3ft P
anel
(885
x
1603
mm
) 2
OD
M88
5PP
Sect
ion
D -
3ft P
anel
(885
x
1603
mm
) 2
OD
M88
5PP
Sect
ion
D -
3ft P
anel
(885
x
1603
mm
) 2
SDM
885P
PSe
ctio
n D
- 3f
t Pan
el (8
85 x
16
03m
m)
2
OD
M59
0PP
Sect
ion
C -
2ft P
anel
(590
x
1603
mm
)4
OD
M59
0PP
Sect
ion
C -
2ft P
anel
(590
x
1603
mm
)2
OD
M59
0PP
Sect
ion
C -
2ft P
anel
(590
x
1603
mm
)2
OD
M59
0PP
Sect
ion
C -
2ft P
anel
(590
x
1603
mm
)2
SDM
590P
PSe
ctio
n C
- 2f
t Pan
el (5
90 x
16
03m
m)
4
OD
M11
80W
PSe
ctio
n E
- 4ft
Win
dow
Pan
el
(118
0x16
03m
m)
1O
DM
1180
PPSe
ctio
n E
- 4ft
Pane
l (1
180x
1603
mm
)4
OD
M11
80W
PSe
ctio
n E
- 4ft
Win
dow
Pan
el
(118
0x16
03m
m)
1O
DM
1180
WP
Sect
ion
E - 4
ft W
indo
w P
anel
(1
180x
1603
mm
)2
SDM
1180
WP
Sect
ion
E - 4
ft W
indo
w P
anel
(1
180x
1603
)1
OD
M11
80PP
Sect
ion
E - 4
ft Pa
nel
(118
0x16
03m
m)
2O
DA
MPE
A6
Apex
Sec
tion
- Bac
k1
OD
M11
80PP
Sect
ion
E - 4
ft Pa
nel
(118
0x16
03m
m)
3O
DM
1180
PPSe
ctio
n E
- 4ft
Pane
l (1
180x
1603
mm
)2
SDM
1180
PPSe
ctio
n E
- 4ft
Pane
l (1
180x
1603
mm
)2
OD
AM
PEA
6Ap
ex S
ectio
n - B
ack
1O
DA
MD
EA6
Apex
Sec
tion
- Doo
r1
OD
AM
PEA
6Ap
ex S
ectio
n - B
ack
1O
DA
MPE
A6
Apex
Sec
tion
- Bac
k1
SDA
MPE
A6
Apex
Sec
tion
- Bac
k1
OD
AM
DEA
6Ap
ex S
ectio
n - D
oor
1M
SDD
RD
oor
1O
DA
MD
EA6
Apex
Sec
tion
- Doo
r1
OD
AM
DEA
6Ap
ex S
ectio
n - D
oor
1SD
AM
DEA
6Ap
ex S
ectio
n - D
oor
1M
SDD
RD
oor
1M
SBFL
46Fl
oor
2M
SDD
RD
oor
1M
SDD
RD
oor
1M
SDD
RD
oor
1
MSB
FL46
Floo
r2
2812
1637
PDT
Slam
min
g St
rip (2
8x12
x163
7mm
)1
MSB
FL46
Floo
r2
MSB
FL46
Floo
r2
MSB
FL46
Floo
r2
2812
1637
PDT
Slam
min
g St
rip (2
8x12
x163
7mm
)1
2828
0590
DT
Doo
r Bat
ten
(28x
28x5
90m
m)
128
1216
37PD
TSl
amm
ing
Strip
(28x
12x1
637m
m)
128
1216
37PD
TSl
amm
ing
Strip
(28x
12x1
637m
m)
128
1205
50PD
TW
indo
w C
over
Stri
p (2
8x12
x550
mm
)3
2816
0550
DT
Win
dow
Cov
er S
trip
(28x
16x5
50m
m)
328
2811
96R
oof S
uppo
rt St
rip (2
8x28
x119
6)4
2816
0550
DT
Win
dow
Cov
er S
trip
(28x
16x5
50m
m)
328
1605
50D
TW
indo
w C
over
Stri
p (2
8x16
x550
mm
)6
2812
1637
PDT
Slam
min
g St
rip (2
8x12
x163
7mm
)1
2828
0548
DT
Inte
rior S
ill (2
8x28
x548
mm
)2
3728
1124
KD
Bea
m -
Trus
s (3
7x28
x112
4)8
2828
0548
DT
Inte
rior S
ill (2
8x28
x548
mm
)2
2828
0548
DT
Inte
rior S
ill (2
8x28
x548
mm
)4
2828
0548
DT
Inte
rior S
ill (2
8x28
x548
mm
)2
2828
0590
DT
Doo
r Bat
ten
(28x
28x5
90m
m)
138
1217
10PD
TW
eath
er S
trip
(38x
12x1
710m
m)
128
2805
90D
TD
oor B
atte
n (2
8x28
x590
mm
)1
2828
0590
DT
Doo
r Bat
ten
(28x
28x5
90m
m)
128
2805
90D
TD
oor B
atte
n (2
8x28
x590
mm
)1
2828
1196
Roo
f Sup
port
Strip
(28x
28x1
196)
444
1615
83D
TC
over
Stri
p (4
4x16
x158
3mm
)7
2828
1196
Roo
f Sup
port
Strip
(28x
28x1
196)
428
2811
96R
oof S
uppo
rt St
rip (2
8x28
x119
6)4
2828
1196
Roo
f Sup
port
Strip
(28x
28x1
196)
4
3728
1124
KD
Bea
m -
Trus
s (3
7x28
x112
4)8
4545
1015
PAII6
3C
entra
l Bea
m -
Trus
s (4
5x45
x101
5)2
3728
1124
KD
Bea
m -
Trus
s (3
7x28
x112
4)8
3728
1124
KD
Bea
m -
Trus
s (3
7x28
x112
4)8
3728
1124
KD
Bea
m -
Trus
s (3
7x28
x112
4)8
3812
1710
PDT
Wea
ther
Stri
p (3
8x12
x171
0mm
)1
5912
1145
PAII6
3DT
Fasc
ia (5
9x12
x114
5)4
3812
1710
PDT
Wea
ther
Stri
p (3
8x12
x171
0mm
)1
3812
1710
PDT
Wea
ther
Stri
p (3
8x12
x171
0mm
)1
3812
1710
PDT
Wea
ther
Stri
p (3
8x12
x171
0mm
)1
4416
1583
DT
Cov
er S
trip
(44x
16x1
583m
m)
8O
SB11
9611
058
OSB
She
et -
Roo
f4
4416
1583
DT
Cov
er S
trip
(44x
16x1
583m
m)
744
1615
83D
TC
over
Stri
p (4
4x16
x158
3mm
)7
4012
1583
PDT
Cov
er S
trip
(40x
12x1
583m
m)
8
4545
1015
PAII6
3C
entra
l Bea
m -
Trus
s (4
5x45
x101
5)2
FIN
2001
0512
DT
Fini
al1
4545
1015
PAII6
3C
entra
l Bea
m -
Trus
s (4
5x45
x101
5)2
4545
1015
PAII6
3C
entra
l Bea
m -
Trus
s (4
5x45
x101
5)2
4545
1015
PAII6
3C
entra
l Bea
m -
Trus
s (4
5x45
x101
5)2
5912
1145
PAII6
3DT
Fasc
ia (5
9x12
x114
5)4
FELT
78B
LFe
lt1
5912
1145
PAII6
3DT
Fasc
ia (5
9x12
x114
5)4
5912
1145
PAII6
3DT
Fasc
ia (5
9x12
x114
5)4
5912
1145
PAII6
3DT
Fasc
ia (5
9x12
x114
5)4
RPE
T590
Win
dow
2R
PET5
90W
indo
w2
RPE
T590
Win
dow
4R
PET5
90W
indo
w2
OSB
1196
1105
8O
SB S
heet
- R
oof
4O
SB11
9611
058
OSB
She
et -
Roo
f4
OSB
1196
1105
8O
SB S
heet
- R
oof
4O
SB11
9611
058
OSB
She
et -
Roo
f4
FIN
2001
0512
DT
Fini
al1
FIN
2001
0512
DT
Fini
al1
FIN
2001
0512
DT
Fini
al1
FIN
2001
0512
DT
Fini
al1
FELT
78B
LFe
lt1
FELT
78B
LFe
lt1
FELT
78B
LFe
lt1
8501
4Fe
lt1
Ship
lap
Apex
8' x
6' -
2 W
indo
ws
(SD
A68M
)O
verla
p Ap
ex 8
' x 6
' - 2
Win
dow
s (O
DA6
8M)
Ove
rlap
Apex
8' x
6' -
2 W
indo
ws
(OD
A682
WM
)O
verla
p Ap
ex 8
' x 6
' - 4
Win
dow
s (O
DA6
84W
MF)
Ove
rlap
Apex
8' x
6' -
No
Win
dow
s (O
DA6
8NW
M)
9
SELE
CT
YO
UR
CH
OSE
N S
HE
D &
CH
EC
K Y
OU
HA
VE
ALL
YO
UR
PA
RTS
.
PR
ESS
UR
E T
RE
ATE
D A
PE
X S
HE
DS
(The
par
ts d
o n
ot
have
co
des
on
them
. The
y ar
e lis
ted
ab
ove
sho
uld
yo
u ne
ed t
o o
rder
one
.)
Part
Cod
eD
escr
iptio
nN
o.
Part
Cod
eD
escr
iptio
nN
o.
Part
Cod
eD
escr
iptio
nN
o.
Part
Cod
eD
escr
iptio
nN
o.
OPM
885P
PSe
ctio
n D
- 3f
t Pan
el (8
85 x
16
03m
m)
2O
PM88
5PP
Sect
ion
D -
3ft P
anel
(885
x
1603
mm
)2
OPM
885P
PSe
ctio
n D
- 3f
t Pan
el (8
85 x
16
03m
m)
2O
PM88
5PP
Sect
ion
D -
3ft P
anel
(885
x
1603
mm
)2
OPM
590P
PSe
ctio
n C
- 2f
t Pan
el (5
90 x
16
03m
m)
4O
PM59
0PP
Sect
ion
C -
2ft P
anel
(590
x
1603
mm
)2
OPM
590P
PSe
ctio
n C
- 2f
t Pan
el (5
90 x
16
03m
m)
2O
PM59
0PP
Sect
ion
C -
2ft P
anel
(590
x
1603
mm
)2
OPM
1180
WP
Sect
ion
E - 4
ft W
indo
w P
anel
(1
180x
1603
mm
)1
OPM
1180
PPSe
ctio
n E
- 4ft
Pane
l (1
180x
1603
mm
)4
OPM
1180
WP
Sect
ion
E - 4
ft W
indo
w P
anel
(1
180x
1603
mm
)1
OPM
1180
WP
Sect
ion
E - 4
ft W
indo
w P
anel
(1
180x
1603
mm
)2
OPM
1180
PPSe
ctio
n E
- 4ft
Pane
l (1
180x
1603
mm
)2
OPA
MPE
A6
Apex
Sec
tion
- Bac
k1
OPM
1180
PPSe
ctio
n E
- 4ft
Pane
l (1
180x
1603
mm
)3
OPM
1180
PPSe
ctio
n E
- 4ft
Pane
l (1
180x
1603
mm
)2
OPA
MPE
A6
Apex
Sec
tion
- Bac
k1
OPA
MD
EA6
Apex
Sec
tion
- Doo
r1
OPA
MPE
A6
Apex
Sec
tion
- Bac
k1
OPA
MPE
A6Ap
ex S
ectio
n - B
ack
1O
PAM
DEA
6Ap
ex S
ectio
n - D
oor
1M
SPD
RD
oor
1O
PAM
DEA
6Ap
ex S
ectio
n - D
oor
1O
PAM
DEA
6Ap
ex S
ectio
n - D
oor
1M
SPD
RD
oor
1M
SBFL
46Fl
oor
2M
SPD
RD
oor
1M
SPD
RD
oor
1
MSB
FL46
Floo
r2
2812
1637
PPT
Slam
min
g St
rip (2
8x12
x163
7mm
)1
MSB
FL46
Floo
r2
MSB
FL46
Floo
r2
2812
1637
PPT
Slam
min
g St
rip (2
8x12
x163
7mm
)1
2828
0590
PTD
oor B
atte
n (2
8x28
x590
mm
)1
2812
1637
PPT
Slam
min
g St
rip (2
8x12
x163
7mm
)1
2812
1637
PPT
Slam
min
g St
rip (2
8x12
x163
7mm
)1
2816
0550
PTW
indo
w C
over
Stri
p (2
8x16
x550
mm
)3
2828
1196
Roo
f Sup
port
Strip
(28x
28x1
196)
428
1605
50PT
Win
dow
Cov
er S
trip
(28x
16x5
50m
m)
328
1605
50PT
Win
dow
Cov
er S
trip
(28x
16x5
50m
m)
628
2805
48PT
Inte
rior S
ill (2
8x28
x548
mm
)2
3728
1124
KD
Bea
m -
Trus
s (3
7x28
x112
4)8
2828
0548
PTIn
terio
r Sill
(28x
28x5
48m
m)
228
2805
48PT
Inte
rior S
ill (2
8x28
x548
mm
)4
2828
0590
PTD
oor B
atte
n (2
8x28
x590
mm
)1
3812
1710
PPT
Wea
ther
Stri
p (3
8x12
x171
0mm
)1
2828
0590
PTD
oor B
atte
n (2
8x28
x590
mm
)1
2828
0590
PTD
oor B
atte
n (2
8x28
x590
mm
)1
2828
1196
Roo
f Sup
port
Strip
(28x
28x1
196)
444
1615
83PT
Cov
er S
trip
(44x
16x1
583m
m)
728
2811
96R
oof S
uppo
rt St
rip (2
8x28
x119
6)4
2828
1196
Roo
f Sup
port
Strip
(28x
28x1
196)
4
3728
1124
KD
Bea
m -
Trus
s (3
7x28
x112
4)8
4545
1015
PAII6
3C
entra
l Bea
m -
Trus
s (4
5x45
x101
5)2
3728
1124
KD
Bea
m -
Trus
s (3
7x28
x112
4)8
3728
1124
KD
Bea
m -
Trus
s (3
7x28
x112
4)8
3812
1710
PPT
Wea
ther
Stri
p (3
8x12
x171
0mm
)1
5912
1145
PAII6
3PT
Fasc
ia (5
9x12
x114
5)4
3812
1710
PPT
Wea
ther
Stri
p (3
8x12
x171
0mm
)1
3812
1710
PPT
Wea
ther
Stri
p (3
8x12
x171
0mm
)1
4416
1583
PTC
over
Stri
p (4
4x16
x158
3mm
)8
OSB
1196
1105
8O
SB S
heet
- R
oof
444
1615
83PT
Cov
er S
trip
(44x
16x1
583m
m)
744
1615
83PT
Cov
er S
trip
(44x
16x1
583m
m)
7
4545
1015
PAII6
3C
entra
l Bea
m -
Trus
s (4
5x45
x101
5)2
FIN
2001
0512
PTFi
nial
145
4510
15PA
II63
Cen
tral B
eam
- Tr
uss
(45x
45x1
015)
245
4510
15PA
II63
Cen
tral B
eam
- Tr
uss
(45x
45x1
015)
259
1211
45PA
II63P
TFa
scia
(59x
12x1
145)
4FE
LT78
BL
Felt
159
1211
45PA
II63P
TFa
scia
(59x
12x1
145)
459
1211
45PA
II63P
TFa
scia
(59x
12x1
145)
4R
PET5
90W
indo
w2
RPE
T590
Win
dow
2R
PET5
90W
indo
w4
OSB
1196
1105
8O
SB S
heet
- R
oof
4O
SB11
9611
058
OSB
She
et -
Roo
f4
OSB
1196
1105
8O
SB S
heet
- R
oof
4FI
N20
0105
12PT
Fini
al1
FIN
2001
0512
PTFi
nial
1FI
N20
0105
12PT
Fini
al1
FELT
78B
LFe
lt1
FELT
78B
LFe
lt1
FELT
78B
LFe
lt1
Ove
rlap
Apex
8' x
6' -
2 W
indo
ws
(OPA
68M
)O
verla
p Ap
ex 8
' x 6
' - N
o W
indo
ws
(OPA
68N
WM
)O
verla
p Ap
ex 8
' x 6
' - 2
Win
dow
s (O
PA68
2WM
)O
verla
p Ap
ex 8
' x 6
' - 4
Win
dow
s (O
PA68
4WM
F)
10
SELE
CT
YO
UR
CH
OSE
N S
HE
D &
CH
EC
K Y
OU
HA
VE
ALL
YO
UR
PA
RTS
.
TRE
ATE
D R
EV
ER
SE A
PE
X S
HE
DS
(The
par
ts d
o n
ot
have
co
des
on
them
. The
y ar
e lis
ted
ab
ove
sho
uld
yo
u ne
ed t
o o
rder
one
.)
Part
Cod
eD
escr
iptio
nN
o.
Part
Cod
eD
escr
iptio
nN
o.
OPM
1180
PPSe
ctio
n E
- 4ft
Pane
l (1
180x
1603
mm
)2
OD
M11
80PP
Sect
ion
E - 4
ft Pa
nel
(118
0x16
03m
m)
2
OPM
885P
PSe
ctio
n D
- 3f
t Pan
el (8
85 x
16
03m
m)
4O
DM
885P
PSe
ctio
n D
- 3f
t Pan
el (8
85 x
16
03m
m)
4
OPM
1180
WP
Sect
ion
E - 4
ft W
indo
w P
anel
(1
180x
1603
mm
)1
OD
M11
80W
PSe
ctio
n E
- 4ft
Win
dow
Pan
el
(118
0x16
03m
m)
1
OPM
295P
PSe
ctio
n A
- 1ft
Pane
l (29
5x
1603
mm
)2
OD
M29
5PP
Sect
ion
A - 1
ft Pa
nel (
295x
16
03m
m)
2O
PM11
80PI
FP4f
t Ext
ensi
on P
anel
3O
DM
1180
PIFP
4ft E
xten
sion
Pan
el3
OPM
1180
DIF
P4f
t ext
ensi
on -
front
doo
r pan
el1
OD
M11
80D
IFP
4ft e
xten
sion
- fro
nt d
oor p
anel
1
OPR
AM
PEA
6Ap
ex S
ectio
n2
OD
RA
MPE
A6
Apex
Sec
tion
2M
SPD
RD
oor
1M
SDD
RD
oor
1M
SBFL
46Fl
oor
2M
SBFL
46Fl
oor
2
2812
1637
PPT
Slam
min
g St
rip (2
8x12
x163
7mm
)1
2812
1637
PDT
Slam
min
g St
rip (2
8x12
x163
7mm
)1
2816
0550
PTW
indo
w C
over
Stri
p (2
8x16
x550
mm
)3
2816
0550
DT
Win
dow
Cov
er S
trip
(28x
16x5
50m
m)
328
2805
48PT
Inte
rior S
ill (2
8x28
x548
mm
)2
2828
0548
DT
Inte
rior S
ill (2
8x28
x548
mm
)2
2828
0590
PTD
oor B
atte
n (2
8x28
x590
mm
)1
2828
0590
DT
Doo
r Bat
ten
(28x
28x5
90m
m)
1
2828
1196
Roo
f Sup
port
Strip
(28x
28x1
196)
428
2811
96R
oof S
uppo
rt St
rip (2
8x28
x119
6)4
3728
1124
KD
Bea
m -
Trus
s (3
7x28
x112
4)8
3728
1124
KD
Bea
m -
Trus
s (3
7x28
x112
4)8
3812
1710
PPT
Wea
ther
Stri
p (3
8x12
x171
0mm
)1
3812
1710
PDT
Wea
ther
Stri
p (3
8x12
x171
0mm
)1
4416
1810
PTC
over
Stri
p (4
4x16
x181
0mm
)8
4416
1810
DT
Cov
er S
trip
(44x
16x1
810m
m)
8
4545
1015
PAII6
3C
entra
l Bea
m -
Trus
s (4
5x45
x101
5)2
4545
1015
PAII6
3C
entra
l Bea
m -
Trus
s (4
5x45
x101
5)2
5912
1145
PAII6
3PT
Fasc
ia (5
9x12
x114
5)4
5912
1145
PAII6
3DT
Fasc
ia (5
9x12
x114
5)4
RPE
T590
Win
dow
2R
PET5
90W
indo
w2
OSB
1196
1105
8O
SB S
heet
- R
oof
4O
SB11
9611
058
OSB
She
et -
Roo
f4
FELT
78B
LFe
lt1
FELT
78B
LFe
lt1
Pres
sure
Tre
ated
Ove
rlap
Rev
erse
Ape
x 8'
x 6
' (O
PR86
M)
Dip
Tre
ated
Ove
rlap
Rev
erse
Ape
x 8'
x 6
' (O
DR
86M
)