Sharing understanding of risk
through the planning process
Sizarta Sarshar [email protected]
PhD candidate at NTNU
Senior researcher at IFE
IO13 Conference – IO1 Teamwork and Capabilities
Trondheim, Norway, 24th-25th September 2013
IO1 Teamwork and Capabilities
Corrective
maintenance
Backlog
Priority
2
Design
Technical safety
Preventive
maintenance
program
Technical hierarchy
Consequence classification
Risk based preventive
maintenance Maintenance
management
Technical barrier
management
Other
operations
Execution
Safe Job
Analysis Work Permit plan
Work Order plan
Operational plan
IO1 Teamwork and Capabilities 3
Onshore
Operation
Organisation
(HUB)
Contractors/
Vendors
Headquarter
Offshore
Operations
Organisation
Contractors/
Vendors
at other
locations
IO1 Teamwork and Capabilities 4
Corrective
maintenance
Backlog
Priority
Design
Technical safety
Preventive
maintenance
program
Technical hierarchy
Consequence classification
Risk based preventive
maintenance Maintenance
management
Technical barrier
management
Other
operations
Execution
Safe Job
Analysis Work Permit plan
Work Order plan
Operational plan
IO1 Teamwork and Capabilities
Corrective
maintenance
Backlog
Priority
Design
Technical safety
Preventive
maintenance
program
Technical hierarchy
Consequence classification
Risk based preventive
maintenance Maintenance
management
Technical barrier
management
Other
operations
Execution
Safe Job
Analysis Work Permit plan
Work Order plan
Operational plan
5
Zone classification
Laydown area
Potential hazards/
weakened barriers
Planned work
to be executed
• Allow for participants having different backgrounds and thus
not the same ability for interpreting data
• Allow for knowledge sharing
• Visualize history, consensus and implications
• Provide an overview of the planned activities
[Skjerve et al, 2011]
IO1 Teamwork and Capabilities 6
Onshore
Organisation
Offshore
Organisation
IO MAP prototype
Developed in the IO-FuCE project
in phase 1 of the IO Center by IFE
[Braseth & Sarshar, 2012]
IO1 Teamwork and Capabilities
Findings from the usability study 1/2
• IO-MAP fills an important function in visualising risk
factors in connection to tasks and location, offering
an extra highlight and reminder of these on the map.
• Visualization may help onshore staff with limited
offshore familiarity to align to the existing offshore
setting.
7
IO1 Teamwork and Capabilities
Findings from the usability study 2/2
• The findings from the usability study of the first
version of the tool showed that users could more
easily share understanding and communicate
through a shared visualization.
• Such tools can help simplify the day to day operation
in the way that information is gathered in one place
and it allows users to see relations and possible
outcome of the job planning.
8
IO1 Teamwork and Capabilities
On-going study:
• Explore the relation between high quality plans for
offshore maintenance and operational activities and
major accident prevention.
Assumption:
• Low quality planning processes lead to low quality
plans, which in turn increase the risk for major
accidents.
10
IO1 Teamwork and Capabilities 11
Onshore
Organisation
Offshore
Organisation
IO1 Teamwork and Capabilities 12
• Maintenance management is illustrated as a work
flow where products are produced with low HSE risks
and high production performance [NORSOK Z-008].
• A high quality plan shall make it possible to execute
the work in a safe manner, without accidents, and
make it possible to deliver a finished work
state/product that can be operated safely.
IO1 Teamwork and Capabilities 13
What are attributes of high-quality plans vis-à-vis
preventing major accidents?
How should the planning process be organized to
promote development of high-quality plans?
• The plan is robust and is comprehensible to its users
• Description of task execution includes contributions from all
disciplines and parties
• All safety issues have been resolved
• Allow time and avoid pressure
• Competence
• Involvement
• Communication
• Feedback loop
[Sarshar et al., 2013]
Sizarta Sarshar
PhD Supervisors:
Stein Haugen and Ann Britt Skjerve
IO1 Program manager: IO1 Project leader:
Jon Kvalem Grete Rindahl
IO13 Conference – IO1 Teamwork and Capabilities
Trondheim, Norway, 24th-25th October 2013
Sharing understanding of risk
through the planning process
IO1 Teamwork and Capabilities
References
• S. Sarshar et al. “Towards an understanding of information needed
when planning offshore activities”, ESREL 2013.
• A.O. Braseth and S. Sarshar “Improving Oil & Gas Installation Safety
through Visualization of Risk Factors”, SPE 2012.
• M. Kaarstad and G. Rindahl “Shared collaboration surfaces to
support adequate team decision processes in an Integrated
Operations setting”, ESREL 2011.
• S. Sarshar et al. “Quality Aspects in Planning of Maintenance and
Modification on Offshore Oil and Gas Installations”, ESREL 2011.
• A.B. Skjerve et al. “The Integrated Operations Maintenance and
Modification Planner (IO-MAP) First Usability Evaluation”, IO
CENTER report 2011.
• NORSOK Z-008 “Risk based maintenance and consequence
classification”, 3rd ed., 2011.
15