Share Fair – 4th November 2015

Graham Clarke and Allan Baird

Page 2: Share Fair 4 November 2015 - Oil & Gas UKoilandgasuk.co.uk/wp-content/uploads/2015/06/Amec... · Construction QA/ QC HSE Amec Foster Wheeler ... The Amec Foster Wheeler team will

2

WE ARE HERE

Safety – Floor Plan

Page 3: Share Fair 4 November 2015 - Oil & Gas UKoilandgasuk.co.uk/wp-content/uploads/2015/06/Amec... · Construction QA/ QC HSE Amec Foster Wheeler ... The Amec Foster Wheeler team will

Amec Foster Wheeler Agenda

3

• Amec Foster Wheeler at a Glance

• Value and Vision

• How to do Business with us

• A Changing Market

• The Supply Chain Challenge

• Cost Reduction initiatives

• Systems - Then and Now

• What are we doing

• Current Work and Opportunities

Page 4: Share Fair 4 November 2015 - Oil & Gas UKoilandgasuk.co.uk/wp-content/uploads/2015/06/Amec... · Construction QA/ QC HSE Amec Foster Wheeler ... The Amec Foster Wheeler team will

► Headquartered in London and listed on: -

► London Stock Exchange (AMFW)

► New York Stock Exchange (AMFW)

Amec Foster Wheeler Key Facts and Services

>40,000

people

>US$10bn

revenues

>150 years

of history

4

>50

countries

► Services: -

► Consultancy;

► Engineering;

► Project management;

► Project delivery;

► Ongoing asset support;

► Specialised power equipment.

Page 5: Share Fair 4 November 2015 - Oil & Gas UKoilandgasuk.co.uk/wp-content/uploads/2015/06/Amec... · Construction QA/ QC HSE Amec Foster Wheeler ... The Amec Foster Wheeler team will

Amec Foster Wheeler Markets and Sectors

5

Markets Sectors Business units S

trate

gy &

Bu

sin

ess D

evelo

pm

en

t

Oil & Gas

Mining

E&I

Clean

Energy

Renewables / Bioprocess

Nuclear

Transmission & Distribution

Conventional Power

Glo

ba

l P

ow

er

Gro

up

No

rth

ern

Eu

rop

e &

CIS

Am

eri

ca

s

As

ia,

Mid

dle

Ea

st,

Afr

ica

& S

ou

the

rn E

uro

pe

Water

Transport

Government

Industrial / Pharma

Upstream

Midstream

Downstream

Mining & Minerals

Page 6: Share Fair 4 November 2015 - Oil & Gas UKoilandgasuk.co.uk/wp-content/uploads/2015/06/Amec... · Construction QA/ QC HSE Amec Foster Wheeler ... The Amec Foster Wheeler team will

► We have a clear vision which

encompasses our ambitions for the

future.

Amec Foster Wheeler Vision and Values

Add a coloured

transparent

segment and

caption if

required.

Delivering on

our promises

► Our values express who we are and

what we stand for: -

To be the most trusted

partner for our customers

by consistently delivering

excellence – bringing

together the knowledge,

expertise and skills of our

people from across our

global network.

6

Page 7: Share Fair 4 November 2015 - Oil & Gas UKoilandgasuk.co.uk/wp-content/uploads/2015/06/Amec... · Construction QA/ QC HSE Amec Foster Wheeler ... The Amec Foster Wheeler team will

► At Amec Foster Wheeler we: -

► Recognise the important role our suppliers have in the development and ongoing success of our business;

► Believe that successful relationship management within our supply chain is fundamental to our delivery of safe and excellent projects;

► We expect our chosen suppliers and subcontractors to: -

► deliver on their promises;

► aid us in delivering projects excellently;

► be safe;

► take care of the environment;

► be ethical and fair.

► We expect our chosen suppliers and subcontractors to share our core values.

Amec Foster Wheeler How to do Business with Amec Foster Wheeler

7

Page 8: Share Fair 4 November 2015 - Oil & Gas UKoilandgasuk.co.uk/wp-content/uploads/2015/06/Amec... · Construction QA/ QC HSE Amec Foster Wheeler ... The Amec Foster Wheeler team will

►Efficient

► Structural change in the market means we need more than this, we need to do something different, to think differently: -

► Strong financial / commercial structure;

► Technical excellence, quality and competent personnel;

► Proven systems, procedures and control mechanisms to support execution and delivery;

► Alignment with Amec Foster Wheeler values, Code of Business Conduct;

► ISO9001/29001, ISO14001 certification and OHSAS 18001 accreditation;;

► Excellent HSSE track record.

Amec Foster Wheeler How to do Business with Amec Foster Wheeler

8

► Pre-qualification for UKCS projects (FPAL, project specific questionnaires);

► Top quartile performance feedback;

► Previously and continually we will select for suppliers that have: -

►Innovative ►Collaborative

Page 9: Share Fair 4 November 2015 - Oil & Gas UKoilandgasuk.co.uk/wp-content/uploads/2015/06/Amec... · Construction QA/ QC HSE Amec Foster Wheeler ... The Amec Foster Wheeler team will

Amec Foster Wheeler A significantly changing market

9

► The industry, and its supply chain, needs to evolve to meet the current challenges.

► Do we do too much for any given outcome;

► Are we inefficient…are we getting any better;

► Industry costs have been largely uncontrolled;

► Why so many bespoke solutions.

Page 10: Share Fair 4 November 2015 - Oil & Gas UKoilandgasuk.co.uk/wp-content/uploads/2015/06/Amec... · Construction QA/ QC HSE Amec Foster Wheeler ... The Amec Foster Wheeler team will

Amec Foster Wheeler How have other industries evolved

10

• Asset / service / geographic

restructure

• M&A + network integration

• Operating Model

• Activity reduction

• Consolidation

• Organisation design

• Digital / Technology

• Spend reduction

• Tactical process

improvements

• Cost avoidance

Impro

vem

ent (%

)

Category

12 – 36 months 5 – 18 months 3 – 9 months

Transform Efficiency Cost Out

Timing

10-15 %

15-25 %

25-40 %

Page 11: Share Fair 4 November 2015 - Oil & Gas UKoilandgasuk.co.uk/wp-content/uploads/2015/06/Amec... · Construction QA/ QC HSE Amec Foster Wheeler ... The Amec Foster Wheeler team will

Amec Foster Wheeler Cost Reduction, Efficiency and Transformational Change

11

► Agenda

► Looking Back…understand what history tells us: -

► Industry;

► Design Engineering.

► Looking Forward…understand what we need to do: -

► Efficiency Drivers;

► Amec Foster Wheeler.

► What we need from Supply Chain…

Page 12: Share Fair 4 November 2015 - Oil & Gas UKoilandgasuk.co.uk/wp-content/uploads/2015/06/Amec... · Construction QA/ QC HSE Amec Foster Wheeler ... The Amec Foster Wheeler team will

Amec Foster Wheeler The Supply Chain Challenge

12

Innovation

Collaborate

> FTEs

Eliminating

waste

Standard

Solutions

Efficiency

Gains

The Supply Chain contribution –

what can you bring?

Page 13: Share Fair 4 November 2015 - Oil & Gas UKoilandgasuk.co.uk/wp-content/uploads/2015/06/Amec... · Construction QA/ QC HSE Amec Foster Wheeler ... The Amec Foster Wheeler team will

13

Amec Foster Wheeler Cost Reduction, Efficiency and Transformational Change

Allan Baird

Page 14: Share Fair 4 November 2015 - Oil & Gas UKoilandgasuk.co.uk/wp-content/uploads/2015/06/Amec... · Construction QA/ QC HSE Amec Foster Wheeler ... The Amec Foster Wheeler team will

Amec Foster Wheeler Looking Back – Industry - CRINE

► Early 1990s…oil prices of $12 a barrel;

► CRINE - Cost Reduction In the New Era…collaborative effort to find ways of reducing costs;

► CRINE Report published in 1994 - recommendations for functional rather than prescriptive specifications, shared working practices, a sole industry body for prequalification and a reduction in paperwork through the procurement process;

► The industry was able to reduce costs by 40%...

► Some industry commentators have gone as far as stating that CRINE platforms are less efficient, and even less safe…

► Recent strong steer from HSE...whilst they recognise the need to reduce costs...we must not compromise on safety;

► They will be watching closely...

14

Page 15: Share Fair 4 November 2015 - Oil & Gas UKoilandgasuk.co.uk/wp-content/uploads/2015/06/Amec... · Construction QA/ QC HSE Amec Foster Wheeler ... The Amec Foster Wheeler team will

Amec Foster Wheeler Looking Back, 3D Modelling in 1980’s

15

Page 16: Share Fair 4 November 2015 - Oil & Gas UKoilandgasuk.co.uk/wp-content/uploads/2015/06/Amec... · Construction QA/ QC HSE Amec Foster Wheeler ... The Amec Foster Wheeler team will

Amec Foster Wheeler Design Engineering - 3D Modelling Now…2015

16

Page 17: Share Fair 4 November 2015 - Oil & Gas UKoilandgasuk.co.uk/wp-content/uploads/2015/06/Amec... · Construction QA/ QC HSE Amec Foster Wheeler ... The Amec Foster Wheeler team will

Amec Foster Wheeler Design Engineering – ES & IM

17

Innovation in Engineering Systems & Information Management….

► So far…

► Increased Efficiency in Engineering Design;

► Improvements in Supply Chain Engagement;

► Some Standardisation;

► Improved Data Integrity;

► Asset Information Hubs.

► Looking Forward…what we need to do:-

► Continue to engage with System Providers;

► Align ES/IM with all aspects of Supply Chain;

► Embrace System Developments & Innovation, e.g. Fluid Dynamics, etc.

Page 18: Share Fair 4 November 2015 - Oil & Gas UKoilandgasuk.co.uk/wp-content/uploads/2015/06/Amec... · Construction QA/ QC HSE Amec Foster Wheeler ... The Amec Foster Wheeler team will

-20

-10

0

10

20

30

40

50

60

70

1970

1971

1972

1973

1974

1975

1976

1977

1978

1979

1980

1981

1982

1983

1984

1985

1986

1987

1988

1989

1990

1991

1992

1993

1994

1995

1996

1997

1998

1999

2000

2001

2002

2003

2004

2005

2006

2007

2008

2009

2010

2011

2012

2013

2014

2015

Cash

Flo

w (£

Bill

ion

-201

4 M

oney

)

Total Revenue

Post-Tax Costs

Post-Tax Cash Flow

Source: Oil & Gas UK, DECC

► The UKCS Oil and Gas Industry continues to face significant cost challenges: -

► $49 barrel currently, was trading at $115 in June 2014;

► Expect average price per barrel in 2016?... $70?... $85?

► Investment in UKCS is likely to depend upon how the industry meets these cost challenges.

Amec Foster Wheeler Cost Reduction Drivers…2015

18

UKCS Revenues and Cash Flow

Page 19: Share Fair 4 November 2015 - Oil & Gas UKoilandgasuk.co.uk/wp-content/uploads/2015/06/Amec... · Construction QA/ QC HSE Amec Foster Wheeler ... The Amec Foster Wheeler team will

19

HVEC CENTRE CAPABILITIES

PROCUREMENT

Pre-order

Post-order

Quantity Surveying

Contracts

Inspection

Project Management

Project Controls – Planning

Project Control – Cost

Project Risk Management

Change Management and Control

PROJECT MANAGEMENT / CONTROL

ENGINEERING

Piping Engineering and Design

Equipment

Civil and Structural Engineering

Electrical

Control Systems and Instruments

Process Engineering

CONSTRUCTION

All Home Office Functions

Construction Supervision

Construction QA/ QC

HSE

Amec Foster Wheeler What are we doing…HVEC

► So far…

► Developed Strong Track Record of HVEC Delivery across multiple centres;

► Realised significant Cost Savings;

► Realised significant Schedule Benefits.

► Looking Forward…what we need to do: -

► Continue to optimise use of our Global High Value Execution Centres (HVEC);

► Continue to Invest in System Integration & Innovation;

► Align further with our Customers & Supply Chain.

Page 20: Share Fair 4 November 2015 - Oil & Gas UKoilandgasuk.co.uk/wp-content/uploads/2015/06/Amec... · Construction QA/ QC HSE Amec Foster Wheeler ... The Amec Foster Wheeler team will

z

Amec Foster Wheeler More 4 Less – What are we doing

20

Ris

kDeliverables

Conventional approach Efficient Modifications

Man hours DeliverablesMan hours Deliverables

AES

E&I

Prioritise Categorise Deliver

Needs

Operator

Supply Chain More

Less

Delivering 30% – 60% Cost Savings

Page 21: Share Fair 4 November 2015 - Oil & Gas UKoilandgasuk.co.uk/wp-content/uploads/2015/06/Amec... · Construction QA/ QC HSE Amec Foster Wheeler ... The Amec Foster Wheeler team will

► In summary...what we need from you!

► Innovation;

► Efficiency;

► Simplification;

► Collaboration;

► Assurance...Quality, Cost, Schedule;

► Challenge!

Amec Foster Wheeler Expectation of Supply Chain…what we need from you!

21

Page 22: Share Fair 4 November 2015 - Oil & Gas UKoilandgasuk.co.uk/wp-content/uploads/2015/06/Amec... · Construction QA/ QC HSE Amec Foster Wheeler ... The Amec Foster Wheeler team will

Amec Foster Wheeler Get involved…

22

Oil and Gas UK Efficiency Task Force

[email protected]

You can submit your ideas on how to

reduce costs, generate efficiencies

and bring innovation to Amec Foster

Wheeler by contacting us at: -

[email protected] please use the

following as subject headers: -

• Technology

• Cost Reduction

• Late Life and Decommissioning

• Efficiency

Page 23: Share Fair 4 November 2015 - Oil & Gas UKoilandgasuk.co.uk/wp-content/uploads/2015/06/Amec... · Construction QA/ QC HSE Amec Foster Wheeler ... The Amec Foster Wheeler team will

23

Amec Foster Wheeler And finally…

Page 24: Share Fair 4 November 2015 - Oil & Gas UKoilandgasuk.co.uk/wp-content/uploads/2015/06/Amec... · Construction QA/ QC HSE Amec Foster Wheeler ... The Amec Foster Wheeler team will

Amec Foster Wheeler Current Work and Opportunities

Graham Clarke

Page 25: Share Fair 4 November 2015 - Oil & Gas UKoilandgasuk.co.uk/wp-content/uploads/2015/06/Amec... · Construction QA/ QC HSE Amec Foster Wheeler ... The Amec Foster Wheeler team will

25

ECAPS AJS

SCOPE:

Integrated cost, planning, maintenance project and

operations management.

50 offshore assets in Southern North Sea .

2 gas plants in Den Helder (NL) and Bacton (UK).

Long term relationship since 2003.

TERM: 2018

OPPORTUNITIES:

Mechanical: Pumps, Foam Injection Package,

Compressor Upgrades.

Piping: Valve and Pipe Spool Fabrication.

Electrical: Transformers, Switchboards, Cable.

Instruments: Bulks and Valves.

Structural: Fabrications.

OPPORTUNITIES:

Mechanical: Pumps.

Piping: Valves and piping material bulks.

Electrical: Bulks.

Instruments: Bulks.

Fabrication: Structural and pipe spool fabrications,

heat treatment, dimensional surveys, HV surveys.

SCOPE:

East Irish Sea Onshore and Offshore Assets.

Successful Integration of Centrica / Amec Foster

Wheeler team.

Extend Field life beyond 2030.

TERM: 2016

Contact: Jim Landamore Tel: +31610880713 Contact: Nick Fletcher Tel: +44(0)1524 864760

Amec Foster Wheeler Current Opportunities

Page 26: Share Fair 4 November 2015 - Oil & Gas UKoilandgasuk.co.uk/wp-content/uploads/2015/06/Amec... · Construction QA/ QC HSE Amec Foster Wheeler ... The Amec Foster Wheeler team will

SCOPE:

Kinneil LPG Chilldown currently in Detailed Design

(DD) and Fabrication Stage.

TERM: 2016

OPPORTUNITIES:

Mechanical: Various.

Piping: Valves, Bulks and Pipe Spool Fabrication.

Electrical: Bulks.

Instruments: Bulks and Valves.

Structural: Fabrications, Surveys.

Contact: Michael O’Hare Tel: +44(0)141 304 4294

Amec Foster Wheeler Current Opportunities

BP ETAP

SCOPE:

ETAP Additional Living Quarters (ALQ) now in EXECUTE

phase. The 1st Shiipment of Modules due 5th November

2015, final shipment of Modules due 30th December 2015.

All long lead equipment procurement executed with

deliveries scheduled for 4th Qtr 2015, 1st Qtr 2016. All

structural and piping fabrication well underway to support

offshore installation programme. Focus is moving to

construction and commissioning of offshore vendor support.

TERM: 2016

OPPORTUNITIES:

Piping: Valves, Bulks and Pipe Spool Fabrication.

Electrical: Bulks.

Instruments: Bulks and Valves.

Structural: Fabrications – dependent on emergent scopes.

Contact: Mike Hume (ETAP) Tel: +44(0)1224 291000

BP Kinneil LPG

Chilldown

Page 27: Share Fair 4 November 2015 - Oil & Gas UKoilandgasuk.co.uk/wp-content/uploads/2015/06/Amec... · Construction QA/ QC HSE Amec Foster Wheeler ... The Amec Foster Wheeler team will

27

Cygnus Field

Development

BP Clair Ridge

HUC

SCOPE:

Primary engineering and project management

services consultant.

Second phase of development.

Hook up and commissioning services.

Target for first oil is 2017.

Designed for 40 years of production.

TERM: 2016

OPPORTUNITIES:

Mechanical: Various.

Piping: Valves and pipe spool fabrication.

Electrical: Bulks and Cable.

Instruments: Valves and Bulks.

Structural: Fabrications, Surveys.

OPPORTUNITIES:

Procurement mainly by Engie. Amec Foster Wheeler are

currently procuring the following:

Piping: Bulks, Valves and Pipe Spool Fabrication.

Structural: Fabrications, Dimensional Surveys.

Hire / Procurement of Plant and Equipment.

SCOPE:

Awarded HUC support contract.

Follows on from the FEED and detail design work executed by Amec Foster Wheeler.

First gas scheduled for Q4 2015.

Production due to account for around 5% of the UK’s gas production by 2016.

TERM: 2016

Contact: John Hutchins Tel: +44(0)1224 291000 Contact: Marti Scott Tel: +44(0)1224 291000

Amec Foster Wheeler Current Opportunities

Page 28: Share Fair 4 November 2015 - Oil & Gas UKoilandgasuk.co.uk/wp-content/uploads/2015/06/Amec... · Construction QA/ QC HSE Amec Foster Wheeler ... The Amec Foster Wheeler team will

28

Amec Foster Wheeler Current Opportunities

E&C Projects

OPPORTUNITIES:

Mechanical: Chemical Injection Package.

Piping: Valves and Pipe Spool Fabrication.

Electrical: MCC Board, Bulks.

Instruments: Bulks and Valves.

Structural: Fabrications.

SCOPE:

EPC Brownfield Modifications.

CNS - Judy, Jade, Britannia and Jasmine Assets.

SNS - 42 Assets (4 Hubs with NUIs) / TGT Gas

Terminal at Gt Yarmouth.

Main Focus: Compression Optimisation project and

Process Efficiencies. Integrity Campaigns of aging

asset and process efficiency.

TERM: 2017

(5x1 Year Possible Extensions)

Contact: Dave Hutcheon Tel: +44(0)1224 291000

OPPORTUNITIES:

Mechanical: Various.

Piping: Valves, Bulks and Pipe Spool Fabrication.

Electrical: Bulks.

Instruments: Bulks and Valves.

Structural: Fabrications, Surveys.

SCOPE:

Operations, maintenance and project support to BP Forties Pipeline System. O&M and Project Support Services for North Sea Midstream, now to include BP CATS, Teesside. O&M Activities on 1 offshore platform (Unity) and 4 Landline Pumping Stations (Cruden Bay, Netherley, Brechin, and Balbeggie).

TERM: 2016

Contact: Stuart Simpson Tel: +44(0)1325 744661

BP Midstream

Page 29: Share Fair 4 November 2015 - Oil & Gas UKoilandgasuk.co.uk/wp-content/uploads/2015/06/Amec... · Construction QA/ QC HSE Amec Foster Wheeler ... The Amec Foster Wheeler team will

29

Talisman

MonArb Project

SCOPE:

EPCC Brownfield Modifications.

Montrose Platform.

2016 TAR Campaign.

TERM: 2016

OPPORTUNITIES:

Piping: Fabrication.

Electrical: Bulks and Cable.

Instruments: Bulks and Valves.

Structural: Small Fabrications.

Contact: Kimberley Duncan Tel: +44(0)1224 291000

Amec Foster Wheeler Current Opportunities

Nexen Project

OPPORTUNITIES:

Mechanical: Various (dependable on emerging scopes);

Piping: Valves and Pipe Spool Fabrication;

Electrical: Bulks;

Instruments: Bulks and Valves;

Structural: Fabrications.

SCOPE:

5 years remaining of a 6 year engineering,

procurement and construction (EPC) contract.

Operational modifications and Brownfield projects.

Buzzard, Scott and Golden Eagle platforms.

TERM: 2019

Contact: Alan Purkis Tel: +44(0)1224 291000

Page 30: Share Fair 4 November 2015 - Oil & Gas UKoilandgasuk.co.uk/wp-content/uploads/2015/06/Amec... · Construction QA/ QC HSE Amec Foster Wheeler ... The Amec Foster Wheeler team will

30

Maersk Oil

SCOPE:

Integrated Services Contract (ISC).

The provision of integrated services in the UK sector of

the North Sea includes project management, engineering

services, procurement, offshore construction and

offshore operations support.

TERM: 2018

OPPORTUNITIES:

The Amec Foster Wheeler team will make use of the

company's proven 'more 4 less' lean and scalable

engineering processes and integrated delivery together

with Scopus Engineering. Efficiencies from 'more 4 less'

have been proven to deliver 30 to 60 percent savings,

in time and cost, compared to traditional approaches.

Contact: Alan Purkis Tel: +44(0)1224 291000