23
SHARE Conference Paris, 17-18 March 2010 Welcome Axel Börsch-Supan Introduction, State of the SHARE projects, Budget Kathrin Axt: Budget, Contracts Eva Schneider: Family list, Conferences

SHARE Conference Paris, 17-18 March 2010 Welcome Axel Börsch-Supan Introduction, State of the SHARE projects, Budget Kathrin Axt: Budget, Contracts Eva

Embed Size (px)

Citation preview

Page 1: SHARE Conference Paris, 17-18 March 2010 Welcome Axel Börsch-Supan Introduction, State of the SHARE projects, Budget Kathrin Axt: Budget, Contracts Eva

SHARE Conference

Paris, 17-18 March 2010

Welcome

Axel Börsch-Supan

Introduction, State of the SHARE projects, Budget

Kathrin Axt: Budget, ContractsEva Schneider: Family list, Conferences

Page 2: SHARE Conference Paris, 17-18 March 2010 Welcome Axel Börsch-Supan Introduction, State of the SHARE projects, Budget Kathrin Axt: Budget, Contracts Eva

© SHARE-Consortium

Purpose

• Get wave 4 going: Discuss pilot results and continue preparation of wave 4

• Substantive research! Go through all papers of FRB3

• Business:

• Report on state of SHARE projects State of ESFRI process (coordinator, countries) To do list for countries

• Refresher sample set up

• Data dissemination and publication policy (FRB3!)

• Budget matters (PREP-LIFE-LEAP-M4) and related contracts

Page 3: SHARE Conference Paris, 17-18 March 2010 Welcome Axel Börsch-Supan Introduction, State of the SHARE projects, Budget Kathrin Axt: Budget, Contracts Eva

SHARE Conference

Paris, 17-18 March 2010

State of the SHARE projects

Axel Börsch-Supan

Introduction, State of the SHARE projects, Budget

Page 4: SHARE Conference Paris, 17-18 March 2010 Welcome Axel Börsch-Supan Introduction, State of the SHARE projects, Budget Kathrin Axt: Budget, Contracts Eva

© SHARE-Consortium

What is happening in 2010?

Wave 4 surveyinstrument (LEAP)

Wave 4 surveyagencies

Wave 4 pilots and tests

Concrete long term arrangements

Actual money on the table for wave 4

Wave 3 final data collection (LIFE)

Start setting up data (LIFE)

Analyses: FRB

Wave 1-2 data base maintenance (LEAP, M4)

Memorandum of Understanding (PREP)

Basic engagement

SHARE-ERIC Statutes:Center, Countries, To Dos

Page 5: SHARE Conference Paris, 17-18 March 2010 Welcome Axel Börsch-Supan Introduction, State of the SHARE projects, Budget Kathrin Axt: Budget, Contracts Eva

© SHARE-Consortium

Agenda

• Business:

• Report on state of SHARE projects State of ESFRI process (coordinator) Draft Statutes 6.0c: Presubmission OK, Article 1 (3) deleted, VAT exemption from Germany State of ESFRI process (countries) To do list for countries

• Refresher sample set up

• Data dissemination and publication policy (FRB3)

• Budget matters (PREP-LIFE-LEAP-M4) and related contracts

Page 6: SHARE Conference Paris, 17-18 March 2010 Welcome Axel Börsch-Supan Introduction, State of the SHARE projects, Budget Kathrin Axt: Budget, Contracts Eva

© SHARE-Consortium

ERIC-Statutes

Article 1

Establishment of a SHARE-ERIC

(1) There shall be a distributed European Research Infrastructure called the Survey of Health,

Ageing and Retirement in Europe (SHARE).

(2) SHARE shall obtain the legal form of a European Research Infrastructure Consortium

(ERIC) incorporated under the provision of Council Regulation 723/2009 of 25 June 2009

and be named “SHARE-ERIC” (hereafter also referred to as “the Organisation”).

(3) SHARE-ERIC shall be an international body within the meaning of Article 151(1)(b) of

Directive 2006/112/EC, and an international organisation within the meaning of the second

indent of Article 23(1) of Directive 92/12/EEC and of Article 15(c), of Directive 2004/18/EC.

Page 7: SHARE Conference Paris, 17-18 March 2010 Welcome Axel Börsch-Supan Introduction, State of the SHARE projects, Budget Kathrin Axt: Budget, Contracts Eva

© SHARE-Consortium

• Business:

• Report on state of SHARE projects State of ESFRI process (coordinator) Draft Statutes 6.0c: Presubmission OK Article 1 (3) will probably be deleted Still needed: VAT exemption from Germany two more countries‘ OK State of ESFRI process (countries) To do list for countries

• Refresher sample set up

• Data dissemination and publication policy (FRB3)

• Budget matters (PREP-LIFE-LEAP-M4) and related contracts

Agenda

Page 8: SHARE Conference Paris, 17-18 March 2010 Welcome Axel Börsch-Supan Introduction, State of the SHARE projects, Budget Kathrin Axt: Budget, Contracts Eva

IE

PLCZ

IL

ES

PT

SVHU

SE

DK

DE

CH

ATFR

SP IT

GR

BENL

LUX

Memo of Understanding: Warsaw

Austria, Belgium, Czech Republic, Estonia, France, Germany, Israel, Italy, Portugal, Spain, Switzerland, and The Netherlands,

Page 9: SHARE Conference Paris, 17-18 March 2010 Welcome Axel Börsch-Supan Introduction, State of the SHARE projects, Budget Kathrin Axt: Budget, Contracts Eva

IE

PLCZ

IL

ES

PT

SVHU

SE

DK

DE

CH

ATFR

SP IT

GR

BENL

LUX

Memo of Understanding: Paris

Austria, Belgium, Czech Republic, Estonia, France, Germany, Israel, Italy, Portugal, Spain, Switzerland, and The Netherlands, U

K

Page 10: SHARE Conference Paris, 17-18 March 2010 Welcome Axel Börsch-Supan Introduction, State of the SHARE projects, Budget Kathrin Axt: Budget, Contracts Eva

© SHARE-Consortium

• Business:

• Report on state of SHARE projects State of ESFRI process (coordinator) Draft Statutes 6.0c: Presubmission OK, Article 1 (3) deleted, Still needed: VAT exemption from Germany two more countries´ OK

State of ESFRI process (countries) To do list for countries : Statutes translated, Statutes accepted

• Refresher sample set up

• Data dissemination and publication policy (FRB3)

• Budget matters (PREP-LIFE-LEAP-M4) and related contracts

Agenda

Page 11: SHARE Conference Paris, 17-18 March 2010 Welcome Axel Börsch-Supan Introduction, State of the SHARE projects, Budget Kathrin Axt: Budget, Contracts Eva

© SHARE-Consortium

Countries

• Statutes translated? Statutes formally accepted? Money on the table?

• SE, DK, EE

• BE, NL, LUX, FR

• DE, CH, AT

• PL, CZ, SV, HU

• PT, ES, IT, GR, IL

• IE, UK

Page 12: SHARE Conference Paris, 17-18 March 2010 Welcome Axel Börsch-Supan Introduction, State of the SHARE projects, Budget Kathrin Axt: Budget, Contracts Eva

© SHARE-Consortium

• Business:

• Report on state of SHARE projects State of ESFRI process (coordinator) Draft Statutes 6.0c: Presubmission OK, Article 1 (3) deleted, Still needed: VAT exemption from Germany two more countries´ OK

State of ESFRI process (countries) To do list for countries : Statutes translated, Statutes accepted

• Refresher sample set up

• Data dissemination and publication policy (FRB3)

• Budget matters (PREP-LIFE-LEAP-M4) and related contracts

Agenda

Page 13: SHARE Conference Paris, 17-18 March 2010 Welcome Axel Börsch-Supan Introduction, State of the SHARE projects, Budget Kathrin Axt: Budget, Contracts Eva

© SHARE-Consortium

Countries

• Refresher sample: individuals plus partners (not households), oversampling of cohorts 57-60, get gross sample ex ante!

• New possibilities to draw? How large (money on the table)?

• SE, DK, EE

• BE, NL, LUX, FR

• DE, CH, AT

• PL, CZ, SV, HU

• PT, ES, IT, GR, IL

• IE, UK

Page 14: SHARE Conference Paris, 17-18 March 2010 Welcome Axel Börsch-Supan Introduction, State of the SHARE projects, Budget Kathrin Axt: Budget, Contracts Eva

© SHARE-Consortium

• Business:

• Report on state of SHARE projects State of ESFRI process (coordinator) Draft Statutes 6.0c: Presubmission OK, Article 1 (3) deleted, Still needed: VAT exemption from Germany two more countries´ OK

State of ESFRI process (countries) To do list for countries : Statutes translated, Statutes accepted

• Refresher sample set up

• Data dissemination and publication policy (FRB3)

• Budget matters (PREP-LIFE-LEAP-M4) and related contracts

Agenda

Page 15: SHARE Conference Paris, 17-18 March 2010 Welcome Axel Börsch-Supan Introduction, State of the SHARE projects, Budget Kathrin Axt: Budget, Contracts Eva

© SHARE-Consortium

SHARE-M4Multinational Advancement ofResearch Infrastructures on Ageing

WP1: Management of the contract

WP4: Multi-country

data basemaintenance

WP8: Response behaviour

WP9: Multi-modeinterviewing

facility

WP10: Biomarkers

WP5: User trainingand feedback

WP11: European

healthmodule

WP3: Standards and procedures

WP7: Global access

WP12: Social and

familialembedding

WP13: European

pension claimsdata base

WP15: European time usemodule

WP16: European 50+ exclusion module

WP17: Transnational access services

ScienceInfrastructure service

Management

WP2: Conferences and communication

WP6:Interviewer training and

quality control

WP14: Harmonized

incomemeasures

Pillar 3:

4 years

8 mio €

17 WPs

12 partners

30% cut?

Page 16: SHARE Conference Paris, 17-18 March 2010 Welcome Axel Börsch-Supan Introduction, State of the SHARE projects, Budget Kathrin Axt: Budget, Contracts Eva

© SHARE-Consortium

• Business:

• Report on state of SHARE projects State of ESFRI process (coordinator) Draft Statutes 6.0c: Presubmission OK, Article 1 (3) deleted, Still needed: VAT exemption from Germany two more countries´ OK

State of ESFRI process (countries) To do list for countries : Statutes translated, Statutes accepted

• Refresher sample set up

• Data dissemination and publication policy (FRB3)

• Budget matters (PREP-LIFE-LEAP-M4) and related contracts

Agenda

Page 17: SHARE Conference Paris, 17-18 March 2010 Welcome Axel Börsch-Supan Introduction, State of the SHARE projects, Budget Kathrin Axt: Budget, Contracts Eva

- release 0 strictly internal

- release 1 in November

- no publications with release 0

- FRB short articles based on release 0

- conference presentations only with disclaimer: „preliminary-not for quotation“ (verbally and on paper)

- acknowledments to sponsors (EU, NIA, national funds), methodology book

- Springer?

SHARE Conference: Data dissemination and publication policy

Paris, 17 March 2010

Page 18: SHARE Conference Paris, 17-18 March 2010 Welcome Axel Börsch-Supan Introduction, State of the SHARE projects, Budget Kathrin Axt: Budget, Contracts Eva

SHARE Conference

Paris, 17-18 March 2010

Budget matters

Axel Börsch-Supan

Introduction, State of the SHARE projects, Budget

Page 19: SHARE Conference Paris, 17-18 March 2010 Welcome Axel Börsch-Supan Introduction, State of the SHARE projects, Budget Kathrin Axt: Budget, Contracts Eva

© SHARE-Consortium

• Business:

• Report on state of SHARE projects State of ESFRI process (coordinator) Draft Statutes 6.0c: Presubmission OK, Article 1 (3) deleted, Still needed: VAT exemption from Germany two more countries´ OK

State of ESFRI process (countries) To do list for countries : Statutes translated, Statutes accepted

• Refresher sample set up

• Data dissemination and publication policy (FRB3)

• Budget matters (PREP-LIFE-LEAP-M4) and related contracts

Agenda

Page 20: SHARE Conference Paris, 17-18 March 2010 Welcome Axel Börsch-Supan Introduction, State of the SHARE projects, Budget Kathrin Axt: Budget, Contracts Eva

Payment plan to survey agencies for Dec 2009

Still to pay ded advance Still to pay RestSubCon WP8 Status Verification(rest of FW) NIA LIFE LEAP

AT 43.027€ 43.027€ 26.425€ 16.602€

BE_FR 52.835€ 52.835€ 32.449€ 20.386€

BE_NL 88.353€ 88.353€ 54.262€ 34.091€

CH 146.811€ 146.811€ 90.164€ 56.647€

CZ 40.784€ 40.784€ 25.047€ 15.736€

DE 46.378€ 46.378€ 28.483€ 17.895€

DK 58.997€ 58.997€ 36.233€ 22.764€

ES 160.015€ 100.000 60.015€ 36.858€ 23.157€

FR 101.091€ 101.091€ 62.085€ 39.006€

GR 147.305€ 100.000 47.305€ 29.052€ 18.253€

IT 96.882€ 96.882€ 59.500€ 37.382€

NL 106.701€ 106.701€ 65.530€ 41.170€

PL 66.419€ 66.419€ 40.791€ 25.628€Total 1.155.597€

SE 1.179.243,32 SEK

115.554 € 60.000 55.554€ 34.119€ 21.435€adjustments 4.760€

TOTAL 1.271.151€ 260.000€ 1.011.151€ 621.000€ 394.911€

Budget 621.000€ 691.851€Leftover 0€ 296.940€at risk 49.400€

1. still to pay after NIA

2. divide leftover LIFE subcons in

proportion to what is left to pay3. rest out of LEAP

spent in Dec. 09

Page 21: SHARE Conference Paris, 17-18 March 2010 Welcome Axel Börsch-Supan Introduction, State of the SHARE projects, Budget Kathrin Axt: Budget, Contracts Eva

WP6 Pilots&Pretest Blue: in own budget as personnelYellow: in budget Tilburg Orange: In own budget as subcontracting

pilot pretest leftovers total budget

Austria 30.000

Belgium 15.000 28.500 0 43.500 € 30.547,52

BE-NL need to share BE money

Switzerland 45.000

Czech Rep. 0 0 0 0

Germany 0 0 15.000 15.000

Denmark 45.233 € 45.233,36

Spain 10.000 30.750 40.750

France 27.634 € 12.692,18

Greece 25.000

Italy 32.050

Netherlands 12.900 20.500 33.400

Poland 8.415 25.000

Sweden 42.222 € 42.221,86should be adjusted b/o doesn't do pilot

Total 362.567€ 296.940€ available in LEAP

Ireland 0 € 51.698,00 use for HACs?

Israel 45.892 € 45.891,67 adjustment?

Slovenia 41.155 € 41.154,79 adjustment?Total 0€ 0€ 0€ 449.614€ 435.685€ available in LEAP

NIA fundingMar2010 Jun2010 Sep2010 Sep2011 TOTAL

Agencies US$ 21.546 43.092 1.073.150 728.414 1.866.2031,40 € 15.390 30.780 766.536 520.296 1.333.002

NIA fundingMar2010 Jun2010 Sep2010 Sep2011 TOTAL

Agencies US$ 21.546 43.092 1.073.150 728.414 1.866.2031,40 € 15.390 30.780 766.536 520.296 1.333.002

Page 22: SHARE Conference Paris, 17-18 March 2010 Welcome Axel Börsch-Supan Introduction, State of the SHARE projects, Budget Kathrin Axt: Budget, Contracts Eva

© SHARE-Consortium

Countries

• Costs for pilot – pretest – any remaining panel care

• Paid by country (part of ESFRI deal)?

• SE, DK, EE

• BE, NL, LUX, FR

• DE, CH, AT

• PL, CZ, SV, HU

• PT, ES, IT, GR, IL

• IE, UK

WP6 Pilots&Pretest Blue: in own budget as personnelYellow: in budget Tilburg Orange: In own budget as subcontracting

pilot pretest leftovers total budget

Austria 30.000

Belgium 15.000 28.500 0 43.500 € 30.547,52

BE-NL need to share BE money

Switzerland 45.000

Czech Rep. 0 0 0 0

Germany 0 0 15.000 15.000

Denmark 45.233 € 45.233,36

Spain 10.000 30.750 40.750

France 27.634 € 12.692,18

Greece 25.000

Italy 32.050

Netherlands 12.900 20.500 33.400

Poland 8.415 25.000

Sweden 42.222 € 42.221,86should be adjusted b/o doesn't do pilot

Total 362.567€ 296.940€ available in LEAP

Ireland 0 € 51.698,00 use for HACs?

Israel 45.892 € 45.891,67 adjustment?

Slovenia 41.155 € 41.154,79 adjustment?Total 0€ 0€ 0€ 449.614€ 435.685€ available in LEAP

Page 23: SHARE Conference Paris, 17-18 March 2010 Welcome Axel Börsch-Supan Introduction, State of the SHARE projects, Budget Kathrin Axt: Budget, Contracts Eva

© SHARE-Consortium

• Business:

• Report on state of SHARE projects State of ESFRI process (coordinator) Draft Statutes 6.0c: Presubmission OK, Article 1 (3) deleted, Still needed: VAT exemption from Germany two more countries´ OK

State of ESFRI process (countries) To do list for countries : Statutes translated, Statutes accepted

• Refresher sample set up

• Data dissemination and publication policy (FRB3!)

• Budget matters (PREP-LIFE-LEAP-M4) and related contracts

Agenda