SG-Systems Boot Camp Use Case Process with TOGAF AMI-ENT Example Kay Stefferud Chair, SG-Systems Use Cases [email protected] For more information visit: http://osgug.ucaiug.o rg

SG-Systems Boot Camp Use Case Process with TOGAF AMI-ENT Example

  • Upload
    annona

  • View
    26

  • Download
    0

Embed Size (px)

DESCRIPTION

SG-Systems Boot Camp Use Case Process with TOGAF AMI-ENT Example. Kay Stefferud Chair, SG-Systems Use Cases [email protected] . For more information visit: http://osgug.ucaiug.org. OpenSG Mapped to NIST Priority Action Plans (PAPs). SGIP - SGAC. PAP 3 Price Model PAP 4 Common Scheduling - PowerPoint PPT Presentation

Citation preview

Page 1: SG-Systems Boot Camp Use Case Process with TOGAF AMI-ENT Example

SG-SystemsBoot Camp Use Case Process with TOGAF AMI-ENT Example

Kay StefferudChair, SG-Systems Use [email protected]

For more information visit: http://osgug.ucaiug.org

Page 2: SG-Systems Boot Camp Use Case Process with TOGAF AMI-ENT Example

Open Smart Grid(OpenSG)Subcommittee

OpenHANTask Force

Open AMI-ENTTask Force

AMI-NetworkTask Force

SG SystemsWorking Group

SG Communications (UtiliComm)Working Group

SG Security(UtiliSec)

Working Group

UtilityAMIInterest Group

AMI-SecurityTask Force

Network InteropTask Force

SG Conformance(CWG)

Working Group(Proposed)

OpenADRTask Force

OpenADETask Force

ASAP-SGSGIP - CSWG

PAP 1 Internet Role PAP 2 Wireless

PAP 5 Power Line/ Appliances

PAP 3 Price ModelPAP 4 Common SchedulingPAP 9 Demand Response/DERPAP 10 Energy Usage Info

NIST Phase 3 SGIP

SGTCC

Edge ConfTask Force

Enterrpise ConfTask Force

Security ConfTask Force

OpenSG Mapped to NIST Priority Action Plans (PAPs) SGIP - SGAC

Diagram courtesy of Wayne Longcore

Page 3: SG-Systems Boot Camp Use Case Process with TOGAF AMI-ENT Example

SG Systems Use Case Methodology

Use Cases: Best Practice for Requirements Development

Page 4: SG-Systems Boot Camp Use Case Process with TOGAF AMI-ENT Example

SG Systems Mapped to NIST Roadmap

[Source: NIST Interim Roadmap]

Open Automated Demand

ResponseOpenADR

Open Automated Data Exchange

OpenADE

Advanced Metering Infrastructure Enterprise

AMI ENTOpen Home Area

NetworkOpenHAN

Page 5: SG-Systems Boot Camp Use Case Process with TOGAF AMI-ENT Example

SG Systems Use Case List

Page 6: SG-Systems Boot Camp Use Case Process with TOGAF AMI-ENT Example

The Open Group Architectural Framework (TOGAF)

Architectural Development Method (ADM)

“The Crop Circle”

ADM Defines Phases of Architecture Development

Cycle

“The How”

Page 7: SG-Systems Boot Camp Use Case Process with TOGAF AMI-ENT Example

OpenSG Process Mapped to TOGAF

Use Cases

System Requirements Specification (SRS) Reference

Implementation

Page 8: SG-Systems Boot Camp Use Case Process with TOGAF AMI-ENT Example

TOGAF’s 4 Architectural Domains “The What”

Page 9: SG-Systems Boot Camp Use Case Process with TOGAF AMI-ENT Example

Use Case Enterprise Architect (EA) Example uc Open Smart Grid

Manage Smart Grid

Generate Power Manage Power Delivery/Distribution

Manage Energy Resource

Manage Large Scale

Production

Manage Distributed Generation

Manage MicroGrid

Manage Demand

Manage Supply

Manage Storage

Page 10: SG-Systems Boot Camp Use Case Process with TOGAF AMI-ENT Example

Open SG Actors uc Actors 4 Charts

Metering Agent

Settlement Agent

Billing Agent

OpenSmartGrid

ISO or Grid Operator

Distributor

Small-Scale Merchant Generator

Large C/I Customer and Co-Generator

Demand Response Provider

Customer Residential

Customer Commercial

Customer Industrial

Customer

The mission of the Open Smart Grid is to transform the electric grid infrastructure into a smarter, more efficient more reliable system using open standards addressing the needs of all stakeholders including consumers, utilities,regulators, energy service providers, and industry.

Regulator«role»

Page 11: SG-Systems Boot Camp Use Case Process with TOGAF AMI-ENT Example

Business Process Model – DR exampleclass Demand Response Business Process Model

Manage Demand for Grid Reliability

Customer

Energy Shortage/Congestion/Equipment

Failure

«goal»Maintain Reliability of

the Grid

Load Control Transaction

ISO or Grid Operator

(from Actors)

Supply Profile

Compliance

Distributor

(from Actors)

Demand Response Prov ider

(from Actors)

Manage Demand for Economic Dispatch

«goal»Achieve Least Cost

Dispatch

Automatic Generation Control

(AGC)

Spinning Reserves Non-spinning Reserv es

Replacement Reserves

Market condition that forces either buying more energy at significant cost or reduce

demand to avoid the buy

Load Control Transaction Sufficient to Av oid Buying Energy

«uses»

«supply»

«signal» «load» «uses»

«signal»

«load»«signal»

«flow» «flow» «flow» «flow»

«signal»

Page 12: SG-Systems Boot Camp Use Case Process with TOGAF AMI-ENT Example

BPM – OpenADE Requirements ExampleID Business Requirement

OADE BR-P1 Ability for 3rd parties to be authorized and receive user-specific pricing data from the utility.

OADE BR-P2 Pricing data available from OpenADE shall be specific to a user and measurement point (service delivery point) and shall represent the customer agreed rate, e.g. consumption threshold block tiers and TOU (time of use) tiers, and buy and sell prices for each block / TOU.

OADE BR-P3 Ability for 3rd parties to receive indication of the price tier applicable to each consumption interval, e.g. Pricing tier (block and TOU) and maximum instantaneous demand

OADE BR-MD Ability for Utilities or other authorized parties, to send public and directed messages, including price or program details and announcements, to users, via authorized 3rd parties.

Page 13: SG-Systems Boot Camp Use Case Process with TOGAF AMI-ENT Example

Data – Common Information Model (CIM) object Business Functions

IEC-61968 IRM

Distribution Mamagement

External to Distribution Management

Electric Distribution Network Planning, Construction, Maintenance, and Ops

Generation and Transmission Management, ERP, Supply Chain, and

General Corporate Serv ices

NO- Network Ops

AM - Records and Asset Management

OP - Operational Planning and Optimization

MC - Maintenance and Construction

EMS - Energy Management and

Trading

RET- Retail

SC - Supply Chain and Logistics

NE - Network Extension Planning

CS - Customer Support

MR - Meter Reading and

Control

ACT - Customer Account

Management

FIN - Financial

PRM - Premises

HR - Human Resources

Page 14: SG-Systems Boot Camp Use Case Process with TOGAF AMI-ENT Example

Data – HAN EA example analysis Business Context

Utility Third Party

Home Area Network

Usage Data

Usage Data{UsageData}

Usage Data

Pricing Information

«flow»Pricing Information

Pricing Information

Page 15: SG-Systems Boot Camp Use Case Process with TOGAF AMI-ENT Example

Technical – OpenADR EA Examplesd Remov e DR Resource

DR Asset Owner

(from Actors)

DR Control ling Entity

(from Actors)

Remove DR Resource()

Ack-DR ResourceRemoval()

Page 16: SG-Systems Boot Camp Use Case Process with TOGAF AMI-ENT Example

Technical -- OpenADE example

Page 17: SG-Systems Boot Camp Use Case Process with TOGAF AMI-ENT Example

Questions

Use Cases are Best Practice

for Requirements Development