GEOTECHNICAL REPORT
SEVEN SISTERS REHABILITATION ANDRECOVERY UNIT RELOCATIONMILLS MEMORIAL HOSPITAL
TERRACE, B.C.
Prepared for
NORTHERN HEALTHPRINCE GEORGE, B.C.
Prepared by
GEONORTH ENGINEERING LTD.3975 18th AVENUE
PRINCE GEORGE, B.C., V2N 1B2Phone: 250-564-4304 Fax: 250-564-9323
PROJECT No. K-4875-7S
February 8, 2019
GEONORTH ENGINEERING LTD.
Northern Health February 8, 2019Seven Sisters Rehabilitation and Recovery Unit Relocation,Mills Memorial Hospital, Terrace, B.C. File No. K-4875-7S
TABLE OF CONTENTS
Page No.
1.0 INTRODUCTION 1
2.0 BACKGROUND INFORMATION 2
3.0 SITE INVESTIGATIONS 3
4.0 SUBSURFACE CONDITIONS 5
4.1 Drilling Results 5
4.2 CPT Results 6
4.3 Laboratory Tests 7
5.0 DISCUSSION AND RECOMMENDATIONS 8
5.1 Seismic Site Classification 11
5.2 Liquefaction Assessment 11
5.3 Spread Footing Foundations 11
5.4 Grade-Supported Floor Slabs 13
5.5 Lateral Earth Pressure and Perimeter Drains 15
5.6 Mechanically Stabilized Earth Retaining Wall
Design and Construction 16
6.0 CONSTRUCTION REVIEW 18
7.0 CLOSURE 18
REFERENCES 20
GEONORTH ENGINEERING LTD.
Northern Health February 8, 2019Seven Sisters Rehabilitation and Recovery Unit Relocation,Mills Memorial Hospital, Terrace, B.C. File No. K-4875-7S
APPENDICES
APPENDIX A
Site Plan Showing Drill Hole and CPT Locations Drawing 4875-7S-A1
Cross Section B-B Drawing 4875-7S-A2
APPENDIX B
Drill Hole Logs Plates 4875-7S-B1 to B19
Explanation of Terms and Symbols 3 pages
APPENDIX C
Cone Penetration Test Results Plates 4875-7S-C1 to C6
APPENDIX D
Laboratory Test Results Plates 4875-7S-D1 to D10
APPENDIX E
Typical Lateral Earth Pressures Drawing 4875-7S-E1
Typical Perimeter Drain Detail Drawing 4875-7S-E2
Water Level Elevation Drawing 4875-7S-E3
Locking Block Retaining Wall
Conceptual Cross Section Drawing 4875-7S-E4
GEONORTH ENGINEERING LTD.
Northern Health February 8, 2019Seven Sisters Rehabilitation and Recovery Unit Relocation,Mills Memorial Hospital, Terrace, B.C. File No. K-4875-7S
1.0 INTRODUCTION
Northern Health and Partnerships BC are in the planning stages of the Mills Memorial
Hospital Redevelopment Project (MMHRP), which includes construction of a new hospital and
relocation of the Seven Sisters Rehabilitation and Recovery Unit (SSRRU). Northern Health
commissioned GeoNorth Engineering Ltd. to provide geotechnical recommendations for the
proposed relocated SSRRU based on the scope of work outlined in our proposal dated
September 12, 2018. Authorization to proceed with the work was provided by Mr. Albert
Sommerfeld, P.Eng., Director Capital Development and Projects, of Northern Health under
Contract Number CI190249.
The existing SSRRU is adjacent to the east property boundary, and is partly below the
footprint designated for the proposed hospital. The SSRRU will be relocated west of the existing
hospital and south of the proposed hospital footprint. The building will be a single-storey
wood-framed structure with a rectangular footprint measuring approximately 27 by 73 m. It will
have a basement with a finished floor at about geodetic elevation 62 m.
The existing hospital, SSRRU and MMHRP are situated on a seven hectare property
bordered to the north by Keith Avenue and Highway 16, Tetrault Street to the east, Haugland
Avenue to the south and residential and commercial properties accessed by Eby Street to the
west. The existing hospital occupies the south part of the property. The site location and
orientation of the existing and proposed hospitals and SSRRU are on Drawing 4875-7S-A1, in
Appendix A.
Northern Health commissioned GeoNorth Engineering Ltd. to provide Facility Consultant
Advisory Services for the MMHRP. Our report dated November 13, 2018 under our project
number K-4875 presents the results of geotechnical site investigations carried out at the location
of the proposed hospital and provides indicative geotechnical recommendations for design and
construction of building foundations, grade-supported concrete slabs, discusses frost protection
and the results of an evaluation of seismic site classification and liquefaction potential.
Page 1 of 20
GEONORTH ENGINEERING LTD.
Northern Health February 8, 2019Seven Sisters Rehabilitation and Recovery Unit Relocation,Mills Memorial Hospital, Terrace, B.C. File No. K-4875-7S
This report summarises the previous investigations and provides recommendations for
design and construction of building foundations for the SSRRU.
2.0 BACKGROUND INFORMATION
During the last glaciation, the earth’s crust along the west coast was depressed below
present sea level due to the weight of glacial ice that once covered the area. As the glaciers
melted, the Terrace area was inundated by the ocean and subsequently covered by sediments
carried by the melting glacial runoff into what was an extension of Douglas Channel (Clague,
1984). As ground level rose due to isostatic rebound, the glaciomarine sediments were scoured
in places and replaced with clean sandy gravel glaciofluvial deposits. Weak, sensitive
glaciomarine sediments are known to remain in the Terrace area below the glaciofluvial deposits
and on slopes within and around the community up to about elevation 180 m.
A geotechnical investigation for the existing SSRRU (GeoNorth 2003) encountered about
1 m of sandy silt over clean sandy gravel with frequent cobbles. The sandy silt was likely
deposited during ancient, over-bank flow events and the clean sandy gravel is likely reworked
glacial outwash and ancient Skeena River sediments.
Water well logs available on a website maintained by the BC Ministry of Forests Lands
and Natural Resource Operations, Water Stewardship Branch describe soil conditions at a
groundwater well located approximately 300 m east of the site as about 1 m of silt over about
24 m of coarse gravel and sand, glaciofluvial deposits, over clay, silt and fine grained sand,
glaciomarine sediments, to more than 40 m depth. A water well log describes soil conditions in
a water well about 700 m west of the site as about 9 m of glaciofluvial deposits covering the
glaciomarine sediments to more than 60 m depth.
A flood plain map dated August 2011 in the City of Terrace Official Community Plan
shows the Skeena River 200 year return period flood level is between elevations 60 and 61 m.
Skeena River is between 1 and 1.4 km east and south of the proposed building area.
Page 2 of 20
GEONORTH ENGINEERING LTD.
Northern Health February 8, 2019Seven Sisters Rehabilitation and Recovery Unit Relocation,Mills Memorial Hospital, Terrace, B.C. File No. K-4875-7S
3.0 SITE INVESTIGATIONS
On June 5 to 7, and September 20 to 22, 2018, GeoNorth carried out geotechnical
investigations for the MMHRP and SSRRU. The investigations included eleven drill holes,
designated DH18-1 to 11, drilled to between 6.1 and 17.4 m depth by Blue Max Drilling Inc.
using sonic drilling methods. Of the eleven drill holes, DH18-10 and 11 bracket the proposed
location for the SSRRU. Standard Penetration Tests (ASTM D1586) (SPT) were carried out at
intervals to the bottom of the drill holes. We logged soil conditions as the drill holes were
advanced and retrieved samples from the SPT and from drill cuttings for laboratory moisture
content and classification testing. The SPT involves driving a standard 50 mm diameter
sampling tube into the bottom of the drill hole using a 62 kg weight free-falling a height of
760 mm. The number of blows needed to advance the sampling tube 300 mm after a 150 mm
seating penetration is referred to as the SPT N value. This value provides information on soil
density and compressibility. The presence of cobbles in the sand and gravel deposit, described
below, prevented sample recovery and penetration of the SPT in some locations, and blocked the
end of the drill core barrel preventing recovery of drill cuttings in some locations.
Drill hole logs describing subsurface conditions are on Plates 4875-7S-B1 to B19, in
Appendix B, and are followed by an explanation of terms and symbols used on the logs. The
results of laboratory tests are shown on the logs and on Plates 4875-7S-D1 to D10, in
Appendix D.
A standpipe piezometer consisting of 50 mm diameter PVC pipe slotted along the bottom
3.0 m was installed to 17.4 m depth in DH18-4. A Solinst water level data logger was installed
in the standpipe to record groundwater level daily. A barometric pressure logger was also
installed in the well to allow the water level data to be corrected for fluctuations in atmospheric
pressure.
Page 3 of 20
GEONORTH ENGINEERING LTD.
Northern Health February 8, 2019Seven Sisters Rehabilitation and Recovery Unit Relocation,Mills Memorial Hospital, Terrace, B.C. File No. K-4875-7S
GeoNorth CPT Investigations Ltd. carried out two cone penetration tests (CPTs)
(ASTM D5778), designated CPT18-1 and 2, using a 20-ton capacity probe manufactured by
Vertek, a division of Applied Research Associates, Inc. CPT18-2 is located adjacent to the north
of the proposed SSRRU building. The CPT uses a 45 mm diameter steel probe with a 60E
conical tip and a 200 mm long section of sleeve just above the tip that are instrumented with load
cells to measure soil resistance. It is also equipped with a pressure transducer that measures the
induced soil pore-water pressure that develops at a filter element between the tip and sleeve as
the probe is advanced. All three readings are recorded at one second intervals in a field computer
as the probe is pushed into the ground at a rate of 2 cm/sec using hydraulic rams. The CPT
apparatus is also equipped with geophones to allow measurement of soil shear wave velocity;
tests were carried out at 1 m intervals. CPT18-1 was carried out to 30 m depth, through DH18-5
after it was drilled to 11.3 m depth, past gravel and cobbles that might have prevented passage
of the probe. CPT18-2 was carried out through DH18-10 after it was drilled to 12.2 m depth and
penetrated to refusal at 23.3 m depth.
CPT logs showing tip and sleeve resistance and the induced pore-water pressures, an
interpretation of the test results and the results of the shear wave velocity measurements are on
Plates 4875-7S-C1 to C6, in Appendix C.
We determined the locations of DH18-10 and 11 by measuring from site landmarks and
estimated their elevations from a site contour map. The drill hole and CPT locations are shown
on Drawing 4875-7S-A1. A summary of subsurface conditions is also shown on a cross section
shown on Drawing 4875-7S-A2, in Appendix A.
Page 4 of 20
GEONORTH ENGINEERING LTD.
Northern Health February 8, 2019Seven Sisters Rehabilitation and Recovery Unit Relocation,Mills Memorial Hospital, Terrace, B.C. File No. K-4875-7S
4.0 SUBSURFACE CONDITIONS
4.1 Drilling Results
The drill holes encountered similar conditions consisting of the following soil units;
• Unit 1, loose to compact, non-plastic silt with some fine grained sand and some
gravel.
• Unit 2, compact to very dense sandy gravel with a trace amount of fines and
occasional cobbles.
• Unit 3, soft to firm silty clay of intermediate plasticity with a variable sand and
gravel content.
• Unit 4, fine grained sand with some fines and occasional layers of stiff to very
stiff silty clay.
Table 1, below, summarizes the depths the soil units were encountered in the drill holes.
Table 1 - Summary of Soil Unit Depths
Drill Hole Unit 1 Unit 2 Unit 3 Unit 4
DH18-10 0.6 m 9.1 m* 11.0 m Bottom of Hole 12.2 m
DH18-11 1.8 m 9.4 m 11.0 m Bottom of Hole 14.2 m
* Inferred from drill action.
SPT N values in the sandy gravel unit ranged between 17 and 69 and frequently met
refusal due to the presence of cobbles, indicating compact to very dense conditions.
Groundwater level measured in DH18-4 on June 7, 2018 was 9.6 m below the ground
surface, at about elevation 57.7 m. Water level measured in DH18-5 at the time of drilling on
June 7 was 5.7 m below ground surface, at about elevation 59.0 m. Water level dropped from
Page 5 of 20
GEONORTH ENGINEERING LTD.
Northern Health February 8, 2019Seven Sisters Rehabilitation and Recovery Unit Relocation,Mills Memorial Hospital, Terrace, B.C. File No. K-4875-7S
elevation 57.8 to 56.4 m between June 12 and August 17, 2018 as recorded by a
Solinst Levelogger installed in DH18-4. A plot showing the water level readings is on
Plate 4875-7S-E3, in Appendix E. We anticipate groundwater levels below the proposed
SSRRU will be similar to those recorded at DH18-4.
4.2 CPT Results
The soil behaviour type (SBT) plots shown on the CPT18-2 log indicate silty sand to
clean sand from the bottom of DH18-10 to 17.3 m depth, then silty clay to clayey silt 22.8 m
depth, followed by silty sand to clean sand to the bottom of CPT18-2 at 23.3 m depth.
A correlation between the soil behaviour type index (Jefferies, 1993), Ic, and SPT “N”
using the formula ((qt / pa) / N60 ) = ( 8.5 * (1 - Ic / 4.6 )) where qt is corrected CPT tip pressure
and pa is atmospheric pressure estimates the “N” values of the silty sand to clean sand are
between 25 and 45 indicating compact to dense conditions.
A second correlation between undrained shear strength (Lunne, 1997), su, and qt using
the formula su = ( qt - óv) / Nkt, where óv is the vertical stress and Nkt is a variable between 10 and
20, shows the silty clay to clayey silt is stiff to very stiff, with an undrained shear strength
between 100 and 150 kPa. Nkt tends to increase with increasing plasticity and decrease with soil
sensitivity. The above calculation is based on an Nkt of 17.
Shear wave velocity measurements in CPT18-2 ranged between 240 and 370 and
averaged 300 m/s.
Bedrock was not encountered in the drill holes or CPTs.
Page 6 of 20
GEONORTH ENGINEERING LTD.
Northern Health February 8, 2019Seven Sisters Rehabilitation and Recovery Unit Relocation,Mills Memorial Hospital, Terrace, B.C. File No. K-4875-7S
4.3 Laboratory Tests
To characterise the soil, we carried out laboratory moisture content, Atterberg limits,
grain size distribution and oedometer consolidation tests. The results are presented on the drill
hole logs and in Appendix D. The following table summarizes the results of laboratory Atterberg
plastic and liquid limit tests.
Table 2 - Atterberg Limit Test Results
Drill Hole Depth(m)
LiquidLimit
%
Plastic Limit
%
MoistureContent
%
PlasticityIndex
LiquidityIndex
Symbol
DH18-11 10.1 33 18 28.3 15 0.69 CI
To assess the deformation and settlement characteristics of the silty clay and clayey silt
deposits, Unit 3, we carried out consolidation tests on two Shelby tube samples. Plots showing
the consolidation test results are on Plates 4875-7S-D9 and 10. The results for DH18-11 are
summarized in Table 3, below.
Table 3 - Consolidation Test Results
DrillHole
Depth(m)
CompressionIndex
Ccv
RecompressionIndex
Ccr
Pre-consolidationStress, Pc’
(kPa)
Over-consolidationRatio (OCR)
DH18-11 10.1 0.20 0.061 225 1.1
The pre-consolidation stress and over-consolidation ratio referred to in Table 3 relate the
present vertical stress state of the soil to normally consolidated conditions. A normally
consolidated deposit has experienced no greater vertical load than that from the present
overburden stress at the existing groundwater conditions. Deposits can be over-consolidated due
to the weight of soil that previously covered the area or due to a change in groundwater
conditions, or other factors. The pre-consolidation stress is a measure of the maximum past
Page 7 of 20
GEONORTH ENGINEERING LTD.
Northern Health February 8, 2019Seven Sisters Rehabilitation and Recovery Unit Relocation,Mills Memorial Hospital, Terrace, B.C. File No. K-4875-7S
effective vertical stress that has acted on the silty clay and clayey silt deposits.
Over-consolidation ratio (OCR) is a commonly used term to describe the consolidation state, and
is defined as the ratio of the pre-consolidation stress to the present soil stress condition.
Accurately defining the pre-consolidation stress is important for analysis of foundation
settlement. The results of our analysis show that an increase in vertical stress that exceeds the
pre-consolidation stress at this site will result in settlement at a rate three times that of the same
stress increase that does not exceed the pre-consolidation stress. Settlements of normally
consolidated and over-consolidated deposits are determined by the compression and
recompression indices, respectively, noted in Table 3.
Undrained shear strength is related to the state of consolidation of a soil deposit and since
CPT tip resistance is correlated to the undrained shear strength of cohesive soil, the CPT results
can be used to estimate the consolidation state of a fine grained soil deposit. The OCR is shown
on the interpreted CPT results for those deposits that have a soil behaviour type identified as
clay, silty clay or clayey silt. The consolidation state of primarily granular deposits is not defined
using this method. Correlations based on CPT tip pressure to OCR (Kulhawy, 1990) use the
formula “OCR = k (( qt - óvo ) / ó’vo )” where k is a variable between 0.2 and 0.5, óvo is the in-situ
vertical stress and ó’vo is the effective vertical stress. The results show the silty clay to clayey
silt encountered in the tests, is slightly over-consolidated with an OCR of about 2. The above
calculation is based on a k value of 0.33.
5.0 DISCUSSION AND RECOMMENDATIONS
Subsurface conditions at the site arise from a complex depositional environment as
described in Section 2.0. We interpret the drilling and CPT results to indicate several cycles of
deposition and erosion with the ground surface having at one time been higher then present.
Page 8 of 20
GEONORTH ENGINEERING LTD.
Northern Health February 8, 2019Seven Sisters Rehabilitation and Recovery Unit Relocation,Mills Memorial Hospital, Terrace, B.C. File No. K-4875-7S
The surface layer of compact silt, Unit 1, has properties of low to moderate shear
strength, low to moderate compressibility, is sensitive to disturbance and has a high susceptibility
to the development of frost lenses. The natural, compact to very dense sandy gravel, Unit 2, and
sand with some fines, Unit 4, have properties of moderate to high shear strength, low to moderate
compressibility and the Unit 2 gravel has low susceptibility to the development of frost lenses.
The silty clay to clayey silt, Unit 3 has low shear strength and moderate to high compressibility.
The results of our site investigation indicate that conventional pad and strip footing
foundations constructed on the natural sandy gravel unit or on compacted structural fill placed
on the natural sandy gravel unit are feasible. The compact silt, organic soil, fill and disturbed
soil are not suitable for support of building foundations as they have relatively low shear strength
when compared to the gravel unit, and variable compaction and gradation characteristics which
can contribute to differential settlement.
Over-excavation to remove cobbles will likely be required in some areas for preparation
of building foundations. Details on foundation preparation are outlined below.
The depth of fill may vary across the site and the depth of fill in some locations might
be deeper than was encountered during our investigation. This investigation was not intended
to determine the full extent of existing fill across the site.
As noted above, the low over-consolidation ratio of the natural silty clay deposit, Unit 3,
indicates moderate to high susceptibility to consolidation settlement. The stress from building
foundations extends to about three times the foundation width, but the stress drops to about a
tenth of the foundation bearing pressure at a depth equal to twice the foundation width.
Assuming a basement floor elevation of 62.0 m and spread footing foundations at elevation
61.6 m, the compressible clay deposit, Unit 3, encountered in DH18-11 at elevation 55.8 m, is
below the zone of influence of strip and pad spread footing foundations. Consolidation
settlement due to the stress from shallow spread footing foundations is unlikely.
Page 9 of 20
GEONORTH ENGINEERING LTD.
Northern Health February 8, 2019Seven Sisters Rehabilitation and Recovery Unit Relocation,Mills Memorial Hospital, Terrace, B.C. File No. K-4875-7S
Site grading fills of up to elevation 67 m may be required to bring parts of the site to
design grade. The wide area covered by site grading fill will result in stress increases that extend
to greater depth than that from a conventional narrow spread footing. This will cause
consolidation of Unit 3 and layers of silty clay encountered in Unit 4. To determine the amount
of settlement below the site grading fill, we developed a geological model based on the results
of our investigations and laboratory tests. Our analysis indicates the weight of fill up to elevation
67 m, assuming a unit weight of 22 kN/m3, will cause about 3 cm of settlement, provided Unit 3
is no more than 2 m thick. The length of time for this process to occur depends on the hydraulic
conductivity of the soil, on the thickness and depth to compressible layers and the distance
between permeable layers that allow drainage. We estimate settlement will occur over a period
of about one month. The risk of differential settlement caused by site grading fill can be avoided
by pre-constructing fill in advance of construction.
Groundwater levels likely vary seasonally and in response to precipitation, snow melt and
water levels in Skeena River. Water levels at the site are likely to be slightly higher than river
level although the available data does not provide a correlation. We anticipate groundwater level
could be 1 or 2 m higher than river level and, based on the projected 200 year return period flood
levels between 60 and 61 m, groundwater levels could approach elevation 62 m, the proposed
basement floor elevation. Basements that extend below the groundwater level will need to be
water-proof and designed to resist buoyant uplift pressure.
The recommendations in this report are based on the necessary assumption that soil
conditions encountered in the drill holes and CPTs are representative of soil conditions
elsewhere on the site. Please contact our office for additional recommendations if conditions
encountered during construction differ in any way from those described in this report.
Page 10 of 20
GEONORTH ENGINEERING LTD.
Northern Health February 8, 2019Seven Sisters Rehabilitation and Recovery Unit Relocation,Mills Memorial Hospital, Terrace, B.C. File No. K-4875-7S
5.1 Seismic Site Classification
The 2018 B.C. Building Code defines the “Site Classification for Seismic Site Response”
in Table 4.1.8.-A. The seismic site classification depends on measurements of the shear wave
velocity, SPT ‘N’ or undrained shear strength of the soil to a depth of at least 30 m. We used the
results of shear wave velocity measurements in CPT18-1 and 2, and calculate the Site
Classification for Seismic Site Response corresponds to be Site Class “D”, “stiff soil”
(180<Vs30<360).
5.2 Liquefaction Assessment
National Resources Canada (NRC) 2015 National Building Code of Canada seismic
hazard calculator indicates a peak horizontal ground acceleration (PGA) with a 2% probability
of exceedance in 50 years of 0.072g. This value is based on Site Class “C”.
To assess the potential for liquefaction at the site we used the program CLiq v2.0 by
Geologismiki Geotechnical Software. Based on a magnitude 7.5 earthquake and a PGA of
0.072g, no zones of soil are susceptible to liquefaction. As a sensitivity check, we carried out
a back-analysis using CLiq and determined that the PGA required to induce liquefaction is 0.13,
equal to a scaling factor of 1.8.
CLiq indicates that during earthquake shaking, as much as 6 cm of settlement could occur
but based on a probabilistic analysis less than 2 cm is expected.
5.3 Spread Footing Foundations
We recommend supporting pad and strip footings on the natural, compact to dense sandy
gravel with a trace amount of fines or on compacted structural fill placed on the natural sandy
gravel. Existing fill, silt, organic and disturbed soil are not suitable for foundation support.
Page 11 of 20
GEONORTH ENGINEERING LTD.
Northern Health February 8, 2019Seven Sisters Rehabilitation and Recovery Unit Relocation,Mills Memorial Hospital, Terrace, B.C. File No. K-4875-7S
Design spread footings using a factored bearing resistance of 400 kPa (limit states
design), and an allowable bearing pressure of 270 kPa (working stress design). The allowable
bearing pressure may be increased by one-third for transient loads caused by wind or seismic
events. Use a minimum footing width of 400 mm for strip footings and 600 mm for square pad
footings.
To prepare foundation areas, remove all existing fill, silt, debris, organic and disturbed
soil to expose the natural compact to dense sandy gravel with a trace amount of fines.
Over-excavate as required to remove cobbles that protrude above design grade. Compact the
surface of the excavation with several passes of a vibrating plate compactor weighing at least
450 kg. Bring foundation areas to grade using clean granular fill that meets the gradation
specifications for Select Granular Subbase (SGSB), defined in Table 4, in Section 5.4 below.
Place the SGSB in thin, uniform layers no thicker than 300 mm and compact each layer to at
least 100% Standard Proctor Density (SPD) (ASTM D698). Place the fill out beyond the edges
of each footing a horizontal distance equal to the depth of fill under the footing to allow for a
1H:1V load distribution through the fill to the natural ground.
We estimate that a 2.4 m square pad footing placed on the natural compact to dense sandy
gravel, and subjected to the allowable bearing pressure, will settle less than 2 cm. Differential
settlement between footings could be up to 75% of the total settlement. We can carry out
additional settlement analysis as required.
Provide 1.2 m of cover over perimeter foundations for confinement and to protect against
accidental undermining, and at least 300 mm of cover over interior footings for confinement,
measured from the slab surface to the base of the footing.
The natural, compact to dense sandy gravel and structural fill meeting our specifications
for SGSB and Well Grade Base (WGB) contain less than 5% fines, which consists of soil
particles smaller than 0.075 mm diameter, and are considered to have a low susceptibility to frost
heave. Footings placed on this soil do not require further protection from frost.
Page 12 of 20
GEONORTH ENGINEERING LTD.
Northern Health February 8, 2019Seven Sisters Rehabilitation and Recovery Unit Relocation,Mills Memorial Hospital, Terrace, B.C. File No. K-4875-7S
Use a slope no steeper than 2 horizontal to 1 vertical (2H:1V) between footings at
different elevations, unless site specific analysis indicates that steeper angles are appropriate.
Step strip footings that cross areas of different elevations using a maximum vertical rise of
600 mm between horizontal steps. Construct the steps at an overall slope no steeper than 2H:1V.
If buried utilities are installed parallel to building foundations, place the footings or the utility
so that the utility is above a line drawn down at a slope of 2H:1V from the edge of the footing.
Excavations for installation of buried services that extend within a 1H:1V line extending
down from the outside edge of building foundations will reduce foundation support which can
cause building settlement. We recommend buried services be installed prior to construction of
building foundations. If buried services can not be installed prior to foundation construction,
either install a length of steel casing at the desired service location below the building or
construct the building foundations below the utility and install a sleeve through the foundation
wall at the service location. Backfill around the casing using placement and compaction
procedures described above.
5.4 Grade-Supported Floor Slabs
Prepare slab areas using the following procedures to reduce the potential for future slab
movement and cracking:
• Remove all existing fill, organic soil and soft, deleterious materials, to expose the
natural compact silt or compact to dense sandy gravel.
• Bring slab areas to grade using granular fill that meets the gradation specification
for SGSB, placed in uniform layers no thicker than 300 mm, and compact each
layer to at least 100% SPD. Provide at least 300 mm of SGSB below
grade-supported slab areas.
• Directly below the slab, place a minimum 100 mm thick layer of WGB, as
defined in Table 4. Compact this layer to at least 100% SPD.
Page 13 of 20
GEONORTH ENGINEERING LTD.
Northern Health February 8, 2019Seven Sisters Rehabilitation and Recovery Unit Relocation,Mills Memorial Hospital, Terrace, B.C. File No. K-4875-7S
Use granular fill and drain rock that meets the following gradation specifications.
Table 4 - Specified Gradation for Granular Fill
Sieve
Size
(mm)
Percentage Passing
Well Graded
Base
Select Granular
Subbase
Drain
Rock
100 - 100 -
75 - 95-100 -
40 - - 100
25 100 - -
19 80-100 35-100 0-100
9.5 50-85 - -
4.75 35-70 15-60 0-10
2.36 25-50 - 0-5
1.18 15-35 - -
0.300 5-20 3-15 -
0.075 0-5 0-5 0-2
For WGB, use crushed and screened material that meets the requirements of B.C.
Ministry of Transportation and Infrastructure (BCMoT) Standard Specifications. The SGSB
can be a pit run material that meets the gradation noted in Table 4. Use durable aggregate that
will not degrade from exposure to water, freeze-thaw cycles or handling, spreading or
compacting. It must not contain organic materials or an excess of flat or elongate stones. Do
not place fill that is frozen and do not place fill on frozen ground.
Page 14 of 20
GEONORTH ENGINEERING LTD.
Northern Health February 8, 2019Seven Sisters Rehabilitation and Recovery Unit Relocation,Mills Memorial Hospital, Terrace, B.C. File No. K-4875-7S
5.5 Lateral Earth Pressure and Perimeter Drains
Protect basement walls against seepage and a buildup of hydrostatic pressures by
installing a perimeter drainage system. Drawing 4875-7S-E2, in Appendix E, shows a typical
perimeter drain installation. Set the invert of the perimeter drain at least 200 mm below finished
floor elevation and slope at a minimum 0.25% gradient. Discharge the perimeter drainage
system into a sump equipped with an automatic pump. Do not connect rainwater leaders to the
perimeter drainage system. Equip the discharge line of the perimeter drainage system with a
one-way (back-up prevention) valve at a location that is accessible for maintenance.
We estimated the flow in the perimeter drainage system based on climate data available
on the Government of Canada website for station Terrace PCC recorded between 1981 and
2010 and the hydraulic conductivity of the natural soil. Our analysis assumes the recorded
extreme daily rainfall of 97 mm falls on a 1 m tributary area around the building perimeter,
infiltrates vertically and is intercepted by the perimeter drainage system over a period of three
hours. We estimate infiltrated surface water will reach the perimeter drainage system at a rate
of no more than 0.6 L/m/min.
Design basement walls and any retaining walls to withstand lateral pressures caused by
soil, seismic and surcharge loads. Drawings 4875-7S-E1, in Appendix E show typical lateral
earth pressures that can develop against a restrained wall. It assumes that the wall is unyielding.
The at-rest (Ko) and seismic loads will apply for all restrained walls. Fill against the walls using
granular fill that meets the gradation specifications for SGSB or use drain rock. Use an at-rest
coefficient of lateral earth pressure, Ko, of 0.38 and a soil density of 22 kN/m3. Add the
pressures from compaction and vehicle loading where they are appropriate.
The compaction stress is based on a 900 mm wide, double-drum, vibratory walk-behind
roller that has a total compactive force (dead plus live load) of 76 kN (17,000 lb). The stress is
based on the assumption that the fill is placed in 300 mm thick layers and that the compactor is
kept at least 300 mm away from the wall. The use of larger compaction equipment, thinner lifts,
or less distance to the back of the walls will increase the lateral earth pressures from that shown.
Page 15 of 20
GEONORTH ENGINEERING LTD.
Northern Health February 8, 2019Seven Sisters Rehabilitation and Recovery Unit Relocation,Mills Memorial Hospital, Terrace, B.C. File No. K-4875-7S
Design walls against sliding using a coefficient of friction of 0.55 for footings placed on
compacted structural fill, as described above.
5.6 Mechanically Stabilized Earth Retaining Wall Design and Construction
Mechanically Stabilised Earth (MSE) retaining walls consist of a facing and a mass of
reinforced structural fill to retain soil behind the wall. We carried out a design for a 4.5 m high
wall using principles found in Report No. FHWA-NH1-00-043, dated March 2001 (published
by the National Highway Institute, US Department of Transportation) and the Canadian
Foundation Engineering Manual, 4th Edition. The wall design details are shown on
Drawing 4875-7S-E4, in Appendix E. We checked the design for factors of safety against
external failure (bearing capacity, sliding and overturning) and internal failure (geogrid breakage
and pullout). We determined that adequate factors of safety were achieved using the geogrid
length and configuration shown on Drawing 4875-7S-E4, and using the following construction
procedures:
1. Locate the bottom row of lock blocks to have at least 400 mm of soil cover over the
front of the blocks. Where temporary excavation slopes are required grade them to
no steeper than 1.25 horizontal to 1 vertical (1.25H:1V) in dry, loose silt and sand
and 1H:1V in dry, compact to dense sandy gravel. Excavation slopes will stand
unsupported at these angles but may be subject to ravelling and surface erosion
during precipitation events. Remove cobbles from excavation slopes that may roll
downslope prior to personnel entering the excavation.
2. Below the first row of blocks, place a levelling course of WGB, defined in Table 4,
at least 150 mm thick and at least 300 mm beyond the front and back of the blocks.
Compact this layer to at least 98% SPD. Concrete with a compressive strength of at
least 10 MPa could be used as an alternative to WGB.
Page 16 of 20
GEONORTH ENGINEERING LTD.
Northern Health February 8, 2019Seven Sisters Rehabilitation and Recovery Unit Relocation,Mills Memorial Hospital, Terrace, B.C. File No. K-4875-7S
3. Place the first row of blocks on the levelling course. Fill behind the blocks using
SGSB. Place the fill in uniform layers no thicker than 300 mm and compact each
layer to at least 98% SPD.
4. When the fill is up to the top of the first row of blocks, place a length of uniaxial
geogrid, as specified on Drawing 4875-S7-E4, over the cruciform on the top of the
block; do not cut the geogrid to fit the cruciform. Place the geogrid with the direction
of reinforcement perpendicular to the blocks. Place the geogrid sheets adjacent to
each other to provide complete coverage behind the wall but do not overlap the
sheets. Place the second row of blocks over the geogrid and pull out any slack.
5. Keeping the geogrid flat and taut, place granular fill over the geogrid using material
that meets our specification for SGSB. Place the fill in uniform layers no thicker
than 300 mm and compact each layer to at least 98% SPD. Spread the fill starting
from the back of the block and working towards the back of the excavation
to maintain tension in the geogrid. Within 1 m of the back of the blocks,
use hand-operated vibratory compaction equipment weighing less than 450 kg
(1,000 lbs).
6. Repeat this process for the remaining layers of geogrid, blocks and compacted,
structural fill.
Where the retaining wall transitions in height, make the transition a full block in height
to maintain continuity of the geogrid. This also applies to corners and areas where site grading
affects the height of the wall. If the geogrid overlaps at corners or curves, separate the geogrid
with at least 75 mm of compacted fill. Slope the fill in front of the bottom row of blocks at no
steeper than 2H:1V .
Page 17 of 20
GEONORTH ENGINEERING LTD.
Northern Health February 8, 2019Seven Sisters Rehabilitation and Recovery Unit Relocation,Mills Memorial Hospital, Terrace, B.C. File No. K-4875-7S
6.0 CONSTRUCTION REVIEW
We recommend that we review the design drawings prior to construction to check that
our recommendations are appropriate for the proposed design and that the level of the
investigation is adequate for the project.
We also recommend, and the B.C. Building Code specifies, that an experienced engineer
or his designate carry out construction review and testing of the following:
• all foundation excavations, and
• all compacted, structural fill below buildings.
Prior being able to complete Schedule C-B of the Code, which is a form titled “Assurance
of Professional Field Review and Compliance”, the necessary field reviews will need to be
completed. The Schedule C-B form is often required by Building Inspection Officials prior to
an Occupancy Permit being issued.
The foundation excavation review will include checks that soil conditions are as expected
and that the base is free of water or sloughed or loosened soil. If soil conditions are different
than expected, we can provide recommendations for remedial measures, as required.
We recommend that an experienced geotechnical technician review the placement and
compaction of all structural fill, starting with the first layer, to confirm that the fill materials and
soil density meet the project specifications.
7.0 CLOSURE
This indicative geotechnical report was prepared by GeoNorth Engineering Ltd. for the
use of Northern Health and their consultants. The material in it reflects GeoNorth Engineering’s
judgement in light of the information available to us at the time of preparation. Any use which
Page 18 of 20
GEONORTH ENGINEERING LTD.
Northern Health February 8, 2019Seven Sisters Rehabilitation and Recovery Unit Relocation,Mills Memorial Hospital, Terrace, B.C. File No. K-4875-7S
Third Parties make of this report, or any reliance on decisions to be made based on it, are the
responsibility of such Third Parties. GeoNorth Engineering Ltd. accepts no responsibility for
damages, if any, suffered by any third party as a result of decisions made or actions based on this
report.
Please contact the writers if any parts of the report need to be clarified.
Yours truly, Reviewed by,
GeoNorth Engineering Ltd. GeoNorth Engineering Ltd.
Per: W.J. Lanenga, P.Eng. Per: D.J. McDougall, M.Eng., P.Eng.
Page 19 of 20
GEONORTH ENGINEERING LTD.
Northern Health February 8, 2019Seven Sisters Rehabilitation and Recovery Unit Relocation,Mills Memorial Hospital, Terrace, B.C. File No. K-4875-7S
References
GeoNorth Engineering Ltd. 2003. Proposed Tertiary Psychiatric Care Facility, Terrace, B.C. Prince George, B.C.
Jefferies, M.G. and Davies, M.P. 1993. Estimation of SPT N values from the CPT. ASTM
Lunne, T., Robertson, P.K., and Powell, J.J.M. 1997. Cone penetration in geotechnical practice., E & FN Spon
Routledge, 352 p, ISBN 0-7514-0393-8.
Kulhawy, F.H., and Mayne, P.W. 1990. Manual on Estimating Soil Properties for Foundation Design. Ithaca, New
York. Cornell University.
Page 20 of 20
GEONORTH ENGINEERING LTD.
Northern Health February 8, 2019Seven Sisters Rehabilitation and Recovery Unit Relocation,Mills Memorial Hospital, Terrace, B.C. File No. K-4875-7S
A P P E N D I X A
ã ã
ã
DRAFT
DRAFT
GEONORTH ENGINEERING LTD.
Northern Health February 8, 2019Seven Sisters Rehabilitation and Recovery Unit Relocation,Mills Memorial Hospital, Terrace, B.C. File No. K-4875-7S
A P P E N D I X B
63.4
59.0
1.7
6.1
SILT, some fine grained sand, some gravel,subangular to subrounded, no visible structure,compact, non plastic, light brown, traceorganics, damp.
- below 0.8 m, trace gravel, trace sand, finegrained
GRAVEL, subangular to subrounded, sandy,coarse to medium grained, trace fines, verydense, light brown-grey, frequent cobbles,damp.
- below 4.1 m, gravels are subrounded torounded.
End of drill hole at 6.1 m.Backfilled with bentonite and drill cuttings.No seepage encountered.
360
480
190
180
0
DATE OF INVEST:
L
COMMENTS65.1
SEVEN SISTERS REHABILITATION ANDRECOVERY UNIT RELOCATION
MILLS MEMORIAL HOSPITAL, TERRACE, B.C.
SOIL DESCRIPTION
Prince George, B.C. V2N 1B2
P
LOGGED:
LOCATION:
SURFACE ELEVATION (m):
PROJECT
SA
MP
LES
PLATE NO.
WN W
JP
50%40%30%
DRILL:kPa25020015010050
3975 18th Avenue
SY
MB
OL
0
2018/06/05
ELEV (m)
20%10%W
POCKET PENETROMETER RDG.STRENGTH TEST RESULTS
K-4875-7S
CLIENT
FILE NO:
10
DE
PT
H (
m)
DEPTH (m)
HOLE NO:DRILL HOLE LOG
1
2
3
4
5
6
7
8
9
WATER CONTENT
DH18-1
Tel. 250-564-4304 Fax 250-564-9323
Sonic
4875-7S - B1
9U 526109E 6040458N
NORTHERN HEALTH
SP
T,
BLO
WS
PE
R 1
52 m
mS
PT
'N'
RE
CO
VE
RY
(m
m)
7
11
10
6
3
8
4
6
7
21
36
29
23
39
50
21
12
57
Ref
Ref
63.8
58.9
1.2
6.1
SILT, some fine grained sand, trace gravel,subrounded, loose, non plastic, light brown,damp.
- below 0.5 m, interbedded sand, coarse tomedium grained, gravelly, subrounded,compact, brown.
GRAVEL, subrounded, and some coarse tomedium grained sand, trace fines, very dense,light brown-grey, isolated cobbles, damp.
- below 3.0 m, frequent cobbles, sandy, coarsegrained.
End of drill hole at 6.1 m.Backfilled with drill cuttings.No seepage encountered.
- Grain Size Analysis, See Plate4875-7S-D1
- Grain Size Analysis, See Plate4875-7S-D2
310
200
210
DATE OF INVEST:
L
COMMENTS65.0
SEVEN SISTERS REHABILITATION ANDRECOVERY UNIT RELOCATION
MILLS MEMORIAL HOSPITAL, TERRACE, B.C.
SOIL DESCRIPTION
Prince George, B.C. V2N 1B2
P
LOGGED:
LOCATION:
SURFACE ELEVATION (m):
PROJECT
SA
MP
LES
PLATE NO.
WN W
JP
50%40%30%
DRILL:kPa25020015010050
3975 18th Avenue
SY
MB
OL
0
2018/06/05
ELEV (m)
20%10%W
POCKET PENETROMETER RDG.STRENGTH TEST RESULTS
K-4875-7S
CLIENT
FILE NO:
10
DE
PT
H (
m)
DEPTH (m)
HOLE NO:DRILL HOLE LOG
1
2
3
4
5
6
7
8
9
WATER CONTENT
DH18-2
Tel. 250-564-4304 Fax 250-564-9323
Sonic
4875-7S - B2
9U 526065E 6040584N
NORTHERN HEALTH
SP
T,
BLO
WS
PE
R 1
52 m
mS
PT
'N'
RE
CO
VE
RY
(m
m)
2
3
4
6
6
31
40
41
37
32
30
7
Ref
69
65.2
59.4
0.3
6.1
ORGANIC SOIL, reddish-brown.
GRAVEL, rounded to subrounded, and coarseto fine grained sand, trace fines, no visiblestructure, compact, light brown, damp.
- below 0.8 m, isolated cobbles.
- below 2.4 m, frequent cobbles, sand changesto medium-coarse grained.
End of drill hole at 6.1 m.Backfilled with bentonite and drill cuttings.No seepage encountered.
200
200
130
DATE OF INVEST:
L
COMMENTS65.5
SEVEN SISTERS REHABILITATION ANDRECOVERY UNIT RELOCATION
MILLS MEMORIAL HOSPITAL, TERRACE, B.C.
SOIL DESCRIPTION
Prince George, B.C. V2N 1B2
P
LOGGED:
LOCATION:
SURFACE ELEVATION (m):
PROJECT
SA
MP
LES
PLATE NO.
WN W
JP
50%40%30%
DRILL:kPa25020015010050
3975 18th Avenue
SY
MB
OL
0
2018/06/05
ELEV (m)
20%10%W
POCKET PENETROMETER RDG.STRENGTH TEST RESULTS
K-4875-7S
CLIENT
FILE NO:
10
DE
PT
H (
m)
DEPTH (m)
HOLE NO:
Blows/300mm
DCP
DRILL HOLE LOG
1
2
3
4
5
6
7
8
9
WATER CONTENT
DH18-3
Tel. 250-564-4304 Fax 250-564-9323
Sonic
4875-7S - B3
9U 526141E 6040590N
NORTHERN HEALTH
SP
T,
BLO
WS
PE
R 1
52 m
mS
PT
'N'
RE
CO
VE
RY
(m
m)
5
7
9
18
10
11
9
9
43
37
16
20
Ref
65.5
Cuttings
Bentonite and Cuttings
1.8
SILT, trace fine grained sand, no visiblestructure, loose, brown, organics, damp.
- below 1.2 m, interbedded sand, fine to mediumgrained, no visible structure, loose, dark brown,damp.
GRAVEL, subrounded, sandy, coarse tomedium grained, trace fines, no visiblestructure, dense, light brown-grey, damp.
- below 3.8 m, frequent cobbles.
- below 4.6 m, very dense.
- between 6.1 and 6.4 m, rust staining observed.
- below 6.7 m, some coarse to fine grainedsand.
- Grain Size Analysis, See Plate4875-7S-D3
- Grain Size Analysis, See Plate4875-7S-D4
- Grain Size Analysis, See Plate4875-7S-D5
June 7, 2018
300
560
180
400
240
230
DATE OF INVEST:
L
COMMENTS
(continued on next page)
67.3
SEVEN SISTERS REHABILITATION ANDRECOVERY UNIT RELOCATION
MILLS MEMORIAL HOSPITAL, TERRACE, B.C.
SOIL DESCRIPTION
Prince George, B.C. V2N 1B2
P
LOGGED:
LOCATION:
SURFACE ELEVATION (m):
PROJECT
SA
MP
LES
PLATE NO.
WN W
JP
50%40%30%
DRILL:kPa25020015010050
3975 18th Avenue
SY
MB
OL
0
2018/06/05-06
ELEV (m)
20%10%W
POCKET PENETROMETER RDG.STRENGTH TEST RESULTS
K-4875-7S
CLIENT
FILE NO:
10
DE
PT
H (
m)
DEPTH (m)
HOLE NO:DRILL HOLE LOG
1
2
3
4
5
6
7
8
9
WATER CONTENT
DH18-4
Tel. 250-564-4304 Fax 250-564-9323
Sonic
4875-7S - B4
9U 526171E 6040464N
NORTHERN HEALTH
SP
T,
BLO
WS
PE
R 1
52 m
mS
PT
'N'
RE
CO
VE
RY
(m
m)
3
4
4
4
4
2
3
3
5
10
23
30
20
21
28
26
20
28
24
36
38
27
28
8
5
33
49
Ref
60
55
51.5
51.1
49.9
Filter Sand
15.8
16.2
17.4
GRAVEL, subrounded, sandy, coarse tomedium grained, trace fines, no visiblestructure, dense, light brown-grey, damp.(continued)
- below 10.7 m, dense.
- below 13.7 m, trace coarse grained sand,compact.
CLAY, silty, trace sand, fine to medium grained,layered, very soft, intermediate plasticity, grey,Wn<WL.
SAND, fine grained to medium grained, somefines, no visible structure, wet.
End of drill hole at 17.4 m.Seepage encountered below 9.6 m depth.
- Grain Size Analysis, See Plate4875-7S-D6
190
210
150
170
DATE OF INVEST:
L
COMMENTS67.3
SEVEN SISTERS REHABILITATION ANDRECOVERY UNIT RELOCATION
MILLS MEMORIAL HOSPITAL, TERRACE, B.C.
SOIL DESCRIPTION
Prince George, B.C. V2N 1B2
P
LOGGED:
LOCATION:
SURFACE ELEVATION (m):
PROJECT
SA
MP
LES
PLATE NO.
WN W
JP
50%40%30%
DRILL:kPa25020015010050
3975 18th Avenue
SY
MB
OL
10
2018/06/05-06
ELEV (m)
20%10%W
POCKET PENETROMETER RDG.STRENGTH TEST RESULTS
K-4875-7S
CLIENT
FILE NO:
20
DE
PT
H (
m)
DEPTH (m)
HOLE NO:DRILL HOLE LOG
11
12
13
14
15
16
17
18
19
WATER CONTENT
DH18-4
Tel. 250-564-4304 Fax 250-564-9323
Sonic
4875-7S - B5
9U 526171E 6040464N
NORTHERN HEALTH
SP
T,
BLO
WS
PE
R 1
52 m
mS
PT
'N'
RE
CO
VE
RY
(m
m)
25
15
16
25
21
18
18
15
18
11
18
8
10
8
12
5
5
41
33
26
17
62.6
55.4
2.1
9.3
SILT, trace fine grained sand, non plastic,brown, organic rich, damp.- layered with sand, fine to medium grained,trace fines, brown.
GRAVEL, subrounded, sandy, medium tocoarse grained, trace fines, light brown-grey,isolated cobbles, damp.
- below 3.9 m, silty with frequent cobbles.
- below 7.6 m, some medium to coarse grainedsand.
CLAY, silty, trace fine grained sand, layered,very soft, low to intermediate plasticity, grey,wet.
- Grain Size Analysis, See Plate4875-7S-D7
June 7, 2018
240
260
120
120
80
DATE OF INVEST:
L
COMMENTS
(continued on next page)
64.7
SEVEN SISTERS REHABILITATION ANDRECOVERY UNIT RELOCATION
MILLS MEMORIAL HOSPITAL, TERRACE, B.C.
SOIL DESCRIPTION
Prince George, B.C. V2N 1B2
P
LOGGED:
LOCATION:
SURFACE ELEVATION (m):
PROJECT
SA
MP
LES
PLATE NO.
WN W
JP
50%40%30%
DRILL:kPa25020015010050
3975 18th Avenue
SY
MB
OL
0
2018/06/06
ELEV (m)
20%10%W
POCKET PENETROMETER RDG.STRENGTH TEST RESULTS
K-4875-7S
CLIENT
FILE NO:
10
DE
PT
H (
m)
DEPTH (m)
HOLE NO:DRILL HOLE LOG
1
2
3
4
5
6
7
8
9
WATER CONTENT
DH18-5
Tel. 250-564-4304 Fax 250-564-9323
Sonic
4875-7S - B6
9U 526077E 6040527N
NORTHERN HEALTH
SP
T,
BLO
WS
PE
R 1
52 m
mS
PT
'N'
RE
CO
VE
RY
(m
m)
25
2
3
3
4
4
4
5
5
32
40
49
28
26
23
12
10
7
6
6
9
Ref
Ref
Ref
49
17
53.411.3
CLAY, silty, trace fine grained sand, layered,very soft, low to intermediate plasticity, grey,wet. (continued)
End of drill hole at 11.3 m.Backfilled with bentonite and drill cuttings.Seepage encountered below 5.7 m depth.
Tore Vane completedon Shelby Tube= 25 kPa
Consolidation Test,See Plate 4875-7S-D9Pc'=280kPaCcr=0.048Ccv=0.12
DATE OF INVEST:
L
COMMENTS64.7
SEVEN SISTERS REHABILITATION ANDRECOVERY UNIT RELOCATION
MILLS MEMORIAL HOSPITAL, TERRACE, B.C.
SOIL DESCRIPTION
Prince George, B.C. V2N 1B2
P
LOGGED:
LOCATION:
SURFACE ELEVATION (m):
PROJECT
SA
MP
LES
PLATE NO.
WN W
JP
50%40%30%
DRILL:kPa25020015010050
3975 18th Avenue
SY
MB
OL
10
2018/06/06
ELEV (m)
20%10%W
POCKET PENETROMETER RDG.STRENGTH TEST RESULTS
K-4875-7S
CLIENT
FILE NO:
20
DE
PT
H (
m)
DEPTH (m)
HOLE NO:DRILL HOLE LOG
11
12
13
14
15
16
17
18
19
WATER CONTENT
DH18-5
Tel. 250-564-4304 Fax 250-564-9323
Sonic
4875-7S - B7
9U 526077E 6040527N
NORTHERN HEALTH
SP
T,
BLO
WS
PE
R 1
52 m
mS
PT
'N'
RE
CO
VE
RY
(m
m)
50
64.9
64.3
58.2
0.6
1.2
7.3
SAND, gravelly, trace to some fines, no visiblestructure, compact, brown, moist (FILL).
- below 0.5 m, trace organic silt.
SILT, some sand, no visible structure, compact,non plastic, brown to rust colour, damp.
GRAVEL, sandy, trace to some fines, no visiblestructure, compact, brown, damp.
- below 2.9 m, frequent cobbles.
CLAY, silty, some sand, some gravel, no visiblestructure, stiff, intermediate plasticity, brown,Wn>Wp.- below 7.6 m, sandy, gravelly.
- below 9.1 m, layered with stiff, varved, siltyclay up to 25 cm thick.
0
0
350
500
210
DATE OF INVEST:
L
COMMENTS
(continued on next page)
65.5
SEVEN SISTERS REHABILITATION ANDRECOVERY UNIT RELOCATION
MILLS MEMORIAL HOSPITAL, TERRACE, B.C.
SOIL DESCRIPTION
Prince George, B.C. V2N 1B2
P
LOGGED:
LOCATION:
SURFACE ELEVATION (m):
PROJECT
SA
MP
LES
PLATE NO.
WN W
WJL
50%40%30%
DRILL:kPa25020015010050
3975 18th Avenue
SY
MB
OL
0
2018/09/20
ELEV (m)
20%10%W
POCKET PENETROMETER RDG.STRENGTH TEST RESULTS
K-4875-7S
CLIENT
FILE NO:
10
DE
PT
H (
m)
DEPTH (m)
HOLE NO:DRILL HOLE LOG
1
2
3
4
5
6
7
8
9
WATER CONTENT
DH18-6
Tel. 250-564-4304 Fax 250-564-9323
Sonic
4875-7S - B8
9U 526153E 6040545N
NORTHERN HEALTH
SP
T,
BLO
WS
PE
R 1
52 m
mS
PT
'N'
RE
CO
VE
RY
(m
m)
100
200
150
12
9
6
8
15
16
15
12
14
14
17
12
19
8
13
12
18
15
Ref
27
29
25
50.315.2
CLAY, silty, some sand, some gravel, no visiblestructure, stiff, intermediate plasticity, brown,Wn>Wp. (continued)
- below 12.2 m, less frequent layers of sandygravel.
End of drill hole at 15.2 m.No seepage encountered.
15 blows for 2.5 cm50
50
DATE OF INVEST:
L
COMMENTS65.5
SEVEN SISTERS REHABILITATION ANDRECOVERY UNIT RELOCATION
MILLS MEMORIAL HOSPITAL, TERRACE, B.C.
SOIL DESCRIPTION
Prince George, B.C. V2N 1B2
P
LOGGED:
LOCATION:
SURFACE ELEVATION (m):
PROJECT
SA
MP
LES
PLATE NO.
WN W
WJL
50%40%30%
DRILL:kPa25020015010050
3975 18th Avenue
SY
MB
OL
10
2018/09/20
ELEV (m)
20%10%W
POCKET PENETROMETER RDG.STRENGTH TEST RESULTS
K-4875-7S
CLIENT
FILE NO:
20
DE
PT
H (
m)
DEPTH (m)
HOLE NO:DRILL HOLE LOG
11
12
13
14
15
16
17
18
19
WATER CONTENT
DH18-6
Tel. 250-564-4304 Fax 250-564-9323
Sonic
4875-7S - B9
9U 526153E 6040545N
NORTHERN HEALTH
SP
T,
BLO
WS
PE
R 1
52 m
mS
PT
'N'
RE
CO
VE
RY
(m
m)
250
150 200
200
27
15
15
21
20
Ref
41
65.350.15 SILT, some sand, no visible structure, compact,non plastic, rust coloured, roots, damp.
GRAVEL, sandy, trace to some fines, no visiblestructure, compact, brown to grey, damp.
- below 1.8 m, occasional to frequent cobbles,trace fines.
- below 8.2 m, some sand.
bouncing on a rock
20 blows for 5 cm
spoon bouncing
spoon bouncing for 20blows
0
100
0
0
360
150
DATE OF INVEST:
L
COMMENTS
(continued on next page)
65.5
SEVEN SISTERS REHABILITATION ANDRECOVERY UNIT RELOCATION
MILLS MEMORIAL HOSPITAL, TERRACE, B.C.
SOIL DESCRIPTION
Prince George, B.C. V2N 1B2
P
LOGGED:
LOCATION:
SURFACE ELEVATION (m):
PROJECT
SA
MP
LES
PLATE NO.
WN W
WJL
50%40%30%
DRILL:kPa25020015010050
3975 18th Avenue
SY
MB
OL
0
2018/09/20-21
ELEV (m)
20%10%W
POCKET PENETROMETER RDG.STRENGTH TEST RESULTS
K-4875-7S
CLIENT
FILE NO:
10
DE
PT
H (
m)
DEPTH (m)
HOLE NO:DRILL HOLE LOG
1
2
3
4
5
6
7
8
9
WATER CONTENT
DH18-7
Tel. 250-564-4304 Fax 250-564-9323
Sonic
4875-7S - B10
9U 526116E 6040575N
NORTHERN HEALTH
SP
T,
BLO
WS
PE
R 1
52 m
mS
PT
'N'
RE
CO
VE
RY
(m
m)
17
34
37
20
17
18
15
13
6
14
9
9
Ref
Ref
Ref
Ref
33
23
49.8
48.7
15.7
16.8
GRAVEL, sandy, trace to some fines, no visiblestructure, compact, brown to grey, damp.(continued)
CLAY, silty, some sand, some gravel, no visiblestructure, intermediate plasticity, grey, Wn>Wp.
End of drill hole at 16.8 m.Seepage encountered at 9.1 m.
0
0
0
100
DATE OF INVEST:
L
COMMENTS65.5
SEVEN SISTERS REHABILITATION ANDRECOVERY UNIT RELOCATION
MILLS MEMORIAL HOSPITAL, TERRACE, B.C.
SOIL DESCRIPTION
Prince George, B.C. V2N 1B2
P
LOGGED:
LOCATION:
SURFACE ELEVATION (m):
PROJECT
SA
MP
LES
PLATE NO.
WN W
WJL
50%40%30%
DRILL:kPa25020015010050
3975 18th Avenue
SY
MB
OL
10
2018/09/20-21
ELEV (m)
20%10%W
POCKET PENETROMETER RDG.STRENGTH TEST RESULTS
K-4875-7S
CLIENT
FILE NO:
20
DE
PT
H (
m)
DEPTH (m)
HOLE NO:DRILL HOLE LOG
11
12
13
14
15
16
17
18
19
WATER CONTENT
DH18-7
Tel. 250-564-4304 Fax 250-564-9323
Sonic
4875-7S - B11
9U 526116E 6040575N
NORTHERN HEALTH
SP
T,
BLO
WS
PE
R 1
52 m
mS
PT
'N'
RE
CO
VE
RY
(m
m)
150 200
2
3
7
7
15
7
5
8
12
11
10
9
5
6
7
8
10
12
21
13
65.2
57.9
0.3
7.6
SILT, sandy, no visible structure, compact, nonplastic, rust coloured, roots, damp.
GRAVEL, sandy, trace fines, no visiblestructure, compact, grey, occasional cobble,damp.
- below 2.1 m, frequent cobbles.
- below 6.1 m, occasional layer of silty, sandygravel.
GRAVEL, sandy, some silt, layered, dense,brown, moist to wet. 25 blows for 7.5 cm
150
120
DATE OF INVEST:
L
COMMENTS
(continued on next page)
65.5
SEVEN SISTERS REHABILITATION ANDRECOVERY UNIT RELOCATION
MILLS MEMORIAL HOSPITAL, TERRACE, B.C.
SOIL DESCRIPTION
Prince George, B.C. V2N 1B2
P
LOGGED:
LOCATION:
SURFACE ELEVATION (m):
PROJECT
SA
MP
LES
PLATE NO.
WN W
WJL
50%40%30%
DRILL:kPa25020015010050
3975 18th Avenue
SY
MB
OL
0
2018/09/21
ELEV (m)
20%10%W
POCKET PENETROMETER RDG.STRENGTH TEST RESULTS
K-4875-7S
CLIENT
FILE NO:
10
DE
PT
H (
m)
DEPTH (m)
HOLE NO:DRILL HOLE LOG
1
2
3
4
5
6
7
8
9
WATER CONTENT
DH18-8
Tel. 250-564-4304 Fax 250-564-9323
Sonic
4875-7S - B12
9U 526146E 6040641N
NORTHERN HEALTH
SP
T,
BLO
WS
PE
R 1
52 m
mS
PT
'N'
RE
CO
VE
RY
(m
m)
26
22
25
22
22
8
7
Ref
30
49.715.8
GRAVEL, sandy, some silt, layered, dense,brown, moist to wet. (continued)
- below 10.7 m, some fines.
End of drill hole at 15.8 m.Seepage encountered below 9.1 m.
40 blows for 5 cm
150
0
100
120
DATE OF INVEST:
L
COMMENTS65.5
SEVEN SISTERS REHABILITATION ANDRECOVERY UNIT RELOCATION
MILLS MEMORIAL HOSPITAL, TERRACE, B.C.
SOIL DESCRIPTION
Prince George, B.C. V2N 1B2
P
LOGGED:
LOCATION:
SURFACE ELEVATION (m):
PROJECT
SA
MP
LES
PLATE NO.
WN W
WJL
50%40%30%
DRILL:kPa25020015010050
3975 18th Avenue
SY
MB
OL
10
2018/09/21
ELEV (m)
20%10%W
POCKET PENETROMETER RDG.STRENGTH TEST RESULTS
K-4875-7S
CLIENT
FILE NO:
20
DE
PT
H (
m)
DEPTH (m)
HOLE NO:DRILL HOLE LOG
11
12
13
14
15
16
17
18
19
WATER CONTENT
DH18-8
Tel. 250-564-4304 Fax 250-564-9323
Sonic
4875-7S - B13
9U 526146E 6040641N
NORTHERN HEALTH
SP
T,
BLO
WS
PE
R 1
52 m
mS
PT
'N'
RE
CO
VE
RY
(m
m)
8
11
9
12
40
18
1
15
12
21
10
13
11
20
Ref
16
23
65.70.3SILT, trace fine grained sand, no visiblestructure, compact, non plastic, rust coloured,damp.
GRAVEL, sandy, trace fines, no visiblestructure, compact, brown to grey, occasionalcobble, damp.
- below 7.6 m, some fines.230
260
DATE OF INVEST:
L
COMMENTS
(continued on next page)
66.0
SEVEN SISTERS REHABILITATION ANDRECOVERY UNIT RELOCATION
MILLS MEMORIAL HOSPITAL, TERRACE, B.C.
SOIL DESCRIPTION
Prince George, B.C. V2N 1B2
P
LOGGED:
LOCATION:
SURFACE ELEVATION (m):
PROJECT
SA
MP
LES
PLATE NO.
WN W
WJL
50%40%30%
DRILL:kPa25020015010050
3975 18th Avenue
SY
MB
OL
0
2018/09/21-22
ELEV (m)
20%10%W
POCKET PENETROMETER RDG.STRENGTH TEST RESULTS
K-4875-7S
CLIENT
FILE NO:
10
DE
PT
H (
m)
DEPTH (m)
HOLE NO:DRILL HOLE LOG
1
2
3
4
5
6
7
8
9
WATER CONTENT
DH18-9
Tel. 250-564-4304 Fax 250-564-9323
Sonic
4875-7S - B14
9U 526092E 6040635N
NORTHERN HEALTH
SP
T,
BLO
WS
PE
R 1
52 m
mS
PT
'N'
RE
CO
VE
RY
(m
m)
10
13
10
11
16
14
11
12
23
25
50.8
50.2
15.2
15.8
GRAVEL, sandy, trace fines, no visiblestructure, compact, brown to grey, occasionalcobble, damp. (continued)
CLAY, silty, trace sand, trace gravel, varved,hard, intermediate plasticity, occasional layer ofsandy gravel, Wn~Wp.
End of drill hole at 15.8 m.No seepage encountered.
120
0
110
600
DATE OF INVEST:
L
COMMENTS66.0
SEVEN SISTERS REHABILITATION ANDRECOVERY UNIT RELOCATION
MILLS MEMORIAL HOSPITAL, TERRACE, B.C.
SOIL DESCRIPTION
Prince George, B.C. V2N 1B2
P
LOGGED:
LOCATION:
SURFACE ELEVATION (m):
PROJECT
SA
MP
LES
PLATE NO.
WN W
WJL
50%40%30%
DRILL:kPa25020015010050
3975 18th Avenue
SY
MB
OL
10
2018/09/21-22
ELEV (m)
20%10%W
POCKET PENETROMETER RDG.STRENGTH TEST RESULTS
K-4875-7S
CLIENT
FILE NO:
20
DE
PT
H (
m)
DEPTH (m)
HOLE NO:DRILL HOLE LOG
11
12
13
14
15
16
17
18
19
WATER CONTENT
DH18-9
Tel. 250-564-4304 Fax 250-564-9323
Sonic
4875-7S - B15
9U 526092E 6040635N
NORTHERN HEALTH
SP
T,
BLO
WS
PE
R 1
52 m
mS
PT
'N'
RE
CO
VE
RY
(m
m)
350400
14
16
9
8
11
11
10
8
26
20
10
7
9
11
16
20
25
21
30
27
64.62
64.1
0.08
0.6
ORGANIC SILT, black, roots, damp.
SILT, sandy, trace gravel, compact, non plastic,rust coloured, damp.
GRAVEL, sandy, trace fines, no visiblestructure, dense, brown, occasional to frequentcobbles, damp.
- below 8.2 m, occasional cobble.
30 blows for 5 cm
spoon bouncing
30 blows for 2.5 cm
130
0
50
DATE OF INVEST:
L
COMMENTS
(continued on next page)
64.7
SEVEN SISTERS REHABILITATION ANDRECOVERY UNIT RELOCATION
MILLS MEMORIAL HOSPITAL, TERRACE, B.C.
SOIL DESCRIPTION
Prince George, B.C. V2N 1B2
P
LOGGED:
LOCATION:
SURFACE ELEVATION (m):
PROJECT
SA
MP
LES
PLATE NO.
WN W
WJL
50%40%30%
DRILL:kPa25020015010050
3975 18th Avenue
SY
MB
OL
0
2018/09/22
ELEV (m)
20%10%W
POCKET PENETROMETER RDG.STRENGTH TEST RESULTS
K-4875-7S
CLIENT
FILE NO:
10
DE
PT
H (
m)
DEPTH (m)
HOLE NO:DRILL HOLE LOG
1
2
3
4
5
6
7
8
9
WATER CONTENT
DH18-10
Tel. 250-564-4304 Fax 250-564-9323
Sonic
4875-7S - B16
9U 526094E 6040412N
NORTHERN HEALTH
SP
T,
BLO
WS
PE
R 1
52 m
mS
PT
'N'
RE
CO
VE
RY
(m
m)
21
30
21
30
Ref
Ref
Ref
53.7
52.5
11.0
12.2
GRAVEL, sandy, trace fines, no visiblestructure, dense, brown, occasional to frequentcobbles, damp. (continued)
SAND, fine to medium grained, some fines,layered, compact, grey, layer of coarse grainedsand and sandy silt, wet.
End of drill hole at 12.2 m.Seepage encountered below 11.3 m.
spoon bouncing0
DATE OF INVEST:
L
COMMENTS64.7
SEVEN SISTERS REHABILITATION ANDRECOVERY UNIT RELOCATION
MILLS MEMORIAL HOSPITAL, TERRACE, B.C.
SOIL DESCRIPTION
Prince George, B.C. V2N 1B2
P
LOGGED:
LOCATION:
SURFACE ELEVATION (m):
PROJECT
SA
MP
LES
PLATE NO.
WN W
WJL
50%40%30%
DRILL:kPa25020015010050
3975 18th Avenue
SY
MB
OL
10
2018/09/22
ELEV (m)
20%10%W
POCKET PENETROMETER RDG.STRENGTH TEST RESULTS
K-4875-7S
CLIENT
FILE NO:
20
DE
PT
H (
m)
DEPTH (m)
HOLE NO:DRILL HOLE LOG
11
12
13
14
15
16
17
18
19
WATER CONTENT
DH18-10
Tel. 250-564-4304 Fax 250-564-9323
Sonic
4875-7S - B17
9U 526094E 6040412N
NORTHERN HEALTH
SP
T,
BLO
WS
PE
R 1
52 m
mS
PT
'N'
RE
CO
VE
RY
(m
m)
45 Ref
64.3
64.0
63.4
55.8
0.9
1.2
1.8
9.4
SAND, silty, no visible structure, compact, rustcoloured, damp (FILL).
GAVEL, sandy, trace fines, no visible structure,compact, brown, damp (FILL).
SILT, some sand, no visible structure, compact,non plastic, rust coloured, damp.
GRAVEL, sandy, trace fines, no visiblestructure, brown, damp.
- below 2.4 m, frequent cobbles.
- below 5.5 m, numerous cobbles.
- below 6.4 m, occasional cobble.
CLAY, silty, varved, firm, intermediate plasticity,brown, Wn>Wp.
- below 9.8 m, layered with gravelly sand.
30 blows for 5 cm
Consolidation Test,See Plate4875-7S-D10Pc'=225kPaCcr=0.061
150
300
DATE OF INVEST:
L
COMMENTS
(continued on next page)
65.2
SEVEN SISTERS REHABILITATION ANDRECOVERY UNIT RELOCATION
MILLS MEMORIAL HOSPITAL, TERRACE, B.C.
SOIL DESCRIPTION
Prince George, B.C. V2N 1B2
P
LOGGED:
LOCATION:
SURFACE ELEVATION (m):
PROJECT
SA
MP
LES
PLATE NO.
WN W
WJL
50%40%30%
DRILL:kPa25020015010050
3975 18th Avenue
SY
MB
OL
0
2018/09/22
ELEV (m)
20%10%W
POCKET PENETROMETER RDG.STRENGTH TEST RESULTS
K-4875-7S
CLIENT
FILE NO:
10
DE
PT
H (
m)
DEPTH (m)
HOLE NO:DRILL HOLE LOG
1
2
3
4
5
6
7
8
9
WATER CONTENT
DH18-11
Tel. 250-564-4304 Fax 250-564-9323
Sonic
4875-7S - B18
9U 526092E 6040330N
NORTHERN HEALTH
SP
T,
BLO
WS
PE
R 1
52 m
mS
PT
'N'
RE
CO
VE
RY
(m
m)
50
33
36
30
28
24
11
7
Ref
35
54.2
51.0
11.0
14.2
CLAY, silty, varved, firm, intermediate plasticity,brown, Wn>Wp. (continued)
- between 10.7 and 11.0 m, trace sand, tracegravel.
SAND, some silt, no visible structure, compact,grey, wet.
End of drill hole at 14.2 m.Seepage encountered at 9.4 m.
Ccv=0.20
- Grain Size Analysis, See Plate4875-7S-C8
300
350
0
DATE OF INVEST:
L
COMMENTS65.2
SEVEN SISTERS REHABILITATION ANDRECOVERY UNIT RELOCATION
MILLS MEMORIAL HOSPITAL, TERRACE, B.C.
SOIL DESCRIPTION
Prince George, B.C. V2N 1B2
P
LOGGED:
LOCATION:
SURFACE ELEVATION (m):
PROJECT
SA
MP
LES
PLATE NO.
WN W
WJL
50%40%30%
DRILL:kPa25020015010050
3975 18th Avenue
SY
MB
OL
10
2018/09/22
ELEV (m)
20%10%W
POCKET PENETROMETER RDG.STRENGTH TEST RESULTS
K-4875-7S
CLIENT
FILE NO:
20
DE
PT
H (
m)
DEPTH (m)
HOLE NO:DRILL HOLE LOG
11
12
13
14
15
16
17
18
19
WATER CONTENT
DH18-11
Tel. 250-564-4304 Fax 250-564-9323
Sonic
4875-7S - B19
9U 526092E 6040330N
NORTHERN HEALTH
SP
T,
BLO
WS
PE
R 1
52 m
mS
PT
'N'
RE
CO
VE
RY
(m
m)
50
6
8
19
21
8
19
22
12
18
20
27
41
38
GEONORTH ENGINEERING LTD.
Northern Health February 8, 2019Seven Sisters Rehabilitation and Recovery Unit Relocation,Mills Memorial Hospital, Terrace, B.C. File No. K-4875-7S
A P P E N D I X C
GEONORTH ENGINEERING LTD.
Cone Penetration Test Results
Client: Northern Health Job No.: K-4875 Location: UTM 9U 526077E 6040527N, Elev. 64.7 m Date of Investigation: 2018-06-06
Project: Seven Sisters Rehabilitation and Recovery Unit RelocationHole No.: CPT18-1 Drilling Details: Drilled out to 11.3 m depth, see DH18-5 Plate no.: 4875-7S-C1
Soil Behavior Type (SBT) 1 Sensitive Fine-Grained 3 Clay to Silty Clay 5 Silty Sand to Sandy Silt 7 Gravelly Sand to Dense Sand 9 Very Stiff, Fine-grained*
(Robertson 1990) 2 Organic Soil - Peat 4 Silty Clay to Clayey Silt 6 Silty Sand to Clean Sand 8 Very Stiff Sand to Clayey Sand* * Heavily Overconsolidated or Cemented
0.00
1.00
2.00
3.00
4.00
5.00
6.00
7.00
8.00
9.00
10.00
11.00
12.00
13.00
14.00
15.00
16.00
17.00
18.00
19.00
20.00
21.00
22.00
23.00
24.00
25.00
26.00
27.00
28.00
29.00
30.00
0 50 100 150 200
(kPa)
fs - Sleeve Stress
0.00
1.00
2.00
3.00
4.00
5.00
6.00
7.00
8.00
9.00
10.00
11.00
12.00
13.00
14.00
15.00
16.00
17.00
18.00
19.00
20.00
21.00
22.00
23.00
24.00
25.00
26.00
27.00
28.00
29.00
30.00
0% 3% 6% 9% 12%
Rf - fs / qt
(%)
0.00
1.00
2.00
3.00
4.00
5.00
6.00
7.00
8.00
9.00
10.00
11.00
12.00
13.00
14.00
15.00
16.00
17.00
18.00
19.00
20.00
21.00
22.00
23.00
24.00
25.00
26.00
27.00
28.00
29.00
30.00
0 50 100 150 200
(m of water)
U - Pore Pressure
0 1 2 3 4 5 6 7 8 9 10
0.00
1.00
2.00
3.00
4.00
5.00
6.00
7.00
8.00
9.00
10.00
11.00
12.00
13.00
14.00
15.00
16.00
17.00
18.00
19.00
20.00
21.00
22.00
23.00
24.00
25.00
26.00
27.00
28.00
29.00
30.00
(Robertson, 1990)
SBT
Depth
(m
)
0.00
1.00
2.00
3.00
4.00
5.00
6.00
7.00
8.00
9.00
10.00
11.00
12.00
13.00
14.00
15.00
16.00
17.00
18.00
19.00
20.00
21.00
22.00
23.00
24.00
25.00
26.00
27.00
28.00
29.00
30.00
0 6000 12000 18000 24000
(kPa)
qt - Tip Stress
DRAFT
GEONORTH ENGINEERING LTD.
Cone Penetration Test - Correlations to Geotechnical Parameters
Client: Northern Health Job No.: K-4875 Location: UTM 9U 526077E 6040527N, Elev. 64.7 m Date of Investigation: 2018-06-06
Project: Seven Sisters Rehabilitation and Recovery Unit RelocationHole No.: CPT18-1 Drilling Details: Drilled out to 11.3 m depth, see DH18-5 Plate no.: 4875-7S-C2
Soil Behavior Type (SBT) 1 Sensitive Fine-Grained 3 Clay to Silty Clay 5 Silty Sand to Sandy Silt 7 Gravelly Sand to Dense Sand 9 Very Stiff, Fine-grained*
(Robertson 1990) 2 Organic Soil - Peat 4 Silty Clay to Clayey Silt 6 Silty Sand to Clean Sand 8 Very Stiff Sand to Clayey Sand* * Heavily Overconsolidated or Cemented
0.00
1.00
2.00
3.00
4.00
5.00
6.00
7.00
8.00
9.00
10.00
11.00
12.00
13.00
14.00
15.00
16.00
17.00
18.00
19.00
20.00
21.00
22.00
23.00
24.00
25.00
26.00
27.00
28.00
29.00
30.00
0 100 200 300 400
Su
(kPa)
0 1 2 3 4 5 6 7 8 910
0.00
1.00
2.00
3.00
4.00
5.00
6.00
7.00
8.00
9.00
10.00
11.00
12.00
13.00
14.00
15.00
16.00
17.00
18.00
19.00
20.00
21.00
22.00
23.00
24.00
25.00
26.00
27.00
28.00
29.00
30.00
(Robertson, 1990)
SBT
Depth
(m
)
0.00
1.00
2.00
3.00
4.00
5.00
6.00
7.00
8.00
9.00
10.00
11.00
12.00
13.00
14.00
15.00
16.00
17.00
18.00
19.00
20.00
21.00
22.00
23.00
24.00
25.00
26.00
27.00
28.00
29.00
30.00
0 2 4 6 8
OCR
0.00
1.00
2.00
3.00
4.00
5.00
6.00
7.00
8.00
9.00
10.00
11.00
12.00
13.00
14.00
15.00
16.00
17.00
18.00
19.00
20.00
21.00
22.00
23.00
24.00
25.00
26.00
27.00
28.00
29.00
30.00
0 15 30 45 60
N60
(Blows)
DRAFT
GEONORTH ENGINEERING LTD.
Client: Northern Health UTM Coordinates: UTM 9U 526077E 6040527N
Project: Seven Sisters Rehabilitation and Recovery Unit Relocation Drilling Details: Drilled out to 11.3 m depth
Job No.: K-4875 Elevation: 64.7 m
Hole No.: CPT18-1 Plate no.: 4875-7S-C3
Cone Penetration Test - Seismic Velocity Profile
0.00
1.00
2.00
3.00
4.00
5.00
6.00
7.00
8.00
9.00
10.00
11.00
12.00
13.00
14.00
15.00
16.00
17.00
18.00
19.00
20.00
21.00
22.00
23.00
24.00
25.00
26.00
27.00
28.00
29.00
30.00
0 125 250 375 500D
ep
th (
m)
Vs(m/s)
DRAFT
GEONORTH ENGINEERING LTD.
Cone Penetration Test Results
Client: Northern Health Job No.: K-4875 Location: UTM 9U 526094E 6040412N, Elev. 64.5 m Date of Investigation: 2018-09-22
Project: Seven Sisters Rehabilitation and Recovery Unit RelocationHole No.: CPT18-2 Drilling Details: Drilled out to 12.2 m depth, see DH18-10 Plate no.: 4875-7S-C4
Soil Behavior Type (SBT) 1 Sensitive Fine-Grained 3 Clay to Silty Clay 5 Silty Sand to Sandy Silt 7 Gravelly Sand to Dense Sand 9 Very Stiff, Fine-grained*
(Robertson 1990) 2 Organic Soil - Peat 4 Silty Clay to Clayey Silt 6 Silty Sand to Clean Sand 8 Very Stiff Sand to Clayey Sand* * Heavily Overconsolidated or Cemented
0.00
1.00
2.00
3.00
4.00
5.00
6.00
7.00
8.00
9.00
10.00
11.00
12.00
13.00
14.00
15.00
16.00
17.00
18.00
19.00
20.00
21.00
22.00
23.00
24.00
25.00
26.00
27.00
28.00
29.00
30.00
0 50 100 150 200
(kPa)
fs - Sleeve Stress
0.00
1.00
2.00
3.00
4.00
5.00
6.00
7.00
8.00
9.00
10.00
11.00
12.00
13.00
14.00
15.00
16.00
17.00
18.00
19.00
20.00
21.00
22.00
23.00
24.00
25.00
26.00
27.00
28.00
29.00
30.00
0% 3% 6% 9% 12%
Rf - fs / qt
(%)
0.00
1.00
2.00
3.00
4.00
5.00
6.00
7.00
8.00
9.00
10.00
11.00
12.00
13.00
14.00
15.00
16.00
17.00
18.00
19.00
20.00
21.00
22.00
23.00
24.00
25.00
26.00
27.00
28.00
29.00
30.00
0 50 100 150 200
(m of water)
U - Pore Pressure
0 1 2 3 4 5 6 7 8 9 10
0.00
1.00
2.00
3.00
4.00
5.00
6.00
7.00
8.00
9.00
10.00
11.00
12.00
13.00
14.00
15.00
16.00
17.00
18.00
19.00
20.00
21.00
22.00
23.00
24.00
25.00
26.00
27.00
28.00
29.00
30.00
(Robertson, 1990)
SBT
Depth
(m
)
0.00
1.00
2.00
3.00
4.00
5.00
6.00
7.00
8.00
9.00
10.00
11.00
12.00
13.00
14.00
15.00
16.00
17.00
18.00
19.00
20.00
21.00
22.00
23.00
24.00
25.00
26.00
27.00
28.00
29.00
30.00
0 6000 12000 18000 24000
(kPa)
qt - Tip Stress
DRAFT
GEONORTH ENGINEERING LTD.
Cone Penetration Test - Correlations to Geotechnical Parameters
Client: Northern Health Job No.: K-4875 Location: UTM 9U 526094E 6040412N, Elev. 64.5 m Date of Investigation: 2018-09-22
Project: Seven Sisters Rehabilitation and Recovery Unit RelocationHole No.: CPT18-2 Drilling Details: Drilled out to 12.2 m depth, see DH18-10 Plate no.: 4875-7S-C5
Soil Behavior Type (SBT) 1 Sensitive Fine-Grained 3 Clay to Silty Clay 5 Silty Sand to Sandy Silt 7 Gravelly Sand to Dense Sand 9 Very Stiff, Fine-grained*
(Robertson 1990) 2 Organic Soil - Peat 4 Silty Clay to Clayey Silt 6 Silty Sand to Clean Sand 8 Very Stiff Sand to Clayey Sand* * Heavily Overconsolidated or Cemented
0.00
1.00
2.00
3.00
4.00
5.00
6.00
7.00
8.00
9.00
10.00
11.00
12.00
13.00
14.00
15.00
16.00
17.00
18.00
19.00
20.00
21.00
22.00
23.00
24.00
25.00
26.00
27.00
28.00
29.00
30.00
0 100 200 300 400
Su
(kPa)
0 1 2 3 4 5 6 7 8 910
0.00
1.00
2.00
3.00
4.00
5.00
6.00
7.00
8.00
9.00
10.00
11.00
12.00
13.00
14.00
15.00
16.00
17.00
18.00
19.00
20.00
21.00
22.00
23.00
24.00
25.00
26.00
27.00
28.00
29.00
30.00
(Robertson, 1990)
SBT
Depth
(m
)
0.00
1.00
2.00
3.00
4.00
5.00
6.00
7.00
8.00
9.00
10.00
11.00
12.00
13.00
14.00
15.00
16.00
17.00
18.00
19.00
20.00
21.00
22.00
23.00
24.00
25.00
26.00
27.00
28.00
29.00
30.00
0 2 4 6 8
OCR
0.00
1.00
2.00
3.00
4.00
5.00
6.00
7.00
8.00
9.00
10.00
11.00
12.00
13.00
14.00
15.00
16.00
17.00
18.00
19.00
20.00
21.00
22.00
23.00
24.00
25.00
26.00
27.00
28.00
29.00
30.00
0 15 30 45 60
N60
(Blows)
DRAFT
GEONORTH ENGINEERING LTD.
Client: Northern Health UTM Coordinates: UTM 9U 526077E 6040527N
Project: Seven Sisters Rehabilitation and Recovery Unit Relocation Drilling Details: Drilled out to 12.2 m depth
Job No.: K-4875 Elevation: 64.5 m
Hole No.: CPT18-2 Plate no.: 4875-7S-C6
Cone Penetration Test - Seismic Velocity Profile
0.00
1.00
2.00
3.00
4.00
5.00
6.00
7.00
8.00
9.00
10.00
11.00
12.00
13.00
14.00
15.00
16.00
17.00
18.00
19.00
20.00
21.00
22.00
23.00
24.00
25.00
26.00
27.00
28.00
29.00
30.00
0 125 250 375 500D
ep
th (
m)
Vs(m/s)
DRAFT
GEONORTH ENGINEERING LTD.
Northern Health February 8, 2019Seven Sisters Rehabilitation and Recovery Unit Relocation,Mills Memorial Hospital, Terrace, B.C. File No. K-4875-7S
A P P E N D I X D
LABORATORY CONSOLIDATION TEST, ASTM D2435
Project: Project No.:Client: Drill Hole:Location: Depth (m):
Soil Type: CL 23.3 Plastic Limit, %: 18 Liquid Limit, %: 28 19
Plate No.: 4875-7S-D9
Moisture Content, %: Unit Weight, kN/m3
Proposed Mills Memorial Hospital RedevelopmentNorthern Health4720 Haugland Avenue, Terrace, BC
K-4875DH18-510.9
0.45
0.50
0.55
0.60
0.65
10 100 1000 10000
Void
Rat
io
Vertical Effective Stress, kPa
Ccv = 0.12
Ccr = 0.048
Pc = 280 kPa
1.E-031.E-021.E-01Coefficient of Consolidation, cm2/sec
LABORATORY CONSOLIDATION TEST, ASTM D2435
Project: Project No.:Client: Drill Hole:Location: Depth (m):
Soil Type: CI 28.3 Plastic Limit, %: 18 Liquid Limit, %: 33 19.7
Plate No.: 4875-7S-D10
Proposed Mills Memorial Hospital RedevelopmentNorthern Health4720 Haugland Avenue, Terrace, BC
K-4875DH18-1110.1
Moisture Content, %: Unit Weight, kN/m3
0.40
0.45
0.50
0.55
0.60
0.65
0.70
0.75
0.80
10 100 1000 10000
Void
Rat
io
Vertical Effective Stress, kPa
Ccv = 0.20
Ccr = 0.061
Pc = 225 kPa
1.E-04 1.E-03 1.E-02 1.E-01Coefficient of Consolidation, cm2/sec
GEONORTH ENGINEERING LTD.
Northern Health February 8, 2019Seven Sisters Rehabilitation and Recovery Unit Relocation,Mills Memorial Hospital, Terrace, B.C. File No. K-4875-7S
A P P E N D I X E
DRAFT