35
SETH R. TAKOCH STRUCTURAL OPTION Computer Associates International, Regional Office Herndon, VA Seth R. Takoch AE Senior Thesis Structural Option April 15, 2003

SETH R. TAKOCH STRUCTURAL OPTION Computer Associates International, Regional Office Herndon, VA Seth R. Takoch AE Senior Thesis Structural Option April

Embed Size (px)

Citation preview

Page 1: SETH R. TAKOCH STRUCTURAL OPTION Computer Associates International, Regional Office Herndon, VA Seth R. Takoch AE Senior Thesis Structural Option April

SETH R. TAKOCH STRUCTURAL OPTION

Computer Associates International, Regional

Office Herndon, VA

Seth R. Takoch

AE Senior Thesis

Structural Option

April 15, 2003

Page 2: SETH R. TAKOCH STRUCTURAL OPTION Computer Associates International, Regional Office Herndon, VA Seth R. Takoch AE Senior Thesis Structural Option April

SETH R. TAKOCH STRUCTURAL OPTION

Presentation Outline

Background InformationExisting Structural ConditionsDesign CriteriaRedesignConstruction ManagementLighting DesignConclusions and RecommendationAcknowledgements

SETH R. TAKOCH STRUCTURAL OPTION

Page 3: SETH R. TAKOCH STRUCTURAL OPTION Computer Associates International, Regional Office Herndon, VA Seth R. Takoch AE Senior Thesis Structural Option April

SETH R. TAKOCH STRUCTURAL OPTION

Location

15min. Off Beltway 35mins. Outside D.C

Wood Oak Dr.

Baseball Field

Page 4: SETH R. TAKOCH STRUCTURAL OPTION Computer Associates International, Regional Office Herndon, VA Seth R. Takoch AE Senior Thesis Structural Option April

SETH R. TAKOCH STRUCTURAL OPTION

Background Information

Function: Computer Associates Int. Regional Headquarters

Size: 233,000 sq. ft. – 6 floors

Rentable Office Space: 207,000 sq. ft.

Architectural Features:

•Precast Concrete Façade with Glass Curtain Wall

•Six Story Glass Enclosed Atrium

•Adjacent Day Care Facility

Page 5: SETH R. TAKOCH STRUCTURAL OPTION Computer Associates International, Regional Office Herndon, VA Seth R. Takoch AE Senior Thesis Structural Option April

SETH R. TAKOCH STRUCTURAL OPTION

Project Team

Owner – Computer Associates International Arcitect – Davis, Carter, Scott Structural Engineer – Smislova, Kehnemui, & Associates. General Contractor – Clark Construction Developer – Tishman Speyer Properties Mechanical – GHT Limited Plumbing – GHT Limited

Page 6: SETH R. TAKOCH STRUCTURAL OPTION Computer Associates International, Regional Office Herndon, VA Seth R. Takoch AE Senior Thesis Structural Option April

SETH R. TAKOCH STRUCTURAL OPTION

Existing Structure

Flat Slab ConstructionConcrete Structure

• 30’ x 30’ Bays• 9” Thick Slab Thickness• 10’ x 10’ x 5-1/2” Drop

Panels• 24” x 24” Conc. Columns

Page 7: SETH R. TAKOCH STRUCTURAL OPTION Computer Associates International, Regional Office Herndon, VA Seth R. Takoch AE Senior Thesis Structural Option April

SETH R. TAKOCH STRUCTURAL OPTION

Existing Structure

Wind Loads are Transferred by Diaphragm Action of Façade

Transferred to Framing by Tributary Area• 8 Frames N-S and 9 Frames E-W

Concrete Frames Resist Lateral Forces • Short and Long Frames

Floor Slab Adds Resistance due to Diaphragm Action

Page 8: SETH R. TAKOCH STRUCTURAL OPTION Computer Associates International, Regional Office Herndon, VA Seth R. Takoch AE Senior Thesis Structural Option April

SETH R. TAKOCH STRUCTURAL OPTION

Design Limitations

Old Code – BOCA 96 New Code – IBC 2000 Local Zoning Ordinances Similar Square Footage Minimal Architectural

Changes Floor-to-Floor Heights

LIVE LOADS PER IBC 2000  

LOAD TYPE LOAD

ROOF ( RAIN ) 50 psf

ROOF ( SNOW ) HIGH ROOF 22 psf

ROOF (SNOW) LOW ROOF 30 psf

OFFICES, CUBICLES 50 psf

ASSEMBLY, STAIRS 100 psf

MECHANICAL 150 psf

CORRIDORS 80 psf

Page 9: SETH R. TAKOCH STRUCTURAL OPTION Computer Associates International, Regional Office Herndon, VA Seth R. Takoch AE Senior Thesis Structural Option April

SETH R. TAKOCH STRUCTURAL OPTION

Proposal

To Redesign a Feasible and Desirable Alternative Structural System and to Incorporate Construction Costs and Schedule Length Into My Solution

Time = Money …

Money = Time

$$$$

Page 10: SETH R. TAKOCH STRUCTURAL OPTION Computer Associates International, Regional Office Herndon, VA Seth R. Takoch AE Senior Thesis Structural Option April

SETH R. TAKOCH STRUCTURAL OPTION

Possible Faming Alternatives

Composite Steel Construction

Non-Composite Steel Construction

Page 11: SETH R. TAKOCH STRUCTURAL OPTION Computer Associates International, Regional Office Herndon, VA Seth R. Takoch AE Senior Thesis Structural Option April

SETH R. TAKOCH STRUCTURAL OPTION

Steel Construction

Code – IBC2000LRFD Analysis

• Parameters• 30’ x30’ Typical Bays• Fy = 50ksi ASTM A992 Steel• F’c = 3ksi• Normal Weight Concrete• Shear Studs - 3-1/2”high, ¾” diameter

(composite)• 22 gage Metal Deck

Page 12: SETH R. TAKOCH STRUCTURAL OPTION Computer Associates International, Regional Office Herndon, VA Seth R. Takoch AE Senior Thesis Structural Option April

SETH R. TAKOCH STRUCTURAL OPTION

Composite Steel Construction

Gravity Analysis – RAM • Determined Beam Sizes• Determined Column Sizes

2 Story Column Lengths 26’ – 28’ Tall• Ranging from W10’s to W12’s

Beam Sizes W12x14 Spaced at 6’ o.c.• Girders as Deep as a W21’s

Page 13: SETH R. TAKOCH STRUCTURAL OPTION Computer Associates International, Regional Office Herndon, VA Seth R. Takoch AE Senior Thesis Structural Option April

SETH R. TAKOCH STRUCTURAL OPTION

Non-Composite Construction

Gravity Analysis – RAM • Determined Beam Sizes• Determined Column Sizes

2 Story Column Lengths 26’ – 28’ Tall• Using W12’s

Beam Sizes W12x14 Spaced at 6’ o.c.• Girders as Deep as a W24’s

Page 14: SETH R. TAKOCH STRUCTURAL OPTION Computer Associates International, Regional Office Herndon, VA Seth R. Takoch AE Senior Thesis Structural Option April

SETH R. TAKOCH STRUCTURAL OPTION

Depth Comparison

Composite Steel

•Average – W12’s

•Critical Depth – W21

Non-Composite Steel

•Average – W12’s

•Critical Depth – W24

Advantage – Composite Steel Construction

Composite Saves 20 Tons

of Steel

Page 15: SETH R. TAKOCH STRUCTURAL OPTION Computer Associates International, Regional Office Herndon, VA Seth R. Takoch AE Senior Thesis Structural Option April

SETH R. TAKOCH STRUCTURAL OPTION

Lateral System

Shear Wall to Resist Lateral LoadingBased on Critical Wind Loading and

Torsion2 – 60’ Long Shear Walls

• Reinforced to Resist Forces• Deflection of h/400

A trium

S hear Wall #2

Shear W

all #1

C enter of Rigidity

A trium

Page 16: SETH R. TAKOCH STRUCTURAL OPTION Computer Associates International, Regional Office Herndon, VA Seth R. Takoch AE Senior Thesis Structural Option April

SETH R. TAKOCH STRUCTURAL OPTION

Design

Reinforcement Based on the Following Vn = (2f’c bd +

Avfyvd/s) Mn = Asfy (d-a/2)

Wall Floor ShearBendin

g

  1#4 @ 12"

8 - #11

  2#4 @ 12"

6 - #11

1 3#4 @ 12"

6 - #9

  4#6 @ 12"

4 - #9

  5#7 @ 12"

2 - #9

  6#9 @ 12"

1 - #9

  1#4 @ 12"

8 - #11

  2#4 @ 12"

6 - #11

2 3#5 @ 12"

6 - #9

  4#6 @ 12"

4 - #9

  5#8 @ 12"

2 - #9

  6#10 @

12"1 - #9

Page 17: SETH R. TAKOCH STRUCTURAL OPTION Computer Associates International, Regional Office Herndon, VA Seth R. Takoch AE Senior Thesis Structural Option April

SETH R. TAKOCH STRUCTURAL OPTION

Construction Management`

Address Two Main Issues

•Cost Comparison

•Project Duration

Page 18: SETH R. TAKOCH STRUCTURAL OPTION Computer Associates International, Regional Office Herndon, VA Seth R. Takoch AE Senior Thesis Structural Option April

SETH R. TAKOCH STRUCTURAL OPTION

Construction Management

Total Building Cost• D4 Cost

• Total = $27,678,667• 20-25% Accurate• Range of $34.6 million to $20.8 million • Not Very Accurate• $115.33 / sq. ft.

`

Page 19: SETH R. TAKOCH STRUCTURAL OPTION Computer Associates International, Regional Office Herndon, VA Seth R. Takoch AE Senior Thesis Structural Option April

SETH R. TAKOCH STRUCTURAL OPTION

Construction Management

Total Building Cost• Means Building Construction Cost Data

• Separate Estimates for Steel and Concrete• 10 -15% Accurate• More Precise Than D4• Steel Framing = $96.74 / sq.ft.• Concrete Frame = $98.45 / sq.ft. • Difference = $1.71 / sq.ft. = $410,400

`

Page 20: SETH R. TAKOCH STRUCTURAL OPTION Computer Associates International, Regional Office Herndon, VA Seth R. Takoch AE Senior Thesis Structural Option April

SETH R. TAKOCH STRUCTURAL OPTION

Construction Management

Cost Comparison• D4 Cost = $115.33/sq.ft. = $27,678,667• Means Steel = $96.74/sq.ft. = $23,217,600• Means Concrete = $98.45/sq.ft. =

$23,628,000• Percentage Savings Using Steel = 1.7%

Savings

`

Page 21: SETH R. TAKOCH STRUCTURAL OPTION Computer Associates International, Regional Office Herndon, VA Seth R. Takoch AE Senior Thesis Structural Option April

SETH R. TAKOCH STRUCTURAL OPTION

Construction Management

Scheduling• Means Data to Calculate Duration • Primavera Utilized to Schedule Sequences• Total Duration Steel Erection = 376days• Total Duration Concrete Placement = 847

days

`

Page 22: SETH R. TAKOCH STRUCTURAL OPTION Computer Associates International, Regional Office Herndon, VA Seth R. Takoch AE Senior Thesis Structural Option April

SETH R. TAKOCH STRUCTURAL OPTION

Construction Management`

After Scheduling Concrete – 260 Days

Page 23: SETH R. TAKOCH STRUCTURAL OPTION Computer Associates International, Regional Office Herndon, VA Seth R. Takoch AE Senior Thesis Structural Option April

SETH R. TAKOCH STRUCTURAL OPTION

Construction ManagementAfter Scheduling – 150 Days

`

Page 24: SETH R. TAKOCH STRUCTURAL OPTION Computer Associates International, Regional Office Herndon, VA Seth R. Takoch AE Senior Thesis Structural Option April

SETH R. TAKOCH STRUCTURAL OPTION

Construction Management

Savings• Advantage Composite Steel Construction

Time

• Advantage Composite Steel Construction

`

Composite Design is Considered One of the Most Economical Methods of Floor Construction for an Office Building

Page 25: SETH R. TAKOCH STRUCTURAL OPTION Computer Associates International, Regional Office Herndon, VA Seth R. Takoch AE Senior Thesis Structural Option April

SETH R. TAKOCH STRUCTURAL OPTION

Construction Management

Crane Sizing• On Site 3-1/2 Months• Tower Crane

• Placed Through Atrium• Liebherr 200HC• Hook Radius – 197ft.• Capacity – 5,070#• Satisfies Critical Lift of 3,000# @160ft.

`

Page 26: SETH R. TAKOCH STRUCTURAL OPTION Computer Associates International, Regional Office Herndon, VA Seth R. Takoch AE Senior Thesis Structural Option April

SETH R. TAKOCH STRUCTURAL OPTION

Lighting Design

Design of Lighting of Daycare Facility• Minimum Footcandles of 30fc• Fluorescent Luminaries• 120’ x 56’ Space to Illuminate• 2’ x 4’ Fixtures with 3” Louvers Spaced

on a 16’ x 8’ grid• Specification From Lithonia• Workplane of 2-1/2 ft.

Page 27: SETH R. TAKOCH STRUCTURAL OPTION Computer Associates International, Regional Office Herndon, VA Seth R. Takoch AE Senior Thesis Structural Option April

SETH R. TAKOCH STRUCTURAL OPTION

Lighting Design

Designed Using LuxiconRenderings on April 15, 2003

• At 9:00 am with Daylighting• At 1:30 pm with Daylighting• At 5:00 pm with Daylighting• Without Daylighting

Page 28: SETH R. TAKOCH STRUCTURAL OPTION Computer Associates International, Regional Office Herndon, VA Seth R. Takoch AE Senior Thesis Structural Option April

SETH R. TAKOCH STRUCTURAL OPTION

Lighting Design

9:00 am

Page 29: SETH R. TAKOCH STRUCTURAL OPTION Computer Associates International, Regional Office Herndon, VA Seth R. Takoch AE Senior Thesis Structural Option April

SETH R. TAKOCH STRUCTURAL OPTION

At 1:30 pm

Lighting Design

Page 30: SETH R. TAKOCH STRUCTURAL OPTION Computer Associates International, Regional Office Herndon, VA Seth R. Takoch AE Senior Thesis Structural Option April

SETH R. TAKOCH STRUCTURAL OPTION

At 5:00 pm

Lighting Design

Page 31: SETH R. TAKOCH STRUCTURAL OPTION Computer Associates International, Regional Office Herndon, VA Seth R. Takoch AE Senior Thesis Structural Option April

SETH R. TAKOCH STRUCTURAL OPTION

• Without Daylighting

Lighting Design

Page 32: SETH R. TAKOCH STRUCTURAL OPTION Computer Associates International, Regional Office Herndon, VA Seth R. Takoch AE Senior Thesis Structural Option April

SETH R. TAKOCH STRUCTURAL OPTION

Lighting Design

The Lighting Design Meets Required Parameters of 30fc

Page 33: SETH R. TAKOCH STRUCTURAL OPTION Computer Associates International, Regional Office Herndon, VA Seth R. Takoch AE Senior Thesis Structural Option April

SETH R. TAKOCH STRUCTURAL OPTION

Conclusion

In Conclusion, Composite Steel Construction is a Better Alternative to Non-Composite Construction.

Composite Steel is a Viable Alternative to a Two-Way Flat Slab System

Page 34: SETH R. TAKOCH STRUCTURAL OPTION Computer Associates International, Regional Office Herndon, VA Seth R. Takoch AE Senior Thesis Structural Option April

SETH R. TAKOCH STRUCTURAL OPTION

Shout Outs’My Family

My Friends

The AE Student Body

The Entire AE Faculity

Smislova, Kehnemui, & Associates, P.A.

Computer Associates

The ‘U’

And All Of Those Out There That Stuck With Me

Page 35: SETH R. TAKOCH STRUCTURAL OPTION Computer Associates International, Regional Office Herndon, VA Seth R. Takoch AE Senior Thesis Structural Option April

SETH R. TAKOCH STRUCTURAL OPTION

Questions

?