Upload
ctrltech
View
20
Download
2
Embed Size (px)
DESCRIPTION
We offer Turkey solution for Server room & Datacenter complete site Preparation. In nutshell we offer Power, cooling and Monitoring solution for Tier I to Tier IV Datacenter and server rooms. We specialize in planning, designing, engineering, constructing Datacenter or Server room or Computer rooms with modern technologies. We do sizing & selection of various equipment like datacenter equipment such as UPS, Precision Air conditioner, Fire suppression, raised flooring, water leak detection system, environmental monitoring system, Static Transfer switch etc. As part of Datacenter and server room preparation, we do supply installation and commissioning of following equipment:1) Uninterruptible Power Supply (UPS): We offer Three phase or single phase, redundant or standalone UPS with required battery backup time ranging from 1kvA to 4800kVA.2) Close Control Unit (CCU) or Computer Room Air Conditioner (CRAC) or Precision Air Conditioner: We do sizing, supply, installation & commissioning of CRAC unit from 1kw to 180kw down/up flow type, chilled water or DX type.3) Fire Suppression: We offer clean fire suppression system such as HFC-227e agent which is recommended for Server room and datacenter. Specialty of HFC-227e agent is it is very quick and do not leave any residue. It also called as FM200.4) Raised Flooring: We offer different type of raised flooring or access flooring along with perforated tile for server room.5) Water Leak Detection System.6) Environmental monitoring system for server room which can monitor temperature & humidity in server room and can notify user through email, SMS or alarms.7) Static Transfer Switch (STS): We offer Single & Three phase static transfer switch of 2 pole or 3 pole or 4 pole type.8) Power Backup, conditioning and security equipments such as Generator, ATS, Transient voltage surge suppressor (TVSS), access control etc.We are one stop solution provider for building of Datacenter & Server room who can convert your rooms in modern Datacenter. Server room, data center, datacentre, server room preparation, server room construction, datacenter construction, datacenter preparation, data center construction, data center preparation, datacenter design, data center design, server room design, datacenter equipment, server room design, datacenter design, server room designing, datacenter designing, server room layout, serverroom, how to built server room, datacenter services, what is data center, what is data center, it datacenter--------------------------------------------------------------------------------------------------CONTROL TECHNOLOGIES FZE (Ctrltech) Sharjah, UAE. T: +971 6 5489626 Mobile: +971 55 2338912 / +971 50 1537113F: +971 6 5489627 E: [email protected]: www.ctrltechnologies.com
Citation preview
CONTROL TECHNOLOGIES FZEPh: +971-6-5489626 E: [email protected] W:www.ctrltechnologies.com
We offer Turkey solution for Server room & Datacenter complete site Preparation. In nutshell we offer Power, cooling and Monitoring solution for Tier I to Tier IV Datacenter and server rooms. We specialize in planning, designing, engineering, constructing Datacenter or Server room or Computer rooms with modern technologies. We do sizing & selection of various equipment like datacenter equipment such as UPS, Precision Air conditioner, Fire suppression, raised flooring, water leak detection system, environmental monitoring system, Static Transfer switch etc. As part of Datacenter and server room preparation, we do supply installation and commissioning of various equipment which is integral part of a complete Datacenter.
Control Technologies Fze | Ph: +971 6 5489626 | E: [email protected], UAE. | M: +971 50 1537113 | W: www.ctrltechnologies.com
7
6
5
4
3
2
1
We do Selection, Supply, Installation & commissioning of following Product as part of Datacenter or Server room construction:
Control Technologies Fze | Ph: +971 6 5489626 | E: [email protected], UAE. | M: +971 50 1537113 | W: www.ctrltechnologies.com
8
Continuous, clean and safe power supply is major requirement of any Datacenter and Server room. We help to select proper rating of Uninterruptible Power Supply by conduction load study of datacenter. Depending on critical index of datacenter and required percentage of uptime, we offer solution with proper redundancies so as to achieve continuous, clean and safe power at low initial and operating cost. Uninterruptible Power Supply (UPS) is important equipment with regards to uptime of Datacenter. Real time monitoring of these UPSs can be done with help of SNMP card with which we can monitor real time parameters of UPS and get alert through Email, SMS in case of alarm conditions.
Control Technologies Fze | Ph: +971 6 5489626 | E: [email protected], UAE. | M: +971 50 1537113 | W: www.ctrltechnologies.com
Precision Air Conditioner also commonly known as Close control Unit (CCU) or Computer Room Air Conditioner (CRAC). It is use for precise control of Temperature along with Humidity in Server room or Datacenter which is major requirement for high uptime of critical Datacenter. Ctrltech helps you to calculate cooling load of datacenter and select proper rating, brand, air flow configuration (up flow or Down flow type), required air flow & location of Close control unit. We also help you to select type of close control unit ( Chilled Water, DX type or Dual Fluid type) depending on site limitations, running cost restriction, critical index of datacenter operations etc. In short we offer complete cooling solution for modern Datacenter.
Control Technologies Fze | Ph: +971 6 5489626 | E: [email protected], UAE. | M: +971 50 1537113 | W: www.ctrltechnologies.com
We offer Water leak detection system for server room, Datacenter, telecommunication room & Industrial applications.
Water leakage detection systems early detects potential water leakage problem. Notification can be obtained over alarm, e-mail & SMS ensures highest uptime for your business. Event logging to for easy diagnostic Leakage detection can be done over distance, zone or specific spot. It reduces major financial risk at minimal cost. Web interfaced owned telecommunications switches, damaged files.
Water leak detection system can be integrated with BMS, IT network and fire alarm system.
Control Technologies Fze | Ph: +971 6 5489626 | E: [email protected], UAE. | M: +971 50 1537113 | W: www.ctrltechnologies.com
We offer stand-alone Environmental monitoring appliance that provides dynamic, real-time temperature monitoring, humidity monitoring for server room, Datacenter and computer rooms or any critical environment.
It is simple device consists of main module connected to sensors. In case temperature and humidity crosses set values then it sent alert to user via alarm, email, SMS. We can integrate & monitor other devices like UPS, smoke detector, water leak detection sensor, access control system etc. with environmental monitoring system.
Control Technologies Fze | Ph: +971 6 5489626 | E: [email protected], UAE. | M: +971 50 1537113 | W: www.ctrltechnologies.com
We offer different types of high pressure raised flooring or access flooring for server rooms and Datacenter.
Raised flooring consists of a gridded metal framework or understructure of adjustable-height legs (called "pedestals") that provide support for individual floor panels, which are usually 2×2 feet or 60×60cm in size. The height of the legs/pedestals is dictated by the volume of cables and other services provided beneath, but typically arranged for a clearance of at least six inches or 15cm.
Floor panel can be of wood core type, Calcium Sulfate type with anti static capability.
Control Technologies Fze | Ph: +971 6 5489626 | E: [email protected], UAE. | M: +971 50 1537113 | W: www.ctrltechnologies.com
We offer FM200 Clean fire protection for server room , datacenter (or data center) and telecom room.
Traditional method of fire suppression (for example water sprinkler) cannot be use in Server room and datacenter since this will cause same damage as that of fire. To extinguish server room fire or datacenter fire a gaseous agent is recommended HFC-227ea (chemical name is heptafluoropropane) which is environmental friendly. Server room fire suppression agent FM200 is quick, clean, environmental friendly, non conductive in nature and does not reduces oxygen level atmosphere when it releases.
Control Technologies Fze | Ph: +971 6 5489626 | E: [email protected], UAE. | M: +971 50 1537113 | W: www.ctrltechnologies.com
Static Transfer Switch (STS) is an electrical device that switches between two power sources without delay. Digital static transfer switch has provision to connect two power sources at input & out of which is power source is default while other will be standby. In case of interruption in default power source, STS will switch to standby power source instantaneously and visa versa so that your load will not observe any power interruption.
Major advantage of Static Transfer Switch over traditional Automatic transfer switch is it’s fast acting capacity. Automatic Static Transfer switch uses solid state power electronics which is static switching devices such as SCR & IGBT hence it is also called as Solid state static transfer switch.
Control Technologies Fze | Ph: +971 6 5489626 | E: [email protected], UAE. | M: +971 50 1537113 | W: www.ctrltechnologies.com
Server room & datacenter needs right humidity level. If humidity is on higher side then it can cause condensation which can cause malfunctioning of IT equipment and on other hand if humidity is less then static charge can be develop in PCB of IT equipments.
Ideally server room should be provided with Close control Unit which can control humidity. But in case one can not install CRAC the individual dehumidifier to control dehumidifier. Ctrltech size, design and offers wide range of dehumidifier including portable dehumidifier, ceiling mount dehumidifier and desiccant dehumidifiers.
Control Technologies Fze | Ph: +971 6 5489626 | E: [email protected], UAE. | M: +971 50 1537113 | W: www.ctrltechnologies.com
We do Selection, Supply, Installation & commissioning of following server room Products:
1.Voltage Stabilizer or Voltage regulator.2.Power Distribution Unit (PDU)3.Isolation Transformer.4.Transient Voltage Surge Suppressor (TVSS). 5.Generators with Automatic Transfer Switch (ATS).
We are one stop solution provider for Server room and datacenter contraction.
Control Technologies Fze | Ph: +971 6 5489626 | E: [email protected], UAE. | M: +971 50 1537113 | W: www.ctrltechnologies.comControl Technologies Fze | Ph: +971 6 5489626 | E: [email protected]
Sharjah, UAE. | M: +971 50 1537113 | W: www.ctrltechnologies.com
Control Technologies Fze | Ph: +971 6 5489626 | E: [email protected], UAE. | M: +971 50 1537113 | W: www.ctrltechnologies.com