September 5, 2008 CG25277 Mr. Ross Dickson Alberta Transportation 2nd Floor, 803 Manning Road NE Calgary, AB T2E 7M8 Dear Ross: Re: Southern Region Geohazard Assessment Spring 2008 Instrumentation Monitoring Results Site S2: Highway 22:14, PRIDDIS This letter documents the Spring 2008 instrument readings at the above-noted site and can be inserted into Section C of the site binder. The updated site plan, instrument data, and plots are also attached and can be inserted into Section D of the site binder.
1.0 OBSERVATIONS
1.1 Field Program and Instrumentation Status
Four slope inclinometers and three pneumatic piezometers were read at the S2 – Priddis site on Hwy 22:14, on May 21, 2008 by Mr. Bryan Bale of AMEC Earth and Environmental (AMEC), a division of AMEC Americas Limited. The SI’s were read using an imperial Slope Indicator probe and Digitilt Datamate readout manufactured by Durham Geo Slope Indicator (DGSI). Inclinometer reading depths were referenced to the top of the SI casing, except for SI #9 and #11, which were referenced to the ground surface. The SI’s and piezometers at the site were installed to monitor the effectiveness of a pile wall and dewatering pumps installed to remediate past slope instablility. Please refer to Figure S2-1 attached in Section D for site layout and instrument locations. Figure S2-2 illustrates the location of the instruments that remain operational at the site. At the time of the readings there were four SI’s and three piezometers functioning at this site At the time of the Spring 2008 instrument readings, extensive cracking was noted along the pile wall along the downslope side of the road. It also appeared that some undermining of the pavement along the downslope edge of the road had occurred due to water infiltrating into the cracks and washing out the road bed material.
AMEC Earth & Environmental A division of AMEC Americas Limited 221 – 18th Street SE Calgary, AB, CANADA T2E 6J5 Tel +1 (403) 248-4331 Fax +1 (403) 248-2188 www.amec.com
R:\Projects\Calgary Geo\CG25277 - AIT Southern Region 2008\600 Reports\Spring 2008\Spring 2008 Instrumentation Monitoring - S2.doc Page 1
Alberta Transportation Instrumentation Monitoring Results Southern Region Site S2 – Highway 22:14, Priddis September 5, 2008 2.0 INTERPRETATION AND RECOMMENDATIONS
2.1 General
Plots of the SI and piezometer data are presented in Section D and are summarized in the following sections. Where applicable, the resultant movement has also been plotted.
2.2 Zones of Movement
No new zones of movement have been noted since the last reading in September 2007. Zones of previous movement and historical results are summarized in Table S2-1.
2.3 Interpretation of Monitoring Results and Recommendations
2.3.1 Interpretation
Plots of the instrument readings from the Priddis site are included in Section D. A summary of each of the SI readings is presented below. Due to the resetting of the initial data sets to the Spring 2000 values, previously identified movement zones that are being tracked are also noted. AMEC BH#2 (Figures S2-3 to S2-7) The data from previous readings of this SI showed downslope and cross-slope
movement in a zone between approximately 5.3 m and 6.6 m depth. Due to continuing slope movement, the probe has not been able to pass below approximately 6.5 m since the Fall 2005 readings. From the fall of 2005 to the spring of 2008, the readings have been taken to a depth of 6.3 to 7.0 m. The instrument was not read in May 2008 since the zone above 6.3 m has not shown movement. When referring to Figures S2-3 to S2-7, please note that the plot of any given data set after May 2005 is valid only above the reading depths noted above.
This SI is no longer useful for measuring displacement since any movement
detected above the blockage at 6.3 m is relative to a moving reference point. Any noted movement above this zone would not include the movement rate of the reference point and would be inaccurate.
SI #4 (Figures S2-8 and S2-9) The SI was found blocked at 1.5 m depth and the planned reading could not be
completed to full depth. On June 19th, 2008 a tape measure was able to pass below 1.5 m, therefore it is thought that the blockage was likely due to ice. The SI will be read in the fall and some water will be removed to reduce the risk of ice blockage occurring again.
R:\Projects\Calgary Geo\CG25277 - AIT Southern Region 2008\600 Reports\Spring 2008\Spring 2008 Instrumentation Monitoring - S2.doc Page 2
Alberta Transportation Instrumentation Monitoring Results Southern Region Site S2 – Highway 22:14, Priddis September 5, 2008 SI #6 (Figures S2-10 to S2-12) The SI was found blocked at 6.1 m. This blockage coincides with the previously
identified movement zone at approximately 5.8 m depth and shown on Figure S2-12. Figure S2-12 demonstrates a clear trend of downslope movement around 4 to 5 m depth since the spring of 2002 with an increase in movement rate between the Spring 2007 and Fall 2007 readings. The SI has likely deformed to the extent that the probe can no longer pass the movement zone. The SI is no longer functional.
Figure S2-11 shows no significant increase in incremental cross-slope
(B-direction) displacement above 5.5 m depth since the Fall 2005 readings. SI #9 (Figures S2-13 and S2-14) There has been no significant movement since the previous readings at this
instrument. As previously noted, the full depth of 35’ could not be reached due to an accumulation of debris at the bottom of the casing. Therefore, for the purposes of plotting the current data, the Fall 2002 reading from 35’ (i.e. the last set of readings obtained at depth of 35’) were used to replace the missing reading at 35’.
SI #11 (Figures S2-15 and S2-16) There has been no significant movement since the previous readings at this
instrument. As previously noted, the full depth of 37’ could not be reached due to an accumulation of debris at the bottom of the casing. Therefore, for the purposes of plotting the current data, the Fall 2002 reading from 37’ (i.e. the last set of readings obtained at depth of 37’) were used to replace the missing reading at 37’.
The SI’s in AMEC BH #1 and SI#10 and the settlement gauge in AMEC BH #1A could not be read. They have been paved over since the Spring 2005 readings. The readings for piezometers 34397, 34398, and 34399 were all measured as approximately 0 kPa. Piezometer #34396 has an audible leak in the segment of excess cable coiled at surface; therefore no actual reading was obtained. The piezometer data plots (Figures S2-17 to S2-20) show that the pressure measured by each of the functioning piezometers in the spring of 2008 is consistent with past readings. However, each of the piezometers has a significant length of unprotected lead tubes coiled at ground surface and it is hypothesized that they may have been damaged and be inaudibly leaking, which could be causing the measured pressures of 0 kPa.
R:\Projects\Calgary Geo\CG25277 - AIT Southern Region 2008\600 Reports\Spring 2008\Spring 2008 Instrumentation Monitoring - S2.doc Page 3
Alberta Transportation Instrumentation Monitoring Results Southern Region Site S2 – Highway 22:14, Priddis September 5, 2008 In summary, the Spring 2008 data shows that:
• The movement at 5 m in SI #6 has continued and has sheared off the SI rendering it inoperable. Movement will likely continue, however, magnitudes and rates cannot be confirmed with the existing SI #6.
• SI’s #9 and #11 in the westbound lane of the road continue to show no significant
movement. This suggests that the pile wall along the downslope edge of the road is supporting the road surface despite continued settlement and cracking along the downslope edge of the road (i.e. downslope of the pile wall).
• The piezometers on the upslope side of the road all measured near zero pore pressure.
This is consistent with past readings and suggests that the automated pumping wells continue to be effective and/or that the piezometers are not functioning properly.
2.3.2 Recommendations
Based on the monitoring results and observations, AMEC recommends that:
• The semi-annual instrument monitoring should be continued. • The annual assessments should be continued.
• The maintenance contractor should restore access to the paved-over instruments.
• The operating status of the automatic pumps should be further checked as per
discussion in the 2006 and 2007 annual inspection report. Also, as per discussions on site during the 2007 annual inspection, new piezometers (with flush-mounted casing protectors) should be installed adjacent to the existing piezometers in order to replace the questionable existing piezometers and provide a reliable means for continuing to monitor the effectiveness of the pumping wells.
3.0 INSTRUMENTATION REPAIRS AND MAINTENANCE REQUIRED
• Extend SI’s #9 and #11 above the pile wall and install new flush-mount casing protectors to ensure that these SI’s are not destroyed.
• Recover SI #10 and BH1 settlement gauge which have been buried beneath asphalt.
• Bail down the water level in SI #4 to prevent is blockage from occurring in the future.
• Replace the piezometers on the south side of the road. A proposal for this work will be
prepared by AMEC.
R:\Projects\Calgary Geo\CG25277 - AIT Southern Region 2008\600 Reports\Spring 2008\Spring 2008 Instrumentation Monitoring - S2.doc Page 4
Alberta Transportation Instrumentation Monitoring Results Southern Region Site S2 – Highway 22:14, Priddis September 5, 2008 AMEC does not recommend replacing or retrofitting the SI’s below the pile wall with Measurand SAA cables because the depth of landslide movement is known and the repaired SI’s in the highway can be used for future monitoring.
R:\Projects\Calgary Geo\CG25277 - AIT Southern Region 2008\600 Reports\Spring 2008\Spring 2008 Instrumentation Monitoring - S2.doc Page 5
Alberta Transportation Instrumentation Monitoring Results Southern Region Site S2 – Highway 22:14, Priddis September 5, 2008
TABLE S2-1 SPRING 2008 – PRIDDIS
Slope Inclinometer Instrumentation Reading Summary
Date Monitored: May 21, 2008 SINCE PREVIOUS READING
INSTRUMENT DATE INITIALIZED
TOTAL CUMULATIVE RESULTANT
MOVEMENT AT DEPTH SINCE
INITIAL READING
MAXIMUM RATE OF
MOVEMENT CURRENT STATUS
DATE OF PREVIOUS READING
INCREMENTAL MOVEMENT
RATE OF MOVEMENT
CHANGE IN RATE OF
MOVEMENT
SI #4 5/18/20001 No movement detected N/A
Operational. Ice blockage at 1.5m on
May 21, 2008. Snapped off at ground
level.
9/17/2007 N/A N/A N/A
SI #6 6/27/20001 37mm between 0.7 and 5.6m at
342°
26mm/yr between May and October
2005
Pinched off at 6.1 m 9/17/2007 N/A N/A N/A
SI #9 4/26/20011 No movement detected N/A Operational. 9/17/2007 0 0 0
SI #10 4/26/20011
2mm between 3.5 and 4.7m
and between 5.9 and 7.1m
2mm/yr between May and October
2002 Paved over 5/17/2005 N/A N/A N/A
SI #11 6/27/20001 No movement detected N/A Operational 9/17/2007 N/A N/A N/A
SI BH#1 4/19/2001 No movement detected N/A Paved over 6/4/2004 N/A N/A N/A
SI BH#2 4/19/2001 17mm at 6.0 m
at 4° as of 5/17/2005.
6mm/yr between May and October
2002
Casing deformed due to accumulated
movement and SI probe unable to pass
below 6.3m depth. See report for
discussion.
5/22/2005 N/A N/A N/A
1Readings by previous consultants have not been included in the calculations of total movement.
R:\Projects\Calgary Geo\CG25277 - AIT Southern Region 2008\600 Reports\Spring 2008\Spring 2008 Instrumentation Monitoring - S2.doc Page 6
Alberta Transportation Instrumentation Monitoring Results Southern Region Site S2 – Highway 22:14, Priddis September 5, 2008
TABLE S2-2 SPRING 2008 – PRIDDIS
Piezometer Instrumentation Reading Summary
Date Monitored: May 21, 2008
INSTRUMENT DATE INITIALIZED
TIP ELEVATION*
(m)
GROUND ELEVATION*
(m)
CURRENT STATUS
MAXIMUM PIEZOMETRIC ELEVATION
(m)
CURRENT PIEZOMETRIC ELEVATION
(m)
PREVIOUS PIEZOMETRIC ELEVATION
(m)
CHANGE IN CALCULATED EQUIVALENT
GROUNDWATER ELEVATION SINCE
PREVIOUS READING (m)
PORE WATER PRESSURE RATIO
(ru)
34396 1/5/1993 97.50 103.00 Leaking 100.31 <97.50 <97.50 N/A 0.00 34397 1/5/1993 98.75 103.00 Operational 100.16 98.92 98.85 +0.07 0.02 34398 1/5/1993 96.10 102.00 Operational 97.73 <96.10 <96.10 N/A 0.00 34399 1/5/1993 98.60 103.00 Operational 100.01 <98.60 98.61 N/A 0.00
*Relative to assumed site benchmark of 100m.
R:\Projects\Calgary Geo\CG25277 - AIT Southern Region 2008\600 Reports\Spring 2008\Spring 2008 Instrumentation Monitoring - S2.doc Page 7
Alberta Transportation Instrumentation Monitoring Results Southern Region Site S2 – Highway 22:14, Priddis September 5, 2008
4.0 CLOSURE
This report has been prepared for the exclusive use of Alberta Transportation for the specific project described herein. Any use which a third party makes of this report, or any reliance on or decisions to be made based on it are the responsibility of such third parties. AMEC Earth & Environmental, a division of AMEC Americas Limited, cannot accept responsibility for such damages, if any, suffered by any third party as a result of decisions made or actions based on this report. This report has been prepared in accordance with accepted geotechnical engineering practices. No other warranty, expressed or implied, is made. We trust that this meets your needs at this time. Please contact the undersigned if you have any questions or require any further information. Respectfully Submitted, AMEC Earth & Environmental, a division of AMEC Americas Limited Bryan Bale, M.Sc., E.I.T. Andrew Bidwell, M.Eng., P.Eng. Geotechnical Engineer Associate Geological Engineer APEGGA Permit to Practice No. P-04546 Reviewed by: Pete Barlow, M.Sc., P.Eng. Principal Geotechnical Engineer
R:\Projects\Calgary Geo\CG25277 - AIT Southern Region 2008\600 Reports\Spring 2008\Spring 2008 Instrumentation Monitoring - S2.doc Page 8
SECTION D Southern Region Geohazard Assignment
Site S2 – Priddis Spring 2008 Instrument Data and Plots
R:\Projects\Calgary Geo\CG25277 - AIT Southern Region 2008\600 Reports\Spring 2008\Spring 2008 Instrumentation Monitoring - S2.doc
Site No.: S2 Probe: 27087Location: Priddis Readout: Datamate
File Number 22:14 Temp.: 9°CCable: Imperial Read by: Bryan Bale
A+ A- B+ B-
4 21-May-08 0.33 47.83 340° Feels snapped at 5'. Not read.
6 21-May-08 2.75 38.67 340° Feels pinched off at 20'. Not read.
9 21-May-08 -0.92 33 333° -1330 1320 -1715 1705 Read to ground level.
10 paved over
11 21-May-08 -0.83 35.25 20° Read to ground level.
BH-1 paved over
BH-2 21-May-08 3.6 23 320° Read to A- groove, 0.3' above ground.
PIEZO.# Date Field Reading (psi) Comments/Observations
34396 21-May-08 Leak at surface.
34397 21-May-08 Slowly losing pressure. BH-1A Paved over.
34398 21-May-08
34399 21-May-08
Arrival Time 13:35 Departure Time 15:20
Damage to any Instruments
Slope Conditions and Groundwater Seepage Observations No change noted.
Pavement Settlement/Cracking Noted No change noted.
Comments/ Observations
ALBERTA INFRASTRUCTURE & TRANSPORTATIONSOUTHERN REGION
SLOPE INCLINOMETER MONITORING FIELD SUMMARYSPRING 2008
SLOPE INCLINOMETER READINGSCurrent Bottom Depth ReadingsSI # Date Filename
None.
SETTLEMENT GAUGE READINGPNEUMATIC PIEZOMETER READINGS
Gauge Name
DateDepth to Casing Bottom
Comments/Observations
DAILY INSPECTION REPORT
Azimuth of A+
Groove
Casing DepthRelative to
TOC
0.0
0.0
0.0
1.7
Stickup (ft)
Elevation
11
10
9
8
7
6
5
4
3
2
1
0
Depth
(m)
-100 -50 0 50 100
11
10
9
8
7
6
5
4
3
2
1
0
-100 -50 0 50 100 11
10
9
8
7
6
5
4
3
2
1
0
Depth
(m)
-50 -25 0 25 50
11
10
9
8
7
6
5
4
3
2
1
0
-50 -25 0 25 50
LEGEND
Initial 19 Mar2001
16 Jul2001
16 Oct2001
2 May2002
16 Oct2002
12 May2003
8 Jul2003
1 Nov2003
3 Jun2004
12 Nov2004
17 May2005
27 Oct2005
10 May2006
18 Oct2006
22 May2007
17 Sep2007
21 May2008
Figure S2-3
October 2005 onwards:
Probe will not pass
beyond 6.3 m depth.
Cumulative DeflectionDirection A
Deflection (mm)
Incremental DeflectionDirection A
Deflection (mm)
Ref. Elevation m
R:\Projects\Calgary Geo\CG25277 - AIT Southern Region 2008\400 Data\S2 - Priddis\priddisBh2.gtl
S2-22:14 Priddis, Inclinometer AMEC BH#2AIT
AMEC Earth & Environmental - Calgary, AB
11
10
9
8
7
6
5
4
3
2
1
0
Depth
(m)
-50 -25 0 25 50
11
10
9
8
7
6
5
4
3
2
1
0
-50 -25 0 25 50 11
10
9
8
7
6
5
4
3
2
1
0
Depth
(m)
-25 -12.5 0 12.5 25
11
10
9
8
7
6
5
4
3
2
1
0
-25 -12.5 0 12.5 25
LEGEND
Initial 19 Mar2001
16 Jul2001
16 Oct2001
2 May2002
16 Oct2002
12 May2003
8 Jul2003
1 Nov2003
3 Jun2004
12 Nov2004
17 May2005
27 Oct2005
10 May2006
18 Oct2006
22 May2007
17 Sep2007
21 May2008
Figure S2-4
October 2005 onwards:
Probe will not pass
beyond 6.3 m depth.
Cumulative DeflectionDirection B
Deflection (mm)
Incremental DeflectionDirection B
Deflection (mm)
Ref. Elevation m
R:\Projects\Calgary Geo\CG25277 - AIT Southern Region 2008\400 Data\S2 - Priddis\priddisBh2.gtl
S2-22:14 Priddis, Inclinometer AMEC BH#2AIT
AMEC Earth & Environmental - Calgary, AB
Figure S2-5
S2-22:14 Priddis, Inclinometer BH#2A-Direction Displacement (5.3 m Depth Relative to 6.6 m Depth)
0
2
4
6
8
10
12
14
16
1-Oct-00 19-Apr-01 5-Nov-01 24-May-02 10-Dec-02 28-Jun-03 14-Jan-04 1-Aug-04 17-Feb-05 5-Sep-05
Dis
plac
emen
t (m
m)
Probe would not pass below 6.3 m in October 2005. No further movement can be tracked in this zone.
Figure S2-6
S2-22:14 Priddis, Inclinometer AMEC BH#2B-Direction Displacement (5.3 m Depth Relative to 6.6 m Depth)
0
1
2
3
4
5
6
7
8
1-Oct-00 19-Apr-01 5-Nov-01 24-May-02 10-Dec-02 28-Jun-03 14-Jan-04 1-Aug-04 17-Feb-05 5-Sep-05
Dis
plac
emen
t (m
m) Probe would not pass below
6.3 m in October 2005. No further movement can be tracked in this zone.
Figure S2-7
AMEC BH#2(SI) Resultant Displacement(5.3 m Depth Relative to 6.6 m Depth)
S2-22:14 Priddis
0
2
4
6
8
10
12
14
16
18
1-Oct-00 19-Apr-01 5-Nov-01 24-May-02 10-Dec-02 28-Jun-03 14-Jan-04 1-Aug-04 17-Feb-05 5-Sep-05
Mag
nitu
de o
f Res
ulta
nt D
ispl
acem
ent (
mm
)
May 2, 20021.7 mm displacement at 20 degrees bearing.
November 12, 200416.0 mm displacement at 5 degrees bearing.
Probe would not pass below 6.3 m in October 2005. No further movement can be tracked in this zone.
14
12
10
8
6
4
2
0
Depth
(m)
-50 -25 0 25 50
14
12
10
8
6
4
2
0
-50 -25 0 25 50
14
12
10
8
6
4
2
0
Depth
(m)
-20 -10 0 10 20
14
12
10
8
6
4
2
0
-20 -10 0 10 20
LEGEND
Initial 18 May2000
15 Sep2000*
26 Apr2001
16 Oct2001
21 May2002
16 Oct2002
8 Jul2003
22 Oct2003
3 Jun2004
12 Nov2004
17 May2005
25 Oct2005
10 May2006
18 Oct2006
22 May2007
17 Sep2007
Figure S2-8
Cumulative DeflectionDirection A
Deflection (mm)
Incremental DeflectionDirection A
Deflection (mm)
Ref. Elevation 1291.7 m
R:\Projects\Calgary Geo\CG25277 - AIT Southern Region 2008\400 Data\S2 - Priddis\PRID4_reinitialized Oct 2006.GTL
S2-22:14 Priddis, Inclinometer Si#4 NewRefAIT
Sets marked * include zero shift and/or rotation corrections.
AMEC Earth & Environmental - Calgary, AB
14
12
10
8
6
4
2
0
Depth
(m)
-50 -25 0 25 50
14
12
10
8
6
4
2
0
-50 -25 0 25 50
14
12
10
8
6
4
2
0
Depth
(m)
-20 -10 0 10 20
14
12
10
8
6
4
2
0
-20 -10 0 10 20
LEGEND
Initial 18 May2000
15 Sep2000*
26 Apr2001
16 Oct2001
21 May2002
16 Oct2002
8 Jul2003
22 Oct2003
3 Jun2004
12 Nov2004
17 May2005
25 Oct2005
10 May2006
18 Oct2006
22 May2007
17 Sep2007
Figure S2-9
Cumulative DeflectionDirection B
Deflection (mm)
Incremental DeflectionDirection B
Deflection (mm)
Ref. Elevation 1291.7 m
R:\Projects\Calgary Geo\CG25277 - AIT Southern Region 2008\400 Data\S2 - Priddis\PRID4_reinitialized Oct 2006.GTL
S2-22:14 Priddis, Inclinometer Si#4 NewRefAIT
Sets marked * include zero shift and/or rotation corrections.
AMEC Earth & Environmental - Calgary, AB
12
11
10
9
8
7
6
5
4
3
2
1
0
Depth
(m)
-50 -25 0 25 50
12
11
10
9
8
7
6
5
4
3
2
1
0
-50 -25 0 25 50 12
11
10
9
8
7
6
5
4
3
2
1
0
Depth
(m)
-50 -25 0 25 50
12
11
10
9
8
7
6
5
4
3
2
1
0
-50 -25 0 25 50
LEGEND
Initial 2 May2002
21 May2002
16 Oct2002
12 May2003
1 Nov2003
3 Jun2004
12 Nov2004
17 May2005
25 Oct2005
10 May2006
18 Oct2006
22 May2007
17 Sep2007
Figure S2-10
Cumulative DeflectionDirection A
Deflection (mm)
Incremental DeflectionDirection A
Deflection (mm)
Ref. Elevation m
R:\Projects\Calgary Geo\CG25277 - AIT Southern Region 2008\400 Data\S2 - Priddis\PRID06_R.GTL
S2-22:14 Priddis, Inclinometer SI #6AIT
AMEC Earth & Environmental - Calgary, AB
12
11
10
9
8
7
6
5
4
3
2
1
0
Depth
(m)
-50 -25 0 25 50
12
11
10
9
8
7
6
5
4
3
2
1
0
-50 -25 0 25 50 12
11
10
9
8
7
6
5
4
3
2
1
0
Depth
(m)
-20 -10 0 10 20
12
11
10
9
8
7
6
5
4
3
2
1
0
-20 -10 0 10 20
LEGEND
Initial 2 May2002
21 May2002
16 Oct2002
12 May2003
1 Nov2003
3 Jun2004
12 Nov2004
17 May2005
25 Oct2005
10 May2006
18 Oct2006
22 May2007
17 Sep2007
Figure S2-11
Cumulative DeflectionDirection B
Deflection (mm)
Incremental DeflectionDirection B
Deflection (mm)
Ref. Elevation m
R:\Projects\Calgary Geo\CG25277 - AIT Southern Region 2008\400 Data\S2 - Priddis\PRID06_R.GTL
S2-22:14 Priddis, Inclinometer SI #6AIT
AMEC Earth & Environmental - Calgary, AB
Figure S2-12
S2-22:14 Priddis, Inclinometer SI#6A-Direction Displacement (5.6 m Depth Relative to 0.7 m Depth)
0
5
10
15
20
25
30
35
40
4/19/2001 9/1/2002 1/14/2004 5/28/2005 10/10/2006 2/22/2008
Dis
plac
emen
t (m
m)
12
11
10
9
8
7
6
5
4
3
2
1
0
Depth
(m)
-50 -25 0 25 50
12
11
10
9
8
7
6
5
4
3
2
1
0
-50 -25 0 25 50 12
11
10
9
8
7
6
5
4
3
2
1
0
Depth
(m)
-10 -5 0 5 10
12
11
10
9
8
7
6
5
4
3
2
1
0
-10 -5 0 5 10
LEGEND
Initial 26 Apr2001
2 May2002
16 Oct2002
12 May2003
22 Oct2003
4 Jun2004
12 Nov2004
17 May2005
25 Oct2005
10 May2006
18 Oct2006
22 May2007
17 Sep2007
21 May2008
Figure S2-13
Cumulative DeflectionDirection A
Deflection (mm)
Incremental DeflectionDirection A
Deflection (mm)
Ref. Elevation m
R:\Projects\Calgary Geo\CG25277 - AIT Southern Region 2008\400 Data\S2 - Priddis\prid09.gtl
S2-22:14 Priddis, Inclinometer SI #9AIT
AMEC Earth & Environmental - Calgary, AB
12
11
10
9
8
7
6
5
4
3
2
1
0
Depth
(m)
-50 -25 0 25 50
12
11
10
9
8
7
6
5
4
3
2
1
0
-50 -25 0 25 50 12
11
10
9
8
7
6
5
4
3
2
1
0
Depth
(m)
-10 -5 0 5 10
12
11
10
9
8
7
6
5
4
3
2
1
0
-10 -5 0 5 10
LEGEND
Initial 26 Apr2001
2 May2002
16 Oct2002
12 May2003
22 Oct2003
4 Jun2004
12 Nov2004
17 May2005
25 Oct2005
10 May2006
18 Oct2006
22 May2007
17 Sep2007
21 May2008
Figure S2-14
Cumulative DeflectionDirection B
Deflection (mm)
Incremental DeflectionDirection B
Deflection (mm)
Ref. Elevation m
R:\Projects\Calgary Geo\CG25277 - AIT Southern Region 2008\400 Data\S2 - Priddis\prid09.gtl
S2-22:14 Priddis, Inclinometer SI #9AIT
AMEC Earth & Environmental - Calgary, AB
12
11
10
9
8
7
6
5
4
3
2
1
0
Depth
(m)
-50 -25 0 25 50
12
11
10
9
8
7
6
5
4
3
2
1
0
-50 -25 0 25 50 12
11
10
9
8
7
6
5
4
3
2
1
0
Depth
(m)
-20 -10 0 10 20
12
11
10
9
8
7
6
5
4
3
2
1
0
-20 -10 0 10 20
LEGEND
Initial 27 Jun2000
13 Sep2000
2 May2002*
16 Oct2002
12 May2003
4 Jun2004
12 Nov2004
17 May2005
25 Oct2005
10 May2006
18 Oct2006
22 May2007
17 Sep2007
21 May2008
Figure S2-15
Cumulative DeflectionDirection A
Deflection (mm)
Incremental DeflectionDirection A
Deflection (mm)
Ref. Elevation m
R:\Projects\Calgary Geo\CG25277 - AIT Southern Region 2008\400 Data\S2 - Priddis\prid11.gtl
S2-22:14 Priddis, Inclinometer SI #11AIT
Sets marked * include zero shift and/or rotation corrections.
AMEC Earth & Environmental - Calgary, AB
12
11
10
9
8
7
6
5
4
3
2
1
0
Depth
(m)
-50 -25 0 25 50
12
11
10
9
8
7
6
5
4
3
2
1
0
-50 -25 0 25 50 12
11
10
9
8
7
6
5
4
3
2
1
0
Depth
(m)
-20 -10 0 10 20
12
11
10
9
8
7
6
5
4
3
2
1
0
-20 -10 0 10 20
LEGEND
Initial 27 Jun2000
13 Sep2000
2 May2002*
16 Oct2002
12 May2003
4 Jun2004
12 Nov2004
17 May2005
25 Oct2005
10 May2006
18 Oct2006
22 May2007
17 Sep2007
21 May2008
Figure S2-16
Cumulative DeflectionDirection B
Deflection (mm)
Incremental DeflectionDirection B
Deflection (mm)
Ref. Elevation m
R:\Projects\Calgary Geo\CG25277 - AIT Southern Region 2008\400 Data\S2 - Priddis\prid11.gtl
S2-22:14 Priddis, Inclinometer SI #11AIT
Sets marked * include zero shift and/or rotation corrections.
AMEC Earth & Environmental - Calgary, AB
Figure S2-17
HIGHWAY 22:14 - PRIDDIS - #34396
94
96
98
100
102
104
Jan-93 Jan-94 Jan-95 Jan-96 Jan-97 Jan-98 Jan-99 Jan-00 Jan-01 Jan-02 Jan-03 Jan-04 Jan-05 Jan-06 Jan-07 Jan-08 Jan-09DATE
ELEV
ATI
ON
(m)
Ground Surface
Piezo 34396
Leak noted in cable. Readings are invalid after this date.
Figure S2-18
HIGHWAY 22:14 - PRIDDIS - #34397
94
96
98
100
102
104
Jan-93 Jan-94 Jan-95 Jan-96 Jan-97 Jan-98 Jan-99 Jan-00 Jan-01 Jan-02 Jan-03 Jan-04 Jan-05 Jan-06 Jan-07 Jan-08 Jan-09DATE
ELEV
ATI
ON
(m)
Ground Surface
Piezo 34397
Figure S2-19
HIGHWAY 22:14 - PRIDDIS - #34398
94
96
98
100
102
104
Jan-93 Jan-94 Jan-95 Jan-96 Jan-97 Jan-98 Jan-99 Jan-00 Jan-01 Jan-02 Jan-03 Jan-04 Jan-05 Jan-06 Jan-07 Jan-08 Jan-09DATE
ELEV
ATI
ON
(m)
Ground Surface
Piezo 34398
Figure S2-20
HIGHWAY 22:14 - PRIDDIS - #34399
94
96
98
100
102
104
Jan-93 Jan-94 Jan-95 Jan-96 Jan-97 Jan-98 Jan-99 Jan-00 Jan-01 Jan-02 Jan-03 Jan-04 Jan-05 Jan-06 Jan-07 Jan-08 Jan-09DATE
ELEV
ATI
ON
(m)
Ground Surface
Piezo 34399
TABLE S2-1PROJECT:
File No. HWG 22:14DESCRIPTION: 11 KM WEST OF PRIDDIS
PIEZOMETER:NUMBER: 34396STATION: LOCATION: SOIL TYPE: CLAY TILL SOIL DENSITY (AVG.): 1790 kg/m3ELEVATION INITIAL GROUND: 103.00 m PIEZOMETER TIP: 97.50 m
DATE PRESENT FIELD PIEZO PIEZO Ru Rue REMARKSGROUND READING HEAD ELEV.
ELEV. (above tip)(m) (kpa) (m) (m)
5-Jan-93 103.00 13.0 1.33 98.83 0.13 0.002-Feb-93 103.00 8.0 0.82 98.32 0.08 -0.05
23-Feb-93 103.00 7.0 0.71 98.21 0.07 -0.0623-Mar-93 103.00 3.0 0.31 97.81 0.03 -0.106-Apr-93 103.00 3.0 0.31 97.81 0.03 -0.10
27-Apr-93 103.00 26.0 2.65 100.15 0.26 0.1329-Apr-93 103.00 22.0 2.24 99.74 0.22 0.094-May-93 103.00 11 1.12 98.62 0.11 -0.028-Jun-93 103.00 6 0.61 98.11 0.06 -0.0723-Jul-93 103.00 9 0.92 98.42 0.09 -0.0431-Aug-93 103.00 13 1.33 98.83 0.13 0.0022-Sep-93 103.00 13 1.33 98.83 0.13 0.0029-Sep-93 103.00 8 0.82 98.32 0.08 -0.0513-Oct-93 103.00 7 0.71 98.21 0.07 -0.0610-Nov-93 103.00 4 0.41 97.91 0.04 -0.097-Dec-93 103.00 3 0.31 97.81 0.03 -0.105-Jan-94 103.00 9 0.92 98.42 0.09 -0.04
25-Jan-94 103.00 8 0.82 98.32 0.08 -0.053-Feb-94 103.00 9 0.92 98.42 0.09 -0.04
15-Feb-94 103.00 12 1.22 98.72 0.12 -0.011-Mar-94 103.00 12 1.22 98.72 0.12 -0.0123-Mar-94 103.00 1 0.10 97.60 0.01 -0.1213-Apr-94 103.00 20 2.04 99.54 0.20 0.073-May-94 103.00 6 0.61 98.11 0.06 -0.0710-May-94 103.00 6 0.61 98.11 0.06 -0.072-Jun-94 103.00 9 0.92 98.42 0.09 -0.04
16-Jun-94 103.00 19 1.94 99.44 0.19 0.0621-Jun-94 103.00 9 0.92 98.42 0.09 -0.0428-Jun-94 103.00 6 0.61 98.11 0.06 -0.074-Aug-94 103.00 10 1.02 98.52 0.10 -0.03
19-Aug-94 103.00 13 1.33 98.83 0.13 0.0019-Sep-94 103.00 10 1.02 98.52 0.10 -0.037-Oct-94 103.00 10 1.02 98.52 0.10 -0.034-Nov-94 103.00 12 1.22 98.72 0.12 -0.0127-Jun-96 103.00 0.1 0.01 97.51 0.00 -0.137-Dec-96 103.00 0.1 0.01 97.51 0.00 -0.131-May-97 103.00 21.4 2.18 99.68 0.22 0.0916-Sep-97 103.00 0.34 0.03 97.53 0.00 -0.139-May-98 103.00 3.45 0.35 97.85 0.04 -0.0930-Sep-98 103.00 2.07 0.21 97.71 0.02 -0.116-May-99 103.00 0.21 0.02 97.52 0.00 -0.1320-Sep-99 103.00 0.50 0.05 97.55 0.01 -0.12 Cable leaking19-May-00 103.00 0.00 0.00 97.50 0.00 -0.13 11-Oct-00 103.00 0.00 0.00 97.50 0.00 -0.13 26-Apr-01 103.00 0.00 0.00 97.50 0.00 -0.13 16-Oct-01 103.00 0.00 0.00 97.50 0.00 -0.13 2-May-02 103.00 11.00 1.12 98.62 0.11 -0.02 Can hear leak in cable.16-Oct-02 103.00 20.70 2.11 99.61 0.21 0.0812-May-03 103.00 27.60 2.81 100.31 0.28 0.1522-Oct-03 103.00 1.74 0.18 97.68 0.02 -0.113-Jun-04 103.00 13.80 1.41 98.91 0.14 0.01
12-Nov-04 103.00 0.00 0.00 97.50 0.00 -0.13 cable leaking17-May-05 103.00 0.00 0.00 97.50 0.00 -0.13 Cable leaking25-Oct-05 103.00 0.00 0.00 97.50 0.00 -0.13 Cable leaking30-May-06 103.00 0.00 0.00 97.50 0.00 -0.13 Cable leaking18-Oct-06 103.00 0.00 0.00 97.50 0.00 -0.13 Cable leaking22-May-07 103.00 0.00 0.00 97.50 0.00 -0.13 Cable leaking17-Sep-07 103.00 0.00 0.00 97.50 0.00 -0.13 Cable leaking21-May-08 103.00 0.00 0.00 97.50 0.00 -0.13 Cable leaking
TABLE S2-2PROJECT:
File No. HWG 22:14DESCRIPTION: 11 KM WEST OF PRIDDIS
PIEZOMETER:NUMBER: 34397STATION: LOCATION: SOIL TYPE: CLAY TILL SOIL DENSITY (AVG.): 1790 kg/m3ELEVATION INITIAL GROUND: 103.00 m PIEZOMETER TIP: 98.75 m
DATE PRESENT FIELD PIEZO PIEZO Ru Rue REMARKSGROUND READING HEAD ELEV.
ELEV. (above tip)(m) (kpa) (m) (m)
5-Jan-93 103.00 2.0 0.20 98.95 0.03 0.002-Feb-93 103.00 2.0 0.20 98.95 0.03 0.00
23-Feb-93 103.00 3.0 0.31 99.06 0.04 0.0123-Mar-93 103.00 1.0 0.10 98.85 0.01 -0.026-Apr-93 103.00 0.0 0.00 98.75 0.00 -0.03
27-Apr-93 103.00 5.0 0.51 99.26 0.07 0.0429-Apr-93 103.00 6.0 0.61 99.36 0.08 0.054-May-93 103.00 3 0.31 99.06 0.04 0.018-Jun-93 103.00 2 0.20 98.95 0.03 0.0023-Jul-93 103.00 2 0.20 98.95 0.03 0.0031-Aug-93 103.00 8 0.82 99.57 0.11 0.0822-Sep-93 103.00 8 0.82 99.57 0.11 0.0829-Sep-93 103.00 10 1.02 99.77 0.13 0.1013-Oct-93 103.00 5 0.51 99.26 0.07 0.0410-Nov-93 103.00 2 0.20 98.95 0.03 0.007-Dec-93 103.00 3.5 0.36 99.11 0.05 0.025-Jan-94 103.00 1 0.10 98.85 0.01 -0.02
25-Jan-94 103.00 1 0.10 98.85 0.01 -0.023-Feb-94 103.00 0.1 0.01 98.76 0.00 -0.03
15-Feb-94 103.00 1 0.10 98.85 0.01 -0.021-Mar-94 103.00 8 0.82 99.57 0.11 0.0823-Mar-94 103.00 4 0.41 99.16 0.05 0.0213-Apr-94 103.00 0.1 0.01 98.76 0.00 -0.033-May-94 103.00 11 1.12 99.87 0.14 0.1110-May-94 103.00 3 0.31 99.06 0.04 0.012-Jun-94 103.00 3 0.31 99.06 0.04 0.01
16-Jun-94 103.00 3 0.31 99.06 0.04 0.0121-Jun-94 103.00 8 0.82 99.57 0.11 0.0828-Jun-94 103.00 6 0.61 99.36 0.08 0.054-Aug-94 103.00 4 0.41 99.16 0.05 0.02
19-Aug-94 103.00 3 0.31 99.06 0.04 0.0119-Sep-94 103.00 4 0.41 99.16 0.05 0.027-Oct-94 103.00 3 0.31 99.06 0.04 0.014-Nov-94 103.00 7 0.71 99.46 0.09 0.0627-Jun-96 103.00 0.2 0.02 98.77 0.00 -0.037-Dec-96 103.00 0.1 0.01 98.76 0.00 -0.031-May-97 103.00 13.1 1.34 100.09 0.17 0.1416-Sep-97 103.00 0.28 0.03 98.78 0.00 -0.039-May-98 103.00 2.78 0.28 99.03 0.04 0.0130-Sep-98 103.00 2.07 0.21 98.96 0.03 0.006-May-99 103.00 0.21 0.02 98.77 0.00 -0.0320-Sep-99 103.00 1 0.10 98.85 0.01 -0.0219-May-00 103.00 0 0.00 98.75 0.00 -0.0311-Oct-00 103.00 0 0.00 98.75 0.00 -0.0326-Apr-01 103.00 13.8 1.41 100.16 0.18 0.1516-Oct-01 103.00 0 0.00 98.75 0.00 -0.032-May-02 103.00 2.75 0.28 99.03 0.04 0.0116-Oct-02 103.00 0 0.00 98.75 0.00 -0.0312-May-03 103.00 1.7 0.17 98.92 0.02 -0.0122-Oct-03 103.00 0 0.00 98.75 0.00 -0.033-Jun-04 103.00 0 0.00 98.75 0.00 -0.03
12-Nov-04 103.00 0 0.00 98.75 0.00 -0.0317-May-05 103.00 5.5 0.56 99.31 0.07 0.0425-Oct-05 103.00 1.7 0.17 98.92 0.02 -0.0130-May-06 103.00 10 1.02 99.77 0.13 0.1018-Oct-06 103.00 0 0.00 98.75 0.00 -0.0322-May-07 103.00 0.04 0.00 98.75 0.00 -0.0317-Sep-07 103.00 0.94 0.10 98.85 0.01 -0.0221-May-08 103.00 1.7 0.17 98.92 0.02 -0.01
TABLE S2-3PROJECT:
File No. HWG 22:14DESCRIPTION: 11 KM WEST OF PRIDDIS
PIEZOMETER:NUMBER: 34398STATION: LOCATION: SOIL TYPE: CLAY TILL SOIL DENSITY (AVG.): 1790 kg/m3ELEVATION INITIAL GROUND: 102.00 m PIEZOMETER TIP: 96.10 m
DATE PRESENT FIELD PIEZO PIEZO Ru Rue REMARKSGROUND READING HEAD ELEV.
ELEV. (above tip)(m) (kpa) (m) (m)
5-Jan-93 102.00 4.0 0.41 96.51 0.04 0.002-Feb-93 102.00 1.0 0.10 96.20 0.01 -0.0323-Feb-93 102.00 5.0 0.51 96.61 0.05 0.0123-Mar-93 102.00 1.0 0.10 96.20 0.01 -0.036-Apr-93 102.00 1.0 0.10 96.20 0.01 -0.0327-Apr-93 102.00 16.0 1.63 97.73 0.15 0.1129-Apr-93 102.00 15.0 1.53 97.63 0.14 0.104-May-93 102.00 3 0.31 96.41 0.03 -0.018-Jun-93 102.00 1 0.10 96.20 0.01 -0.0323-Jul-93 102.00 1 0.10 96.20 0.01 -0.0331-Aug-93 102.00 1 0.10 96.20 0.01 -0.0322-Sep-93 102.00 2 0.20 96.30 0.02 -0.0229-Sep-93 102.00 2 0.20 96.30 0.02 -0.0213-Oct-93 102.00 3 0.31 96.41 0.03 -0.0110-Nov-93 102.00 3 0.31 96.41 0.03 -0.0124-Nov-93 102.00 0.2 0.02 96.12 0.00 -0.04 By Consultant7-Dec-93 102.00 2 0.20 96.30 0.02 -0.025-Jan-94 102.00 1 0.10 96.20 0.01 -0.0325-Jan-94 102.00 0.1 0.01 96.11 0.00 -0.043-Feb-94 102.00 1 0.10 96.20 0.01 -0.0315-Feb-94 102.00 8 0.82 96.92 0.08 0.041-Mar-94 102.00 4 0.41 96.51 0.04 0.0023-Mar-94 102.00 0.1 0.01 96.11 0.00 -0.0413-Apr-94 102.00 15 1.53 97.63 0.14 0.103-May-94 102.00 2 0.20 96.30 0.02 -0.0210-May-94 102.00 2 0.20 96.30 0.02 -0.022-Jun-94 102.00 2 0.20 96.30 0.02 -0.0216-Jun-94 102.00 4 0.41 96.51 0.04 0.0021-Jul-94 102.00 5 0.51 96.61 0.05 0.0128-Jul-94 102.00 3 0.31 96.41 0.03 -0.014-Aug-94 102.00 2 0.20 96.30 0.02 -0.0219-Aug-94 102.00 3 0.31 96.41 0.03 -0.0119-Sep-94 102.00 2 0.20 96.30 0.02 -0.027-Oct-94 102.00 3 0.31 96.41 0.03 -0.014-Nov-94 102.00 4 0.41 96.51 0.04 0.0027-Jun-96 102.00 0.1 0.01 96.11 0.00 -0.047-Dec-96 102.00 0.1 0.01 96.11 0.00 -0.041-May-97 102.00 8.3 0.85 96.95 0.08 0.0416-Sep-97 102.00 0.34 0.03 96.13 0.00 -0.049-May-98 102.00 2.76 0.28 96.38 0.03 -0.0130-Sep-98 102.00 2.07 0.21 96.31 0.02 -0.026-May-99 102.00 0.35 0.04 96.14 0.00 -0.0420-Sep-99 102.00 0.50 0.05 96.15 0.00 -0.0419-May-00 102.00 0.00 0.00 96.10 0.00 -0.0415-Sep-00 102.00 0.00 0.00 96.10 0.00 -0.0426-Apr-01 102.00 0.00 0.00 96.10 0.00 -0.0416-Oct-01 102.00 0.00 0.00 96.10 0.00 -0.042-May-02 102.00 2.75 0.28 96.38 0.03 -0.0116-Oct-02 102.00 0.00 0.00 96.10 0.00 -0.0412-May-03 102.00 2.76 0.28 96.38 0.03 -0.0122-Oct-03 102.00 0.00 0.00 96.10 0.00 -0.043-Jun-04 102.00 0.00 0.00 96.10 0.00 -0.04
12-Nov-04 102.00 0.00 0.00 96.10 0.00 -0.0417-May-05 102.00 1.40 0.14 96.24 0.01 -0.0325-Oct-05 102.00 0.00 0.00 96.10 0.00 -0.0430-May-06 102.00 7.00 0.71 96.81 0.07 0.0318-Oct-06 102.00 0.00 0.00 96.10 0.00 -0.0422-May-07 102.00 0.00 0.00 96.10 0.00 -0.0417-Sep-07 102.00 0.01 0.00 96.10 0.00 -0.0421-May-08 102.00 0.00 0.00 96.10 0.00 -0.04
TABLE S2-4PROJECT:
File No. HWG 22:14DESCRIPTION: 11 KM WEST OF PRIDDIS
PIEZOMETER:NUMBER: 34399STATION: LOCATION: SOIL TYPE: CLAY TILL SOIL DENSITY (AVG.): 1790 kg/m3ELEVATION INITIAL GROUND: 103.00 m PIEZOMETER TIP: 98.60 m
DATE PRESENT FIELD PIEZO PIEZO Ru Rue REMARKSGROUND READING HEAD ELEV.
ELEV. (above tip)(m) (kpa) (m) (m)
5-Jan-93 103.00 2.0 0.20 98.80 0.03 0.002-Feb-93 103.00 2.0 0.20 98.80 0.03 0.00
23-Feb-93 103.00 2.0 0.20 98.80 0.03 0.0023-Mar-93 103.00 0.0 0.00 98.60 0.00 -0.036-Apr-93 103.00 0.0 0.00 98.60 0.00 -0.03
27-Apr-93 103.00 6.0 0.61 99.21 0.08 0.0529-Apr-93 103.00 4.0 0.41 99.01 0.05 0.024-May-93 103.00 1 0.10 98.70 0.01 -0.028-Jun-93 103.00 1 0.10 98.70 0.01 -0.0223-Jul-93 103.00 1 0.10 98.70 0.01 -0.0231-Aug-93 103.00 1 0.10 98.70 0.01 -0.0222-Sep-93 103.00 2 0.20 98.80 0.03 0.0029-Sep-93 103.00 2 0.20 98.80 0.03 0.0013-Oct-93 103.00 2 0.20 98.80 0.03 0.0010-Nov-93 103.00 3 0.31 98.91 0.04 0.0124-Nov-93 103.00 0 0.00 98.60 0.00 -0.03 By Consultant7-Dec-93 103.00 2 0.20 98.80 0.03 0.005-Jan-94 103.00 1 0.10 98.70 0.01 -0.02
25-Jan-94 103.00 0.1 0.01 98.61 0.00 -0.033-Feb-94 103.00 1 0.10 98.70 0.01 -0.02
15-Feb-94 103.00 7 0.71 99.31 0.09 0.061-Mar-94 103.00 4 0.41 99.01 0.05 0.0223-Mar-94 103.00 0.1 0.01 98.61 0.00 -0.0313-Apr-94 103.00 7 0.71 99.31 0.09 0.063-May-94 103.00 2 0.20 98.80 0.03 0.0010-May-94 103.00 2 0.20 98.80 0.03 0.002-Jun-94 103.00 3 0.31 98.91 0.04 0.01
16-Jun-94 103.00 1 0.10 98.70 0.01 -0.0221-Jul-94 103.00 5 0.51 99.11 0.06 0.0328-Jul-94 103.00 3 0.31 98.91 0.04 0.014-Aug-94 103.00 2 0.20 98.80 0.03 0.00
19-Aug-94 103.00 3 0.31 98.91 0.04 0.0119-Sep-94 103.00 2 0.20 98.80 0.03 0.004-Nov-94 103.00 3 0.31 98.91 0.04 0.0127-Jun-96 103.00 0.1 0.01 98.61 0.00 -0.037-Dec-96 103.00 0.1 0.01 98.61 0.00 -0.031-May-97 103.00 3.5 0.36 98.96 0.04 0.0116-Sep-97 103.00 0.34 0.03 98.63 0.00 -0.039-May-98 103.00 2.07 0.21 98.81 0.03 0.0030-Sep-98 103.00 2.07 0.21 98.81 0.03 0.006-May-99 103.00 0.35 0.04 98.64 0.00 -0.0320-Sep-99 103.00 0.50 0.05 98.65 0.01 -0.0219-May-00 103.00 0.00 0.00 98.60 0.00 -0.0315-Sep-00 103.00 0.00 0.00 98.60 0.00 -0.0326-Apr-01 103.00 0.00 0.00 98.60 0.00 -0.0316-Oct-01 103.00 0.00 0.00 98.60 0.00 -0.032-May-02 103.00 4.10 0.42 99.02 0.05 0.0216-Oct-02 103.00 3.40 0.35 98.95 0.04 0.0112-May-03 103.00 13.79 1.41 100.01 0.18 0.1522-Oct-03 103.00 1.74 0.18 98.78 0.02 -0.013-Jun-04 103.00 0.00 0.00 98.60 0.00 -0.03
12-Nov-04 103.00 0.00 0.00 98.60 0.00 -0.0317-May-05 103.00 1.40 0.14 98.74 0.02 -0.0125-Oct-05 103.00 0.00 0.00 98.60 0.00 -0.0330-May-06 103.00 9.00 0.92 99.52 0.11 0.0818-Oct-06 103.00 0.00 0.00 98.60 0.00 -0.0322-May-07 103.00 0.00 0.00 98.60 0.00 -0.0317-Sep-07 103.00 0.08 0.01 98.61 0.00 -0.03
5/21/2008 103.00 0.00 0.00 98.60 0.00 -0.03