2000 South 15 th Street, Waco, Texas 76706 Ph: 254-235-1048 www.LFEctx.com Fx: 254-235-1625 September 28, 2016 Walker Partners 600 Austin Avenue, Suite 20 Waco, Texas 76701 Attention: Mr. Jacob Bell, P.E. Reference: Geotechnical Investigation Report Kendrick Park Improvements Waco, Texas LFE Project No. W16-065 Dear Mr. Bell: This letter transmits our geotechnical report for Improvements at Kendrick Park in Waco. The report has been electronically produced. We appreciate the opportunity to provide engineering services for you. Once the project plans and specifications are completed, we would be pleased to review those portions that pertain to this report. We would also appreciate the opportunity to provide construction phase services such as materials testing as a part of the success of the project. If you have any questions regarding our report, please call me at (254) 235-1048. Best Regards, LANGERMAN FOSTER ENGINEERING COMPANY Texas Registered Engineering Firm No. F-13144 Scott M. Langerman, P.E. Principal / Geotechnical Engineer Distribution List: Walker Partners- Mr. Jacob Bell, P.E. ([email protected]) Walker Partners- Mr. Talmadge Hill, P.E. ([email protected])

September 28, 2016 Kendrick Park Improvements … Report No... · 2018-02-22 · September 28, 2016 Walker Partners 600 Austin Avenue, Suite 20 Waco, ... construction phase services

Embed Size (px)

Citation preview

Page 1: September 28, 2016 Kendrick Park Improvements … Report No... · 2018-02-22 · September 28, 2016 Walker Partners 600 Austin Avenue, Suite 20 Waco, ... construction phase services

2000 South 15th Street, Waco, Texas 76706 Ph: 254-235-1048 www.LFEctx.com Fx: 254-235-1625

September 28, 2016 Walker Partners 600 Austin Avenue, Suite 20 Waco, Texas 76701 Attention: Mr. Jacob Bell, P.E. Reference: Geotechnical Investigation Report Kendrick Park Improvements Waco, Texas LFE Project No. W16-065 Dear Mr. Bell: This letter transmits our geotechnical report for Improvements at Kendrick Park in Waco. The report has been electronically produced. We appreciate the opportunity to provide engineering services for you. Once the project plans and specifications are completed, we would be pleased to review those portions that pertain to this report. We would also appreciate the opportunity to provide construction phase services such as materials testing as a part of the success of the project. If you have any questions regarding our report, please call me at (254) 235-1048. Best Regards, LANGERMAN FOSTER ENGINEERING COMPANY Texas Registered Engineering Firm No. F-13144

Scott M. Langerman, P.E. Principal / Geotechnical Engineer Distribution List:

Walker Partners- Mr. Jacob Bell, P.E. ([email protected]) Walker Partners- Mr. Talmadge Hill, P.E. ([email protected])

Page 2: September 28, 2016 Kendrick Park Improvements … Report No... · 2018-02-22 · September 28, 2016 Walker Partners 600 Austin Avenue, Suite 20 Waco, ... construction phase services

GEOTECHNICAL INVESTIGATION

KENDRICK PARK IMPROVEMENTS Waco, Texas

LFE Project No. W16-065

Report Prepared For: Walker Partners Waco, Texas Report Prepared By:

Scott M. Langerman, P.E. Principal / Geotechnical Engineer

2000 South 15th Street, Waco, Texas 76706 Ph: 254/235-1048 www.LFEctx.com

September 28, 2016

Page 3: September 28, 2016 Kendrick Park Improvements … Report No... · 2018-02-22 · September 28, 2016 Walker Partners 600 Austin Avenue, Suite 20 Waco, ... construction phase services

Copyright 2016 2000 South 15th Street, Waco, Texas 76706 Page 1 of 14 LFE Project No. W16-065 Ph: 254-235-1048 www.LFEctx.com Fx: 254-235-1625 September 28, 2016

GEOTECHNICAL INVESTIGATION KENDRICK PARK IMPROVEMENTS

WACO, TEXAS 1.0 INTRODUCTION Purpose: The purpose of this geotechnical investigation is to provide geotechnical

design and construction criteria for Improvements to Kendrick Park. Geotechnical data and recommendations are provided in a brief, and hopefully user friendly manner.

Authorization: Services were performed in general accordance with LFE Proposal No.

GEO16-082, dated June 30, 2016. Authorization to proceed was provided by Mr. Jacob Bell, P.E. on August 31, 2016.

2.0 SUBSURFACE EXPLORATION Drilling Date: September 15, 2016. Boring Layout: The boring locations were marked in the field by LFE personnel based on a

sketch provided by Walker Partners. Plates 1 and 2 show the approximate boring locations.

If precise location and elevation data are desired, then a registered

professional land surveyor should be retained to locate the borings and determine the ground surface elevation.

Sampling Methods: A split-spoon sampler was used in conjunction with standard penetration

tests to sample most of the soils. A push-tube sampler was also used for a few samples.

3.0 LABORATORY TESTS Test Procedures: The following tests were conducted in general conformance with the

standards noted in Table 3.1.

Page 4: September 28, 2016 Kendrick Park Improvements … Report No... · 2018-02-22 · September 28, 2016 Walker Partners 600 Austin Avenue, Suite 20 Waco, ... construction phase services

Copyright 2016 2000 South 15th Street, Waco, Texas 76706 Page 2 of 14 LFE Project No. W16-065 Ph: 254-235-1048 www.LFEctx.com Fx: 254-235-1625 September 28, 2016

TABLE 3.1: LABORATORY TESTS

Test Name Test Method

Atterberg Limits ASTM D 4318

-#200 Mesh Sieve ASTM D 1140

Moisture Content ASTM D 2216

Soil Classification ASTM D 2487

Test Results: Laboratory test results are shown in the Appendix, and selected test

results on the boring logs. 4.0 SUBSURFACE MATERIALS AND SITE OBSERVATIONS Stratigraphy: Major strata types from the borings are listed in Table 4.1. Individual

boring logs are contained in the Appendix. Material descriptions are general and range of depths approximate because boundaries between different strata are seldom clear and abrupt in the field.

TABLE 4.1: MAJOR STRATA TYPES

Strata Depth to Top of Strata (ft)

Depth to Base of Strata (ft)

General Description

I 0 4” 4” Concrete over 3” Gravel (Boring B-1 only)

II 0 to 4” 13.5 to 14 CLAYEY SAND, CLAYEY GRAVEL, SANDY FAT CLAY, SAND, and GRAVEL; dark gray, tan, brown, orange-brown, and dark brown

III 13.5 to 14 14.5+ WEATHERED LIMESTONE; tan (Borings B-1 and B-2 only)

Strata changes are approximate, and in-situ transitions are usually gradual.

Page 5: September 28, 2016 Kendrick Park Improvements … Report No... · 2018-02-22 · September 28, 2016 Walker Partners 600 Austin Avenue, Suite 20 Waco, ... construction phase services

Copyright 2016 2000 South 15th Street, Waco, Texas 76706 Page 3 of 14 LFE Project No. W16-065 Ph: 254-235-1048 www.LFEctx.com Fx: 254-235-1625 September 28, 2016

Geology: Based on the available geologic map1 of the area, and the contents of the borings, the site is located within Terrace Deposits overlying the Austin Chalk Formation.

Terrace Deposits are derived from ancient meandering paths and flood

events of the Brazos River. Due to the inconsistent means of deposition, the deposits vary both horizontally and vertically in content and engineering properties. From a geologic perspective, terrace deposits are considered recent.

The underlying Austin Chalk is considered a relatively soft limestone based

on universal rock classification systems, but is considered relatively hard rock in the Central Texas area. Although the Austin Chalk is usually described as limestone, it is comprised of chalk, limestone, and marl (marl is calcareous clay).

Groundwater: The borings were drilled to depths of 14 to 15 feet using dry drilling

methods, meaning that water was not used in the drilling process. Groundwater was initially encountered in Boring B-2 at a depth of 9 feet,

and then rose to 8.5 feet after a 10 minute observation period. Groundwater was not observed in Borings B-1 and B-3 during our drilling

operations. However, it is unusual in these types of soils to have water in only one adjacent boring. In our opinion, water would have entered Borings B-1 and B-3 if the holes were left open for a longer period of time.

Groundwater is common in this area, and will likely be present during construction. The water tends to percolate down through the surficial soils until encountering a relatively impervious layer, and then either flow down gradient or become trapped.

The water observations conducted for this investigation are short-term and should not be interpreted as a groundwater study. However, the presence of groundwater will affect construction and long-term performance of the proposed foundations.

Page 6: September 28, 2016 Kendrick Park Improvements … Report No... · 2018-02-22 · September 28, 2016 Walker Partners 600 Austin Avenue, Suite 20 Waco, ... construction phase services

Copyright 2016 2000 South 15th Street, Waco, Texas 76706 Page 4 of 14 LFE Project No. W16-065 Ph: 254-235-1048 www.LFEctx.com Fx: 254-235-1625 September 28, 2016

5.0 GEOTECHNICAL FOUNDATION RECOMMENDATIONS Project Summary: The project consists of various improvements including a restroom, splash

pad, and playground containment walls. We anticipate that the restroom will have a simple slab-on-grade with CMU block walls. The splash pad will also be a concrete slab, but may have a below-grade water re-circulation system. Playground walls will be less than 5 feet in height.

Expansive Soil: Clay soils in the Central Texas area are subject to expansive soil

movements, which include swelling under moist conditions and shrinking under dry conditions. Moisture fluctuations occur due to seasonal wet and dry cycles, but are also influenced after construction by site grading, drainage, landscaping, and groundwater. Actual soil movement is difficult to determine due to the many unpredictable variables involved.

TxDOT uses the Potential Vertical Rise (PVR) procedure to estimate soil movements. For purposes of this project, the results of the laboratory tests, engineering judgment, and experience have also been considered. The approximate PVR for a typical ground supported slab will be about ½ to 1½ inches, which is considered low to moderate for the Central Texas area. Actual soil movements will depend on the subsurface moisture fluctuations over the life of the structure. Soil movements may be less than those calculated if moisture variations are minimized after construction. However, significantly larger soil movements than estimated could occur due to inadequate site grading, poor drainage, ponding of rainfall, and/or leaking utilities.

Page 7: September 28, 2016 Kendrick Park Improvements … Report No... · 2018-02-22 · September 28, 2016 Walker Partners 600 Austin Avenue, Suite 20 Waco, ... construction phase services

Copyright 2016 2000 South 15th Street, Waco, Texas 76706 Page 5 of 14 LFE Project No. W16-065 Ph: 254-235-1048 www.LFEctx.com Fx: 254-235-1625 September 28, 2016

STIFFENED SLAB ON GRADE (RESTROOM) Boring B-1

Risk: A properly designed and constructed stiffened slab on grade will offer a

moderate amount of risk of future foundation movements. The adverse movements will occur as a result of shrinking and swelling of the expansive clay soils, which may result in cracking and differential movement of the slab. Select fill can be used below the slab to reduce the risk of adverse cracking.

Rigid architectural features such as masonry, stucco, CMU block walls and

floor tiles do not perform well when the PVR exceeds approximately ½- to ¾-inch. Allowances for differential movement including frequent movement joints will be required to reduce architectural cracking. A properly designed slab may perform satisfactorily from a structural standpoint but still experience architectural cracking.

Bearing Stratum: Select Fill or Native Soil. We recommend that at least 2 feet of select fill

be placed below the restroom building to provide a uniform pad. Select fill should extend at least 2 feet beyond the building perimeter. The resultant PVR will be less than ¾ inch.

Bearing Pressure: An allowable bearing pressure of 2,500 psf can be used for select fill or

native soil. Footings and/or grade beams should bear at a depth of at least 24 inches below the final ground surface.

BRAB/PCI: The Building Research Advisory Board (BRAB) and Prestressed Concrete

Institute are two published design procedures for slabs on expansive soils. Both of these method utilize an effective PI of the subsurface soils and a Regional Climatic Index of Cw=19 for Waco. The effective PI at Boring B-1 is 20.

Depth of Removaland Replacement

Slope Away FromFoundation

12" Clay CapSelect

Fill

Page 8: September 28, 2016 Kendrick Park Improvements … Report No... · 2018-02-22 · September 28, 2016 Walker Partners 600 Austin Avenue, Suite 20 Waco, ... construction phase services

Copyright 2016 2000 South 15th Street, Waco, Texas 76706 Page 6 of 14 LFE Project No. W16-065 Ph: 254-235-1048 www.LFEctx.com Fx: 254-235-1625 September 28, 2016

SLAB ON GRADE (SPLASH PAD) Boring B-3

Risk: A properly designed and constructed foundation using a simple slab on

grade will offer a moderate risk of future foundation movements.

The Splash Pad will be located near Boring B-3, which is subject to about 1½ inches of potential vertical rise movement. Unfortunately, the movement will occur in sandy fat clay soils that are at a depth of 7 to 15 feet. One method to reduce the expansive clay soil movements would be to remove the fat clay; however, excavating 7+ feet of soil below a splash pad does not seem practical. Instead, we suggest that the slab be heavily-reinforced. Cracking is still possible.

Bearing Stratum: Select Fill or Native Soil. We recommend that at least 12 inches of select

fill be placed below the splash pad to provide a uniform pad. Select fill should extend at least 2 feet beyond the perimeter. The resultant PVR will be about 1½ inches.

Bearing Pressure: An allowable bearing pressure of 2,500 psf can be used for select fill or

native soil. Footings and/or grade beams should bear at a depth of at least 24 inches below the final ground surface.

BRAB/PCI: The Building Research Advisory Board (BRAB) and Prestressed Concrete

Institute are two published design procedures for slabs on expansive soils. Both of these method utilize an effective PI of the subsurface soils and a Regional Climatic Index of Cw=19 for Waco. The effective PI at Boring B-3 is 26.

Page 9: September 28, 2016 Kendrick Park Improvements … Report No... · 2018-02-22 · September 28, 2016 Walker Partners 600 Austin Avenue, Suite 20 Waco, ... construction phase services

Copyright 2016 2000 South 15th Street, Waco, Texas 76706 Page 7 of 14 LFE Project No. W16-065 Ph: 254-235-1048 www.LFEctx.com Fx: 254-235-1625 September 28, 2016

UNDERGROUND TANK Tank: An underground tank will be installed outside of the splash pad area in the

event that a recirculation system is used. We assume the excavation for the tank will extend about 12 feet or less below the existing ground surface. The tank must be designed to resist buoyancy.

Excavations: The following paragraphs contain general comments regarding below

grade excavations. Excavations characteristics, design of temporary support systems, and dewatering methods are the sole responsibility of the contractor. Accordingly, the following statements should be regarded only as opinions.

The upper soil materials such as clay, sand, and gravel may be excavated

with conventional earthmoving equipment. The underlying Weathered Limestone (beginning at a depth of about 13.5 to 14 feet) is hard bedrock, and will require heavy-duty excavating equipment.

With the above in mind, the contractor should carefully consider the choice of excavating equipment. As a precaution, it would be prudent for the contractor to evaluate the excavation potential with test pits or trenches.

The design of temporary excavation support systems, trench safety

systems, and slope stability for temporary open cut excavations were excluded from our scope of services. The contractor is solely responsible for designing and constructing stable, temporary excavations and must shore, slope or bench the sides of the excavations as required to maintain stability of both the excavation sides and bottom. All excavations must comply with applicable local, state, and federal safety regulations including current OSHA Excavation and Trench Safety Standards. Construction site safety is generally the sole responsibility of the contractor, who shall also be responsible for the means, methods, and sequencing of construction operations. We are providing information in this report solely as a service to our client. Under no circumstances should the provided information be interpreted to mean that LFE is assuming responsibility for construction site safety or the contractor’s activities; such responsibility is not being implied and must not be inferred.

In no case should slope height, slope inclination, or excavation depth,

including utility trench excavation depth, exceed those specified in local, state, and federal safety regulations. Specifically, the current OSHA Health and Safety Standards for Excavations, 29 CFR Part 1926 must be followed. The contractor’s “responsible person” as defined in 29 CFR Part 1926, must

Page 10: September 28, 2016 Kendrick Park Improvements … Report No... · 2018-02-22 · September 28, 2016 Walker Partners 600 Austin Avenue, Suite 20 Waco, ... construction phase services

Copyright 2016 2000 South 15th Street, Waco, Texas 76706 Page 8 of 14 LFE Project No. W16-065 Ph: 254-235-1048 www.LFEctx.com Fx: 254-235-1625 September 28, 2016

evaluate the materials exposed in the excavations as part of the contractor’s safety procedures. If an excavation, including a trench, is extended to a depth of more than twenty (20) feet, it will be necessary to have the side slopes designed by a professional engineer licensed in the State of Texas. The contractor’s “responsible person” must establish a minimum lateral distance from the crest of the slope for vehicles, spoil piles, or other surcharge loads. Likewise, the contractor’s “responsible person” shall establish protective measures for exposed slope faces.

The contractor must include the proximity to adjacent features when planning their method of excavation and support. These features include, but are not limited to, adjacent structures and utility lines. The contractor must also be prepared to manage varying amounts of subsurface water. Dewatering quantities will depend on drainage features, any groundwater, and rainfall prior to and during construction.

Retention systems must be designed by a professional engineer licensed in the State of Texas with experience in designing such systems.

Page 11: September 28, 2016 Kendrick Park Improvements … Report No... · 2018-02-22 · September 28, 2016 Walker Partners 600 Austin Avenue, Suite 20 Waco, ... construction phase services

Copyright 2016 2000 South 15th Street, Waco, Texas 76706 Page 9 of 14 LFE Project No. W16-065 Ph: 254-235-1048 www.LFEctx.com Fx: 254-235-1625 September 28, 2016

RETAINING WALLS Project Information: Site retaining walls will be constructed to accommodate changes in the

grade or to provide barriers. The maximum wall height will be 5 feet.

TABLE 5.2: EARTH PRESSURE PARAMETERS

Earth Pressure Coefficient Equivalent Fluid

Pressure (pcf)

Surcharge Pressure, P1

(psf)

Earth Pressure, P2

(psf)

At-Rest (K0) 0.50 60 (0.50)S 60X

Active (KA) 0.33 40 (0.33)S 40X

Passive (KP) 3.0 360 -- --

Values assume a 1H:1V wedge of select fill behind the wall with a unit weight of 120 pcf.

Values assume that the wall is drained. Hydrostatic pressures must be added for an undrained condition

Earth pressure parameters do not include a factor of safety

Drainage material: ASTM C-33, Size 67 gravel aggregate, uniformly compacted

Base sliding resistance: 500 psf (or an ultimate coefficient of friction of 0.3)

Footing bearing pressure: 2,500 psf

Resultant Horizontal Forces per linear foot: o RH1= (P1)(X), where RH1 is acting at ½X from the top of the wall o RH2= (0.5)(P2)(X), where RH2 is acting at ⅔X from the top of the wall

Wedge ofSelect Fill

For the active condition,movement at the top isabout 0.002X to 0.004XS

X2

3

RH2

RH1

X

For the at-rest condition,it is assumed that nomovement will occur

Synthetic drain ordrainage material

X1

2

Page 12: September 28, 2016 Kendrick Park Improvements … Report No... · 2018-02-22 · September 28, 2016 Walker Partners 600 Austin Avenue, Suite 20 Waco, ... construction phase services

Copyright 2016 2000 South 15th Street, Waco, Texas 76706 Page 10 of 14 LFE Project No. W16-065 Ph: 254-235-1048 www.LFEctx.com Fx: 254-235-1625 September 28, 2016

MISCELLANEOUS DESIGN ITEMS: Seismic: For structural designs based upon the 2012 IBC, the following criteria will

apply. The Site Class is C. The Mapped Spectral Response Acceleration at short periods (SS) is about 0.10g, and the Mapped Spectral Response Acceleration at a 1 second period (S1) is about 0.04g. Site Coefficients are as follows: Fa= 1.2 and Fv= 1.7.

Hazards associated with slope stability, soil liquefaction, surface rupture, and lateral spreading are not considered an issue with this site due to the study area being in a seismically inactive area and the site being underlain at a shallow depth by bedrock.

Subgrade Improvement: The onsite soils are subject to instability, especially in the presence of

water. When unstable or pumping soils are encountered during construction, then clean stone may be used to improve the subgrade. Clean crushed stone should be placed to create a firm working surface where needed and/or specified. We expect that a layer of about 6 to 8 inches in thickness will be needed if soft and/or wet subgrade conditions are present, but field conditions may dictate an increased thickness.

The crushed stone must be clean, and should generally range in size from

3 to 6 inches. Compaction specifications do not apply; however, the rock should be placed in such a manner that will stabilize the subgrade. This type of clean rock is normally used to stabilize construction entrances, and should be readily available.

Be aware that plumbing and other features that require trenching will be

difficult to install if the trenches extend into clean stone. Vapor Barriers: The need for vapor barriers, and where to place them, must be determined

by the architect or structural engineer based on the proposed floor treatment, building function, concrete properties, placement techniques, and the construction schedule. When moisture barriers are used, precautions should be taken during the initial floor slab concrete curing period to reduce differential curing and possible curling of the slabs.

Impervious Seal: We recommend that an impervious seal consisting of at least 12 inches of

clay soil be constructed on top of the backfill material around the building perimeter. The intent of this impervious seal is to reduce surface runoff water from infiltrating the backfill. The seal must be sloped away from the foundation. In addition, a “plug” of clay soil must be placed at the exit

Page 13: September 28, 2016 Kendrick Park Improvements … Report No... · 2018-02-22 · September 28, 2016 Walker Partners 600 Austin Avenue, Suite 20 Waco, ... construction phase services

Copyright 2016 2000 South 15th Street, Waco, Texas 76706 Page 11 of 14 LFE Project No. W16-065 Ph: 254-235-1048 www.LFEctx.com Fx: 254-235-1625 September 28, 2016

points of the utilities from the foundation to reduce water intrusion into utility trenches.

Utility Connections: Utilities resting on or within expansive soils are subject to soil movements.

Utility connections should account for such movement potential, such as using flexible connections.

Based on our previous experience, clay soils are corrosive to buried metals. Corrosion protection should be provided for such metals. If granular backfill materials are used for the utility lines, then a clay plug must be placed at the exterior foundation penetrations to avoid water intrusion and collection within the utility trenches.

Review by MEP: We recommend that this report be provided to the project Mechanical, Electrical, and Plumbing engineers (MEP’s). Their designs should account for the estimated soil movement potential. We are available to help with questions they may have about soil movements.

Page 14: September 28, 2016 Kendrick Park Improvements … Report No... · 2018-02-22 · September 28, 2016 Walker Partners 600 Austin Avenue, Suite 20 Waco, ... construction phase services

Copyright 2016 2000 South 15th Street, Waco, Texas 76706 Page 12 of 14 LFE Project No. W16-065 Ph: 254-235-1048 www.LFEctx.com Fx: 254-235-1625 September 28, 2016

6.0 GEOTECHNICAL CONSTRUCTION RECOMMENDATIONS Site Preparation: Surficial vegetation, root systems, existing fill, existing utilities, and

underground structures must be removed below the building pads. The stripping depth must be based on field observations with attention given to old drainage areas, uneven topography, and wet soils. If practical, proof-rolling should be used to detect soft spots or pumping subgrade areas. Proof-rolling should be performed using a heavy pneumatic tired roller, loaded dump truck, or similar piece of equipment weighing at least 25 tons.

Grading: Grading, landscaping, and drainage pose a significant risk factor for future

performance of the foundation systems. Prevention of water ponding around the foundation is critical. We suggest the following general guidelines for perimeter drainage:

1. The building pad or the finished floor elevation must be elevated from

the exterior finished grade to assist in draining the surface water away from the structure.

2. Where possible, extend paved surfaces up to the building line to serve as a barrier to soil moisture evaporation and infiltration. These surfaces must slope away from the building.

3. Outlets for gutter systems must rapidly discharge water away from the

foundation.

4. Roots from trees and decorative vegetation remove moisture from soils, which causes soil shrinkage (settlement). Trees should have root blockers near the foundation or be located as far away from the foundation as practical.

5. Sprinkler systems must be properly maintained and over-watering of

the soils should be avoided.

Subgrade: The subgrade soils should be scarified and compacted to at least 95 percent of ASTM D698 (or TEX-113-E) maximum dry density at 0 to +3% of the optimum moisture content. A maximum compacted lift thickness of six inches must be specified, with each lift tested for compliance prior to the addition of subsequent lifts. The placement and compaction of fill material must be observed, monitored, and tested by LFE on a full-time basis. Proof-rolling may be used in lieu of compaction testing of the subgrade, but will require approval by LFE on a case-by-case basis.

Page 15: September 28, 2016 Kendrick Park Improvements … Report No... · 2018-02-22 · September 28, 2016 Walker Partners 600 Austin Avenue, Suite 20 Waco, ... construction phase services

Copyright 2016 2000 South 15th Street, Waco, Texas 76706 Page 13 of 14 LFE Project No. W16-065 Ph: 254-235-1048 www.LFEctx.com Fx: 254-235-1625 September 28, 2016

Select Fill: Fill should meet the requirements of 2014 TxDOT Item 247, Type A, Grade 3 or better. If another local source of select fill is desired, the following specification may be used as a guide:

Maximum Aggregate: 3 inches Percent Retained on #4 Sieve: 25 - 50 Percent Retained on #40 Sieve: 50 - 75 Plasticity Index: 5 - 15 Non-Organic Please note that locally available “red fill” is generally acceptable for use

as select fill below the restroom and splash pad, provided that these materials are confined by grade beams. However, red fill is highly variable and will require evaluation by LFE on a case-by-case basis.

The select fill material should be compacted to at least 95 percent of ASTM

D698 (or TEX-113-E) maximum dry density at ±3% of the optimum moisture content. A maximum compacted lift thickness of six inches must be specified, with each lift tested for compliance prior to the addition of subsequent lifts. The placement and compaction of fill material must be observed, monitored, and tested by LFE on a full-time basis.

Foundation: Foundation construction recommendations are listed below.

1. The foundation construction must be observed by LFE to determine that the proper bearing material has been reached in accordance with the recommendations given herein.

2. Prior to the placement of concrete, water must be removed from

the foundation excavations. Prolonged exposure or inundation of the bearing surface with water may result in changes in bearing strength and compressibility characteristics. If delays occur, the footing excavations should be deepened and cleaned, in order to provide a fresh bearing surface.

3. Concrete must be placed promptly after the excavations are

completed, cleaned, and observed.

Page 16: September 28, 2016 Kendrick Park Improvements … Report No... · 2018-02-22 · September 28, 2016 Walker Partners 600 Austin Avenue, Suite 20 Waco, ... construction phase services

Copyright 2016 2000 South 15th Street, Waco, Texas 76706 Page 14 of 14 LFE Project No. W16-065 Ph: 254-235-1048 www.LFEctx.com Fx: 254-235-1625 September 28, 2016

6.0 DESIGN REVIEW AND LIMITATIONS Design Review: The recommendations contained in this report were based on preliminary

site plans and design information provided by the Client. Our recommendations may not be applicable if changes have been made to the original information that formed the basis for this report, and we must be retained to make such a determination if such changes have been made. We also must be given the opportunity to review construction documents to affirm that our recommendations have been interpreted correctly. We cannot be responsible for misinterpretations if not given the opportunity to review aspects of the project that are based on the contents of this report. Such a review is considered an additional service.

Limitations: This report has been prepared for the exclusive use of our client and their

designated project design team. Preparation of the report has been performed using that degree of care and skill ordinarily exercised under similar conditions by reputable geotechnical engineers practicing in the same locality. No warranties, express or implied, are intended or made.

As stated in the attachment “Important Information About Your Geotechnical Engineering Report”, the subsurface conditions are interpreted from samples taken only at the boring locations. During construction, variations will be encountered, and will require interpretation by LFE to verify the adequacy of the geotechnical recommendations. Other concerns and limitations are discussed in the attachment.

This investigation did not include environmental testing or evaluations,

and does not address whether landfilling operations, as defined by the State of Texas, have occurred on the property. An environmental professional should be retained to address environmental issues.

7.0 REFERENCES:

1. Geologic Atlas of Texas, Waco Sheet, Bureau of Economic Geology, The University of Texas at Austin, Austin, Texas 1970.

APPENDIX Site Location Map Boring Location Sketch Laboratory Test Results Boring Logs

Important Information about Your Geotechnical Engineering Report

Page 17: September 28, 2016 Kendrick Park Improvements … Report No... · 2018-02-22 · September 28, 2016 Walker Partners 600 Austin Avenue, Suite 20 Waco, ... construction phase services

SITE LOCATION MAP

KENDRICK PARK IMPROVEMENTS WACO, TEXAS

LFE PROJECT NO. W16-065

PLATE

1

Kendrick Park

Page 18: September 28, 2016 Kendrick Park Improvements … Report No... · 2018-02-22 · September 28, 2016 Walker Partners 600 Austin Avenue, Suite 20 Waco, ... construction phase services

BORING LOCATION SKETCH

KENDRICK PARK IMPROVEMENTS WACO, TEXAS

LFE PROJECT NO. W16-065

PLATE

2

B – 3

B – 1

B – 2

Base sketch provided by Walker Partners, dated 6/29/2016

Page 19: September 28, 2016 Kendrick Park Improvements … Report No... · 2018-02-22 · September 28, 2016 Walker Partners 600 Austin Avenue, Suite 20 Waco, ... construction phase services

B-1 0.4 - 1.9 23 13 10 23 9

B-1 2.0 - 3.5 18 13

B-1 4.0 - 5.5 71 23 48 37 17

B-1 6.0 - 8.0 12 15

B-1 8.5 - 10.0 89 29 60 55 31

B-1 10.0 - 11.5 23 17

B-1 13.5 - 14.5 4 16

B-2 0.3 - 1.8 38 17 21 42 10

B-2 2.0 - 4.0 38 5

B-2 4.0 - 5.5 7 2

B-2 6.0 - 7.5 17 5

B-2 10.0 - 11.5 32 12

B-3 0.0 - 2.0 24 9

B-3 2.0 - 3.5 13 7

B-3 4.0 - 5.5 8 6

B-3 8.5 - 10.0 70 23 47 63 24

B-3 13.5 - 15.0 60 21 39 56 25

Strain atFailure

(%)

LiquidLimit

UnconfinedCompressive

Strength(tsf)

PlasticLimit

PlasticityIndex

Project: Kendrick Park Improvements

Project Number: W16-065

Summary of Laboratory Results

Unit DryWeight

(pcf)

MoistureContent

(%)

PercentPassingNo. 200Sieve

SampleDepth

(ft.)

BoringNo.

Plate 3

Page 20: September 28, 2016 Kendrick Park Improvements … Report No... · 2018-02-22 · September 28, 2016 Walker Partners 600 Austin Avenue, Suite 20 Waco, ... construction phase services

23

71

89

13

23

29

23

18

37

12

55

23

4

9

13

17

15

31

17

16

10

48

60

A

SS

A

SS

A

SS

A

ST

A

SS

SS

A

SS

4" Concrete over 3" Gravel

CLAYEY SAND; dark gray, with gravel

--- orange-brown below 4 feet

CLAYEY GRAVEL; tan, calcareous. with sand

SANDY FAT CLAY; tan, calcareous

CLAYEY GRAVEL; tan, calcareous. with sand

WEATHERED LIMESTONE; tan

2-3-4(7)

4-5-6(11)

6-5-4(9)

3-7-5(12)

7-14-40(54)

22-50/6"

15 ft.

9/15/16

9/15/16

W Henley

DR

Y U

NIT

WT

.(p

cf)

ATTERBERGLIMITS

Remarks:

Completion Depth:Date Started:Completed:Logged by:

Approximate Surface Elevation feet

Boring was advanced to a depth of 14.5 feet using dry drillingtechniques. Groundwater was not observed above that depth.

ST

RA

IN A

TF

AIL

UR

E (

%)

UN

CO

NF

INE

DC

OM

PR

ES

SIV

ES

TR

EN

GT

H (

tsf)

GR

AP

HIC

LOG

DE

PT

H(f

t)

0

5

10

15

PO

CK

ET

PE

N.

(tsf

)

LIQ

UID

LIM

IT

PLA

ST

ICLI

MIT

FIN

ES

CO

NT

EN

T(%

)

MO

IST

UR

EC

ON

TE

NT

(%

)

PLA

ST

ICIT

YIN

DE

X

SA

MP

LE T

YP

E

MATERIAL DESCRIPTION

RE

CO

VE

RY

%(R

QD

)

BLO

WC

OU

NT

S(N

VA

LUE

)

PAGE 1 OF 1BORING NO. B-1

CLIENT Walker Partners

PROJECT NUMBER W16-065

PROJECT NAME Kendrick Park Improvements

PROJECT LOCATION Waco, Texas

LAN

GE

RM

AN

FO

ST

ER

- G

INT

ST

D U

S L

AB

.GD

T -

9/2

8/1

6 0

8:55

- C

:\US

ER

S\P

UB

LIC

\DO

CU

ME

NT

S\B

EN

TLE

Y\G

INT

\PR

OJE

CT

S\W

16-0

65 K

EN

DR

ICK

PA

RK

IMP

RO

VM

EN

TS

.GP

JLangerman Foster Engineering CompanyWaco and Harker Heights (Killeen), TexasPh: 254-235-1048 www.LFECTX.com

Page 21: September 28, 2016 Kendrick Park Improvements … Report No... · 2018-02-22 · September 28, 2016 Walker Partners 600 Austin Avenue, Suite 20 Waco, ... construction phase services

4.5+

1.5

38 17 42

38

7

17

32

10

5

2

5

12

21

ST

SS

A

ST

SS

A

SS

A

SS

SS

A

SS

CLAYEY SAND; brown and orange-brown, withgravel

CLAYEY SAND; orange-brown, trace gravel

SAND and GRAVEL; tan, trace clay

CLAYEY SAND; tan, calcareous, with gravel

WEATHERED LIMESTONE; tan

5-4-3(7)

3-7-7(14)

4-8-9(17)

1-1-1(2)

40-50/1"

15 ft.

9/15/16

9/15/16

W Henley

DR

Y U

NIT

WT

.(p

cf)

ATTERBERGLIMITS

Remarks:

Completion Depth:Date Started:Completed:Logged by:

Approximate Surface Elevation feet

Boring was advanced to a depth of 14.1 feet using dry drillingtechniques. Groundwater was observed at a depth of 9 feet. After a 10minute observation period, the groundwater level rose to 8.5 feet.

ST

RA

IN A

TF

AIL

UR

E (

%)

UN

CO

NF

INE

DC

OM

PR

ES

SIV

ES

TR

EN

GT

H (

tsf)

GR

AP

HIC

LOG

DE

PT

H(f

t)

0

5

10

15

PO

CK

ET

PE

N.

(tsf

)

LIQ

UID

LIM

IT

PLA

ST

ICLI

MIT

FIN

ES

CO

NT

EN

T(%

)

MO

IST

UR

EC

ON

TE

NT

(%

)

PLA

ST

ICIT

YIN

DE

X

SA

MP

LE T

YP

E

MATERIAL DESCRIPTION

RE

CO

VE

RY

%(R

QD

)

BLO

WC

OU

NT

S(N

VA

LUE

)

PAGE 1 OF 1BORING NO. B-2

CLIENT Walker Partners

PROJECT NUMBER W16-065

PROJECT NAME Kendrick Park Improvements

PROJECT LOCATION Waco, Texas

LAN

GE

RM

AN

FO

ST

ER

- G

INT

ST

D U

S L

AB

.GD

T -

9/2

8/1

6 0

8:55

- C

:\US

ER

S\P

UB

LIC

\DO

CU

ME

NT

S\B

EN

TLE

Y\G

INT

\PR

OJE

CT

S\W

16-0

65 K

EN

DR

ICK

PA

RK

IMP

RO

VM

EN

TS

.GP

JLangerman Foster Engineering CompanyWaco and Harker Heights (Killeen), TexasPh: 254-235-1048 www.LFECTX.com

Page 22: September 28, 2016 Kendrick Park Improvements … Report No... · 2018-02-22 · September 28, 2016 Walker Partners 600 Austin Avenue, Suite 20 Waco, ... construction phase services

4.5+

70

60

23

21

24

13

8

63

56

9

7

6

24

25

47

39

ST

SS

A

SS

A

SS

A

SS

SS

A

SS

CLAYEY SAND; dark brown, with gravel

SAND; orange-tan, trace gravel, trace clay

CLAYEY SAND; tan, with gravel

SANDY FAT CLAY; tan, calcareous, with gravel

5-4-3(7)

4-3-3(6)

9-5-4(9)

2-7-10(17)

3-5-7(12)

17-17-14(31)

15 ft.

9/15/16

9/15/16

W Henley

DR

Y U

NIT

WT

.(p

cf)

ATTERBERGLIMITS

Remarks:

Completion Depth:Date Started:Completed:Logged by:

Approximate Surface Elevation feet

Boring was advanced to a depth of 15 feet using dry drilling techniques.Groundwater was not observed above that depth.

ST

RA

IN A

TF

AIL

UR

E (

%)

UN

CO

NF

INE

DC

OM

PR

ES

SIV

ES

TR

EN

GT

H (

tsf)

GR

AP

HIC

LOG

DE

PT

H(f

t)

0

5

10

15

PO

CK

ET

PE

N.

(tsf

)

LIQ

UID

LIM

IT

PLA

ST

ICLI

MIT

FIN

ES

CO

NT

EN

T(%

)

MO

IST

UR

EC

ON

TE

NT

(%

)

PLA

ST

ICIT

YIN

DE

X

SA

MP

LE T

YP

E

MATERIAL DESCRIPTION

RE

CO

VE

RY

%(R

QD

)

BLO

WC

OU

NT

S(N

VA

LUE

)

PAGE 1 OF 1BORING NO. B-3

CLIENT Walker Partners

PROJECT NUMBER W16-065

PROJECT NAME Kendrick Park Improvements

PROJECT LOCATION Waco, Texas

LAN

GE

RM

AN

FO

ST

ER

- G

INT

ST

D U

S L

AB

.GD

T -

9/2

8/1

6 0

8:55

- C

:\US

ER

S\P

UB

LIC

\DO

CU

ME

NT

S\B

EN

TLE

Y\G

INT

\PR

OJE

CT

S\W

16-0

65 K

EN

DR

ICK

PA

RK

IMP

RO

VM

EN

TS

.GP

JLangerman Foster Engineering CompanyWaco and Harker Heights (Killeen), TexasPh: 254-235-1048 www.LFECTX.com

Page 23: September 28, 2016 Kendrick Park Improvements … Report No... · 2018-02-22 · September 28, 2016 Walker Partners 600 Austin Avenue, Suite 20 Waco, ... construction phase services

Geotechnical-Engineering ReportImportant Information about This

Subsurface problems are a principal cause of construction delays, cost overruns, claims, and disputes.

While you cannot eliminate all such risks, you can manage them. The following information is provided to help.

The Geoprofessional Business Association (GBA) has prepared this advisory to help you – assumedly a client representative – interpret and apply this geotechnical-engineering report as effectively as possible. In that way, clients can benefit from a lowered exposure to the subsurface problems that, for decades, have been a principal cause of construction delays, cost overruns, claims, and disputes. If you have questions or want more information about any of the issues discussed below, contact your GBA-member geotechnical engineer. Active involvement in the Geoprofessional Business Association exposes geotechnical engineers to a wide array of risk-confrontation techniques that can be of genuine benefit for everyone involved with a construction project.

Geotechnical-Engineering Services Are Performed for Specific Purposes, Persons, and ProjectsGeotechnical engineers structure their services to meet the specific needs of their clients. A geotechnical-engineering study conducted for a given civil engineer will not likely meet the needs of a civil-works constructor or even a different civil engineer. Because each geotechnical-engineering study is unique, each geotechnical-engineering report is unique, prepared solely for the client. Those who rely on a geotechnical-engineering report prepared for a different client can be seriously misled. No one except authorized client representatives should rely on this geotechnical-engineering report without first conferring with the geotechnical engineer who prepared it. And no one – not even you – should apply this report for any purpose or project except the one originally contemplated.

Read this Report in FullCostly problems have occurred because those relying on a geotechnical-engineering report did not read it in its entirety. Do not rely on an executive summary. Do not read selected elements only. Read this report in full.

You Need to Inform Your Geotechnical Engineer about ChangeYour geotechnical engineer considered unique, project-specific factors when designing the study behind this report and developing the confirmation-dependent recommendations the report conveys. A few typical factors include: • the client’s goals, objectives, budget, schedule, and risk-management preferences; • the general nature of the structure involved, its size, configuration, and performance criteria; • the structure’s location and orientation on the site; and • other planned or existing site improvements, such as retaining walls, access roads, parking lots, and underground utilities.

Typical changes that could erode the reliability of this report include those that affect:• the site’s size or shape;• the function of the proposed structure, as when it’s changed from a parking garage to an office building, or from a light-industrial plant to a refrigerated warehouse;• the elevation, configuration, location, orientation, or weight of the proposed structure;• the composition of the design team; or• project ownership.

As a general rule, always inform your geotechnical engineer of project changes – even minor ones – and request an assessment of their impact. The geotechnical engineer who prepared this report cannot accept responsibility or liability for problems that arise because the geotechnical engineer was not informed about developments the engineer otherwise would have considered.

This Report May Not Be ReliableDo not rely on this report if your geotechnical engineer prepared it:• for a different client;• for a different project;• for a different site (that may or may not include all or a portion of the original site); or • before important events occurred at the site or adjacent to it; e.g., man-made events like construction or environmental remediation, or natural events like floods, droughts, earthquakes, or groundwater fluctuations.

Note, too, that it could be unwise to rely on a geotechnical-engineering report whose reliability may have been affected by the passage of time, because of factors like changed subsurface conditions; new or modified codes, standards, or regulations; or new techniques or tools. If your geotechnical engineer has not indicated an “apply-by” date on the report, ask what it should be, and, in general, if you are the least bit uncertain about the continued reliability of this report, contact your geotechnical engineer before applying it. A minor amount of additional testing or analysis – if any is required at all – could prevent major problems.

Most of the “Findings” Related in This Report Are Professional OpinionsBefore construction begins, geotechnical engineers explore a site’s subsurface through various sampling and testing procedures. Geotechnical engineers can observe actual subsurface conditions only at those specific locations where sampling and testing were performed. The data derived from that sampling and testing were reviewed by your geotechnical engineer, who then applied professional judgment to form opinions about subsurface conditions throughout the site. Actual sitewide-subsurface conditions may differ – maybe significantly – from those indicated in this report. Confront that risk by retaining your geotechnical engineer to serve on the design team from project start to project finish, so the individual can provide informed guidance quickly, whenever needed.

Page 24: September 28, 2016 Kendrick Park Improvements … Report No... · 2018-02-22 · September 28, 2016 Walker Partners 600 Austin Avenue, Suite 20 Waco, ... construction phase services

This Report’s Recommendations Are Confirmation-DependentThe recommendations included in this report – including any options or alternatives – are confirmation-dependent. In other words, they are not final, because the geotechnical engineer who developed them relied heavily on judgment and opinion to do so. Your geotechnical engineer can finalize the recommendations only after observing actual subsurface conditions revealed during construction. If through observation your geotechnical engineer confirms that the conditions assumed to exist actually do exist, the recommendations can be relied upon, assuming no other changes have occurred. The geotechnical engineer who prepared this report cannot assume responsibility or liability for confirmation-dependent recommendations if you fail to retain that engineer to perform construction observation.

This Report Could Be MisinterpretedOther design professionals’ misinterpretation of geotechnical-engineering reports has resulted in costly problems. Confront that risk by having your geotechnical engineer serve as a full-time member of the design team, to: • confer with other design-team members, • help develop specifications, • review pertinent elements of other design professionals’ plans and specifications, and • be on hand quickly whenever geotechnical-engineering guidance is needed. You should also confront the risk of constructors misinterpreting this report. Do so by retaining your geotechnical engineer to participate in prebid and preconstruction conferences and to perform construction observation.

Give Constructors a Complete Report and GuidanceSome owners and design professionals mistakenly believe they can shift unanticipated-subsurface-conditions liability to constructors by limiting the information they provide for bid preparation. To help prevent the costly, contentious problems this practice has caused, include the complete geotechnical-engineering report, along with any attachments or appendices, with your contract documents, but be certain to note conspicuously that you’ve included the material for informational purposes only. To avoid misunderstanding, you may also want to note that “informational purposes” means constructors have no right to rely on the interpretations, opinions, conclusions, or recommendations in the report, but they may rely on the factual data relative to the specific times, locations, and depths/elevations referenced. Be certain that constructors know they may learn about specific project requirements, including options selected from the report, only from the design drawings and specifications. Remind constructors that they may

perform their own studies if they want to, and be sure to allow enough time to permit them to do so. Only then might you be in a position to give constructors the information available to you, while requiring them to at least share some of the financial responsibilities stemming from unanticipated conditions. Conducting prebid and preconstruction conferences can also be valuable in this respect.

Read Responsibility Provisions CloselySome client representatives, design professionals, and constructors do not realize that geotechnical engineering is far less exact than other engineering disciplines. That lack of understanding has nurtured unrealistic expectations that have resulted in disappointments, delays, cost overruns, claims, and disputes. To confront that risk, geotechnical engineers commonly include explanatory provisions in their reports. Sometimes labeled “limitations,” many of these provisions indicate where geotechnical engineers’ responsibilities begin and end, to help others recognize their own responsibilities and risks. Read these provisions closely. Ask questions. Your geotechnical engineer should respond fully and frankly.

Geoenvironmental Concerns Are Not CoveredThe personnel, equipment, and techniques used to perform an environmental study – e.g., a “phase-one” or “phase-two” environmental site assessment – differ significantly from those used to perform a geotechnical-engineering study. For that reason, a geotechnical-engineering report does not usually relate any environmental findings, conclusions, or recommendations; e.g., about the likelihood of encountering underground storage tanks or regulated contaminants. Unanticipated subsurface environmental problems have led to project failures. If you have not yet obtained your own environmental information, ask your geotechnical consultant for risk-management guidance. As a general rule, do not rely on an environmental report prepared for a different client, site, or project, or that is more than six months old.

Obtain Professional Assistance to Deal with Moisture Infiltration and MoldWhile your geotechnical engineer may have addressed groundwater, water infiltration, or similar issues in this report, none of the engineer’s services were designed, conducted, or intended to prevent uncontrolled migration of moisture – including water vapor – from the soil through building slabs and walls and into the building interior, where it can cause mold growth and material-performance deficiencies. Accordingly, proper implementation of the geotechnical engineer’s recommendations will not of itself be sufficient to prevent moisture infiltration. Confront the risk of moisture infiltration by including building-envelope or mold specialists on the design team. Geotechnical engineers are not building-envelope or mold specialists.

Copyright 2016 by Geoprofessional Business Association (GBA). Duplication, reproduction, or copying of this document, in whole or in part, by any means whatsoever, is strictly prohibited, except with GBA’s specific written permission. Excerpting, quoting, or otherwise extracting wording from this document is permitted only with the express written permission of GBA, and only for purposes of scholarly research or book review. Only members of GBA may use this document or its wording as a complement to or as an element of a report of any

kind. Any other firm, individual, or other entity that so uses this document without being a GBA member could be committing negligent

Telephone: 301/565-2733e-mail: [email protected] www.geoprofessional.org