17
Work Session Agenda Item # 1 Meeting Date September 21, 2015 Prepared By Erkin Ozberk, Senior Planner Approved By Suzanne R. Ludlow City Manager Discussion Item Discussion of Site Plan Application for N.E. Quadrant of New Hampshire Avenue and Holton Lane (Taco Bell) Background The Memorandum of Understanding between the City of Takoma Park and the Montgomery County Planning Board establishes a coordinated review process for subdivision and site plan applications in Takoma Park. City Council communicates with the Planning Board via resolution. Options include: 1. No Resolution 2. Resolution to Approve 3. Resolution to Approve with Conditions 4. Resolution to Disapprove The Council is asked to consider the site plan application for the Taco Bell development on New Hampshire Avenue at Holton Lane. Site plan review dictates landscaping, parking, and building specifics, which are being considered at this time. This is the first of two Council work sessions that have been scheduled. The site plan is tentatively scheduled to be reviewed by the Planning Board in December 2015. Status of the site plan’s review and downloads of plans and reports can be found on the Montgomery County Development Activity Information Center (DAIC) website: http://mcatlas.org/Development_Info/default.aspx?apno=820150150. Project Description The applicant, MUY Brands, LLC (Taco Bell) submitted a site plan application to construct a single-story commercial building on a pad site at the northeast quadrant of the intersection of New Hampshire Avenue and Holton Lane. The site is known as Lot 56 in the Gude and Abraham’s Subdivision with a net lot area of 24,591 square feet (0.56 acres), owned by JBG/Takoma Park Retail Center, LLC. Presently, the site is improved with a paved surface parking lot with some landscaped areas. This proposal would allow for the development of a single-story building with a 2,063 sq. ft. footprint to be used as a Taco Bell restaurant that facilitates a drive thru aisle, and landscaping around the building on both the New Hampshire Avenue and Holton Lane frontages. Zoning Designation The property is zoned CRT-2.5, a mixed use zoning designation with maximum Floor Area Ratio (FAR) of 2.5.

September 21, 2015 Work Session - Amazon Web Servicescitycouncil-takomapark.s3.amazonaws.com/agenda/items/...2015/09/21  · Discussion of Site Plan Application for N.E. Quadrant of

  • Upload
    others

  • View
    0

  • Download
    0

Embed Size (px)

Citation preview

Page 1: September 21, 2015 Work Session - Amazon Web Servicescitycouncil-takomapark.s3.amazonaws.com/agenda/items/...2015/09/21  · Discussion of Site Plan Application for N.E. Quadrant of

Work Session

Agenda Item # 1

Meeting Date September 21, 2015

Prepared By Erkin Ozberk, Senior Planner

Approved By Suzanne R. Ludlow City Manager

Discussion Item Discussion of Site Plan Application for N.E. Quadrant of New Hampshire Avenue and Holton Lane (Taco Bell)

Background The Memorandum of Understanding between the City of Takoma Park and the Montgomery County Planning Board establishes a coordinated review process for subdivision and site plan applications in Takoma Park. City Council communicates with the Planning Board via resolution. Options include:

1. No Resolution 2. Resolution to Approve 3. Resolution to Approve with Conditions 4. Resolution to Disapprove

The Council is asked to consider the site plan application for the Taco Bell development on New Hampshire Avenue at Holton Lane. Site plan review dictates landscaping, parking, and building specifics, which are being considered at this time. This is the first of two Council work sessions that have been scheduled. The site plan is tentatively scheduled to be reviewed by the Planning Board in December 2015. Status of the site plan’s review and downloads of plans and reports can be found on the Montgomery County Development Activity Information Center (DAIC) website: http://mcatlas.org/Development_Info/default.aspx?apno=820150150. Project Description The applicant, MUY Brands, LLC (Taco Bell) submitted a site plan application to construct a single-story commercial building on a pad site at the northeast quadrant of the intersection of New Hampshire Avenue and Holton Lane. The site is known as Lot 56 in the Gude and Abraham’s Subdivision with a net lot area of 24,591 square feet (0.56 acres), owned by JBG/Takoma Park Retail Center, LLC. Presently, the site is improved with a paved surface parking lot with some landscaped areas. This proposal would allow for the development of a single-story building with a 2,063 sq. ft. footprint to be used as a Taco Bell restaurant that facilitates a drive thru aisle, and landscaping around the building on both the New Hampshire Avenue and Holton Lane frontages. Zoning Designation The property is zoned CRT-2.5, a mixed use zoning designation with maximum Floor Area Ratio (FAR) of 2.5.

Page 2: September 21, 2015 Work Session - Amazon Web Servicescitycouncil-takomapark.s3.amazonaws.com/agenda/items/...2015/09/21  · Discussion of Site Plan Application for N.E. Quadrant of

Project Review In November 2014, land use attorneys from Lerch, Early, & Brewer, representing Taco Bell, contacted HCD staff to discuss the project and the City’s involvement in Montgomery County’s development review process. At the time, staff recommended the Takoma/Langley Crossroads Sector Plan (and associated Design Guidelines) and the Holton Lane Area Improvement Vision as key policy documents to consider when developing the Site Plan application. A pre-submission meeting for the Site Plan application was held on April 29, 2015 at the Takoma Park Community Center. The Stormwater Management Concept was reviewed by the City Engineer and approved on May 12, 2015. Taco Bell representatives will be present at the September 21, 2015 work session to provide additional background information and answer any questions the Council may have regarding the site plan. A second worksession is scheduled for October 5, 2015 at which time a draft resolution will be presented for Council consideration. The resolution will be finalized and adopted by the Council on October 12, 2015.

Policy Redevelop and revitalize New Hampshire Avenue

Fiscal Impact

None

Attachments • Taco Bell Site Plan (Sheet C-4), Landscape Plan (Sheet LS-1) and Elevations (Sheets A4 and A4.1)

• Statement of Justification provided by Lerch, Early, Brewer, included in the Site Plan application

Recommendation Discuss proposed Site Plan

Special Consideration

Article 28 of the Maryland State Code requires that a two-thirds majority vote of both the Planning Board and the District Council of Montgomery County is required to take any action relating to zoning or land use planning within the City of Takoma Park that is contrary to a resolution of the Mayor and City Council.

Page 3: September 21, 2015 Work Session - Amazon Web Servicescitycouncil-takomapark.s3.amazonaws.com/agenda/items/...2015/09/21  · Discussion of Site Plan Application for N.E. Quadrant of
Page 4: September 21, 2015 Work Session - Amazon Web Servicescitycouncil-takomapark.s3.amazonaws.com/agenda/items/...2015/09/21  · Discussion of Site Plan Application for N.E. Quadrant of
Page 5: September 21, 2015 Work Session - Amazon Web Servicescitycouncil-takomapark.s3.amazonaws.com/agenda/items/...2015/09/21  · Discussion of Site Plan Application for N.E. Quadrant of
Page 6: September 21, 2015 Work Session - Amazon Web Servicescitycouncil-takomapark.s3.amazonaws.com/agenda/items/...2015/09/21  · Discussion of Site Plan Application for N.E. Quadrant of
Page 7: September 21, 2015 Work Session - Amazon Web Servicescitycouncil-takomapark.s3.amazonaws.com/agenda/items/...2015/09/21  · Discussion of Site Plan Application for N.E. Quadrant of
Page 8: September 21, 2015 Work Session - Amazon Web Servicescitycouncil-takomapark.s3.amazonaws.com/agenda/items/...2015/09/21  · Discussion of Site Plan Application for N.E. Quadrant of
Page 9: September 21, 2015 Work Session - Amazon Web Servicescitycouncil-takomapark.s3.amazonaws.com/agenda/items/...2015/09/21  · Discussion of Site Plan Application for N.E. Quadrant of
Page 10: September 21, 2015 Work Session - Amazon Web Servicescitycouncil-takomapark.s3.amazonaws.com/agenda/items/...2015/09/21  · Discussion of Site Plan Application for N.E. Quadrant of
Page 11: September 21, 2015 Work Session - Amazon Web Servicescitycouncil-takomapark.s3.amazonaws.com/agenda/items/...2015/09/21  · Discussion of Site Plan Application for N.E. Quadrant of
Page 12: September 21, 2015 Work Session - Amazon Web Servicescitycouncil-takomapark.s3.amazonaws.com/agenda/items/...2015/09/21  · Discussion of Site Plan Application for N.E. Quadrant of
Page 13: September 21, 2015 Work Session - Amazon Web Servicescitycouncil-takomapark.s3.amazonaws.com/agenda/items/...2015/09/21  · Discussion of Site Plan Application for N.E. Quadrant of
Page 14: September 21, 2015 Work Session - Amazon Web Servicescitycouncil-takomapark.s3.amazonaws.com/agenda/items/...2015/09/21  · Discussion of Site Plan Application for N.E. Quadrant of

AL

BLF

06/25/15

AS SHOWN

SS0

C-4OF 5

SITE PLAN

DEVELOPMENT SEQUENCE:

DEVELOPMENT IS PLANNED TO TAKE PLACE IN ONE PHASE

(DEMOLITION, BUILDING, AND SITE WORK)

NOTE:

SEE SHEET C-5 FOR SITE DETAILS

PROPOSED NOTE

CURB AND GUTTER

SPILL CURB TRANSITION CURB

DEPRESSED CURB AND GUTTER

TYPICAL NOTE TEXT

NEIGHBORING

PROPERTY LINE /

INTERIOR PARCEL LINE

STANDARD DRAWING LEGENDFOR ENTIRE PLAN SET

(NOT TO SCALE)

ONSITE PROPERTY

LINE / R.O.W. LINE

EASEMENT

LINE

SETBACK

LINE

CONCRETE CURB &

GUTTER

UTILITY POLE

WITH LIGHT

POLE

LIGHT

SAN

#

STM

#

SANITARY

LABEL

STORM

LABEL

SANITARY SEWER

LATERAL

UNDERGROUND

WATER LINE

UNDERGROUND

ELECTRIC LINE

UNDERGROUND

GAS LINE

OVERHEAD

WIRE

UNDERGROUND

TELEPHONE LINE

UNDERGROUND

CABLE LINE

STORM

SEWER

SANITARY

SEWER MAIN

HYDRANT

SANITARY

MANHOLE

STORM

MANHOLE

WATER

METER

WATER

VALVE

GAS

VALVE

GAS

METER

TYPICAL END

SECTION

HEADWALL OR

ENDWALL

YARD

INLET

CURB

INLET

CLEAN

OUT

ELECTRIC

MANHOLE

TELEPHONE

MANHOLE

ELECTRIC

BOX

ELECTRIC

PEDESTAL

MONITORING

WELL

TEST

PIT

S

COPYRIGHT 2003DELORME STREET ATLAS 2004 PLUS USA

SCALE: 1"=2000'

CONSTRUCTIONNOT APPROVED FOR

REVISIONS

REV DATE COMMENT BY

LOCATION OF SITE

FOR

PROJECT No.:

DRAWN BY:

CHECKED BY:

DATE:

SCALE:

CAD I.D.:

SHEET NUMBER:

SHEET TITLE:

PROJECT:

THE FOLLOWING STATES REQUIRE NOTIFICATION BYEXCAVATORS, DESIGNERS, OR ANY PERSON PREPARING TO

DISTURB THE EARTH'S SURFACE ANYWHERE IN THE STATE.IN VIRGINIA, MARYLAND, THE DISTRICT OF COLUMBIA,

NORTH CAROLINA AND DELAWARE CALL - 811

(WV 1-800-245-4848) (PA 1-800-242-1776) (DC 1-800-257-7777)(VA 1-800-552-7001) (MD 1-800-257-7777) (DE 1-800-282-8555)

MB14200601

MUYTACO BELL

NEW HAMPSHIRE AVE

AND HOLTON AVE

TAKOMA PARK, MD 20912

MONTGOMERY COUNTY

16701 MELFORD BLVD , SUITE 310

BOWIE, MARYLAND 20715

Phone: (301) 809-4500

Fax: (301) 809-4501

[email protected]

SU

ST

AIN

ABLE D

ESIG

N

LA

ND

SC

APE A

RC

HIT

EC

TU

RE

SIT

E C

IVIL

AN

D C

ON

SU

LT

ING

EN

GIN

EER

ING

LA

ND

SU

RV

EY

ING

PR

OG

RA

M M

AN

AG

EM

EN

T

PER

MIT

TIN

G S

ER

VIC

ES

TR

AN

SPO

RT

AT

ION

SER

VIC

ES

BO

ST

ON

, M

A

UP

ST

AT

E N

EW

YO

RK

NE

W Y

OR

K M

ET

RO

LE

HIG

H V

ALLE

Y, P

A

SO

UT

HE

AS

TE

RN

, P

A

PH

ILA

DE

LP

HIA

/SO

UT

HE

RN

NJ

SO

UT

HE

RN

MA

RY

LA

ND

BA

LT

IMO

RE

, M

D

WA

SH

ING

TO

N, D

C

CE

NT

RA

L V

IRG

INIA

CH

AR

LO

TT

E, N

C

RA

LE

IGH

, N

C

NO

RT

HE

RN

VIR

GIN

IA

WA

RR

EN

, N

J

TM

GENERAL NOTE:

IT IS THE RESPONSIBILITY OF THE CONTRACTOR TO REVIEW ALL OF THE DRAWINGS AND SPECIFICATIONS ASSOCIATED WITH THIS PROJECT

WORK SCOPE PRIOR TO THE INITIATION OF CONSTRUCTION. SHOULD THE CONTRACTOR FIND A CONFLICT WITH THE DOCUMENTS RELATIVE TO

THE SPECIFICATIONS OR APPLICABLE CODES, IT IS THE CONTRACTOR'S RESPONSIBILITY TO NOTIFY THE PROJECT ENGINEER OF RECORD IN

WRITING PRIOR TO THE START OF CONSTRUCTION. FAILURE BY THE CONTRACTOR TO NOTIFY THE PROJECT ENGINEER SHALL CONSTITUTE

ACCEPTANCE OF FULL RESPONSIBILITY BY THE CONTRACTOR TO COMPLETE THE SCOPE OF THE WORK AS DEFINED BY THE DRAWINGS AND IN

FULL CONFORMANCE WITH LOCAL REGULATIONS AND CODES.

PROFESSIONAL CERTIFICATION

MARYLAND LICENSE No. 39999

I, MATTHEW K. JONES, HEREBY CERTIFY THAT THESE

DOCUMENTS WERE PREPARED OR APPROVED BY ME, AND

THAT I AM A DULY LICENSED PROFESSIONAL ENGINEER

UNDER THE LAWS OF THE STATE OF MARYLAND,

LICENSE NO. 39999, EXPIRATION DATE: 3/15/2017

1"= 20'

0 205 10 20

LEGEND

PUBLIC OPEN SPACE

PROJECT DATA TABLE: CRT-2.5 ZONE (C-2.0, R-1.5, H-100 )

ZONING ORDINANCE

DEVELOPMENT STANDARDS

PROPOSED FOR

SITE PLAN

APPROVAL

B. GROSS TRACT AREA NONE 0.56 AC

C. MAXIMUM BUILDING HEIGHT 100' 23'

D. FLOOR AREA RATIO (FAR) (BUILDING COVERAGE TO GROSS TRACT AREA)

C=2.0 (48,787 SF)

R=1.5 (36,590 SF)

2.5 MAX (60,984 SF)

0.1 FAR OR

2,063 SF GFA

E. PUBLIC OPEN SPACE

TOTAL PUBLIC OPEN SPACE10 % NET TRACT AREA

2,459 SF2,500 SF

H. MIN. BUILDING SETBACKS

FRONT(NEW HAMPSHIRE AVE.) 0' 0'

REAR 0' 0'

NORTH SIDE 0' 0'

SOUTH SIDE (HOLTON LANE) 0' 0'

I. MAXIMUM SETBACK - BUILD TO AREA1

FRONT STREET

70% OF THE BUILDING FACADE

MUST BE WITHIN 30' OF NEW

HAMPSHIRE AVE WITH EXISTING

10 FOOT PUE.1

70% OF THE

BUILDING

FACADE IS

WITHIN 27' OF

NEW HAMPSHIRE

AVE.

SIDE STREET

35% OF THE BUILDING FACADE

MUST BE WITHIN OF 20' OF

HOLTON LANE.

35% OF THE

BUILDING

FACADE IS

WITHIN 15.5' OF

HOLTON LANE.

1 THE BUILD TO AREA MAXIMUM SETBACK MAY BE INCREASED BY THE MINIMUM SETBACK NECESSARY TO AVOID A PLATTED PUBLIC

UTILITY EASMENT.

D

PARKING REQUIREMENTS (CRT-2.53,4)

BUILDING USE CATEGORY ZONING ORDINANCE DEVELOPMENT

STANDARDSPARKING REQUIRED PARKING PROPOSED

MNIMUM MAXIMUM MINIMUM MAXIMUM STANDARD SPACES 25 SPACES

TACO

BELL

RESTAURANT

(GENERAL) 4 SPACES/1,000 S.F.

OF PATRON USE

12 SPACES/1,000 S.F.

OF PATRON USE

4/1,000 X 875.3 PATRON S.F. = 3.5

= 4 SPACES

12/1,000 X 875.3 PATRON S.F. = 10.5

= 11 SPACESADA SPACES 2 SPACES (2 VAN ACCESSIBLE)

TOTAL SPACES 4 SPACES 11 SPACES 27 SPACES2

2 PARKING COMPLIES WITH THE MAXIMUM REQUIREMENT BECAUSE PARKING SPACES IN EXCESS OF MAXIMUM WILL NOT BE RESERVED FOR TACO BELL'S USE.

3 THE TACO BELL LOT IS PART OF AN INTEGRATED SHOPPING CENTER, FOR WHICH THERE IS SHARED PARKING. A MINIMUM OF 206 PARKING SPACES AND A MAXIMUM OF 355 PARKING SPACES ARE REQUIRED FOR THE

OVERALL SHOPPING CENTER. AFTER CONSTRUCTION OF THE TACO BELL, A TOTAL OF 269 PARKING SPACES WILL BE PROVIDED.

4CRT-2.5 ZONE IS ELIGIBLE TO BE CONSIDERED A REDUCED PARKING AREA. REQUIRED SPACES SHOWN REFLECT THIS REDUCTION.

SITE PLAN#820150150

TACO BELLTAKOMA PARK

Page 15: September 21, 2015 Work Session - Amazon Web Servicescitycouncil-takomapark.s3.amazonaws.com/agenda/items/...2015/09/21  · Discussion of Site Plan Application for N.E. Quadrant of
Page 16: September 21, 2015 Work Session - Amazon Web Servicescitycouncil-takomapark.s3.amazonaws.com/agenda/items/...2015/09/21  · Discussion of Site Plan Application for N.E. Quadrant of
Page 17: September 21, 2015 Work Session - Amazon Web Servicescitycouncil-takomapark.s3.amazonaws.com/agenda/items/...2015/09/21  · Discussion of Site Plan Application for N.E. Quadrant of