UGANDA ELECTRICITY DISTRIBUTION COMPANY LIMITED
VERIFICATION OF ASSET ADDITIONS TO THE ELECTRICITY
DISTRIBUTION NETWORK
FOR YEAR 2013
SEPTEMBER 2014
REPORT SUBMISSION AND APPROVAL
Preparation of Report:
Name:________________________________________________________
Designation:___________________________________________________
Signature:____________________________Date:____________________
Checking:
Name:________________________________________________________
Designation:___________________________________________________
Signature:____________________________Date:____________________
Approval for Dissemination:
Name:________________________________________________________
Designation:___________________________________________________
Signature:____________________________Date:____________________
CONTENTS
1 LIST OF FIGURES .........................................................................................................iii
2 LIST OF TABLES...........................................................................................................iii
3 ACRONYMS AND ABBREVIATIONS ........................................................................ iv
4 EXECUTIVE SUMMARY .............................................................................................. v
5 INTRODUCTION ............................................................................................................ 1
6 UMEME 2013 INVESTMENT SUBMISSION............................................................... 2
7 INVESTMENT VERIFICATION METHODOLOGY.................................................... 2
8 APPROVED 2013 INVESTMENT PLAN ...................................................................... 4
8.1 Projects Approved but not Implemented. .............................................. 6
8.2 Approved Projects Overspent. ..................................................................... 6
8.3 Investments under-spent............................................................................... 7
8.4 Investments not Approved ............................................................................ 7
9 FINDINGS OF THE VERIFICATION EXERCISE. ....................................................... 8
9.1 SAFETY. .................................................................................................................. 8
9.2 LOAD GROWTH. ................................................................................................ 11
9.3 OTHER INVESTMENTS .................................................................................... 28
10 CONCLUDING SUMMARY .................................................................................... 32
11 RECOMMENDATIONS ............................................................................................ 34
12 Appendix I: KEY RISKS IDENTIFIED AND MITIGATION MEASURES ........... 36
13 Appendix II: Safety Priority Projects .......................................................................... 38
14 Appendix III: Commercial Loss Reduction Services ................................................. 39
15 Appendix IV: Umeme 2013 Investment Plan ............................................................. 43
16 Appendix V: Umeme 2013 Detailed Asset Additions ................................................ 45
17 Appendix VI: Customer funded schemes added onto Network.................................. 66
1 LIST OF FIGURES
Figure 1: UMEME investment Trends, 2005 - 2013 ............................................................. vii Figure 2: UMEME allocation of Investment Funds in 2013 ................................................... 3
2 LIST OF TABLES
Table 1: Cumulative UMEME addition to network, 2005 - 2013 .......................................... vi
Table 2: UMEME 2013 Investment Submission. .................................................................... 2 Table 3: 2013 Investment Plan submitted by UMEME ........................................................... 5 Table 4: Projects approved but not implemented .................................................................... 6 Table 5: Approved projects Overspent .................................................................................... 7
Table 6: Investments under-spent ............................................................................................ 7 Table 7: Expenditure not approved by ERA ............................................................................ 8 Table 8: Summary of Works done on Safety Priority Projects .............................................. 10
Table 9: UMEME submission of completed projects under Load Growth ........................... 12 Table 10: Number and costs of Substations and Lines approved by ERA ............................ 13
Table 11: UMEME completed investment submission for Substations and Lines ............... 13 Table 12: Breakdown of Feeder projects ............................................................................... 14 Table 13: Substation projects with Completion Certificates ................................................. 16
Table 14: 2012 Projects re-submitted in 2013 ....................................................................... 18
Table 15: Summary of substations and Interconnecting Lines .............................................. 19 Table 16: Summary of Quality of Supply Projects ................................................................ 20 Table 17: Quality of Supply Projects and Adjustments ......................................................... 21
Table 18: Approved Technical Loss Reduction projects for 2013 ........................................ 22 Table 19: Transformer injections against Approved injections ............................................. 22
Table 20: Detailed breakdown ............................................................................................... 23 Table 21: Technical Loss Reduction – Services .................................................................... 25 Table 22: Summary of Technical Loss Reduction – System Improvements ......................... 26 Table 23: Other projects for Load Growth and Technical Loss Reduction ........................... 28
Table 24: UMEME 2013 Investment Summary .................................................................... 33 Table 25: Safety Priority projects .......................................................................................... 38 Table 26: Commercial Loss Reduction Services ................................................................... 40
iv
3 ACRONYMS AND ABBREVIATIONS
ABC: Aerial Bundled Conductors
CAPEX Capital Expenditure
DOMC: Distribution, Operations & Maintenance Costs
GoU: Government of Uganda
ERA: Electricity Regulatory Authority
HV: High Voltage
LAA: Lease and Assignment Agreement
LV: Low Voltage
MV: Medium Voltage
REA: Rural Electrification Agency
ROI: Return on Investment
SCADA:
Supervisory Control And Data Acquisition
UEDCL: Uganda Electricity Distribution Company Limited
UETCL: Uganda Electricity Transmission Company Limited
UMEME Umeme Limited
UGX: Uganda Shillings
USD: United States Dollars
VFM: Value for money
v
4 EXECUTIVE SUMMARY This report presents outcome of the joint verification exercise for assets added by Umeme Limited (UMEME) to the Distribution Network in 2013.
The verification was carried out by a joint team from Electricity Regulatory Authority (ERA) and Uganda Electricity Distribution Company Limited (UEDCL) between March 2013 and May 2013 basing on The Electricity (Transmission and Distribution) Investment Approval and Verification Guidelines that was published by ERA in March 2013.
UMEME submitted a copy of the asset register to UEDCL on 2nd April 2014,
which was in violation of Section 2.9 (d) of the LAA, which obligates UMEME to furnish UEDCL with a copy of the assets register detailing all asset additions and modifications by 1st February of each calendar year after the
transfer date.
Additions to the Distribution Network financed by Rural Electrification Agency (REA) and Customers were also taken into consideration during the verification exercise.
Summary outcomes of the verification exercise were as follows:
a) For 2013 UMEME investment submission, the category by category additions applied to be considered for ROI totaled UGX
129,475,558,933 for network assets;
b) Of the above, total verified and recommended as qualifying for ROI for network assets was UGX 92,545,253,738 while UGX
36,930,305,195 was disallowed;
c) An amount of USD 1,000,000 approved by ERA for operation and maintenance of non-network assets was clawed back on account of
UMEME not submitting accountability for it;
d) As indicated in the Table 1, a cumulative total value of
UGX530,952,839,084 worth of assets was added to the Distribution Network by UMEME as of 31st December 2013, and a cumulative total
UGX 384,471,667,123 has so far been verified as qualifying for UMEME to earn ROI. This constitutes 72.4% of cumulative additions;
vi
Table 1: Cumulative UMEME addition to network, 2005 - 2013
Period Amount added to Distribution
Network [UGX]
Amount Disallowed [UGX]
Amount Recommended to
earn ROI [UGX]
Mar – Dec 2005 19,359,660,237 9,705,157,238 9,654,502,999
Jan – Dec 2006 8,491,835,423 1,627,355,370 6,864,480,053
Jan – Dec 2007 41,117,962,610 14,741,438,489 26,376,524,121
Jan – Dec 2008 53,472,067,991 11,035,728,584 42,436,339,407
Jan – Dec 2009 61,099,234,587 2,760,798,926 58,338,435,661
Jan – Dec 2010 40,588,723,230 2,502,697,746 38,086,025,484 Jan – Dec 2011 75,895,076,545 23,320,754,480 52,574,322,065
Jan – Dec 2012 **101,452,719,528 43,856,935,932 57,595,783,595
Jan – Dec 2013 129,475,558,933 36,930,305,195 92,545,253,738
Cumulative Total 530,952,839,084 146,481,171,960 384,471,667,123
**This constitutes additions due to UMEME minus additions due to REA and those paid for
by consumers
e) As previously discussed and agreed, UMEME should endeavour to make quarterly submissions of investments done to avoid the accumulation and subsequent pressure of carrying out the
verification;
f) Similarly, UMEME should notify UEDCL prior to undertaking implementation of all investment works to ease monitoring and subsequently hasten the verification process.
vii
Figure 1: UMEME investment Trends, 2005 - 2013
0
20,000,000,000
40,000,000,000
60,000,000,000
80,000,000,000
100,000,000,000
120,000,000,000
140,000,000,000
2005 2006 2007 2008 2009 2010 2011 2012 2013
UMEME Investment Trends (UGX)
Amount added to Distribution Network [UGX] Amount Disallowed [UGX] Amount Recommended to earn ROI [UGX]
1
5 INTRODUCTION
The Government of Uganda (GoU) signed a 20-year concession agreement with Umeme Limited (hereafter referred to as UMEME) on 17 May 2004. The
agreement obliged UMEME to invest in the Distribution Network. The concession also involved UMEME and other parties entering into the following agreements:
a) The Lease and Assignment Agreement (LAA) with UEDCL; b) The Support Agreement with GoU; c) The Power Sales Agreement with Uganda Electricity Transmission
Company Limited (UETCL); d) Licenses for Electricity Distribution, Supply, and Embedded generation
by the Electricity Regulatory Authority (ERA).
Under the Lease and Assignment Agreement (LAA) UMEME is obliged to submit
to Uganda Electricity Distribution Company Limited (UEDCL) a register of assets added onto the distribution network annually. This submission is supposed to
be done on 1st February of every year after the transfer date, as stipulated in the LAA. UMEME submitted the register on 2nd April 2014, meaning it violated the provision in the LAA.
UEDCL is obliged to monitor the quality of these assets, as well as verify all asset additions that UMEME declares as investments, and that should earn a 20%
return on investment (ROI).
As stipulated in the Electricity (Transmission & Distribution) Investment Approval and Verification Guidelines these investments have to be verified by a joint task
force of ERA and UEDCL technical personnel prior to being allowed to earn ROI. Such an exercise was carried out between January 2014 and March 2014, and
a report was prepared and circulated to stakeholders by ERA via a letter of 9th May 2014.
This report presents results and outcomes of the joint verification exercise carried out.
2
6 UMEME 2013 INVESTMENT SUBMISSION UMEME submitted investments undertaken in 2013 for verification for purposes of ROI totaling to UGX129.5bn equivalent to USD51.3m as shown in Table 2.
Figure 2 shows the percentage allocation of funds to each of the investment categories submitted. See Appendix IV for detailed 2013 investmenbt plan submission by Umeme.
Figure 2 gives a breakdown of how these funds were allocated to the various investment categories that Umeme presented.
Table 2: UMEME 2013 Investment Submission.
Category UGX USD
New Substations and Interconnecting Lines 17,052,880,510 6,762,963.66
Substation and Line Upgrades 28,165,760,246 11,170,195.73
New Connections - Post and Prepaid 21,451,811,948 8,507,526.03
Prepaid Metering - Retrofit 14,869,219,494 5,896,950.44
Technical Loss Reduction Projects 22,798,671,637 9,041,674.09
Safety 7,239,999,786 2,871,295.29
Commercial Loss Reduction Services 3,994,529,431 1,584,181.47
Quality of Supply Projects - System Upgrades 7,588,661,893 3,009,570.41
Distribution Automation Project 2,617,634,539 1,038,121.82
SCADA Upgrade project- Phase 2 1,031,384,782 409,034.58
UECTL Check Metering Project 2,665,004,667 1,056,908.23
TOTALS 129,475,558,933 51,348,422
7 INVESTMENT VERIFICATION METHODOLOGY The process of investment verification was broken down into phases as follows:-
(a) Desk review
All documentation of submitted investments were reviewed to check the justification given for the investments, the procurement processes, the
respective contracts, the implementation and close-out reports, and any payments made against completed works. All investments submitted were fully checked in this phase. In this phase, the assumptions to be
undertaken while verifying the completeness and accuracy of the new connections were also agreed with UMEME and that agreement was evidenced by a sign-off of the methodology to be applied. All of UMEME
submissions were verified 100%;
3
Figure 2: UMEME allocation of Investment Funds in 2013
(b) Analytical procedures
This followed a top down approach relying on the proper operation of controls, and on logical linkages between different information components derived from the assumption of proper system operation. This
led to testing details which rely on the direct vouching or tracing of individual accounts or transactions to obtain substantive evidence.
The choice of the approach taken among the two above was premised on practical considerations, e.g. New Connections which exceed 59,000
different connections was tested using the Analytical review approach and a methodology was agreed upon.
New Substations and Interconnecting
Lines13%
Substation and Line Upgrades
22%
New Connections -Post and Prepaid
16%
Prepaid Metering -Retrofit
11%
Technical Loss Reduction Projects
18%
Safety6%
Commercial Loss Reduction Services
3%
Quality of Supply Projects - System
Upgrades6%
Distribution Automation Project
2%SCADA Upgrade project- Phase 2
1%UECTL Check Metering Project
2%
Other11%
UMEME Allocation of Investment Funds
4
(c) Field verification
Particular investments were sampled out to validate the works completed in the field, confirm implementation and quality of works done.
In conducting the verification exercise, the methodology adopted was guided by
the Investment Approval and Verification Guidelines, 2013, and the practice
notes relating to risk identification and mitigation as detailed in Appendix (I).
8 APPROVED 2013 INVESTMENT PLAN ERA approved a total amount of USD55.8million for UMEME to invest in various categories in 2013 and USD1.0 million for Non-Network Assets. Table 3 shows
the detailed categories of the approved 2013 Investment Plan aligned against the actual submission made by UMEME.
5
Table 3: 2013 Investment Plan submitted by UMEME SUB-CATEGORY PROJECT Amount
approved (MUSD)
Amount Actual (MUSD)
Variance (MUSD)
SAFETY Safety new projects plus Aerial Bundled Conductor (ABC) 3.50 2.9 (0.60)
LOSSES Technical Loss Reduction 10.00 9.04 (0.96)
Prepayment retrofitting and ABC - 0 0.00
AMR 2.93 0 (2.93)
Commercial Loss Reduction - 0 0.00
UETCL check metering 1.00 1.06 0.06
LOAD GROWTH AND NEW CONNECTIONS
Lubowa Substation 2.10 3.6 1.50
Waligo Substation 1.17 1.97 0.80
Lubowa interconnecting lines 0.32 0.82 0.50
Iganga Capacitor bank 0.60 0 (0.60)
Kampala North Hilton 3kV feeder 0.00
Mortomart Substation 4.00 0 (4.00)
Lugogo-Kitante-Motormart-Queensway 33kV cable 1.10 2.05 0.95
Namamve-Kireka 33kV cable 1.00 1.18 0.18
33kV switchgear for the 33kV cable feeder 0.96 1.18 0.22
Kawanda-Busunji 33kV cable feeder 2.70 2.5 (0.20)
Luweero substation and lines 2.50 1.62 (0.88)
Quality of supply improvement 3.00 3.01 0.01
Jinja 33kV lines re-conductoring 0.40 0 (0.40)
Namamve-Mbalala 33kV feeder 1.20 0.75 (0.45)
New connections 8.00 8.51 0.51
Projects Management - 0 0.00
RESTORATION Kayunga-Kangulumira 0.65 0 (0.65)
Mutundwe-Masaka Central 33kV 1.00 0 (1.00)
Mukono - Seeta 0.80 0 (0.80)
Tororo - Mbale 1 and 2 1.00 0 (1.00)
Masaka Cenytral - Masaka 1.55 0 (1.55)
Opuyo-Kumi-Kapchorwa-Mbale 0.75 0 (0.75)
Busunju - Hoima 1.00 0 (1.00)
Kireka-Namugongo 0.55 0 (0.55)
Lira 33kV switch gear ans S/S Battery Banks 2.00 0 (2.00)
Distribution Automation Distribution Automation - 0 0.00
Operational Vehicles - 0.00
IT Backbone infrastructure 1.00 0 (1.00)
IT Projects and Initiatives -
Tools -
TOTALS 56.78 40.19 (16.59)
6
8.1 Projects Approved but not Implemented. The Company did not implement projects amounting to USD17.3million. These
projects included Safety, Loss reduction projects, Customer Service - Load growth and Customer Service – Restoration. These had been approved by ERA
in the 2013 UMEME submissions. Table 4 below shows the approved investments where no investment was done. The Company did not provide any explanation whether these were work in progress or were completely left out.
Table 4: Projects approved but not implemented
PROJECT Amount approved (MUSD)
Amount Actual (MUSD)
Variance (MUSD)
AMR 2.93 - (2.93)
Iganga Capacitor bank 0.60 - (0.60)
Mortomart Substation 4.00 - (4.00)
Jinja 33kV lines re-conductoring 0.40 - (0.40)
Projects Management - - -
Kayunga-Kangulumira 0.65 - (0.65)
Mutundwe-Masaka Central 33kV 1.00 - (1.00)
Mukono - Seeta 0.80 - (0.80)
Tororo - Mbale 1 and 2 1.00 - (1.00)
Masaka Cenytral - Masaka 1.55 - (1.55)
Opuyo-Kumi-Kapchorwa-Mbale 0.75 - (0.75)
Busunju - Hoima 1.00 - (1.00)
Kireka-Namugongo 0.55 - (0.55)
Lira 33kV switch gear and S/S Battery Banks 2.00 - (2.00)
TOTALS 17.23 -17.23
8.2 Approved Projects Overspent.
From the submission, UMEME over spent on projects to the tune of USD4.73 million, as indicated in Table 5. These were in the load growth and loss reduction categories. The over spent is 8% of the total approved investment.
7
Table 5: Approved projects Overspent
PROJECT Amount approved (MUSD)
Amount Actual (MUSD)
Variance (MUSD)
UETCL check metering 1.00 1.06 0.06
Lubowa Substation 2.10 3.60 1.50
Waligo Substation 1.17 1.97 0.80
Lubowa interconnecting lines 0.32 0.82 0.50
Lugogo-Kitante-Motormart-Queensway 33kV cable 1.10 2.05 0.95
Namamve-Kireka 33kV cable 1.00 1.18 0.18
33kV switchgear for the 33kV cable feeder 0.96 1.18 0.22
Quality of supply improvement 3.00 3.01 0.01
New connections 8.00 8.51 0.51
TOTALS 18.65 23.38 4.73
8.3 Investments under-spent
During the year, the Company implemented projects at less than the approved
amount. These are indicated in Table 6. The under spend were 6% of the total
approved investments.
Table 6: Investments under-spent
PROJECT Amount approved (MUSD)
Amount Actual (MUSD)
Variance (MUSD)
Safety new projects plus Aerial Bundled Conductor (ABC) 3.5 2.9 -0.6
Technical Loss Reduction 10 9.04 -0.96
Kawanda-Busunji 33kV cable feeder 2.7 2.5 -0.2
Luweero substation and lines 2.5 1.62 -0.88
Namamve-Mbalala 33kV feeder 1.2 0.75 -0.45
TOTALS 19.9 16.81 -3.09
8.4 Investments not Approved Whilst UMEME never implemented projects to the tune of USD17.3million, the
company submitted investments worth USD9.81m undertaken in 2013 that were not approved by ERA as shown in Table 7.
8
Table 7: Expenditure not approved by ERA
Description of Projects Base Amount (UGX) Equivalent USD
New Substations and Interconnecting Lines 846,886,436 335,865
Substation and Line Upgrades 1,366,540,175 541,953
Prepaid Metering - Retrofit 14,869,219,494 5,896,950
Commercial Loss Reduction 3,994,529,431 1,584,181
Distribution Automation Project 2,617,634,539 1,038,122
SCADA Upgrade project- Phase 2 1,031,384,782 409,035
Total Un approved Investments 24,726,194,857 9,806,106
Section 11 (2) of the Investment Approval and Verification Guidelines require the Company to submit for monitoring and verification only approved investments.
However as noted in Table 7 above, some of the investments made did not adhere to this provision. There is another provision in the Distribution license Section 2.3.2 which provides the Company with some flexibility whereby investments
may be made without prior approval to the limit of 10% of the net asset base of the preceding year cumulatively over a two year period.
Therefore the 10% limit using the net asset base of 2012 as approved translates into a limit of UGX 25.2bn. This being higher than the amount the Company
invested without approval, implies that the unapproved amount qualifies for verification and if approved they will earn a Return on Investment (ROI).
9 FINDINGS OF THE VERIFICATION EXERCISE. 9.1 SAFETY.
UMEME in its 2013 investment plan submitted that the budget for safety will be
used to complete the 7 districts on their priority list and school safety projects in the top 4 priority districts. These school’s projects were to be completed in
Aerial Bundled Conductors (ABC) in 40 schools. In UMEME submission of the completed 2013 investments for verification, Safety projects were justified as projects to replace bare wire conductor in schools that
were of high risk of exposure to electrical incidents with ABC. ERA approved USD 3.5m equivalent to UGX8.8bn.
9.1.1 Approach to Review of the Safety Projects
The following approach was used in the desk review: (i) Comparison of the submitted projects against ERA’s approval;
(ii) Examining the rationale and justifications for the work done; (iii)Review of incidence reports and any other triggers for the safety work; (iv) Examining scope of works done and material usage;
9
(v) Review of progress reports and commissioning reports for the works done; (vi) Comparing the 2013 submission against the 2012 verified projects to ensure
that 2012 projects were not being resubmitted; (vii) Assessment of Value for Money (VFM) for safety priority projects. This
included the process (i.e. bidding, evaluation and contracting) and verifying the procurement principles of open competition, fairness, transparency and efficiency;
9.1.2 Findings of the Review
UMEME submitted 55 projects worth UGX7.2billion and the team reviewed 49
worth UGX6.6bn; the remaining six (6), were projects that were completed and reviewed in 2012.
9.1.2.1 Desk Review Observations
(i) All the 49 projects reviewed were part of UMEME’s submission for the 2013 approved plan;
(ii) The rationale and justification for the projects was generic, networks identified as a safety risk with an aim of combating non-illegal fatalities;
(iii) There was no risk assessment and fatality reports done on these projects to justify the need for safety;
(iv) Sixteen (16) safety projects had a combination of ABC replacement,
transformer injections and an element of relocation of the existing transformers without justification for load growth. UMEME argued that the injections were necessary because of the introduction of ABC that has
limitations on the transformer radius;
(v) All the projects had commissioning reports and handover reports. It was noted that all the injected transformers were poorly earthed posing a risk to
the transformer safety;
(vi) Sixteen (16) safety projects were open wire replacements without any ABC conversion;
(vii) Two (2) safety projects had transformer injections and re-conductoring done using bare conductor;
(viii) Fifteen (15) projects were done within the scope of safety by replacing bare wire with ABC;
(ix) Six (6) projects were re-submitted from the 2012 completed investments.
These projects were verified and disallowed on account of being O&M works in 2012;
(x) All the safety projects had replacement of rotten LV poles as part of the scope;
(xi) On the procurement side of contractors, key stages of bidding and evaluation were conducted for all projects;
(xii)On the Value For Money (VFM) side, the following were noted:-
10
There were no standard operating procedures or guidelines for
procurement operations;
All contractor price offers were in the similar range, thus a fair
representation of the cost of the works projects;
There was maximum competition of at least a minimum of four
contractors invited to bid for the works;
For projects that were post July 2013, standard costs for labour and
transport were used, averaging to about 40% of total project costs;
Works are fairly rotated among the list basing on performance and
capability of each contractor;
It was observed that there were no procurement committee meetings to
approve recommendations of award by the evaluation teams;
The project contractors were not issued written terms and conditions.
Contractors were merely letters of award inferring to terms and conditions governing the contract;
The estimated project costs and market offers were in close range (+/-
25%) and thus a clear indication that a thorough market assessment
of pricing and costing was carried out;
9.1.2.2 Field Verification Findings
Field verifications of the Safety projects revealed the following:
(i) UMEME carried out the works as per the submitted scope and the quality of work done was satisfactory save for the poor earth values of the
distribution transformer substations; (ii) Safety of the schools being the main driver of the safety priority projects
was not of primary concern in most of the projects implemented. These
projects had a loss reduction and load growth aspect embedded; (iii)There was an aspect of pole replacements which are considered to be O&M
in nature. Table 8 shows a summary of the findings of works done under
safety priority projects.
Table 8: Summary of Works done on Safety Priority Projects
Category No Cost (UGX) Pole Replacements Cost to be
offset
Recommended
Value LV MV
Transformer injection and ABC 10 1,701,381,929 535 42 310,000,920 1,391,381,009
Transformer injection and Bare 2 110,111,192 29 1 12,722,420 97,388,772
Bare wire 16 1,420,069,133 585 32 263,105,460 1,156,963,673
ABC and pole replacement 14 1,676,340,247 416 23 236,992,460 1,439,347,787
Projects for 2012 6 648,519,848 0 0 648,519,848 0
Poor Earth 7 1,683,577,437 479 16 1,683,577,437 0
Totals 55 7,239,999,786 2,044 114 3,154,918,545 4,085,081,241
11
9.1.3 Recommendations
Verification team recommended that,
(i) All poles replaced totaling to 2,158 poles (2,044 LV and 114 MV) amounting to UGX822.8million be disallowed as these were of regular operations and maintenance (O&M) nature;
(ii) Projects worth UGX 649 million that were presented and disallowed in 2012 be removed and the Company should explain why these were resubmitted as
shown in Appendix (II); (iii)Projects reviewed where distribution transformers had poor earth, amounting
to UGX 1.68 billion, is set aside. These will be resubmitted after remedial
works were completed. (iv) Taking into consideration off setting adjustments from (i) to (iii) totaling
to UGX3.155 billion, the component that meets the criteria and therefore qualifies for a return (ROI) is UGX 4.085 billion as detailed in Table 8.
9.2 LOAD GROWTH.
ERA approved a total of USD29.05 million in the Investment Plan for load growth
projects and the projects submitted under this category included;
(i) Substations and overhead lines (ii) Quality of supply (iii)New connections
The desk review was done according to four categories, i.e. Overhead lines, substations and integrating lines, Quality of supply and New Connections.
9.2.1 Approach to Review of Load Growth Projects
The approach adopted for the review of load growth projects was based on the
following:
(i) Reviewing approved projects in the investment plan; (ii) Examining the rationale and justification for the implemented projects; (iii)Reviewing the Historical data and reports on feeders and substations within
the study area to confirm load growth; (iv) Examining Load flow studies to show optimum solution;
(v) Examining the Scope of works done against the approved scope; (vi) Reviewing the Completion reports and handover certificates to show that the
project was completed and fully operation;
(vii) Comparing the 2013 submission against the 2012 verified projects to ensure that 2012 projects were not being resubmitted;
12
(viii) Assessing VFM on safety priority projects. This included reviewing the process of bidding, evaluating, contracting and verifying the procurement
principles of openness, competition, fairness, transparency and efficiency;
(ix) Table 9 shows UMEME’s submission of completed investments under the
Load growth category totaling to UGX 72.26billion.
Table 9: UMEME submission of completed projects under Load Growth
Description Base Amount (UGX)
Amount (USD)
Substations and Interconnecting Lines
New Waliggo Substation 4,961,355,176 1,967,613
New Lubowa Substation 9,171,016,840 3,637,113
Lubowa intergration Line Phase one - Bunamwaya feeder
694,473,319 275,420
Lumpewe substation 962,510,255 381,720
Luwero-Lumpewe Integration Lines 3,113,853,850 1,234,916
Upgrade-Tororo Substation 71,895,751 28,513
15/20MVA Kampala South S/S Power Transformer (55,353,637) (21,953)
Walligo-Ntinda 33kV Interconnector 54,667,916 21,681
10/14MVA Mukono Substation Power Transformer 53,985,322 21,410
Kawanda waligo interconecting line 13,481,411 5,347
Total substations and Interconnecting lines 19,041,886,203 7,551,779
Feeders
New Namanve - Mukono Feeder 2 1,881,083,187 746,015
Kampala North - Nakasero 33kV line 3,455,729,020 1,370,500
Lugogo-Kitante 33kV Cable 2 1,976,353,500 783,798
Kitante-Queensway 33kV cable 3,203,845,870 1,270,606
2 33Kv GIS Switch gears for Kawanda Susbstation 641,745,786 254,509
Lugogo-Kisugu-Queensway 33kV feeder uprate 544,245,400 215,841
Kawanda - Busunju 33kV line 6,330,339,100 2,510,535
Namanve - Kireka 2 2,965,345,750 1,176,020
Lubowa - Kigo / Ndejje feeder phase two(2) Resurvey 1,379,148,739 546,954
Waligo Intergration Line 833,405,025 330,518
33kV switchgear and associated costs 2,965,513,176 1,176,086
Total Feeders 26,176,754,553 10,381,380
Quality of Supply 5,038,845,740 1,998,345
New Connections 22,000,000,000 8,724,931
TOTAL LOAD GROWTH 72,257,486,496 28,656,435
13
9.2.2 Substations and Interconnecting Lines
Table 10 below shows the summary of the substations and lines according to ERA-approved budget.
Table 10: Number and costs of Substations and Lines approved by ERA
Description No Costs (USD Millions)
Approved 13 18.85
Reviewed/Submitted 10 13.85
Approved but not submitted 03 5.00
Included in this category shown in Table 11 are projects amounting to UGX4.274 billion under the load growth category that were submitted for verification but
had no prior approval of ERA in the 2013 Approved Investment plan.
Table 11: UMEME completed investment submission for Substations and Lines
Description (substation and lines)
Location Base amount UGX
USD
Amt-
@2521.5
1
Approved by ERA (USD)
Approved by ERA UGX
Upgrade-Tororo Substation Tororo 71,895,751 28,513 0 0
15/20MVA Kampala South S/S
Power Transformer
Najjanankumbi (55,353,637) (21,953) 0 0
2 33Kv GIS Switch gears for
Kawanda Susbstation
Bombo 641,745,786 254,509 0 0
Walligo-Ntinda 33kV
Interconnector
Wandegeya 54,667,916 21,681 0 0
10/14MVA Mukono Substation
Power Transformer
Mukono 53,985,322 21,410 0 0
New Namanve - Mukono Feeder
2
Mukono 1,881,083,187 746,015 1,200,000 3,025,812,000
Kampala North - Nakasero 33kV
line
Metro 3,455,729,020 1,370,500 800,000 2,017,208,000
Lugogo-Kisugu-Queensway 33kV
feeder uprate
Metro 544,245,400 215,841 0 0
Lugogo-Kitante-Motormart-
Queensway 33kV Cable 2
Metro 5,180,199,370 2,054,404 1,100,000 2,773,661,000
Luwero-Lumpewe substation and
Integration Lines
Bombo 4,076,364,105 1,616,636 2,500,000 6,303,775,000
Kawanda - Busunju 33kV line Mityana 6,330,339,100 2,510,535 2,700,000 6,808,077,000
Namanve - Kireka 2 Banda 2,965,345,750 1,176,020 1,000,000 2,521,510,000
33kV switchgear and associated
costs
Metro 2,965,513,176 1,176,086 960,000 2,420,649,600
New Waliggo Substation Wandegeya 4,961,355,176 1,967,613 1,170,000 2,950,166,700
New Lubowa Substation Najjanankumbi 9,171,016,840 3,637,113 2,100,000 5,295,171,000
Lubowa - Kigo / Ndejje feeder
phase two(2) Resurvey, Lubowa
- Bunamwaya phase 1
Najjanankumbi 2,073,622,058 822,373 320,000 806,883,200
Kawanda waligo interconecting
line
Bombo 13,481,411 5,347 0 0
Waligo Intergration Line 833,405,025 330,518 0 0
Total 45,218,640,756 17,933,159 13,850,000 34,922,913,500
14
These projects include:
(i) Two 33kV GIS switchgear for Kawanda substation; (ii) Waligo integration line; (iii)KawandaWaligo interconnecting lines;
(iv) Upgrade of Tororo substation; (v) WaligoNtinda 33kV interconnector;
(vi) Mukono substation power transformer; (vii) Lugogo – Kisugu - Queensway 33kV feeder upgrade.
Therefore, they are part of the investments that were verified and recommended for approval by exception as explained in Section 1.
9.2.2.1 Feeders
This category had sixteen (16) projects whose justification was to improve power
supply reliability by providing alternative feeds, reduce losses and improve voltage profiles. Of these, 11 projects worth UGX26.18bn as shown in Table 12
were reviewed whist the remaining 5 projects worth UGX138.7m (section 9.2.2.3) had been verified in 2012.
Table 12: Breakdown of Feeder projects
Description Base Amount Certificates
UGX Verified
1 Kawanda - Busunju 33kV line 6,330,339,100 6,314,401,891 15,937,209
2 Kampala North - Nakasero 33kV line 3,455,729,020 2,648,373,148 807,355,872
3 Kitante-Queensway 33kV cable 3,203,845,870 1,366,018,768 1,837,827,102
4
Lubowa - Kigo / Ndejje feeder phase two(2)
Resurvey 1,379,148,739 1,232,230,877 146,917,862
5 33kV switchgear and associated costs 2,965,513,176 963,573,552 2,001,939,624
6 Namanve - Kireka 2 2,965,345,750 2,836,892,786 128,452,964
7 Lugogo-Kitante 33kV Cable 2 1,976,353,500 1,143,062,338 833,291,162
8 New Namanve - Mukono Feeder 2 1,881,083,187 1,881,083,187 -
24,157,358,342 18,385,636,547 5,771,721,795
1 Waligo Intergration Line 833,405,025 833,405,025
2 2 33Kv GIS Switch gears for Kawanda Susbstation 641,745,786 615,376,063 26,369,723
3 Lugogo-Kisugu-Queensway 33kV feeder uprate 544,245,400 544,245,400 -
2,019,396,211 1,159,621,463 859,774,748
26,176,754,553 19,545,258,010 6,631,496,543
Insufficient
Information
Below is a technical summary of the desk review of feeders:
15
(i) All the projects in this category were done under turn key projects. UMEME hired the services of a project manager Mott McDonald to manage the scoping,
tendering and supervision of the construction of the turn key projects. M/s Mot MacDonald was procured competitively through open advertising;
(ii) Justifications for the respective projects were provided and were found to be adequate for the purpose for which they were submitted;
(iii) Three (3) out of the eleven (11) projects were not part of the approved 2013
Investment plan. See details in Table 9; (iv) It was noted that the Factory Acceptance Tests (FATS) for cables procured by
the turn key contractor were not signed off by UMEME;
(v) The scope of works and proposed drawings for the respective projects was reviewed and found to be adequate in terms of detailed work breakdowns and
material requirements for the respective projects; (vi) Progress reports and completion reports for the turn key projects were
submitted;
(vii) Seven (7) out of the eleven (11) projects were new interconnections to substations;
(viii) Two (2) of the eleven (11) projects were existing feeders whose conductor sizes were being upgraded and included a component of pole replacement;
(ix) On the VFM side, the following were noted regarding the relationship between
Mott McDonald, UMEME and the contractors that executed the works:-
There were no procurement guidelines utilized in the process of
acquiring the contractors;
There was a clash in the role of MacDonald and UMEME as turnkey
project managers. Mott Mac Donald never assumed the complete risk/liability for the project outcomes of the contractor works yet the company scoped, tendered and procured the contractors for the
respective projects;
The bidding for poles in the turnkey projects implied standards SANS
753:1994 for supplied poles onto the feeders. The lack of express detail of the standard in the bidding document withholds critical information
from the bidders (i.e. pole treatment technology, warranty life and shelf life), for which the awarded bidders are liable post contract placement and assurance of VFM for the asset.
The field verification exercise revealed that the works were done as per the submitted scope and the quality of works done was satisfactory. There were few
snags noted which the Company will have to rectify.
Therefore as shown in Table 12 above, under the feeders’ sub-category, UGX 19.55 billion was supported with certificates whereas UGX 6.63 billion
could not be supported. These were set aside until the necessary documentation has been provided. Add on UGX138.7 million verified in 2012, total disallowed was UGX6.77 billion.
16
9.2.2.2 Substations and Interconnecting Lines
A total of three (3) substations and two (2) interconnecting lines were submitted
under this category. The justification of these projects was to address high demand and new developments in the respective areas; low voltages; high losses; and poor quality of supply. All these substations submitted were approved by
ERA. The supporting documentation for the submitted substations worth UGX17.052 billion was all availed for verification. Table 13 shows the submission against the actual verified certificates.
Table 13: Substation projects with Completion Certificates
Description Base Amount Certificates
UGX US$ Verified US$
1 New Waliggo Substation 4,961,355,176 1,967,230 4,737,099,311 1,878,311
2 New Lubowa Substation 9,171,016,840 3,636,406 7,388,173,287 2,929,490
3
Lubowa intergration Line Phase one -
Bunamwaya feeder 694,473,319 275,366 549,702,695 217,963
4 Lumpewe substation 962,510,255 381,646 455,836,642 180,744
5 Luwero-Lumpewe Integration Lines 3,113,853,850 1,234,676 3,189,796,519 1,264,788
New Substations and Interconnecting Lines18,903,209,440 7,495,325 16,320,608,455 6,471,296
The desk review showed the following findings:-
(i) Lubowa and Waliggo substations were part of the Network Development Plans of 2005 and 2006 respectively to address demand & new developments, low
voltages, high losses and poor quality of supply on 11kV supply;
(ii) Lubowa and Waliggo substation were also turnkey projects that were contracted to Conco Pty and IET. FBW was contracted as the project
supervisor for the civil works and Grid Consult Ltd was contracted as the supervisor for the electrical works;
(iii)Lumpewe substation was constructed to improve quality of supply, reduce
losses and to cater for load growth in the near future by relieving load and reducing the circuit lengths of the existing Luweero-Kyampisi feeder and
Busunju-Namukerera feeder;
(iv) Lumpewe substation was a turnkey project that was contracted to IET. Mott McDonald was contracted as the project supervisor for all the works on the
substation and the integration lines for the substation;
(v) Progress reports and commissioning reports of the respective transformers
were submitted and reviewed. There were a number of snags highlighted by the respective project managers and these were subsequently verified;
(vi) M/s Grid Consult was directly procured by M/s Mott Macdonald as electrical
projects engineer. UMEME was to manage the supervision of the works of
17
Grid Consult. This coincides with the primary role of the primary contractor, Mot MacDonald and a thus a double cost for UMEME;
(vii) The evaluation and recommendation of award for the contractors by Mott MacDonald was done alongside by UMEME. Thus clashing with the primary
role and liability Mott Mac Donald;
(viii) The FIDIC, 1999 contract terms and conditions governing subcontracts, release the primary liability from the agent to the client. This therefore,
comprises the value that is set to be realized from the agent.
The field verification findings revealed that the works were done as per the submitted scopes and the quality of works done was satisfactory save for a few
snags that UMEME has to clear. Notable among the snags are the following:-
(i) Transformers at Waliggo substation were not operating in parallel; (ii) Lack of firefighting equipment at Waliggo substation and Lubowa substation; (iii)Faulty battery charger at Waliggo substation;
(iv) Lack of single line diagrams at all the substations; (v) Bay numbering at all the substations was not according to the standard
SCADA numbering nomenclature;
(vi) All substations were not being monitored by SCADA by the time of the inspection.
Of the projects considered, UGX6.63 billion represented projects for which relevant information could not be availed. Eleven (11) projects worth UGX21.538
billion were reviewed out of which five (5) projects worth UGX138.7 billion were found to have been verified in 2012, as indicated in the next section.
9.2.2.3 2012 Projects Resubmitted.
The Company submitted projects totaling to uses 138.68 million including a reversal of the overstated works on Kampala south substation that had been
verified and allowed in 2012 as shown in Table 14.
18
Table 14: 2012 Projects re-submitted in 2013
Description Base Amount (UgX)
Amount USD
Reason for Rejection
Location
Kawanda waligo
interconecting line
13,481,411 5,346.56 Submitted in entirety in 2012 as Investment additions and was later approved for ROI.
Bombo
Upgrade-Tororo
Substation
71,895,751 28,512.97 Submitted in entirety in 2012 as Investment additions and was approved for ROI.
Tororo
Walligo-Ntinda 33kV
Interconnector
54,667,916 21,680.63 Submitted in entirety in 2012 as Investment additions and was later approved for ROI.
Wandegeya
10/14MVA Mukono
Substation Power
Transformer
53,985,322 21,409.92 Disallowed in 2012 submission as WIP, resubmitted in 2014 investment plan.
Mukono
15/20MVA Kampala
South S/S Power
Transformer
(55,353,637) (21,952.57) Error on the Kampala South Substation works that had been removed from the approved investments.
Najjanankumbi
138,676,763 54,998
9.2.2.4 Recommendations
Verification team therefore recommended as follows:-
(i) Projects under new substation and interconnecting lines submitted at UGX17.052billion and having gone through verification, UGX14.39 billion to be approved and the balance of UGX 2.66 billion be considered
when adequate information has been submitted;
(ii) Under existing substation and lines where UGX28.165 billion had been
submitted, UGX21.390 billion to be approved for investment. The remainder UGX 6.63billion will be considered when sufficient information is available;
(iii)With the regard to 2012 submitted and disallowed investments amounting to UGX138.68million, we recommend to maintain the 2012
position and disallow this;
19
(iv) For the projects which were not approved in the Investment Plan totaling UGX 2.02 billion but verified by exception as discussed earlier,
UGX1.265billion was recommend be approved for ROI;
(v) Therefore, the total investment recommended for approval to earn
ROI under Substations and Interconnecting Lines is UGX35.97billion as shown in Table 15.
Table 15: Summary of substations and Interconnecting Lines
Submission Base
Amount US$
Certificates
Verified US$
UGX UGX
1 New Substations and Interconnecting Lines 18,903,209,440 7,495,325 16,320,608,455 6,471,296
2 Approved substations and Lines 24,157,358,342 9,578,651 18,385,636,547 7,290,102
3 Not Approved but reviewed 2,019,396,211 800,712 1,265,115,762 501,632
4 2012 Submissions 138,676,763 54,987 - -
Total 45,218,640,756 17,929,675 35,971,360,764 14,263,030
Description
9.2.3 Quality of Supply
The works done under this category included a mix of transformer injections,
transformer upgrades, pole replacements and replacement/upgrade of bare wire conductor. Of the 180 schemes, information was provided for 148 schemes amounting to UGX3.48billion. The remaining 33 projects/schemes did not have
appropriate supporting documentation.
9.2.3.1 The following technical observations were made from the desk review
(i) All the transformers in this category were upgraded after faulting;
(ii) The justification for all the upgrades was overload, but the review of the technical reports showed that the main reason for failure was phase
imbalance leading to overload in one phase of the transformers; (iii) Many of the transformers were below their expected life time; (iv) A number of transformers injected in the schemes were repaired;
(v) A number of the upgrades were as a result of lack of transformer capacities in stock resulting into the use of bigger sizes;
(vi) Cases of upgrades resulting from lightning and vandalism were noted;
(vii) Many of the injected upgraded transformers were poorly earthed; (viii) The submission was checked against the population sample for
2012 and it was noted that a number of projects were being resubmitted from the 2012 investments. It was further observed that out of the 33 schemes that were not submitted a number of schemes were re-
submissions from 2012;
20
Details of the findings per project are found in the excel sheets attached in Annex (III).
9.2.3.2 Recommendations
Verification team recommended as follows:- (i) Upgrades amounting to UGX 238.8 million which were prudently done i.e.
before the transformers blew due to over load are approved subject to
impairment, except for cases where the transformer had served its full life, as investments;
(ii) To allow offsets for schemes where the upgrade was done after transformer failure amounting to UGX 241.3million;
(iii)To disallow cases where upgrades were arising from vandalism, lightning,
poor earth, replacements with same rating, investments done in 2012, and where transformers were repairs. All this amounting to UGX2.038 billion;
(iv) In the quality of supply submission made by the Company totaling to
UGX 7.588billion, Verification team recommended UGX 480million to be approved to earn ROI.
Table 16 shows the recommendations and the number of projects that lie in each proposal, while Table 17 shows the detailed breakdown.
Table 16: Summary of Quality of Supply Projects
Category No Cost (UGX) Comment
Allow 8 238,814,151
Allow with offset 43 902,110,172
Disallow 97 2,339,792,832
148 3,480,717,155
Supporting documents not submitted 33 1,557,128,585
Submitted as being closed Not given 2,549,816,153 WIP
Total 7,587,661,893
21
Table 17: Quality of Supply Projects and Adjustments
QUALITY OF SUPPLY Submission Offset
Amount Total
Disallowed UgX
Submission: UgX UgX UgX 7,588,661,893
Allowed projects 238,814,151
Insufficient information:
No supporting documentation 1,557,128,585
Support information given but not adequate 302,499,336 1,859,627,921
Allow with offsets:
Upgrades 902,110,172 660,844,627 660,844,627
Set aside in principle:
O&M in nature 738,365,998 738,365,998
No Transformer size in Store 167,207,211 167,207,211
Repaired Transformers 118,625,904 118,625,904
Poor Earth 525,171,118 525,171,118
Replacements 69,527,611 69,527,611
Projects completed and reviewed in 2011 & 2012 123,114,977 123,114,977
Functioning Transformer 5,274,505 5,274,505
Faulty Equipment at Commissioning 151,971,554 151,971,554
No Commissioning Report 139,034,618 139,034,618
Submission of works in Progress 2,549,816,153 2,549,816,153
Total Amendment after Review (7,108,582,197)
ROI Recommendation 480,079,696
9.2.4 Technical Loss Reduction
In the 2013 Investment plan submission for approval, the company planned to
reduce technical losses creating smaller transformer zones on certain high loss feeders as shown in Table 18. ERA approved UGX25.2bn (USD9.99 million) for this category of investments.
It was observed that the Company submitted completed investments in this category with two sub-categories, feeders and system improvements.
22
Table 18: Approved Technical Loss Reduction projects for 2013
Feeder Targeted transformer Zones
Cost (USD Annual loss Reduction (GWh)
1 Gayaza 45 1,819,000 3
2 Mulago 6 244,000 0
3 Kampala South - Entebbe 1 30 802,000 1
4 Kigo 22 750,000 1
5 Namugongo 60 2,203,000 4
6 Mbale Ring 1 38 782,000 1
7 Kabowa 10 488,000 1
8 Buddo 42 1,328,000 2
9 Mutundwe- Mityana 5 144,000 0
10 Namungona 11 740,000 1
11 Nsambya 17 690,000 1
Total 286 9,990,000 17
9.2.4.1 Feeders and Transformer additions
This sub-category included four high loss feeders where works done were to replace the LV bare conductor network with ABC wire and injection of
transformers. Table 19 shows the details of the said feeders comparing the number of transformer injections with the approved injections. The table indicates that transformers were not injected as approved.
Table 19: Transformer injections against Approved injections
Feeder name No. of transformers
injected
Approved transformer
injections
Kigo feeder 0 22
Buddo feeder 96 42
Namugongo 0 60
Mutundwe- Kabowa 12 10
Table 20 shows that the total value of the feeders was UGX 17.75billion. This included UGX591million which did not have supporting documentation having
been verified in 2012 and thus could not be considered.
23
Table 20: Detailed breakdown
Description Base Amount Base Amount
Feeders UGX USD
1 Kigo Feeder At Kampala South Resurvey 1 1,030,721,232 408,771
2 Mutundwe Buddo Feeder Zone2 4,635,110,649 1,838,228
3 Mutundwe Buddo Feeder Zone3 2,675,085,627 1,060,906
4 Mutundwe Buddo Feeder Zone4 2,809,703,772 1,114,294
5 Mutundwe Buddo Feeder Zone5 3,080,633,851 1,221,741
6 Mutundwe Buddo Feeder Zone1 741,488,541 294,065
7 Kireka-Namugongo - MV Reconductoring 129,818,065 51,484
8 Loss Study LV Metering_300meters 464,981,853 184,406
9 Mutundwe Kabowa Feeder - Zone 1 1,606,052,825 636,940
Total reviewed 17,173,596,417 6,810,838
10 Kyabakuza-Abc/Lv Cables- Masaka 933,759 370
11 Natete Feeder Upgrade - ABC LV Network Zone 2 6,291,800 2,495
12 Natete feeder Upgrade - ABC LV Network Zone 3 57,137,570 22,660
13 Natete Feeder Upgrade - ABC LV Network Zone 4 199,449,062 79,099
14 Kamuli 33kv Feeder upgrade 327,563,564 129,907
Documentation not reviewed 591,375,755 234,532
Total Technical Loss reduction - Feeders 17,764,972,172 7,045,370
9.2.4.1.1 Observations
It was observed from the review that;
(i) Mutundwe-Buddo feeder had a conversion of bare wire conductor to
ABC with several LV pole replacements about 2000 poles; (ii) All MV works and ABC installations were completed; some zones had
no recoveries for the conductor;
(iii)Low Voltage meters were used for the loss reduction study whose costs should were included in the Loss reduction study;
(iv) There was an upgrading of the MV line conductor sizes from 50mm2 and 25mm2 to 100mm2 i.e. Kigo feeder and Namugongo feeder;
(v) The Company injected fewer transformers than approved. UMEME
deviated from the original submission as approved by ERA; there was no approval for the ABC on the feeders, no approval for the upgrades
on Kigo feeder and Namugongo feeder; (vi) A total of 102 transformers were injected against the approved 286
transformers and no explanations were made for this variation;
(vii) The works done and the procurement conducted were in accordance with the standard procurement guidelines;
(viii) The Company obtained improved transformer models from one of
their suppliers.
24
9.2.4.1.2 Findings
The field verification exercise carried out on Mutundwe – Buddo feeder (sampled out) revealed the following;
(i) UMEME carried out the works as per the submitted scope and the
quality of work done was satisfactory; (ii) The entire feeder has now been converted from bare conductor to ABC;
a total of 96 new transformer zones were introduced to relieve the
existing 37 transformer zones; (iii)There was an aspect of pole replacements which are considered to be
O&M in nature.
9.2.4.1.3 Recommendations
Verification team recommended as follows:-
(i) The work done on Mutundwe - Kabowa feeder worth UGX 1.606billion be set aside until the installation has been completed (WIP);
(ii) Poles replaced (1,930 MV &259 HV poles) amounting to UGX952 million in Aerial Bundled Conductor (ABC) re-conductoring on Mutundwe -
Buddo, Kireka-Namugongo and Kigo feeders be disallowed as they are O&M costs;
(iii)Projects worth UGX2.87billion where information was not provided be set
aside until information is availed for verification; (iv) As shown in Table 21, Verification team recommended that
UGX12.327 billion be approved as Investment for ROI under Technical Loss Reduction, of which UGX 265million relates to LV Meters used in the loss reduction study and the balance relates to
other works as explained above.
25
Table 21: Technical Loss Reduction – Services Description Base Amount Certificates Set aside in
Principle
Insufficient or Recommended
Amount UGX Verified No Information
1 TLR - Mutundwe Buddo
Feeder Zone2
4,635,110,649 4,196,333,303 304,918,220 438,777,346 3,891,415,083
2 TLR - Mutundwe Buddo
Feeder Zone5
3,080,633,851 2,729,758,292 152,289,180 350,875,559 2,577,469,112
3 TLR - Mutundwe Buddo
Feeder Zone4
2,809,703,773 1,964,928,410 232,362,440 844,775,363 1,732,565,970
4 TLR - Mutundwe Buddo
Feeder Zone3
2,675,085,628 2,457,473,494 154,641,720 217,612,134 2,302,831,774
5 TLR- Mutundwe Buddo
Feeder Zone1
741,488,541 741,488,541 20,219,760 0 721,268,781
Sub-total Mutundwe-
Buddo
13,942,022,442 12,089,982,040 864,431,320 1,852,040,402 11,225,550,720
6 Mutundwe Kabowa
Feeder - Zone 1
1,606,052,825 950,475,926 0 0 0
7 TLR - Kigo Feeder At
Kampala South
Resurvey 1
1,030,721,232 594,319,158 74,867,760 436,402,074 519,451,398
8 TLR - Loss Study LV
Metering_300meters
464,981,853 464,981,853 0 0 464,981,853
9 Kamuli 33kv Feeder
upgrade
327,563,564 0 0 327,563,564 0
10 Natete Feeder Upgrade -
ABC LV Network Zone
4
199,449,062 0 0 199,449,062 0
11 Kireka-Namugongo - MV
Reconductoring
129,818,065 129,818,065 12,569,040 0 117,249,025
12 Natete feeder Upgrade -
ABC LV Network Zone
3
57,137,570 0 0 57,137,570 0
13 Natete Feeder Upgrade -
ABC LV Network Zone
2
6,291,800 0 0 6,291,800 0
14 Lv Loss Reductn-
Kyabakuza-Abc/Lv
Cables- Masaka
933,759 0 0 933,759 0
15 Tororo- Busia 33kV
Feeder Upgrade
(6,134,418) 0 0 (6,134,418) 0
Sub-total 3,816,815,312 1,189,119,076 87,436,800 1,021,643,411 1,101,682,276
TLR Completed and fully
closed
17,758,837,754 13,279,101,116 951,868,120 2,873,683,813 12,327,232,996
9.2.5 System Improvements
In the submission, system improvements were indicated as completed but not
closed. UMEME’s submission had 102 schemes under this category amounting to UGX5.04billion.
The works done under this category comprised of a mix of transformer injections, pole replacements and replacement/upgrade of bare wire conductor. There were 15 schemes which were double-entries amounting to UGX881.35 million, which
were therefore discarded.
26
Out of the 102 schemes initially submitted for verification, only 39 schemes equivalent to 39% and representing UGX 1.74billion had supporting
documentation. The remaining schemes amounting to UGX2.42billion that never had supporting documentation were set aside as shown in Table 22.
Table 22: Summary of Technical Loss Reduction – System Improvements
Detail No. Cost Billion (UgX)
Submission 102 5,039,833,883
Double posting -15 (881,358,832)
Total 87 4,158,475,051
Reviewed by the team 39 1,740,058,218
Allow 4 154,930,553
Allow with offsets 1 92,548,962
Disallow 34 1,492,578,703
Information not provided 48 2,418,416,833
9.2.5.1 Observations
The following observations were made from the review;
(i) Most schemes lacked sufficient justification and historical data to enable assess the need for system improvement;
(ii) A comparison with 2012 investment samples revealed that thirteen of
the reviewed schemes were done in 2012 while Nine (9) schemes whose information was not provided were also identified as projects submitted in the 2012 investment verification;
(iii)Works relating to O&M such as transformer replacements with same rating, replacement of rotten poles and the use repaired transformers
were noted; (iv) 8 schemes had their closeout reports missing. It is hard to ascertain
if works were completed for these schemes;
(v) Four schemes in the submission had information deficiency, while one scheme had an injected transformer with very poor earth values;
(vi) This category was not part of the approved submission of 2013.
9.2.5.2 Recommendations
Verification team recommended as follows:-
27
(i) Projects worth UGX 881 million be disallowed on grounds that these were duplicated and a caution issued to the company to desist from
such practices; (ii) Forty six (46) projects worth UGX 2.51 billion be set aside until
appropriate supporting documentation has been submitted and verified;
(iii)Under this category of system improvement, ERA approves UGX 155million that qualify for ROI.
9.2.6 UETCL Check Metering
In their investment plan, the Company had applied for Check meter at all boundaries with other concessionaires. ERA approved the installation of check
meters in UETCL substations where such meters never existed. The desk review findings indicated that the company installed 18 check meters at boundaries with other concessionaires, 36 check meters at energy purchase nodes with
UETCL. The total amount of investment involved in this category is UGX 2.665 billion.
An inspection of installation of check meters was done at four UETCL
substations to ascertain that works were done and that there was no existing UECTL check meter at the respective energy purchase nodes. These substations
included Mutundwe, Namungoona, Kampala North and Lugogo. The findings revealed the following:-
(i) A total of 13 check meters and their CT and VT sets were installed by UMEME
at the secondary side of each UETCL transformer just before the UETCL main and check meters. This was contrary to the approval of ERA;
(ii) All the 13 meters were seen and were new and in good working condition;
(iii)It was noted that the UETCL main and check meters at Namungoona were sharing the CTs and VTS, otherwise the other UETCL meters at other substations had separate CTs and VTs for the main and check meters.
9.2.6.1 Recommendation
Verification team recommended that installations of check meters worth UGX 2.665 billion be approved as an Investment for ROI and where UETCL
meters exist, installed meters be redeployed to other energy purchase nodes where UETCL meters do not exist.
28
9.3 OTHER INVESTMENTS
Other investments which do not fall in the categories discussed above were made by the Company amounting to UGX 3.65 billion as shown in Table 23. Whilst
these had no prior ERA approval, they were verified and recommended by exception as discussed earlier and they include distribution Automation and
SCADA II.
(i) Distribution Automation
The Company submitted UGX 2.6billion as investment in this category. The verification procedures established that configuration of the switches and their commissioning was still outstanding and therefore rendering the
project to be classified as work in progress.
(ii) SCADA II This was a continuation of the project that had started earlier with the rationale of decreasing the response time to electricity supply anomalies
through the deployment and use of better and cost effective tools to monitor and control substations, coordinate all field operations, and share information company-wide. The desk review showed that the SCADA
phase two was completed.
The field verification exercise covered 19 sampled substations and indicated that none of the substations could be traced on SCADA 100%. The extracted data sheets showed either the feeder were ‘suspect’ or ‘Ok’. ‘Ok’ meant analog value
was a valid value measured and reported to SCADA system within set timeouts, whereas ‘suspect’ meant the reported value time-stamp was outside the current time-stamp window (value had not been updated in the RTU by the measuring
equipment), hence should not be relied upon. None of the sampled substations gave an ‘OK’ for all the time or 100% availability.
While the Company had executed this investment, the customers have not yet received the full expected value from this investment. Since the system was not
available 100%, only 70% of the value was allowed and subsequent monitoring be conducted during the year to establish improvement of availability. If the situation does not improve, at the next review, the investment would be
retrospectively impaired.
Table 23: Other projects for Load Growth and Technical Loss Reduction
S/N Description Base Amount Location
1 Distribution Automation Project 2,617,634,539 Lugogo
2 SCADA Upgrade project- Phase 2 1,031,384,782 Lugogo
Total 3,649,019,321
29
9.3.1 Recommendations
Verification team recommended as follows:-
(i) Distribution Automation project worth UGX 2.62 billion be disallowed
being work in progress; (ii) 70% of SCADA phase II worth UGX721.969million is approved subject to
subsequent validation of availability.
9.3.2 Commercial Loss Reduction
The Company submitted commercial loss reduction projects in its investment plan for 2013 worth UGX3.994 billion for approval. These projects were not
approved because they did not meet the criteria and rather were of O&M character already covered under the O&M budget.
Of these, UGX1.128 billion were projects completed but not yet closed. Projects worth UGX 2.867billion were submitted as completed and closed, and these were examined during the verification process and once again confirmed to be of O&M
nature as shown in Annex (iii).
9.3.2.1 Recommendation
Verification team recommended that UGX 3.994billion claimed on account of Commercial Loss Reduction, be disallowed in principle and the company be cautioned against non-compliance with ERA directives.
9.3.3 NEW CONNECTIONS
UMEME submitted investment in New Connections totaling to UGX21.451billion
(USD8.51 million).
9.3.3.1 Assumptions Underlying analysis of New Connections
(i) All new connections must pay a connection fee. All new connection fees include capital contribution and this is true for only new connections, but not
reconnections;
(ii) It is possible to track new connections in any given period through the connection dates and capital contribution;
30
(iii)If connection is not made in the period of capital contribution payment, then that amount is reflected in the short term obligations at the reporting date (in
this case 31stDec 2013) and thus not a new connection;
(iv) However, if connection is made, a meter number will be attached to the customer, a connection date, receipt amount and date of payment will be held in the billing system database for every new connection;
(v) New connections that are more than one pole are paid for 100% by the
customer and UMEME does not contribute to creation of that asset and
therefore these do not constitute eligible investments for ROI and thus were left out;
(vi) The connection charges for both no pole and one pole new services are
standard. Therefore we can build a reasonable expectation of the number of
connections and then apply standard cost to the number of one pole or no pole services created for the period under review;
(vii) Then a comparison is made of what the verification findings are with the
UMEME submission and investigate any variances that arise in this respect;
(viii) All materials as listed in the standard cost are installed at all the
customer’s premises;
9.3.3.2 Results of analysis
New postpaid connections worth UGX 20.195bn were examined with the following results:-
(i) New Connection customer numbers from the verification processes are consistent with the submission. The submission of 59,693 post paid
connections is supported by the verification’s billing system query; (ii) Assurance on standard contractor costs has been provided by the
procurement processes review;
(iii)Standard costs were checked for consistence with the standard connection profiles. The Company provided adequate explanation for any variances that
arose from the verification process.
9.3.3.3 Recommendation
In light of the considerations from (i) to (iii) above, Verification team recommended the approval of investments made on account of postpaid
new connections to the tune of UGX20.195billion to earn a return and UGX1.256billion for Prepaid new connections thus a total of UGX
21.451billion on new connections.
31
9.3.4 NON NETWORK ASSETS
In considering the investments for 2013, ERA approved USD1million for non-
network assets to cater for back IT backbone infrastructure. The company did not submit any information in investment activities in the category of non-
network assets. Subsequent request for supporting documentation in this category were not honored by the company.
9.3.4.1 Recommendation
Verification team recommended that the USD1million allowed on the
account of non-network assets be clawed-back from the 2013 subsidiary O&M allowances until complete information and appropriate documentation are provided by the Company.
32
10 CONCLUDING SUMMARY As detailed in Table 24 below, the total value of Investments submitted for verification by the company is UGX 129.4 billion. From Section 3 of this report, several considerations were made in assessing the performance of the company
vis-à-vis the approved investment plan. (i) As an outcome of the verification exercise, UGX19.46 billion of submitted
investments has been set aside and excluded from earning a return on account of lack of sufficient information, as and when this information
becomes available and verified, these investment will represented for approval;
(ii) Amongst projects set aside in principle include those disallowed for being work in progress (projects whose works/installation had not been completed
by the year end and thus were not deployed in service). These amounts to UGX4.155 billion. Their verification will be conducted once they are deployed;
(iii) Amongst those set aside in principle include such projects that do not qualify for ROI because they are of Operations and Maintenance (O&M) nature. Their total value is UGX13.313 billion and these were completely disallowed;
(iv) In consideration of (i) to (iii) above, the investments qualifying for ROI as at
December 31st 2013 having been verified is UGX92,545,253,738.
33
Table 24: UMEME 2013 Investment Summary Category Submission
(UGX)
Disallowed (UGX) Total
disallowed(UGX)
Recommended
for ROI (UGX)
(A)
Insufficient
Information
(B)
WIP
(C)
From
Guidelines
(D)
(E) = (B)+(C)+(D)
(F)=(A)-(E)
New substations
and interconnecting
lines
18,903,209,440 2,658,543,654 0 0 2,658,543,654 14,394,336,856
Substation and
line upgrades
26,315,431,316 6,631,496,543 0 138,676,763 6,770,173,306 21,395,586,940
New connections –
postpaid
20,195,355,219 0 0 0 0 20,195,355,219
New connections –
prepaid
1,256,456,729 0 0 0 0 1,256,456,729
Prepaid metering
retrofit
14,869,219,494 0 0 0 0 14,869,219,494
Technical loss
reduction projects
– feeders
17,758,837,754 2,873,683,813 1,606,052,825 951,868,120 5,431,604,758 12,327,232,996
Technical loss
reduction projects
– system
improvements
5,039,833,883 2,510,965,795 0 2,373,937,535 4,884,903,330 154,930,553
Safety 7,239,999,786 0 0 3,154,918,545 3,154,918,545 4,085,081,241
Commercial los
reduction services
3,994,529,431 0 0 3,994,529,431 3,994,529,431 0
Quality of supply 7,588,661,893 1,859,627,921 2,549,816,153 2,699,138,123 7,108,582,197 480,079,696
Distribution
automation Project
2,617,634,539 2,617,634,539 0 0 2,617,634,539 0
SCADA projects 1,031,384,782 309,415,435 0 0 309,415,435 721,969,347
UETCL check
metering Project
2,665,004,667 0 0 0 0 2,665,004,667
TOTALS 129,475,558,933 19,461,367,700 4,155,868,978 13,313,068,517 36,930,305,195 92,545,253,738
34
11 RECOMMENDATIONS
This report was presented to ERA as an output from the verification of UMEME’s investment for 2013. It was presented for consideration and subject to any amendments as may be deemed necessary, be recommended to ERA for further consideration and approval. Verification team recommended that ERA approves the
following:
a) The setting side of UGX 19.461 billion of submitted investments and exclusion from earning a return on account of lack of sufficient information; as and when
this information becomes available and verified, these investment will represented for approval;
b) Disallow projects that have principally not met the criteria for award of ROI which include work in progress that had not been completed by the year end
amounting to UGX 4.155 billion their verification will be conducted once they are deployed;
c) Additionally disallow projects on principle basis that include such projects that do not qualify for ROI because they are of Operations and Maintenance (O&M) nature whose total value is UGX13.313billion;
d) In consideration of (a) to (c) above as detailed in this report and summarized in Table 24, the investments qualifying for ROI as at December 31st 2013 having been verified is UGX92,545,253,738;
e) As previously discussed and agreed, UMEME should endeavour to make quarterly submissions of investments done to avoid the accumulation and
subsequent pressure of carrying out the verification;
f) Similarly, UMEME should notify UEDCL prior to undertaking implementation
of all investment works to ease monitoring and subsequently hasten the verification process.
35
APPENDICES
36
12 Appendix I: KEY RISKS IDENTIFIED AND MITIGATION MEASURES
(i) Funding Sources The risk that investments submitted for ROI purposes are not funded by UMEME would be addressed from the Audited Financial Statements review.
(ii) Asset Valuation
The risk that the asset valuation methods used by UMEME overstate the investment would be addressed by testing the valuation of store issues and ensure that it accords with good costing practice. The company uses the Weighted
Average Costing method. Contractor costs were addressed the procurement review.
(iii)Impairment of Investments
The risk of post-recognition impairment of investments was addressed by a review
of all the submission to ensure that replaced assets were removed from the value to be recommended. The approach assumes that all impaired assets are replaced, which was the most practical option.
(iv) ERA Approval Risk
The risk that investments submitted for ROI by UMEME were not approved by ERA was addressed by requesting the company to provide an alignment between ERA approval and the submission.
(v) Work in progress and Cutoff
The risks that investments submitted for ROI were not in use for the benefit of
customers as at 31st Dec 2013 was addressed by carrying out technical reviews focused on commissioning reports, whereas analytical reviews (e.g. those used to
test New Connections) used the cutoff date criteria as part of the test design. (vi) O&M Definition Risk
The risk that UMEME would submit O&M expenditure as investments to earn ROI was addressed by making a judgment call of the character of the asset during
the review of specific projects. All assets deemed to be of an O&M character were isolated and valued separately for the purposes of a proportional mark down of the investment.
(vii) System Risk
The risk that reliance on UMEME’s internal control systems was not justified was
addressed by the team performing compliance tests on the billing system, inventory control system as the areas that are particularly relevant to the
valuation of investments.
37
(viii) Value for Money (VFM) The risk that value for money was delivered by UMEME’s investing decisions was
addressed through our procurement review.
(ix) Verification team Representations The risk that UMEME Verification team deliberately misrepresented information relating to Investments undertaken in 2013 was addressed (in addition to all the
other processes) by the provision of a Verification team Letter signed off by UMEME top Verification team making a commitment to the veracity of the information provided to the verification team.
38
13 Appendix II: Safety Priority Projects Table 25: Safety Priority projects
Item Account Code
Description Base Amount
Location
1 102002 Safety Priority - St. Paul's Church Area Najjanankumbi
65,330,120 Najjanankumbi
2 102002 Safety Priority - Kabojja International Sch ,Kirundu Buziga TX
227,245,790 Kabalagala
3 102002 Safety Priority - Kitgum RCM Mission TX (St Joseph Hospital)
35,469,833 Kitgum
4 102002 Safety Priority - Old Mkt Kakyeka, Rwebukoona
46,896,931 Mbarara
5 102002 Safety Priority - Buziga Water Pump 165,974,272 Kabalagala
6 102002 Safety Priority - Iganga RCM 107,602,902 Iganga
648,519,848
39
14 Appendix III: Commercial Loss Reduction Services
40
Table 26: Commercial Loss Reduction Services
Appendix (III) COMMERCIAL LOSS REDUCTION - SERVICES
102003 Services Mbale Loss Reduction - Meter Replace 1Q customers 96,424,796 Mbale
102003 Services CLR Mbarara - 3 Phase Customers 83,477,113 Mbarara
102003 Services Bulk Metering Of Bupadhengo TC Millers 71,678,948 Iganga
102003 Services Comm Loss Reductn -Central Metering Naguru Barrack 60,847,893 Banda
102003 Services CLR Mityana - Kataka millers association 59,529,067 Mityana
102003 Services NAJJA SALAMA RD CLUSTER BOXES PHASE 3 51,104,947 Najjanankumbi
102003 Services CLR Najja -Salama road cluster boxes-Phase2 48,165,470 Najjanankumbi
102003 Services CLR Natete - Natete feeder TOU Securing 48,151,511 Natete
102003 Services Kamuli Commercial loss reduction grp 2 46,619,657 Kamuli
102003 Services CLR Wandegeya - Erisa Tx Customer Securing 45,934,049 Wandegeya
102003 Services Secure meter instaltns&Inject poles-Lira Industr A 42,571,492 Lira
102003 Services CLR Three phase meter Audit Hoima-Masindi phase2 42,550,973 Hoima
102003 Services Commercial Loss Reduction for Wakasenke Market 42,264,153 Nakulabye
102003 Services CLR Three phase meter Audit Hoima-Masindi phase1 42,243,659 Hoima
102003 Services CLR Kabalagala - Relocate MU-Multiple industries K 38,846,419 Kabalagala
102003 Services CLR Iganga - 50 EDMATLAS Meters 38,500,341 Iganga
102003 Services CLR Mityana Lwamata Maize millers 38,248,180 Mityana
102003 Services CLR Najjanankumbi - Single Phase Obsolete Meters S 37,186,548 Najjanankumbi
102003 Services CLR Kabalagala - Uganda Police Barracks-Nsambya 36,620,708 Kabalagala
102003 Services Com Loss Red-Semuto Maize Millers 35,620,177 Mityana
102003 Services CLR Mityana Sekanyonyi Maize millers 35,451,188 Mityana
102003 Services CLR Masindi - Secure KVA Meters 35,035,606 Masindi
102003 Services Namugona 3 Tx Zone-Comm Loss Red works 33,510,176 Nakulabye
102003 Services NAJJA TELECOM SITES 33,411,747 Najjanankumbi
102003 Services CLR Mityana - Ngando Millers Association 30,841,654 Mityana
102003 Services CLR Mukono - metering mukono interconnector 29,399,382 Mukono
102003 Services CLR Wandegeya - Kawanda Interconnector - KVA/TOU M 28,132,263 Wandegeya
102003 Services CLR Jinja - Jinja kva meter replacement 27,600,640 Jinja
102003 Services CLR Entebbe - ABC Nkumba Bwaise X1 26,974,447 Entebbe
102003 Services CLR Kitintale - Securing KVA Customers - Batch 2 26,872,893 Kitintale
102003 Services Replace & Secure 44 TOU/KVA Meters at Nateete 26,751,500 Natete
102003 Services Secure metering for Kabalagala KVA Meter customers 25,988,078 Kabalagala
102003 Services CLR Three phase meter Audit Hoima-Masindi phase3 25,821,980 Hoima
102003 Services CLR Secure Kabalagala 3phase meters 25,415,918 Kabalagala
102003 Services Securing Kampala Industrial - KVA And TOU Custmer 25,119,678 Kitintale
102003 Services Com Loss Red Jinja - Namata/Lugazi Town 24,537,342 Jinja
102003 Services CLR Securing Kabalagala 3 phase meters 24,110,179 Kabalagala
102003 Services Com Loss Red Banda - Single Phase Meters 23,615,961 Banda
102003 Services Provide 103 1phase,MCBS-Hima Labour Camp Kasese 23,289,007 Kasese
102003 Services CLR Wandegeya - Clusters Q2 23,047,533 Wandegeya
102003 Services CLR Wandegeya - Faulty Meters Phase 2 22,971,302 Wandegeya
102003 Services Com Loss Red-Securing Kamuli Kva meters 22,167,962 Kamuli
102003 Services Comm Loss Redcutn Nakulabye - Kabumbi 3 Tx Zone 22,040,666 Nakulabye
102003 Services KABALAGALA- 3- PHASE METERS TO SECURE IN 2013 Q1 21,522,699 Kabalagala
102003 Services CLR Mbale - Securing KVA meters-Mbale Ring 1 (phas 21,321,860 Mbale
102003 Services Com Loss Red-Ht KVA Meter Security 20,310,992 Kampala Metropolitan
102003 Services CLR Entebbe - Securing Metering Units for Entebb 19,877,353 Entebbe
102003 Services CLR Kabale - Kabale TOU Meters 19,618,742 Kabale
102003 Services Comm Loss Reductn Entbe-Cluster meters kasenyi Q2 19,232,429 Entebbe
102003 Services CLR Iganga - Iganga 1 loss reduction 19,077,478 Iganga
102003 Services Masindi 1-Phase Commercial Customers-CLR Project 18,714,487 Masindi
102003 Services CLR Wandegeya - Secure 17 KVA Meters 18,450,544 Wandegeya
102003 Services Kibwa Tx Zone-Comm Loss Reductn works 18,282,438 Nakulabye
102003 Services CLR Mbale - Soroti securing KVA CTS 17,979,989 Mbale
102003 Services CLR Lira - Securing HT Customers Lira 17,783,819 Lira
102003 Services CLR Banda - Securing TescoBweyogerere 17,771,409 Banda
102003 Services Comm LoSS Reductn- Kitintale feeder sectionalising 17,636,916 Kitintale
102003 Services CLR Wandegeya - Gaz Tx Customer Securing 17,422,790 Wandegeya
102003 Services CLR Mbale -LV millers groups on industrial 11kv f 17,153,893 Mbale
102003 Services Bus And Taxi Parks Mbale Ring 2 Feeder Phase 1 16,591,774 Mbale
102003 Services CLR Metro - Kampala Metro Loss Rdn Phase 7 16,555,712 Kampala Metropolitan
102003 Services CLR Jinja - Jinja KVA LV Customer securing 16,192,622 Jinja
102003 Services Com Loss Red-Iganga Kva Customers 16,136,042 Iganga
102003 Services Com Loss Red-Arcade Bulky Metering 16,032,274 Kampala Metropolitan
102003 Services CLR Kitintale - Securing Kireka Feeder TOUs 15,844,716 Banda
102003 Services CLR Natete - Metering unit for Viseki Millers 15,832,814 Kampala Metropolitan
41
102003 Services CLR Banda -secure TOUs&KVAs-Namugongo feeder-LOT1 15,828,599 Banda
102003 Services CLR Mukono - securing and Lowering KVA Meters 15,784,083 Mukono
102003 Services CLR Kitintale - ABB Obsolete Meter Replacement 15,757,617 Kitintale
102003 Services CLR Iganga - Kamuli 1 loss reduction 15,631,127 Kamuli
102003 Services CLR Entebbe - Obsolete meters Sisa feeder 15,608,255 Kampala Metropolitan
102003 Services CLR Metro -Boundary meter Lugogo kololo feeder 15,508,523 Kampala Metropolitan
102003 Services Mvule Millers Association-Install 800/5A&800/5A CT 15,183,200 Tororo
102003 Services CLR Kabalagala - Kisugu village single phase custo 14,600,227 Kabalagala
102003 Services Kisugu Village single phase customers phase one 14,236,032 Kabalagala
102003 Services Securing TOU and KVAs on Britania 14,228,581 Banda
102003 Services CLR Wandegeya - Resecuring HT Customers 14,161,721 Wandegeya
102003 Services Com Loss Red Mbale - Iki-Iki Feeder 13,887,366 Mbale
102003 Services Com Loss Red-125 Masaka Single Phase Meters 13,857,513 Masaka
102003 Services CLR Entebbe - Kawuku market entebbe 13,545,408 Entebbe
102003 Services Bombo-Three Phase Meters&Meter Upgrade 13,532,866 Bombo
102003 Services CLR Mukono - securing mayangayanga millers 12,961,429 Mukono
102003 Services Com Loss Red-Sekilu General Enterprises-Bombo 12,863,409 Bombo
102003 Services CLR Mukono - Securing mukono quarries 1 12,549,419 Mukono
102003 Services CLR Mbale - Soroti and Kumi securing KVA CTs 12,230,036 Soroti
102003 Services CLR Mbale - 3 millers groups & 1 soap factory 12,095,301 Mbale
102003 Services CLR Tororo - Tororo loss reduction project phase 1 12,072,085 Tororo
102003 Services CLR Iganga - Iganga kamuli hospital loss reduction 11,657,566 Iganga
102003 Services Com Loss Red-Kigongi & Surroundings 11,566,586 Kabale
102003 Services Comm Loss Reductn-Kabale - Kabale schools 11,560,423 Kabale
102003 Services CLR Natete - Natete Kva Millers 11,385,195 Natete
102003 Services Comm Loss Reductn-Nakulabye- Yesu Amala Tx Zone 11,377,034 Nakulabye
102003 Services CLR Entebbe - 3 Phase Kisubi Mission 11,352,567 Entebbe
102003 Services Com Loss Red-100 Single Phase Meters Kasese 11,044,168 Kasese
102003 Services CLR Entebbe - ABC Magara 10,983,435 Entebbe
102003 Services CLR Wndegeya - Naklabye & Mulago f'ders (KVA &TOU) 10,830,422 Wandegeya
102003 Services CLR Tororo - Tororo loss reduction project phase 2 10,764,023 Tororo
102003 Services CLR Natete - Natete feeder KVA LV Accounts 10,732,198 Natete
102003 Services CLR Natete - Katwe phase 3 10,668,377 Natete
102003 Services CLR Mukono - Securing Mukono quarries 2 10,360,965 Mukono
102003 Services Comm Loss Reductn Kitintale - KVA & TOU Securing 10,356,348 Kitintale
102003 Services CLR Najja-Metering unit-Kabowa feeder boundary 10,256,973 Najjanankumbi
102003 Services CLR Kumi Road/Pallisa Road North 9,958,568 Mbale
102003 Services CLR Kabalagala -Obsolete single Qmeters replacemen 9,681,816 Kabalagala
102003 Services Com Loss Red-Loss Reduction Material Requisition 9,495,631 Jinja
102003 Services CLR Entebbe - Gerenge Landing Site 9,490,100 Entebbe
102003 Services Kiwatule feeder - welders clustering 9,103,643 Banda
102003 Services Natete Clusters Katwe diary Q2 8,651,604 Natete
102003 Services CLR -Kabalagala High end welders, Bars, Guest hses 8,326,788 Kabalagala
102003 Services Securing Single Phase Customers Gulu 8,125,691 Gulu
102003 Services CLR Mbale - Bulk metering millers kabole pallisa 7,653,921 Mbale
102003 Services CLR Entebbe - 3 Phase Entebbe general 7,618,849 Entebbe
102003 Services CLR Metro - Plot 12/16 Next to Post Bank EBB Road 7,469,890 Kampala Metropolitan
102003 Services Loss Red- Tamper Proof Meter Boxes At Kitasa Barra 7,150,653 Entebbe
102003 Services CLR Metro - Mackay Shopping Centre, Mackay RD 7,098,110 Kampala Metropolitan
102003 Services CLR Najjanankumbi -Securing Metring Units for Najj 6,838,672 Najjanankumbi
102003 Services Com Loss Red-Police Installation 6,818,469 Kabalagala
102003 Services Natete Clusters Katwe diary Q2. 6,658,265 Natete
102003 Services Cairo Bank Main Branch 6,503,432 Kampala Metropolitan
102003 Services Com Loss Red-Kabale Main Street & Surroundings 6,292,462 Kabale
102003 Services CLR Mityana -Central Buganda, Sewanyana, Zigoti co 6,154,420 Mityana
102003 Services CLR Entebbe - 3 Phase Airport and Mission Feeders 6,130,488 Entebbe
102003 Services Comm Loss Reductn-Mityana Secure HT Meters 6,127,160 Mityana
102003 Services New Ankole Western University & KIU Ishaka Campus 6,083,558 Bushenyi
102003 Services Com Loss Red-Wandegeya Ht Securing 5,909,578 Wandegeya
102003 Services Com Loss Red works Kla Metro - Orient Plaza 5,876,513 Kampala Metropolitan
102003 Services Com Loss Red Kla Metro - MBK Arcade, Mackay Road 5,676,217 Kampala Metropolitan
102003 Services Crane chambers & warid telc k'la rd 5,652,652 Kampala Metropolitan
102003 Services CLR Metro - Rambahai Apartments Plot 11 Nakivubo R 5,422,620 Kampala Metropolitan
102003 Services CLR Mbale - Sleeping baby factory 5,418,591 Mbale
102003 Services CLR Mbarara - Rutooma millers 5,387,684 Mbarara
102003 Services Com Loss Red-76 Single Phase Meters Kasese 5,379,204 Kasese
102003 Services CLR Natete - Bunamwaya feeder KVA LV Accounts 5,352,812 Natete
102003 Services CLR Metro - Spare world shoping arcade 5,315,531 Kampala Metropolitan
102003 Services CLR Metro - Former National Housing Flats 5,303,215 Kampala Metropolitan
102003 Services CLR Natete - Kabowa feeder KVA LV Accounts 5,152,312 Natete
102003 Services CLR Kampala Metro - Carol Hse, City Oil Plot 56 4,746,000 Kampala Metropolitan
102003 Services CLR Metro - Khojashia Jamat Apartments plot 84/90 4,717,461 Kampala Metropolitan
102003 Services Com Loss Red-100 Single Phase Meters Fortportal 4,662,648 Fort Portal
102003 Services NW&SC flats Nakasero Rd 4,501,985 Kampala Metropolitan
102003 Services CLR Kabalagala - Falcon Estates - Kabalagala 4,487,093 Kabalagala
102003 Services CLR Natete -secure Trinity college, Gulumani, Mand 4,372,443 Natete
102003 Services CLR Entebbe - 3 Phase Botanical feeder custmers 4,327,426 Entebbe
102003 Services Plot 3/2 & Plot 5/1 market street Kampala metro 4,147,600 Kampala Metropolitan
102003 Services Com Loss Red-Securing Budwege,Busesa Nawanso Mille 4,014,250 Iganga
102003 Services Loss reductn-Buildings on plot 71/73/69 & 65 3,994,541 Kampala Metropolitan
102003 Services CLR Mbarara - Buteraniro millers 3,986,451 Jinja
102003 Services CLR Metro - Mariana Agencies Plot 96 Nakivubo rd 3,831,855 Kampala Metropolitan
102003 Services CLR Mbale - Mbale police barracks 3,814,517 Mbale
102003 Services Comm Loss Reductn Entebbe - 3 Phase Township KVA 3,612,349 Entebbe
102003 Services MBARARA BUS PARK 3,476,622 Mbarara
102003 Services Com Loss Red Kla Metro - MOIL Petro Station 3,421,499 Kampala Metropolitan
102003 Services Com Loss Red-Kabale Isolated Millers 3,293,836 Kabale
102003 Services Com Loss Red-30 Single Phase Meters Kasese 3,293,723 Kasese
102003 Services Bulk Metering For St.Joseph Namagunga & St. Mary'S 3,271,067 Jinja
102003 Services CLR Entebbe - 3 Phase township TOU 3,248,062 Entebbe
102003 Services Jinja single phase customers 3,219,651 Jinja
102003 Services Comm Loss Reductn-Securing Kasese HT Meters 3,172,271 Kasese
102003 Services MBARARA KIZUNGU 3,166,103 Mbarara
102003 Services Loss Red- Sembatya+Bldg On Plot 13 Nabugabo 3,096,288 Kampala Metropolitan
102003 Services Com Loss Red Kla Metro - Kololo Teachers Flats 2,975,658 Kampala Metropolitan
102003 Services Comm Los Redn wks Jokasa House & Utl Mast 2,975,646 Kampala Metropolitan
102003 Services CLR Metro-C/King Church, Platinum&Comm.Centre 2,871,275 Kampala Metropolitan
102003 Services Com Loss Red-Uganda Prisons Mbarara 2,673,228 Mbarara
102003 Services CLR Natete - Nalukolongo feeder TOU Securing 2,595,296 Natete
42
102003 Services Com Loss Red-Bulk Metering Gulu Prisons 2,533,588 Gulu
102003 Services CLR Najjanankumbi - Najja Gayaza Electronics (U254 2,385,536 Najjanankumbi
102003 Services Comm Loss Reductn - Securing Masaka HT Meters 2,241,768 Masaka
102003 Services CLR Masaka - Kikoni West general traders 2,229,131 Masaka
102003 Services Sir apollo kagwa rd sch.Nakasero-Loss Redtn works 2,211,077 Kampala Metropolitan
102003 Services Com Loss Red Kla - Global Trust Bank , Plot 2A Kla 2,002,304 Kampala Metropolitan
102003 Services CLR Metro - Plot 80 & 82 Nakivubo road 2,002,165 Kampala Metropolitan
102003 Services CLR Natete - Mitala maria metering unit replacemen 1,899,000 Natete
102003 Services Comm Loss Red -Hoima-Secure HT Customers Hoima 1,858,847 Hoima
102003 Services Com Loss Red - Walusimbi Garage Plot 13 Dewington 1,853,067 Kampala Metropolitan
102003 Services Com Loss Red-Kyotera Central Millers No.2 1,653,626 Masaka
102003 Services Ngona Semakula ,Bagonza Central Mtring-Natete-CLR 1,555,905 Natete
102003 Services Com Loss Red-Loss Reduction Material Requisition 1,462,918 Jinja
102003 Services Com Loss Red -SAB & Boston View Restraunt, Buganda 1,315,886 Kampala Metropolitan
102003 Services CLR Najjanankumbi - Clay Factory At Kawuto (Atumal 1,175,321 Najjanankumbi
102003 Services CLR Kabalagala - Metring unit at for Multiple indu 922,699 Kabalagala
102003 Services Securing an HT Metering unit,the metering unit for 831,616 Kampala Metropolitan
102003 Services CLR Lira - Securing & Clustering Pulanga customers 729,598 Lira
102003 Services CLR Lira - Bulk metering Lango college 528,627 Lira
102003 Services CLR Najjanankumbi - Muguluma's Flats (E242086) & K 396,543 Najjanankumbi
102003 Services 248 Single phase meters-Najjanankumbi 139,196 Najjanankumbi
102003 Services CLR Mbale - Sleeping baby factory (571,914) Mbale
102003 Services Replace faulty meters at Martin Rd, old Kla Rd (4,147,600) Nakulabye
102003 Services Replace faulty meters at Musajja Alumba flats (4,746,000) Nakulabye
Completed and fully closed 2,866,764,939
Per scheduleServices
Loss reduction services completed and being closed - per
schedule attached 1,127,764,492 As per Schedule attached
TOTAL - COMMERCIAL LOSS REDUCTION - SERVICES 3,994,529,431
43
15 Appendix IV: Umeme 2013 Investment Plan PRIORITISATION OF 2013 CAPITAL PROJECTS
CATEGORY SUB-CATEGORY
PROJECT Commitments b/f
from 2012 ($m)
Q1 Priorities
[$m]
Q2 - Q4 Priorities
($m)
Total 2013 Priority 1
[$m]
SAFETY SAFETY Safety new projects plus Aerial bundled conductor
(ABC)
1.00
2.50
3.50
LOSSES LOSSES Technical Loss Reduction
0.00 2.00 8.00 10.00
Prepayment retrofitting & ABC
2.00 7.00 9.00
AMR 1.00 2.00 3.00
Commercial loss reduction
1.00 2.00 3.00
UETCL check metering 1.00 - 1.00
CUSTOMER SERVICE
-
LOAD GROWTH AND NEW
CONNECTIONS
Lubowa substation 2.10 2.10
Waligo substation 1.17 1.17
Lubowa interconnecting lines
0.32 0.32
Iganga Capacitor bank 0.00 0.60 0.60
Kampala North- Hilton 33kV feeder
0.80 - 0.80
Motormart substation 4.00 - 4.00
Lugogo-Kitante-Motormart-Queensway
33kV cable
1.10 - 1.10
Namamve-Kireka 33kV cable
1.00 - 1.00
33kV switchgear for the 33 KV cable
feeders
0.96 0.96
Kawanda- Busunji 33kV feeder
2.70 - 2.70
Luwero substation and lines
2.50 2.50
Quality of supply improvement
3.00 3.00
Jinja 33kV lines re-conductoring
0.40 0.40
Namamve-Mbalala 33kV feeder
1.20 1.20
New Connections 2.00 6.00 8.00
Project Management 0.80 0.80
RESTORATION Kayunga-Kangulumira 0.65 0.65
44
CATEGORY SUB-CATEGORY
PROJECT Commitments b/f
from 2012 ($m)
Q1 Priorities
[$m]
Q2 - Q4 Priorities
($m)
Total 2013 Priority 1
[$m]
Mutundwe-Masaka Central 33kv
1.00 1.00
Mukono- Seeta 0.80 0.80
Tororo-Mbale 1 and 2 1.00 1.00
Mbarara Central- Masaka
1.55 1.55
Opuyo-Kumi-Kapchorwa-Mbale
0.75 0.75
Busunju-Hoima 1.00 1.00
Kireka-namugongo 0.55 0.55
Lira 33kV swutchgear and s/s Battery banks
2.00 2.00
Distribution automation
Distribution automation 1.00 0.00 0.50 1.50
Assets leased from UEDCL
Property Long Lease Renewals
0.20 0.20
Operational Vehicles 2.00 2.00
TOTALS 4.59 40.56 28.00 73.15
45
16 Appendix V: Umeme 2013 Detailed Asset Additions
Account
Code Description Description UGX Base Amount
USD Amt-
@2521.51 Location Investment Category
LOAD GROWTH PROJECTS -NEW SUBSTATIONS AND LINE UPGRADES
102001 Sub-Stations New Waliggo Substation 4,961,355,176 Wandegeya Load Growth
102001 Sub-Stations New Lubowa Substation 9,171,016,840 Najjanankumbi Load Growth
102002 Low Voltage Lines
Lubowa - Kigo / Ndejje feeder phase two(2)
Resurvey 1,379,148,739 Najjanankumbi Load Growth
102002 Low Voltage Lines
Lubowa intergration Line Phase one - Bunamwaya
feeder 694,473,319 Natete Load Growth
102002 Low Voltage Lines Kawanda waligo interconecting line 13,481,411 Bombo Load Growth
100202 Low Voltage Lines Waligo Intergration Line 833,405,025
New Substations and Interconnecting Lines 17,052,880,510
$
6,762,964
102002 Low Voltage Lines Kawanda - Busunju 33kV line 6,330,339,100 Mityana Load Growth
102002 Low Voltage Lines Kampala North - Nakasero 33kV line 3,455,729,020 Kampala Metropolitan Load Growth
102002 Low Voltage Lines Kitante-Queensway 33kV cable 3,203,845,870 Kampala Metropolitan Load Growth
102002 Low Voltage Lines Luwero-Lumpewe Integration Lines 3,113,853,850 Bombo Load Growth
102002 Low Voltage Lines 33kV switchgear and associated costs 2,965,513,176 Kampala Metropolitan Load Growth
102002 Low Voltage Lines Namanve - Kireka 2 2,965,345,750 Banda Load Growth
102002 Low Voltage Lines Lugogo-Kitante 33kV Cable 2 1,976,353,500 Kampala Metropolitan Load Growth
102002 Low Voltage Lines New Namanve - Mukono Feeder 2 1,881,083,187 Mukono Load Growth
102002 Low Voltage Lines Lumpewe substation 962,510,255 Bombo Load Growth
102001 Sub-Stations 2 33Kv GIS Switch gears for Kawanda Susbstation 641,745,786 Bombo Load Growth
102002 Low Voltage Lines Lugogo-Kisugu-Queensway 33kV feeder uprate 544,245,400 Kampala Metropolitan Load Growth
102001 Sub-Stations Upgrade-Tororo Substation 71,895,751 Tororo Load Growth
102002 Low Voltage Lines Walligo-Ntinda 33kV Interconnector 54,667,916 Wandegeya Load Growth
102002 Low Voltage Lines 10/14MVA Mukono Substation Power Transformer 53,985,322 Mukono Load Growth
46
Account
Code Description Description UGX Base Amount
USD Amt-
@2521.51 Location Investment Category
102001 Sub-Stations 15/20MVA Kampala South S/S Power Transformer
(55,353,637) Najjanankumbi Load Growth
Substation and Line Upgrades 28,165,760,246
$
11,170,196
NEW CONNECTIONS
102003 Services Capitalise New Connectns_No-Pole Services 218,142,941
Services No pole &
One Pole New Connections
102003 Services Capitalise New Connectns_No-Pole Services 314,381,603
Services No pole &
One Pole New Connections
102003 Services Capitalise New Connectns_No-Pole Services 443,256,207
Services No pole &
One Pole New Connections
102003 Services Capitalise New Connectns_Pole Services 499,600,837
Services No pole &
One Pole New Connections
102003 Services Capitalise New Connectns_Pole Services 648,543,643
Services No pole &
One Pole New Connections
102003 Services Capitalise New Connectns_Pole Services 568,055,935
Services No pole &
One Pole New Connections
102003 Services Capitalise New Prepaid Connectns_No-Pole 54,136,219
Services No pole &
One Pole New Connections
102003 Services Capitalise New Prepaid Connectns_No-Pole 15,502,986
Services No pole &
One Pole New Connections
102003 Services Capitalise New Prepaid Connectns_No-Pole 116,334,450
Services No pole &
One Pole New Connections
102003 Services Capitalise New Prepaid Connectns_Pole 20,284,959
Services No pole &
One Pole New Connections
102003 Services Capitalise New Prepaid Connectns_Pole 8,661,274
Services No pole &
One Pole New Connections
102003 Services Capitalise New Prepaid Connectns_Pole 12,557,415
Services No pole &
One Pole New Connections
102003 Services Capitalised No-Pole Services 542,551,672
Services No pole &
One Pole New Connections
102003 Services Capitalised Pole Services/ Low Voltag 1,009,612,524
Services No pole &
One Pole New Connections
102003 Services Capitalised- No Pole Services- Prepaid 35,391,836
Services No pole &
One Pole New Connections
102003 Services Capitalised- Pole Services- Prepaid 1,649,157
Services No pole &
One Pole New Connections
102003 Services Capitalised No-Pole Services 360,150,305
Services No pole &
One Pole New Connections
47
Account
Code Description Description UGX Base Amount
USD Amt-
@2521.51 Location Investment Category
102003 Services Capitalised Pole Services/ Low Voltag 753,259,658
Services No pole &
One Pole New Connections
102003 Services Capitalised- No Pole Services- Prepaid 45,527,413
Services No pole &
One Pole New Connections
102003 Services Capitalised- Pole Services- Prepaid 7,538,792
Services No pole &
One Pole New Connections
102003 Services Capitalised No-Pole Services 300,312,557
Services No pole &
One Pole New Connections
102003 Services Capitalised Pole Services/ Low Voltag 509,315,399
Services No pole &
One Pole New Connections
102003 Services Capitalised- No Pole Services- Prepaid 34,697,488
Services No pole &
One Pole New Connections
102003 Services Capitalised- Pole Services- Prepaid 3,667,669
Services No pole &
One Pole New Connections
102003 Services Capitalised No-Pole Services 770,714,005
Services No pole &
One Pole New Connections
102003 Services Capitalised Pole Services/ Low Voltag 1,103,008,586
Services No pole &
One Pole New Connections
102003 Services Capitalised- No Pole Services- Prepaid 97,305,230
Services No pole &
One Pole New Connections
102003 Services Capitalised- Pole Services- Prepaid 35,606,368
Services No pole &
One Pole New Connections
102003 Services Capitalised No-Pole Services 629,185,947
Services No pole &
One Pole New Connections
102003 Services Capitalised Pole Services/ Low Voltag 2,030,769,421
Services No pole &
One Pole New Connections
102003 Services Capitalised- No Pole Services- Prepaid 86,624,746
Services No pole &
One Pole New Connections
102003 Services Capitalised- Pole Services- Prepaid 8,690,358
Services No pole &
One Pole New Connections
102003 Services Capitalised No-Pole Services 1,071,316,613
Services No pole &
One Pole New Connections
102003 Services Capitalised Pole Services/ Low Voltag 1,192,674,104
Services No pole &
One Pole New Connections
102003 Services Capitalised- No Pole Services- Prepaid 248,906,681
Services No pole &
One Pole New Connections
102003 Services Capitalised- Pole Services- Prepaid 14,851,716
Services No pole &
One Pole New Connections
102003 Services NO-POLE SERVICES CONNECTIONS 128,883,875
Services No pole &
One Pole New Connections
102003 Services POLE SERVICE CONNECTIONS 5,666,915,269
Services No pole &
One Pole New Connections
102003 Services No pole services- Prepaid 539,837,522
Services No pole &
One Pole New Connections
48
Account
Code Description Description UGX Base Amount
USD Amt-
@2521.51 Location Investment Category
102003 Services Pole Services- Prepaid 96,161,753
Services No pole &
One Pole New Connections
102003 Services POLE SERVICE CONNECTIONS 1,207,226,815
New Connections - Post and Prepaid 21,451,811,948
$
8,507,526
PREPAID METERING - RETROFIT
102003 Services Capitalistn-Prepaid Metering Project- Natete-2012 1,648,926,782 Natete Prepayment Retrofitting
102003 Services Prepayment Metering- Kitintale-Phase 2 1,750,109,952 Kitintale Prepayment Retrofitting
102003 Services Prepayment Metering project-Banda 11,470,182,760 Banda Prepayment Retrofitting
Prepaid Metering - Retrofit 14,869,219,494
$
5,896,950
TECHNICAL LOSS REDUCTION PROJECTS
102002 Low Voltage Lines TLR - Mutundwe Buddo Feeder Zone2 4,635,110,649 Natete Technical Loss Reduction
102002 Low Voltage Lines TLR - Mutundwe Buddo Feeder Zone5 3,080,633,851 Natete Technical Loss Reduction
102002 Low Voltage Lines TLR - Mutundwe Buddo Feeder Zone4 2,809,703,773 Natete Technical Loss Reduction
102002 Low Voltage Lines TLR - Mutundwe Buddo Feeder Zone3 2,675,085,628 Natete Technical Loss Reduction
102002 Low Voltage Lines Mutundwe Kabowa Feeder - Zone 1 1,606,052,825 Natete Technical Loss Reduction
102002 Low Voltage Lines TLR - Kigo Feeder At Kampala South Resurvey 1 1,030,721,232 Najjanankumbi Technical Loss Reduction
102002 Low Voltage Lines TLR- Mutundwe Buddo Feeder Zone1 741,488,541 Natete Technical Loss Reduction
102002 Low Voltage Lines TLR - Loss Study LV Metering_300meters 464,981,853 Kampala Metropolitan Technical Loss Reduction
102002 Low Voltage Lines Kamuli 33kv Feeder upgrade 327,563,564 Kamuli Technical Loss Reduction
102002 Low Voltage Lines Natete Feeder Upgrade - ABC LV Network Zone 4 199,449,062 Natete Technical Loss Reduction
102002 Low Voltage Lines Kireka-Namugongo - MV Reconductoring 129,818,065 Banda Technical Loss Reduction
102002 Low Voltage Lines Natete feeder Upgrade - ABC LV Network Zone 3 57,137,570 Natete Technical Loss Reduction
102002 Low Voltage Lines Natete Feeder Upgrade - ABC LV Network Zone 2 6,291,800 Natete Technical Loss Reduction
102002 Low Voltage Lines Lv Loss Reductn-Kyabakuza-Abc/Lv Cables- Masaka 933,759 Masaka Technical Loss Reduction
49
Account
Code Description Description UGX Base Amount
USD Amt-
@2521.51 Location Investment Category
102002 Low Voltage Lines Tororo- Busia 33kV Feeder Upgrade
(6,134,418) Tororo Technical Loss Reduction
Completed and fully closed 17,758,837,754
$
7,042,938
Per schedule
System
Improvements- Low
Voltage Lines
Technical Loss Reduction Projects completed and
being closed - per schedule attached 5,039,833,883
$
1,998,736
TOTAL TECHNICAL LOSS REDUCTION PROJECTS 22,798,671,637
$
9,041,674
SAFETY
102002 Low Voltage Lines Safety Priority - Nakifuma PS 353,965,031 Mukono Safety
102002 Low Voltage Lines Safety Priority - Kawanda Quarters Tx 315,500,842 Wandegeya Safety
102002 Low Voltage Lines Safety Priority - St. Thereza Kitenga PS 296,490,594 Masaka Safety
102002 Low Voltage Lines Safety Priority - Kidda Islamic Primary School 284,928,330 Masaka Safety
102002 Low Voltage Lines
Safety Priority - Aunt Edith Nursery School Rakai
Town Tx 283,557,192 Masaka Safety
102002 Low Voltage Lines Safety Priority - Fatith Islamic School 261,646,238 Masaka Safety
102002 Low Voltage Lines
Safety Priority - Kabojja International Sch ,Kirundu
Buziga TX 227,245,790 Kabalagala Safety
102002 Low Voltage Lines Safety Priority - Kyosimba Onaanya PS 213,862,483 Masaka Safety
102002 Low Voltage Lines
Kabowa Behind Ntake Bakery-Safety/Upgrade
Project 209,240,295 Natete Safety
102002 Low Voltage Lines Safety Priority - Kimwanyi PS 203,447,990 Masaka Safety
102002 Low Voltage Lines Safety Priority - Nyimbwa Village 197,984,401 Bombo Safety
102002 Low Voltage Lines Safety Priority - Kiziba Primary School 189,036,934 Bombo Safety
102002 Low Voltage Lines Kasubi Parents Safety Priority Project 183,201,615 Nakulabye Safety
102002 Low Voltage Lines Safety Priority - Greenville SS 176,626,375 Mukono Safety
102002 Low Voltage Lines Safety Priority - Buziga Water Pump 165,974,272 Kabalagala Safety
102002 Low Voltage Lines Safety Priority - Katosi PS 164,068,649 Mukono Safety
50
Account
Code Description Description UGX Base Amount
USD Amt-
@2521.51 Location Investment Category
102002 Low Voltage Lines Safety Priority - Kasala 50KVA/33KV/LV 154,528,424 Bombo Safety
102002 Low Voltage Lines Good Times Primary School-Safety project 149,951,574 Nakulabye Safety
102002 Low Voltage Lines
Salaama Road Nsombabyuma
SafetyPriority/Upgrade 146,744,233 Najjanankumbi Safety
102002 Low Voltage Lines Safety Priority - Kako Primary School 140,880,737 Masaka Safety
102002 Low Voltage Lines Safety Priority - St. Cicilia Villa Maria 131,649,536 Masaka Safety
102002 Low Voltage Lines
Namungoona Nakibinge Safety Priority/Upgrade
works 124,060,971 Nakulabye Safety
102002 Low Voltage Lines Safety Priority - Busika UMEA Primary school 120,527,886 Bombo Safety
102002 Low Voltage Lines Safety Priority - Bugema Adventist SS 118,325,022 Bombo Safety
102002 Low Voltage Lines Safety Priority - Proposed Nkokonjeru Tx 115,365,195 Bombo Safety
102002 Low Voltage Lines Nana Slum (ABC)-Safety/Network upgrade Works 110,084,458 Nakulabye Safety
102002 Low Voltage Lines Safety Priority - Jinja Misindye 108,615,106 Mukono Safety
102002 Low Voltage Lines Safety Priority - Iganga RCM 107,602,902 Iganga Safety
102002 Low Voltage Lines Safety Priority - Kitala Tx 107,118,755 Wandegeya Safety
102002 Low Voltage Lines Kibiri Trading Centre Safety Priority/Upgrade work 101,723,312 Najjanankumbi Safety
102002 Low Voltage Lines Safety Priority - Don Bosco Namaliga 100,949,138 Bombo Safety
102002 Low Voltage Lines
Bunamwaya Roundabout-Safety/Network upgrade
projec 100,550,234 Najjanankumbi Safety
102002 Low Voltage Lines Katwe - Kinyoro- Safety/Network upgrade project 98,998,838 Najjanankumbi Safety
102002 Low Voltage Lines Safety Priority - Lower Nsooba Tx 98,693,929 Wandegeya Safety
102002 Low Voltage Lines
Wankulukuku Mosque-Safety/Network upgrade
project 96,978,441 Natete Safety
102002 Low Voltage Lines Zana St. Noah Safety Priority/Network upgrade 93,420,121 Najjanankumbi Safety
102002 Low Voltage Lines Mpigi Barracks-Safety/Network upgrade Project 92,154,630 Natete Safety
102002 Low Voltage Lines Lweza Fuelex SafetyPriority/Network upgrade projec 91,417,261 Najjanankumbi Safety
102002 Low Voltage Lines Safety Priority - St. Balikudembe SS 85,368,532 Mukono Safety
102002 Low Voltage Lines Safety Priority - Maganjo Lukadde Tx 79,832,345 Wandegeya Safety
102002 Low Voltage Lines
Safety Priority - St. Herman and St. Clement
Schools - Nkoni 79,582,847 Masaka Safety
102002 Low Voltage Lines
St. Mary’s Kitende – Open Wire-Safety/Upgrade
proj 75,833,342 Najjanankumbi Safety
102002 Low Voltage Lines Safety Priority - Proposed Shanam Tx 69,227,098 Bombo Safety
102002 Low Voltage Lines Lubowa Estates Safety/Network upgrade project 67,781,226 Najjanankumbi Safety
51
Account
Code Description Description UGX Base Amount
USD Amt-
@2521.51 Location Investment Category
102002 Low Voltage Lines Safety Priority - Kutawo Kalerwe Tx 66,254,680 Wandegeya Safety
102002 Low Voltage Lines
Safety Priority - St. Paul's Church Area
Najjanankumbi 65,330,120 Najjanankumbi Safety
102002 Low Voltage Lines Nana Slum – Full Gospel-Safety project works 63,624,317 Nakulabye Safety
102002 Low Voltage Lines Makindye Mubarak Safety Priority 55,964,134 Najjanankumbi Safety
102002 Low Voltage Lines Safety Priority - Old Mkt Kakyeka, Rwebukoona 46,896,931 Mbarara Safety
102002 Low Voltage Lines Masajja Trading Centre Safety Priority/Upgrade wor 46,844,239 Najjanankumbi Safety
102002 Low Voltage Lines Safety Priority - Natyole St. Kizito Primary School 45,872,019 Bombo Safety
102002 Low Voltage Lines
St. Mary’s Kitende - ABC-Safety/Network upgrade
pr 42,857,972 Najjanankumbi Safety
102002 Low Voltage Lines Safety Priority - Bembe Village Tx No.2_rev 41,864,567 Bombo Safety
102002 Low Voltage Lines
Safety Priority - Kitgum RCM Mission TX (St Joseph
Hospital) 35,469,833 Kitgum Safety
102002 Low Voltage Lines Wavamuno Munyonoyo- Safety/Upgrade works 34,277,850 Najjanankumbi Safety
TOTAL - SAFETY 7,239,999,786
2,871,295
COMMERCIAL LOSS REDUCTION - SERVICES
102003 Services
Mbale Loss Reduction - Meter Replace 1Q
customers 96,424,796 Mbale Commercial Loss Reduction
102003 Services CLR Mbarara - 3 Phase Customers 83,477,113 Mbarara Commercial Loss Reduction
102003 Services Bulk Metering Of Bupadhengo TC Millers 71,678,948 Iganga Commercial Loss Reduction
102003 Services
Comm Loss Reductn -Central Metering Naguru
Barrack 60,847,893 Banda Commercial Loss Reduction
102003 Services CLR Mityana - Kataka millers association 59,529,067 Mityana Commercial Loss Reduction
102003 Services NAJJA SALAMA RD CLUSTER BOXES PHASE 3 51,104,947 Najjanankumbi Commercial Loss Reduction
102003 Services CLR Najja -Salama road cluster boxes-Phase2 48,165,470 Najjanankumbi Commercial Loss Reduction
102003 Services CLR Natete - Natete feeder TOU Securing 48,151,511 Natete Commercial Loss Reduction
102003 Services Kamuli Commercial loss reduction grp 2 46,619,657 Kamuli Commercial Loss Reduction
102003 Services CLR Wandegeya - Erisa Tx Customer Securing 45,934,049 Wandegeya Commercial Loss Reduction
102003 Services Secure meter instaltns&Inject poles-Lira Industr A 42,571,492 Lira Commercial Loss Reduction
52
Account
Code Description Description UGX Base Amount
USD Amt-
@2521.51 Location Investment Category
102003 Services
CLR Three phase meter Audit Hoima-Masindi
phase2 42,550,973 Hoima Commercial Loss Reduction
102003 Services Commercial Loss Reduction for Wakasenke Market 42,264,153 Nakulabye Commercial Loss Reduction
102003 Services
CLR Three phase meter Audit Hoima-Masindi
phase1 42,243,659 Hoima Commercial Loss Reduction
102003 Services CLR Kabalagala - Relocate MU-Multiple industries K 38,846,419 Kabalagala Commercial Loss Reduction
102003 Services CLR Iganga - 50 EDMATLAS Meters 38,500,341 Iganga Commercial Loss Reduction
102003 Services CLR Mityana Lwamata Maize millers 38,248,180 Mityana Commercial Loss Reduction
102003 Services
CLR Najjanankumbi - Single Phase Obsolete Meters
S 37,186,548 Najjanankumbi Commercial Loss Reduction
102003 Services CLR Kabalagala - Uganda Police Barracks-Nsambya 36,620,708 Kabalagala Commercial Loss Reduction
102003 Services Com Loss Red-Semuto Maize Millers 35,620,177 Mityana Commercial Loss Reduction
102003 Services CLR Mityana Sekanyonyi Maize millers 35,451,188 Mityana Commercial Loss Reduction
102003 Services CLR Masindi - Secure KVA Meters 35,035,606 Masindi Commercial Loss Reduction
102003 Services Namugona 3 Tx Zone-Comm Loss Red works 33,510,176 Nakulabye Commercial Loss Reduction
102003 Services NAJJA TELECOM SITES 33,411,747 Najjanankumbi Commercial Loss Reduction
102003 Services CLR Mityana - Ngando Millers Association 30,841,654 Mityana Commercial Loss Reduction
102003 Services CLR Mukono - metering mukono interconnector 29,399,382 Mukono Commercial Loss Reduction
102003 Services
CLR Wandegeya - Kawanda Interconnector -
KVA/TOU M 28,132,263 Wandegeya Commercial Loss Reduction
102003 Services CLR Jinja - Jinja kva meter replacement 27,600,640 Jinja Commercial Loss Reduction
102003 Services CLR Entebbe - ABC Nkumba Bwaise X1 26,974,447 Entebbe Commercial Loss Reduction
102003 Services CLR Kitintale - Securing KVA Customers - Batch 2 26,872,893 Kitintale Commercial Loss Reduction
102003 Services Replace & Secure 44 TOU/KVA Meters at Nateete 26,751,500 Natete Commercial Loss Reduction
102003 Services
Secure metering for Kabalagala KVA Meter
customers 25,988,078 Kabalagala Commercial Loss Reduction
102003 Services
CLR Three phase meter Audit Hoima-Masindi
phase3 25,821,980 Hoima Commercial Loss Reduction
102003 Services CLR Secure Kabalagala 3phase meters 25,415,918 Kabalagala Commercial Loss Reduction
102003 Services
Securing Kampala Industrial - KVA And TOU
Custmer 25,119,678 Kitintale Commercial Loss Reduction
102003 Services Com Loss Red Jinja - Namata/Lugazi Town 24,537,342 Jinja Commercial Loss Reduction
102003 Services CLR Securing Kabalagala 3 phase meters 24,110,179 Kabalagala Commercial Loss Reduction
102003 Services Com Loss Red Banda - Single Phase Meters 23,615,961 Banda Commercial Loss Reduction
53
Account
Code Description Description UGX Base Amount
USD Amt-
@2521.51 Location Investment Category
102003 Services
Provide 103 1phase,MCBS-Hima Labour Camp
Kasese 23,289,007 Kasese Commercial Loss Reduction
102003 Services CLR Wandegeya - Clusters Q2 23,047,533 Wandegeya Commercial Loss Reduction
102003 Services CLR Wandegeya - Faulty Meters Phase 2 22,971,302 Wandegeya Commercial Loss Reduction
102003 Services Com Loss Red-Securing Kamuli Kva meters 22,167,962 Kamuli Commercial Loss Reduction
102003 Services
Comm Loss Redcutn Nakulabye - Kabumbi 3 Tx
Zone 22,040,666 Nakulabye Commercial Loss Reduction
102003 Services
KABALAGALA- 3- PHASE METERS TO SECURE IN
2013 Q1 21,522,699 Kabalagala Commercial Loss Reduction
102003 Services
CLR Mbale - Securing KVA meters-Mbale Ring 1
(phas 21,321,860 Mbale Commercial Loss Reduction
102003 Services Com Loss Red-Ht KVA Meter Security 20,310,992 Kampala Metropolitan Commercial Loss Reduction
102003 Services CLR Entebbe - Securing Metering Units for Entebb 19,877,353 Entebbe Commercial Loss Reduction
102003 Services CLR Kabale - Kabale TOU Meters 19,618,742 Kabale Commercial Loss Reduction
102003 Services
Comm Loss Reductn Entbe-Cluster meters kasenyi
Q2 19,232,429 Entebbe Commercial Loss Reduction
102003 Services CLR Iganga - Iganga 1 loss reduction 19,077,478 Iganga Commercial Loss Reduction
102003 Services Masindi 1-Phase Commercial Customers-CLR Project 18,714,487 Masindi Commercial Loss Reduction
102003 Services CLR Wandegeya - Secure 17 KVA Meters 18,450,544 Wandegeya Commercial Loss Reduction
102003 Services Kibwa Tx Zone-Comm Loss Reductn works 18,282,438 Nakulabye Commercial Loss Reduction
102003 Services CLR Mbale - Soroti securing KVA CTS 17,979,989 Mbale Commercial Loss Reduction
102003 Services CLR Lira - Securing HT Customers Lira 17,783,819 Lira Commercial Loss Reduction
102003 Services CLR Banda - Securing TescoBweyogerere 17,771,409 Banda Commercial Loss Reduction
102003 Services Comm LoSS Reductn- Kitintale feeder sectionalising 17,636,916 Kitintale Commercial Loss Reduction
102003 Services CLR Wandegeya - Gaz Tx Customer Securing 17,422,790 Wandegeya Commercial Loss Reduction
102003 Services CLR Mbale -LV millers groups on industrial 11kv f 17,153,893 Mbale Commercial Loss Reduction
102003 Services Bus And Taxi Parks Mbale Ring 2 Feeder Phase 1 16,591,774 Mbale Commercial Loss Reduction
102003 Services CLR Metro - Kampala Metro Loss Rdn Phase 7 16,555,712 Kampala Metropolitan Commercial Loss Reduction
102003 Services CLR Jinja - Jinja KVA LV Customer securing 16,192,622 Jinja Commercial Loss Reduction
102003 Services Com Loss Red-Iganga Kva Customers 16,136,042 Iganga Commercial Loss Reduction
102003 Services Com Loss Red-Arcade Bulky Metering 16,032,274 Kampala Metropolitan Commercial Loss Reduction
102003 Services CLR Kitintale - Securing Kireka Feeder TOUs 15,844,716 Banda Commercial Loss Reduction
102003 Services CLR Natete - Metering unit for Viseki Millers 15,832,814 Kampala Metropolitan Commercial Loss Reduction
54
Account
Code Description Description UGX Base Amount
USD Amt-
@2521.51 Location Investment Category
102003 Services
CLR Banda -secure TOUs&KVAs-Namugongo
feeder-LOT1 15,828,599 Banda Commercial Loss Reduction
102003 Services CLR Mukono - securing and Lowering KVA Meters 15,784,083 Mukono Commercial Loss Reduction
102003 Services CLR Kitintale - ABB Obsolete Meter Replacement 15,757,617 Kitintale Commercial Loss Reduction
102003 Services CLR Iganga - Kamuli 1 loss reduction 15,631,127 Kamuli Commercial Loss Reduction
102003 Services CLR Entebbe - Obsolete meters Sisa feeder 15,608,255 Kampala Metropolitan Commercial Loss Reduction
102003 Services CLR Metro -Boundary meter Lugogo kololo feeder 15,508,523 Kampala Metropolitan Commercial Loss Reduction
102003 Services
Mvule Millers Association-Install 800/5A&800/5A
CT 15,183,200 Tororo Commercial Loss Reduction
102003 Services CLR Kabalagala - Kisugu village single phase custo 14,600,227 Kabalagala Commercial Loss Reduction
102003 Services Kisugu Village single phase customers phase one 14,236,032 Kabalagala Commercial Loss Reduction
102003 Services Securing TOU and KVAs on Britania 14,228,581 Banda Commercial Loss Reduction
102003 Services CLR Wandegeya - Resecuring HT Customers 14,161,721 Wandegeya Commercial Loss Reduction
102003 Services Com Loss Red Mbale - Iki-Iki Feeder 13,887,366 Mbale Commercial Loss Reduction
102003 Services Com Loss Red-125 Masaka Single Phase Meters 13,857,513 Masaka Commercial Loss Reduction
102003 Services CLR Entebbe - Kawuku market entebbe 13,545,408 Entebbe Commercial Loss Reduction
102003 Services Bombo-Three Phase Meters&Meter Upgrade 13,532,866 Bombo Commercial Loss Reduction
102003 Services CLR Mukono - securing mayangayanga millers 12,961,429 Mukono Commercial Loss Reduction
102003 Services Com Loss Red-Sekilu General Enterprises-Bombo 12,863,409 Bombo Commercial Loss Reduction
102003 Services CLR Mukono - Securing mukono quarries 1 12,549,419 Mukono Commercial Loss Reduction
102003 Services CLR Mbale - Soroti and Kumi securing KVA CTs 12,230,036 Soroti Commercial Loss Reduction
102003 Services CLR Mbale - 3 millers groups & 1 soap factory 12,095,301 Mbale Commercial Loss Reduction
102003 Services CLR Tororo - Tororo loss reduction project phase 1 12,072,085 Tororo Commercial Loss Reduction
102003 Services CLR Iganga - Iganga kamuli hospital loss reduction 11,657,566 Iganga Commercial Loss Reduction
102003 Services Com Loss Red-Kigongi & Surroundings 11,566,586 Kabale Commercial Loss Reduction
102003 Services Comm Loss Reductn-Kabale - Kabale schools 11,560,423 Kabale Commercial Loss Reduction
102003 Services CLR Natete - Natete Kva Millers 11,385,195 Natete Commercial Loss Reduction
102003 Services
Comm Loss Reductn-Nakulabye- Yesu Amala Tx
Zone 11,377,034 Nakulabye Commercial Loss Reduction
102003 Services CLR Entebbe - 3 Phase Kisubi Mission 11,352,567 Entebbe Commercial Loss Reduction
102003 Services Com Loss Red-100 Single Phase Meters Kasese 11,044,168 Kasese Commercial Loss Reduction
102003 Services CLR Entebbe - ABC Magara 10,983,435 Entebbe Commercial Loss Reduction
55
Account
Code Description Description UGX Base Amount
USD Amt-
@2521.51 Location Investment Category
102003 Services
CLR Wndegeya - Naklabye & Mulago f'ders (KVA
&TOU) 10,830,422 Wandegeya Commercial Loss Reduction
102003 Services CLR Tororo - Tororo loss reduction project phase 2 10,764,023 Tororo Commercial Loss Reduction
102003 Services CLR Natete - Natete feeder KVA LV Accounts 10,732,198 Natete Commercial Loss Reduction
102003 Services CLR Natete - Katwe phase 3 10,668,377 Natete Commercial Loss Reduction
102003 Services CLR Mukono - Securing Mukono quarries 2 10,360,965 Mukono Commercial Loss Reduction
102003 Services
Comm Loss Reductn Kitintale - KVA & TOU
Securing 10,356,348 Kitintale Commercial Loss Reduction
102003 Services CLR Najja-Metering unit-Kabowa feeder boundary 10,256,973 Najjanankumbi Commercial Loss Reduction
102003 Services CLR Kumi Road/Pallisa Road North 9,958,568 Mbale Commercial Loss Reduction
102003 Services
CLR Kabalagala -Obsolete single Qmeters
replacemen 9,681,816 Kabalagala Commercial Loss Reduction
102003 Services Com Loss Red-Loss Reduction Material Requisition 9,495,631 Jinja Commercial Loss Reduction
102003 Services CLR Entebbe - Gerenge Landing Site 9,490,100 Entebbe Commercial Loss Reduction
102003 Services Kiwatule feeder - welders clustering 9,103,643 Banda Commercial Loss Reduction
102003 Services Natete Clusters Katwe diary Q2 8,651,604 Natete Commercial Loss Reduction
102003 Services CLR -Kabalagala High end welders, Bars, Guest hses 8,326,788 Kabalagala Commercial Loss Reduction
102003 Services Securing Single Phase Customers Gulu 8,125,691 Gulu Commercial Loss Reduction
102003 Services CLR Mbale - Bulk metering millers kabole pallisa 7,653,921 Mbale Commercial Loss Reduction
102003 Services CLR Entebbe - 3 Phase Entebbe general 7,618,849 Entebbe Commercial Loss Reduction
102003 Services
CLR Metro - Plot 12/16 Next to Post Bank EBB
Road 7,469,890 Kampala Metropolitan Commercial Loss Reduction
102003 Services
Loss Red- Tamper Proof Meter Boxes At Kitasa
Barra 7,150,653 Entebbe Commercial Loss Reduction
102003 Services CLR Metro - Mackay Shopping Centre, Mackay RD 7,098,110 Kampala Metropolitan Commercial Loss Reduction
102003 Services CLR Najjanankumbi -Securing Metring Units for Najj 6,838,672 Najjanankumbi Commercial Loss Reduction
102003 Services Com Loss Red-Police Installation 6,818,469 Kabalagala Commercial Loss Reduction
102003 Services Natete Clusters Katwe diary Q2. 6,658,265 Natete Commercial Loss Reduction
102003 Services Cairo Bank Main Branch 6,503,432 Kampala Metropolitan Commercial Loss Reduction
102003 Services Com Loss Red-Kabale Main Street & Surroundings 6,292,462 Kabale Commercial Loss Reduction
102003 Services
CLR Mityana -Central Buganda, Sewanyana, Zigoti
co 6,154,420 Mityana Commercial Loss Reduction
102003 Services CLR Entebbe - 3 Phase Airport and Mission Feeders 6,130,488 Entebbe Commercial Loss Reduction
102003 Services Comm Loss Reductn-Mityana Secure HT Meters 6,127,160 Mityana Commercial Loss Reduction
56
Account
Code Description Description UGX Base Amount
USD Amt-
@2521.51 Location Investment Category
102003 Services
New Ankole Western University & KIU Ishaka
Campus 6,083,558 Bushenyi Commercial Loss Reduction
102003 Services Com Loss Red-Wandegeya Ht Securing 5,909,578 Wandegeya Commercial Loss Reduction
102003 Services Com Loss Red works Kla Metro - Orient Plaza 5,876,513 Kampala Metropolitan Commercial Loss Reduction
102003 Services
Com Loss Red Kla Metro - MBK Arcade, Mackay
Road 5,676,217 Kampala Metropolitan Commercial Loss Reduction
102003 Services Crane chambers & warid telc k'la rd 5,652,652 Kampala Metropolitan Commercial Loss Reduction
102003 Services
CLR Metro - Rambahai Apartments Plot 11
Nakivubo R 5,422,620 Kampala Metropolitan Commercial Loss Reduction
102003 Services CLR Mbale - Sleeping baby factory 5,418,591 Mbale Commercial Loss Reduction
102003 Services CLR Mbarara - Rutooma millers 5,387,684 Mbarara Commercial Loss Reduction
102003 Services Com Loss Red-76 Single Phase Meters Kasese 5,379,204 Kasese Commercial Loss Reduction
102003 Services CLR Natete - Bunamwaya feeder KVA LV Accounts 5,352,812 Natete Commercial Loss Reduction
102003 Services CLR Metro - Spare world shoping arcade 5,315,531 Kampala Metropolitan Commercial Loss Reduction
102003 Services CLR Metro - Former National Housing Flats 5,303,215 Kampala Metropolitan Commercial Loss Reduction
102003 Services CLR Natete - Kabowa feeder KVA LV Accounts 5,152,312 Natete Commercial Loss Reduction
102003 Services CLR Kampala Metro - Carol Hse, City Oil Plot 56 4,746,000 Kampala Metropolitan Commercial Loss Reduction
102003 Services
CLR Metro - Khojashia Jamat Apartments plot
84/90 4,717,461 Kampala Metropolitan Commercial Loss Reduction
102003 Services Com Loss Red-100 Single Phase Meters Fortportal 4,662,648 Fort Portal Commercial Loss Reduction
102003 Services NW&SC flats Nakasero Rd 4,501,985 Kampala Metropolitan Commercial Loss Reduction
102003 Services CLR Kabalagala - Falcon Estates - Kabalagala 4,487,093 Kabalagala Commercial Loss Reduction
102003 Services CLR Natete -secure Trinity college, Gulumani, Mand 4,372,443 Natete Commercial Loss Reduction
102003 Services CLR Entebbe - 3 Phase Botanical feeder custmers 4,327,426 Entebbe Commercial Loss Reduction
102003 Services Plot 3/2 & Plot 5/1 market street Kampala metro 4,147,600 Kampala Metropolitan Commercial Loss Reduction
102003 Services
Com Loss Red-Securing Budwege,Busesa Nawanso
Mille 4,014,250 Iganga Commercial Loss Reduction
102003 Services Loss reductn-Buildings on plot 71/73/69 & 65 3,994,541 Kampala Metropolitan Commercial Loss Reduction
102003 Services CLR Mbarara - Buteraniro millers 3,986,451 Jinja Commercial Loss Reduction
102003 Services CLR Metro - Mariana Agencies Plot 96 Nakivubo rd 3,831,855 Kampala Metropolitan Commercial Loss Reduction
102003 Services CLR Mbale - Mbale police barracks 3,814,517 Mbale Commercial Loss Reduction
102003 Services
Comm Loss Reductn Entebbe - 3 Phase Township
KVA 3,612,349 Entebbe Commercial Loss Reduction
102003 Services MBARARA BUS PARK 3,476,622 Mbarara Commercial Loss Reduction
57
Account
Code Description Description UGX Base Amount
USD Amt-
@2521.51 Location Investment Category
102003 Services Com Loss Red Kla Metro - MOIL Petro Station 3,421,499 Kampala Metropolitan Commercial Loss Reduction
102003 Services Com Loss Red-Kabale Isolated Millers 3,293,836 Kabale Commercial Loss Reduction
102003 Services Com Loss Red-30 Single Phase Meters Kasese 3,293,723 Kasese Commercial Loss Reduction
102003 Services
Bulk Metering For St.Joseph Namagunga & St.
Mary'S 3,271,067 Jinja Commercial Loss Reduction
102003 Services CLR Entebbe - 3 Phase township TOU 3,248,062 Entebbe Commercial Loss Reduction
102003 Services Jinja single phase customers 3,219,651 Jinja Commercial Loss Reduction
102003 Services Comm Loss Reductn-Securing Kasese HT Meters 3,172,271 Kasese Commercial Loss Reduction
102003 Services MBARARA KIZUNGU 3,166,103 Mbarara Commercial Loss Reduction
102003 Services Loss Red- Sembatya+Bldg On Plot 13 Nabugabo 3,096,288 Kampala Metropolitan Commercial Loss Reduction
102003 Services Com Loss Red Kla Metro - Kololo Teachers Flats 2,975,658 Kampala Metropolitan Commercial Loss Reduction
102003 Services Comm Los Redn wks Jokasa House & Utl Mast 2,975,646 Kampala Metropolitan Commercial Loss Reduction
102003 Services CLR Metro-C/King Church, Platinum&Comm.Centre 2,871,275 Kampala Metropolitan Commercial Loss Reduction
102003 Services Com Loss Red-Uganda Prisons Mbarara 2,673,228 Mbarara Commercial Loss Reduction
102003 Services CLR Natete - Nalukolongo feeder TOU Securing 2,595,296 Natete Commercial Loss Reduction
102003 Services Com Loss Red-Bulk Metering Gulu Prisons 2,533,588 Gulu Commercial Loss Reduction
102003 Services
CLR Najjanankumbi - Najja Gayaza Electronics
(U254 2,385,536 Najjanankumbi Commercial Loss Reduction
102003 Services Comm Loss Reductn - Securing Masaka HT Meters 2,241,768 Masaka Commercial Loss Reduction
102003 Services CLR Masaka - Kikoni West general traders 2,229,131 Masaka Commercial Loss Reduction
102003 Services Sir apollo kagwa rd sch.Nakasero-Loss Redtn works 2,211,077 Kampala Metropolitan Commercial Loss Reduction
102003 Services Com Loss Red Kla - Global Trust Bank , Plot 2A Kla 2,002,304 Kampala Metropolitan Commercial Loss Reduction
102003 Services CLR Metro - Plot 80 & 82 Nakivubo road 2,002,165 Kampala Metropolitan Commercial Loss Reduction
102003 Services CLR Natete - Mitala maria metering unit replacemen 1,899,000 Natete Commercial Loss Reduction
102003 Services
Comm Loss Red -Hoima-Secure HT Customers
Hoima 1,858,847 Hoima Commercial Loss Reduction
102003 Services
Com Loss Red - Walusimbi Garage Plot 13
Dewington 1,853,067 Kampala Metropolitan Commercial Loss Reduction
102003 Services Com Loss Red-Kyotera Central Millers No.2 1,653,626 Masaka Commercial Loss Reduction
102003 Services
Ngona Semakula ,Bagonza Central Mtring-Natete-
CLR 1,555,905 Natete Commercial Loss Reduction
102003 Services Com Loss Red-Loss Reduction Material Requisition 1,462,918 Jinja Commercial Loss Reduction
102003 Services
Com Loss Red -SAB & Boston View Restraunt,
Buganda 1,315,886 Kampala Metropolitan Commercial Loss Reduction
58
Account
Code Description Description UGX Base Amount
USD Amt-
@2521.51 Location Investment Category
102003 Services
CLR Najjanankumbi - Clay Factory At Kawuto
(Atumal 1,175,321 Najjanankumbi Commercial Loss Reduction
102003 Services CLR Kabalagala - Metring unit at for Multiple indu 922,699 Kabalagala Commercial Loss Reduction
102003 Services Securing an HT Metering unit,the metering unit for 831,616 Kampala Metropolitan Commercial Loss Reduction
102003 Services CLR Lira - Securing & Clustering Pulanga customers 729,598 Lira Commercial Loss Reduction
102003 Services CLR Lira - Bulk metering Lango college 528,627 Lira Commercial Loss Reduction
102003 Services
CLR Najjanankumbi - Muguluma's Flats (E242086)
& K 396,543 Najjanankumbi Commercial Loss Reduction
102003 Services 248 Single phase meters-Najjanankumbi 139,196 Najjanankumbi Commercial Loss Reduction
102003 Services CLR Mbale - Sleeping baby factory
(571,914) Mbale Commercial Loss Reduction
102003 Services Replace faulty meters at Martin Rd, old Kla Rd
(4,147,600) Nakulabye Commercial Loss Reduction
102003 Services Replace faulty meters at Musajja Alumba flats
(4,746,000) Nakulabye Commercial Loss Reduction
Completed and fully closed 2,866,764,939
$
1,136,924
Per schedule Services
Loss reduction services completed and being closed
- per schedule attached 1,127,764,492
$
447,171
As per Schedule
attached Commercial Loss Reduction
TOTAL - COMMERCIAL LOSS REDUCTION -
SERVICES 3,994,529,431
$
1,584,095
QUALITY OF SUPPLY - SYSTEM UPGRADES
102002 Low Voltage Lines Upgrade 33kV Incomer Bays at Jinja Substation 308,336,206 Jinja Qlty of Spply
102002 Low Voltage Lines Lugogo CMB 11kV Feeder Refurbishment 231,111,531 Kitintale Qlty of Spply
102002 Low Voltage Lines Entebbe Interconnector Cable Upgrade works 196,919,302 Entebbe Qlty of Spply
102002 Low Voltage Lines New Jinja Upper Industrial 33kV Feeder upgrade 196,145,686 Jinja Qlty of Spply
102002 Low Voltage Lines Network refurbishmnt- Gongonyo Spur , Pallisa 163,150,221 Mbale Qlty of Spply
102002 Low Voltage Lines Jinja Southwest Ring Feeder Upgrade 147,568,465 Jinja Qlty of Spply
102002 Low Voltage Lines Upgrade Jesa - Farm T-off on 11kV Kiziba feeder 144,598,196 Mityana Qlty of Spply
59
Account
Code Description Description UGX Base Amount
USD Amt-
@2521.51 Location Investment Category
102002 Low Voltage Lines
Integration LInes - Lubowa - Ndejje/Namasuba
Phase one 135,000,000 Najjanankumbi Qlty of Spply
102002 Low Voltage Lines Upgrade 315KVA to 515KVA Mpigi Town Tx 125,393,067 Natete Qlty of Spply
102002 Low Voltage Lines Instal Current sensors on Existing 33kV Capacitor 100,292,641 Mityana Qlty of Spply
102002 Low Voltage Lines Upgrade Lira - Apac - Masindi 33kV feeder 79,149,823 Lira Qlty of Spply
102002 Low Voltage Lines
Pwr sply to Muheese- Mugasani Zone at Karambi
Fort 75,720,921 Fort Portal Qlty of Spply
102002 Low Voltage Lines Kyengera –Mugongo Safety Priority/Upgrade works 66,498,004 Natete Qlty of Spply
102002 Low Voltage Lines Upgrade 500KVA Turfnell Drive Tx on 11K 65,104,736 Wandegeya Qlty of Spply
102002 Low Voltage Lines Upgrade 315kVA Mulago - Nsooba Tx on 11 62,051,951 Wandegeya Qlty of Spply
102002 Low Voltage Lines Upgrade Network at Lukwanga area 60,523,860 Nakulabye Qlty of Spply
102002 Low Voltage Lines Kibuli Lubowa Zone -Transformer upgrade 60,046,619 Kabalagala Qlty of Spply
102002 Low Voltage Lines Upgrade 200kVA Nansana west 2Tx-2-200kV 59,711,539 Nakulabye Qlty of Spply
102002 Low Voltage Lines Upgrade Cable on 11KV Nansana feeder at 56,716,073 Nakulabye Qlty of Spply
102002 Low Voltage Lines Upgrade 200KVA Kawempe - Kyadondo Medic 56,695,597 Wandegeya Qlty of Spply
102002 Low Voltage Lines Upgrade auto recloser at Masindi port on 33kv 55,524,286 Masindi Qlty of Spply
102002 Low Voltage Lines Busano Village - Tx Restoration 51,678,913 Mbale Qlty of Spply
102002 Low Voltage Lines
Network Upgrade - Gulu Hospital feeder 11 kV
feede 48,262,101 Gulu Qlty of Spply
102002 Low Voltage Lines Kalagala Village-Safety/Network upgrade Project 47,434,766 Natete Qlty of Spply
102002 Low Voltage Lines Upgrade 200KVA Nkumba no.3 Ssebugwawo T 45,942,634 Entebbe Qlty of Spply
102002 Low Voltage Lines Construct Single Phs line Namugogo Martyrs shrine 44,564,687 Banda Qlty of Spply
102002 Low Voltage Lines Kitintale feeder isolation points upgrade 44,509,441 Kitintale Qlty of Spply
102002 Low Voltage Lines Upgrade 100KVA Nakabugu TC Tx on 11KV K 43,964,003 Iganga Qlty of Spply
102002 Low Voltage Lines
Upgrde 315kVA Bwaise Ind Tx 11 kV Kawmpe
fder 43,115,637 Wandegeya Qlty of Spply
102002 Low Voltage Lines
Maya Trading Centre Safety Priority/Network
Upgrad 41,410,490 Natete Qlty of Spply
102002 Low Voltage Lines Upgrade 200kVA Kasenge TC Tx-2 200kVAs-Budd 40,183,544 Natete Qlty of Spply
102002 Low Voltage Lines Upgrade 315KVA Kibuye market Tx-2-200kva 39,597,799 Natete Qlty of Spply
102002 Low Voltage Lines Wayleaves &Line Diversn Mr. Tubenamukama 37,888,133 Qlty of Spply
102002 Low Voltage Lines Upgrade 100kVA to 150kVA Kinoni TC Tx o 35,735,898 Masaka Qlty of Spply
102002 Low Voltage Lines Njeru West Bank System improvement 34,377,807 Jinja Qlty of Spply
60
Account
Code Description Description UGX Base Amount
USD Amt-
@2521.51 Location Investment Category
102002 Low Voltage Lines Upgrade 200KVA to 315KVA Central View A 33,235,007 Mbarara Qlty of Spply
102002 Low Voltage Lines Upgrade 315KVA to 500KVA Bunabuwama Mil 32,340,828 Kamuli Qlty of Spply
102002 Low Voltage Lines Upgrade 315KVA Lubiri hill Tx on 11KV K 31,913,826 Nakulabye Qlty of Spply
102002 Low Voltage Lines Upgrade 315KVA to 500KVA Busia ICD Tx o 31,726,393 Tororo Qlty of Spply
102002 Low Voltage Lines Upgrade 200KVA to 500KVA Kadama Town Tx 29,889,174 Mbale Qlty of Spply
102002 Low Voltage Lines Upgrade 315KVA to 500KVA Wandegeya office Tx 29,425,228 Wandegeya Qlty of Spply
102002 Low Voltage Lines New 11kV Dedicated Jesa Mixed Farm feder 28,487,509 Mityana Qlty of Spply
102002 Low Voltage Lines Upgrade 100KVA Erute Prison Tx on 11KV 28,105,928 Lira Qlty of Spply
102002 Low Voltage Lines Upgrade 100kVA to 315kVA Lango College 28,105,928 Lira Qlty of Spply
102002 Low Voltage Lines Upgrade 100KVA UBC Mast Tx on Ngetta/ 27,730,024 Li\ Qlty of Spply
102002 Low Voltage Lines Upgrade 100KVA Nabweru - Kibwa Tx on 11 27,330,213 Wandegeya Qlty of Spply
102002 Low Voltage Lines Upgrade 200KVA to 315KVA Bukoto TC Tx o 27,330,213 Banda Qlty of Spply
102002 Low Voltage Lines Upgrade 315KVA Kilembe Quarter Tx on 11 26,581,290 Kasese Qlty of Spply
102002 Low Voltage Lines Namulanda Lutembe rd network is a safety refurbish 25,688,079 Entebbe Qlty of Spply
102002 Low Voltage Lines Upgrade 500kVA New Daniel Hotel Tx on 1 25,547,792 Jinja Qlty of Spply
102002 Low Voltage Lines Upgrade 315KVA Kira Gombolola Tx to 500KVA 25,050,409 Banda Qlty of Spply
102002 Low Voltage Lines Upgrade 315KVA Mafubira TCentre Tx to 500kV 24,954,751 Jinja Qlty of Spply
102002 Low Voltage Lines Upgrade 315KVA Nabulagala Tx to 500KVA on 1 24,954,751 Nakulabye Qlty of Spply
102002 Low Voltage Lines Upgrade 315KVA to 500KVA Kabumbi road Tx on 24,954,751 Nakulabye Qlty of Spply
102002 Low Voltage Lines
Upgrade an o/load315KVA Cementry Rd Tx500KVA
on an 24,579,799 Mbale Qlty of Spply
102002 Low Voltage Lines Upgrade 100KVA to 200KVA Kirunda Kiveji 24,273,991 Iganga Qlty of Spply
102002 Low Voltage Lines Upgrade 50KVA to 200KVA Buwenda TC Tx 24,273,991 Jinja Qlty of Spply
102002 Low Voltage Lines Uprade 100KVA to 200KVA Lumino TC Tx on 33K 24,273,991 Tororo Qlty of Spply
102002 Low Voltage Lines Auto Recloser Nulec for Mukono Town feeder 24,104,353 Mukono Qlty of Spply
102002 Low Voltage Lines Upgrade 300KVA Ambercourt Tx to 315KVA 23,956,640 Jinja Qlty of Spply
102002 Low Voltage Lines Upgrade 200KVA to 315KVA Kitara Prison 23,192,368 Entebbe Qlty of Spply
102002 Low Voltage Lines Upgrade 315kVA Kireka III Tx on 11kV Kyam 23,036,546 Banda Qlty of Spply
102002 Low Voltage Lines
Upgrade 25kVA to 50kVA Kabaganda TX
Namulonge Kawa 22,593,617 Mbarara Qlty of Spply
102002 Low Voltage Lines Upgrade 100KVA to 200KVA Zana Nfufu Vil 22,124,234 Najjanankumbi Qlty of Spply
61
Account
Code Description Description UGX Base Amount
USD Amt-
@2521.51 Location Investment Category
102002 Low Voltage Lines LV Network Refurbishment - Nazigo Coffee Factory 21,878,100 Qlty of Spply
102002 Low Voltage Lines Upgrade 100KVA to 200KVA Iganga CMS Tx on 3 21,831,471 Iganga Qlty of Spply
102002 Low Voltage Lines Install New metering unit on Pader 33kV feeder 21,579,119 Gulu Qlty of Spply
102002 Low Voltage Lines
N/w Upgrade-faulty 200kVA Nama Jaggery Tx
mpoma 20,848,613 Mukono Qlty of Spply
102002 Low Voltage Lines Transformer Upgrade 100kVA Rukoki Village Tx 19,660,730 Kasese Qlty of Spply
102002 Low Voltage Lines
Upgrade an overloaded 200KVA Kayabwe Tx 33KV
Mital 19,572,147 Masaka Qlty of Spply
102002 Low Voltage Lines Upgrade 200KVA to 315KVA Maganjo Zone A 19,572,147 Wandegeya Qlty of Spply
102002 Low Voltage Lines
New MU for Auromeera Industries ltd-33KV
Kayunga 19,081,239 Jinja Qlty of Spply
102002 Low Voltage Lines Upgrade 50kVA to 100kVA Kabembe Tx on 3 19,073,211 Mukono Qlty of Spply
102002 Low Voltage Lines Upgrade 25KVA to 100KVA Magere Mosque T 18,522,480 Wandegeya Qlty of Spply
102002 Low Voltage Lines Upgrade 100KVA-200KVA-Total Ptrol Stn-Jin 18,428,296 Jinja Qlty of Spply
102002 Low Voltage Lines Upgrade 200kVA-315kVA Kava Interna-Kireka 18,428,052 Banda Qlty of Spply
102002 Low Voltage Lines Upgrade 200KVA to 2*200KVA Jinja Kalori 18,016,165 Wandegeya Qlty of Spply
102002 Low Voltage Lines Upgrade 100KVA to 200KVA Bunghoko Dev't Tx 17,618,314 Mbale Qlty of Spply
102002 Low Voltage Lines Upgrade Kiryatete Village Transformer-3015kVA 17,408,639 Hoima Qlty of Spply
102002 Low Voltage Lines Upgrade 200KVA to 2*200KVA Upper Nsooba 17,110,730 Wandegeya Qlty of Spply
102002 Low Voltage Lines
Insert 100Kva Tx,recuce safety risk& upgrade
Namwe 16,010,339 Natete Qlty of Spply
102002 Low Voltage Lines Upgrad 100kVA Mbalala Coff Fac.Tx to 200k 15,884,667 Masaka Qlty of Spply
102002 Low Voltage Lines Upgrade 100KVA to 200KVA Kavule TC Tx o 15,844,802 Natete Qlty of Spply
102002 Low Voltage Lines Upgrade 150KVA Bikaali Coffee Factor-200k 15,835,610 Masaka Qlty of Spply
102002 Low Voltage Lines Upgrade 100KVA Kyengera Hawaii Tx-200kV 15,825,453 Natete Qlty of Spply
102002 Low Voltage Lines Upgrade 100KVA Kagoma-Littleway Tx-200kVA 15,760,589 Wandegeya Qlty of Spply
102002 Low Voltage Lines Upgrade 100KVA Katanabirwa TC Tx to 200K 15,541,312 Hoima Qlty of Spply
102002 Low Voltage Lines Upgrade 100kVA to 200kVA Sanga TC TX on 15,541,312 Bombo Qlty of Spply
102002 Low Voltage Lines Upgrade 100kVA to 200kVA Namagoma TC Tx on 15,538,202 Nakulabye Qlty of Spply
102002 Low Voltage Lines Upgrade 100KVA Mbalala TC Tx to 200KVA 15,179,758 Mukono Qlty of Spply
102002 Low Voltage Lines Upgrade 100KVA Ndejje Aiden College2-to200k 15,028,788 Najjanankumbi Qlty of Spply
102002 Low Voltage Lines Upgrade works- 33kV Namanve Tower 15,012,229 Mukono Qlty of Spply
62
Account
Code Description Description UGX Base Amount
USD Amt-
@2521.51 Location Investment Category
102002 Low Voltage Lines Upgrade 50KVA to 2*50KVA Ruharo Village 14,825,554 Mbarara Qlty of Spply
102002 Low Voltage Lines Upgrade 50KVA to 100KVA Sseke Village T 14,650,455 Masaka Qlty of Spply
102002 Low Voltage Lines
Upgrade a faulty 100KVA Tula kilokole Tx to
200KVA 14,620,492 Wandegeya Qlty of Spply
102002 Low Voltage Lines
Upgrade an overloaded 100KVA Manyangwa 1 Tx
to a 2 14,620,492 Bombo Qlty of Spply
102002 Low Voltage Lines Upgrade 100KVA EBB Liddo Beach Tx to 200KVA 14,620,492 Entebbe Qlty of Spply
102002 Low Voltage Lines Upgrade 100KVA Seeta mosque Tx-200kVA-on1 14,620,492 Wandegeya Qlty of Spply
102002 Low Voltage Lines Upgrade Namataba5 Tx-100 to 200 Kva 14,616,503 Banda Qlty of Spply
102002 Low Voltage Lines Upgrade 50KVA to 100KVA Kanaba TC Tx on 14,576,481 Najjanankumbi Qlty of Spply
102002 Low Voltage Lines Upgrade 50KVA to 100KVA Bwahwa Masts Tx 14,356,119 Mbarara Qlty of Spply
102002 Low Voltage Lines
Upd25siglephse-50 3phse
Dr.DuguTx33kVMitlaMriafder 14,247,593 Masaka Qlty of Spply
102002 Low Voltage Lines Uprade 25KVA to 50KVA Kamwokya Village Tx o 14,216,630 Jinja Qlty of Spply
102002 Low Voltage Lines Lugazi boundary MU on 11kV Namataba feeder 14,209,839 Jinja Qlty of Spply
102002 Low Voltage Lines Upgrade 25kVA-50kVA Jjogo Village Tx 11kv 14,198,962 Mukono Qlty of Spply
102002 Low Voltage Lines Upgrade 25KVA to 2*25KVA Bujjuko Villag 13,823,256 Mityana Qlty of Spply
102002 Low Voltage Lines Upgrade 50kVA to 100kVA Oil Installatio 13,573,024 Kasese Qlty of Spply
102002 Low Voltage Lines Relocate 200KVA/11KV/LV Go Down Tx 13,296,151 Kasese Qlty of Spply
102002 Low Voltage Lines Upgrade 50KVA to 100KVA Ndeeba Village Tx o 13,161,405 Kayunga Qlty of Spply
102002 Low Voltage Lines Upgrade 50KVA Katikamu Village Tx on 13,097,471 Bombo Qlty of Spply
102002 Low Voltage Lines Upgrade 50KVA to 100KVA Naboa TC Tx on 12,839,121 Mbale Qlty of Spply
102002 Low Voltage Lines Upgrade 50KVA to 100KVA Busiisi Village 12,795,316 Hoima Qlty of Spply
102002 Low Voltage Lines Upgrade 50kVA to 100kVA Nabilumba Tx on 12,781,882 Kamuli Qlty of Spply
102002 Low Voltage Lines Upgrade 50KVA-100KVA Kimbugumu Coffe Fact 12,715,017 Lugazi Qlty of Spply
102002 Low Voltage Lines Upgrade 50KVA to 100KVA Bugembe NR Baba 12,715,017 Jinja Qlty of Spply
102002 Low Voltage Lines Upgrade 50KVA to 100KVA Karugangama Village 12,488,964 Mbarara Qlty of Spply
102002 Low Voltage Lines Upgrade Mini-Pillar to 4-way feeder-Contr 12,350,450 Kitintale Qlty of Spply
102002 Low Voltage Lines Namusisi TC Tx relocation 12,338,500 Iganga Qlty of Spply
102002 Low Voltage Lines Upgrade 50KVA to 100KVA Bigyera TC Tx on 33 12,141,589 Mbarara Qlty of Spply
102002 Low Voltage Lines Upgrade 50KVA Naminya TCentre Tx to100kV 11,931,929 Jinja Qlty of Spply
102002 Low Voltage Lines Upgrade 50KVA Masafu village Tx to 100K 11,931,929 Tororo Qlty of Spply
63
Account
Code Description Description UGX Base Amount
USD Amt-
@2521.51 Location Investment Category
102002 Low Voltage Lines Upgrade 50kVA to 100kVA Kashenyi TC Tx 11,931,929 Bushenyi Qlty of Spply
102002 Low Voltage Lines
Upgrade a 100KVA Canan site nasuti Tx to
200KVA on 11,786,201 Mukono Qlty of Spply
102002 Low Voltage Lines Upgrade 25KVA to 2*25KVA Namungalwe TC 11,661,175 Iganga Qlty of Spply
102002 Low Voltage Lines Upgrade 25KVA Acaba ss Tx to 50KVA on 3 11,600,765 Gulu Qlty of Spply
102002 Low Voltage Lines Upgrade 25kVA to 50kVA Kyarusozi TC Tx o 11,418,240 Fort Portal Qlty of Spply
102002 Low Voltage Lines
The Mukono Town Network Refurbishmt-
Safety&System 11,351,098 Mukono Qlty of Spply
102002 Low Voltage Lines Upgrade 50KVA to 100KVA Kiwangala Tx on 33K 11,351,098 Jinja Qlty of Spply
102002 Low Voltage Lines Upgrade 50KVA Mayenze TC Tx-100kVA-Mbal 11,351,098 Mbale Qlty of Spply
102002 Low Voltage Lines Upgrade 50KVA to 100KVA Naluwerere MTN 11,351,098 Iganga Qlty of Spply
102002 Low Voltage Lines
Network upgrade-Namasagali 11kV feeder-Kaisa
farm 10,946,695 Kamuli Qlty of Spply
102002 Low Voltage Lines New Metering Unit for Multiple Industries, Kabalag 10,497,661 Kabalagala Qlty of Spply
102002 Low Voltage Lines Upgrade 100-200kva Tx Friends Corner 11kv 9,552,609 Jinja Qlty of Spply
102002 Low Voltage Lines Upgrade 100KVA to 200KVA Masooli Happim 9,535,791 Wandegeya Qlty of Spply
102002 Low Voltage Lines Upgrade 4-Way to 6-Way feeder pillar at Wam 9,528,383 Mityana Qlty of Spply
102002 Low Voltage Lines upgrade 50kva Nsuube Tx 11kv Mutai Feeder 9,417,697 Mbale Qlty of Spply
102002 Low Voltage Lines Upgrade 50kVA to 100kVA MTN Lumuli Tx , Muk 8,949,120 Mukono Qlty of Spply
102002 Low Voltage Lines Upgrade 200kVA -315kVA Nakifuma TC-Nten 8,477,899 Mukono Qlty of Spply
102002 Low Voltage Lines Upgrade 315KVA to 500KVA Banda Village 8,334,541 Banda Qlty of Spply
102002 Low Voltage Lines Upgrade 25KVA Doko village Tx to 50KVA-In 8,058,158 Mbale Qlty of Spply
102002 Low Voltage Lines Upgrade 100KVA to 2*100KVA Bulera Villa 7,850,488 Mityana Qlty of Spply
102002 Low Voltage Lines Upgrade 200kVA to 315kVA Kasokoso Kigan 7,842,382 Banda Qlty of Spply
102002 Low Voltage Lines Upgrade 200KVA Kachumbala TC Tx-to315kV 7,830,057 Mbale Qlty of Spply
102002 Low Voltage Lines LV upgrade/reticulation for Nakibizi network 7,705,085 Jinja Qlty of Spply
102002 Low Voltage Lines Upgrade 100KVA Nakawa court Tx to 200KV 7,655,620 Banda Qlty of Spply
102002 Low Voltage Lines Upgrade 100KVA Nabuti Nsube Tx to 200KV 7,484,797 Mukono Qlty of Spply
102002 Low Voltage Lines Upgrade 50KVA to 100KVA Busia Water Pum 7,475,663 Tororo Qlty of Spply
102002 Low Voltage Lines Upgrade 100KVA Kefa road Tx to200KVA-Namu 7,446,826 Banda Qlty of Spply
102002 Low Voltage Lines Upgrade Masanfu Tx from 200-315kVA-11Kv 7,309,634 Mbale Qlty of Spply
102002 Low Voltage Lines Upgrade 100KVA Mutai TC Tx to 200kVA-Mu 6,944,399 Jinja Qlty of Spply
64
Account
Code Description Description UGX Base Amount
USD Amt-
@2521.51 Location Investment Category
102002 Low Voltage Lines Upgrade 100KVA to 200KVA Namakwekwe Tx 6,788,823 Mbale Qlty of Spply
102002 Low Voltage Lines Upgrade 50KVA-100KVA Kyesiiga Villag-Hoim 6,408,971 Hoima Qlty of Spply
102002 Low Voltage Lines Upgrade 100KVA-200KVA Mukokotokwa TC Tx o 6,322,633 Kamuli Qlty of Spply
102002 Low Voltage Lines Upgrade 100KVA to 200KVA Waitambogwe TC 6,322,633 Iganga Qlty of Spply
102002 Low Voltage Lines Upgrade 315KVA to 500KVA Buziga Water P 5,872,771 Najjanankumbi Qlty of Spply
102002 Low Voltage Lines
Upgrade 50KVA-100kVA Busibizi RMC Tx on 33KV
Kirir 5,751,491 Mityana Qlty of Spply
102002 Low Voltage Lines Upgrade 100kVA to 200kVA Rubare TC Tx 5,647,086 Mbarara Qlty of Spply
102002 Low Voltage Lines Upgrade 50KVA Birongo Kitiko No.1 Tx-100k 5,542,236 Najjanankumbi Qlty of Spply
102002 Low Voltage Lines Upgrade 50KVA Erute Prison Tx to 100KVA 5,274,505 Lira Qlty of Spply
102002 Low Voltage Lines Upgrade 200KVA to 2*200KVA Buziga Cosin 5,274,475 Najjanankumbi Qlty of Spply
102002 Low Voltage Lines Upgrade 200KVA to 2*200KVA Lukuli Kirom 5,274,475 Najjanankumbi Qlty of Spply
102002 Low Voltage Lines Upgrade 50KVA to 100KVA Nakwero Tx on 11KV 5,148,162 Bombo Qlty of Spply
102002 Low Voltage Lines
Down grade50KVA Bumboi TC Tx to 25kVA 11kv
Ring1 f 4,988,804 Mbale Qlty of Spply
102002 Low Voltage Lines Upgrade 50kVA to 100kVA Sittankya Coffe 4,863,349 Entebbe Qlty of Spply
102002 Low Voltage Lines
Upgrade 50KVA to 100KVA Pandwong Tx on
33KV 4,850,118 Kitgum Qlty of Spply
102002 Low Voltage Lines Upgrade Wisdom PSch Tx on Masanafu Feeder-Nak 4,599,832 Nakulabye Qlty of Spply
102002 Low Voltage Lines Upgrade 50KVA Police Airtel MityanaTx-100 4,573,182 Mityana Qlty of Spply
102002 Low Voltage Lines Upgrade 50KVA to 100KVA Brund Tx on 11K 4,573,182 Mubende Qlty of Spply
102002 Low Voltage Lines Upgrade 200kVA to 500KVA Central Avenue Tx 4,225,227 Kampala Metropolitan Qlty of Spply
102002 Low Voltage Lines Upgrade Line at Mukongoro Township PS 3,408,730 Mbale Qlty of Spply
102002 Low Voltage Lines Upgrade 100kVA Budumbuli transformer on Wai 424,519 Jinja Qlty of Spply
102002 Low Voltage Lines Upgrade 200KVA Mr. Kalanzi farm Katakala on 407,611 Mityana Qlty of Spply
102002 Low Voltage Lines Upgrade 100kVA to 200kVA Kavumba Wakiso 322,421 Nakulabye Qlty of Spply
102002 Low Voltage Lines
Upgrade 100kVA Angelo Negri PS Tx on 11kV
Layibi f 291,807 Gulu Qlty of Spply
102002 Low Voltage Lines Upgrade 100KVA Buteraniro TC Tx to 200k 84,783 Mbarara Qlty of Spply
102002 Low Voltage Lines Upgrade 200KVA Masajja Zone B Tx 11kv Kigo 62,999 Najjanankumbi Qlty of Spply
102002 Low Voltage Lines Kawuku - Bunga Tx Upgrade
(293,141) Najjanankumbi Qlty of Spply
102002 Low Voltage Lines
Mpanga Forest Line Diversion on 33kV Mutundwe-
Masa
(7,206,295) Masaka Qlty of Spply
65
Account
Code Description Description UGX Base Amount
USD Amt-
@2521.51 Location Investment Category
102002 Low Voltage Lines
Upgrade25kV -100kva bulamu cou 11 namulonge
fde
(36,285,696) Bombo Qlty of Spply
Completed and fully closed 5,038,845,740
$
1,998,345
Per schedule Quality of Supply
Projects - System
Improvements
Quality of Supply -System Improvements -
completed and being closed - per schedule attached
2,549,816,153 $
1,011,226
TOTAL QUALITY OF SUPPLY PROJECTS- SYSTEM
UPGRADES 7,588,661,893
$
3,009,570
102002 Low Voltage Lines Distribution Automation Project 2,617,634,539 Lugogo
Technology- Distribution
Automation
102001 Sub-Stations SCADA Upgrade project- Phase 2 1,031,384,782 Lugogo Technology- SCADA
3,649,019,321
$
1,447,156
102002 Low Voltage Lines UECTL Check Metering Project 2,665,004,667 Regions UETCL Check Metering
2,665,004,667
$
1,056,908
TOTAL INVESTMENT ADDITIONS IN 2013 129,475,558,933
$
51,348,335
66
17 Appendix VI: Customer funded schemes added onto Network
Name Project Value Closed Earlier
years
Project Value Closed 2013
Total Project Cost
Funds Received Funder
Power Supply to Kyabirwa Village - Bujagali Energy - 284,072,099.00 284,072,099.00 284,072,099.00 BEL
pwr sply to Kiira Resettl'nt vilage fr Bujagali Ji - 108,547,198.00 108,547,198.00 108,547,198.00 BEL
Power Supply to Namizi Village - Bujagali Energy L - 349,345,372.00 349,345,372.00 349,345,372.00 BEL
PwrSuply to BulobaResetlm't Village Bujagali-Jinja - 81,322,605.00 81,322,605.00 81,322,605.00 BEL
Pwr Supply to Kikubamutwe Village - Bujagali-Jinja - 102,801,496.00 102,801,496.00 102,801,496.00 BEL
Pwr Suply to Malindi restlm't Vilage Bujagali-Jinj - 62,697,381.00 62,697,381.00 62,697,381.00 BEL
Power Supply to Ivunamba Village - Bujagali Energy - 178,037,731.00 178,037,731.00 178,037,731.00 BEL
Power supply to Namubiru Cell at Nama Subcounty - 136,711,454.00 136,711,454.00 136,711,454.00 REA
Power supply Karungi Com Centr 48,220,093.00 7,217,001.18 55,437,094.18 55,437,094.18 REA
Pwr Sply to Rusekere Sec School-F/Portal - 46,146,714.00 46,146,714.00 46,146,714.00 REA
Power supply to Igambiro Trading Centre at Mitooma 78,029,967.52 -8,223,866.68 69,806,100.85 69,806,100.85 REA
Power supply to Nyakahita TC Lyantonde Mbarara Rd - 61,799,330.00 61,799,330.00 61,799,330.00 REA
Pwr Sply-Nyabahuma Miginia, Nyakabira, Omukapera & 478,899,813.37 68,092,604.45 546,992,417.82 546,992,417.82 REA
Power sply to Abilonino Community Polytech at Lira 309,220,977.96 -28,332,307.96 280,888,670.00 280,888,670.00 REA
Pwr Sply-Kigoma Trading Centre & Environs - Bushen 155,026,011.39 9,398,565.56 164,424,576.95 164,424,576.95 REA
Loss Reductn Bugodi trading center-Iganga REA 273,590,592.13 39,366,973.12 312,957,565.25 312,957,565.25 REA
Pwr Suply to Katerananga Rwenjeru-Biharwe-Mbarara 30,685,556.00 13,006,734.09 43,692,290.09 43,692,290.09 REA
Pwr Sply to Amos Dairies Ltd-Kageti TC-Lyantonde-M - 69,717,003.00 69,717,003.00 69,717,003.00 REA
Pwr Sply to Omagoro Village-Nyero Subcounty - 98,735,136.00 98,735,136.00 98,735,136.00 REA
Rwimi Secondary School 9,304,446.00 -1,734,282.50 7,570,163.50 7,570,163.50 REA
Pwr Spply to Kabaco Ug Ltd at Kyamuhunga 27,710,722.79 11,718,842.21 39,429,565.00 39,429,565.00 REA
Pwr supply to Kubamitwe village - Luwero - 72,820,092.30 72,820,092.30 72,820,092.30 REA
Pwr Suply-Kalera Technical Sch&Environs 412,939,448.00 17,628,477.66 430,567,925.66 430,567,925.66 REA
Power Supply to Kiyagi Kitula Village at Buikwe 113,703,413.60 -7,062,722.07 106,640,691.53 106,640,691.53 REA
67
Name Project Value Closed Earlier
years
Project Value Closed 2013
Total Project Cost
Funds Received Funder
Kotojo Market - Biharwe 22,816,018.00 3,382,527.47 26,198,545.47 26,198,545.47 REA
Pwr Sply-Nombe,Bugarama,Katinda&Nyabushenyi-Mba 500,052,214.93 13,928,292.70 513,980,507.63 513,980,507.63 REA
Power supply to Atiiri Secondary Sch Tororo 52,203,899.57 -4,263,797.88 47,940,101.69 47,940,101.69 REA
33kV Metrng Unit-Nile Breweries Factory-Ruharo Mba - 27,366,494.00 27,366,494.00 27,366,494.00 Other
Power sply to Banyankole Kweterana Coffee factory 44,313,229.38 -1,797,548.82 42,515,680.56 42,515,680.56 Other
Pwr supply to Seeta Nazigo Parish-SBT Engineering - 198,214,234.00 198,214,234.00 198,214,234.00 Other
Power sply to Hanhe Farm Uganda Ltd-Nakaseke 62,198,172.36 6,354,986.18 68,553,158.54 68,553,158.54 Other
System upgrade for Kigezi Industries Ltd-Kabale 61,357,054.61 -5,144,344.61 56,212,710.00 56,212,710.00 Other
Pwr sply to Mr.J.C.Kalanda Wood Treatment Plant - 68,900,827.00 68,900,827.00 68,900,827.00 Other
Pwr sply and Install 33KV MUat Grain Milling Co. Ltd- Jinja 116,141,900.94 -23,797,841.94 92,344,059.00 92,344,059.00 Other
Pwr sply to Nation Farmer l'dership centre kamping - 48,159,604.00 48,159,604.00 48,159,604.00 Other
Pwr supply-Hotel Equatoria -New Extensions 29,176,983.00 488,545.46 29,665,528.46 29,665,528.46 Other
33kV Metering Unit for Bushenyi Tea Growers 1,753,025.00 18,260,624.62 20,013,649.62 20,013,649.62 Other
33KV MU-2 4 Roofing Steel Plant-Namanve Ind.Park 2,370,916.00 46,168,263.91 48,539,179.91 48,539,179.91 Other
11kV Metring Unit for MM properties Ltd at Adokomi 2,370,916.00 17,277,008.16 19,647,924.16 19,647,924.16 Other
Power supply to Naguru General Hospital 2,135,549.00 167,292,252.00 169,427,801.00 169,427,801.00 Other
Power Supply to Navelty Tannery Trnasformer-Masaka 2,370,916.00 45,479,639.95 47,850,555.95 47,850,555.95 Other
33Kv Line Divsn along Kabale-Kisoro Town Centre 104,556,741.00 63,502,947.08 168,059,688.08 168,059,688.08 Other
Pwr Spply to Cougar Industries Ltd at Njerere-Muko - 93,666,289.00 93,666,289.00 93,666,289.00 Other
P/supply to Agro Choice Investments Ltd Mityana 55,149,322.37 16,465,427.63 71,614,750.00 71,614,750.00 Other
Pwr Sply to Kla Cement C. Ltd at Namataba Jinja - 49,092,730.00 49,092,730.00 49,092,730.00 Other
Line Divsrn Makerere University Food Science&Tech - 35,569,678.00 35,569,678.00 35,569,678.00 Other
Pwr Spply to Kijura Tea Growers Factory-F/Portal - 66,672,738.00 66,672,738.00 66,672,738.00 Other
Pwr Sply to Integrated Fin Mgt Systm-Busoga Avenue - 58,850,184.00 58,850,184.00 58,850,184.00 Other
11kV Mtrng Unit-UAP Properties Ltd-Nakawa Zone-Por - 21,950,374.00 21,950,374.00 21,950,374.00 Other
11kV metering unit for Bugolobi Village Mall Ltd - 22,439,489.00 22,439,489.00 22,439,489.00 Other
Power supply to Bishop Masereka Christian Foundati - 58,106,064.00 58,106,064.00 58,106,064.00 Other
68
Name Project Value Closed Earlier
years
Project Value Closed 2013
Total Project Cost
Funds Received Funder
Pwr Sply-Nakabango Regional Youth Model farm&-Jinj 39,666,635.00 7,665,333.00 47,331,968.00 47,331,968.00 Other
11kV metering unit for Hoid Esterblishment Limited - 22,120,377.00 22,120,377.00 22,120,377.00 Other
Power supply to Park Scong GU James' commercial pr 2,057,042.00 31,546,915.34 33,603,957.34 33,603,957.34 Other
Pwr Spply to Simba Farms at Ibanda - Mbarara - 39,821,656.00 39,821,656.00 39,821,656.00 Other
Pwr Sply to Kabalye Police Traing Sch-LV Extension - 55,441,462.00 55,441,462.00 55,441,462.00 Other
Power supply to Lubigi Sewage Trearment Plant L.Vi 2,370,916.00 46,171,582.00 48,542,498.00 48,542,498.00 Other
11KV Line Divsn_Civil Service Collge-Kisanja Rd - 9,307,043.00 9,307,043.00 9,307,043.00 Other
Power supply to Boy Holding Construction Uganda Lt - 42,156,439.00 42,156,439.00 42,156,439.00 Other
Pwr supply to Formula Feeds Ltd at Wattuba Village - 36,562,655.00 36,562,655.00 36,562,655.00 Other
Pwr suply to Farmers Centre (U) Ltd-Industrial - 76,058,187.00 76,058,187.00 76,058,187.00 Other
33 KV MU -MM Integrated Steel Mills Uganda Ltd 2,135,549.00 19,993,947.00 22,129,496.00 22,129,496.00 Other
Power supply to Mbarara Referral Hospital New Bloc 78,239,964.83 7,082,171.17 85,322,136.00 85,322,136.00 Other
Ham Towers Makerere - Metering Unit - 22,120,377.00 22,120,377.00 22,120,377.00 Other
11kV Meteringunit Nationwide properti ltd Butabika - 21,852,619.00 21,852,619.00 21,852,619.00 Other
33kV Mtrng Unit at Mukono for Linda Packaging - 27,260,064.00 27,260,064.00 27,260,064.00 Other
33kV Metrng Unit -Kawempe for Blue Nile Distilrs L - 28,480,821.00 28,480,821.00 28,480,821.00 Other
11Kv Meterg Unit-Kiwatule-Metropole Propts,Plot102 1,753,025.00 12,199,320.06 13,952,345.06 13,952,345.06 Other
Line diversion at Kyaddondo Block 5 plot 147 for B 2,057,042.00 12,873,689.25 14,930,731.25 14,930,731.25 Other
Line Div. Captain Mzee Clement 145,679.00 1,880,228.34 2,025,907.34 2,025,907.34 Other
Bakatonda Nazario - LV Line Diversion -Commercial 2,020,511.00 1,786,541.87 3,807,052.87 3,807,052.87 Other
System Upgrade for NWSC at Biziga -Najja 30,170,451.16 8,602,236.84 38,772,688.00 38,772,688.00 Other
33kV Mtrng Unit for Bereket Constrctn co-Mityana - 18,049,773.00 18,049,773.00 18,049,773.00 Other
Pwr Sply to Joint Clinical Research Centre at Gulu 31,690,347.00 -2,521,472.42 29,168,874.58 29,168,874.58 Other
33kV Line Div'ion at Nakatunya for Lifestyle Minis - 19,270,286.00 19,270,286.00 19,270,286.00 Other
Supply to Pedo Shoes Company Ltd 752,148.00 13,926,740.98 14,678,888.98 14,678,888.98 Other
Pwr sply to UBC Digital Terrestrial At Kololo - 43,202,851.00 43,202,851.00 43,202,851.00 Other
Harris Engineering-11Kv Metering Unit 8,601,948.00 2,601,344.42 11,203,292.42 11,203,292.42 Other
69
Name Project Value Closed Earlier
years
Project Value Closed 2013
Total Project Cost
Funds Received Funder
Pwr Sply to Atalmeca Medicare Hospital at Mafubira - 59,185,420.00 59,185,420.00 59,185,420.00 Other
Power Sply-Uganda Communicatn Comm-Mbarara 197,789,909.16 -1,905,576.96 195,884,332.20 195,884,332.20 Other
Line diversion for Uganda National Roads Authority - 51,678,599.00 51,678,599.00 51,678,599.00 Other
Pwr Suply to Namazige-Kasenge &Hatches Ltd - 140,805,504.00 140,805,504.00 140,805,504.00 Other
Sys Upde 200 to 500kVA Tx-vision Africa Int 2,370,916.00 12,368,666.00 14,739,582.00 14,739,582.00 Other
Pwr Sply to Salin Housing Estate-Naminya-Bugererer 40,409,370.26 4,407,697.53 44,817,067.80 44,817,067.80 Other
Kijura Tea Company Metering Unit - 38,684,477.00 38,684,477.00 38,684,477.00 Other
33&11kV line Diversion-Musinguzi,Wankoko-Metro 35,290,273.00 4,723,914.40 40,014,187.40 40,014,187.40 Other
Power Supply to MTN Switch Centre at Mutundwe 235,910,836.35 -4,171,777.03 231,739,059.32 231,739,059.32 Other
HT Metrg Unit-Makerere University 60,693,948.11 4,231,187.89 64,925,136.00 64,925,136.11 Other
3,770,424,410.79 3,821,936,616.97 7,592,361,027.76 7,592,361,027.87