1800 010 875
crossriverrail.qld.gov.au
Precinct UpdateWoolloongabba
A new heart for Woolloongabba
March 2019
Cross River RailAbout
CRRDA Concept Visualisation Only - Not Final or ApprovedWoolloongabba precinct concept.
CRRDA Concept Visualisation Only - Not Final or Approved
Cross River Rail is a new 10.2km rail line between Dutton Park and Bowen Hills that includes 5.9kms of twin tunnels under the Brisbane River and CBD.
The project will unlock the bottleneck at the core of our transport network, allowing more trains to run more often and integrating with new roads and bus services to enable a turn-up-and-go transport system for the whole of South East Queensland.
Once Cross River Rail is complete in 2024, Woolloongabba will have its very own underground station and will be just a three-minute train journey from both a new Albert Street station in Brisbane’s CBD to the north and a new underground station at the Boggo Road health, science and education precinct to the south.
'Station to Stadium' connection.
A new underground station will not only provide Woolloongabba residents with access to high frequency rail services, but also an opportunity for urban renewal, economic development and revitalisation of the land above the station.
The Cross River Rail Woolloongabba Precinct Concept explores the possibility of new public spaces, a large public park, affordable and sustainable housing, new retail outlets and multiple new commercial premises, located across the 6.5 hectare site that is currently being cleared for construction.
A 'Station to Stadium' connection is a core part of this concept, providing safe and convenient access from the Woolloongabba bus and train stations to The Gabba on event days and delivering a new stadium plaza that will benefit visitors and residents all year round.
This Station to Stadium connection will also be a boost for the redevelopment of the iconic Gabba Stadium. That is why the Queensland Government has specifically asked Cross River Rail to investigate the possibility of a stadium connection that could be delivered at the same time as the construction of the train station.
New Albert Street Station
New Woolloongabba
Station
Dutton Park
Boggo Road
Woolloongabba
Albert Street
Exhibition
Roma Street
BrisbaneMetro
Existing RailNetwork
Cross River Rail
Travel time to the new Albert Street station will be just three minutes.
1800 010 875
crossriverrail.qld.gov.au
Work at the Woolloongabba site is already underway. In February 2018, demolition of the Goprint site was completed and works to remove the Landcentre and South Brisbane Dental Hospital buildings started in August 2018. Remediation of the site is now well underway and is scheduled to be completed by mid 2019.
Once fully cleared, the site will first be used to launch the tunnelling machines that will construct the new 5.9km twin tunnels. This will be followed by station construction and any subsequent precinct construction.
It is critical that we consult with the local Woolloongabba community as we develop precinct concepts and move towards major construction.
Visit the Woolloongabba Precinct page on our website where you can learn more about the precinct concept, participate in a survey and lodge with us any specific thoughts or suggestions.
On the same page you will find details of information stands and community engagement sessions that we will be hosting throughout March, including:
Please use our information line or email address if you would like to contact Cross River Rail to speak directly to our team.
Work is already underway
Demolition of the Landcentre building.
Find out more and have your say Let us know
what you thinkVisit www.crossriverrail.qld.gov.au/woolloongabba-survey
Gabba Central (near Coles) Woolloongabba Busway
12th March 4:30pm – 6:30pm 5th March 7:00am – 9:00am
13th March 4:30pm – 6:30pm 6th March 7:00am – 9:00am
14th March 4:30pm – 6:30pm 7th March 7:00am – 9:00am
19th March 4:30pm – 6:30pm 18th March 7:00am – 9:00am
21st March 4:30pm – 6:30pm 20th March 7:00am – 9:00am
Community drop-in session
Queensland Cricketers' Club 14th March 6:00pm – 8:00pm
East Brisbane State School 17th March 2:00pm – 4:00pm
Woolloongabba Substation 23rd March 10:30am – 2:00pm
Consultation timelineCross River Rail has been engaging with the Woolloongabba community about demolition work at the station site and will continue to engage on the development of a new Woolloongabba precinct as well as station design and construction activity as this draws closer.
Demolition and remediation works engagement
Aug 2018
Sep Oct Nov Dec Jan 2019
Feb Mar Apr May Jun Jul
Meetings with local businesses & community groups
Precinct concept
feedbackConcept development and ongoing community engagement
Aug