12
Seminário Regulação, Infraestrutura e o Futuro do País FGV, 31 julho 2014 Jerson Kelman COPPE-UFRJ [email protected]

Seminário Regulação, Infraestrutura e o Futuro do País FGV, 31 julho 2014 Jerson Kelman COPPE-UFRJ [email protected]

Embed Size (px)

Citation preview

Seminário Regulação, Infraestrutura e o Futuro do País

FGV, 31 julho 2014

Jerson KelmanCOPPE-UFRJ

[email protected]

Explaining to the consumer the rise of electric energy tariff

Tariff calculation is based on the “required revenue” of the discos

Non manageable costs (Parcel A):

Pass through

EnergyTaxesTransmission system

Manageable costs(Parcel B):

Subject to the regulator

O&MDepreciationRemuneration of the capital

+

64 distribution companies

The dispatcher ranks the generators by unit price

5

In countries that get electricity from coal or oil, power dispatch is done “locally” and is

conceptually a simple matter

6

FutureToday

Time

In countries that most of the electricity is generated by hydro plants, hydrological uncertainty is a relevant issue

Future water storage depends on present storage, future water inflow and the decision about how much thermoelectricity

could be substituted by hydroelectricity

rbhrghrbgrfrrfrr Região Sudeste / Centro-Oeste

0

20

40

60

80

100

120

Nov/99 Dez/99 Jan/00 Fev/00 Mar/00 Abr/00 Mai/00 Jun/00 Jul/00 Ago/00 Set/00 Out/00 Nov/00 Dez/00

% EAR MÁX

Hydrological uncertainty

Reliability

Energy buyers (distribution companies & free consumers): 100% of the energy consumption should be

contracted through PPAs

Energy sellers (generators) ∑ PPAs < calculated firm energy

Energy producer 1

Energyproducer 2

EnergyProducer m

.

.

.

Disco 1

Disco 2

Disco n

.

.

.

New power plants are built if their proponents win Government organized auctions of PPAs

CEMIG

FURNAS

AES-TIETÊ

CESP

CDSA

Consórcios

COPEL

TRACTEBEL

ITAIPUBinacional

Rio Grande

Rio Paranaíba

Rio Tietê

Rio Paranapanema

Rio Iguaçu

CEMIG

FURNAS

AES-TIETÊ

CESP

CDSA

Consórcios

COPEL

TRACTEBEL

ITAIPUBinacional

Rio Grande

Rio Paranaíba

Rio Tietê

Rio Paranapanema

Rio Iguaçu

Centralized dispatchIn order to take advantage of hydrological diversity, energy is transported through long distances

Hydropower plants in the same river basin are own by different companies

Hydropower plants share the joint production proportionally to the firm energies

Three contemporary regulatory problems

How to incentive the existing hydropower plants to be transparent, innovative and efficient?

Regulatory activism X Regulatory stability

How to allocate the energy theft and delinquency cost between the Discos and the honest consumers?