Seminar Seminar -- Wave Energy in Portugal in the International ContextWave Energy in Portugal in the International ContextWEC Development in PortugalWEC Development in Portugal
15th June 2009, Lisbon
Marc Hadden
Reunião de Quadros – Figueira da Foz
AGENDA
• Overview Martifer + FLOW
• Today's Scenario in Portugal... a Martifer perspectivey g p p
• NavalRia, sink or swim
C l i• Conclusions
AGENDA
•• Overview Martifer + FLOWOverview Martifer + FLOW
• Today's Scenario in Portugal... a Martifer perspectivey g p p
• NavalRia, sink or swim
C l i• Conclusions
Business Areas
MetallicConstructions
Energy Systems
ElectricityGeneration
Agriculture andBiofuels
4
International presence
M tif i t i 18 C t i i 5 C ti tMartifer is present in 18 Countries in 5 Continents
Unique portfolio • Execution of turn-key projects with a great metallicconstruction component
Unique portfolio track record:
Expo 98
• Iberian Leader and one of the top 10 European players
• Industrial presence in Portugal, Poland and Angola(currently under creation)
• Focus on large and complex projects (design and OportoAirport
engineering)
• Activities
Airport
• Metallic Constructions
• Facades in glass and aluminiumEuro 2004
• Stainless steel solutions
• Mono Units
Euro 2004
B i A i h P d i f El i iBusiness Areas in the Production of Electricity
Energy resources
WaveWind Solar Hydro
Target Markets
Portugal, Spain, Poland, Romania, Slovakia, Ukraine, the USA, Brazil, Greece, Ireland, Italy and Australia
Business Model
Production of electricity for the
network and operation
Supply and distribution of electricity for the
Create/ Acquire means of electricity
7
network and operation and maintenance
yultimate user
ygeneration
• Group Martifer holds 60%
Bi f l l h i
Agriculture Extraction Production of Distribution of
Biofuels value chain
CommercializationAgriculture Extraction Biodiesel fuelsand Logistics
• At present:At present:
• 2 Biodiesel production units (Romania and Portugal) – 200 thousand Ton/year of totalproduction capacity
F l d i R i d B il d l t ti iti i M bi• Farm lands in Romania and Brazil and exploratory activities in Mozambique
• Build a strong brand:
• PRIO as the “top of the mind” brand
• Customer loyalty development by the uniqueness of the product:
8
Customer loyalty development by the uniqueness of the product:
• High inclusion of biofuels
Energy Systems
Business Lines Wind FarmsIndustrial Projects Solar Energy Projects
Main lines of strategic orientation
B f th i l i th l f g t f bl gi• Become one of the main players in the supply of energy systems for renewable energies.• Take advantage of the market opportunities that arise from the changes in the energy industry. • Take advantage of the synergies of the various business lines of the Group.
9
10
AGENDA
• Overview Martifer + FLOW
•• Today's Scenario in Portugal... a Martifer perspectiveToday's Scenario in Portugal... a Martifer perspectivey g p py g p p
• NavalRia, sink or swim
C l i• Conclusions
Today's Scenario in Portugal... a Martifer perspectiveToday's Scenario in Portugal... a Martifer perspective
• Ideas Models Systems = Prototype
n
• Therefore Three main steps can be considered
1. Ideas Models (R&D Phase) PT INT( )
• First phase development (experience)
• Numerical Model Analysis (Freq & Time) etc
X
X• Numerical Model Analysis (Freq & Time) etc..
• Model building and wave tank testing
X
X
• Finite Element Analysis etc... X
Today's Scenario in Portugal... a Martifer perspectiveToday's Scenario in Portugal... a Martifer perspective
2. Models Systems (R&D and Engineering Phase)
AreaR&D Engineering
CountryPT INT PT INT
NavalConstruction X X Various
M h i l X X ES UK DEMechanical X X ES;UK;DE
Hydraulics X X UK;DE
Electrical Electrical (comp) X X X UK;DE
ElectricC bl X X UK;DECable X X UK;DE
Mooring X X X X UK;AU
Offshore Offshore Installation X X UK
AGENDA
• Overview Martifer + FLOW
• Today's Scenario in Portugal... a Martifer perspectivey g p p
•• NavalRia, sink or swimNavalRia, sink or swim
C l i• Conclusions
NavalRia, sink or swimNavalRia, sink or swim
• During 2004/5 over 20 Shipyards contacted in Portugal & Spain• Peniche
M d Fi i d F• Mondego, Figueria da Foz• NavalRia, Aveiro
C tl N l t ti i i it “hi h” l• Currently Naval construction is in its “high” cycle
• In some European shipyards there exists a waiting list of over 1 year
• Decision taken in mid 2007 to acquire a shipyard in Portugalq py g
Shipbuilding Yard acquired by Martifer in late 2007
•126,000 m2 of Land,
•Dry Dock
Fl ti g D D k•Floating Dry Dock
•Slipway
•400Ton Shiplift
•12 berth
horizontal plans
16
38 500m238,500m2
60,000m2
27 500m227,500m2
17
Shipbuilding Yard acquired by Martifer in late 2007
•126,000 m2 of Land,
•Dry Dock
Fl ti g D D k•Floating Dry Dock
•Slipway
•400Ton Shiplift
•12 berth
horizontal plans
18
Dry Docky•Length 103,5mts•Breadth 20mts •Draught 7mts•Draught 7mts
19
Shipbuilding Yard acquired by Martifer in late 2007
•126,000 m2 of Land,
•Dry Dock
Fl ti g D D k•Floating Dry Dock
•Slipway
•400Ton Shiplift
•12 berth
horizontal plans
20
Floating Dry Dockg y•Length 60mts•Breadth 12mts •Draught 4 5mtsDraught 4,5mts
21
Shipbuilding Yard acquired by Martifer in late 2007
•126,000 m2 of Land,
•Dry Dock
Fl ti g D D k•Floating Dry Dock
•Slipway
•400Ton Shiplift
•12 berth
horizontal plans
22
SlipwayS p y•Length 85mts•Breadth 26mts •Capacity 900T•Capacity 900T
23
Shipbuilding Yard acquired by Martifer in late 2007
•126,000 m2 of Land,
•Dry Dock
Fl ti g D D k•Floating Dry Dock
•Slipway
•400Ton Shiplift
•12 berth
horizontal plans
24
Ship LiftS p•Capacity 400T
25
Shipbuilding Yard acquired by Martifer in late 2007
•126,000 m2 of Land,
•Dry Dock
Fl ti g D D k•Floating Dry Dock
•Slipway
•400Ton Shiplift
•12 berth
horizontal plans
26
Investments are being made to better its infra structure and equipment
27
State of the Art Operational Processes
28
AGENDAAGENDA
• Overview Martifer + FLOW
• Today's Scenario in Portugal... a Martifer perspectivey g p p
• NavalRia, sink or swim
C l iC l i•• ConclusionsConclusions
ConclusionsConclusions
• Portugal has excellent R&D capabilities• But lacks adequate test facilities
• Portugal has excellent natural resources for wave energy• But still lacks its Pilot Zone which is fundamental to the future of
W E i PTWave Energy in PT
• Important that Wave Energy in PT is seen as a potential industry in th ki d t “b ith t ” ( l l b t l )the making, and not “boys with toys” (slowly but surely)
• Important for Portugal to have necessary conditions for any potential p g y y pdevelopers (infra structure, engineering and construction capabilities)
• HAS TO BE a government strategy AND PRIORITY
ThankThank YouYou!!!!
AnyAny QuestionsQuestions??AnyAny QuestionsQuestions??
Marc HaddenMarc Hadden
NAVALRIA - Docas, Construções e Reparações Navais, S.A.
Porto Comercial, Terminal SulApartado 39
3811-901 AveiroPortugal
Phone: +351 234 378 970Fax:+351 234 378 971
www.martifer.com