38
1 1 MICRA 2007 FIDIC 2007 SELECTION OF CONSULTANTS FOR PUBLIC SECTOR INFRASTRUCTURE PROJECTS IN MALAYSIA FIDIC 2007

SELECTION OF CONSULTANTS FOR PUBLIC SECTOR INFRASTRUCTURE ...fidic.org/sites/default/files/keizrul.pdf · 1 1 micra 2007 fidic 2007 selection of consultants for public sector infrastructure

Embed Size (px)

Citation preview

Page 1: SELECTION OF CONSULTANTS FOR PUBLIC SECTOR INFRASTRUCTURE ...fidic.org/sites/default/files/keizrul.pdf · 1 1 micra 2007 fidic 2007 selection of consultants for public sector infrastructure

11

MIC

RA

200

7 FI

DIC

200

7SELECTION OF CONSULTANTS FOR PUBLIC SECTOR INFRASTRUCTURE

PROJECTS IN MALAYSIA

FID

IC 2

007

Page 2: SELECTION OF CONSULTANTS FOR PUBLIC SECTOR INFRASTRUCTURE ...fidic.org/sites/default/files/keizrul.pdf · 1 1 micra 2007 fidic 2007 selection of consultants for public sector infrastructure

22

MIC

RA

200

7 FI

DIC

200

7FI

DIC

200

7

IntroductionIntroduction

Page 3: SELECTION OF CONSULTANTS FOR PUBLIC SECTOR INFRASTRUCTURE ...fidic.org/sites/default/files/keizrul.pdf · 1 1 micra 2007 fidic 2007 selection of consultants for public sector infrastructure

33

MIC

RA

200

7 FI

DIC

200

7Development Expenditure and Allocation for

Infrastructure & Utilities under 8th & 9th

Malaysian PlanFI

DIC

200

7

Table 1: Development Expenditure and Allocation For Infrastructure and Utilities, 8th and 9th Malaysia Plans

Summary

Source: Economic Planning Unit, Prime’s Minister Department (2001 and 2006)

16,540.507,752.70UTILITIES

30,304.4030,936.50TRANSPORT

9th. MP (2006-2010)ALLOCATION

(RM billion)

8th. MP (2001-2005)EXPENDITURE

(RM billion)SECTOR

Page 4: SELECTION OF CONSULTANTS FOR PUBLIC SECTOR INFRASTRUCTURE ...fidic.org/sites/default/files/keizrul.pdf · 1 1 micra 2007 fidic 2007 selection of consultants for public sector infrastructure

44

MIC

RA

200

7 FI

DIC

200

7The Need for Consultancy ServicesThe Need for Consultancy Services

The Department of Irrigation and Drainage (DID) is responsible for the following functions :

• River management• Coastal protection• Flood mitigation• Urban Stormwater management• Hydrology and water resources

assessment

FID

IC 2

007

Page 5: SELECTION OF CONSULTANTS FOR PUBLIC SECTOR INFRASTRUCTURE ...fidic.org/sites/default/files/keizrul.pdf · 1 1 micra 2007 fidic 2007 selection of consultants for public sector infrastructure

55

MIC

RA

200

7 FI

DIC

200

7FI

DIC

200

7

• DID may on occasion use consultancy services for the following purposes :

•Conduct feasibility studies on proposed projects; •Carry out detailed engineering design, •Documentation and tendering processes and •Supervision of construction works.

• DID has been allocated RM6.078 billion (US$1.73b) for development programs under the 9th Malaysia Plan (2006 – 2010)• Consultants are engaged in order to expedite the implementation of these development projects

The Need for Consultancy ServicesThe Need for Consultancy Services

Page 6: SELECTION OF CONSULTANTS FOR PUBLIC SECTOR INFRASTRUCTURE ...fidic.org/sites/default/files/keizrul.pdf · 1 1 micra 2007 fidic 2007 selection of consultants for public sector infrastructure

66

MIC

RA

200

7 FI

DIC

200

7FI

DIC

200

7

Methods Of Appointing Engineering ConsultantsMethods Of Appointing

Engineering Consultants

Page 7: SELECTION OF CONSULTANTS FOR PUBLIC SECTOR INFRASTRUCTURE ...fidic.org/sites/default/files/keizrul.pdf · 1 1 micra 2007 fidic 2007 selection of consultants for public sector infrastructure

77

MIC

RA

200

7 FI

DIC

200

7

MODE OF APPOINTMENTMODE OF APPOINTMENT

• CONVENTIONAL MODE - appointment by Government

• TURNKEY/D&B MODE - appointment by Contractor

FID

IC 2

007

Page 8: SELECTION OF CONSULTANTS FOR PUBLIC SECTOR INFRASTRUCTURE ...fidic.org/sites/default/files/keizrul.pdf · 1 1 micra 2007 fidic 2007 selection of consultants for public sector infrastructure

88

MIC

RA

200

7 FI

DIC

200

7Registration RequirementRegistration Requirement

• Approval by the Board of Engineers is a prerequisite requirement before registering with the Ministry of Finance (MOF) or Treasury

• MOF registration is carried out on linewww.eperolehan.com.my

FID

IC 2

007

Page 9: SELECTION OF CONSULTANTS FOR PUBLIC SECTOR INFRASTRUCTURE ...fidic.org/sites/default/files/keizrul.pdf · 1 1 micra 2007 fidic 2007 selection of consultants for public sector infrastructure

99

MIC

RA

200

7 FI

DIC

200

7Registration With TreasuryRegistration With Treasury

• Only two (2) categories of consultancy firms are registered with MOF:-

• Normal registration by firms wholly owned by Malaysian citizens;• Joint Venture between Local and Foreign consultancy firms that are formed in Malaysia with the foreign equity share not exceeding 30%

• Renewal every 3 years

FID

IC 2

007

Page 10: SELECTION OF CONSULTANTS FOR PUBLIC SECTOR INFRASTRUCTURE ...fidic.org/sites/default/files/keizrul.pdf · 1 1 micra 2007 fidic 2007 selection of consultants for public sector infrastructure

1010

MIC

RA

200

7 FI

DIC

200

7Foreign consultantsForeign consultants

• MOF special approval is required• Expertise ie. no local consultants

available• Procurement `outsourcing'

through local consultants • Totally foreign services on case to

case basis

FID

IC 2

007

Page 11: SELECTION OF CONSULTANTS FOR PUBLIC SECTOR INFRASTRUCTURE ...fidic.org/sites/default/files/keizrul.pdf · 1 1 micra 2007 fidic 2007 selection of consultants for public sector infrastructure

1111

MIC

RA

200

7 FI

DIC

200

7FI

DIC

200

7

ProcessProcess

Page 12: SELECTION OF CONSULTANTS FOR PUBLIC SECTOR INFRASTRUCTURE ...fidic.org/sites/default/files/keizrul.pdf · 1 1 micra 2007 fidic 2007 selection of consultants for public sector infrastructure

1212

MIC

RA

200

7 FI

DIC

200

7

ProcessProcessFI

DIC

200

7 CONVENTIONAL MODE - appointment by Government

TURNKEY/D&B MODE - appointment by Contractor

Page 13: SELECTION OF CONSULTANTS FOR PUBLIC SECTOR INFRASTRUCTURE ...fidic.org/sites/default/files/keizrul.pdf · 1 1 micra 2007 fidic 2007 selection of consultants for public sector infrastructure

1313

MIC

RA

200

7 FI

DIC

200

7

ProcessProcessFI

DIC

200

7 CONVENTIONAL MODE - appointment by Government

TURNKEY/D&B MODE - appointment by Contractor

Page 14: SELECTION OF CONSULTANTS FOR PUBLIC SECTOR INFRASTRUCTURE ...fidic.org/sites/default/files/keizrul.pdf · 1 1 micra 2007 fidic 2007 selection of consultants for public sector infrastructure

1414

MIC

RA

200

7 FI

DIC

200

7Consultancy Selection Criteria

(Conventional Mode)FI

DIC

200

7

Relevant other areas

Financial standing of

firm

Pass financial & technical

evaluation

Experience &

performanceof firm Specialist in

relevant areas

Size & capacity of

suitablefirm

Current job in hand

Appointment on rotation

basis

Priority to Bumiputeraconsultants

Priority to local

consultants (locality)

Registration with MOF

Selection Criteria

2111

9

8

7 65

4

3

10

Page 15: SELECTION OF CONSULTANTS FOR PUBLIC SECTOR INFRASTRUCTURE ...fidic.org/sites/default/files/keizrul.pdf · 1 1 micra 2007 fidic 2007 selection of consultants for public sector infrastructure

1515

MIC

RA

200

7 FI

DIC

200

7Consultants' Selection CriteriaConsultants' Selection Criteria

• Registered with MOF with relevant disciplines

• Priority to local consultants (locality)• Priority to Bumiputera (Bp) consultants

– Treasury Circular No. 4/1995 – Minimum 51% Bp equity– Minimum 51% Bp Board Members– Important Bp posts i.e.. CEO, MD, GM– Minimum 51% Bp personnel– Financial management by Bp– Organizational Chart and Managerial functions

reflects full control by Bp

FID

IC 2

007

Page 16: SELECTION OF CONSULTANTS FOR PUBLIC SECTOR INFRASTRUCTURE ...fidic.org/sites/default/files/keizrul.pdf · 1 1 micra 2007 fidic 2007 selection of consultants for public sector infrastructure

1616

MIC

RA

200

7 FI

DIC

200

7

• Appointment on rotation basis– treasury data base on-line – common usage for all government agencies

• Current job in hand– treasury data base on-line– common usage for all government agencies

• Size & capacity of suitable consultancy– treasury data base on-line– common usage for all government agencies

• Specialist in relevant areas

FID

IC 2

007

Consultants' Selection CriteriaConsultants' Selection Criteria

Page 17: SELECTION OF CONSULTANTS FOR PUBLIC SECTOR INFRASTRUCTURE ...fidic.org/sites/default/files/keizrul.pdf · 1 1 micra 2007 fidic 2007 selection of consultants for public sector infrastructure

1717

MIC

RA

200

7 FI

DIC

200

7

• Experience & performance of consultancy firm

• Need to pass financial & technical evaluation

• Financial standing of consultancy firm• Other relevant criteria

FID

IC 2

007

Consultants' Selection CriteriaConsultants' Selection Criteria

Page 18: SELECTION OF CONSULTANTS FOR PUBLIC SECTOR INFRASTRUCTURE ...fidic.org/sites/default/files/keizrul.pdf · 1 1 micra 2007 fidic 2007 selection of consultants for public sector infrastructure

1818

MIC

RA

200

7 FI

DIC

200

7AppointmentAppointment

• Technical & Financial Committee (JTKP)• Direct appointment

– Flow Chart of direct appointment• Technical & Financial Proposal

– Flow Chart of technical & financial proposal• Current Financial Rules

– Treasury Instructions & circulars– MOF Consultancy Services Procurement

Manual (2006 Edition)

FID

IC 2

007

Page 19: SELECTION OF CONSULTANTS FOR PUBLIC SECTOR INFRASTRUCTURE ...fidic.org/sites/default/files/keizrul.pdf · 1 1 micra 2007 fidic 2007 selection of consultants for public sector infrastructure

1919

MIC

RA

200

7 FI

DIC

200

7Evaluation Technical & Financial Evaluation Technical & Financial

ProposalProposalFI

DIC

200

7

Experience 15%Methodology 30%Personnel 50%Other Criteria 5%

•The weightage for the evaluation of the technical and financial proposal is set as below:-

Page 20: SELECTION OF CONSULTANTS FOR PUBLIC SECTOR INFRASTRUCTURE ...fidic.org/sites/default/files/keizrul.pdf · 1 1 micra 2007 fidic 2007 selection of consultants for public sector infrastructure

2020

MIC

RA

200

7 FI

DIC

200

7Performance Monitoring Performance Monitoring

ReportingReporting• Periodical (every 3 months)• Once if projects < 6 months duration• Final report 1 month after end of

consultancy services• Complaints to MOF for disciplinary action

– Warning issued to consultancy firm– Suspension of firm’s registration with MOF – Cancellation of registration with MOF – Blacklisting the firm– Blacklisting the proprietor/Board Members– Other disciplinary action

FID

IC 2

007

Page 21: SELECTION OF CONSULTANTS FOR PUBLIC SECTOR INFRASTRUCTURE ...fidic.org/sites/default/files/keizrul.pdf · 1 1 micra 2007 fidic 2007 selection of consultants for public sector infrastructure

2121

MIC

RA

200

7 FI

DIC

200

7

ProcessProcessFI

DIC

200

7 CONVENTIONAL MODE - appointment by Government

TURNKEY/D&B MODE - appointment by Contractor

Page 22: SELECTION OF CONSULTANTS FOR PUBLIC SECTOR INFRASTRUCTURE ...fidic.org/sites/default/files/keizrul.pdf · 1 1 micra 2007 fidic 2007 selection of consultants for public sector infrastructure

2222

MIC

RA

200

7 FI

DIC

200

7Turnkey/D&B Mode : Turnkey/D&B Mode :

Appointment by the ContractorAppointment by the Contractor• Contractor’s own selection criteria• Contractor’s own method of

appointment• Subject to Treasury’s terms &

conditions– Local Bumiputera consultants for

projects less than RM50.0 million• Contractor’s own performance

monitoring report• Avenues for Government Agencies to

submit a complaint to MOF

FID

IC 2

007

Page 23: SELECTION OF CONSULTANTS FOR PUBLIC SECTOR INFRASTRUCTURE ...fidic.org/sites/default/files/keizrul.pdf · 1 1 micra 2007 fidic 2007 selection of consultants for public sector infrastructure

2323

MIC

RA

200

7 FI

DIC

200

7FI

DIC

200

7

Improvements Introduced by

Individual Agencies

Improvements Introduced by

Individual Agencies

Page 24: SELECTION OF CONSULTANTS FOR PUBLIC SECTOR INFRASTRUCTURE ...fidic.org/sites/default/files/keizrul.pdf · 1 1 micra 2007 fidic 2007 selection of consultants for public sector infrastructure

2424

MIC

RA

200

7 FI

DIC

200

7Issues Under Conventional ModeIssues Under Conventional Mode

Lack of Understanding by the Consultants

• Terms of Reference (TOR) – Introduce Key Performance Indicators– Include TOR as part of Consultancy

Agreement

• MOF selection criteria– MOF Manual on Consultant Services

Procurement (2006 Edition)– Accessible via web site

FID

IC 2

007

Page 25: SELECTION OF CONSULTANTS FOR PUBLIC SECTOR INFRASTRUCTURE ...fidic.org/sites/default/files/keizrul.pdf · 1 1 micra 2007 fidic 2007 selection of consultants for public sector infrastructure

2525

MIC

RA

200

7 FI

DIC

200

7 • Set weightage on specific selection criteria depending on the nature of the job• Pre-qualification of firm’s capacity into categories

FID

IC 2

007

Issues Under Conventional ModeIssues Under Conventional ModeMismatch Between The Capacity of Consultancy Firm and Project Value

Page 26: SELECTION OF CONSULTANTS FOR PUBLIC SECTOR INFRASTRUCTURE ...fidic.org/sites/default/files/keizrul.pdf · 1 1 micra 2007 fidic 2007 selection of consultants for public sector infrastructure

2626

MIC

RA

200

7 FI

DIC

200

7Set Set WeightageWeightage On Specific Selection On Specific Selection

Criteria Depending on the Nature of the Criteria Depending on the Nature of the Job Job -- DIDDID

• Project size compared to number of professionals 30%

• Job experience 40%• Similar job experience 20%• Balance of work in hand 10%• Scoring

– Passing mark 60%– Recommendation exceeding 80%

FID

IC 2

007

Page 27: SELECTION OF CONSULTANTS FOR PUBLIC SECTOR INFRASTRUCTURE ...fidic.org/sites/default/files/keizrul.pdf · 1 1 micra 2007 fidic 2007 selection of consultants for public sector infrastructure

2727

MIC

RA

200

7 FI

DIC

200

7

• Specialization 15%• Professional & Semi Prof staff capacity 20%• Professional experience 10%• Firm's experience 10%• Balance work in hand 10%• Equity 15%• Locality 10%• Performance 5%• Financial capacity 2%• Equipments & software 2%• ISO Certification 1%

FID

IC 2

007

Set Set WeightageWeightage On Specific Selection On Specific Selection Criteria Depending on the Nature of the Criteria Depending on the Nature of the

Job Job -- PWDPWD

Page 28: SELECTION OF CONSULTANTS FOR PUBLIC SECTOR INFRASTRUCTURE ...fidic.org/sites/default/files/keizrul.pdf · 1 1 micra 2007 fidic 2007 selection of consultants for public sector infrastructure

2828

MIC

RA

200

7 FI

DIC

200

7Comparison of Weightage Specific

Criterion ChartFI

DIC

200

7

001020

40

30

DID PWD

Professional & Semi Professional Staff Capacity

Firm Experience

Equity

Performance

Equipment & Software/ISO

Balance of Works in Hand

Locality

Financial Capacity

Professional Experience

Specialization

Comparison of Comparison of WeightageWeightage Specific Specific Criteria ChartCriteria Chart

Page 29: SELECTION OF CONSULTANTS FOR PUBLIC SECTOR INFRASTRUCTURE ...fidic.org/sites/default/files/keizrul.pdf · 1 1 micra 2007 fidic 2007 selection of consultants for public sector infrastructure

2929

MIC

RA

200

7 FI

DIC

200

7PWD PrePWD Pre--qualification of Firmqualification of Firm’’s Capacity s Capacity

Into CategoriesInto CategoriesFI

DIC

200

7

• PWD further pre-qualifies the consultancy firm’s capacity into categories as shown below

Sole proprietor for small jobs

Sole proprietor for small jobs

Category C – 2 to 6 Professionals

Category C – 2 to 6 Professionals

Category B – 7 to 15 Professionals

Category B – 7 to 15 Professionals

Category A –more than 15 Professionals

Category A –more than 15 Professionals

Pre-Q Registered Firms

Pre-Q Registered Firms

Page 30: SELECTION OF CONSULTANTS FOR PUBLIC SECTOR INFRASTRUCTURE ...fidic.org/sites/default/files/keizrul.pdf · 1 1 micra 2007 fidic 2007 selection of consultants for public sector infrastructure

3030

MIC

RA

200

7 FI

DIC

200

7Issues Under Turnkey/D&B ModeIssues Under Turnkey/D&B Mode

Lack of ProfessionalismLack of Professionalism

• Appointment of independent Consultants by the Contractor. In-house Consultants are prohibited;

• Appointment of Consultants is subject to the Project Director’s consent; and

• Direct payment by Government to the Consultants subject to the Contractor’s consent.

FID

IC 2

007

Page 31: SELECTION OF CONSULTANTS FOR PUBLIC SECTOR INFRASTRUCTURE ...fidic.org/sites/default/files/keizrul.pdf · 1 1 micra 2007 fidic 2007 selection of consultants for public sector infrastructure

3131

MIC

RA

200

7 FI

DIC

200

7FI

DIC

200

7

Consultancy AgreementsConsultancy Agreements

Page 32: SELECTION OF CONSULTANTS FOR PUBLIC SECTOR INFRASTRUCTURE ...fidic.org/sites/default/files/keizrul.pdf · 1 1 micra 2007 fidic 2007 selection of consultants for public sector infrastructure

3232

MIC

RA

200

7 FI

DIC

200

7Consultancy AgreementsConsultancy Agreements

• Conventional Mode of Appointment– BEM/JKR.FORM A (Revised 1/83) -Schedule of Fees–Agreement for Consultancy Services (Man-Month) (Revised 1/83)

• Turnkey/D&B Mode of Appointment– No Standard Consultancy Agreement

FID

IC 2

007

Page 33: SELECTION OF CONSULTANTS FOR PUBLIC SECTOR INFRASTRUCTURE ...fidic.org/sites/default/files/keizrul.pdf · 1 1 micra 2007 fidic 2007 selection of consultants for public sector infrastructure

3333

MIC

RA

200

7 FI

DIC

200

7Rights & Liabilities of Employers Rights & Liabilities of Employers

& Consultants& Consultants

• Consequences of breach of contract & remedies available

• Resolution of disputesFID

IC 2

007

Page 34: SELECTION OF CONSULTANTS FOR PUBLIC SECTOR INFRASTRUCTURE ...fidic.org/sites/default/files/keizrul.pdf · 1 1 micra 2007 fidic 2007 selection of consultants for public sector infrastructure

3434

MIC

RA

200

7 FI

DIC

200

7Recent & Current DevelopmentsRecent & Current Developments

• Consultancy Agreement is being reviewed by MOF & Board of Engineers Malaysia (BEM)

• Professional Indemnity – Insurance

• Terms of Reference (TOR)

• Intellectual Property Rights (IPR)

FID

IC 2

007

Page 35: SELECTION OF CONSULTANTS FOR PUBLIC SECTOR INFRASTRUCTURE ...fidic.org/sites/default/files/keizrul.pdf · 1 1 micra 2007 fidic 2007 selection of consultants for public sector infrastructure

3535

MIC

RA

200

7 FI

DIC

200

7FI

DIC

200

7

ConclusionConclusion

Page 36: SELECTION OF CONSULTANTS FOR PUBLIC SECTOR INFRASTRUCTURE ...fidic.org/sites/default/files/keizrul.pdf · 1 1 micra 2007 fidic 2007 selection of consultants for public sector infrastructure

3636

MIC

RA

200

7 FI

DIC

200

7CONCLUSIONCONCLUSION

• Common basis for selection of Engineering Consultants for public projects

• Mechanism to ensure the selection of the best consultants– Conventional mode: Technical & Financial

Committee responsible for the selection of the best consultant for the job

– Turnkey/D&B mode: In-built safe-guards to ensure professionalism

• Requirement for periodical feedback on performance

• Disciplinary action initiated by MOF• Review of the Consultancy Agreement to

incorporate improvements

FID

IC 2

007

Page 37: SELECTION OF CONSULTANTS FOR PUBLIC SECTOR INFRASTRUCTURE ...fidic.org/sites/default/files/keizrul.pdf · 1 1 micra 2007 fidic 2007 selection of consultants for public sector infrastructure

3737

MIC

RA

200

7 FI

DIC

200

7FI

DIC

200

7

Page 38: SELECTION OF CONSULTANTS FOR PUBLIC SECTOR INFRASTRUCTURE ...fidic.org/sites/default/files/keizrul.pdf · 1 1 micra 2007 fidic 2007 selection of consultants for public sector infrastructure

3838

MIC

RA

200

7 FI

DIC

200

7ACKNOWLEDGEMENTSACKNOWLEDGEMENTS

–Procurement Division of MOF Malaysia

–PWD Malaysia–Board of Engineers Malaysia

(BEM)–Institution of Engineers Malaysia

(IEM)

FID

IC 2

007